NC

SL. NCR NO. MONTH Job Order No. UNIT NO.


NO.

1 Q/IP/NCR/183/001-15
Jan 14B12030 14B12030

2 Q/IP/NCR/184/001-15
Jan 14B12030 14B12030

3 Q/IP/NCR/185/01-15Jan 14B12030 14B12030

14B12030 (LV
4 Q/IP/NCR/186/01-15Jan 14B12030 Winding)

5 Q/IP/NCR/187/01-15Jan 14B11008 14B11008

6 Q/IP/NCR/188/01-15Jan 14B11008 14B11008

7 Q/IP/NCR/189/01-15Jan 14B12030 14B12030

8 Q/IP/NCR/190/01-15Jan 14B12030 14B12030

9 Q/IP/NCR/191/02-15
Feb 14B12030 14B12030

10 Q/IP/NCR/192/02-15
Feb 14B12030 14B12030

11 Q/IP/NCR/193/02-15feb 14B12012 14B12012

12 Q/IP/NCR/194/02-15feb 14B12030 14B12030


13 Q/IP/NCR/195/02-15feb 14B12030 14B12030

14 Q/IP/NCR/196/02-15feb 14B12031 14B12031

15 Q/IP/NCR/197/02-15
Feb 14B12031 14B12031

16 Q/IP/NCR/198/02-15
Feb 14B12013 14B12013

17 Q/IP/NCR/199/02-15
Feb 14B12031 14B12031

18 Q/IP/NCR/200/02-15
Feb 14B12031 14B12031

19 Q/IP/NCR/201/02-15
Feb 14B12031 14B12031

20 Q/IP/NCR/202/02-15
Feb 14B12032 14B12032

21 Q/IP/NCR/203/02-15
Feb 14B12031 14B12031

22 Q/IP/NCR/204/02-15
Feb 14B12031 14B12031

23 Q/IP/NCR/205/02-15
Feb 14B12031 14B12031

NCR
24 Q/IP/NCR206/02-15
Cancelle NCR Cancelled NCR Cancelled
d
NCR
25 Cancelle NCR Cancelled NCR Cancelled
Q/IP/NCR/207/02-15d

26 Q/IP/NCR/208/02-15
March 14B12031 14B12031

14B12032& 14B12032&
27 Q/IP/NCR/209/03-15
March 15B01002 15B01002

13B07259(ICT
28 Q/IP/NCR/210/03-15
March 13B07259 Repair)
14B12031
29 Q/IP/NCR/211/03-15
March 14B12031 APTRANSCO

14B12031
30 Q/IP/NCR/212/03-15
March 14B12031 APTRANSCO

15B01004 /5th
31 Q/IP/NCR/213/03-15
March 15B01004 Unit [LV
Wdg]

15B01002
32 Q/IP/NCR/214/03-15
March 15B01002 APTRANSCO

14B12032,
33 March 14B12032,15B010
Q/IP/NCR/215/03-15 15B01002,15B0
02, 15B01003 1003

14B12031
34 Q/IP/NCR/216/03-15
March 14B12031 APTRANSCO

March 13B07332,13B073 13B07332 &


35 Q/IP/NCR/217/03-15 42 13B07342

36 Q/IP/NCR/218/03-15
March 13B07332 13B12332

15B01002
37 Q/IP/NCR/219/03-15
March 15B01002 APTRANSCO

38 Q/IP/NCR/220/03-15
March 15B01003 15B01003

Q/IP/NCR/221/ March 14B12032,15B010 14B12032,15B0


39 1002,15B01003
03-15 02,15B01003 APTRANSCO

40 Q/IP/NCR/222/03-15
March 15B01007 15B01007

41 Q/IP/NCR/223/03-15
March 15B01005 15B01005

14B12026(Tech
42 Q/IP/NCR/224/04-15
April 14B12026 no Power)
14B12026 &
43 Q/IP/NCR/225/04-15
April 14B12026 14B12027(Tech
no Power)

14B12026 &
14B12026,
44 Q/IP/NCR/226/04-15
April 14B12027(Tech
14B12027 no Power)
14B12026 &
14B12026,
45 Q/IP/NCR/227/04-15
April 14B12027(Tech
14B12027 no Power)

46 Q/IP/NCR/228/04-15
April 14B12031 14B12031

47 Q/IP/NCR/229/04-15
April 14B12032 14B12032

13B07259(ICT
48 Q/IP/NCR/230/04-15
April 13B07259 Repair)

14B12026, TECHNO Power


49 Q/IP/NCR/231/04-15
April 14B12027 14B12026 &27

14B12031, 32,
Q/IP/NCR/232/ 15B01002,03,04,0 APTRANSCO All
50 April
04-15 Units
5,06,07,08

Q/IP/NCR/233/ APTRANSCO 1st


51 May 14B12031
05-15 Unit

14B12026,14B120
Q/IP/NCR/234/
52 May 27,14B12028,14B1 Techno Power
05-15 2029

TECHNO Power
53 Q/IP/NCR/235/05-15
May 14B12028 14B12028

APTRANCO
54 Q/IP/NCR/236/05-15
May 14B12032 14B12032
( 2nd Unit)

TSTRANSCO
55 Q/IP/NCR/237/05-15
May 15B05075 15B05075
( 3rd Unit)

APTRANCO
56 Q/IP/NCR/238/05-15
May 14B12032 14B12032
( 2nd Unit)

M/s UPPTCL
57 Q/IP/NCR/239/06-15
June 15B02011 15B02011

M/s TSTRANSCO
58 Q/IP/NCR/240/06-15
June 15B06076 (15B06076) 4th
Unit

59 Q/IP/NCR/241/06-15
June 14B12029 14B12029

60 Q/IP/NCR/242/06-15
June 15B05075 15B05075
14B12026,14B120
61 Q/IP/NCR/243/06-15
June 27,14B12028,14B1 14B12026,27,28
,29
2029

14B12026,14B120
62 Q/IP/NCR/244/06-15
June 27,14B12028,14B1 14B12026,27,28
,29
2029

63 Q/IP/NCR/245/06-15
June 13B07259 13B07259(ICT)

64 Q/IP/NCR/246/06-15
June 13B07259 13B07259 (ICT)

65 Q/IP/NCR/247/06-15
June 15B02011 15B02011

66 Q/IP/NCR/248/06-15
June 15B04009 15B04009

67 Q/IP/NCR/249/06-15
June 15B01007 15B01007

68 Q/IP/NCR/250/06-15
June 15B04009 15B04009

69 Q/IP/NCR/251/06-15
June 15B04009 15B04009

70 Q/IP/NCR/252/06-15
June 15B04009 15B04009

71 Q/IP/NCR/253/06-15
June 15B04009 15B04009

72 Q/IP/NCR/254/06-15
June 15B04009 15B04009

73 Q/IP/NCR/255/06-15
June 15B04009 15B04009

14B12026,14B120
74 Q/IP/NCR/256/06-15
June 27,14B12028,14B1 14B12026-29
2029

14B12026,14B120
75 Q/IP/NCR/257/06-15
June 27,14B12028,14B1 14B12026-29
2029
76 Q/IP/NCR/258/06-15
June 14B12030 14B12030

77 Q/IP/NCR/259/06-15
June 14B12030 14B12030

14B12028,14B120
78 Q/IP/NCR/260/06-15
June 14B12028,29
29

79 Q/IP/NCR/261/06-15
June 14B12030 14B12030

Q/IP/NCR/262/
80 June 15B04009 15B04009
06-15

81 Q/IP/NCR/263/06-15
June 15B04009 15B04009

82 Q/IP/NCR/264/06-15
June 15B06077 15B06077

UPPTCL,
83 Q/IP/NCR/265/06-15
June 15B02011 15B02011

84 Q/IP/NCR/266/06-15
June 15B01007 AP-8, 15B01007

3 Q/IP/NCR/267/06-15
June 14B12030 14B12030

86 Q/IP/NCR/268/06-15
June 15B01007 AP-8, 15B01007

Techno Power,
87 Q/IP/NCR/269/06-15
June 14B12029 14B12029

14B12030
88 Q/IP/NCR/270/06-15
June 14B12030 Bhushan

14B12019
89 Q/IP/NCR/271/07-15
July 14B12019 ( M/s Niger )

TATA Power
90 Q/IP/NCR/272/07-15
July 15B04009 15B04009
15B02011
91 Q/IP/NCR/273/07-15
JULY 15B02011 ( M/s Upptcl)
M/s Niger 30
92 Q/IP/NCR/274/07-15
JULY 14B12020 MVA 2nd unit

93 Q/IP/NCR/275/07-15
JULY 14B12030 14B12030

94 Q/IP/NCR/276/07-15
JULY 14B12030 14B12030

14B12026,14B120
95 Q/IP/NCR/277/07-15
JULY M/s TECHNO
27

96 Q/IP/NCR/278/07-15
JULY 15B04009 15B04009

UPPTCL
97 Q/IP/NCR/279/07-15
JULY 15B02011 15B02011
NCR
Q/IP/NCR/280/ Cancelle
98 NCR Cancelled NCR Cancelled
07-15 d

15B04009
101 Q/IP/NCR/281/07-15
JULY 15B04009 ( M/s TATA
POWER)

UPPTCL
102 Q/IP/NCR/282/07-15
JULY 15B02011 15B02011

UPPTCL
101 Q/IP/NCR/283/07-15
JULY 15B02011 15B02011

15B04009
102 Q/IP/NCR/284/07-15
JULY 15B04009 ( M/s TATA
POWER)

103 Q/IP/NCR/285/07-15
JULY 14B12019 14B12019

Bhushan Steel
104 Q/IP/NCR/286/07-15
JULY 14B12030 14B12030

TSTRANSCO
105 Q/IP/NCR/287/07-15
JULY 15B06076 15B06076

M/s Niger
106 Q/IP/NCR/288/07-15
JULY 14B12019 14B12019

M/s Niger,
107 Q/IP/NCR/289/07-15
JULY 14B12020 14B12020
M/s Niger,
108 Q/IP/NCR/290/07-15
JULY 14B12021 14B12021

M/s TS Transco
109 Q/IP/NCR/291/07-15
JULY 15B05074 15B05074

14B12020,14B120 M/s Niger 30


110 Q/IP/NCR/292/07-15
JULY 21 MVA Unit 2 & 3

111 Q/IP/NCR/293/07-15
JULY 14B12019 14B12019

112 Q/IP/NCR/294/07-15
JULY 14B12020 14B12020

113 Q/IP/NCR/295/07-15
JULY 14B12021 14B12021

M/s NIGER (30


MVA ) Work
114 Q/IP/NCR/296/07-15
JULY order not
mention in NCR

TATA Power
115 Q/IP/NCR/297/07-15
JULY 15B04009 15B04009

14B12034 M/s
Skipper Tap
116 Q/IP/NCR/298/07-15
JULY 14B12034 Winding
Cylinder
(3 Nos)

14B12019;20;21
14B12019,14B120 ( M/s NIGER
117 Q/IP/NCR/299/07-15
JULY 20,14B12021 Winding Coil
( HV;LV;TV)

Niger, 63
118 Q/IP/NCR/300/07-15
JULY 14B12016 MVA,unit 2 U,
TV winding

Niger, 63
119 Q/IP/NCR/301/07-15
JULY 14B12016 MVA,unit 2 V,
TV winding

Niger, 63
120 Q/IP/NCR/302/07-15
JULY 14B12016 MVA,unit 2 W,
TV winding
14B12034,
121 Q/IP/NCR/303/07-15
JULY 14B12034 Skipper Unit 1
14B12015 M/s
122 Q/IP/NCR/304/07-15
JULY 14B12015 Niger 63 MVA

14B12034
123 Aug 14B12034 Skipper
Q/IP/NCR/305/08-15

14B12015 M/s
124 Aug 14B12015 Niger 63 MVA
Q/IP/NCR/306/08-15

14B12017, M/s
125 Q/IP/NCR/307/08-15
Aug 14B12017 Niger

14B12018, M/s
126 Q/IP/NCR/308/08-15
Aug 14B12018 Niger

127 Q/IP/NCR/309/08-15
Aug 14B12019 14B12019

Niger 40 MVA,
128 Q/IP/NCR/310/08-15
Aug 14B12017 Unit 1 V phase

14B12015,14B120 14B12015,14B1
129 Q/IP/NCR/311/08-15
Aug 16 2016

15B06076, TSTRANSCO ,
4 Q/IP/NCR/312/08-15
Aug 15B06077 15B06077

UPPTCL,
131 Q/IP/NCR/313/08-15
Aug 15B02011 15B02011

UPPTCL,
132 Q/IP/NCR/314/08-15
Aug 15B02011 15B02011

UPPTCL,
133 Q/IP/NCR/315/08-15
Aug 15B02011 15B02011

UPPTCL,
134 Aug 15B02011 15B02011
Q/IP/NCR/316/08-15

UPPTCL,
135 Q/IP/NCR/317/08-15
Aug 15B02011 15B02011

Niger 63 MVA ,
136 Q/IP/NCR/318/08-15
Aug 14B12016 Unit 2

Skipper Unit 1,
137 Q/IP/NCR/319/08-15
Aug 14B12034 14B12034
Niger 63 MVA
138 Q/IP/NCR/320/08-15
Aug 14B12015 unit 1 14B12015

139 Q/IP/NCR/321/08-15
Aug 15B02011 15B02011

140 Q/IP/NCR/322/08-15
Aug 14B12034 14B12034

14B12018, 40
141 Q/IP/NCR/323/08-15
Aug 14B12018 MVA , LV Coil W
phase Unit 2

142 Q/IP/NCR/324/08-15
Aug 15B05047 15B05047

143 Q/IP/NCR/325/08-15
Aug 14B12015 M/s Niger

144 Q/IP/NCR/326/08-15
Aug 14B12016 M/s Niger

M/s TATA
145 Q/IP/NCR/327/08-15
Aug 15B04009 POWER

M/s TATA
146 Q/IP/NCR/328/08-15
Aug 15B04009 POWER

Testing
147 Q/IP/NCR/329/08-15
Aug 15B05047 Transformer

148 Q/IP/NCR/330/08-15
Aug 15B02011 UPPTCL

Testing
149 Q/IP/NCR/331/08-15
Aug 15B05047 Transformer

150 Q/IP/NCR/332/08-15
Aug 15B02011 UPPTCL

151 Q/IP/NCR/333/08-15
Aug 14B12015 M/s Niger
Testing
152 Q/IP/NCR/334/08-15
Aug 15B05047 Transformer

M/s UPPTCL
153 Q/IP/NCR/335/08-15
Aug 15B02011 15B02011

M/s UPPTCL
154 Q/IP/NCR/336/08-15
Aug 15B02011 15B02011

M/s UPPTCL
155 Q/IP/NCR/337/08-15
Aug 15B02011 15B02011

14B12034--HV
14B12034 V Phase &
156 Q/IP/NCR/338/08-15
Aug 14B12035 14B12035 HV V
& U Phase

Testing
157 Q/IP/NCR/339/08-15
Aug 15B05047 Transformer

14B12034 Skipper, HV
158 Q/IP/NCR/340/08-15
Aug 14B12035 winding

159 Q/IP/NCR/341/08-15
Aug 14B12034 Skipper

Testing
160 Q/IP/NCR/342/08-15
Aug 15B05047 Transformer

Testing
161 Q/IP/NCR/343/08-15
Aug 15B05047 Transformer

162 Q/IP/NCR/344/08-15
Aug 14B12034 Skipper 1st Unit

163 Q/IP/NCR/345/08-15
Aug 14B12034 Skipper

Testing
164 Q/IP/NCR/346/08-15
Aug 15B05047 Transformer

165 Q/IP/NCR/347/08-15
Aug 30624/R PGCIL
166 Q/IP/NCR/348/08-15
Aug 14B12035 Skipper unit 2

167 Q/IP/NCR/349/08-15
Aug 14B12035 Skipper unit 2

Niger 63 MVA
168 Q/IP/NCR/350/08-15
Aug 14B12015 unit 1 14B12015

Niger 63 MVA
170 Q/IP/NCR/351/08-15
Aug 14B12016 unit-2

Testing
171 Q/IP/NCR/352/08-15
Aug 15B05047 Transformer

Q/IP/NCR/353/ Testing
172 Sep 15B05047
09-15 Transformer

Q/IP/NCR/354/
173 Sep 14B12035 Skipper Unit 2
09-15

Q/IP/NCR/355/
174 Sep 15B01001 PGCIL, ICT
09-15

Q/IP/NCR/356/
175 Sep 15B05053 Essel
09-15

Q/IP/NCR/357/ Skipper Unit 1,


176 Sep 14B12034
09-15 14B12034

Q/IP/NCR/358/ Skipper Unit 1,


177 Sep 14B12034
09-15 14B12034

M/s ESSEL
Q/IP/NCR/359/
178 Sep 15B05053 (500MVA/400K
09-15 VA) (Unit-1)
Q/IP/NCR/360/ Niger 40 MVA,
179 Sep 14B12017
09-15 Unit 1 V phase

Q/IP/NCR/361/ Skipper A/c


180 Sep 14B12034
09-15 HVPNL

Q/IP/NCR/362/
181 Sep 15B02011 M/s UPPTCL
09-15

M/s ESSEL
Q/IP/NCR/363/
182 Sep 15B05053 (500MVA/400K
09-15 VA) (Unit-1)

M/s ESSEL
Q/IP/NCR/364/
183 Sep 15B05053 (500MVA/400K
09-15 V) (Unit-1)

Q/IP/NCR/365/ TATA Power


184 Sep 15B04009
09-15 15B04009

Q/IP/NCR/366/
185 Sep 15B01001 PGCIL ICT
09-15

Q/IP/NCR/367/ TATA Power


186 Sep 15B04009
09-15 15B04009
Q/IP/NCR/368/
187 Sep 14B12033 PGCIL Reactor
09-15

Q/IP/NCR/369/
188 Sep 15B02011 M/s UPPTCL
09-15

Q/IP/NCR/370/
189 Sep 15B05049 M/s Essel
09-15

Q/IP/NCR/371/
190 Sep 15B05049 M/s Essel
09-15

Q/IP/NCR/372/ M/s Skipper,


191 Sep 14B12034
09-15 Unit 1

Q/IP/NCR/373/
192 Sep 15B05049 M/s Essel
09-15

Q/IP/NCR/374/ M/s Skipper


193 Sep 14B12035
09-15 Unit 2
Q/IP/NCR/375/ 14B12034,
194 Sep M/s Skipper
09-15 14B12035

Q/IP/NCR/376/ Testing
195 Sep 15B05047
08-15 Transformer

196 Q/IP/NCR/377/ Sep 14B12017 Niger Power


09-15 14B12018

Q/IP/NCR/378/ Skipper Unit 1,


197 Sep 14B12034
09-15 14B12034

Q/IP/NCR/379/
198 Sep 15B01001 PGCIL Sapre ICT
09-15

Q/IP/NCR/380/
199 Sep 15B01001 PGCIL Spare ICT
09-15

Q/IP/NCR/381/
200 Sep 15B05053 Essel Power
09-15
Testing
201 Q/IP/NCR/382/09-15
Sep 15B05047 Transformer

Testing
202 Q/IP/NCR/383/09-15
Sep 15B05047 Transformer

203 Q/IP/NCR/384/10-15
Oct 15B05053 Essel ICT

204 Q/IP/NCR/385/10-15
Oct 15B10081 APTRANSCO

205 Q/IP/NCR/386/10-15
Oct 15B05053 Essel ICT
15B05058

206 Q/IP/NCR/387/10-15
Oct 15B05058 M/s ESSEL ( ICT )

M/s Aptransco
207 Q/IP/NCR/388/10-15
Oct 15B10083 ( 100MVA /
220KV )
PGCIL
208 Q/IP/NCR/389/11-15
Nov 15B09059 Srikakulam Unit
1

PGCIL
209 Q/IP/NCR/390/11-15
Nov 15B09059 Srikakulam Unit
1

PGCIL
210 Q/IP/NCR/391/11-15
Nov 15B09059 Srikakulam Unit
1

Testing
211 Q/IP/NCR/392/11-15
Nov 15B05047 Transformer

212 Q/IP/NCR/393/11-15
Nov 15B10081 Aptransco

213 Q/IP/NCR/394/11-15
Nov -- --

M/s TATA
6 Q/IP/NCR/395/11-15
Nov 15B04009 POWER

M/s TATA
215 Q/IP/NCR/396/11-15
Nov 15B04009 POWER
M/s TATA
7 Q/IP/NCR/397/11-15
Nov 15B04009 POWER

217 Q/IP/NCR/398/11-15
Nov 15B010076 Unnao

218 Q/IP/NCR/399/11-15
Nov 15B01001 PGCIL

219 Q/IP/NCR/400/11-15
Nov 15B12080 CESC

220 Q/IP/NCR/401/11-15
Nov 15B12080 CESC

Essel 500 MVA,


221 Q/IP/NCR/402/12-15
Dec 15B05053 400 kV

222 Q/IP/NCR/403/12-15
Dec 15B10083 APTRANSCO

223 Q/IP/NCR/404/12-15
Dec 15B06057 Essel Reactor
224 Q/IP/NCR/405/12-15
Dec Prototype Reactor Unnao

225 Q/IP/NCR/406/12-15
Dec 15B05051 Essel 200 MVA

226 Q/IP/NCR/407/12-15
Dec 15B05051 Essel 200 MVA

PGCIL
227 Q/IP/NCR/408/12-15
Dec 15B09060 Srikakulam Unit-
2

M/s ESSEL
228 Q/IP/NCR/409/12-15
Dec 15B05050 (125MVAR

229 Q/IP/NCR/410/12-15
Dec 15B05049 Essel 125 MVAr

230 Q/IP/NCR/411/12-15
Dec 15B05050 M/s ESSEL

PGCIL
231 Q/IP/NCR/412/12-15
Dec 15B09061 Srikakulam
NCR MONITORING SHEET-INPROCESS QUALITY

Criticality RESPONSIBLE Sub


DESCRIPTION OF NCR PROCESS DEPT Function

Assembly of parts of OD deflector found Winding Minor Production Winding


mismatched.

Crack was observed at ride over, refer NCR Winding Minor Production Winding

Variation found in filling strips, refer NCR Winding Minor Production Winding

Crack observed in Ride over at many Winding/Insulation Minor Production Winding


locations, also thickness variation found

Dimension varion observed in insulation Active Part Assembly Minor Design Design
component

Lifting arrangement is not at appropriate Active Part Assembly Minor Design Design
place, refer NCR

Step block foul with core lamination Core Building Minor SCM SCM

Wraps assembly not found as per Drawing, Winding/Insulation Minor Production Winding
found variatin of around 10 mm

Assembly of Tensile Belt , refer NCR Core Building Minor Design Design

Haldoo Wood Rod required as per drawing, Core &


Core Building Minor Production
refer NCR Active part

Final
Radiator fins found damaged, Refer NCR Tanking Minor Production Assembly

Step block foul with core lamination Core Building Minor Design Design
Earhing rod not matching with earthing boss Core Building Minor Design Design

HV Coil ( U Phase ) deflector position not as


per drawing ( M/s Winding Minor Production Winding
APTRANSCO)

Extra Radial Spacer inserted at the


transposition bend Position affected the size Winding Minor Production Winding
of Bend

Final
Winding Height found more by 19 mm Final Assembly Minor Production Assembly

Regarding Shortage of Conductor Lengthof Winding Major SCM SCM


LV Coil ( M/s Aptransco)

Item No. 1,2,3,5,6,7 mismatch on flitch plate Core Building Minor SCM SCM
Insulation

ID Rider Block for MV WDG not as per DRG Winding Minor Production Winding

Axial Spacer pasted Wrongly for TV Coil Winding Minor Production Winding
M/s Aptransco ( 2nd Unit )

Verticality of the winding should be with in 5 Winding Minor Production Winding


% of total height, Refer NCR

To be fit in top and bottom frame, as std. Core Building Minor Design Design
practice, Refer NCR

5 mm Washer shown in Winding assembly Winding Minor Design Design


drawing but not called., Refer NCR

NCR NCR
NCR Cancelled NCR Cancelled Cancelled NCR Cancelled Cancelled

NCR NCR
NCR Cancelled NCR Cancelled Cancelled NCR Cancelled Cancelled

Core &
Refer NCR Core Building Major Production Active part

Core &
Refer NCR Core Building Minor Production Active part

FOS reading shuld match the ambient Winding Major Production Winding
temprature reading
Refer NCR Winding Minor Design Design

Refer NCR Winding Minor Production Winding

Individual transposition in LV winding


between turn 27 & 28 and 83 & 84 should be Winding Major Production Winding
as per drawing

Same Work order coil should be assembled Winding Minor Production Winding
in same job

Copper conductor should be used of Winding Minor Production Winding


approved vendor.

Cylender found damage Winding Minor Production Winding

Resistance Thermometer and Mercurial Tanking Minor SCM SCM


thermometer found not working

Resistance Thermometer found not working Tanking Minor SCM SCM

HV main Lead found 30 mm offset. Winding Minor Production Winding

Coil should be completely Oil impgrenated Winding VPD Major Production Processing
during VPD process

Core Yoke Should not beloose, tool should


not be inserted more than 90 mm as per Core Building Major Design Design
requirement.

Crossover Bend should be within radial Winding Minor Production Winding


depth of the coil

Coil should be completely Oil impgrenated Winding VPD Major Production Processing
during VPD process

Inter coil block dimension found 61 mm in Winding Minor Design Design


stead of 63 mm

Core &
Refer NCR Core Building Minor Production Active part

As per the drawing end surface of the tensile


belt (Item no. 1 & 3) No paint at the end but Core Building Minor SCM SCM
same was found with paint. ,Refer NCR
Refer NCR Core Frame Minor Design Design

Refer NCR Tanking Minor Design Design

HV CT cylinder OD found more than the Tanking Minor Design Design


turret ID

Core &
Vidya Wire is not approved and used. CCA Major Production Active part

Tensile Belt should be regular in shop. Core Assembly Minor Design Design

Vertical Shaft to be matched with DM box. Final Assembly Major Design Design

Hardware Temperature, should not go up Testing Major Design Design


during HRT.

Bushing Mounting Flange Dimension wrong, Tanking Major Design Design


refer NCR

CCA locking cup Dimension mismatch, refer Tanking Major SCM SCM
NCR

Impact Recorder Mounting plate not as per Final


Tanking Minor Production
requirement. Assembly

LV Winding Cylinder (5 mm thick)


found Bulged after VPD process of U,V,W Winding Major Production Winding
phase

Final
Refer NCR Tanking Minor Production Assembly

Refer NCR Coil Winding Minor Production Winding

LV Winding Cylinder (5 mm thick)


found Bulged after VPD process of Winding Major Production Winding
Assembled Coil ""U" Phase

Final
CT Turret found Not Blank Tanking Major Production Assembly

Vaccum Application stopped before Vaccum Application Major Production Processing


completiion of cycle
CG plate and mounting Plate both dimension Tanking Minor Design Design
found mismatch.

Only Gravity written in place of Center of Tanking Minor Design Design


gravity

Final
Different Make hardware used Tanking Minor Production Assembly

Rusting / Blisters Observed in Painted area. Tanking Minor SCM SCM

OD Ride Over Not As per Drawing Winding process Major Production Winding

Winding Cylinder should not be damaged Winding process Major Production Winding

Final
Allocated HV, LV , BR not mounted on Job. Tanking Major Production Assembly

Cylinder Found damage in TV Winding Winding process Major Production Winding

Rider Block not as per drawing. Insulation Major Production Winding

Assembly of component Winding Major Production Winding

LV Axial Strip Height not As per drawing Winding Major Production Winding

Cylinder should not be damaged as per Winding Major Production Winding


requirement.

Ride over are required without damage and Coil Winding Major Production Winding
sharp edges.

N2 cylinder should be mounted without Final Assembly Minor Design Design


fouling with any other component.

N2 cylinder mounting should be as per Final


Final Assembly Minor Production
TBEAEI standard practice. Assembly
Status
Bushing mounting arrangement should be Final Assembly Changed Design Design
suitable for bushing mounting. By Design

Status
Adequate clearnace should be maintained Final Assembly Changed Design Design
between tank wall and OLTC leads. By Design

Uniform tightening of bushing should be Final


Final Assembly Minor Production
done. Assembly

Correct Size of vacuum Blocks should be Final Assembly Minor Design Design
called in drawing.

As per drawing ID ride over found without Winding Process Major Production Winding
sharp edges/ damages.

LV ID ride over are required without damge Coil Winding Major Production Winding
and sharp edges.

Correct Size of vacuum Block Required. Final Assembly Minor Design Design

Cooling Duct Block Pasted , not as per Core &


Core Building Minor Production
drawing at equal pitch. Active part

Final
Black Phospate hardware used out side. Tanking Minor Production Assembly

Impact Recorder mounting plate dimension Status


found mismatch with Impact recorder Tanking Changed Design Design
dimension. By Design

Final
POLG Clamp Found Broken. Tanking Minor Production Assembly

Non Uniform projection of Stud observed in Final


Tanking Minor Production
Inspection window. Assembly

Earthing Boss not fixed in Coller bank Tanking Minor Design Design
assembly.
Bare Copper Conductor observed with Sharp
Marks/Dents & Voids ( Shakti Winding Major SCM SCM
Insulated Wires Pvt Ltd )
Variation in length found in LV rider Block Winding Major Design Design
(OD)
Dimension Variation found in Clamping Core Building Minor Design Design
Insulation ( Lower )
Winding Cylinder should be chamferred , not
damaged /de laminated, should be without Winding Major Production Winding
sharp edges.

Two Drawing No. Obseved with different Tanking Major Design Design
dimenssions having same revision status.

Two Drawing No. Obseved with different Tanking Major Design Design
dimenssions having same revision status.

Transformer has to be dispatched with Final


Dispatch Major Production
Dispatch clearance Note. Assembly

Rider Block dimension given as per drawing


are not as per the practical requirement, It is Winding Major Design Design
found short by 1 segment. (MV)

12*40 mm Dia. Ho;e required in upper clamp Core Building Major Design Design
while 12*24 mm dia is observed.

NCR NCR
NCR Cancelled NCR Cancelled Cancelled NCR Cancelled Cancelled

Rider Block dimension given as per drawing


are not as per the practical requirement, It is Winding Major Design Design
found short by 1 segment. (HV)

Width of Tensile belt given in drawing is 120 Core Building Major Design Design
mm while required is 50 mm.
Winding Cylinder should be chamferred , not
damaged /de laminated, should be without Winding Major Production Winding
sharp edges.

OD Ride Over has to be fitted in the coil as


per the required dimension before Winding Major Production Winding
stabilization.

Winding Cylinder should not be buldged , Winding Major Production Winding


delaminated.

POLG Clamp Should not be broken while Final Assembly Minor SCM SCM
tightening.

Conservator inspection cover mounting Final Assembly Minor SCM SCM


flange paint should not be peeled off.

Core Assembly not as per drawing, rubber Core &


Core Assembly Minor Production
sheet missing. Active Part

Core Assembly not as per drawing, rubber Core &


Core Assembly Minor Production
sheet missing. Active Part
Core Assembly not as per drawing, rubber Core &
Core Assembly Minor Production
sheet missing. Active Part

Conservator inspection cover mounting Final Assembly Minor SCM SCM


flange paint should not be peeled off.

Winding Cylinder should be chamferred , not


damaged /de laminated, should be without Winding Major Production Winding
sharp edges.

Base Feet drawing Item no. 2, (Bolt M 24) Core Building Minor SCM SCM
missing.

Base Feet drawing Item no. 2, (Bolt M 24) Core Building Minor SCM SCM
Bluing was missing.

Base Feet drawing Item no. 2, (Bolt M 24) Core Building Minor SCM SCM
Bluing was missing.

Winding Cylinder and top insulation ring Winding Major Production Winding
should not be buldged.

Wimdow width dimension should be within Core Building Minor SCM SCM
tolerance

Winding Cylinder should be well pasted,


should not have air gaps at joint position. Winding Major SCM SCM
( procured From M/s ABB)

Same Work Order Coil Has to be assembled ,


TV W phase 3rd unit assembled in TV W Winding Major Production Winding
phase 1st unit, etc.

Winding Cylinder should be over lap as per Winding Major Production Winding
drawing 75 mm, should not be delaminated.

Winding Cylinder should be over lap as per Winding Major Production Winding
drawing 75 mm, should not be delaminated.

Winding Cylinder should be over lap as per Winding Major Production Winding
drawing 75 mm, should not be delaminated.

Pitch of the strip pasted, has to be equal in Winding Major Design Design
all segments.
Winding Copper Conductor should not be
twisted and damaged., After VPD process it Winding Major Production Winding
was found twisted.

LV V phase winding should be manufactured Winding Major Production Winding


with ten and tension post, (short circuit Job)

Upper Clamp insulation Not Found As per Core Building Minor SCM SCM
Drwaing, Dimension 355 found 335

Bluning Was missing in Bolt M24 , Item no. 2 Core Building Minor SCM SCM

Bluning Was missing in Bolt M24 , Item no. 2 Core Building Minor SCM SCM

Sleeve was not fitted , 120 sq mm cable is Core &


Core Building Minor Production
called but 150 sq. mm. cable used. Active part

Winding Cylinder should be over lap as per Winding Major Production Winding
drawing, not damage, not delaminated.

4 no. Pet bend used without design Core &


Core Building Minor Production
instruction in bottom yokes Active part

Status
Valve schedule Plate not matching with exact Final Assembly Changed Design Design
location of valve in main unit. By Design

Paint Should not be peeled off, Paint Peeled Final Assembly Minor SCM SCM
off observed in turrets and CT munting Pipe.

Inspection window cover fouling with Plate Final Assembly Minor Design Design
stiffner.

Non Approved Make Hardware used (PANKAJ Final Assembly Minor SCM SCM
INTL)

Final Paint Observed at Bottom header Pipe Final Assembly Minor SCM SCM
Instead of oil resistant paint.

Movable Flap should cover th opening of 150 Final Assembly Minor SCM SCM
NB pipe in PRD

STB Windign W phase, Heavily found


delaminated and Bulged, Later it was Winding Major Production Winding
assembled in U phase.

Skipper Unit 1, Tap Winding Cylinder V Winding Major Production Winding


Phase Found Oval In shape.
Core assembly Diameter found 3 mm less , Core &
Core Building Major Production
observed 703 aginst 706 mm Active part

Bottom tank Insulation should be made as Tanking Minor Production Winding


per drawing, but not found as required,

Lamination Dimenssion in step no. 22 should Core Building Major SCM SCM
be as per drawing.

Winding Cylinder Found De laminated and Winding Major Production Winding


damaged.

Job Winding should be made with tension


and tension post. Testing Transformer Layer Winding Major Production Winding
Winding made without Tension.

Base Feet drawing Item no. 2, (Bolt M 24) Core Building Minor SCM SCM
Bluing was missing.

Base Feet drawing Item no. 2, (Bolt M 24) Core Building Minor SCM SCM
Bluing was missing.

Cylinder wraps in assembled coil found


damaged b/w MV & TV coil after final VPD Winding Major Production Winding
process

FOS Routing found not as per drg for HV Coil Winding Major Production Winding

Testing Transformer ( U phase) conductor


found loose, twisted, covring insulation Winding Major Production Winding
damaged & bare copper. Kindly take
necessary action for the same

Radiator Sr. no. 11, Fin found damaged Tanking Minor SCM SCM

Testing Transformer ( V phase) tones spacer


not provided beween tones 1 to 5 as per
design. Also covering insulation found Winding Major Production Winding
damaged. Kindly take necessary action for
the same.

TBEA Logo Plate mounting Fixture found Tanking Minor SCM SCM
damaged. Logo plate unable to be fixed.

Lead and counductor joint should be as per Core &


CCA Minor Production
drawing and standard. Active Part
Windign turns found twisted. Winding Major Production Winding

Expanssion Bellow tie rod should not be ZPP Final


Final Assembly Minor Production
materail, because it will catch rust at site. Assembly

MOLG should be mounted straight. Final Assembly Minor SCM SCM

POLG found Missing in OLTC Conservator Final Assembly Minor SCM SCM

Oil Impegrination should be done througth Winding VPD Major Production Processing
the coil.

Windig Cylinder OD required 1634mm but Winding Major Production Winding


observed is 1639 mm

OD Rider Block between the Disc has to be Winding Major Production Winding
fitted covering the force application section.

LV Winding Cylinder found buldged/ Winding Major Production Winding


Delaminated

Winding Cylinder segment should be


minimum 1100/1000 mm, only 400 mm Winding Major Production Winding
piece used.

Winding Turns should not be twisted. Winding Major Production Winding

Tap Winding, Block Alignment not done, Winding Major Production Winding
Central Lead Exit Hole not done.

LV W Phase, Winding Cylinder found heavily Winding Major Production Winding


buldged and delaminated.

Bar Coductor Found inTesting Transformer


( V phase) WV Coil , 1)Coil wound loosely.2)
Bar Conductor found on many Places.3) Winding Major Production Winding
Twisted Conductor Found. Kindly take
necessary action for the same.

Fastners to be as per drawing & approved


make, Black phosphating fastners observed Final
Tanking Minor Production
at inspection cover of conservator and also Assembly
make is not approved at MOLG side.
There should not be any air gaps at Joint Winding Major Production Winding
position in cylinder/ Wrap.

ID and OD of Block Washer assembly for


Skipper job required 1740 and 1950 Winding Major SCM SCM
respectively but observed 10 mm less

Lead and counductor joint should be as per Final


drawing and standard. Short Length of Lead Tanking Major Production Assembly
LV bushing connection.

W phase , STB top block found loose, not Tanking Major Production Winding
completely clamped after pressing.

Oil Impegrination should be done througth Winding VPD Major Production Processing
the coil.

Windign turns found loose and conductor Winding Major Production Winding
found bare.

Heavy Rust Observed in CRGO Laminations Core Building Minor SCM SCM

2-3 mm gap obseved between Padding foot Core &


Core Building Minor Production
& step thickness guiding block. Active Part

JOB Winding Should be manufactured with


Tension and with Tension Post. M/S ESSEL
TAP Coil (UPhase) Coil winding going on Winding Major Production Winding
without Tension & Tension post, Kindly take
necessary action for the same. Refer
attached Photograph

Identification , job Order Punch not found at Core &


Core Building Major Production
built core. Active Part

Lubricating oil/ Grease observed on Builded Core &


Core of M/s Skipper ( Ist Unit). Please find Core Building Minor Production Active Part
the attcached annexure for the same.

M/S ESSEL L.V Coil (W Phase) layer Coil


winding going on without Tension & Tension Winding Major Production Winding
post, Kindly take necessry action for the
same.
Tap Leads Exit ( top & Bottom ) should be as
per Drawings Tap leads ( Bottom ) of U Phase
found interchanged . One lead from Lead Coil Assembly Major Production Winding
Bunch of Leads found interchanged and
bunch tapping has been provided.

Coil Alingment should be as per drawing. Tap


Winding in Assembled Coil found shifted (5- Winding Major Production Winding
10) mm with respect to LV & HV. So, the
alingment fund mismatched.

Bushing to as per standard & drawing. Crack Final


observed at oil end porcelain of HV bushing Final Assembly Minor Production Assembly
bearing serial number S-72994.

M/S ESSEL L.V Coils (W phase) conductor


found covering insulation damaged & bare Winding Major Production Winding
copper. Kindly take necessary action for the
same.

Winding to be as per Dwrg & Standard.


M/S ESSEL L.V Coils (U & V phase) Segment
Spacer Asper Design 10.5+4.5+4.5=19.5Total
But Actual only 10.5mm Spacer Provided Winding Major Production Winding
Between Transposition Disk 34 , 35 & 104 ,
105. Kindly take necessary action for the
same.

Coil height after pressing: 2140 mm, Coil Final


Final Assembly Minor Production
height after pressing : 2150 (all three phase) Assembly

JOB Winding Should be manufactured


without Any Damaged .
M/S PGCIL L.V Coil (without mantion Phase
on same ) after VPD process found Winding Major Production Winding
Bare copper & conductor indsulation
damaged, Kindly take necessry action for
the same.

tank rim hardware to be as per drawing.


( M24X120) quantity -140 nos. Final
Final Assembly Minor Production
Hardware size is M24X140( Quantity -140 Assembly
nos)
Conductor should not be Twisted.
After VPD & Clamping process , Reactor
Winding Coil found twisted between turns
( 24 to 1 ) in Non Std section( A & B) of coil & Winding Major Production Winding
( 1 to 24 ) in Std sections( A & B) of coil at
some places. Kindly take necessary action for
the same.

Valve Schedule Plate , item No. should not be


missed. Final Assembly Minor Design Design
Valve schedule plate Item no. AA025 &
AA028 are missing in Diagram .

Item 97 Earthing Piece Dimension as per


Drg : 50 x 150 x 400 Core &
Core Minor Production
Width of the Earthing Piece used found 40 Active Part
mm , against 50 mm.

Fiber Glass Insulation Washer (Used in Core


Building) should be as per drawing.
Fiber glass insulation Washer is not as per
Core Minor SCM SCM
drawing, Dimension L1 & L2 got
interchanged. So Hardware unable to be
fixed.

Connecting leads for OLTC Divertor Should


be Connected on the marked position.
During Assembly of OLTC Component for Ms
Skipper ( 160 MVA, 220/66 kV), Divertor Core &
CCA Major Production
Connecting Lead ( V 32 ) Connected Wrongly. Active Part
Due to Wrong Connection of the lead Ratio
measurement of the same found error in
certain tap positions.

Job to be Cleaned , there should not be any


Rust or Metal Chips. Core &
Core Minor Production
Rust & metal Chips observed During Active Part
Assembly of Top Core Frame parts

OLTC Should be without Damaged &


Components without Rusted.
M/S SKIPPER ( Unit=2) OLTC( Sr No: 1540047)
conaction lead insulation found damaged & CCA Major SCM SCM
with Black Carbon also found Dust , rusting
at tapping Area. Kindly take necessary action
for the
OLTC Bracket Support should not be foul
with OLTC while its placement. During CCA Major Design Design
assembly of OLTC on the support bracket,
OLTC foul with bracket resulting its bending.

Base foot holes to be matched with bottom


clamps. Core Minor SCM SCM
Base foot holes mismatched with tapped
holes of welded supports on bottom clamps

Assembly for cable conduit to be as per


drawing, Item no. 19 & 20 was missing. Tanking Minor Production Final
(5TT.426.10277A.1E) Flexible metal pipe Assembly
used for same

Compression Bolt Head should not be


broken.
During Tightening of Job 14B12034 ( Unit 01- Final
Tanking Major Production
160 MVA/220 kV) one No. Compression Bolt Assembly
Head of V Phase broked.Kindly take
necessary action for the same

Winding Cylinder should be properly Oil


Impregenated & Should not be Delaminated.
Insulating Cylinder( item 3- Dia 1401 X 3120 ) Processing Minor Production Winding
of Coloum ''A'"( ODFPSZ - 500/750TH ) found
not properly Oil Impregnated & found
Delaminate & Damged at Scraffing Area.

Winding should be properly Oil Impregnated.


M/S PGCIL ICT Coils (H.V= W phase, V phase Winding Major Production Processing
& Tap Coil) Rating 500mva / 765 kv after VPD
process found not proper Oil Impregnated.
Kindly take necessary action for the same.

Winding should be properly Oil Impregnated.


M/S ESSEL (Unit =1) Coils M.V (V phase) L.V
(W phase) Rating 500mva / 400 kv after VPD Winding Major Production Processing
process found not proper Oil Impregnated.
Kindly take necessary action for the same
Insualtion Blocks below Winding Coil Should
not be damaged & Shifted. Also Winding
Cylinder Should not be Bulged.
After Winding VPD Process of Assembled
Coil ( U Phase ) , Insulation Blocks Below Winding Major Production Winding
Stabilizing Winding ( WV) found shifed,
toppled from its actual position in approx 50
% of the segments.At some part cylinder also
found bulged.

Coil ID required as per design is 1176 mm.


Non Uniform Coil ID observed. Coil ID Core Coil Assembly Major Production Winding
measured is 1171mm and 1166 mm at both
the axis.

Step Block to be Designed as per Core Steps.


One Step of 5 mm not mentioned in Step
Block Design. Design for Inner Window Core Building Major Design Design
9Tensile Belt) for M/s Exxel 500 MVAICT in
Core Building.

M/S ApTransco L.V Coils (W phase)


Transposition Spacer Asper Design
7.5+3+3=13.5Total But Actual only 10.5mm Winding Major Production Winding
Spacer Provided Between Transposition Disk
27,28 Kindly take necessary action for the
same.

Step Block to be Designed as per Core Steps.


One Step of 5 mm not mentioned in Step
Block Design ( Rev -00) for Bottom Yoke. 24 CCA Major Design Design
Nos Block for Unit 01 & Unit 02 has been
received as per Drg, Rev 00.

Winding Cylinder Should not be damaged .


Wiinding Cylinder found damaged ( Hole )
Observed in ID side of M/s Essel ( 500 MVA Winding Major Production Winding
ICT - Unit 02 ) Tap Winding W Phase after
manufacturing of Winding .

Winding should be properly Oil


Impregenated.
M/S ApTransco (Unit =3) Rating 100mva / Winding VPD Major Production Processing
220KV Coils found After Completion of VPD
Process found partially impregnated. Kindly
take necessary action for the same
Winding should be without Damaged.
M/S (PGCIL) Sikakulam Unit-1 M.V coil Bare
conductor found & damaged insulation at Winding Major Production Winding
Varies places. which informed before VPD
Process but still found in same codition.
Kindly take necessary action for the same

Winding should be properly Oil Impregnated.


M/S (PGCIL) Srikakulam Unit-1 H.V coil
Completion of VPD Process found partially Winding VPD Major Production Processing
impregnated. Kindly take necessary action
for the same.

Winding should be properly Oil Impregnated.


M/s SIKAKULAM (PGCIL) ICT H.V Coil
wounding going on V2, In the same after
completion of half coil Winding Major Production Winding
used intermediate strips 7mm with1mm
Insulation Instead of Single piece 8mm strip
as per design item
no:9 ( H.V winding : DRWG 6TT.600.30375.1).

HV turret should not be put into VPD


HV turret were kept into VPD, resulting in VPD Process Minor Production Processing
Paint Peel off and Blistes Observed in HV
turret. Please

No. of turns required in LV winding should be


111 as per drawing.
1 no. turn found less in LV, U phase winding. Core Coil Assembly Major Production Winding
Total turns found 110 instead of 111

Black phosphate Washer should not be


Rusted and coating should not be removed.
Black phosphate Washer found Rusted and Core Building Minor SCM SCM
black powder get stuck in hand. Kindly take
necessary action for the same.

There should be Proper support for the


Cables. Support for cable handlling not Status
provided, may leads to following: Final Assembly Changed Design Design
Bad Aesthetic, May be damaged during By Design
Transportation and also may be thept.

Main Unit should be dispatched as per Final


Transport Drawing, 2V Turret is not fixed as Final Assembly Minor Production Assembly
per Transport Drawing.
Centre of Gravity Identification mark should
be shown in Drawing, and Dimension should
be specified either with max limit or with Status
their tolerance limit. Centre of Gravity Final Assembly Changed Design Design
Identification mark not given in transport By Design
Drawing and also Dimension shown without
tolerance or Max limit.

Clamp Insulation Hole Distance should match


the Hole marked in the clamp.
Clamp Insulation Hole found mismatched
with the lower & Upper clamp. Hole to hole Core Building Minor Design Design
Distance marked in the Clamp Insulation
Drawing found wrong . Hole Centre to hole
Centre distance found 335 mm instead of
325 mm.

Main Unit Accessories component should


not be rusted and damaged. Final
Final Assembly Minor Production
Main Unit Accessories component found Assembly
rusted, also damged due to improper storage

Hardware should be used as per


drawing/Hardware List. Final Assembly Minor Production Final
Extra Long hardware used in inspection Assembly
window and also uneven in size

Black Phospate hard ware should not be


used in out side of tank. Final
Final Assembly Minor Production
Black Phospate hardware used in inspection Assembly
Used, that will catch rust at site

OLTC shaft Should not touch with any Parts.


M/S ESSEL (15B05053) (Unit -1) OLTC shaft Final
Tanking Minor Production
Foul with pipe. kindly take necessary action Assembly
for the same

Spatters should not be observed inside the O


- Ring placement Groove. Spatters has been
observed inside the O ring Groove of OTC Tanking Minor SCM SCM
Conservator at many places which will
damage the O ring and make a oil seepage
point in future.

Pitting Should not be there on the surface of


the Core Frame. Pitting( Small Voids ) on the Core Minor SCM SCM
surface has been observed on the HV side
Clamp of M/s Essel reactor.
Assembly of Padding foot and Conservator
Side Clamp should not be mismatched.
In M/s UPPTCL ( Unnao) one M24 Bolt could Core Minor SCM SCM
not be inserted due to mismatched observed
in the padding foot and Conservator side
Clamp.

CRGO Pallet shuould not be found rusted.


CRGO Pallet received from M/s Posco, found Core Minor SCM SCM
damaged and heavily rusted.

CRGO Pallet shuould not be found rusted.


CRGO Pallet which we are sending to our Core Minor Production IED
vendor, found rusted ,

FO Sensor should show the Job temperature


after Final Assembly.
Two Nos Sensors ( No. 6 - ( Top Oil ) & No . 7
- Upper Clamp of radiator Side ) out of 8 Nos Final
Tanking Major Production
found Faulty after Final Assembly of M/s Assembly
PGCIL Srikaulam ( 500 MVA; 765 kV ) ICT .
Error observed for both the sensor in
temperature measuring instrumen

Tank Top Cover should be not damage ,


without paint & with dust particles .
M/S ESSEL (15B05050) (Unit -2) inside of Top Tanking Major SCM SCM
cover paint found Damaged & removed also
found

C Clamp used for Top Cover Fixing with tank ,


should not be rusted. Tanking Minor Production IED
Most of the C Clamp used for Top Cover
Fixing with tank , found heavily rusted.

Job Should pass the Megger Test at 2.5 kV


between Core & Core Clamp during final
assembly of Job. Megger found failed at 2.5 Final
Final Assembly Major Production
kV between core to core frame during Final Assembly
Assembly of M/s ESSEL ( 125 MVAr, 3 Phase
Shunt Reactor

Winding should be properly Oil


Impregenated.
M/S (PGCIL) Sikakulam Unit-3(15B09061) H.V Winding Major Production Processing
coil Completion of VPD Process found
partially impregnated. Kindly take necessary
action for the same.
Y
NCR Name of
Disposition NCR Status Frequency CA/PA Status NC Raised By Remarks
Person
Status

Deepankar
Done Closed Not Required Porwal &
Team

Deepankar
Done Closed Not Required Porwal &
Team

Deepankar
Done Closed Not Required Porwal &
Team

Deepankar
Done Closed Not Required Porwal &
Team

Done Closed Not Required Design Team

Done Closed Not Required Design Team

Tarun Sharma
Done Closed Not Required & Team

Deepankar
Done Closed Not Required Porwal &
Team

Done Closed Not Required Design Team

Bhargav
Done Closed Not Required Pandya &
Team

Jagdish Shukla
Done Closed Not Required & Team

Done Closed Not Required Design Team


Done Closed Not Required Design Team

Deepankar
Done Closed Not Required Porwal &
Team

Deepankar
Done Closed Not Required Porwal &
Team

Jagdish Shukla
Done Closed Not Required & Team

Tarun Sharma
Done Closed Received & Team

Tarun Sharma
Done Closed Not Required & Team

Deepankar
Done Closed Not Required Porwal &
Team

Deepankar
Done Closed Not Required Porwal &
Team

Deepankar
Done Closed Not Required Porwal &
Team

Done Closed Not Required Design Team

Done Closed Not Required Design Team

NCR NCR Cancelled NCR Cancelled NCR Cancelled NCR Cancelled NCR Cancelled
Cancelled

NCR NCR Cancelled NCR Cancelled NCR Cancelled NCR Cancelled NCR Cancelled
Cancelled

Bhargav
Arjun
Done Closed Received Pandya &
Chundawat Team

Bhargav
Done Closed Not Required Pandya &
Team

Deepankar
Done Closed Received Porwal &
Team
Done Closed Not Required Design Team

Deepankar
Done Closed Not Required Porwal &
Team

Deepankar
Done Closed Received Porwal &
Team

Deepankar
Done Closed Not Required Porwal &
Team

Deepankar
Done Closed Not Required Porwal &
Team

Deepankar
Done Closed Not Required Porwal &
Team

Tarun Sharma
Done Closed Not Required & Team

Tarun Sharma
Done Closed Not Required & Team

Deepankar
Done Closed Not Required Porwal &
Team

Gouranga
Done Closed Received Biswas &
Team

Shantanu
Done Closed Received Design Team
Tiwari

Deepankar
Done Closed Not Required Porwal &
Team

Gouranga
Done Closed Received Biswas &
Team

Done Closed Not Required Design Team

Bhargav
Done Closed Not Required Pandya &
Team

Tarun Sharma
Done Closed Not Required & Team
Done Closed Not Required Design Team

Done Closed Not Required Design Team

Done Closed Not Required Design Team

Bhargav
Done Closed Received Pandya &
Team

Done Closed Not Required Design Team

Anil Ram
Done Closed Received Design Team
Prasad

Done Closed Received Vipin Tiwari Design Team

Done Closed Received Arjun Singh Design Team

Tarun Sharma
Done Closed Received & Team

Jagdish Shukla
Done Closed Not Required & Team

Deepankar
Done Closed Received Porwal &
Team

Jagdish Shukla
Done Closed Not Required & Team

Deepankar
Done Closed Not Required Porwal &
Team

Deepankar
Done Closed Received Porwal &
Team

Jagdish Shukla
Done Closed Received & Team
Gouranga
Done Closed Received Biswas &
Team
Done Closed Not Required Design Team

Done Closed Not Required Design Team

Jagdish Shukla
Done Closed Not Required & Team

Tarun Sharma
Done Closed Not Required & Team

Deepankar
Done Closed Received Porwal &
Team

Deepankar
Done Closed Received Porwal &
Team

Jagdish Shukla
Done Closed Received & Team

Deepankar
Done Closed Received Porwal &
Team

Deepankar
Done Closed Received Porwal &
Team

Deepankar
Done Closed Received Porwal &
Team

Deepankar
Done Closed Received Porwal &
Team

Deepankar
Done Closed Received Porwal &
Team

Deepankar
Done Closed Received Porwal &
Team

Done Closed Not Required Design Team

Jagdish Shukla
Done Closed Not Required & Team
Done Closed Not Received Design Team

Done Closed Not Received Design Team

Jagdish Shukla
Done Closed Not Required & Team

Done Closed Not Required Design Team

Deepankar
Done Closed Received Porwal &
Team

Deepankar
Done Closed Received Porwal &
Team

Done Closed Not Required Design Team

Bhargav
Done Closed Not Required Pandya &
Team

Jagdish Shukla
Done Closed Not Required & Team

Done Closed Not Received Design Team

Jagdish Shukla
Done Closed Not Required & Team

Jagdish Shukla
Done Closed Not Required & Team

Done Closed Not Required Design Team

Tarun Sharma
Done Closed Not Received & Team

Shantanu
Done Closed Received Design Team
Tiwari

Done Closed Not Required Design Team


Deepankar
Done Closed Received Porwal &
Team

Ashish Shukla
Done Closed Received Vipin Tiwari & Team

Ashish Shukla
Done Closed Received Vipin Tiwari & Team

Jagdish Shukla
Done Closed Not Received & Team

Shantanu
Done Closed Received Design Team
Tiwari

Anil Ram
Done Closed Received Design Team
Prasad

NCR NCR Cancelled NCR Cancelled NCR Cancelled NCR Cancelled NCR Cancelled NCR Cancelled
Cancelled

Shantanu
Done Closed Received Design Team
Tiwari

Shantanu
Done Closed Received Design Team
Tiwari
Deepankar
Done Closed Received Porwal &
Team

Deepankar
Done Closed Received Porwal &
Team

Deepankar
Done Closed Received Porwal &
Team

Tarun Sharma
Done Closed Not Required & Team

Tarun Sharma
Done Closed Not Required & Team

Bhargav
Done Closed Not Required Pandya &
Team

Bhargav
Done Closed Not Required Pandya &
Team
Bhargav
Done Closed Not Required Pandya &
Team

Tarun Sharma
Done Closed Not Required & Team

Deepankar
Done Closed Received Porwal &
Team

Tarun Sharma
Done Closed Not Required & Team

Tarun Sharma
Done Closed Not Required & Team

Tarun Sharma
Done Closed Not Required & Team

Deepankar
Done Closed Received Porwal &
Team

Tarun Sharma
Done Closed Not Required & Team

Tarun Sharma
Done Closed Not Received & Team

Deepankar
Done Closed Received Porwal &
Team

Deepankar
Done Closed Received Porwal &
Team

Deepankar
Done Closed Received Porwal &
Team

Deepankar
Done Closed Received Porwal &
Team
Shantanu
Done Closed Received Design Team
Tiwari
Deepankar
Done Closed Received Porwal &
Team

Deepankar
Done Open Received Porwal &
Team

Tarun Sharma
Done Closed Not Required & Team

Tarun Sharma
Done Closed Not Required & Team

Tarun Sharma
Done Closed Not Required & Team

Bhargav
Done Closed Not Required Pandya &
Team

Deepankar
Done Closed Received Porwal &
Team

Bhargav
Done Closed Not Required Pandya &
Team

Done Closed Not Received Design Team

Tarun Sharma
Done Closed Not Required & Team

Done Closed Not Required Design Team

Tarun Sharma
Done Closed Not Required & Team

Tarun Sharma
Done Closed Not Required & Team

Tarun Sharma
Done Closed Not Required & Team

Deepankar
Done Closed Received Porwal &
Team

Deepankar
Done Closed Received Porwal &
Team
Bhargav
Done Closed Received Pandya &
Team

Deepankar
Done Closed Not Required Porwal &
Team

Tarun Sharma
Done Closed Received & Team

Deepankar
Done Closed Received Porwal &
Team

Deepankar
Done Open Received Porwal &
Team

Done Closed Not Required Tarun Sharma


& Team

Tarun Sharma
Done Closed Not Required & Team

Deepankar
Done Closed Received Porwal &
Team

Deepankar
Done Closed Received Porwal &
Team

Deepankar
Done Closed Received Porwal &
Team

Tarun Sharma
Done Closed Not Required & Team

Deepankar
Done Closed Received Porwal &
Team

Tarun Sharma
Done Closed Not Required & Team

Bhargav
Done Closed Not Required Pandya &
Team
Deepankar
Done Closed Received Porwal &
Team

Jagdish Shukla
Done Closed Not Required & Team

Tarun Sharma
Done Closed Not Required & Team

Tarun Sharma
Done Closed Not Required & Team

Gouranga
Done Closed Received Biswas &
Team

Deepankar
Done Closed Received Porwal &
Team

Deepankar
Done Closed Received Porwal &
Team

Deepankar
Done Closed Received Porwal &
Team

Deepankar
Done Closed Received Porwal &
Team

Deepankar
Done Closed Received Porwal &
Team

Deepankar
Done Closed Received Porwal &
Team

Deepankar
Done Closed Received Porwal &
Team

Deepankar
Done Closed Received Porwal &
Team

Jagdish Shukla
Done Closed Not Required & Team
Deepankar
Done Closed Received Porwal &
Team

Tarun Sharma
Done Closed Received & Team

Jagdish Shukla
Done Closed Received & Team

Deepankar
Done Closed Received Porwal &
Team

Gouranga
Done Closed Received Biswas &
Team

Deepankar
Done Closed Received Porwal &
Team

Tarun Sharma
Done Open Not Required & Team

Bhargav
Done Closed Not Required Pandya &
Team

Deepankar
Done Open Received Porwal &
Team

Disputed NCR,
Bhargav It is not
Done Open Not Received Pandya & Accepted By
Team Addressee
Department

Bhargav
Done Closed Not Required Pandya &
Team

Deepankar
Done Open Received Porwal &
Team
Deepankar
Done Closed Received Porwal &
Team

Deepankar
Done Closed Received Porwal &
Team

Jagdish Shukla
Done Closed Not Required & Team

Deepankar
Done Closed Received Porwal &
Team

Deepankar
Done Closed Received Porwal &
Team

Jagdish Shukla
Done Closed Not Required & Team

Deepankar
Done Closed Received Porwal &
Team

Jagdish Shukla
Done Closed Not Required & Team
Deepankar
Done Closed Received Porwal &
Team

Done Closed Not Required Design Team

Bhargav
Done Closed Not Required Pandya &
Team

Tarun Sharma
Done Open Not Required & Team

Bhargav
Done Closed Received Pandya &
Team

Bhargav
Done Closed Not Required Pandya &
Team

Tarun Sharma
Done Open Received & Team
Done Closed Received Vipin Tiwari Design Team

Tarun Sharma
Done Open Not Required & Team

Done Closed Not Required Jagdish Shukla


& Team

Jagdish Shukla
Done Closed Received & Team

Deepankar
Done Closed Not Required Porwal &
Team

Gouranga
Done Closed Received Biswas &
Team

Gouranga
Done Closed Received Biswas &
Team
Deepankar
Done Closed Received Porwal &
Team

Deepankar
Done Closed Received Porwal &
Team

Done Closed Received Shantanu Design Team


Tiwari

Deepankar
Done Closed Received Porwal &
Team

Done Closed Received Design Team

Deepankar
Done Closed Received Porwal &
Team

Gouranga
Done Closed Received Biswas &
Team
Deepankar
Done Closed Received Porwal &
Team

Gouranga
Done Open Received Biswas &
Team

Deepankar
Done Closed Received Porwal &
Team

Gouranga
Done Open Not Required Biswas &
Team

Deepankar
Done Closed Received Porwal &
Team

Tarun Sharma
Done Closed Not Required & Team

Done Closed Not Received Design Team

Jagdish Shukla
Done Closed Not Required & Team
Done Closed Not Received Design Team

Done Closed Not Required Design Team

Jagdish Shukla
Done Closed Not Required & Team

Done Closed Not Required Jagdish Shukla


& Team

Jagdish Shukla
Done Closed Not Required & Team

Jagdish Shukla
Done Closed Not Required & Team

Tarun Sharma
Done Closed Not Required & Team

Tarun Sharma
Done Closed Not Required & Team
Tarun Sharma
Done Closed Not Required & Team

Tarun Sharma
Done Closed Not Required & Team

Chandrashekh
Done Open Not Required ar Goswami &
Team

Jagdish Shukla
Done Closed Not Received & Team

Tarun Sharma
Done Closed Received & Team

Chandrashekh
Done Open Not Required ar Goswami &
Team

Jagdish Shukla
Done Closed Not Received & Team

Gouranga
Done Closed Received Biswas &
Team
Total Open Major Minor
Sr. No. Name of the Department Closed NCR
NCRs NCRs NCRs NCRs

Winding (Including Insulation, Coil


1 81 81 0 62 19
Clamping & Coil Assembly)

2 Core & Active Part 19 18 1 5 14

Final Assembly (Including Tanking &


3 28 28 0 10 18
Dispatch

4 SCM 42 38 4 10 32

5 Design 44 44 0 21 23

6 VPD/Processing 11 9 2 10 1

7 IED 2 0 2 0 2

Total 227 218 9 118 109


CA/PA on Major CA/PA on Minor
NCRs NCRs Remarks
Required Received Required Received
1) NCR No. 305, 325,256 & 359 are
rergarding Tension & Tension Post,
62 0 0 0 so no SOP was given yet By IED
Department. 2) All 57 no. Major
NCRs required CAAP to be closed.

NCR No. 208,230,320,357,372 are


5 0 0 0 MAJOR Ncrs and Open due to not
submission of CAPA

10 0 0 0

10 0 0 0

21 0 0 0

10 0 0 0

0 0 0 0

Open Ncr No.


118 0 0 0 410,407,392,390,376,374,371,357,
354
SL. NO. NCR NO. MONTH UNIT NO.

1 1 Jan 1,2 , 3

2 2 Jan 1

3 3 Feb 1

4 4 Feb 1

5 5 Feb 4

6 6 Feb 2,3 ,4,5

7 7 Feb 5
8 8 Feb 13B07308

9 9 Feb 13B07306

10 10 Feb 13B07306

11 11 Feb 13B07313

12 12 Feb 13B07311

13 13 Feb Raw Material

14 14 Feb 13B07307

15 15 Feb 13B07308

13B07333
16 16 Feb 13B07334
13B07334
17 17 Feb 13B07335

13B07336
18 18 Mar 13B07337

19 19 Mar 13B07333

20 20 Mar 13B07300

21 21 Mar 13B07309

22 22 APR 13B07339

23 Q/Q/NCR/23/4-14 April 13B07300

24 Q/Q/NCR/24/4-14 April 13B07333

25 Q/Q/NCR/25/4-14 April 13B07312


26 Q/Q/NCR/26/4-14 April 13B07303

27 Q/Q/NCR/27/4-14 April 13B07302

28 Q/Q/NCR/28/4-14 April 13B07303

29 Q/Q/NCR/29/4-14 April 13B07303

30 Q/Q/NCR/30/4-14 April 13B07303

31 Q/Q/NCR/31/4-14 April 13B07303

32 Q/Q/NCR/32/4-14 April 13B07302

33 Q/Q/NCR/33/4-14 April 13B07302

34 Q/Q/NCR/34/4-14 April 13B07303


35 Q/Q/NCR/35/4-14 MAY 13B07301

36 Q/Q/NCR/36/4-14 MAY 13B07333

13B07309,13B07
37 Q/Q/NCR/37/4-14 MAY 310

38 Q/IQ/NCR/38/05-14 MAY 13B07311

39 Q/IQ/NCR/39/05-14 MAY 13B07303

40 Q/IQ/NCR/40/05-14 JUNE 13B07310

41 Q/IQ/NCR/41/05-14 JUNE 13B07303

42 Q/IQ/NCR/42/05-14 JUNE 13B07311

43 Q/IQ/NCR/43/06-14 JUNE 13B07312,18


44 Q/IQ/NCR/44/06-14 JUNE 13B07312,18

45 Q/IQ/NCR/45/06-14 JUNE 13B07310,11

46 Q/IQ/NCR/46/06-14 JUNE 13B07300

Q/IQ/NCR/47/06-
47 JUNE 13B07304
14

13B07312,
48 Q/IQ/NCR/48/06-14 JUNE 13B07318

49 Q/IQ/NCR/49/06-14 JUNE 13B07304

50 Q/IP/NCR/50/06-14 JUNE 13B07320

51 Q/IP/NCR/51/07-14 JULY 13B07337

52 Q/IP/NCR/52/07-14 JULY 13B07304


53 Q/IP/NCR/53/07-14 JULY 13B07300

54 Q/IP/NCR/54/07-14 JULY 13B07304

55 Q/IP/NCR/55/07-14 JULY 13B07304

56 Q/IP/NCR/56/07-14 JULY 13B07306,307


57 Q/IP/NCR/57/07-14 JULY 13B07325

58 Q/IP/NCR/58/07-14 JULY 13B07326

59 Q/IP/NCR/59/07-14 JULY 13B07304

60 Q/IP/NCR/60/07-14 JULY 13B07327

Q/IP/NCR/61/07-
61 JULY 13B07307
14

Q/IP/NCR/62/07-
62 JULY 13B07308
14
Q/IP/NCR/63/07-
63 JULY 13B07310
14

64 Q/IP/NCR/64/07-14 JULY 13B07324

65 Q/IP/NCR/65/07-14 JULY 13B07326

66 Q/IP/NCR/66/07-14 JULY 13B07303

67 Q/IP/NCR/67/07-14 JULY 13B07300

68 Q/IP/NCR/68/07-14 JULY 13B07328

69 Q/IP/NCR/69/07-14 JULY 13B07328

70 Q/IP/NCR/70/07-14 JULY 13B07341

Q/IP/NCR/71/07-
71 JULY 13B07308
14
72 Q/IP/NCR/72/07-14 JULY 13B07310

73 Q/IP/NCR/73/07-14 JULY 13B07309

74 Q/IP/NCR/74/07-14 JULY 13B07340

75 Q/IP/NCR/75/07-14 JULY ---

76 Q/IP/NCR/76/07-14 JULY 13B07320

13B07312 and
77 Q/IP/NCR/77/07-14 JULY 318

13B07312 and
78 Q/IP/NCR/78/08-14 August 318

79 Q/IP/NCR/79/08-14 August 13B07319/331

80 Q/IP/NCR/80/08-14 August 13B07327,28


81 Q/IP/NCR/81/08-14 August 13B07302

82 Q/IP/NCR/82/08-14 August 13B07338

83 Q/IP/NCR/83/08-14 August 13B07339

84 Q/IP/NCR/84/08-14 August 13B07340

85 Q/IP/NCR/85/08-14 August 13B07302

86 Q/IP/NCR/86/08-14 August 13B07312

87 Q/IP/NCR/87/08-14 August All Reactor jobs

88 Q/IP/NCR/88/08-14 August All ICT jobs

89 Q/IP/NCR/89/08-14 August 13B07311


13B07338,339,3
90 Q/IP/NCR/90/08-14 August 40

91 Q/IP/NCR/91/08-14 August 13B07307

92 Q/IP/NCR/92/08-14 August All Reactor jobs

Q/IP/NCR/93/08- All Reactor and


93 August
14 ICT jobs

94 Q/IP/NCR/94/08-14 August 13B07319

95 Q/IP/NCR/95/08-14 August 13B07330

96 Q/IP/NCR/96/08-14 August 13B07325

97 Q/IP/NCR/97/09-14 Sept. 13B07319

98 Q/IP/NCR/98/09-14 Sept. 13B07330


99 Q/IP/NCR/99/09-14 Sept. ICT-13B07305

100 Q/IP/NCR/100/09-14 Sept. 13B07331

13B02139
101 Q/IP/NCR/101/08-14 Sep. &12B08122

102 Q/IP/NCR/102/09-14 sep 13B07342

103 Q/IP/NCR/103/09-14 Sept. 13B07326

104 Q/IP/NCR/104/08-14 Sept. 12B08122

105 Q/IP/NCR/105/09-14 Sept. 13B07329

106 Q/IP/NCR/106/08-14 Sept. 13B07329

107 Q/IP/NCR/107/08-14 Sept. 13B02139


Q/IP/NCR/108/08
108 Sept. 13B07321
-14

Q/IP/NCR/109/08
109 -14 Sept. 13B07321

13B07331,
110 Q/IP/NCR/110/09-14 Sept. 13B07319

111 Q/IP/NCR/111/09-14 Sept. 13B07327

112 Q/IP/NCR/112/09-14 Sept. 70152General

113 Q/IP/NCR/113/09-14 Sept. General

114 Q/IP/NCR/114/09-14 Sept. 13B07326

Q/IP/NCR/115/09
115 Sept. 13B07303
-15

Q/IP/NCR/116/09
116 Sept. 13B07326
-16
Q/IP/NCR/117/09
117 Sept. Storage system
-17

118 Q/IP/NCR/118/10-14 OCT 13B07326

118 Q/IP/NCR/119/09-14 Sept. 70152 General

120 Q/IP/NCR/120/09-14 Sept. 13B07326

121 Q/IP/NCR/121/10-14 OCT 13B02139

122 Q/IP/NCR/122/10-14 OCT 13B02139

123 Q/IP/NCR/123/10-14 OCT 13B02139

124 Q/IP/NCR/124/10-14 OCT 13B07321

125 Q/IP/NCR/125/10-14 OCT 13B07322


126 Q/IP/NCR/126/10-14 OCT 13B07342

127 Q/IP/NCR/127/10-14 OCT 13B07342

128 Q/IP/NCR/128/10-14 OCT 13B07309

129 Q/IP/NCR/129/10-15 OCT 13B07327

130 Q/IP/NCR/130/10-16 OCT 13B07304

131 Q/IP/NCR/131/10-14 OCT 13B07329

132 Q/IP/NCR/132/10-14 OCT 13B07304

133 Q/IP/NCR/133/10-14 OCT N/A

134 Q/IP/NCR/134/10-14 OCT 13B07304


13B07332
135 Q/IP/NCR/135/10-14 OCT &14B07001

13B07332
136 Q/IP/NCR/136/10-14 OCT &14B07002

137 Q/IP/NCR/137/10-14 OCT 13B07342

138 Q/IP/NCR/138/10-14 OCT 13B07328

139 Q/IP/NCR/139/10-14 OCT 13B07342

140 Q/IP/NCR/140/10-14 OCT 13B07331

141 Q/IP/NCR/141/10-14 OCT 13B07319

142 Q/IP/NCR/142/10-14 OCT 13B07330

143 Q/IP/NCR/143/10-14 OCT 13B07319


144 Q/IP/NCR/144/10-14 OCT 13B07331

145 Q/IP/NCR/145/10-14 OCT 13B07330

146 Q/IP/NCR/146/10-14 OCT 13B07328

Common for
147 Q/IP/NCR/147/10-14 OCT PGCIL jobs

148 Q/IP/NCR/148/10-14 OCT 1307305

149 Q/IP/NCR/149/11-14 Nov 13B07329

150 Q/IP/NCR/150/10-14 Nov --

151 Q/IP/NCR/151/11-14 Nov 13B07304

152 Q/IP/NCR/152/11-14 Nov 13B07329 & 327


153 Q/IP/NCR/153/11-14 Nov 13B07304

154 Q/IP/NCR/154/11-14 Nov 13B07329

155 Q/IP/NCR/155/11-14 Nov 13B07329

156 Q/IP/NCR/156/11-14 Nov 13B07330

157 Q/IP/NCR/157/11-14 Nov 13B07327

158 Q/IP/NCR/158/11-14 Nov 14B11008

159 Q/IP/NCR/159/11-14 Nov 14B11008

160 Q/IP/NCR/160/11-14 Nov 14B11008

161 Q/IP/NCR/161/11-14 Nov 14B11008


162 Q/IP/NCR/162/11-14 Nov 14B11008

163 Q/IP/NCR/163/11-14 Nov 14B12011

164 Q/IP/NCR/164/11-14 Nov 13B07319

165 Q/IP/NCR/165/11-14 Nov 13B07319

166 Q/IP/NCR/166/11-14 Nov 13B07328

167 Q/IP/NCR/167/11-14 Nov 13B07307

168 Q/IP/NCR/168/11-14 Nov 12B08122

169 Q/IP/NCR/169/11-14 Nov 12B07328,319

170 Q/IP/NCR/170/11-14 Nov 13B07342


171 Q/IP/NCR/171/11-14 Nov 14B12013

172 Q/IP/NCR/172/12-14 Dec 12B08122

173 Q/IP/NCR/173/12-14 DEC 13B07329

174 Q/IP/NCR/174/12-14 DEC 14B11008

175 Q/IP/NCR/175/12-14 DEC 14B12014

176 Q/IP/NCR/176/12-14 DEC 14B11008

14B12011-
177 Q/IP/NCR/177/12-14 Dec 14B12014

178 Q/IP/NCR/178/12-14 Dec 13B07332

179 Q/IP/NCR/179/12-14 Dec 13B07332


180 Q/IP/NCR/180/12-14 Dec 13B07332

181 Q/IP/NCR/181/12-14 Dec 14B11008

182 Q/IP/NCR/182/12-14 Dec 14B11008


DESCRIPTION OF NCR PROCESS Criticality

Arrangement of keyed block not as per


drawing Winding Minor

Brazing performed by unqualified brazer Winding Major

> Manufacturing of the Winding not as


per the design requirement.
> Insertion of several components missed Winding Minor
out.
> Other assemble problems observed.

Dimensional variation in hole pitch &


location. Core Building Minor
Burr observed on holes.

Location of radial spacer not as per Winding Minor


design requirement

Radial spacer having burr on edges. Winding Minor


Material problem.

Location of radial spacer not as per Winding Minor


design requirement
Winding coil of HV main found damaged. Winding Major

Core stack height not as per design Core Building Minor


requirement.

Varinish was not prepared as per the Active Part Minor


specification(mixing Ratio) Assembly

Slotted portion of keyed strip found in the


opposite direction. Found on OD instead Winding Minor
of ID.

Brazing performed by unqualified brazer Winding Major

Storage of insulation not proper. Mixed Winding Minor


with metal pieces and kept on floor.

Quality records not available of winding Winding Minor


coil used in procduction.

Winding coil found twisted and conductor Winding Major


got bent during the pressing of coil.

M24 bolt found broken inside the Yoke


clamp hole, in the side feet of HV side. Core Building Major
Core cake assembly not dne as per Active Part Minor
drawing. Assembly

Burr observed on laminations in assembly


process Core Building Minor

Phase barier support 4 No Bolts found Active Part


broken in 2 places on top side core coil Major
Assembly
assembly. (HV & HV neutral)

CRGO lamination width not as per Core Building Minor


specification in core building.

Winding coil found twisted and conductor Winding Major


got bent during the pressing of coil.

CRGO lamination found damage from


Corner side Core Building Major

metal burrs and chips observed on the Core Building Major


threaded part of the top side feet.

Paint should be removed from DOWEL Core Building Minor


PIN

HV coil section B Disc observed loose Winding Minor


waviness observed in the CRGO Core Building Minor
lamination sheets.

LV widing height less than specified after


compression process. Winding Minor

Rust observed in the CRGO lamination Core Building Minor


sheets.

length more than specified observed in Core Building Minor


the CRGO lamination sheets.

Side limb damage observed in the CRGO Core Building Minor


lamination sheets.

haldu wood having rough surface . Core Building Minor

Cylinder damage in the winding Assly of Winding Minor


the "X" limb.

Fibre optic sensor found failed in the Winding Major


energizing winding of the "X" column

copper conductor bobbin found damage Winding Minor


in the stored condition
Process inspection not Followed for the Tanking Major
humidity

Leakage test not conducted Tanking Major

For Counductor twisting Winding Major

Neutral frame not in order and undercut core building Minor


observed, Refer NCR

Cylinder Damaged in ICT Coil (L.V) Winding Major


13B07303.

For Counductor twisting Winding Major

found less insulation on sensor Winding Minor

For Counductor twisting Winding Major

Bolster Plate not as per design CORE BUILDING Minor


requirement and fitted.
Core Lamination found Shifted after CORE BUILDING Minor
Clamping, Refer NCR

Fiber Optical Probe head found broken, Active Part


Clamp insulation found damaged, Refer Minor
Assembly
NCR.

Earthing Bolt found Broken and Tanking Minor


Lamination damaged

CTC Counductor Dimension found Winding N


different

For Counductor twisting. Winding Major

Metal dust observed in the core pallets &


rust observed in the core pallets Core Building Minor

Conductor Twisting after VPD process Winding Major

RADIATOR FOUND DAMAGED Tanking Major

During winding assembly of X column for


job 13B07304 ICT Non conformance
observed during the lowering of enerzing Winding Minor
coil as the OD of assembled Coils found
(1604 mm) i.e. 2 mm plus with respect to
Energising coil ID (1602 mm)
Gasket material (Acrylic gasket) is using at
sleaing joints in reactor/transformer Tanking Major
under manufacturing presently at our
shop
For Job 13B07304 ICT non conformance
observed at right wound HV coil for
section C2, 28th no. Disc continuos Winding Major
winding 2//, as approx 2 turn copper
short

ICT-13B07304 HV Coil conductor found Winding Minor


Damage during Winding stage
Gasket material (Acrylic gasket) is using at
sleaing joints in reactor/transformer Tanking Major
under manufacturing presently at our
4-5 laminationshop.
misplaced from its Core Building Minor
origional position
Non conformance observed on left
wound Section C, 26/25th no. Disc butt
lap joint was made in shield condutor of Winding Major
approx 850 mm to complete the two
turns of shield wire in the corresponding
disc.
For Job 13B07304 ICT non conformance
observed at right wound HV coil for
section D3, 63/64th no. Disc butt lap joint Winding Major
was made in shield condutor of approx
700 mm to complete the two turns of
shield wire in the corresponding disc.

Brazing done by unqualified brazer Winding Major

Gasket material (Acrylic gasket) is using at


sleaing joints in reactor/transformer Tanking Major
under manufacturing presently at our
shop

Gasket material (Acrylic gasket) is using at


sleaing joints in reactor/transformer Tanking Major
under manufacturing presently at our
shop
Gasket material (Acrylic gasket) is using at
sleaing joints in reactor/transformer Tanking Major
under manufacturing presently at our
shop for more details refer NCR

Copper conductor found twisted after


VPD Winding Major

Waviness observed in core assembly Core building Minor

Gasket material (Acrylic gasket) is using at


sleaing joints in reactor/transformer Tanking Major
under manufacturing presently at our
shop.

Conduit pipe alignment Is Not straight. Tanking Minor

Scartched guide pins are used for making


core building core building Minor

Job Order Found mismatch, Punch is


13B07328 and marked is 13B07341 and Tanking Major
13B07339

Job Order Found mismatch, Punch is Tanking Major


13B07341 and marked is 13B07309

Job Order Found mismatch, Punch is Tanking Major


13B07308 and marked is 13B07311
Job Order Found mismatch, Punch is Tanking Major
13B07310 and marked is 13B07306

Job Order Found mismatch, Punch is


13B07309 and marked is 13B07308 Tanking Major

Job Order Found mismatch, Punch is Tanking Major


13B07340 and marked is 13B07338

Incorrect information displayed on board Tanking Minor


in VPD no. C and D

Depth of the M24 hole shall be 60 mm Core Building Minor


but observed is 45 mm

13B07339 is punched in active part assly


of 13B07312 at more than 2 places Tanking Major

13B07307 is punched in13B07312 and Tanking Major


13B07310 is punched in 13B07318

Raidail depth found out opf tolerance , Winding Major


approx 4 mm positive side.

Rust observed in the stress cap and found Active Part Major
improper tag welding Assembly
4 no. holes in marshalling box mounted
on job order no. 13B07340 found not
blanked. During the transportation in Tanking Minor
rainy season watter may accumlate
inside.
2 no. holes in marshalling box mounted
on job order no. 13B07340 found not
blanked. During the transportation in Tanking Minor
rainy season watter may accumlate
inside.
2 no. holes in marshalling box mounted
on job order no. 13B07340 found not
blanked. During the transportation in Tanking Minor
rainy season watter may accumlate
inside.
2 no. holes in marshalling box mounted
on job order no. 13B07340 found not
blanked. During the transportation in Tanking Minor
rainy season watter may accumlate
inside.
Expansion bellow mounting found
inadequate in job order no.13B07302 4
no. mounting rods are not used and Tanking Minor
whole pipe weight was coming on
expansion bellow.

Top Cover fixing holes found rust, dust


and metal particles. Tanking Minor

Marshalling box protection cover inside


channel foul with the marshalling box Tanking Minor
during mounting.

Detachable lugs , 4 nos. not being used in


Indian powergrid sites. the bolted lugs Tanking Minor
not used.

Two job order punched on single job.


13B07308 and 13B07311 both the sr. no. Tanking major
punched.
M.box protection guard support
mismatch, butterfly valve (mounted on
side wall) cap not fitted, earthing pad
found rusted,jacking pad, rim welding, Tanking Minor
over all touch up painting not up to the
mark, pressure gauge mounted on
cylinder is in wrong direction.
High Volatge resting time not completed
and testting has been started Tanking Major

Actual over all dimension is not as per Tanking Minor


approved drawing.

Earthing pad material is being used is Tanking Minor


Mild steel (MS), which uis getting rusted.

2-3 lamination misplaced from its Core building Minor


origional position after clamping of job.

2-3 lamination misplaced from its


origional position after clamping of job. Core Building Minor

4-5 lamination misplaced from its


origional position at two location in top Core Building Minor
yoke & lamination also damaged.

Bulging of CRGO lamination has been Active Part


observed in Active part assembly of Minor
Assembly
13B07319 in bottom frame .

Active Part
Bolster Plate found defective Minor
Assembly
Damaged DOF washer in Regulating Coil Winding Minor

Active Part
Core Cheese packet found Damage Assembly Minor

Rust Observed In Marshalling Box Tanking Minor

FOS Sensor not working Winding Minor

M'Box Found damage Tanking Minor

Poor painting and rusting observed etc.


refer NCR For more details Tanking Minor

Gasket material (Acrylic gasket) is using at


sleaing joints in reactor/transformer Tanking Minor
under manufacturing presently at our
shop

Acrylic gasket used in bushing clamp. Tanking Minor


Which is restricted.

M. Box door gasket found damaged. Tanking Minor


CT terminal marking was incomplete & Tanking Minor
improper.

Turret hardware found rusty Tanking Minor

Active Part
Hardware Found Rusty, Refer NCR Minor
Assembly

Improper surface finish and paint Tanking Minor


application, Refer NCR

Expansion Bellow damaged. Dispatch Minor

Inadequate size of hardware found during


dispatch. Dispatch Minor

Wrong Core-Frame Identification Tanking Major

Spatter & rust observed inside the oltc Tanking Minor


conservator.

Paint peel off observed at bushing Tanking Minor


mounting plate.
pipe was stored in improper
way/hafazard way due which paint will be Tanking Minor
damged & rusting will take place.

Welding joint damage found in


marshalling Box Tanking Minor

Gaskets
(Acrylic) used at wall flanges. Dispatch Minor

Tanking Minor
Marshalling Box Name Plate matter paint
peel off.
ZPP (Yellow) hardware used in
Marshalling box support, also in main Tanking Minor
tank., These hardware will catch rust at
site. As per PGCIL only hdg to be used.

ZPP (Yellow) hardware used in Conduit


pipe gland plate and one hardware got Tanking Minor
rusted.As per PGCIL only hdg to be used.

Rusted hardware used in inspection Tanking Minor


window.

Protection guard Mismatch. Tanking Minor

Oil level indicator plate marking paint Tanking Minor


peel off as shown in photo.
Rust found in Bolts Core Building Minor

Rust Found in washer. Core Building Minor

Rust found in Conservator (which is Dispatch Minor


loaded on trailer)

Manufacturer location are different in Tanking Minor


rating and diagram plate,VSP plate also.

Letters of R&D(Hindi) plate are spreading. Tanking Minor

Marshalling Box found damaged Tanking Minor

Inspection cover handle found damaged Tanking Minor

Unidentified job found at Active Part Active Part Minor


station 3. Assembly

Door of Marshalling Box found Misaligned Tanking Minor


M24 SS Hardware used Core Building Minor

Active Part
Core Cheese Packet Assembly Major

Gasket material (Acrylic gasket) is using at


sleaing joints in reactor/transformer Tanking Minor
under manufacturing presently at our
shop

Stud length was not appropriate,bolt was


used inplace of stud,palin washer M12 Tanking Minor
was used in place of M10

Tag indentification of CT terminal was Tanking Minor


missing

Tag indentification of CT terminal was


missing Tanking Minor

Tag indentification of CT terminal was Tanking Minor


missing

Stud length was not appropriate,bolt was


used inplace of stud,palin washer was Tanking Minor
missing inspection cover of man hole.

bolt was used inplace of stud,palin Tanking Minor


washer M12 was used in place of M10
bolt was used inplace of stud,palin Tanking Minor
washer M12 was used in place of M10

Improper identification of job. Tanking Major

Rating & Diagram Plate fixing Tanking Minor


arrangement

Rust Found in hardwere Core Building Minor

Marshling Box Rusted Tanking Minor

6-8 mm Gap observed in Marshalling Box


door gasket and flange. Tanking Major

Washer found with Rust, sharp edges and Tanking Minor


Notches

Rusted hardware used in Cooler bank Tanking Minor


assembly at oil flow level indicator

Bigger size bolts alonwith 5 no. washer Tanking Minor


used.
Hardware tighting done without washer. Tanking Minor

Zpp hard ware used in Marshalling box.


(Please refer NC) Tanking Minor

Black phospate hard ware used in Tanking Minor


butterfly valve flange

Non uniform size of stud used. Tanking Minor

6-8 mm Gap observed in Marshalling Box Tanking Major


door and flange.

Regarding Placement of ID DOF


washer( M/s Getco ). Winding major

Regarding the Radial Depth of HV Coil Winding Minor


( M/s Getco ) refer ncr.

Regarding the Marking of Turns in MV Winding Minor


Coil Drawing- M/s Getco

HV Coil OD Riders ( V phase)M/s Winding Minor


Getco.not as per sop.
Regarding Pressure application on HV &
MV winding Coil- M/s Getco. Pressure Winding Major
application not as per design/SOP.

Regarding Pressure application on HV Coil


- Shunt Reactor-- M/s Isolux. Pressure Winding Major
application not as per design/SOP.

Core _frame support insulator found Tanking Minor


burnt

Marshalling Box paint found Burnt Tanking Minor

Minor crack has been observed in the Tanking Minor


Marshalling Box. Cover

RADIATOR FOUND DAMAGED DURING


THE TRA SPORTATION Dispatch Major

Radiator found damged & rusty Tanking Major

Mbox both front doors located at bottom


side not fitted properly. There is gap Tanking Major
between gasket and flange in when door
is in locked condition.

Marshalling Box Gasket found open Tanking Minor


Uneven Guiding hole cutting Core Building Minor

Radiator fins damaged. Tanking Major

Punching found 13B0729 instead of Tanking Minor


13B07329

Coil ID found less than required, Pls refer Winding Major


NCR

Burr observed in tapped hole. Core Building Minor

Middle limb core lamination length


observed less than required Core Building Major

Hardware in core, not used as per


drawing. Ss used instead of blued Core Building Minor
hardware.

M. Box support not OK Tanking Minor

Nut used instead of washer. Tanking Minor


Coinduit pipe gasket damaged Tanking Minor

Issues during core building of 14B11008,


Please Refer NCR-181 Core Building Minor

Waviness found in core lamination, refer Core Building Minor


NCR
RESPONSIBLE NCR Status FREQUENCY CA/PA STATUS NC Raised BY
DEPT

Winding Closed 1 NR Arjun Singh

Winding Closed Yes Shantanu Tiwari

Winding Closed 1 NR Shantanu Tiwari

Core & Active Closed 1 NR Shantanu Tiwari


Part

Winding Closed 1 NR Shantanu Tiwari

Winding Closed 1 NR Shantanu Tiwari

Winding Closed 2 NR Shantanu Tiwari


Winding Closed Yes Arjun Singh

Core & Active Closed 1 NR Arjun Singh


Part

Core & Active Closed 1 NR Arjun Singh


Part

Design Closed NR Shantanu Tiwari

Winding Closed Yes Shantanu Tiwari

Winding Closed NR Arjun Singh

Winding Closed NR Shantanu Tiwari

Winding Closed yes Arjun Singh

Core & Active


Part Closed Yes Arjun Singh
Core & Active Closed 1 NR Arjun Singh
Part

SCM Closed 1 NR Arjun Singh

Core & Active Closed Yes Arjun Singh


Part

core & Active Closed 1 NR Viral Bhatt


Part

Winding Closed yes Shantanu Tiwari

SCM Closed Yes Viral Bhatt

Core & Active Closed Yes Arjun Singh


Part

SCM Closed NR Arjun Singh

Winding Closed NR Viral Bhatt


SCM Closed NR Arjun Singh

Winding Closed NR Shantanu Tiwari

SCM Closed NR Viral Bhatt

SCM Closed NR Viral Bhatt

SCM Closed NR Viral Bhatt

SCM Closed NR Arjun Singh

Winding Closed NR Shantanu Tiwari

Winding Closed Yes Shantanu Tiwari

Winding Closed 1 NR Shantanu Tiwari


Final Assembly Closed Yes Arjun Singh

Final Assembly Closed Yes Arjun Singh

Winding Closed 3 Yes Viral Bhatt

SCM Closed NR Arjun Singh

Winding Closed Yes Viral Bhatt

Winding Closed 4 Yes Viral Bhatt

SCM Closed NR Viral Bhatt

Winding Closed 5 Yes Viral Bhatt

Core & Active Closed 1 NR Arjun Singh


Part
Core & Active Closed 1 NR Arjun Singh
Part

Core & Active


Part Closed 1 NR Arjun Singh

Final Assembly closed NR Arjun Singh

NCR Cancelled

Winding closed Yes Viral Bhatt

Core & Active


Part Closed NR Arjun Singh

Winding closed Yes Shantanu Tiwari

Final Assembly Closed Yes Arjun Singh

Winding closed NR Shantanu Tiwari


Final Assembly closed Yes Anil Kumar

Winding Closed Yes Shantanu Tiwari

SCM Closed NR Viral Bhatt

Final Assembly Closed Yes Vipin Tiwari


Core & Active Closed 1 NR Anil Kumar
Part

Winding Closed Yes Shantanu Tiwari

Winding Closed Yes Shantanu Tiwari

Winding Closed Yes Shantanu Tiwari

Final Assembly Closed Yes Anil Kumar

Final Assembly Closed Yes Anil Kumar


Final Assembly Closed Yes Anil Kumar

Winding Closed Yes Shantanu Tiwari

Core & Active Closed 1 NR Anil Kumar


Part

Final Assembly Closed Yes Anil Kumar

Final Assembly Closed 1 NR Vipin Tiwari

Core & Active


Part Closed 1 NR Vipin Tiwari

Final Assembly Closed Yes Vipin Tiwari

Final Assembly Closed Yes Vipin Tiwari

Final Assembly Closed Yes Vipin Tiwari


Final Assembly Closed Yes Vipin Tiwari

Final Assembly Closed Yes Vipin Tiwari

Final Assembly Closed Yes Vipin Tiwari

Final Assembly Closed NR Vipin Tiwari

SCM Closed NR Arjun Singh

Final Assembly Closed Yes Vipin Tiwari

Final Assembly Closed Yes Anil Kumar

Winding Closed yes Shantanu Tiwari

SCM Closed Yes Arjun Singh


Final Assembly Closed NR Vipin Tiwari

Final Assembly Closed 1 NR Vipin Tiwari

Final Assembly Closed 2 NR Vipin Tiwari

Final Assembly Closed 3 NR Vipin Tiwari

Final Assembly Closed NR Vipin Tiwari

Final Assembly Closed NR Vipin Tiwari

Final Assembly Closed NR Vipin Tiwari

Final Assembly Closed NR Vipin Tiwari

Final Assembly Closed Yes Vipin Tiwari


Final Assembly Closed NR Vipin Tiwari

Final Assembly Closed Yes Arjun Singh

Design Closed 1 NR Vipin Tiwari

Final Assembly Closed NR Vipin Tiwari

Core & Active Closed 1 NR Anil Kumar


Part

Core & Active


Part Closed 2 NR Anil Kumar

Final Assembly Closed 1 NR Anil Kumar

Core & Active Closed 1 NR Vipin Tiwari


Part

SCM closed 1 NR Arjun Singh


Winding Closed NR Shantanu Tiwari

SCM Closed 1 NR Arjun Singh

Final Assembly Closed NR Vipin Tiwari

Winding Closed NR Viral Bhatt

Final Assembly Closed NR Arjun Singh

Final Assembly Closed NR Arjun Singh

Final Assembly Closed NR Viral Bhatt

Final Assembly Closed 1 NR Vipin Tiwari

Final Assembly Closed NR Vipin Tiwari


Final Assembly Closed NR Anil Kumar

Final Assembly Closed NR Anil Kumar

SCM Closed NR Arjun Singh

SCM Closed NR Arjun Singh

Final Assembly Closed NR Viral Bhatt

Dispatch Closed NR Viral Bhatt

Final Assembly Closed Yes Arjun Singh

SCM Closed NR Anil Kumar

SCM Closed NR Anil Kumar


Dispatch Closed NR Anil Kumar

Final Assembly Closed NR Shantanu Tiwari

Final Assembly Closed NR Viral Bhatt

SCM Closed NR Viral Bhatt

Final Assembly Closed NR Vipin Tiwari

Final Assembly Closed NR Vipin Tiwari

Final Assembly Closed NR Vipin Tiwari

Final Assembly Closed NR Vipin Tiwari

Final Assembly Closed NR Vipin Tiwari


SCM Closed NR Vipin Tiwari

SCM Closed NR Vipin Tiwari

Dispatch Closed NR Vipin Tiwari

Final Assembly Closed NR Anil Kumar

SCM Closed NR Anil Kumar

Final Assembly Closed NR Arjun Singh

Final Assembly Closed NR Arjun Singh

Core & Active Closed NR Viral Bhatt


Part

Final Assembly Closed NR Viral Bhatt


SCM Closed NR Arjun Singh

SCM Closed Yes Arjun Singh

Final Assembly Closed NR Anil Kumar

Final Assembly Closed NR Anil Kumar

Final Assembly Closed NR Anil Kumar

Final Assembly Closed NR Anil Kumar

Final Assembly Closed NR Anil Kumar

Final Assembly Closed NR Anil Kumar

Final Assembly Closed 1 NR Anil Kumar


Final Assembly Closed 2 NR Anil Kumar

Final Assembly Closed Yes Anil Kumar

Final Assembly Closed NR Anil Kumar

SCM Closed NR Viral Bhatt

Final Assembly Closed NR Viral Bhatt

SCM Closed Yes Vipin Tiwari

SCM Closed NR Vipin Tiwari

Final Assembly Closed NR Vipin Tiwari

Final Assembly Closed 1 NR Vipin Tiwari


Final Assembly Closed NR Vipin Tiwari

Final Assembly Closed NR Vipin Tiwari

Final Assembly Closed 1 NR Vipin Tiwari

Final Assembly Closed NR Vipin Tiwari

SCM Closed Yes Vipin Tiwari

Winding Closed yes Shantanu Tiwari

Design Closed NR Shantanu Tiwari

Design Closed NR Shantanu Tiwari

Winding Closed NR Viral Bhatt


Winding Closed yes Shantanu Tiwari

Winding Closed yes Shantanu Tiwari

Final Assembly Closed 1 NR Arjun Singh

Final Assembly Closed NR Arjun Singh

SCM Closed NR Arjun Singh

Dispatch Closed Yes Arjun Singh

Dispatch Closed Yes Anil Kumar

SCM Closed Yes VPS

SCM Closed NR Arjun Singh


SCM Closed NR Arjun Singh

Final Assembly Closed Yes Anil Kumar

Final Assembly Closed NR Viral Bhatt

Winding Closed Yes Shantanu Tiwari

SCM Closed 1 NR Viral Bhatt

SCM Closed Yes Arjun Singh

Core & Active Closed NR Arjun Singh


Part

Final Assembly Closed NR Vipin Tiwari

Final Assembly Closed NR Vipin Tiwari


Final Assembly Closed 1 NR Vipin Tiwari

Design Open NR Arjun Singh

Core & Active Closed NR Vipin Tiwari


Part
Remarks

2
1
2
3

5
6

7
8
Minor NCR 109

Major NCR 55
Major
Sr. No. Name of the Department Total NCRs Closed NCRs Open NCRs NCRs

Winding (Including
1 Insulation, Coil Clamping & 37 37 0 22
Coil Assembly)

2 Core & Active Part 21 21 0 3

Final Assembly (Including


3 83 83 0 24
Tanking & Dispatch

4 SCM 35 35 0 7

5 Design 5 5 0 0

Total 181 181 0 56


CA/PA on Major CA/PA on Minor
Minor NCRs NCRs
NCRs
Required Received Required Received

15 22 22

18 3 3

59 24 24

28 7 7

5 0 0

125 56 56
NCR MONITORING S

MONT Job Order


SL. NO. NCR NO. UNIT NO.
H No.

Essel 200
1 Q/IP/NCR/413/01-2016
Jan 15B05052 MVA , W
Phase, Unit 2

PGCIL
2 Q/IP/NCR/414/01-2016
Jan 15B09062 Srikakulam,
Tap Winding

Essel 80 MVAr
3 Q/IP/NCR/415/01-2016
Jan 15B06053 Core

15B05049, Essel 125 MVAr


4 Q/IP/NCR/416/01-2016
Jan 15B05050

Jan 15B09059 ,
5 Q/IP/NCR/417/01-2016 15B09060 Srikakulam ICT

6 Q/IP/NCR/418/01-2016
Jan 16B03001 Model ICT

Essel 200
MVA , W
7 Q/IP/NCR/419/01-2016
Jan 15B05052 Phase, Unit 2,
LV Coil, U
phase

8 Q/IP/NCR/420/01-2016
Jan 16B01003 Model ICT
9 Q/IP/NCR/421/01-2016
Jan 15B05052 Essel 200 MVA

10 Q/IP/NCR/422/01-2016
Jan 15B05048 Essel 500 MVA

11 Q/IP/NCR/423/01-2016
Jan 15B05053 Essel 500 MVA

12 Q/IP/NCR/424/01-2016
Jan 15B06054 Essel400
80 MVAr,
kV

13 Q/IP/NCR/425/01-2016
Jan 16B01003 Model ICT

14 Q/IP/NCR/426/01-2016
Jan 16B01003 Model ICT

15 Q/IP/NCR/427/01-2016
Jan 15B05052 Essel 200
16 Q/IP/NCR/428/01-2016
Jan 16B01003 Model ICT

17 Q/IP/NCR/429/01-2016
Jan 16B01003 Model ICT

Q/IP/NCR/430/0
18 Jan
1-2016
19 Jan
20 Jan
21 Jan
22 Jan
23 Jan
24 Jan
25 Jan
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
NCR MONITORING SHEET-INPROCESS QUALITY

PROCESS Criticality RESPONSI Sub


DESCRIPTION OF NCR BLE DEPT Function

Productio Winding
Fire Blanket not used while making Brzing Joint/deburring. Winding Major n

Insulation Components in the coil has to be placed as per the


design.
M/s PGCIL , Srikakulam ( 500 MVA ; 765 kV) Tap Winding
unloaded from the machine ( HM -01 ) without placing the Productio Winding
Winding Minor
insulation components ( Such as Inner Deflector on top side n
between first turn) . Radial Spacers found wrongly inserted
between Ist & Second turn in all 36 segments , lead numbering
for top & Bottom part for all 36 conductors found not done.

Core
CRGO Lamination found not as per design Major SCM SCM
Building

Final Productio Final


Job Order Punching not Done Minor
Assembly n Assembly

Final Productio Final


Job Order Punching not Done Minor
Assembly n Assembly

Core Assembly farm parts should be smooth and without


spatters. Core
MODEL ICT (16B03001) Core Assembly farm and pitch plate Major SCM SCM
found with spatters. Kindly take Building
necessary action for the same

winding conductor insulation should not be Damaged.


M/s ESSEL (15B05052 )Unit-2 L.V coil U phase conductor Productio Winding
Winding Major
insulation found damaged & bare conductor n
found at Disk -57. Kindly take necessary action for the same.

Joint in Winding Coil has to be done by Qualified Brazers. Productio Winding


Non Qualified Brazer found Doing Brazing in HV Coil ( Model Winding Major n
ICT ) - CTC - CTC Joint.
winding should be as per Design.
M/s ESSEL (15B05052)Unit-2 M/s Essel (15B05052) Unit -2 Tap Productio Winding
W phase coil intermediate spacer Winding Major n
found not as per design, And coil unloaded. Kindly take
necessary action for the same

CT Terminal Marking / Identification should be there.


Scrap cost
Job Delay Hrs. Final Productio Final
Minor
Material Cost Assembly n Assembly
CT Terminal Marking missing, because it was done by white
board marker.

winding should as per Design.


M/s ESSEL (15B05053)Unit-1 as per design all coils with Iteam Core Productio Winding
No:4 ID cylinder, But without ID Major
Building n
cylinder All phase dummy coils hand over to CCA. Kindly take
necessary action for the same.

CRGO Lamination should be received in Order/ as per drawing.


CRGO laminations received in reverse order. Extra manpower Core Major SCM SCM
deployed to reverse the lamination Building
sheets for stacking.

Drawing Should be made as per the type of Winding . 1.LV


Winding arrangement not shown as per the type of Winding,
Helical Arrangement/Spacer insertion not shown in the drawing. Winding Major Design Design
2. Angle Ring Dimension ( 8TT.759.T0100.1 ) found not as per the
requirement.

winding lead legnth as per design.


Model ICT (16B03001) as per design in Technical Requirements
Point 2: mention lead length 2000mm for Regulating coil, But Winding Major Design Design
after completion actual same coil lead length found 1000mm
short, Due to wrong calculation / called of copper conductor
length in TDS. Kindly take necessary action for the same.

winding should be as per design.


M/s ESSEL (15B05052)Unit-2, In M.V coil beetwen disk no: 11 to Winding Productio Winding
Major
12 OD DOF not provided / missing. n
Kindly take necessary action for the same.
Design should be clear and with proper Identification
MODEL-ICT (16B03001) IN DWRG (6TY.600.30009.5) E.V coil
winding B section disk no
identification found different, In Copper conductor size Table B
section disk no
shown 2 X 4 Instead of Shilled conductor position diagram &coil Winding Major Design Design
winding DWRG
6TY.600.30009.5 B section disk shown 06 no’s, Also in the same
conductor bands
position shown wrong. Kindly take necessary action for the
same.

winding conductor insulation should not be Damaged from the


supplier.
During coil wounding of Model - ICT E.V coil conductor insulation
found damaged from the
Conductor Drum. Winding Major SCM SCM
Copper Conductor Drum No: Not Found,
P.O No: SP/4101150001844EV2.
Length : 533000mm.
Gross WT: 1054000Kg.
Kindly take necessary action for the same.
NCR NCR FREQUEN CA/PA NC Raised Name of
Dispositio REMARKS
Status CY STATUS BY Person
n Status

Vipin Deepankar
Porwal&
Tiwari Team

Deepankar
Shantanu Porwal&
Tiwari Team

Tarun
Vipin Sharma &
Tiwari Team

Jagdish
Vipin Shukla &
Tiwari Team

Jagdish
Vipin Shukla &
Tiwari Team

Tarun
Viral Bhatt Sharma &
Team

Deepankar
Viral Bhatt Porwal&
Team

Deepankar
Shantanu Porwal&
Tiwari Team
Deepankar
Viral Bhatt Porwal&
Team

Jagdish
Vipin Shukla &
Tiwari Team

Deepankar
Viral Bhatt Porwal&
Team

Tarun
Vipin Sharma &
Tiwari Team

Viral Bhatt Design Team

Viral Bhatt Design Team

Deepankar
Viral Bhatt Porwal&
Team
Viral Bhatt Design Team