1 SUMMARY ........................................................................................................... 6
2 CONCLUSIONS ................................................................................................... 7
2.1 General.................................................................................................................. 7
2.2 Personal Injury....................................................................................................... 7
2.3 Financial Damage .................................................................................................. 8
3 OBJECTIVES AND SCOPE ................................................................................ 9
4 DEFINITIONS, ASSUMPTIONS AND BACKGROUND FOR THE ASSUMPTIONS
........................................................................................................................... 10
4.1 Definitions ............................................................................................................ 10
4.2 Assumptions ........................................................................................................ 10
4.3 Background for the assumptions.......................................................................... 10
5 SYSTEM IDENTIFICATION ............................................................................... 11
5.1 Technical Design ................................................................................................. 11
5.2 Interfaces to other systems/service units ............................................................. 11
5.3 Field of application/Use environment ................................................................... 11
6 MODES OF OPERATION .................................................................................. 12
6.1 General................................................................................................................ 12
6.2 Modes of Operation ............................................................................................. 12
7 ANALYSIS METHODS ...................................................................................... 13
7.1 System Hazard Analysis/Sub System Hazard Analysis (SHA/SSHA) .................. 13
7.2 Operating and Support Hazard Analysis (O&SHA) .............................................. 13
7.3 Environmental Hazard Analysis (EHA)................................................................. 13
7.4 Risk Assessment ................................................................................................. 14
7.5 Risk-Reducing Actions ......................................................................................... 17
7.6 Risk Log .............................................................................................................. 18
7.7 Requirements Analysis ........................................................................................ 18
7.8 Hazardous Substances ........................................................................................ 19
7.9 Interviews ............................................................................................................ 19
8 DESCRIPTION OF RISKS ................................................................................. 20
9 PROPOSED SAFETY INSTRUCTIONS ............................................................ 21
10 REFERENCES ................................................................................................... 21
10.1 References .......................................................................................................... 21
10.2 Interviews ............................................................................................................ 21
2
Logotype Safety Assessment Report (SAR) Date
YYYY-MM-DD
APPENDICES
Risk Log with the closing of risks ............................................................................Appendix 1
Requirements Analysis ...........................................................................................Appendix 2
Hazardous Substances ..........................................................................................Appendix 3
3
Logotype Safety Assessment Report (SAR) Date
YYYY-MM-DD
Revision Information
4
Logotype Safety Assessment Report (SAR) Date
YYYY-MM-DD
WORD LIST
Abbreviation Explanation
5
Logotype Safety Assessment Report (SAR) Date
YYYY-MM-DD
1 SUMMARY
The supplier XXX has, on behalf of XXX, carried out system safety analyses (SHA/SSHA) on XXX,
MXXXX-XXXXXX.
This safety assessment report concerns XXX as a complete unit with necessary accessories. The
report does not include XXX.
The analyses have been performed and evaluated in accordance with the requirements in the
specification for XXX, annexed to the request for proposal/order XXX and System Safety Program
Plan (SSPP) for XXX technical service, edition XXX, dated YYYY-MM-DD.
The task has been to identify, analyze and evaluate potential risks for injury to persons or damage to
property or the external environment caused by the system. The work has also included proposals for
action and implementation of measures to minimize the probability of hazardous events and limit the
consequences if they do occur.
Section 2 Conclusions presents all the remaining risks that are considered to be either “not tolerable”
or “limited tolerable”. A more detailed description of each risk and proposals for action as well as an
account for measures already implemented are described in section 8 Description of risks, their
consequences and recommended and already implemented actions.
The safety assessment report provides a consultative basis with proposed actions such as design
changes and/or additions or amendments in the relevant publications in order to increase safety for
persons, property and the external environment during the life cycle of the system.
The supplier XXX together with XXX has actively been working with system safety issues during
the acquisition. The implementation of the proposed actions was verified at XXX, YYYY-MM-DD.
Wording 1: The system safety work identified a total of XXX risks. After implementation of
risk-reducing actions a total of XXX risks remain. Based on the risk levels given in
the risk matrix in the contract XXX, the system is estimated to have XXX tolerable
risks (T), XXX limited tolerable risks (BT) and XXX not tolerable risks (ET).
Wording 2: The system safety work identified a total of XXX risks. If the proposed risk-
reducing actions in this report are implemented a total of XXX risks will remain.
Based on the risk levels given in the risk matrix in TTEM XXX the system will
have XXX tolerable risks (T), XXX limited tolerable risks (BT) and XXX not
tolerable risks (ET).
6
Logotype Safety Assessment Report (SAR) Date
YYYY-MM-DD
2 CONCLUSIONS
2.1 General
System safety is defined as the property of a system not to cause personal injury or damage to
property or the external environment. A system is defined as an assembly of supplies, facilities and
personnel. The term system generally also includes instructions, regulations etc. for use in training,
operation and maintenance in both war, crisis and peace.
To perform a realistic safety assessment, this document is based on the hazardous events that can
cause personal injury, environmental damage and/or financial damage (i.e. material damage on your
own or third party’s property or the costs associated with environmental remediation) and that may
occur both nationally and internationally. The system safety activities do not normally include risks
of hostile weapon effects against your own system, personnel or environment.
Hazardous events may occur either as a result of human error, material failure or a combination of
these two factors. This document is intended to be a basis to both reduce risks and, in some cases, to
exclude the risks altogether.
It is essential that the relevant documentation describes and highlights the remaining risks that
cannot, or is not intended to, be avoided by redesigning the system.
7
Logotype Safety Assessment Report (SAR) Date
YYYY-MM-DD
8
Logotype Safety Assessment Report (SAR) Date
YYYY-MM-DD
In section 8 Description of risks, their consequences and recommended and already implemented
actions, the proposed risk-reducing actions are presented together with each risk, under the heading
Proposed actions. Already implemented measures are presented under the heading Implemented
actions YYYY-MM-DD. The purpose of the proposed actions is to minimize or eliminate risks of
personal injury and damage to property and environment as far as possible.
The safety assessment report should be viewed as a descriptive document for XXX to be able to
reduce the probability of a hazardous event and/or limit the consequences if it does occur.
The performed system safety activities have lead to the identification of risks, assessment of
probabilities and consequences, proposed actions, implementation of actions and closure of risks.
This has been documented according to Appendix 1, Risk Log.
The system safety activities have also included studying the need for directions/instructions and
additions to warnings in the existing documentation as well as operating instructions related to
supervision in accordance to the system safety requirements.
A list showing which laws and regulations that should apply to XXX and whether these are met with
or not has been established. See Appendix 2, Requirements Analysis.
A list of hazardous substances has been established. See Appendix 3, Hazardous substances.
9
Logotype Safety Assessment Report (SAR) Date
YYYY-MM-DD
4.2 Assumptions
The following assumptions apply to the analysis:
The system XXX is assumed to be complete and without any defects before a hazardous
event occurs.
Personnel handling the system are assumed to receive the training necessary to operate and
maintain the system XXX in a safe manner before the system is taken into use.
All preventive maintenance is performed according to the current materiel care schedules.
Maintenance personnel at the various maintenance levels have intimate knowledge of the
system XXX and have been trained for the purpose.
Equipment that is to be connected to the system XXX is not affected by this analysis but is
assumed to be adapted to the purpose and comply with applicable electrical safety
requirements, system requirements etc.
If untrained personnel were to operate the system XXX in full, the risks could in many cases be
incalculable.
10
Logotype Safety Assessment Report (SAR) Date
YYYY-MM-DD
5 SYSTEM IDENTIFICATION
5.1 Technical Design
A brief description of the system’s fundamental design, function, components, existing subsystems,
interfaces between subsystems etc.
11
Logotype Safety Assessment Report (SAR) Date
YYYY-MM-DD
6 MODES OF OPERATION
6.1 General
During its life cycle the equipment undergoes several different stages, each of which with its special
conditions. The product/system utilization has been divided into a number of different modes of
operation, as certain risks only occur e.g. at certain sequences or conditions and it can be important
that this is made clear in the analysis. Certain risks may occur only during assembly, operation or
maintenance etc. The risks’ relations to different modes of operation are presented in Appendix 1,
Risk Log.
6.2.4 Maintenance
Example: ”Maintenance” refers to both preventive and corrective maintenance. Preventive and
corrective maintenance include daily and special attendance, basic attendance, actions
according to MVIF and repairs.
6.2.5 Arrangement/storage
Example: ”Arrangement/storage” refers to storage in store XXX or container XXX etc.
6.2.6 Disposal
Example: ”Disposal” refers to organized forms and methods in stores supply for the final disposal of
materiel systems and their constituent supplies from all or part of the Swedish Armed
Forces. Methods include: destruction, dismantling, scrapping, shredding, disassembly,
recycling and/or deposition.
12
Logotype Safety Assessment Report (SAR) Date
YYYY-MM-DD
7 ANALYSIS METHODS
The analyses in this report have been implemented according to the System Safety Program Plan
(SSPP) for XXX, Issue XXX, dated YYYY-MM-DD.
The system safety analyses include (e.g. SHA, SSHA, O&SHA and EHA).
The analysis activities have been to identify potential risks, evaluate them by assessing their impact
and probability, and to propose safety-enhancing changes.
The analysis activities have involved the identification of health risks and to propose measures to
eliminate or reduce these to acceptable levels.
The analysis activities have been to survey and evaluate the substances as regards quantity and
impact.
13
Logotype Safety Assessment Report (SAR) Date
YYYY-MM-DD
An accident will always have a consequence. However, the outcome of a particular accident may
vary. To put it simply, the possible adverse outcomes are broken down by severity into four so-called
injury classes.
The four injury classes (I-IV) of each risk now have an estimated probability. Each of these is
arranged under each probability class (A-E) in the current risk matrix. The risk matrix shows the
level of tolerance of each injury class within the probability classes.
The risk of an accident is valued after the injury class considered having the strictest tolerance level.
For example, the “entire” risk of an accident is considered limited tolerable if the damage
corresponding to injury class IV is supposed to occur with a limited tolerable frequency even if the
damage corresponding to injury classes I, II and III is supposed to occur with a tolerable frequency
and vice versa.
I Death
II Serious injury
III Less-serious injury
IV Negligible injury
14
Logotype Safety Assessment Report (SAR) Date
YYYY-MM-DD
I Approximately the same cost as a total system loss > 105 $ (> 100 000)
15
Logotype Safety Assessment Report (SAR) Date
YYYY-MM-DD
16
Logotype Safety Assessment Report (SAR) Date
YYYY-MM-DD
Actions can be divided in different action classes. Below is a breakdown of actions in 6 different
classes. From a general risk management perspective, actions that belong to a class with a lower
figure should have priority over actions belonging to classes with higher figures as shown below.
1. Design Changes
These actions involve some form of redesign. This implies that the risk is managed by removing,
adding, replacing or changing something in the system’s physical characteristics.
2. Protective Devices
These actions mean that the risk is managed through the introduction of e.g. fixed or automatic safety
devices, stop modes, protection zones or protective equipment.
3. Warning Devices
These actions imply that the risk is managed by warning devices, such as sound or light signals, text
messages etc. that cannot be misinterpreted.
4. Instructions/Warning Labels
These are actions in which the risk is managed by calling attention to it in written form for the
personnel who will use the equipment. This can be done through instructions and/or warning labels.
5. Training
These actions mean that the risk is managed by calling attention to it as part of the training on the
system for the personnel who will use the equipment.
6. Testing
These actions imply that the risk should be verified with some form of trial or testing before final
approval is issued.
For each action proposed in section 8 it is clear what action class it belongs to. Each action is
preceded by the name of the action class.
17
Logotype Safety Assessment Report (SAR) Date
YYYY-MM-DD
All identified risks according to the methods described in 7.1-7.3. These are numbered and
named with appropriate names.
Initial risk assessment and risk evaluation according to 7.4. All estimated probabilities are
reported.
A new risk assessment and risk evaluation, also according to 7.4, after proposed or
implemented actions.
Acceptance and closure of tolerable risks. It is clear from the risk log when and by whom each
risk has been closed.
Appendix 2 lists the most common regulations for this type of equipment and should therefore not be
considered complete. In the list, basic health and safety requirements have been termed “shall
requirements” (S).
18
Logotype Safety Assessment Report (SAR) Date
YYYY-MM-DD
These safety data sheets provide both recommendations how to deal with hazardous and
environmentally harmful products in order to avoid/reduce risks, and recommendations for actions to
be taken in connection with accidents (injuries).
The hazardous substances/materials that personnel may come into contact with have been listed and
assessed. See Appendix 3. The list includes references to the Swedish Armed Forces’ database for
hazardous substances or relevant safety data sheets.
7.9 Interviews
Interviews have been conducted with personnel at XXX and YYY. (Any references see section 10.)
19
Logotype Safety Assessment Report (SAR) Date
YYYY-MM-DD
8 DESCRIPTION OF RISKS
Below is a description of the risks identified after completed analyses including their consequences
and recommended and already implemented actions. To obtain complete information about each risk,
the risk log should be studied parallel to this report.
Proposed actions
Describe the proposed action and how it is expected to affect the risk, e.g. reduce the probability of a
hazardous event, change the injury class outcome (i.e. a greater proportion of accidents result in less
serious injuries or damages).
20
Logotype Safety Assessment Report (SAR) Date
YYYY-MM-DD
10 REFERENCES
10.1 References
Example:
10.2 Interviews
Last name, Fist name, title, unit/department, company, interview, city, YYYY-MM-DD.