MEP Services Electrical (Lighting, and power system), Electronic (Sound System, Security, Fire Alarm, Telephone, BMS, EMS, )
Mechanical (Air Conditioning,
Lift & Escalator)
Plumbing System (Rain
Water, Sanitary, Drainage, Plumbing System) Fire Protection System (Sprinkler and Hydrant) MEP DESIGN STAGE 3 Concept Design Design outline report with description of each M&E system
Schedule of major Marked-up architect’s
options with briefed plants showing proposed comparative table major plant items & space
Schedule of plant space
requirements Preliminary list of major equipment
MEP DESIGN STAGE 4
Draft design feature report
Preliminary plants marked-up showing proposed major plants
Outline schematics and single line diagram for major system
Analyses of major systems option with comparative table
Update list of major equipment
Update schedule of plant space requirements to include major
services routes and riser
MEP DESIGN STAGE 5
Design Development 1. Details calculations
2. Schematic diagram for all services
3. Typical details for repeated installations
4. Detail of construction and standard
5. Ceiling Plant for MEP
6. Equipment Schedule
7. Detail of plant room
8. Detail layout
9. Main routes
10. Final Specification
MEP DESIGN STAGE 6
Related Session 1. Bekerja dalam tekanan di dunia konstruksi