CRONOGRAMA DE OBRA V

MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE NIVEL PRIMARIO I.E.E. N°30318 DEL CENTRO P

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07
BLOQUE AB - YANAMUCLO 1,990,094.42
01 ESTRUCTURAS 1,077,684.21 MES 01 MES 02
01.01 OBRAS PROVISIONALES 44,569.85
01.01.01 CONSTRUCCION PROVISIONAL DE OFICINA 384.00 384.00 0.00 0.00 0.00 0.00 0.00 0.00
01.01.02 CONSTRUCCION PROVISIONAL DE CASETA PARA GUARDIANIA 144.00 144.00 0.00 0.00 0.00 0.00 0.00 0.00
01.01.03 CONSTRUCCION PROVISIONAL DE VESTIDOR PARA PERSONAL 480.00 480.00 0.00 0.00 0.00 0.00 0.00 0.00
01.01.04 GUARDIANIA DE OBRA 37,785.60 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44
01.01.05 ALQUILER DE ALMACEN 1,440.00 56.00 56.00 56.00 56.00 56.00 56.00 56.00
01.01.06 CARTEL DE IDENTIFICACION DE OBRA (3.60x2.40) 856.25 0.00 856.25 0.00 0.00 0.00 0.00 0.00
01.01.07 AGUA PARA CONSUMO EN LA CONSTRUCCION 1,080.00 42.00 42.00 42.00 42.00 42.00 42.00 42.00
01.01.08 DESAGUE PARA LA CONSTRUCCION 750.00 0.00 750.00 0.00 0.00 0.00 0.00 0.00
01.01.09 ENERGIA ELECTRICA PROVISIONAL PARA LA CONSTRUCCION 1,650.00 64.17 64.17 64.17 64.17 64.17 64.17 64.17
01.02 TRABAJOS PRELIMINARES 66,669.81
01.02.01 DEMOLICION DE CONSTRUCCION EXISTENTE 46,142.30 46,142.30 0.00 0.00 0.00 0.00 0.00 0.00
01.02.02 ELIMINACION DE CONSTRUCCION DEMOLIDA DP=2 KM. 8,433.24 6,324.93 2,108.31 0.00 0.00 0.00 0.00 0.00
01.02.03 LIMPIEZA DEL TERRENO MANUAL 3,218.46 0.00 3,218.46 0.00 0.00 0.00 0.00 0.00
01.02.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS 2,500.00 2,500.00 0.00 0.00 0.00 0.00 0.00 0.00
01.02.05 TRAZO, NIVELACION Y REPLANTEO PARA EDIFICACION 2,770.32 0.00 1,007.39 1,762.93 0.00 0.00 0.00 0.00
01.02.06 CONTROL TOPOGRAFICO DURANTE EJECUCION DE OBRA 3,605.49 841.28 841.28 841.28 841.28 240.37 0.00 0.00
01.03 MOVIMIENTO DE TIERRAS 32,782.10
01.03.01 EXCAVACION DE ZANJAS PARA ZAPATAS H=1.20 - 1.50 M. 9,038.33 0.00 753.19 5,272.36 3,012.78 0.00 0.00 0.00
01.03.02 EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS 2,632.52 0.00 0.00 548.44 767.82 767.82 548.44 0.00
01.03.03 EXCAVACION DE ZANJAS PARA JARDIN 31.43 0.00 0.00 31.43 0.00 0.00 0.00 0.00
01.03.04 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 4,776.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.03.05 REFINE, NIVELACION Y COMPACTACION DE PLATAFORMA 4,486.78 0.00 0.00 0.00 0.00 0.00 560.85 3,925.93
01.03.06 REFINE, NIVELACION Y COMPACTACION DE BASE PARA VEREDAS 6,019.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.03.07 RELLENO Y COMPACTACION DE PODIUM CON MATERIAL PROPIO 301.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.03.08 ACARREO INTERNO DE MATERIAL EXCEDENTE DP=20 M. 2,694.29 0.00 0.00 0.00 0.00 0.00 0.00 1,347.15
01.03.09 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 2,801.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.04 OBRAS DE CONCRETO SIMPLE 90,690.96
CRONOGRAMA DE OBRA V

MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE NIVEL PRIMARIO I.E.E. N°30318 DEL CENTRO P

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07
01.04.01 SOLADO PARA ZAPATAS E=0.10 M. 1:10 CEMENTO - HORMIGON 5,467.93 0.00 0.00 0.00 911.32 3,189.63 1,366.98 0.00
01.04.02 CONCRETO 1:10+30% P.G. PARA CIMIENTOS CORRIDOS 21,485.78 0.00 0.00 0.00 0.00 8,057.17 9,400.03 4,028.58
01.04.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO 6,829.64 0.00 0.00 0.00 0.00 0.00 2,276.55 3,983.96
01.04.04 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS 3,042.44 0.00 0.00 0.00 0.00 0.00 0.00 1,521.22
01.04.05 FALSO PISO DE CONCRETO E=0.10 M. CEMENTO - HORMIGON 16,168.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.04.06 ENCOFRADO Y DESENCOFRADO NORMAL PARA VEREDAS 4,000.12 0.00 0.00 0.00 0.00 2,000.06 2,000.06 0.00
01.04.07 CONCRETO F'C=140 KG/CM2 PARA VEREDAS INCLUYE ACABADOS 19,168.71 0.00 0.00 0.00 0.00 0.00 5,750.61 13,418.10
01.04.08 ENCOFRADO Y DESENCOFRADO NORMAL PARA CUNETAS 3,648.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.04.09 CONCRETO F'C=140 KG/CM2 PARA CUNETAS INCLUYE ACABADOS 4,971.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.04.10 ENCOFRADO Y DESENCOFRADO NORMAL PARA JARDIN 3,281.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.04.11 CONCRETO F'C=140 KG/CM2 PARA JARDIN 2,627.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.05 OBRAS DE CONCRETO ARMADO 772,773.58
01.05.01 ZAPATAS 49,980.45
01.05.01.01 ACERO F'Y= 4200 KG/CM2 PARA ZAPATAS 11,429.97 0.00 0.00 0.00 0.00 0.00 10,001.22 1,428.75
01.05.01.02 CONCRETO F'C=210 KG/CM2 PARA ZAPATAS 38,550.48 0.00 0.00 0.00 0.00 0.00 0.00 23,130.29
01.05.02 COLUMNAS 113,702.39
01.05.02.01 ACERO F'Y= 4200 KG/CM2 PARA COLUMNAS 43,524.40 0.00 0.00 0.00 0.00 0.00 4,974.22 8,704.88
01.05.02.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS 47,502.09 0.00 0.00 0.00 0.00 0.00 0.00 3,064.65
01.05.02.03 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS 22,675.90 0.00 0.00 0.00 0.00 0.00 0.00 2,451.45
01.05.03 COLUMNETAS 43,559.15
01.05.03.01 ACERO F'Y= 4200 KG/CM2 PARA COLUMNETAS 13,992.87 0.00 0.00 0.00 0.00 0.00 0.00 1,023.87
01.05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNETAS 20,137.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.05.03.03 CONCRETO F'C=175 KG/CM2 PARA COLUMNETAS 9,428.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.05.04 VIGAS 210,855.32
01.05.04.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA VIGAS 79,074.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.05.04.02 ACERO F'Y= 4200 KG/CM2 PARA VIGAS 84,562.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.05.04.03 CONCRETO F'C=210 KG/CM2 PARA VIGAS 47,218.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.05.05 LOSA ALIGERADA 288,844.61
01.05.05.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA ALIGERADA 134,294.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.05.05.02 BLOQUETA DE ARCILLA H=0.15 M. PARA LOSA ALIGERADA 21,223.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.05.05.03 BLOQUETA DE ARCILLA H=0.12 M. PARA LOSA ALIGERADA 21,181.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CRONOGRAMA DE OBRA V

MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE NIVEL PRIMARIO I.E.E. N°30318 DEL CENTRO P

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07
01.05.05.04 ACERO F'Y= 4200 KG/CM2 PARA LOSA ALIGERADA 57,235.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.05.05.05 CONCRETO F'C=210 KG/CM2 PARA LOSA ALIGERADA 54,910.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.05.06 ESCALERAS 65,831.66
01.05.06.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESCALERAS 18,440.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.05.06.02 ACERO F'Y= 4200 KG/CM2 PARA ESCALERAS 9,971.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.05.06.03 CONCRETO F'C=210 KG/CM2 PARA ESCALERAS 37,419.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.06 TANQUE CISTERNA 64,777.91
01.06.01 EXCAVACION DE ZANJAS PARA CIMENTACION 2,738.86 0.00 0.00 2,738.86 0.00 0.00 0.00 0.00
01.06.02 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 889.89 0.00 0.00 0.00 0.00 0.00 889.89 0.00
01.06.03 SOLADO PARA ZAPATAS E=0.10 M. 1:10 CEMENTO - HORMIGON 289.53 0.00 0.00 289.53 0.00 0.00 0.00 0.00
01.06.04 ACERO F'Y= 4200 KG/CM2 PARA ZAPATAS 581.27 0.00 0.00 0.00 581.27 0.00 0.00 0.00
01.06.05 CONCRETO F'C=210 KG/CM2 PARA ZAPATAS 2,041.31 0.00 0.00 0.00 2,041.31 0.00 0.00 0.00
01.06.06 ACERO F'Y= 4200 KG/CM2 PARA COLUMNAS 4,301.61 0.00 0.00 0.00 3,584.68 716.93 0.00 0.00
01.06.07 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS 3,278.17 0.00 0.00 0.00 0.00 1,966.90 1,311.27 0.00
01.06.08 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS 1,901.00 0.00 0.00 0.00 0.00 475.25 1,425.75 0.00
01.06.09 ENCOFRADO Y DESENCOFRADO NORMAL PARA VIGAS 2,007.72 0.00 0.00 0.00 0.00 0.00 1,003.86 1,003.86
01.06.10 ACERO F'Y= 4200 KG/CM2 PARA VIGAS 3,065.73 0.00 0.00 0.00 0.00 0.00 0.00 3,065.73
01.06.11 CONCRETO F'C=210 KG/CM2 PARA VIGAS 1,380.31 0.00 0.00 0.00 0.00 0.00 0.00 1,380.31
01.06.12 ACERO F'Y= 4200 KG/CM2 PARA CISTERNA 5,076.96 0.00 0.00 0.00 0.00 0.00 5,076.96 0.00
01.06.13 ENCOFRADO Y DESENCOFRADO NORMAL PARA CISTERNA 3,718.82 0.00 0.00 0.00 0.00 1,859.41 1,859.41 0.00
01.06.14 CONCRETO F'C=210 KG/CM2 PARA CISTERNA 4,092.64 0.00 0.00 0.00 0.00 0.00 4,092.64 0.00
01.06.15 ACERO F'Y= 4200 KG/CM2 PARA TANQUE ELEVADO 4,880.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.06.16 ENCOFRADO Y DESENCOFRADO NORMAL PARA TANQUE ELEVADO 4,492.10 0.00 0.00 0.00 0.00 0.00 0.00 4,492.10
01.06.17 CONCRETO F'C=210 KG/CM2 PARA TANQUE ELEVADO 2,618.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.06.18 ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA ALIGERADA 453.94 0.00 0.00 0.00 0.00 0.00 453.94 0.00
01.06.19 BLOQUETA DE ARCILLA H=0.15 M. PARA LOSA ALIGERADA 182.52 0.00 0.00 0.00 0.00 0.00 182.52 0.00
01.06.20 ACERO F'Y= 4200 KG/CM2 PARA LOSA ALIGERADA 321.44 0.00 0.00 0.00 0.00 0.00 321.44 0.00
01.06.21 CONCRETO F'C=210 KG/CM2 PARA LOSA ALIGERADA 224.55 0.00 0.00 0.00 0.00 0.00 0.00 224.55
01.06.22 MURO DE SOGA CON LADRILLO K.K. 18H 9X13X24 CM. 2,287.88 0.00 0.00 0.00 0.00 0.00 0.00 2,287.88
01.06.23 TARRAJEO EN MUROS INTERIORES FROTACHADO MEZCLA 1:5 851.76 0.00 0.00 0.00 0.00 0.00 0.00 851.76
01.06.24 TARRAJEO INTERIOR CON IMPERMEABILIZANTE DE TANQUE CISTERNA 1,402.11 0.00 0.00 0.00 0.00 0.00 0.00 701.06
CRONOGRAMA DE OBRA V

MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE NIVEL PRIMARIO I.E.E. N°30318 DEL CENTRO P

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07
01.06.25 TARRAJEO INTERIOR CON IMPERMEABILIZANTE DE TANQUE ELEVADO 886.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.06.26 TARRAJEO EXTERIOR FROTACHADO DE ESTRUCTURA MEZCLA 1:5 4,004.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.06.27 PINTURA LATEX EN ESTRUCTURA DOS MANOS 1,975.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.06.28 INSTALACION DE ACCESORIOS DE TANQUE CISTERNA 2,112.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.06.29 INSTALACION DE PUERTA DE MADERA P-1 320.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.06.30 INSTALACION DE ESCALERA METALICA SEGUN DISEÑO 2,400.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.07 PRUEBAS Y ENSAYOS DE CALIDAD 3,820.00
01.07.01 PROCTOR MODIFICADO 160.00 0.00 0.00 0.00 0.00 160.00 0.00 0.00
01.07.02 DENSIDAD DE CAMPO 480.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.07.03 DISEÑO DE MEZCLA 540.00 0.00 0.00 0.00 462.86 77.14 0.00 0.00
01.07.04 ROTURA DE PROBETA (COMPRESION SIMPLE) 2,640.00 0.00 0.00 0.00 0.00 0.00 65.19 228.15
01.08 FLETE 1,600.00
01.08.01 FLETE TERRESTRE 1,600.00 119.15 119.15 119.15 119.15 119.15 119.15 119.15
02 ARQUITECTURA 743,584.58
02.01 MUROS Y TABIQUES 140,636.03
02.01.01 MURO DE SOGA CON LADRILLO K.K. 18H 9X13X24 CM. 140,051.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00
MURO DE CABEZA CON LADRILLO K.K. 18H 9X13X24 CM. 584.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02 REVOQUES, ENLUCIDOS Y MOLDURAS 217,896.67
02.02.01 TARRAJEO EN CIELO RASO FROTACHADO MEZCLA 1:4 62,875.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.02 TARRAJEO EN MUROS INTERIORES FROTACHADO MEZCLA 1:5 63,390.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.03 TARRAJEO EN MUROS EXTERIORES FROTACHADO MEZCLA 1:5 35,522.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.04 TARRAJEO EN VIGAS MEZCLA 1:4 27,465.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.05 TARRAJEO EN COLUMNAS MEZCLA 1:5 19,492.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.06 VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS MEZCLA 1:5 9,002.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.02.07 TARRAJEO DE PODIUM MEZCLA 1:5 147.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.03 PISOS Y PAVIMENTOS 111,696.25
02.03.01 PISO DE PORCELANATO ALTO TRANSITO ANTIDESLIZANTE PARA AMBIENTES 65,681.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.03.02 PISO DE PORCELANATO ALTO TRANSITO ANTIDESLIZANTE PARA VEREDAS 41,788.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.03.03 PISO DE CERAMICO ANTIDESLIZANTE DE ALTO TRANSITO 4,226.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.04 ZOCALOS Y CONTRAZOCALOS 28,505.27
02.04.01 CONTRAZOCALO DE PORCELANATO H=0.10 M. PARA AMBIENTES 11,652.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CRONOGRAMA DE OBRA V

MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE NIVEL PRIMARIO I.E.E. N°30318 DEL CENTRO P

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07
02.04.02 CONTRAZOCALO DE PORCELANATO H=0.10 M. PARA VEREDAS 11,342.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.04.03 CONTRAZOCALO DE CERAMICO H=0.10 M. 5,139.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.04.04 ZOCALO DE CERAMICO 370.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.05 CUBIERTAS 46,545.41
02.05.01 CUBIERTA DE TEJA ANDINA TIPO ETERNIT 46,545.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.06 CARPINTERIA DE MADERA 17,229.50
02.06.01 PUERTA APANELADA DE CEDRO TIPO P-01 INC. INSTALACION 7,810.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.06.02 PUERTA APANELADA DE CEDRO TIPO P-02 INC. INSTALACION 5,583.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.06.03 PUERTA APANELADA DE CEDRO TIPO P-03 INC. INSTALACION 3,836.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.07 CARPINTERIA METALICA 24,910.00
02.07.01 PORTON METALICO PM-01 INC. PINTADO E INSTALACION 860.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.07.02 VENTANA METALICA V-01 INC. PINTADO E INSTALACION 1,120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.07.03 VENTANA METALICA V-02 INC. PINTADO E INSTALACION 4,830.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.07.04 VENTANA METALICA V-03 INC. PINTADO E INSTALACION 2,200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.07.05 VENTANA METALICA V-04 INC. PINTADO E INSTALACION 1,120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.07.06 VENTANA METALICA V-05 INC. PINTADO E INSTALACION 4,830.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.07.07 VENTANA METALICA V-06 INC. PINTADO E INSTALACION 3,520.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.07.08 VENTANA METALICA V-07 INC. PINTADO E INSTALACION 1,140.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.07.09 VENTANA METALICA V-08 INC. PINTADO E INSTALACION 5,290.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.08 CARPINTERIA EN MELAMINA 5,580.00
02.08.01 SEPARADOR DE BAÑOS TIPO 01 5,580.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.09 CERRAJERIA 7,251.54
02.09.01 CERRADURA PARA PUERTA DE TRES GOLPES 4,796.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.09.02 CERRADURA PARA PUERTA TIPO PERILLA 2,454.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.10 VIDRIOS, CRISTALES Y SIMILARES 41,997.06
02.10.01 VIDRIO LAMINAR BUTIRAL DE POLIVINILO INCOLORO 41,997.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.11 PINTURAS 90,207.74
02.11.01 PINTURA LATEX EN CIELO RASO DOS MANOS 22,833.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.11.02 PINTURA LATEX EN MUROS EXTERIORES DOS MANOS 17,654.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.11.03 PINTURA LATEX EN MUROS INTERIORES DOS MANOS 30,153.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.11.04 PINTURA LATEX EN VIGAS DOS MANOS 10,154.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CRONOGRAMA DE OBRA V

MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE NIVEL PRIMARIO I.E.E. N°30318 DEL CENTRO P

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07
02.11.05 PINTURA LATEX EN COLUMNAS DOS MANOS 7,342.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.11.06 PINTURA LATEX PARA DERRAMES EN PUERTAS Y VENTANAS DOS MANOS 1,560.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.11.07 PINTURA PARA PIZARRA 510.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.12 JUNTAS 11,129.11
02.12.01 JUNTAS ASFALTICAS EN VEREDAS 2,066.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.12.02 JUNTAS ASFALTICAS PARA SARDINEL DE JARDIN 91.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.12.03 JUNTAS ASFALTICAS PARA COLUMNETAS 8,971.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03 INSTALACIONES SANITARIAS 58,301.24
03.01 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO 8,682.61
03.01.01 MOVIMIENTO DE TIERRAS 1,649.41
03.01.01.01 EXCAVACION DE ZANJAS PARA TUBERIA DE AGUA 937.63 0.00 0.00 0.00 0.00 937.63 0.00 0.00
03.01.01.02 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 681.36 0.00 0.00 0.00 0.00 0.00 596.19 85.17
03.01.01.03 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 30.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.01.02 SALIDAS 2,360.13
03.01.02.01 SALIDA DE AGUA FRIA PVC SAP DE 1/2" 2,254.32 0.00 0.00 0.00 0.00 0.00 120.77 281.79
03.01.02.02 SALIDA DE AGUA PARA RIEGO PVC SAP DE 1/2" 56.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.01.02.03 SALIDA DE AGUA FRIA CONTRA INCENDIO PVC SAP DE 2" 49.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.01.03 RED DE DISTRIBUCION 4,673.07
03.01.03.01 TUBERIA PARA AGUA POTABLE PVC SAP DE 1/2" C-10 2,106.15 0.00 0.00 0.00 0.00 0.00 0.00 254.19
03.01.03.02 TUBERIA PARA RIEGO PVC SAP DE 1/2" C-10 72.72 0.00 0.00 0.00 0.00 0.00 0.00 72.72
03.01.03.03 TUBERIA CONTRA INCENDIO PVC SAP DE 2" C-10 80.28 0.00 0.00 0.00 0.00 0.00 0.00 80.28
03.01.03.04 VALVULA DE COMPUERTA DE 1/2" 1,834.94 0.00 0.00 0.00 0.00 0.00 0.00 65.53
03.01.03.05 VALVULA DE COMPUERTA DE 2" 127.03 0.00 0.00 0.00 0.00 0.00 0.00 2.23
03.01.03.06 GRIFO CONTRA INCENDIO 451.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.02 SISTEMA DE DESAGUE 19,414.41
03.02.01 MOVIMIENTO DE TIERRAS 1,805.63
03.02.01.01 EXCAVACION DE ZANJAS PARA TUBERIA DE DESAGUE 1,045.58 0.00 0.00 0.00 0.00 0.00 0.00 1,045.58
03.02.01.02 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 703.40 0.00 0.00 0.00 0.00 0.00 0.00 351.70
03.02.01.03 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 56.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.02.02 SALIDAS 5,996.34
03.02.02.01 SALIDA DE DESAGUE CON PVC SAL DE 2" 2,613.30 0.00 0.00 0.00 0.00 0.00 0.00 190.06
CRONOGRAMA DE OBRA V

MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE NIVEL PRIMARIO I.E.E. N°30318 DEL CENTRO P

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07
03.02.02.02 SALIDA DE DESAGUE CON PVC SAL DE 4" 1,461.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.02.02.03 SALIDA DE VENTILACION CON PVC SAL DE 2" 1,921.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.02.03 RED DE DISTRIBUCION 11,612.44
03.02.03.01 TUBERIA PARA DESAGUE CON PVC SAL DE 2" 1,038.11 0.00 0.00 0.00 0.00 0.00 0.00 72.85
03.02.03.02 TUBERIA PARA DESAGUE CON PVC SAL DE 4" 5,387.78 0.00 0.00 0.00 0.00 0.00 0.00 96.21
03.02.03.03 TUBERIA PARA VENTILACION CON PVC SAL DE 2" 2,348.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00
TUBERIA PARA CAJA DE REGISTRO CON PVC SAL DE 2" 2,837.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.03 SISTEMA DE DESAGUE PLUVIAL 15,728.96
03.03.01 TUBERIA PVC SAL PLUVIAL DE 4" 4,216.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.03.02 TUBERIA PVC SAL PLUVIAL DE 3" 1,789.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.03.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA FALSA COLUMNA 5,450.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.03.04 CONCRETO F'C=175 KG/CM2 PARA FALSA COLUMNA 3,930.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.03.05 ACCESORIOS PARA DESAGUE PLUVIAL 341.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.04 APARATOS Y ACCESORIOS SANITARIOS 14,475.26
03.04.01 INODORO DE LOSA TANQUE BAJO 5,908.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.04.02 LAVATORIO DE LOSA CON PEDESTAL 4,385.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.04.03 PAPELERA DE LOSA 1,190.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.04.04 SUMIDERO DE BRONCE ROSCADO DE 2" 985.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.04.05 REGISTRO ROSCADO DE BRONCE DE 4" 1,381.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.04.06 CAJA DE REGISTRO PARA DESAGUE DE 624.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04 INSTALACIONES ELECTRICAS 110,524.39
04.01 PRIMER PISO 64,859.19
04.01.01 SALIDAS 13,513.89
04.01.01.01 SALIDAD DE TECHO PARA CENTRO DE LUZ 6,566.30 0.00 0.00 0.00 0.00 0.00 0.00 1,094.38
04.01.01.02 SALIDA DE TOMACORRIENTE BIPOLARES CON LINEA A TIERRA 4,391.95 0.00 0.00 0.00 0.00 0.00 0.00 548.99
04.01.01.03 SALIDA DE TOMACORRIENTE PARA ALUMBRADO DE EMERGENCIA 363.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.01.01.04 SALIDA PARA INTERRUPTORES EN CONMUTACION 1,057.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.01.01.05 SALIDA PARA INTERRUPTORES SIMPLES 298.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.01.01.06 SALIDA PARA INTERRUPTORES DOBLES 248.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.01.01.07 SALIDA PARA INTERRUPTORES TRIPLES 587.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.01.02 CANALIZACION DE TUBERIAS PVC 20,053.08
CRONOGRAMA DE OBRA V

MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE NIVEL PRIMARIO I.E.E. N°30318 DEL CENTRO P

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07
04.01.02.01 TUBERIA DE 25 MM. PVC SEL (1") 4,054.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.01.02.02 TUBERIA DE 20 MM. PVC SEL (3/4") 15,998.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.01.03 CONDUCTORES 8,301.84
04.01.03.01 CONDUCTOR (2x10+1x10) MM. THHW 358.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.01.03.02 CONDUCTOR (1x10) MM2. THHW 146.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.01.03.03 CONDUCTOR (2x6+1x10) MM2 THHW 975.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.01.03.04 CONDUCTOR (2x2.5) MM2. THHW 4,612.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.01.03.05 CONDUCTOR (2x4.0) MM2. THHW 2,209.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.01.04 TABLEROS ELECTRICOS 4,700.00
04.01.04.01 TABLERO GENERAL Y TABLEROS DE DISTRIBUCION 4,700.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.01.05 CONEXION A TIERRA 5,600.00
04.01.05.01 POZO A TIERRA 5,600.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.01.06 ARTEFACTOS Y ACCESORIOS ELECTRICOS 11,490.39
04.01.06.01 FLUORESCENTE RECTO INCLUYE EQUIPO Y PANTALLA 7,678.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.01.06.02 SPOT LIGHT 656.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.01.06.03 LUCES DE EMERGENCIA CON BATERIA - 02 FAROS 637.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.01.06.04 TOMACORRIENTE BIPOLAR 1,779.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.01.06.05 TOMACORRIENTE SIMPLE 125.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.01.06.06 INTERRUPTOR CONMUTACION 210.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.01.06.07 INTERRUPTOR SIMPLE 107.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.01.06.08 INTERRUPTOR DOBLE 94.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.01.06.09 INTERRUPTOR TRIPLE 201.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.01.07 OTROS 1,199.99
04.01.07.02 DISPOSITIVOS Y EQUIPOS DE SEGURIDAD 1,199.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.02 SEGUNDO PISO 45,665.20
04.02.01 SALIDAS 13,605.84
04.02.01.01 SALIDAD DE TECHO PARA CENTRO DE LUZ 6,212.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.02.01.02 SALIDA DE TOMACORRIENTE BIPOLARES CON LINEA A TIERRA 5,218.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.02.01.03 SALIDA DE TOMACORRIENTE PARA ALUMBRADO DE EMERGENCIA 303.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.02.01.04 SALIDA PARA INTERRUPTORES EN CONMUTACION 704.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CRONOGRAMA DE OBRA V

MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE NIVEL PRIMARIO I.E.E. N°30318 DEL CENTRO P

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07
04.02.01.05 SALIDA PARA INTERRUPTORES SIMPLES 298.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.02.01.06 SALIDA PARA INTERRUPTORES DOBLES 398.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.02.01.07 SALIDA PARA INTERRUPTORES TRIPLES 469.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.02.02 CANALIZACION DE TUBERIAS PVC 13,965.19
04.02.02.01 TUBERIA DE 20 MM. PVC SEL (3/4") 13,965.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.02.03 CONDUCTORES 6,384.59
04.02.03.01 CONDUCTOR (2x2.5) MM2. THHW 3,370.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.02.03.02 CONDUCTOR (2x4.0) MM2. THHW 3,014.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.02.04 ARTEFACTOS Y ACCESORIOS ELECTRICOS 11,709.58
04.02.04.01 FLUORESCENTE RECTO INCLUYE EQUIPO Y PANTALLA 8,432.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.02.04.02 LUCES DE EMERGENCIA CON BATERIA - 02 FAROS 637.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.02.04.03 TOMACORRIENTE BIPOLAR 1,779.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.02.04.04 TOMACORRIENTE SIMPLE 104.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.02.04.05 INTERRUPTOR CONMUTACION 336.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.02.04.06 INTERRUPTOR SIMPLE 107.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.02.04.07 INTERRUPTOR DOBLE 150.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.02.04.08 INTERRUPTOR TRIPLE 161.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00

COSTO DIRECTO 1,990,094.42 58,567.27 11,285.64 13,235.59 13,954.08 22,199.07 56,029.55 88,256.67
GASTOS GENERALES 10.00% 199,009.44 5,856.73 1,128.56 1,323.56 1,395.41 2,219.91 5,602.96 8,825.67
UTILIDAD 10.00% 199,009.44 5,856.73 1,128.56 1,323.56 1,395.41 2,219.91 5,602.96 8,825.67
SUB TOTAL 2,388,113.30 70,280.73 13,542.76 15,882.71 16,744.90 26,638.89 67,235.47 105,908.01
IGV 18.00% 429,860.39 12,650.53 2,437.70 2,858.89 3,014.08 4,795.00 12,102.38 19,063.44
PRESUPUESTO PARCIAL 2,817,973.69 82,931.26 15,980.46 18,741.60 19,758.98 31,433.89 79,337.85 124,971.45
PORCENTAJE DE AVANCE 2.94% 0.57% 0.67% 0.70% 1.12% 2.82% 4.43%
PORCENTAJE DE AVANCE ACUMULADO 100.00% 4.88%
CRONOGRAMA DE OBRA V

MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE NIVEL PRIMARIO I.E.E. N°30318 DEL CENTRO P

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
BLOQUE AB - YANAMUCLO 1,990,094.42
01 ESTRUCTURAS 1,077,684.21 MES 01 MES 02
01.01 OBRAS PROVISIONALES 44,569.85
01.01.01 CONSTRUCCION PROVISIONAL DE OFICINA 384.00 384.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.02 CONSTRUCCION PROVISIONAL DE CASETA PARA GUARDIANIA 144.00 144.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.03 CONSTRUCCION PROVISIONAL DE VESTIDOR PARA PERSONAL 480.00 480.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.04 GUARDIANIA DE OBRA 37,785.60 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.4
01.01.05 ALQUILER DE ALMACEN 1,440.00 56.00 56.00 56.00 56.00 56.00 56.00 56.00 56.0
01.01.06 CARTEL DE IDENTIFICACION DE OBRA (3.60x2.40) 856.25 0.00 856.25 0.00 0.00 0.00 0.00 0.00 0.0
01.01.07 AGUA PARA CONSUMO EN LA CONSTRUCCION 1,080.00 42.00 42.00 42.00 42.00 42.00 42.00 42.00 42.0
01.01.08 DESAGUE PARA LA CONSTRUCCION 750.00 0.00 750.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.09 ENERGIA ELECTRICA PROVISIONAL PARA LA CONSTRUCCION 1,650.00 64.17 64.17 64.17 64.17 64.17 64.17 64.17 64.1
01.02 TRABAJOS PRELIMINARES 66,669.81
01.02.01 DEMOLICION DE CONSTRUCCION EXISTENTE 46,142.30 46,142.30 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.02.02 ELIMINACION DE CONSTRUCCION DEMOLIDA DP=2 KM. 8,433.24 6,324.93 2,108.31 0.00 0.00 0.00 0.00 0.00 0.0
01.02.03 LIMPIEZA DEL TERRENO MANUAL 3,218.46 0.00 3,218.46 0.00 0.00 0.00 0.00 0.00 0.0
01.02.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS 2,500.00 2,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.02.05 TRAZO, NIVELACION Y REPLANTEO PARA EDIFICACION 2,770.32 0.00 1,007.39 1,762.93 0.00 0.00 0.00 0.00 0.0
01.02.06 CONTROL TOPOGRAFICO DURANTE EJECUCION DE OBRA 3,605.49 841.28 841.28 841.28 841.28 240.37 0.00 0.00 0.0
01.03 MOVIMIENTO DE TIERRAS 32,782.10
01.03.01 EXCAVACION DE ZANJAS PARA ZAPATAS H=1.20 - 1.50 M. 9,038.33 0.00 753.19 5,272.36 3,012.78 0.00 0.00 0.00 0.0
01.03.02 EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS 2,632.52 0.00 0.00 548.44 767.82 767.82 548.44 0.00 0.0
01.03.03 EXCAVACION DE ZANJAS PARA JARDIN 31.43 0.00 0.00 31.43 0.00 0.00 0.00 0.00 0.0
01.03.04 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 4,776.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,776.2
01.03.05 REFINE, NIVELACION Y COMPACTACION DE PLATAFORMA 4,486.78 0.00 0.00 0.00 0.00 0.00 560.85 3,925.93 0.0
01.03.06 REFINE, NIVELACION Y COMPACTACION DE BASE PARA VEREDAS 6,019.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,019.8
01.03.07 RELLENO Y COMPACTACION DE PODIUM CON MATERIAL PROPIO 301.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 301.5
01.03.08 ACARREO INTERNO DE MATERIAL EXCEDENTE DP=20 M. 2,694.29 0.00 0.00 0.00 0.00 0.00 0.00 1,347.15 1,347.1
01.03.09 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 2,801.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.04 OBRAS DE CONCRETO SIMPLE 90,690.96
CRONOGRAMA DE OBRA V

MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE NIVEL PRIMARIO I.E.E. N°30318 DEL CENTRO P

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.04.01 SOLADO PARA ZAPATAS E=0.10 M. 1:10 CEMENTO - HORMIGON 5,467.93 0.00 0.00 0.00 911.32 3,189.63 1,366.98 0.00 0.0
01.04.02 CONCRETO 1:10+30% P.G. PARA CIMIENTOS CORRIDOS 21,485.78 0.00 0.00 0.00 0.00 8,057.17 9,400.03 4,028.58 0.0
01.04.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO 6,829.64 0.00 0.00 0.00 0.00 0.00 2,276.55 3,983.96 569.1
01.04.04 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS 3,042.44 0.00 0.00 0.00 0.00 0.00 0.00 1,521.22 1,521.2
01.04.05 FALSO PISO DE CONCRETO E=0.10 M. CEMENTO - HORMIGON 16,168.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9,701.1
01.04.06 ENCOFRADO Y DESENCOFRADO NORMAL PARA VEREDAS 4,000.12 0.00 0.00 0.00 0.00 2,000.06 2,000.06 0.00 0.0
01.04.07 CONCRETO F'C=140 KG/CM2 PARA VEREDAS INCLUYE ACABADOS 19,168.71 0.00 0.00 0.00 0.00 0.00 5,750.61 13,418.10 0.0
01.04.08 ENCOFRADO Y DESENCOFRADO NORMAL PARA CUNETAS 3,648.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,648.2
01.04.09 CONCRETO F'C=140 KG/CM2 PARA CUNETAS INCLUYE ACABADOS 4,971.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,142.8
01.04.10 ENCOFRADO Y DESENCOFRADO NORMAL PARA JARDIN 3,281.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,460.7
01.04.11 CONCRETO F'C=140 KG/CM2 PARA JARDIN 2,627.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 656.7
01.05 OBRAS DE CONCRETO ARMADO 772,773.58
01.05.01 ZAPATAS 49,980.45
01.05.01.01 ACERO F'Y= 4200 KG/CM2 PARA ZAPATAS 11,429.97 0.00 0.00 0.00 0.00 0.00 10,001.22 1,428.75 0.0
01.05.01.02 CONCRETO F'C=210 KG/CM2 PARA ZAPATAS 38,550.48 0.00 0.00 0.00 0.00 0.00 0.00 23,130.29 15,420.1
01.05.02 COLUMNAS 113,702.39
01.05.02.01 ACERO F'Y= 4200 KG/CM2 PARA COLUMNAS 43,524.40 0.00 0.00 0.00 0.00 0.00 4,974.22 8,704.88 8,704.8
01.05.02.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS 47,502.09 0.00 0.00 0.00 0.00 0.00 0.00 3,064.65 10,726.2
01.05.02.03 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS 22,675.90 0.00 0.00 0.00 0.00 0.00 0.00 2,451.45 4,290.0
01.05.03 COLUMNETAS 43,559.15
01.05.03.01 ACERO F'Y= 4200 KG/CM2 PARA COLUMNETAS 13,992.87 0.00 0.00 0.00 0.00 0.00 0.00 1,023.87 2,389.0
01.05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNETAS 20,137.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,179.6
01.05.03.03 CONCRETO F'C=175 KG/CM2 PARA COLUMNETAS 9,428.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 764.4
01.05.04 VIGAS 210,855.32
01.05.04.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA VIGAS 79,074.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.04.02 ACERO F'Y= 4200 KG/CM2 PARA VIGAS 84,562.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.04.03 CONCRETO F'C=210 KG/CM2 PARA VIGAS 47,218.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05 LOSA ALIGERADA 288,844.61
01.05.05.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA ALIGERADA 134,294.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.02 BLOQUETA DE ARCILLA H=0.15 M. PARA LOSA ALIGERADA 21,223.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.03 BLOQUETA DE ARCILLA H=0.12 M. PARA LOSA ALIGERADA 21,181.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA V

MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE NIVEL PRIMARIO I.E.E. N°30318 DEL CENTRO P

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.05.05.04 ACERO F'Y= 4200 KG/CM2 PARA LOSA ALIGERADA 57,235.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.05 CONCRETO F'C=210 KG/CM2 PARA LOSA ALIGERADA 54,910.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06 ESCALERAS 65,831.66
01.05.06.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESCALERAS 18,440.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06.02 ACERO F'Y= 4200 KG/CM2 PARA ESCALERAS 9,971.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06.03 CONCRETO F'C=210 KG/CM2 PARA ESCALERAS 37,419.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.06 TANQUE CISTERNA 64,777.91
01.06.01 EXCAVACION DE ZANJAS PARA CIMENTACION 2,738.86 0.00 0.00 2,738.86 0.00 0.00 0.00 0.00 0.0
01.06.02 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 889.89 0.00 0.00 0.00 0.00 0.00 889.89 0.00 0.0
01.06.03 SOLADO PARA ZAPATAS E=0.10 M. 1:10 CEMENTO - HORMIGON 289.53 0.00 0.00 289.53 0.00 0.00 0.00 0.00 0.0
01.06.04 ACERO F'Y= 4200 KG/CM2 PARA ZAPATAS 581.27 0.00 0.00 0.00 581.27 0.00 0.00 0.00 0.0
01.06.05 CONCRETO F'C=210 KG/CM2 PARA ZAPATAS 2,041.31 0.00 0.00 0.00 2,041.31 0.00 0.00 0.00 0.0
01.06.06 ACERO F'Y= 4200 KG/CM2 PARA COLUMNAS 4,301.61 0.00 0.00 0.00 3,584.68 716.93 0.00 0.00 0.0
01.06.07 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS 3,278.17 0.00 0.00 0.00 0.00 1,966.90 1,311.27 0.00 0.0
01.06.08 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS 1,901.00 0.00 0.00 0.00 0.00 475.25 1,425.75 0.00 0.0
01.06.09 ENCOFRADO Y DESENCOFRADO NORMAL PARA VIGAS 2,007.72 0.00 0.00 0.00 0.00 0.00 1,003.86 1,003.86 0.0
01.06.10 ACERO F'Y= 4200 KG/CM2 PARA VIGAS 3,065.73 0.00 0.00 0.00 0.00 0.00 0.00 3,065.73 0.0
01.06.11 CONCRETO F'C=210 KG/CM2 PARA VIGAS 1,380.31 0.00 0.00 0.00 0.00 0.00 0.00 1,380.31 0.0
01.06.12 ACERO F'Y= 4200 KG/CM2 PARA CISTERNA 5,076.96 0.00 0.00 0.00 0.00 0.00 5,076.96 0.00 0.0
01.06.13 ENCOFRADO Y DESENCOFRADO NORMAL PARA CISTERNA 3,718.82 0.00 0.00 0.00 0.00 1,859.41 1,859.41 0.00 0.0
01.06.14 CONCRETO F'C=210 KG/CM2 PARA CISTERNA 4,092.64 0.00 0.00 0.00 0.00 0.00 4,092.64 0.00 0.0
01.06.15 ACERO F'Y= 4200 KG/CM2 PARA TANQUE ELEVADO 4,880.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,880.2
01.06.16 ENCOFRADO Y DESENCOFRADO NORMAL PARA TANQUE ELEVADO 4,492.10 0.00 0.00 0.00 0.00 0.00 0.00 4,492.10 0.0
01.06.17 CONCRETO F'C=210 KG/CM2 PARA TANQUE ELEVADO 2,618.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,618.4
01.06.18 ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA ALIGERADA 453.94 0.00 0.00 0.00 0.00 0.00 453.94 0.00 0.0
01.06.19 BLOQUETA DE ARCILLA H=0.15 M. PARA LOSA ALIGERADA 182.52 0.00 0.00 0.00 0.00 0.00 182.52 0.00 0.0
01.06.20 ACERO F'Y= 4200 KG/CM2 PARA LOSA ALIGERADA 321.44 0.00 0.00 0.00 0.00 0.00 321.44 0.00 0.0
01.06.21 CONCRETO F'C=210 KG/CM2 PARA LOSA ALIGERADA 224.55 0.00 0.00 0.00 0.00 0.00 0.00 224.55 0.0
01.06.22 MURO DE SOGA CON LADRILLO K.K. 18H 9X13X24 CM. 2,287.88 0.00 0.00 0.00 0.00 0.00 0.00 2,287.88 0.0
01.06.23 TARRAJEO EN MUROS INTERIORES FROTACHADO MEZCLA 1:5 851.76 0.00 0.00 0.00 0.00 0.00 0.00 851.76 0.0
01.06.24 TARRAJEO INTERIOR CON IMPERMEABILIZANTE DE TANQUE CISTERNA 1,402.11 0.00 0.00 0.00 0.00 0.00 0.00 701.06 701.0
CRONOGRAMA DE OBRA V

MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE NIVEL PRIMARIO I.E.E. N°30318 DEL CENTRO P

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.06.25 TARRAJEO INTERIOR CON IMPERMEABILIZANTE DE TANQUE ELEVADO 886.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 886.6
01.06.26 TARRAJEO EXTERIOR FROTACHADO DE ESTRUCTURA MEZCLA 1:5 4,004.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,004.0
01.06.27 PINTURA LATEX EN ESTRUCTURA DOS MANOS 1,975.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.06.28 INSTALACION DE ACCESORIOS DE TANQUE CISTERNA 2,112.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,112.3
01.06.29 INSTALACION DE PUERTA DE MADERA P-1 320.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 320.0
01.06.30 INSTALACION DE ESCALERA METALICA SEGUN DISEÑO 2,400.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,400.0
01.07 PRUEBAS Y ENSAYOS DE CALIDAD 3,820.00
01.07.01 PROCTOR MODIFICADO 160.00 0.00 0.00 0.00 0.00 160.00 0.00 0.00 0.0
01.07.02 DENSIDAD DE CAMPO 480.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.7
01.07.03 DISEÑO DE MEZCLA 540.00 0.00 0.00 0.00 462.86 77.14 0.00 0.00 0.0
01.07.04 ROTURA DE PROBETA (COMPRESION SIMPLE) 2,640.00 0.00 0.00 0.00 0.00 0.00 65.19 228.15 228.1
01.08 FLETE 1,600.00
01.08.01 FLETE TERRESTRE 1,600.00 119.15 119.15 119.15 119.15 119.15 119.15 119.15 119.1
02 ARQUITECTURA 743,584.58
02.01 MUROS Y TABIQUES 140,636.03
02.01.01 MURO DE SOGA CON LADRILLO K.K. 18H 9X13X24 CM. 140,051.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
MURO DE CABEZA CON LADRILLO K.K. 18H 9X13X24 CM. 584.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02 REVOQUES, ENLUCIDOS Y MOLDURAS 217,896.67
02.02.01 TARRAJEO EN CIELO RASO FROTACHADO MEZCLA 1:4 62,875.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.02 TARRAJEO EN MUROS INTERIORES FROTACHADO MEZCLA 1:5 63,390.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.03 TARRAJEO EN MUROS EXTERIORES FROTACHADO MEZCLA 1:5 35,522.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.04 TARRAJEO EN VIGAS MEZCLA 1:4 27,465.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.05 TARRAJEO EN COLUMNAS MEZCLA 1:5 19,492.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.06 VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS MEZCLA 1:5 9,002.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.07 TARRAJEO DE PODIUM MEZCLA 1:5 147.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03 PISOS Y PAVIMENTOS 111,696.25
02.03.01 PISO DE PORCELANATO ALTO TRANSITO ANTIDESLIZANTE PARA AMBIENTES 65,681.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03.02 PISO DE PORCELANATO ALTO TRANSITO ANTIDESLIZANTE PARA VEREDAS 41,788.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03.03 PISO DE CERAMICO ANTIDESLIZANTE DE ALTO TRANSITO 4,226.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04 ZOCALOS Y CONTRAZOCALOS 28,505.27
02.04.01 CONTRAZOCALO DE PORCELANATO H=0.10 M. PARA AMBIENTES 11,652.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA V

MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE NIVEL PRIMARIO I.E.E. N°30318 DEL CENTRO P

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
02.04.02 CONTRAZOCALO DE PORCELANATO H=0.10 M. PARA VEREDAS 11,342.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04.03 CONTRAZOCALO DE CERAMICO H=0.10 M. 5,139.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04.04 ZOCALO DE CERAMICO 370.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.05 CUBIERTAS 46,545.41
02.05.01 CUBIERTA DE TEJA ANDINA TIPO ETERNIT 46,545.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06 CARPINTERIA DE MADERA 17,229.50
02.06.01 PUERTA APANELADA DE CEDRO TIPO P-01 INC. INSTALACION 7,810.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06.02 PUERTA APANELADA DE CEDRO TIPO P-02 INC. INSTALACION 5,583.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06.03 PUERTA APANELADA DE CEDRO TIPO P-03 INC. INSTALACION 3,836.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07 CARPINTERIA METALICA 24,910.00
02.07.01 PORTON METALICO PM-01 INC. PINTADO E INSTALACION 860.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.02 VENTANA METALICA V-01 INC. PINTADO E INSTALACION 1,120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.03 VENTANA METALICA V-02 INC. PINTADO E INSTALACION 4,830.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.04 VENTANA METALICA V-03 INC. PINTADO E INSTALACION 2,200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.05 VENTANA METALICA V-04 INC. PINTADO E INSTALACION 1,120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.06 VENTANA METALICA V-05 INC. PINTADO E INSTALACION 4,830.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.07 VENTANA METALICA V-06 INC. PINTADO E INSTALACION 3,520.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.08 VENTANA METALICA V-07 INC. PINTADO E INSTALACION 1,140.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.09 VENTANA METALICA V-08 INC. PINTADO E INSTALACION 5,290.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.08 CARPINTERIA EN MELAMINA 5,580.00
02.08.01 SEPARADOR DE BAÑOS TIPO 01 5,580.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.09 CERRAJERIA 7,251.54
02.09.01 CERRADURA PARA PUERTA DE TRES GOLPES 4,796.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.09.02 CERRADURA PARA PUERTA TIPO PERILLA 2,454.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.10 VIDRIOS, CRISTALES Y SIMILARES 41,997.06
02.10.01 VIDRIO LAMINAR BUTIRAL DE POLIVINILO INCOLORO 41,997.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11 PINTURAS 90,207.74
02.11.01 PINTURA LATEX EN CIELO RASO DOS MANOS 22,833.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.02 PINTURA LATEX EN MUROS EXTERIORES DOS MANOS 17,654.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.03 PINTURA LATEX EN MUROS INTERIORES DOS MANOS 30,153.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.04 PINTURA LATEX EN VIGAS DOS MANOS 10,154.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA V

MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE NIVEL PRIMARIO I.E.E. N°30318 DEL CENTRO P

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
02.11.05 PINTURA LATEX EN COLUMNAS DOS MANOS 7,342.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.06 PINTURA LATEX PARA DERRAMES EN PUERTAS Y VENTANAS DOS MANOS 1,560.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.07 PINTURA PARA PIZARRA 510.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12 JUNTAS 11,129.11
02.12.01 JUNTAS ASFALTICAS EN VEREDAS 2,066.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12.02 JUNTAS ASFALTICAS PARA SARDINEL DE JARDIN 91.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12.03 JUNTAS ASFALTICAS PARA COLUMNETAS 8,971.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03 INSTALACIONES SANITARIAS 58,301.24
03.01 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO 8,682.61
03.01.01 MOVIMIENTO DE TIERRAS 1,649.41
03.01.01.01 EXCAVACION DE ZANJAS PARA TUBERIA DE AGUA 937.63 0.00 0.00 0.00 0.00 937.63 0.00 0.00 0.0
03.01.01.02 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 681.36 0.00 0.00 0.00 0.00 0.00 596.19 85.17 0.0
03.01.01.03 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 30.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.01.02 SALIDAS 2,360.13
03.01.02.01 SALIDA DE AGUA FRIA PVC SAP DE 1/2" 2,254.32 0.00 0.00 0.00 0.00 0.00 120.77 281.79 281.7
03.01.02.02 SALIDA DE AGUA PARA RIEGO PVC SAP DE 1/2" 56.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 56.6
03.01.02.03 SALIDA DE AGUA FRIA CONTRA INCENDIO PVC SAP DE 2" 49.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 49.1
03.01.03 RED DE DISTRIBUCION 4,673.07
03.01.03.01 TUBERIA PARA AGUA POTABLE PVC SAP DE 1/2" C-10 2,106.15 0.00 0.00 0.00 0.00 0.00 0.00 254.19 254.1
03.01.03.02 TUBERIA PARA RIEGO PVC SAP DE 1/2" C-10 72.72 0.00 0.00 0.00 0.00 0.00 0.00 72.72 0.0
03.01.03.03 TUBERIA CONTRA INCENDIO PVC SAP DE 2" C-10 80.28 0.00 0.00 0.00 0.00 0.00 0.00 80.28 0.0
03.01.03.04 VALVULA DE COMPUERTA DE 1/2" 1,834.94 0.00 0.00 0.00 0.00 0.00 0.00 65.53 229.3
03.01.03.05 VALVULA DE COMPUERTA DE 2" 127.03 0.00 0.00 0.00 0.00 0.00 0.00 2.23 15.6
03.01.03.06 GRIFO CONTRA INCENDIO 451.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02 SISTEMA DE DESAGUE 19,414.41
03.02.01 MOVIMIENTO DE TIERRAS 1,805.63
03.02.01.01 EXCAVACION DE ZANJAS PARA TUBERIA DE DESAGUE 1,045.58 0.00 0.00 0.00 0.00 0.00 0.00 1,045.58 0.0
03.02.01.02 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 703.40 0.00 0.00 0.00 0.00 0.00 0.00 351.70 351.7
03.02.01.03 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 56.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02.02 SALIDAS 5,996.34
03.02.02.01 SALIDA DE DESAGUE CON PVC SAL DE 2" 2,613.30 0.00 0.00 0.00 0.00 0.00 0.00 190.06 332.6
CRONOGRAMA DE OBRA V

MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE NIVEL PRIMARIO I.E.E. N°30318 DEL CENTRO P

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
03.02.02.02 SALIDA DE DESAGUE CON PVC SAL DE 4" 1,461.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 91.3
03.02.02.03 SALIDA DE VENTILACION CON PVC SAL DE 2" 1,921.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02.03 RED DE DISTRIBUCION 11,612.44
03.02.03.01 TUBERIA PARA DESAGUE CON PVC SAL DE 2" 1,038.11 0.00 0.00 0.00 0.00 0.00 0.00 72.85 127.4
03.02.03.02 TUBERIA PARA DESAGUE CON PVC SAL DE 4" 5,387.78 0.00 0.00 0.00 0.00 0.00 0.00 96.21 673.4
03.02.03.03 TUBERIA PARA VENTILACION CON PVC SAL DE 2" 2,348.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 132.9
TUBERIA PARA CAJA DE REGISTRO CON PVC SAL DE 2" 2,837.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03 SISTEMA DE DESAGUE PLUVIAL 15,728.96
03.03.01 TUBERIA PVC SAL PLUVIAL DE 4" 4,216.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.02 TUBERIA PVC SAL PLUVIAL DE 3" 1,789.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA FALSA COLUMNA 5,450.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.04 CONCRETO F'C=175 KG/CM2 PARA FALSA COLUMNA 3,930.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.05 ACCESORIOS PARA DESAGUE PLUVIAL 341.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04 APARATOS Y ACCESORIOS SANITARIOS 14,475.26
03.04.01 INODORO DE LOSA TANQUE BAJO 5,908.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.02 LAVATORIO DE LOSA CON PEDESTAL 4,385.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.03 PAPELERA DE LOSA 1,190.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.04 SUMIDERO DE BRONCE ROSCADO DE 2" 985.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.05 REGISTRO ROSCADO DE BRONCE DE 4" 1,381.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.06 CAJA DE REGISTRO PARA DESAGUE DE 624.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04 INSTALACIONES ELECTRICAS 110,524.39
04.01 PRIMER PISO 64,859.19
04.01.01 SALIDAS 13,513.89
04.01.01.01 SALIDAD DE TECHO PARA CENTRO DE LUZ 6,566.30 0.00 0.00 0.00 0.00 0.00 0.00 1,094.38 1,915.1
04.01.01.02 SALIDA DE TOMACORRIENTE BIPOLARES CON LINEA A TIERRA 4,391.95 0.00 0.00 0.00 0.00 0.00 0.00 548.99 1,921.4
04.01.01.03 SALIDA DE TOMACORRIENTE PARA ALUMBRADO DE EMERGENCIA 363.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.01.04 SALIDA PARA INTERRUPTORES EN CONMUTACION 1,057.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.01.05 SALIDA PARA INTERRUPTORES SIMPLES 298.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 298.5
04.01.01.06 SALIDA PARA INTERRUPTORES DOBLES 248.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.4
04.01.01.07 SALIDA PARA INTERRUPTORES TRIPLES 587.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 419.5
04.01.02 CANALIZACION DE TUBERIAS PVC 20,053.08
CRONOGRAMA DE OBRA V

MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE NIVEL PRIMARIO I.E.E. N°30318 DEL CENTRO P

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
04.01.02.01 TUBERIA DE 25 MM. PVC SEL (1") 4,054.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.02.02 TUBERIA DE 20 MM. PVC SEL (3/4") 15,998.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03 CONDUCTORES 8,301.84
04.01.03.01 CONDUCTOR (2x10+1x10) MM. THHW 358.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.02 CONDUCTOR (1x10) MM2. THHW 146.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.03 CONDUCTOR (2x6+1x10) MM2 THHW 975.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.04 CONDUCTOR (2x2.5) MM2. THHW 4,612.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.05 CONDUCTOR (2x4.0) MM2. THHW 2,209.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.04 TABLEROS ELECTRICOS 4,700.00
04.01.04.01 TABLERO GENERAL Y TABLEROS DE DISTRIBUCION 4,700.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.05 CONEXION A TIERRA 5,600.00
04.01.05.01 POZO A TIERRA 5,600.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06 ARTEFACTOS Y ACCESORIOS ELECTRICOS 11,490.39
04.01.06.01 FLUORESCENTE RECTO INCLUYE EQUIPO Y PANTALLA 7,678.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.02 SPOT LIGHT 656.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.03 LUCES DE EMERGENCIA CON BATERIA - 02 FAROS 637.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.04 TOMACORRIENTE BIPOLAR 1,779.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.05 TOMACORRIENTE SIMPLE 125.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.06 INTERRUPTOR CONMUTACION 210.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.07 INTERRUPTOR SIMPLE 107.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.08 INTERRUPTOR DOBLE 94.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.09 INTERRUPTOR TRIPLE 201.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.07 OTROS 1,199.99
04.01.07.02 DISPOSITIVOS Y EQUIPOS DE SEGURIDAD 1,199.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02 SEGUNDO PISO 45,665.20
04.02.01 SALIDAS 13,605.84
04.02.01.01 SALIDAD DE TECHO PARA CENTRO DE LUZ 6,212.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.02 SALIDA DE TOMACORRIENTE BIPOLARES CON LINEA A TIERRA 5,218.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.03 SALIDA DE TOMACORRIENTE PARA ALUMBRADO DE EMERGENCIA 303.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.04 SALIDA PARA INTERRUPTORES EN CONMUTACION 704.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA V

MEJORAMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO DE NIVEL PRIMARIO I.E.E. N°30318 DEL CENTRO P

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
04.02.01.05 SALIDA PARA INTERRUPTORES SIMPLES 298.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.06 SALIDA PARA INTERRUPTORES DOBLES 398.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.07 SALIDA PARA INTERRUPTORES TRIPLES 469.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.02 CANALIZACION DE TUBERIAS PVC 13,965.19
04.02.02.01 TUBERIA DE 20 MM. PVC SEL (3/4") 13,965.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.03 CONDUCTORES 6,384.59
04.02.03.01 CONDUCTOR (2x2.5) MM2. THHW 3,370.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.03.02 CONDUCTOR (2x4.0) MM2. THHW 3,014.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04 ARTEFACTOS Y ACCESORIOS ELECTRICOS 11,709.58
04.02.04.01 FLUORESCENTE RECTO INCLUYE EQUIPO Y PANTALLA 8,432.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.02 LUCES DE EMERGENCIA CON BATERIA - 02 FAROS 637.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.03 TOMACORRIENTE BIPOLAR 1,779.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.04 TOMACORRIENTE SIMPLE 104.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.05 INTERRUPTOR CONMUTACION 336.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.06 INTERRUPTOR SIMPLE 107.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.07 INTERRUPTOR DOBLE 150.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.08 INTERRUPTOR TRIPLE 161.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0

COSTO DIRECTO 1,990,094.42 58,567.27 11,285.64 13,235.59 13,954.08 22,199.07 56,029.55 88,256.67 107,755.4
GASTOS GENERALES 10.00% 199,009.44 5,856.73 1,128.56 1,323.56 1,395.41 2,219.91 5,602.96 8,825.67 10,775.5
UTILIDAD 10.00% 199,009.44 5,856.73 1,128.56 1,323.56 1,395.41 2,219.91 5,602.96 8,825.67 10,775.5
SUB TOTAL 2,388,113.30 70,280.73 13,542.76 15,882.71 16,744.90 26,638.89 67,235.47 105,908.01 129,306.4
IGV 18.00% 429,860.39 12,650.53 2,437.70 2,858.89 3,014.08 4,795.00 12,102.38 19,063.44 23,275.1
PRESUPUESTO PARCIAL 2,817,973.69 82,931.26 15,980.46 18,741.60 19,758.98 31,433.89 79,337.85 124,971.45 152,581.6
PORCENTAJE DE AVANCE 2.94% 0.57% 0.67% 0.70% 1.12% 2.82% 4.43% 5.41%
PORCENTAJE DE AVANCE ACUMULADO 100.00% 4.88% 13.78%
CRONOGRAMA
CRONOGRAMA
DE OBRA
DEVALORI
OBRA V

MEJORAMIENTO
MEJORAMIENTO
Y AMPLIACION
Y AMPLIACION
DEL SERVICIO
DEL SERVICIO
EDUCATIVO
EDUCATIVO
DE NIVELDE
PRIMARIO
NIVEL PRIMARIO
I.E.E. N°30318
I.E.E.DEL
N°30318
CENTRO
DEL POBLADO
CENTRO P

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
BLOQUE AB - YANAMUCLO 1,990,094.42
01 ESTRUCTURAS 1,077,684.21 MES 01 MES 02
01.01 OBRAS PROVISIONALES 44,569.85
01.01.01 CONSTRUCCION PROVISIONAL DE OFICINA 384.00 384.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.02 CONSTRUCCION PROVISIONAL DE CASETA PARA GUARDIANIA 144.00 144.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.03 CONSTRUCCION PROVISIONAL DE VESTIDOR PARA PERSONAL 480.00 480.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.04 GUARDIANIA DE OBRA 37,785.60 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.4
01.01.05 ALQUILER DE ALMACEN 1,440.00 56.00 56.00 56.00 56.00 56.00 56.00 56.00 56.0
01.01.06 CARTEL DE IDENTIFICACION DE OBRA (3.60x2.40) 856.25 0.00 856.25 0.00 0.00 0.00 0.00 0.00 0.0
01.01.07 AGUA PARA CONSUMO EN LA CONSTRUCCION 1,080.00 42.00 42.00 42.00 42.00 42.00 42.00 42.00 42.0
01.01.08 DESAGUE PARA LA CONSTRUCCION 750.00 0.00 750.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.09 ENERGIA ELECTRICA PROVISIONAL PARA LA CONSTRUCCION 1,650.00 64.17 64.17 64.17 64.17 64.17 64.17 64.17 64.1
01.02 TRABAJOS PRELIMINARES 66,669.81
01.02.01 DEMOLICION DE CONSTRUCCION EXISTENTE 46,142.30 46,142.30 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.02.02 ELIMINACION DE CONSTRUCCION DEMOLIDA DP=2 KM. 8,433.24 6,324.93 2,108.31 0.00 0.00 0.00 0.00 0.00 0.0
01.02.03 LIMPIEZA DEL TERRENO MANUAL 3,218.46 0.00 3,218.46 0.00 0.00 0.00 0.00 0.00 0.0
01.02.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS 2,500.00 2,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.02.05 TRAZO, NIVELACION Y REPLANTEO PARA EDIFICACION 2,770.32 0.00 1,007.39 1,762.93 0.00 0.00 0.00 0.00 0.0
01.02.06 CONTROL TOPOGRAFICO DURANTE EJECUCION DE OBRA 3,605.49 841.28 841.28 841.28 841.28 240.37 0.00 0.00 0.0
01.03 MOVIMIENTO DE TIERRAS 32,782.10
01.03.01 EXCAVACION DE ZANJAS PARA ZAPATAS H=1.20 - 1.50 M. 9,038.33 0.00 753.19 5,272.36 3,012.78 0.00 0.00 0.00 0.0
01.03.02 EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS 2,632.52 0.00 0.00 548.44 767.82 767.82 548.44 0.00 0.0
01.03.03 EXCAVACION DE ZANJAS PARA JARDIN 31.43 0.00 0.00 31.43 0.00 0.00 0.00 0.00 0.0
01.03.04 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 4,776.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,776.2
01.03.05 REFINE, NIVELACION Y COMPACTACION DE PLATAFORMA 4,486.78 0.00 0.00 0.00 0.00 0.00 560.85 3,925.93 0.0
01.03.06 REFINE, NIVELACION Y COMPACTACION DE BASE PARA VEREDAS 6,019.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,019.8
01.03.07 RELLENO Y COMPACTACION DE PODIUM CON MATERIAL PROPIO 301.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 301.5
01.03.08 ACARREO INTERNO DE MATERIAL EXCEDENTE DP=20 M. 2,694.29 0.00 0.00 0.00 0.00 0.00 0.00 1,347.15 1,347.1
01.03.09 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 2,801.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.04 OBRAS DE CONCRETO SIMPLE 90,690.96
CRONOGRAMA
CRONOGRAMA
DE OBRA
DEVALORI
OBRA V

MEJORAMIENTO
MEJORAMIENTO
Y AMPLIACION
Y AMPLIACION
DEL SERVICIO
DEL SERVICIO
EDUCATIVO
EDUCATIVO
DE NIVELDE
PRIMARIO
NIVEL PRIMARIO
I.E.E. N°30318
I.E.E.DEL
N°30318
CENTRO
DEL POBLADO
CENTRO P

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.04.01 SOLADO PARA ZAPATAS E=0.10 M. 1:10 CEMENTO - HORMIGON 5,467.93 0.00 0.00 0.00 911.32 3,189.63 1,366.98 0.00 0.0
01.04.02 CONCRETO 1:10+30% P.G. PARA CIMIENTOS CORRIDOS 21,485.78 0.00 0.00 0.00 0.00 8,057.17 9,400.03 4,028.58 0.0
01.04.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO 6,829.64 0.00 0.00 0.00 0.00 0.00 2,276.55 3,983.96 569.1
01.04.04 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS 3,042.44 0.00 0.00 0.00 0.00 0.00 0.00 1,521.22 1,521.2
01.04.05 FALSO PISO DE CONCRETO E=0.10 M. CEMENTO - HORMIGON 16,168.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9,701.1
01.04.06 ENCOFRADO Y DESENCOFRADO NORMAL PARA VEREDAS 4,000.12 0.00 0.00 0.00 0.00 2,000.06 2,000.06 0.00 0.0
01.04.07 CONCRETO F'C=140 KG/CM2 PARA VEREDAS INCLUYE ACABADOS 19,168.71 0.00 0.00 0.00 0.00 0.00 5,750.61 13,418.10 0.0
01.04.08 ENCOFRADO Y DESENCOFRADO NORMAL PARA CUNETAS 3,648.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,648.2
01.04.09 CONCRETO F'C=140 KG/CM2 PARA CUNETAS INCLUYE ACABADOS 4,971.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,142.8
01.04.10 ENCOFRADO Y DESENCOFRADO NORMAL PARA JARDIN 3,281.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,460.7
01.04.11 CONCRETO F'C=140 KG/CM2 PARA JARDIN 2,627.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 656.7
01.05 OBRAS DE CONCRETO ARMADO 772,773.58
01.05.01 ZAPATAS 49,980.45
01.05.01.01 ACERO F'Y= 4200 KG/CM2 PARA ZAPATAS 11,429.97 0.00 0.00 0.00 0.00 0.00 10,001.22 1,428.75 0.0
01.05.01.02 CONCRETO F'C=210 KG/CM2 PARA ZAPATAS 38,550.48 0.00 0.00 0.00 0.00 0.00 0.00 23,130.29 15,420.1
01.05.02 COLUMNAS 113,702.39
01.05.02.01 ACERO F'Y= 4200 KG/CM2 PARA COLUMNAS 43,524.40 0.00 0.00 0.00 0.00 0.00 4,974.22 8,704.88 8,704.8
01.05.02.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS 47,502.09 0.00 0.00 0.00 0.00 0.00 0.00 3,064.65 10,726.2
01.05.02.03 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS 22,675.90 0.00 0.00 0.00 0.00 0.00 0.00 2,451.45 4,290.0
01.05.03 COLUMNETAS 43,559.15
01.05.03.01 ACERO F'Y= 4200 KG/CM2 PARA COLUMNETAS 13,992.87 0.00 0.00 0.00 0.00 0.00 0.00 1,023.87 2,389.0
01.05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNETAS 20,137.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,179.6
01.05.03.03 CONCRETO F'C=175 KG/CM2 PARA COLUMNETAS 9,428.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 764.4
01.05.04 VIGAS 210,855.32
01.05.04.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA VIGAS 79,074.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.04.02 ACERO F'Y= 4200 KG/CM2 PARA VIGAS 84,562.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.04.03 CONCRETO F'C=210 KG/CM2 PARA VIGAS 47,218.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05 LOSA ALIGERADA 288,844.61
01.05.05.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA ALIGERADA 134,294.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.02 BLOQUETA DE ARCILLA H=0.15 M. PARA LOSA ALIGERADA 21,223.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.03 BLOQUETA DE ARCILLA H=0.12 M. PARA LOSA ALIGERADA 21,181.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA
CRONOGRAMA
DE OBRA
DEVALORI
OBRA V

MEJORAMIENTO
MEJORAMIENTO
Y AMPLIACION
Y AMPLIACION
DEL SERVICIO
DEL SERVICIO
EDUCATIVO
EDUCATIVO
DE NIVELDE
PRIMARIO
NIVEL PRIMARIO
I.E.E. N°30318
I.E.E.DEL
N°30318
CENTRO
DEL POBLADO
CENTRO P

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.05.05.04 ACERO F'Y= 4200 KG/CM2 PARA LOSA ALIGERADA 57,235.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.05 CONCRETO F'C=210 KG/CM2 PARA LOSA ALIGERADA 54,910.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06 ESCALERAS 65,831.66
01.05.06.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESCALERAS 18,440.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06.02 ACERO F'Y= 4200 KG/CM2 PARA ESCALERAS 9,971.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06.03 CONCRETO F'C=210 KG/CM2 PARA ESCALERAS 37,419.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.06 TANQUE CISTERNA 64,777.91
01.06.01 EXCAVACION DE ZANJAS PARA CIMENTACION 2,738.86 0.00 0.00 2,738.86 0.00 0.00 0.00 0.00 0.0
01.06.02 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 889.89 0.00 0.00 0.00 0.00 0.00 889.89 0.00 0.0
01.06.03 SOLADO PARA ZAPATAS E=0.10 M. 1:10 CEMENTO - HORMIGON 289.53 0.00 0.00 289.53 0.00 0.00 0.00 0.00 0.0
01.06.04 ACERO F'Y= 4200 KG/CM2 PARA ZAPATAS 581.27 0.00 0.00 0.00 581.27 0.00 0.00 0.00 0.0
01.06.05 CONCRETO F'C=210 KG/CM2 PARA ZAPATAS 2,041.31 0.00 0.00 0.00 2,041.31 0.00 0.00 0.00 0.0
01.06.06 ACERO F'Y= 4200 KG/CM2 PARA COLUMNAS 4,301.61 0.00 0.00 0.00 3,584.68 716.93 0.00 0.00 0.0
01.06.07 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS 3,278.17 0.00 0.00 0.00 0.00 1,966.90 1,311.27 0.00 0.0
01.06.08 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS 1,901.00 0.00 0.00 0.00 0.00 475.25 1,425.75 0.00 0.0
01.06.09 ENCOFRADO Y DESENCOFRADO NORMAL PARA VIGAS 2,007.72 0.00 0.00 0.00 0.00 0.00 1,003.86 1,003.86 0.0
01.06.10 ACERO F'Y= 4200 KG/CM2 PARA VIGAS 3,065.73 0.00 0.00 0.00 0.00 0.00 0.00 3,065.73 0.0
01.06.11 CONCRETO F'C=210 KG/CM2 PARA VIGAS 1,380.31 0.00 0.00 0.00 0.00 0.00 0.00 1,380.31 0.0
01.06.12 ACERO F'Y= 4200 KG/CM2 PARA CISTERNA 5,076.96 0.00 0.00 0.00 0.00 0.00 5,076.96 0.00 0.0
01.06.13 ENCOFRADO Y DESENCOFRADO NORMAL PARA CISTERNA 3,718.82 0.00 0.00 0.00 0.00 1,859.41 1,859.41 0.00 0.0
01.06.14 CONCRETO F'C=210 KG/CM2 PARA CISTERNA 4,092.64 0.00 0.00 0.00 0.00 0.00 4,092.64 0.00 0.0
01.06.15 ACERO F'Y= 4200 KG/CM2 PARA TANQUE ELEVADO 4,880.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,880.2
01.06.16 ENCOFRADO Y DESENCOFRADO NORMAL PARA TANQUE ELEVADO 4,492.10 0.00 0.00 0.00 0.00 0.00 0.00 4,492.10 0.0
01.06.17 CONCRETO F'C=210 KG/CM2 PARA TANQUE ELEVADO 2,618.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,618.4
01.06.18 ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA ALIGERADA 453.94 0.00 0.00 0.00 0.00 0.00 453.94 0.00 0.0
01.06.19 BLOQUETA DE ARCILLA H=0.15 M. PARA LOSA ALIGERADA 182.52 0.00 0.00 0.00 0.00 0.00 182.52 0.00 0.0
01.06.20 ACERO F'Y= 4200 KG/CM2 PARA LOSA ALIGERADA 321.44 0.00 0.00 0.00 0.00 0.00 321.44 0.00 0.0
01.06.21 CONCRETO F'C=210 KG/CM2 PARA LOSA ALIGERADA 224.55 0.00 0.00 0.00 0.00 0.00 0.00 224.55 0.0
01.06.22 MURO DE SOGA CON LADRILLO K.K. 18H 9X13X24 CM. 2,287.88 0.00 0.00 0.00 0.00 0.00 0.00 2,287.88 0.0
01.06.23 TARRAJEO EN MUROS INTERIORES FROTACHADO MEZCLA 1:5 851.76 0.00 0.00 0.00 0.00 0.00 0.00 851.76 0.0
01.06.24 TARRAJEO INTERIOR CON IMPERMEABILIZANTE DE TANQUE CISTERNA 1,402.11 0.00 0.00 0.00 0.00 0.00 0.00 701.06 701.0
CRONOGRAMA
CRONOGRAMA
DE OBRA
DEVALORI
OBRA V

MEJORAMIENTO
MEJORAMIENTO
Y AMPLIACION
Y AMPLIACION
DEL SERVICIO
DEL SERVICIO
EDUCATIVO
EDUCATIVO
DE NIVELDE
PRIMARIO
NIVEL PRIMARIO
I.E.E. N°30318
I.E.E.DEL
N°30318
CENTRO
DEL POBLADO
CENTRO P

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.06.25 TARRAJEO INTERIOR CON IMPERMEABILIZANTE DE TANQUE ELEVADO 886.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 886.6
01.06.26 TARRAJEO EXTERIOR FROTACHADO DE ESTRUCTURA MEZCLA 1:5 4,004.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,004.0
01.06.27 PINTURA LATEX EN ESTRUCTURA DOS MANOS 1,975.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.06.28 INSTALACION DE ACCESORIOS DE TANQUE CISTERNA 2,112.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,112.3
01.06.29 INSTALACION DE PUERTA DE MADERA P-1 320.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 320.0
01.06.30 INSTALACION DE ESCALERA METALICA SEGUN DISEÑO 2,400.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,400.0
01.07 PRUEBAS Y ENSAYOS DE CALIDAD 3,820.00
01.07.01 PROCTOR MODIFICADO 160.00 0.00 0.00 0.00 0.00 160.00 0.00 0.00 0.0
01.07.02 DENSIDAD DE CAMPO 480.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.7
01.07.03 DISEÑO DE MEZCLA 540.00 0.00 0.00 0.00 462.86 77.14 0.00 0.00 0.0
01.07.04 ROTURA DE PROBETA (COMPRESION SIMPLE) 2,640.00 0.00 0.00 0.00 0.00 0.00 65.19 228.15 228.1
01.08 FLETE 1,600.00
01.08.01 FLETE TERRESTRE 1,600.00 119.15 119.15 119.15 119.15 119.15 119.15 119.15 119.1
02 ARQUITECTURA 743,584.58
02.01 MUROS Y TABIQUES 140,636.03
02.01.01 MURO DE SOGA CON LADRILLO K.K. 18H 9X13X24 CM. 140,051.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
MURO DE CABEZA CON LADRILLO K.K. 18H 9X13X24 CM. 584.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02 REVOQUES, ENLUCIDOS Y MOLDURAS 217,896.67
02.02.01 TARRAJEO EN CIELO RASO FROTACHADO MEZCLA 1:4 62,875.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.02 TARRAJEO EN MUROS INTERIORES FROTACHADO MEZCLA 1:5 63,390.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.03 TARRAJEO EN MUROS EXTERIORES FROTACHADO MEZCLA 1:5 35,522.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.04 TARRAJEO EN VIGAS MEZCLA 1:4 27,465.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.05 TARRAJEO EN COLUMNAS MEZCLA 1:5 19,492.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.06 VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS MEZCLA 1:5 9,002.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.07 TARRAJEO DE PODIUM MEZCLA 1:5 147.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03 PISOS Y PAVIMENTOS 111,696.25
02.03.01 PISO DE PORCELANATO ALTO TRANSITO ANTIDESLIZANTE PARA AMBIENTES 65,681.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03.02 PISO DE PORCELANATO ALTO TRANSITO ANTIDESLIZANTE PARA VEREDAS 41,788.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03.03 PISO DE CERAMICO ANTIDESLIZANTE DE ALTO TRANSITO 4,226.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04 ZOCALOS Y CONTRAZOCALOS 28,505.27
02.04.01 CONTRAZOCALO DE PORCELANATO H=0.10 M. PARA AMBIENTES 11,652.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA
CRONOGRAMA
DE OBRA
DEVALORI
OBRA V

MEJORAMIENTO
MEJORAMIENTO
Y AMPLIACION
Y AMPLIACION
DEL SERVICIO
DEL SERVICIO
EDUCATIVO
EDUCATIVO
DE NIVELDE
PRIMARIO
NIVEL PRIMARIO
I.E.E. N°30318
I.E.E.DEL
N°30318
CENTRO
DEL POBLADO
CENTRO P

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
02.04.02 CONTRAZOCALO DE PORCELANATO H=0.10 M. PARA VEREDAS 11,342.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04.03 CONTRAZOCALO DE CERAMICO H=0.10 M. 5,139.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04.04 ZOCALO DE CERAMICO 370.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.05 CUBIERTAS 46,545.41
02.05.01 CUBIERTA DE TEJA ANDINA TIPO ETERNIT 46,545.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06 CARPINTERIA DE MADERA 17,229.50
02.06.01 PUERTA APANELADA DE CEDRO TIPO P-01 INC. INSTALACION 7,810.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06.02 PUERTA APANELADA DE CEDRO TIPO P-02 INC. INSTALACION 5,583.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06.03 PUERTA APANELADA DE CEDRO TIPO P-03 INC. INSTALACION 3,836.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07 CARPINTERIA METALICA 24,910.00
02.07.01 PORTON METALICO PM-01 INC. PINTADO E INSTALACION 860.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.02 VENTANA METALICA V-01 INC. PINTADO E INSTALACION 1,120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.03 VENTANA METALICA V-02 INC. PINTADO E INSTALACION 4,830.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.04 VENTANA METALICA V-03 INC. PINTADO E INSTALACION 2,200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.05 VENTANA METALICA V-04 INC. PINTADO E INSTALACION 1,120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.06 VENTANA METALICA V-05 INC. PINTADO E INSTALACION 4,830.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.07 VENTANA METALICA V-06 INC. PINTADO E INSTALACION 3,520.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.08 VENTANA METALICA V-07 INC. PINTADO E INSTALACION 1,140.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.09 VENTANA METALICA V-08 INC. PINTADO E INSTALACION 5,290.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.08 CARPINTERIA EN MELAMINA 5,580.00
02.08.01 SEPARADOR DE BAÑOS TIPO 01 5,580.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.09 CERRAJERIA 7,251.54
02.09.01 CERRADURA PARA PUERTA DE TRES GOLPES 4,796.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.09.02 CERRADURA PARA PUERTA TIPO PERILLA 2,454.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.10 VIDRIOS, CRISTALES Y SIMILARES 41,997.06
02.10.01 VIDRIO LAMINAR BUTIRAL DE POLIVINILO INCOLORO 41,997.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11 PINTURAS 90,207.74
02.11.01 PINTURA LATEX EN CIELO RASO DOS MANOS 22,833.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.02 PINTURA LATEX EN MUROS EXTERIORES DOS MANOS 17,654.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.03 PINTURA LATEX EN MUROS INTERIORES DOS MANOS 30,153.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.04 PINTURA LATEX EN VIGAS DOS MANOS 10,154.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA
CRONOGRAMA
DE OBRA
DEVALORI
OBRA V

MEJORAMIENTO
MEJORAMIENTO
Y AMPLIACION
Y AMPLIACION
DEL SERVICIO
DEL SERVICIO
EDUCATIVO
EDUCATIVO
DE NIVELDE
PRIMARIO
NIVEL PRIMARIO
I.E.E. N°30318
I.E.E.DEL
N°30318
CENTRO
DEL POBLADO
CENTRO P

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
02.11.05 PINTURA LATEX EN COLUMNAS DOS MANOS 7,342.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.06 PINTURA LATEX PARA DERRAMES EN PUERTAS Y VENTANAS DOS MANOS 1,560.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.07 PINTURA PARA PIZARRA 510.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12 JUNTAS 11,129.11
02.12.01 JUNTAS ASFALTICAS EN VEREDAS 2,066.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12.02 JUNTAS ASFALTICAS PARA SARDINEL DE JARDIN 91.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12.03 JUNTAS ASFALTICAS PARA COLUMNETAS 8,971.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03 INSTALACIONES SANITARIAS 58,301.24
03.01 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO 8,682.61
03.01.01 MOVIMIENTO DE TIERRAS 1,649.41
03.01.01.01 EXCAVACION DE ZANJAS PARA TUBERIA DE AGUA 937.63 0.00 0.00 0.00 0.00 937.63 0.00 0.00 0.0
03.01.01.02 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 681.36 0.00 0.00 0.00 0.00 0.00 596.19 85.17 0.0
03.01.01.03 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 30.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.01.02 SALIDAS 2,360.13
03.01.02.01 SALIDA DE AGUA FRIA PVC SAP DE 1/2" 2,254.32 0.00 0.00 0.00 0.00 0.00 120.77 281.79 281.7
03.01.02.02 SALIDA DE AGUA PARA RIEGO PVC SAP DE 1/2" 56.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 56.6
03.01.02.03 SALIDA DE AGUA FRIA CONTRA INCENDIO PVC SAP DE 2" 49.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 49.1
03.01.03 RED DE DISTRIBUCION 4,673.07
03.01.03.01 TUBERIA PARA AGUA POTABLE PVC SAP DE 1/2" C-10 2,106.15 0.00 0.00 0.00 0.00 0.00 0.00 254.19 254.1
03.01.03.02 TUBERIA PARA RIEGO PVC SAP DE 1/2" C-10 72.72 0.00 0.00 0.00 0.00 0.00 0.00 72.72 0.0
03.01.03.03 TUBERIA CONTRA INCENDIO PVC SAP DE 2" C-10 80.28 0.00 0.00 0.00 0.00 0.00 0.00 80.28 0.0
03.01.03.04 VALVULA DE COMPUERTA DE 1/2" 1,834.94 0.00 0.00 0.00 0.00 0.00 0.00 65.53 229.3
03.01.03.05 VALVULA DE COMPUERTA DE 2" 127.03 0.00 0.00 0.00 0.00 0.00 0.00 2.23 15.6
03.01.03.06 GRIFO CONTRA INCENDIO 451.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02 SISTEMA DE DESAGUE 19,414.41
03.02.01 MOVIMIENTO DE TIERRAS 1,805.63
03.02.01.01 EXCAVACION DE ZANJAS PARA TUBERIA DE DESAGUE 1,045.58 0.00 0.00 0.00 0.00 0.00 0.00 1,045.58 0.0
03.02.01.02 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 703.40 0.00 0.00 0.00 0.00 0.00 0.00 351.70 351.7
03.02.01.03 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 56.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02.02 SALIDAS 5,996.34
03.02.02.01 SALIDA DE DESAGUE CON PVC SAL DE 2" 2,613.30 0.00 0.00 0.00 0.00 0.00 0.00 190.06 332.6
CRONOGRAMA
CRONOGRAMA
DE OBRA
DEVALORI
OBRA V

MEJORAMIENTO
MEJORAMIENTO
Y AMPLIACION
Y AMPLIACION
DEL SERVICIO
DEL SERVICIO
EDUCATIVO
EDUCATIVO
DE NIVELDE
PRIMARIO
NIVEL PRIMARIO
I.E.E. N°30318
I.E.E.DEL
N°30318
CENTRO
DEL POBLADO
CENTRO P

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
03.02.02.02 SALIDA DE DESAGUE CON PVC SAL DE 4" 1,461.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 91.3
03.02.02.03 SALIDA DE VENTILACION CON PVC SAL DE 2" 1,921.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02.03 RED DE DISTRIBUCION 11,612.44
03.02.03.01 TUBERIA PARA DESAGUE CON PVC SAL DE 2" 1,038.11 0.00 0.00 0.00 0.00 0.00 0.00 72.85 127.4
03.02.03.02 TUBERIA PARA DESAGUE CON PVC SAL DE 4" 5,387.78 0.00 0.00 0.00 0.00 0.00 0.00 96.21 673.4
03.02.03.03 TUBERIA PARA VENTILACION CON PVC SAL DE 2" 2,348.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 132.9
TUBERIA PARA CAJA DE REGISTRO CON PVC SAL DE 2" 2,837.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03 SISTEMA DE DESAGUE PLUVIAL 15,728.96
03.03.01 TUBERIA PVC SAL PLUVIAL DE 4" 4,216.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.02 TUBERIA PVC SAL PLUVIAL DE 3" 1,789.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA FALSA COLUMNA 5,450.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.04 CONCRETO F'C=175 KG/CM2 PARA FALSA COLUMNA 3,930.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.05 ACCESORIOS PARA DESAGUE PLUVIAL 341.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04 APARATOS Y ACCESORIOS SANITARIOS 14,475.26
03.04.01 INODORO DE LOSA TANQUE BAJO 5,908.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.02 LAVATORIO DE LOSA CON PEDESTAL 4,385.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.03 PAPELERA DE LOSA 1,190.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.04 SUMIDERO DE BRONCE ROSCADO DE 2" 985.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.05 REGISTRO ROSCADO DE BRONCE DE 4" 1,381.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.06 CAJA DE REGISTRO PARA DESAGUE DE 624.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04 INSTALACIONES ELECTRICAS 110,524.39
04.01 PRIMER PISO 64,859.19
04.01.01 SALIDAS 13,513.89
04.01.01.01 SALIDAD DE TECHO PARA CENTRO DE LUZ 6,566.30 0.00 0.00 0.00 0.00 0.00 0.00 1,094.38 1,915.1
04.01.01.02 SALIDA DE TOMACORRIENTE BIPOLARES CON LINEA A TIERRA 4,391.95 0.00 0.00 0.00 0.00 0.00 0.00 548.99 1,921.4
04.01.01.03 SALIDA DE TOMACORRIENTE PARA ALUMBRADO DE EMERGENCIA 363.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.01.04 SALIDA PARA INTERRUPTORES EN CONMUTACION 1,057.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.01.05 SALIDA PARA INTERRUPTORES SIMPLES 298.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 298.5
04.01.01.06 SALIDA PARA INTERRUPTORES DOBLES 248.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.4
04.01.01.07 SALIDA PARA INTERRUPTORES TRIPLES 587.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 419.5
04.01.02 CANALIZACION DE TUBERIAS PVC 20,053.08
CRONOGRAMA
CRONOGRAMA
DE OBRA
DEVALORI
OBRA V

MEJORAMIENTO
MEJORAMIENTO
Y AMPLIACION
Y AMPLIACION
DEL SERVICIO
DEL SERVICIO
EDUCATIVO
EDUCATIVO
DE NIVELDE
PRIMARIO
NIVEL PRIMARIO
I.E.E. N°30318
I.E.E.DEL
N°30318
CENTRO
DEL POBLADO
CENTRO P

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
04.01.02.01 TUBERIA DE 25 MM. PVC SEL (1") 4,054.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.02.02 TUBERIA DE 20 MM. PVC SEL (3/4") 15,998.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03 CONDUCTORES 8,301.84
04.01.03.01 CONDUCTOR (2x10+1x10) MM. THHW 358.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.02 CONDUCTOR (1x10) MM2. THHW 146.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.03 CONDUCTOR (2x6+1x10) MM2 THHW 975.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.04 CONDUCTOR (2x2.5) MM2. THHW 4,612.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.05 CONDUCTOR (2x4.0) MM2. THHW 2,209.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.04 TABLEROS ELECTRICOS 4,700.00
04.01.04.01 TABLERO GENERAL Y TABLEROS DE DISTRIBUCION 4,700.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.05 CONEXION A TIERRA 5,600.00
04.01.05.01 POZO A TIERRA 5,600.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06 ARTEFACTOS Y ACCESORIOS ELECTRICOS 11,490.39
04.01.06.01 FLUORESCENTE RECTO INCLUYE EQUIPO Y PANTALLA 7,678.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.02 SPOT LIGHT 656.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.03 LUCES DE EMERGENCIA CON BATERIA - 02 FAROS 637.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.04 TOMACORRIENTE BIPOLAR 1,779.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.05 TOMACORRIENTE SIMPLE 125.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.06 INTERRUPTOR CONMUTACION 210.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.07 INTERRUPTOR SIMPLE 107.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.08 INTERRUPTOR DOBLE 94.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.09 INTERRUPTOR TRIPLE 201.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.07 OTROS 1,199.99
04.01.07.02 DISPOSITIVOS Y EQUIPOS DE SEGURIDAD 1,199.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02 SEGUNDO PISO 45,665.20
04.02.01 SALIDAS 13,605.84
04.02.01.01 SALIDAD DE TECHO PARA CENTRO DE LUZ 6,212.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.02 SALIDA DE TOMACORRIENTE BIPOLARES CON LINEA A TIERRA 5,218.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.03 SALIDA DE TOMACORRIENTE PARA ALUMBRADO DE EMERGENCIA 303.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.04 SALIDA PARA INTERRUPTORES EN CONMUTACION 704.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA
CRONOGRAMA
DE OBRA
DEVALORI
OBRA V

MEJORAMIENTO
MEJORAMIENTO
Y AMPLIACION
Y AMPLIACION
DEL SERVICIO
DEL SERVICIO
EDUCATIVO
EDUCATIVO
DE NIVELDE
PRIMARIO
NIVEL PRIMARIO
I.E.E. N°30318
I.E.E.DEL
N°30318
CENTRO
DEL POBLADO
CENTRO P

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
04.02.01.05 SALIDA PARA INTERRUPTORES SIMPLES 298.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.06 SALIDA PARA INTERRUPTORES DOBLES 398.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.07 SALIDA PARA INTERRUPTORES TRIPLES 469.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.02 CANALIZACION DE TUBERIAS PVC 13,965.19
04.02.02.01 TUBERIA DE 20 MM. PVC SEL (3/4") 13,965.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.03 CONDUCTORES 6,384.59
04.02.03.01 CONDUCTOR (2x2.5) MM2. THHW 3,370.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.03.02 CONDUCTOR (2x4.0) MM2. THHW 3,014.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04 ARTEFACTOS Y ACCESORIOS ELECTRICOS 11,709.58
04.02.04.01 FLUORESCENTE RECTO INCLUYE EQUIPO Y PANTALLA 8,432.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.02 LUCES DE EMERGENCIA CON BATERIA - 02 FAROS 637.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.03 TOMACORRIENTE BIPOLAR 1,779.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.04 TOMACORRIENTE SIMPLE 104.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.05 INTERRUPTOR CONMUTACION 336.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.06 INTERRUPTOR SIMPLE 107.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.07 INTERRUPTOR DOBLE 150.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.08 INTERRUPTOR TRIPLE 161.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0

COSTO DIRECTO 1,990,094.42 58,567.27 11,285.64 13,235.59 13,954.08 22,199.07 56,029.55 88,256.67 107,755.4
GASTOS GENERALES 10.00% 199,009.44 5,856.73 1,128.56 1,323.56 1,395.41 2,219.91 5,602.96 8,825.67 10,775.5
UTILIDAD 10.00% 199,009.44 5,856.73 1,128.56 1,323.56 1,395.41 2,219.91 5,602.96 8,825.67 10,775.5
SUB TOTAL 2,388,113.30 70,280.73 13,542.76 15,882.71 16,744.90 26,638.89 67,235.47 105,908.01 129,306.4
IGV 18.00% 429,860.39 12,650.53 2,437.70 2,858.89 3,014.08 4,795.00 12,102.38 19,063.44 23,275.1
PRESUPUESTO PARCIAL 2,817,973.69 82,931.26 15,980.46 18,741.60 19,758.98 31,433.89 79,337.85 124,971.45 152,581.6
PORCENTAJE DE AVANCE 2.94% 0.57% 0.67% 0.70% 1.12% 2.82% 4.43% 5.41%
PORCENTAJE DE AVANCE ACUMULADO 100.00% 4.88% 13.78%
CRONOGRAMACRONOGRAMA
DE OBRA VALORIZADO
DE OBRA- V

MEJORAMIENTO Y MEJORAMIENTO
AMPLIACION DELYSERVICIO
AMPLIACION
EDUCATIVO
DEL SERVICIO
DE NIVEL
EDUCATIVO
PRIMARIO
DEI.E.E.
NIVELN°30318
PRIMARIO
DEL I.E.E.
CENTRO N°30318
POBLADO
DEL CENTRO
MENOR P
D

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
BLOQUE AB - YANAMUCLO 1,990,094.42
01 ESTRUCTURAS 1,077,684.21 MES 01 MES 02
01.01 OBRAS PROVISIONALES 44,569.85
01.01.01 CONSTRUCCION PROVISIONAL DE OFICINA 384.00 384.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.02 CONSTRUCCION PROVISIONAL DE CASETA PARA GUARDIANIA 144.00 144.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.03 CONSTRUCCION PROVISIONAL DE VESTIDOR PARA PERSONAL 480.00 480.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.04 GUARDIANIA DE OBRA 37,785.60 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.4
01.01.05 ALQUILER DE ALMACEN 1,440.00 56.00 56.00 56.00 56.00 56.00 56.00 56.00 56.0
01.01.06 CARTEL DE IDENTIFICACION DE OBRA (3.60x2.40) 856.25 0.00 856.25 0.00 0.00 0.00 0.00 0.00 0.0
01.01.07 AGUA PARA CONSUMO EN LA CONSTRUCCION 1,080.00 42.00 42.00 42.00 42.00 42.00 42.00 42.00 42.0
01.01.08 DESAGUE PARA LA CONSTRUCCION 750.00 0.00 750.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.09 ENERGIA ELECTRICA PROVISIONAL PARA LA CONSTRUCCION 1,650.00 64.17 64.17 64.17 64.17 64.17 64.17 64.17 64.1
01.02 TRABAJOS PRELIMINARES 66,669.81
01.02.01 DEMOLICION DE CONSTRUCCION EXISTENTE 46,142.30 46,142.30 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.02.02 ELIMINACION DE CONSTRUCCION DEMOLIDA DP=2 KM. 8,433.24 6,324.93 2,108.31 0.00 0.00 0.00 0.00 0.00 0.0
01.02.03 LIMPIEZA DEL TERRENO MANUAL 3,218.46 0.00 3,218.46 0.00 0.00 0.00 0.00 0.00 0.0
01.02.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS 2,500.00 2,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.02.05 TRAZO, NIVELACION Y REPLANTEO PARA EDIFICACION 2,770.32 0.00 1,007.39 1,762.93 0.00 0.00 0.00 0.00 0.0
01.02.06 CONTROL TOPOGRAFICO DURANTE EJECUCION DE OBRA 3,605.49 841.28 841.28 841.28 841.28 240.37 0.00 0.00 0.0
01.03 MOVIMIENTO DE TIERRAS 32,782.10
01.03.01 EXCAVACION DE ZANJAS PARA ZAPATAS H=1.20 - 1.50 M. 9,038.33 0.00 753.19 5,272.36 3,012.78 0.00 0.00 0.00 0.0
01.03.02 EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS 2,632.52 0.00 0.00 548.44 767.82 767.82 548.44 0.00 0.0
01.03.03 EXCAVACION DE ZANJAS PARA JARDIN 31.43 0.00 0.00 31.43 0.00 0.00 0.00 0.00 0.0
01.03.04 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 4,776.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,776.2
01.03.05 REFINE, NIVELACION Y COMPACTACION DE PLATAFORMA 4,486.78 0.00 0.00 0.00 0.00 0.00 560.85 3,925.93 0.0
01.03.06 REFINE, NIVELACION Y COMPACTACION DE BASE PARA VEREDAS 6,019.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,019.8
01.03.07 RELLENO Y COMPACTACION DE PODIUM CON MATERIAL PROPIO 301.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 301.5
01.03.08 ACARREO INTERNO DE MATERIAL EXCEDENTE DP=20 M. 2,694.29 0.00 0.00 0.00 0.00 0.00 0.00 1,347.15 1,347.1
01.03.09 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 2,801.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.04 OBRAS DE CONCRETO SIMPLE 90,690.96
CRONOGRAMACRONOGRAMA
DE OBRA VALORIZADO
DE OBRA- V

MEJORAMIENTO Y MEJORAMIENTO
AMPLIACION DELYSERVICIO
AMPLIACION
EDUCATIVO
DEL SERVICIO
DE NIVEL
EDUCATIVO
PRIMARIO
DEI.E.E.
NIVELN°30318
PRIMARIO
DEL I.E.E.
CENTRO N°30318
POBLADO
DEL CENTRO
MENOR P
D

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.04.01 SOLADO PARA ZAPATAS E=0.10 M. 1:10 CEMENTO - HORMIGON 5,467.93 0.00 0.00 0.00 911.32 3,189.63 1,366.98 0.00 0.0
01.04.02 CONCRETO 1:10+30% P.G. PARA CIMIENTOS CORRIDOS 21,485.78 0.00 0.00 0.00 0.00 8,057.17 9,400.03 4,028.58 0.0
01.04.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO 6,829.64 0.00 0.00 0.00 0.00 0.00 2,276.55 3,983.96 569.1
01.04.04 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS 3,042.44 0.00 0.00 0.00 0.00 0.00 0.00 1,521.22 1,521.2
01.04.05 FALSO PISO DE CONCRETO E=0.10 M. CEMENTO - HORMIGON 16,168.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9,701.1
01.04.06 ENCOFRADO Y DESENCOFRADO NORMAL PARA VEREDAS 4,000.12 0.00 0.00 0.00 0.00 2,000.06 2,000.06 0.00 0.0
01.04.07 CONCRETO F'C=140 KG/CM2 PARA VEREDAS INCLUYE ACABADOS 19,168.71 0.00 0.00 0.00 0.00 0.00 5,750.61 13,418.10 0.0
01.04.08 ENCOFRADO Y DESENCOFRADO NORMAL PARA CUNETAS 3,648.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,648.2
01.04.09 CONCRETO F'C=140 KG/CM2 PARA CUNETAS INCLUYE ACABADOS 4,971.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,142.8
01.04.10 ENCOFRADO Y DESENCOFRADO NORMAL PARA JARDIN 3,281.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,460.7
01.04.11 CONCRETO F'C=140 KG/CM2 PARA JARDIN 2,627.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 656.7
01.05 OBRAS DE CONCRETO ARMADO 772,773.58
01.05.01 ZAPATAS 49,980.45
01.05.01.01 ACERO F'Y= 4200 KG/CM2 PARA ZAPATAS 11,429.97 0.00 0.00 0.00 0.00 0.00 10,001.22 1,428.75 0.0
01.05.01.02 CONCRETO F'C=210 KG/CM2 PARA ZAPATAS 38,550.48 0.00 0.00 0.00 0.00 0.00 0.00 23,130.29 15,420.1
01.05.02 COLUMNAS 113,702.39
01.05.02.01 ACERO F'Y= 4200 KG/CM2 PARA COLUMNAS 43,524.40 0.00 0.00 0.00 0.00 0.00 4,974.22 8,704.88 8,704.8
01.05.02.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS 47,502.09 0.00 0.00 0.00 0.00 0.00 0.00 3,064.65 10,726.2
01.05.02.03 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS 22,675.90 0.00 0.00 0.00 0.00 0.00 0.00 2,451.45 4,290.0
01.05.03 COLUMNETAS 43,559.15
01.05.03.01 ACERO F'Y= 4200 KG/CM2 PARA COLUMNETAS 13,992.87 0.00 0.00 0.00 0.00 0.00 0.00 1,023.87 2,389.0
01.05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNETAS 20,137.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,179.6
01.05.03.03 CONCRETO F'C=175 KG/CM2 PARA COLUMNETAS 9,428.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 764.4
01.05.04 VIGAS 210,855.32
01.05.04.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA VIGAS 79,074.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.04.02 ACERO F'Y= 4200 KG/CM2 PARA VIGAS 84,562.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.04.03 CONCRETO F'C=210 KG/CM2 PARA VIGAS 47,218.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05 LOSA ALIGERADA 288,844.61
01.05.05.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA ALIGERADA 134,294.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.02 BLOQUETA DE ARCILLA H=0.15 M. PARA LOSA ALIGERADA 21,223.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.03 BLOQUETA DE ARCILLA H=0.12 M. PARA LOSA ALIGERADA 21,181.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMACRONOGRAMA
DE OBRA VALORIZADO
DE OBRA- V

MEJORAMIENTO Y MEJORAMIENTO
AMPLIACION DELYSERVICIO
AMPLIACION
EDUCATIVO
DEL SERVICIO
DE NIVEL
EDUCATIVO
PRIMARIO
DEI.E.E.
NIVELN°30318
PRIMARIO
DEL I.E.E.
CENTRO N°30318
POBLADO
DEL CENTRO
MENOR P
D

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.05.05.04 ACERO F'Y= 4200 KG/CM2 PARA LOSA ALIGERADA 57,235.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.05 CONCRETO F'C=210 KG/CM2 PARA LOSA ALIGERADA 54,910.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06 ESCALERAS 65,831.66
01.05.06.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESCALERAS 18,440.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06.02 ACERO F'Y= 4200 KG/CM2 PARA ESCALERAS 9,971.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06.03 CONCRETO F'C=210 KG/CM2 PARA ESCALERAS 37,419.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.06 TANQUE CISTERNA 64,777.91
01.06.01 EXCAVACION DE ZANJAS PARA CIMENTACION 2,738.86 0.00 0.00 2,738.86 0.00 0.00 0.00 0.00 0.0
01.06.02 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 889.89 0.00 0.00 0.00 0.00 0.00 889.89 0.00 0.0
01.06.03 SOLADO PARA ZAPATAS E=0.10 M. 1:10 CEMENTO - HORMIGON 289.53 0.00 0.00 289.53 0.00 0.00 0.00 0.00 0.0
01.06.04 ACERO F'Y= 4200 KG/CM2 PARA ZAPATAS 581.27 0.00 0.00 0.00 581.27 0.00 0.00 0.00 0.0
01.06.05 CONCRETO F'C=210 KG/CM2 PARA ZAPATAS 2,041.31 0.00 0.00 0.00 2,041.31 0.00 0.00 0.00 0.0
01.06.06 ACERO F'Y= 4200 KG/CM2 PARA COLUMNAS 4,301.61 0.00 0.00 0.00 3,584.68 716.93 0.00 0.00 0.0
01.06.07 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS 3,278.17 0.00 0.00 0.00 0.00 1,966.90 1,311.27 0.00 0.0
01.06.08 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS 1,901.00 0.00 0.00 0.00 0.00 475.25 1,425.75 0.00 0.0
01.06.09 ENCOFRADO Y DESENCOFRADO NORMAL PARA VIGAS 2,007.72 0.00 0.00 0.00 0.00 0.00 1,003.86 1,003.86 0.0
01.06.10 ACERO F'Y= 4200 KG/CM2 PARA VIGAS 3,065.73 0.00 0.00 0.00 0.00 0.00 0.00 3,065.73 0.0
01.06.11 CONCRETO F'C=210 KG/CM2 PARA VIGAS 1,380.31 0.00 0.00 0.00 0.00 0.00 0.00 1,380.31 0.0
01.06.12 ACERO F'Y= 4200 KG/CM2 PARA CISTERNA 5,076.96 0.00 0.00 0.00 0.00 0.00 5,076.96 0.00 0.0
01.06.13 ENCOFRADO Y DESENCOFRADO NORMAL PARA CISTERNA 3,718.82 0.00 0.00 0.00 0.00 1,859.41 1,859.41 0.00 0.0
01.06.14 CONCRETO F'C=210 KG/CM2 PARA CISTERNA 4,092.64 0.00 0.00 0.00 0.00 0.00 4,092.64 0.00 0.0
01.06.15 ACERO F'Y= 4200 KG/CM2 PARA TANQUE ELEVADO 4,880.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,880.2
01.06.16 ENCOFRADO Y DESENCOFRADO NORMAL PARA TANQUE ELEVADO 4,492.10 0.00 0.00 0.00 0.00 0.00 0.00 4,492.10 0.0
01.06.17 CONCRETO F'C=210 KG/CM2 PARA TANQUE ELEVADO 2,618.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,618.4
01.06.18 ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA ALIGERADA 453.94 0.00 0.00 0.00 0.00 0.00 453.94 0.00 0.0
01.06.19 BLOQUETA DE ARCILLA H=0.15 M. PARA LOSA ALIGERADA 182.52 0.00 0.00 0.00 0.00 0.00 182.52 0.00 0.0
01.06.20 ACERO F'Y= 4200 KG/CM2 PARA LOSA ALIGERADA 321.44 0.00 0.00 0.00 0.00 0.00 321.44 0.00 0.0
01.06.21 CONCRETO F'C=210 KG/CM2 PARA LOSA ALIGERADA 224.55 0.00 0.00 0.00 0.00 0.00 0.00 224.55 0.0
01.06.22 MURO DE SOGA CON LADRILLO K.K. 18H 9X13X24 CM. 2,287.88 0.00 0.00 0.00 0.00 0.00 0.00 2,287.88 0.0
01.06.23 TARRAJEO EN MUROS INTERIORES FROTACHADO MEZCLA 1:5 851.76 0.00 0.00 0.00 0.00 0.00 0.00 851.76 0.0
01.06.24 TARRAJEO INTERIOR CON IMPERMEABILIZANTE DE TANQUE CISTERNA 1,402.11 0.00 0.00 0.00 0.00 0.00 0.00 701.06 701.0
CRONOGRAMACRONOGRAMA
DE OBRA VALORIZADO
DE OBRA- V

MEJORAMIENTO Y MEJORAMIENTO
AMPLIACION DELYSERVICIO
AMPLIACION
EDUCATIVO
DEL SERVICIO
DE NIVEL
EDUCATIVO
PRIMARIO
DEI.E.E.
NIVELN°30318
PRIMARIO
DEL I.E.E.
CENTRO N°30318
POBLADO
DEL CENTRO
MENOR P
D

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.06.25 TARRAJEO INTERIOR CON IMPERMEABILIZANTE DE TANQUE ELEVADO 886.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 886.6
01.06.26 TARRAJEO EXTERIOR FROTACHADO DE ESTRUCTURA MEZCLA 1:5 4,004.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,004.0
01.06.27 PINTURA LATEX EN ESTRUCTURA DOS MANOS 1,975.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.06.28 INSTALACION DE ACCESORIOS DE TANQUE CISTERNA 2,112.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,112.3
01.06.29 INSTALACION DE PUERTA DE MADERA P-1 320.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 320.0
01.06.30 INSTALACION DE ESCALERA METALICA SEGUN DISEÑO 2,400.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,400.0
01.07 PRUEBAS Y ENSAYOS DE CALIDAD 3,820.00
01.07.01 PROCTOR MODIFICADO 160.00 0.00 0.00 0.00 0.00 160.00 0.00 0.00 0.0
01.07.02 DENSIDAD DE CAMPO 480.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.7
01.07.03 DISEÑO DE MEZCLA 540.00 0.00 0.00 0.00 462.86 77.14 0.00 0.00 0.0
01.07.04 ROTURA DE PROBETA (COMPRESION SIMPLE) 2,640.00 0.00 0.00 0.00 0.00 0.00 65.19 228.15 228.1
01.08 FLETE 1,600.00
01.08.01 FLETE TERRESTRE 1,600.00 119.15 119.15 119.15 119.15 119.15 119.15 119.15 119.1
02 ARQUITECTURA 743,584.58
02.01 MUROS Y TABIQUES 140,636.03
02.01.01 MURO DE SOGA CON LADRILLO K.K. 18H 9X13X24 CM. 140,051.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
MURO DE CABEZA CON LADRILLO K.K. 18H 9X13X24 CM. 584.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02 REVOQUES, ENLUCIDOS Y MOLDURAS 217,896.67
02.02.01 TARRAJEO EN CIELO RASO FROTACHADO MEZCLA 1:4 62,875.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.02 TARRAJEO EN MUROS INTERIORES FROTACHADO MEZCLA 1:5 63,390.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.03 TARRAJEO EN MUROS EXTERIORES FROTACHADO MEZCLA 1:5 35,522.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.04 TARRAJEO EN VIGAS MEZCLA 1:4 27,465.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.05 TARRAJEO EN COLUMNAS MEZCLA 1:5 19,492.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.06 VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS MEZCLA 1:5 9,002.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.07 TARRAJEO DE PODIUM MEZCLA 1:5 147.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03 PISOS Y PAVIMENTOS 111,696.25
02.03.01 PISO DE PORCELANATO ALTO TRANSITO ANTIDESLIZANTE PARA AMBIENTES 65,681.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03.02 PISO DE PORCELANATO ALTO TRANSITO ANTIDESLIZANTE PARA VEREDAS 41,788.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03.03 PISO DE CERAMICO ANTIDESLIZANTE DE ALTO TRANSITO 4,226.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04 ZOCALOS Y CONTRAZOCALOS 28,505.27
02.04.01 CONTRAZOCALO DE PORCELANATO H=0.10 M. PARA AMBIENTES 11,652.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMACRONOGRAMA
DE OBRA VALORIZADO
DE OBRA- V

MEJORAMIENTO Y MEJORAMIENTO
AMPLIACION DELYSERVICIO
AMPLIACION
EDUCATIVO
DEL SERVICIO
DE NIVEL
EDUCATIVO
PRIMARIO
DEI.E.E.
NIVELN°30318
PRIMARIO
DEL I.E.E.
CENTRO N°30318
POBLADO
DEL CENTRO
MENOR P
D

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
02.04.02 CONTRAZOCALO DE PORCELANATO H=0.10 M. PARA VEREDAS 11,342.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04.03 CONTRAZOCALO DE CERAMICO H=0.10 M. 5,139.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04.04 ZOCALO DE CERAMICO 370.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.05 CUBIERTAS 46,545.41
02.05.01 CUBIERTA DE TEJA ANDINA TIPO ETERNIT 46,545.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06 CARPINTERIA DE MADERA 17,229.50
02.06.01 PUERTA APANELADA DE CEDRO TIPO P-01 INC. INSTALACION 7,810.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06.02 PUERTA APANELADA DE CEDRO TIPO P-02 INC. INSTALACION 5,583.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06.03 PUERTA APANELADA DE CEDRO TIPO P-03 INC. INSTALACION 3,836.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07 CARPINTERIA METALICA 24,910.00
02.07.01 PORTON METALICO PM-01 INC. PINTADO E INSTALACION 860.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.02 VENTANA METALICA V-01 INC. PINTADO E INSTALACION 1,120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.03 VENTANA METALICA V-02 INC. PINTADO E INSTALACION 4,830.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.04 VENTANA METALICA V-03 INC. PINTADO E INSTALACION 2,200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.05 VENTANA METALICA V-04 INC. PINTADO E INSTALACION 1,120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.06 VENTANA METALICA V-05 INC. PINTADO E INSTALACION 4,830.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.07 VENTANA METALICA V-06 INC. PINTADO E INSTALACION 3,520.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.08 VENTANA METALICA V-07 INC. PINTADO E INSTALACION 1,140.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.09 VENTANA METALICA V-08 INC. PINTADO E INSTALACION 5,290.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.08 CARPINTERIA EN MELAMINA 5,580.00
02.08.01 SEPARADOR DE BAÑOS TIPO 01 5,580.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.09 CERRAJERIA 7,251.54
02.09.01 CERRADURA PARA PUERTA DE TRES GOLPES 4,796.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.09.02 CERRADURA PARA PUERTA TIPO PERILLA 2,454.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.10 VIDRIOS, CRISTALES Y SIMILARES 41,997.06
02.10.01 VIDRIO LAMINAR BUTIRAL DE POLIVINILO INCOLORO 41,997.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11 PINTURAS 90,207.74
02.11.01 PINTURA LATEX EN CIELO RASO DOS MANOS 22,833.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.02 PINTURA LATEX EN MUROS EXTERIORES DOS MANOS 17,654.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.03 PINTURA LATEX EN MUROS INTERIORES DOS MANOS 30,153.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.04 PINTURA LATEX EN VIGAS DOS MANOS 10,154.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMACRONOGRAMA
DE OBRA VALORIZADO
DE OBRA- V

MEJORAMIENTO Y MEJORAMIENTO
AMPLIACION DELYSERVICIO
AMPLIACION
EDUCATIVO
DEL SERVICIO
DE NIVEL
EDUCATIVO
PRIMARIO
DEI.E.E.
NIVELN°30318
PRIMARIO
DEL I.E.E.
CENTRO N°30318
POBLADO
DEL CENTRO
MENOR P
D

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
02.11.05 PINTURA LATEX EN COLUMNAS DOS MANOS 7,342.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.06 PINTURA LATEX PARA DERRAMES EN PUERTAS Y VENTANAS DOS MANOS 1,560.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.07 PINTURA PARA PIZARRA 510.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12 JUNTAS 11,129.11
02.12.01 JUNTAS ASFALTICAS EN VEREDAS 2,066.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12.02 JUNTAS ASFALTICAS PARA SARDINEL DE JARDIN 91.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12.03 JUNTAS ASFALTICAS PARA COLUMNETAS 8,971.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03 INSTALACIONES SANITARIAS 58,301.24
03.01 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO 8,682.61
03.01.01 MOVIMIENTO DE TIERRAS 1,649.41
03.01.01.01 EXCAVACION DE ZANJAS PARA TUBERIA DE AGUA 937.63 0.00 0.00 0.00 0.00 937.63 0.00 0.00 0.0
03.01.01.02 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 681.36 0.00 0.00 0.00 0.00 0.00 596.19 85.17 0.0
03.01.01.03 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 30.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.01.02 SALIDAS 2,360.13
03.01.02.01 SALIDA DE AGUA FRIA PVC SAP DE 1/2" 2,254.32 0.00 0.00 0.00 0.00 0.00 120.77 281.79 281.7
03.01.02.02 SALIDA DE AGUA PARA RIEGO PVC SAP DE 1/2" 56.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 56.6
03.01.02.03 SALIDA DE AGUA FRIA CONTRA INCENDIO PVC SAP DE 2" 49.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 49.1
03.01.03 RED DE DISTRIBUCION 4,673.07
03.01.03.01 TUBERIA PARA AGUA POTABLE PVC SAP DE 1/2" C-10 2,106.15 0.00 0.00 0.00 0.00 0.00 0.00 254.19 254.1
03.01.03.02 TUBERIA PARA RIEGO PVC SAP DE 1/2" C-10 72.72 0.00 0.00 0.00 0.00 0.00 0.00 72.72 0.0
03.01.03.03 TUBERIA CONTRA INCENDIO PVC SAP DE 2" C-10 80.28 0.00 0.00 0.00 0.00 0.00 0.00 80.28 0.0
03.01.03.04 VALVULA DE COMPUERTA DE 1/2" 1,834.94 0.00 0.00 0.00 0.00 0.00 0.00 65.53 229.3
03.01.03.05 VALVULA DE COMPUERTA DE 2" 127.03 0.00 0.00 0.00 0.00 0.00 0.00 2.23 15.6
03.01.03.06 GRIFO CONTRA INCENDIO 451.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02 SISTEMA DE DESAGUE 19,414.41
03.02.01 MOVIMIENTO DE TIERRAS 1,805.63
03.02.01.01 EXCAVACION DE ZANJAS PARA TUBERIA DE DESAGUE 1,045.58 0.00 0.00 0.00 0.00 0.00 0.00 1,045.58 0.0
03.02.01.02 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 703.40 0.00 0.00 0.00 0.00 0.00 0.00 351.70 351.7
03.02.01.03 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 56.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02.02 SALIDAS 5,996.34
03.02.02.01 SALIDA DE DESAGUE CON PVC SAL DE 2" 2,613.30 0.00 0.00 0.00 0.00 0.00 0.00 190.06 332.6
CRONOGRAMACRONOGRAMA
DE OBRA VALORIZADO
DE OBRA- V

MEJORAMIENTO Y MEJORAMIENTO
AMPLIACION DELYSERVICIO
AMPLIACION
EDUCATIVO
DEL SERVICIO
DE NIVEL
EDUCATIVO
PRIMARIO
DEI.E.E.
NIVELN°30318
PRIMARIO
DEL I.E.E.
CENTRO N°30318
POBLADO
DEL CENTRO
MENOR P
D

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
03.02.02.02 SALIDA DE DESAGUE CON PVC SAL DE 4" 1,461.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 91.3
03.02.02.03 SALIDA DE VENTILACION CON PVC SAL DE 2" 1,921.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02.03 RED DE DISTRIBUCION 11,612.44
03.02.03.01 TUBERIA PARA DESAGUE CON PVC SAL DE 2" 1,038.11 0.00 0.00 0.00 0.00 0.00 0.00 72.85 127.4
03.02.03.02 TUBERIA PARA DESAGUE CON PVC SAL DE 4" 5,387.78 0.00 0.00 0.00 0.00 0.00 0.00 96.21 673.4
03.02.03.03 TUBERIA PARA VENTILACION CON PVC SAL DE 2" 2,348.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 132.9
TUBERIA PARA CAJA DE REGISTRO CON PVC SAL DE 2" 2,837.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03 SISTEMA DE DESAGUE PLUVIAL 15,728.96
03.03.01 TUBERIA PVC SAL PLUVIAL DE 4" 4,216.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.02 TUBERIA PVC SAL PLUVIAL DE 3" 1,789.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA FALSA COLUMNA 5,450.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.04 CONCRETO F'C=175 KG/CM2 PARA FALSA COLUMNA 3,930.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.05 ACCESORIOS PARA DESAGUE PLUVIAL 341.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04 APARATOS Y ACCESORIOS SANITARIOS 14,475.26
03.04.01 INODORO DE LOSA TANQUE BAJO 5,908.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.02 LAVATORIO DE LOSA CON PEDESTAL 4,385.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.03 PAPELERA DE LOSA 1,190.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.04 SUMIDERO DE BRONCE ROSCADO DE 2" 985.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.05 REGISTRO ROSCADO DE BRONCE DE 4" 1,381.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.06 CAJA DE REGISTRO PARA DESAGUE DE 624.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04 INSTALACIONES ELECTRICAS 110,524.39
04.01 PRIMER PISO 64,859.19
04.01.01 SALIDAS 13,513.89
04.01.01.01 SALIDAD DE TECHO PARA CENTRO DE LUZ 6,566.30 0.00 0.00 0.00 0.00 0.00 0.00 1,094.38 1,915.1
04.01.01.02 SALIDA DE TOMACORRIENTE BIPOLARES CON LINEA A TIERRA 4,391.95 0.00 0.00 0.00 0.00 0.00 0.00 548.99 1,921.4
04.01.01.03 SALIDA DE TOMACORRIENTE PARA ALUMBRADO DE EMERGENCIA 363.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.01.04 SALIDA PARA INTERRUPTORES EN CONMUTACION 1,057.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.01.05 SALIDA PARA INTERRUPTORES SIMPLES 298.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 298.5
04.01.01.06 SALIDA PARA INTERRUPTORES DOBLES 248.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.4
04.01.01.07 SALIDA PARA INTERRUPTORES TRIPLES 587.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 419.5
04.01.02 CANALIZACION DE TUBERIAS PVC 20,053.08
CRONOGRAMACRONOGRAMA
DE OBRA VALORIZADO
DE OBRA- V

MEJORAMIENTO Y MEJORAMIENTO
AMPLIACION DELYSERVICIO
AMPLIACION
EDUCATIVO
DEL SERVICIO
DE NIVEL
EDUCATIVO
PRIMARIO
DEI.E.E.
NIVELN°30318
PRIMARIO
DEL I.E.E.
CENTRO N°30318
POBLADO
DEL CENTRO
MENOR P
D

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
04.01.02.01 TUBERIA DE 25 MM. PVC SEL (1") 4,054.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.02.02 TUBERIA DE 20 MM. PVC SEL (3/4") 15,998.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03 CONDUCTORES 8,301.84
04.01.03.01 CONDUCTOR (2x10+1x10) MM. THHW 358.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.02 CONDUCTOR (1x10) MM2. THHW 146.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.03 CONDUCTOR (2x6+1x10) MM2 THHW 975.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.04 CONDUCTOR (2x2.5) MM2. THHW 4,612.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.05 CONDUCTOR (2x4.0) MM2. THHW 2,209.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.04 TABLEROS ELECTRICOS 4,700.00
04.01.04.01 TABLERO GENERAL Y TABLEROS DE DISTRIBUCION 4,700.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.05 CONEXION A TIERRA 5,600.00
04.01.05.01 POZO A TIERRA 5,600.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06 ARTEFACTOS Y ACCESORIOS ELECTRICOS 11,490.39
04.01.06.01 FLUORESCENTE RECTO INCLUYE EQUIPO Y PANTALLA 7,678.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.02 SPOT LIGHT 656.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.03 LUCES DE EMERGENCIA CON BATERIA - 02 FAROS 637.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.04 TOMACORRIENTE BIPOLAR 1,779.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.05 TOMACORRIENTE SIMPLE 125.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.06 INTERRUPTOR CONMUTACION 210.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.07 INTERRUPTOR SIMPLE 107.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.08 INTERRUPTOR DOBLE 94.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.09 INTERRUPTOR TRIPLE 201.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.07 OTROS 1,199.99
04.01.07.02 DISPOSITIVOS Y EQUIPOS DE SEGURIDAD 1,199.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02 SEGUNDO PISO 45,665.20
04.02.01 SALIDAS 13,605.84
04.02.01.01 SALIDAD DE TECHO PARA CENTRO DE LUZ 6,212.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.02 SALIDA DE TOMACORRIENTE BIPOLARES CON LINEA A TIERRA 5,218.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.03 SALIDA DE TOMACORRIENTE PARA ALUMBRADO DE EMERGENCIA 303.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.04 SALIDA PARA INTERRUPTORES EN CONMUTACION 704.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMACRONOGRAMA
DE OBRA VALORIZADO
DE OBRA- V

MEJORAMIENTO Y MEJORAMIENTO
AMPLIACION DELYSERVICIO
AMPLIACION
EDUCATIVO
DEL SERVICIO
DE NIVEL
EDUCATIVO
PRIMARIO
DEI.E.E.
NIVELN°30318
PRIMARIO
DEL I.E.E.
CENTRO N°30318
POBLADO
DEL CENTRO
MENOR P
D

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
04.02.01.05 SALIDA PARA INTERRUPTORES SIMPLES 298.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.06 SALIDA PARA INTERRUPTORES DOBLES 398.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.07 SALIDA PARA INTERRUPTORES TRIPLES 469.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.02 CANALIZACION DE TUBERIAS PVC 13,965.19
04.02.02.01 TUBERIA DE 20 MM. PVC SEL (3/4") 13,965.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.03 CONDUCTORES 6,384.59
04.02.03.01 CONDUCTOR (2x2.5) MM2. THHW 3,370.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.03.02 CONDUCTOR (2x4.0) MM2. THHW 3,014.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04 ARTEFACTOS Y ACCESORIOS ELECTRICOS 11,709.58
04.02.04.01 FLUORESCENTE RECTO INCLUYE EQUIPO Y PANTALLA 8,432.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.02 LUCES DE EMERGENCIA CON BATERIA - 02 FAROS 637.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.03 TOMACORRIENTE BIPOLAR 1,779.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.04 TOMACORRIENTE SIMPLE 104.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.05 INTERRUPTOR CONMUTACION 336.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.06 INTERRUPTOR SIMPLE 107.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.07 INTERRUPTOR DOBLE 150.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.08 INTERRUPTOR TRIPLE 161.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0

COSTO DIRECTO 1,990,094.42 58,567.27 11,285.64 13,235.59 13,954.08 22,199.07 56,029.55 88,256.67 107,755.4
GASTOS GENERALES 10.00% 199,009.44 5,856.73 1,128.56 1,323.56 1,395.41 2,219.91 5,602.96 8,825.67 10,775.5
UTILIDAD 10.00% 199,009.44 5,856.73 1,128.56 1,323.56 1,395.41 2,219.91 5,602.96 8,825.67 10,775.5
SUB TOTAL 2,388,113.30 70,280.73 13,542.76 15,882.71 16,744.90 26,638.89 67,235.47 105,908.01 129,306.4
IGV 18.00% 429,860.39 12,650.53 2,437.70 2,858.89 3,014.08 4,795.00 12,102.38 19,063.44 23,275.1
PRESUPUESTO PARCIAL 2,817,973.69 82,931.26 15,980.46 18,741.60 19,758.98 31,433.89 79,337.85 124,971.45 152,581.6
PORCENTAJE DE AVANCE 2.94% 0.57% 0.67% 0.70% 1.12% 2.82% 4.43% 5.41%
PORCENTAJE DE AVANCE ACUMULADO 100.00% 4.88% 13.78%
CRONOGRAMA DE OBRA
CRONOGRAMA
VALORIZADO
DE- BLOQU
OBRA V

MEJORAMIENTO Y AMPLIACION
MEJORAMIENTO
DEL SERVICIO
Y AMPLIACION
EDUCATIVO DE
DEL
NIVEL
SERVICIO
PRIMARIO
EDUCATIVO
I.E.E. N°30318
DE NIVEL
DELPRIMARIO
CENTRO POBLADO
I.E.E. N°30318
MENOR
DEL CENTRO
DE YANAM
P

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
BLOQUE AB - YANAMUCLO 1,990,094.42
01 ESTRUCTURAS 1,077,684.21 MES 01 MES 02 MES 03
01.01 OBRAS PROVISIONALES 44,569.85
01.01.01 CONSTRUCCION PROVISIONAL DE OFICINA 384.00 384.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.02 CONSTRUCCION PROVISIONAL DE CASETA PARA GUARDIANIA 144.00 144.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.03 CONSTRUCCION PROVISIONAL DE VESTIDOR PARA PERSONAL 480.00 480.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.04 GUARDIANIA DE OBRA 37,785.60 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.4
01.01.05 ALQUILER DE ALMACEN 1,440.00 56.00 56.00 56.00 56.00 56.00 56.00 56.00 56.0
01.01.06 CARTEL DE IDENTIFICACION DE OBRA (3.60x2.40) 856.25 0.00 856.25 0.00 0.00 0.00 0.00 0.00 0.0
01.01.07 AGUA PARA CONSUMO EN LA CONSTRUCCION 1,080.00 42.00 42.00 42.00 42.00 42.00 42.00 42.00 42.0
01.01.08 DESAGUE PARA LA CONSTRUCCION 750.00 0.00 750.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.09 ENERGIA ELECTRICA PROVISIONAL PARA LA CONSTRUCCION 1,650.00 64.17 64.17 64.17 64.17 64.17 64.17 64.17 64.1
01.02 TRABAJOS PRELIMINARES 66,669.81
01.02.01 DEMOLICION DE CONSTRUCCION EXISTENTE 46,142.30 46,142.30 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.02.02 ELIMINACION DE CONSTRUCCION DEMOLIDA DP=2 KM. 8,433.24 6,324.93 2,108.31 0.00 0.00 0.00 0.00 0.00 0.0
01.02.03 LIMPIEZA DEL TERRENO MANUAL 3,218.46 0.00 3,218.46 0.00 0.00 0.00 0.00 0.00 0.0
01.02.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS 2,500.00 2,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.02.05 TRAZO, NIVELACION Y REPLANTEO PARA EDIFICACION 2,770.32 0.00 1,007.39 1,762.93 0.00 0.00 0.00 0.00 0.0
01.02.06 CONTROL TOPOGRAFICO DURANTE EJECUCION DE OBRA 3,605.49 841.28 841.28 841.28 841.28 240.37 0.00 0.00 0.0
01.03 MOVIMIENTO DE TIERRAS 32,782.10
01.03.01 EXCAVACION DE ZANJAS PARA ZAPATAS H=1.20 - 1.50 M. 9,038.33 0.00 753.19 5,272.36 3,012.78 0.00 0.00 0.00 0.0
01.03.02 EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS 2,632.52 0.00 0.00 548.44 767.82 767.82 548.44 0.00 0.0
01.03.03 EXCAVACION DE ZANJAS PARA JARDIN 31.43 0.00 0.00 31.43 0.00 0.00 0.00 0.00 0.0
01.03.04 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 4,776.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,776.2
01.03.05 REFINE, NIVELACION Y COMPACTACION DE PLATAFORMA 4,486.78 0.00 0.00 0.00 0.00 0.00 560.85 3,925.93 0.0
01.03.06 REFINE, NIVELACION Y COMPACTACION DE BASE PARA VEREDAS 6,019.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,019.8
01.03.07 RELLENO Y COMPACTACION DE PODIUM CON MATERIAL PROPIO 301.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 301.5
01.03.08 ACARREO INTERNO DE MATERIAL EXCEDENTE DP=20 M. 2,694.29 0.00 0.00 0.00 0.00 0.00 0.00 1,347.15 1,347.1
01.03.09 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 2,801.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.04 OBRAS DE CONCRETO SIMPLE 90,690.96
CRONOGRAMA DE OBRA
CRONOGRAMA
VALORIZADO
DE- BLOQU
OBRA V

MEJORAMIENTO Y AMPLIACION
MEJORAMIENTO
DEL SERVICIO
Y AMPLIACION
EDUCATIVO DE
DEL
NIVEL
SERVICIO
PRIMARIO
EDUCATIVO
I.E.E. N°30318
DE NIVEL
DELPRIMARIO
CENTRO POBLADO
I.E.E. N°30318
MENOR
DEL CENTRO
DE YANAM
P

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.04.01 SOLADO PARA ZAPATAS E=0.10 M. 1:10 CEMENTO - HORMIGON 5,467.93 0.00 0.00 0.00 911.32 3,189.63 1,366.98 0.00 0.0
01.04.02 CONCRETO 1:10+30% P.G. PARA CIMIENTOS CORRIDOS 21,485.78 0.00 0.00 0.00 0.00 8,057.17 9,400.03 4,028.58 0.0
01.04.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO 6,829.64 0.00 0.00 0.00 0.00 0.00 2,276.55 3,983.96 569.1
01.04.04 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS 3,042.44 0.00 0.00 0.00 0.00 0.00 0.00 1,521.22 1,521.2
01.04.05 FALSO PISO DE CONCRETO E=0.10 M. CEMENTO - HORMIGON 16,168.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9,701.1
01.04.06 ENCOFRADO Y DESENCOFRADO NORMAL PARA VEREDAS 4,000.12 0.00 0.00 0.00 0.00 2,000.06 2,000.06 0.00 0.0
01.04.07 CONCRETO F'C=140 KG/CM2 PARA VEREDAS INCLUYE ACABADOS 19,168.71 0.00 0.00 0.00 0.00 0.00 5,750.61 13,418.10 0.0
01.04.08 ENCOFRADO Y DESENCOFRADO NORMAL PARA CUNETAS 3,648.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,648.2
01.04.09 CONCRETO F'C=140 KG/CM2 PARA CUNETAS INCLUYE ACABADOS 4,971.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,142.8
01.04.10 ENCOFRADO Y DESENCOFRADO NORMAL PARA JARDIN 3,281.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,460.7
01.04.11 CONCRETO F'C=140 KG/CM2 PARA JARDIN 2,627.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 656.7
01.05 OBRAS DE CONCRETO ARMADO 772,773.58
01.05.01 ZAPATAS 49,980.45
01.05.01.01 ACERO F'Y= 4200 KG/CM2 PARA ZAPATAS 11,429.97 0.00 0.00 0.00 0.00 0.00 10,001.22 1,428.75 0.0
01.05.01.02 CONCRETO F'C=210 KG/CM2 PARA ZAPATAS 38,550.48 0.00 0.00 0.00 0.00 0.00 0.00 23,130.29 15,420.1
01.05.02 COLUMNAS 113,702.39
01.05.02.01 ACERO F'Y= 4200 KG/CM2 PARA COLUMNAS 43,524.40 0.00 0.00 0.00 0.00 0.00 4,974.22 8,704.88 8,704.8
01.05.02.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS 47,502.09 0.00 0.00 0.00 0.00 0.00 0.00 3,064.65 10,726.2
01.05.02.03 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS 22,675.90 0.00 0.00 0.00 0.00 0.00 0.00 2,451.45 4,290.0
01.05.03 COLUMNETAS 43,559.15
01.05.03.01 ACERO F'Y= 4200 KG/CM2 PARA COLUMNETAS 13,992.87 0.00 0.00 0.00 0.00 0.00 0.00 1,023.87 2,389.0
01.05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNETAS 20,137.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,179.6
01.05.03.03 CONCRETO F'C=175 KG/CM2 PARA COLUMNETAS 9,428.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 764.4
01.05.04 VIGAS 210,855.32
01.05.04.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA VIGAS 79,074.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.04.02 ACERO F'Y= 4200 KG/CM2 PARA VIGAS 84,562.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.04.03 CONCRETO F'C=210 KG/CM2 PARA VIGAS 47,218.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05 LOSA ALIGERADA 288,844.61
01.05.05.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA ALIGERADA 134,294.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.02 BLOQUETA DE ARCILLA H=0.15 M. PARA LOSA ALIGERADA 21,223.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.03 BLOQUETA DE ARCILLA H=0.12 M. PARA LOSA ALIGERADA 21,181.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA
CRONOGRAMA
VALORIZADO
DE- BLOQU
OBRA V

MEJORAMIENTO Y AMPLIACION
MEJORAMIENTO
DEL SERVICIO
Y AMPLIACION
EDUCATIVO DE
DEL
NIVEL
SERVICIO
PRIMARIO
EDUCATIVO
I.E.E. N°30318
DE NIVEL
DELPRIMARIO
CENTRO POBLADO
I.E.E. N°30318
MENOR
DEL CENTRO
DE YANAM
P

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.05.05.04 ACERO F'Y= 4200 KG/CM2 PARA LOSA ALIGERADA 57,235.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.05 CONCRETO F'C=210 KG/CM2 PARA LOSA ALIGERADA 54,910.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06 ESCALERAS 65,831.66
01.05.06.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESCALERAS 18,440.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06.02 ACERO F'Y= 4200 KG/CM2 PARA ESCALERAS 9,971.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06.03 CONCRETO F'C=210 KG/CM2 PARA ESCALERAS 37,419.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.06 TANQUE CISTERNA 64,777.91
01.06.01 EXCAVACION DE ZANJAS PARA CIMENTACION 2,738.86 0.00 0.00 2,738.86 0.00 0.00 0.00 0.00 0.0
01.06.02 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 889.89 0.00 0.00 0.00 0.00 0.00 889.89 0.00 0.0
01.06.03 SOLADO PARA ZAPATAS E=0.10 M. 1:10 CEMENTO - HORMIGON 289.53 0.00 0.00 289.53 0.00 0.00 0.00 0.00 0.0
01.06.04 ACERO F'Y= 4200 KG/CM2 PARA ZAPATAS 581.27 0.00 0.00 0.00 581.27 0.00 0.00 0.00 0.0
01.06.05 CONCRETO F'C=210 KG/CM2 PARA ZAPATAS 2,041.31 0.00 0.00 0.00 2,041.31 0.00 0.00 0.00 0.0
01.06.06 ACERO F'Y= 4200 KG/CM2 PARA COLUMNAS 4,301.61 0.00 0.00 0.00 3,584.68 716.93 0.00 0.00 0.0
01.06.07 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS 3,278.17 0.00 0.00 0.00 0.00 1,966.90 1,311.27 0.00 0.0
01.06.08 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS 1,901.00 0.00 0.00 0.00 0.00 475.25 1,425.75 0.00 0.0
01.06.09 ENCOFRADO Y DESENCOFRADO NORMAL PARA VIGAS 2,007.72 0.00 0.00 0.00 0.00 0.00 1,003.86 1,003.86 0.0
01.06.10 ACERO F'Y= 4200 KG/CM2 PARA VIGAS 3,065.73 0.00 0.00 0.00 0.00 0.00 0.00 3,065.73 0.0
01.06.11 CONCRETO F'C=210 KG/CM2 PARA VIGAS 1,380.31 0.00 0.00 0.00 0.00 0.00 0.00 1,380.31 0.0
01.06.12 ACERO F'Y= 4200 KG/CM2 PARA CISTERNA 5,076.96 0.00 0.00 0.00 0.00 0.00 5,076.96 0.00 0.0
01.06.13 ENCOFRADO Y DESENCOFRADO NORMAL PARA CISTERNA 3,718.82 0.00 0.00 0.00 0.00 1,859.41 1,859.41 0.00 0.0
01.06.14 CONCRETO F'C=210 KG/CM2 PARA CISTERNA 4,092.64 0.00 0.00 0.00 0.00 0.00 4,092.64 0.00 0.0
01.06.15 ACERO F'Y= 4200 KG/CM2 PARA TANQUE ELEVADO 4,880.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,880.2
01.06.16 ENCOFRADO Y DESENCOFRADO NORMAL PARA TANQUE ELEVADO 4,492.10 0.00 0.00 0.00 0.00 0.00 0.00 4,492.10 0.0
01.06.17 CONCRETO F'C=210 KG/CM2 PARA TANQUE ELEVADO 2,618.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,618.4
01.06.18 ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA ALIGERADA 453.94 0.00 0.00 0.00 0.00 0.00 453.94 0.00 0.0
01.06.19 BLOQUETA DE ARCILLA H=0.15 M. PARA LOSA ALIGERADA 182.52 0.00 0.00 0.00 0.00 0.00 182.52 0.00 0.0
01.06.20 ACERO F'Y= 4200 KG/CM2 PARA LOSA ALIGERADA 321.44 0.00 0.00 0.00 0.00 0.00 321.44 0.00 0.0
01.06.21 CONCRETO F'C=210 KG/CM2 PARA LOSA ALIGERADA 224.55 0.00 0.00 0.00 0.00 0.00 0.00 224.55 0.0
01.06.22 MURO DE SOGA CON LADRILLO K.K. 18H 9X13X24 CM. 2,287.88 0.00 0.00 0.00 0.00 0.00 0.00 2,287.88 0.0
01.06.23 TARRAJEO EN MUROS INTERIORES FROTACHADO MEZCLA 1:5 851.76 0.00 0.00 0.00 0.00 0.00 0.00 851.76 0.0
01.06.24 TARRAJEO INTERIOR CON IMPERMEABILIZANTE DE TANQUE CISTERNA 1,402.11 0.00 0.00 0.00 0.00 0.00 0.00 701.06 701.0
CRONOGRAMA DE OBRA
CRONOGRAMA
VALORIZADO
DE- BLOQU
OBRA V

MEJORAMIENTO Y AMPLIACION
MEJORAMIENTO
DEL SERVICIO
Y AMPLIACION
EDUCATIVO DE
DEL
NIVEL
SERVICIO
PRIMARIO
EDUCATIVO
I.E.E. N°30318
DE NIVEL
DELPRIMARIO
CENTRO POBLADO
I.E.E. N°30318
MENOR
DEL CENTRO
DE YANAM
P

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.06.25 TARRAJEO INTERIOR CON IMPERMEABILIZANTE DE TANQUE ELEVADO 886.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 886.6
01.06.26 TARRAJEO EXTERIOR FROTACHADO DE ESTRUCTURA MEZCLA 1:5 4,004.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,004.0
01.06.27 PINTURA LATEX EN ESTRUCTURA DOS MANOS 1,975.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.06.28 INSTALACION DE ACCESORIOS DE TANQUE CISTERNA 2,112.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,112.3
01.06.29 INSTALACION DE PUERTA DE MADERA P-1 320.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 320.0
01.06.30 INSTALACION DE ESCALERA METALICA SEGUN DISEÑO 2,400.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,400.0
01.07 PRUEBAS Y ENSAYOS DE CALIDAD 3,820.00
01.07.01 PROCTOR MODIFICADO 160.00 0.00 0.00 0.00 0.00 160.00 0.00 0.00 0.0
01.07.02 DENSIDAD DE CAMPO 480.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.7
01.07.03 DISEÑO DE MEZCLA 540.00 0.00 0.00 0.00 462.86 77.14 0.00 0.00 0.0
01.07.04 ROTURA DE PROBETA (COMPRESION SIMPLE) 2,640.00 0.00 0.00 0.00 0.00 0.00 65.19 228.15 228.1
01.08 FLETE 1,600.00
01.08.01 FLETE TERRESTRE 1,600.00 119.15 119.15 119.15 119.15 119.15 119.15 119.15 119.1
02 ARQUITECTURA 743,584.58
02.01 MUROS Y TABIQUES 140,636.03
02.01.01 MURO DE SOGA CON LADRILLO K.K. 18H 9X13X24 CM. 140,051.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
MURO DE CABEZA CON LADRILLO K.K. 18H 9X13X24 CM. 584.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02 REVOQUES, ENLUCIDOS Y MOLDURAS 217,896.67
02.02.01 TARRAJEO EN CIELO RASO FROTACHADO MEZCLA 1:4 62,875.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.02 TARRAJEO EN MUROS INTERIORES FROTACHADO MEZCLA 1:5 63,390.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.03 TARRAJEO EN MUROS EXTERIORES FROTACHADO MEZCLA 1:5 35,522.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.04 TARRAJEO EN VIGAS MEZCLA 1:4 27,465.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.05 TARRAJEO EN COLUMNAS MEZCLA 1:5 19,492.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.06 VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS MEZCLA 1:5 9,002.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.07 TARRAJEO DE PODIUM MEZCLA 1:5 147.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03 PISOS Y PAVIMENTOS 111,696.25
02.03.01 PISO DE PORCELANATO ALTO TRANSITO ANTIDESLIZANTE PARA AMBIENTES 65,681.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03.02 PISO DE PORCELANATO ALTO TRANSITO ANTIDESLIZANTE PARA VEREDAS 41,788.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03.03 PISO DE CERAMICO ANTIDESLIZANTE DE ALTO TRANSITO 4,226.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04 ZOCALOS Y CONTRAZOCALOS 28,505.27
02.04.01 CONTRAZOCALO DE PORCELANATO H=0.10 M. PARA AMBIENTES 11,652.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA
CRONOGRAMA
VALORIZADO
DE- BLOQU
OBRA V

MEJORAMIENTO Y AMPLIACION
MEJORAMIENTO
DEL SERVICIO
Y AMPLIACION
EDUCATIVO DE
DEL
NIVEL
SERVICIO
PRIMARIO
EDUCATIVO
I.E.E. N°30318
DE NIVEL
DELPRIMARIO
CENTRO POBLADO
I.E.E. N°30318
MENOR
DEL CENTRO
DE YANAM
P

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
02.04.02 CONTRAZOCALO DE PORCELANATO H=0.10 M. PARA VEREDAS 11,342.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04.03 CONTRAZOCALO DE CERAMICO H=0.10 M. 5,139.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04.04 ZOCALO DE CERAMICO 370.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.05 CUBIERTAS 46,545.41
02.05.01 CUBIERTA DE TEJA ANDINA TIPO ETERNIT 46,545.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06 CARPINTERIA DE MADERA 17,229.50
02.06.01 PUERTA APANELADA DE CEDRO TIPO P-01 INC. INSTALACION 7,810.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06.02 PUERTA APANELADA DE CEDRO TIPO P-02 INC. INSTALACION 5,583.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06.03 PUERTA APANELADA DE CEDRO TIPO P-03 INC. INSTALACION 3,836.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07 CARPINTERIA METALICA 24,910.00
02.07.01 PORTON METALICO PM-01 INC. PINTADO E INSTALACION 860.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.02 VENTANA METALICA V-01 INC. PINTADO E INSTALACION 1,120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.03 VENTANA METALICA V-02 INC. PINTADO E INSTALACION 4,830.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.04 VENTANA METALICA V-03 INC. PINTADO E INSTALACION 2,200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.05 VENTANA METALICA V-04 INC. PINTADO E INSTALACION 1,120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.06 VENTANA METALICA V-05 INC. PINTADO E INSTALACION 4,830.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.07 VENTANA METALICA V-06 INC. PINTADO E INSTALACION 3,520.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.08 VENTANA METALICA V-07 INC. PINTADO E INSTALACION 1,140.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.09 VENTANA METALICA V-08 INC. PINTADO E INSTALACION 5,290.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.08 CARPINTERIA EN MELAMINA 5,580.00
02.08.01 SEPARADOR DE BAÑOS TIPO 01 5,580.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.09 CERRAJERIA 7,251.54
02.09.01 CERRADURA PARA PUERTA DE TRES GOLPES 4,796.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.09.02 CERRADURA PARA PUERTA TIPO PERILLA 2,454.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.10 VIDRIOS, CRISTALES Y SIMILARES 41,997.06
02.10.01 VIDRIO LAMINAR BUTIRAL DE POLIVINILO INCOLORO 41,997.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11 PINTURAS 90,207.74
02.11.01 PINTURA LATEX EN CIELO RASO DOS MANOS 22,833.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.02 PINTURA LATEX EN MUROS EXTERIORES DOS MANOS 17,654.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.03 PINTURA LATEX EN MUROS INTERIORES DOS MANOS 30,153.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.04 PINTURA LATEX EN VIGAS DOS MANOS 10,154.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA
CRONOGRAMA
VALORIZADO
DE- BLOQU
OBRA V

MEJORAMIENTO Y AMPLIACION
MEJORAMIENTO
DEL SERVICIO
Y AMPLIACION
EDUCATIVO DE
DEL
NIVEL
SERVICIO
PRIMARIO
EDUCATIVO
I.E.E. N°30318
DE NIVEL
DELPRIMARIO
CENTRO POBLADO
I.E.E. N°30318
MENOR
DEL CENTRO
DE YANAM
P

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
02.11.05 PINTURA LATEX EN COLUMNAS DOS MANOS 7,342.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.06 PINTURA LATEX PARA DERRAMES EN PUERTAS Y VENTANAS DOS MANOS 1,560.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.07 PINTURA PARA PIZARRA 510.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12 JUNTAS 11,129.11
02.12.01 JUNTAS ASFALTICAS EN VEREDAS 2,066.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12.02 JUNTAS ASFALTICAS PARA SARDINEL DE JARDIN 91.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12.03 JUNTAS ASFALTICAS PARA COLUMNETAS 8,971.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03 INSTALACIONES SANITARIAS 58,301.24
03.01 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO 8,682.61
03.01.01 MOVIMIENTO DE TIERRAS 1,649.41
03.01.01.01 EXCAVACION DE ZANJAS PARA TUBERIA DE AGUA 937.63 0.00 0.00 0.00 0.00 937.63 0.00 0.00 0.0
03.01.01.02 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 681.36 0.00 0.00 0.00 0.00 0.00 596.19 85.17 0.0
03.01.01.03 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 30.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.01.02 SALIDAS 2,360.13
03.01.02.01 SALIDA DE AGUA FRIA PVC SAP DE 1/2" 2,254.32 0.00 0.00 0.00 0.00 0.00 120.77 281.79 281.7
03.01.02.02 SALIDA DE AGUA PARA RIEGO PVC SAP DE 1/2" 56.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 56.6
03.01.02.03 SALIDA DE AGUA FRIA CONTRA INCENDIO PVC SAP DE 2" 49.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 49.1
03.01.03 RED DE DISTRIBUCION 4,673.07
03.01.03.01 TUBERIA PARA AGUA POTABLE PVC SAP DE 1/2" C-10 2,106.15 0.00 0.00 0.00 0.00 0.00 0.00 254.19 254.1
03.01.03.02 TUBERIA PARA RIEGO PVC SAP DE 1/2" C-10 72.72 0.00 0.00 0.00 0.00 0.00 0.00 72.72 0.0
03.01.03.03 TUBERIA CONTRA INCENDIO PVC SAP DE 2" C-10 80.28 0.00 0.00 0.00 0.00 0.00 0.00 80.28 0.0
03.01.03.04 VALVULA DE COMPUERTA DE 1/2" 1,834.94 0.00 0.00 0.00 0.00 0.00 0.00 65.53 229.3
03.01.03.05 VALVULA DE COMPUERTA DE 2" 127.03 0.00 0.00 0.00 0.00 0.00 0.00 2.23 15.6
03.01.03.06 GRIFO CONTRA INCENDIO 451.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02 SISTEMA DE DESAGUE 19,414.41
03.02.01 MOVIMIENTO DE TIERRAS 1,805.63
03.02.01.01 EXCAVACION DE ZANJAS PARA TUBERIA DE DESAGUE 1,045.58 0.00 0.00 0.00 0.00 0.00 0.00 1,045.58 0.0
03.02.01.02 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 703.40 0.00 0.00 0.00 0.00 0.00 0.00 351.70 351.7
03.02.01.03 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 56.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02.02 SALIDAS 5,996.34
03.02.02.01 SALIDA DE DESAGUE CON PVC SAL DE 2" 2,613.30 0.00 0.00 0.00 0.00 0.00 0.00 190.06 332.6
CRONOGRAMA DE OBRA
CRONOGRAMA
VALORIZADO
DE- BLOQU
OBRA V

MEJORAMIENTO Y AMPLIACION
MEJORAMIENTO
DEL SERVICIO
Y AMPLIACION
EDUCATIVO DE
DEL
NIVEL
SERVICIO
PRIMARIO
EDUCATIVO
I.E.E. N°30318
DE NIVEL
DELPRIMARIO
CENTRO POBLADO
I.E.E. N°30318
MENOR
DEL CENTRO
DE YANAM
P

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
03.02.02.02 SALIDA DE DESAGUE CON PVC SAL DE 4" 1,461.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 91.3
03.02.02.03 SALIDA DE VENTILACION CON PVC SAL DE 2" 1,921.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02.03 RED DE DISTRIBUCION 11,612.44
03.02.03.01 TUBERIA PARA DESAGUE CON PVC SAL DE 2" 1,038.11 0.00 0.00 0.00 0.00 0.00 0.00 72.85 127.4
03.02.03.02 TUBERIA PARA DESAGUE CON PVC SAL DE 4" 5,387.78 0.00 0.00 0.00 0.00 0.00 0.00 96.21 673.4
03.02.03.03 TUBERIA PARA VENTILACION CON PVC SAL DE 2" 2,348.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 132.9
TUBERIA PARA CAJA DE REGISTRO CON PVC SAL DE 2" 2,837.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03 SISTEMA DE DESAGUE PLUVIAL 15,728.96
03.03.01 TUBERIA PVC SAL PLUVIAL DE 4" 4,216.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.02 TUBERIA PVC SAL PLUVIAL DE 3" 1,789.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA FALSA COLUMNA 5,450.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.04 CONCRETO F'C=175 KG/CM2 PARA FALSA COLUMNA 3,930.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.05 ACCESORIOS PARA DESAGUE PLUVIAL 341.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04 APARATOS Y ACCESORIOS SANITARIOS 14,475.26
03.04.01 INODORO DE LOSA TANQUE BAJO 5,908.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.02 LAVATORIO DE LOSA CON PEDESTAL 4,385.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.03 PAPELERA DE LOSA 1,190.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.04 SUMIDERO DE BRONCE ROSCADO DE 2" 985.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.05 REGISTRO ROSCADO DE BRONCE DE 4" 1,381.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.06 CAJA DE REGISTRO PARA DESAGUE DE 624.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04 INSTALACIONES ELECTRICAS 110,524.39
04.01 PRIMER PISO 64,859.19
04.01.01 SALIDAS 13,513.89
04.01.01.01 SALIDAD DE TECHO PARA CENTRO DE LUZ 6,566.30 0.00 0.00 0.00 0.00 0.00 0.00 1,094.38 1,915.1
04.01.01.02 SALIDA DE TOMACORRIENTE BIPOLARES CON LINEA A TIERRA 4,391.95 0.00 0.00 0.00 0.00 0.00 0.00 548.99 1,921.4
04.01.01.03 SALIDA DE TOMACORRIENTE PARA ALUMBRADO DE EMERGENCIA 363.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.01.04 SALIDA PARA INTERRUPTORES EN CONMUTACION 1,057.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.01.05 SALIDA PARA INTERRUPTORES SIMPLES 298.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 298.5
04.01.01.06 SALIDA PARA INTERRUPTORES DOBLES 248.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.4
04.01.01.07 SALIDA PARA INTERRUPTORES TRIPLES 587.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 419.5
04.01.02 CANALIZACION DE TUBERIAS PVC 20,053.08
CRONOGRAMA DE OBRA
CRONOGRAMA
VALORIZADO
DE- BLOQU
OBRA V

MEJORAMIENTO Y AMPLIACION
MEJORAMIENTO
DEL SERVICIO
Y AMPLIACION
EDUCATIVO DE
DEL
NIVEL
SERVICIO
PRIMARIO
EDUCATIVO
I.E.E. N°30318
DE NIVEL
DELPRIMARIO
CENTRO POBLADO
I.E.E. N°30318
MENOR
DEL CENTRO
DE YANAM
P

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
04.01.02.01 TUBERIA DE 25 MM. PVC SEL (1") 4,054.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.02.02 TUBERIA DE 20 MM. PVC SEL (3/4") 15,998.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03 CONDUCTORES 8,301.84
04.01.03.01 CONDUCTOR (2x10+1x10) MM. THHW 358.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.02 CONDUCTOR (1x10) MM2. THHW 146.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.03 CONDUCTOR (2x6+1x10) MM2 THHW 975.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.04 CONDUCTOR (2x2.5) MM2. THHW 4,612.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.05 CONDUCTOR (2x4.0) MM2. THHW 2,209.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.04 TABLEROS ELECTRICOS 4,700.00
04.01.04.01 TABLERO GENERAL Y TABLEROS DE DISTRIBUCION 4,700.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.05 CONEXION A TIERRA 5,600.00
04.01.05.01 POZO A TIERRA 5,600.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06 ARTEFACTOS Y ACCESORIOS ELECTRICOS 11,490.39
04.01.06.01 FLUORESCENTE RECTO INCLUYE EQUIPO Y PANTALLA 7,678.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.02 SPOT LIGHT 656.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.03 LUCES DE EMERGENCIA CON BATERIA - 02 FAROS 637.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.04 TOMACORRIENTE BIPOLAR 1,779.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.05 TOMACORRIENTE SIMPLE 125.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.06 INTERRUPTOR CONMUTACION 210.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.07 INTERRUPTOR SIMPLE 107.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.08 INTERRUPTOR DOBLE 94.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.09 INTERRUPTOR TRIPLE 201.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.07 OTROS 1,199.99
04.01.07.02 DISPOSITIVOS Y EQUIPOS DE SEGURIDAD 1,199.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02 SEGUNDO PISO 45,665.20
04.02.01 SALIDAS 13,605.84
04.02.01.01 SALIDAD DE TECHO PARA CENTRO DE LUZ 6,212.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.02 SALIDA DE TOMACORRIENTE BIPOLARES CON LINEA A TIERRA 5,218.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.03 SALIDA DE TOMACORRIENTE PARA ALUMBRADO DE EMERGENCIA 303.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.04 SALIDA PARA INTERRUPTORES EN CONMUTACION 704.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA
CRONOGRAMA
VALORIZADO
DE- BLOQU
OBRA V

MEJORAMIENTO Y AMPLIACION
MEJORAMIENTO
DEL SERVICIO
Y AMPLIACION
EDUCATIVO DE
DEL
NIVEL
SERVICIO
PRIMARIO
EDUCATIVO
I.E.E. N°30318
DE NIVEL
DELPRIMARIO
CENTRO POBLADO
I.E.E. N°30318
MENOR
DEL CENTRO
DE YANAM
P

DESCRIPCION DE PARTIDAS PPTO


SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
04.02.01.05 SALIDA PARA INTERRUPTORES SIMPLES 298.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.06 SALIDA PARA INTERRUPTORES DOBLES 398.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.07 SALIDA PARA INTERRUPTORES TRIPLES 469.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.02 CANALIZACION DE TUBERIAS PVC 13,965.19
04.02.02.01 TUBERIA DE 20 MM. PVC SEL (3/4") 13,965.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.03 CONDUCTORES 6,384.59
04.02.03.01 CONDUCTOR (2x2.5) MM2. THHW 3,370.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.03.02 CONDUCTOR (2x4.0) MM2. THHW 3,014.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04 ARTEFACTOS Y ACCESORIOS ELECTRICOS 11,709.58
04.02.04.01 FLUORESCENTE RECTO INCLUYE EQUIPO Y PANTALLA 8,432.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.02 LUCES DE EMERGENCIA CON BATERIA - 02 FAROS 637.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.03 TOMACORRIENTE BIPOLAR 1,779.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.04 TOMACORRIENTE SIMPLE 104.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.05 INTERRUPTOR CONMUTACION 336.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.06 INTERRUPTOR SIMPLE 107.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.07 INTERRUPTOR DOBLE 150.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.08 INTERRUPTOR TRIPLE 161.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0

COSTO DIRECTO 1,990,094.42 58,567.27 11,285.64 13,235.59 13,954.08 22,199.07 56,029.55 88,256.67 107,755.4
GASTOS GENERALES 10.00% 199,009.44 5,856.73 1,128.56 1,323.56 1,395.41 2,219.91 5,602.96 8,825.67 10,775.5
UTILIDAD 10.00% 199,009.44 5,856.73 1,128.56 1,323.56 1,395.41 2,219.91 5,602.96 8,825.67 10,775.5
SUB TOTAL 2,388,113.30 70,280.73 13,542.76 15,882.71 16,744.90 26,638.89 67,235.47 105,908.01 129,306.4
IGV 18.00% 429,860.39 12,650.53 2,437.70 2,858.89 3,014.08 4,795.00 12,102.38 19,063.44 23,275.1
PRESUPUESTO PARCIAL 2,817,973.69 82,931.26 15,980.46 18,741.60 19,758.98 31,433.89 79,337.85 124,971.45 152,581.6
PORCENTAJE DE AVANCE 2.94% 0.57% 0.67% 0.70% 1.12% 2.82% 4.43% 5.41%
PORCENTAJE DE AVANCE ACUMULADO 100.00% 4.88% 13.78%
CRONOGRAMA DE OBRA VALORIZADO
CRONOGRAMA
- BLOQUE
DE OBRA
AB - Y
V

MEJORAMIENTO Y AMPLIACION DEL SERVICIO


MEJORAMIENTO
EDUCATIVO
Y AMPLIACION
DE NIVEL PRIMARIO
DEL SERVICIO
I.E.E.EDUCATIVO
N°30318 DEL
DECENTRO
NIVEL PRIMARIO
POBLADOI.E.E.
MENORN°30318
DE YANAMUCLO
DEL CENTROEP

S
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
BLOQUE AB - YANAMUCLO 1,990,094.42
01 ESTRUCTURAS 1,077,684.21 MES 01 MES 02
01.01 OBRAS PROVISIONALES 44,569.85
01.01.01 CONSTRUCCION PROVISIONAL DE OFICINA 384.00 384.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.02 CONSTRUCCION PROVISIONAL DE CASETA PARA GUARDIANIA 144.00 144.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.03 CONSTRUCCION PROVISIONAL DE VESTIDOR PARA PERSONAL 480.00 480.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.04 GUARDIANIA DE OBRA 37,785.60 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.4
01.01.05 ALQUILER DE ALMACEN 1,440.00 56.00 56.00 56.00 56.00 56.00 56.00 56.00 56.0
01.01.06 CARTEL DE IDENTIFICACION DE OBRA (3.60x2.40) 856.25 0.00 856.25 0.00 0.00 0.00 0.00 0.00 0.0
01.01.07 AGUA PARA CONSUMO EN LA CONSTRUCCION 1,080.00 42.00 42.00 42.00 42.00 42.00 42.00 42.00 42.0
01.01.08 DESAGUE PARA LA CONSTRUCCION 750.00 0.00 750.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.09 ENERGIA ELECTRICA PROVISIONAL PARA LA CONSTRUCCION 1,650.00 64.17 64.17 64.17 64.17 64.17 64.17 64.17 64.1
01.02 TRABAJOS PRELIMINARES 66,669.81
01.02.01 DEMOLICION DE CONSTRUCCION EXISTENTE 46,142.30 46,142.30 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.02.02 ELIMINACION DE CONSTRUCCION DEMOLIDA DP=2 KM. 8,433.24 6,324.93 2,108.31 0.00 0.00 0.00 0.00 0.00 0.0
01.02.03 LIMPIEZA DEL TERRENO MANUAL 3,218.46 0.00 3,218.46 0.00 0.00 0.00 0.00 0.00 0.0
01.02.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS 2,500.00 2,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.02.05 TRAZO, NIVELACION Y REPLANTEO PARA EDIFICACION 2,770.32 0.00 1,007.39 1,762.93 0.00 0.00 0.00 0.00 0.0
01.02.06 CONTROL TOPOGRAFICO DURANTE EJECUCION DE OBRA 3,605.49 841.28 841.28 841.28 841.28 240.37 0.00 0.00 0.0
01.03 MOVIMIENTO DE TIERRAS 32,782.10
01.03.01 EXCAVACION DE ZANJAS PARA ZAPATAS H=1.20 - 1.50 M. 9,038.33 0.00 753.19 5,272.36 3,012.78 0.00 0.00 0.00 0.0
01.03.02 EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS 2,632.52 0.00 0.00 548.44 767.82 767.82 548.44 0.00 0.0
01.03.03 EXCAVACION DE ZANJAS PARA JARDIN 31.43 0.00 0.00 31.43 0.00 0.00 0.00 0.00 0.0
01.03.04 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 4,776.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,776.2
01.03.05 REFINE, NIVELACION Y COMPACTACION DE PLATAFORMA 4,486.78 0.00 0.00 0.00 0.00 0.00 560.85 3,925.93 0.0
01.03.06 REFINE, NIVELACION Y COMPACTACION DE BASE PARA VEREDAS 6,019.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,019.8
01.03.07 RELLENO Y COMPACTACION DE PODIUM CON MATERIAL PROPIO 301.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 301.5
01.03.08 ACARREO INTERNO DE MATERIAL EXCEDENTE DP=20 M. 2,694.29 0.00 0.00 0.00 0.00 0.00 0.00 1,347.15 1,347.1
01.03.09 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 2,801.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.04 OBRAS DE CONCRETO SIMPLE 90,690.96
CRONOGRAMA DE OBRA VALORIZADO
CRONOGRAMA
- BLOQUE
DE OBRA
AB - Y
V

MEJORAMIENTO Y AMPLIACION DEL SERVICIO


MEJORAMIENTO
EDUCATIVO
Y AMPLIACION
DE NIVEL PRIMARIO
DEL SERVICIO
I.E.E.EDUCATIVO
N°30318 DEL
DECENTRO
NIVEL PRIMARIO
POBLADOI.E.E.
MENORN°30318
DE YANAMUCLO
DEL CENTROEP

S
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.04.01 SOLADO PARA ZAPATAS E=0.10 M. 1:10 CEMENTO - HORMIGON 5,467.93 0.00 0.00 0.00 911.32 3,189.63 1,366.98 0.00 0.0
01.04.02 CONCRETO 1:10+30% P.G. PARA CIMIENTOS CORRIDOS 21,485.78 0.00 0.00 0.00 0.00 8,057.17 9,400.03 4,028.58 0.0
01.04.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO 6,829.64 0.00 0.00 0.00 0.00 0.00 2,276.55 3,983.96 569.1
01.04.04 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS 3,042.44 0.00 0.00 0.00 0.00 0.00 0.00 1,521.22 1,521.2
01.04.05 FALSO PISO DE CONCRETO E=0.10 M. CEMENTO - HORMIGON 16,168.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9,701.1
01.04.06 ENCOFRADO Y DESENCOFRADO NORMAL PARA VEREDAS 4,000.12 0.00 0.00 0.00 0.00 2,000.06 2,000.06 0.00 0.0
01.04.07 CONCRETO F'C=140 KG/CM2 PARA VEREDAS INCLUYE ACABADOS 19,168.71 0.00 0.00 0.00 0.00 0.00 5,750.61 13,418.10 0.0
01.04.08 ENCOFRADO Y DESENCOFRADO NORMAL PARA CUNETAS 3,648.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,648.2
01.04.09 CONCRETO F'C=140 KG/CM2 PARA CUNETAS INCLUYE ACABADOS 4,971.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,142.8
01.04.10 ENCOFRADO Y DESENCOFRADO NORMAL PARA JARDIN 3,281.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,460.7
01.04.11 CONCRETO F'C=140 KG/CM2 PARA JARDIN 2,627.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 656.7
01.05 OBRAS DE CONCRETO ARMADO 772,773.58
01.05.01 ZAPATAS 49,980.45
01.05.01.01 ACERO F'Y= 4200 KG/CM2 PARA ZAPATAS 11,429.97 0.00 0.00 0.00 0.00 0.00 10,001.22 1,428.75 0.0
01.05.01.02 CONCRETO F'C=210 KG/CM2 PARA ZAPATAS 38,550.48 0.00 0.00 0.00 0.00 0.00 0.00 23,130.29 15,420.1
01.05.02 COLUMNAS 113,702.39
01.05.02.01 ACERO F'Y= 4200 KG/CM2 PARA COLUMNAS 43,524.40 0.00 0.00 0.00 0.00 0.00 4,974.22 8,704.88 8,704.8
01.05.02.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS 47,502.09 0.00 0.00 0.00 0.00 0.00 0.00 3,064.65 10,726.2
01.05.02.03 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS 22,675.90 0.00 0.00 0.00 0.00 0.00 0.00 2,451.45 4,290.0
01.05.03 COLUMNETAS 43,559.15
01.05.03.01 ACERO F'Y= 4200 KG/CM2 PARA COLUMNETAS 13,992.87 0.00 0.00 0.00 0.00 0.00 0.00 1,023.87 2,389.0
01.05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNETAS 20,137.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,179.6
01.05.03.03 CONCRETO F'C=175 KG/CM2 PARA COLUMNETAS 9,428.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 764.4
01.05.04 VIGAS 210,855.32
01.05.04.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA VIGAS 79,074.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.04.02 ACERO F'Y= 4200 KG/CM2 PARA VIGAS 84,562.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.04.03 CONCRETO F'C=210 KG/CM2 PARA VIGAS 47,218.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05 LOSA ALIGERADA 288,844.61
01.05.05.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA ALIGERADA 134,294.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.02 BLOQUETA DE ARCILLA H=0.15 M. PARA LOSA ALIGERADA 21,223.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.03 BLOQUETA DE ARCILLA H=0.12 M. PARA LOSA ALIGERADA 21,181.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA VALORIZADO
CRONOGRAMA
- BLOQUE
DE OBRA
AB - Y
V

MEJORAMIENTO Y AMPLIACION DEL SERVICIO


MEJORAMIENTO
EDUCATIVO
Y AMPLIACION
DE NIVEL PRIMARIO
DEL SERVICIO
I.E.E.EDUCATIVO
N°30318 DEL
DECENTRO
NIVEL PRIMARIO
POBLADOI.E.E.
MENORN°30318
DE YANAMUCLO
DEL CENTROEP

S
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.05.05.04 ACERO F'Y= 4200 KG/CM2 PARA LOSA ALIGERADA 57,235.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.05 CONCRETO F'C=210 KG/CM2 PARA LOSA ALIGERADA 54,910.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06 ESCALERAS 65,831.66
01.05.06.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESCALERAS 18,440.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06.02 ACERO F'Y= 4200 KG/CM2 PARA ESCALERAS 9,971.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06.03 CONCRETO F'C=210 KG/CM2 PARA ESCALERAS 37,419.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.06 TANQUE CISTERNA 64,777.91
01.06.01 EXCAVACION DE ZANJAS PARA CIMENTACION 2,738.86 0.00 0.00 2,738.86 0.00 0.00 0.00 0.00 0.0
01.06.02 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 889.89 0.00 0.00 0.00 0.00 0.00 889.89 0.00 0.0
01.06.03 SOLADO PARA ZAPATAS E=0.10 M. 1:10 CEMENTO - HORMIGON 289.53 0.00 0.00 289.53 0.00 0.00 0.00 0.00 0.0
01.06.04 ACERO F'Y= 4200 KG/CM2 PARA ZAPATAS 581.27 0.00 0.00 0.00 581.27 0.00 0.00 0.00 0.0
01.06.05 CONCRETO F'C=210 KG/CM2 PARA ZAPATAS 2,041.31 0.00 0.00 0.00 2,041.31 0.00 0.00 0.00 0.0
01.06.06 ACERO F'Y= 4200 KG/CM2 PARA COLUMNAS 4,301.61 0.00 0.00 0.00 3,584.68 716.93 0.00 0.00 0.0
01.06.07 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS 3,278.17 0.00 0.00 0.00 0.00 1,966.90 1,311.27 0.00 0.0
01.06.08 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS 1,901.00 0.00 0.00 0.00 0.00 475.25 1,425.75 0.00 0.0
01.06.09 ENCOFRADO Y DESENCOFRADO NORMAL PARA VIGAS 2,007.72 0.00 0.00 0.00 0.00 0.00 1,003.86 1,003.86 0.0
01.06.10 ACERO F'Y= 4200 KG/CM2 PARA VIGAS 3,065.73 0.00 0.00 0.00 0.00 0.00 0.00 3,065.73 0.0
01.06.11 CONCRETO F'C=210 KG/CM2 PARA VIGAS 1,380.31 0.00 0.00 0.00 0.00 0.00 0.00 1,380.31 0.0
01.06.12 ACERO F'Y= 4200 KG/CM2 PARA CISTERNA 5,076.96 0.00 0.00 0.00 0.00 0.00 5,076.96 0.00 0.0
01.06.13 ENCOFRADO Y DESENCOFRADO NORMAL PARA CISTERNA 3,718.82 0.00 0.00 0.00 0.00 1,859.41 1,859.41 0.00 0.0
01.06.14 CONCRETO F'C=210 KG/CM2 PARA CISTERNA 4,092.64 0.00 0.00 0.00 0.00 0.00 4,092.64 0.00 0.0
01.06.15 ACERO F'Y= 4200 KG/CM2 PARA TANQUE ELEVADO 4,880.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,880.2
01.06.16 ENCOFRADO Y DESENCOFRADO NORMAL PARA TANQUE ELEVADO 4,492.10 0.00 0.00 0.00 0.00 0.00 0.00 4,492.10 0.0
01.06.17 CONCRETO F'C=210 KG/CM2 PARA TANQUE ELEVADO 2,618.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,618.4
01.06.18 ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA ALIGERADA 453.94 0.00 0.00 0.00 0.00 0.00 453.94 0.00 0.0
01.06.19 BLOQUETA DE ARCILLA H=0.15 M. PARA LOSA ALIGERADA 182.52 0.00 0.00 0.00 0.00 0.00 182.52 0.00 0.0
01.06.20 ACERO F'Y= 4200 KG/CM2 PARA LOSA ALIGERADA 321.44 0.00 0.00 0.00 0.00 0.00 321.44 0.00 0.0
01.06.21 CONCRETO F'C=210 KG/CM2 PARA LOSA ALIGERADA 224.55 0.00 0.00 0.00 0.00 0.00 0.00 224.55 0.0
01.06.22 MURO DE SOGA CON LADRILLO K.K. 18H 9X13X24 CM. 2,287.88 0.00 0.00 0.00 0.00 0.00 0.00 2,287.88 0.0
01.06.23 TARRAJEO EN MUROS INTERIORES FROTACHADO MEZCLA 1:5 851.76 0.00 0.00 0.00 0.00 0.00 0.00 851.76 0.0
01.06.24 TARRAJEO INTERIOR CON IMPERMEABILIZANTE DE TANQUE CISTERNA 1,402.11 0.00 0.00 0.00 0.00 0.00 0.00 701.06 701.0
CRONOGRAMA DE OBRA VALORIZADO
CRONOGRAMA
- BLOQUE
DE OBRA
AB - Y
V

MEJORAMIENTO Y AMPLIACION DEL SERVICIO


MEJORAMIENTO
EDUCATIVO
Y AMPLIACION
DE NIVEL PRIMARIO
DEL SERVICIO
I.E.E.EDUCATIVO
N°30318 DEL
DECENTRO
NIVEL PRIMARIO
POBLADOI.E.E.
MENORN°30318
DE YANAMUCLO
DEL CENTROEP

S
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.06.25 TARRAJEO INTERIOR CON IMPERMEABILIZANTE DE TANQUE ELEVADO 886.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 886.6
01.06.26 TARRAJEO EXTERIOR FROTACHADO DE ESTRUCTURA MEZCLA 1:5 4,004.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,004.0
01.06.27 PINTURA LATEX EN ESTRUCTURA DOS MANOS 1,975.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.06.28 INSTALACION DE ACCESORIOS DE TANQUE CISTERNA 2,112.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,112.3
01.06.29 INSTALACION DE PUERTA DE MADERA P-1 320.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 320.0
01.06.30 INSTALACION DE ESCALERA METALICA SEGUN DISEÑO 2,400.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,400.0
01.07 PRUEBAS Y ENSAYOS DE CALIDAD 3,820.00
01.07.01 PROCTOR MODIFICADO 160.00 0.00 0.00 0.00 0.00 160.00 0.00 0.00 0.0
01.07.02 DENSIDAD DE CAMPO 480.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.7
01.07.03 DISEÑO DE MEZCLA 540.00 0.00 0.00 0.00 462.86 77.14 0.00 0.00 0.0
01.07.04 ROTURA DE PROBETA (COMPRESION SIMPLE) 2,640.00 0.00 0.00 0.00 0.00 0.00 65.19 228.15 228.1
01.08 FLETE 1,600.00
01.08.01 FLETE TERRESTRE 1,600.00 119.15 119.15 119.15 119.15 119.15 119.15 119.15 119.1
02 ARQUITECTURA 743,584.58
02.01 MUROS Y TABIQUES 140,636.03
02.01.01 MURO DE SOGA CON LADRILLO K.K. 18H 9X13X24 CM. 140,051.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
MURO DE CABEZA CON LADRILLO K.K. 18H 9X13X24 CM. 584.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02 REVOQUES, ENLUCIDOS Y MOLDURAS 217,896.67
02.02.01 TARRAJEO EN CIELO RASO FROTACHADO MEZCLA 1:4 62,875.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.02 TARRAJEO EN MUROS INTERIORES FROTACHADO MEZCLA 1:5 63,390.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.03 TARRAJEO EN MUROS EXTERIORES FROTACHADO MEZCLA 1:5 35,522.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.04 TARRAJEO EN VIGAS MEZCLA 1:4 27,465.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.05 TARRAJEO EN COLUMNAS MEZCLA 1:5 19,492.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.06 VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS MEZCLA 1:5 9,002.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.07 TARRAJEO DE PODIUM MEZCLA 1:5 147.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03 PISOS Y PAVIMENTOS 111,696.25
02.03.01 PISO DE PORCELANATO ALTO TRANSITO ANTIDESLIZANTE PARA AMBIENTES 65,681.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03.02 PISO DE PORCELANATO ALTO TRANSITO ANTIDESLIZANTE PARA VEREDAS 41,788.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03.03 PISO DE CERAMICO ANTIDESLIZANTE DE ALTO TRANSITO 4,226.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04 ZOCALOS Y CONTRAZOCALOS 28,505.27
02.04.01 CONTRAZOCALO DE PORCELANATO H=0.10 M. PARA AMBIENTES 11,652.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA VALORIZADO
CRONOGRAMA
- BLOQUE
DE OBRA
AB - Y
V

MEJORAMIENTO Y AMPLIACION DEL SERVICIO


MEJORAMIENTO
EDUCATIVO
Y AMPLIACION
DE NIVEL PRIMARIO
DEL SERVICIO
I.E.E.EDUCATIVO
N°30318 DEL
DECENTRO
NIVEL PRIMARIO
POBLADOI.E.E.
MENORN°30318
DE YANAMUCLO
DEL CENTROEP

S
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
02.04.02 CONTRAZOCALO DE PORCELANATO H=0.10 M. PARA VEREDAS 11,342.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04.03 CONTRAZOCALO DE CERAMICO H=0.10 M. 5,139.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04.04 ZOCALO DE CERAMICO 370.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.05 CUBIERTAS 46,545.41
02.05.01 CUBIERTA DE TEJA ANDINA TIPO ETERNIT 46,545.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06 CARPINTERIA DE MADERA 17,229.50
02.06.01 PUERTA APANELADA DE CEDRO TIPO P-01 INC. INSTALACION 7,810.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06.02 PUERTA APANELADA DE CEDRO TIPO P-02 INC. INSTALACION 5,583.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06.03 PUERTA APANELADA DE CEDRO TIPO P-03 INC. INSTALACION 3,836.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07 CARPINTERIA METALICA 24,910.00
02.07.01 PORTON METALICO PM-01 INC. PINTADO E INSTALACION 860.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.02 VENTANA METALICA V-01 INC. PINTADO E INSTALACION 1,120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.03 VENTANA METALICA V-02 INC. PINTADO E INSTALACION 4,830.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.04 VENTANA METALICA V-03 INC. PINTADO E INSTALACION 2,200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.05 VENTANA METALICA V-04 INC. PINTADO E INSTALACION 1,120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.06 VENTANA METALICA V-05 INC. PINTADO E INSTALACION 4,830.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.07 VENTANA METALICA V-06 INC. PINTADO E INSTALACION 3,520.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.08 VENTANA METALICA V-07 INC. PINTADO E INSTALACION 1,140.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.09 VENTANA METALICA V-08 INC. PINTADO E INSTALACION 5,290.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.08 CARPINTERIA EN MELAMINA 5,580.00
02.08.01 SEPARADOR DE BAÑOS TIPO 01 5,580.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.09 CERRAJERIA 7,251.54
02.09.01 CERRADURA PARA PUERTA DE TRES GOLPES 4,796.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.09.02 CERRADURA PARA PUERTA TIPO PERILLA 2,454.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.10 VIDRIOS, CRISTALES Y SIMILARES 41,997.06
02.10.01 VIDRIO LAMINAR BUTIRAL DE POLIVINILO INCOLORO 41,997.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11 PINTURAS 90,207.74
02.11.01 PINTURA LATEX EN CIELO RASO DOS MANOS 22,833.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.02 PINTURA LATEX EN MUROS EXTERIORES DOS MANOS 17,654.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.03 PINTURA LATEX EN MUROS INTERIORES DOS MANOS 30,153.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.04 PINTURA LATEX EN VIGAS DOS MANOS 10,154.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA VALORIZADO
CRONOGRAMA
- BLOQUE
DE OBRA
AB - Y
V

MEJORAMIENTO Y AMPLIACION DEL SERVICIO


MEJORAMIENTO
EDUCATIVO
Y AMPLIACION
DE NIVEL PRIMARIO
DEL SERVICIO
I.E.E.EDUCATIVO
N°30318 DEL
DECENTRO
NIVEL PRIMARIO
POBLADOI.E.E.
MENORN°30318
DE YANAMUCLO
DEL CENTROEP

S
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
02.11.05 PINTURA LATEX EN COLUMNAS DOS MANOS 7,342.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.06 PINTURA LATEX PARA DERRAMES EN PUERTAS Y VENTANAS DOS MANOS 1,560.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.07 PINTURA PARA PIZARRA 510.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12 JUNTAS 11,129.11
02.12.01 JUNTAS ASFALTICAS EN VEREDAS 2,066.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12.02 JUNTAS ASFALTICAS PARA SARDINEL DE JARDIN 91.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12.03 JUNTAS ASFALTICAS PARA COLUMNETAS 8,971.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03 INSTALACIONES SANITARIAS 58,301.24
03.01 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO 8,682.61
03.01.01 MOVIMIENTO DE TIERRAS 1,649.41
03.01.01.01 EXCAVACION DE ZANJAS PARA TUBERIA DE AGUA 937.63 0.00 0.00 0.00 0.00 937.63 0.00 0.00 0.0
03.01.01.02 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 681.36 0.00 0.00 0.00 0.00 0.00 596.19 85.17 0.0
03.01.01.03 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 30.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.01.02 SALIDAS 2,360.13
03.01.02.01 SALIDA DE AGUA FRIA PVC SAP DE 1/2" 2,254.32 0.00 0.00 0.00 0.00 0.00 120.77 281.79 281.7
03.01.02.02 SALIDA DE AGUA PARA RIEGO PVC SAP DE 1/2" 56.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 56.6
03.01.02.03 SALIDA DE AGUA FRIA CONTRA INCENDIO PVC SAP DE 2" 49.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 49.1
03.01.03 RED DE DISTRIBUCION 4,673.07
03.01.03.01 TUBERIA PARA AGUA POTABLE PVC SAP DE 1/2" C-10 2,106.15 0.00 0.00 0.00 0.00 0.00 0.00 254.19 254.1
03.01.03.02 TUBERIA PARA RIEGO PVC SAP DE 1/2" C-10 72.72 0.00 0.00 0.00 0.00 0.00 0.00 72.72 0.0
03.01.03.03 TUBERIA CONTRA INCENDIO PVC SAP DE 2" C-10 80.28 0.00 0.00 0.00 0.00 0.00 0.00 80.28 0.0
03.01.03.04 VALVULA DE COMPUERTA DE 1/2" 1,834.94 0.00 0.00 0.00 0.00 0.00 0.00 65.53 229.3
03.01.03.05 VALVULA DE COMPUERTA DE 2" 127.03 0.00 0.00 0.00 0.00 0.00 0.00 2.23 15.6
03.01.03.06 GRIFO CONTRA INCENDIO 451.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02 SISTEMA DE DESAGUE 19,414.41
03.02.01 MOVIMIENTO DE TIERRAS 1,805.63
03.02.01.01 EXCAVACION DE ZANJAS PARA TUBERIA DE DESAGUE 1,045.58 0.00 0.00 0.00 0.00 0.00 0.00 1,045.58 0.0
03.02.01.02 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 703.40 0.00 0.00 0.00 0.00 0.00 0.00 351.70 351.7
03.02.01.03 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 56.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02.02 SALIDAS 5,996.34
03.02.02.01 SALIDA DE DESAGUE CON PVC SAL DE 2" 2,613.30 0.00 0.00 0.00 0.00 0.00 0.00 190.06 332.6
CRONOGRAMA DE OBRA VALORIZADO
CRONOGRAMA
- BLOQUE
DE OBRA
AB - Y
V

MEJORAMIENTO Y AMPLIACION DEL SERVICIO


MEJORAMIENTO
EDUCATIVO
Y AMPLIACION
DE NIVEL PRIMARIO
DEL SERVICIO
I.E.E.EDUCATIVO
N°30318 DEL
DECENTRO
NIVEL PRIMARIO
POBLADOI.E.E.
MENORN°30318
DE YANAMUCLO
DEL CENTROEP

S
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
03.02.02.02 SALIDA DE DESAGUE CON PVC SAL DE 4" 1,461.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 91.3
03.02.02.03 SALIDA DE VENTILACION CON PVC SAL DE 2" 1,921.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02.03 RED DE DISTRIBUCION 11,612.44
03.02.03.01 TUBERIA PARA DESAGUE CON PVC SAL DE 2" 1,038.11 0.00 0.00 0.00 0.00 0.00 0.00 72.85 127.4
03.02.03.02 TUBERIA PARA DESAGUE CON PVC SAL DE 4" 5,387.78 0.00 0.00 0.00 0.00 0.00 0.00 96.21 673.4
03.02.03.03 TUBERIA PARA VENTILACION CON PVC SAL DE 2" 2,348.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 132.9
TUBERIA PARA CAJA DE REGISTRO CON PVC SAL DE 2" 2,837.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03 SISTEMA DE DESAGUE PLUVIAL 15,728.96
03.03.01 TUBERIA PVC SAL PLUVIAL DE 4" 4,216.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.02 TUBERIA PVC SAL PLUVIAL DE 3" 1,789.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA FALSA COLUMNA 5,450.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.04 CONCRETO F'C=175 KG/CM2 PARA FALSA COLUMNA 3,930.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.05 ACCESORIOS PARA DESAGUE PLUVIAL 341.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04 APARATOS Y ACCESORIOS SANITARIOS 14,475.26
03.04.01 INODORO DE LOSA TANQUE BAJO 5,908.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.02 LAVATORIO DE LOSA CON PEDESTAL 4,385.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.03 PAPELERA DE LOSA 1,190.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.04 SUMIDERO DE BRONCE ROSCADO DE 2" 985.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.05 REGISTRO ROSCADO DE BRONCE DE 4" 1,381.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.06 CAJA DE REGISTRO PARA DESAGUE DE 624.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04 INSTALACIONES ELECTRICAS 110,524.39
04.01 PRIMER PISO 64,859.19
04.01.01 SALIDAS 13,513.89
04.01.01.01 SALIDAD DE TECHO PARA CENTRO DE LUZ 6,566.30 0.00 0.00 0.00 0.00 0.00 0.00 1,094.38 1,915.1
04.01.01.02 SALIDA DE TOMACORRIENTE BIPOLARES CON LINEA A TIERRA 4,391.95 0.00 0.00 0.00 0.00 0.00 0.00 548.99 1,921.4
04.01.01.03 SALIDA DE TOMACORRIENTE PARA ALUMBRADO DE EMERGENCIA 363.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.01.04 SALIDA PARA INTERRUPTORES EN CONMUTACION 1,057.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.01.05 SALIDA PARA INTERRUPTORES SIMPLES 298.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 298.5
04.01.01.06 SALIDA PARA INTERRUPTORES DOBLES 248.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.4
04.01.01.07 SALIDA PARA INTERRUPTORES TRIPLES 587.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 419.5
04.01.02 CANALIZACION DE TUBERIAS PVC 20,053.08
CRONOGRAMA DE OBRA VALORIZADO
CRONOGRAMA
- BLOQUE
DE OBRA
AB - Y
V

MEJORAMIENTO Y AMPLIACION DEL SERVICIO


MEJORAMIENTO
EDUCATIVO
Y AMPLIACION
DE NIVEL PRIMARIO
DEL SERVICIO
I.E.E.EDUCATIVO
N°30318 DEL
DECENTRO
NIVEL PRIMARIO
POBLADOI.E.E.
MENORN°30318
DE YANAMUCLO
DEL CENTROEP

S
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
04.01.02.01 TUBERIA DE 25 MM. PVC SEL (1") 4,054.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.02.02 TUBERIA DE 20 MM. PVC SEL (3/4") 15,998.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03 CONDUCTORES 8,301.84
04.01.03.01 CONDUCTOR (2x10+1x10) MM. THHW 358.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.02 CONDUCTOR (1x10) MM2. THHW 146.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.03 CONDUCTOR (2x6+1x10) MM2 THHW 975.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.04 CONDUCTOR (2x2.5) MM2. THHW 4,612.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.05 CONDUCTOR (2x4.0) MM2. THHW 2,209.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.04 TABLEROS ELECTRICOS 4,700.00
04.01.04.01 TABLERO GENERAL Y TABLEROS DE DISTRIBUCION 4,700.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.05 CONEXION A TIERRA 5,600.00
04.01.05.01 POZO A TIERRA 5,600.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06 ARTEFACTOS Y ACCESORIOS ELECTRICOS 11,490.39
04.01.06.01 FLUORESCENTE RECTO INCLUYE EQUIPO Y PANTALLA 7,678.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.02 SPOT LIGHT 656.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.03 LUCES DE EMERGENCIA CON BATERIA - 02 FAROS 637.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.04 TOMACORRIENTE BIPOLAR 1,779.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.05 TOMACORRIENTE SIMPLE 125.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.06 INTERRUPTOR CONMUTACION 210.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.07 INTERRUPTOR SIMPLE 107.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.08 INTERRUPTOR DOBLE 94.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.09 INTERRUPTOR TRIPLE 201.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.07 OTROS 1,199.99
04.01.07.02 DISPOSITIVOS Y EQUIPOS DE SEGURIDAD 1,199.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02 SEGUNDO PISO 45,665.20
04.02.01 SALIDAS 13,605.84
04.02.01.01 SALIDAD DE TECHO PARA CENTRO DE LUZ 6,212.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.02 SALIDA DE TOMACORRIENTE BIPOLARES CON LINEA A TIERRA 5,218.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.03 SALIDA DE TOMACORRIENTE PARA ALUMBRADO DE EMERGENCIA 303.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.04 SALIDA PARA INTERRUPTORES EN CONMUTACION 704.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA VALORIZADO
CRONOGRAMA
- BLOQUE
DE OBRA
AB - Y
V

MEJORAMIENTO Y AMPLIACION DEL SERVICIO


MEJORAMIENTO
EDUCATIVO
Y AMPLIACION
DE NIVEL PRIMARIO
DEL SERVICIO
I.E.E.EDUCATIVO
N°30318 DEL
DECENTRO
NIVEL PRIMARIO
POBLADOI.E.E.
MENORN°30318
DE YANAMUCLO
DEL CENTROEP

S
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
04.02.01.05 SALIDA PARA INTERRUPTORES SIMPLES 298.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.06 SALIDA PARA INTERRUPTORES DOBLES 398.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.07 SALIDA PARA INTERRUPTORES TRIPLES 469.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.02 CANALIZACION DE TUBERIAS PVC 13,965.19
04.02.02.01 TUBERIA DE 20 MM. PVC SEL (3/4") 13,965.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.03 CONDUCTORES 6,384.59
04.02.03.01 CONDUCTOR (2x2.5) MM2. THHW 3,370.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.03.02 CONDUCTOR (2x4.0) MM2. THHW 3,014.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04 ARTEFACTOS Y ACCESORIOS ELECTRICOS 11,709.58
04.02.04.01 FLUORESCENTE RECTO INCLUYE EQUIPO Y PANTALLA 8,432.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.02 LUCES DE EMERGENCIA CON BATERIA - 02 FAROS 637.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.03 TOMACORRIENTE BIPOLAR 1,779.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.04 TOMACORRIENTE SIMPLE 104.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.05 INTERRUPTOR CONMUTACION 336.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.06 INTERRUPTOR SIMPLE 107.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.07 INTERRUPTOR DOBLE 150.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.08 INTERRUPTOR TRIPLE 161.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0

COSTO DIRECTO 1,990,094.42 58,567.27 11,285.64 13,235.59 13,954.08 22,199.07 56,029.55 88,256.67 107,755.4
GASTOS GENERALES 10.00% 199,009.44 5,856.73 1,128.56 1,323.56 1,395.41 2,219.91 5,602.96 8,825.67 10,775.5
UTILIDAD 10.00% 199,009.44 5,856.73 1,128.56 1,323.56 1,395.41 2,219.91 5,602.96 8,825.67 10,775.5
SUB TOTAL 2,388,113.30 70,280.73 13,542.76 15,882.71 16,744.90 26,638.89 67,235.47 105,908.01 129,306.4
IGV 18.00% 429,860.39 12,650.53 2,437.70 2,858.89 3,014.08 4,795.00 12,102.38 19,063.44 23,275.1
PRESUPUESTO PARCIAL 2,817,973.69 82,931.26 15,980.46 18,741.60 19,758.98 31,433.89 79,337.85 124,971.45 152,581.6
PORCENTAJE DE AVANCE 2.94% 0.57% 0.67% 0.70% 1.12% 2.82% 4.43% 5.41%
PORCENTAJE DE AVANCE ACUMULADO 100.00% 4.88% 13.78%
CRONOGRAMA DE OBRA VALORIZADO
CRONOGRAMA
- BLOQUE ABDE
- YANAMU
OBRA V

MEJORAMIENTO Y AMPLIACION DEL SERVICIOMEJORAMIENTO


EDUCATIVO DE NIVEL
Y AMPLIACION
PRIMARIODEL
I.E.E.
SERVICIO
N°30318EDUCATIVO
DEL CENTRODEPOBLADO
NIVEL PRIMARIO
MENOR I.E.E.
DE YANAMUCLO
N°30318 DEL
E CENTRO
I.E.E. N°30
P

SEMANAS PR
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
BLOQUE AB - YANAMUCLO 1,990,094.42
01 ESTRUCTURAS 1,077,684.21 MES 01 MES 02
01.01 OBRAS PROVISIONALES 44,569.85
01.01.01 CONSTRUCCION PROVISIONAL DE OFICINA 384.00 384.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.02 CONSTRUCCION PROVISIONAL DE CASETA PARA GUARDIANIA 144.00 144.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.03 CONSTRUCCION PROVISIONAL DE VESTIDOR PARA PERSONAL 480.00 480.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.04 GUARDIANIA DE OBRA 37,785.60 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.4
01.01.05 ALQUILER DE ALMACEN 1,440.00 56.00 56.00 56.00 56.00 56.00 56.00 56.00 56.0
01.01.06 CARTEL DE IDENTIFICACION DE OBRA (3.60x2.40) 856.25 0.00 856.25 0.00 0.00 0.00 0.00 0.00 0.0
01.01.07 AGUA PARA CONSUMO EN LA CONSTRUCCION 1,080.00 42.00 42.00 42.00 42.00 42.00 42.00 42.00 42.0
01.01.08 DESAGUE PARA LA CONSTRUCCION 750.00 0.00 750.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.09 ENERGIA ELECTRICA PROVISIONAL PARA LA CONSTRUCCION 1,650.00 64.17 64.17 64.17 64.17 64.17 64.17 64.17 64.1
01.02 TRABAJOS PRELIMINARES 66,669.81
01.02.01 DEMOLICION DE CONSTRUCCION EXISTENTE 46,142.30 46,142.30 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.02.02 ELIMINACION DE CONSTRUCCION DEMOLIDA DP=2 KM. 8,433.24 6,324.93 2,108.31 0.00 0.00 0.00 0.00 0.00 0.0
01.02.03 LIMPIEZA DEL TERRENO MANUAL 3,218.46 0.00 3,218.46 0.00 0.00 0.00 0.00 0.00 0.0
01.02.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS 2,500.00 2,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.02.05 TRAZO, NIVELACION Y REPLANTEO PARA EDIFICACION 2,770.32 0.00 1,007.39 1,762.93 0.00 0.00 0.00 0.00 0.0
01.02.06 CONTROL TOPOGRAFICO DURANTE EJECUCION DE OBRA 3,605.49 841.28 841.28 841.28 841.28 240.37 0.00 0.00 0.0
01.03 MOVIMIENTO DE TIERRAS 32,782.10
01.03.01 EXCAVACION DE ZANJAS PARA ZAPATAS H=1.20 - 1.50 M. 9,038.33 0.00 753.19 5,272.36 3,012.78 0.00 0.00 0.00 0.0
01.03.02 EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS 2,632.52 0.00 0.00 548.44 767.82 767.82 548.44 0.00 0.0
01.03.03 EXCAVACION DE ZANJAS PARA JARDIN 31.43 0.00 0.00 31.43 0.00 0.00 0.00 0.00 0.0
01.03.04 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 4,776.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,776.2
01.03.05 REFINE, NIVELACION Y COMPACTACION DE PLATAFORMA 4,486.78 0.00 0.00 0.00 0.00 0.00 560.85 3,925.93 0.0
01.03.06 REFINE, NIVELACION Y COMPACTACION DE BASE PARA VEREDAS 6,019.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,019.8
01.03.07 RELLENO Y COMPACTACION DE PODIUM CON MATERIAL PROPIO 301.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 301.5
01.03.08 ACARREO INTERNO DE MATERIAL EXCEDENTE DP=20 M. 2,694.29 0.00 0.00 0.00 0.00 0.00 0.00 1,347.15 1,347.1
01.03.09 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 2,801.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.04 OBRAS DE CONCRETO SIMPLE 90,690.96
CRONOGRAMA DE OBRA VALORIZADO
CRONOGRAMA
- BLOQUE ABDE
- YANAMU
OBRA V

MEJORAMIENTO Y AMPLIACION DEL SERVICIOMEJORAMIENTO


EDUCATIVO DE NIVEL
Y AMPLIACION
PRIMARIODEL
I.E.E.
SERVICIO
N°30318EDUCATIVO
DEL CENTRODEPOBLADO
NIVEL PRIMARIO
MENOR I.E.E.
DE YANAMUCLO
N°30318 DEL
E CENTRO
I.E.E. N°30
P

SEMANAS PR
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.04.01 SOLADO PARA ZAPATAS E=0.10 M. 1:10 CEMENTO - HORMIGON 5,467.93 0.00 0.00 0.00 911.32 3,189.63 1,366.98 0.00 0.0
01.04.02 CONCRETO 1:10+30% P.G. PARA CIMIENTOS CORRIDOS 21,485.78 0.00 0.00 0.00 0.00 8,057.17 9,400.03 4,028.58 0.0
01.04.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO 6,829.64 0.00 0.00 0.00 0.00 0.00 2,276.55 3,983.96 569.1
01.04.04 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS 3,042.44 0.00 0.00 0.00 0.00 0.00 0.00 1,521.22 1,521.2
01.04.05 FALSO PISO DE CONCRETO E=0.10 M. CEMENTO - HORMIGON 16,168.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9,701.1
01.04.06 ENCOFRADO Y DESENCOFRADO NORMAL PARA VEREDAS 4,000.12 0.00 0.00 0.00 0.00 2,000.06 2,000.06 0.00 0.0
01.04.07 CONCRETO F'C=140 KG/CM2 PARA VEREDAS INCLUYE ACABADOS 19,168.71 0.00 0.00 0.00 0.00 0.00 5,750.61 13,418.10 0.0
01.04.08 ENCOFRADO Y DESENCOFRADO NORMAL PARA CUNETAS 3,648.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,648.2
01.04.09 CONCRETO F'C=140 KG/CM2 PARA CUNETAS INCLUYE ACABADOS 4,971.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,142.8
01.04.10 ENCOFRADO Y DESENCOFRADO NORMAL PARA JARDIN 3,281.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,460.7
01.04.11 CONCRETO F'C=140 KG/CM2 PARA JARDIN 2,627.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 656.7
01.05 OBRAS DE CONCRETO ARMADO 772,773.58
01.05.01 ZAPATAS 49,980.45
01.05.01.01 ACERO F'Y= 4200 KG/CM2 PARA ZAPATAS 11,429.97 0.00 0.00 0.00 0.00 0.00 10,001.22 1,428.75 0.0
01.05.01.02 CONCRETO F'C=210 KG/CM2 PARA ZAPATAS 38,550.48 0.00 0.00 0.00 0.00 0.00 0.00 23,130.29 15,420.1
01.05.02 COLUMNAS 113,702.39
01.05.02.01 ACERO F'Y= 4200 KG/CM2 PARA COLUMNAS 43,524.40 0.00 0.00 0.00 0.00 0.00 4,974.22 8,704.88 8,704.8
01.05.02.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS 47,502.09 0.00 0.00 0.00 0.00 0.00 0.00 3,064.65 10,726.2
01.05.02.03 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS 22,675.90 0.00 0.00 0.00 0.00 0.00 0.00 2,451.45 4,290.0
01.05.03 COLUMNETAS 43,559.15
01.05.03.01 ACERO F'Y= 4200 KG/CM2 PARA COLUMNETAS 13,992.87 0.00 0.00 0.00 0.00 0.00 0.00 1,023.87 2,389.0
01.05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNETAS 20,137.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,179.6
01.05.03.03 CONCRETO F'C=175 KG/CM2 PARA COLUMNETAS 9,428.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 764.4
01.05.04 VIGAS 210,855.32
01.05.04.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA VIGAS 79,074.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.04.02 ACERO F'Y= 4200 KG/CM2 PARA VIGAS 84,562.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.04.03 CONCRETO F'C=210 KG/CM2 PARA VIGAS 47,218.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05 LOSA ALIGERADA 288,844.61
01.05.05.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA ALIGERADA 134,294.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.02 BLOQUETA DE ARCILLA H=0.15 M. PARA LOSA ALIGERADA 21,223.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.03 BLOQUETA DE ARCILLA H=0.12 M. PARA LOSA ALIGERADA 21,181.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA VALORIZADO
CRONOGRAMA
- BLOQUE ABDE
- YANAMU
OBRA V

MEJORAMIENTO Y AMPLIACION DEL SERVICIOMEJORAMIENTO


EDUCATIVO DE NIVEL
Y AMPLIACION
PRIMARIODEL
I.E.E.
SERVICIO
N°30318EDUCATIVO
DEL CENTRODEPOBLADO
NIVEL PRIMARIO
MENOR I.E.E.
DE YANAMUCLO
N°30318 DEL
E CENTRO
I.E.E. N°30
P

SEMANAS PR
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.05.05.04 ACERO F'Y= 4200 KG/CM2 PARA LOSA ALIGERADA 57,235.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.05 CONCRETO F'C=210 KG/CM2 PARA LOSA ALIGERADA 54,910.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06 ESCALERAS 65,831.66
01.05.06.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESCALERAS 18,440.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06.02 ACERO F'Y= 4200 KG/CM2 PARA ESCALERAS 9,971.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06.03 CONCRETO F'C=210 KG/CM2 PARA ESCALERAS 37,419.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.06 TANQUE CISTERNA 64,777.91
01.06.01 EXCAVACION DE ZANJAS PARA CIMENTACION 2,738.86 0.00 0.00 2,738.86 0.00 0.00 0.00 0.00 0.0
01.06.02 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 889.89 0.00 0.00 0.00 0.00 0.00 889.89 0.00 0.0
01.06.03 SOLADO PARA ZAPATAS E=0.10 M. 1:10 CEMENTO - HORMIGON 289.53 0.00 0.00 289.53 0.00 0.00 0.00 0.00 0.0
01.06.04 ACERO F'Y= 4200 KG/CM2 PARA ZAPATAS 581.27 0.00 0.00 0.00 581.27 0.00 0.00 0.00 0.0
01.06.05 CONCRETO F'C=210 KG/CM2 PARA ZAPATAS 2,041.31 0.00 0.00 0.00 2,041.31 0.00 0.00 0.00 0.0
01.06.06 ACERO F'Y= 4200 KG/CM2 PARA COLUMNAS 4,301.61 0.00 0.00 0.00 3,584.68 716.93 0.00 0.00 0.0
01.06.07 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS 3,278.17 0.00 0.00 0.00 0.00 1,966.90 1,311.27 0.00 0.0
01.06.08 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS 1,901.00 0.00 0.00 0.00 0.00 475.25 1,425.75 0.00 0.0
01.06.09 ENCOFRADO Y DESENCOFRADO NORMAL PARA VIGAS 2,007.72 0.00 0.00 0.00 0.00 0.00 1,003.86 1,003.86 0.0
01.06.10 ACERO F'Y= 4200 KG/CM2 PARA VIGAS 3,065.73 0.00 0.00 0.00 0.00 0.00 0.00 3,065.73 0.0
01.06.11 CONCRETO F'C=210 KG/CM2 PARA VIGAS 1,380.31 0.00 0.00 0.00 0.00 0.00 0.00 1,380.31 0.0
01.06.12 ACERO F'Y= 4200 KG/CM2 PARA CISTERNA 5,076.96 0.00 0.00 0.00 0.00 0.00 5,076.96 0.00 0.0
01.06.13 ENCOFRADO Y DESENCOFRADO NORMAL PARA CISTERNA 3,718.82 0.00 0.00 0.00 0.00 1,859.41 1,859.41 0.00 0.0
01.06.14 CONCRETO F'C=210 KG/CM2 PARA CISTERNA 4,092.64 0.00 0.00 0.00 0.00 0.00 4,092.64 0.00 0.0
01.06.15 ACERO F'Y= 4200 KG/CM2 PARA TANQUE ELEVADO 4,880.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,880.2
01.06.16 ENCOFRADO Y DESENCOFRADO NORMAL PARA TANQUE ELEVADO 4,492.10 0.00 0.00 0.00 0.00 0.00 0.00 4,492.10 0.0
01.06.17 CONCRETO F'C=210 KG/CM2 PARA TANQUE ELEVADO 2,618.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,618.4
01.06.18 ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA ALIGERADA 453.94 0.00 0.00 0.00 0.00 0.00 453.94 0.00 0.0
01.06.19 BLOQUETA DE ARCILLA H=0.15 M. PARA LOSA ALIGERADA 182.52 0.00 0.00 0.00 0.00 0.00 182.52 0.00 0.0
01.06.20 ACERO F'Y= 4200 KG/CM2 PARA LOSA ALIGERADA 321.44 0.00 0.00 0.00 0.00 0.00 321.44 0.00 0.0
01.06.21 CONCRETO F'C=210 KG/CM2 PARA LOSA ALIGERADA 224.55 0.00 0.00 0.00 0.00 0.00 0.00 224.55 0.0
01.06.22 MURO DE SOGA CON LADRILLO K.K. 18H 9X13X24 CM. 2,287.88 0.00 0.00 0.00 0.00 0.00 0.00 2,287.88 0.0
01.06.23 TARRAJEO EN MUROS INTERIORES FROTACHADO MEZCLA 1:5 851.76 0.00 0.00 0.00 0.00 0.00 0.00 851.76 0.0
01.06.24 TARRAJEO INTERIOR CON IMPERMEABILIZANTE DE TANQUE CISTERNA 1,402.11 0.00 0.00 0.00 0.00 0.00 0.00 701.06 701.0
CRONOGRAMA DE OBRA VALORIZADO
CRONOGRAMA
- BLOQUE ABDE
- YANAMU
OBRA V

MEJORAMIENTO Y AMPLIACION DEL SERVICIOMEJORAMIENTO


EDUCATIVO DE NIVEL
Y AMPLIACION
PRIMARIODEL
I.E.E.
SERVICIO
N°30318EDUCATIVO
DEL CENTRODEPOBLADO
NIVEL PRIMARIO
MENOR I.E.E.
DE YANAMUCLO
N°30318 DEL
E CENTRO
I.E.E. N°30
P

SEMANAS PR
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.06.25 TARRAJEO INTERIOR CON IMPERMEABILIZANTE DE TANQUE ELEVADO 886.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 886.6
01.06.26 TARRAJEO EXTERIOR FROTACHADO DE ESTRUCTURA MEZCLA 1:5 4,004.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,004.0
01.06.27 PINTURA LATEX EN ESTRUCTURA DOS MANOS 1,975.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.06.28 INSTALACION DE ACCESORIOS DE TANQUE CISTERNA 2,112.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,112.3
01.06.29 INSTALACION DE PUERTA DE MADERA P-1 320.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 320.0
01.06.30 INSTALACION DE ESCALERA METALICA SEGUN DISEÑO 2,400.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,400.0
01.07 PRUEBAS Y ENSAYOS DE CALIDAD 3,820.00
01.07.01 PROCTOR MODIFICADO 160.00 0.00 0.00 0.00 0.00 160.00 0.00 0.00 0.0
01.07.02 DENSIDAD DE CAMPO 480.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.7
01.07.03 DISEÑO DE MEZCLA 540.00 0.00 0.00 0.00 462.86 77.14 0.00 0.00 0.0
01.07.04 ROTURA DE PROBETA (COMPRESION SIMPLE) 2,640.00 0.00 0.00 0.00 0.00 0.00 65.19 228.15 228.1
01.08 FLETE 1,600.00
01.08.01 FLETE TERRESTRE 1,600.00 119.15 119.15 119.15 119.15 119.15 119.15 119.15 119.1
02 ARQUITECTURA 743,584.58
02.01 MUROS Y TABIQUES 140,636.03
02.01.01 MURO DE SOGA CON LADRILLO K.K. 18H 9X13X24 CM. 140,051.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
MURO DE CABEZA CON LADRILLO K.K. 18H 9X13X24 CM. 584.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02 REVOQUES, ENLUCIDOS Y MOLDURAS 217,896.67
02.02.01 TARRAJEO EN CIELO RASO FROTACHADO MEZCLA 1:4 62,875.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.02 TARRAJEO EN MUROS INTERIORES FROTACHADO MEZCLA 1:5 63,390.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.03 TARRAJEO EN MUROS EXTERIORES FROTACHADO MEZCLA 1:5 35,522.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.04 TARRAJEO EN VIGAS MEZCLA 1:4 27,465.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.05 TARRAJEO EN COLUMNAS MEZCLA 1:5 19,492.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.06 VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS MEZCLA 1:5 9,002.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.07 TARRAJEO DE PODIUM MEZCLA 1:5 147.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03 PISOS Y PAVIMENTOS 111,696.25
02.03.01 PISO DE PORCELANATO ALTO TRANSITO ANTIDESLIZANTE PARA AMBIENTES 65,681.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03.02 PISO DE PORCELANATO ALTO TRANSITO ANTIDESLIZANTE PARA VEREDAS 41,788.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03.03 PISO DE CERAMICO ANTIDESLIZANTE DE ALTO TRANSITO 4,226.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04 ZOCALOS Y CONTRAZOCALOS 28,505.27
02.04.01 CONTRAZOCALO DE PORCELANATO H=0.10 M. PARA AMBIENTES 11,652.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA VALORIZADO
CRONOGRAMA
- BLOQUE ABDE
- YANAMU
OBRA V

MEJORAMIENTO Y AMPLIACION DEL SERVICIOMEJORAMIENTO


EDUCATIVO DE NIVEL
Y AMPLIACION
PRIMARIODEL
I.E.E.
SERVICIO
N°30318EDUCATIVO
DEL CENTRODEPOBLADO
NIVEL PRIMARIO
MENOR I.E.E.
DE YANAMUCLO
N°30318 DEL
E CENTRO
I.E.E. N°30
P

SEMANAS PR
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
02.04.02 CONTRAZOCALO DE PORCELANATO H=0.10 M. PARA VEREDAS 11,342.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04.03 CONTRAZOCALO DE CERAMICO H=0.10 M. 5,139.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04.04 ZOCALO DE CERAMICO 370.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.05 CUBIERTAS 46,545.41
02.05.01 CUBIERTA DE TEJA ANDINA TIPO ETERNIT 46,545.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06 CARPINTERIA DE MADERA 17,229.50
02.06.01 PUERTA APANELADA DE CEDRO TIPO P-01 INC. INSTALACION 7,810.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06.02 PUERTA APANELADA DE CEDRO TIPO P-02 INC. INSTALACION 5,583.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06.03 PUERTA APANELADA DE CEDRO TIPO P-03 INC. INSTALACION 3,836.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07 CARPINTERIA METALICA 24,910.00
02.07.01 PORTON METALICO PM-01 INC. PINTADO E INSTALACION 860.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.02 VENTANA METALICA V-01 INC. PINTADO E INSTALACION 1,120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.03 VENTANA METALICA V-02 INC. PINTADO E INSTALACION 4,830.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.04 VENTANA METALICA V-03 INC. PINTADO E INSTALACION 2,200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.05 VENTANA METALICA V-04 INC. PINTADO E INSTALACION 1,120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.06 VENTANA METALICA V-05 INC. PINTADO E INSTALACION 4,830.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.07 VENTANA METALICA V-06 INC. PINTADO E INSTALACION 3,520.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.08 VENTANA METALICA V-07 INC. PINTADO E INSTALACION 1,140.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.09 VENTANA METALICA V-08 INC. PINTADO E INSTALACION 5,290.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.08 CARPINTERIA EN MELAMINA 5,580.00
02.08.01 SEPARADOR DE BAÑOS TIPO 01 5,580.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.09 CERRAJERIA 7,251.54
02.09.01 CERRADURA PARA PUERTA DE TRES GOLPES 4,796.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.09.02 CERRADURA PARA PUERTA TIPO PERILLA 2,454.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.10 VIDRIOS, CRISTALES Y SIMILARES 41,997.06
02.10.01 VIDRIO LAMINAR BUTIRAL DE POLIVINILO INCOLORO 41,997.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11 PINTURAS 90,207.74
02.11.01 PINTURA LATEX EN CIELO RASO DOS MANOS 22,833.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.02 PINTURA LATEX EN MUROS EXTERIORES DOS MANOS 17,654.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.03 PINTURA LATEX EN MUROS INTERIORES DOS MANOS 30,153.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.04 PINTURA LATEX EN VIGAS DOS MANOS 10,154.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA VALORIZADO
CRONOGRAMA
- BLOQUE ABDE
- YANAMU
OBRA V

MEJORAMIENTO Y AMPLIACION DEL SERVICIOMEJORAMIENTO


EDUCATIVO DE NIVEL
Y AMPLIACION
PRIMARIODEL
I.E.E.
SERVICIO
N°30318EDUCATIVO
DEL CENTRODEPOBLADO
NIVEL PRIMARIO
MENOR I.E.E.
DE YANAMUCLO
N°30318 DEL
E CENTRO
I.E.E. N°30
P

SEMANAS PR
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
02.11.05 PINTURA LATEX EN COLUMNAS DOS MANOS 7,342.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.06 PINTURA LATEX PARA DERRAMES EN PUERTAS Y VENTANAS DOS MANOS 1,560.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.07 PINTURA PARA PIZARRA 510.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12 JUNTAS 11,129.11
02.12.01 JUNTAS ASFALTICAS EN VEREDAS 2,066.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12.02 JUNTAS ASFALTICAS PARA SARDINEL DE JARDIN 91.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12.03 JUNTAS ASFALTICAS PARA COLUMNETAS 8,971.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03 INSTALACIONES SANITARIAS 58,301.24
03.01 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO 8,682.61
03.01.01 MOVIMIENTO DE TIERRAS 1,649.41
03.01.01.01 EXCAVACION DE ZANJAS PARA TUBERIA DE AGUA 937.63 0.00 0.00 0.00 0.00 937.63 0.00 0.00 0.0
03.01.01.02 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 681.36 0.00 0.00 0.00 0.00 0.00 596.19 85.17 0.0
03.01.01.03 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 30.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.01.02 SALIDAS 2,360.13
03.01.02.01 SALIDA DE AGUA FRIA PVC SAP DE 1/2" 2,254.32 0.00 0.00 0.00 0.00 0.00 120.77 281.79 281.7
03.01.02.02 SALIDA DE AGUA PARA RIEGO PVC SAP DE 1/2" 56.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 56.6
03.01.02.03 SALIDA DE AGUA FRIA CONTRA INCENDIO PVC SAP DE 2" 49.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 49.1
03.01.03 RED DE DISTRIBUCION 4,673.07
03.01.03.01 TUBERIA PARA AGUA POTABLE PVC SAP DE 1/2" C-10 2,106.15 0.00 0.00 0.00 0.00 0.00 0.00 254.19 254.1
03.01.03.02 TUBERIA PARA RIEGO PVC SAP DE 1/2" C-10 72.72 0.00 0.00 0.00 0.00 0.00 0.00 72.72 0.0
03.01.03.03 TUBERIA CONTRA INCENDIO PVC SAP DE 2" C-10 80.28 0.00 0.00 0.00 0.00 0.00 0.00 80.28 0.0
03.01.03.04 VALVULA DE COMPUERTA DE 1/2" 1,834.94 0.00 0.00 0.00 0.00 0.00 0.00 65.53 229.3
03.01.03.05 VALVULA DE COMPUERTA DE 2" 127.03 0.00 0.00 0.00 0.00 0.00 0.00 2.23 15.6
03.01.03.06 GRIFO CONTRA INCENDIO 451.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02 SISTEMA DE DESAGUE 19,414.41
03.02.01 MOVIMIENTO DE TIERRAS 1,805.63
03.02.01.01 EXCAVACION DE ZANJAS PARA TUBERIA DE DESAGUE 1,045.58 0.00 0.00 0.00 0.00 0.00 0.00 1,045.58 0.0
03.02.01.02 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 703.40 0.00 0.00 0.00 0.00 0.00 0.00 351.70 351.7
03.02.01.03 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 56.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02.02 SALIDAS 5,996.34
03.02.02.01 SALIDA DE DESAGUE CON PVC SAL DE 2" 2,613.30 0.00 0.00 0.00 0.00 0.00 0.00 190.06 332.6
CRONOGRAMA DE OBRA VALORIZADO
CRONOGRAMA
- BLOQUE ABDE
- YANAMU
OBRA V

MEJORAMIENTO Y AMPLIACION DEL SERVICIOMEJORAMIENTO


EDUCATIVO DE NIVEL
Y AMPLIACION
PRIMARIODEL
I.E.E.
SERVICIO
N°30318EDUCATIVO
DEL CENTRODEPOBLADO
NIVEL PRIMARIO
MENOR I.E.E.
DE YANAMUCLO
N°30318 DEL
E CENTRO
I.E.E. N°30
P

SEMANAS PR
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
03.02.02.02 SALIDA DE DESAGUE CON PVC SAL DE 4" 1,461.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 91.3
03.02.02.03 SALIDA DE VENTILACION CON PVC SAL DE 2" 1,921.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02.03 RED DE DISTRIBUCION 11,612.44
03.02.03.01 TUBERIA PARA DESAGUE CON PVC SAL DE 2" 1,038.11 0.00 0.00 0.00 0.00 0.00 0.00 72.85 127.4
03.02.03.02 TUBERIA PARA DESAGUE CON PVC SAL DE 4" 5,387.78 0.00 0.00 0.00 0.00 0.00 0.00 96.21 673.4
03.02.03.03 TUBERIA PARA VENTILACION CON PVC SAL DE 2" 2,348.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 132.9
TUBERIA PARA CAJA DE REGISTRO CON PVC SAL DE 2" 2,837.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03 SISTEMA DE DESAGUE PLUVIAL 15,728.96
03.03.01 TUBERIA PVC SAL PLUVIAL DE 4" 4,216.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.02 TUBERIA PVC SAL PLUVIAL DE 3" 1,789.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA FALSA COLUMNA 5,450.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.04 CONCRETO F'C=175 KG/CM2 PARA FALSA COLUMNA 3,930.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.05 ACCESORIOS PARA DESAGUE PLUVIAL 341.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04 APARATOS Y ACCESORIOS SANITARIOS 14,475.26
03.04.01 INODORO DE LOSA TANQUE BAJO 5,908.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.02 LAVATORIO DE LOSA CON PEDESTAL 4,385.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.03 PAPELERA DE LOSA 1,190.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.04 SUMIDERO DE BRONCE ROSCADO DE 2" 985.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.05 REGISTRO ROSCADO DE BRONCE DE 4" 1,381.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.06 CAJA DE REGISTRO PARA DESAGUE DE 624.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04 INSTALACIONES ELECTRICAS 110,524.39
04.01 PRIMER PISO 64,859.19
04.01.01 SALIDAS 13,513.89
04.01.01.01 SALIDAD DE TECHO PARA CENTRO DE LUZ 6,566.30 0.00 0.00 0.00 0.00 0.00 0.00 1,094.38 1,915.1
04.01.01.02 SALIDA DE TOMACORRIENTE BIPOLARES CON LINEA A TIERRA 4,391.95 0.00 0.00 0.00 0.00 0.00 0.00 548.99 1,921.4
04.01.01.03 SALIDA DE TOMACORRIENTE PARA ALUMBRADO DE EMERGENCIA 363.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.01.04 SALIDA PARA INTERRUPTORES EN CONMUTACION 1,057.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.01.05 SALIDA PARA INTERRUPTORES SIMPLES 298.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 298.5
04.01.01.06 SALIDA PARA INTERRUPTORES DOBLES 248.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.4
04.01.01.07 SALIDA PARA INTERRUPTORES TRIPLES 587.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 419.5
04.01.02 CANALIZACION DE TUBERIAS PVC 20,053.08
CRONOGRAMA DE OBRA VALORIZADO
CRONOGRAMA
- BLOQUE ABDE
- YANAMU
OBRA V

MEJORAMIENTO Y AMPLIACION DEL SERVICIOMEJORAMIENTO


EDUCATIVO DE NIVEL
Y AMPLIACION
PRIMARIODEL
I.E.E.
SERVICIO
N°30318EDUCATIVO
DEL CENTRODEPOBLADO
NIVEL PRIMARIO
MENOR I.E.E.
DE YANAMUCLO
N°30318 DEL
E CENTRO
I.E.E. N°30
P

SEMANAS PR
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
04.01.02.01 TUBERIA DE 25 MM. PVC SEL (1") 4,054.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.02.02 TUBERIA DE 20 MM. PVC SEL (3/4") 15,998.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03 CONDUCTORES 8,301.84
04.01.03.01 CONDUCTOR (2x10+1x10) MM. THHW 358.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.02 CONDUCTOR (1x10) MM2. THHW 146.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.03 CONDUCTOR (2x6+1x10) MM2 THHW 975.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.04 CONDUCTOR (2x2.5) MM2. THHW 4,612.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.05 CONDUCTOR (2x4.0) MM2. THHW 2,209.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.04 TABLEROS ELECTRICOS 4,700.00
04.01.04.01 TABLERO GENERAL Y TABLEROS DE DISTRIBUCION 4,700.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.05 CONEXION A TIERRA 5,600.00
04.01.05.01 POZO A TIERRA 5,600.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06 ARTEFACTOS Y ACCESORIOS ELECTRICOS 11,490.39
04.01.06.01 FLUORESCENTE RECTO INCLUYE EQUIPO Y PANTALLA 7,678.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.02 SPOT LIGHT 656.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.03 LUCES DE EMERGENCIA CON BATERIA - 02 FAROS 637.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.04 TOMACORRIENTE BIPOLAR 1,779.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.05 TOMACORRIENTE SIMPLE 125.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.06 INTERRUPTOR CONMUTACION 210.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.07 INTERRUPTOR SIMPLE 107.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.08 INTERRUPTOR DOBLE 94.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.09 INTERRUPTOR TRIPLE 201.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.07 OTROS 1,199.99
04.01.07.02 DISPOSITIVOS Y EQUIPOS DE SEGURIDAD 1,199.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02 SEGUNDO PISO 45,665.20
04.02.01 SALIDAS 13,605.84
04.02.01.01 SALIDAD DE TECHO PARA CENTRO DE LUZ 6,212.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.02 SALIDA DE TOMACORRIENTE BIPOLARES CON LINEA A TIERRA 5,218.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.03 SALIDA DE TOMACORRIENTE PARA ALUMBRADO DE EMERGENCIA 303.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.04 SALIDA PARA INTERRUPTORES EN CONMUTACION 704.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA VALORIZADO
CRONOGRAMA
- BLOQUE ABDE
- YANAMU
OBRA V

MEJORAMIENTO Y AMPLIACION DEL SERVICIOMEJORAMIENTO


EDUCATIVO DE NIVEL
Y AMPLIACION
PRIMARIODEL
I.E.E.
SERVICIO
N°30318EDUCATIVO
DEL CENTRODEPOBLADO
NIVEL PRIMARIO
MENOR I.E.E.
DE YANAMUCLO
N°30318 DEL
E CENTRO
I.E.E. N°30
P

SEMANAS PR
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
04.02.01.05 SALIDA PARA INTERRUPTORES SIMPLES 298.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.06 SALIDA PARA INTERRUPTORES DOBLES 398.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.07 SALIDA PARA INTERRUPTORES TRIPLES 469.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.02 CANALIZACION DE TUBERIAS PVC 13,965.19
04.02.02.01 TUBERIA DE 20 MM. PVC SEL (3/4") 13,965.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.03 CONDUCTORES 6,384.59
04.02.03.01 CONDUCTOR (2x2.5) MM2. THHW 3,370.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.03.02 CONDUCTOR (2x4.0) MM2. THHW 3,014.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04 ARTEFACTOS Y ACCESORIOS ELECTRICOS 11,709.58
04.02.04.01 FLUORESCENTE RECTO INCLUYE EQUIPO Y PANTALLA 8,432.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.02 LUCES DE EMERGENCIA CON BATERIA - 02 FAROS 637.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.03 TOMACORRIENTE BIPOLAR 1,779.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.04 TOMACORRIENTE SIMPLE 104.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.05 INTERRUPTOR CONMUTACION 336.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.06 INTERRUPTOR SIMPLE 107.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.07 INTERRUPTOR DOBLE 150.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.08 INTERRUPTOR TRIPLE 161.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0

COSTO DIRECTO 1,990,094.42 58,567.27 11,285.64 13,235.59 13,954.08 22,199.07 56,029.55 88,256.67 107,755.4
GASTOS GENERALES 10.00% 199,009.44 5,856.73 1,128.56 1,323.56 1,395.41 2,219.91 5,602.96 8,825.67 10,775.5
UTILIDAD 10.00% 199,009.44 5,856.73 1,128.56 1,323.56 1,395.41 2,219.91 5,602.96 8,825.67 10,775.5
SUB TOTAL 2,388,113.30 70,280.73 13,542.76 15,882.71 16,744.90 26,638.89 67,235.47 105,908.01 129,306.4
IGV 18.00% 429,860.39 12,650.53 2,437.70 2,858.89 3,014.08 4,795.00 12,102.38 19,063.44 23,275.1
PRESUPUESTO PARCIAL 2,817,973.69 82,931.26 15,980.46 18,741.60 19,758.98 31,433.89 79,337.85 124,971.45 152,581.6
PORCENTAJE DE AVANCE 2.94% 0.57% 0.67% 0.70% 1.12% 2.82% 4.43% 5.41%
PORCENTAJE DE AVANCE ACUMULADO 100.00% 4.88% 13.78%
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE
CRONOGRAMA
AB - YANAMUCLO
DE OBRA V

AMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO


MEJORAMIENTO
DE NIVEL PRIMARIO
Y AMPLIACION
I.E.E. N°30318
DEL SERVICIO
DEL CENTRO
EDUCATIVO
POBLADO
DE MENOR
NIVEL PRIMARIO
DE YANAMUCLO
I.E.E. N°30318
E I.E.E.DEL
N°30319
CENTRO
DELP

SEMANAS PROGRAMAD
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
BLOQUE AB - YANAMUCLO 1,990,094.42
01 ESTRUCTURAS 1,077,684.21 MES 01 MES 02
01.01 OBRAS PROVISIONALES 44,569.85
01.01.01 CONSTRUCCION PROVISIONAL DE OFICINA 384.00 384.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.02 CONSTRUCCION PROVISIONAL DE CASETA PARA GUARDIANIA 144.00 144.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.03 CONSTRUCCION PROVISIONAL DE VESTIDOR PARA PERSONAL 480.00 480.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.04 GUARDIANIA DE OBRA 37,785.60 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.4
01.01.05 ALQUILER DE ALMACEN 1,440.00 56.00 56.00 56.00 56.00 56.00 56.00 56.00 56.0
01.01.06 CARTEL DE IDENTIFICACION DE OBRA (3.60x2.40) 856.25 0.00 856.25 0.00 0.00 0.00 0.00 0.00 0.0
01.01.07 AGUA PARA CONSUMO EN LA CONSTRUCCION 1,080.00 42.00 42.00 42.00 42.00 42.00 42.00 42.00 42.0
01.01.08 DESAGUE PARA LA CONSTRUCCION 750.00 0.00 750.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.09 ENERGIA ELECTRICA PROVISIONAL PARA LA CONSTRUCCION 1,650.00 64.17 64.17 64.17 64.17 64.17 64.17 64.17 64.1
01.02 TRABAJOS PRELIMINARES 66,669.81
01.02.01 DEMOLICION DE CONSTRUCCION EXISTENTE 46,142.30 46,142.30 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.02.02 ELIMINACION DE CONSTRUCCION DEMOLIDA DP=2 KM. 8,433.24 6,324.93 2,108.31 0.00 0.00 0.00 0.00 0.00 0.0
01.02.03 LIMPIEZA DEL TERRENO MANUAL 3,218.46 0.00 3,218.46 0.00 0.00 0.00 0.00 0.00 0.0
01.02.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS 2,500.00 2,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.02.05 TRAZO, NIVELACION Y REPLANTEO PARA EDIFICACION 2,770.32 0.00 1,007.39 1,762.93 0.00 0.00 0.00 0.00 0.0
01.02.06 CONTROL TOPOGRAFICO DURANTE EJECUCION DE OBRA 3,605.49 841.28 841.28 841.28 841.28 240.37 0.00 0.00 0.0
01.03 MOVIMIENTO DE TIERRAS 32,782.10
01.03.01 EXCAVACION DE ZANJAS PARA ZAPATAS H=1.20 - 1.50 M. 9,038.33 0.00 753.19 5,272.36 3,012.78 0.00 0.00 0.00 0.0
01.03.02 EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS 2,632.52 0.00 0.00 548.44 767.82 767.82 548.44 0.00 0.0
01.03.03 EXCAVACION DE ZANJAS PARA JARDIN 31.43 0.00 0.00 31.43 0.00 0.00 0.00 0.00 0.0
01.03.04 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 4,776.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,776.2
01.03.05 REFINE, NIVELACION Y COMPACTACION DE PLATAFORMA 4,486.78 0.00 0.00 0.00 0.00 0.00 560.85 3,925.93 0.0
01.03.06 REFINE, NIVELACION Y COMPACTACION DE BASE PARA VEREDAS 6,019.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,019.8
01.03.07 RELLENO Y COMPACTACION DE PODIUM CON MATERIAL PROPIO 301.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 301.5
01.03.08 ACARREO INTERNO DE MATERIAL EXCEDENTE DP=20 M. 2,694.29 0.00 0.00 0.00 0.00 0.00 0.00 1,347.15 1,347.1
01.03.09 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 2,801.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.04 OBRAS DE CONCRETO SIMPLE 90,690.96
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE
CRONOGRAMA
AB - YANAMUCLO
DE OBRA V

AMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO


MEJORAMIENTO
DE NIVEL PRIMARIO
Y AMPLIACION
I.E.E. N°30318
DEL SERVICIO
DEL CENTRO
EDUCATIVO
POBLADO
DE MENOR
NIVEL PRIMARIO
DE YANAMUCLO
I.E.E. N°30318
E I.E.E.DEL
N°30319
CENTRO
DELP

SEMANAS PROGRAMAD
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.04.01 SOLADO PARA ZAPATAS E=0.10 M. 1:10 CEMENTO - HORMIGON 5,467.93 0.00 0.00 0.00 911.32 3,189.63 1,366.98 0.00 0.0
01.04.02 CONCRETO 1:10+30% P.G. PARA CIMIENTOS CORRIDOS 21,485.78 0.00 0.00 0.00 0.00 8,057.17 9,400.03 4,028.58 0.0
01.04.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO 6,829.64 0.00 0.00 0.00 0.00 0.00 2,276.55 3,983.96 569.1
01.04.04 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS 3,042.44 0.00 0.00 0.00 0.00 0.00 0.00 1,521.22 1,521.2
01.04.05 FALSO PISO DE CONCRETO E=0.10 M. CEMENTO - HORMIGON 16,168.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9,701.1
01.04.06 ENCOFRADO Y DESENCOFRADO NORMAL PARA VEREDAS 4,000.12 0.00 0.00 0.00 0.00 2,000.06 2,000.06 0.00 0.0
01.04.07 CONCRETO F'C=140 KG/CM2 PARA VEREDAS INCLUYE ACABADOS 19,168.71 0.00 0.00 0.00 0.00 0.00 5,750.61 13,418.10 0.0
01.04.08 ENCOFRADO Y DESENCOFRADO NORMAL PARA CUNETAS 3,648.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,648.2
01.04.09 CONCRETO F'C=140 KG/CM2 PARA CUNETAS INCLUYE ACABADOS 4,971.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,142.8
01.04.10 ENCOFRADO Y DESENCOFRADO NORMAL PARA JARDIN 3,281.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,460.7
01.04.11 CONCRETO F'C=140 KG/CM2 PARA JARDIN 2,627.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 656.7
01.05 OBRAS DE CONCRETO ARMADO 772,773.58
01.05.01 ZAPATAS 49,980.45
01.05.01.01 ACERO F'Y= 4200 KG/CM2 PARA ZAPATAS 11,429.97 0.00 0.00 0.00 0.00 0.00 10,001.22 1,428.75 0.0
01.05.01.02 CONCRETO F'C=210 KG/CM2 PARA ZAPATAS 38,550.48 0.00 0.00 0.00 0.00 0.00 0.00 23,130.29 15,420.1
01.05.02 COLUMNAS 113,702.39
01.05.02.01 ACERO F'Y= 4200 KG/CM2 PARA COLUMNAS 43,524.40 0.00 0.00 0.00 0.00 0.00 4,974.22 8,704.88 8,704.8
01.05.02.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS 47,502.09 0.00 0.00 0.00 0.00 0.00 0.00 3,064.65 10,726.2
01.05.02.03 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS 22,675.90 0.00 0.00 0.00 0.00 0.00 0.00 2,451.45 4,290.0
01.05.03 COLUMNETAS 43,559.15
01.05.03.01 ACERO F'Y= 4200 KG/CM2 PARA COLUMNETAS 13,992.87 0.00 0.00 0.00 0.00 0.00 0.00 1,023.87 2,389.0
01.05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNETAS 20,137.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,179.6
01.05.03.03 CONCRETO F'C=175 KG/CM2 PARA COLUMNETAS 9,428.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 764.4
01.05.04 VIGAS 210,855.32
01.05.04.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA VIGAS 79,074.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.04.02 ACERO F'Y= 4200 KG/CM2 PARA VIGAS 84,562.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.04.03 CONCRETO F'C=210 KG/CM2 PARA VIGAS 47,218.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05 LOSA ALIGERADA 288,844.61
01.05.05.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA ALIGERADA 134,294.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.02 BLOQUETA DE ARCILLA H=0.15 M. PARA LOSA ALIGERADA 21,223.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.03 BLOQUETA DE ARCILLA H=0.12 M. PARA LOSA ALIGERADA 21,181.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE
CRONOGRAMA
AB - YANAMUCLO
DE OBRA V

AMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO


MEJORAMIENTO
DE NIVEL PRIMARIO
Y AMPLIACION
I.E.E. N°30318
DEL SERVICIO
DEL CENTRO
EDUCATIVO
POBLADO
DE MENOR
NIVEL PRIMARIO
DE YANAMUCLO
I.E.E. N°30318
E I.E.E.DEL
N°30319
CENTRO
DELP

SEMANAS PROGRAMAD
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.05.05.04 ACERO F'Y= 4200 KG/CM2 PARA LOSA ALIGERADA 57,235.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.05 CONCRETO F'C=210 KG/CM2 PARA LOSA ALIGERADA 54,910.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06 ESCALERAS 65,831.66
01.05.06.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESCALERAS 18,440.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06.02 ACERO F'Y= 4200 KG/CM2 PARA ESCALERAS 9,971.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06.03 CONCRETO F'C=210 KG/CM2 PARA ESCALERAS 37,419.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.06 TANQUE CISTERNA 64,777.91
01.06.01 EXCAVACION DE ZANJAS PARA CIMENTACION 2,738.86 0.00 0.00 2,738.86 0.00 0.00 0.00 0.00 0.0
01.06.02 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 889.89 0.00 0.00 0.00 0.00 0.00 889.89 0.00 0.0
01.06.03 SOLADO PARA ZAPATAS E=0.10 M. 1:10 CEMENTO - HORMIGON 289.53 0.00 0.00 289.53 0.00 0.00 0.00 0.00 0.0
01.06.04 ACERO F'Y= 4200 KG/CM2 PARA ZAPATAS 581.27 0.00 0.00 0.00 581.27 0.00 0.00 0.00 0.0
01.06.05 CONCRETO F'C=210 KG/CM2 PARA ZAPATAS 2,041.31 0.00 0.00 0.00 2,041.31 0.00 0.00 0.00 0.0
01.06.06 ACERO F'Y= 4200 KG/CM2 PARA COLUMNAS 4,301.61 0.00 0.00 0.00 3,584.68 716.93 0.00 0.00 0.0
01.06.07 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS 3,278.17 0.00 0.00 0.00 0.00 1,966.90 1,311.27 0.00 0.0
01.06.08 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS 1,901.00 0.00 0.00 0.00 0.00 475.25 1,425.75 0.00 0.0
01.06.09 ENCOFRADO Y DESENCOFRADO NORMAL PARA VIGAS 2,007.72 0.00 0.00 0.00 0.00 0.00 1,003.86 1,003.86 0.0
01.06.10 ACERO F'Y= 4200 KG/CM2 PARA VIGAS 3,065.73 0.00 0.00 0.00 0.00 0.00 0.00 3,065.73 0.0
01.06.11 CONCRETO F'C=210 KG/CM2 PARA VIGAS 1,380.31 0.00 0.00 0.00 0.00 0.00 0.00 1,380.31 0.0
01.06.12 ACERO F'Y= 4200 KG/CM2 PARA CISTERNA 5,076.96 0.00 0.00 0.00 0.00 0.00 5,076.96 0.00 0.0
01.06.13 ENCOFRADO Y DESENCOFRADO NORMAL PARA CISTERNA 3,718.82 0.00 0.00 0.00 0.00 1,859.41 1,859.41 0.00 0.0
01.06.14 CONCRETO F'C=210 KG/CM2 PARA CISTERNA 4,092.64 0.00 0.00 0.00 0.00 0.00 4,092.64 0.00 0.0
01.06.15 ACERO F'Y= 4200 KG/CM2 PARA TANQUE ELEVADO 4,880.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,880.2
01.06.16 ENCOFRADO Y DESENCOFRADO NORMAL PARA TANQUE ELEVADO 4,492.10 0.00 0.00 0.00 0.00 0.00 0.00 4,492.10 0.0
01.06.17 CONCRETO F'C=210 KG/CM2 PARA TANQUE ELEVADO 2,618.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,618.4
01.06.18 ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA ALIGERADA 453.94 0.00 0.00 0.00 0.00 0.00 453.94 0.00 0.0
01.06.19 BLOQUETA DE ARCILLA H=0.15 M. PARA LOSA ALIGERADA 182.52 0.00 0.00 0.00 0.00 0.00 182.52 0.00 0.0
01.06.20 ACERO F'Y= 4200 KG/CM2 PARA LOSA ALIGERADA 321.44 0.00 0.00 0.00 0.00 0.00 321.44 0.00 0.0
01.06.21 CONCRETO F'C=210 KG/CM2 PARA LOSA ALIGERADA 224.55 0.00 0.00 0.00 0.00 0.00 0.00 224.55 0.0
01.06.22 MURO DE SOGA CON LADRILLO K.K. 18H 9X13X24 CM. 2,287.88 0.00 0.00 0.00 0.00 0.00 0.00 2,287.88 0.0
01.06.23 TARRAJEO EN MUROS INTERIORES FROTACHADO MEZCLA 1:5 851.76 0.00 0.00 0.00 0.00 0.00 0.00 851.76 0.0
01.06.24 TARRAJEO INTERIOR CON IMPERMEABILIZANTE DE TANQUE CISTERNA 1,402.11 0.00 0.00 0.00 0.00 0.00 0.00 701.06 701.0
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE
CRONOGRAMA
AB - YANAMUCLO
DE OBRA V

AMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO


MEJORAMIENTO
DE NIVEL PRIMARIO
Y AMPLIACION
I.E.E. N°30318
DEL SERVICIO
DEL CENTRO
EDUCATIVO
POBLADO
DE MENOR
NIVEL PRIMARIO
DE YANAMUCLO
I.E.E. N°30318
E I.E.E.DEL
N°30319
CENTRO
DELP

SEMANAS PROGRAMAD
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.06.25 TARRAJEO INTERIOR CON IMPERMEABILIZANTE DE TANQUE ELEVADO 886.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 886.6
01.06.26 TARRAJEO EXTERIOR FROTACHADO DE ESTRUCTURA MEZCLA 1:5 4,004.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,004.0
01.06.27 PINTURA LATEX EN ESTRUCTURA DOS MANOS 1,975.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.06.28 INSTALACION DE ACCESORIOS DE TANQUE CISTERNA 2,112.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,112.3
01.06.29 INSTALACION DE PUERTA DE MADERA P-1 320.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 320.0
01.06.30 INSTALACION DE ESCALERA METALICA SEGUN DISEÑO 2,400.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,400.0
01.07 PRUEBAS Y ENSAYOS DE CALIDAD 3,820.00
01.07.01 PROCTOR MODIFICADO 160.00 0.00 0.00 0.00 0.00 160.00 0.00 0.00 0.0
01.07.02 DENSIDAD DE CAMPO 480.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.7
01.07.03 DISEÑO DE MEZCLA 540.00 0.00 0.00 0.00 462.86 77.14 0.00 0.00 0.0
01.07.04 ROTURA DE PROBETA (COMPRESION SIMPLE) 2,640.00 0.00 0.00 0.00 0.00 0.00 65.19 228.15 228.1
01.08 FLETE 1,600.00
01.08.01 FLETE TERRESTRE 1,600.00 119.15 119.15 119.15 119.15 119.15 119.15 119.15 119.1
02 ARQUITECTURA 743,584.58
02.01 MUROS Y TABIQUES 140,636.03
02.01.01 MURO DE SOGA CON LADRILLO K.K. 18H 9X13X24 CM. 140,051.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
MURO DE CABEZA CON LADRILLO K.K. 18H 9X13X24 CM. 584.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02 REVOQUES, ENLUCIDOS Y MOLDURAS 217,896.67
02.02.01 TARRAJEO EN CIELO RASO FROTACHADO MEZCLA 1:4 62,875.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.02 TARRAJEO EN MUROS INTERIORES FROTACHADO MEZCLA 1:5 63,390.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.03 TARRAJEO EN MUROS EXTERIORES FROTACHADO MEZCLA 1:5 35,522.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.04 TARRAJEO EN VIGAS MEZCLA 1:4 27,465.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.05 TARRAJEO EN COLUMNAS MEZCLA 1:5 19,492.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.06 VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS MEZCLA 1:5 9,002.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.07 TARRAJEO DE PODIUM MEZCLA 1:5 147.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03 PISOS Y PAVIMENTOS 111,696.25
02.03.01 PISO DE PORCELANATO ALTO TRANSITO ANTIDESLIZANTE PARA AMBIENTES 65,681.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03.02 PISO DE PORCELANATO ALTO TRANSITO ANTIDESLIZANTE PARA VEREDAS 41,788.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03.03 PISO DE CERAMICO ANTIDESLIZANTE DE ALTO TRANSITO 4,226.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04 ZOCALOS Y CONTRAZOCALOS 28,505.27
02.04.01 CONTRAZOCALO DE PORCELANATO H=0.10 M. PARA AMBIENTES 11,652.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE
CRONOGRAMA
AB - YANAMUCLO
DE OBRA V

AMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO


MEJORAMIENTO
DE NIVEL PRIMARIO
Y AMPLIACION
I.E.E. N°30318
DEL SERVICIO
DEL CENTRO
EDUCATIVO
POBLADO
DE MENOR
NIVEL PRIMARIO
DE YANAMUCLO
I.E.E. N°30318
E I.E.E.DEL
N°30319
CENTRO
DELP

SEMANAS PROGRAMAD
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
02.04.02 CONTRAZOCALO DE PORCELANATO H=0.10 M. PARA VEREDAS 11,342.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04.03 CONTRAZOCALO DE CERAMICO H=0.10 M. 5,139.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04.04 ZOCALO DE CERAMICO 370.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.05 CUBIERTAS 46,545.41
02.05.01 CUBIERTA DE TEJA ANDINA TIPO ETERNIT 46,545.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06 CARPINTERIA DE MADERA 17,229.50
02.06.01 PUERTA APANELADA DE CEDRO TIPO P-01 INC. INSTALACION 7,810.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06.02 PUERTA APANELADA DE CEDRO TIPO P-02 INC. INSTALACION 5,583.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06.03 PUERTA APANELADA DE CEDRO TIPO P-03 INC. INSTALACION 3,836.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07 CARPINTERIA METALICA 24,910.00
02.07.01 PORTON METALICO PM-01 INC. PINTADO E INSTALACION 860.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.02 VENTANA METALICA V-01 INC. PINTADO E INSTALACION 1,120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.03 VENTANA METALICA V-02 INC. PINTADO E INSTALACION 4,830.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.04 VENTANA METALICA V-03 INC. PINTADO E INSTALACION 2,200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.05 VENTANA METALICA V-04 INC. PINTADO E INSTALACION 1,120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.06 VENTANA METALICA V-05 INC. PINTADO E INSTALACION 4,830.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.07 VENTANA METALICA V-06 INC. PINTADO E INSTALACION 3,520.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.08 VENTANA METALICA V-07 INC. PINTADO E INSTALACION 1,140.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.09 VENTANA METALICA V-08 INC. PINTADO E INSTALACION 5,290.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.08 CARPINTERIA EN MELAMINA 5,580.00
02.08.01 SEPARADOR DE BAÑOS TIPO 01 5,580.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.09 CERRAJERIA 7,251.54
02.09.01 CERRADURA PARA PUERTA DE TRES GOLPES 4,796.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.09.02 CERRADURA PARA PUERTA TIPO PERILLA 2,454.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.10 VIDRIOS, CRISTALES Y SIMILARES 41,997.06
02.10.01 VIDRIO LAMINAR BUTIRAL DE POLIVINILO INCOLORO 41,997.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11 PINTURAS 90,207.74
02.11.01 PINTURA LATEX EN CIELO RASO DOS MANOS 22,833.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.02 PINTURA LATEX EN MUROS EXTERIORES DOS MANOS 17,654.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.03 PINTURA LATEX EN MUROS INTERIORES DOS MANOS 30,153.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.04 PINTURA LATEX EN VIGAS DOS MANOS 10,154.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE
CRONOGRAMA
AB - YANAMUCLO
DE OBRA V

AMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO


MEJORAMIENTO
DE NIVEL PRIMARIO
Y AMPLIACION
I.E.E. N°30318
DEL SERVICIO
DEL CENTRO
EDUCATIVO
POBLADO
DE MENOR
NIVEL PRIMARIO
DE YANAMUCLO
I.E.E. N°30318
E I.E.E.DEL
N°30319
CENTRO
DELP

SEMANAS PROGRAMAD
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
02.11.05 PINTURA LATEX EN COLUMNAS DOS MANOS 7,342.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.06 PINTURA LATEX PARA DERRAMES EN PUERTAS Y VENTANAS DOS MANOS 1,560.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.07 PINTURA PARA PIZARRA 510.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12 JUNTAS 11,129.11
02.12.01 JUNTAS ASFALTICAS EN VEREDAS 2,066.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12.02 JUNTAS ASFALTICAS PARA SARDINEL DE JARDIN 91.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12.03 JUNTAS ASFALTICAS PARA COLUMNETAS 8,971.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03 INSTALACIONES SANITARIAS 58,301.24
03.01 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO 8,682.61
03.01.01 MOVIMIENTO DE TIERRAS 1,649.41
03.01.01.01 EXCAVACION DE ZANJAS PARA TUBERIA DE AGUA 937.63 0.00 0.00 0.00 0.00 937.63 0.00 0.00 0.0
03.01.01.02 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 681.36 0.00 0.00 0.00 0.00 0.00 596.19 85.17 0.0
03.01.01.03 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 30.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.01.02 SALIDAS 2,360.13
03.01.02.01 SALIDA DE AGUA FRIA PVC SAP DE 1/2" 2,254.32 0.00 0.00 0.00 0.00 0.00 120.77 281.79 281.7
03.01.02.02 SALIDA DE AGUA PARA RIEGO PVC SAP DE 1/2" 56.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 56.6
03.01.02.03 SALIDA DE AGUA FRIA CONTRA INCENDIO PVC SAP DE 2" 49.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 49.1
03.01.03 RED DE DISTRIBUCION 4,673.07
03.01.03.01 TUBERIA PARA AGUA POTABLE PVC SAP DE 1/2" C-10 2,106.15 0.00 0.00 0.00 0.00 0.00 0.00 254.19 254.1
03.01.03.02 TUBERIA PARA RIEGO PVC SAP DE 1/2" C-10 72.72 0.00 0.00 0.00 0.00 0.00 0.00 72.72 0.0
03.01.03.03 TUBERIA CONTRA INCENDIO PVC SAP DE 2" C-10 80.28 0.00 0.00 0.00 0.00 0.00 0.00 80.28 0.0
03.01.03.04 VALVULA DE COMPUERTA DE 1/2" 1,834.94 0.00 0.00 0.00 0.00 0.00 0.00 65.53 229.3
03.01.03.05 VALVULA DE COMPUERTA DE 2" 127.03 0.00 0.00 0.00 0.00 0.00 0.00 2.23 15.6
03.01.03.06 GRIFO CONTRA INCENDIO 451.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02 SISTEMA DE DESAGUE 19,414.41
03.02.01 MOVIMIENTO DE TIERRAS 1,805.63
03.02.01.01 EXCAVACION DE ZANJAS PARA TUBERIA DE DESAGUE 1,045.58 0.00 0.00 0.00 0.00 0.00 0.00 1,045.58 0.0
03.02.01.02 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 703.40 0.00 0.00 0.00 0.00 0.00 0.00 351.70 351.7
03.02.01.03 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 56.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02.02 SALIDAS 5,996.34
03.02.02.01 SALIDA DE DESAGUE CON PVC SAL DE 2" 2,613.30 0.00 0.00 0.00 0.00 0.00 0.00 190.06 332.6
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE
CRONOGRAMA
AB - YANAMUCLO
DE OBRA V

AMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO


MEJORAMIENTO
DE NIVEL PRIMARIO
Y AMPLIACION
I.E.E. N°30318
DEL SERVICIO
DEL CENTRO
EDUCATIVO
POBLADO
DE MENOR
NIVEL PRIMARIO
DE YANAMUCLO
I.E.E. N°30318
E I.E.E.DEL
N°30319
CENTRO
DELP

SEMANAS PROGRAMAD
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
03.02.02.02 SALIDA DE DESAGUE CON PVC SAL DE 4" 1,461.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 91.3
03.02.02.03 SALIDA DE VENTILACION CON PVC SAL DE 2" 1,921.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02.03 RED DE DISTRIBUCION 11,612.44
03.02.03.01 TUBERIA PARA DESAGUE CON PVC SAL DE 2" 1,038.11 0.00 0.00 0.00 0.00 0.00 0.00 72.85 127.4
03.02.03.02 TUBERIA PARA DESAGUE CON PVC SAL DE 4" 5,387.78 0.00 0.00 0.00 0.00 0.00 0.00 96.21 673.4
03.02.03.03 TUBERIA PARA VENTILACION CON PVC SAL DE 2" 2,348.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 132.9
TUBERIA PARA CAJA DE REGISTRO CON PVC SAL DE 2" 2,837.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03 SISTEMA DE DESAGUE PLUVIAL 15,728.96
03.03.01 TUBERIA PVC SAL PLUVIAL DE 4" 4,216.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.02 TUBERIA PVC SAL PLUVIAL DE 3" 1,789.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA FALSA COLUMNA 5,450.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.04 CONCRETO F'C=175 KG/CM2 PARA FALSA COLUMNA 3,930.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.05 ACCESORIOS PARA DESAGUE PLUVIAL 341.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04 APARATOS Y ACCESORIOS SANITARIOS 14,475.26
03.04.01 INODORO DE LOSA TANQUE BAJO 5,908.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.02 LAVATORIO DE LOSA CON PEDESTAL 4,385.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.03 PAPELERA DE LOSA 1,190.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.04 SUMIDERO DE BRONCE ROSCADO DE 2" 985.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.05 REGISTRO ROSCADO DE BRONCE DE 4" 1,381.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.06 CAJA DE REGISTRO PARA DESAGUE DE 624.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04 INSTALACIONES ELECTRICAS 110,524.39
04.01 PRIMER PISO 64,859.19
04.01.01 SALIDAS 13,513.89
04.01.01.01 SALIDAD DE TECHO PARA CENTRO DE LUZ 6,566.30 0.00 0.00 0.00 0.00 0.00 0.00 1,094.38 1,915.1
04.01.01.02 SALIDA DE TOMACORRIENTE BIPOLARES CON LINEA A TIERRA 4,391.95 0.00 0.00 0.00 0.00 0.00 0.00 548.99 1,921.4
04.01.01.03 SALIDA DE TOMACORRIENTE PARA ALUMBRADO DE EMERGENCIA 363.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.01.04 SALIDA PARA INTERRUPTORES EN CONMUTACION 1,057.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.01.05 SALIDA PARA INTERRUPTORES SIMPLES 298.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 298.5
04.01.01.06 SALIDA PARA INTERRUPTORES DOBLES 248.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.4
04.01.01.07 SALIDA PARA INTERRUPTORES TRIPLES 587.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 419.5
04.01.02 CANALIZACION DE TUBERIAS PVC 20,053.08
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE
CRONOGRAMA
AB - YANAMUCLO
DE OBRA V

AMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO


MEJORAMIENTO
DE NIVEL PRIMARIO
Y AMPLIACION
I.E.E. N°30318
DEL SERVICIO
DEL CENTRO
EDUCATIVO
POBLADO
DE MENOR
NIVEL PRIMARIO
DE YANAMUCLO
I.E.E. N°30318
E I.E.E.DEL
N°30319
CENTRO
DELP

SEMANAS PROGRAMAD
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
04.01.02.01 TUBERIA DE 25 MM. PVC SEL (1") 4,054.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.02.02 TUBERIA DE 20 MM. PVC SEL (3/4") 15,998.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03 CONDUCTORES 8,301.84
04.01.03.01 CONDUCTOR (2x10+1x10) MM. THHW 358.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.02 CONDUCTOR (1x10) MM2. THHW 146.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.03 CONDUCTOR (2x6+1x10) MM2 THHW 975.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.04 CONDUCTOR (2x2.5) MM2. THHW 4,612.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.05 CONDUCTOR (2x4.0) MM2. THHW 2,209.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.04 TABLEROS ELECTRICOS 4,700.00
04.01.04.01 TABLERO GENERAL Y TABLEROS DE DISTRIBUCION 4,700.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.05 CONEXION A TIERRA 5,600.00
04.01.05.01 POZO A TIERRA 5,600.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06 ARTEFACTOS Y ACCESORIOS ELECTRICOS 11,490.39
04.01.06.01 FLUORESCENTE RECTO INCLUYE EQUIPO Y PANTALLA 7,678.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.02 SPOT LIGHT 656.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.03 LUCES DE EMERGENCIA CON BATERIA - 02 FAROS 637.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.04 TOMACORRIENTE BIPOLAR 1,779.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.05 TOMACORRIENTE SIMPLE 125.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.06 INTERRUPTOR CONMUTACION 210.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.07 INTERRUPTOR SIMPLE 107.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.08 INTERRUPTOR DOBLE 94.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.09 INTERRUPTOR TRIPLE 201.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.07 OTROS 1,199.99
04.01.07.02 DISPOSITIVOS Y EQUIPOS DE SEGURIDAD 1,199.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02 SEGUNDO PISO 45,665.20
04.02.01 SALIDAS 13,605.84
04.02.01.01 SALIDAD DE TECHO PARA CENTRO DE LUZ 6,212.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.02 SALIDA DE TOMACORRIENTE BIPOLARES CON LINEA A TIERRA 5,218.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.03 SALIDA DE TOMACORRIENTE PARA ALUMBRADO DE EMERGENCIA 303.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.04 SALIDA PARA INTERRUPTORES EN CONMUTACION 704.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE
CRONOGRAMA
AB - YANAMUCLO
DE OBRA V

AMIENTO Y AMPLIACION DEL SERVICIO EDUCATIVO


MEJORAMIENTO
DE NIVEL PRIMARIO
Y AMPLIACION
I.E.E. N°30318
DEL SERVICIO
DEL CENTRO
EDUCATIVO
POBLADO
DE MENOR
NIVEL PRIMARIO
DE YANAMUCLO
I.E.E. N°30318
E I.E.E.DEL
N°30319
CENTRO
DELP

SEMANAS PROGRAMAD
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
04.02.01.05 SALIDA PARA INTERRUPTORES SIMPLES 298.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.06 SALIDA PARA INTERRUPTORES DOBLES 398.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.07 SALIDA PARA INTERRUPTORES TRIPLES 469.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.02 CANALIZACION DE TUBERIAS PVC 13,965.19
04.02.02.01 TUBERIA DE 20 MM. PVC SEL (3/4") 13,965.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.03 CONDUCTORES 6,384.59
04.02.03.01 CONDUCTOR (2x2.5) MM2. THHW 3,370.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.03.02 CONDUCTOR (2x4.0) MM2. THHW 3,014.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04 ARTEFACTOS Y ACCESORIOS ELECTRICOS 11,709.58
04.02.04.01 FLUORESCENTE RECTO INCLUYE EQUIPO Y PANTALLA 8,432.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.02 LUCES DE EMERGENCIA CON BATERIA - 02 FAROS 637.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.03 TOMACORRIENTE BIPOLAR 1,779.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.04 TOMACORRIENTE SIMPLE 104.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.05 INTERRUPTOR CONMUTACION 336.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.06 INTERRUPTOR SIMPLE 107.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.07 INTERRUPTOR DOBLE 150.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.08 INTERRUPTOR TRIPLE 161.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0

COSTO DIRECTO 1,990,094.42 58,567.27 11,285.64 13,235.59 13,954.08 22,199.07 56,029.55 88,256.67 107,755.4
GASTOS GENERALES 10.00% 199,009.44 5,856.73 1,128.56 1,323.56 1,395.41 2,219.91 5,602.96 8,825.67 10,775.5
UTILIDAD 10.00% 199,009.44 5,856.73 1,128.56 1,323.56 1,395.41 2,219.91 5,602.96 8,825.67 10,775.5
SUB TOTAL 2,388,113.30 70,280.73 13,542.76 15,882.71 16,744.90 26,638.89 67,235.47 105,908.01 129,306.4
IGV 18.00% 429,860.39 12,650.53 2,437.70 2,858.89 3,014.08 4,795.00 12,102.38 19,063.44 23,275.1
PRESUPUESTO PARCIAL 2,817,973.69 82,931.26 15,980.46 18,741.60 19,758.98 31,433.89 79,337.85 124,971.45 152,581.6
PORCENTAJE DE AVANCE 2.94% 0.57% 0.67% 0.70% 1.12% 2.82% 4.43% 5.41%
PORCENTAJE DE AVANCE ACUMULADO 100.00% 4.88% 13.78%
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB
CRONOGRAMA
- YANAMUCLODE OBRA V

Y AMPLIACION DEL SERVICIO EDUCATIVO DE NIVEL


MEJORAMIENTO
PRIMARIO I.E.E.
Y AMPLIACION
N°30318 DELDEL
CENTRO
SERVICIO
POBLADO
EDUCATIVO
MENORDEDE
NIVEL
YANAMUCLO
PRIMARIOE I.E.E.
I.E.E. N°30318
N°30319 DEL
DEL CENTRO
ANEXO DE
P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
BLOQUE AB - YANAMUCLO 1,990,094.42
01 ESTRUCTURAS 1,077,684.21 MES 01 MES 02
01.01 OBRAS PROVISIONALES 44,569.85
01.01.01 CONSTRUCCION PROVISIONAL DE OFICINA 384.00 384.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.02 CONSTRUCCION PROVISIONAL DE CASETA PARA GUARDIANIA 144.00 144.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.03 CONSTRUCCION PROVISIONAL DE VESTIDOR PARA PERSONAL 480.00 480.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.04 GUARDIANIA DE OBRA 37,785.60 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.4
01.01.05 ALQUILER DE ALMACEN 1,440.00 56.00 56.00 56.00 56.00 56.00 56.00 56.00 56.0
01.01.06 CARTEL DE IDENTIFICACION DE OBRA (3.60x2.40) 856.25 0.00 856.25 0.00 0.00 0.00 0.00 0.00 0.0
01.01.07 AGUA PARA CONSUMO EN LA CONSTRUCCION 1,080.00 42.00 42.00 42.00 42.00 42.00 42.00 42.00 42.0
01.01.08 DESAGUE PARA LA CONSTRUCCION 750.00 0.00 750.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.09 ENERGIA ELECTRICA PROVISIONAL PARA LA CONSTRUCCION 1,650.00 64.17 64.17 64.17 64.17 64.17 64.17 64.17 64.1
01.02 TRABAJOS PRELIMINARES 66,669.81
01.02.01 DEMOLICION DE CONSTRUCCION EXISTENTE 46,142.30 46,142.30 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.02.02 ELIMINACION DE CONSTRUCCION DEMOLIDA DP=2 KM. 8,433.24 6,324.93 2,108.31 0.00 0.00 0.00 0.00 0.00 0.0
01.02.03 LIMPIEZA DEL TERRENO MANUAL 3,218.46 0.00 3,218.46 0.00 0.00 0.00 0.00 0.00 0.0
01.02.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS 2,500.00 2,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.02.05 TRAZO, NIVELACION Y REPLANTEO PARA EDIFICACION 2,770.32 0.00 1,007.39 1,762.93 0.00 0.00 0.00 0.00 0.0
01.02.06 CONTROL TOPOGRAFICO DURANTE EJECUCION DE OBRA 3,605.49 841.28 841.28 841.28 841.28 240.37 0.00 0.00 0.0
01.03 MOVIMIENTO DE TIERRAS 32,782.10
01.03.01 EXCAVACION DE ZANJAS PARA ZAPATAS H=1.20 - 1.50 M. 9,038.33 0.00 753.19 5,272.36 3,012.78 0.00 0.00 0.00 0.0
01.03.02 EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS 2,632.52 0.00 0.00 548.44 767.82 767.82 548.44 0.00 0.0
01.03.03 EXCAVACION DE ZANJAS PARA JARDIN 31.43 0.00 0.00 31.43 0.00 0.00 0.00 0.00 0.0
01.03.04 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 4,776.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,776.2
01.03.05 REFINE, NIVELACION Y COMPACTACION DE PLATAFORMA 4,486.78 0.00 0.00 0.00 0.00 0.00 560.85 3,925.93 0.0
01.03.06 REFINE, NIVELACION Y COMPACTACION DE BASE PARA VEREDAS 6,019.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,019.8
01.03.07 RELLENO Y COMPACTACION DE PODIUM CON MATERIAL PROPIO 301.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 301.5
01.03.08 ACARREO INTERNO DE MATERIAL EXCEDENTE DP=20 M. 2,694.29 0.00 0.00 0.00 0.00 0.00 0.00 1,347.15 1,347.1
01.03.09 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 2,801.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.04 OBRAS DE CONCRETO SIMPLE 90,690.96
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB
CRONOGRAMA
- YANAMUCLODE OBRA V

Y AMPLIACION DEL SERVICIO EDUCATIVO DE NIVEL


MEJORAMIENTO
PRIMARIO I.E.E.
Y AMPLIACION
N°30318 DELDEL
CENTRO
SERVICIO
POBLADO
EDUCATIVO
MENORDEDE
NIVEL
YANAMUCLO
PRIMARIOE I.E.E.
I.E.E. N°30318
N°30319 DEL
DEL CENTRO
ANEXO DE
P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.04.01 SOLADO PARA ZAPATAS E=0.10 M. 1:10 CEMENTO - HORMIGON 5,467.93 0.00 0.00 0.00 911.32 3,189.63 1,366.98 0.00 0.0
01.04.02 CONCRETO 1:10+30% P.G. PARA CIMIENTOS CORRIDOS 21,485.78 0.00 0.00 0.00 0.00 8,057.17 9,400.03 4,028.58 0.0
01.04.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO 6,829.64 0.00 0.00 0.00 0.00 0.00 2,276.55 3,983.96 569.1
01.04.04 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS 3,042.44 0.00 0.00 0.00 0.00 0.00 0.00 1,521.22 1,521.2
01.04.05 FALSO PISO DE CONCRETO E=0.10 M. CEMENTO - HORMIGON 16,168.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9,701.1
01.04.06 ENCOFRADO Y DESENCOFRADO NORMAL PARA VEREDAS 4,000.12 0.00 0.00 0.00 0.00 2,000.06 2,000.06 0.00 0.0
01.04.07 CONCRETO F'C=140 KG/CM2 PARA VEREDAS INCLUYE ACABADOS 19,168.71 0.00 0.00 0.00 0.00 0.00 5,750.61 13,418.10 0.0
01.04.08 ENCOFRADO Y DESENCOFRADO NORMAL PARA CUNETAS 3,648.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,648.2
01.04.09 CONCRETO F'C=140 KG/CM2 PARA CUNETAS INCLUYE ACABADOS 4,971.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,142.8
01.04.10 ENCOFRADO Y DESENCOFRADO NORMAL PARA JARDIN 3,281.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,460.7
01.04.11 CONCRETO F'C=140 KG/CM2 PARA JARDIN 2,627.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 656.7
01.05 OBRAS DE CONCRETO ARMADO 772,773.58
01.05.01 ZAPATAS 49,980.45
01.05.01.01 ACERO F'Y= 4200 KG/CM2 PARA ZAPATAS 11,429.97 0.00 0.00 0.00 0.00 0.00 10,001.22 1,428.75 0.0
01.05.01.02 CONCRETO F'C=210 KG/CM2 PARA ZAPATAS 38,550.48 0.00 0.00 0.00 0.00 0.00 0.00 23,130.29 15,420.1
01.05.02 COLUMNAS 113,702.39
01.05.02.01 ACERO F'Y= 4200 KG/CM2 PARA COLUMNAS 43,524.40 0.00 0.00 0.00 0.00 0.00 4,974.22 8,704.88 8,704.8
01.05.02.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS 47,502.09 0.00 0.00 0.00 0.00 0.00 0.00 3,064.65 10,726.2
01.05.02.03 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS 22,675.90 0.00 0.00 0.00 0.00 0.00 0.00 2,451.45 4,290.0
01.05.03 COLUMNETAS 43,559.15
01.05.03.01 ACERO F'Y= 4200 KG/CM2 PARA COLUMNETAS 13,992.87 0.00 0.00 0.00 0.00 0.00 0.00 1,023.87 2,389.0
01.05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNETAS 20,137.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,179.6
01.05.03.03 CONCRETO F'C=175 KG/CM2 PARA COLUMNETAS 9,428.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 764.4
01.05.04 VIGAS 210,855.32
01.05.04.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA VIGAS 79,074.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.04.02 ACERO F'Y= 4200 KG/CM2 PARA VIGAS 84,562.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.04.03 CONCRETO F'C=210 KG/CM2 PARA VIGAS 47,218.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05 LOSA ALIGERADA 288,844.61
01.05.05.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA ALIGERADA 134,294.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.02 BLOQUETA DE ARCILLA H=0.15 M. PARA LOSA ALIGERADA 21,223.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.03 BLOQUETA DE ARCILLA H=0.12 M. PARA LOSA ALIGERADA 21,181.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB
CRONOGRAMA
- YANAMUCLODE OBRA V

Y AMPLIACION DEL SERVICIO EDUCATIVO DE NIVEL


MEJORAMIENTO
PRIMARIO I.E.E.
Y AMPLIACION
N°30318 DELDEL
CENTRO
SERVICIO
POBLADO
EDUCATIVO
MENORDEDE
NIVEL
YANAMUCLO
PRIMARIOE I.E.E.
I.E.E. N°30318
N°30319 DEL
DEL CENTRO
ANEXO DE
P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.05.05.04 ACERO F'Y= 4200 KG/CM2 PARA LOSA ALIGERADA 57,235.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.05 CONCRETO F'C=210 KG/CM2 PARA LOSA ALIGERADA 54,910.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06 ESCALERAS 65,831.66
01.05.06.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESCALERAS 18,440.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06.02 ACERO F'Y= 4200 KG/CM2 PARA ESCALERAS 9,971.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06.03 CONCRETO F'C=210 KG/CM2 PARA ESCALERAS 37,419.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.06 TANQUE CISTERNA 64,777.91
01.06.01 EXCAVACION DE ZANJAS PARA CIMENTACION 2,738.86 0.00 0.00 2,738.86 0.00 0.00 0.00 0.00 0.0
01.06.02 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 889.89 0.00 0.00 0.00 0.00 0.00 889.89 0.00 0.0
01.06.03 SOLADO PARA ZAPATAS E=0.10 M. 1:10 CEMENTO - HORMIGON 289.53 0.00 0.00 289.53 0.00 0.00 0.00 0.00 0.0
01.06.04 ACERO F'Y= 4200 KG/CM2 PARA ZAPATAS 581.27 0.00 0.00 0.00 581.27 0.00 0.00 0.00 0.0
01.06.05 CONCRETO F'C=210 KG/CM2 PARA ZAPATAS 2,041.31 0.00 0.00 0.00 2,041.31 0.00 0.00 0.00 0.0
01.06.06 ACERO F'Y= 4200 KG/CM2 PARA COLUMNAS 4,301.61 0.00 0.00 0.00 3,584.68 716.93 0.00 0.00 0.0
01.06.07 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS 3,278.17 0.00 0.00 0.00 0.00 1,966.90 1,311.27 0.00 0.0
01.06.08 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS 1,901.00 0.00 0.00 0.00 0.00 475.25 1,425.75 0.00 0.0
01.06.09 ENCOFRADO Y DESENCOFRADO NORMAL PARA VIGAS 2,007.72 0.00 0.00 0.00 0.00 0.00 1,003.86 1,003.86 0.0
01.06.10 ACERO F'Y= 4200 KG/CM2 PARA VIGAS 3,065.73 0.00 0.00 0.00 0.00 0.00 0.00 3,065.73 0.0
01.06.11 CONCRETO F'C=210 KG/CM2 PARA VIGAS 1,380.31 0.00 0.00 0.00 0.00 0.00 0.00 1,380.31 0.0
01.06.12 ACERO F'Y= 4200 KG/CM2 PARA CISTERNA 5,076.96 0.00 0.00 0.00 0.00 0.00 5,076.96 0.00 0.0
01.06.13 ENCOFRADO Y DESENCOFRADO NORMAL PARA CISTERNA 3,718.82 0.00 0.00 0.00 0.00 1,859.41 1,859.41 0.00 0.0
01.06.14 CONCRETO F'C=210 KG/CM2 PARA CISTERNA 4,092.64 0.00 0.00 0.00 0.00 0.00 4,092.64 0.00 0.0
01.06.15 ACERO F'Y= 4200 KG/CM2 PARA TANQUE ELEVADO 4,880.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,880.2
01.06.16 ENCOFRADO Y DESENCOFRADO NORMAL PARA TANQUE ELEVADO 4,492.10 0.00 0.00 0.00 0.00 0.00 0.00 4,492.10 0.0
01.06.17 CONCRETO F'C=210 KG/CM2 PARA TANQUE ELEVADO 2,618.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,618.4
01.06.18 ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA ALIGERADA 453.94 0.00 0.00 0.00 0.00 0.00 453.94 0.00 0.0
01.06.19 BLOQUETA DE ARCILLA H=0.15 M. PARA LOSA ALIGERADA 182.52 0.00 0.00 0.00 0.00 0.00 182.52 0.00 0.0
01.06.20 ACERO F'Y= 4200 KG/CM2 PARA LOSA ALIGERADA 321.44 0.00 0.00 0.00 0.00 0.00 321.44 0.00 0.0
01.06.21 CONCRETO F'C=210 KG/CM2 PARA LOSA ALIGERADA 224.55 0.00 0.00 0.00 0.00 0.00 0.00 224.55 0.0
01.06.22 MURO DE SOGA CON LADRILLO K.K. 18H 9X13X24 CM. 2,287.88 0.00 0.00 0.00 0.00 0.00 0.00 2,287.88 0.0
01.06.23 TARRAJEO EN MUROS INTERIORES FROTACHADO MEZCLA 1:5 851.76 0.00 0.00 0.00 0.00 0.00 0.00 851.76 0.0
01.06.24 TARRAJEO INTERIOR CON IMPERMEABILIZANTE DE TANQUE CISTERNA 1,402.11 0.00 0.00 0.00 0.00 0.00 0.00 701.06 701.0
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB
CRONOGRAMA
- YANAMUCLODE OBRA V

Y AMPLIACION DEL SERVICIO EDUCATIVO DE NIVEL


MEJORAMIENTO
PRIMARIO I.E.E.
Y AMPLIACION
N°30318 DELDEL
CENTRO
SERVICIO
POBLADO
EDUCATIVO
MENORDEDE
NIVEL
YANAMUCLO
PRIMARIOE I.E.E.
I.E.E. N°30318
N°30319 DEL
DEL CENTRO
ANEXO DE
P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.06.25 TARRAJEO INTERIOR CON IMPERMEABILIZANTE DE TANQUE ELEVADO 886.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 886.6
01.06.26 TARRAJEO EXTERIOR FROTACHADO DE ESTRUCTURA MEZCLA 1:5 4,004.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,004.0
01.06.27 PINTURA LATEX EN ESTRUCTURA DOS MANOS 1,975.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.06.28 INSTALACION DE ACCESORIOS DE TANQUE CISTERNA 2,112.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,112.3
01.06.29 INSTALACION DE PUERTA DE MADERA P-1 320.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 320.0
01.06.30 INSTALACION DE ESCALERA METALICA SEGUN DISEÑO 2,400.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,400.0
01.07 PRUEBAS Y ENSAYOS DE CALIDAD 3,820.00
01.07.01 PROCTOR MODIFICADO 160.00 0.00 0.00 0.00 0.00 160.00 0.00 0.00 0.0
01.07.02 DENSIDAD DE CAMPO 480.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.7
01.07.03 DISEÑO DE MEZCLA 540.00 0.00 0.00 0.00 462.86 77.14 0.00 0.00 0.0
01.07.04 ROTURA DE PROBETA (COMPRESION SIMPLE) 2,640.00 0.00 0.00 0.00 0.00 0.00 65.19 228.15 228.1
01.08 FLETE 1,600.00
01.08.01 FLETE TERRESTRE 1,600.00 119.15 119.15 119.15 119.15 119.15 119.15 119.15 119.1
02 ARQUITECTURA 743,584.58
02.01 MUROS Y TABIQUES 140,636.03
02.01.01 MURO DE SOGA CON LADRILLO K.K. 18H 9X13X24 CM. 140,051.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
MURO DE CABEZA CON LADRILLO K.K. 18H 9X13X24 CM. 584.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02 REVOQUES, ENLUCIDOS Y MOLDURAS 217,896.67
02.02.01 TARRAJEO EN CIELO RASO FROTACHADO MEZCLA 1:4 62,875.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.02 TARRAJEO EN MUROS INTERIORES FROTACHADO MEZCLA 1:5 63,390.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.03 TARRAJEO EN MUROS EXTERIORES FROTACHADO MEZCLA 1:5 35,522.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.04 TARRAJEO EN VIGAS MEZCLA 1:4 27,465.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.05 TARRAJEO EN COLUMNAS MEZCLA 1:5 19,492.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.06 VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS MEZCLA 1:5 9,002.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.07 TARRAJEO DE PODIUM MEZCLA 1:5 147.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03 PISOS Y PAVIMENTOS 111,696.25
02.03.01 PISO DE PORCELANATO ALTO TRANSITO ANTIDESLIZANTE PARA AMBIENTES 65,681.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03.02 PISO DE PORCELANATO ALTO TRANSITO ANTIDESLIZANTE PARA VEREDAS 41,788.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03.03 PISO DE CERAMICO ANTIDESLIZANTE DE ALTO TRANSITO 4,226.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04 ZOCALOS Y CONTRAZOCALOS 28,505.27
02.04.01 CONTRAZOCALO DE PORCELANATO H=0.10 M. PARA AMBIENTES 11,652.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB
CRONOGRAMA
- YANAMUCLODE OBRA V

Y AMPLIACION DEL SERVICIO EDUCATIVO DE NIVEL


MEJORAMIENTO
PRIMARIO I.E.E.
Y AMPLIACION
N°30318 DELDEL
CENTRO
SERVICIO
POBLADO
EDUCATIVO
MENORDEDE
NIVEL
YANAMUCLO
PRIMARIOE I.E.E.
I.E.E. N°30318
N°30319 DEL
DEL CENTRO
ANEXO DE
P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
02.04.02 CONTRAZOCALO DE PORCELANATO H=0.10 M. PARA VEREDAS 11,342.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04.03 CONTRAZOCALO DE CERAMICO H=0.10 M. 5,139.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04.04 ZOCALO DE CERAMICO 370.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.05 CUBIERTAS 46,545.41
02.05.01 CUBIERTA DE TEJA ANDINA TIPO ETERNIT 46,545.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06 CARPINTERIA DE MADERA 17,229.50
02.06.01 PUERTA APANELADA DE CEDRO TIPO P-01 INC. INSTALACION 7,810.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06.02 PUERTA APANELADA DE CEDRO TIPO P-02 INC. INSTALACION 5,583.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06.03 PUERTA APANELADA DE CEDRO TIPO P-03 INC. INSTALACION 3,836.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07 CARPINTERIA METALICA 24,910.00
02.07.01 PORTON METALICO PM-01 INC. PINTADO E INSTALACION 860.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.02 VENTANA METALICA V-01 INC. PINTADO E INSTALACION 1,120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.03 VENTANA METALICA V-02 INC. PINTADO E INSTALACION 4,830.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.04 VENTANA METALICA V-03 INC. PINTADO E INSTALACION 2,200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.05 VENTANA METALICA V-04 INC. PINTADO E INSTALACION 1,120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.06 VENTANA METALICA V-05 INC. PINTADO E INSTALACION 4,830.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.07 VENTANA METALICA V-06 INC. PINTADO E INSTALACION 3,520.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.08 VENTANA METALICA V-07 INC. PINTADO E INSTALACION 1,140.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.09 VENTANA METALICA V-08 INC. PINTADO E INSTALACION 5,290.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.08 CARPINTERIA EN MELAMINA 5,580.00
02.08.01 SEPARADOR DE BAÑOS TIPO 01 5,580.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.09 CERRAJERIA 7,251.54
02.09.01 CERRADURA PARA PUERTA DE TRES GOLPES 4,796.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.09.02 CERRADURA PARA PUERTA TIPO PERILLA 2,454.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.10 VIDRIOS, CRISTALES Y SIMILARES 41,997.06
02.10.01 VIDRIO LAMINAR BUTIRAL DE POLIVINILO INCOLORO 41,997.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11 PINTURAS 90,207.74
02.11.01 PINTURA LATEX EN CIELO RASO DOS MANOS 22,833.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.02 PINTURA LATEX EN MUROS EXTERIORES DOS MANOS 17,654.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.03 PINTURA LATEX EN MUROS INTERIORES DOS MANOS 30,153.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.04 PINTURA LATEX EN VIGAS DOS MANOS 10,154.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB
CRONOGRAMA
- YANAMUCLODE OBRA V

Y AMPLIACION DEL SERVICIO EDUCATIVO DE NIVEL


MEJORAMIENTO
PRIMARIO I.E.E.
Y AMPLIACION
N°30318 DELDEL
CENTRO
SERVICIO
POBLADO
EDUCATIVO
MENORDEDE
NIVEL
YANAMUCLO
PRIMARIOE I.E.E.
I.E.E. N°30318
N°30319 DEL
DEL CENTRO
ANEXO DE
P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
02.11.05 PINTURA LATEX EN COLUMNAS DOS MANOS 7,342.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.06 PINTURA LATEX PARA DERRAMES EN PUERTAS Y VENTANAS DOS MANOS 1,560.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.07 PINTURA PARA PIZARRA 510.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12 JUNTAS 11,129.11
02.12.01 JUNTAS ASFALTICAS EN VEREDAS 2,066.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12.02 JUNTAS ASFALTICAS PARA SARDINEL DE JARDIN 91.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12.03 JUNTAS ASFALTICAS PARA COLUMNETAS 8,971.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03 INSTALACIONES SANITARIAS 58,301.24
03.01 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO 8,682.61
03.01.01 MOVIMIENTO DE TIERRAS 1,649.41
03.01.01.01 EXCAVACION DE ZANJAS PARA TUBERIA DE AGUA 937.63 0.00 0.00 0.00 0.00 937.63 0.00 0.00 0.0
03.01.01.02 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 681.36 0.00 0.00 0.00 0.00 0.00 596.19 85.17 0.0
03.01.01.03 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 30.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.01.02 SALIDAS 2,360.13
03.01.02.01 SALIDA DE AGUA FRIA PVC SAP DE 1/2" 2,254.32 0.00 0.00 0.00 0.00 0.00 120.77 281.79 281.7
03.01.02.02 SALIDA DE AGUA PARA RIEGO PVC SAP DE 1/2" 56.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 56.6
03.01.02.03 SALIDA DE AGUA FRIA CONTRA INCENDIO PVC SAP DE 2" 49.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 49.1
03.01.03 RED DE DISTRIBUCION 4,673.07
03.01.03.01 TUBERIA PARA AGUA POTABLE PVC SAP DE 1/2" C-10 2,106.15 0.00 0.00 0.00 0.00 0.00 0.00 254.19 254.1
03.01.03.02 TUBERIA PARA RIEGO PVC SAP DE 1/2" C-10 72.72 0.00 0.00 0.00 0.00 0.00 0.00 72.72 0.0
03.01.03.03 TUBERIA CONTRA INCENDIO PVC SAP DE 2" C-10 80.28 0.00 0.00 0.00 0.00 0.00 0.00 80.28 0.0
03.01.03.04 VALVULA DE COMPUERTA DE 1/2" 1,834.94 0.00 0.00 0.00 0.00 0.00 0.00 65.53 229.3
03.01.03.05 VALVULA DE COMPUERTA DE 2" 127.03 0.00 0.00 0.00 0.00 0.00 0.00 2.23 15.6
03.01.03.06 GRIFO CONTRA INCENDIO 451.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02 SISTEMA DE DESAGUE 19,414.41
03.02.01 MOVIMIENTO DE TIERRAS 1,805.63
03.02.01.01 EXCAVACION DE ZANJAS PARA TUBERIA DE DESAGUE 1,045.58 0.00 0.00 0.00 0.00 0.00 0.00 1,045.58 0.0
03.02.01.02 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 703.40 0.00 0.00 0.00 0.00 0.00 0.00 351.70 351.7
03.02.01.03 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 56.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02.02 SALIDAS 5,996.34
03.02.02.01 SALIDA DE DESAGUE CON PVC SAL DE 2" 2,613.30 0.00 0.00 0.00 0.00 0.00 0.00 190.06 332.6
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB
CRONOGRAMA
- YANAMUCLODE OBRA V

Y AMPLIACION DEL SERVICIO EDUCATIVO DE NIVEL


MEJORAMIENTO
PRIMARIO I.E.E.
Y AMPLIACION
N°30318 DELDEL
CENTRO
SERVICIO
POBLADO
EDUCATIVO
MENORDEDE
NIVEL
YANAMUCLO
PRIMARIOE I.E.E.
I.E.E. N°30318
N°30319 DEL
DEL CENTRO
ANEXO DE
P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
03.02.02.02 SALIDA DE DESAGUE CON PVC SAL DE 4" 1,461.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 91.3
03.02.02.03 SALIDA DE VENTILACION CON PVC SAL DE 2" 1,921.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02.03 RED DE DISTRIBUCION 11,612.44
03.02.03.01 TUBERIA PARA DESAGUE CON PVC SAL DE 2" 1,038.11 0.00 0.00 0.00 0.00 0.00 0.00 72.85 127.4
03.02.03.02 TUBERIA PARA DESAGUE CON PVC SAL DE 4" 5,387.78 0.00 0.00 0.00 0.00 0.00 0.00 96.21 673.4
03.02.03.03 TUBERIA PARA VENTILACION CON PVC SAL DE 2" 2,348.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 132.9
TUBERIA PARA CAJA DE REGISTRO CON PVC SAL DE 2" 2,837.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03 SISTEMA DE DESAGUE PLUVIAL 15,728.96
03.03.01 TUBERIA PVC SAL PLUVIAL DE 4" 4,216.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.02 TUBERIA PVC SAL PLUVIAL DE 3" 1,789.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA FALSA COLUMNA 5,450.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.04 CONCRETO F'C=175 KG/CM2 PARA FALSA COLUMNA 3,930.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.05 ACCESORIOS PARA DESAGUE PLUVIAL 341.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04 APARATOS Y ACCESORIOS SANITARIOS 14,475.26
03.04.01 INODORO DE LOSA TANQUE BAJO 5,908.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.02 LAVATORIO DE LOSA CON PEDESTAL 4,385.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.03 PAPELERA DE LOSA 1,190.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.04 SUMIDERO DE BRONCE ROSCADO DE 2" 985.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.05 REGISTRO ROSCADO DE BRONCE DE 4" 1,381.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.06 CAJA DE REGISTRO PARA DESAGUE DE 624.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04 INSTALACIONES ELECTRICAS 110,524.39
04.01 PRIMER PISO 64,859.19
04.01.01 SALIDAS 13,513.89
04.01.01.01 SALIDAD DE TECHO PARA CENTRO DE LUZ 6,566.30 0.00 0.00 0.00 0.00 0.00 0.00 1,094.38 1,915.1
04.01.01.02 SALIDA DE TOMACORRIENTE BIPOLARES CON LINEA A TIERRA 4,391.95 0.00 0.00 0.00 0.00 0.00 0.00 548.99 1,921.4
04.01.01.03 SALIDA DE TOMACORRIENTE PARA ALUMBRADO DE EMERGENCIA 363.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.01.04 SALIDA PARA INTERRUPTORES EN CONMUTACION 1,057.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.01.05 SALIDA PARA INTERRUPTORES SIMPLES 298.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 298.5
04.01.01.06 SALIDA PARA INTERRUPTORES DOBLES 248.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.4
04.01.01.07 SALIDA PARA INTERRUPTORES TRIPLES 587.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 419.5
04.01.02 CANALIZACION DE TUBERIAS PVC 20,053.08
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB
CRONOGRAMA
- YANAMUCLODE OBRA V

Y AMPLIACION DEL SERVICIO EDUCATIVO DE NIVEL


MEJORAMIENTO
PRIMARIO I.E.E.
Y AMPLIACION
N°30318 DELDEL
CENTRO
SERVICIO
POBLADO
EDUCATIVO
MENORDEDE
NIVEL
YANAMUCLO
PRIMARIOE I.E.E.
I.E.E. N°30318
N°30319 DEL
DEL CENTRO
ANEXO DE
P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
04.01.02.01 TUBERIA DE 25 MM. PVC SEL (1") 4,054.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.02.02 TUBERIA DE 20 MM. PVC SEL (3/4") 15,998.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03 CONDUCTORES 8,301.84
04.01.03.01 CONDUCTOR (2x10+1x10) MM. THHW 358.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.02 CONDUCTOR (1x10) MM2. THHW 146.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.03 CONDUCTOR (2x6+1x10) MM2 THHW 975.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.04 CONDUCTOR (2x2.5) MM2. THHW 4,612.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.05 CONDUCTOR (2x4.0) MM2. THHW 2,209.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.04 TABLEROS ELECTRICOS 4,700.00
04.01.04.01 TABLERO GENERAL Y TABLEROS DE DISTRIBUCION 4,700.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.05 CONEXION A TIERRA 5,600.00
04.01.05.01 POZO A TIERRA 5,600.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06 ARTEFACTOS Y ACCESORIOS ELECTRICOS 11,490.39
04.01.06.01 FLUORESCENTE RECTO INCLUYE EQUIPO Y PANTALLA 7,678.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.02 SPOT LIGHT 656.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.03 LUCES DE EMERGENCIA CON BATERIA - 02 FAROS 637.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.04 TOMACORRIENTE BIPOLAR 1,779.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.05 TOMACORRIENTE SIMPLE 125.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.06 INTERRUPTOR CONMUTACION 210.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.07 INTERRUPTOR SIMPLE 107.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.08 INTERRUPTOR DOBLE 94.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.09 INTERRUPTOR TRIPLE 201.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.07 OTROS 1,199.99
04.01.07.02 DISPOSITIVOS Y EQUIPOS DE SEGURIDAD 1,199.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02 SEGUNDO PISO 45,665.20
04.02.01 SALIDAS 13,605.84
04.02.01.01 SALIDAD DE TECHO PARA CENTRO DE LUZ 6,212.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.02 SALIDA DE TOMACORRIENTE BIPOLARES CON LINEA A TIERRA 5,218.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.03 SALIDA DE TOMACORRIENTE PARA ALUMBRADO DE EMERGENCIA 303.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.04 SALIDA PARA INTERRUPTORES EN CONMUTACION 704.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB
CRONOGRAMA
- YANAMUCLODE OBRA V

Y AMPLIACION DEL SERVICIO EDUCATIVO DE NIVEL


MEJORAMIENTO
PRIMARIO I.E.E.
Y AMPLIACION
N°30318 DELDEL
CENTRO
SERVICIO
POBLADO
EDUCATIVO
MENORDEDE
NIVEL
YANAMUCLO
PRIMARIOE I.E.E.
I.E.E. N°30318
N°30319 DEL
DEL CENTRO
ANEXO DE
P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
04.02.01.05 SALIDA PARA INTERRUPTORES SIMPLES 298.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.06 SALIDA PARA INTERRUPTORES DOBLES 398.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.07 SALIDA PARA INTERRUPTORES TRIPLES 469.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.02 CANALIZACION DE TUBERIAS PVC 13,965.19
04.02.02.01 TUBERIA DE 20 MM. PVC SEL (3/4") 13,965.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.03 CONDUCTORES 6,384.59
04.02.03.01 CONDUCTOR (2x2.5) MM2. THHW 3,370.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.03.02 CONDUCTOR (2x4.0) MM2. THHW 3,014.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04 ARTEFACTOS Y ACCESORIOS ELECTRICOS 11,709.58
04.02.04.01 FLUORESCENTE RECTO INCLUYE EQUIPO Y PANTALLA 8,432.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.02 LUCES DE EMERGENCIA CON BATERIA - 02 FAROS 637.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.03 TOMACORRIENTE BIPOLAR 1,779.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.04 TOMACORRIENTE SIMPLE 104.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.05 INTERRUPTOR CONMUTACION 336.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.06 INTERRUPTOR SIMPLE 107.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.07 INTERRUPTOR DOBLE 150.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.08 INTERRUPTOR TRIPLE 161.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0

COSTO DIRECTO 1,990,094.42 58,567.27 11,285.64 13,235.59 13,954.08 22,199.07 56,029.55 88,256.67 107,755.4
GASTOS GENERALES 10.00% 199,009.44 5,856.73 1,128.56 1,323.56 1,395.41 2,219.91 5,602.96 8,825.67 10,775.5
UTILIDAD 10.00% 199,009.44 5,856.73 1,128.56 1,323.56 1,395.41 2,219.91 5,602.96 8,825.67 10,775.5
SUB TOTAL 2,388,113.30 70,280.73 13,542.76 15,882.71 16,744.90 26,638.89 67,235.47 105,908.01 129,306.4
IGV 18.00% 429,860.39 12,650.53 2,437.70 2,858.89 3,014.08 4,795.00 12,102.38 19,063.44 23,275.1
PRESUPUESTO PARCIAL 2,817,973.69 82,931.26 15,980.46 18,741.60 19,758.98 31,433.89 79,337.85 124,971.45 152,581.6
PORCENTAJE DE AVANCE 2.94% 0.57% 0.67% 0.70% 1.12% 2.82% 4.43% 5.41%
PORCENTAJE DE AVANCE ACUMULADO 100.00% 4.88% 13.78%
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO
CRONOGRAMA DE OBRA V

CION DEL SERVICIO EDUCATIVO DE NIVEL PRIMARIO


MEJORAMIENTO
I.E.E. N°30318
Y AMPLIACION
DEL CENTRODEL
POBLADO
SERVICIO
MENOR
EDUCATIVO
DE YANAMUCLO
DE NIVEL E
PRIMARIO
I.E.E. N°30319
I.E.E. DEL
N°30318
ANEXO
DELDE
CENTRO
MARAVIP

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
BLOQUE AB - YANAMUCLO 1,990,094.42
01 ESTRUCTURAS 1,077,684.21 MES 01 MES 02 MES 04
01.01 OBRAS PROVISIONALES 44,569.85
01.01.01 CONSTRUCCION PROVISIONAL DE OFICINA 384.00 384.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.02 CONSTRUCCION PROVISIONAL DE CASETA PARA GUARDIANIA 144.00 144.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.03 CONSTRUCCION PROVISIONAL DE VESTIDOR PARA PERSONAL 480.00 480.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.04 GUARDIANIA DE OBRA 37,785.60 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.4
01.01.05 ALQUILER DE ALMACEN 1,440.00 56.00 56.00 56.00 56.00 56.00 56.00 56.00 56.0
01.01.06 CARTEL DE IDENTIFICACION DE OBRA (3.60x2.40) 856.25 0.00 856.25 0.00 0.00 0.00 0.00 0.00 0.0
01.01.07 AGUA PARA CONSUMO EN LA CONSTRUCCION 1,080.00 42.00 42.00 42.00 42.00 42.00 42.00 42.00 42.0
01.01.08 DESAGUE PARA LA CONSTRUCCION 750.00 0.00 750.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.09 ENERGIA ELECTRICA PROVISIONAL PARA LA CONSTRUCCION 1,650.00 64.17 64.17 64.17 64.17 64.17 64.17 64.17 64.1
01.02 TRABAJOS PRELIMINARES 66,669.81
01.02.01 DEMOLICION DE CONSTRUCCION EXISTENTE 46,142.30 46,142.30 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.02.02 ELIMINACION DE CONSTRUCCION DEMOLIDA DP=2 KM. 8,433.24 6,324.93 2,108.31 0.00 0.00 0.00 0.00 0.00 0.0
01.02.03 LIMPIEZA DEL TERRENO MANUAL 3,218.46 0.00 3,218.46 0.00 0.00 0.00 0.00 0.00 0.0
01.02.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS 2,500.00 2,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.02.05 TRAZO, NIVELACION Y REPLANTEO PARA EDIFICACION 2,770.32 0.00 1,007.39 1,762.93 0.00 0.00 0.00 0.00 0.0
01.02.06 CONTROL TOPOGRAFICO DURANTE EJECUCION DE OBRA 3,605.49 841.28 841.28 841.28 841.28 240.37 0.00 0.00 0.0
01.03 MOVIMIENTO DE TIERRAS 32,782.10
01.03.01 EXCAVACION DE ZANJAS PARA ZAPATAS H=1.20 - 1.50 M. 9,038.33 0.00 753.19 5,272.36 3,012.78 0.00 0.00 0.00 0.0
01.03.02 EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS 2,632.52 0.00 0.00 548.44 767.82 767.82 548.44 0.00 0.0
01.03.03 EXCAVACION DE ZANJAS PARA JARDIN 31.43 0.00 0.00 31.43 0.00 0.00 0.00 0.00 0.0
01.03.04 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 4,776.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,776.2
01.03.05 REFINE, NIVELACION Y COMPACTACION DE PLATAFORMA 4,486.78 0.00 0.00 0.00 0.00 0.00 560.85 3,925.93 0.0
01.03.06 REFINE, NIVELACION Y COMPACTACION DE BASE PARA VEREDAS 6,019.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,019.8
01.03.07 RELLENO Y COMPACTACION DE PODIUM CON MATERIAL PROPIO 301.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 301.5
01.03.08 ACARREO INTERNO DE MATERIAL EXCEDENTE DP=20 M. 2,694.29 0.00 0.00 0.00 0.00 0.00 0.00 1,347.15 1,347.1
01.03.09 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 2,801.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.04 OBRAS DE CONCRETO SIMPLE 90,690.96
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO
CRONOGRAMA DE OBRA V

CION DEL SERVICIO EDUCATIVO DE NIVEL PRIMARIO


MEJORAMIENTO
I.E.E. N°30318
Y AMPLIACION
DEL CENTRODEL
POBLADO
SERVICIO
MENOR
EDUCATIVO
DE YANAMUCLO
DE NIVEL E
PRIMARIO
I.E.E. N°30319
I.E.E. DEL
N°30318
ANEXO
DELDE
CENTRO
MARAVIP

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.04.01 SOLADO PARA ZAPATAS E=0.10 M. 1:10 CEMENTO - HORMIGON 5,467.93 0.00 0.00 0.00 911.32 3,189.63 1,366.98 0.00 0.0
01.04.02 CONCRETO 1:10+30% P.G. PARA CIMIENTOS CORRIDOS 21,485.78 0.00 0.00 0.00 0.00 8,057.17 9,400.03 4,028.58 0.0
01.04.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO 6,829.64 0.00 0.00 0.00 0.00 0.00 2,276.55 3,983.96 569.1
01.04.04 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS 3,042.44 0.00 0.00 0.00 0.00 0.00 0.00 1,521.22 1,521.2
01.04.05 FALSO PISO DE CONCRETO E=0.10 M. CEMENTO - HORMIGON 16,168.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9,701.1
01.04.06 ENCOFRADO Y DESENCOFRADO NORMAL PARA VEREDAS 4,000.12 0.00 0.00 0.00 0.00 2,000.06 2,000.06 0.00 0.0
01.04.07 CONCRETO F'C=140 KG/CM2 PARA VEREDAS INCLUYE ACABADOS 19,168.71 0.00 0.00 0.00 0.00 0.00 5,750.61 13,418.10 0.0
01.04.08 ENCOFRADO Y DESENCOFRADO NORMAL PARA CUNETAS 3,648.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,648.2
01.04.09 CONCRETO F'C=140 KG/CM2 PARA CUNETAS INCLUYE ACABADOS 4,971.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,142.8
01.04.10 ENCOFRADO Y DESENCOFRADO NORMAL PARA JARDIN 3,281.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,460.7
01.04.11 CONCRETO F'C=140 KG/CM2 PARA JARDIN 2,627.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 656.7
01.05 OBRAS DE CONCRETO ARMADO 772,773.58
01.05.01 ZAPATAS 49,980.45
01.05.01.01 ACERO F'Y= 4200 KG/CM2 PARA ZAPATAS 11,429.97 0.00 0.00 0.00 0.00 0.00 10,001.22 1,428.75 0.0
01.05.01.02 CONCRETO F'C=210 KG/CM2 PARA ZAPATAS 38,550.48 0.00 0.00 0.00 0.00 0.00 0.00 23,130.29 15,420.1
01.05.02 COLUMNAS 113,702.39
01.05.02.01 ACERO F'Y= 4200 KG/CM2 PARA COLUMNAS 43,524.40 0.00 0.00 0.00 0.00 0.00 4,974.22 8,704.88 8,704.8
01.05.02.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS 47,502.09 0.00 0.00 0.00 0.00 0.00 0.00 3,064.65 10,726.2
01.05.02.03 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS 22,675.90 0.00 0.00 0.00 0.00 0.00 0.00 2,451.45 4,290.0
01.05.03 COLUMNETAS 43,559.15
01.05.03.01 ACERO F'Y= 4200 KG/CM2 PARA COLUMNETAS 13,992.87 0.00 0.00 0.00 0.00 0.00 0.00 1,023.87 2,389.0
01.05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNETAS 20,137.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,179.6
01.05.03.03 CONCRETO F'C=175 KG/CM2 PARA COLUMNETAS 9,428.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 764.4
01.05.04 VIGAS 210,855.32
01.05.04.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA VIGAS 79,074.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.04.02 ACERO F'Y= 4200 KG/CM2 PARA VIGAS 84,562.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.04.03 CONCRETO F'C=210 KG/CM2 PARA VIGAS 47,218.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05 LOSA ALIGERADA 288,844.61
01.05.05.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA ALIGERADA 134,294.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.02 BLOQUETA DE ARCILLA H=0.15 M. PARA LOSA ALIGERADA 21,223.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.03 BLOQUETA DE ARCILLA H=0.12 M. PARA LOSA ALIGERADA 21,181.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO
CRONOGRAMA DE OBRA V

CION DEL SERVICIO EDUCATIVO DE NIVEL PRIMARIO


MEJORAMIENTO
I.E.E. N°30318
Y AMPLIACION
DEL CENTRODEL
POBLADO
SERVICIO
MENOR
EDUCATIVO
DE YANAMUCLO
DE NIVEL E
PRIMARIO
I.E.E. N°30319
I.E.E. DEL
N°30318
ANEXO
DELDE
CENTRO
MARAVIP

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.05.05.04 ACERO F'Y= 4200 KG/CM2 PARA LOSA ALIGERADA 57,235.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.05 CONCRETO F'C=210 KG/CM2 PARA LOSA ALIGERADA 54,910.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06 ESCALERAS 65,831.66
01.05.06.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESCALERAS 18,440.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06.02 ACERO F'Y= 4200 KG/CM2 PARA ESCALERAS 9,971.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06.03 CONCRETO F'C=210 KG/CM2 PARA ESCALERAS 37,419.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.06 TANQUE CISTERNA 64,777.91
01.06.01 EXCAVACION DE ZANJAS PARA CIMENTACION 2,738.86 0.00 0.00 2,738.86 0.00 0.00 0.00 0.00 0.0
01.06.02 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 889.89 0.00 0.00 0.00 0.00 0.00 889.89 0.00 0.0
01.06.03 SOLADO PARA ZAPATAS E=0.10 M. 1:10 CEMENTO - HORMIGON 289.53 0.00 0.00 289.53 0.00 0.00 0.00 0.00 0.0
01.06.04 ACERO F'Y= 4200 KG/CM2 PARA ZAPATAS 581.27 0.00 0.00 0.00 581.27 0.00 0.00 0.00 0.0
01.06.05 CONCRETO F'C=210 KG/CM2 PARA ZAPATAS 2,041.31 0.00 0.00 0.00 2,041.31 0.00 0.00 0.00 0.0
01.06.06 ACERO F'Y= 4200 KG/CM2 PARA COLUMNAS 4,301.61 0.00 0.00 0.00 3,584.68 716.93 0.00 0.00 0.0
01.06.07 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS 3,278.17 0.00 0.00 0.00 0.00 1,966.90 1,311.27 0.00 0.0
01.06.08 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS 1,901.00 0.00 0.00 0.00 0.00 475.25 1,425.75 0.00 0.0
01.06.09 ENCOFRADO Y DESENCOFRADO NORMAL PARA VIGAS 2,007.72 0.00 0.00 0.00 0.00 0.00 1,003.86 1,003.86 0.0
01.06.10 ACERO F'Y= 4200 KG/CM2 PARA VIGAS 3,065.73 0.00 0.00 0.00 0.00 0.00 0.00 3,065.73 0.0
01.06.11 CONCRETO F'C=210 KG/CM2 PARA VIGAS 1,380.31 0.00 0.00 0.00 0.00 0.00 0.00 1,380.31 0.0
01.06.12 ACERO F'Y= 4200 KG/CM2 PARA CISTERNA 5,076.96 0.00 0.00 0.00 0.00 0.00 5,076.96 0.00 0.0
01.06.13 ENCOFRADO Y DESENCOFRADO NORMAL PARA CISTERNA 3,718.82 0.00 0.00 0.00 0.00 1,859.41 1,859.41 0.00 0.0
01.06.14 CONCRETO F'C=210 KG/CM2 PARA CISTERNA 4,092.64 0.00 0.00 0.00 0.00 0.00 4,092.64 0.00 0.0
01.06.15 ACERO F'Y= 4200 KG/CM2 PARA TANQUE ELEVADO 4,880.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,880.2
01.06.16 ENCOFRADO Y DESENCOFRADO NORMAL PARA TANQUE ELEVADO 4,492.10 0.00 0.00 0.00 0.00 0.00 0.00 4,492.10 0.0
01.06.17 CONCRETO F'C=210 KG/CM2 PARA TANQUE ELEVADO 2,618.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,618.4
01.06.18 ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA ALIGERADA 453.94 0.00 0.00 0.00 0.00 0.00 453.94 0.00 0.0
01.06.19 BLOQUETA DE ARCILLA H=0.15 M. PARA LOSA ALIGERADA 182.52 0.00 0.00 0.00 0.00 0.00 182.52 0.00 0.0
01.06.20 ACERO F'Y= 4200 KG/CM2 PARA LOSA ALIGERADA 321.44 0.00 0.00 0.00 0.00 0.00 321.44 0.00 0.0
01.06.21 CONCRETO F'C=210 KG/CM2 PARA LOSA ALIGERADA 224.55 0.00 0.00 0.00 0.00 0.00 0.00 224.55 0.0
01.06.22 MURO DE SOGA CON LADRILLO K.K. 18H 9X13X24 CM. 2,287.88 0.00 0.00 0.00 0.00 0.00 0.00 2,287.88 0.0
01.06.23 TARRAJEO EN MUROS INTERIORES FROTACHADO MEZCLA 1:5 851.76 0.00 0.00 0.00 0.00 0.00 0.00 851.76 0.0
01.06.24 TARRAJEO INTERIOR CON IMPERMEABILIZANTE DE TANQUE CISTERNA 1,402.11 0.00 0.00 0.00 0.00 0.00 0.00 701.06 701.0
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO
CRONOGRAMA DE OBRA V

CION DEL SERVICIO EDUCATIVO DE NIVEL PRIMARIO


MEJORAMIENTO
I.E.E. N°30318
Y AMPLIACION
DEL CENTRODEL
POBLADO
SERVICIO
MENOR
EDUCATIVO
DE YANAMUCLO
DE NIVEL E
PRIMARIO
I.E.E. N°30319
I.E.E. DEL
N°30318
ANEXO
DELDE
CENTRO
MARAVIP

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.06.25 TARRAJEO INTERIOR CON IMPERMEABILIZANTE DE TANQUE ELEVADO 886.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 886.6
01.06.26 TARRAJEO EXTERIOR FROTACHADO DE ESTRUCTURA MEZCLA 1:5 4,004.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,004.0
01.06.27 PINTURA LATEX EN ESTRUCTURA DOS MANOS 1,975.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.06.28 INSTALACION DE ACCESORIOS DE TANQUE CISTERNA 2,112.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,112.3
01.06.29 INSTALACION DE PUERTA DE MADERA P-1 320.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 320.0
01.06.30 INSTALACION DE ESCALERA METALICA SEGUN DISEÑO 2,400.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,400.0
01.07 PRUEBAS Y ENSAYOS DE CALIDAD 3,820.00
01.07.01 PROCTOR MODIFICADO 160.00 0.00 0.00 0.00 0.00 160.00 0.00 0.00 0.0
01.07.02 DENSIDAD DE CAMPO 480.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.7
01.07.03 DISEÑO DE MEZCLA 540.00 0.00 0.00 0.00 462.86 77.14 0.00 0.00 0.0
01.07.04 ROTURA DE PROBETA (COMPRESION SIMPLE) 2,640.00 0.00 0.00 0.00 0.00 0.00 65.19 228.15 228.1
01.08 FLETE 1,600.00
01.08.01 FLETE TERRESTRE 1,600.00 119.15 119.15 119.15 119.15 119.15 119.15 119.15 119.1
02 ARQUITECTURA 743,584.58
02.01 MUROS Y TABIQUES 140,636.03
02.01.01 MURO DE SOGA CON LADRILLO K.K. 18H 9X13X24 CM. 140,051.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
MURO DE CABEZA CON LADRILLO K.K. 18H 9X13X24 CM. 584.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02 REVOQUES, ENLUCIDOS Y MOLDURAS 217,896.67
02.02.01 TARRAJEO EN CIELO RASO FROTACHADO MEZCLA 1:4 62,875.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.02 TARRAJEO EN MUROS INTERIORES FROTACHADO MEZCLA 1:5 63,390.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.03 TARRAJEO EN MUROS EXTERIORES FROTACHADO MEZCLA 1:5 35,522.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.04 TARRAJEO EN VIGAS MEZCLA 1:4 27,465.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.05 TARRAJEO EN COLUMNAS MEZCLA 1:5 19,492.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.06 VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS MEZCLA 1:5 9,002.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.07 TARRAJEO DE PODIUM MEZCLA 1:5 147.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03 PISOS Y PAVIMENTOS 111,696.25
02.03.01 PISO DE PORCELANATO ALTO TRANSITO ANTIDESLIZANTE PARA AMBIENTES 65,681.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03.02 PISO DE PORCELANATO ALTO TRANSITO ANTIDESLIZANTE PARA VEREDAS 41,788.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03.03 PISO DE CERAMICO ANTIDESLIZANTE DE ALTO TRANSITO 4,226.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04 ZOCALOS Y CONTRAZOCALOS 28,505.27
02.04.01 CONTRAZOCALO DE PORCELANATO H=0.10 M. PARA AMBIENTES 11,652.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO
CRONOGRAMA DE OBRA V

CION DEL SERVICIO EDUCATIVO DE NIVEL PRIMARIO


MEJORAMIENTO
I.E.E. N°30318
Y AMPLIACION
DEL CENTRODEL
POBLADO
SERVICIO
MENOR
EDUCATIVO
DE YANAMUCLO
DE NIVEL E
PRIMARIO
I.E.E. N°30319
I.E.E. DEL
N°30318
ANEXO
DELDE
CENTRO
MARAVIP

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
02.04.02 CONTRAZOCALO DE PORCELANATO H=0.10 M. PARA VEREDAS 11,342.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04.03 CONTRAZOCALO DE CERAMICO H=0.10 M. 5,139.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04.04 ZOCALO DE CERAMICO 370.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.05 CUBIERTAS 46,545.41
02.05.01 CUBIERTA DE TEJA ANDINA TIPO ETERNIT 46,545.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06 CARPINTERIA DE MADERA 17,229.50
02.06.01 PUERTA APANELADA DE CEDRO TIPO P-01 INC. INSTALACION 7,810.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06.02 PUERTA APANELADA DE CEDRO TIPO P-02 INC. INSTALACION 5,583.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06.03 PUERTA APANELADA DE CEDRO TIPO P-03 INC. INSTALACION 3,836.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07 CARPINTERIA METALICA 24,910.00
02.07.01 PORTON METALICO PM-01 INC. PINTADO E INSTALACION 860.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.02 VENTANA METALICA V-01 INC. PINTADO E INSTALACION 1,120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.03 VENTANA METALICA V-02 INC. PINTADO E INSTALACION 4,830.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.04 VENTANA METALICA V-03 INC. PINTADO E INSTALACION 2,200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.05 VENTANA METALICA V-04 INC. PINTADO E INSTALACION 1,120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.06 VENTANA METALICA V-05 INC. PINTADO E INSTALACION 4,830.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.07 VENTANA METALICA V-06 INC. PINTADO E INSTALACION 3,520.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.08 VENTANA METALICA V-07 INC. PINTADO E INSTALACION 1,140.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.09 VENTANA METALICA V-08 INC. PINTADO E INSTALACION 5,290.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.08 CARPINTERIA EN MELAMINA 5,580.00
02.08.01 SEPARADOR DE BAÑOS TIPO 01 5,580.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.09 CERRAJERIA 7,251.54
02.09.01 CERRADURA PARA PUERTA DE TRES GOLPES 4,796.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.09.02 CERRADURA PARA PUERTA TIPO PERILLA 2,454.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.10 VIDRIOS, CRISTALES Y SIMILARES 41,997.06
02.10.01 VIDRIO LAMINAR BUTIRAL DE POLIVINILO INCOLORO 41,997.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11 PINTURAS 90,207.74
02.11.01 PINTURA LATEX EN CIELO RASO DOS MANOS 22,833.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.02 PINTURA LATEX EN MUROS EXTERIORES DOS MANOS 17,654.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.03 PINTURA LATEX EN MUROS INTERIORES DOS MANOS 30,153.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.04 PINTURA LATEX EN VIGAS DOS MANOS 10,154.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO
CRONOGRAMA DE OBRA V

CION DEL SERVICIO EDUCATIVO DE NIVEL PRIMARIO


MEJORAMIENTO
I.E.E. N°30318
Y AMPLIACION
DEL CENTRODEL
POBLADO
SERVICIO
MENOR
EDUCATIVO
DE YANAMUCLO
DE NIVEL E
PRIMARIO
I.E.E. N°30319
I.E.E. DEL
N°30318
ANEXO
DELDE
CENTRO
MARAVIP

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
02.11.05 PINTURA LATEX EN COLUMNAS DOS MANOS 7,342.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.06 PINTURA LATEX PARA DERRAMES EN PUERTAS Y VENTANAS DOS MANOS 1,560.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.07 PINTURA PARA PIZARRA 510.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12 JUNTAS 11,129.11
02.12.01 JUNTAS ASFALTICAS EN VEREDAS 2,066.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12.02 JUNTAS ASFALTICAS PARA SARDINEL DE JARDIN 91.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12.03 JUNTAS ASFALTICAS PARA COLUMNETAS 8,971.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03 INSTALACIONES SANITARIAS 58,301.24
03.01 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO 8,682.61
03.01.01 MOVIMIENTO DE TIERRAS 1,649.41
03.01.01.01 EXCAVACION DE ZANJAS PARA TUBERIA DE AGUA 937.63 0.00 0.00 0.00 0.00 937.63 0.00 0.00 0.0
03.01.01.02 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 681.36 0.00 0.00 0.00 0.00 0.00 596.19 85.17 0.0
03.01.01.03 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 30.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.01.02 SALIDAS 2,360.13
03.01.02.01 SALIDA DE AGUA FRIA PVC SAP DE 1/2" 2,254.32 0.00 0.00 0.00 0.00 0.00 120.77 281.79 281.7
03.01.02.02 SALIDA DE AGUA PARA RIEGO PVC SAP DE 1/2" 56.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 56.6
03.01.02.03 SALIDA DE AGUA FRIA CONTRA INCENDIO PVC SAP DE 2" 49.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 49.1
03.01.03 RED DE DISTRIBUCION 4,673.07
03.01.03.01 TUBERIA PARA AGUA POTABLE PVC SAP DE 1/2" C-10 2,106.15 0.00 0.00 0.00 0.00 0.00 0.00 254.19 254.1
03.01.03.02 TUBERIA PARA RIEGO PVC SAP DE 1/2" C-10 72.72 0.00 0.00 0.00 0.00 0.00 0.00 72.72 0.0
03.01.03.03 TUBERIA CONTRA INCENDIO PVC SAP DE 2" C-10 80.28 0.00 0.00 0.00 0.00 0.00 0.00 80.28 0.0
03.01.03.04 VALVULA DE COMPUERTA DE 1/2" 1,834.94 0.00 0.00 0.00 0.00 0.00 0.00 65.53 229.3
03.01.03.05 VALVULA DE COMPUERTA DE 2" 127.03 0.00 0.00 0.00 0.00 0.00 0.00 2.23 15.6
03.01.03.06 GRIFO CONTRA INCENDIO 451.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02 SISTEMA DE DESAGUE 19,414.41
03.02.01 MOVIMIENTO DE TIERRAS 1,805.63
03.02.01.01 EXCAVACION DE ZANJAS PARA TUBERIA DE DESAGUE 1,045.58 0.00 0.00 0.00 0.00 0.00 0.00 1,045.58 0.0
03.02.01.02 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 703.40 0.00 0.00 0.00 0.00 0.00 0.00 351.70 351.7
03.02.01.03 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 56.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02.02 SALIDAS 5,996.34
03.02.02.01 SALIDA DE DESAGUE CON PVC SAL DE 2" 2,613.30 0.00 0.00 0.00 0.00 0.00 0.00 190.06 332.6
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO
CRONOGRAMA DE OBRA V

CION DEL SERVICIO EDUCATIVO DE NIVEL PRIMARIO


MEJORAMIENTO
I.E.E. N°30318
Y AMPLIACION
DEL CENTRODEL
POBLADO
SERVICIO
MENOR
EDUCATIVO
DE YANAMUCLO
DE NIVEL E
PRIMARIO
I.E.E. N°30319
I.E.E. DEL
N°30318
ANEXO
DELDE
CENTRO
MARAVIP

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
03.02.02.02 SALIDA DE DESAGUE CON PVC SAL DE 4" 1,461.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 91.3
03.02.02.03 SALIDA DE VENTILACION CON PVC SAL DE 2" 1,921.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02.03 RED DE DISTRIBUCION 11,612.44
03.02.03.01 TUBERIA PARA DESAGUE CON PVC SAL DE 2" 1,038.11 0.00 0.00 0.00 0.00 0.00 0.00 72.85 127.4
03.02.03.02 TUBERIA PARA DESAGUE CON PVC SAL DE 4" 5,387.78 0.00 0.00 0.00 0.00 0.00 0.00 96.21 673.4
03.02.03.03 TUBERIA PARA VENTILACION CON PVC SAL DE 2" 2,348.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 132.9
TUBERIA PARA CAJA DE REGISTRO CON PVC SAL DE 2" 2,837.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03 SISTEMA DE DESAGUE PLUVIAL 15,728.96
03.03.01 TUBERIA PVC SAL PLUVIAL DE 4" 4,216.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.02 TUBERIA PVC SAL PLUVIAL DE 3" 1,789.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA FALSA COLUMNA 5,450.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.04 CONCRETO F'C=175 KG/CM2 PARA FALSA COLUMNA 3,930.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.05 ACCESORIOS PARA DESAGUE PLUVIAL 341.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04 APARATOS Y ACCESORIOS SANITARIOS 14,475.26
03.04.01 INODORO DE LOSA TANQUE BAJO 5,908.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.02 LAVATORIO DE LOSA CON PEDESTAL 4,385.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.03 PAPELERA DE LOSA 1,190.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.04 SUMIDERO DE BRONCE ROSCADO DE 2" 985.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.05 REGISTRO ROSCADO DE BRONCE DE 4" 1,381.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.06 CAJA DE REGISTRO PARA DESAGUE DE 624.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04 INSTALACIONES ELECTRICAS 110,524.39
04.01 PRIMER PISO 64,859.19
04.01.01 SALIDAS 13,513.89
04.01.01.01 SALIDAD DE TECHO PARA CENTRO DE LUZ 6,566.30 0.00 0.00 0.00 0.00 0.00 0.00 1,094.38 1,915.1
04.01.01.02 SALIDA DE TOMACORRIENTE BIPOLARES CON LINEA A TIERRA 4,391.95 0.00 0.00 0.00 0.00 0.00 0.00 548.99 1,921.4
04.01.01.03 SALIDA DE TOMACORRIENTE PARA ALUMBRADO DE EMERGENCIA 363.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.01.04 SALIDA PARA INTERRUPTORES EN CONMUTACION 1,057.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.01.05 SALIDA PARA INTERRUPTORES SIMPLES 298.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 298.5
04.01.01.06 SALIDA PARA INTERRUPTORES DOBLES 248.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.4
04.01.01.07 SALIDA PARA INTERRUPTORES TRIPLES 587.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 419.5
04.01.02 CANALIZACION DE TUBERIAS PVC 20,053.08
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO
CRONOGRAMA DE OBRA V

CION DEL SERVICIO EDUCATIVO DE NIVEL PRIMARIO


MEJORAMIENTO
I.E.E. N°30318
Y AMPLIACION
DEL CENTRODEL
POBLADO
SERVICIO
MENOR
EDUCATIVO
DE YANAMUCLO
DE NIVEL E
PRIMARIO
I.E.E. N°30319
I.E.E. DEL
N°30318
ANEXO
DELDE
CENTRO
MARAVIP

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
04.01.02.01 TUBERIA DE 25 MM. PVC SEL (1") 4,054.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.02.02 TUBERIA DE 20 MM. PVC SEL (3/4") 15,998.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03 CONDUCTORES 8,301.84
04.01.03.01 CONDUCTOR (2x10+1x10) MM. THHW 358.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.02 CONDUCTOR (1x10) MM2. THHW 146.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.03 CONDUCTOR (2x6+1x10) MM2 THHW 975.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.04 CONDUCTOR (2x2.5) MM2. THHW 4,612.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.05 CONDUCTOR (2x4.0) MM2. THHW 2,209.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.04 TABLEROS ELECTRICOS 4,700.00
04.01.04.01 TABLERO GENERAL Y TABLEROS DE DISTRIBUCION 4,700.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.05 CONEXION A TIERRA 5,600.00
04.01.05.01 POZO A TIERRA 5,600.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06 ARTEFACTOS Y ACCESORIOS ELECTRICOS 11,490.39
04.01.06.01 FLUORESCENTE RECTO INCLUYE EQUIPO Y PANTALLA 7,678.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.02 SPOT LIGHT 656.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.03 LUCES DE EMERGENCIA CON BATERIA - 02 FAROS 637.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.04 TOMACORRIENTE BIPOLAR 1,779.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.05 TOMACORRIENTE SIMPLE 125.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.06 INTERRUPTOR CONMUTACION 210.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.07 INTERRUPTOR SIMPLE 107.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.08 INTERRUPTOR DOBLE 94.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.09 INTERRUPTOR TRIPLE 201.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.07 OTROS 1,199.99
04.01.07.02 DISPOSITIVOS Y EQUIPOS DE SEGURIDAD 1,199.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02 SEGUNDO PISO 45,665.20
04.02.01 SALIDAS 13,605.84
04.02.01.01 SALIDAD DE TECHO PARA CENTRO DE LUZ 6,212.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.02 SALIDA DE TOMACORRIENTE BIPOLARES CON LINEA A TIERRA 5,218.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.03 SALIDA DE TOMACORRIENTE PARA ALUMBRADO DE EMERGENCIA 303.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.04 SALIDA PARA INTERRUPTORES EN CONMUTACION 704.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO
CRONOGRAMA DE OBRA V

CION DEL SERVICIO EDUCATIVO DE NIVEL PRIMARIO


MEJORAMIENTO
I.E.E. N°30318
Y AMPLIACION
DEL CENTRODEL
POBLADO
SERVICIO
MENOR
EDUCATIVO
DE YANAMUCLO
DE NIVEL E
PRIMARIO
I.E.E. N°30319
I.E.E. DEL
N°30318
ANEXO
DELDE
CENTRO
MARAVIP

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
04.02.01.05 SALIDA PARA INTERRUPTORES SIMPLES 298.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.06 SALIDA PARA INTERRUPTORES DOBLES 398.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.07 SALIDA PARA INTERRUPTORES TRIPLES 469.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.02 CANALIZACION DE TUBERIAS PVC 13,965.19
04.02.02.01 TUBERIA DE 20 MM. PVC SEL (3/4") 13,965.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.03 CONDUCTORES 6,384.59
04.02.03.01 CONDUCTOR (2x2.5) MM2. THHW 3,370.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.03.02 CONDUCTOR (2x4.0) MM2. THHW 3,014.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04 ARTEFACTOS Y ACCESORIOS ELECTRICOS 11,709.58
04.02.04.01 FLUORESCENTE RECTO INCLUYE EQUIPO Y PANTALLA 8,432.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.02 LUCES DE EMERGENCIA CON BATERIA - 02 FAROS 637.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.03 TOMACORRIENTE BIPOLAR 1,779.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.04 TOMACORRIENTE SIMPLE 104.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.05 INTERRUPTOR CONMUTACION 336.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.06 INTERRUPTOR SIMPLE 107.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.07 INTERRUPTOR DOBLE 150.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.08 INTERRUPTOR TRIPLE 161.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0

COSTO DIRECTO 1,990,094.42 58,567.27 11,285.64 13,235.59 13,954.08 22,199.07 56,029.55 88,256.67 107,755.4
GASTOS GENERALES 10.00% 199,009.44 5,856.73 1,128.56 1,323.56 1,395.41 2,219.91 5,602.96 8,825.67 10,775.5
UTILIDAD 10.00% 199,009.44 5,856.73 1,128.56 1,323.56 1,395.41 2,219.91 5,602.96 8,825.67 10,775.5
SUB TOTAL 2,388,113.30 70,280.73 13,542.76 15,882.71 16,744.90 26,638.89 67,235.47 105,908.01 129,306.4
IGV 18.00% 429,860.39 12,650.53 2,437.70 2,858.89 3,014.08 4,795.00 12,102.38 19,063.44 23,275.1
PRESUPUESTO PARCIAL 2,817,973.69 82,931.26 15,980.46 18,741.60 19,758.98 31,433.89 79,337.85 124,971.45 152,581.6
PORCENTAJE DE AVANCE 2.94% 0.57% 0.67% 0.70% 1.12% 2.82% 4.43% 5.41%
PORCENTAJE DE AVANCE ACUMULADO 100.00% 4.88% 13.78%
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO
CRONOGRAMA DE OBRA V

L SERVICIO EDUCATIVO DE NIVEL PRIMARIO I.E.E.


MEJORAMIENTO
N°30318 DEL CENTRO
Y AMPLIACION
POBLADODEL
MENOR
SERVICIO
DE YANAMUCLO
EDUCATIVO DE
E I.E.E.
NIVELN°30319
PRIMARIO
DEL I.E.E.
ANEXO N°30318
DE MARAVILCA,
DEL CENTRO
DIST
P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
BLOQUE AB - YANAMUCLO 1,990,094.42
01 ESTRUCTURAS 1,077,684.21 MES 01 MES 02
01.01 OBRAS PROVISIONALES 44,569.85
01.01.01 CONSTRUCCION PROVISIONAL DE OFICINA 384.00 384.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.02 CONSTRUCCION PROVISIONAL DE CASETA PARA GUARDIANIA 144.00 144.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.03 CONSTRUCCION PROVISIONAL DE VESTIDOR PARA PERSONAL 480.00 480.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.04 GUARDIANIA DE OBRA 37,785.60 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.4
01.01.05 ALQUILER DE ALMACEN 1,440.00 56.00 56.00 56.00 56.00 56.00 56.00 56.00 56.0
01.01.06 CARTEL DE IDENTIFICACION DE OBRA (3.60x2.40) 856.25 0.00 856.25 0.00 0.00 0.00 0.00 0.00 0.0
01.01.07 AGUA PARA CONSUMO EN LA CONSTRUCCION 1,080.00 42.00 42.00 42.00 42.00 42.00 42.00 42.00 42.0
01.01.08 DESAGUE PARA LA CONSTRUCCION 750.00 0.00 750.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.09 ENERGIA ELECTRICA PROVISIONAL PARA LA CONSTRUCCION 1,650.00 64.17 64.17 64.17 64.17 64.17 64.17 64.17 64.1
01.02 TRABAJOS PRELIMINARES 66,669.81
01.02.01 DEMOLICION DE CONSTRUCCION EXISTENTE 46,142.30 46,142.30 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.02.02 ELIMINACION DE CONSTRUCCION DEMOLIDA DP=2 KM. 8,433.24 6,324.93 2,108.31 0.00 0.00 0.00 0.00 0.00 0.0
01.02.03 LIMPIEZA DEL TERRENO MANUAL 3,218.46 0.00 3,218.46 0.00 0.00 0.00 0.00 0.00 0.0
01.02.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS 2,500.00 2,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.02.05 TRAZO, NIVELACION Y REPLANTEO PARA EDIFICACION 2,770.32 0.00 1,007.39 1,762.93 0.00 0.00 0.00 0.00 0.0
01.02.06 CONTROL TOPOGRAFICO DURANTE EJECUCION DE OBRA 3,605.49 841.28 841.28 841.28 841.28 240.37 0.00 0.00 0.0
01.03 MOVIMIENTO DE TIERRAS 32,782.10
01.03.01 EXCAVACION DE ZANJAS PARA ZAPATAS H=1.20 - 1.50 M. 9,038.33 0.00 753.19 5,272.36 3,012.78 0.00 0.00 0.00 0.0
01.03.02 EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS 2,632.52 0.00 0.00 548.44 767.82 767.82 548.44 0.00 0.0
01.03.03 EXCAVACION DE ZANJAS PARA JARDIN 31.43 0.00 0.00 31.43 0.00 0.00 0.00 0.00 0.0
01.03.04 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 4,776.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,776.2
01.03.05 REFINE, NIVELACION Y COMPACTACION DE PLATAFORMA 4,486.78 0.00 0.00 0.00 0.00 0.00 560.85 3,925.93 0.0
01.03.06 REFINE, NIVELACION Y COMPACTACION DE BASE PARA VEREDAS 6,019.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,019.8
01.03.07 RELLENO Y COMPACTACION DE PODIUM CON MATERIAL PROPIO 301.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 301.5
01.03.08 ACARREO INTERNO DE MATERIAL EXCEDENTE DP=20 M. 2,694.29 0.00 0.00 0.00 0.00 0.00 0.00 1,347.15 1,347.1
01.03.09 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 2,801.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.04 OBRAS DE CONCRETO SIMPLE 90,690.96
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO
CRONOGRAMA DE OBRA V

L SERVICIO EDUCATIVO DE NIVEL PRIMARIO I.E.E.


MEJORAMIENTO
N°30318 DEL CENTRO
Y AMPLIACION
POBLADODEL
MENOR
SERVICIO
DE YANAMUCLO
EDUCATIVO DE
E I.E.E.
NIVELN°30319
PRIMARIO
DEL I.E.E.
ANEXO N°30318
DE MARAVILCA,
DEL CENTRO
DIST
P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.04.01 SOLADO PARA ZAPATAS E=0.10 M. 1:10 CEMENTO - HORMIGON 5,467.93 0.00 0.00 0.00 911.32 3,189.63 1,366.98 0.00 0.0
01.04.02 CONCRETO 1:10+30% P.G. PARA CIMIENTOS CORRIDOS 21,485.78 0.00 0.00 0.00 0.00 8,057.17 9,400.03 4,028.58 0.0
01.04.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO 6,829.64 0.00 0.00 0.00 0.00 0.00 2,276.55 3,983.96 569.1
01.04.04 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS 3,042.44 0.00 0.00 0.00 0.00 0.00 0.00 1,521.22 1,521.2
01.04.05 FALSO PISO DE CONCRETO E=0.10 M. CEMENTO - HORMIGON 16,168.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9,701.1
01.04.06 ENCOFRADO Y DESENCOFRADO NORMAL PARA VEREDAS 4,000.12 0.00 0.00 0.00 0.00 2,000.06 2,000.06 0.00 0.0
01.04.07 CONCRETO F'C=140 KG/CM2 PARA VEREDAS INCLUYE ACABADOS 19,168.71 0.00 0.00 0.00 0.00 0.00 5,750.61 13,418.10 0.0
01.04.08 ENCOFRADO Y DESENCOFRADO NORMAL PARA CUNETAS 3,648.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,648.2
01.04.09 CONCRETO F'C=140 KG/CM2 PARA CUNETAS INCLUYE ACABADOS 4,971.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,142.8
01.04.10 ENCOFRADO Y DESENCOFRADO NORMAL PARA JARDIN 3,281.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,460.7
01.04.11 CONCRETO F'C=140 KG/CM2 PARA JARDIN 2,627.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 656.7
01.05 OBRAS DE CONCRETO ARMADO 772,773.58
01.05.01 ZAPATAS 49,980.45
01.05.01.01 ACERO F'Y= 4200 KG/CM2 PARA ZAPATAS 11,429.97 0.00 0.00 0.00 0.00 0.00 10,001.22 1,428.75 0.0
01.05.01.02 CONCRETO F'C=210 KG/CM2 PARA ZAPATAS 38,550.48 0.00 0.00 0.00 0.00 0.00 0.00 23,130.29 15,420.1
01.05.02 COLUMNAS 113,702.39
01.05.02.01 ACERO F'Y= 4200 KG/CM2 PARA COLUMNAS 43,524.40 0.00 0.00 0.00 0.00 0.00 4,974.22 8,704.88 8,704.8
01.05.02.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS 47,502.09 0.00 0.00 0.00 0.00 0.00 0.00 3,064.65 10,726.2
01.05.02.03 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS 22,675.90 0.00 0.00 0.00 0.00 0.00 0.00 2,451.45 4,290.0
01.05.03 COLUMNETAS 43,559.15
01.05.03.01 ACERO F'Y= 4200 KG/CM2 PARA COLUMNETAS 13,992.87 0.00 0.00 0.00 0.00 0.00 0.00 1,023.87 2,389.0
01.05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNETAS 20,137.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,179.6
01.05.03.03 CONCRETO F'C=175 KG/CM2 PARA COLUMNETAS 9,428.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 764.4
01.05.04 VIGAS 210,855.32
01.05.04.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA VIGAS 79,074.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.04.02 ACERO F'Y= 4200 KG/CM2 PARA VIGAS 84,562.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.04.03 CONCRETO F'C=210 KG/CM2 PARA VIGAS 47,218.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05 LOSA ALIGERADA 288,844.61
01.05.05.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA ALIGERADA 134,294.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.02 BLOQUETA DE ARCILLA H=0.15 M. PARA LOSA ALIGERADA 21,223.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.03 BLOQUETA DE ARCILLA H=0.12 M. PARA LOSA ALIGERADA 21,181.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO
CRONOGRAMA DE OBRA V

L SERVICIO EDUCATIVO DE NIVEL PRIMARIO I.E.E.


MEJORAMIENTO
N°30318 DEL CENTRO
Y AMPLIACION
POBLADODEL
MENOR
SERVICIO
DE YANAMUCLO
EDUCATIVO DE
E I.E.E.
NIVELN°30319
PRIMARIO
DEL I.E.E.
ANEXO N°30318
DE MARAVILCA,
DEL CENTRO
DIST
P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.05.05.04 ACERO F'Y= 4200 KG/CM2 PARA LOSA ALIGERADA 57,235.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.05 CONCRETO F'C=210 KG/CM2 PARA LOSA ALIGERADA 54,910.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06 ESCALERAS 65,831.66
01.05.06.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESCALERAS 18,440.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06.02 ACERO F'Y= 4200 KG/CM2 PARA ESCALERAS 9,971.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06.03 CONCRETO F'C=210 KG/CM2 PARA ESCALERAS 37,419.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.06 TANQUE CISTERNA 64,777.91
01.06.01 EXCAVACION DE ZANJAS PARA CIMENTACION 2,738.86 0.00 0.00 2,738.86 0.00 0.00 0.00 0.00 0.0
01.06.02 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 889.89 0.00 0.00 0.00 0.00 0.00 889.89 0.00 0.0
01.06.03 SOLADO PARA ZAPATAS E=0.10 M. 1:10 CEMENTO - HORMIGON 289.53 0.00 0.00 289.53 0.00 0.00 0.00 0.00 0.0
01.06.04 ACERO F'Y= 4200 KG/CM2 PARA ZAPATAS 581.27 0.00 0.00 0.00 581.27 0.00 0.00 0.00 0.0
01.06.05 CONCRETO F'C=210 KG/CM2 PARA ZAPATAS 2,041.31 0.00 0.00 0.00 2,041.31 0.00 0.00 0.00 0.0
01.06.06 ACERO F'Y= 4200 KG/CM2 PARA COLUMNAS 4,301.61 0.00 0.00 0.00 3,584.68 716.93 0.00 0.00 0.0
01.06.07 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS 3,278.17 0.00 0.00 0.00 0.00 1,966.90 1,311.27 0.00 0.0
01.06.08 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS 1,901.00 0.00 0.00 0.00 0.00 475.25 1,425.75 0.00 0.0
01.06.09 ENCOFRADO Y DESENCOFRADO NORMAL PARA VIGAS 2,007.72 0.00 0.00 0.00 0.00 0.00 1,003.86 1,003.86 0.0
01.06.10 ACERO F'Y= 4200 KG/CM2 PARA VIGAS 3,065.73 0.00 0.00 0.00 0.00 0.00 0.00 3,065.73 0.0
01.06.11 CONCRETO F'C=210 KG/CM2 PARA VIGAS 1,380.31 0.00 0.00 0.00 0.00 0.00 0.00 1,380.31 0.0
01.06.12 ACERO F'Y= 4200 KG/CM2 PARA CISTERNA 5,076.96 0.00 0.00 0.00 0.00 0.00 5,076.96 0.00 0.0
01.06.13 ENCOFRADO Y DESENCOFRADO NORMAL PARA CISTERNA 3,718.82 0.00 0.00 0.00 0.00 1,859.41 1,859.41 0.00 0.0
01.06.14 CONCRETO F'C=210 KG/CM2 PARA CISTERNA 4,092.64 0.00 0.00 0.00 0.00 0.00 4,092.64 0.00 0.0
01.06.15 ACERO F'Y= 4200 KG/CM2 PARA TANQUE ELEVADO 4,880.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,880.2
01.06.16 ENCOFRADO Y DESENCOFRADO NORMAL PARA TANQUE ELEVADO 4,492.10 0.00 0.00 0.00 0.00 0.00 0.00 4,492.10 0.0
01.06.17 CONCRETO F'C=210 KG/CM2 PARA TANQUE ELEVADO 2,618.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,618.4
01.06.18 ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA ALIGERADA 453.94 0.00 0.00 0.00 0.00 0.00 453.94 0.00 0.0
01.06.19 BLOQUETA DE ARCILLA H=0.15 M. PARA LOSA ALIGERADA 182.52 0.00 0.00 0.00 0.00 0.00 182.52 0.00 0.0
01.06.20 ACERO F'Y= 4200 KG/CM2 PARA LOSA ALIGERADA 321.44 0.00 0.00 0.00 0.00 0.00 321.44 0.00 0.0
01.06.21 CONCRETO F'C=210 KG/CM2 PARA LOSA ALIGERADA 224.55 0.00 0.00 0.00 0.00 0.00 0.00 224.55 0.0
01.06.22 MURO DE SOGA CON LADRILLO K.K. 18H 9X13X24 CM. 2,287.88 0.00 0.00 0.00 0.00 0.00 0.00 2,287.88 0.0
01.06.23 TARRAJEO EN MUROS INTERIORES FROTACHADO MEZCLA 1:5 851.76 0.00 0.00 0.00 0.00 0.00 0.00 851.76 0.0
01.06.24 TARRAJEO INTERIOR CON IMPERMEABILIZANTE DE TANQUE CISTERNA 1,402.11 0.00 0.00 0.00 0.00 0.00 0.00 701.06 701.0
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO
CRONOGRAMA DE OBRA V

L SERVICIO EDUCATIVO DE NIVEL PRIMARIO I.E.E.


MEJORAMIENTO
N°30318 DEL CENTRO
Y AMPLIACION
POBLADODEL
MENOR
SERVICIO
DE YANAMUCLO
EDUCATIVO DE
E I.E.E.
NIVELN°30319
PRIMARIO
DEL I.E.E.
ANEXO N°30318
DE MARAVILCA,
DEL CENTRO
DIST
P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.06.25 TARRAJEO INTERIOR CON IMPERMEABILIZANTE DE TANQUE ELEVADO 886.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 886.6
01.06.26 TARRAJEO EXTERIOR FROTACHADO DE ESTRUCTURA MEZCLA 1:5 4,004.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,004.0
01.06.27 PINTURA LATEX EN ESTRUCTURA DOS MANOS 1,975.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.06.28 INSTALACION DE ACCESORIOS DE TANQUE CISTERNA 2,112.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,112.3
01.06.29 INSTALACION DE PUERTA DE MADERA P-1 320.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 320.0
01.06.30 INSTALACION DE ESCALERA METALICA SEGUN DISEÑO 2,400.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,400.0
01.07 PRUEBAS Y ENSAYOS DE CALIDAD 3,820.00
01.07.01 PROCTOR MODIFICADO 160.00 0.00 0.00 0.00 0.00 160.00 0.00 0.00 0.0
01.07.02 DENSIDAD DE CAMPO 480.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.7
01.07.03 DISEÑO DE MEZCLA 540.00 0.00 0.00 0.00 462.86 77.14 0.00 0.00 0.0
01.07.04 ROTURA DE PROBETA (COMPRESION SIMPLE) 2,640.00 0.00 0.00 0.00 0.00 0.00 65.19 228.15 228.1
01.08 FLETE 1,600.00
01.08.01 FLETE TERRESTRE 1,600.00 119.15 119.15 119.15 119.15 119.15 119.15 119.15 119.1
02 ARQUITECTURA 743,584.58
02.01 MUROS Y TABIQUES 140,636.03
02.01.01 MURO DE SOGA CON LADRILLO K.K. 18H 9X13X24 CM. 140,051.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
MURO DE CABEZA CON LADRILLO K.K. 18H 9X13X24 CM. 584.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02 REVOQUES, ENLUCIDOS Y MOLDURAS 217,896.67
02.02.01 TARRAJEO EN CIELO RASO FROTACHADO MEZCLA 1:4 62,875.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.02 TARRAJEO EN MUROS INTERIORES FROTACHADO MEZCLA 1:5 63,390.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.03 TARRAJEO EN MUROS EXTERIORES FROTACHADO MEZCLA 1:5 35,522.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.04 TARRAJEO EN VIGAS MEZCLA 1:4 27,465.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.05 TARRAJEO EN COLUMNAS MEZCLA 1:5 19,492.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.06 VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS MEZCLA 1:5 9,002.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.07 TARRAJEO DE PODIUM MEZCLA 1:5 147.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03 PISOS Y PAVIMENTOS 111,696.25
02.03.01 PISO DE PORCELANATO ALTO TRANSITO ANTIDESLIZANTE PARA AMBIENTES 65,681.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03.02 PISO DE PORCELANATO ALTO TRANSITO ANTIDESLIZANTE PARA VEREDAS 41,788.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03.03 PISO DE CERAMICO ANTIDESLIZANTE DE ALTO TRANSITO 4,226.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04 ZOCALOS Y CONTRAZOCALOS 28,505.27
02.04.01 CONTRAZOCALO DE PORCELANATO H=0.10 M. PARA AMBIENTES 11,652.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO
CRONOGRAMA DE OBRA V

L SERVICIO EDUCATIVO DE NIVEL PRIMARIO I.E.E.


MEJORAMIENTO
N°30318 DEL CENTRO
Y AMPLIACION
POBLADODEL
MENOR
SERVICIO
DE YANAMUCLO
EDUCATIVO DE
E I.E.E.
NIVELN°30319
PRIMARIO
DEL I.E.E.
ANEXO N°30318
DE MARAVILCA,
DEL CENTRO
DIST
P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
02.04.02 CONTRAZOCALO DE PORCELANATO H=0.10 M. PARA VEREDAS 11,342.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04.03 CONTRAZOCALO DE CERAMICO H=0.10 M. 5,139.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04.04 ZOCALO DE CERAMICO 370.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.05 CUBIERTAS 46,545.41
02.05.01 CUBIERTA DE TEJA ANDINA TIPO ETERNIT 46,545.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06 CARPINTERIA DE MADERA 17,229.50
02.06.01 PUERTA APANELADA DE CEDRO TIPO P-01 INC. INSTALACION 7,810.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06.02 PUERTA APANELADA DE CEDRO TIPO P-02 INC. INSTALACION 5,583.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06.03 PUERTA APANELADA DE CEDRO TIPO P-03 INC. INSTALACION 3,836.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07 CARPINTERIA METALICA 24,910.00
02.07.01 PORTON METALICO PM-01 INC. PINTADO E INSTALACION 860.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.02 VENTANA METALICA V-01 INC. PINTADO E INSTALACION 1,120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.03 VENTANA METALICA V-02 INC. PINTADO E INSTALACION 4,830.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.04 VENTANA METALICA V-03 INC. PINTADO E INSTALACION 2,200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.05 VENTANA METALICA V-04 INC. PINTADO E INSTALACION 1,120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.06 VENTANA METALICA V-05 INC. PINTADO E INSTALACION 4,830.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.07 VENTANA METALICA V-06 INC. PINTADO E INSTALACION 3,520.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.08 VENTANA METALICA V-07 INC. PINTADO E INSTALACION 1,140.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.09 VENTANA METALICA V-08 INC. PINTADO E INSTALACION 5,290.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.08 CARPINTERIA EN MELAMINA 5,580.00
02.08.01 SEPARADOR DE BAÑOS TIPO 01 5,580.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.09 CERRAJERIA 7,251.54
02.09.01 CERRADURA PARA PUERTA DE TRES GOLPES 4,796.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.09.02 CERRADURA PARA PUERTA TIPO PERILLA 2,454.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.10 VIDRIOS, CRISTALES Y SIMILARES 41,997.06
02.10.01 VIDRIO LAMINAR BUTIRAL DE POLIVINILO INCOLORO 41,997.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11 PINTURAS 90,207.74
02.11.01 PINTURA LATEX EN CIELO RASO DOS MANOS 22,833.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.02 PINTURA LATEX EN MUROS EXTERIORES DOS MANOS 17,654.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.03 PINTURA LATEX EN MUROS INTERIORES DOS MANOS 30,153.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.04 PINTURA LATEX EN VIGAS DOS MANOS 10,154.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO
CRONOGRAMA DE OBRA V

L SERVICIO EDUCATIVO DE NIVEL PRIMARIO I.E.E.


MEJORAMIENTO
N°30318 DEL CENTRO
Y AMPLIACION
POBLADODEL
MENOR
SERVICIO
DE YANAMUCLO
EDUCATIVO DE
E I.E.E.
NIVELN°30319
PRIMARIO
DEL I.E.E.
ANEXO N°30318
DE MARAVILCA,
DEL CENTRO
DIST
P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
02.11.05 PINTURA LATEX EN COLUMNAS DOS MANOS 7,342.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.06 PINTURA LATEX PARA DERRAMES EN PUERTAS Y VENTANAS DOS MANOS 1,560.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.07 PINTURA PARA PIZARRA 510.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12 JUNTAS 11,129.11
02.12.01 JUNTAS ASFALTICAS EN VEREDAS 2,066.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12.02 JUNTAS ASFALTICAS PARA SARDINEL DE JARDIN 91.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12.03 JUNTAS ASFALTICAS PARA COLUMNETAS 8,971.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03 INSTALACIONES SANITARIAS 58,301.24
03.01 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO 8,682.61
03.01.01 MOVIMIENTO DE TIERRAS 1,649.41
03.01.01.01 EXCAVACION DE ZANJAS PARA TUBERIA DE AGUA 937.63 0.00 0.00 0.00 0.00 937.63 0.00 0.00 0.0
03.01.01.02 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 681.36 0.00 0.00 0.00 0.00 0.00 596.19 85.17 0.0
03.01.01.03 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 30.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.01.02 SALIDAS 2,360.13
03.01.02.01 SALIDA DE AGUA FRIA PVC SAP DE 1/2" 2,254.32 0.00 0.00 0.00 0.00 0.00 120.77 281.79 281.7
03.01.02.02 SALIDA DE AGUA PARA RIEGO PVC SAP DE 1/2" 56.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 56.6
03.01.02.03 SALIDA DE AGUA FRIA CONTRA INCENDIO PVC SAP DE 2" 49.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 49.1
03.01.03 RED DE DISTRIBUCION 4,673.07
03.01.03.01 TUBERIA PARA AGUA POTABLE PVC SAP DE 1/2" C-10 2,106.15 0.00 0.00 0.00 0.00 0.00 0.00 254.19 254.1
03.01.03.02 TUBERIA PARA RIEGO PVC SAP DE 1/2" C-10 72.72 0.00 0.00 0.00 0.00 0.00 0.00 72.72 0.0
03.01.03.03 TUBERIA CONTRA INCENDIO PVC SAP DE 2" C-10 80.28 0.00 0.00 0.00 0.00 0.00 0.00 80.28 0.0
03.01.03.04 VALVULA DE COMPUERTA DE 1/2" 1,834.94 0.00 0.00 0.00 0.00 0.00 0.00 65.53 229.3
03.01.03.05 VALVULA DE COMPUERTA DE 2" 127.03 0.00 0.00 0.00 0.00 0.00 0.00 2.23 15.6
03.01.03.06 GRIFO CONTRA INCENDIO 451.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02 SISTEMA DE DESAGUE 19,414.41
03.02.01 MOVIMIENTO DE TIERRAS 1,805.63
03.02.01.01 EXCAVACION DE ZANJAS PARA TUBERIA DE DESAGUE 1,045.58 0.00 0.00 0.00 0.00 0.00 0.00 1,045.58 0.0
03.02.01.02 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 703.40 0.00 0.00 0.00 0.00 0.00 0.00 351.70 351.7
03.02.01.03 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 56.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02.02 SALIDAS 5,996.34
03.02.02.01 SALIDA DE DESAGUE CON PVC SAL DE 2" 2,613.30 0.00 0.00 0.00 0.00 0.00 0.00 190.06 332.6
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO
CRONOGRAMA DE OBRA V

L SERVICIO EDUCATIVO DE NIVEL PRIMARIO I.E.E.


MEJORAMIENTO
N°30318 DEL CENTRO
Y AMPLIACION
POBLADODEL
MENOR
SERVICIO
DE YANAMUCLO
EDUCATIVO DE
E I.E.E.
NIVELN°30319
PRIMARIO
DEL I.E.E.
ANEXO N°30318
DE MARAVILCA,
DEL CENTRO
DIST
P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
03.02.02.02 SALIDA DE DESAGUE CON PVC SAL DE 4" 1,461.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 91.3
03.02.02.03 SALIDA DE VENTILACION CON PVC SAL DE 2" 1,921.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02.03 RED DE DISTRIBUCION 11,612.44
03.02.03.01 TUBERIA PARA DESAGUE CON PVC SAL DE 2" 1,038.11 0.00 0.00 0.00 0.00 0.00 0.00 72.85 127.4
03.02.03.02 TUBERIA PARA DESAGUE CON PVC SAL DE 4" 5,387.78 0.00 0.00 0.00 0.00 0.00 0.00 96.21 673.4
03.02.03.03 TUBERIA PARA VENTILACION CON PVC SAL DE 2" 2,348.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 132.9
TUBERIA PARA CAJA DE REGISTRO CON PVC SAL DE 2" 2,837.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03 SISTEMA DE DESAGUE PLUVIAL 15,728.96
03.03.01 TUBERIA PVC SAL PLUVIAL DE 4" 4,216.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.02 TUBERIA PVC SAL PLUVIAL DE 3" 1,789.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA FALSA COLUMNA 5,450.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.04 CONCRETO F'C=175 KG/CM2 PARA FALSA COLUMNA 3,930.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.05 ACCESORIOS PARA DESAGUE PLUVIAL 341.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04 APARATOS Y ACCESORIOS SANITARIOS 14,475.26
03.04.01 INODORO DE LOSA TANQUE BAJO 5,908.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.02 LAVATORIO DE LOSA CON PEDESTAL 4,385.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.03 PAPELERA DE LOSA 1,190.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.04 SUMIDERO DE BRONCE ROSCADO DE 2" 985.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.05 REGISTRO ROSCADO DE BRONCE DE 4" 1,381.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.06 CAJA DE REGISTRO PARA DESAGUE DE 624.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04 INSTALACIONES ELECTRICAS 110,524.39
04.01 PRIMER PISO 64,859.19
04.01.01 SALIDAS 13,513.89
04.01.01.01 SALIDAD DE TECHO PARA CENTRO DE LUZ 6,566.30 0.00 0.00 0.00 0.00 0.00 0.00 1,094.38 1,915.1
04.01.01.02 SALIDA DE TOMACORRIENTE BIPOLARES CON LINEA A TIERRA 4,391.95 0.00 0.00 0.00 0.00 0.00 0.00 548.99 1,921.4
04.01.01.03 SALIDA DE TOMACORRIENTE PARA ALUMBRADO DE EMERGENCIA 363.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.01.04 SALIDA PARA INTERRUPTORES EN CONMUTACION 1,057.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.01.05 SALIDA PARA INTERRUPTORES SIMPLES 298.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 298.5
04.01.01.06 SALIDA PARA INTERRUPTORES DOBLES 248.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.4
04.01.01.07 SALIDA PARA INTERRUPTORES TRIPLES 587.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 419.5
04.01.02 CANALIZACION DE TUBERIAS PVC 20,053.08
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO
CRONOGRAMA DE OBRA V

L SERVICIO EDUCATIVO DE NIVEL PRIMARIO I.E.E.


MEJORAMIENTO
N°30318 DEL CENTRO
Y AMPLIACION
POBLADODEL
MENOR
SERVICIO
DE YANAMUCLO
EDUCATIVO DE
E I.E.E.
NIVELN°30319
PRIMARIO
DEL I.E.E.
ANEXO N°30318
DE MARAVILCA,
DEL CENTRO
DIST
P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
04.01.02.01 TUBERIA DE 25 MM. PVC SEL (1") 4,054.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.02.02 TUBERIA DE 20 MM. PVC SEL (3/4") 15,998.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03 CONDUCTORES 8,301.84
04.01.03.01 CONDUCTOR (2x10+1x10) MM. THHW 358.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.02 CONDUCTOR (1x10) MM2. THHW 146.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.03 CONDUCTOR (2x6+1x10) MM2 THHW 975.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.04 CONDUCTOR (2x2.5) MM2. THHW 4,612.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.05 CONDUCTOR (2x4.0) MM2. THHW 2,209.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.04 TABLEROS ELECTRICOS 4,700.00
04.01.04.01 TABLERO GENERAL Y TABLEROS DE DISTRIBUCION 4,700.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.05 CONEXION A TIERRA 5,600.00
04.01.05.01 POZO A TIERRA 5,600.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06 ARTEFACTOS Y ACCESORIOS ELECTRICOS 11,490.39
04.01.06.01 FLUORESCENTE RECTO INCLUYE EQUIPO Y PANTALLA 7,678.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.02 SPOT LIGHT 656.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.03 LUCES DE EMERGENCIA CON BATERIA - 02 FAROS 637.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.04 TOMACORRIENTE BIPOLAR 1,779.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.05 TOMACORRIENTE SIMPLE 125.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.06 INTERRUPTOR CONMUTACION 210.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.07 INTERRUPTOR SIMPLE 107.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.08 INTERRUPTOR DOBLE 94.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.09 INTERRUPTOR TRIPLE 201.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.07 OTROS 1,199.99
04.01.07.02 DISPOSITIVOS Y EQUIPOS DE SEGURIDAD 1,199.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02 SEGUNDO PISO 45,665.20
04.02.01 SALIDAS 13,605.84
04.02.01.01 SALIDAD DE TECHO PARA CENTRO DE LUZ 6,212.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.02 SALIDA DE TOMACORRIENTE BIPOLARES CON LINEA A TIERRA 5,218.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.03 SALIDA DE TOMACORRIENTE PARA ALUMBRADO DE EMERGENCIA 303.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.04 SALIDA PARA INTERRUPTORES EN CONMUTACION 704.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO
CRONOGRAMA DE OBRA V

L SERVICIO EDUCATIVO DE NIVEL PRIMARIO I.E.E.


MEJORAMIENTO
N°30318 DEL CENTRO
Y AMPLIACION
POBLADODEL
MENOR
SERVICIO
DE YANAMUCLO
EDUCATIVO DE
E I.E.E.
NIVELN°30319
PRIMARIO
DEL I.E.E.
ANEXO N°30318
DE MARAVILCA,
DEL CENTRO
DIST
P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
04.02.01.05 SALIDA PARA INTERRUPTORES SIMPLES 298.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.06 SALIDA PARA INTERRUPTORES DOBLES 398.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.07 SALIDA PARA INTERRUPTORES TRIPLES 469.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.02 CANALIZACION DE TUBERIAS PVC 13,965.19
04.02.02.01 TUBERIA DE 20 MM. PVC SEL (3/4") 13,965.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.03 CONDUCTORES 6,384.59
04.02.03.01 CONDUCTOR (2x2.5) MM2. THHW 3,370.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.03.02 CONDUCTOR (2x4.0) MM2. THHW 3,014.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04 ARTEFACTOS Y ACCESORIOS ELECTRICOS 11,709.58
04.02.04.01 FLUORESCENTE RECTO INCLUYE EQUIPO Y PANTALLA 8,432.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.02 LUCES DE EMERGENCIA CON BATERIA - 02 FAROS 637.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.03 TOMACORRIENTE BIPOLAR 1,779.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.04 TOMACORRIENTE SIMPLE 104.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.05 INTERRUPTOR CONMUTACION 336.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.06 INTERRUPTOR SIMPLE 107.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.07 INTERRUPTOR DOBLE 150.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.08 INTERRUPTOR TRIPLE 161.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0

COSTO DIRECTO 1,990,094.42 58,567.27 11,285.64 13,235.59 13,954.08 22,199.07 56,029.55 88,256.67 107,755.4
GASTOS GENERALES 10.00% 199,009.44 5,856.73 1,128.56 1,323.56 1,395.41 2,219.91 5,602.96 8,825.67 10,775.5
UTILIDAD 10.00% 199,009.44 5,856.73 1,128.56 1,323.56 1,395.41 2,219.91 5,602.96 8,825.67 10,775.5
SUB TOTAL 2,388,113.30 70,280.73 13,542.76 15,882.71 16,744.90 26,638.89 67,235.47 105,908.01 129,306.4
IGV 18.00% 429,860.39 12,650.53 2,437.70 2,858.89 3,014.08 4,795.00 12,102.38 19,063.44 23,275.1
PRESUPUESTO PARCIAL 2,817,973.69 82,931.26 15,980.46 18,741.60 19,758.98 31,433.89 79,337.85 124,971.45 152,581.6
PORCENTAJE DE AVANCE 2.94% 0.57% 0.67% 0.70% 1.12% 2.82% 4.43% 5.41%
PORCENTAJE DE AVANCE ACUMULADO 100.00% 4.88% 13.78%
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

O EDUCATIVO DE NIVEL PRIMARIO I.E.E. N°30318MEJORAMIENTO


DEL CENTRO POBLADO
Y AMPLIACION
MENORDEL
DE SERVICIO
YANAMUCLOEDUCATIVO
E I.E.E. N°30319
DE NIVEL
DEL
PRIMARIO
ANEXO DE
I.E.E.
MARAVILCA,
N°30318 DEL
DISTRITO
CENTRODEP

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
BLOQUE AB - YANAMUCLO 1,990,094.42
01 ESTRUCTURAS 1,077,684.21 MES 01 MES 02
01.01 OBRAS PROVISIONALES 44,569.85
01.01.01 CONSTRUCCION PROVISIONAL DE OFICINA 384.00 384.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.02 CONSTRUCCION PROVISIONAL DE CASETA PARA GUARDIANIA 144.00 144.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.03 CONSTRUCCION PROVISIONAL DE VESTIDOR PARA PERSONAL 480.00 480.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.04 GUARDIANIA DE OBRA 37,785.60 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.4
01.01.05 ALQUILER DE ALMACEN 1,440.00 56.00 56.00 56.00 56.00 56.00 56.00 56.00 56.0
01.01.06 CARTEL DE IDENTIFICACION DE OBRA (3.60x2.40) 856.25 0.00 856.25 0.00 0.00 0.00 0.00 0.00 0.0
01.01.07 AGUA PARA CONSUMO EN LA CONSTRUCCION 1,080.00 42.00 42.00 42.00 42.00 42.00 42.00 42.00 42.0
01.01.08 DESAGUE PARA LA CONSTRUCCION 750.00 0.00 750.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.09 ENERGIA ELECTRICA PROVISIONAL PARA LA CONSTRUCCION 1,650.00 64.17 64.17 64.17 64.17 64.17 64.17 64.17 64.1
01.02 TRABAJOS PRELIMINARES 66,669.81
01.02.01 DEMOLICION DE CONSTRUCCION EXISTENTE 46,142.30 46,142.30 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.02.02 ELIMINACION DE CONSTRUCCION DEMOLIDA DP=2 KM. 8,433.24 6,324.93 2,108.31 0.00 0.00 0.00 0.00 0.00 0.0
01.02.03 LIMPIEZA DEL TERRENO MANUAL 3,218.46 0.00 3,218.46 0.00 0.00 0.00 0.00 0.00 0.0
01.02.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS 2,500.00 2,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.02.05 TRAZO, NIVELACION Y REPLANTEO PARA EDIFICACION 2,770.32 0.00 1,007.39 1,762.93 0.00 0.00 0.00 0.00 0.0
01.02.06 CONTROL TOPOGRAFICO DURANTE EJECUCION DE OBRA 3,605.49 841.28 841.28 841.28 841.28 240.37 0.00 0.00 0.0
01.03 MOVIMIENTO DE TIERRAS 32,782.10
01.03.01 EXCAVACION DE ZANJAS PARA ZAPATAS H=1.20 - 1.50 M. 9,038.33 0.00 753.19 5,272.36 3,012.78 0.00 0.00 0.00 0.0
01.03.02 EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS 2,632.52 0.00 0.00 548.44 767.82 767.82 548.44 0.00 0.0
01.03.03 EXCAVACION DE ZANJAS PARA JARDIN 31.43 0.00 0.00 31.43 0.00 0.00 0.00 0.00 0.0
01.03.04 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 4,776.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,776.2
01.03.05 REFINE, NIVELACION Y COMPACTACION DE PLATAFORMA 4,486.78 0.00 0.00 0.00 0.00 0.00 560.85 3,925.93 0.0
01.03.06 REFINE, NIVELACION Y COMPACTACION DE BASE PARA VEREDAS 6,019.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,019.8
01.03.07 RELLENO Y COMPACTACION DE PODIUM CON MATERIAL PROPIO 301.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 301.5
01.03.08 ACARREO INTERNO DE MATERIAL EXCEDENTE DP=20 M. 2,694.29 0.00 0.00 0.00 0.00 0.00 0.00 1,347.15 1,347.1
01.03.09 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 2,801.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.04 OBRAS DE CONCRETO SIMPLE 90,690.96
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

O EDUCATIVO DE NIVEL PRIMARIO I.E.E. N°30318MEJORAMIENTO


DEL CENTRO POBLADO
Y AMPLIACION
MENORDEL
DE SERVICIO
YANAMUCLOEDUCATIVO
E I.E.E. N°30319
DE NIVEL
DEL
PRIMARIO
ANEXO DE
I.E.E.
MARAVILCA,
N°30318 DEL
DISTRITO
CENTRODEP

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.04.01 SOLADO PARA ZAPATAS E=0.10 M. 1:10 CEMENTO - HORMIGON 5,467.93 0.00 0.00 0.00 911.32 3,189.63 1,366.98 0.00 0.0
01.04.02 CONCRETO 1:10+30% P.G. PARA CIMIENTOS CORRIDOS 21,485.78 0.00 0.00 0.00 0.00 8,057.17 9,400.03 4,028.58 0.0
01.04.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO 6,829.64 0.00 0.00 0.00 0.00 0.00 2,276.55 3,983.96 569.1
01.04.04 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS 3,042.44 0.00 0.00 0.00 0.00 0.00 0.00 1,521.22 1,521.2
01.04.05 FALSO PISO DE CONCRETO E=0.10 M. CEMENTO - HORMIGON 16,168.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9,701.1
01.04.06 ENCOFRADO Y DESENCOFRADO NORMAL PARA VEREDAS 4,000.12 0.00 0.00 0.00 0.00 2,000.06 2,000.06 0.00 0.0
01.04.07 CONCRETO F'C=140 KG/CM2 PARA VEREDAS INCLUYE ACABADOS 19,168.71 0.00 0.00 0.00 0.00 0.00 5,750.61 13,418.10 0.0
01.04.08 ENCOFRADO Y DESENCOFRADO NORMAL PARA CUNETAS 3,648.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,648.2
01.04.09 CONCRETO F'C=140 KG/CM2 PARA CUNETAS INCLUYE ACABADOS 4,971.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,142.8
01.04.10 ENCOFRADO Y DESENCOFRADO NORMAL PARA JARDIN 3,281.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,460.7
01.04.11 CONCRETO F'C=140 KG/CM2 PARA JARDIN 2,627.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 656.7
01.05 OBRAS DE CONCRETO ARMADO 772,773.58
01.05.01 ZAPATAS 49,980.45
01.05.01.01 ACERO F'Y= 4200 KG/CM2 PARA ZAPATAS 11,429.97 0.00 0.00 0.00 0.00 0.00 10,001.22 1,428.75 0.0
01.05.01.02 CONCRETO F'C=210 KG/CM2 PARA ZAPATAS 38,550.48 0.00 0.00 0.00 0.00 0.00 0.00 23,130.29 15,420.1
01.05.02 COLUMNAS 113,702.39
01.05.02.01 ACERO F'Y= 4200 KG/CM2 PARA COLUMNAS 43,524.40 0.00 0.00 0.00 0.00 0.00 4,974.22 8,704.88 8,704.8
01.05.02.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS 47,502.09 0.00 0.00 0.00 0.00 0.00 0.00 3,064.65 10,726.2
01.05.02.03 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS 22,675.90 0.00 0.00 0.00 0.00 0.00 0.00 2,451.45 4,290.0
01.05.03 COLUMNETAS 43,559.15
01.05.03.01 ACERO F'Y= 4200 KG/CM2 PARA COLUMNETAS 13,992.87 0.00 0.00 0.00 0.00 0.00 0.00 1,023.87 2,389.0
01.05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNETAS 20,137.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,179.6
01.05.03.03 CONCRETO F'C=175 KG/CM2 PARA COLUMNETAS 9,428.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 764.4
01.05.04 VIGAS 210,855.32
01.05.04.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA VIGAS 79,074.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.04.02 ACERO F'Y= 4200 KG/CM2 PARA VIGAS 84,562.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.04.03 CONCRETO F'C=210 KG/CM2 PARA VIGAS 47,218.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05 LOSA ALIGERADA 288,844.61
01.05.05.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA ALIGERADA 134,294.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.02 BLOQUETA DE ARCILLA H=0.15 M. PARA LOSA ALIGERADA 21,223.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.03 BLOQUETA DE ARCILLA H=0.12 M. PARA LOSA ALIGERADA 21,181.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

O EDUCATIVO DE NIVEL PRIMARIO I.E.E. N°30318MEJORAMIENTO


DEL CENTRO POBLADO
Y AMPLIACION
MENORDEL
DE SERVICIO
YANAMUCLOEDUCATIVO
E I.E.E. N°30319
DE NIVEL
DEL
PRIMARIO
ANEXO DE
I.E.E.
MARAVILCA,
N°30318 DEL
DISTRITO
CENTRODEP

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.05.05.04 ACERO F'Y= 4200 KG/CM2 PARA LOSA ALIGERADA 57,235.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.05 CONCRETO F'C=210 KG/CM2 PARA LOSA ALIGERADA 54,910.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06 ESCALERAS 65,831.66
01.05.06.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESCALERAS 18,440.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06.02 ACERO F'Y= 4200 KG/CM2 PARA ESCALERAS 9,971.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06.03 CONCRETO F'C=210 KG/CM2 PARA ESCALERAS 37,419.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.06 TANQUE CISTERNA 64,777.91
01.06.01 EXCAVACION DE ZANJAS PARA CIMENTACION 2,738.86 0.00 0.00 2,738.86 0.00 0.00 0.00 0.00 0.0
01.06.02 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 889.89 0.00 0.00 0.00 0.00 0.00 889.89 0.00 0.0
01.06.03 SOLADO PARA ZAPATAS E=0.10 M. 1:10 CEMENTO - HORMIGON 289.53 0.00 0.00 289.53 0.00 0.00 0.00 0.00 0.0
01.06.04 ACERO F'Y= 4200 KG/CM2 PARA ZAPATAS 581.27 0.00 0.00 0.00 581.27 0.00 0.00 0.00 0.0
01.06.05 CONCRETO F'C=210 KG/CM2 PARA ZAPATAS 2,041.31 0.00 0.00 0.00 2,041.31 0.00 0.00 0.00 0.0
01.06.06 ACERO F'Y= 4200 KG/CM2 PARA COLUMNAS 4,301.61 0.00 0.00 0.00 3,584.68 716.93 0.00 0.00 0.0
01.06.07 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS 3,278.17 0.00 0.00 0.00 0.00 1,966.90 1,311.27 0.00 0.0
01.06.08 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS 1,901.00 0.00 0.00 0.00 0.00 475.25 1,425.75 0.00 0.0
01.06.09 ENCOFRADO Y DESENCOFRADO NORMAL PARA VIGAS 2,007.72 0.00 0.00 0.00 0.00 0.00 1,003.86 1,003.86 0.0
01.06.10 ACERO F'Y= 4200 KG/CM2 PARA VIGAS 3,065.73 0.00 0.00 0.00 0.00 0.00 0.00 3,065.73 0.0
01.06.11 CONCRETO F'C=210 KG/CM2 PARA VIGAS 1,380.31 0.00 0.00 0.00 0.00 0.00 0.00 1,380.31 0.0
01.06.12 ACERO F'Y= 4200 KG/CM2 PARA CISTERNA 5,076.96 0.00 0.00 0.00 0.00 0.00 5,076.96 0.00 0.0
01.06.13 ENCOFRADO Y DESENCOFRADO NORMAL PARA CISTERNA 3,718.82 0.00 0.00 0.00 0.00 1,859.41 1,859.41 0.00 0.0
01.06.14 CONCRETO F'C=210 KG/CM2 PARA CISTERNA 4,092.64 0.00 0.00 0.00 0.00 0.00 4,092.64 0.00 0.0
01.06.15 ACERO F'Y= 4200 KG/CM2 PARA TANQUE ELEVADO 4,880.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,880.2
01.06.16 ENCOFRADO Y DESENCOFRADO NORMAL PARA TANQUE ELEVADO 4,492.10 0.00 0.00 0.00 0.00 0.00 0.00 4,492.10 0.0
01.06.17 CONCRETO F'C=210 KG/CM2 PARA TANQUE ELEVADO 2,618.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,618.4
01.06.18 ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA ALIGERADA 453.94 0.00 0.00 0.00 0.00 0.00 453.94 0.00 0.0
01.06.19 BLOQUETA DE ARCILLA H=0.15 M. PARA LOSA ALIGERADA 182.52 0.00 0.00 0.00 0.00 0.00 182.52 0.00 0.0
01.06.20 ACERO F'Y= 4200 KG/CM2 PARA LOSA ALIGERADA 321.44 0.00 0.00 0.00 0.00 0.00 321.44 0.00 0.0
01.06.21 CONCRETO F'C=210 KG/CM2 PARA LOSA ALIGERADA 224.55 0.00 0.00 0.00 0.00 0.00 0.00 224.55 0.0
01.06.22 MURO DE SOGA CON LADRILLO K.K. 18H 9X13X24 CM. 2,287.88 0.00 0.00 0.00 0.00 0.00 0.00 2,287.88 0.0
01.06.23 TARRAJEO EN MUROS INTERIORES FROTACHADO MEZCLA 1:5 851.76 0.00 0.00 0.00 0.00 0.00 0.00 851.76 0.0
01.06.24 TARRAJEO INTERIOR CON IMPERMEABILIZANTE DE TANQUE CISTERNA 1,402.11 0.00 0.00 0.00 0.00 0.00 0.00 701.06 701.0
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

O EDUCATIVO DE NIVEL PRIMARIO I.E.E. N°30318MEJORAMIENTO


DEL CENTRO POBLADO
Y AMPLIACION
MENORDEL
DE SERVICIO
YANAMUCLOEDUCATIVO
E I.E.E. N°30319
DE NIVEL
DEL
PRIMARIO
ANEXO DE
I.E.E.
MARAVILCA,
N°30318 DEL
DISTRITO
CENTRODEP

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.06.25 TARRAJEO INTERIOR CON IMPERMEABILIZANTE DE TANQUE ELEVADO 886.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 886.6
01.06.26 TARRAJEO EXTERIOR FROTACHADO DE ESTRUCTURA MEZCLA 1:5 4,004.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,004.0
01.06.27 PINTURA LATEX EN ESTRUCTURA DOS MANOS 1,975.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.06.28 INSTALACION DE ACCESORIOS DE TANQUE CISTERNA 2,112.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,112.3
01.06.29 INSTALACION DE PUERTA DE MADERA P-1 320.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 320.0
01.06.30 INSTALACION DE ESCALERA METALICA SEGUN DISEÑO 2,400.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,400.0
01.07 PRUEBAS Y ENSAYOS DE CALIDAD 3,820.00
01.07.01 PROCTOR MODIFICADO 160.00 0.00 0.00 0.00 0.00 160.00 0.00 0.00 0.0
01.07.02 DENSIDAD DE CAMPO 480.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.7
01.07.03 DISEÑO DE MEZCLA 540.00 0.00 0.00 0.00 462.86 77.14 0.00 0.00 0.0
01.07.04 ROTURA DE PROBETA (COMPRESION SIMPLE) 2,640.00 0.00 0.00 0.00 0.00 0.00 65.19 228.15 228.1
01.08 FLETE 1,600.00
01.08.01 FLETE TERRESTRE 1,600.00 119.15 119.15 119.15 119.15 119.15 119.15 119.15 119.1
02 ARQUITECTURA 743,584.58
02.01 MUROS Y TABIQUES 140,636.03
02.01.01 MURO DE SOGA CON LADRILLO K.K. 18H 9X13X24 CM. 140,051.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
MURO DE CABEZA CON LADRILLO K.K. 18H 9X13X24 CM. 584.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02 REVOQUES, ENLUCIDOS Y MOLDURAS 217,896.67
02.02.01 TARRAJEO EN CIELO RASO FROTACHADO MEZCLA 1:4 62,875.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.02 TARRAJEO EN MUROS INTERIORES FROTACHADO MEZCLA 1:5 63,390.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.03 TARRAJEO EN MUROS EXTERIORES FROTACHADO MEZCLA 1:5 35,522.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.04 TARRAJEO EN VIGAS MEZCLA 1:4 27,465.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.05 TARRAJEO EN COLUMNAS MEZCLA 1:5 19,492.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.06 VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS MEZCLA 1:5 9,002.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.07 TARRAJEO DE PODIUM MEZCLA 1:5 147.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03 PISOS Y PAVIMENTOS 111,696.25
02.03.01 PISO DE PORCELANATO ALTO TRANSITO ANTIDESLIZANTE PARA AMBIENTES 65,681.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03.02 PISO DE PORCELANATO ALTO TRANSITO ANTIDESLIZANTE PARA VEREDAS 41,788.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03.03 PISO DE CERAMICO ANTIDESLIZANTE DE ALTO TRANSITO 4,226.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04 ZOCALOS Y CONTRAZOCALOS 28,505.27
02.04.01 CONTRAZOCALO DE PORCELANATO H=0.10 M. PARA AMBIENTES 11,652.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

O EDUCATIVO DE NIVEL PRIMARIO I.E.E. N°30318MEJORAMIENTO


DEL CENTRO POBLADO
Y AMPLIACION
MENORDEL
DE SERVICIO
YANAMUCLOEDUCATIVO
E I.E.E. N°30319
DE NIVEL
DEL
PRIMARIO
ANEXO DE
I.E.E.
MARAVILCA,
N°30318 DEL
DISTRITO
CENTRODEP

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
02.04.02 CONTRAZOCALO DE PORCELANATO H=0.10 M. PARA VEREDAS 11,342.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04.03 CONTRAZOCALO DE CERAMICO H=0.10 M. 5,139.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04.04 ZOCALO DE CERAMICO 370.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.05 CUBIERTAS 46,545.41
02.05.01 CUBIERTA DE TEJA ANDINA TIPO ETERNIT 46,545.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06 CARPINTERIA DE MADERA 17,229.50
02.06.01 PUERTA APANELADA DE CEDRO TIPO P-01 INC. INSTALACION 7,810.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06.02 PUERTA APANELADA DE CEDRO TIPO P-02 INC. INSTALACION 5,583.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06.03 PUERTA APANELADA DE CEDRO TIPO P-03 INC. INSTALACION 3,836.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07 CARPINTERIA METALICA 24,910.00
02.07.01 PORTON METALICO PM-01 INC. PINTADO E INSTALACION 860.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.02 VENTANA METALICA V-01 INC. PINTADO E INSTALACION 1,120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.03 VENTANA METALICA V-02 INC. PINTADO E INSTALACION 4,830.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.04 VENTANA METALICA V-03 INC. PINTADO E INSTALACION 2,200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.05 VENTANA METALICA V-04 INC. PINTADO E INSTALACION 1,120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.06 VENTANA METALICA V-05 INC. PINTADO E INSTALACION 4,830.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.07 VENTANA METALICA V-06 INC. PINTADO E INSTALACION 3,520.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.08 VENTANA METALICA V-07 INC. PINTADO E INSTALACION 1,140.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.09 VENTANA METALICA V-08 INC. PINTADO E INSTALACION 5,290.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.08 CARPINTERIA EN MELAMINA 5,580.00
02.08.01 SEPARADOR DE BAÑOS TIPO 01 5,580.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.09 CERRAJERIA 7,251.54
02.09.01 CERRADURA PARA PUERTA DE TRES GOLPES 4,796.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.09.02 CERRADURA PARA PUERTA TIPO PERILLA 2,454.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.10 VIDRIOS, CRISTALES Y SIMILARES 41,997.06
02.10.01 VIDRIO LAMINAR BUTIRAL DE POLIVINILO INCOLORO 41,997.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11 PINTURAS 90,207.74
02.11.01 PINTURA LATEX EN CIELO RASO DOS MANOS 22,833.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.02 PINTURA LATEX EN MUROS EXTERIORES DOS MANOS 17,654.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.03 PINTURA LATEX EN MUROS INTERIORES DOS MANOS 30,153.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.04 PINTURA LATEX EN VIGAS DOS MANOS 10,154.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

O EDUCATIVO DE NIVEL PRIMARIO I.E.E. N°30318MEJORAMIENTO


DEL CENTRO POBLADO
Y AMPLIACION
MENORDEL
DE SERVICIO
YANAMUCLOEDUCATIVO
E I.E.E. N°30319
DE NIVEL
DEL
PRIMARIO
ANEXO DE
I.E.E.
MARAVILCA,
N°30318 DEL
DISTRITO
CENTRODEP

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
02.11.05 PINTURA LATEX EN COLUMNAS DOS MANOS 7,342.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.06 PINTURA LATEX PARA DERRAMES EN PUERTAS Y VENTANAS DOS MANOS 1,560.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.07 PINTURA PARA PIZARRA 510.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12 JUNTAS 11,129.11
02.12.01 JUNTAS ASFALTICAS EN VEREDAS 2,066.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12.02 JUNTAS ASFALTICAS PARA SARDINEL DE JARDIN 91.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12.03 JUNTAS ASFALTICAS PARA COLUMNETAS 8,971.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03 INSTALACIONES SANITARIAS 58,301.24
03.01 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO 8,682.61
03.01.01 MOVIMIENTO DE TIERRAS 1,649.41
03.01.01.01 EXCAVACION DE ZANJAS PARA TUBERIA DE AGUA 937.63 0.00 0.00 0.00 0.00 937.63 0.00 0.00 0.0
03.01.01.02 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 681.36 0.00 0.00 0.00 0.00 0.00 596.19 85.17 0.0
03.01.01.03 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 30.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.01.02 SALIDAS 2,360.13
03.01.02.01 SALIDA DE AGUA FRIA PVC SAP DE 1/2" 2,254.32 0.00 0.00 0.00 0.00 0.00 120.77 281.79 281.7
03.01.02.02 SALIDA DE AGUA PARA RIEGO PVC SAP DE 1/2" 56.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 56.6
03.01.02.03 SALIDA DE AGUA FRIA CONTRA INCENDIO PVC SAP DE 2" 49.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 49.1
03.01.03 RED DE DISTRIBUCION 4,673.07
03.01.03.01 TUBERIA PARA AGUA POTABLE PVC SAP DE 1/2" C-10 2,106.15 0.00 0.00 0.00 0.00 0.00 0.00 254.19 254.1
03.01.03.02 TUBERIA PARA RIEGO PVC SAP DE 1/2" C-10 72.72 0.00 0.00 0.00 0.00 0.00 0.00 72.72 0.0
03.01.03.03 TUBERIA CONTRA INCENDIO PVC SAP DE 2" C-10 80.28 0.00 0.00 0.00 0.00 0.00 0.00 80.28 0.0
03.01.03.04 VALVULA DE COMPUERTA DE 1/2" 1,834.94 0.00 0.00 0.00 0.00 0.00 0.00 65.53 229.3
03.01.03.05 VALVULA DE COMPUERTA DE 2" 127.03 0.00 0.00 0.00 0.00 0.00 0.00 2.23 15.6
03.01.03.06 GRIFO CONTRA INCENDIO 451.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02 SISTEMA DE DESAGUE 19,414.41
03.02.01 MOVIMIENTO DE TIERRAS 1,805.63
03.02.01.01 EXCAVACION DE ZANJAS PARA TUBERIA DE DESAGUE 1,045.58 0.00 0.00 0.00 0.00 0.00 0.00 1,045.58 0.0
03.02.01.02 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 703.40 0.00 0.00 0.00 0.00 0.00 0.00 351.70 351.7
03.02.01.03 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 56.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02.02 SALIDAS 5,996.34
03.02.02.01 SALIDA DE DESAGUE CON PVC SAL DE 2" 2,613.30 0.00 0.00 0.00 0.00 0.00 0.00 190.06 332.6
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

O EDUCATIVO DE NIVEL PRIMARIO I.E.E. N°30318MEJORAMIENTO


DEL CENTRO POBLADO
Y AMPLIACION
MENORDEL
DE SERVICIO
YANAMUCLOEDUCATIVO
E I.E.E. N°30319
DE NIVEL
DEL
PRIMARIO
ANEXO DE
I.E.E.
MARAVILCA,
N°30318 DEL
DISTRITO
CENTRODEP

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
03.02.02.02 SALIDA DE DESAGUE CON PVC SAL DE 4" 1,461.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 91.3
03.02.02.03 SALIDA DE VENTILACION CON PVC SAL DE 2" 1,921.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02.03 RED DE DISTRIBUCION 11,612.44
03.02.03.01 TUBERIA PARA DESAGUE CON PVC SAL DE 2" 1,038.11 0.00 0.00 0.00 0.00 0.00 0.00 72.85 127.4
03.02.03.02 TUBERIA PARA DESAGUE CON PVC SAL DE 4" 5,387.78 0.00 0.00 0.00 0.00 0.00 0.00 96.21 673.4
03.02.03.03 TUBERIA PARA VENTILACION CON PVC SAL DE 2" 2,348.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 132.9
TUBERIA PARA CAJA DE REGISTRO CON PVC SAL DE 2" 2,837.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03 SISTEMA DE DESAGUE PLUVIAL 15,728.96
03.03.01 TUBERIA PVC SAL PLUVIAL DE 4" 4,216.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.02 TUBERIA PVC SAL PLUVIAL DE 3" 1,789.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA FALSA COLUMNA 5,450.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.04 CONCRETO F'C=175 KG/CM2 PARA FALSA COLUMNA 3,930.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.05 ACCESORIOS PARA DESAGUE PLUVIAL 341.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04 APARATOS Y ACCESORIOS SANITARIOS 14,475.26
03.04.01 INODORO DE LOSA TANQUE BAJO 5,908.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.02 LAVATORIO DE LOSA CON PEDESTAL 4,385.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.03 PAPELERA DE LOSA 1,190.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.04 SUMIDERO DE BRONCE ROSCADO DE 2" 985.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.05 REGISTRO ROSCADO DE BRONCE DE 4" 1,381.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.06 CAJA DE REGISTRO PARA DESAGUE DE 624.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04 INSTALACIONES ELECTRICAS 110,524.39
04.01 PRIMER PISO 64,859.19
04.01.01 SALIDAS 13,513.89
04.01.01.01 SALIDAD DE TECHO PARA CENTRO DE LUZ 6,566.30 0.00 0.00 0.00 0.00 0.00 0.00 1,094.38 1,915.1
04.01.01.02 SALIDA DE TOMACORRIENTE BIPOLARES CON LINEA A TIERRA 4,391.95 0.00 0.00 0.00 0.00 0.00 0.00 548.99 1,921.4
04.01.01.03 SALIDA DE TOMACORRIENTE PARA ALUMBRADO DE EMERGENCIA 363.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.01.04 SALIDA PARA INTERRUPTORES EN CONMUTACION 1,057.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.01.05 SALIDA PARA INTERRUPTORES SIMPLES 298.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 298.5
04.01.01.06 SALIDA PARA INTERRUPTORES DOBLES 248.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.4
04.01.01.07 SALIDA PARA INTERRUPTORES TRIPLES 587.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 419.5
04.01.02 CANALIZACION DE TUBERIAS PVC 20,053.08
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

O EDUCATIVO DE NIVEL PRIMARIO I.E.E. N°30318MEJORAMIENTO


DEL CENTRO POBLADO
Y AMPLIACION
MENORDEL
DE SERVICIO
YANAMUCLOEDUCATIVO
E I.E.E. N°30319
DE NIVEL
DEL
PRIMARIO
ANEXO DE
I.E.E.
MARAVILCA,
N°30318 DEL
DISTRITO
CENTRODEP

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
04.01.02.01 TUBERIA DE 25 MM. PVC SEL (1") 4,054.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.02.02 TUBERIA DE 20 MM. PVC SEL (3/4") 15,998.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03 CONDUCTORES 8,301.84
04.01.03.01 CONDUCTOR (2x10+1x10) MM. THHW 358.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.02 CONDUCTOR (1x10) MM2. THHW 146.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.03 CONDUCTOR (2x6+1x10) MM2 THHW 975.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.04 CONDUCTOR (2x2.5) MM2. THHW 4,612.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.05 CONDUCTOR (2x4.0) MM2. THHW 2,209.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.04 TABLEROS ELECTRICOS 4,700.00
04.01.04.01 TABLERO GENERAL Y TABLEROS DE DISTRIBUCION 4,700.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.05 CONEXION A TIERRA 5,600.00
04.01.05.01 POZO A TIERRA 5,600.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06 ARTEFACTOS Y ACCESORIOS ELECTRICOS 11,490.39
04.01.06.01 FLUORESCENTE RECTO INCLUYE EQUIPO Y PANTALLA 7,678.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.02 SPOT LIGHT 656.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.03 LUCES DE EMERGENCIA CON BATERIA - 02 FAROS 637.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.04 TOMACORRIENTE BIPOLAR 1,779.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.05 TOMACORRIENTE SIMPLE 125.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.06 INTERRUPTOR CONMUTACION 210.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.07 INTERRUPTOR SIMPLE 107.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.08 INTERRUPTOR DOBLE 94.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.09 INTERRUPTOR TRIPLE 201.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.07 OTROS 1,199.99
04.01.07.02 DISPOSITIVOS Y EQUIPOS DE SEGURIDAD 1,199.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02 SEGUNDO PISO 45,665.20
04.02.01 SALIDAS 13,605.84
04.02.01.01 SALIDAD DE TECHO PARA CENTRO DE LUZ 6,212.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.02 SALIDA DE TOMACORRIENTE BIPOLARES CON LINEA A TIERRA 5,218.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.03 SALIDA DE TOMACORRIENTE PARA ALUMBRADO DE EMERGENCIA 303.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.04 SALIDA PARA INTERRUPTORES EN CONMUTACION 704.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

O EDUCATIVO DE NIVEL PRIMARIO I.E.E. N°30318MEJORAMIENTO


DEL CENTRO POBLADO
Y AMPLIACION
MENORDEL
DE SERVICIO
YANAMUCLOEDUCATIVO
E I.E.E. N°30319
DE NIVEL
DEL
PRIMARIO
ANEXO DE
I.E.E.
MARAVILCA,
N°30318 DEL
DISTRITO
CENTRODEP

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
04.02.01.05 SALIDA PARA INTERRUPTORES SIMPLES 298.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.06 SALIDA PARA INTERRUPTORES DOBLES 398.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.07 SALIDA PARA INTERRUPTORES TRIPLES 469.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.02 CANALIZACION DE TUBERIAS PVC 13,965.19
04.02.02.01 TUBERIA DE 20 MM. PVC SEL (3/4") 13,965.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.03 CONDUCTORES 6,384.59
04.02.03.01 CONDUCTOR (2x2.5) MM2. THHW 3,370.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.03.02 CONDUCTOR (2x4.0) MM2. THHW 3,014.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04 ARTEFACTOS Y ACCESORIOS ELECTRICOS 11,709.58
04.02.04.01 FLUORESCENTE RECTO INCLUYE EQUIPO Y PANTALLA 8,432.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.02 LUCES DE EMERGENCIA CON BATERIA - 02 FAROS 637.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.03 TOMACORRIENTE BIPOLAR 1,779.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.04 TOMACORRIENTE SIMPLE 104.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.05 INTERRUPTOR CONMUTACION 336.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.06 INTERRUPTOR SIMPLE 107.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.07 INTERRUPTOR DOBLE 150.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.08 INTERRUPTOR TRIPLE 161.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0

COSTO DIRECTO 1,990,094.42 58,567.27 11,285.64 13,235.59 13,954.08 22,199.07 56,029.55 88,256.67 107,755.4
GASTOS GENERALES 10.00% 199,009.44 5,856.73 1,128.56 1,323.56 1,395.41 2,219.91 5,602.96 8,825.67 10,775.5
UTILIDAD 10.00% 199,009.44 5,856.73 1,128.56 1,323.56 1,395.41 2,219.91 5,602.96 8,825.67 10,775.5
SUB TOTAL 2,388,113.30 70,280.73 13,542.76 15,882.71 16,744.90 26,638.89 67,235.47 105,908.01 129,306.4
IGV 18.00% 429,860.39 12,650.53 2,437.70 2,858.89 3,014.08 4,795.00 12,102.38 19,063.44 23,275.1
PRESUPUESTO PARCIAL 2,817,973.69 82,931.26 15,980.46 18,741.60 19,758.98 31,433.89 79,337.85 124,971.45 152,581.6
PORCENTAJE DE AVANCE 2.94% 0.57% 0.67% 0.70% 1.12% 2.82% 4.43% 5.41%
PORCENTAJE DE AVANCE ACUMULADO 100.00% 4.88% 13.78%
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

TIVO DE NIVEL PRIMARIO I.E.E. N°30318 DEL CENTRO


MEJORAMIENTO
POBLADO MENOR
Y AMPLIACION
DE YANAMUCLO
DEL SERVICIO
E I.E.E.
EDUCATIVO
N°30319 DEL
DEANEXO
NIVEL PRIMARIO
DE MARAVILCA,
I.E.E. N°30318
DISTRITODEL
DECENTRO
MATAHUA
P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
BLOQUE AB - YANAMUCLO 1,990,094.42
01 ESTRUCTURAS 1,077,684.21 MES 01 MES 02
01.01 OBRAS PROVISIONALES 44,569.85
01.01.01 CONSTRUCCION PROVISIONAL DE OFICINA 384.00 384.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.02 CONSTRUCCION PROVISIONAL DE CASETA PARA GUARDIANIA 144.00 144.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.03 CONSTRUCCION PROVISIONAL DE VESTIDOR PARA PERSONAL 480.00 480.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.04 GUARDIANIA DE OBRA 37,785.60 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.4
01.01.05 ALQUILER DE ALMACEN 1,440.00 56.00 56.00 56.00 56.00 56.00 56.00 56.00 56.0
01.01.06 CARTEL DE IDENTIFICACION DE OBRA (3.60x2.40) 856.25 0.00 856.25 0.00 0.00 0.00 0.00 0.00 0.0
01.01.07 AGUA PARA CONSUMO EN LA CONSTRUCCION 1,080.00 42.00 42.00 42.00 42.00 42.00 42.00 42.00 42.0
01.01.08 DESAGUE PARA LA CONSTRUCCION 750.00 0.00 750.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.09 ENERGIA ELECTRICA PROVISIONAL PARA LA CONSTRUCCION 1,650.00 64.17 64.17 64.17 64.17 64.17 64.17 64.17 64.1
01.02 TRABAJOS PRELIMINARES 66,669.81
01.02.01 DEMOLICION DE CONSTRUCCION EXISTENTE 46,142.30 46,142.30 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.02.02 ELIMINACION DE CONSTRUCCION DEMOLIDA DP=2 KM. 8,433.24 6,324.93 2,108.31 0.00 0.00 0.00 0.00 0.00 0.0
01.02.03 LIMPIEZA DEL TERRENO MANUAL 3,218.46 0.00 3,218.46 0.00 0.00 0.00 0.00 0.00 0.0
01.02.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS 2,500.00 2,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.02.05 TRAZO, NIVELACION Y REPLANTEO PARA EDIFICACION 2,770.32 0.00 1,007.39 1,762.93 0.00 0.00 0.00 0.00 0.0
01.02.06 CONTROL TOPOGRAFICO DURANTE EJECUCION DE OBRA 3,605.49 841.28 841.28 841.28 841.28 240.37 0.00 0.00 0.0
01.03 MOVIMIENTO DE TIERRAS 32,782.10
01.03.01 EXCAVACION DE ZANJAS PARA ZAPATAS H=1.20 - 1.50 M. 9,038.33 0.00 753.19 5,272.36 3,012.78 0.00 0.00 0.00 0.0
01.03.02 EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS 2,632.52 0.00 0.00 548.44 767.82 767.82 548.44 0.00 0.0
01.03.03 EXCAVACION DE ZANJAS PARA JARDIN 31.43 0.00 0.00 31.43 0.00 0.00 0.00 0.00 0.0
01.03.04 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 4,776.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,776.2
01.03.05 REFINE, NIVELACION Y COMPACTACION DE PLATAFORMA 4,486.78 0.00 0.00 0.00 0.00 0.00 560.85 3,925.93 0.0
01.03.06 REFINE, NIVELACION Y COMPACTACION DE BASE PARA VEREDAS 6,019.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,019.8
01.03.07 RELLENO Y COMPACTACION DE PODIUM CON MATERIAL PROPIO 301.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 301.5
01.03.08 ACARREO INTERNO DE MATERIAL EXCEDENTE DP=20 M. 2,694.29 0.00 0.00 0.00 0.00 0.00 0.00 1,347.15 1,347.1
01.03.09 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 2,801.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.04 OBRAS DE CONCRETO SIMPLE 90,690.96
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

TIVO DE NIVEL PRIMARIO I.E.E. N°30318 DEL CENTRO


MEJORAMIENTO
POBLADO MENOR
Y AMPLIACION
DE YANAMUCLO
DEL SERVICIO
E I.E.E.
EDUCATIVO
N°30319 DEL
DEANEXO
NIVEL PRIMARIO
DE MARAVILCA,
I.E.E. N°30318
DISTRITODEL
DECENTRO
MATAHUA
P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.04.01 SOLADO PARA ZAPATAS E=0.10 M. 1:10 CEMENTO - HORMIGON 5,467.93 0.00 0.00 0.00 911.32 3,189.63 1,366.98 0.00 0.0
01.04.02 CONCRETO 1:10+30% P.G. PARA CIMIENTOS CORRIDOS 21,485.78 0.00 0.00 0.00 0.00 8,057.17 9,400.03 4,028.58 0.0
01.04.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO 6,829.64 0.00 0.00 0.00 0.00 0.00 2,276.55 3,983.96 569.1
01.04.04 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS 3,042.44 0.00 0.00 0.00 0.00 0.00 0.00 1,521.22 1,521.2
01.04.05 FALSO PISO DE CONCRETO E=0.10 M. CEMENTO - HORMIGON 16,168.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9,701.1
01.04.06 ENCOFRADO Y DESENCOFRADO NORMAL PARA VEREDAS 4,000.12 0.00 0.00 0.00 0.00 2,000.06 2,000.06 0.00 0.0
01.04.07 CONCRETO F'C=140 KG/CM2 PARA VEREDAS INCLUYE ACABADOS 19,168.71 0.00 0.00 0.00 0.00 0.00 5,750.61 13,418.10 0.0
01.04.08 ENCOFRADO Y DESENCOFRADO NORMAL PARA CUNETAS 3,648.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,648.2
01.04.09 CONCRETO F'C=140 KG/CM2 PARA CUNETAS INCLUYE ACABADOS 4,971.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,142.8
01.04.10 ENCOFRADO Y DESENCOFRADO NORMAL PARA JARDIN 3,281.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,460.7
01.04.11 CONCRETO F'C=140 KG/CM2 PARA JARDIN 2,627.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 656.7
01.05 OBRAS DE CONCRETO ARMADO 772,773.58
01.05.01 ZAPATAS 49,980.45
01.05.01.01 ACERO F'Y= 4200 KG/CM2 PARA ZAPATAS 11,429.97 0.00 0.00 0.00 0.00 0.00 10,001.22 1,428.75 0.0
01.05.01.02 CONCRETO F'C=210 KG/CM2 PARA ZAPATAS 38,550.48 0.00 0.00 0.00 0.00 0.00 0.00 23,130.29 15,420.1
01.05.02 COLUMNAS 113,702.39
01.05.02.01 ACERO F'Y= 4200 KG/CM2 PARA COLUMNAS 43,524.40 0.00 0.00 0.00 0.00 0.00 4,974.22 8,704.88 8,704.8
01.05.02.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS 47,502.09 0.00 0.00 0.00 0.00 0.00 0.00 3,064.65 10,726.2
01.05.02.03 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS 22,675.90 0.00 0.00 0.00 0.00 0.00 0.00 2,451.45 4,290.0
01.05.03 COLUMNETAS 43,559.15
01.05.03.01 ACERO F'Y= 4200 KG/CM2 PARA COLUMNETAS 13,992.87 0.00 0.00 0.00 0.00 0.00 0.00 1,023.87 2,389.0
01.05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNETAS 20,137.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,179.6
01.05.03.03 CONCRETO F'C=175 KG/CM2 PARA COLUMNETAS 9,428.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 764.4
01.05.04 VIGAS 210,855.32
01.05.04.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA VIGAS 79,074.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.04.02 ACERO F'Y= 4200 KG/CM2 PARA VIGAS 84,562.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.04.03 CONCRETO F'C=210 KG/CM2 PARA VIGAS 47,218.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05 LOSA ALIGERADA 288,844.61
01.05.05.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA ALIGERADA 134,294.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.02 BLOQUETA DE ARCILLA H=0.15 M. PARA LOSA ALIGERADA 21,223.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.03 BLOQUETA DE ARCILLA H=0.12 M. PARA LOSA ALIGERADA 21,181.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

TIVO DE NIVEL PRIMARIO I.E.E. N°30318 DEL CENTRO


MEJORAMIENTO
POBLADO MENOR
Y AMPLIACION
DE YANAMUCLO
DEL SERVICIO
E I.E.E.
EDUCATIVO
N°30319 DEL
DEANEXO
NIVEL PRIMARIO
DE MARAVILCA,
I.E.E. N°30318
DISTRITODEL
DECENTRO
MATAHUA
P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.05.05.04 ACERO F'Y= 4200 KG/CM2 PARA LOSA ALIGERADA 57,235.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.05 CONCRETO F'C=210 KG/CM2 PARA LOSA ALIGERADA 54,910.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06 ESCALERAS 65,831.66
01.05.06.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESCALERAS 18,440.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06.02 ACERO F'Y= 4200 KG/CM2 PARA ESCALERAS 9,971.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06.03 CONCRETO F'C=210 KG/CM2 PARA ESCALERAS 37,419.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.06 TANQUE CISTERNA 64,777.91
01.06.01 EXCAVACION DE ZANJAS PARA CIMENTACION 2,738.86 0.00 0.00 2,738.86 0.00 0.00 0.00 0.00 0.0
01.06.02 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 889.89 0.00 0.00 0.00 0.00 0.00 889.89 0.00 0.0
01.06.03 SOLADO PARA ZAPATAS E=0.10 M. 1:10 CEMENTO - HORMIGON 289.53 0.00 0.00 289.53 0.00 0.00 0.00 0.00 0.0
01.06.04 ACERO F'Y= 4200 KG/CM2 PARA ZAPATAS 581.27 0.00 0.00 0.00 581.27 0.00 0.00 0.00 0.0
01.06.05 CONCRETO F'C=210 KG/CM2 PARA ZAPATAS 2,041.31 0.00 0.00 0.00 2,041.31 0.00 0.00 0.00 0.0
01.06.06 ACERO F'Y= 4200 KG/CM2 PARA COLUMNAS 4,301.61 0.00 0.00 0.00 3,584.68 716.93 0.00 0.00 0.0
01.06.07 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS 3,278.17 0.00 0.00 0.00 0.00 1,966.90 1,311.27 0.00 0.0
01.06.08 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS 1,901.00 0.00 0.00 0.00 0.00 475.25 1,425.75 0.00 0.0
01.06.09 ENCOFRADO Y DESENCOFRADO NORMAL PARA VIGAS 2,007.72 0.00 0.00 0.00 0.00 0.00 1,003.86 1,003.86 0.0
01.06.10 ACERO F'Y= 4200 KG/CM2 PARA VIGAS 3,065.73 0.00 0.00 0.00 0.00 0.00 0.00 3,065.73 0.0
01.06.11 CONCRETO F'C=210 KG/CM2 PARA VIGAS 1,380.31 0.00 0.00 0.00 0.00 0.00 0.00 1,380.31 0.0
01.06.12 ACERO F'Y= 4200 KG/CM2 PARA CISTERNA 5,076.96 0.00 0.00 0.00 0.00 0.00 5,076.96 0.00 0.0
01.06.13 ENCOFRADO Y DESENCOFRADO NORMAL PARA CISTERNA 3,718.82 0.00 0.00 0.00 0.00 1,859.41 1,859.41 0.00 0.0
01.06.14 CONCRETO F'C=210 KG/CM2 PARA CISTERNA 4,092.64 0.00 0.00 0.00 0.00 0.00 4,092.64 0.00 0.0
01.06.15 ACERO F'Y= 4200 KG/CM2 PARA TANQUE ELEVADO 4,880.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,880.2
01.06.16 ENCOFRADO Y DESENCOFRADO NORMAL PARA TANQUE ELEVADO 4,492.10 0.00 0.00 0.00 0.00 0.00 0.00 4,492.10 0.0
01.06.17 CONCRETO F'C=210 KG/CM2 PARA TANQUE ELEVADO 2,618.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,618.4
01.06.18 ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA ALIGERADA 453.94 0.00 0.00 0.00 0.00 0.00 453.94 0.00 0.0
01.06.19 BLOQUETA DE ARCILLA H=0.15 M. PARA LOSA ALIGERADA 182.52 0.00 0.00 0.00 0.00 0.00 182.52 0.00 0.0
01.06.20 ACERO F'Y= 4200 KG/CM2 PARA LOSA ALIGERADA 321.44 0.00 0.00 0.00 0.00 0.00 321.44 0.00 0.0
01.06.21 CONCRETO F'C=210 KG/CM2 PARA LOSA ALIGERADA 224.55 0.00 0.00 0.00 0.00 0.00 0.00 224.55 0.0
01.06.22 MURO DE SOGA CON LADRILLO K.K. 18H 9X13X24 CM. 2,287.88 0.00 0.00 0.00 0.00 0.00 0.00 2,287.88 0.0
01.06.23 TARRAJEO EN MUROS INTERIORES FROTACHADO MEZCLA 1:5 851.76 0.00 0.00 0.00 0.00 0.00 0.00 851.76 0.0
01.06.24 TARRAJEO INTERIOR CON IMPERMEABILIZANTE DE TANQUE CISTERNA 1,402.11 0.00 0.00 0.00 0.00 0.00 0.00 701.06 701.0
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

TIVO DE NIVEL PRIMARIO I.E.E. N°30318 DEL CENTRO


MEJORAMIENTO
POBLADO MENOR
Y AMPLIACION
DE YANAMUCLO
DEL SERVICIO
E I.E.E.
EDUCATIVO
N°30319 DEL
DEANEXO
NIVEL PRIMARIO
DE MARAVILCA,
I.E.E. N°30318
DISTRITODEL
DECENTRO
MATAHUA
P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.06.25 TARRAJEO INTERIOR CON IMPERMEABILIZANTE DE TANQUE ELEVADO 886.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 886.6
01.06.26 TARRAJEO EXTERIOR FROTACHADO DE ESTRUCTURA MEZCLA 1:5 4,004.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,004.0
01.06.27 PINTURA LATEX EN ESTRUCTURA DOS MANOS 1,975.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.06.28 INSTALACION DE ACCESORIOS DE TANQUE CISTERNA 2,112.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,112.3
01.06.29 INSTALACION DE PUERTA DE MADERA P-1 320.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 320.0
01.06.30 INSTALACION DE ESCALERA METALICA SEGUN DISEÑO 2,400.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,400.0
01.07 PRUEBAS Y ENSAYOS DE CALIDAD 3,820.00
01.07.01 PROCTOR MODIFICADO 160.00 0.00 0.00 0.00 0.00 160.00 0.00 0.00 0.0
01.07.02 DENSIDAD DE CAMPO 480.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.7
01.07.03 DISEÑO DE MEZCLA 540.00 0.00 0.00 0.00 462.86 77.14 0.00 0.00 0.0
01.07.04 ROTURA DE PROBETA (COMPRESION SIMPLE) 2,640.00 0.00 0.00 0.00 0.00 0.00 65.19 228.15 228.1
01.08 FLETE 1,600.00
01.08.01 FLETE TERRESTRE 1,600.00 119.15 119.15 119.15 119.15 119.15 119.15 119.15 119.1
02 ARQUITECTURA 743,584.58
02.01 MUROS Y TABIQUES 140,636.03
02.01.01 MURO DE SOGA CON LADRILLO K.K. 18H 9X13X24 CM. 140,051.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
MURO DE CABEZA CON LADRILLO K.K. 18H 9X13X24 CM. 584.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02 REVOQUES, ENLUCIDOS Y MOLDURAS 217,896.67
02.02.01 TARRAJEO EN CIELO RASO FROTACHADO MEZCLA 1:4 62,875.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.02 TARRAJEO EN MUROS INTERIORES FROTACHADO MEZCLA 1:5 63,390.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.03 TARRAJEO EN MUROS EXTERIORES FROTACHADO MEZCLA 1:5 35,522.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.04 TARRAJEO EN VIGAS MEZCLA 1:4 27,465.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.05 TARRAJEO EN COLUMNAS MEZCLA 1:5 19,492.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.06 VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS MEZCLA 1:5 9,002.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.07 TARRAJEO DE PODIUM MEZCLA 1:5 147.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03 PISOS Y PAVIMENTOS 111,696.25
02.03.01 PISO DE PORCELANATO ALTO TRANSITO ANTIDESLIZANTE PARA AMBIENTES 65,681.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03.02 PISO DE PORCELANATO ALTO TRANSITO ANTIDESLIZANTE PARA VEREDAS 41,788.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03.03 PISO DE CERAMICO ANTIDESLIZANTE DE ALTO TRANSITO 4,226.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04 ZOCALOS Y CONTRAZOCALOS 28,505.27
02.04.01 CONTRAZOCALO DE PORCELANATO H=0.10 M. PARA AMBIENTES 11,652.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

TIVO DE NIVEL PRIMARIO I.E.E. N°30318 DEL CENTRO


MEJORAMIENTO
POBLADO MENOR
Y AMPLIACION
DE YANAMUCLO
DEL SERVICIO
E I.E.E.
EDUCATIVO
N°30319 DEL
DEANEXO
NIVEL PRIMARIO
DE MARAVILCA,
I.E.E. N°30318
DISTRITODEL
DECENTRO
MATAHUA
P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
02.04.02 CONTRAZOCALO DE PORCELANATO H=0.10 M. PARA VEREDAS 11,342.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04.03 CONTRAZOCALO DE CERAMICO H=0.10 M. 5,139.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04.04 ZOCALO DE CERAMICO 370.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.05 CUBIERTAS 46,545.41
02.05.01 CUBIERTA DE TEJA ANDINA TIPO ETERNIT 46,545.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06 CARPINTERIA DE MADERA 17,229.50
02.06.01 PUERTA APANELADA DE CEDRO TIPO P-01 INC. INSTALACION 7,810.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06.02 PUERTA APANELADA DE CEDRO TIPO P-02 INC. INSTALACION 5,583.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06.03 PUERTA APANELADA DE CEDRO TIPO P-03 INC. INSTALACION 3,836.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07 CARPINTERIA METALICA 24,910.00
02.07.01 PORTON METALICO PM-01 INC. PINTADO E INSTALACION 860.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.02 VENTANA METALICA V-01 INC. PINTADO E INSTALACION 1,120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.03 VENTANA METALICA V-02 INC. PINTADO E INSTALACION 4,830.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.04 VENTANA METALICA V-03 INC. PINTADO E INSTALACION 2,200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.05 VENTANA METALICA V-04 INC. PINTADO E INSTALACION 1,120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.06 VENTANA METALICA V-05 INC. PINTADO E INSTALACION 4,830.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.07 VENTANA METALICA V-06 INC. PINTADO E INSTALACION 3,520.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.08 VENTANA METALICA V-07 INC. PINTADO E INSTALACION 1,140.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.09 VENTANA METALICA V-08 INC. PINTADO E INSTALACION 5,290.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.08 CARPINTERIA EN MELAMINA 5,580.00
02.08.01 SEPARADOR DE BAÑOS TIPO 01 5,580.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.09 CERRAJERIA 7,251.54
02.09.01 CERRADURA PARA PUERTA DE TRES GOLPES 4,796.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.09.02 CERRADURA PARA PUERTA TIPO PERILLA 2,454.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.10 VIDRIOS, CRISTALES Y SIMILARES 41,997.06
02.10.01 VIDRIO LAMINAR BUTIRAL DE POLIVINILO INCOLORO 41,997.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11 PINTURAS 90,207.74
02.11.01 PINTURA LATEX EN CIELO RASO DOS MANOS 22,833.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.02 PINTURA LATEX EN MUROS EXTERIORES DOS MANOS 17,654.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.03 PINTURA LATEX EN MUROS INTERIORES DOS MANOS 30,153.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.04 PINTURA LATEX EN VIGAS DOS MANOS 10,154.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

TIVO DE NIVEL PRIMARIO I.E.E. N°30318 DEL CENTRO


MEJORAMIENTO
POBLADO MENOR
Y AMPLIACION
DE YANAMUCLO
DEL SERVICIO
E I.E.E.
EDUCATIVO
N°30319 DEL
DEANEXO
NIVEL PRIMARIO
DE MARAVILCA,
I.E.E. N°30318
DISTRITODEL
DECENTRO
MATAHUA
P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
02.11.05 PINTURA LATEX EN COLUMNAS DOS MANOS 7,342.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.06 PINTURA LATEX PARA DERRAMES EN PUERTAS Y VENTANAS DOS MANOS 1,560.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.07 PINTURA PARA PIZARRA 510.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12 JUNTAS 11,129.11
02.12.01 JUNTAS ASFALTICAS EN VEREDAS 2,066.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12.02 JUNTAS ASFALTICAS PARA SARDINEL DE JARDIN 91.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12.03 JUNTAS ASFALTICAS PARA COLUMNETAS 8,971.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03 INSTALACIONES SANITARIAS 58,301.24
03.01 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO 8,682.61
03.01.01 MOVIMIENTO DE TIERRAS 1,649.41
03.01.01.01 EXCAVACION DE ZANJAS PARA TUBERIA DE AGUA 937.63 0.00 0.00 0.00 0.00 937.63 0.00 0.00 0.0
03.01.01.02 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 681.36 0.00 0.00 0.00 0.00 0.00 596.19 85.17 0.0
03.01.01.03 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 30.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.01.02 SALIDAS 2,360.13
03.01.02.01 SALIDA DE AGUA FRIA PVC SAP DE 1/2" 2,254.32 0.00 0.00 0.00 0.00 0.00 120.77 281.79 281.7
03.01.02.02 SALIDA DE AGUA PARA RIEGO PVC SAP DE 1/2" 56.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 56.6
03.01.02.03 SALIDA DE AGUA FRIA CONTRA INCENDIO PVC SAP DE 2" 49.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 49.1
03.01.03 RED DE DISTRIBUCION 4,673.07
03.01.03.01 TUBERIA PARA AGUA POTABLE PVC SAP DE 1/2" C-10 2,106.15 0.00 0.00 0.00 0.00 0.00 0.00 254.19 254.1
03.01.03.02 TUBERIA PARA RIEGO PVC SAP DE 1/2" C-10 72.72 0.00 0.00 0.00 0.00 0.00 0.00 72.72 0.0
03.01.03.03 TUBERIA CONTRA INCENDIO PVC SAP DE 2" C-10 80.28 0.00 0.00 0.00 0.00 0.00 0.00 80.28 0.0
03.01.03.04 VALVULA DE COMPUERTA DE 1/2" 1,834.94 0.00 0.00 0.00 0.00 0.00 0.00 65.53 229.3
03.01.03.05 VALVULA DE COMPUERTA DE 2" 127.03 0.00 0.00 0.00 0.00 0.00 0.00 2.23 15.6
03.01.03.06 GRIFO CONTRA INCENDIO 451.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02 SISTEMA DE DESAGUE 19,414.41
03.02.01 MOVIMIENTO DE TIERRAS 1,805.63
03.02.01.01 EXCAVACION DE ZANJAS PARA TUBERIA DE DESAGUE 1,045.58 0.00 0.00 0.00 0.00 0.00 0.00 1,045.58 0.0
03.02.01.02 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 703.40 0.00 0.00 0.00 0.00 0.00 0.00 351.70 351.7
03.02.01.03 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 56.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02.02 SALIDAS 5,996.34
03.02.02.01 SALIDA DE DESAGUE CON PVC SAL DE 2" 2,613.30 0.00 0.00 0.00 0.00 0.00 0.00 190.06 332.6
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

TIVO DE NIVEL PRIMARIO I.E.E. N°30318 DEL CENTRO


MEJORAMIENTO
POBLADO MENOR
Y AMPLIACION
DE YANAMUCLO
DEL SERVICIO
E I.E.E.
EDUCATIVO
N°30319 DEL
DEANEXO
NIVEL PRIMARIO
DE MARAVILCA,
I.E.E. N°30318
DISTRITODEL
DECENTRO
MATAHUA
P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
03.02.02.02 SALIDA DE DESAGUE CON PVC SAL DE 4" 1,461.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 91.3
03.02.02.03 SALIDA DE VENTILACION CON PVC SAL DE 2" 1,921.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02.03 RED DE DISTRIBUCION 11,612.44
03.02.03.01 TUBERIA PARA DESAGUE CON PVC SAL DE 2" 1,038.11 0.00 0.00 0.00 0.00 0.00 0.00 72.85 127.4
03.02.03.02 TUBERIA PARA DESAGUE CON PVC SAL DE 4" 5,387.78 0.00 0.00 0.00 0.00 0.00 0.00 96.21 673.4
03.02.03.03 TUBERIA PARA VENTILACION CON PVC SAL DE 2" 2,348.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 132.9
TUBERIA PARA CAJA DE REGISTRO CON PVC SAL DE 2" 2,837.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03 SISTEMA DE DESAGUE PLUVIAL 15,728.96
03.03.01 TUBERIA PVC SAL PLUVIAL DE 4" 4,216.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.02 TUBERIA PVC SAL PLUVIAL DE 3" 1,789.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA FALSA COLUMNA 5,450.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.04 CONCRETO F'C=175 KG/CM2 PARA FALSA COLUMNA 3,930.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.05 ACCESORIOS PARA DESAGUE PLUVIAL 341.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04 APARATOS Y ACCESORIOS SANITARIOS 14,475.26
03.04.01 INODORO DE LOSA TANQUE BAJO 5,908.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.02 LAVATORIO DE LOSA CON PEDESTAL 4,385.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.03 PAPELERA DE LOSA 1,190.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.04 SUMIDERO DE BRONCE ROSCADO DE 2" 985.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.05 REGISTRO ROSCADO DE BRONCE DE 4" 1,381.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.06 CAJA DE REGISTRO PARA DESAGUE DE 624.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04 INSTALACIONES ELECTRICAS 110,524.39
04.01 PRIMER PISO 64,859.19
04.01.01 SALIDAS 13,513.89
04.01.01.01 SALIDAD DE TECHO PARA CENTRO DE LUZ 6,566.30 0.00 0.00 0.00 0.00 0.00 0.00 1,094.38 1,915.1
04.01.01.02 SALIDA DE TOMACORRIENTE BIPOLARES CON LINEA A TIERRA 4,391.95 0.00 0.00 0.00 0.00 0.00 0.00 548.99 1,921.4
04.01.01.03 SALIDA DE TOMACORRIENTE PARA ALUMBRADO DE EMERGENCIA 363.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.01.04 SALIDA PARA INTERRUPTORES EN CONMUTACION 1,057.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.01.05 SALIDA PARA INTERRUPTORES SIMPLES 298.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 298.5
04.01.01.06 SALIDA PARA INTERRUPTORES DOBLES 248.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.4
04.01.01.07 SALIDA PARA INTERRUPTORES TRIPLES 587.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 419.5
04.01.02 CANALIZACION DE TUBERIAS PVC 20,053.08
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

TIVO DE NIVEL PRIMARIO I.E.E. N°30318 DEL CENTRO


MEJORAMIENTO
POBLADO MENOR
Y AMPLIACION
DE YANAMUCLO
DEL SERVICIO
E I.E.E.
EDUCATIVO
N°30319 DEL
DEANEXO
NIVEL PRIMARIO
DE MARAVILCA,
I.E.E. N°30318
DISTRITODEL
DECENTRO
MATAHUA
P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
04.01.02.01 TUBERIA DE 25 MM. PVC SEL (1") 4,054.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.02.02 TUBERIA DE 20 MM. PVC SEL (3/4") 15,998.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03 CONDUCTORES 8,301.84
04.01.03.01 CONDUCTOR (2x10+1x10) MM. THHW 358.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.02 CONDUCTOR (1x10) MM2. THHW 146.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.03 CONDUCTOR (2x6+1x10) MM2 THHW 975.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.04 CONDUCTOR (2x2.5) MM2. THHW 4,612.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.05 CONDUCTOR (2x4.0) MM2. THHW 2,209.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.04 TABLEROS ELECTRICOS 4,700.00
04.01.04.01 TABLERO GENERAL Y TABLEROS DE DISTRIBUCION 4,700.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.05 CONEXION A TIERRA 5,600.00
04.01.05.01 POZO A TIERRA 5,600.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06 ARTEFACTOS Y ACCESORIOS ELECTRICOS 11,490.39
04.01.06.01 FLUORESCENTE RECTO INCLUYE EQUIPO Y PANTALLA 7,678.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.02 SPOT LIGHT 656.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.03 LUCES DE EMERGENCIA CON BATERIA - 02 FAROS 637.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.04 TOMACORRIENTE BIPOLAR 1,779.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.05 TOMACORRIENTE SIMPLE 125.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.06 INTERRUPTOR CONMUTACION 210.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.07 INTERRUPTOR SIMPLE 107.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.08 INTERRUPTOR DOBLE 94.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.09 INTERRUPTOR TRIPLE 201.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.07 OTROS 1,199.99
04.01.07.02 DISPOSITIVOS Y EQUIPOS DE SEGURIDAD 1,199.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02 SEGUNDO PISO 45,665.20
04.02.01 SALIDAS 13,605.84
04.02.01.01 SALIDAD DE TECHO PARA CENTRO DE LUZ 6,212.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.02 SALIDA DE TOMACORRIENTE BIPOLARES CON LINEA A TIERRA 5,218.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.03 SALIDA DE TOMACORRIENTE PARA ALUMBRADO DE EMERGENCIA 303.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.04 SALIDA PARA INTERRUPTORES EN CONMUTACION 704.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

TIVO DE NIVEL PRIMARIO I.E.E. N°30318 DEL CENTRO


MEJORAMIENTO
POBLADO MENOR
Y AMPLIACION
DE YANAMUCLO
DEL SERVICIO
E I.E.E.
EDUCATIVO
N°30319 DEL
DEANEXO
NIVEL PRIMARIO
DE MARAVILCA,
I.E.E. N°30318
DISTRITODEL
DECENTRO
MATAHUA
P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
04.02.01.05 SALIDA PARA INTERRUPTORES SIMPLES 298.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.06 SALIDA PARA INTERRUPTORES DOBLES 398.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.07 SALIDA PARA INTERRUPTORES TRIPLES 469.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.02 CANALIZACION DE TUBERIAS PVC 13,965.19
04.02.02.01 TUBERIA DE 20 MM. PVC SEL (3/4") 13,965.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.03 CONDUCTORES 6,384.59
04.02.03.01 CONDUCTOR (2x2.5) MM2. THHW 3,370.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.03.02 CONDUCTOR (2x4.0) MM2. THHW 3,014.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04 ARTEFACTOS Y ACCESORIOS ELECTRICOS 11,709.58
04.02.04.01 FLUORESCENTE RECTO INCLUYE EQUIPO Y PANTALLA 8,432.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.02 LUCES DE EMERGENCIA CON BATERIA - 02 FAROS 637.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.03 TOMACORRIENTE BIPOLAR 1,779.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.04 TOMACORRIENTE SIMPLE 104.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.05 INTERRUPTOR CONMUTACION 336.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.06 INTERRUPTOR SIMPLE 107.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.07 INTERRUPTOR DOBLE 150.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.08 INTERRUPTOR TRIPLE 161.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0

COSTO DIRECTO 1,990,094.42 58,567.27 11,285.64 13,235.59 13,954.08 22,199.07 56,029.55 88,256.67 107,755.4
GASTOS GENERALES 10.00% 199,009.44 5,856.73 1,128.56 1,323.56 1,395.41 2,219.91 5,602.96 8,825.67 10,775.5
UTILIDAD 10.00% 199,009.44 5,856.73 1,128.56 1,323.56 1,395.41 2,219.91 5,602.96 8,825.67 10,775.5
SUB TOTAL 2,388,113.30 70,280.73 13,542.76 15,882.71 16,744.90 26,638.89 67,235.47 105,908.01 129,306.4
IGV 18.00% 429,860.39 12,650.53 2,437.70 2,858.89 3,014.08 4,795.00 12,102.38 19,063.44 23,275.1
PRESUPUESTO PARCIAL 2,817,973.69 82,931.26 15,980.46 18,741.60 19,758.98 31,433.89 79,337.85 124,971.45 152,581.6
PORCENTAJE DE AVANCE 2.94% 0.57% 0.67% 0.70% 1.12% 2.82% 4.43% 5.41%
PORCENTAJE DE AVANCE ACUMULADO 100.00% 4.88% 13.78%
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

NIVEL PRIMARIO I.E.E. N°30318 DEL CENTRO POBLADO


MEJORAMIENTO
MENOR DEY YANAMUCLO
AMPLIACION E
DEL
I.E.E.
SERVICIO
N°30319EDUCATIVO
DEL ANEXODE
DENIVEL
MARAVILCA,
PRIMARIO
DISTRITO
I.E.E. N°30318
DE MATAHUASI
DEL CENTRO
- CONP

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
BLOQUE AB - YANAMUCLO 1,990,094.42
01 ESTRUCTURAS 1,077,684.21 MES 01 MES 02
01.01 OBRAS PROVISIONALES 44,569.85
01.01.01 CONSTRUCCION PROVISIONAL DE OFICINA 384.00 384.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.02 CONSTRUCCION PROVISIONAL DE CASETA PARA GUARDIANIA 144.00 144.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.03 CONSTRUCCION PROVISIONAL DE VESTIDOR PARA PERSONAL 480.00 480.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.04 GUARDIANIA DE OBRA 37,785.60 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.4
01.01.05 ALQUILER DE ALMACEN 1,440.00 56.00 56.00 56.00 56.00 56.00 56.00 56.00 56.0
01.01.06 CARTEL DE IDENTIFICACION DE OBRA (3.60x2.40) 856.25 0.00 856.25 0.00 0.00 0.00 0.00 0.00 0.0
01.01.07 AGUA PARA CONSUMO EN LA CONSTRUCCION 1,080.00 42.00 42.00 42.00 42.00 42.00 42.00 42.00 42.0
01.01.08 DESAGUE PARA LA CONSTRUCCION 750.00 0.00 750.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.09 ENERGIA ELECTRICA PROVISIONAL PARA LA CONSTRUCCION 1,650.00 64.17 64.17 64.17 64.17 64.17 64.17 64.17 64.1
01.02 TRABAJOS PRELIMINARES 66,669.81
01.02.01 DEMOLICION DE CONSTRUCCION EXISTENTE 46,142.30 46,142.30 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.02.02 ELIMINACION DE CONSTRUCCION DEMOLIDA DP=2 KM. 8,433.24 6,324.93 2,108.31 0.00 0.00 0.00 0.00 0.00 0.0
01.02.03 LIMPIEZA DEL TERRENO MANUAL 3,218.46 0.00 3,218.46 0.00 0.00 0.00 0.00 0.00 0.0
01.02.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS 2,500.00 2,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.02.05 TRAZO, NIVELACION Y REPLANTEO PARA EDIFICACION 2,770.32 0.00 1,007.39 1,762.93 0.00 0.00 0.00 0.00 0.0
01.02.06 CONTROL TOPOGRAFICO DURANTE EJECUCION DE OBRA 3,605.49 841.28 841.28 841.28 841.28 240.37 0.00 0.00 0.0
01.03 MOVIMIENTO DE TIERRAS 32,782.10
01.03.01 EXCAVACION DE ZANJAS PARA ZAPATAS H=1.20 - 1.50 M. 9,038.33 0.00 753.19 5,272.36 3,012.78 0.00 0.00 0.00 0.0
01.03.02 EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS 2,632.52 0.00 0.00 548.44 767.82 767.82 548.44 0.00 0.0
01.03.03 EXCAVACION DE ZANJAS PARA JARDIN 31.43 0.00 0.00 31.43 0.00 0.00 0.00 0.00 0.0
01.03.04 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 4,776.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,776.2
01.03.05 REFINE, NIVELACION Y COMPACTACION DE PLATAFORMA 4,486.78 0.00 0.00 0.00 0.00 0.00 560.85 3,925.93 0.0
01.03.06 REFINE, NIVELACION Y COMPACTACION DE BASE PARA VEREDAS 6,019.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,019.8
01.03.07 RELLENO Y COMPACTACION DE PODIUM CON MATERIAL PROPIO 301.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 301.5
01.03.08 ACARREO INTERNO DE MATERIAL EXCEDENTE DP=20 M. 2,694.29 0.00 0.00 0.00 0.00 0.00 0.00 1,347.15 1,347.1
01.03.09 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 2,801.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.04 OBRAS DE CONCRETO SIMPLE 90,690.96
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

NIVEL PRIMARIO I.E.E. N°30318 DEL CENTRO POBLADO


MEJORAMIENTO
MENOR DEY YANAMUCLO
AMPLIACION E
DEL
I.E.E.
SERVICIO
N°30319EDUCATIVO
DEL ANEXODE
DENIVEL
MARAVILCA,
PRIMARIO
DISTRITO
I.E.E. N°30318
DE MATAHUASI
DEL CENTRO
- CONP

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.04.01 SOLADO PARA ZAPATAS E=0.10 M. 1:10 CEMENTO - HORMIGON 5,467.93 0.00 0.00 0.00 911.32 3,189.63 1,366.98 0.00 0.0
01.04.02 CONCRETO 1:10+30% P.G. PARA CIMIENTOS CORRIDOS 21,485.78 0.00 0.00 0.00 0.00 8,057.17 9,400.03 4,028.58 0.0
01.04.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO 6,829.64 0.00 0.00 0.00 0.00 0.00 2,276.55 3,983.96 569.1
01.04.04 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS 3,042.44 0.00 0.00 0.00 0.00 0.00 0.00 1,521.22 1,521.2
01.04.05 FALSO PISO DE CONCRETO E=0.10 M. CEMENTO - HORMIGON 16,168.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9,701.1
01.04.06 ENCOFRADO Y DESENCOFRADO NORMAL PARA VEREDAS 4,000.12 0.00 0.00 0.00 0.00 2,000.06 2,000.06 0.00 0.0
01.04.07 CONCRETO F'C=140 KG/CM2 PARA VEREDAS INCLUYE ACABADOS 19,168.71 0.00 0.00 0.00 0.00 0.00 5,750.61 13,418.10 0.0
01.04.08 ENCOFRADO Y DESENCOFRADO NORMAL PARA CUNETAS 3,648.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,648.2
01.04.09 CONCRETO F'C=140 KG/CM2 PARA CUNETAS INCLUYE ACABADOS 4,971.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,142.8
01.04.10 ENCOFRADO Y DESENCOFRADO NORMAL PARA JARDIN 3,281.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,460.7
01.04.11 CONCRETO F'C=140 KG/CM2 PARA JARDIN 2,627.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 656.7
01.05 OBRAS DE CONCRETO ARMADO 772,773.58
01.05.01 ZAPATAS 49,980.45
01.05.01.01 ACERO F'Y= 4200 KG/CM2 PARA ZAPATAS 11,429.97 0.00 0.00 0.00 0.00 0.00 10,001.22 1,428.75 0.0
01.05.01.02 CONCRETO F'C=210 KG/CM2 PARA ZAPATAS 38,550.48 0.00 0.00 0.00 0.00 0.00 0.00 23,130.29 15,420.1
01.05.02 COLUMNAS 113,702.39
01.05.02.01 ACERO F'Y= 4200 KG/CM2 PARA COLUMNAS 43,524.40 0.00 0.00 0.00 0.00 0.00 4,974.22 8,704.88 8,704.8
01.05.02.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS 47,502.09 0.00 0.00 0.00 0.00 0.00 0.00 3,064.65 10,726.2
01.05.02.03 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS 22,675.90 0.00 0.00 0.00 0.00 0.00 0.00 2,451.45 4,290.0
01.05.03 COLUMNETAS 43,559.15
01.05.03.01 ACERO F'Y= 4200 KG/CM2 PARA COLUMNETAS 13,992.87 0.00 0.00 0.00 0.00 0.00 0.00 1,023.87 2,389.0
01.05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNETAS 20,137.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,179.6
01.05.03.03 CONCRETO F'C=175 KG/CM2 PARA COLUMNETAS 9,428.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 764.4
01.05.04 VIGAS 210,855.32
01.05.04.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA VIGAS 79,074.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.04.02 ACERO F'Y= 4200 KG/CM2 PARA VIGAS 84,562.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.04.03 CONCRETO F'C=210 KG/CM2 PARA VIGAS 47,218.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05 LOSA ALIGERADA 288,844.61
01.05.05.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA ALIGERADA 134,294.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.02 BLOQUETA DE ARCILLA H=0.15 M. PARA LOSA ALIGERADA 21,223.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.03 BLOQUETA DE ARCILLA H=0.12 M. PARA LOSA ALIGERADA 21,181.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

NIVEL PRIMARIO I.E.E. N°30318 DEL CENTRO POBLADO


MEJORAMIENTO
MENOR DEY YANAMUCLO
AMPLIACION E
DEL
I.E.E.
SERVICIO
N°30319EDUCATIVO
DEL ANEXODE
DENIVEL
MARAVILCA,
PRIMARIO
DISTRITO
I.E.E. N°30318
DE MATAHUASI
DEL CENTRO
- CONP

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.05.05.04 ACERO F'Y= 4200 KG/CM2 PARA LOSA ALIGERADA 57,235.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.05 CONCRETO F'C=210 KG/CM2 PARA LOSA ALIGERADA 54,910.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06 ESCALERAS 65,831.66
01.05.06.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESCALERAS 18,440.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06.02 ACERO F'Y= 4200 KG/CM2 PARA ESCALERAS 9,971.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06.03 CONCRETO F'C=210 KG/CM2 PARA ESCALERAS 37,419.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.06 TANQUE CISTERNA 64,777.91
01.06.01 EXCAVACION DE ZANJAS PARA CIMENTACION 2,738.86 0.00 0.00 2,738.86 0.00 0.00 0.00 0.00 0.0
01.06.02 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 889.89 0.00 0.00 0.00 0.00 0.00 889.89 0.00 0.0
01.06.03 SOLADO PARA ZAPATAS E=0.10 M. 1:10 CEMENTO - HORMIGON 289.53 0.00 0.00 289.53 0.00 0.00 0.00 0.00 0.0
01.06.04 ACERO F'Y= 4200 KG/CM2 PARA ZAPATAS 581.27 0.00 0.00 0.00 581.27 0.00 0.00 0.00 0.0
01.06.05 CONCRETO F'C=210 KG/CM2 PARA ZAPATAS 2,041.31 0.00 0.00 0.00 2,041.31 0.00 0.00 0.00 0.0
01.06.06 ACERO F'Y= 4200 KG/CM2 PARA COLUMNAS 4,301.61 0.00 0.00 0.00 3,584.68 716.93 0.00 0.00 0.0
01.06.07 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS 3,278.17 0.00 0.00 0.00 0.00 1,966.90 1,311.27 0.00 0.0
01.06.08 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS 1,901.00 0.00 0.00 0.00 0.00 475.25 1,425.75 0.00 0.0
01.06.09 ENCOFRADO Y DESENCOFRADO NORMAL PARA VIGAS 2,007.72 0.00 0.00 0.00 0.00 0.00 1,003.86 1,003.86 0.0
01.06.10 ACERO F'Y= 4200 KG/CM2 PARA VIGAS 3,065.73 0.00 0.00 0.00 0.00 0.00 0.00 3,065.73 0.0
01.06.11 CONCRETO F'C=210 KG/CM2 PARA VIGAS 1,380.31 0.00 0.00 0.00 0.00 0.00 0.00 1,380.31 0.0
01.06.12 ACERO F'Y= 4200 KG/CM2 PARA CISTERNA 5,076.96 0.00 0.00 0.00 0.00 0.00 5,076.96 0.00 0.0
01.06.13 ENCOFRADO Y DESENCOFRADO NORMAL PARA CISTERNA 3,718.82 0.00 0.00 0.00 0.00 1,859.41 1,859.41 0.00 0.0
01.06.14 CONCRETO F'C=210 KG/CM2 PARA CISTERNA 4,092.64 0.00 0.00 0.00 0.00 0.00 4,092.64 0.00 0.0
01.06.15 ACERO F'Y= 4200 KG/CM2 PARA TANQUE ELEVADO 4,880.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,880.2
01.06.16 ENCOFRADO Y DESENCOFRADO NORMAL PARA TANQUE ELEVADO 4,492.10 0.00 0.00 0.00 0.00 0.00 0.00 4,492.10 0.0
01.06.17 CONCRETO F'C=210 KG/CM2 PARA TANQUE ELEVADO 2,618.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,618.4
01.06.18 ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA ALIGERADA 453.94 0.00 0.00 0.00 0.00 0.00 453.94 0.00 0.0
01.06.19 BLOQUETA DE ARCILLA H=0.15 M. PARA LOSA ALIGERADA 182.52 0.00 0.00 0.00 0.00 0.00 182.52 0.00 0.0
01.06.20 ACERO F'Y= 4200 KG/CM2 PARA LOSA ALIGERADA 321.44 0.00 0.00 0.00 0.00 0.00 321.44 0.00 0.0
01.06.21 CONCRETO F'C=210 KG/CM2 PARA LOSA ALIGERADA 224.55 0.00 0.00 0.00 0.00 0.00 0.00 224.55 0.0
01.06.22 MURO DE SOGA CON LADRILLO K.K. 18H 9X13X24 CM. 2,287.88 0.00 0.00 0.00 0.00 0.00 0.00 2,287.88 0.0
01.06.23 TARRAJEO EN MUROS INTERIORES FROTACHADO MEZCLA 1:5 851.76 0.00 0.00 0.00 0.00 0.00 0.00 851.76 0.0
01.06.24 TARRAJEO INTERIOR CON IMPERMEABILIZANTE DE TANQUE CISTERNA 1,402.11 0.00 0.00 0.00 0.00 0.00 0.00 701.06 701.0
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

NIVEL PRIMARIO I.E.E. N°30318 DEL CENTRO POBLADO


MEJORAMIENTO
MENOR DEY YANAMUCLO
AMPLIACION E
DEL
I.E.E.
SERVICIO
N°30319EDUCATIVO
DEL ANEXODE
DENIVEL
MARAVILCA,
PRIMARIO
DISTRITO
I.E.E. N°30318
DE MATAHUASI
DEL CENTRO
- CONP

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.06.25 TARRAJEO INTERIOR CON IMPERMEABILIZANTE DE TANQUE ELEVADO 886.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 886.6
01.06.26 TARRAJEO EXTERIOR FROTACHADO DE ESTRUCTURA MEZCLA 1:5 4,004.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,004.0
01.06.27 PINTURA LATEX EN ESTRUCTURA DOS MANOS 1,975.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.06.28 INSTALACION DE ACCESORIOS DE TANQUE CISTERNA 2,112.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,112.3
01.06.29 INSTALACION DE PUERTA DE MADERA P-1 320.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 320.0
01.06.30 INSTALACION DE ESCALERA METALICA SEGUN DISEÑO 2,400.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,400.0
01.07 PRUEBAS Y ENSAYOS DE CALIDAD 3,820.00
01.07.01 PROCTOR MODIFICADO 160.00 0.00 0.00 0.00 0.00 160.00 0.00 0.00 0.0
01.07.02 DENSIDAD DE CAMPO 480.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.7
01.07.03 DISEÑO DE MEZCLA 540.00 0.00 0.00 0.00 462.86 77.14 0.00 0.00 0.0
01.07.04 ROTURA DE PROBETA (COMPRESION SIMPLE) 2,640.00 0.00 0.00 0.00 0.00 0.00 65.19 228.15 228.1
01.08 FLETE 1,600.00
01.08.01 FLETE TERRESTRE 1,600.00 119.15 119.15 119.15 119.15 119.15 119.15 119.15 119.1
02 ARQUITECTURA 743,584.58
02.01 MUROS Y TABIQUES 140,636.03
02.01.01 MURO DE SOGA CON LADRILLO K.K. 18H 9X13X24 CM. 140,051.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
MURO DE CABEZA CON LADRILLO K.K. 18H 9X13X24 CM. 584.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02 REVOQUES, ENLUCIDOS Y MOLDURAS 217,896.67
02.02.01 TARRAJEO EN CIELO RASO FROTACHADO MEZCLA 1:4 62,875.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.02 TARRAJEO EN MUROS INTERIORES FROTACHADO MEZCLA 1:5 63,390.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.03 TARRAJEO EN MUROS EXTERIORES FROTACHADO MEZCLA 1:5 35,522.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.04 TARRAJEO EN VIGAS MEZCLA 1:4 27,465.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.05 TARRAJEO EN COLUMNAS MEZCLA 1:5 19,492.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.06 VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS MEZCLA 1:5 9,002.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.07 TARRAJEO DE PODIUM MEZCLA 1:5 147.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03 PISOS Y PAVIMENTOS 111,696.25
02.03.01 PISO DE PORCELANATO ALTO TRANSITO ANTIDESLIZANTE PARA AMBIENTES 65,681.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03.02 PISO DE PORCELANATO ALTO TRANSITO ANTIDESLIZANTE PARA VEREDAS 41,788.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03.03 PISO DE CERAMICO ANTIDESLIZANTE DE ALTO TRANSITO 4,226.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04 ZOCALOS Y CONTRAZOCALOS 28,505.27
02.04.01 CONTRAZOCALO DE PORCELANATO H=0.10 M. PARA AMBIENTES 11,652.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

NIVEL PRIMARIO I.E.E. N°30318 DEL CENTRO POBLADO


MEJORAMIENTO
MENOR DEY YANAMUCLO
AMPLIACION E
DEL
I.E.E.
SERVICIO
N°30319EDUCATIVO
DEL ANEXODE
DENIVEL
MARAVILCA,
PRIMARIO
DISTRITO
I.E.E. N°30318
DE MATAHUASI
DEL CENTRO
- CONP

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
02.04.02 CONTRAZOCALO DE PORCELANATO H=0.10 M. PARA VEREDAS 11,342.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04.03 CONTRAZOCALO DE CERAMICO H=0.10 M. 5,139.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04.04 ZOCALO DE CERAMICO 370.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.05 CUBIERTAS 46,545.41
02.05.01 CUBIERTA DE TEJA ANDINA TIPO ETERNIT 46,545.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06 CARPINTERIA DE MADERA 17,229.50
02.06.01 PUERTA APANELADA DE CEDRO TIPO P-01 INC. INSTALACION 7,810.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06.02 PUERTA APANELADA DE CEDRO TIPO P-02 INC. INSTALACION 5,583.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06.03 PUERTA APANELADA DE CEDRO TIPO P-03 INC. INSTALACION 3,836.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07 CARPINTERIA METALICA 24,910.00
02.07.01 PORTON METALICO PM-01 INC. PINTADO E INSTALACION 860.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.02 VENTANA METALICA V-01 INC. PINTADO E INSTALACION 1,120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.03 VENTANA METALICA V-02 INC. PINTADO E INSTALACION 4,830.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.04 VENTANA METALICA V-03 INC. PINTADO E INSTALACION 2,200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.05 VENTANA METALICA V-04 INC. PINTADO E INSTALACION 1,120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.06 VENTANA METALICA V-05 INC. PINTADO E INSTALACION 4,830.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.07 VENTANA METALICA V-06 INC. PINTADO E INSTALACION 3,520.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.08 VENTANA METALICA V-07 INC. PINTADO E INSTALACION 1,140.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.09 VENTANA METALICA V-08 INC. PINTADO E INSTALACION 5,290.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.08 CARPINTERIA EN MELAMINA 5,580.00
02.08.01 SEPARADOR DE BAÑOS TIPO 01 5,580.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.09 CERRAJERIA 7,251.54
02.09.01 CERRADURA PARA PUERTA DE TRES GOLPES 4,796.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.09.02 CERRADURA PARA PUERTA TIPO PERILLA 2,454.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.10 VIDRIOS, CRISTALES Y SIMILARES 41,997.06
02.10.01 VIDRIO LAMINAR BUTIRAL DE POLIVINILO INCOLORO 41,997.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11 PINTURAS 90,207.74
02.11.01 PINTURA LATEX EN CIELO RASO DOS MANOS 22,833.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.02 PINTURA LATEX EN MUROS EXTERIORES DOS MANOS 17,654.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.03 PINTURA LATEX EN MUROS INTERIORES DOS MANOS 30,153.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.04 PINTURA LATEX EN VIGAS DOS MANOS 10,154.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

NIVEL PRIMARIO I.E.E. N°30318 DEL CENTRO POBLADO


MEJORAMIENTO
MENOR DEY YANAMUCLO
AMPLIACION E
DEL
I.E.E.
SERVICIO
N°30319EDUCATIVO
DEL ANEXODE
DENIVEL
MARAVILCA,
PRIMARIO
DISTRITO
I.E.E. N°30318
DE MATAHUASI
DEL CENTRO
- CONP

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
02.11.05 PINTURA LATEX EN COLUMNAS DOS MANOS 7,342.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.06 PINTURA LATEX PARA DERRAMES EN PUERTAS Y VENTANAS DOS MANOS 1,560.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.07 PINTURA PARA PIZARRA 510.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12 JUNTAS 11,129.11
02.12.01 JUNTAS ASFALTICAS EN VEREDAS 2,066.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12.02 JUNTAS ASFALTICAS PARA SARDINEL DE JARDIN 91.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12.03 JUNTAS ASFALTICAS PARA COLUMNETAS 8,971.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03 INSTALACIONES SANITARIAS 58,301.24
03.01 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO 8,682.61
03.01.01 MOVIMIENTO DE TIERRAS 1,649.41
03.01.01.01 EXCAVACION DE ZANJAS PARA TUBERIA DE AGUA 937.63 0.00 0.00 0.00 0.00 937.63 0.00 0.00 0.0
03.01.01.02 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 681.36 0.00 0.00 0.00 0.00 0.00 596.19 85.17 0.0
03.01.01.03 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 30.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.01.02 SALIDAS 2,360.13
03.01.02.01 SALIDA DE AGUA FRIA PVC SAP DE 1/2" 2,254.32 0.00 0.00 0.00 0.00 0.00 120.77 281.79 281.7
03.01.02.02 SALIDA DE AGUA PARA RIEGO PVC SAP DE 1/2" 56.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 56.6
03.01.02.03 SALIDA DE AGUA FRIA CONTRA INCENDIO PVC SAP DE 2" 49.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 49.1
03.01.03 RED DE DISTRIBUCION 4,673.07
03.01.03.01 TUBERIA PARA AGUA POTABLE PVC SAP DE 1/2" C-10 2,106.15 0.00 0.00 0.00 0.00 0.00 0.00 254.19 254.1
03.01.03.02 TUBERIA PARA RIEGO PVC SAP DE 1/2" C-10 72.72 0.00 0.00 0.00 0.00 0.00 0.00 72.72 0.0
03.01.03.03 TUBERIA CONTRA INCENDIO PVC SAP DE 2" C-10 80.28 0.00 0.00 0.00 0.00 0.00 0.00 80.28 0.0
03.01.03.04 VALVULA DE COMPUERTA DE 1/2" 1,834.94 0.00 0.00 0.00 0.00 0.00 0.00 65.53 229.3
03.01.03.05 VALVULA DE COMPUERTA DE 2" 127.03 0.00 0.00 0.00 0.00 0.00 0.00 2.23 15.6
03.01.03.06 GRIFO CONTRA INCENDIO 451.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02 SISTEMA DE DESAGUE 19,414.41
03.02.01 MOVIMIENTO DE TIERRAS 1,805.63
03.02.01.01 EXCAVACION DE ZANJAS PARA TUBERIA DE DESAGUE 1,045.58 0.00 0.00 0.00 0.00 0.00 0.00 1,045.58 0.0
03.02.01.02 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 703.40 0.00 0.00 0.00 0.00 0.00 0.00 351.70 351.7
03.02.01.03 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 56.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02.02 SALIDAS 5,996.34
03.02.02.01 SALIDA DE DESAGUE CON PVC SAL DE 2" 2,613.30 0.00 0.00 0.00 0.00 0.00 0.00 190.06 332.6
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

NIVEL PRIMARIO I.E.E. N°30318 DEL CENTRO POBLADO


MEJORAMIENTO
MENOR DEY YANAMUCLO
AMPLIACION E
DEL
I.E.E.
SERVICIO
N°30319EDUCATIVO
DEL ANEXODE
DENIVEL
MARAVILCA,
PRIMARIO
DISTRITO
I.E.E. N°30318
DE MATAHUASI
DEL CENTRO
- CONP

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
03.02.02.02 SALIDA DE DESAGUE CON PVC SAL DE 4" 1,461.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 91.3
03.02.02.03 SALIDA DE VENTILACION CON PVC SAL DE 2" 1,921.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02.03 RED DE DISTRIBUCION 11,612.44
03.02.03.01 TUBERIA PARA DESAGUE CON PVC SAL DE 2" 1,038.11 0.00 0.00 0.00 0.00 0.00 0.00 72.85 127.4
03.02.03.02 TUBERIA PARA DESAGUE CON PVC SAL DE 4" 5,387.78 0.00 0.00 0.00 0.00 0.00 0.00 96.21 673.4
03.02.03.03 TUBERIA PARA VENTILACION CON PVC SAL DE 2" 2,348.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 132.9
TUBERIA PARA CAJA DE REGISTRO CON PVC SAL DE 2" 2,837.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03 SISTEMA DE DESAGUE PLUVIAL 15,728.96
03.03.01 TUBERIA PVC SAL PLUVIAL DE 4" 4,216.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.02 TUBERIA PVC SAL PLUVIAL DE 3" 1,789.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA FALSA COLUMNA 5,450.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.04 CONCRETO F'C=175 KG/CM2 PARA FALSA COLUMNA 3,930.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.05 ACCESORIOS PARA DESAGUE PLUVIAL 341.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04 APARATOS Y ACCESORIOS SANITARIOS 14,475.26
03.04.01 INODORO DE LOSA TANQUE BAJO 5,908.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.02 LAVATORIO DE LOSA CON PEDESTAL 4,385.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.03 PAPELERA DE LOSA 1,190.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.04 SUMIDERO DE BRONCE ROSCADO DE 2" 985.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.05 REGISTRO ROSCADO DE BRONCE DE 4" 1,381.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.06 CAJA DE REGISTRO PARA DESAGUE DE 624.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04 INSTALACIONES ELECTRICAS 110,524.39
04.01 PRIMER PISO 64,859.19
04.01.01 SALIDAS 13,513.89
04.01.01.01 SALIDAD DE TECHO PARA CENTRO DE LUZ 6,566.30 0.00 0.00 0.00 0.00 0.00 0.00 1,094.38 1,915.1
04.01.01.02 SALIDA DE TOMACORRIENTE BIPOLARES CON LINEA A TIERRA 4,391.95 0.00 0.00 0.00 0.00 0.00 0.00 548.99 1,921.4
04.01.01.03 SALIDA DE TOMACORRIENTE PARA ALUMBRADO DE EMERGENCIA 363.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.01.04 SALIDA PARA INTERRUPTORES EN CONMUTACION 1,057.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.01.05 SALIDA PARA INTERRUPTORES SIMPLES 298.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 298.5
04.01.01.06 SALIDA PARA INTERRUPTORES DOBLES 248.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.4
04.01.01.07 SALIDA PARA INTERRUPTORES TRIPLES 587.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 419.5
04.01.02 CANALIZACION DE TUBERIAS PVC 20,053.08
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

NIVEL PRIMARIO I.E.E. N°30318 DEL CENTRO POBLADO


MEJORAMIENTO
MENOR DEY YANAMUCLO
AMPLIACION E
DEL
I.E.E.
SERVICIO
N°30319EDUCATIVO
DEL ANEXODE
DENIVEL
MARAVILCA,
PRIMARIO
DISTRITO
I.E.E. N°30318
DE MATAHUASI
DEL CENTRO
- CONP

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
04.01.02.01 TUBERIA DE 25 MM. PVC SEL (1") 4,054.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.02.02 TUBERIA DE 20 MM. PVC SEL (3/4") 15,998.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03 CONDUCTORES 8,301.84
04.01.03.01 CONDUCTOR (2x10+1x10) MM. THHW 358.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.02 CONDUCTOR (1x10) MM2. THHW 146.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.03 CONDUCTOR (2x6+1x10) MM2 THHW 975.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.04 CONDUCTOR (2x2.5) MM2. THHW 4,612.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.05 CONDUCTOR (2x4.0) MM2. THHW 2,209.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.04 TABLEROS ELECTRICOS 4,700.00
04.01.04.01 TABLERO GENERAL Y TABLEROS DE DISTRIBUCION 4,700.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.05 CONEXION A TIERRA 5,600.00
04.01.05.01 POZO A TIERRA 5,600.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06 ARTEFACTOS Y ACCESORIOS ELECTRICOS 11,490.39
04.01.06.01 FLUORESCENTE RECTO INCLUYE EQUIPO Y PANTALLA 7,678.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.02 SPOT LIGHT 656.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.03 LUCES DE EMERGENCIA CON BATERIA - 02 FAROS 637.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.04 TOMACORRIENTE BIPOLAR 1,779.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.05 TOMACORRIENTE SIMPLE 125.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.06 INTERRUPTOR CONMUTACION 210.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.07 INTERRUPTOR SIMPLE 107.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.08 INTERRUPTOR DOBLE 94.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.09 INTERRUPTOR TRIPLE 201.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.07 OTROS 1,199.99
04.01.07.02 DISPOSITIVOS Y EQUIPOS DE SEGURIDAD 1,199.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02 SEGUNDO PISO 45,665.20
04.02.01 SALIDAS 13,605.84
04.02.01.01 SALIDAD DE TECHO PARA CENTRO DE LUZ 6,212.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.02 SALIDA DE TOMACORRIENTE BIPOLARES CON LINEA A TIERRA 5,218.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.03 SALIDA DE TOMACORRIENTE PARA ALUMBRADO DE EMERGENCIA 303.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.04 SALIDA PARA INTERRUPTORES EN CONMUTACION 704.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

NIVEL PRIMARIO I.E.E. N°30318 DEL CENTRO POBLADO


MEJORAMIENTO
MENOR DEY YANAMUCLO
AMPLIACION E
DEL
I.E.E.
SERVICIO
N°30319EDUCATIVO
DEL ANEXODE
DENIVEL
MARAVILCA,
PRIMARIO
DISTRITO
I.E.E. N°30318
DE MATAHUASI
DEL CENTRO
- CONP

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
04.02.01.05 SALIDA PARA INTERRUPTORES SIMPLES 298.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.06 SALIDA PARA INTERRUPTORES DOBLES 398.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.07 SALIDA PARA INTERRUPTORES TRIPLES 469.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.02 CANALIZACION DE TUBERIAS PVC 13,965.19
04.02.02.01 TUBERIA DE 20 MM. PVC SEL (3/4") 13,965.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.03 CONDUCTORES 6,384.59
04.02.03.01 CONDUCTOR (2x2.5) MM2. THHW 3,370.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.03.02 CONDUCTOR (2x4.0) MM2. THHW 3,014.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04 ARTEFACTOS Y ACCESORIOS ELECTRICOS 11,709.58
04.02.04.01 FLUORESCENTE RECTO INCLUYE EQUIPO Y PANTALLA 8,432.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.02 LUCES DE EMERGENCIA CON BATERIA - 02 FAROS 637.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.03 TOMACORRIENTE BIPOLAR 1,779.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.04 TOMACORRIENTE SIMPLE 104.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.05 INTERRUPTOR CONMUTACION 336.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.06 INTERRUPTOR SIMPLE 107.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.07 INTERRUPTOR DOBLE 150.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.08 INTERRUPTOR TRIPLE 161.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0

COSTO DIRECTO 1,990,094.42 58,567.27 11,285.64 13,235.59 13,954.08 22,199.07 56,029.55 88,256.67 107,755.4
GASTOS GENERALES 10.00% 199,009.44 5,856.73 1,128.56 1,323.56 1,395.41 2,219.91 5,602.96 8,825.67 10,775.5
UTILIDAD 10.00% 199,009.44 5,856.73 1,128.56 1,323.56 1,395.41 2,219.91 5,602.96 8,825.67 10,775.5
SUB TOTAL 2,388,113.30 70,280.73 13,542.76 15,882.71 16,744.90 26,638.89 67,235.47 105,908.01 129,306.4
IGV 18.00% 429,860.39 12,650.53 2,437.70 2,858.89 3,014.08 4,795.00 12,102.38 19,063.44 23,275.1
PRESUPUESTO PARCIAL 2,817,973.69 82,931.26 15,980.46 18,741.60 19,758.98 31,433.89 79,337.85 124,971.45 152,581.6
PORCENTAJE DE AVANCE 2.94% 0.57% 0.67% 0.70% 1.12% 2.82% 4.43% 5.41%
PORCENTAJE DE AVANCE ACUMULADO 100.00% 4.88% 13.78%
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

MARIO I.E.E. N°30318 DEL CENTRO POBLADO MENOR


MEJORAMIENTO
DE YANAMUCLO
Y AMPLIACION
E I.E.E. N°30319
DEL SERVICIO
DEL ANEXO
EDUCATIVO
DE MARAVILCA,
DE NIVEL
DISTRITO
PRIMARIO
DEI.E.E.
MATAHUASI
N°30318-DEL
CONCEPCION
CENTRO P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
BLOQUE AB - YANAMUCLO 1,990,094.42
01 ESTRUCTURAS 1,077,684.21 MES 01 MES 02 MES 05
01.01 OBRAS PROVISIONALES 44,569.85
01.01.01 CONSTRUCCION PROVISIONAL DE OFICINA 384.00 384.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.02 CONSTRUCCION PROVISIONAL DE CASETA PARA GUARDIANIA 144.00 144.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.03 CONSTRUCCION PROVISIONAL DE VESTIDOR PARA PERSONAL 480.00 480.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.04 GUARDIANIA DE OBRA 37,785.60 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.4
01.01.05 ALQUILER DE ALMACEN 1,440.00 56.00 56.00 56.00 56.00 56.00 56.00 56.00 56.0
01.01.06 CARTEL DE IDENTIFICACION DE OBRA (3.60x2.40) 856.25 0.00 856.25 0.00 0.00 0.00 0.00 0.00 0.0
01.01.07 AGUA PARA CONSUMO EN LA CONSTRUCCION 1,080.00 42.00 42.00 42.00 42.00 42.00 42.00 42.00 42.0
01.01.08 DESAGUE PARA LA CONSTRUCCION 750.00 0.00 750.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.09 ENERGIA ELECTRICA PROVISIONAL PARA LA CONSTRUCCION 1,650.00 64.17 64.17 64.17 64.17 64.17 64.17 64.17 64.1
01.02 TRABAJOS PRELIMINARES 66,669.81
01.02.01 DEMOLICION DE CONSTRUCCION EXISTENTE 46,142.30 46,142.30 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.02.02 ELIMINACION DE CONSTRUCCION DEMOLIDA DP=2 KM. 8,433.24 6,324.93 2,108.31 0.00 0.00 0.00 0.00 0.00 0.0
01.02.03 LIMPIEZA DEL TERRENO MANUAL 3,218.46 0.00 3,218.46 0.00 0.00 0.00 0.00 0.00 0.0
01.02.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS 2,500.00 2,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.02.05 TRAZO, NIVELACION Y REPLANTEO PARA EDIFICACION 2,770.32 0.00 1,007.39 1,762.93 0.00 0.00 0.00 0.00 0.0
01.02.06 CONTROL TOPOGRAFICO DURANTE EJECUCION DE OBRA 3,605.49 841.28 841.28 841.28 841.28 240.37 0.00 0.00 0.0
01.03 MOVIMIENTO DE TIERRAS 32,782.10
01.03.01 EXCAVACION DE ZANJAS PARA ZAPATAS H=1.20 - 1.50 M. 9,038.33 0.00 753.19 5,272.36 3,012.78 0.00 0.00 0.00 0.0
01.03.02 EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS 2,632.52 0.00 0.00 548.44 767.82 767.82 548.44 0.00 0.0
01.03.03 EXCAVACION DE ZANJAS PARA JARDIN 31.43 0.00 0.00 31.43 0.00 0.00 0.00 0.00 0.0
01.03.04 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 4,776.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,776.2
01.03.05 REFINE, NIVELACION Y COMPACTACION DE PLATAFORMA 4,486.78 0.00 0.00 0.00 0.00 0.00 560.85 3,925.93 0.0
01.03.06 REFINE, NIVELACION Y COMPACTACION DE BASE PARA VEREDAS 6,019.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,019.8
01.03.07 RELLENO Y COMPACTACION DE PODIUM CON MATERIAL PROPIO 301.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 301.5
01.03.08 ACARREO INTERNO DE MATERIAL EXCEDENTE DP=20 M. 2,694.29 0.00 0.00 0.00 0.00 0.00 0.00 1,347.15 1,347.1
01.03.09 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 2,801.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.04 OBRAS DE CONCRETO SIMPLE 90,690.96
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

MARIO I.E.E. N°30318 DEL CENTRO POBLADO MENOR


MEJORAMIENTO
DE YANAMUCLO
Y AMPLIACION
E I.E.E. N°30319
DEL SERVICIO
DEL ANEXO
EDUCATIVO
DE MARAVILCA,
DE NIVEL
DISTRITO
PRIMARIO
DEI.E.E.
MATAHUASI
N°30318-DEL
CONCEPCION
CENTRO P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.04.01 SOLADO PARA ZAPATAS E=0.10 M. 1:10 CEMENTO - HORMIGON 5,467.93 0.00 0.00 0.00 911.32 3,189.63 1,366.98 0.00 0.0
01.04.02 CONCRETO 1:10+30% P.G. PARA CIMIENTOS CORRIDOS 21,485.78 0.00 0.00 0.00 0.00 8,057.17 9,400.03 4,028.58 0.0
01.04.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO 6,829.64 0.00 0.00 0.00 0.00 0.00 2,276.55 3,983.96 569.1
01.04.04 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS 3,042.44 0.00 0.00 0.00 0.00 0.00 0.00 1,521.22 1,521.2
01.04.05 FALSO PISO DE CONCRETO E=0.10 M. CEMENTO - HORMIGON 16,168.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9,701.1
01.04.06 ENCOFRADO Y DESENCOFRADO NORMAL PARA VEREDAS 4,000.12 0.00 0.00 0.00 0.00 2,000.06 2,000.06 0.00 0.0
01.04.07 CONCRETO F'C=140 KG/CM2 PARA VEREDAS INCLUYE ACABADOS 19,168.71 0.00 0.00 0.00 0.00 0.00 5,750.61 13,418.10 0.0
01.04.08 ENCOFRADO Y DESENCOFRADO NORMAL PARA CUNETAS 3,648.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,648.2
01.04.09 CONCRETO F'C=140 KG/CM2 PARA CUNETAS INCLUYE ACABADOS 4,971.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,142.8
01.04.10 ENCOFRADO Y DESENCOFRADO NORMAL PARA JARDIN 3,281.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,460.7
01.04.11 CONCRETO F'C=140 KG/CM2 PARA JARDIN 2,627.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 656.7
01.05 OBRAS DE CONCRETO ARMADO 772,773.58
01.05.01 ZAPATAS 49,980.45
01.05.01.01 ACERO F'Y= 4200 KG/CM2 PARA ZAPATAS 11,429.97 0.00 0.00 0.00 0.00 0.00 10,001.22 1,428.75 0.0
01.05.01.02 CONCRETO F'C=210 KG/CM2 PARA ZAPATAS 38,550.48 0.00 0.00 0.00 0.00 0.00 0.00 23,130.29 15,420.1
01.05.02 COLUMNAS 113,702.39
01.05.02.01 ACERO F'Y= 4200 KG/CM2 PARA COLUMNAS 43,524.40 0.00 0.00 0.00 0.00 0.00 4,974.22 8,704.88 8,704.8
01.05.02.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS 47,502.09 0.00 0.00 0.00 0.00 0.00 0.00 3,064.65 10,726.2
01.05.02.03 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS 22,675.90 0.00 0.00 0.00 0.00 0.00 0.00 2,451.45 4,290.0
01.05.03 COLUMNETAS 43,559.15
01.05.03.01 ACERO F'Y= 4200 KG/CM2 PARA COLUMNETAS 13,992.87 0.00 0.00 0.00 0.00 0.00 0.00 1,023.87 2,389.0
01.05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNETAS 20,137.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,179.6
01.05.03.03 CONCRETO F'C=175 KG/CM2 PARA COLUMNETAS 9,428.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 764.4
01.05.04 VIGAS 210,855.32
01.05.04.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA VIGAS 79,074.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.04.02 ACERO F'Y= 4200 KG/CM2 PARA VIGAS 84,562.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.04.03 CONCRETO F'C=210 KG/CM2 PARA VIGAS 47,218.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05 LOSA ALIGERADA 288,844.61
01.05.05.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA ALIGERADA 134,294.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.02 BLOQUETA DE ARCILLA H=0.15 M. PARA LOSA ALIGERADA 21,223.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.03 BLOQUETA DE ARCILLA H=0.12 M. PARA LOSA ALIGERADA 21,181.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

MARIO I.E.E. N°30318 DEL CENTRO POBLADO MENOR


MEJORAMIENTO
DE YANAMUCLO
Y AMPLIACION
E I.E.E. N°30319
DEL SERVICIO
DEL ANEXO
EDUCATIVO
DE MARAVILCA,
DE NIVEL
DISTRITO
PRIMARIO
DEI.E.E.
MATAHUASI
N°30318-DEL
CONCEPCION
CENTRO P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.05.05.04 ACERO F'Y= 4200 KG/CM2 PARA LOSA ALIGERADA 57,235.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.05 CONCRETO F'C=210 KG/CM2 PARA LOSA ALIGERADA 54,910.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06 ESCALERAS 65,831.66
01.05.06.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESCALERAS 18,440.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06.02 ACERO F'Y= 4200 KG/CM2 PARA ESCALERAS 9,971.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06.03 CONCRETO F'C=210 KG/CM2 PARA ESCALERAS 37,419.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.06 TANQUE CISTERNA 64,777.91
01.06.01 EXCAVACION DE ZANJAS PARA CIMENTACION 2,738.86 0.00 0.00 2,738.86 0.00 0.00 0.00 0.00 0.0
01.06.02 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 889.89 0.00 0.00 0.00 0.00 0.00 889.89 0.00 0.0
01.06.03 SOLADO PARA ZAPATAS E=0.10 M. 1:10 CEMENTO - HORMIGON 289.53 0.00 0.00 289.53 0.00 0.00 0.00 0.00 0.0
01.06.04 ACERO F'Y= 4200 KG/CM2 PARA ZAPATAS 581.27 0.00 0.00 0.00 581.27 0.00 0.00 0.00 0.0
01.06.05 CONCRETO F'C=210 KG/CM2 PARA ZAPATAS 2,041.31 0.00 0.00 0.00 2,041.31 0.00 0.00 0.00 0.0
01.06.06 ACERO F'Y= 4200 KG/CM2 PARA COLUMNAS 4,301.61 0.00 0.00 0.00 3,584.68 716.93 0.00 0.00 0.0
01.06.07 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS 3,278.17 0.00 0.00 0.00 0.00 1,966.90 1,311.27 0.00 0.0
01.06.08 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS 1,901.00 0.00 0.00 0.00 0.00 475.25 1,425.75 0.00 0.0
01.06.09 ENCOFRADO Y DESENCOFRADO NORMAL PARA VIGAS 2,007.72 0.00 0.00 0.00 0.00 0.00 1,003.86 1,003.86 0.0
01.06.10 ACERO F'Y= 4200 KG/CM2 PARA VIGAS 3,065.73 0.00 0.00 0.00 0.00 0.00 0.00 3,065.73 0.0
01.06.11 CONCRETO F'C=210 KG/CM2 PARA VIGAS 1,380.31 0.00 0.00 0.00 0.00 0.00 0.00 1,380.31 0.0
01.06.12 ACERO F'Y= 4200 KG/CM2 PARA CISTERNA 5,076.96 0.00 0.00 0.00 0.00 0.00 5,076.96 0.00 0.0
01.06.13 ENCOFRADO Y DESENCOFRADO NORMAL PARA CISTERNA 3,718.82 0.00 0.00 0.00 0.00 1,859.41 1,859.41 0.00 0.0
01.06.14 CONCRETO F'C=210 KG/CM2 PARA CISTERNA 4,092.64 0.00 0.00 0.00 0.00 0.00 4,092.64 0.00 0.0
01.06.15 ACERO F'Y= 4200 KG/CM2 PARA TANQUE ELEVADO 4,880.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,880.2
01.06.16 ENCOFRADO Y DESENCOFRADO NORMAL PARA TANQUE ELEVADO 4,492.10 0.00 0.00 0.00 0.00 0.00 0.00 4,492.10 0.0
01.06.17 CONCRETO F'C=210 KG/CM2 PARA TANQUE ELEVADO 2,618.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,618.4
01.06.18 ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA ALIGERADA 453.94 0.00 0.00 0.00 0.00 0.00 453.94 0.00 0.0
01.06.19 BLOQUETA DE ARCILLA H=0.15 M. PARA LOSA ALIGERADA 182.52 0.00 0.00 0.00 0.00 0.00 182.52 0.00 0.0
01.06.20 ACERO F'Y= 4200 KG/CM2 PARA LOSA ALIGERADA 321.44 0.00 0.00 0.00 0.00 0.00 321.44 0.00 0.0
01.06.21 CONCRETO F'C=210 KG/CM2 PARA LOSA ALIGERADA 224.55 0.00 0.00 0.00 0.00 0.00 0.00 224.55 0.0
01.06.22 MURO DE SOGA CON LADRILLO K.K. 18H 9X13X24 CM. 2,287.88 0.00 0.00 0.00 0.00 0.00 0.00 2,287.88 0.0
01.06.23 TARRAJEO EN MUROS INTERIORES FROTACHADO MEZCLA 1:5 851.76 0.00 0.00 0.00 0.00 0.00 0.00 851.76 0.0
01.06.24 TARRAJEO INTERIOR CON IMPERMEABILIZANTE DE TANQUE CISTERNA 1,402.11 0.00 0.00 0.00 0.00 0.00 0.00 701.06 701.0
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

MARIO I.E.E. N°30318 DEL CENTRO POBLADO MENOR


MEJORAMIENTO
DE YANAMUCLO
Y AMPLIACION
E I.E.E. N°30319
DEL SERVICIO
DEL ANEXO
EDUCATIVO
DE MARAVILCA,
DE NIVEL
DISTRITO
PRIMARIO
DEI.E.E.
MATAHUASI
N°30318-DEL
CONCEPCION
CENTRO P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.06.25 TARRAJEO INTERIOR CON IMPERMEABILIZANTE DE TANQUE ELEVADO 886.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 886.6
01.06.26 TARRAJEO EXTERIOR FROTACHADO DE ESTRUCTURA MEZCLA 1:5 4,004.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,004.0
01.06.27 PINTURA LATEX EN ESTRUCTURA DOS MANOS 1,975.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.06.28 INSTALACION DE ACCESORIOS DE TANQUE CISTERNA 2,112.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,112.3
01.06.29 INSTALACION DE PUERTA DE MADERA P-1 320.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 320.0
01.06.30 INSTALACION DE ESCALERA METALICA SEGUN DISEÑO 2,400.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,400.0
01.07 PRUEBAS Y ENSAYOS DE CALIDAD 3,820.00
01.07.01 PROCTOR MODIFICADO 160.00 0.00 0.00 0.00 0.00 160.00 0.00 0.00 0.0
01.07.02 DENSIDAD DE CAMPO 480.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.7
01.07.03 DISEÑO DE MEZCLA 540.00 0.00 0.00 0.00 462.86 77.14 0.00 0.00 0.0
01.07.04 ROTURA DE PROBETA (COMPRESION SIMPLE) 2,640.00 0.00 0.00 0.00 0.00 0.00 65.19 228.15 228.1
01.08 FLETE 1,600.00
01.08.01 FLETE TERRESTRE 1,600.00 119.15 119.15 119.15 119.15 119.15 119.15 119.15 119.1
02 ARQUITECTURA 743,584.58
02.01 MUROS Y TABIQUES 140,636.03
02.01.01 MURO DE SOGA CON LADRILLO K.K. 18H 9X13X24 CM. 140,051.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
MURO DE CABEZA CON LADRILLO K.K. 18H 9X13X24 CM. 584.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02 REVOQUES, ENLUCIDOS Y MOLDURAS 217,896.67
02.02.01 TARRAJEO EN CIELO RASO FROTACHADO MEZCLA 1:4 62,875.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.02 TARRAJEO EN MUROS INTERIORES FROTACHADO MEZCLA 1:5 63,390.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.03 TARRAJEO EN MUROS EXTERIORES FROTACHADO MEZCLA 1:5 35,522.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.04 TARRAJEO EN VIGAS MEZCLA 1:4 27,465.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.05 TARRAJEO EN COLUMNAS MEZCLA 1:5 19,492.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.06 VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS MEZCLA 1:5 9,002.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.07 TARRAJEO DE PODIUM MEZCLA 1:5 147.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03 PISOS Y PAVIMENTOS 111,696.25
02.03.01 PISO DE PORCELANATO ALTO TRANSITO ANTIDESLIZANTE PARA AMBIENTES 65,681.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03.02 PISO DE PORCELANATO ALTO TRANSITO ANTIDESLIZANTE PARA VEREDAS 41,788.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03.03 PISO DE CERAMICO ANTIDESLIZANTE DE ALTO TRANSITO 4,226.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04 ZOCALOS Y CONTRAZOCALOS 28,505.27
02.04.01 CONTRAZOCALO DE PORCELANATO H=0.10 M. PARA AMBIENTES 11,652.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

MARIO I.E.E. N°30318 DEL CENTRO POBLADO MENOR


MEJORAMIENTO
DE YANAMUCLO
Y AMPLIACION
E I.E.E. N°30319
DEL SERVICIO
DEL ANEXO
EDUCATIVO
DE MARAVILCA,
DE NIVEL
DISTRITO
PRIMARIO
DEI.E.E.
MATAHUASI
N°30318-DEL
CONCEPCION
CENTRO P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
02.04.02 CONTRAZOCALO DE PORCELANATO H=0.10 M. PARA VEREDAS 11,342.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04.03 CONTRAZOCALO DE CERAMICO H=0.10 M. 5,139.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04.04 ZOCALO DE CERAMICO 370.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.05 CUBIERTAS 46,545.41
02.05.01 CUBIERTA DE TEJA ANDINA TIPO ETERNIT 46,545.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06 CARPINTERIA DE MADERA 17,229.50
02.06.01 PUERTA APANELADA DE CEDRO TIPO P-01 INC. INSTALACION 7,810.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06.02 PUERTA APANELADA DE CEDRO TIPO P-02 INC. INSTALACION 5,583.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06.03 PUERTA APANELADA DE CEDRO TIPO P-03 INC. INSTALACION 3,836.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07 CARPINTERIA METALICA 24,910.00
02.07.01 PORTON METALICO PM-01 INC. PINTADO E INSTALACION 860.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.02 VENTANA METALICA V-01 INC. PINTADO E INSTALACION 1,120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.03 VENTANA METALICA V-02 INC. PINTADO E INSTALACION 4,830.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.04 VENTANA METALICA V-03 INC. PINTADO E INSTALACION 2,200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.05 VENTANA METALICA V-04 INC. PINTADO E INSTALACION 1,120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.06 VENTANA METALICA V-05 INC. PINTADO E INSTALACION 4,830.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.07 VENTANA METALICA V-06 INC. PINTADO E INSTALACION 3,520.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.08 VENTANA METALICA V-07 INC. PINTADO E INSTALACION 1,140.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.09 VENTANA METALICA V-08 INC. PINTADO E INSTALACION 5,290.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.08 CARPINTERIA EN MELAMINA 5,580.00
02.08.01 SEPARADOR DE BAÑOS TIPO 01 5,580.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.09 CERRAJERIA 7,251.54
02.09.01 CERRADURA PARA PUERTA DE TRES GOLPES 4,796.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.09.02 CERRADURA PARA PUERTA TIPO PERILLA 2,454.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.10 VIDRIOS, CRISTALES Y SIMILARES 41,997.06
02.10.01 VIDRIO LAMINAR BUTIRAL DE POLIVINILO INCOLORO 41,997.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11 PINTURAS 90,207.74
02.11.01 PINTURA LATEX EN CIELO RASO DOS MANOS 22,833.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.02 PINTURA LATEX EN MUROS EXTERIORES DOS MANOS 17,654.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.03 PINTURA LATEX EN MUROS INTERIORES DOS MANOS 30,153.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.04 PINTURA LATEX EN VIGAS DOS MANOS 10,154.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

MARIO I.E.E. N°30318 DEL CENTRO POBLADO MENOR


MEJORAMIENTO
DE YANAMUCLO
Y AMPLIACION
E I.E.E. N°30319
DEL SERVICIO
DEL ANEXO
EDUCATIVO
DE MARAVILCA,
DE NIVEL
DISTRITO
PRIMARIO
DEI.E.E.
MATAHUASI
N°30318-DEL
CONCEPCION
CENTRO P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
02.11.05 PINTURA LATEX EN COLUMNAS DOS MANOS 7,342.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.06 PINTURA LATEX PARA DERRAMES EN PUERTAS Y VENTANAS DOS MANOS 1,560.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.07 PINTURA PARA PIZARRA 510.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12 JUNTAS 11,129.11
02.12.01 JUNTAS ASFALTICAS EN VEREDAS 2,066.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12.02 JUNTAS ASFALTICAS PARA SARDINEL DE JARDIN 91.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12.03 JUNTAS ASFALTICAS PARA COLUMNETAS 8,971.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03 INSTALACIONES SANITARIAS 58,301.24
03.01 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO 8,682.61
03.01.01 MOVIMIENTO DE TIERRAS 1,649.41
03.01.01.01 EXCAVACION DE ZANJAS PARA TUBERIA DE AGUA 937.63 0.00 0.00 0.00 0.00 937.63 0.00 0.00 0.0
03.01.01.02 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 681.36 0.00 0.00 0.00 0.00 0.00 596.19 85.17 0.0
03.01.01.03 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 30.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.01.02 SALIDAS 2,360.13
03.01.02.01 SALIDA DE AGUA FRIA PVC SAP DE 1/2" 2,254.32 0.00 0.00 0.00 0.00 0.00 120.77 281.79 281.7
03.01.02.02 SALIDA DE AGUA PARA RIEGO PVC SAP DE 1/2" 56.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 56.6
03.01.02.03 SALIDA DE AGUA FRIA CONTRA INCENDIO PVC SAP DE 2" 49.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 49.1
03.01.03 RED DE DISTRIBUCION 4,673.07
03.01.03.01 TUBERIA PARA AGUA POTABLE PVC SAP DE 1/2" C-10 2,106.15 0.00 0.00 0.00 0.00 0.00 0.00 254.19 254.1
03.01.03.02 TUBERIA PARA RIEGO PVC SAP DE 1/2" C-10 72.72 0.00 0.00 0.00 0.00 0.00 0.00 72.72 0.0
03.01.03.03 TUBERIA CONTRA INCENDIO PVC SAP DE 2" C-10 80.28 0.00 0.00 0.00 0.00 0.00 0.00 80.28 0.0
03.01.03.04 VALVULA DE COMPUERTA DE 1/2" 1,834.94 0.00 0.00 0.00 0.00 0.00 0.00 65.53 229.3
03.01.03.05 VALVULA DE COMPUERTA DE 2" 127.03 0.00 0.00 0.00 0.00 0.00 0.00 2.23 15.6
03.01.03.06 GRIFO CONTRA INCENDIO 451.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02 SISTEMA DE DESAGUE 19,414.41
03.02.01 MOVIMIENTO DE TIERRAS 1,805.63
03.02.01.01 EXCAVACION DE ZANJAS PARA TUBERIA DE DESAGUE 1,045.58 0.00 0.00 0.00 0.00 0.00 0.00 1,045.58 0.0
03.02.01.02 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 703.40 0.00 0.00 0.00 0.00 0.00 0.00 351.70 351.7
03.02.01.03 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 56.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02.02 SALIDAS 5,996.34
03.02.02.01 SALIDA DE DESAGUE CON PVC SAL DE 2" 2,613.30 0.00 0.00 0.00 0.00 0.00 0.00 190.06 332.6
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

MARIO I.E.E. N°30318 DEL CENTRO POBLADO MENOR


MEJORAMIENTO
DE YANAMUCLO
Y AMPLIACION
E I.E.E. N°30319
DEL SERVICIO
DEL ANEXO
EDUCATIVO
DE MARAVILCA,
DE NIVEL
DISTRITO
PRIMARIO
DEI.E.E.
MATAHUASI
N°30318-DEL
CONCEPCION
CENTRO P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
03.02.02.02 SALIDA DE DESAGUE CON PVC SAL DE 4" 1,461.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 91.3
03.02.02.03 SALIDA DE VENTILACION CON PVC SAL DE 2" 1,921.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02.03 RED DE DISTRIBUCION 11,612.44
03.02.03.01 TUBERIA PARA DESAGUE CON PVC SAL DE 2" 1,038.11 0.00 0.00 0.00 0.00 0.00 0.00 72.85 127.4
03.02.03.02 TUBERIA PARA DESAGUE CON PVC SAL DE 4" 5,387.78 0.00 0.00 0.00 0.00 0.00 0.00 96.21 673.4
03.02.03.03 TUBERIA PARA VENTILACION CON PVC SAL DE 2" 2,348.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 132.9
TUBERIA PARA CAJA DE REGISTRO CON PVC SAL DE 2" 2,837.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03 SISTEMA DE DESAGUE PLUVIAL 15,728.96
03.03.01 TUBERIA PVC SAL PLUVIAL DE 4" 4,216.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.02 TUBERIA PVC SAL PLUVIAL DE 3" 1,789.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA FALSA COLUMNA 5,450.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.04 CONCRETO F'C=175 KG/CM2 PARA FALSA COLUMNA 3,930.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.05 ACCESORIOS PARA DESAGUE PLUVIAL 341.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04 APARATOS Y ACCESORIOS SANITARIOS 14,475.26
03.04.01 INODORO DE LOSA TANQUE BAJO 5,908.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.02 LAVATORIO DE LOSA CON PEDESTAL 4,385.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.03 PAPELERA DE LOSA 1,190.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.04 SUMIDERO DE BRONCE ROSCADO DE 2" 985.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.05 REGISTRO ROSCADO DE BRONCE DE 4" 1,381.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.06 CAJA DE REGISTRO PARA DESAGUE DE 624.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04 INSTALACIONES ELECTRICAS 110,524.39
04.01 PRIMER PISO 64,859.19
04.01.01 SALIDAS 13,513.89
04.01.01.01 SALIDAD DE TECHO PARA CENTRO DE LUZ 6,566.30 0.00 0.00 0.00 0.00 0.00 0.00 1,094.38 1,915.1
04.01.01.02 SALIDA DE TOMACORRIENTE BIPOLARES CON LINEA A TIERRA 4,391.95 0.00 0.00 0.00 0.00 0.00 0.00 548.99 1,921.4
04.01.01.03 SALIDA DE TOMACORRIENTE PARA ALUMBRADO DE EMERGENCIA 363.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.01.04 SALIDA PARA INTERRUPTORES EN CONMUTACION 1,057.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.01.05 SALIDA PARA INTERRUPTORES SIMPLES 298.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 298.5
04.01.01.06 SALIDA PARA INTERRUPTORES DOBLES 248.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.4
04.01.01.07 SALIDA PARA INTERRUPTORES TRIPLES 587.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 419.5
04.01.02 CANALIZACION DE TUBERIAS PVC 20,053.08
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

MARIO I.E.E. N°30318 DEL CENTRO POBLADO MENOR


MEJORAMIENTO
DE YANAMUCLO
Y AMPLIACION
E I.E.E. N°30319
DEL SERVICIO
DEL ANEXO
EDUCATIVO
DE MARAVILCA,
DE NIVEL
DISTRITO
PRIMARIO
DEI.E.E.
MATAHUASI
N°30318-DEL
CONCEPCION
CENTRO P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
04.01.02.01 TUBERIA DE 25 MM. PVC SEL (1") 4,054.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.02.02 TUBERIA DE 20 MM. PVC SEL (3/4") 15,998.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03 CONDUCTORES 8,301.84
04.01.03.01 CONDUCTOR (2x10+1x10) MM. THHW 358.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.02 CONDUCTOR (1x10) MM2. THHW 146.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.03 CONDUCTOR (2x6+1x10) MM2 THHW 975.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.04 CONDUCTOR (2x2.5) MM2. THHW 4,612.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.05 CONDUCTOR (2x4.0) MM2. THHW 2,209.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.04 TABLEROS ELECTRICOS 4,700.00
04.01.04.01 TABLERO GENERAL Y TABLEROS DE DISTRIBUCION 4,700.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.05 CONEXION A TIERRA 5,600.00
04.01.05.01 POZO A TIERRA 5,600.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06 ARTEFACTOS Y ACCESORIOS ELECTRICOS 11,490.39
04.01.06.01 FLUORESCENTE RECTO INCLUYE EQUIPO Y PANTALLA 7,678.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.02 SPOT LIGHT 656.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.03 LUCES DE EMERGENCIA CON BATERIA - 02 FAROS 637.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.04 TOMACORRIENTE BIPOLAR 1,779.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.05 TOMACORRIENTE SIMPLE 125.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.06 INTERRUPTOR CONMUTACION 210.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.07 INTERRUPTOR SIMPLE 107.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.08 INTERRUPTOR DOBLE 94.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.09 INTERRUPTOR TRIPLE 201.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.07 OTROS 1,199.99
04.01.07.02 DISPOSITIVOS Y EQUIPOS DE SEGURIDAD 1,199.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02 SEGUNDO PISO 45,665.20
04.02.01 SALIDAS 13,605.84
04.02.01.01 SALIDAD DE TECHO PARA CENTRO DE LUZ 6,212.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.02 SALIDA DE TOMACORRIENTE BIPOLARES CON LINEA A TIERRA 5,218.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.03 SALIDA DE TOMACORRIENTE PARA ALUMBRADO DE EMERGENCIA 303.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.04 SALIDA PARA INTERRUPTORES EN CONMUTACION 704.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
CRONOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

MARIO I.E.E. N°30318 DEL CENTRO POBLADO MENOR


MEJORAMIENTO
DE YANAMUCLO
Y AMPLIACION
E I.E.E. N°30319
DEL SERVICIO
DEL ANEXO
EDUCATIVO
DE MARAVILCA,
DE NIVEL
DISTRITO
PRIMARIO
DEI.E.E.
MATAHUASI
N°30318-DEL
CONCEPCION
CENTRO P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
04.02.01.05 SALIDA PARA INTERRUPTORES SIMPLES 298.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.06 SALIDA PARA INTERRUPTORES DOBLES 398.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.07 SALIDA PARA INTERRUPTORES TRIPLES 469.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.02 CANALIZACION DE TUBERIAS PVC 13,965.19
04.02.02.01 TUBERIA DE 20 MM. PVC SEL (3/4") 13,965.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.03 CONDUCTORES 6,384.59
04.02.03.01 CONDUCTOR (2x2.5) MM2. THHW 3,370.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.03.02 CONDUCTOR (2x4.0) MM2. THHW 3,014.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04 ARTEFACTOS Y ACCESORIOS ELECTRICOS 11,709.58
04.02.04.01 FLUORESCENTE RECTO INCLUYE EQUIPO Y PANTALLA 8,432.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.02 LUCES DE EMERGENCIA CON BATERIA - 02 FAROS 637.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.03 TOMACORRIENTE BIPOLAR 1,779.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.04 TOMACORRIENTE SIMPLE 104.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.05 INTERRUPTOR CONMUTACION 336.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.06 INTERRUPTOR SIMPLE 107.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.07 INTERRUPTOR DOBLE 150.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.08 INTERRUPTOR TRIPLE 161.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0

COSTO DIRECTO 1,990,094.42 58,567.27 11,285.64 13,235.59 13,954.08 22,199.07 56,029.55 88,256.67 107,755.4
GASTOS GENERALES 10.00% 199,009.44 5,856.73 1,128.56 1,323.56 1,395.41 2,219.91 5,602.96 8,825.67 10,775.5
UTILIDAD 10.00% 199,009.44 5,856.73 1,128.56 1,323.56 1,395.41 2,219.91 5,602.96 8,825.67 10,775.5
SUB TOTAL 2,388,113.30 70,280.73 13,542.76 15,882.71 16,744.90 26,638.89 67,235.47 105,908.01 129,306.4
IGV 18.00% 429,860.39 12,650.53 2,437.70 2,858.89 3,014.08 4,795.00 12,102.38 19,063.44 23,275.1
PRESUPUESTO PARCIAL 2,817,973.69 82,931.26 15,980.46 18,741.60 19,758.98 31,433.89 79,337.85 124,971.45 152,581.6
PORCENTAJE DE AVANCE 2.94% 0.57% 0.67% 0.70% 1.12% 2.82% 4.43% 5.41%
PORCENTAJE DE AVANCE ACUMULADO 100.00% 4.88% 13.78%
NOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

.E. N°30318 DEL CENTRO POBLADO MENOR DE MEJORAMIENTO


YANAMUCLO E I.E.E.
Y AMPLIACION
N°30319 DEL
DEL
ANEXO
SERVICIO
DE MARAVILCA,
EDUCATIVODISTRITO
DE NIVELDE
PRIMARIO
MATAHUASI
I.E.E.- CONCEPCION
N°30318 DEL CENTRO
- JUNIN P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
BLOQUE AB - YANAMUCLO 1,990,094.42
01 ESTRUCTURAS 1,077,684.21 MES 01 MES 02
01.01 OBRAS PROVISIONALES 44,569.85
01.01.01 CONSTRUCCION PROVISIONAL DE OFICINA 384.00 384.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.02 CONSTRUCCION PROVISIONAL DE CASETA PARA GUARDIANIA 144.00 144.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.03 CONSTRUCCION PROVISIONAL DE VESTIDOR PARA PERSONAL 480.00 480.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.04 GUARDIANIA DE OBRA 37,785.60 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.4
01.01.05 ALQUILER DE ALMACEN 1,440.00 56.00 56.00 56.00 56.00 56.00 56.00 56.00 56.0
01.01.06 CARTEL DE IDENTIFICACION DE OBRA (3.60x2.40) 856.25 0.00 856.25 0.00 0.00 0.00 0.00 0.00 0.0
01.01.07 AGUA PARA CONSUMO EN LA CONSTRUCCION 1,080.00 42.00 42.00 42.00 42.00 42.00 42.00 42.00 42.0
01.01.08 DESAGUE PARA LA CONSTRUCCION 750.00 0.00 750.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.09 ENERGIA ELECTRICA PROVISIONAL PARA LA CONSTRUCCION 1,650.00 64.17 64.17 64.17 64.17 64.17 64.17 64.17 64.1
01.02 TRABAJOS PRELIMINARES 66,669.81
01.02.01 DEMOLICION DE CONSTRUCCION EXISTENTE 46,142.30 46,142.30 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.02.02 ELIMINACION DE CONSTRUCCION DEMOLIDA DP=2 KM. 8,433.24 6,324.93 2,108.31 0.00 0.00 0.00 0.00 0.00 0.0
01.02.03 LIMPIEZA DEL TERRENO MANUAL 3,218.46 0.00 3,218.46 0.00 0.00 0.00 0.00 0.00 0.0
01.02.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS 2,500.00 2,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.02.05 TRAZO, NIVELACION Y REPLANTEO PARA EDIFICACION 2,770.32 0.00 1,007.39 1,762.93 0.00 0.00 0.00 0.00 0.0
01.02.06 CONTROL TOPOGRAFICO DURANTE EJECUCION DE OBRA 3,605.49 841.28 841.28 841.28 841.28 240.37 0.00 0.00 0.0
01.03 MOVIMIENTO DE TIERRAS 32,782.10
01.03.01 EXCAVACION DE ZANJAS PARA ZAPATAS H=1.20 - 1.50 M. 9,038.33 0.00 753.19 5,272.36 3,012.78 0.00 0.00 0.00 0.0
01.03.02 EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS 2,632.52 0.00 0.00 548.44 767.82 767.82 548.44 0.00 0.0
01.03.03 EXCAVACION DE ZANJAS PARA JARDIN 31.43 0.00 0.00 31.43 0.00 0.00 0.00 0.00 0.0
01.03.04 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 4,776.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,776.2
01.03.05 REFINE, NIVELACION Y COMPACTACION DE PLATAFORMA 4,486.78 0.00 0.00 0.00 0.00 0.00 560.85 3,925.93 0.0
01.03.06 REFINE, NIVELACION Y COMPACTACION DE BASE PARA VEREDAS 6,019.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,019.8
01.03.07 RELLENO Y COMPACTACION DE PODIUM CON MATERIAL PROPIO 301.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 301.5
01.03.08 ACARREO INTERNO DE MATERIAL EXCEDENTE DP=20 M. 2,694.29 0.00 0.00 0.00 0.00 0.00 0.00 1,347.15 1,347.1
01.03.09 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 2,801.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.04 OBRAS DE CONCRETO SIMPLE 90,690.96
NOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

.E. N°30318 DEL CENTRO POBLADO MENOR DE MEJORAMIENTO


YANAMUCLO E I.E.E.
Y AMPLIACION
N°30319 DEL
DEL
ANEXO
SERVICIO
DE MARAVILCA,
EDUCATIVODISTRITO
DE NIVELDE
PRIMARIO
MATAHUASI
I.E.E.- CONCEPCION
N°30318 DEL CENTRO
- JUNIN P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.04.01 SOLADO PARA ZAPATAS E=0.10 M. 1:10 CEMENTO - HORMIGON 5,467.93 0.00 0.00 0.00 911.32 3,189.63 1,366.98 0.00 0.0
01.04.02 CONCRETO 1:10+30% P.G. PARA CIMIENTOS CORRIDOS 21,485.78 0.00 0.00 0.00 0.00 8,057.17 9,400.03 4,028.58 0.0
01.04.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO 6,829.64 0.00 0.00 0.00 0.00 0.00 2,276.55 3,983.96 569.1
01.04.04 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS 3,042.44 0.00 0.00 0.00 0.00 0.00 0.00 1,521.22 1,521.2
01.04.05 FALSO PISO DE CONCRETO E=0.10 M. CEMENTO - HORMIGON 16,168.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9,701.1
01.04.06 ENCOFRADO Y DESENCOFRADO NORMAL PARA VEREDAS 4,000.12 0.00 0.00 0.00 0.00 2,000.06 2,000.06 0.00 0.0
01.04.07 CONCRETO F'C=140 KG/CM2 PARA VEREDAS INCLUYE ACABADOS 19,168.71 0.00 0.00 0.00 0.00 0.00 5,750.61 13,418.10 0.0
01.04.08 ENCOFRADO Y DESENCOFRADO NORMAL PARA CUNETAS 3,648.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,648.2
01.04.09 CONCRETO F'C=140 KG/CM2 PARA CUNETAS INCLUYE ACABADOS 4,971.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,142.8
01.04.10 ENCOFRADO Y DESENCOFRADO NORMAL PARA JARDIN 3,281.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,460.7
01.04.11 CONCRETO F'C=140 KG/CM2 PARA JARDIN 2,627.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 656.7
01.05 OBRAS DE CONCRETO ARMADO 772,773.58
01.05.01 ZAPATAS 49,980.45
01.05.01.01 ACERO F'Y= 4200 KG/CM2 PARA ZAPATAS 11,429.97 0.00 0.00 0.00 0.00 0.00 10,001.22 1,428.75 0.0
01.05.01.02 CONCRETO F'C=210 KG/CM2 PARA ZAPATAS 38,550.48 0.00 0.00 0.00 0.00 0.00 0.00 23,130.29 15,420.1
01.05.02 COLUMNAS 113,702.39
01.05.02.01 ACERO F'Y= 4200 KG/CM2 PARA COLUMNAS 43,524.40 0.00 0.00 0.00 0.00 0.00 4,974.22 8,704.88 8,704.8
01.05.02.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS 47,502.09 0.00 0.00 0.00 0.00 0.00 0.00 3,064.65 10,726.2
01.05.02.03 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS 22,675.90 0.00 0.00 0.00 0.00 0.00 0.00 2,451.45 4,290.0
01.05.03 COLUMNETAS 43,559.15
01.05.03.01 ACERO F'Y= 4200 KG/CM2 PARA COLUMNETAS 13,992.87 0.00 0.00 0.00 0.00 0.00 0.00 1,023.87 2,389.0
01.05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNETAS 20,137.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,179.6
01.05.03.03 CONCRETO F'C=175 KG/CM2 PARA COLUMNETAS 9,428.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 764.4
01.05.04 VIGAS 210,855.32
01.05.04.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA VIGAS 79,074.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.04.02 ACERO F'Y= 4200 KG/CM2 PARA VIGAS 84,562.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.04.03 CONCRETO F'C=210 KG/CM2 PARA VIGAS 47,218.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05 LOSA ALIGERADA 288,844.61
01.05.05.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA ALIGERADA 134,294.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.02 BLOQUETA DE ARCILLA H=0.15 M. PARA LOSA ALIGERADA 21,223.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.03 BLOQUETA DE ARCILLA H=0.12 M. PARA LOSA ALIGERADA 21,181.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
NOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

.E. N°30318 DEL CENTRO POBLADO MENOR DE MEJORAMIENTO


YANAMUCLO E I.E.E.
Y AMPLIACION
N°30319 DEL
DEL
ANEXO
SERVICIO
DE MARAVILCA,
EDUCATIVODISTRITO
DE NIVELDE
PRIMARIO
MATAHUASI
I.E.E.- CONCEPCION
N°30318 DEL CENTRO
- JUNIN P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.05.05.04 ACERO F'Y= 4200 KG/CM2 PARA LOSA ALIGERADA 57,235.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.05 CONCRETO F'C=210 KG/CM2 PARA LOSA ALIGERADA 54,910.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06 ESCALERAS 65,831.66
01.05.06.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESCALERAS 18,440.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06.02 ACERO F'Y= 4200 KG/CM2 PARA ESCALERAS 9,971.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06.03 CONCRETO F'C=210 KG/CM2 PARA ESCALERAS 37,419.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.06 TANQUE CISTERNA 64,777.91
01.06.01 EXCAVACION DE ZANJAS PARA CIMENTACION 2,738.86 0.00 0.00 2,738.86 0.00 0.00 0.00 0.00 0.0
01.06.02 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 889.89 0.00 0.00 0.00 0.00 0.00 889.89 0.00 0.0
01.06.03 SOLADO PARA ZAPATAS E=0.10 M. 1:10 CEMENTO - HORMIGON 289.53 0.00 0.00 289.53 0.00 0.00 0.00 0.00 0.0
01.06.04 ACERO F'Y= 4200 KG/CM2 PARA ZAPATAS 581.27 0.00 0.00 0.00 581.27 0.00 0.00 0.00 0.0
01.06.05 CONCRETO F'C=210 KG/CM2 PARA ZAPATAS 2,041.31 0.00 0.00 0.00 2,041.31 0.00 0.00 0.00 0.0
01.06.06 ACERO F'Y= 4200 KG/CM2 PARA COLUMNAS 4,301.61 0.00 0.00 0.00 3,584.68 716.93 0.00 0.00 0.0
01.06.07 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS 3,278.17 0.00 0.00 0.00 0.00 1,966.90 1,311.27 0.00 0.0
01.06.08 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS 1,901.00 0.00 0.00 0.00 0.00 475.25 1,425.75 0.00 0.0
01.06.09 ENCOFRADO Y DESENCOFRADO NORMAL PARA VIGAS 2,007.72 0.00 0.00 0.00 0.00 0.00 1,003.86 1,003.86 0.0
01.06.10 ACERO F'Y= 4200 KG/CM2 PARA VIGAS 3,065.73 0.00 0.00 0.00 0.00 0.00 0.00 3,065.73 0.0
01.06.11 CONCRETO F'C=210 KG/CM2 PARA VIGAS 1,380.31 0.00 0.00 0.00 0.00 0.00 0.00 1,380.31 0.0
01.06.12 ACERO F'Y= 4200 KG/CM2 PARA CISTERNA 5,076.96 0.00 0.00 0.00 0.00 0.00 5,076.96 0.00 0.0
01.06.13 ENCOFRADO Y DESENCOFRADO NORMAL PARA CISTERNA 3,718.82 0.00 0.00 0.00 0.00 1,859.41 1,859.41 0.00 0.0
01.06.14 CONCRETO F'C=210 KG/CM2 PARA CISTERNA 4,092.64 0.00 0.00 0.00 0.00 0.00 4,092.64 0.00 0.0
01.06.15 ACERO F'Y= 4200 KG/CM2 PARA TANQUE ELEVADO 4,880.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,880.2
01.06.16 ENCOFRADO Y DESENCOFRADO NORMAL PARA TANQUE ELEVADO 4,492.10 0.00 0.00 0.00 0.00 0.00 0.00 4,492.10 0.0
01.06.17 CONCRETO F'C=210 KG/CM2 PARA TANQUE ELEVADO 2,618.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,618.4
01.06.18 ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA ALIGERADA 453.94 0.00 0.00 0.00 0.00 0.00 453.94 0.00 0.0
01.06.19 BLOQUETA DE ARCILLA H=0.15 M. PARA LOSA ALIGERADA 182.52 0.00 0.00 0.00 0.00 0.00 182.52 0.00 0.0
01.06.20 ACERO F'Y= 4200 KG/CM2 PARA LOSA ALIGERADA 321.44 0.00 0.00 0.00 0.00 0.00 321.44 0.00 0.0
01.06.21 CONCRETO F'C=210 KG/CM2 PARA LOSA ALIGERADA 224.55 0.00 0.00 0.00 0.00 0.00 0.00 224.55 0.0
01.06.22 MURO DE SOGA CON LADRILLO K.K. 18H 9X13X24 CM. 2,287.88 0.00 0.00 0.00 0.00 0.00 0.00 2,287.88 0.0
01.06.23 TARRAJEO EN MUROS INTERIORES FROTACHADO MEZCLA 1:5 851.76 0.00 0.00 0.00 0.00 0.00 0.00 851.76 0.0
01.06.24 TARRAJEO INTERIOR CON IMPERMEABILIZANTE DE TANQUE CISTERNA 1,402.11 0.00 0.00 0.00 0.00 0.00 0.00 701.06 701.0
NOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

.E. N°30318 DEL CENTRO POBLADO MENOR DE MEJORAMIENTO


YANAMUCLO E I.E.E.
Y AMPLIACION
N°30319 DEL
DEL
ANEXO
SERVICIO
DE MARAVILCA,
EDUCATIVODISTRITO
DE NIVELDE
PRIMARIO
MATAHUASI
I.E.E.- CONCEPCION
N°30318 DEL CENTRO
- JUNIN P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.06.25 TARRAJEO INTERIOR CON IMPERMEABILIZANTE DE TANQUE ELEVADO 886.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 886.6
01.06.26 TARRAJEO EXTERIOR FROTACHADO DE ESTRUCTURA MEZCLA 1:5 4,004.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,004.0
01.06.27 PINTURA LATEX EN ESTRUCTURA DOS MANOS 1,975.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.06.28 INSTALACION DE ACCESORIOS DE TANQUE CISTERNA 2,112.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,112.3
01.06.29 INSTALACION DE PUERTA DE MADERA P-1 320.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 320.0
01.06.30 INSTALACION DE ESCALERA METALICA SEGUN DISEÑO 2,400.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,400.0
01.07 PRUEBAS Y ENSAYOS DE CALIDAD 3,820.00
01.07.01 PROCTOR MODIFICADO 160.00 0.00 0.00 0.00 0.00 160.00 0.00 0.00 0.0
01.07.02 DENSIDAD DE CAMPO 480.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.7
01.07.03 DISEÑO DE MEZCLA 540.00 0.00 0.00 0.00 462.86 77.14 0.00 0.00 0.0
01.07.04 ROTURA DE PROBETA (COMPRESION SIMPLE) 2,640.00 0.00 0.00 0.00 0.00 0.00 65.19 228.15 228.1
01.08 FLETE 1,600.00
01.08.01 FLETE TERRESTRE 1,600.00 119.15 119.15 119.15 119.15 119.15 119.15 119.15 119.1
02 ARQUITECTURA 743,584.58
02.01 MUROS Y TABIQUES 140,636.03
02.01.01 MURO DE SOGA CON LADRILLO K.K. 18H 9X13X24 CM. 140,051.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
MURO DE CABEZA CON LADRILLO K.K. 18H 9X13X24 CM. 584.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02 REVOQUES, ENLUCIDOS Y MOLDURAS 217,896.67
02.02.01 TARRAJEO EN CIELO RASO FROTACHADO MEZCLA 1:4 62,875.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.02 TARRAJEO EN MUROS INTERIORES FROTACHADO MEZCLA 1:5 63,390.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.03 TARRAJEO EN MUROS EXTERIORES FROTACHADO MEZCLA 1:5 35,522.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.04 TARRAJEO EN VIGAS MEZCLA 1:4 27,465.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.05 TARRAJEO EN COLUMNAS MEZCLA 1:5 19,492.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.06 VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS MEZCLA 1:5 9,002.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.07 TARRAJEO DE PODIUM MEZCLA 1:5 147.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03 PISOS Y PAVIMENTOS 111,696.25
02.03.01 PISO DE PORCELANATO ALTO TRANSITO ANTIDESLIZANTE PARA AMBIENTES 65,681.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03.02 PISO DE PORCELANATO ALTO TRANSITO ANTIDESLIZANTE PARA VEREDAS 41,788.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03.03 PISO DE CERAMICO ANTIDESLIZANTE DE ALTO TRANSITO 4,226.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04 ZOCALOS Y CONTRAZOCALOS 28,505.27
02.04.01 CONTRAZOCALO DE PORCELANATO H=0.10 M. PARA AMBIENTES 11,652.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
NOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

.E. N°30318 DEL CENTRO POBLADO MENOR DE MEJORAMIENTO


YANAMUCLO E I.E.E.
Y AMPLIACION
N°30319 DEL
DEL
ANEXO
SERVICIO
DE MARAVILCA,
EDUCATIVODISTRITO
DE NIVELDE
PRIMARIO
MATAHUASI
I.E.E.- CONCEPCION
N°30318 DEL CENTRO
- JUNIN P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
02.04.02 CONTRAZOCALO DE PORCELANATO H=0.10 M. PARA VEREDAS 11,342.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04.03 CONTRAZOCALO DE CERAMICO H=0.10 M. 5,139.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04.04 ZOCALO DE CERAMICO 370.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.05 CUBIERTAS 46,545.41
02.05.01 CUBIERTA DE TEJA ANDINA TIPO ETERNIT 46,545.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06 CARPINTERIA DE MADERA 17,229.50
02.06.01 PUERTA APANELADA DE CEDRO TIPO P-01 INC. INSTALACION 7,810.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06.02 PUERTA APANELADA DE CEDRO TIPO P-02 INC. INSTALACION 5,583.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06.03 PUERTA APANELADA DE CEDRO TIPO P-03 INC. INSTALACION 3,836.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07 CARPINTERIA METALICA 24,910.00
02.07.01 PORTON METALICO PM-01 INC. PINTADO E INSTALACION 860.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.02 VENTANA METALICA V-01 INC. PINTADO E INSTALACION 1,120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.03 VENTANA METALICA V-02 INC. PINTADO E INSTALACION 4,830.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.04 VENTANA METALICA V-03 INC. PINTADO E INSTALACION 2,200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.05 VENTANA METALICA V-04 INC. PINTADO E INSTALACION 1,120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.06 VENTANA METALICA V-05 INC. PINTADO E INSTALACION 4,830.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.07 VENTANA METALICA V-06 INC. PINTADO E INSTALACION 3,520.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.08 VENTANA METALICA V-07 INC. PINTADO E INSTALACION 1,140.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.09 VENTANA METALICA V-08 INC. PINTADO E INSTALACION 5,290.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.08 CARPINTERIA EN MELAMINA 5,580.00
02.08.01 SEPARADOR DE BAÑOS TIPO 01 5,580.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.09 CERRAJERIA 7,251.54
02.09.01 CERRADURA PARA PUERTA DE TRES GOLPES 4,796.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.09.02 CERRADURA PARA PUERTA TIPO PERILLA 2,454.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.10 VIDRIOS, CRISTALES Y SIMILARES 41,997.06
02.10.01 VIDRIO LAMINAR BUTIRAL DE POLIVINILO INCOLORO 41,997.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11 PINTURAS 90,207.74
02.11.01 PINTURA LATEX EN CIELO RASO DOS MANOS 22,833.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.02 PINTURA LATEX EN MUROS EXTERIORES DOS MANOS 17,654.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.03 PINTURA LATEX EN MUROS INTERIORES DOS MANOS 30,153.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.04 PINTURA LATEX EN VIGAS DOS MANOS 10,154.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
NOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

.E. N°30318 DEL CENTRO POBLADO MENOR DE MEJORAMIENTO


YANAMUCLO E I.E.E.
Y AMPLIACION
N°30319 DEL
DEL
ANEXO
SERVICIO
DE MARAVILCA,
EDUCATIVODISTRITO
DE NIVELDE
PRIMARIO
MATAHUASI
I.E.E.- CONCEPCION
N°30318 DEL CENTRO
- JUNIN P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
02.11.05 PINTURA LATEX EN COLUMNAS DOS MANOS 7,342.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.06 PINTURA LATEX PARA DERRAMES EN PUERTAS Y VENTANAS DOS MANOS 1,560.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.07 PINTURA PARA PIZARRA 510.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12 JUNTAS 11,129.11
02.12.01 JUNTAS ASFALTICAS EN VEREDAS 2,066.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12.02 JUNTAS ASFALTICAS PARA SARDINEL DE JARDIN 91.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12.03 JUNTAS ASFALTICAS PARA COLUMNETAS 8,971.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03 INSTALACIONES SANITARIAS 58,301.24
03.01 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO 8,682.61
03.01.01 MOVIMIENTO DE TIERRAS 1,649.41
03.01.01.01 EXCAVACION DE ZANJAS PARA TUBERIA DE AGUA 937.63 0.00 0.00 0.00 0.00 937.63 0.00 0.00 0.0
03.01.01.02 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 681.36 0.00 0.00 0.00 0.00 0.00 596.19 85.17 0.0
03.01.01.03 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 30.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.01.02 SALIDAS 2,360.13
03.01.02.01 SALIDA DE AGUA FRIA PVC SAP DE 1/2" 2,254.32 0.00 0.00 0.00 0.00 0.00 120.77 281.79 281.7
03.01.02.02 SALIDA DE AGUA PARA RIEGO PVC SAP DE 1/2" 56.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 56.6
03.01.02.03 SALIDA DE AGUA FRIA CONTRA INCENDIO PVC SAP DE 2" 49.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 49.1
03.01.03 RED DE DISTRIBUCION 4,673.07
03.01.03.01 TUBERIA PARA AGUA POTABLE PVC SAP DE 1/2" C-10 2,106.15 0.00 0.00 0.00 0.00 0.00 0.00 254.19 254.1
03.01.03.02 TUBERIA PARA RIEGO PVC SAP DE 1/2" C-10 72.72 0.00 0.00 0.00 0.00 0.00 0.00 72.72 0.0
03.01.03.03 TUBERIA CONTRA INCENDIO PVC SAP DE 2" C-10 80.28 0.00 0.00 0.00 0.00 0.00 0.00 80.28 0.0
03.01.03.04 VALVULA DE COMPUERTA DE 1/2" 1,834.94 0.00 0.00 0.00 0.00 0.00 0.00 65.53 229.3
03.01.03.05 VALVULA DE COMPUERTA DE 2" 127.03 0.00 0.00 0.00 0.00 0.00 0.00 2.23 15.6
03.01.03.06 GRIFO CONTRA INCENDIO 451.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02 SISTEMA DE DESAGUE 19,414.41
03.02.01 MOVIMIENTO DE TIERRAS 1,805.63
03.02.01.01 EXCAVACION DE ZANJAS PARA TUBERIA DE DESAGUE 1,045.58 0.00 0.00 0.00 0.00 0.00 0.00 1,045.58 0.0
03.02.01.02 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 703.40 0.00 0.00 0.00 0.00 0.00 0.00 351.70 351.7
03.02.01.03 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 56.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02.02 SALIDAS 5,996.34
03.02.02.01 SALIDA DE DESAGUE CON PVC SAL DE 2" 2,613.30 0.00 0.00 0.00 0.00 0.00 0.00 190.06 332.6
NOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

.E. N°30318 DEL CENTRO POBLADO MENOR DE MEJORAMIENTO


YANAMUCLO E I.E.E.
Y AMPLIACION
N°30319 DEL
DEL
ANEXO
SERVICIO
DE MARAVILCA,
EDUCATIVODISTRITO
DE NIVELDE
PRIMARIO
MATAHUASI
I.E.E.- CONCEPCION
N°30318 DEL CENTRO
- JUNIN P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
03.02.02.02 SALIDA DE DESAGUE CON PVC SAL DE 4" 1,461.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 91.3
03.02.02.03 SALIDA DE VENTILACION CON PVC SAL DE 2" 1,921.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02.03 RED DE DISTRIBUCION 11,612.44
03.02.03.01 TUBERIA PARA DESAGUE CON PVC SAL DE 2" 1,038.11 0.00 0.00 0.00 0.00 0.00 0.00 72.85 127.4
03.02.03.02 TUBERIA PARA DESAGUE CON PVC SAL DE 4" 5,387.78 0.00 0.00 0.00 0.00 0.00 0.00 96.21 673.4
03.02.03.03 TUBERIA PARA VENTILACION CON PVC SAL DE 2" 2,348.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 132.9
TUBERIA PARA CAJA DE REGISTRO CON PVC SAL DE 2" 2,837.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03 SISTEMA DE DESAGUE PLUVIAL 15,728.96
03.03.01 TUBERIA PVC SAL PLUVIAL DE 4" 4,216.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.02 TUBERIA PVC SAL PLUVIAL DE 3" 1,789.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA FALSA COLUMNA 5,450.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.04 CONCRETO F'C=175 KG/CM2 PARA FALSA COLUMNA 3,930.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.05 ACCESORIOS PARA DESAGUE PLUVIAL 341.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04 APARATOS Y ACCESORIOS SANITARIOS 14,475.26
03.04.01 INODORO DE LOSA TANQUE BAJO 5,908.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.02 LAVATORIO DE LOSA CON PEDESTAL 4,385.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.03 PAPELERA DE LOSA 1,190.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.04 SUMIDERO DE BRONCE ROSCADO DE 2" 985.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.05 REGISTRO ROSCADO DE BRONCE DE 4" 1,381.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.06 CAJA DE REGISTRO PARA DESAGUE DE 624.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04 INSTALACIONES ELECTRICAS 110,524.39
04.01 PRIMER PISO 64,859.19
04.01.01 SALIDAS 13,513.89
04.01.01.01 SALIDAD DE TECHO PARA CENTRO DE LUZ 6,566.30 0.00 0.00 0.00 0.00 0.00 0.00 1,094.38 1,915.1
04.01.01.02 SALIDA DE TOMACORRIENTE BIPOLARES CON LINEA A TIERRA 4,391.95 0.00 0.00 0.00 0.00 0.00 0.00 548.99 1,921.4
04.01.01.03 SALIDA DE TOMACORRIENTE PARA ALUMBRADO DE EMERGENCIA 363.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.01.04 SALIDA PARA INTERRUPTORES EN CONMUTACION 1,057.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.01.05 SALIDA PARA INTERRUPTORES SIMPLES 298.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 298.5
04.01.01.06 SALIDA PARA INTERRUPTORES DOBLES 248.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.4
04.01.01.07 SALIDA PARA INTERRUPTORES TRIPLES 587.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 419.5
04.01.02 CANALIZACION DE TUBERIAS PVC 20,053.08
NOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

.E. N°30318 DEL CENTRO POBLADO MENOR DE MEJORAMIENTO


YANAMUCLO E I.E.E.
Y AMPLIACION
N°30319 DEL
DEL
ANEXO
SERVICIO
DE MARAVILCA,
EDUCATIVODISTRITO
DE NIVELDE
PRIMARIO
MATAHUASI
I.E.E.- CONCEPCION
N°30318 DEL CENTRO
- JUNIN P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
04.01.02.01 TUBERIA DE 25 MM. PVC SEL (1") 4,054.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.02.02 TUBERIA DE 20 MM. PVC SEL (3/4") 15,998.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03 CONDUCTORES 8,301.84
04.01.03.01 CONDUCTOR (2x10+1x10) MM. THHW 358.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.02 CONDUCTOR (1x10) MM2. THHW 146.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.03 CONDUCTOR (2x6+1x10) MM2 THHW 975.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.04 CONDUCTOR (2x2.5) MM2. THHW 4,612.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.05 CONDUCTOR (2x4.0) MM2. THHW 2,209.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.04 TABLEROS ELECTRICOS 4,700.00
04.01.04.01 TABLERO GENERAL Y TABLEROS DE DISTRIBUCION 4,700.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.05 CONEXION A TIERRA 5,600.00
04.01.05.01 POZO A TIERRA 5,600.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06 ARTEFACTOS Y ACCESORIOS ELECTRICOS 11,490.39
04.01.06.01 FLUORESCENTE RECTO INCLUYE EQUIPO Y PANTALLA 7,678.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.02 SPOT LIGHT 656.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.03 LUCES DE EMERGENCIA CON BATERIA - 02 FAROS 637.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.04 TOMACORRIENTE BIPOLAR 1,779.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.05 TOMACORRIENTE SIMPLE 125.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.06 INTERRUPTOR CONMUTACION 210.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.07 INTERRUPTOR SIMPLE 107.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.08 INTERRUPTOR DOBLE 94.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.09 INTERRUPTOR TRIPLE 201.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.07 OTROS 1,199.99
04.01.07.02 DISPOSITIVOS Y EQUIPOS DE SEGURIDAD 1,199.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02 SEGUNDO PISO 45,665.20
04.02.01 SALIDAS 13,605.84
04.02.01.01 SALIDAD DE TECHO PARA CENTRO DE LUZ 6,212.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.02 SALIDA DE TOMACORRIENTE BIPOLARES CON LINEA A TIERRA 5,218.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.03 SALIDA DE TOMACORRIENTE PARA ALUMBRADO DE EMERGENCIA 303.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.04 SALIDA PARA INTERRUPTORES EN CONMUTACION 704.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
NOGRAMA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

.E. N°30318 DEL CENTRO POBLADO MENOR DE MEJORAMIENTO


YANAMUCLO E I.E.E.
Y AMPLIACION
N°30319 DEL
DEL
ANEXO
SERVICIO
DE MARAVILCA,
EDUCATIVODISTRITO
DE NIVELDE
PRIMARIO
MATAHUASI
I.E.E.- CONCEPCION
N°30318 DEL CENTRO
- JUNIN P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
04.02.01.05 SALIDA PARA INTERRUPTORES SIMPLES 298.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.06 SALIDA PARA INTERRUPTORES DOBLES 398.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.07 SALIDA PARA INTERRUPTORES TRIPLES 469.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.02 CANALIZACION DE TUBERIAS PVC 13,965.19
04.02.02.01 TUBERIA DE 20 MM. PVC SEL (3/4") 13,965.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.03 CONDUCTORES 6,384.59
04.02.03.01 CONDUCTOR (2x2.5) MM2. THHW 3,370.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.03.02 CONDUCTOR (2x4.0) MM2. THHW 3,014.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04 ARTEFACTOS Y ACCESORIOS ELECTRICOS 11,709.58
04.02.04.01 FLUORESCENTE RECTO INCLUYE EQUIPO Y PANTALLA 8,432.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.02 LUCES DE EMERGENCIA CON BATERIA - 02 FAROS 637.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.03 TOMACORRIENTE BIPOLAR 1,779.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.04 TOMACORRIENTE SIMPLE 104.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.05 INTERRUPTOR CONMUTACION 336.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.06 INTERRUPTOR SIMPLE 107.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.07 INTERRUPTOR DOBLE 150.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.08 INTERRUPTOR TRIPLE 161.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0

COSTO DIRECTO 1,990,094.42 58,567.27 11,285.64 13,235.59 13,954.08 22,199.07 56,029.55 88,256.67 107,755.4
GASTOS GENERALES 10.00% 199,009.44 5,856.73 1,128.56 1,323.56 1,395.41 2,219.91 5,602.96 8,825.67 10,775.5
UTILIDAD 10.00% 199,009.44 5,856.73 1,128.56 1,323.56 1,395.41 2,219.91 5,602.96 8,825.67 10,775.5
SUB TOTAL 2,388,113.30 70,280.73 13,542.76 15,882.71 16,744.90 26,638.89 67,235.47 105,908.01 129,306.4
IGV 18.00% 429,860.39 12,650.53 2,437.70 2,858.89 3,014.08 4,795.00 12,102.38 19,063.44 23,275.1
PRESUPUESTO PARCIAL 2,817,973.69 82,931.26 15,980.46 18,741.60 19,758.98 31,433.89 79,337.85 124,971.45 152,581.6
PORCENTAJE DE AVANCE 2.94% 0.57% 0.67% 0.70% 1.12% 2.82% 4.43% 5.41%
PORCENTAJE DE AVANCE ACUMULADO 100.00% 4.88% 13.78%
MA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

18 DEL CENTRO POBLADO MENOR DE YANAMUCLO


MEJORAMIENTO
E I.E.E. N°30319
Y AMPLIACION
DEL ANEXO DEL
DE MARAVILCA,
SERVICIO EDUCATIVO
DISTRITO DE
DE MATAHUASI
NIVEL PRIMARIO
- CONCEPCION
I.E.E. N°30318
- JUNIN
DEL CENTRO P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
BLOQUE AB - YANAMUCLO 1,990,094.42
01 ESTRUCTURAS 1,077,684.21 MES 01 MES 02
01.01 OBRAS PROVISIONALES 44,569.85
01.01.01 CONSTRUCCION PROVISIONAL DE OFICINA 384.00 384.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.02 CONSTRUCCION PROVISIONAL DE CASETA PARA GUARDIANIA 144.00 144.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.03 CONSTRUCCION PROVISIONAL DE VESTIDOR PARA PERSONAL 480.00 480.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.04 GUARDIANIA DE OBRA 37,785.60 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.4
01.01.05 ALQUILER DE ALMACEN 1,440.00 56.00 56.00 56.00 56.00 56.00 56.00 56.00 56.0
01.01.06 CARTEL DE IDENTIFICACION DE OBRA (3.60x2.40) 856.25 0.00 856.25 0.00 0.00 0.00 0.00 0.00 0.0
01.01.07 AGUA PARA CONSUMO EN LA CONSTRUCCION 1,080.00 42.00 42.00 42.00 42.00 42.00 42.00 42.00 42.0
01.01.08 DESAGUE PARA LA CONSTRUCCION 750.00 0.00 750.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.09 ENERGIA ELECTRICA PROVISIONAL PARA LA CONSTRUCCION 1,650.00 64.17 64.17 64.17 64.17 64.17 64.17 64.17 64.1
01.02 TRABAJOS PRELIMINARES 66,669.81
01.02.01 DEMOLICION DE CONSTRUCCION EXISTENTE 46,142.30 46,142.30 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.02.02 ELIMINACION DE CONSTRUCCION DEMOLIDA DP=2 KM. 8,433.24 6,324.93 2,108.31 0.00 0.00 0.00 0.00 0.00 0.0
01.02.03 LIMPIEZA DEL TERRENO MANUAL 3,218.46 0.00 3,218.46 0.00 0.00 0.00 0.00 0.00 0.0
01.02.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS 2,500.00 2,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.02.05 TRAZO, NIVELACION Y REPLANTEO PARA EDIFICACION 2,770.32 0.00 1,007.39 1,762.93 0.00 0.00 0.00 0.00 0.0
01.02.06 CONTROL TOPOGRAFICO DURANTE EJECUCION DE OBRA 3,605.49 841.28 841.28 841.28 841.28 240.37 0.00 0.00 0.0
01.03 MOVIMIENTO DE TIERRAS 32,782.10
01.03.01 EXCAVACION DE ZANJAS PARA ZAPATAS H=1.20 - 1.50 M. 9,038.33 0.00 753.19 5,272.36 3,012.78 0.00 0.00 0.00 0.0
01.03.02 EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS 2,632.52 0.00 0.00 548.44 767.82 767.82 548.44 0.00 0.0
01.03.03 EXCAVACION DE ZANJAS PARA JARDIN 31.43 0.00 0.00 31.43 0.00 0.00 0.00 0.00 0.0
01.03.04 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 4,776.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,776.2
01.03.05 REFINE, NIVELACION Y COMPACTACION DE PLATAFORMA 4,486.78 0.00 0.00 0.00 0.00 0.00 560.85 3,925.93 0.0
01.03.06 REFINE, NIVELACION Y COMPACTACION DE BASE PARA VEREDAS 6,019.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,019.8
01.03.07 RELLENO Y COMPACTACION DE PODIUM CON MATERIAL PROPIO 301.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 301.5
01.03.08 ACARREO INTERNO DE MATERIAL EXCEDENTE DP=20 M. 2,694.29 0.00 0.00 0.00 0.00 0.00 0.00 1,347.15 1,347.1
01.03.09 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 2,801.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.04 OBRAS DE CONCRETO SIMPLE 90,690.96
MA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

18 DEL CENTRO POBLADO MENOR DE YANAMUCLO


MEJORAMIENTO
E I.E.E. N°30319
Y AMPLIACION
DEL ANEXO DEL
DE MARAVILCA,
SERVICIO EDUCATIVO
DISTRITO DE
DE MATAHUASI
NIVEL PRIMARIO
- CONCEPCION
I.E.E. N°30318
- JUNIN
DEL CENTRO P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.04.01 SOLADO PARA ZAPATAS E=0.10 M. 1:10 CEMENTO - HORMIGON 5,467.93 0.00 0.00 0.00 911.32 3,189.63 1,366.98 0.00 0.0
01.04.02 CONCRETO 1:10+30% P.G. PARA CIMIENTOS CORRIDOS 21,485.78 0.00 0.00 0.00 0.00 8,057.17 9,400.03 4,028.58 0.0
01.04.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO 6,829.64 0.00 0.00 0.00 0.00 0.00 2,276.55 3,983.96 569.1
01.04.04 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS 3,042.44 0.00 0.00 0.00 0.00 0.00 0.00 1,521.22 1,521.2
01.04.05 FALSO PISO DE CONCRETO E=0.10 M. CEMENTO - HORMIGON 16,168.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9,701.1
01.04.06 ENCOFRADO Y DESENCOFRADO NORMAL PARA VEREDAS 4,000.12 0.00 0.00 0.00 0.00 2,000.06 2,000.06 0.00 0.0
01.04.07 CONCRETO F'C=140 KG/CM2 PARA VEREDAS INCLUYE ACABADOS 19,168.71 0.00 0.00 0.00 0.00 0.00 5,750.61 13,418.10 0.0
01.04.08 ENCOFRADO Y DESENCOFRADO NORMAL PARA CUNETAS 3,648.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,648.2
01.04.09 CONCRETO F'C=140 KG/CM2 PARA CUNETAS INCLUYE ACABADOS 4,971.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,142.8
01.04.10 ENCOFRADO Y DESENCOFRADO NORMAL PARA JARDIN 3,281.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,460.7
01.04.11 CONCRETO F'C=140 KG/CM2 PARA JARDIN 2,627.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 656.7
01.05 OBRAS DE CONCRETO ARMADO 772,773.58
01.05.01 ZAPATAS 49,980.45
01.05.01.01 ACERO F'Y= 4200 KG/CM2 PARA ZAPATAS 11,429.97 0.00 0.00 0.00 0.00 0.00 10,001.22 1,428.75 0.0
01.05.01.02 CONCRETO F'C=210 KG/CM2 PARA ZAPATAS 38,550.48 0.00 0.00 0.00 0.00 0.00 0.00 23,130.29 15,420.1
01.05.02 COLUMNAS 113,702.39
01.05.02.01 ACERO F'Y= 4200 KG/CM2 PARA COLUMNAS 43,524.40 0.00 0.00 0.00 0.00 0.00 4,974.22 8,704.88 8,704.8
01.05.02.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS 47,502.09 0.00 0.00 0.00 0.00 0.00 0.00 3,064.65 10,726.2
01.05.02.03 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS 22,675.90 0.00 0.00 0.00 0.00 0.00 0.00 2,451.45 4,290.0
01.05.03 COLUMNETAS 43,559.15
01.05.03.01 ACERO F'Y= 4200 KG/CM2 PARA COLUMNETAS 13,992.87 0.00 0.00 0.00 0.00 0.00 0.00 1,023.87 2,389.0
01.05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNETAS 20,137.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,179.6
01.05.03.03 CONCRETO F'C=175 KG/CM2 PARA COLUMNETAS 9,428.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 764.4
01.05.04 VIGAS 210,855.32
01.05.04.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA VIGAS 79,074.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.04.02 ACERO F'Y= 4200 KG/CM2 PARA VIGAS 84,562.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.04.03 CONCRETO F'C=210 KG/CM2 PARA VIGAS 47,218.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05 LOSA ALIGERADA 288,844.61
01.05.05.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA ALIGERADA 134,294.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.02 BLOQUETA DE ARCILLA H=0.15 M. PARA LOSA ALIGERADA 21,223.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.03 BLOQUETA DE ARCILLA H=0.12 M. PARA LOSA ALIGERADA 21,181.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
MA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

18 DEL CENTRO POBLADO MENOR DE YANAMUCLO


MEJORAMIENTO
E I.E.E. N°30319
Y AMPLIACION
DEL ANEXO DEL
DE MARAVILCA,
SERVICIO EDUCATIVO
DISTRITO DE
DE MATAHUASI
NIVEL PRIMARIO
- CONCEPCION
I.E.E. N°30318
- JUNIN
DEL CENTRO P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.05.05.04 ACERO F'Y= 4200 KG/CM2 PARA LOSA ALIGERADA 57,235.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.05 CONCRETO F'C=210 KG/CM2 PARA LOSA ALIGERADA 54,910.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06 ESCALERAS 65,831.66
01.05.06.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESCALERAS 18,440.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06.02 ACERO F'Y= 4200 KG/CM2 PARA ESCALERAS 9,971.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06.03 CONCRETO F'C=210 KG/CM2 PARA ESCALERAS 37,419.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.06 TANQUE CISTERNA 64,777.91
01.06.01 EXCAVACION DE ZANJAS PARA CIMENTACION 2,738.86 0.00 0.00 2,738.86 0.00 0.00 0.00 0.00 0.0
01.06.02 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 889.89 0.00 0.00 0.00 0.00 0.00 889.89 0.00 0.0
01.06.03 SOLADO PARA ZAPATAS E=0.10 M. 1:10 CEMENTO - HORMIGON 289.53 0.00 0.00 289.53 0.00 0.00 0.00 0.00 0.0
01.06.04 ACERO F'Y= 4200 KG/CM2 PARA ZAPATAS 581.27 0.00 0.00 0.00 581.27 0.00 0.00 0.00 0.0
01.06.05 CONCRETO F'C=210 KG/CM2 PARA ZAPATAS 2,041.31 0.00 0.00 0.00 2,041.31 0.00 0.00 0.00 0.0
01.06.06 ACERO F'Y= 4200 KG/CM2 PARA COLUMNAS 4,301.61 0.00 0.00 0.00 3,584.68 716.93 0.00 0.00 0.0
01.06.07 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS 3,278.17 0.00 0.00 0.00 0.00 1,966.90 1,311.27 0.00 0.0
01.06.08 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS 1,901.00 0.00 0.00 0.00 0.00 475.25 1,425.75 0.00 0.0
01.06.09 ENCOFRADO Y DESENCOFRADO NORMAL PARA VIGAS 2,007.72 0.00 0.00 0.00 0.00 0.00 1,003.86 1,003.86 0.0
01.06.10 ACERO F'Y= 4200 KG/CM2 PARA VIGAS 3,065.73 0.00 0.00 0.00 0.00 0.00 0.00 3,065.73 0.0
01.06.11 CONCRETO F'C=210 KG/CM2 PARA VIGAS 1,380.31 0.00 0.00 0.00 0.00 0.00 0.00 1,380.31 0.0
01.06.12 ACERO F'Y= 4200 KG/CM2 PARA CISTERNA 5,076.96 0.00 0.00 0.00 0.00 0.00 5,076.96 0.00 0.0
01.06.13 ENCOFRADO Y DESENCOFRADO NORMAL PARA CISTERNA 3,718.82 0.00 0.00 0.00 0.00 1,859.41 1,859.41 0.00 0.0
01.06.14 CONCRETO F'C=210 KG/CM2 PARA CISTERNA 4,092.64 0.00 0.00 0.00 0.00 0.00 4,092.64 0.00 0.0
01.06.15 ACERO F'Y= 4200 KG/CM2 PARA TANQUE ELEVADO 4,880.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,880.2
01.06.16 ENCOFRADO Y DESENCOFRADO NORMAL PARA TANQUE ELEVADO 4,492.10 0.00 0.00 0.00 0.00 0.00 0.00 4,492.10 0.0
01.06.17 CONCRETO F'C=210 KG/CM2 PARA TANQUE ELEVADO 2,618.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,618.4
01.06.18 ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA ALIGERADA 453.94 0.00 0.00 0.00 0.00 0.00 453.94 0.00 0.0
01.06.19 BLOQUETA DE ARCILLA H=0.15 M. PARA LOSA ALIGERADA 182.52 0.00 0.00 0.00 0.00 0.00 182.52 0.00 0.0
01.06.20 ACERO F'Y= 4200 KG/CM2 PARA LOSA ALIGERADA 321.44 0.00 0.00 0.00 0.00 0.00 321.44 0.00 0.0
01.06.21 CONCRETO F'C=210 KG/CM2 PARA LOSA ALIGERADA 224.55 0.00 0.00 0.00 0.00 0.00 0.00 224.55 0.0
01.06.22 MURO DE SOGA CON LADRILLO K.K. 18H 9X13X24 CM. 2,287.88 0.00 0.00 0.00 0.00 0.00 0.00 2,287.88 0.0
01.06.23 TARRAJEO EN MUROS INTERIORES FROTACHADO MEZCLA 1:5 851.76 0.00 0.00 0.00 0.00 0.00 0.00 851.76 0.0
01.06.24 TARRAJEO INTERIOR CON IMPERMEABILIZANTE DE TANQUE CISTERNA 1,402.11 0.00 0.00 0.00 0.00 0.00 0.00 701.06 701.0
MA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

18 DEL CENTRO POBLADO MENOR DE YANAMUCLO


MEJORAMIENTO
E I.E.E. N°30319
Y AMPLIACION
DEL ANEXO DEL
DE MARAVILCA,
SERVICIO EDUCATIVO
DISTRITO DE
DE MATAHUASI
NIVEL PRIMARIO
- CONCEPCION
I.E.E. N°30318
- JUNIN
DEL CENTRO P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.06.25 TARRAJEO INTERIOR CON IMPERMEABILIZANTE DE TANQUE ELEVADO 886.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 886.6
01.06.26 TARRAJEO EXTERIOR FROTACHADO DE ESTRUCTURA MEZCLA 1:5 4,004.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,004.0
01.06.27 PINTURA LATEX EN ESTRUCTURA DOS MANOS 1,975.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.06.28 INSTALACION DE ACCESORIOS DE TANQUE CISTERNA 2,112.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,112.3
01.06.29 INSTALACION DE PUERTA DE MADERA P-1 320.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 320.0
01.06.30 INSTALACION DE ESCALERA METALICA SEGUN DISEÑO 2,400.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,400.0
01.07 PRUEBAS Y ENSAYOS DE CALIDAD 3,820.00
01.07.01 PROCTOR MODIFICADO 160.00 0.00 0.00 0.00 0.00 160.00 0.00 0.00 0.0
01.07.02 DENSIDAD DE CAMPO 480.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.7
01.07.03 DISEÑO DE MEZCLA 540.00 0.00 0.00 0.00 462.86 77.14 0.00 0.00 0.0
01.07.04 ROTURA DE PROBETA (COMPRESION SIMPLE) 2,640.00 0.00 0.00 0.00 0.00 0.00 65.19 228.15 228.1
01.08 FLETE 1,600.00
01.08.01 FLETE TERRESTRE 1,600.00 119.15 119.15 119.15 119.15 119.15 119.15 119.15 119.1
02 ARQUITECTURA 743,584.58
02.01 MUROS Y TABIQUES 140,636.03
02.01.01 MURO DE SOGA CON LADRILLO K.K. 18H 9X13X24 CM. 140,051.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
MURO DE CABEZA CON LADRILLO K.K. 18H 9X13X24 CM. 584.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02 REVOQUES, ENLUCIDOS Y MOLDURAS 217,896.67
02.02.01 TARRAJEO EN CIELO RASO FROTACHADO MEZCLA 1:4 62,875.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.02 TARRAJEO EN MUROS INTERIORES FROTACHADO MEZCLA 1:5 63,390.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.03 TARRAJEO EN MUROS EXTERIORES FROTACHADO MEZCLA 1:5 35,522.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.04 TARRAJEO EN VIGAS MEZCLA 1:4 27,465.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.05 TARRAJEO EN COLUMNAS MEZCLA 1:5 19,492.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.06 VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS MEZCLA 1:5 9,002.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.07 TARRAJEO DE PODIUM MEZCLA 1:5 147.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03 PISOS Y PAVIMENTOS 111,696.25
02.03.01 PISO DE PORCELANATO ALTO TRANSITO ANTIDESLIZANTE PARA AMBIENTES 65,681.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03.02 PISO DE PORCELANATO ALTO TRANSITO ANTIDESLIZANTE PARA VEREDAS 41,788.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03.03 PISO DE CERAMICO ANTIDESLIZANTE DE ALTO TRANSITO 4,226.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04 ZOCALOS Y CONTRAZOCALOS 28,505.27
02.04.01 CONTRAZOCALO DE PORCELANATO H=0.10 M. PARA AMBIENTES 11,652.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
MA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

18 DEL CENTRO POBLADO MENOR DE YANAMUCLO


MEJORAMIENTO
E I.E.E. N°30319
Y AMPLIACION
DEL ANEXO DEL
DE MARAVILCA,
SERVICIO EDUCATIVO
DISTRITO DE
DE MATAHUASI
NIVEL PRIMARIO
- CONCEPCION
I.E.E. N°30318
- JUNIN
DEL CENTRO P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
02.04.02 CONTRAZOCALO DE PORCELANATO H=0.10 M. PARA VEREDAS 11,342.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04.03 CONTRAZOCALO DE CERAMICO H=0.10 M. 5,139.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04.04 ZOCALO DE CERAMICO 370.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.05 CUBIERTAS 46,545.41
02.05.01 CUBIERTA DE TEJA ANDINA TIPO ETERNIT 46,545.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06 CARPINTERIA DE MADERA 17,229.50
02.06.01 PUERTA APANELADA DE CEDRO TIPO P-01 INC. INSTALACION 7,810.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06.02 PUERTA APANELADA DE CEDRO TIPO P-02 INC. INSTALACION 5,583.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06.03 PUERTA APANELADA DE CEDRO TIPO P-03 INC. INSTALACION 3,836.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07 CARPINTERIA METALICA 24,910.00
02.07.01 PORTON METALICO PM-01 INC. PINTADO E INSTALACION 860.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.02 VENTANA METALICA V-01 INC. PINTADO E INSTALACION 1,120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.03 VENTANA METALICA V-02 INC. PINTADO E INSTALACION 4,830.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.04 VENTANA METALICA V-03 INC. PINTADO E INSTALACION 2,200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.05 VENTANA METALICA V-04 INC. PINTADO E INSTALACION 1,120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.06 VENTANA METALICA V-05 INC. PINTADO E INSTALACION 4,830.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.07 VENTANA METALICA V-06 INC. PINTADO E INSTALACION 3,520.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.08 VENTANA METALICA V-07 INC. PINTADO E INSTALACION 1,140.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.09 VENTANA METALICA V-08 INC. PINTADO E INSTALACION 5,290.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.08 CARPINTERIA EN MELAMINA 5,580.00
02.08.01 SEPARADOR DE BAÑOS TIPO 01 5,580.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.09 CERRAJERIA 7,251.54
02.09.01 CERRADURA PARA PUERTA DE TRES GOLPES 4,796.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.09.02 CERRADURA PARA PUERTA TIPO PERILLA 2,454.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.10 VIDRIOS, CRISTALES Y SIMILARES 41,997.06
02.10.01 VIDRIO LAMINAR BUTIRAL DE POLIVINILO INCOLORO 41,997.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11 PINTURAS 90,207.74
02.11.01 PINTURA LATEX EN CIELO RASO DOS MANOS 22,833.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.02 PINTURA LATEX EN MUROS EXTERIORES DOS MANOS 17,654.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.03 PINTURA LATEX EN MUROS INTERIORES DOS MANOS 30,153.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.04 PINTURA LATEX EN VIGAS DOS MANOS 10,154.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
MA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

18 DEL CENTRO POBLADO MENOR DE YANAMUCLO


MEJORAMIENTO
E I.E.E. N°30319
Y AMPLIACION
DEL ANEXO DEL
DE MARAVILCA,
SERVICIO EDUCATIVO
DISTRITO DE
DE MATAHUASI
NIVEL PRIMARIO
- CONCEPCION
I.E.E. N°30318
- JUNIN
DEL CENTRO P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
02.11.05 PINTURA LATEX EN COLUMNAS DOS MANOS 7,342.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.06 PINTURA LATEX PARA DERRAMES EN PUERTAS Y VENTANAS DOS MANOS 1,560.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.07 PINTURA PARA PIZARRA 510.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12 JUNTAS 11,129.11
02.12.01 JUNTAS ASFALTICAS EN VEREDAS 2,066.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12.02 JUNTAS ASFALTICAS PARA SARDINEL DE JARDIN 91.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12.03 JUNTAS ASFALTICAS PARA COLUMNETAS 8,971.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03 INSTALACIONES SANITARIAS 58,301.24
03.01 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO 8,682.61
03.01.01 MOVIMIENTO DE TIERRAS 1,649.41
03.01.01.01 EXCAVACION DE ZANJAS PARA TUBERIA DE AGUA 937.63 0.00 0.00 0.00 0.00 937.63 0.00 0.00 0.0
03.01.01.02 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 681.36 0.00 0.00 0.00 0.00 0.00 596.19 85.17 0.0
03.01.01.03 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 30.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.01.02 SALIDAS 2,360.13
03.01.02.01 SALIDA DE AGUA FRIA PVC SAP DE 1/2" 2,254.32 0.00 0.00 0.00 0.00 0.00 120.77 281.79 281.7
03.01.02.02 SALIDA DE AGUA PARA RIEGO PVC SAP DE 1/2" 56.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 56.6
03.01.02.03 SALIDA DE AGUA FRIA CONTRA INCENDIO PVC SAP DE 2" 49.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 49.1
03.01.03 RED DE DISTRIBUCION 4,673.07
03.01.03.01 TUBERIA PARA AGUA POTABLE PVC SAP DE 1/2" C-10 2,106.15 0.00 0.00 0.00 0.00 0.00 0.00 254.19 254.1
03.01.03.02 TUBERIA PARA RIEGO PVC SAP DE 1/2" C-10 72.72 0.00 0.00 0.00 0.00 0.00 0.00 72.72 0.0
03.01.03.03 TUBERIA CONTRA INCENDIO PVC SAP DE 2" C-10 80.28 0.00 0.00 0.00 0.00 0.00 0.00 80.28 0.0
03.01.03.04 VALVULA DE COMPUERTA DE 1/2" 1,834.94 0.00 0.00 0.00 0.00 0.00 0.00 65.53 229.3
03.01.03.05 VALVULA DE COMPUERTA DE 2" 127.03 0.00 0.00 0.00 0.00 0.00 0.00 2.23 15.6
03.01.03.06 GRIFO CONTRA INCENDIO 451.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02 SISTEMA DE DESAGUE 19,414.41
03.02.01 MOVIMIENTO DE TIERRAS 1,805.63
03.02.01.01 EXCAVACION DE ZANJAS PARA TUBERIA DE DESAGUE 1,045.58 0.00 0.00 0.00 0.00 0.00 0.00 1,045.58 0.0
03.02.01.02 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 703.40 0.00 0.00 0.00 0.00 0.00 0.00 351.70 351.7
03.02.01.03 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 56.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02.02 SALIDAS 5,996.34
03.02.02.01 SALIDA DE DESAGUE CON PVC SAL DE 2" 2,613.30 0.00 0.00 0.00 0.00 0.00 0.00 190.06 332.6
MA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

18 DEL CENTRO POBLADO MENOR DE YANAMUCLO


MEJORAMIENTO
E I.E.E. N°30319
Y AMPLIACION
DEL ANEXO DEL
DE MARAVILCA,
SERVICIO EDUCATIVO
DISTRITO DE
DE MATAHUASI
NIVEL PRIMARIO
- CONCEPCION
I.E.E. N°30318
- JUNIN
DEL CENTRO P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
03.02.02.02 SALIDA DE DESAGUE CON PVC SAL DE 4" 1,461.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 91.3
03.02.02.03 SALIDA DE VENTILACION CON PVC SAL DE 2" 1,921.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02.03 RED DE DISTRIBUCION 11,612.44
03.02.03.01 TUBERIA PARA DESAGUE CON PVC SAL DE 2" 1,038.11 0.00 0.00 0.00 0.00 0.00 0.00 72.85 127.4
03.02.03.02 TUBERIA PARA DESAGUE CON PVC SAL DE 4" 5,387.78 0.00 0.00 0.00 0.00 0.00 0.00 96.21 673.4
03.02.03.03 TUBERIA PARA VENTILACION CON PVC SAL DE 2" 2,348.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 132.9
TUBERIA PARA CAJA DE REGISTRO CON PVC SAL DE 2" 2,837.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03 SISTEMA DE DESAGUE PLUVIAL 15,728.96
03.03.01 TUBERIA PVC SAL PLUVIAL DE 4" 4,216.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.02 TUBERIA PVC SAL PLUVIAL DE 3" 1,789.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA FALSA COLUMNA 5,450.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.04 CONCRETO F'C=175 KG/CM2 PARA FALSA COLUMNA 3,930.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.05 ACCESORIOS PARA DESAGUE PLUVIAL 341.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04 APARATOS Y ACCESORIOS SANITARIOS 14,475.26
03.04.01 INODORO DE LOSA TANQUE BAJO 5,908.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.02 LAVATORIO DE LOSA CON PEDESTAL 4,385.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.03 PAPELERA DE LOSA 1,190.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.04 SUMIDERO DE BRONCE ROSCADO DE 2" 985.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.05 REGISTRO ROSCADO DE BRONCE DE 4" 1,381.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.06 CAJA DE REGISTRO PARA DESAGUE DE 624.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04 INSTALACIONES ELECTRICAS 110,524.39
04.01 PRIMER PISO 64,859.19
04.01.01 SALIDAS 13,513.89
04.01.01.01 SALIDAD DE TECHO PARA CENTRO DE LUZ 6,566.30 0.00 0.00 0.00 0.00 0.00 0.00 1,094.38 1,915.1
04.01.01.02 SALIDA DE TOMACORRIENTE BIPOLARES CON LINEA A TIERRA 4,391.95 0.00 0.00 0.00 0.00 0.00 0.00 548.99 1,921.4
04.01.01.03 SALIDA DE TOMACORRIENTE PARA ALUMBRADO DE EMERGENCIA 363.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.01.04 SALIDA PARA INTERRUPTORES EN CONMUTACION 1,057.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.01.05 SALIDA PARA INTERRUPTORES SIMPLES 298.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 298.5
04.01.01.06 SALIDA PARA INTERRUPTORES DOBLES 248.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.4
04.01.01.07 SALIDA PARA INTERRUPTORES TRIPLES 587.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 419.5
04.01.02 CANALIZACION DE TUBERIAS PVC 20,053.08
MA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

18 DEL CENTRO POBLADO MENOR DE YANAMUCLO


MEJORAMIENTO
E I.E.E. N°30319
Y AMPLIACION
DEL ANEXO DEL
DE MARAVILCA,
SERVICIO EDUCATIVO
DISTRITO DE
DE MATAHUASI
NIVEL PRIMARIO
- CONCEPCION
I.E.E. N°30318
- JUNIN
DEL CENTRO P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
04.01.02.01 TUBERIA DE 25 MM. PVC SEL (1") 4,054.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.02.02 TUBERIA DE 20 MM. PVC SEL (3/4") 15,998.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03 CONDUCTORES 8,301.84
04.01.03.01 CONDUCTOR (2x10+1x10) MM. THHW 358.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.02 CONDUCTOR (1x10) MM2. THHW 146.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.03 CONDUCTOR (2x6+1x10) MM2 THHW 975.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.04 CONDUCTOR (2x2.5) MM2. THHW 4,612.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.05 CONDUCTOR (2x4.0) MM2. THHW 2,209.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.04 TABLEROS ELECTRICOS 4,700.00
04.01.04.01 TABLERO GENERAL Y TABLEROS DE DISTRIBUCION 4,700.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.05 CONEXION A TIERRA 5,600.00
04.01.05.01 POZO A TIERRA 5,600.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06 ARTEFACTOS Y ACCESORIOS ELECTRICOS 11,490.39
04.01.06.01 FLUORESCENTE RECTO INCLUYE EQUIPO Y PANTALLA 7,678.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.02 SPOT LIGHT 656.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.03 LUCES DE EMERGENCIA CON BATERIA - 02 FAROS 637.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.04 TOMACORRIENTE BIPOLAR 1,779.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.05 TOMACORRIENTE SIMPLE 125.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.06 INTERRUPTOR CONMUTACION 210.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.07 INTERRUPTOR SIMPLE 107.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.08 INTERRUPTOR DOBLE 94.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.09 INTERRUPTOR TRIPLE 201.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.07 OTROS 1,199.99
04.01.07.02 DISPOSITIVOS Y EQUIPOS DE SEGURIDAD 1,199.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02 SEGUNDO PISO 45,665.20
04.02.01 SALIDAS 13,605.84
04.02.01.01 SALIDAD DE TECHO PARA CENTRO DE LUZ 6,212.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.02 SALIDA DE TOMACORRIENTE BIPOLARES CON LINEA A TIERRA 5,218.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.03 SALIDA DE TOMACORRIENTE PARA ALUMBRADO DE EMERGENCIA 303.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.04 SALIDA PARA INTERRUPTORES EN CONMUTACION 704.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
MA DE OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

18 DEL CENTRO POBLADO MENOR DE YANAMUCLO


MEJORAMIENTO
E I.E.E. N°30319
Y AMPLIACION
DEL ANEXO DEL
DE MARAVILCA,
SERVICIO EDUCATIVO
DISTRITO DE
DE MATAHUASI
NIVEL PRIMARIO
- CONCEPCION
I.E.E. N°30318
- JUNIN
DEL CENTRO P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
04.02.01.05 SALIDA PARA INTERRUPTORES SIMPLES 298.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.06 SALIDA PARA INTERRUPTORES DOBLES 398.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.07 SALIDA PARA INTERRUPTORES TRIPLES 469.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.02 CANALIZACION DE TUBERIAS PVC 13,965.19
04.02.02.01 TUBERIA DE 20 MM. PVC SEL (3/4") 13,965.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.03 CONDUCTORES 6,384.59
04.02.03.01 CONDUCTOR (2x2.5) MM2. THHW 3,370.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.03.02 CONDUCTOR (2x4.0) MM2. THHW 3,014.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04 ARTEFACTOS Y ACCESORIOS ELECTRICOS 11,709.58
04.02.04.01 FLUORESCENTE RECTO INCLUYE EQUIPO Y PANTALLA 8,432.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.02 LUCES DE EMERGENCIA CON BATERIA - 02 FAROS 637.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.03 TOMACORRIENTE BIPOLAR 1,779.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.04 TOMACORRIENTE SIMPLE 104.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.05 INTERRUPTOR CONMUTACION 336.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.06 INTERRUPTOR SIMPLE 107.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.07 INTERRUPTOR DOBLE 150.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.08 INTERRUPTOR TRIPLE 161.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0

COSTO DIRECTO 1,990,094.42 58,567.27 11,285.64 13,235.59 13,954.08 22,199.07 56,029.55 88,256.67 107,755.4
GASTOS GENERALES 10.00% 199,009.44 5,856.73 1,128.56 1,323.56 1,395.41 2,219.91 5,602.96 8,825.67 10,775.5
UTILIDAD 10.00% 199,009.44 5,856.73 1,128.56 1,323.56 1,395.41 2,219.91 5,602.96 8,825.67 10,775.5
SUB TOTAL 2,388,113.30 70,280.73 13,542.76 15,882.71 16,744.90 26,638.89 67,235.47 105,908.01 129,306.4
IGV 18.00% 429,860.39 12,650.53 2,437.70 2,858.89 3,014.08 4,795.00 12,102.38 19,063.44 23,275.1
PRESUPUESTO PARCIAL 2,817,973.69 82,931.26 15,980.46 18,741.60 19,758.98 31,433.89 79,337.85 124,971.45 152,581.6
PORCENTAJE DE AVANCE 2.94% 0.57% 0.67% 0.70% 1.12% 2.82% 4.43% 5.41%
PORCENTAJE DE AVANCE ACUMULADO 100.00% 4.88% 13.78%
OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

ENTRO POBLADO MENOR DE YANAMUCLO E I.E.E.


MEJORAMIENTO
N°30319 DEL ANEXO
Y AMPLIACION
DE MARAVILCA,
DEL SERVICIO
DISTRITO
EDUCATIVO
DE MATAHUASI
DE NIVEL
- CONCEPCION
PRIMARIO I.E.E.
- JUNIN
N°30318 DEL CENTRO P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
BLOQUE AB - YANAMUCLO 1,990,094.42
01 ESTRUCTURAS 1,077,684.21 MES 01 MES 02
01.01 OBRAS PROVISIONALES 44,569.85
01.01.01 CONSTRUCCION PROVISIONAL DE OFICINA 384.00 384.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.02 CONSTRUCCION PROVISIONAL DE CASETA PARA GUARDIANIA 144.00 144.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.03 CONSTRUCCION PROVISIONAL DE VESTIDOR PARA PERSONAL 480.00 480.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.04 GUARDIANIA DE OBRA 37,785.60 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.44 1,469.4
01.01.05 ALQUILER DE ALMACEN 1,440.00 56.00 56.00 56.00 56.00 56.00 56.00 56.00 56.0
01.01.06 CARTEL DE IDENTIFICACION DE OBRA (3.60x2.40) 856.25 0.00 856.25 0.00 0.00 0.00 0.00 0.00 0.0
01.01.07 AGUA PARA CONSUMO EN LA CONSTRUCCION 1,080.00 42.00 42.00 42.00 42.00 42.00 42.00 42.00 42.0
01.01.08 DESAGUE PARA LA CONSTRUCCION 750.00 0.00 750.00 0.00 0.00 0.00 0.00 0.00 0.0
01.01.09 ENERGIA ELECTRICA PROVISIONAL PARA LA CONSTRUCCION 1,650.00 64.17 64.17 64.17 64.17 64.17 64.17 64.17 64.1
01.02 TRABAJOS PRELIMINARES 66,669.81
01.02.01 DEMOLICION DE CONSTRUCCION EXISTENTE 46,142.30 46,142.30 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.02.02 ELIMINACION DE CONSTRUCCION DEMOLIDA DP=2 KM. 8,433.24 6,324.93 2,108.31 0.00 0.00 0.00 0.00 0.00 0.0
01.02.03 LIMPIEZA DEL TERRENO MANUAL 3,218.46 0.00 3,218.46 0.00 0.00 0.00 0.00 0.00 0.0
01.02.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS 2,500.00 2,500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.02.05 TRAZO, NIVELACION Y REPLANTEO PARA EDIFICACION 2,770.32 0.00 1,007.39 1,762.93 0.00 0.00 0.00 0.00 0.0
01.02.06 CONTROL TOPOGRAFICO DURANTE EJECUCION DE OBRA 3,605.49 841.28 841.28 841.28 841.28 240.37 0.00 0.00 0.0
01.03 MOVIMIENTO DE TIERRAS 32,782.10
01.03.01 EXCAVACION DE ZANJAS PARA ZAPATAS H=1.20 - 1.50 M. 9,038.33 0.00 753.19 5,272.36 3,012.78 0.00 0.00 0.00 0.0
01.03.02 EXCAVACION DE ZANJAS PARA CIMIENTOS CORRIDOS 2,632.52 0.00 0.00 548.44 767.82 767.82 548.44 0.00 0.0
01.03.03 EXCAVACION DE ZANJAS PARA JARDIN 31.43 0.00 0.00 31.43 0.00 0.00 0.00 0.00 0.0
01.03.04 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 4,776.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,776.2
01.03.05 REFINE, NIVELACION Y COMPACTACION DE PLATAFORMA 4,486.78 0.00 0.00 0.00 0.00 0.00 560.85 3,925.93 0.0
01.03.06 REFINE, NIVELACION Y COMPACTACION DE BASE PARA VEREDAS 6,019.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,019.8
01.03.07 RELLENO Y COMPACTACION DE PODIUM CON MATERIAL PROPIO 301.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 301.5
01.03.08 ACARREO INTERNO DE MATERIAL EXCEDENTE DP=20 M. 2,694.29 0.00 0.00 0.00 0.00 0.00 0.00 1,347.15 1,347.1
01.03.09 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 2,801.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.04 OBRAS DE CONCRETO SIMPLE 90,690.96
OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

ENTRO POBLADO MENOR DE YANAMUCLO E I.E.E.


MEJORAMIENTO
N°30319 DEL ANEXO
Y AMPLIACION
DE MARAVILCA,
DEL SERVICIO
DISTRITO
EDUCATIVO
DE MATAHUASI
DE NIVEL
- CONCEPCION
PRIMARIO I.E.E.
- JUNIN
N°30318 DEL CENTRO P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.04.01 SOLADO PARA ZAPATAS E=0.10 M. 1:10 CEMENTO - HORMIGON 5,467.93 0.00 0.00 0.00 911.32 3,189.63 1,366.98 0.00 0.0
01.04.02 CONCRETO 1:10+30% P.G. PARA CIMIENTOS CORRIDOS 21,485.78 0.00 0.00 0.00 0.00 8,057.17 9,400.03 4,028.58 0.0
01.04.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO 6,829.64 0.00 0.00 0.00 0.00 0.00 2,276.55 3,983.96 569.1
01.04.04 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS 3,042.44 0.00 0.00 0.00 0.00 0.00 0.00 1,521.22 1,521.2
01.04.05 FALSO PISO DE CONCRETO E=0.10 M. CEMENTO - HORMIGON 16,168.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9,701.1
01.04.06 ENCOFRADO Y DESENCOFRADO NORMAL PARA VEREDAS 4,000.12 0.00 0.00 0.00 0.00 2,000.06 2,000.06 0.00 0.0
01.04.07 CONCRETO F'C=140 KG/CM2 PARA VEREDAS INCLUYE ACABADOS 19,168.71 0.00 0.00 0.00 0.00 0.00 5,750.61 13,418.10 0.0
01.04.08 ENCOFRADO Y DESENCOFRADO NORMAL PARA CUNETAS 3,648.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,648.2
01.04.09 CONCRETO F'C=140 KG/CM2 PARA CUNETAS INCLUYE ACABADOS 4,971.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,142.8
01.04.10 ENCOFRADO Y DESENCOFRADO NORMAL PARA JARDIN 3,281.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,460.7
01.04.11 CONCRETO F'C=140 KG/CM2 PARA JARDIN 2,627.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 656.7
01.05 OBRAS DE CONCRETO ARMADO 772,773.58
01.05.01 ZAPATAS 49,980.45
01.05.01.01 ACERO F'Y= 4200 KG/CM2 PARA ZAPATAS 11,429.97 0.00 0.00 0.00 0.00 0.00 10,001.22 1,428.75 0.0
01.05.01.02 CONCRETO F'C=210 KG/CM2 PARA ZAPATAS 38,550.48 0.00 0.00 0.00 0.00 0.00 0.00 23,130.29 15,420.1
01.05.02 COLUMNAS 113,702.39
01.05.02.01 ACERO F'Y= 4200 KG/CM2 PARA COLUMNAS 43,524.40 0.00 0.00 0.00 0.00 0.00 4,974.22 8,704.88 8,704.8
01.05.02.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS 47,502.09 0.00 0.00 0.00 0.00 0.00 0.00 3,064.65 10,726.2
01.05.02.03 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS 22,675.90 0.00 0.00 0.00 0.00 0.00 0.00 2,451.45 4,290.0
01.05.03 COLUMNETAS 43,559.15
01.05.03.01 ACERO F'Y= 4200 KG/CM2 PARA COLUMNETAS 13,992.87 0.00 0.00 0.00 0.00 0.00 0.00 1,023.87 2,389.0
01.05.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNETAS 20,137.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,179.6
01.05.03.03 CONCRETO F'C=175 KG/CM2 PARA COLUMNETAS 9,428.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 764.4
01.05.04 VIGAS 210,855.32
01.05.04.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA VIGAS 79,074.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.04.02 ACERO F'Y= 4200 KG/CM2 PARA VIGAS 84,562.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.04.03 CONCRETO F'C=210 KG/CM2 PARA VIGAS 47,218.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05 LOSA ALIGERADA 288,844.61
01.05.05.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA ALIGERADA 134,294.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.02 BLOQUETA DE ARCILLA H=0.15 M. PARA LOSA ALIGERADA 21,223.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.03 BLOQUETA DE ARCILLA H=0.12 M. PARA LOSA ALIGERADA 21,181.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

ENTRO POBLADO MENOR DE YANAMUCLO E I.E.E.


MEJORAMIENTO
N°30319 DEL ANEXO
Y AMPLIACION
DE MARAVILCA,
DEL SERVICIO
DISTRITO
EDUCATIVO
DE MATAHUASI
DE NIVEL
- CONCEPCION
PRIMARIO I.E.E.
- JUNIN
N°30318 DEL CENTRO P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.05.05.04 ACERO F'Y= 4200 KG/CM2 PARA LOSA ALIGERADA 57,235.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.05.05 CONCRETO F'C=210 KG/CM2 PARA LOSA ALIGERADA 54,910.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06 ESCALERAS 65,831.66
01.05.06.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESCALERAS 18,440.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06.02 ACERO F'Y= 4200 KG/CM2 PARA ESCALERAS 9,971.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.05.06.03 CONCRETO F'C=210 KG/CM2 PARA ESCALERAS 37,419.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.06 TANQUE CISTERNA 64,777.91
01.06.01 EXCAVACION DE ZANJAS PARA CIMENTACION 2,738.86 0.00 0.00 2,738.86 0.00 0.00 0.00 0.00 0.0
01.06.02 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 889.89 0.00 0.00 0.00 0.00 0.00 889.89 0.00 0.0
01.06.03 SOLADO PARA ZAPATAS E=0.10 M. 1:10 CEMENTO - HORMIGON 289.53 0.00 0.00 289.53 0.00 0.00 0.00 0.00 0.0
01.06.04 ACERO F'Y= 4200 KG/CM2 PARA ZAPATAS 581.27 0.00 0.00 0.00 581.27 0.00 0.00 0.00 0.0
01.06.05 CONCRETO F'C=210 KG/CM2 PARA ZAPATAS 2,041.31 0.00 0.00 0.00 2,041.31 0.00 0.00 0.00 0.0
01.06.06 ACERO F'Y= 4200 KG/CM2 PARA COLUMNAS 4,301.61 0.00 0.00 0.00 3,584.68 716.93 0.00 0.00 0.0
01.06.07 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS 3,278.17 0.00 0.00 0.00 0.00 1,966.90 1,311.27 0.00 0.0
01.06.08 CONCRETO F'C=210 KG/CM2 PARA COLUMNAS 1,901.00 0.00 0.00 0.00 0.00 475.25 1,425.75 0.00 0.0
01.06.09 ENCOFRADO Y DESENCOFRADO NORMAL PARA VIGAS 2,007.72 0.00 0.00 0.00 0.00 0.00 1,003.86 1,003.86 0.0
01.06.10 ACERO F'Y= 4200 KG/CM2 PARA VIGAS 3,065.73 0.00 0.00 0.00 0.00 0.00 0.00 3,065.73 0.0
01.06.11 CONCRETO F'C=210 KG/CM2 PARA VIGAS 1,380.31 0.00 0.00 0.00 0.00 0.00 0.00 1,380.31 0.0
01.06.12 ACERO F'Y= 4200 KG/CM2 PARA CISTERNA 5,076.96 0.00 0.00 0.00 0.00 0.00 5,076.96 0.00 0.0
01.06.13 ENCOFRADO Y DESENCOFRADO NORMAL PARA CISTERNA 3,718.82 0.00 0.00 0.00 0.00 1,859.41 1,859.41 0.00 0.0
01.06.14 CONCRETO F'C=210 KG/CM2 PARA CISTERNA 4,092.64 0.00 0.00 0.00 0.00 0.00 4,092.64 0.00 0.0
01.06.15 ACERO F'Y= 4200 KG/CM2 PARA TANQUE ELEVADO 4,880.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,880.2
01.06.16 ENCOFRADO Y DESENCOFRADO NORMAL PARA TANQUE ELEVADO 4,492.10 0.00 0.00 0.00 0.00 0.00 0.00 4,492.10 0.0
01.06.17 CONCRETO F'C=210 KG/CM2 PARA TANQUE ELEVADO 2,618.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,618.4
01.06.18 ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA ALIGERADA 453.94 0.00 0.00 0.00 0.00 0.00 453.94 0.00 0.0
01.06.19 BLOQUETA DE ARCILLA H=0.15 M. PARA LOSA ALIGERADA 182.52 0.00 0.00 0.00 0.00 0.00 182.52 0.00 0.0
01.06.20 ACERO F'Y= 4200 KG/CM2 PARA LOSA ALIGERADA 321.44 0.00 0.00 0.00 0.00 0.00 321.44 0.00 0.0
01.06.21 CONCRETO F'C=210 KG/CM2 PARA LOSA ALIGERADA 224.55 0.00 0.00 0.00 0.00 0.00 0.00 224.55 0.0
01.06.22 MURO DE SOGA CON LADRILLO K.K. 18H 9X13X24 CM. 2,287.88 0.00 0.00 0.00 0.00 0.00 0.00 2,287.88 0.0
01.06.23 TARRAJEO EN MUROS INTERIORES FROTACHADO MEZCLA 1:5 851.76 0.00 0.00 0.00 0.00 0.00 0.00 851.76 0.0
01.06.24 TARRAJEO INTERIOR CON IMPERMEABILIZANTE DE TANQUE CISTERNA 1,402.11 0.00 0.00 0.00 0.00 0.00 0.00 701.06 701.0
OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

ENTRO POBLADO MENOR DE YANAMUCLO E I.E.E.


MEJORAMIENTO
N°30319 DEL ANEXO
Y AMPLIACION
DE MARAVILCA,
DEL SERVICIO
DISTRITO
EDUCATIVO
DE MATAHUASI
DE NIVEL
- CONCEPCION
PRIMARIO I.E.E.
- JUNIN
N°30318 DEL CENTRO P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
01.06.25 TARRAJEO INTERIOR CON IMPERMEABILIZANTE DE TANQUE ELEVADO 886.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 886.6
01.06.26 TARRAJEO EXTERIOR FROTACHADO DE ESTRUCTURA MEZCLA 1:5 4,004.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,004.0
01.06.27 PINTURA LATEX EN ESTRUCTURA DOS MANOS 1,975.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
01.06.28 INSTALACION DE ACCESORIOS DE TANQUE CISTERNA 2,112.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,112.3
01.06.29 INSTALACION DE PUERTA DE MADERA P-1 320.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 320.0
01.06.30 INSTALACION DE ESCALERA METALICA SEGUN DISEÑO 2,400.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,400.0
01.07 PRUEBAS Y ENSAYOS DE CALIDAD 3,820.00
01.07.01 PROCTOR MODIFICADO 160.00 0.00 0.00 0.00 0.00 160.00 0.00 0.00 0.0
01.07.02 DENSIDAD DE CAMPO 480.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.7
01.07.03 DISEÑO DE MEZCLA 540.00 0.00 0.00 0.00 462.86 77.14 0.00 0.00 0.0
01.07.04 ROTURA DE PROBETA (COMPRESION SIMPLE) 2,640.00 0.00 0.00 0.00 0.00 0.00 65.19 228.15 228.1
01.08 FLETE 1,600.00
01.08.01 FLETE TERRESTRE 1,600.00 119.15 119.15 119.15 119.15 119.15 119.15 119.15 119.1
02 ARQUITECTURA 743,584.58
02.01 MUROS Y TABIQUES 140,636.03
02.01.01 MURO DE SOGA CON LADRILLO K.K. 18H 9X13X24 CM. 140,051.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
MURO DE CABEZA CON LADRILLO K.K. 18H 9X13X24 CM. 584.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02 REVOQUES, ENLUCIDOS Y MOLDURAS 217,896.67
02.02.01 TARRAJEO EN CIELO RASO FROTACHADO MEZCLA 1:4 62,875.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.02 TARRAJEO EN MUROS INTERIORES FROTACHADO MEZCLA 1:5 63,390.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.03 TARRAJEO EN MUROS EXTERIORES FROTACHADO MEZCLA 1:5 35,522.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.04 TARRAJEO EN VIGAS MEZCLA 1:4 27,465.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.05 TARRAJEO EN COLUMNAS MEZCLA 1:5 19,492.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.06 VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS MEZCLA 1:5 9,002.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.02.07 TARRAJEO DE PODIUM MEZCLA 1:5 147.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03 PISOS Y PAVIMENTOS 111,696.25
02.03.01 PISO DE PORCELANATO ALTO TRANSITO ANTIDESLIZANTE PARA AMBIENTES 65,681.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03.02 PISO DE PORCELANATO ALTO TRANSITO ANTIDESLIZANTE PARA VEREDAS 41,788.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.03.03 PISO DE CERAMICO ANTIDESLIZANTE DE ALTO TRANSITO 4,226.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04 ZOCALOS Y CONTRAZOCALOS 28,505.27
02.04.01 CONTRAZOCALO DE PORCELANATO H=0.10 M. PARA AMBIENTES 11,652.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

ENTRO POBLADO MENOR DE YANAMUCLO E I.E.E.


MEJORAMIENTO
N°30319 DEL ANEXO
Y AMPLIACION
DE MARAVILCA,
DEL SERVICIO
DISTRITO
EDUCATIVO
DE MATAHUASI
DE NIVEL
- CONCEPCION
PRIMARIO I.E.E.
- JUNIN
N°30318 DEL CENTRO P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
02.04.02 CONTRAZOCALO DE PORCELANATO H=0.10 M. PARA VEREDAS 11,342.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04.03 CONTRAZOCALO DE CERAMICO H=0.10 M. 5,139.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.04.04 ZOCALO DE CERAMICO 370.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.05 CUBIERTAS 46,545.41
02.05.01 CUBIERTA DE TEJA ANDINA TIPO ETERNIT 46,545.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06 CARPINTERIA DE MADERA 17,229.50
02.06.01 PUERTA APANELADA DE CEDRO TIPO P-01 INC. INSTALACION 7,810.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06.02 PUERTA APANELADA DE CEDRO TIPO P-02 INC. INSTALACION 5,583.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.06.03 PUERTA APANELADA DE CEDRO TIPO P-03 INC. INSTALACION 3,836.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07 CARPINTERIA METALICA 24,910.00
02.07.01 PORTON METALICO PM-01 INC. PINTADO E INSTALACION 860.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.02 VENTANA METALICA V-01 INC. PINTADO E INSTALACION 1,120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.03 VENTANA METALICA V-02 INC. PINTADO E INSTALACION 4,830.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.04 VENTANA METALICA V-03 INC. PINTADO E INSTALACION 2,200.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.05 VENTANA METALICA V-04 INC. PINTADO E INSTALACION 1,120.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.06 VENTANA METALICA V-05 INC. PINTADO E INSTALACION 4,830.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.07 VENTANA METALICA V-06 INC. PINTADO E INSTALACION 3,520.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.08 VENTANA METALICA V-07 INC. PINTADO E INSTALACION 1,140.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.07.09 VENTANA METALICA V-08 INC. PINTADO E INSTALACION 5,290.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.08 CARPINTERIA EN MELAMINA 5,580.00
02.08.01 SEPARADOR DE BAÑOS TIPO 01 5,580.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.09 CERRAJERIA 7,251.54
02.09.01 CERRADURA PARA PUERTA DE TRES GOLPES 4,796.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.09.02 CERRADURA PARA PUERTA TIPO PERILLA 2,454.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.10 VIDRIOS, CRISTALES Y SIMILARES 41,997.06
02.10.01 VIDRIO LAMINAR BUTIRAL DE POLIVINILO INCOLORO 41,997.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11 PINTURAS 90,207.74
02.11.01 PINTURA LATEX EN CIELO RASO DOS MANOS 22,833.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.02 PINTURA LATEX EN MUROS EXTERIORES DOS MANOS 17,654.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.03 PINTURA LATEX EN MUROS INTERIORES DOS MANOS 30,153.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.04 PINTURA LATEX EN VIGAS DOS MANOS 10,154.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

ENTRO POBLADO MENOR DE YANAMUCLO E I.E.E.


MEJORAMIENTO
N°30319 DEL ANEXO
Y AMPLIACION
DE MARAVILCA,
DEL SERVICIO
DISTRITO
EDUCATIVO
DE MATAHUASI
DE NIVEL
- CONCEPCION
PRIMARIO I.E.E.
- JUNIN
N°30318 DEL CENTRO P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
02.11.05 PINTURA LATEX EN COLUMNAS DOS MANOS 7,342.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.06 PINTURA LATEX PARA DERRAMES EN PUERTAS Y VENTANAS DOS MANOS 1,560.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.11.07 PINTURA PARA PIZARRA 510.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12 JUNTAS 11,129.11
02.12.01 JUNTAS ASFALTICAS EN VEREDAS 2,066.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12.02 JUNTAS ASFALTICAS PARA SARDINEL DE JARDIN 91.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
02.12.03 JUNTAS ASFALTICAS PARA COLUMNETAS 8,971.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03 INSTALACIONES SANITARIAS 58,301.24
03.01 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO 8,682.61
03.01.01 MOVIMIENTO DE TIERRAS 1,649.41
03.01.01.01 EXCAVACION DE ZANJAS PARA TUBERIA DE AGUA 937.63 0.00 0.00 0.00 0.00 937.63 0.00 0.00 0.0
03.01.01.02 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 681.36 0.00 0.00 0.00 0.00 0.00 596.19 85.17 0.0
03.01.01.03 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 30.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.01.02 SALIDAS 2,360.13
03.01.02.01 SALIDA DE AGUA FRIA PVC SAP DE 1/2" 2,254.32 0.00 0.00 0.00 0.00 0.00 120.77 281.79 281.7
03.01.02.02 SALIDA DE AGUA PARA RIEGO PVC SAP DE 1/2" 56.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 56.6
03.01.02.03 SALIDA DE AGUA FRIA CONTRA INCENDIO PVC SAP DE 2" 49.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 49.1
03.01.03 RED DE DISTRIBUCION 4,673.07
03.01.03.01 TUBERIA PARA AGUA POTABLE PVC SAP DE 1/2" C-10 2,106.15 0.00 0.00 0.00 0.00 0.00 0.00 254.19 254.1
03.01.03.02 TUBERIA PARA RIEGO PVC SAP DE 1/2" C-10 72.72 0.00 0.00 0.00 0.00 0.00 0.00 72.72 0.0
03.01.03.03 TUBERIA CONTRA INCENDIO PVC SAP DE 2" C-10 80.28 0.00 0.00 0.00 0.00 0.00 0.00 80.28 0.0
03.01.03.04 VALVULA DE COMPUERTA DE 1/2" 1,834.94 0.00 0.00 0.00 0.00 0.00 0.00 65.53 229.3
03.01.03.05 VALVULA DE COMPUERTA DE 2" 127.03 0.00 0.00 0.00 0.00 0.00 0.00 2.23 15.6
03.01.03.06 GRIFO CONTRA INCENDIO 451.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02 SISTEMA DE DESAGUE 19,414.41
03.02.01 MOVIMIENTO DE TIERRAS 1,805.63
03.02.01.01 EXCAVACION DE ZANJAS PARA TUBERIA DE DESAGUE 1,045.58 0.00 0.00 0.00 0.00 0.00 0.00 1,045.58 0.0
03.02.01.02 RELLENO Y COMPACTACION DE ZANJAS C/MAT. PROPIO 703.40 0.00 0.00 0.00 0.00 0.00 0.00 351.70 351.7
03.02.01.03 ELIMINACION DE MATERIAL EXCEDENTE DP=2.0 KM. 56.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02.02 SALIDAS 5,996.34
03.02.02.01 SALIDA DE DESAGUE CON PVC SAL DE 2" 2,613.30 0.00 0.00 0.00 0.00 0.00 0.00 190.06 332.6
OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

ENTRO POBLADO MENOR DE YANAMUCLO E I.E.E.


MEJORAMIENTO
N°30319 DEL ANEXO
Y AMPLIACION
DE MARAVILCA,
DEL SERVICIO
DISTRITO
EDUCATIVO
DE MATAHUASI
DE NIVEL
- CONCEPCION
PRIMARIO I.E.E.
- JUNIN
N°30318 DEL CENTRO P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
03.02.02.02 SALIDA DE DESAGUE CON PVC SAL DE 4" 1,461.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 91.3
03.02.02.03 SALIDA DE VENTILACION CON PVC SAL DE 2" 1,921.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.02.03 RED DE DISTRIBUCION 11,612.44
03.02.03.01 TUBERIA PARA DESAGUE CON PVC SAL DE 2" 1,038.11 0.00 0.00 0.00 0.00 0.00 0.00 72.85 127.4
03.02.03.02 TUBERIA PARA DESAGUE CON PVC SAL DE 4" 5,387.78 0.00 0.00 0.00 0.00 0.00 0.00 96.21 673.4
03.02.03.03 TUBERIA PARA VENTILACION CON PVC SAL DE 2" 2,348.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 132.9
TUBERIA PARA CAJA DE REGISTRO CON PVC SAL DE 2" 2,837.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03 SISTEMA DE DESAGUE PLUVIAL 15,728.96
03.03.01 TUBERIA PVC SAL PLUVIAL DE 4" 4,216.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.02 TUBERIA PVC SAL PLUVIAL DE 3" 1,789.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA FALSA COLUMNA 5,450.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.04 CONCRETO F'C=175 KG/CM2 PARA FALSA COLUMNA 3,930.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.03.05 ACCESORIOS PARA DESAGUE PLUVIAL 341.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04 APARATOS Y ACCESORIOS SANITARIOS 14,475.26
03.04.01 INODORO DE LOSA TANQUE BAJO 5,908.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.02 LAVATORIO DE LOSA CON PEDESTAL 4,385.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.03 PAPELERA DE LOSA 1,190.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.04 SUMIDERO DE BRONCE ROSCADO DE 2" 985.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.05 REGISTRO ROSCADO DE BRONCE DE 4" 1,381.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
03.04.06 CAJA DE REGISTRO PARA DESAGUE DE 624.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04 INSTALACIONES ELECTRICAS 110,524.39
04.01 PRIMER PISO 64,859.19
04.01.01 SALIDAS 13,513.89
04.01.01.01 SALIDAD DE TECHO PARA CENTRO DE LUZ 6,566.30 0.00 0.00 0.00 0.00 0.00 0.00 1,094.38 1,915.1
04.01.01.02 SALIDA DE TOMACORRIENTE BIPOLARES CON LINEA A TIERRA 4,391.95 0.00 0.00 0.00 0.00 0.00 0.00 548.99 1,921.4
04.01.01.03 SALIDA DE TOMACORRIENTE PARA ALUMBRADO DE EMERGENCIA 363.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.01.04 SALIDA PARA INTERRUPTORES EN CONMUTACION 1,057.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.01.05 SALIDA PARA INTERRUPTORES SIMPLES 298.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 298.5
04.01.01.06 SALIDA PARA INTERRUPTORES DOBLES 248.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.4
04.01.01.07 SALIDA PARA INTERRUPTORES TRIPLES 587.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 419.5
04.01.02 CANALIZACION DE TUBERIAS PVC 20,053.08
OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

ENTRO POBLADO MENOR DE YANAMUCLO E I.E.E.


MEJORAMIENTO
N°30319 DEL ANEXO
Y AMPLIACION
DE MARAVILCA,
DEL SERVICIO
DISTRITO
EDUCATIVO
DE MATAHUASI
DE NIVEL
- CONCEPCION
PRIMARIO I.E.E.
- JUNIN
N°30318 DEL CENTRO P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
04.01.02.01 TUBERIA DE 25 MM. PVC SEL (1") 4,054.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.02.02 TUBERIA DE 20 MM. PVC SEL (3/4") 15,998.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03 CONDUCTORES 8,301.84
04.01.03.01 CONDUCTOR (2x10+1x10) MM. THHW 358.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.02 CONDUCTOR (1x10) MM2. THHW 146.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.03 CONDUCTOR (2x6+1x10) MM2 THHW 975.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.04 CONDUCTOR (2x2.5) MM2. THHW 4,612.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.03.05 CONDUCTOR (2x4.0) MM2. THHW 2,209.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.04 TABLEROS ELECTRICOS 4,700.00
04.01.04.01 TABLERO GENERAL Y TABLEROS DE DISTRIBUCION 4,700.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.05 CONEXION A TIERRA 5,600.00
04.01.05.01 POZO A TIERRA 5,600.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06 ARTEFACTOS Y ACCESORIOS ELECTRICOS 11,490.39
04.01.06.01 FLUORESCENTE RECTO INCLUYE EQUIPO Y PANTALLA 7,678.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.02 SPOT LIGHT 656.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.03 LUCES DE EMERGENCIA CON BATERIA - 02 FAROS 637.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.04 TOMACORRIENTE BIPOLAR 1,779.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.05 TOMACORRIENTE SIMPLE 125.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.06 INTERRUPTOR CONMUTACION 210.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.07 INTERRUPTOR SIMPLE 107.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.08 INTERRUPTOR DOBLE 94.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.06.09 INTERRUPTOR TRIPLE 201.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.01.07 OTROS 1,199.99
04.01.07.02 DISPOSITIVOS Y EQUIPOS DE SEGURIDAD 1,199.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02 SEGUNDO PISO 45,665.20
04.02.01 SALIDAS 13,605.84
04.02.01.01 SALIDAD DE TECHO PARA CENTRO DE LUZ 6,212.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.02 SALIDA DE TOMACORRIENTE BIPOLARES CON LINEA A TIERRA 5,218.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.03 SALIDA DE TOMACORRIENTE PARA ALUMBRADO DE EMERGENCIA 303.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.04 SALIDA PARA INTERRUPTORES EN CONMUTACION 704.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
OBRA VALORIZADO - BLOQUE AB - YANAMUCLO CRONOGRAMA DE OBRA V

ENTRO POBLADO MENOR DE YANAMUCLO E I.E.E.


MEJORAMIENTO
N°30319 DEL ANEXO
Y AMPLIACION
DE MARAVILCA,
DEL SERVICIO
DISTRITO
EDUCATIVO
DE MATAHUASI
DE NIVEL
- CONCEPCION
PRIMARIO I.E.E.
- JUNIN
N°30318 DEL CENTRO P

SEMANAS PROGRAMADAS
DESCRIPCION DE PARTIDAS PPTO
SEM. 01 SEM. 02 SEM. 03 SEM. 04 SEM. 05 SEM. 06 SEM. 07 SEM. 08
04.02.01.05 SALIDA PARA INTERRUPTORES SIMPLES 298.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.06 SALIDA PARA INTERRUPTORES DOBLES 398.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.01.07 SALIDA PARA INTERRUPTORES TRIPLES 469.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.02 CANALIZACION DE TUBERIAS PVC 13,965.19
04.02.02.01 TUBERIA DE 20 MM. PVC SEL (3/4") 13,965.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.03 CONDUCTORES 6,384.59
04.02.03.01 CONDUCTOR (2x2.5) MM2. THHW 3,370.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.03.02 CONDUCTOR (2x4.0) MM2. THHW 3,014.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04 ARTEFACTOS Y ACCESORIOS ELECTRICOS 11,709.58
04.02.04.01 FLUORESCENTE RECTO INCLUYE EQUIPO Y PANTALLA 8,432.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.02 LUCES DE EMERGENCIA CON BATERIA - 02 FAROS 637.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.03 TOMACORRIENTE BIPOLAR 1,779.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.04 TOMACORRIENTE SIMPLE 104.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.05 INTERRUPTOR CONMUTACION 336.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.06 INTERRUPTOR SIMPLE 107.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.07 INTERRUPTOR DOBLE 150.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0
04.02.04.08 INTERRUPTOR TRIPLE 161.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0

COSTO DIRECTO 1,990,094.42 58,567.27 11,285.64 13,235.59 13,954.08 22,199.07 56,029.55 88,256.67 107,755.4
GASTOS GENERALES 10.00% 199,009.44 5,856.73 1,128.56 1,323.56 1,395.41 2,219.91 5,602.96 8,825.67 10,775.5
UTILIDAD 10.00% 199,009.44 5,856.73 1,128.56 1,323.56 1,395.41 2,219.91 5,602.96 8,825.67 10,775.5
SUB TOTAL 2,388,113.30 70,280.73 13,542.76 15,882.71 16,744.90 26,638.89 67,235.47 105,908.01 129,306.4
IGV 18.00% 429,860.39 12,650.53 2,437.70 2,858.89 3,014.08 4,795.00 12,102.38 19,063.44 23,275.1
PRESUPUESTO PARCIAL 2,817,973.69 82,931.26 15,980.46 18,741.60 19,758.98 31,433.89 79,337.85 124,971.45 152,581.6
PORCENTAJE DE AVANCE 2.94% 0.57% 0.67% 0.70% 1.12% 2.82% 4.43% 5.41%
PORCENTAJE DE AVANCE ACUMULADO 100.00% 4.88% 13.78%