PROJECT DRAWING M53, HOT WATER LAYOUT

Size
Floor Elevation Forces / Expansion Joint Travel Details / Operating Deflections
Material
= Top, Deflection= 1.3 mm (0.1-in)
Estimated operating load= -60,890 N (-13,680 lbs.) DN350
55 165.2 m Estimated max (staged) load= -299,740 N (-67,370 lbs.) x x x Top & Anchor 1, Connected per Structural Eng's Instructions
Part No: 3501-181-4, Carbon Steel
~ 162.5 m Estimated design expansion= 84.4 mm (3.3-in) DN350 Pressure (including pump)= 425 kPag (61 psig)
54 161.0 m I I Guide - Slide
DN350
53 157.7 m I I Guide - Slide
DN350
42 124.4 m I I Guide - Slide
DN350
32 94.5 m I I Guide - Slide

Estimated operating load= 2,000 N (450 lbs.) DN350


22 64.6 m Estimated max (staged) load= -236,350 N (-53,120 lbs.) x x x Anchor 2, Connected per Structural Eng's instructions
= Part No: 3501-380-4, Carbon Steel
~ 62.8 m Estimated design expansion= 44.3 mm (1.7-in) DN300 Pressure (including pump)= 1397 kPag (200 psig)
21 61.3 m I I Branch & Guide - Slide
DN300
20 58.3 m I I Guide - Slide
DN300
16 46.5 m I I Guide - Slide
DN300
10 28.4 m I I Guide - Slide
= Branch deflection above Anchor-3= 1.3 mm (0.1-in)
Estimated operating load= 332,000 N (75,000 lbs.) DN250
5 11.9 m Estimated max (design) load= 409,000 N (92,000 lbs.) x x x Anchor 3, Connected per Structural Eng's instructions
3 5.6 m = DN200 Branch deflection below Anchor-3= -1.1 mm (0.0-in)
0.0 m = Bottom, Deflection= -4.3 mm (-0.2-in)
DN200 Min. distance to first support= 4009 mm.
-1 -7.3 m Pressure (including pump)= 2065 kPag (296 psig)

LEGEND Dielectric Transition T = Branch


Positive loads are DOWN Expansion Joint Positive deflections are UP
Negative loads are UP Anchor x x x Negative deflections are DOWN
Mineral Wool insulation Pipe Guide I I Carbon steel STD pipe (CS)
Offset > Fan Coil
Flexible Loop / Flex at branch = xxxxxxxx
THIS DOCUMENT IS THE PROPERTY OF LEONINE INTERNATIONAL INC. THE DATA HEREIN IS NOT TO BE DISCLOSED IN ANY FORM TO ANYONE WITHOUT THE WRITTEN
PERMISSION OF LEONINE INTERNATIONAL INC.
CUSTOMER:
Another Contractor
Leonine International Inc
ABC Drive 19 Thorne Street, Suite 204
Woodbridge, Ontario Cambridge, Ontario N13 1S3
Tel: (905) 123-4567 Tel: +1 519 267 2198
PROJECT: DRAWING TITLE:
A tall high rise
Lakeview Blvd., HEAT PUMP EXPRESS RISER- HWS
Toronto From P1 To LOWER PENTHOUSE MECHANICAL
Project # Date: DRAWING No. SHEET Rev.
0562 May 04, 2019 HPER- HWS 1 OF 3 0
Using RISERCALC version 1603.22.14.25
PROJECT DRAWING M53, HOT WATER LOADS
Operating Loads Design Loads Test Loads Staged Loads
Description
[kg] [lbs] [kg] [lbs] [kg] [lbs] [kg] [lbs]
Mass of Water 702 1,549 702 1,549 0 0 702
Mass of Pipe 179 396 179 396 179 396 179
Mass of Insulation 27 60 27 60 0 0 0
Top Anchor 1

Mass of Cladding 1 3 1 3 0 0 0
Mass - Expansion Joint 98 215 98 215 98 215 98
Mass of Guides 0 0 0 0 0 0 0
Expansion Load -740 -1,631 -1,730 -3,814 0 0 0
Static Pressure Load -5,764 -12,709 -14,011 -30,895 -30,833 -67,986 -30,833
TOTAL -6,207 -13,687 -15,436 -34,036 -30,556 -67,375 -30,556
Mass of Water 9,132 20,135 9,132 20,135 0 0 9,132 20,135
Mass of Pipe 8,548 18,849 8,548 18,849 8,548 18,849 256 565
Mass of Insulation 725 1,599 725 1,599 0 0 0 0
Mass of Cladding 32 70 32 70 0 0 0 0
Anchor 2

Mass - Expansion Joint 196 432 196 432 196 432 196 432
Mass of Guides 0 0 0 0 0 0 0 0
Expansion Load 416 917 973 2,145 0 0 0 0
Static Pressure Load -9,307 -20,522 -8,297 -18,295 6,287 13,863 -24,545 -54,123
TOTAL 203 449 2,177 4,800 15,032 33,145 -24,093 -53,126
Mass of Water 4,410 9,724 4,410 9,724 0 0 4,410 9,724
Mass of Pipe 4,498 9,917 4,498 9,917 4,498 9,917 4,498 9,917
Mass of Insulation 405 893 405 893 0 0 0 0
Mass of Cladding 18 40 18 40 0 0 0 0
Anchor 3

Mass - Expansion Joint 99 217 99 217 99 217 99 217


Mass of Guides 0 0 0 0 0 0 0 0
Expansion Load 313 689 731 1,612 0 0 0 0
Static Pressure Load 15,071 33,231 22,309 49,190 24,545 54,123 0 0
TOTAL 33,819 74,571 41,689 91,924 29,142 64,257 4,596 10,134
Mass of Water
Mass of Pipe
Mass of Insulation
Mass of Cladding
Mass of Joint
Mass of Guides
Expansion Load
Static Pressure Load
TOTAL
NOTES
Positive loads are DOWN, and negative loads are UP.
The structural Engineer shall verify the building capacity to support the anchor loads.
Estimated anchor loads include no factors, and are based on an ASME B31.3 pneumatic pressure test of 2,276 kPag (330 psig)
The loads may vary depending on the pneumatic test procedure and test pressure used by the Contractor.
The Contractor is responsible to ensure that a safe pneumatic pressure test procedure is used.
Seismic and dynamic loads are not included. Loads caused by water hammer are not included.
The pipe weights include a safety margin of 5.0 %.
THIS DOCUMENT IS THE PROPERTY OF LEONINE INTERNATIONAL INC. THE DATA HEREIN IS NOT TO BE DISCLOSED IN ANY FORM TO ANYONE WITHOUT THE
WRITTEN PERMISSION OF LEONINE INTERNATIONAL INC.
CUSTOMER:
Another Contractor
Leonine International Inc
ABC Drive 19 Thorne Street, Suite 204
Woodbridge, Ontario Cambridge, Ontario N13 1S3
Tel: (905) 123-4567 Tel: +1 519 267 2198
PROJECT: DRAWING TITLE:
A tall high rise
Lakeview Blvd., HEAT PUMP EXPRESS RISER- HWS
Toronto From P1 To LOWER PENTHOUSE MECHANICAL
Project # Date: DRAWING No. SHEET Rev.
0562 May 04, 2019 HPER- HWS 2 OF 3 0
Using RISERCALC version 1603.22.14.25
PROJECT DRAWING M53, HOT WATER DEFLECTIONS
Deflection Results Operating Design Vertical Rise
Top & Anchor (Floor 55) to Anchor 1
1.35 mm 0.053 in 3.15 mm 0.124 in 3.8 m 12.30 ft
(Floor 55)- TOTAL
Anchor 1 (Floor 55) to Anchor 2 (Floor
36.10 mm 1.421 in 84.41 mm 3.323 in 100.6 m 330.05 ft
22)- TOTAL
Anchor 2 (Floor 22) to Anchor 3 (Floor
18.93 mm 0.745 in 44.26 mm 1.743 in 52.8 m 173.06 ft
5)- TOTAL
Anchor 3 (Floor 5) to Bottom (Floor -1)-
4.26 mm 0.168 in 9.95 mm 0.392 in 11.9 m 38.91 ft
TOTAL

Temperature Differential 30.556 °C 55.0 °F 57.778 °C 104.0 °F


Expansion Rate - Carbon Steel STD 0.359 mm/m 0.43 in/100-ft 0.839 mm/m 1.01 in/100-ft

NOTES
Minus values indicate contraction (cold) movements, and positive values represent expansion (hot) movements.
Calculated pipe expansion for sizing the expansion joint, is based on 40.0 to -17.8 °C (104.0 to 0.0 °F) plus 25.0 % safety factor.
Calculated operating pipe expansion, is based on 35.0 to 4.4 °C (95.0 to 40.0 °F)
The calculated deflections do not include building creep and shrinkage.
Branches to be located so that the insulation clears the underneath of the slab sufficiently to allow for the movement of the pipe.
THIS DOCUMENT IS THE PROPERTY OF LEONINE INTERNATIONAL INC. THE DATA HEREIN IS NOT TO BE DISCLOSED IN ANY FORM TO ANYONE
WITHOUT THE WRITTEN PERMISSION OF LEONINE INTERNATIONAL INC.
CUSTOMER:
Another Contractor
Leonine International Inc
ABC Drive 19 Thorne Street, Suite 204
Woodbridge, Ontario Cambridge, Ontario N13 1S3
Tel: (905) 123-4567 Tel: +1 519 267 2198
PROJECT: DRAWING TITLE:
A tall high rise
Lakeview Blvd., HEAT PUMP EXPRESS RISER- HWS
Toronto From P1 To LOWER PENTHOUSE MECHANICAL
Project # Date: DRAWING No. SHEET Rev.

0562 May 04, 2019 HPER- HWS 3 OF 3 0


Using RISERCALC version 1603.22.14.25