Floor Elevation Forces / Expansion Joint Travel Details / Operating Deflections
Material
= Top, Deflection= 1.3 mm (0.1-in)
Estimated operating load= -60,890 N (-13,680 lbs.) DN350
55 165.2 m Estimated max (staged) load= -299,740 N (-67,370 lbs.) x x x Top & Anchor 1, Connected per Structural Eng's Instructions
Part No: 3501-181-4, Carbon Steel
~ 162.5 m Estimated design expansion= 84.4 mm (3.3-in) DN350 Pressure (including pump)= 425 kPag (61 psig)
54 161.0 m I I Guide - Slide
DN350
53 157.7 m I I Guide - Slide
DN350
42 124.4 m I I Guide - Slide
DN350
32 94.5 m I I Guide - Slide
Mass of Cladding 1 3 1 3 0 0 0
Mass - Expansion Joint 98 215 98 215 98 215 98
Mass of Guides 0 0 0 0 0 0 0
Expansion Load -740 -1,631 -1,730 -3,814 0 0 0
Static Pressure Load -5,764 -12,709 -14,011 -30,895 -30,833 -67,986 -30,833
TOTAL -6,207 -13,687 -15,436 -34,036 -30,556 -67,375 -30,556
Mass of Water 9,132 20,135 9,132 20,135 0 0 9,132 20,135
Mass of Pipe 8,548 18,849 8,548 18,849 8,548 18,849 256 565
Mass of Insulation 725 1,599 725 1,599 0 0 0 0
Mass of Cladding 32 70 32 70 0 0 0 0
Anchor 2
Mass - Expansion Joint 196 432 196 432 196 432 196 432
Mass of Guides 0 0 0 0 0 0 0 0
Expansion Load 416 917 973 2,145 0 0 0 0
Static Pressure Load -9,307 -20,522 -8,297 -18,295 6,287 13,863 -24,545 -54,123
TOTAL 203 449 2,177 4,800 15,032 33,145 -24,093 -53,126
Mass of Water 4,410 9,724 4,410 9,724 0 0 4,410 9,724
Mass of Pipe 4,498 9,917 4,498 9,917 4,498 9,917 4,498 9,917
Mass of Insulation 405 893 405 893 0 0 0 0
Mass of Cladding 18 40 18 40 0 0 0 0
Anchor 3
NOTES
Minus values indicate contraction (cold) movements, and positive values represent expansion (hot) movements.
Calculated pipe expansion for sizing the expansion joint, is based on 40.0 to -17.8 °C (104.0 to 0.0 °F) plus 25.0 % safety factor.
Calculated operating pipe expansion, is based on 35.0 to 4.4 °C (95.0 to 40.0 °F)
The calculated deflections do not include building creep and shrinkage.
Branches to be located so that the insulation clears the underneath of the slab sufficiently to allow for the movement of the pipe.
THIS DOCUMENT IS THE PROPERTY OF LEONINE INTERNATIONAL INC. THE DATA HEREIN IS NOT TO BE DISCLOSED IN ANY FORM TO ANYONE
WITHOUT THE WRITTEN PERMISSION OF LEONINE INTERNATIONAL INC.
CUSTOMER:
Another Contractor
Leonine International Inc
ABC Drive 19 Thorne Street, Suite 204
Woodbridge, Ontario Cambridge, Ontario N13 1S3
Tel: (905) 123-4567 Tel: +1 519 267 2198
PROJECT: DRAWING TITLE:
A tall high rise
Lakeview Blvd., HEAT PUMP EXPRESS RISER- HWS
Toronto From P1 To LOWER PENTHOUSE MECHANICAL
Project # Date: DRAWING No. SHEET Rev.