You are on page 1of 3

Pile Load Capacity Calculation –

Single Pile and Group Pile

The Pile load capacity calculation will determine the ultimate load the pile foundation
can take under service load condition. This capacity is also called as bearing capacity
of piles.

The piles installed can be a single pile or group piles. Hence the load calculation for a
single pile and group pile will be different. This is done for given load condition or for
the size of foundation.

Here the load carrying capacity calculation for both single piles and group piles.

Single Pile Load Capacity Calculation


Here the vertical load and the horizontal load acting on the pile has to be determined.

Calculation of Vertical Load

Fig.1: Vertical Load on Pile


The allowable resistance to compression Rac of a single pile is provided by the end
bearing, Feb and the skin friction for each strata, Fsf. Thus,
Rac = Feb + Total (Fsf ) Eq.1

Therefore, the maximum compressive service load that can be supported by a single
pile is its total resistance Rac , less the self-weight of the pile, W. Thus
Nser < Rac -W = Rnet Eq.2
A pile can also resist a tensile load. The maximum tensile service load, that can be
resisted by pile is

Rat = Total (Fsf )+ W Eq.3


The soil exploration details will provide the details of the end bearing and the skin
friction value. These values are obtained by test loadings and pile driving energy
procedures. These ultimate values are divided by a partial factor of safety of between
2 and 3 to give the allowable values Feb and Fsf.
Calculation of Horizontal Load

Fig.2: Horizontal load on piles


The two main factors that limit the horizontal capacity of the pile are:

1. Maximum deflection on the structure

2. Structural Capacity of the pile


The maximum horizontal capacity for a given deflection is determined from the
modulus of subgrade reaction (kN/m3). There are several methods to determine the
modulus of subgrade reaction.

Group Pile Load Capacity


Calculation
In order to support heavy loads, the piles are arranged in groups. The piles are
arranged in groups so that the size and the cost of construction of pile cap can be
reduced.
Fig.3.Group Pile Capacity
Undisturbed Bearing capacity and required driving conditions are obtained by
providing minimum Clear Distance between the piles. This distance will be equal to
the twice the pile diameter.

Fig.4.The minimum clear spacing between piles


The total vertical service load on a group of piles should not exceed the group
capacity, which is given by:

Group capacity= group friction capacity + group end bearing capacity

= 2D(L+K)k1 + BLk2 Eq.4


Where k1 and k2 are soil coefficients. Individual pile loads within the group are
limited to the single pile capacity.

You might also like