Location: Quotation: 20 Harbour Drive #06-06 P.S.A. Vista Project: Singapore 117612 List No. Design Engineer: Phone: Date: B 2.14 CP 65 Resp.: Project Name:
Table 3.3b Rsd Rbd Rcd c =s/2 s s
s/2 s3 s/2 cs3 s cs4 Hilti HIT-RE 500 cs1 cs2 cs1 design loads in [kN/m] cs1 dry concrete steel bond of adhesive concrete: splitting INPUT Material Safety factors transverse reinforcement steel strength fyk 460 N/mm² steel γs 1.15 0.87 spacing: str 200 class of concrete 40 N/mm² bond γb 1.80 0.56 diameter db,tr 0 Geometry concrete γc 1.50 0.67 yield strength fyk 460 min. edge distance cs,min 2.5 ∅ reduction factor 1.00 min. spacing smin 5 ∅ for recommended loads Drilled Hole Condition shear stress acting in slab [N/mm²] 0 hole to be clean cracks parallel to bar no water saturation fw,sat 1 factor type of connection anchorage Substrate temperature Cast-in bars yield strength fyk 460 at installation Tinst 20 °C reinforcement location factor 1.3 in service Tser 20 °C splice type (class B = standard) class B
Project Name Switchgear Name Panel Type Document Title Ekc Dwg. No. Total Sheet:::::: 11039-0-LPL-06 5 Bahregan Storage Tanks Development IRP/23, SS1/IRP/23, SS2/IRP/23