You are on page 1of 1

ier

PILE CAP

of p
75
=
R.

C/L
400

CV
.
CL
750 2000 750
75 1000

1 850

2+3
2a + 3

3600 1000Ø

C/S OF PILE AT PIER LOCATION 3600


(SCALE 1:25)

SCHEDULE OF REINFORCEMENT
BAR DIA.
100 SL. No. BAR SHAPE REAMRKS
Nos./SPACING
C/L of

8900
1 VARIES Q 25 - 20Nos.
T MAIN
1 carriage way/pile cap
400
2a Q 10@100c/c
T TIES
PILE

2 400 T
Q 10@200 c/c TIES
2 + 3

3 400
T
Q 16@1500 c/c STIFFNER 3600

850

600
3500

HARD ROCK PILE LAYOUT UNDER PIER


(SCALE 1:60)

SECTIONAL ELEVATION OF
PILE UNDER PIERS P1 & P2 &
ABUTMENTS A1 & A2
(SCALE 1:50)