CONTENTS
PAGE
CONTROL PROCEDURE
PAGE DATE 01-Dec-2014
2 OF 9 REV. 0A
THIS DOCUMENT C ONTAINS C TCI&IHI CONS ORTIUM C ONFI DENTIAL INF ORMATION OF A PROPRIETARY NATURE. THIS INFO RMATION MUST NO T BE COPIED OR DISCLOSED IN WHOLE OR IN
1.0 SCOPE
The intent of this procedure is to establish a program that covers the requirements for
receiving, storage, distribution of welding filler metals
2.0 REFERENCE
3.0 RESPONSIBILITY
4.0 PROCEDURE
4.1 Welding filler metals shall be purchased which meet all requirements of ASME
Section II, Part "C".
4.2 Storage
Bare filler wire shall be stored in a central location on site. The storage
area or room shall be weather proof dry and clean. All containers or
bags shall be stored off the floor.
4.3 Identification
All filler metals shall be clearly segregated as to type size, heat number and/or lot
number and manufacturer.
CONTROL PROCEDURE
PAGE DATE 01-Dec-2014
3 OF 9 REV. 0A
THIS DOCUMENT C ONTAINS C TCI&IHI CONS ORTIUM C ONFI DENTIAL INF ORMATION OF A PROPRIETARY NATURE. THIS INFO RMATION MUST NO T BE COPIED OR DISCLOSED IN WHOLE OR IN
4.4 Distribution
4.4.1 Electrodes and Bare filler wire shall be distributed for specific
components or systems by a specifically designated issue clerk and
shall be used only for the welds for which they were issued. A welding
material request sheet (as recommented in Attachment 3) shall be use
when welders request welding materials to issue clerk.
0A
4.4.2 The responsibilities of the issue clerk are including proper maintenance
and continuous operation of the holding ovens. He is also responsible
for the maintenance of the quivers. In addition he is responsible for the
issuance of correct filler metals only to welders.
PART TO O UTSIDE PARTIES NOR USED F OR O THER THAN THE PURPOSE FOR WHICH PR OVIDED WITHOU T PERMISSION OF MANAGEMENT.
D. Quivers shall be checked out of and into the rod room daily.
4.4.4 Whenever practical a quantity of welding filler material sufficient for one
shift of work shall be issued. Unused filler material shall be returned to
the issuing rod room at the end of each shift or sooner upon the
completion of the assigned welds or series of welds.
4.5 The QC welding supervisor shall be responsible for rechecking of the withdrawn
filler metal to see if they are issued in compliance with required specifications.
4.5.1 Total material withdrawn per month will be calculated by the distribution
clerk. And a copy of this calculation list LN-903 will be send to the QCP
for filing.
4.6 Welding filler metals shall be inspected by the issue clerk at the time of
distribution to insure that they meet the following requirements.
CONTROL PROCEDURE
PAGE DATE 01-Dec-2014
4 OF 9 REV. 0A
THIS DOCUMENT C ONTAINS C TCI&IHI CONS ORTIUM C ONFI DENTIAL INF ORMATION OF A PROPRIETARY NATURE. THIS INFO RMATION MUST NO T BE COPIED OR DISCLOSED IN WHOLE OR IN
4.6.1 Covered electrode coatings are not broken cracked wet discolored.
Starting tips are properly exposed holding ends are clean.
4.6.2 Bare filler wire are not dirty damaged of discolored. In the event of
damage the material shall be discarded. If the material is dirty it shall be
cleaned by wiping clean.
Welding filler metals issued for use in the field shall be stored per manufacturer's
recommendations or if these are not available as detailed below.
PART TO O UTSIDE PARTIES NOR USED F OR O THER THAN THE PURPOSE FOR WHICH PR OVIDED WITHOU T PERMISSION OF MANAGEMENT.
4.7.4 Clellulose electrodes shall not be stored with low hydrogen electrodes.
Cellulose electrodes don't have to be stored in heated ovens.
4.7.5 Only the same type of electrodes filler materials are to be stored
together in the same oven boxes, bins or containers.
4.7.6 Welding foreman or welding supervisor shall allow only qualified welders
to draw welding material out of storage for field use.
0A 4.7.7 Continuous power supply shall be provided for the electrodes in oven,
SAMAC No: N-00-PQ-5006-PR
CONTROL PROCEDURE
PAGE DATE 01-Dec-2014
5 OF 9 REV. 0A
THIS DOCUMENT C ONTAINS C TCI&IHI CONS ORTIUM C ONFI DENTIAL INF ORMATION OF A PROPRIETARY NATURE. THIS INFO RMATION MUST NO T BE COPIED OR DISCLOSED IN WHOLE OR IN
5.1.1 All unused low hydrogen electrodes at the end of shift are to be returned
to baking oven for recondition at 300 -350 for one hour minimum.
After that shall transfer to holding oven at 100 -150 before issuance.
PART TO O UTSIDE PARTIES NOR USED F OR O THER THAN THE PURPOSE FOR WHICH PR OVIDED WITHOU T PERMISSION OF MANAGEMENT.
5.1.2 Before re-baking, electrodes shall be painted with “Red” color at the end
of electrode for indicating the status as re-baking.
0A 5.1.3 All the electrodes left after re-baking shall not be used at site and shall
be discarded.
5.2.1 All unused stainless steel electrodes at the end of shift are to be
returned to baking oven for recondition at 100-150 before issuance.
5.2.2 Remaining electrodes from second issuance, this stage shall be make
“Black” color”. These electrodes shall not be used for welding work in
permanent part.
6.0 ATTACHMENTS
CONTROL PROCEDURE
PAGE DATE 01-Dec-2014
6 OF 9 REV. 0A
Attachment 1
PREPARED BY:
SUBCONTRACTOR DATE
LN-901
INSPECTED BY:
CTCI Q.C DATE
Attachment 2
WELDING MATERIAL
CONSUMPTION MONTHLY REPORT
CLIENT : RECORD NO. :
PROJECT : UNIT :
PROJECT NO. : PAGE: OF DATE:
PREPARED BY:
SUBCONTRACTOR DATE
LN-903
INSPECTED BY:
CTCI Q.C DATE
Attachment 3