Superintendent Reunion, May 06

6:45 Century Superintendent Report


Operación 06/05/201 SEGURIDAD

ACCIDENTS 0 Special Security Committee


INCIDENTS 2 investigates and analyzes:
SUBSTANDARD CONDITIONS 23 Accident:
Revised 15
Uncorrected 8

Subestandar
Pérdidas Act
al Proceso 0
Losses to the process 0 Recommendations
EPP:
Training
Safety Incidents quantity
Perforation 1
Cut Shots 0
Electric Power 1
Operation of Machineries 2
Carry anf transport 1
Detachment of Rocks 1
Tools 1
Other 1
Total 8

MINA Mine Reunion 6.00 AM

Broken (ton) Extracted (ton)


Ore Wast Ore Wast
Total 321.0 411.0 294.9 42.2
Century 321.0 257.0 294.9 42.2
Century Development 0.0 102.0 0.0
MBM 0.0 52.0 0.0 0.0

Transported mineral plant (ton) 264.1 Cero 150 Esperanza Mercedes 1 Mercedes 2 Yessica Acopio
P.B. 246.1 40.0 38.0 100.0 42.5 25.6
CIL 18.0 18.0 0.00
Acumulado 264.1 1657.9 192.0 194.0 524.0 195.5 123.6 418.0 10.8

KPI Blasting Productivity Blast factor workers Advance (m)


break Extraction Stopes front
Century 34 2.28 1.34 0.49 253
Century Development 8 2.00 1.02 50 11.4
MBM 4 2.00 1.10 27 6.1

Quantity Comments
Jack leg inoperative Seco 1
Toyo 6 bronze
Inoperative loader 0 Cable Toyo Jack Leg inoperative for lack of spare parts
Inoperative Winche 0 Arrancador
Inoperative Compressor Motor

PLANT Dia 03 Head grade (calculated) % Recover Ounces produced Ounces produced accum.
P.B CIL B.P. CIL B.P. CIL B.P. CIL Total B.P. CIL TOTAL
Dry Tonnes Milled Total 361.0 286 75 5.78 8.79 90.00 68.00 44.46 13.83 58.29 225.83 75.14 300.97
Accum. 1,956.0 1,509.0 447.0
Stock 140.0 75 65 92% 91% ok ok ok
Tails (gr
mill operation (Hr) P.B CIL /tm)
Comesa 6x6 22'h30' 0.60
Comesa 5x6 22'h30'
Funcal 5x6 20h00' 00h00' < 0.50
Funcal 6x6 00h00' 20h00'

Unloading gold bar

Comments

You need to make new armor for mills FUNCAL 5x 6 and 5x6, that are completely damaged
Geology
Extracted Mineral Ton Gr/ton Au
Cero 40.80 5.17
150 38.00 5.10
Esperanza 84.00 7.37 > 7.5
Mercedes 1 42.50 5.44
mercedes 2 25.60 6.02 > 7.0
Sub total 230.90 6.10
Yessica 64.00 4.67 > 5.5
Total 294.90 5.79
Acopio 0 18.0 > 15.0
Comments

Maintenance
OIL OIL
Accum. Accum.
Power Generation (KW) 16,689 Air Compressors (Hr) 72.5
Power Generation (Hr.) 65.2
consumption (gal) 1,111 consumption (gal) 838.0
KPI (KW/GAL) 15.0 KPI (GAL/Hr) 11.55
KPI (KW/Hr.) 256.0
KPI (GAL/Hr.) 17.0
Logistics
OIL Accum.
consumption (gal) 2,666.00 14,123
Stock (gal) 8,080.00
O.K.

HOSPITAL hospitalized 0
accidents 0

Administration
Being installed in the mining camp a new line of Payment of money by CTS San Juan Advance
wastewater drain with 8-inch PVC pipe. workers 164
housings Reparation of the camp Employees 35
Repaired housing 86
Calamines utili 689

Environment

It is fitted with the bulldozer the tailings pond No. 3


Advance 100%
It is fitted with the bulldozer the tailings pond CIL
Advance 5%

Projects Advance
riverside defense
Removal of tailings 100%
Excavation of the dam foundation 100%
Filled with base material 80%
M3/day -
Channel tailings Advance 100%

OIL
Accum.
Equipment (Hr)
consumption (gal) 300
KPI (GAL/Hr)

Mining camp Electrification Project Posts total installed main line 39 Installed
energy house 325
Transfor
mers
repaired:
Posts total installed auxiliary line 57 02 ADVANCE 95%
Generator cat # 16 1.0
Posts preparations 12
Principal voltage line (m) 5,200.00
Auxiliar Voltage line (m) 5712
Syndicate
Calm working atmosphere.

Are there problems with retired workers has since 2002 provisional court in an area of 1,000 ml in the area of tailings deposits are currently preventing the construction of a new stadium for CIL tailings and what is more preventing
serious we are cleaning the canal that carries the tailings to the tailings pond Pb # 3.We are awaiting the decision Camana city Magistrate and Inspection City Chuquibamba Magistrate

Social By day May 1st is Labor Day is going to deliver 01 chicken and 01 bottles of 2 liters of cola per worker

Iternal
Mine entrance Door construct protection patrol operating

New
personnel
patrol = 6 informal recovered
Mine Site Security San Juan VILLA 400 Kg. miners mineral Kilos

Exploration
Geological mapping is being conducted in the Prospectus Erika
Superintendent Reunion, May 06
6:45 Century Superintendent Report
Operación 06/05/201 SEGURIDAD

ACCIDENTS 0 Special Security Committee


INCIDENTS 2 investigates and analyzes:
SUBSTANDARD CONDITIONS 23 Accident:
Revised 15
Uncorrected 8

Subestandar
Pérdidas Act
al Proceso 0
Losses to the process 0 Recommendations
EPP:
Training
Safety Incidents quantity
Perforation 1
Cut Shots 0
Electric Power 1
Operation of Machineries 2
Carry anf transport 1
Detachment of Rocks 1
Tools 1
Other 1
Total 8

MINA Mine Reunion 6.00 AM

Broken (ton) Extracted (ton)


Ore Wast Ore Wast
Total 321.0 411.0 294.9 42.2
Century 321.0 257.0 294.9 42.2
Century Development 0.0 102.0 0.0
MBM 0.0 52.0 0.0 0.0

Transported mineral plant (ton) 264.1 Cero 150 Esperanza Mercedes 1 Mercedes 2 Yessica Acopio
P.B. 246.1 40.0 38.0 100.0 42.5 25.6
CIL 18.0 18.0 0.00
Acumulado 264.1 1657.9 192.0 194.0 524.0 195.5 123.6 418.0 10.8

KPI Blasting Productivity Blast factor workers Advance (m)


break Extraction Stopes front
Century 34 2.28 1.34 0.49 253
Century Development 8 2.00 1.02 50 11.4
MBM 4 2.00 1.10 27 6.1

Quantity Comments
Jack leg inoperative Seco 1
Toyo 6 bronze
Inoperative loader 0 Cable Toyo Jack Leg inoperative for lack of spare parts
Inoperative Winche 0 Arrancador
Inoperative Compressor Motor

PLANT Dia 06 Head grade (calculated) % Recover Ounces produced Ounces produced accum.
P.B CIL B.P. CIL B.P. CIL B.P. CIL Total B.P. CIL TOTAL
Dry Tonnes Milled Total 361.0 286 75 5.78 8.79 90.00 68.00 44.46 13.83 58.29 225.83 75.14 300.97
Accum. 1,956.0 1,509.0 447.0
Stock 140.0 75 65 92% 91% ok ok ok
Tails (gr
mill operation (Hr) P.B CIL /tm)
Comesa 6x6 22'h30' 0.60
Comesa 5x6 22'h30'
Funcal 5x6 20h00' 00h00' < 0.50
Funcal 6x6 00h00' 20h00'

Unloading gold bar

Comments

You need to make new armor for mills FUNCAL 5x 6 and 5x6, that are completely damaged
Geology
Extracted Mineral Ton Gr/ton Au
Cero 40.80 5.17
150 38.00 5.10
Esperanza 84.00 7.37 > 7.5
Mercedes 1 42.50 5.44
mercedes 2 25.60 6.02 > 7.0
Sub total 230.90 6.10
Yessica 64.00 4.67 > 5.5
Total 294.90 5.79
Acopio 0 18.0 > 15.0
Comments

Maintenance
OIL OIL
Accum. Accum.
Power Generation (KW) 16,689 Air Compressors (Hr) 72.5
Power Generation (Hr.) 65.2
consumption (gal) 1,111 consumption (gal) 838.0
KPI (KW/GAL) 15.0 KPI (GAL/Hr) 11.55
KPI (KW/Hr.) 256.0
KPI (GAL/Hr.) 17.0
Logistics
OIL Accum.
consumption (gal) 2,666.00 14,123
Stock (gal) 8,080.00
O.K.

HOSPITAL hospitalized 0
accidents 0

Administration
Being installed in the mining camp a new line of Payment of money by CTS San Juan Advance
wastewater drain with 8-inch PVC pipe. workers 164
housings Reparation of the camp Employees 35
Repaired housing 86
Calamines utili 689

Environment

It is fitted with the bulldozer the tailings pond No. 3


Advance 100%
It is fitted with the bulldozer the tailings pond CIL
Advance 5%

Projects Advance
riverside defense
Removal of tailings 100%
Excavation of the dam foundation 100%
Filled with base material 80%
M3/day -
Channel tailings Advance 100%

OIL
Accum.
Equipment (Hr)
consumption (gal) 300
KPI (GAL/Hr)

Mining camp Electrification Project Posts total installed main line 39 Installed
energy house 325
Transfor
mers
repaired:
Posts total installed auxiliary line 57 02 ADVANCE 95%
Generator cat # 16 1.0
Posts preparations 12
Principal voltage line (m) 5,200.00
Auxiliar Voltage line (m) 5712
Syndicate
Calm working atmosphere.

Patrimony

Are there problems with retired workers has since 2002 provisional court in an area of 1,000 ml in the area of tailings deposits are currently preventing the construction of a new stadium for CIL tailings and what is more preventing
serious we are cleaning the canal that carries the tailings to the tailings pond Pb # 3.We are awaiting the decision Camana city Magistrate and Inspection City Chuquibamba Magistrate

Social
Held on Mother's Day with a sports show on the slab as the presence of all mothers in the valley of San Juan Chorunga, managers and employees of the company present was Mr.
Edgar Fernandez, Ms Araujo and Eng Yasika . Jesus Salamanca. It gave away 100 baskets of food products
Iternal
Mine entrance Door construct protection patrol operating

New
personnel
patrol = 6 informal recovered
Mine Site Security San Juan VILLA miners mineral Kilos

Exploration
Geological mapping is being conducted in the Prospectus Erika
Superintendent Reunion, May 09
6:45 Century Superintendent Report
Operación 09/05/201 SEGURIDAD

ACCIDENTS 0 Special Security Committee


INCIDENTS 0 investigates and analyzes:
SUBSTANDARD CONDITIONS 14 Accident:
Revised 10
Uncorrected 4

Subestandar
Pérdidas Act
al Proceso 0
Losses to the process 0 Recommendations
EPP:
Training
Safety Incidents quantity
Perforation 2
Cut Shots 0
Electric Power 1
Operation of Machineries 3
Carry anf transport 1
Detachment of Rocks 1
Tools 2
Other 1
Total 11

MINA Mine Reunion 6.00 AM

Broken (ton) Extracted (ton)


Ore Wast Ore Wast
Total 259.0 107.0 173.8 0.0
Century 259.0 20.0 173.8 0.0
Century Development 0.0 29.0 0.0
MBM 0.0 58.0 0.0 0.0

Transported mineral plant (ton) 193.6 Cero 150 Esperanza Mercedes 1 Mercedes 2 Yessica Acopio
P.B. 193.6 40.0 24.0 70.0 34.0 25.6
CIL 0.0 0.0 0.00
Acumulado 193.6 2347.3 313.0 299.0 784.0 323.0 200.4 413.0 14.9

KPI Blasting Productivity Blast factor workers Advance (m)


break Extraction Stopes front
Century 11 1.44 1.34 0.38 194
Century Development 4 2.00 1.40 31 5.6
MBM 5 2.00 0.90 18 7.4

Quantity Comments
Jack leg inoperative Seco 1
Toyo 6 bronze
Inoperative loader 0 Cable Toyo Jack Leg inoperative for lack of spare parts
Inoperative Winche 0 Arrancador
Inoperative Compressor Motor

PLANT Dia 09 Head grade (calculated) % Recover Ounces produced Ounces produced accum.
P.B CIL B.P. CIL B.P. CIL B.P. CIL Total B.P. CIL TOTAL
Dry Tonnes Milled Total 330.0 280 50 6.02 5.40 90.05 85.00 45.39 7.08 52.47 329.40 99.59 428.99
Accum. 2,743.0 2,137.0 606.0
Stock 175.0 140 35 92% 91% ok ok ok
Tails (gr
mill operation (Hr) P.B CIL /tm)
Comesa 6x6 24'h00' 0.60
Comesa 5x6 24'h00'
Funcal 5x6 06h20' 15h00' < 0.50
Funcal 6x6 00h00' 15h00'

Unloading gold bar

Comments

TROMMEL: inoperative due to rupture axis the trommel, machining is sent to the city of
Arequipa.
This frozen treat Arenillas
Geology
Extracted Mineral Ton Gr/ton Au
Cero 42.00 5.08
150 16.50 5.00
Esperanza 55.60 7.38 > 7.5
Mercedes 1 34.00 5.30
mercedes 2 25.60 7.17 > 7.0
Sub total 173.70 6.16
Yessica 53.00 5.25 > 5.5
Total 226.70 5.95
Acopio 0 18.0 > 15.0
Comments

Maintenance
OIL OIL
Accum. Accum.
Power Generation (KW) 16,206 Air Compressors (Hr) 59.2
Power Generation (Hr.) 55.0
consumption (gal) 1,050 consumption (gal) 524.0
KPI (KW/GAL) 15.4 KPI (GAL/Hr) 8.85
KPI (KW/Hr.) 294.7
KPI (GAL/Hr.) 19.1
Logistics
OIL Accum.
consumption (gal) 2,237.00 21,160
Stock (gal) 5,368.00
O.K.

HOSPITAL hospitalized 0
accidents 0

Administration
Being installed in the mining camp a new line of Payment of money by CTS San Juan Advance
wastewater drain with 8-inch PVC pipe. workers 164
housings Reparation of the camp Employees 35
Repaired housing 86
Calamines utili 689

Environment

It is fitted with the bulldozer the tailings pond No. 3


Advance 100%
It is fitted with the bulldozer the tailings pond CIL
Advance 5%

Projects Advance
riverside defense
Removal of tailings 100%
Excavation of the dam foundation 100%
Filled with base material 80%
M3/day -
Channel tailings Advance 100%

OIL
Accum.
Equipment (Hr)
consumption (gal) 160
KPI (GAL/Hr)

Mining camp Electrification Project Posts total installed main line 39 Installed
energy house 325
Transfor
mers
repaired:
Posts total installed auxiliary line 57 02 ADVANCE 95%
Generator cat # 16 1.0
Posts preparations 12
Principal voltage line (m) 5,200.00
Auxiliar Voltage line (m) 5712
Syndicate
Calm working atmosphere.

Patrimony

Are there problems with retired workers has since 2002 provisional court in an area of 1,000 ml in the area of tailings deposits are currently preventing the construction of a new stadium for CIL tailings and what is more preventing
serious we are cleaning the canal that carries the tailings to the tailings pond Pb # 3.We are awaiting the decision Camana city Magistrate and Inspection City Chuquibamba Magistrate

Social
Held on Mother's Day with a sports show on the slab as the presence of all mothers in the valley of San Juan Chorunga, managers and employees of the company present was Mr.
Edgar Fernandez, Ms Araujo and Eng Yasika . Jesus Salamanca. It gave away 100 baskets of food products
Iternal
Mine entrance Door construct protection patrol operating

New
personnel
patrol = 6 informal recovered
Mine Site Security San Juan VILLA miners mineral Kilos

Exploration
Geological mapping is being conducted in the Prospectus Erika
Superintendent Reunion, May 14
6:45 Century Superintendent Report
Operación 14/05/201 SEGURIDAD

ACCIDENTS 0 Special Security Committee


INCIDENTS 0 investigates and analyzes:
SUBSTANDARD CONDITIONS 14 Accident:
Revised 10
Uncorrected 4

Subestandar
Pérdidas Act
al Proceso 0
Losses to the process 0 Recommendations
EPP:
Training
Safety Incidents quantity
Perforation 2
Cut Shots 0
Electric Power 1
Operation of Machineries 4
Carry anf transport 1
Detachment of Rocks 2
Tools 2
Perforation 2
Other 5
Total 19

MINA Mine Reunion 6.00 AM

Broken (ton) Extracted (ton)


Ore Wast Ore Wast
Total 329.0 207.0 291.9 0.0
Century 329.0 85.0 267.9 0.0
Century Development 0.0 40.0 0 0.0
MBM 0.0 82.0 24.0 0.0

Transported mineral plant (ton) 302.1 Cero 150 Esperanza Mercedes 1 Mercedes 2 Yessica Acopio
P.B. 266.1 40.0 38.0 120.0 42.5 25.6
CIL 36.0 36.0 0.00
Acumulado 302.1 3911.7 513.0 484.0 1274.0 510.0 328.0 780.0 22.7

KPI Blasting Productivity Blast factor workers Advance (m)


break Extraction Stopes front
Century 26 1.59 1.6 0.31 260
Century Development 4 2.00 1.30 46 6.0
MBM 6 2.00 0.97 25 8.8

Quantity Comments
Jack leg inoperative Seco 2 Seco Jack Leg inoperative for piston and horn
Toyo 3 bronze Toyo Jack Leg inoperative for lack of spare
Inoperative loader 0 Cable parts
Inoperative Winche 0 Arrancador
Inoperative Compressor Motor

PLANT Dia 14 Head grade (calculated) % Recover Ounces produced Ounces produced accum.
P.B CIL B.P. CIL B.P. CIL B.P. CIL Total B.P. CIL TOTAL
Dry Tonnes Milled Total 310.0 254 56 6.19 7.98 91.34 70.25 42.97 9.69 52.66 539.60 135.18 674.78
Accum. 4,264.0 3,422.0 842.0
Stock 165.0 105 60 92% 91% ok ok ok
Tails (gr
mill operation (Hr) P.B CIL /tm)
Comesa 6x6 22'h30' 0.56
Comesa 5x6 22'h30'
Funcal 5x6 07h00' 03h30' < 0.50
Funcal 6x6 00h00' 15h00'

Unloading gold bar

Comments

TROMMEL: inoperative due to rupture axis the trommel, machining is sent to the city of
Arequipa.
This frozen treat Arenillas
Geology
Extracted Mineral Ton Gr/ton Au
Cero 40.80 5.19
150 38.00 5.49
Esperanza 118.00 8.07 > 7.5
Mercedes 1 42.50 5.88
mercedes 2 25.60 7.38 > 7.0
Sub total 264.90 6.84
Yessica 53.00 5.70 > 5.5
Total 317.90 6.65
Acopio 0 18.0 > 15.0
Comments

Maintenance
OIL OIL
Accum. Accum.
Power Generation (KW) 15,534 Air Compressors (Hr) 70.2
Power Generation (Hr.) 67.0
consumption (gal) 1,081 consumption (gal) 865.0
KPI (KW/GAL) 14.4 KPI (GAL/Hr) 12.31
KPI (KW/Hr.) 231.9
KPI (GAL/Hr.) 16.1
Logistics
OIL Accum.
consumption (gal) 2,317.00 33,288
Stock (gal) 3,828.00
O.K.

HOSPITAL hospitalized 0
accidents 0

Administration
Being installed in the mining camp a new line of Payment of money by CTS San Juan Advance
wastewater drain with 8-inch PVC pipe. workers 164
housings Reparation of the camp Employees 35
Repaired housing 86
Calamines utili 689

Environment

It is fitted with the bulldozer the tailings pond No. 3


Advance 100%
It is fitted with the bulldozer the tailings pond CIL
Advance 5%

Projects Advance
riverside defense
Removal of tailings 100%
Excavation of the dam foundation 100%
Filled with base material 80%
M3/day -
Channel tailings Advance 100%

OIL
Accum.
Equipment (Hr)
consumption (gal) 194
KPI (GAL/Hr)

Mining camp Electrification Project Posts total installed main line 39 Installed
energy house 325
Transfor
mers
repaired:
Posts total installed auxiliary line 57 02 ADVANCE 95%
Generator cat # 16 1.0
Posts preparations 12
Principal voltage line (m) 5,200.00
Auxiliar Voltage line (m) 5712
Syndicate
Calm working atmosphere.

Patrimony

Social
Held on Mother's Day with a sports show on the slab as the presence of all mothers in the valley of San Juan Chorunga, managers and employees of the company present was Mr.
Edgar Fernandez, Ms Araujo and Eng Yasika . Jesus Salamanca. It gave away 100 baskets of food products
Iternal
Mine entrance Door construct protection patrol operating

New
personnel
patrol = 6 informal recovered
Mine Site Security San Juan VILLA miners mineral Kilos

Exploration
Geological mapping is being conducted in the Prospectus Erika
Superintendent Reunion, May 27
6:45 Century Superintendent Report
Operación 27/05/201 SEGURIDAD

ACCIDENTS 0 Special Security Committee


INCIDENTS 0 investigates and analyzes:
SUBSTANDARD CONDITIONS 10 Accident:
Revised 7
Uncorrected 3

Subestandar
Pérdidas Act
al Proceso 0
Losses to the process 0 Recommendations
EPP:
Training
Safety Incidents quantity
Perforation 8
Cut Shots 1
Electric Power 2
Operation of Machineries 5
Carry anf transport 3
Detachment of Rocks 2
Tools 2
SYMPTOMS OF DRUNKENNESS 1
Other 6
Total 30

MINA Mine Reunion 6.00 AM

Broken (ton) Extracted (ton)


Ore Wast Ore Wast
Total 413.0 412.0 274.7 101.0
Century 374.0 173.0 274.7 101.0
Century Development 16.0 166.0 0.0 0.0
MBM 23.0 73.0 0.0 0.0

Transported mineral plant (ton) 241.3 Cero 150 Esperanza Mercedes 1 Mercedes 2 Yessica Acopio
P.B. 241.3 40.0 40.0 100.0 35.7 25.6
CIL 0.0 0.0 0.00
Acumulado 241.3 7308.1 1016.0 922.0 2547.0 1013.2 661.2 1126.0 22.7

KPI Blasting Productivity Blast factor workers Advance (m)


break Extraction Stopes front
Century 26 2.06 1.42 0.51 265
Century Development 11 3.00 0.95 45 15.6
MBM 7 2.00 0.97 21 10.2

Quantity Comments
Jack leg inoperative Seco 4 Seco Jack Leg inoperative for piston and horn
Toyo 4 bronze Toyo Jack Leg inoperative for lack of spare
Inoperative loader 0 Cable parts
Inoperative Winche 0 Arrancador
Inoperative Compressor Motor

PLANT Dia 27 Head grade (calculated) % Recover Ounces produced Ounces produced accum.
P.B CIL B.P. CIL B.P. CIL B.P. CIL Total B.P. CIL TOTAL
Dry Tonnes Milled Total 340.0 270 70 6.37 10.20 90.68 68.00 46.04 14.98 61.02 1,086.34 300.42 1,386.76
Accum. 8,388.0 6,737.0 1,651.0
Stock 140.0 60 80 92% 91% ok ok ok
Tails (gr
mill operation (Hr) P.B CIL /tm)
Comesa 6x6 22'h30' 0.62
Comesa 5x6 22'h30'
Funcal 5x6 17h30' 00h00' < 0.50
Funcal 6x6 00h00' 17h00'

Unloading gold bar

Comments

TROMMEL: inoperative due to rupture axis the trommel, machining is sent to the city of
Arequipa.
This frozen treat Arenillas
Geology
Extracted Mineral Ton Gr/ton Au
Cero 40.80 5.35
150 38.00 5.00
Esperanza 88.00 8.11 > 7.5
Mercedes 1 35.70 5.54
mercedes 2 25.80 8.31 > 7.0
Sub total 228.30 6.72
Yessica 46.00 6.30 > 5.5
Total 274.30 6.65
Acopio 0 18.0 > 15.0
Comments

Maintenance
OIL OIL
Accum. Accum.
Power Generation (KW) 17,050 Air Compressors (Hr) 82.5
Power Generation (Hr.) 66.0
consumption (gal) 1,078 consumption (gal) 848.0
KPI (KW/GAL) 15.8 KPI (GAL/Hr) 10.28
KPI (KW/Hr.) 258.3
KPI (GAL/Hr.) 16.3
Logistics
OIL Accum.
consumption (gal) 2,657.00 63,876
Stock (gal) 1,860.00
O.K.

HOSPITAL hospitalized 0
accidents 0

Administration
Being installed in the mining camp a new line of Payment of money by CTS San Juan Advance
wastewater drain with 8-inch PVC pipe. workers 164
housings Reparation of the camp Employees 35
Repaired housing 94
Calamines utili 761

Environment

It is fitted with the bulldozer the tailings pond No. 3


Advance 100%
It is fitted with the bulldozer the tailings pond CIL
Advance 30%

Projects Advance
riverside defense
Removal of tailings 100%
Excavation of the dam foundation 100%
Filled with base material 90%
M3/day -
Channel tailings Advance 100%

OIL
Accum.
Equipment (Hr)
consumption (gal) 440
KPI (GAL/Hr)

Mining camp Electrification Project Posts total installed main line 39 Installed
energy house 325
Transfor
mers
repaired:
Posts total installed auxiliary line 57 02 ADVANCE 98%
Generator cat # 16 1.0
Posts preparations 12
Principal voltage line (m) 5,200.00
Auxiliar Voltage line (m) 5712
Syndicate
Calm working atmosphere.

Patrimony

Workshops are scheduled for the


Environmental Impact Study
day 29;16 hours: San juan city
Social 30th; 10 hours: Iquipi city

Iternal
Mine entrance Door construct protection patrol operating

New
personnel
patrol = 6 informal recovered
Mine Site Security San Juan VILLA miners mineral Kilos

Exploration
Geological mapping is being conducted in the Prospectus Erika
Superintendent Reunion, May 30
6:45 Century Superintendent Report
Operación 30/05/201 SEGURIDAD

ACCIDENTS 0 Special Security Committee


INCIDENTS 0 investigates and analyzes:
SUBSTANDARD CONDITIONS 10 Accident:
Revised 2
Uncorrected 2

Subestandar
Pérdidas Act
al Proceso 0
Losses to the process 0 Recommendations
EPP:
Training
Safety Incidents quantity
Perforation 12
Cut Shots 12
Electric Power 3
Operation of Machineries 5
Carry anf transport 3
Detachment of Rocks 2
Tools 3
SYMPTOMS OF DRUNKENNESS 1
Other 12
Total 53

MINA Mine Reunion 6.00 AM

Broken (ton) Extracted (ton)


Ore Wast Ore Wast
Total 52.0 73.0 62 0.0
Century 38.0 15.0 62 0.0
Century Development 14.0 58.0 0.0 0.0
MBM 0.0 0.0 0.0 0.0

Transported mineral plant (ton) 354.0 Cero 150 Esperanza Mercedes 1 Mercedes 2 Yessica Acopio
P.B. 48.0 0.0 24.0 24.0 0.0 0.0
CIL 306.0 306.0 0.00
Acumulado 354.0 8160.4 1096.0 1024.0 2776.0 1091.0 712.0 1432.0 29.4

KPI Blasting Productivity Blast factor workers Advance (m)


break Extraction Stopes front
Century 6 0.51 105
Century Development 5 0.73 17 7.0
MBM 11 0 0.0

Quantity Comments
Jack leg inoperative Seco 4 Seco Jack Leg inoperative for piston and horn
Toyo 4 bronze Toyo Jack Leg inoperative for lack of spare
Inoperative loader 0 Cable parts
Inoperative Winche 0 Arrancador
Inoperative Compressor Motor

PLANT Dia 30 Head grade (calculated) % Recover Ounces produced Ounces produced accum.
P.B CIL B.P. CIL B.P. CIL B.P. CIL Total B.P. CIL TOTAL
Dry Tonnes Milled Total 355.0 280 75 5.29 9.83 88.93 68.01 39.38 15.47 54.85 1,210.33 341.36 1,551.69
Accum. 9,384.0 7,523.0 1,861.0
Stock 115.0 35 80 92% 91% ok ok ok
Tails (gr
mill operation (Hr) P.B CIL /tm)
Comesa 6x6 21'h00' 0.61
Comesa 5x6 21'h00'
Funcal 5x6 20h00' 00h00' < 0.50 The treatment program only sulphide mineral vein Jessica
Funcal 6x6 00h00' 21h30'

Unloading gold bar

Comments

TROMMEL: inoperative due to rupture axis the trommel, machining is sent to the city of
Arequipa.
This frozen treat Arenillas
Geology
Extracted Mineral Ton Gr/ton Au
Cero 23.80 5.34
150 23.40 5.31
Esperanza 14.80 8.00 > 7.5
Mercedes 1 0.00 0.00
mercedes 2 0.00 0.00 > 7.0
Sub total 62.00 5.96
Yessica 0.00 6.30 > 5.5
Total 62.00 5.96
Acopio 0 18.0 > 15.0
Comments

Maintenance
OIL OIL
Accum. Accum.
Power Generation (KW) 14,507 Air Compressors (Hr) 82.5
Power Generation (Hr.) 52.0
consumption (gal) 973 consumption (gal) 848.0
KPI (KW/GAL) 14.9 KPI (GAL/Hr) 10.28
KPI (KW/Hr.) 279.0
KPI (GAL/Hr.) 18.7
Logistics
OIL Accum.
consumption (gal) 1,705.00 70,576
Stock (gal) 4,950.00
O.K.

HOSPITAL hospitalized 0
accidents 0

Administration
Being installed in the mining camp a new line of Payment of money by CTS San Juan Advance
wastewater drain with 8-inch PVC pipe. workers 164
housings Reparation of the camp Employees 35
Repaired housing 94
Calamines utili 761

Environment

It is fitted with the bulldozer the tailings pond No. 3


Advance 100%
It is fitted with the bulldozer the tailings pond CIL
Advance 40%

Projects Advance
riverside defense
Removal of tailings 100%
Excavation of the dam foundation 100%
Filled with base material 90%
M3/day -
Channel tailings Advance 100%

OIL
Accum.
Equipment (Hr)
consumption (gal) 606
KPI (GAL/Hr)

Mining camp Electrification Project Posts total installed main line 39 Installed
energy house 325
Transfor
mers
repaired:
Posts total installed auxiliary line 57 02 ADVANCE 98%
Generator cat # 16 1.0
Posts preparations 12
Principal voltage line (m) 5,200.00
Auxiliar Voltage line (m) 5712
Syndicate
Calm working atmosphere.

Patrimony

It makes the 02 informative workshops and diagnosis to modify the approved Environmental Impact Study in 1995.
With a favorable balance of good relations with the communities of San Juan de Chorunga and Iquipi.
Remaining to meet various commitments until the next workshop of Approval of EIA within 03. months or so.
The assistance and San Juan was 300 attendees
Social The asistcia in Iquipi was 400 attendees

Iternal
Mine entrance Door construct protection patrol operating

New
personnel
patrol = 6 informal recovered
Mine Site Security San Juan VILLA miners mineral Kilos

Exploration
Geological mapping is being conducted in the Prospectus Erika
Superintendent Reunion, May 30
6:45 Century Superintendent Report
Operación 31/05/201 SEGURIDAD

ACCIDENTS 0 Special Security Committee


INCIDENTS 1 investigates and analyzes:
SUBSTANDARD CONDITIONS 23 Accident:
Revised 15
Uncorrected 8

Subestandar
Pérdidas Act
al Proceso 0
Losses to the process 1 Recommendations
EPP:
Training
Safety Incidents quantity
Perforation 12
Cut Shots 12
Electric Power 3
Operation of Machineries 5
Carry anf transport 3
Detachment of Rocks 2
Tools 3
SYMPTOMS OF DRUNKENNESS 1
Other 12
Total 53

MINA Mine Reunion 6.00 AM

Broken (ton) Extracted (ton)


Ore Wast Ore Wast
Total 338.0 302.0 305.5 23.0
Century 323.0 126.0 305.5 23.0
Century Development 15.0 116.0 0.0 0.0
MBM 0.0 60.0 0.0 0.0

Transported mineral plant (ton) 288.1 Cero 150 Esperanza Mercedes 1 Mercedes 2 Yessica Acopio
P.B. 288.1 60.0 40.0 120.0 42.5 25.6
CIL 0.0 0.00
Acumulado 288.1 8449.3 1156.0 1064.0 2896.0 1133.9 738.0 1432.0 29.4

KPI Blasting Productivity Blast factor workers Advance (m)


break Extraction Stopes front
Century 32 1.70 1.3 0.51 264
Century Development 8 2.9 0.52 45 9.4
MBM 3 3 18 4.5

Quantity Comments
Jack leg inoperative Seco 4 Seco Jack Leg inoperative for piston and horn
Toyo 4 bronze Toyo Jack Leg inoperative for lack of spare
Inoperative loader 0 Cable parts
Inoperative Winche 0 Arrancador
Inoperative Compressor Motor

PLANT Dia 31 Head grade (calculated) % Recover Ounces produced Ounces produced accum.
P.B CIL B.P. CIL B.P. CIL B.P. CIL Total B.P. CIL TOTAL
Dry Tonnes Milled Total 292.0 209 83 6.05 7.20 90.33 72.41 34.15 13.36 47.51 1,244.07 358.31 1,602.38
Accum. 9,677.0 7,733.0 1,944.0
Stock 165.0 95 70 92% 91% ok ok ok
Tails (gr
mill operation (Hr) P.B CIL /tm)
Comesa 6x6 18'h00' 0.61
Comesa 5x6 18'h00'
Funcal 5x6 06h00' 10h00' < 0.50 The treatment program only sulphide mineral vein Jessica
Funcal 6x6 00h00' 23h00'

Unloading gold bar

Comments

TROMMEL: inoperative due to rupture axis the trommel, machining is sent to the city of
Arequipa.
This frozen treat Arenillas
Geology
Extracted Mineral Ton Gr/ton Au
Cero 40.80 5.51
150 21.60 5.38
Esperanza 92.80 8.67 > 7.5
Mercedes 1 42.50 5.54
mercedes 2 25.60 7.59 > 7.0
Sub total 223.30 7.05
Yessica 82.20 5.55 > 5.5
Total 305.50 6.65
Acopio 0 18.0 > 15.0
Comments

Maintenance
OIL OIL
Accum. Accum.
Power Generation (KW) 13,902 Air Compressors (Hr) 89.2
Power Generation (Hr.) 65.2
consumption (gal) 975 consumption (gal) 959.0
KPI (KW/GAL) 14.3 KPI (GAL/Hr) 10.75
KPI (KW/Hr.) 213.3
KPI (GAL/Hr.) 15.0
Logistics
OIL Accum.
consumption (gal) 2,310.00 72,897
Stock (gal) 2,810.00
O.K.

HOSPITAL hospitalized 1
accidents 0

Administration
Being installed in the mining camp a new line of Payment of money by CTS San Juan Advance
wastewater drain with 8-inch PVC pipe. workers 164
housings Reparation of the camp Employees 35
Repaired housing 99
Calamines utili 813

Environment

It is fitted with the bulldozer the tailings pond No. 3


Advance 100%
It is fitted with the bulldozer the tailings pond CIL
Advance 50%

Projects Advance
riverside defense
Removal of tailings 100%
Excavation of the dam foundation 100%
Filled with base material 90%
M3/day -
Channel tailings Advance 100%

OIL
Accum.
Equipment (Hr)
consumption (gal) 606
KPI (GAL/Hr)

Mining camp Electrification Project Posts total installed main line 39 Installed
energy house 325
Transfor
mers
repaired:
Posts total installed auxiliary line 57 02 ADVANCE 98%
Generator cat # 16 1.0
Posts preparations 12
Principal voltage line (m) 5,200.00
Auxiliar Voltage line (m) 5712
Syndicate
Calm working atmosphere.

Patrimony

It makes the 02 informative workshops and diagnosis to modify the approved Environmental Impact Study in 1995.
With a favorable balance of good relations with the communities of San Juan de Chorunga and Iquipi.
Remaining to meet various commitments until the next workshop of Approval of EIA within 03. months or so.
E.I.A The assistance and San Juan was 300 attendees
The asistcia in Iquipi was 400 attendees

Iternal
Mine entrance Door construct protection patrol operating

New
personnel
patrol = 6 informal recovered
Mine Site Security San Juan VILLA miners mineral Kilos

Exploration
Geological mapping is being conducted in the Prospectus Erika