Synopsis:
A client wish to build a factory warehouse with attached office unit. The sketches of the factory are
as shown in the drawings below:
6m
Frame
height, 9m
3.5m
3.5m
Frame width, A
Fig. 3: Factory Front View
Distance per
Total frame
length 54m bay, B
Office, 6m
Distance per
Office, B
bay, B
Distance per
Office, B
bay, B
Frame width, A
6m 3m 3m
Water Tank
Toilet Utilities
3m
B Machinery
Room
Roof
Office
The project report must be in A4 size, hand writing. The drawings can be in A4 and A3, folded
appropriately and attached to the report. The report should be in professional format, with
necessary cover, table of contents, introduction, references, appendices etc.
Engineers are expected to meet the client’s representative periodically to follow-up their progress.
Upon the submission of the project report, the engineers have to present their works to the client’s
representative.
Note:
Assume all connections are pinned joint unless justified by the design engineers.
The roof gradient shall be in between 6o or upon the engineers’ decision.
The value of A, B, and C are as per attached.