You are on page 1of 107

EASTERN RAILWAY

(CONSTRUCTION DEPARTMENT)

NAME OF WORK :- Construction of Sr. SE/TR-D/S&W Office buildings, and other miscellenous works at Bandel.

SL NO SCHEDULE OF ITEMS COST % ABOVE / BELOW

1 SCHEDULE-- 'A' (NS item) 1210285.00


2 SCHEDULE -- BI "A" 4643343.89
3 SCHEDULE -- BI "B" 6825394.78
4 SCHEDULE -- BI "C" 7984847.10
5 SCHEDULE -- BII 510000.00
6 SCHEDULE -- C-I (Cement) 5103940.00
7 SCHEDULE -- C - II (Reinforcement) 4249490.00
TOTAL RUPEES 30527300.77
SAY 3.05 CRORES

SSE/Con/W/BDC DEN/Con/VII/HWH Dy.CE/Con/II/HWH


EASTERN RAILWAY
(CONSTRUCTION DEPARTMENT)

NAME OF WORK :- Construction of Sr. SE/TR-D/S&W Office buildings, and other miscellenous works at Ba

SCHEDULE –A-I (Non Schedule Item)

Total
SL NO DESCRIPTION OF WORKS UNIT QUANTITY
RATE

With Contractor's earth of approved quality and Railway's specification, obtained from
outside Railway land with loading, unloading, all lead, lift, ascend, descend, crossing of
1 nullah, road, fencing and any other obstructions etc. including material cost & other 10 m3 1000.00 1511.00
incidental charges complete in all respect.
Note:
(i) 25% variation limit shall not be applicable to these items if more than one item is
operated as these items may very widely depending on quantity and nature of soil released
from cutting vide item 1.

(ii) Earthwork shall be done strictly in accordance with the provisions of latest RDSO's
Guidelines for Earthwork in Railway projects, Engineering Code, General Conditions of
Contract & Additional Conditions and Specifications given in the tender document.
(iii) Payment of royalty, taxes, cost of earth and any other incidental charges are to be borne
by the contractor and the quoted rate should include all such charges.
(iv) The contractor shall establish field laboratory with all equipment for conducting
required soil tests and compaction tests at site at his own cost. The contractor shall also
supply required number of printed registers free of cost for recording of test results of
earthwork and compaction tests. The field laboratory shall be equipped with minimum
equipments as listed in the Annexure-X of RDSO’s Guideline no. GE:G-1 for “ Guidelines
for Earthwork in Railway Projects”-July-2003 to facilitate the following minimum tests:

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH/ER


Total
SL NO DESCRIPTION OF WORKS UNIT QUANTITY
RATE

Note:
(a) Gradation Analysis-Sieve and Hydrometer
(b) Atterberg's limits-liquid limits & plastic limits
(c) Optimum moisture content (OMC), Maximum Dry Density (MDD) and Relative Density
(d) Placement moisture content & in-situ density
The field lab should be manned adequately by contractor at his own cost with trained staff
capable of carrying out required investigation, soil testing and quality control at site.
(v) Samples of earth along with its test results as prescribed and slope analysis results shall
be submitted to the Engineer-in-Charge for approval before making the embankment.

(vi) Soil testing shall be done at frequency of at least one test at every change of soil strata
subject to minimum of one test for every 5000 cum to assess suitability of fill material and
to lay down OMC and MDD/Relative density. The cost/charges of all such testing shall be
borne by the contractor.
(vii) Before starting of earthwork, contractor will have to make proper benching as per site
condition on existing embankment slopes as per RDSO's guidelines and also remove all
grasses, bushes etc from proposed area of work. No extra payment will be made for such
works.
(viii) The contractor shall take undisturbed samples as per IS : 2132-1986 of the parent soil
over which the embankment shall rest and shall conduct prescribed laboratory test to enable
analysis of stability of the base to asses its long term stability and distance of borrow pits
etc. test results and technical observations should be submitted for approval of the engineer-
in-charge.

(ix) If any service roads, culverts, bridges etc. are to be built, the contractor shall build the
same at his own cost, including ramps for transporting earth to make embankment. All the
service roads are to be maintained by the contractor at his own cost. No separate payment
for such works shall be made.

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH/ER


Total
SL NO DESCRIPTION OF WORKS UNIT QUANTITY
RATE

(x) Payment of this item will be made as per finished and approved cross section
measurement only after necessary compaction and all necessary testing for compaction in
layers to be done by the contractor up to the satisfaction of engineer-in-charge. Lead, if
applicable, will be measured based on c.g. of earth moved only after compaction.
(xi) Before undertaking the earthwork involving movement of machinery, equipments, road
vehicles etc in the vicinity of existing track, the contractor shall ensure protection of track as
per direction of engineer at site as per item no. 10 of Schedule-A-I for which payment will
be made separately under item no.10 of Schedule-A-I.
(xii) Before quoting the rate, the contractor should inspect the site to assess the lead, site condition etc.
(xiii) Spacing of trolley refuges should be as per RDSO’s Guidelines (Latest)/ instruction of
site engineer, if site condition such warrants from safety point of view.
(xiv) Before the work is started, the whole area between the toes of the bank or top of
cutting, shall be properly cleared by the contractor of all Trees, Roots, Heavy grass and all
obstructions. No extra payment will be made for such work. All trees of girth (parameter)
more than 12 inch at 1 meter above the bottom shall be the property of the Railway and the
contractor shall, after uprooting, deposit the same with Railway. Before cutting trees,
necessary permission required from the forest department or any other appropriate, shall be
taken by the contractor on the basis of Railway’s recommendatory letter.

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH/ER


Total
SL NO DESCRIPTION OF WORKS UNIT QUANTITY
RATE

Supplying & driving approx. 5.5 m to 7 m. long hard wood piles (without any joint) of
Eucalyptus or similar type of dia 125mm (average) for protection of bank slope in water
bodies, bridge approaches & other locations, if required, as directed by Railway engineer at
site including supplying and erecting derrick, monkey and necessary equipments to
2 penetrate the piles in any types of soil, removal of the equipments from the site after 1 m 500.00 97.00
completion of the work. The rate includes all cost of material, labour, transportation, lead,
lift, descend, ascend and two coats of coal tarring on pile complete in all respect.

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH/ER


Total
SL NO DESCRIPTION OF WORKS UNIT QUANTITY
RATE

Note:
(i) Payment will be made as per actual length of pile supplied at site. Driving shall be done
to the required depth as directed by Engieer-at-site.
(ii) All sorts of safety aspects to be observed by the contractor at his own risk and cost
during execution of work by the side of running track and over-head live wires.
(iii) Each pile shall be of average diameter 125mm. The average diameter of a pile will be
its actual diameter measured at a point located at a distance 1/3rd of its length from its head.
3 Supplying and fixing bitumen drum sheet by nailing to wooden piles
125 mm dia (supplied and driven vide item no. 6 of this schedule) with nailing as directed
by the Engineer at site for guarding against slippage of earth as per approved drawing. The
rate includes supplying of all necessary materials, fittings like nails to hold in proper 1 m2 100 157.00
position, all labour, equipment, all lead, lift, descent, crossing of Rly. tracks, fencing etc.
complete in all respect.

.
Note: This item to be operated on specific written instruction of site engineer about location
and quantity.

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH/ER


Total
SL NO DESCRIPTION OF WORKS UNIT QUANTITY
RATE

Providing temporary barricading for protection of running trains from the working
locality of new bank during plying of earth, moving equipments, machineries etc. The
barricading will be done by vertical posts of hard wood ballah of 75 mm to 100 mm dia
fixed at a spacing of 1.5 m center to center distance and horizontally connected (minimum
in three layers) with each other by bamboos (dia 50 mm minimum) fixed properly. The
height of barricading to be kept minimum 1.20 m above rail level of existing running track
4 with suitable foundation to sustain the alignment. The barricading to be provided at distance 1 m 200.00 113.00
of 3.0 m from the running track. Safety strips clearly visible during night will also to be
fixed along with barricading. The rate includes supply of all materials required for making
barricading, labour, tools and plants. Rate also includes earthwork in excavation required to
fix ballah post minimum

75 mm into the ground/formation and as per instruction of site in-charge. Barricade will be
removed after completing all activities viz. earth work, blanketing etc. and only after the
instruction of site engineer. The material should be arranged by the contractor to cover at
least one stage of minimum 1 km to work parallely at number of location at time. (Only one
time payment will be paid in the activity if earthwork and blanketing is staggered.) The
fencing made of ballah and bamboo will be used. The damaged/missing ballah/bamboo
should be recouped at contractor's cost. After completion of the work, barricading will be
taken back by the contractor. Payment will be made for each meter length covered by
barricade. The rate includes providing safety strips along with barricading.

Note:
This item is to be operated exclusively for bridge works/platform for erection, if required,
after approval of Engineer in charge.

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH/ER


Total
SL NO DESCRIPTION OF WORKS UNIT QUANTITY
RATE

Supply of labour(helpers) for assistance to Railway inspector(s)/officers during


inspection,supervision and measurement of field work etc as per instruction of engineer-in-
5 charge or his representative. For safety related works, competency will be ensured by the 1 man day 2000.00 315.12
inspector concerned.

Straightening, cutting, bending and placing in position re-inforcing steel at site of work
6 including cost ofGI binding wire of standard SWG etc. complete in all respect. This item to 1 MT 65.00 3213.00
be operated against RCC items under USSOR 2011.
Supply and filling granular materials of Gw , GP, SW group as per IS:1498-1970 behind
aboutment in layer not exceeding 150 mm thick including its compaction with all lead ,lift ,
7 labour , tax royalty etc. complete in all respect as per provisions of rly. bridge sub-stracture 1 m3 100.00 540.00
and foundation coad.

Supply, fitting & fixing submersible pump KSB type cora A/4 C/6 UMA (s) 100-0.8/21 H.P.
230v 50 HZ single phase 40 mm dia out let with starter type M.K.single phase prevent or
8
end necessary G.I. Fitting and valves complete in all respect at G/level including, supply &
1 set 1.00 16041.00
filling of switch for starting 85 mm of pump.

Drilling holes of sinking of T/well of 50 x 100 mm dia by water yet system of all position
9
of soil excert rock including supply of all tolls & plants complete as required.

a) 50 mm dia 1 m 100.00 125.00

b) 100 mm dia 1 m 100.00 406.00

10 Supply of PVC ribbed screen strainer oriplast brand and conforming to IS : 12828-1997. 1 m 10.00 374.00

Supply, fitting, & fixing PVC top cover 100 mm x dia 01 No. +50mm dia socket 01 no +
11
plug cutting - 01 nos.
1 set 10.00 428.00

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH/ER


Total
SL NO DESCRIPTION OF WORKS UNIT QUANTITY
RATE

Development of yield test of the T/well of using are compressor for 24 hrs or more sand
12
from water is obtained including measuring etc.
1 No 1.00 2139.00

TOTAL COST OF SCHEDULE 'A' RUPEES

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH/ER


UCTION DEPARTMENT)

/S&W Office buildings, and other miscellenous works at Bandel.

E –A-I (Non Schedule Item)

AMOUNT REMARKS

151100.00 LAR

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH/ER


AMOUNT REMARKS

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH/ER


AMOUNT REMARKS

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH/ER


AMOUNT REMARKS

48500.00 LAR

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH/ER


AMOUNT REMARKS

15700.00 LAR

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH/ER


AMOUNT REMARKS

22600.00 LAR

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH/ER


AMOUNT REMARKS

630240.00 LAR

208845.00 LAR

54000.00 LAR

16041.00 LAR

12500.00 LAR
40600.00 LAR

3740.00 LAR

4280.00 LAR

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH/ER


AMOUNT REMARKS

2139.00 LAR

1210285.00

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH/ER


Eastern Railway
(Construction Department)
NAME OF WORK :- Construction of Sr. SE/TR-D/S&W Office buildings, and other miscellenous works
SCHEDULE B-I"A"

RATE AS PER
SL NO ITEM NO DESCRIPTION OF WORK UNIT QUANTITY
USSOR2011

Brick work with FPS brick of class designation 7.5 in


1 51010 foundation & plinth etc.

(a) 51014 In cement mortar 1:4 etc. 1 m3 2208.57 200 m3


(b) 51015 In cement mortar 1:6 etc. 1 m3 2163.97 800 m3
2 57141 Brick on edging laid dry etc. 1 m 18.53 300 m
3 91032 Brick flat soling 1 m2 171.16 700 m2
Extra over above item for brick work in s/s beyond
4 51040 1 m3 151.99 700
plinth level up to floor two level
m3
Extra for brick work in s/s beyond second floor level for
5 51050 1 m3 287.47 30
every 3m or part thereof…
m3

6 53010 Honey comb brick work in cement mortar 1:4 in 1 Sqm 177.92 100.00
10/11.4 cm thick wall etc. Sqm
BASIC COST OF SCHEDULE - B I- "A" RUPEES TOTAL
ADD AS PER LAR B I"A" ABOVE 91%
TOTAL COST OF SCHEDULE B-I"A" RUPEES

SSE/CON/BDC DEN/CON/VII/HWH DY.CE/CON/II/HWH


Eastern Railway
(Construction Department)
of Sr. SE/TR-D/S&W Office buildings, and other miscellenous works at Bandel.
SCHEDULE B-I"A"

AMOUNT AS PER USSOR 2011

441714.00
1731176
5559
119812

106393

8624.1

17792.00

2431070.10
2212273.79
4643343.89

SSE/CON/BDC DEN/CON/VII/HWH DY.CE/CON/II/HWH


EASTERN RAILWAY
(CONSTRUCTION DEPARTMENT)
SCHEDULE OF ITEMS SCHEDULE –B-I(b)

NAME OF WORK :- Construction of Sr. SE/TR-D/S&W Office buildings, and other miscellenous works at Band

SL NO. ITEM NO. DESCRIPTION OF WORK UNIT RATE QUANTITY

Providing and laying in position cement concrete of specified proportion


1 excluding cost of cement, centering & shuttering. All work upto Plinth level.
CC M10 cast in position in situ at site using properly graded aggregates of 40
a 31012 mm size as per Railway approved drawing and 1 m3 2002.39 150.00

Providing and laying cement concrete, up to plinth in retaining wall, wall


including attached plasters, column, pillars, struts, buttresses, string or lacing
2 courses, Parapets, coping, bed block, anchor blocks, plain window sills, fillets
etc, excluding the cost of cement and of shuttering, centering
CC-M15 with 12 to 20 mm down stone chips as per IS 456-2000 cast in
b 31023 situ/or precast at site as per Railway app 1 m3 2325.34 75.00

Providing and laying in position cement concrete of M20 Grade, excluding the
3 cost of cement and centering etc.
(a) 31051 All work up to plinth 1 m3 2247.57 325.00
(b) 31052 All work above plinth level 1 m3 2384.98 50.00
Cenetring and shuttering including strutting, propping etc. and removal of
4 31060 form work.
a 31061 Foundation and Footings etc. 1 m2 146.28 300.00
b 31063 Columns, Pillars etc. 1 m2 296.96 200.00
5 Providing and laying cement concrete 1:2:4 in damp proof course.
032052 40 mm thick. 1 m2 150.24 100.00
Providing precast plain cement concrete jali 1:2:4 including hoisting and
setting in position with cement mortar 1:3 including the cost of centering,
6 shuttering and finishing complete including the cost of cement and of
plastering of jambs, sills and soffits.
a 032081 40 mm thick. 1 m2 374.80 10.00
b 032082 50 mm thick. 1 m2 425.92 10.00
Providing and laying in position M20 Grade concrete for reinforced concrete
structural elements but excluding cost of centering, shuttering, reinforcement
7 and Admixtures in recommended proportion to accelerate, retard setting of
concrete, improve workability without impairing strength and durability as per
direction of Engineer in charge.

All work upto plinth level including raft foundation of washable aprons, HS
a 041011 tank, pile cap, footing of FOB and Platform shelter etc. 1 m3 2732.49 300.00
b 041012 All work in buildings above plinth level upto floor two level. 1 m3 3004.22 350.00
c 041015 In kerbs, steps and the likes etc. 1 m3 2638.05 50.00
Centering and shuttering including strutting propping etc. and removal of form
8 for.
Foundations, footings, bases of columns, raft foundation of washable aprons,
a 042011 pile caps, Footings of FOB etc. 1 m2 145.90 400.00
b 042012 Walls including attached plasters, buttresses, plinth and string courses etc. 1 m2 239.00 200.00
Suspended floors, roofs, landings, balconies, FOB slabs, walkway slabs and
c 042013 access platform 1 m2 234.36 1500.00
Lintels, beams, plinth beams, bed blocks, girders, bressumers and cantilevers
d 042014 1 m2 208.55 400.00
e 042015 Columns, pillars, posts and struts 1 m2 297.00 400.00
f 042016 Stair (excluding landings) except spiral- staircases 1 m2 298.10 300.00
g 042029 Weather shade, Chajjas, Corbrls, etc. including edges. 1 m2 375.69 200.00
Supply and applying shuttering oil for mould releasing, having for concrete
9 042040 form work to be applying either by brush or with spray mechine to the entire 1 m2 6.43 3400.00
satisfaction of Engineer Incharge.

Providing, hoisting and fixing in portion upto floor two level M20 Grade
10 precast RCC work including setting in cement mortar 1:3 & finishing smooth
with 6mm thick cement plaster 1:3 on exposed surfaces etc.
a 043014 In shelves, cantilevers, chajjas, sunshades etc. 1 m3 3986.14 10.00
b 043015 In slabs for drain covers, manhole covers, flue tops etc. 1 m3 3223.38 25.00
Flat Brick flooring with brick of class designation 7.5 including cement slurry
11 etc. complete in cement mortar.
a 091021 1:4 (1 cement : 4 course sand) (With FPS Bricks) 1 m2 192.07 200.00
b 091022 1:6 (1 cement : 4 course sand) (With FPS Bricks) 1 m2 192.07 300.00
12 Providing and laying plain cement concrete flooring of specified thickness.
a 092011 M20 1 m3 2841.02 50.00
b 092013 M25 1 m3 2841.02 35.00

Cement Plaster skirting (Upto 30cm hight) with cement mortar 1:3 (1 cement :
13 3 coarse sand) finished with a floating coat of neat cement
a 092021 15 mm thick 1 m2 116.08 100.00
Laying 15mm thick hardened topping on concrete surface with 1 part matallic
14 092050 flooring, hardener, 4 parts cement and 9 parts by weight hard stone chips of 1 m2 246.88 250.00
size 6mm mixed and laid as per specification,

15 12mm Cement plaster of mix.


a 111011 1:4 (1 Cement : 4 fine sand) 1 m2 62.44 400.00
b 111012 1:6 (1 Cement : 6 fine sand) 1 m2 62.44 1000.00

16 Cement plaster to ceiling of mix.


a 111151 6mm thick 1:3 (1 Cement : 3 fine sand) 1 m2 55.56 450.00
b 111152 12mm thick 1:3 (1 Cement : 3 fine sand) 1 m2 65.80 100.00

6mm cement plaster 1:3 to C.C/RCC in columns, beam, stairs etc when specifically
17 111160 1 m2 56.91 140.00
ordered except underside of celling

16 12mm Cement plaster finished with a floating coat of neat Cement of mix-
a 111071 1:3 (1 Cement : 3 fine sand) 1 m2 74.89 50.00
b 111072 1:4 (1 Cement : 4 fine sand) 1 m2 75.83 100.00

18 Pointing on brick work with cement mortar 1:3 (1 Cement : 3 fine sand)
a 114011 Flush/Ruled/Struck or weathered pointing 1 m2 49.88 50.00

Cement concrete Grade M-15 of coarse aggregate 40mm nominal size, in


19 236010 pavements, laid to required slope and camber in panels as required including cqm 2020.53 50.00
consolidation finishing and tamping complete
TOTAL
ADD AS PER LAR B I"B" ABOVE 35%
TOTAL COST OF SCHEDULE B-I"B" RUPEES
us works at Bandel.

AMOUNT REMARKS

300358.50

174400.50

730460.25
119249.00

43884.00
59392.00

15024.00
3748.00
4259.20

819747.00
1051477.00
131902.50

58360.00
47800.00
351540.00

83420.00
118800.00
89430.00
75138.00

21862.00

39861.40
80584.50

38414.00
57621.00

142051.00
99435.70

11608.00

61720.00

24976.00
62440.00

25002.00
6580.00

7967.40

3744.50
7583.00

2494.00

101026.50
5073360.95
1752033.8280437
6825394.778044
250

350
Page 32
EASTERN RAILWAY
(CONSTRUCTION DEPARTMENT)
NAME OF WORK :- Construction of Sr. SE/TR-D/S&W Office buildings, and other miscellenous works at Bandel.
SCHEDULE OF ITEMS SCHEDULE –B-I(c)

SL NO/ QUANTITY
ITEM NO ITEM NO DESCRIPTION OF WORK UNIT RATE AMOUNT

Providing and fixing 1st quality ceramic tiles conforming to group B-III (Ceramic wall
1 tiles) of IS: 15622 of manufacturers approved by railway in all colours, shades, and
design as approved by the Engineer-in-charge.

a 095011 200 x 200 mm 1 m2 673.21 200.00 134642


b 095012 200 x 300 mm 1 m2 673.17 200.00 134634
c 095013 300 x 450 mm & above 1 m2 745.00 200.00 149000

Of Group B-II Clause 5.1 (for abrasion resistance) of IS:15622 (Ceramic floor tiles) of
2 size 300x300mm.
1 m2 587.06 200.00 117412
095021
Of Group B-I -a of IS:15622 (Vitrified tiles) of size above 400mmx400mm up to
3 600mmx600mm.
1 m2 1102.32 350.00 385812
095026

Marble stone flooring with 18mm thick marbal stone (sampal of marble shall be
approved by the Engineer-in-Charge) over 20mm (average) thick base of cement mortar
4 1:4 (1 cement : 4 coarse sand) laid and jointed with grey/white cement slurry, including
pigment if required, including rubbing and polishing complete with.

a 096011 Makrana White quality marble 1 m2 1523.05 100.00 152305.00


b 096012 Rajnagar Plain/Black Zebra/Udaipur green marble/Pink plain marble. 1 m2 1301.72 100.00 130172.00
c 096040 Extra for marble stone flooring in treads of steps, not exceeding 30cm in wide 1 m2 177.08 35.00 6197.80

Kota stone slab flooring of size up to 60cmx60cm over 20mm (average) thick base of 1:4
5 cement mortar (1 cement : 4 coarse sand) and jointed with grey cement slurry mixed
with pigment to match the shade of the slab including rubbing and polishing complete,

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH


Page 33

SL NO/ QUANTITY
ITEM NO ITEM NO DESCRIPTION OF WORK UNIT RATE AMOUNT

a 096061 25mm thick 1 m2 1174.68 400.00 469872.00

Kota stone slabs 25mm thick in risers of steps, skirting, dado and pillars laid on 12mm
(average) thick cement mortar 1:3 (1 cement : 3 coarse sand) and jointed with grey
6 cement slurry mixed with pigment to match the shade of the slab, including rubbing and
1 m2 1031.57 150.00 154735.50
096080 polishing complete.

Providing and fixing 10mm thick heavy duty acid and/or alkall resistant factory made
tiles conforming to Group V-RD series of approved make and colour using acid and/or
7 alkali resisting mortar bedding and joints filling with acid and/or alkali resisting cement
as per IS-4457 complete including cost of acid/alkali resistance cement,

a In flooring on a bed of 10mm thick mortar 1:4 (1 appropriate cement : 4 coarse sand) 1 m2 1076.43 100.00 107643.00
094071

b In dado/skirting on 12mm thick mortar 1:4 (1 appropriate cement : 4 coarse sand) 1 m2 1156.54 75.00 86740.5
094072

Providing corrugated G.S sheet roofing, including vertical/curved surface, fixed with
polymer coated 'J'or 'L' hooks, bolts and nuts 8mm diameter with bitumen and G.I limpet
washer or with G.I limpet washer filling with white lead and including a coat of
8 approved steel primer and two coats of approved paint on overlapping of sheets complete
(uptp any pitch in horizontal/vertical or curved surfaces) excluding the cost of purline,
rafters and trusses and including cutting to size and shape wherever required.

a 101011 1.00mm thick with zinc coating not less than 275gm/sqm 1 m2 1147.76 300.00 344328.00
b 101013 0.63mm thick with zinc coating not less than 275gm/sqm 1 m2 801.86 250.00 200465.00

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH


Page 34

SL NO/ QUANTITY
ITEM NO ITEM NO DESCRIPTION OF WORK UNIT RATE AMOUNT

Supply & installation of precoated galvanized iron profile sheets (Size, shape and pitch
of corrugation as approved by Engineer-in-charge) 0.50mm +/- 5% total coated thickness
(TCT) thick Zinc coating 120 gsm as per IS:277 in 240mpa steel grade, 5-7 microns
epoxy primer on both side of the sheet and polyester top coat 15-18 microns,sheet should
have protective guard film of 25 micron minimum to avoid scratches while transporation
9 and should be supplied in single length upto 12m or as desired by Engineer-in-charge. 1 m2 632.17 200.00 126434.00
The sheet shall be fixed using self drilling/self tapping screws of size (5.5mm x 55mm)
with EPDM seal or with polymer coated J or L hooks, bolts and nuts 8mm diameter with
bitumen and G.I. limpet washer or with G.I limpet washers filled with white lead
complete upto any pitch in horizontal/vertical or curved surfaces excluding the cost of
purline, rafters and trusses, including cutting to size and shape, wherever required.

101080

Providing and fixing asbestors cement 6mm thick corrugated/semi corrugated sheet
roofing upto any pitch and fixing with polymer coated J or L hook, bolts and nuts 8mm
10 dia G.I. plain and bitumen washer complete excluding the cost of purlines, rafters and
1 m2 319.94 100.00 31994.00

102010 trusses:

Extra for providing and fixing wind ties of 40mm x 6mm flat iron section complete with
11 1 m 121.37 240.00 29128.80
103040 hooks, nuts, washers etc.

Providing and fixing on wall face unplasticised Rigid PVC single socketed rain water
12 pipes conforming to IS:13592 Type-A including jointing with seal ring conforming to
108160 IS:5382 leaving 10mm gap for thermal expansion
a 108161 75mm dia 1 m 145.21 50.00 7260.50
b 108162 110mm dia 1 m 232.69 25.00 5817.25

13 White washing with lime to given an even shade


a 115011 New work (three or more coats) 1 m2 10.39 300.00 3117.00
b 115020 Lime wash on wall one coat with quick lime of approved quality 1 m2 4.39 200.00 878.00

14 Colour washing such as green, blue or buff to give an even shade


a 115031 New work (two or more coats) with a base coat of white washing with lime 1 m2 12.87 300.00 3861.00

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH


Page 35

SL NO/ QUANTITY
ITEM NO ITEM NO DESCRIPTION OF WORK UNIT RATE AMOUNT

Distempering with oil bond washable distemper of approved brand and manufacture to
15 give an even shade
New work (two or more coats of distemper) over and including priming coat with
a 1 m2 63.01 50.00 3150.50
115041 cement primer

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH


Page 36

SL NO/ QUANTITY
ITEM NO ITEM NO DESCRIPTION OF WORK UNIT RATE AMOUNT

New work (two or more coats of distemper) over and including priming coat with
b distemper primer
1 m2 63.25 150.00 9487.50
115042

Distempering two or more coats on new work with 1st quality acrylic washable
16 distemper (ready mixed) of approved manufacture and of required shade and colour
complete as per manufacturer's specification

a Applying one coat of cement primer of approved brand and manufacture on wall surface 1 m2 25.16 300.00 7548.00
115060

Finishing wall with Delux Multi surface paint system for interiors and exteriors using
17 Primer as per manufacturers specification with two or more coats applied @ 1.25 litre/10 1 m2 83.49 300.00 25047.00
sqm over and including one coat of Special primer applied @ 0.75 litre/10 sqm.

Wall painting on new work with two or more coats of plastic emulsion paint of approved
18 1 m2 56.61 200.00 11322.00
115090 brand and manufacture to give an even shade

19 White washing with lime to given an even shade


a 117052 Old work (One or more coats) 1 m2 6.06 170.00 1030.20

With ready mixed pink or grey primer of approved brand and manufacture on woodwork
20 1 m2 22.42 20.00 448.40
121011 (hard and soft wood)

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH


Page 37
SL NO/ QUANTITY
ITEM NO ITEM NO DESCRIPTION OF WORK UNIT RATE AMOUNT

With ready mixed red oxide zinc chromate primer of approved brand and manufacture on
21 1 m2 10.52 20.00 210.40
121014 steel work (Second coat)

Painting wood work with Deluxe Multi Surfaces Paint of required shade. Two or more
22 coat applied @ 0.90 litre/10sqm over an under coat of primer, applied @ 0.75 1 m2 69.79 50.00 3489.50
121020 litre/10sqm of approved brand or manufacture

Painting Steel work with Delux Multi Surface Paint to give an even shade. Two or more
23 coat applied @ 0.90 litre/10sqm over an under coat of primer applied @ 0.80 litre/10sqm 1 m2 72.63 50.00 3631.5
121030 of approved brand or manufacture

24 Painting with aluminium paint of approved brand and manufacture to give an even shade

a 121091 Two or more coats on new work 1 m2 42.42 50.00 2121


b 121092 One or more coats on old work 1 m2 26.9 50.00 1345

Providing and fixing medium grade G.I. pipes complete with G.I. fittings and
clamps, including cutting and making good the wall etc. : Concealed pipe
25 including painting with anti-corrosive bitumestic paint, cutting chase and making
good the wall

a 15mm dia. nominal bore 1 m 195.86 200.00 39172.00


131141
b 20mm dia. nominal bore 1 m 242.17 100.00 24217.00
131142
c 25mm dia. nominal bore 1 m 290.26 100.00 29026.00
131143
d 32mm dia. nominal bore 1 m 323.65 100.00 32365.00
131144

Providing and fixing medium grade G.I. pipes complete with G.I. fittings
26 including trenching and refilling etc. : External Work

a 15mm dia. nominal bore 1 m 138.82 100.00 13882.00


131151
b 131152 20mm dia. nominal bore 1 m 185.13 100.00 18513.00
c 131153 25mm dia. nominal bore 1 m 236.37 100.00 23637.00

d 131155 40mm dia. nominal bore 1 m 320.53 50.00 16026.50

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH


Page 38

SL NO/ QUANTITY
ITEM NO ITEM NO DESCRIPTION OF WORK UNIT RATE AMOUNT

e 131156 50mm dia. nominal bore 1 m 416.70 50.00 20835.00


f 131159 100mm dia. nominal bore 1 m 811.68 50.00 40584.00

27 Providing & fixing brass bib cock of approved quality


a 132011 15mm nominal bore Each 246.31 15.00 3694.65
b 132012 20mm nominal bore Each 275.5 7.00 1928.5

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH


Page 39

SL NO/ QUANTITY
ITEM NO ITEM NO DESCRIPTION OF WORK UNIT RATE AMOUNT

28 Providing and fixing brass stop cock of approved quality


a 132021 15mm nominal bore Each 277.7 5.00 1388.5

b 132022 20mm nominal bore Each 358.86 5.00 1794.3

Providing and placing on terrace/staging (at all heights) polyethylene water


storage tank ISI:12701 marked with cover and suitable locking arrangement and
29 making necessary holes for inlet, outlet and overflow pipes but without fittings
LITER 9.34 2500.00 23350

136150 and the base support for tank

Providing and fixing white vitreous china pedestal type water closet (European
type W.C. pan) with seat and lid, 10 litres low level white, P.V.C. flushing cistern
30 with manually controlled device (handle lever) conforming to IS:7231, with all
fittings and fixtures complete including cutting and making good the walls and
floors wherever required
a 151021 W.C. pan with ISI marked white solid plastic seat and lid Each 2986.84 5.00 14934.2
Providing and fixing white, vitreous china water closet squatting pan (Indian
31 type)
a 151121 Long pattern W.C. pan of size 580mm Each 792.18 10.00 7921.8

Providing and fixing white, vitreous china flat back or wall corner type lipped
32 front urinal basin of 430mmx260mmx350mm and 340mmx410mm x265mm Each 750.06 4.00 3000.24
151260 sizes respectively

Providing and fixing white, vitreous china wash basin, including making all
33 connections but excluding the cost of fittings
a 151281 Flat back wash basin of size 630mmx450mm Each 949.12 5.00 4745.6

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH


Page 40
SL NO/ QUANTITY
ITEM NO ITEM NO DESCRIPTION OF WORK UNIT RATE AMOUNT

Providing and fixing 110mm dia PVC soil, waste and vent pipes including
34 jointing and cost of spun yarn and sand etc. complete
metre 266.19 25.00 6654.75
154010

Providing and fixing 110mmx110mmx110mm dia. PVC plain branch (single


35 equal junction) of the required degree including jointing and cost of spun yarn EACH 134.77 5.00 673.85
and sand etc. complete
154030

Hollock wood or locally available comparable species of country wood (to be


36 listed by respective railway) - Kiln seasoned & chemically treated
Cudm 53.02 550.00 29161
071013

Providing and fixing panelled/glazed or panelled and glazed shutters for doors,
windows and clerestory windows including ISI marked black enamelled M.S.
37 butt hinges with necessary screws excluding, panelling/glazing which will be
paid for separately

a 072012 Second class teak wood, 30mm thick 1 Sqm 2221.6 30.00 66648

Providing and fixing flush door shutters to IS:2202 Part-I non-decorative type,
core of block board construction with frame of 1st class hard wood and well
38 matched commercial 3-ply veneering with vertical grains or cross bands and
face veneers on both faces of shutters

30mm thick including ISI marked stainless steel butt hinges with necessary
a screws
1 Sqm 1286.46 42.00 54031.32
072152
25mm thick (for cupboard) including ISI marked nickel plated bright finished
b M.S. piano hinges with necessary screws
1 Sqm 1209.22 10.00 12092.2
072153
Extra for providing and fixing flush doors with teak veneering on one side in Item
c 1 Sqm 331.03 10.00 3310.3
072160 072150

Providing and fixing M.S. grills of required pattern in frames of windows etc. with
39 M.S. flats, square or round bars etc. all complete
a 074232 Fixed to opening / wooden frames with rawl plugs screws etc. 1 Kg 88.09 3000.00 264270

Providing and fixing M.S. pressed butt hinges generally conforming to IS:1341,
40 bright satin finish with necessary screws etc. complete of size
a 075011 125mmx65mmx2.12mm Each 33.94 15.00 509.1
b 075013 75mmx47mmx1.7mm Each 21.65 15.00 324.75

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH


Page 41
SL NO/ QUANTITY
ITEM NO ITEM NO DESCRIPTION OF WORK UNIT RATE AMOUNT

Providing and fixing M.S. sliding door bolts generally conforming to IS:281,
41 bright satin finish or black stone enamelled with nuts and screws etc. complete
of size
a 075052 250mmx16mm Each 178.34 8.00 1426.72

Providing and fixing M.S. tower bolts generally conforming to IS:204 (Part I) with
42 necessary screws etc. complete of size :
a 075061 250 x 10 mm Each 79.23 20.00 1584.6
b 075063 150 x 10 mm Each 56.66 20.00 1133.2

c 075064 100 x 10 mm Each 45.19 20.00 903.8

43 Providing and fixing M.S. door handles with necessary screws etc. complete :

a 075071 125 mm Each 25.1 10.00 251.00

b 075072 100 mm Each 22.15 6.00 132.90

c 075073 75 mm Each 94.61 6.00 567.66

Providing and fixing M.S. hasp and staple (Safety type) with necessary screws
44 etc. complete :

075111 150mm Each 31.56 15.00 473.4

Providing and fixing chromium plated brass 100mm mortice latch and lock with 6
42 levers and a pair of lever handles with necessary screws etc. complete (best Each 838.66 5.00 4193.3
077330 make of approved quality)

Providing and fixing factory made P.V.C. door frame of size 50mmx47mm with a
wall thickness of 5mm, made out of extruded 5mm rigid PVC foam sheet
mitered at corners and joined with 2 nos. of 150mm long brackets of
15mmx15mm M.S. square tube, the vertical door profiles to be reinforced with
43 19mmx19mm M.S. square tube of 19 gauge, EPDM rubber gasket weather seal
metre 486.05 50.00 24302.5
to be provided through out the frame. The door frame to be fixed to the wall
using M.S. screws of 65mm/100mm size complete as per manufacturers
specification and direction of Engineer-in-Charge
078130

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH


Page 42

SL NO/ QUANTITY
ITEM NO ITEM NO DESCRIPTION OF WORK UNIT RATE AMOUNT

Providing and fixing to existing door frame 24mm thick factory made PVC door
shutters made of styles and rails of a PVC hollow section of size 34mmx24mm
with a wall thickness 2mm±0.2mm. The styles and rails mitered cut and joined at
corners by means of M.S. galvanized/plastic brackets of size 75mmx 220mm
having wall thickness 1.0mm/solid and fix with stainless steel screws. The styles
of shutter reinforced by inserting galvanized M.S. tube of size 19mmx19mm with
44 a wall thickness 1mm±0.1mm. The shutter frame filled with a PVC multi-
Sqm 1694.99 35.00 59324.65
chambered single panel of size 20mmx 762mm with a wall thickness
1mm±0.1mm. The panels filled vertically and tie bar at two places by inserting
horizontally 0.6mm galvanized M.S. rod and fastened with nuts and washers. All
complete as per manufacturer’s specification and direction of Engineer-In-
Charge
078190

Structural steel work in single section including cutting, bending, straightening,


45 drilling, rivetting, bolting, hoisting, fixing in position, including applying a priming
coat of approved steel primer, complete - upto 6m height above GL
a 081011 In RSJ, tees, angles and channels Kg 71.43 500.00 35715
b 081012 In flats, plates, round or square bars Kg 71.23 100.00 7123

Structural steel work riveted or bolted in built up sections, trusses and framed
work, girders, staging, racks etc. including cutting, bending, straightening,
46 drilling, rivetting, bolting, hoisting, fixing in position including applying a priming
coat of a approved steel primer complete - upto 6m height above GL
081021 In RSJ, tees, angles and channels Kg 74.79 10000.00 747900
081022 In flats, plates, round or square bars Kg 75 500.00 37500

Providing and fixing in position collapsible steel shutters with vertical channels
20mmx10mmx2mm and braced with flat iron diagonals 20mmx5mm size with
47 top and bottom rail of T-iron 40mmx40mmx6mm with 40mm dia. steel pulleys Sqm 3457.49 20.00 69149.8
complete with bolts, nuts, locking arrangement, stoppers, handles and hold fasts
081180 including applying a priming coat of approved steel primer
Providing and fixing 1mm thick M.S. sheet door shutter with frame of
40mmx40mmx6mm angle iron and 3mm M.S. gusset plates at the junctions and
48 corners, all necessary fittings complete including applying a priming coat of
approved steel primer
a 081201 Using M.S. angles 40mmx40mmx6mm for diagonal braces Sqm 2496.87 30.00 74906.1

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH


Page 43

SL NO/ QUANTITY
ITEM NO ITEM NO DESCRIPTION OF WORK UNIT RATE AMOUNT

Supplying and fixing rolling shutters of approved make as per IS:6248, made of
required size M.S. laths interlocked together through their entire length and
jointed together at the end by end locks mounted on specially designed pipe
49 shaft with brackets, side guides and arrangements for inside and outside locking
with push and pull operation complete including the cost of providing and fixing
necessary 27.5cm long wire spring grade no. 2 and M.S. top cover of required
thickness for rolling shutters :

a 081211 80mmx1.25mm M.S. laths with 1.25mm thick top cover Sqm 2470.18 20.00 49403.6

Providing and fixing M.S. fan clamp of 16mm dia M.S. bar bent to shape with
50 hooked ends in R.C.C. slabs during laying including painting the exposed Each 108.4 30.00 3252
081320 portion of loop, all as per standard design complete

Providing and fixing hand rail by welding etc. to steel ladders railing, balcony
51 railing and staircase railing including applying a priming coat of approved steel
primer

a 081421 M.S. tube (medium) 40mm nominal bore Kg 106.58 20.00 2131.6

Providing and fixing anodised aluminium work for doors, windows, ventilators
and partitions with extruded built-up standard tubular and other sections of
approved make conforming to IS:733 .. contd. .. contd. - and IS:1285, anodised
transparent or dyed to required shade according to IS:1868 (Minimum anodic
coating of grade AC 15), fixed with rawl plugs and screws or with fixing clips, or
with expansion hold fasteners including necessary filling up of gaps at junctions,
52 at top, bottom and sides with required PVC/neoprene felt etc. Aluminium
sections shall be smooth, rust free, straight, mitered and jointed mechanically
wherever required including cleat angle. Aluminium snap beading for
glazing/panelling, C.P. brass/stainless steel screws, all complete as per
architectural drawings and directions of Engineer-incharge. (Glazing & panelling
to be paid for separately)

a 082011 For fixed portion Kg 494.56 50.00 24728


For openable/sliding portions and fixing hinges / pivots, PVC/neoprene gasket
b required and making provision for fixing of fittings. (Fittings shall be paid for Kg 514.02 50.00 25701
082012 separately)

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH


Page 44

SL NO/ QUANTITY
ITEM NO ITEM NO DESCRIPTION OF WORK UNIT RATE AMOUNT

Providing and fixing glazing in aluminium door, window, ventilator shutters and
partitions etc. with PVC/neoprene gasket etc. complete as per the architectural
53
drawings and the directions of engineerin-charge. (Cost of aluminium snap
beading shall be paid in basic item)
With float/frosted glass panes of 4mm thickness (weight not less than 10.0
a Sqm 907.36 100.00 90736.00
082031 kg/sqm)
With float/frosted glass panes of 5.5mm thickness (weight not less than 13.75
b Sqm 1030.01 100.00 103001.00
082032 kg/sqm)

Providing and making tree guard 53cm dia. and 2m high as per design from
contractor's own empty coal tar drums including providing and fixing four legs
54 40cm long of 30mmx3mm M.S. flat riveted to tree guard and providing and fixing
2 nos. M.S. sheet rings 50mmx0.5mm with rivets complete in all respects
including painting inside and outside of tree guard with :

a 161191 A coat of cal tar Each 433.87 25.00 10846.75

Azadirachta Indica (Neem) of height 120cm-135cm in big polybag of size 25cm-


55 162063 Each 65.28 10.00 652.80
30cm

Bassis latifolia (Mahua) of height 90cm-120cm in big polybag of size 25cm-


56 162064 Each 54.82 10.00 548.20
30cm

Delonix regia (Gulmohar) of height 135cm-150 cm in big each polybag of size


57 162080 Each 51.72 20.00 1034.40
25cm-30cm

Polyalthia longifolia (Ashoka) of height 150cm-165cm in earthen pots of size


58 162119 Each 74.72 20.00 1494.40
25cm

Pterospermum acerifolium (Kanak champa) of height 150cm180cm in big


59 162121 Each 83.63 20.00 1672.60
polybag of size 30cm-35cm

Providing and fixing fancy printed tiles of size 150mmx75mm or any other
suitable length conforming to IS:15622 in border of baths and toilets on 12mm
60 171280 Sqm 542.01 10.00 5420.10
thick cement plaster 1:3 / chemical adhesive (1 cement : 3 coarse sand) jointed
with matching pigment etc. complete

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH


Page 45

SL NO/ QUANTITY
ITEM NO ITEM NO DESCRIPTION OF WORK UNIT RATE AMOUNT

Supplying, fitting, fixing & installing including boring of 40mm dia. hand tube well
assembly India MarkII having total depth of 50m with the following components
as per IS:9301 : i) Hand pump (single acting) India Mark-II galvanised as per
IS:93011990. ii) Brass strainer mesh type made of long slotted medium B class
G.I. pipes with 80-mesh brass wire net wrapping around the perforated pipe and
jacketed by 26 / 28 SWG brass perforated sheet. 40mm dia. (2 lengths of each
1.83m connected with G.I. socket). iii) C.I. cylinder with G.M. parts India Mark-II
65mm dia. x 0.45m long as per IS:9301-1990. iv) G.I. casing pipe 100mm dia.
medium quality ISI marked 18m long. contd... contd..... v) G.I. pipe 40mm dia.
medium quality ISI marked 28.35m long. vi) 32mm dia G.I. pipe (riser) medium
61 171420 quality ISI marked 17m long. vii) 12mm dia. bright bar electro galvanised Each 54907.12 2.00 109814.24
connecting rod, 3m long each as per IS:9301 of length as required. viii) all
accessories as per IS:9301-90 such as G.I. reducing socket 100mm x 40mm,
C.I. plug cutter 40mm, base plate, M.S. nuts & bolts etc. The work also includes
priming, development and testing of the yield (which should be sufficient
enough) for seven days with all labour, material, tools and plants complete. ix)
40mm dia. G.I. ISI marked medium quality hanging pipe to the extent of 17 m. x)
all accessories such as C.I. plug cutter 40mm, base plate, M.S. nuts & bolts etc.,
as required . The work also includes priming & development and testing of the
yield (which should be sufficient enough) for seven days with cost of labour and
material, all tools and plants complete in all respect

Extra / Less for sinking including drilling, supplying, fitting, fixing & installing of
62 171470 Meter 442.22 50.00 22111.00
G.I. riser pipe 40mm dia. medium ISI marked over 17m

63 171502 Low Carbon Galvanised (LCG) jacketed strainer 40mm dia. x 1.83m long Each 454.91 4.00 1819.64

64 181010 Demolishing lime concrete and disposal of material within 50m lead cum 156.44 25.00 3911.00

Demolishing plain cement concrete including disposal of material within 50m


65
lead

a 181021 1:2:4 or richer mix with max. 20 mm coarse aggregate cum 448.29 200.00 89658.00

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH


Page 46
SL NO/ QUANTITY
ITEM NO ITEM NO DESCRIPTION OF WORK UNIT RATE AMOUNT
Dismantling concrete kerb stones/rail level platform stones /concrete beams /
b 181023 slabs or similar light structural parts/ stones without appreciable damage cum 481.38 50.00 24069.00
including stacking
Demolishing R.C.C. work including cutting and stacking of steel bars and
c 181030 disposal of unserviceable material within 50m lead. (Extra payment for scraping, cum 654.01 200.00 130802.00
cleaning and straightening of bars to be made separately)
Extra over Item Nos. 181021 and 181050, if pavement breaker is used on
d 181040 cum 196.2 200.00 39240.00
orders of Engineer

Demolishing brick work including stacking of serviceable material and disposal


66
of unserviceable material within 50m lead

a 182012 In lime mortar/lime cinder mortar cum 156.44 600.00 93864.00

b 182013 In cement mortar cum 378.5 600.00 227100.00

Extra for removing mortar from bricks and cleaning bricks (stacks of cleaned
67
bricks shall be measured)

a 182022 From brick work in lime mortar/lime cinder mortar 1000 nos 1030.91 10000.00 10309.10

b 182023 From brick work in cement mortar 1000 nos 1301.74 20000.00 26034.80

Dismantling Precast concrete or stone slabs in walls, partition wall etc. including
68
stacking within 50m lead

a 182052 Thickness above 40mm upto 75mm Sqm 82.14 10.00 821.40

Dismantling old plaster or skirting raking out joints and cleaning the surface for
69 182070 Sqm 10.16 300.00 3048.00
plaster/pointing including disposal of rubbish within 50m lead
Dismantling stone slab flooring / dado / skirting laid in cement mortar/ lime
70 183030 mortar including stacking of serviceable material and disposal of unserviceable Sqm 49.23 500.00 24615.00
material within 50m lead
Dismantling roofing including ridges, hips valleys and gutters etc. and stacking
72
the material within 50m lead

a 184081 G.I Sheet Sqm 33.42 100.00 3342.00

b 184082 Asbestos Sheet Sqm 15.59 500.00 7795.00

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH


Page 47

SL NO/ QUANTITY
ITEM NO ITEM NO DESCRIPTION OF WORK UNIT RATE AMOUNT

Dismantling doors, windows and clerestory windows (steel or wood) shutter


73 185010 including chowkhats, architrave, holdfasts in CC or masonry etc. complete and Each 100.18 20.00 2003.60
stacking within 50m lead

Earthwork in excavation for foundations and floors of the bridges, retaining walls
etc. including setting out, dressing of sides, ramming of bottom, getting out the
excavated material, back filling in layers with approved material and
74 consolidation of the layers by ramming and watering etc. including all lift,
disposal of surplus soil upto a lead of 300m, all types of shoring and strutting
with all labour and material complete as per drawing and technical specification
as directed by Engineer in charge

a 192011 All kind of soil cum 316.31 300.00 94893.00

Supplying and filling ordinary sand/excavated river bed material, if approved in


between bottom plug and top plug in wells including all lead lift handling, re-
handling, as a complete job. Sand should be simultaneously filled with water for
75 193080 cum 454.17 300.00 136251.00
three days to achieve full compaction so that further chances of shrinkage due
to voids are eliminated. Note - If sand is brought from a source other then bridge
site it shall be paid as NS item.

76 259330 Polypropylene-Random-Co-Polymer (PPR) pipes SDR 7.4mm16mm outer dia meter 60.55 200.00 12110.00

77 259340 Polypropylene-Random-Co-Polymer (PPR) pipes SDR 7.4mm20mm outer dia. meter 66.29 200.00 13258.00

78 259350 Polypropylene-Random-Co-Polymer (PPR) pipes SDR 7.4mm25mm outer dia. meter 100.52 200.00 20104.00

79 259360 Polypropylene-Random-Co-Polymer (PPR) pipes SDR 7.4mm32mm outer dia. meter 155.42 200.00 31084.00

TOTAL 6125238.77
ADD AS PER LAR B I"C" ABOVE 30% 1859608.33
TOTAL COST OF SCHEDULE B-I"C" RUPEES 7984847.10

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH


Page 48

TRUCTION DEPARTMENT)
e buildings, and other miscellenous works at Bandel.
F ITEMS SCHEDULE –B-I(c)

REMARKS

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH


Page 49

REMARKS

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH


Page 50

REMARKS

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH


Page 51

REMARKS

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH


Page 52

REMARKS

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH


Page 53

REMARKS

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH


Page 54

REMARKS

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH


Page 55

REMARKS

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH


Page 56

REMARKS

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH


Page 57

REMARKS

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH


Page 58

REMARKS

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH


Page 59

REMARKS

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH


Page 60

REMARKS

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH


Page 61

REMARKS

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH


Page 62

REMARKS

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH


Page 63

REMARKS

SSE/WORKS/CON/BDC DEN/CON/VII/HWH DY/CE/CON/II/HWH


Eastern Railway
(Construction Department)
NAME OF WORK :- Construction of Sr. SE/TR-D/S&W Office buildings, and other miscellenous works at
Bandel.

SCHEDULE – B-II (Works)

Sl. No. DESCRIPTION OF WORKS UNIT AMOUNT (`)

1 Overall percentage increase/ decrease over the rates under Howrah Division of Eastern Railway Unified
Standard Schedule of Rates (Works & Materials) 2011 for all items not included in Schedule –BI.

Approx. basic cost-` 1000000.00 500000.00


ADD 2% 10000.00
TOTAL COST OF SCHEDULE B - II RUPEES 510000.00
Note:
(1) Any item of schedule of Eastern Railway Unified Standard Schedule of Rates (Works & Materials)
2011 can beone
(2) Only executed underisthis
percentage schedule
to be quoted.except that items which are listed in Sch-BI.
(3) All the materials / conditions for works under this schedule. Will be as given at the top of each
Chapter in Eastern Railway Unified Standard Schedule of Rates (Works & Materials) 2011 in the
following modifications.

i) All the water to be used in works shall be of appropriate quality & shall be supplied by the contractor at
site of requirement, Railway shall not supply the same.

ii)The materials to be supplied by Railway shall be supplied by the SSE/W/CON’s stores at Katwa from
where the contractor will transport the same to site & return excess materials to the said stores without any
separate payment for lead loading & unloading. The contractor shall include such expenses in the overall
percentages.

iii) Railway shall not supply any equipment, tools & machineries.
iv) Work under this Schedule will be executed after getting work order approved by Engineer-In-Charge.
Eastern Railway
(Construction Department)

NAME OF WORK :- Construction of Sr. SE/TR-D/S&W Office buildings, and other miscellenous works at
Bandel.

SCHEDULE "C-'I'"
SL NO DESCRIPTION OF WORKS UNIT RATE QUANTITY AMOUNT

Supply of cement to the site of work to the extent required by Railway for use
in the work. The rate quoted shall include all costs of handling, loading,
1 transportation, unloading, lead, lift, descent, ascent, storing etc and all other
incidental charges.

Portland Slag Cement conforming to IS:455 (43/53 Grade) with latest


(1a) correction slips. 1 MT 7185.00 700 5029500.00

Ordinary Portland Cement (OPC) conforming to IS 8112/IS12269 (43/53


(1b) Grade) with latest correction slips. 1 MT 7444.00 10 74440.00

Total basic cost of Schedule : C-I 5103940.00

(A) Conditions for supply of Cement


The cement conforming to IS standards shall be procured from manufacturers/authorized dealers/ authorized stock holders of reputed cement brands
preferably ULTRATECH/AMBUJA/LAFARGE/JAYPEE/ACC/KONARK etc which will be approved by Engineer-in-charge before commencement of
work and on the basis of which design mix(es) will be submitted by the tenderer(s)/contractor(s) for approval of Engineer-in-charge for proposed usage
(i) in concreting works.
The type of cement to be used will be decided by the Engineer -in- Charge. Decision of railway regarding grade of cement shall be final & binding on the
(ii) contractor.

Quantity of Oridinary Portland Cement or Slag cement may vary individually upto combined quantity of OPC and Slag Cement provided in this schedule
(iii) i.e. upto 710 MT
(iv) Cement as per requirements should be brought to the site only in such reasonable quantity that can be utilized within a month or so from the date of supply and
(v) within
The 45-60 days shall
contractor fromdisclose
the date the
of packing and the
source from same
where shouldof
supplies becement
satisfactorily keptby
is received under
him Contractor's
and maintaincustody/godowns
a detailed record at
oftheir own
receipt ofcost and from
cement risk, without
differentany
(vi) sourcesbags
Cement and shall keep the
preferably challans,
in papers bagsRailway
sholud receipts number,information
bear following if any, lorryinnumber, etc., and store balance in a register as directed by the Engineer-in-charge and
legible marking:
(vii) i)Manufacturer's
Manufacturer's name:
Test certificate conforming to latest IS (BIS) Specification should also be produced by Contractor, duly authenticated by the Gazetted Officer of
(viii) Payment towards cement will be made the through
Engineering Department
running and finalatbills
the on
timetheofbasis
claiming payment
of actual towards supply
consumption of cement.
based on theoretical requirements in the work as per
(ix) Contractor shall also estabilsh his own field laboratory equipped with apparatus duly manned for carrying out the followingand
design/drawing/mix design and whatever wastage taken place i.e. empty cement bags etc. will be the contractor's property theofsame
tests shallaccording
Cement be removed from the
to relevant
(x) IS
In (BLS)
case ofspecification.
any doubts regarding quality of cement, the Railway reserves the right to take samples of cement supplied by the contractor at any time and to get the
(xi) sameoftested
Testing in reputed
Cement will be laboratories and acceptance
done periodically of the by
or as instructed supplied cement- Charge
Engineer-in shall befrom
subject to laboratory
Govt such test results whichInstitution.
or reputed shall be binding
Testingoncharges
the contractor. Cost by
will be borne
(xii) the contractor .
The rate shall be inclusive of all wastage, octroi, and all kind of taxes, levied by local municipal authorities / State Govt./Central Govt.
(xiii) Railway reserves the right to supply the cement partly or fully from its own stores.
(xiv) Particular attention is invited to the fact materials are not meant for supply only and no payment shall be made for supply alone. The payment shall be made
(B) onlyafter use of these materials in the actual work for which supply is intended. The payment shall be restricted to the extent of materials used in the work.
NOTE:
(i) Please quote overall %age above/below rates in reference to above basic cost of this schedule on Rate index page only. Please note that item wise quoting of rates
(ii) Basic cost of this schedule are indicatedon individual
only basedschedules
on averagewill not be acceptable
prevalent and
rates shown the tender
against each will
item.be summarily rejected.
(iii) It will be the contractor's responsibility to hand over the vacant unoccupied possession of the completed works to the Railway's Authorized Representative.
(iv) All water to be used in the work shall be of appropriate quality and shall be arranged by the Contractor at the site of requirement at his own cost. Railway shall
(v) not
Thesupply
Railway it. shall not supply any equipments, tools and plants unless specifically mentioned in the item of Schedule-C-I.
(vi) The items to be operated under this Schedule are those, which have been listed in Schedule-C-I.
lenous works at

REMARKS

f reputed cement brands


before commencement of
harge for proposed usage
final & binding on the

ovided in this schedule


from the date of supply and
nofcost and from
cement risk, without
differentany
he Engineer-in-charge and
by the Gazetted Officer of
ements in the work as per
ement
shallaccording
be removed from the
to relevant
r at any time and to get the
gngoncharges
the contractor. Cost by
will be borne
Central Govt.

e payment shall be made


erials used in the work.
item wise quoting of rates

zed Representative.
own cost. Railway shall
Eastern Railway
(Construction Department)

NAME OF WORK :- Construction of Sr. SE/TR-D/S&W Office buildings, and other miscellenous works at Band

SCHEDULE - C-II
SL
DESCRIPTION OF WORKS UNIT RATE QUANTITY
NO
1 Supply, fitting & fixing of reinforcing steel (tor steel) to the site of work to
the extent required by the Railway for use in the work. The rate quoted shall
include all costs of handling, loading, transportation, unloading, lead, lift,
(A) descent,ascent, storing,
Reinforcement steel (torcleaning etc.
steel) conforming to IS -1786-2008 of any diameter 1 MT 60707.00 70 MT
Basic Cost of Schedule:C-II

(A) Conditions for supply of Reinforcing Steel


(i) The reinforcing steel shall be procured from manufacturers/authorized dealers/ authorized stock holders of SAIL/TISCO/IISCO/RINL only.

(ii) The material shall be strictly in accordance with the contract specifications.
(iii)The quantity of material shall be brought to the site only in such installments that would faciliate smooth progress of work and consumed in a reasonable time wi
(iv) The
like contractor
The rusting shall
materialofshall
steel disclose
beetc. theatsource
delivered site &from where
properly supplies
stored underofcovered
reinforcing
shedsteel is receivedstacks.
in measurable by him and maintain a detailed record of receipt of steel from differe
shall keep the challans, Railway receipts number, if any, lorry number, etc., and store balance in a register as directed by the Engineer-in-charge and produce the
(v)
Engineer as and when demanded. A copy of purchase document shall have to be submitted along the bill for claiming payment against this item. Railway reserve
inspect contractor's godowns and documents pertaining to this work.
(vi) Manufacturer's Test certificate conforming to latest IS (BIS) Specification should also be produced by Contractor, duly authenticated by the Gazetted Officer of
Department at the time of claiming payment towards supply of reinforcing steel.
(vii) Payment towards reinforcing steel will be made through running and final bills on the basis of actual consumption based on theoretical requirements in the wo
design/drawing, bar bending schedule,lap length and no payment will be payable towards whatever wastage taken place i.e. cut pieces etc. which will be the con
(viii) In case of any doubts regarding quality of steel, the Railway reserves the right to take samples of steel supplied by the contractor at any time and to get the sam
laboratories and acceptance of the supplied steel shall be subject to such test results which shall be binding on the contractor. Cost incurred towards conducting su
(ix) Testing of reinforcing steel will be done periodically or as instructed by Engineer-in - Charge from Govt laboratory or reputed Institution. Testing charges will be
contractor .
(x) The rate shall be inclusive of all wastage, octroi, and all kind of taxes, levied by local municipal authorities / State Govt./Central Govt.

(xi) Railway reserves the right to supply the material partly or fully from its own stores.

(xii) Particular attention is invited to the fact materials are not meant for supply only and no payment shall be made for supply alone. The payment shall be made only
materials in the actual work for which supply is intended. The payment shall be restricated to the extent of materials used in the work.
(B) NOTE:
(i) Please quote overall %age above/below rates in reference to above basic cost of this schedule on Rate index page only. Please note that item wise quoting of rate
(ii) schedules
Basic cost will notschedule
of this be acceptable and the only
are indicated tender will on
based be summarily rejected.
average prevalent rates shown against each item.

(iii) It will be the contractor's responsibility to hand over the vacant unoccupied possession of the completed works to the Railway's Authorized Representative.
(iv) All water to be used in the work shall be of appropriate quality and shall be arranged by the Contractor at the site of requirement at his own cost. Railway shall n
(v) The Railway shall not supply anyequipments, tools and plants unless specifically mentioned in the item of Schedule-C-II.
(vi) The items to be operated under this Schedule are those, which have been listed in Schedule-C-II.
ellenous works at Bandel.

AMOUNT REMARKS

4249490.00
4249490.00

ISCO/RINL only.

nsumed in a reasonable time without any damage


d of receipt of steel from different sources and
eer-in-charge and produce the same to the
inst this item. Railway reserves the right to

ted by the Gazetted Officer of the Engineering

retical requirements in the work as per


eces etc. which will be the contractor's property
r at any time and to get the same tested in reputed
incurred towards conducting such tests will be
itution. Testing charges will be borne by the

Govt.

he payment shall be made only after use of these


ork.

te that item wise quoting of rates on individual

uthorized Representative.
t his own cost. Railway shall not supply it.
Eastern Railway
(Construction Department)
NAME OF WORK :- Construction of Sr. SE/TR-D/S&W Office buildings, and other miscellenous wor

Escalation Up to May 2016 RBI Index = 179.40 Provisional/Confirmed

LOWEST AVERAGE RATE SHEET


ACCEPTED
AGGREMENT / RBI INDEX OF
LAR DESCRIPTION OF DATE OF RATE (Rs.)
ACCEPTANCE QUOTED RATE REBATE OPENING
NO. WORKS OPENING AFTER
LETTER NO. MONTH
REBATE
SCHEDULE - "C-'I' (Sch-6)
1 Supply of Cement
CAO/C/WT/9027,DT.20.05.2014. 25/03/2014 7323.9 0.00% 7323.90 180.30
a) SLAG CEMENT
confirming to IS-455
CAO/C/WT/9050,dt 13.8.2014. 19/06/2014 7412.595 0.00% 7412.60 183.00

7168.77
CAO/C/WT/9086,dt.31.12.14 (FOB,PF,L 09.10.2014 0.00% 7168.77 183.70

7426.43
CAO/C/WT/9086,dt.31.12.14 (FOB,PF,L 09.10.2014 0.00% 7426.43 183.70
(b)Supply of
ORDINARY 25/3/14
CAO/C/WT/9027,DT.20.5.14(RCC R
PROTLAND CEMENT wall, drain, Misc work in Kalna - 7530.47 0.00% 7530.47 180.30
(43/53 Grade) Nabadwip) HWH-II
conforming IS-
8112/12269
CAO/C/WT/9027,DT.20.05.2014. 25/03/2014 7625.7923 0.00% 7625.79 180.30

SCHEDULE - "C - 'II'" (Sch- 7)

Supply of Reinforcement

CAO/C/WT/9070,DT.2.2.15 (2 lane
ROB- Bolpur(Open Web-27m Span) 30-12-14 58840.28 0.00% 58840.28 179.80
HWH-IV
(A) Reinforcing Steel
1
as per Is 1786 CAO/C/WT/9050,dt 13.8.2014. 19/06/2014 64157.62 0.00% 64157.62 183.00

CAO/C/WT/9027,DT.20.05.2014. 25/03/2014 60819.2 0.00% 60819.20 180.30

SSE
Eastern Railway
nstruction Department)
/TR-D/S&W Office buildings, and other miscellenous works at Bandel.

Provisional/Confirmed

LOWEST AVERAGE RATE SHEET

RATE AFTER
% of INCREA-SE AVERAGE RATE
ESCALATION

SCHEDULE - "C-'I' (Sch-6)

-0.50% 7287.34 7185.00

-1.97% 7266.77

-2.34% 7000.97

-2.34% 7252.59 7444.00

-0.50% 7492.88

-0.50% 7587.73

SCHEDULE - "C - 'II'" (Sch- 7)

-0.22% 58709.38 60707.00

-1.97% 62895.50

-0.50% 60515.61

SSE
SSE
SSE
Eastern Railway
(Construction Department)
NAME OF WORK :- Construction of Sr. SE/TR-D/S&W Office buildings, and other miscellenous works at
D
e
p
t
%
.
C Index as on May- 2016
o Actual %
o
f above/Belo
s CHAPTER Date of Accepted Rebater
Sl. No. LAR Reference Division Assess rate Rebate w of
t INVOLVE opening Rate Rate
C USSOR
o 2011
o
s (Sch- 3) LAR STATEMENT FOR SCHEDULE "B-I"B (seen items) UNDER USSOR-2011 (CONCRETE)
f
t
1 S CAO/C/WT/9041, DT-5.12.2014 26.8.2014 35.700% 0.00% 0.00% 0.00% 35.70%
c
h 1,3,4,5,7,8,9,11,1
CAO/C/WT/9051,DT.13.8.14((E
2 .work br. Etc. Santhia - RPH
HWH-III 2,13,15,17,18,19 15.5.14 50.580% 55.00% 36.63% -1.78% 47.90%
,22
CAO/C/WT/9050,DT.13.8.14(W 1,2,3,4,7,8,9,10,1
3 heel shop LLH work shop)
HWH-II
1,12,18,22
19.6.14 37.004% 0.00% 5.55% -5.55% 29.40%

(Sch- 4 ) LAR STATEMENT FOR SCHEDULE "B-I"C (seen items) UNDER USSOR-2011 (Otherthan Brickwork & Concrete)
CAO/C/WT/9027,DT.20.5.14(R 1,3,4,5,7,8,9,11,1
1 ###
### B-I(a) CC R wall, drain, Misc work in HWH-II 2,13,17,22,23,25 25.3.14 18.17% 2.000% 1.25% 0.72% 19.03%
Kalna - Nabadwip ,
1,3,4,5,7,8,9,11,1
CAO/C/WT/9051,DT.13.8.14((E
2 ###
### B-(i)
.work br. Etc. Santhia - RPH
HWH-III 2,13,15,17,18,19 15.5.14 50.580% 55.00% 36.63% -1.78% 47.90%
,22

CAO/C/WT/9050,DT.13.8.14(W 1,2,3,4,7,8,9,10,1
3 ###
### B-I(ii)
heel shop LLH work shop)
HWH-II
1,12,18,22
19.6.14 37.004% 0.00% 5.55% -5.55% 29.40%

LAR STATEMENT FOR SCHEDULE B-II (Unseen items) UNDER USSOR-2011 (Sch- 5)
CAO/CON/WT/8963
DT.20.05.2013 (Tower wagon
1 ###
###
shed.ETC Mayapur-
HWH-I 26.3.13 0.00% 0.00% 0.00% 0.00% 0.00%
Arambag)HWH
CAO/CON/WT/8996
d.t20.8.2013 (Linking of P.way
2 ###
###
tract-Ambika kalna-
HWH-II 18.6.13 0.00% -5.00% 0.00% -5.00% -5.00%
Nabadwipdham

CAO/C/WT/9027,DT.20.5.14
3 ###
### (RCC R wall, drain, Misc work HWH-II 25.3.14 0.00% 2.990% 1.25% 1.70% 1.70%
in Kalna - Nabadwip
0
scellenous works at Bandel.

179.40
%
ESCALATE
RBI INDEX ESCALATI Av Rate
D RATE
ON

CONCRETE)

185.9 -3.5% 31.0%

182 -1.4% 45.8% 35%

183 -2.0% 26.9%

rickwork & Concrete)

180.3 -0.5% 18.4%

182 -1.4% 45.8% 30%

183 -2.0% 26.9%

(Sch- 5)

170.1 5.5% 5.5% 2%


173.2 3.6% -1.6%

180.3 -0.5% 1.2%


EASTERN RAILWAY
(CONSTRUCTION DEPARTMENT)

NAME OF WORK :- Earthwork in filling/cutting with required compaction in Railway embankment, supplying and spreading
of blanket materials (stone dust) over formation, construction of minor bridges, gate lodges, station buildings, retaining
walls, platform and
other ancillary works from Bainchi (excluding) to Memari (including) in connection with construction of 3rd line from Boinchi
to Shaktigarh.

SL NO SCHEDULE OF ITEMS COST % ABOVE / BELOW


1 SCHEDULE-- 'A' (NS item) 1210285.00
2 SCHEDULE -- BI "A" 4643343.89
3 SCHEDULE -- BI "B" 6825394.78
4 SCHEDULE -- BI "C" 7984847.10
5 SCHEDULE -- BI "D" #REF!
6 SCHEDULE -- C-I (Cement) 5103940.00
7 SCHEDULE -- C - II (Reinforcement) 4249490.00
TOTAL RUPEES #REF!
SAY 38.122 CRORES

SSE/Con/W/BDC DEN/Con/VII/HWH Dy.CE/Con/II/HWH


Supply of labours to work as trolleyman, petrolman Chief Labour Commissioner © New Delhi, letter no- 1/2
35
etc. (3)/2013-LS-II dtd, 18.03.2013.
Chief Labour Commissioner © New Delhi, letter no- 1/2 279.00 0.00% 279.00 224.00 12.95%
(3)/2013-LS-II dtd, 18.03.2013.
315.13 315.12
EASTERN RAILWAY
(CONSTRUCTION DEPARTMENT)
NAME OF WORK :- Construction of Sr. SE/TR-D/S&W Office buildings, and other miscellenous works at Bandel.
LAR for Sch-B-I(A) (BRICK WORK) (Sch- 2)
RBI Index for May .2016 179.40
Sl No Unit LAR Referrence Date of
Rate in
Description of Work Opening of Rebate
LAR No Name of work Rs.
Tender
1 Schedule B-I/I
Brick work (USSOR-2011) DCE/CON/II/HWH/WT/937 RCC Pit at LLH
14/05/2015 150.00% 17.00%
,dt 31.08.2015. Workshop.

DEC/Con/II/HWH/WT/952,
RRI Bandel 5/4/2016 77.00% 8.20%
Dtd, 30.05.2016

DCE.CON/HWH/WT/938,
Shooting range at LLH. 15.06.2015 150.00% 20.00%
dt.23.09.2015
Rebated
% Excalate
Rate in RBI INDEX
increase d Rate
Rs. Av. Rate

107.50% 178.00 0.79% 109.13%

62.49% 177.00 1.36% 64.69% 91%

100.00% 179.10 0.17% 100.34%


Eastern Ra
(Construction De
Standard Schedule Escal;ation Consi
A-II(For Eath Work & Bank Protecton)
It. Unit
A/L No
No.

1 With contractor's earth of approved quality and specification CAO/C/WT/8874,DT.10.09.2012.


obtained from outside Rly land etc.
10 m3
CAO/C/WT/8898,dt 21.12.2012
CAO/C/WT/9071,DT.12.12.14

2 Supplying & driving hard wood pile 5 to 7 m. long without joint 1 m


of 125 mm average dia. CAO/C/WT/8898,dt 21.12.2012

CAO/C/WT/9070,DT.2.2.15
CAO/C/WT/9071,DT.12.12.14

3 Supplying and fixing bitumen drum sheet walling by nalling to 1 m2


CAO/C/WT/8938,dt 31.01.2013
wooden piles 125 mm dia supplied and driven.
CAO/Con/WT/8887,dt.03.12.2012.
CAO/C/WT/9071,DT.12.12.14
1m
CAO/C/WT/8872,dt 21.09.2012.
4 Supplying of baricading. CAO/C/WT/8874,DT.10.09.2012.
CAO/C/WT/9070,DT.2.2.15

Chief Labour Commissioner © New Delhi, letter no- 1/2 (3)/2


5 Supply of Labour. 1 no
18.03.2013.
1 mt CAO/C/WT/9027,DT.20.5.14
CAO/C/WT/9050,dt.13.8.14
6 Making Reinforcement
CAO/C/WT/9070,DT.2.2.15

1 m3
CAO/C/WT/8872,dt.21.9.12
7
Supply and filling granular materials of Gw , GP, SW group as per
IS:1498-1970 CAO/C/WT/8873,DT.14.8.12

Supply, fitting & fixing submersible pump KSB type cora A/4 C/6
UMA (s) 100-0.8/21 H.P. 230v 50 HZ
No. OAH/2/132/15-16/KWAE/Qtn, dtd,
11.11.15
8 1 set

No. OAH/2/23/15-16/KWAE/Qtn, dtd,


15.06.15

1 m No. OAH/2/132/15-16/KWAE/Qtn, dtd,


11.11.15
9(a) Drilling holes of sinking of T/well of 50 mm dia by water jet.
1 m No. OAH/2/23/15-16/KWAE/Qtn, dtd,
15.06.15

1 m No. OAH/2/132/15-16/KWAE/Qtn, dtd,


11.11.15
9(b) Drilling holes of sinking of T/well of100 mm dia by water jet.
1 m No. OAH/2/23/15-16/KWAE/Qtn, dtd,
15.06.15
Supply of PVC ribbed screen strainer oriplast brand and No. OAH/2/132/15-16/KWAE/Qtn, dtd,
conforming to IS : 12828-1997. 11.11.15
10 1 m
No. OAH/2/23/15-16/KWAE/Qtn, dtd,
15.06.15
s

1 set No. OAH/2/132/15-16/KWAE/Qtn, dtd, 11.


Supply, fitting, & fixing the accessories 50x100,top cover
11
100mm , plug cutter No. OAH/2/23/15-16/KWAE/Qtn, dtd,
15.06.15

Development of yield test of the T/well of using air compressor 1 No


No. OAH/2/132/15-16/KWAE/Qtn, dtd,
for 24 hrs or more sand 11.11.15
12
No. OAH/2/23/15-16/KWAE/Qtn, dtd,
15.06.15
Eastern Railway
(Construction Department)
Escal;ation Considered upto May - 2017 Index 112.8
HWH
%
Dt of
Location Division Open/Nego. Rate Offer Rate Rebate Final Rate RBI Index escalatio
n

E/WBDC-Bainchi
Major Bridge Bagila3-Memari
rd
Line 3rd line 8/14/2012 2289 7.0% 4% 2351.26 167.3 -32.58%
Boichi- Shaktigarh 11/21/2012 2289 8.0% 0% 2472.12 168.8 -33.18%
E.Work etc. Balgana _ Katwa I 12/9/2014 2043 1.0% 0.00% 2063.43 179.8 -37.26%

8.0% 0% 177.12 168.8 -33.18%


Major Bridge Bagila -Memari 3rd line
Boichi- Shaktigarh 11/21/2012 164
2 lane ROB- Bolpur IV 12/30/2014 146 -3.00% 2.00% 138.79 179.8 -37.26%
E.Work etc. Balgana _ Katwa I 12/9/2014 135 1.0% 0.00% 136.35 179.8 -37.26%

E/Work Minor bridge Pachandi-


Nabagram Kankurhati (Ahmedpur 1/21/2013 260 0.0% 5.05% 246.87 170.3 -33.76%
-Katwa)(HWH-III)
E/W Minor Brg BAINCHI-MEMARI
3RD LINE(HWH-IV) 6/12/2012 279 -15.0% 0% 237.15 164.7 -31.51%
E.Work etc. Balgana _ Katwa I 12/9/2014 230 1.0% 0.00% 232.30 179.8 -37.26%
E/WBandel-Bainchi 3rd line(HWH-II)
8/21/2012 173 -1.8% 2.70% 165.30 167.3 -32.58%

E/WBDC-Bainchi 3rd Line II 8/14/2012 173 7.0% 4% 177.71 167.3 -32.58%


2 lane ROB- Bolpur IV 12/30/2014 180 -3.00% 2.00% 171.11 179.8 -37.26%

Delhi, letter no- 1/2 (3)/2013-LS-II dtd,


279 0.00% 279 224 12.95%
.2013.
Kalna - Nabadwip II 25/3/14 5205 2.99% 1.25% 5293.62 180.3 -37.44%
Extn Of Wheel shop At LLH Workshop II 6/19/2014 5205 0.0% 5.55% 4916.12 183 -38.36%
2 lane ROB- Bolpur(Open Web-27m IV 12/30/2014 5205 3.00% 2.00% 5253.93 179.8 -37.26%
Span)

5/24/2012 824.58 167.3 -32.58%


Talandu Panduia 3rd line II 863 -1.800% 2.70%
5/24/2012
776.70 167.3 -32.58%
BDC to Talandu 3rd line II 863 -10.000% 0.00%

HWH Division 19/08/2015 26400.00 0.0% 0.00% 26400.00 176.50 -36.09%

HWH Division 22/5/2015 24000.00 0.0% 0.00% 24000.00 178.00 -36.63%

-36.09%
HWH Division 19/08/2015 206.08 0.0% 0.00% 206.08 176.50
-36.63%
HWH Division 22/5/2015 188.00 0.0% 0.00% 188.00 178.00

-36.09%
HWH Division 19/08/2015 668.80 0.0% 0.00% 668.80 176.50
-36.63%
HWH Division 22/5/2015 608.00 0.0% 0.00% 608.00 178.00
-36.09%
HWH Division 19/08/2015 616.00 0.0% 0.00% 616.00 176.50
-36.63%
HWH Division 22/5/2015 560.00 0.0% 0.00% 560.00 178.00

HWH Division 19/08/2015 704.00 0.0% 0.00% 704.00 176.50 -36.09%

-36.63%
22/5/2015 640.00 0.0% 0.00% 640.00 178.00
HWH Division

HWH Division 19/08/2015 3520.00 0.0% 0.00% 3520.00 176.50 -36.09%

HWH Division 22/5/2015 3200.00 0.0% 0.00% 3200.00 178.00 -36.63%


Escalated Av Rate
Rtae

1585.31
1511.00
1651.99
1294.52

118.36
97.00
87.07
85.54

163.52

162.42 157.00
145.74
111.45
113.00
119.82
107.35

315.12 315.00
3311.82
3030.27
3213.00
3296.12

555.97
540.00
523.68

16872.07
16041.00

15208.99

131.70
125.00
119.14

427.43
406.00
385.29
393.68
374.00
354.88

449.92
428.00
405.57

2249.61
2139.00
2027.87

You might also like