Proposed Construction Schedule - 1 Storey Residence Emerging Architects Studio

Month 1 Month 2 Month 3 Month 4 Month 5 Month 6


Task Name Duration
1 GENERAL REQUIREMENTS
Mobilization and Demobilization
Temporary Barracks
Temporary Fence
Construction Supervision
Punchlist of Works
Rectification of Works
Project Turnover
Testing and Commissioning (if necessary)
2 SITE WORKS
Clearing and Grubbing
Layout and Staking
Excavation
Gravel Bed Preparation
3 CONCRETE WORKS
Footing
Fabrication/Installation of Forms
Fabrication of Rebars
Installation of Rebars
Concrete pouring (by area)
Backfill
Columns
Fabrication/Installation of Forms
Fabrication/Installation of Rebars
Concrete pouring (by area)
Beam and Girders
Fabrication/Installation of Forms
Fabrication/Installation of Rebars
Concrete pouring (by area)
Slab on Grade
Fabrication/Installation of Forms
Fabrication/Installation of Rebars
Concrete pouring (by area)
Septic Tank
Excavation
Fabrication/Installation of Forms
Fabrication/Installation of Rebars
Masonry Works
Concrete pouring of under slab
Concrete pouring of top slab
Masonry Works including stiffeners, lintel beams,
reinforcements
CHB Laying
Plastering
4 THERMAL AND MOISTURE PROTECTION
Waterproofing
Waterproofing to toilets and balconies
Roofing Works
Fabrication/Installation of roof framing
Installation of roofing sheets
5 ELECTRICAL WORKS
Service entrance including cap & accessories
Panelboard; power and lighting; enclosed circuit breaker
including enclosure in NEMA 3R
Wiring Devices
Lighting Fixtures
Conduits and roughing-ins
PVC Pipes. Utility box and Junction Box
Wires and cables including auxiliary (Tel and CATV)
6 PLUMBING WORKS
PPR Pipes and Fittings
PVC Pipes and Fittings
Installation of Plumbing Fixtures
7 WOOD AND PLASTIC
Finish Carpentry
Ceiling Assembly (Framing and Boards)
8 FINISHES
Ceiling Finishes
Exterior Wall Finishes
Interior Wall Finishes
Tile Works
Railings
9 DOORS AND WINDOWS
Fabrication and Installation of Doors
Fabrication and Installation of Windows