You are on page 1of 2

INTERNATIONAL GENERAL

CERTIFICATE Candidate report template


(2011 specification)

UNIT IGC3 – THE HEALTH AND


SAFETY PRACTICAL APPLICAITON

Student number - 00186375

Location- Construction site at


Ruwais Refinery Expansion project-2, ABUDHABI. Date of review 25/05/13

INTRODUCTION INCLUDING OVERVIEW OF AREA INSPECTED AND ACTIVITIES TAKING PLACE


The report follows from inspection carried out in laydown area of Target engineering construction company
LLC.The Target in specialist in pipe line and oil and gas construction is a sub contractor for GS engineering and
construction Ltd. Which is undertaking the ruwais refinery expansion project (Ph-2) for Abudhabi oil refinery
company (Takreer) there are 550 people working in lay down area. For target. Task
include,Rigging,scaffolding,Hot work, loading & unloading, paint work and fabrication etc.
EXECUTIVE SUMMARY
The health and safety management of the laydown area is generally acceptable condition ,Adequate signs board are posted
with emergency contact numbers, list of trained first aider, colour coding done. to every tools and tackles, electrical
equipment inspected and inspection sticker available .all materials are properly stored and barricaded in laydown area.PPE
compliance has been generally found good
However some observation are made in painting yard electrical tools, noise equipment and welfare facilities which need
improvement.
Recommendation : Regular maintenance of ablution blocked with schedule for cleaning the toilet and emptying the septic
tank and check list should be maintained at least two 2 more nos of ablution blocked water cooler are regular in laydown
area cost approx-AED 3500
 Ministerial order No.32-(1982)-Article(6)-measures to prevent health risk
 Federal low No.8-(1980) on regulation of labour relations-article (94)- cleanliness drinking water and toilet
Electrical equipment : There were some observation of electrical hazards like ELCB of distribution board not working,
electrical equipment not earthed, some dead man switches and plug chasing got damaged which may propagate electrocution
if there is a short circuit action required immediately to rectify and weekly inspection by electrical engineer.
Recommendation : ELCB to be checked and if not working should be replaced new switch an plugs should be provided
wherever required. An electrical awareness training session to be conducted to all user and electrician coast approx-AED-
1500
 Ministerial order No.32(1982)-Article(a)-pre cautionary measure is protect worker from electric shock
Noise control :- Heavy noise in surrounding area of laydown workshop as may be damage in silencer of power generator.
which need immediate repair , noise level was beyond the workplace exposure limit. Maintenance depart should arrange by
generator till the repair existing one, preventive maintenance should be done regularly to avoid generation of dust in filter.
which may got blocked and generator may get heated
Recommendation : Maintenance work required power generator ensure provision and usaged of ear plug. Awareness
training and noise survey to be conducted.
Approx cost – AED 1000 (Maintenance expenses to ear plug )
 Ministerial order No-32 years (1982)- Article personal protective equipment
 Ministerial order No-32 years (1982)- Article- (5)safe

CONCLUSION
This report shows that health and safety in target engineering & construction company is not up to required level. the
laydown activity are not fully complied with UAE legal requirement like ministerial order No-32years (1982)and UAE
federal low No.8(1980)
If the activity are not complied with this laws your company will have to race problems like negative publicity, poor
company reputation , decrease in staff moral and there will be high staff turnover or worker absence due to sickness. all this
will effect your financial stability. If management does not make effort for improvement in health and safety it will effect
your productivity.
RECOMMENDATIONS -
Some recommendation are been listed below for improvement in health & safety. According to my personnel knowledge
from the observation found. I recommend you to go through it and implement changes in your work place.

Recommendation Likely resources implications Priority Target date


Inspection of work place by area 1 hours daily for supervisor No cost Continues
supervisor before signing permit. H
Maintenance and cleaning of 1 hours daily for hr depart Continues
ablution block No cost H
Provision of ablution block and Procurement of ablution block and 10 Days
water cooler water cooler AED-3500
Random checking of plugs and 2 hours in 15 days for electrician Continues
dead switch procurement of ELCB and electrical H 15 Days
Provision of ELCB and other accessories .
electrical accessories AED-1500
Cleaning and maintenance of One hours at the beginning of day by Continues
power generator and repair of break machine H
down generator provision of Procurement of PPE and repair work of
personal protective equipment like D.G One week
ear plugs and ensuring usage AED-1000

You might also like