MECHANISMS AND CONTROL OF WATER INFLOW TO WELLS IN GAS

RESERVOIRS WITH BOTTOM-WATER DRIVE

A Dissertation

Submitted to the Graduate Faculty of the


Louisiana State University and
Agricultural and Mechanical College
in Partial fulfillment of the
requirements for the degree of
Doctor of Philosophy

in

The Craft & Hawkins Department of Petroleum Engineering

by
Miguel Armenta
B.S. Petroleum Engineering, Universidad Industrial de Santander, Colombia, 1985
M. Environmental Development, Pontificia Universidad Javeriana, Colombia, 1996
December 2003
ACKNOWLEDGMENTS

To God, my best and inseparable friend, for you are the glory, honor and

recognition.

To my wife, Chechy, and my children Andrea and Miguel, for giving me so much

love and support. Without you, getting this important step in my life, my PhD, has no

meaning. You are my inspiration and my strength.

To my parents, El Viejo Migue and La Niña Dorita, you are my source of beliefs.

You taught and gave me the determination and tools to reach my dreams with honesty

and hard work.

To my advisor, Dr. Andrew Wojtanowicz, for his guidance and challenging

comments. Without that motivation, this research would have been poor; however, facing

the challenges four different technical papers have been already published and presented

from this research.

To Dr. Christopher White for helping me with such honesty and unselfishness.

You were my lifesaver at my hardest time during my research. I knew I could always

count on you.

To Dr. Zaki Bassiouni, chairman of the Craft & Hawking Petroleum Engineering

Department, for giving me the right comments and advise at the right time.

To the rest of Craft & Hawking Petroleum Engineering Department faculty

members, Dr. John Smith, Dr. Julius Langlinais, Dr. Dandina Rao, and Dr. John

McMullan, from each one of you I learned many important things not only for my

professional life, but also for my personal life. I will always have you in my mind and

heart.

ii
To my friends in Baton Rouge: Patricio & Maquica, Jose & Ericka, Juan &

Joanne, Fernando & Sabina, Jaime & Luz Edith, Alvaro & Tonya, Doña Luz & Dr.

Narses, Jorge & Ana Maria, Nicolas & Solange, and La Pili. All of you are angels sent by

God to help me during my crisis-time; you, however, did not know your mission. God

bless you.

iii
TABLE OF CONTENTS

ACKNOWLEDGEMENTS….…………………………………………………………ii

LIST OF TABLES……………………………………………………………………..vii

LIST OF FIGURES..…………………………………………………………………..viii

NOMENCLATURE.…………….…………………………………………………….xiv

ABSTRACT…………………….……………………………………………………..xvii

CHAPTER 1 INTRODUCTION ………………………………………………………1


1.1 Background and Purpose……………………...…………………………………..1
1.2 Statement of Research Problem………………...…..……………………………..4
1.3 Significance and Contribution of this Research.…………………………………..5
1.4 Research Method and Approach……………....…………………………………..6
1.5 Work Program Logic………………………….…………………………………..8

CHAPTER 2 LITERATURE REVIEW……………………………………………...11


2.1 Critical Velocity………………………………………………………………….11
2.2 Critical Rate for Water Coning………………………………….……………….13
2.3 Techniques Used in Solving Water Loading ……………………………………16
2.3.1 Tubing Lift Improvement..………………………………………………16
2.3.1.1. Chemical Injection….…………………………………………16
2.3.1.2. Physical Modification…..……………………………………..18
2.3.1.3. Thermal…………..……………………………………………19
2.3.1.4. Mechanical. ….…..……………………………………………20
2.3.2 Bottom Liquid Removal...………………………………………………21
2.3.2.1. Pumps………….………………………………………………22
2.3.2.2. Swabbing………………………………………………………23
2.3.2.3. Plungers…………………………………..……………………24
2.3.2.4. Downhole Gas Water Separation……………………….……..27

CHAPTER 3 MECHANISTIC COMPARISON OF WATER CONING IN OIL


AND GAS WELLS…………..…………………………………………30
3.1 Vertical Equilibrium.………………………………...…………………………..30
3.2 Analytical Comparison of Water Coning in Oil and Gas Wells before Water
Breakthrough ………………………………………...…………………………..31
3.3 Analytical Comparison of Water Coning in Oil and Gas Wells after Water
Breakthrough ………………………………………...…………………………..32
3.4 Numerical Simulation Comparison of Water Coning in Oil and Gas Wells after
Water Breakthrough …………….…………………...…………………………..37
3.5 Discussion about Water Coning in Oil-Water and Gas-Water Systems..………..41

CHAPTER 4 EFFECTS INCREASING BOTTOM WATER INFLOW TO GAS


WELLS………....…………...…………………………………..………43
4.1 Effect of Vertical Permeability…………………...…………….………………..44
iv
4.2 Aquifer Size Effects..………………..…..………...………..…….……………..47
4.3 Non-Darcy Flow Effect..…………………………………………….…………..49
4.3.1 Analytical Model………………..…….………………….….…………..50
4.3.2 Numerical Model………………..…….………………….….…………..55
4.4 Effect of Perforation Density……………………..……...……………….……...57
4.5 Effect of Flow behind Casing …………………….……...……………….……..58
4.5.1 Cement Leak Model….…………..…….………………….……………..59
4.5.1.1 Effect of Leak Size and Length………………………………….64
4.5.1.2 Diagnosis of Gas Well with Leaking Cement…………..……….67

CHAPTER 5 EFFECT OF NON-DARCY FLOW ON WELL PRODUCTIVITY


IN TIGHT GAS RESERVOIRS…….………………………..………69
5.1 Non-Darcy Flow Effect in Low-Rate Gas Wells……………….………………..70
5.2 Field Data Analysis…………………………….……………….………………..73
5.3 Numerical Simulator Model…..……………….……………….………………..76
5.3.1 Volumetric Gas Reservoir………..…….………………….……………..78
5.3.2 Water Drive Gas Reservoir………..…….………………….………..…..80
5.4 Results and Discussion………..……………….……………….………………..85

CHAPTER 6 WELL COMPLETION LENGTH OPTIMIZATION IN GAS


RESERVOIRS WITH BOTTOM WATER ………..………..……….87
6.1 Problem Statement……………………….………………….….………………..87
6.2 Study Approach…..…….…………..……………………….….………………..88
6.2.1 Reservoir Simulation Model……………………………………………..88
6.2.1.1 Factors Considered…………………………………………………..89
6.2.1.2 Responses Considered…………………………………………….…90
6.2.2 Statistical Methods…………………………………………………….…91
6.2.2.1 Experimental Design…………………………………………………91
6.2.2.2 Statistical Analyses…………………………………………………..91
6.2.2.3 Linear Regression Models…………………………………………...92
6.2.2.4 Analysis of Variance…………………………………………………93
6.2.2.5 Monte Carlo Simulation……………………………………………..93
6.2.3 Optimization……………………………………………………………..94
6.2.4 Workflow………………………………………………………………...94
6.3 Results and Discussion…………………………………………………………..96
6.3.1 Linear Models……………………………………………………………96
6.3.2 Sensitivities (ANOVA)…………………………………………………..98
6.3.3 Monte Carlo Simulation………………………………………………...103
6.3.4 Optimization……………………………………………………………107
6.4 Implications For Water-Drive Gas Wells………………………………………108

CHAPTER 7 DOWNHOLE WATER SINK WELL COMPLETIONS IN GAS


RESERVOIR WITH BOTTOM WATER….………………...……..110
7.1 Alternative Design of DWS for Gas Wells…………………….……………….110
7.1.1 Dual Completion without Packer..…….………………….…………….111
7.1.2 Dual Completion with Packer…...…….………………….…………….112
7.1.3 Dual Completion with a Packer and Gravity Gas-Water
Separation………………………..…….………………….……………113
v
7.2 Comparison of Conventional Wells and DWS Wells.………….………………115
7.2.1 Reservoir Simulator Model……...…….………………….…………….115
7.2.2 Reservoir Parameters Selection…..…….………………….…………...117
7.2.3 Conventional Wells Completion Length…...…………….…………….118
7.2.4 Gas Recovery and Production Time Comparison..……….…………….122
7.2.5 Reservoir Candidates for DWS Application……..……….…………….124
7.3 Comparison of DWS and DGWS………………………..…….……………….126
7.3.1 DWS and DGWS Simulation Model….………………….…………….126
7.3.2 DWS vs. DGWS Comparison Results ..………………….…………….127
7.3.3 Discussion About the Packer for DWS Wells...………….…………….131

CHAPTER 8 DESIGN AND PRODUCTION OF DWS GAS WELLS.…..……...133


8.1 Effect of Top Completion Length………………………….….………………..134
8.2 Effect of Water-Drainage Rate from the Bottom Completion……..….………..137
8.3 Effect of Separation between the Two Completions.……….….………………139
8.4 Effect of Bottom Completion Length………………………….….…………....141
8.5 DWS Operational Conditions for Gas Wells…………….….………………….143
8.5.1 Effect of Bottom Hole Flowing Pressure at the Bottom
Completion….………….………………………………….…………...149
8.6 When to Install DWS in Gas Wells…………….….……………..…………….153
8.7 Recommended DWS Operational Conditions in Gas Wells……….….……….156

CHAPTER 9 CONCLUSIONS AND RECOMMENDATIONS….………...……..158


9.1 Conclusions………………………..……………………….….………………..158
9.2 Recommendations..………………..……………………….….………………..161

REFERENCES……………………….………………………………………………..163

APPENDIX-A ANALYTICAL COMPARISON OF WATER CONING IN OIL


AND GAS WELLS……….…………..……………………………..175

APPENDIX-B EXAMPLE ECLIPSE DATA DECK FOR COMPARISON OF


WATER CONING IN OIL AND GAS WELLS AFTER WATER
BREAKTHROUGH ………………………………………………..181

APPENDIX-C EXAMPLE ECLIPSE DATA DECK FOR EFFECT OF


VERTICAL PERMEABILITY ON WATER CONING..………..190

APPENDIX-D ANALYTICAL MODEL FOR NON-DARCY EFFECT IN LOW


PRODUCTIVITY GAS RESERVOIRS……………….....………..213

APPENDIX-E EXAMPLE IMEX DATA DECK FOR NON-DARCY FLOW IN


LOW PRODUCTIVITY GAS RESERVOIRS..…..……..………..215

APPENDIX-F EXAMPLE ECLIPSE DATA DECK FOR COMPARISON OF


CONVENTIONAL WELLS AND DWS WELLS..……..………...227

VITA…………………………………………………………….……..……..………..245
vi
LIST OF TABLES

Table 3.1 Gas, Water, and Oil Properties Used for the Numerical Simulator Model…...38

Table 5.1 Data Used for the Analytical Model…………………………………………..71

Table 5.2 Rock Properties and Flow Rates Data for Wells A-6, A-7, and A-8 from Brar
& Aziz (1978)…………….……………………………………………………74

Table 5.3 Flow Rate and Values of a and b for Gas Wells with Multi-flow Tests….…...75

Table 5.4 Gas and Water Properties Used for the Numerical Simulator Model…………77

Table 6.1 Factor Descriptions……………………………………………………………89

Table 6.2 Factor Descriptions Including Box-Tidwell Power Coefficients……………..97

Table 6.3 Linear Sensitivity Estimates For Models Without Factors Interactions….…..99

Table 6.4 Transformed, Scaled Model for the Box-Cox Transform of Net Present
Value………………………………………………………………….…….100

Table 6.5 Parameters for Beta Distributions of Factors………………………….……..104

Table 6.6 Monte Carlo Sensitivity Estimates…………………………………………..105

Table 8.1 Operation Conditions for Top Completion Length Evaluation….…………..136

Table 8.2 Operation Conditions for Water-Drained Rate Evaluation……….………….137

Table 8.3 Operation Conditions for Evaluation of Separation Between The


Completions………………………………………………………….……..139

Table 8.4 Operation Conditions for Different Bottom Completion Length……….…...142

Table 8.5 Operation Conditions for Different Top Completion Length, Bottom
Completion Length, and Water-Drained Rate…….……..…….…………...145

Table 8.6 Operation Conditions for Evaluation of Different Constant Bottomhole


Flowing Pressure at The Bottom Completion………………………………149

Table 8.7 Operation Conditions for “When” to Install DWS in Low Productivity Gas
Well…………..………………………………………….………………….153

vii
LIST OF FIGURES

Figure 1.1 Gas Rate and Water Rate History for an Actual Gas Well……………………2

Figure 1.2 Gas Recovery Factor and Water Rate History for an Actual Gas Well……….2

Figure 3.1 Theoretical Model Used to Compare Analytically Water Coning in Oil and
Gas Wells before Breakthrough..………..…………………………………...31

Figure 3.2 Theoretical Model Used to Compare Analytically Water Coning in Oil and
Gas Wells after Breakthrough….....…….……………………………….…...33

Figure 3.3 Shape of the Gas-Water and Oil-Water Contact for Total Perforation.……...36

Figure 3.4 Numerical Model Used for Comparison of Water Coning in Oil-Water and
Gas-Water Systems……..…………………………………………….……...37

Figure 3.5 Numerical Comparison of Water Coning in Oil-Water and Gas-Water


Systems after 395 Days of Production………….…………………….……...39

Figure 3.6 Zoom View around the Wellbore to Watch Cone Shape for the Numerical
Model after 395 Days of Production….………..…………………….….…...40

Figure 4.1 Numerical Reservoir Model Used to Investigate Mechanisms Improving


Water Coning/Production (Vertical Permeability and Aquifer Size)….….....44

Figure 4.2 Distribution of Water Saturation after 395 days of Gas Production…….…...45

Figure 4.3 Water Rate versus Time for Different Values of Permeability Anisotropy....46

Figure 4.4 Distribution of Water Saturation after 1124.8 days of Gas Production……..48

Figure 4.5 Water Rate versus Time for Different Values of Aquifer Size……………...49

Figure 4.6 Analytical Model Used to Investigate the Effect of Non-Darcy in Water
Production…..………..……………………………………………………...50

Figure 4.7 Skin Components at the Well for a Single Perforation for the Analytical
Model Used to Investigate Non-Darcy Flow Effect in Water Production…...52

Figure 4.8 Water-Gas Ratio versus Gas Recovery Factor for Total Penetration of Gas
Column without Skin and Non-Darcy Effect………..………..….……….…53

Figure 4.9 Water-Gas Ratio versus Gas Recovery Factor for Total Penetration of Gas
Column Including Mechanical Skin Only…………..…………..…………...53
viii
Figure 4.10 Water-Gas Ratio versus Gas Recovery Factor for Total Penetration of Gas
and Water Columns, Skin and Non-Darcy Effect Included……...…..……...54

Figure 4.11 Water-Gas Ratio versus Gas Recovery Factor for Wells Completed Only
through Total Perforation the Gas Column with Combined Effects of Skin
and Non-Darcy……..……………………..……..…………..……….……...55

Figure 4.12 Gas Rate versus Time for the Numerical Model Used to Evaluate the Effect
of Non-Darcy Flow in Water Production……..……………………………...56

Figure 4.13 Water Rate versus Time for the Numerical Model Used to Evaluate the
Effect of Non-Darcy Flow in Water Production……..……………………....57

Figure 4.14 Effect of Perforation Density on Water-Gas Ratio for a Well Perforating in
the Gas Column, Skin and Non-Darcy Effect Included..…………….……....58

Figure 4.15 Cement Channeling as a Mechanism Enhancing Water Production in Gas


Wells………..……………………………..………………………………....59

Figure 4.16 Modeling Cement Leak in Numerical Simulator ……..…………………....60

Figure 4.17 Relationship between Channel Diameter and Equivalent Permeability in the
First Grid for the Leaking Cement Model……..………………………….....62

Figure 4.18 Values of Radial and Vertical Permeability in the Simulator’s First Grid to
Represent a Channel in the Cemented Annulus.……..…………….….….....63

Figure 4.19 Effect of Leak Length: Behavior of Water Production Rate with and
without a Channel in the Cemented Annulus.….……………………..….....64

Figure 4.20 Effect of Channel Size: Behavior of Water Production Rate for a Channel
in the Cemented Annulus above the Initial Gas-Water Contact.……..…......65

Figure 4.21 Effect of Channel Size: Behavior of Water Production Rate for a Channel
in the Cemented Annulus throughout the Gas Zone Ending in the Water
Zone…………………………………………………………………………66

Figure 5.1 Fraction of Pressure Drop Generated by N-D Flow for a Gas Well Flowing
from a Reservoir with Permeability 100 md.….…..………………….…..…71

Figure 5.2 Fraction of Pressure Drop Generated by N-D Flow for a Gas Well Flowing
from a Reservoir with Permeability 10 md.…….………….………….…..…72

Figure 5.3 Fraction of Pressure Drop Generated by N-D Flow for a Gas Well Flowing
from a Reservoir with Permeability 1 md.……....…………………….…..…73

ix
Figure 5.4 Fraction of Pressure Drop Generated by N-D Flow for Wells A-6, A-7, and
A-8; from Brar & Aziz (1978)….…………………………………….…..….74

Figure 5.5 Fraction of Pressure Drop Generated by N-D Flow for Gas Wells–Field
Data..…………………………………………………………………………76

Figure 5.6 Sketch Illustrating the Simulator Model Used to Investigate N-D Flow….…77

Figure 5.7 Gas Rate Performance with and without N-D Flow for a Volumetric Gas
Reservoir ………..………………………………………………………...…78

Figure 5.8 Cumulative Gas Recovery Performance with and without N-D Flow for a
Volumetric Gas Reservoir..………..…………………………………….…..79

Figure 5.9 Fraction of Pressure Drop Generated by Non-Darcy Flow for Gas Wells –
Simulator Model………..….………………………….………………...…...79

Figure 5.10 Gas Rate Performances with N-D (Distributed in the Reservoir and
Assigned to the Wellbore) and without N-D Flow for a Gas Water-Drive
Reservoir…………………………………………………………………..…80

Figure 5.11 Gas Recovery Performances with N-D (Distributed in the Reservoir and
Assigned to the Wellbore) and without N-D Flow for a Gas Water-Drive
Reservoir.…………………………………………………………………….81

Figure 5.12 Water Rate Performances With N-D (Distributed in the Reservoir and
Assigned to the Wellbore) and without N-D Flow for a Gas Water-Drive
Reservoir……………………………………………………………..………82

Figure 5.13 Flowing bottom hole pressure performances with N-D (distributed in the
reservoir and assigned to the wellbore) and without N-D flow……………...82

Figure 5.14 Pressure performances in the first simulator grid (before completion) with
ND (distributed in the reservoir and assigned to the wellbore) and without
N-D flow.…..…………………………..….………………………………...83

Figure 5.15 Pressure distribution on the radial direction at the lower completion layer
after 126 days of production (Wells produced at constant gas rate of 8.0
MMSCFD) with ND (distributed in the reservoir and assigned to the
wellbore) and without N-D flow…………………………………………….84

Figure 6.1 Flow diagram for the workflow used for the study…………………….….…95

Figure 6.2 Effect of Permeability and Initial Reservoir Pressure on Net Present
Value……………………………………………..……………………..…..101

Figure 6.3 Effect of Permeability and Completion Length on Net Present Value……..102

x
Figure 6.4 Effect of Gas Price and Completion Length on Net Present Value……….102

Figure 6.5 Effect of Discount Rate and Gas Price on Net Present Value……………..103

Figure 6.6 Beta Distribution Used for Monte Carlo Simulation………………………104

Figure 6.7 Monte Carlo Simulation of the Net Present Value…………………………105

Figure 6.8 Optimization of Net Present Value Considering Uncertainty in Reservoir


and Economic Factors (two cases) ……………………….………….…….106

Figure 6.9 Optimal Completion Length Calculated from the Transformed Model and
a Response Model Computed from Local Optimization……..…………….108

Figure 6.10 Relative Loss of Net Present Values If Completion Length Is Not
Optimized…………………………………………………………………...109

Figure 7.1 Dual Completion without Packer….………………………………………..111

Figure 7.2 Dual Completion with Packer…..…………………………………………..113

Figure 7.3 Dual Completion with a Packer and Gravity Gas-Water Separation...……..114

Figure 7.4 Simulation Model of Gas Reservoir for DWS Evaluation…….……………116

Figure 7.5 Gas Recovery for Different Completion Length in Gas Reservoirs with
Subnormal Initial Pressure…………………………..……….……..………119

Figure 7.6 Gas Recovery for Different Completion Length in Gas Reservoirs with
Normal Initial Pressure…..……………………….…..……………..……...119

Figure 7.7 Gas Recovery for Different Completion Length in Gas Reservoirs with
Abnormal Initial Pressure…….………………..……..……………..……...120

Figure 7.8 Flowing Bottom Hole Pressure versus Time (Normal Initial Pressure; 50%
Penetration)……………………….…………………..……………..……..120

Figure 7.9 Gas Rate versus Time (Normal Initial Pressure; 50% Penetration)………...121

Figure 7.10 Gas Recovery and Total Production Time for Conventional and DWS
Wells for Different Initial Reservoir Pressure and Permeability 1 md……..122

Figure 7.11 Gas Recovery and Total Production Time for Conventional and DWS
Wells for Different Initial Reservoir Pressure and Permeability 10 md…....123

Figure 7.12 Gas Recovery and Total Production Time for Conventional and DWS
Wells for Different Initial Reservoir Pressure and Permeability 100 md…..124

xi
Figure 7.13 Gas Rate History for Conventional and DWS Wells (Subnormal Reservoir
Pressure and Permeability 1 md)…….……..………….…………………...125

Figure 7.14 Flowing Bottom Hole Pressure History for Conventional and DWS Wells
(Subnormal Reservoir Pressure and Permeability 1 md)…..….……………125

Figure 7.15 Gas Recovery and Production Time Ratio (PTR) for Conventional, DWS,
and DGWS Wells……….………………………………….……………….128

Figure 7.16 Gas Recovery versus Time for DWS, DGWS, and Conventional Wells….129

Figure 7.17 Gas Rate History for DWS-2, DGWS-1, and Conventional Wells…..……130

Figure 7.18 Water Rate History for DWS-2, DGWS-1, and Conventional Wells…..…130

Figure 7.19 Bottom hole flowing pressure history for DWS-2, DGWS-1, and
conventional wells.…………………………………………………….…131

Figure 8.1 Factors Used to Evaluate DWS Performance ………...….…………..…….133

Figure 8.2 Gas Recovery Factor for Different Length ff The Top Completion..………134

Figure 8.3 Total Production Time for Different Length of The Top Completion. …….135

Figure 8.4 Gas Recovery Factor for Different Water-Drained Rate.……..……………138

Figure 8.5 Total Production Time for Different Water-Drained Rate………..………...138

Figure 8.6 Gas Recovery Factor for Different Separation Distance Between The
Completions. ……………………………………………………………….140

Figure 8.7 Total Production Time for Different Separation Distance Between The
Completions …………….………………………………………………….141

Figure 8.8 Gas Recovery Factor for Evaluation of Different Length at The Bottom
Completion.………..….…………………………………………………….142

Figure 8.9 Total Production Time for Evaluation of Different Length at The Bottom
Completion …………………………………………………………………143

Figure 8.10 Gas Recovery for Different Lengths of Top, and Bottom Completions and
Maximum Water Drained. The Two Completions Are Together. Reservoir
Permeability Is 1 md.……………………………………………………….146

Figure 8.11 Total Production Time for Different Lengths of Top and Bottom
Completions and Maximum Water Drained. The Two Completions Are
Together. Reservoir Permeability Is 1 md …………………………………146

xii
Figure 8.12 Gas Recovery for Different Lengths of Top, and Bottom Completions and
Maximum Water Drained. The Two Completions Are Together. Reservoir
Permeability Is 10 md ……………………………………………………...147

Figure 8.13 Total Production Time for Different Lengths of Both Completions and
Maximum Water Drained. The Two Completions Are Together. Reservoir
Permeability Is 10 md …………….………………………………………..148

Figure 8.14 Gas Recovery for Different Constant BHP at The Bottom Completion.….150

Figure 8.15 Total Production Time for Evaluation of Different Constant BHP at The
Bottom Completion …………………………….…………………………..150

Figure 8.16 Flowing Bottomhole Pressure History at The Top, and Bottom Completion
for Two Different Constant BHP at The Bottom Completion (100 psia, and
200 psia). Permeability Is 1 md ………………………….………………...151

Figure 8.17 Average Reservoir for Two Different Constant BHP at The Bottom
Completion (100 psia, and 200 psia). Permeability Is 1 md …….…………152

Figure 8.18 Gas Recovery for Different Times of Installing DWS.…….……………...154

Figure 8.19 Total Production Time for Different Times of Installing DWS.…………..154

Figure 8.20 Cumulative Gas Recovery for Different Times of Installing DWS.
Reservoir Permeability Is 10 md.…….……………………..…………...156

xiii
NOMENCLATURE

a = Darcy flow coefficient, (psia2-cp)/(MMscf-D) for calculation in terms of

pseudopressure or psia2/(MMscf-D) for calculations in terms of pressure

squared

A = drainage area of well, ft2

b = Non-Darcy flow coefficient, (psia2-cp)/(MMscf-D)2 for calculation in

terms of pseudopressure or psia2/(MMscf-D)2 for calculations in terms of

pressure squared

Bw = water formation volume factor, reservoir barrels per surface barrels

CA = factor of well drainage area

D = Non-Darcy flow coefficient, day/Mscf

dp = pressure derivative, psia

dL = length derivative, ft

F = fraction of pressure drop generated by Non-Darcy flow effect,

dimensionless

h = net formation thickness, ft

hg = thickness of gas, ft

hpre = perforated interval, ft

hw = thickness of water, ft

k = permeability, millidarcies

kd = altered reservoir permeability, millidarcies

kdp = crashed zone permeability, millidarcies

xiv
kH = horizontal permeability, millidarcies

kg = gas permeability, millidarcies

kV = vertical permeability, millidarcies

kw = water permeability, millidarcies

L = length, ft

Lp = length of perforation, ft

M = apparent molecular weight, lbm/lbm-mol

np = number of perforations

p = pressure, psia

Pe = reservoir pressure at the boundary, psia

pp( p ) = average reservoir pseudopressure, psia2/cp

pp( p wf )= flowing bottom hole pseudopressure, psia2/cp

∆pp = difference of average reservoir and flowing bottom hole pseudopressure,

psia2/cp

Pw = flowing bottom hole pressure, psia

q = gas rate, MMscfd

Qg = gas flow rate, Mscfd

Qw = water flow rate, barrel/day

qg = gas flow rate, Mscfd

qw = water flow rate, barrel/day

rd = altered reservoir radius, ft

rdp = crashed zone radius, ft

re = outer radius, ft

rp = radius of perforation, ft

xv
rw = wellbore radius, ft

S = skin factor, dimensionless

s = skin factor, dimensionless

Sd = skin factor representing mud filtrate invasion

Sdp = skin factor representing perforation density

Spp = skin factor due to partial penetration

T = temperature, oR

Tsc = temperature at standard conditions, oR

v = velocity, ft per second

y = gas-water or oil-water interface thickness, ft

ye = water thickness at the boundary, ft

Z = gas deviation factor

β = turbulent factor, 1/ ft

βr = turbulent factor for reservoir, 1/ ft

βdp = turbulent factor for crashed zone, 1/ ft

ρ = density, lbm/ft3

∂p = pressure derivative, psia

∂r = radius derivative, ft

φ = porosity

γg = specific gravity of gas (air = 1.0)

µ = viscosity, centipoises

µg = viscosity of gas, centipoises

µw = viscosity of water, centipoises

xvi
ABSTRACT

Water inflow may cease production of gas wells, leaving a significant amount of

gas in the reservoir. Conventional technologies of gas well dewatering remove water

from inside the wellbore without controlling water at its source. This study addresses

mechanisms of water inflow to gas wells and a new completion method to control it.

In a vertical oil well, the water cone top is horizontal, but in a gas well, the

gas/water interface tends to bend downwards. It could be economically possible to

produce gas-water systems without water breakthrough.

Non-Darcy flow effect (NDFE), vertical permeability, aquifer size, density of

well perforation, and flow behind casing increase water coning/inflow to wells in

homogeneous gas reservoirs with bottom water. NDFE is important in low-productivity

gas reservoirs with low porosity and permeability. Also, NDFE should be considered in

the reservoir (outside the well) to describe properly gas wells performance.

A particular pattern of water rate in a gas well with leaking cement is revealed.

The pattern might be used to diagnose the leak. The pattern explanation considers cement

leak flow hydraulics. Water production depends on leak properties.

Advanced methods at parametric experimental design and statistical analysis of

regression, variance, with uncertainty (Monte Carlo) were used building economic model

at gas wells with bottom water. Completion length optimization reveled that penetrating

80% of the gas zone gets the maximum net present value.

The most promising Downhole Water Sink (DWS) installation in gas wells

includes dual completion with an isolating packer and gravity gas-water separation at the

xvii
bottom completion. In comparison to Downhole Gas/Water Separation wells, the DWS

wells would recover about the same amount of gas but much sooner.

The best DWS completion design should comprise a short top completion

penetrating 20% - 40% of the gas zone, a long bottom completion penetrating the

remaining gas zone, and vigorous pumping of water at the bottom completion. Being as

close as practically possible the two completions are only separated by a packer. DWS

should be installed early after water breakthrough.

xviii
CHAPTER 1

INTRODUCTION

1.1 Background and Purpose

Water production kills gas wells, leaving a significant amount of gas in the

reservoir. One study of large sample gas wells revealed that the original reserves figures

had to be reduced by 20% for water problems alone (National Energy Board of Canada,

1995).

Gas demand in the US increased 16% during the last decade, but gas production

increased only 4.5% during the same period (Energy Information Administration, 2001).

The demand for natural gas is projected to increase at an average annual rate of 1.8%

between 2001 and 2025 (Energy Information Administration, 2003).

Water production is one of the two recurring problems of critical concern in the

oil and gas industry (Inikori, 2002). Many gas reservoirs are water driven. Water supplies

an extra mechanism to produce the gas reservoir, but it can create production problems in

the wellbore. These water production problems are more critical in low productivity gas

wells. More than 97% of the gas wells in the United Stated produce at low gas rates.

Eight areas account for 81.7 % of the United States’ dry natural gas proved reserves:

Texas, Gulf of Mexico Federal Offshore, Wyoming, New Mexico, Oklahoma, Colorado,

Alaska, and Louisiana (EIA, 2001). These areas had 144,326 producing gas wells in

1996, but only 366 wells (0.25%) produced more than 12.8 MMscfd (EIA, 2000).

Figures 1.1 and 1.2 show actual field data from a well located in a gas reservoir

with bottom water drive where water production affected the well performance.

1
300 1800
Water Rate (Stb/d) 250 1500

Gas Rate (Mscf/d)


200 1200
150 900
100 600
50 300
0 0
ar 8
Ap -98
a 8

ar 9
Ap -99
ay 9
8

Ju y-98
Ju -98
8

Ju -99
Ju -99
9
Ja -97

p 8
O -98

Ja -98

9
99
o 8
ec 8
M r-9

M r-9
M b-9

M b-9
Au l-9

Au l-9
Fen-9

Seg-9

Fen-9

Seg-9
N -9
D v-9

p-
n

n
ec

ct
D

Time (days)

Water Rate Gas Rate

Figure 1.1 Gas rate and water rate history for an actual gas well.

Figure 1.1 shows the history of gas and water rate. Water production begins after

eleven months of gas production. Water production increases rapidly, reducing gas rate

and killing the well after seven months of water production.

300 30
Recovery Factor (%)

250 25
Water Rate (Stb/d)

200 20
150 15
100 10
50 5
0 0
M -98
Apr-98
ay 8

M -99
Ap -99
ay 9
b 8

Ju -98
Ju -98
8

Fe -99

Ju -99
Ju -99
9
Ja -97

p 8
O -98

Ja -98

9
99
ov 8
ec 8
M r-9

M r-9
Au l-9

Au l-9
Fe -9

Seg-9

Seg-9
N t-9
D -9

p-
b
ar
n

n
ec

c
a
D

Time (days)

Water Rate Gas Recovery Factor

Figure 1.2 Gas recovery factor and water rate history for an actual gas well.

2
Figure 1.2 shows gas recovery factor and water rate history. The final recovery

for the well is 28% at the moment when production stopped. This well died because of

the liquid loading inside the wellbore.

Liquid loading happens when the gas does not have enough energy to carry the

water out of the wellbore. Water accumulates at the bottom of the well, generating

backpressure in the reservoir and blocking gas inflow.

It is well known that water coning occurs in oil and gas reservoirs, with the water

drive mechanism, when the well is produced above the critical rate. Water coning is

responsible for the early water breakthrough into the wellbore. Water coning has been

studied extensively for oil reservoirs. However, only a few studies of water coning in gas

wells have been reported in the literature. Most of the studies assume that water coning in

gas and oil wells is the same phenomenon, and correlation developed for oil-water system

could be used for gas-water systems.

The obvious solution for water coning problems is to produce the well below the

critical rate; this solution, however, has become uneconomical for oil wells because of

the low value for the critical rate. A correlation for critical rate in gas wells has not been

published, yet, to the author’s knowledge.

Different well dewatering technologies have been used to control water loading

problem in gas wells (pumping units, liquid diverters, gas lifts, soap injections, flow

controllers, swabbing, coiled tubing/nitrogen, venting, plunger lift, and one small

concentric tubing string). All of them would reduce liquid-loading without controlling

water inflow. Recently, a new technology of Downhole Water Sink (DWS) has been

develop and successfully used to control water production/coning in oil wells. DWS

3
controls water inflow to the well, by reversing water coning with a second bottom

completion. That drains water from under the top completion.

The purpose of this research is to evaluate the performance of the DWS

technology controlling water production-problems in gas wells. Design and operation of

DWS gas wells is also addressed. Moreover, Identification of unique mechanisms

improving water production in gas reservoirs, and completion length optimization for

conventional gas wells are also approached.

1.2 Statement of Research Problem

In response to economic and environmental concerns, in-situ injection of water in

the same gas well, without lifting the water to surface, has become a new technology

knows as Downhole Gas-Water Separation (DGWS). Similarly to all the other

technologies use to solve liquid-loading in gas wells, DGWS does not consider the well-

reservoir interaction solving water production problem, either.

Therefore, new technologies that consider both, the well and the reservoir,

component of the water problem production in gas wells are needed. These technologies,

not only have to improve gas production/recovery from the reservoir, but have to reduce

the amount of water produced at the surface, too.

In the past, water coning in gas wells has not received much attention from

researcher in the petroleum industry. The reason for that probably is the general “feeling”

that the problem is of minimal importance or even does not exist because of the high gas

mobility compared with the water mobility. Therefore, few studies have been done

addressing reservoir mechanisms increasing water coning/production in gas reservoir.

The low gas price experienced during the last decade reduced the interest in gas well

problems at the United States. This low gas price environment, however, has slowly

4
changed since the beginning of this century due to increases in gas demand and reduction

in gas supply, pushing people trying to explain, understand and solve gas

production/recovery problems. One such attempt includes the “pilot” work conducted for

the research described herein.

1.3 Significance and Contribution of This Research

The significance of this research stems from the following six studies:

• First, the research presents analytical and numerical evidence that the water

coning is different in gas wells than in oil wells.

• Second, this research identifies vertical permeability, aquifer size, Non-Darcy

flow effect (N-D), density of perforation, and flow behind casing as unique

mechanisms improving water coning in gas wells.

• Third, the research presents a new perspective for N-D flow in gas reservoirs,

showing that very well accepted statements in the oil and gas industry about this

phenomenon are not correct (Non Darcy flow is not important in gas wells

flowing at low rates. Non-Darcy flow coefficient applied only to the well bore

properly represents N-D flow throughout the reservoir).

• Fourth, this research presents a new procedure to identify flow behind casing

(channeling in the cemented annulus) in gas wells.

• Fifth, the optimum completion length in gas wells for the maximum net present

value is presented. Reservoir and economic parameters affecting water production

in gas reservoir are prioritized.

• Finally, the research presents an evaluation for DWS in gas reservoirs, identifying

the reservoir conditions where the technology could be successful. The best way

5
to operate DWS in gas reservoirs, considering different completion/production

parameters, is identified, too.

1.4 Research Method and Approach

This research uses two existing commercial numerical simulators (Eclipse 100,

and IMEX) and a radial grid model to study water coning mechanisms and DWS

evaluation in gas reservoirs. Two commercial numerical simulators are used during the

study because the first simulator used for this research (Eclipse 100) does not properly

represent N-D in gas reservoirs. N-D flow is identified as an important phenomenon.

Another simulator (IMEX) is also used. Analytical models are built to support procedures

and results for different mechanisms that increase water coning in gas reservoirs. Field

data are used to confirm analytical and numerical results from the N-D flow effect

analysis. Statistical analyses are performed with the numerical simulation results from the

analysis of mechanisms affecting water coning/production in gas wells.

Because of the very nature of this first “pilot” research of DWS in gas reservoir,

several different types of approaches, studies, and evaluations are performed.

Analytical and numerical approaches are used to identify similarities and

differences between water coning in gas and oil wells (Chapter 3). The analysis is

focused on the amount of fluid produced, under the same production conditions, from the

oil-water and gas-water system, and the shape of the interface (oil-water and gas-water)

around the wellbore for both systems. One new analytical model, to investigate gas-water

and oil-water interface shape, is developed following Muskat (1982) procedure. The

results from the analytical model are compared with results from a numerical reservoir

simulator model built with similar characteristics. Another analytical model is built to

investigate the amount of fluid produced from both systems.

6
Qualitative studies identifying mechanisms increasing water coning/productions

in gas wells are conducted using numerical and analytical models (Chapter 4). Vertical

permeability, aquifer size, Non-Darcy flow effect, perforation density, and flow behind

casing are evaluated. Analytical models are constructed to confirm the results from the

numerical reservoir simulator models. Moreover, one analytical model is developed to

enhance the capability of reservoir simulator representing the phenomena of flow behind

casing in gas wells because the reservoir simulator does not include the annulus space

between the casing and the wellbore wall in its modeling. A new procedure identifying

flow behind casing in gas wells, using water production field data, is presented.

Analytical and numerical models are used to identify and quantify the importance

of Non Darcy flow effect in low productivity gas reservoirs. The results from the models

are compared with actual field data (Chapter 5). Recommendations on the correct way of

modeling Non Darcy flow in gas reservoir using numerical reservoir simulators are

included.

Feasibility studies of DWS in gas wells are done using reservoir numerical

models (Chapter 6). The studies compare final gas recovery for conventional gas wells

and DWS gas wells. Quantitative comparison of final gas recovery between two different

technologies solving water production problems in gas wells is made, too [One

technology solves the problem in the wellbore (DGWS), and the other one solves the

problem in the reservoir (DWS)]. Modeling DWS, and DGWS wells in commercial

numerical simulator brings several challenges because of the inability of the reservoir

simulator to perform dual completed well with two-different bottom hole condition and

two different tubing performance model at the same well. Model modifications (e.g., two

7
wells in the same location with different completion length, two tubing performance

models for the same well, etc) are made to evaluate DWS and DGWS wells performance.

Sensitivity studies of mechanisms increasing water coning/production in gas wells

are conducted using analysis of variance. Three different linear regression models,

without interaction among the factors, for ultimate cumulative gas production, net present

value and peak gas rate are built and evaluated using numerical reservoir simulation

results. One linear regression model for the discount cash flow, considering interaction

among the eight factors, is built and evaluated (Chapter 7). Horizontal permeability,

aquifer size, permeability anisotropy, initial reservoir pressure, length of completion, gas

price, water disposal cost, and discount rate are the factors considered for the analysis.

Optimization of Net Present Value with respect to completion length in gas reservoir with

bottom-water drive, using the response model from the statistical model and the direct

result from the simulator, was done, too.

Qualification of the most important operational factors affecting DWS

performance in gas reservoir is done using numerical reservoir simulator model (Chapter

8). The analysis includes length-of-top completion, length-of-bottom completion,

drained-water rate, separation between the top-and the bottom-completion, and the time

to install DWS technology. Recommendations on how to use DWS effectively in gas

reservoirs are included.

1.5 Work Program Logic

The dissertation is divided into nine chapters. The introduction chapter presents

an overview of the problem of water production in gas wells explaining the necessity for

new technologies to solve the problem. It also presents a concise statement about the lack

8
of attention about the problem and ends with a presentation of the relevance of this study

and its approach.

Chapter two presents a literature review of scientific research into water loading

theory and different technologies used to solve water production problems in gas wells.

Chapter three gives a comparison of water coning in oil and gas wells with

specific focus on the interface oil-water and gas-water shape, and the amount of fluid

produced in both system at the same operational conditions.

Chapter four gives a qualitative analysis about different mechanisms increasing

water coning/production in gas reservoir with bottom-water drive. Vertical permeability,

aquifer size, Non-Darcy flow effect, perforation density, and flow behind casing were the

mechanisms evaluated. Chapter four ends with a new procedure to identify flow behind

casing in gas wells using water production data.

Chapter five takes an overview of the Non-Darcy effect phenomena in low

productivity gas wells. The well assumption that setting Non-Darcy flow at the wellbore

properly represents the phenomena is revised. Chapter five ends with a recommendation

about the correct way of modeling Non Darcy flow in gas reservoir using numerical

reservoir simulators.

Chapter six has the statistical evaluation of completion length optimization in gas

wells for maximum net present value. The analysis includes sensitivity studies for

reservoir and economical factors. Horizontal permeability, aquifer size, permeability

anisotropy, initial reservoir pressure, length of completion, gas price, water disposal cost,

and discount rate were the factor considered for the analysis.

Chapter seven includes the feasibility study of DWS in gas reservoirs.

Comparisons of final cumulative gas recovery in conventional and DWS wells are

9
performed. The study includes a comparison between two different technologies solving

water production problems in gas wells for the same gas reservoir [one technology solves

the problem in the wellbore (DGWS), and the other one solve the problem into the

reservoir (DWS)].

Chapter eight reviews the operational parameters involved in DWS performance

in gas reservoirs giving recommendation about the way to use the technology. Chapter

nine provides conclusions from this research work, including recommendations for future

research.

10
CHAPTER 2

LITERATURE REVIEW

Liquid loading or accumulation in gas wells occurs when the gas phase does not

provide adequate energy for the continuous removal of liquids from the wellbore. The

accumulation of liquid will impose an additional back pressure on the formation, which

can restrict well productivity (Ikoku, 1984). The limited gas flow velocity for upward

liquid-drop movement is the critical velocity.

2.1 Critical Velocity

Turner, Hubbard, and Dukler (1969) analyzed two physical models for removal of

gas well liquids: the liquid droplet and the liquid film models. A comparison of these two

models with field data led to the conclusion that the onset of load up could be predicted

adequately with the droplet model, but that a 20% adjustment of the equation upward was

necessary. Equation 2.1 shows Turner et al. correlation.

1.912σ 1 / 4 ( ρ L − ρ g ) 1 / 4
vt = ………………………………………….(2.1)
ρ 1g / 2

Where vt is critical velocity (ft/sec), σ is interfacial tension (dynes/cm), ρL is

liquid-phase density (lbm/ft3), and ρg is gas phase density (lbm/ft3).

Turner et al. equation (Eqn. 2.1) calculating gas critical velocity has gained

widespread industry acceptance because of its close agreement with field data, and it is

widely referenced in the literature (Hutlas & Granberry, 1972; Libson & Henry, 1980;

Ikoku, 1984; Beggs, 1985; Upchurch, 1987; Bizanti & Moonesas, 1989; Smith, 1990;

Elmer, 1995).

11
Coleman et al. (1991), using a different set of field data, conclude that the 20%

adjustment of Turner’s equation is not needed. They found that the critical flow rate

required to keep low pressure gas wells unloaded can be predicted adequately with the

Turner et al. (1969) liquid-droplet model without the 20% upward adjustment. Equation

2.2 shows Coleman et al. (1991) correlation.

1.593σ 1 / 4 ( ρ L − ρ g ) 1 / 4
vt = ………………………………………….(2.2)
ρ 1g / 2

Where vt is critical velocity (ft/sec), σ is interfacial tension (dynes/cm), ρL is

liquid-phase density (lbm/ft3), and ρg is gas phase density (lbm/ft3).

Nosseir et al. (2000) explained the difference between Turner et al. (1969) and

Coleman et al. (1991) results because both of them ignored flow regime conditions for

their data set. Flow regime considerations directly affect the shape of the drag coefficient

and hence the critical velocity equation. They found that most of the Turner et al. (1969)

data set fall in the highly turbulent region where NRE exceeds a value of 200,000, and the

drag coefficient acquires a value of 0.2. Most of the Coleman et al. (1991) data set,

however, falls in the region where 104< NRE <2*105 corresponding drag coefficient of

0.44. Nosseir et al. (2000) derived two analytical equations describing the flow regimes

for each set of data. Equations 2.3 and 2.4 show Nosseir et al. (2000) correlations.

For transition flow regime (104 < NRe < 2*105):

14.6σ 0.35 ( ρ L − ρ g ) 0.21


vg = ……………………………………………(2.3)
µ 0.134 ρ g0.426

For highly turbulent flow regime (NRe > 2*105):

21.3σ 0.25 ( ρ L − ρ g ) 0.25


vg = ……………………………………………(2.4)
ρ g0.5

12
Where vg is gas critical velocity (ft/sec), σ is interfacial tension (dynes/cm), ρL is

liquid-phase density (lbm/ft3), µ is gas viscosity (lbm/ft/sec), and ρg is gas phase density

(lbm/ft3).

Sutton et al. (2003) evaluates gas well performance at Subcritical rates. They

evaluated six different models describing the presence of a static liquid column in the

wellbore with field data from 15 wells. They concluded that the model proposed by

Hasan and Kabir (1985) offers the best approach for simulating this phenomenon.

2.2 Critical Rate for Water Coning

Water coning happens on the vicinity of the well when water moves up from the

free water level in a vertical direction. Production from a well causes a pressure sink at

the completion. If the wellbore pressure is higher than the gravitational forces resulting

from the density difference between gas and water, then water coning occurs. Equation

2.5 shows the basic correlation between pressure in the wellbore and at the well vicinity

for coning.

p − p well = 0.433(γ w − γ g )h g − w ………………………………………………(2.5)

Where p is average reservoir pressure (psi), pwell is the flowing bottom hole

pressure (psi), γw is water specific gravity, γg is gas specific gravity, and hg-w is the

vertical distance from the bottom of the well’s completion to the gas/water contact (ft).

Critical rate is defined as the maximum rate at which oil/gas is produced without

production of water (Joshi, 1991). The critical rate for oil-water systems has been

discussed for several authors developing different correlations to calculate that rate. For

gas-water system, however, no correlation has been published calculating critical rate,

yet. One possible reason for the low interest in critical rate for gas-water system could be

the general “feeling” that water coning in gas wells is less important than in oil wells.

13
Muskat (1982), for example, discussing about water coning problem said: “water coning

will be much more readily suppressed and will involve less serious difficulties for wells

producing from gas zones than for wells producing oil…the critical-pressure differential

for water coning will be probably grater by a factor of at least four in gas wells than in oil

wells.” Joshy (1991) presets an excellent discussion about critical rate in oil wells. He

included analytical and empirical correlation to calculate critical rate. The correlations

include: Craft and Hawking method (1959), Meyer, and Garder method (1954), Chaperon

method (1986), Schols method (1972), and Hoyland, Papatzacos and Skjaeveland method

(1986). Joshy presents equations and example calculation for each method, concluding

that the critical rate calculated for each method is different. He said that there is no right

or wrong critical correlation, and each one should make decision about which correlation

could be used for specific field applications. Meyer, and Garder correlation (1954), and

Schols correlation (1972) are shown here as examples of critical rate equations for oil-

water system (Eqns. 2.6 and 2.7).

Meyer and Garder correlation (1954):

0.001535( ρ w − ρ o )k (h 2 − D 2 )
qc = ……………………………………………(2.6)
µ o Bo ln(re / rw )

Where: qc is critical oil rate (STB/D), ρw is water density (gm/cc), ρo is oil density

(gm/cc), k is formation permeability (md), h is oil zone thickness (ft), D is completion

interval thickness (ft), µo is oil viscosity (cp), Bo is oil formation volume factor

(bbl/STB), re is external drainage radius (ft), and rw is wellbore radius (ft).

Schols correlation (1972):


0.14
( ρ w − ρ o )k o (h 2 − h p2 )  π  h 
qo = * 0.432 +   ……………………………(2.7)
2049 µ o B o  ln(re / rw )  re 

14
Where: qo is critical oil rate (STB/D), ρw is water density (gm/cc), ρo is oil density

(gm/cc), ko is effective oil permeability (md), h is oil zone thickness (ft), hp is completion

interval thickness (ft), µo is oil viscosity (cp), Bo is oil formation volume factor

(bbl/STB), re is external drainage radius (ft), and rw is wellbore radius (ft).

Water coning supplies the liquid source for liquid loading in gas wells. Liquid

loading begins when wells start producing gas flowing below the critical velocity in the

wellbore. Different concepts and techniques have been used to solve water-loading

problems in gas wells.

Trimble and DeRose (1976) discussed that Mustak-Wyckoff (1935) theory for

critical rates in oil wells could be modified to calculate critical rate for gas wells. The

procedure could give an approximate idea about the gas critical rate for quick field

calculations. The modified Muskat-Wyckoff (1935) equation presented by Trimble and

DeRose (1976) is:

0.000703k g h( p e2 − p w2 )  b  r πb 
qg =  1 + 7 w cos  ……………………..…….(2.8)
zT R µ g ln(re / rw )  h  2b 2h 

Where: qg is gas flow rate (Msc/d), kg is effective gas permeability (md), h is gas

zone thickness (ft), pe is reservoir pressure at drainage radius (psia), pw is wellbore

pressure at drainage radius (psia), µg is gas viscosity at reservoir conditions (cp), z is gas

compressibility factor, TR is reservoir temperature (oR), re is external drainage radius (ft),

rw is wellbore radius (ft), and b is footage perforated (ft).

Equations 2.8 and 2.9 are combined, and solved graphically following Muskat-

Wyckoff (1935) procedure, calculating minimum drawdown preventing water coning.

φw −φD gh∆ρ  D 
= 1− 1 −  …………………………………………………..(2.9)
φw φe
− ∆p  h

15
Where: φw is potential at well radius (psi), φD is potential at well radius and depth

D (psi), φe is potential at drainage radius (psi), g∆ρ is difference in hydrostatic gradient at

reservoir conditions between the gas and water (psi/ft), ∆p is pressure drawdown (psia), h

is gas zone thickness (ft), and D is distance from formation to cone surface at r (ft).

Trimble and DeRose (1976) procedure combined gas flow equation (Eqn. 2.8)

with oil graphical solution for Eqn 2.9. Changes in oil density and viscosity with respect

to pressure are negligible. Gas properties (density, and viscosity), however, strongly

depend on pressure; therefore, the previous procedure should be used as a reference with

limitations.

2.3 Techniques Used in Solving Water Loading

Techniques used in solving water loading in gas wells could be classified as:

• Tubing lift improvement:

- Chemical injection

- Physical modification

- Thermal

- Mechanical

• Bottom liquid removal:

- Mechanical

2.3.1 Tubing Lift Improvement

2.3.1.1 Chemical Injection

Chemicals are injected in gas wells with liquid loading problems to prolong the

extracting period and enhance wells’ productivity. Foam agents are used to carry the

water out of the well. The objective of using foaming agents is to create a molecular bond

between the gas and the liquid phases and to maintain its foam stability for a useful

16
period of time so that the accumulated liquid is transported to the surface in a foamed,

slurry state (Neves & Brimhall, 1989).

Chemical composition, concentration, temperature, water salinity, presence of

condensate oil, and hydrogen sulfide are factors controlling foaming agent performance

(Xu & Yang, 1995).

Foam lift uses reservoir energy to carry out the water, reducing the critical

velocity. The most common application of foam lift is in the form of a “soap stick.” The

soap bar (1-inch diameter, 1-foot long) is dropped inside the tubing and foam is generated

by fluid mixing and agitation with the surfactant dissolved from the soap bar (Saleh, and

Al-Jamae’y, 1997).

Surfactant concentrations are difficult to gauge and control when the surfactant is

dumped into the annulus or the tubing (Lea, and Tighe, 1983).

Other applications include injection of surfactant through the annulus from the

wellhead, or downhole injection using a capillary string inside the tubing.

Libson and Henry (1980) reported successful results injecting foaming agent into

the casing annulus in very low permeability gas wells located in the Intermediate Shelf

area of Southwest Texas. After 10 days of injecting a foaming agent to the wellhead, the

gas rate increased from 142 Mscfd to 664 Mscfd, and water rate increased from 0.8 bwpd

to 3.2 bwpd.

Placing a capillary string through the producing tubing foam is injected downhole

in front of the perforations. Vosika (1983) reported foam injection an economic success

in four wells at the Great Green River Basing, Wyoming. Average gas rates increase

more than doubled when the foam agent was injected in conjunction with the methanol

used to solve traditional freezing problems.

17
Silverman et al. (1997), and Awadzi et al. (1999) reported liquid loading success

in gas wells located in the Cotton Valley formation in East Texas using the capillary

technique. Gas rate increments in four wells went from 28.2% to 676.3%.

Surfactant injection could increase corrosion. Campbell et al. (2001) reported a

chemical mixture between the foaming agent and corrosion inhibitor to improve liquid

lifting without increasing corrosion in the wellbore.

2.3.1.2 Physical Modification

Physical modification of the wellbore has been done to increase gas velocity. Gas

velocity is increased, reducing the gas-flow area to improve gas carry capacity. A small

concentric tubing string and tubing collar insert have been proposed to improve gas

velocity. These methods of producing marginal gas wells are also viewed as a temporary

solution to liquid loading. As time elapses and the reservoir pressure declines, the smaller

diameter tubing string eventually loads up with liquids. At this point, another method

must be employed to help combat the accumulation of liquid in the wellbore (Neves &

Brimhall, 1989).

Hutlas and Grandberry (1972) reported success using a 1-in tubing string in

northwestern Oklahoma and the Texas Panhandle. Running a 1-in tubing string inside the

production tubing increased gas rate more than 100% in four wells.

Libson and Henry (1980) reported that gas rate increased by 50 Mscfd per

installation in the Intermediate Shelf area of southwest Texas when a 1.90-in tubing was

installed in a 2 3/8-in production tubing.

One-in tubing string run inside 2 7/8-in production tubing increased gas rate,

decreasing field annual decline, in seven wells, two sour gas fields, at the Edward Reef in

Texas (Weeks, 1982).

18
Yamamoto & Christiansen (1999) and Putra & Christiansen (2001) reported

laboratory data for tubing collar inserts increasing liquid lifting. The tubing collar inserts

are restrictions installed inside the tubing string. The restrictions alter flow mechanisms

and liquid could be lifted by gas flowing below the critical velocity; the effect could be

reduced due to the pressure drop across the restriction (Yamamoto and Christiansen,

1999). Parameters affecting the tubing collars inserts include: insert geometric shape, size

and spacing of the inserts, gas and liquid flow rates, and pressure drop across the insert

(Putra and Christiansen, 2001).

Installing concentric coiled tubing is another technique used to increase gas

velocity. An estimated 15,000 wells have coiled tubing installed in them as velocity or

siphon strings. The coiled string consists of either steel or plastic tubing (Scott and

Hoffman, 1999).

Adams and Marsili (1992) presented the design and installation for a 20,500-ft

coiled tubing velocity string in the Gomez Field, Pecos County, Texas. One 1 ¼-in coiled

tubing string was installed in a 4 ½-in production tubing, solving liquid loading problems

and increasing gas production more than two-fold.

Elmer (1995) discussed the combined application of small tubing string with

some extra gas production through the casing/tubing annulus. The small tubing string

always flowed above the critical velocity, and some gas, due to extra reservoir production

capacity, was produced up to the annulus. Gas production increased 33% in two wells

and 91% in another well when this production strategy was used.

2.3.1.3 Thermal

Pigott et al. (2002) presented the first successful application of wellbore heating

to prevent fluid condensation and eliminate liquid loading in low-pressure, low-

19
productivity gas wells. The application was in the Carthage Field. A heater cable installed

around the tubing string increased wellbore temperature, avoiding liquid condensation.

The heating technique alone increased gas production more than 100%. However,

combination of the heating technique with a compressor increased gas production more

than three-fold. Water-drive gas reservoirs are not good candidates to install the heating

technique because of the high amount of energy needed to increase wellbore temperature.

Gas wells with low liquid ratio (1 to 8 bbls/MMcf) and liquid loading problems due to

condensations are good candidates to apply the heater technique. Currently the major

limitation to widespread application of this technique is the comparatively high operating

cost. The average cost to operate the well is $5,000/month. This compares to an average

operating cost of $1,200/month in offset wells (Pigott et al., 2002).

2.3.1.4 Mechanical

Gas lift has been used to improve tubing lifting capacity. Gas lift systems inject

high-pressure gas from the casing tubing annulus through valves into liquids in the tubing

to reduce their density and move them to the surface (Lea, Winkler, and Snyder, 2003).

Gas lift may be used to removed water continuously or intermittently. Gas lift

could be used in conjunction with plunger lift and surface liquid diverters to improve its

overall efficiency (Neves & Brimhall; 1989). Gas lift could be combined with a small

concentric string (siphon string), too (Lea, & Tigher; 1983).

The main disadvantage of the gas lift method solving liquid loading is that it

would not operate efficiently to the abandonment pressure of the well. The optimum

operational efficiency is obtained when the water-lift ratio is in the range from 1.5 to 3

Mscf/bbl of water lifted. The efficiency of the gas lift technique declines in low-

20
productivity gas wells producing in excess of 8 bwpd due to the large amount of gas

needed (Melton & Cook, 1964).

Hutlas & Granberry (1972) presented four gas wells where gas rate was increased

from 50% to more than 100% when a combined gas lift liquid-diverter system was

installed to solve liquid loading problems. The wells were located in north-western

Oklahoma and the Texas Panhandle in high-pressure fields at depths ranging from 5,100

to 8,600 ft.

Stephenson et al. (2000) presented successful installation of gas lift for

dewatering gas wells at the Box Church Field – a high water-cut gas reservoir located in

Texas. Soap sticks, swabbing, and coiled tubing/nitrogen had been used at the field try to

solve liquid loading, but these techniques provided only a short-term solution to the

problem. A 50% increase in the average gas rate of the field was reported after the

combined mechanism of gas-lift with compressor was installed in four high water-cut

(more than 200 bbl/MMscf) wells.

Gas lift had been used for dewatering gas wells down-dip increasing and

accelerating gas recovery in wells located up-dip in the same reservoir (Girardi et al,

2001; Aguilera et al 2002) using a co-production strategy (Arcaro & Bassiouni, 1987).

Some field tests have been done to use Coproduction of gas and water as a

secondary gas recovery technique for abandoned water-out wells with limited success

(Rogers, 1984; Randolph et al, 1991).

2.3.2 Bottom Liquid Removal

Pumps, plunger, swabbing, and gas injection using coiled tubing have been used

to remove liquid from the bottom of the well after the gas is flowing below the critical

rate.

21
2.3.2.1 Pumps

Pumping systems used to solve liquid loading in gas wells include: beam

pumping, progressive-cavity pumping, and jet pumping. The main advantage of pumping

is that they do not depend on the reservoir energy or on the gas velocity for liquid lifting

(Hutlas & Granberry, 1972).

Down-hole pumps do have application in gas wells producing high liquid rate-

over 30 bwdp (Lea & Tigher, 1983).

Beam pumping comprises a motor-driven surface system lifting sucker rods

within the tubing string to operate a downhole-reciprocating pump. The liquid is pumped

up the tubing and the gas is produced out the annulus (Libson & Henry, 1980).

Melton & Cook (1964) reported that beam units were the most efficient as well as

economical method of solving liquid loading problems in low-pressure shallow gas wells

producing between 12 and 15 bwpd on the Panhandle in the Hugton and Greenwood

fields.

Hutlas & Granberry (1972) presented a successful installation of beam units at the

Hugoton field, Kansas solving water-loading problems in gas wells. Gas rate increased

from 50% to more than 100% in four wells after the beam unit was installed.

Libson & Henry (1980) explained that production increased when beam units

were installed in low-gas rate wells (less than 40 Mscf/d) with liquid production between

10 to 40 bwpd at the intermediate Shelf area of southwest Texas, in Sutton County.

Henderson (1984) described the technical challenge of installing a beam pump

unit to solve liquid loading problems at 16,850 ft in the Pyote Gas Unit 14-1 well at the

Block 16 (Ellengurger) field located in Ward Co., Texas. The pump removed 70 bfpd,

increasing gas production at the well from 20 to 450 Mscfd.

22
Progressing-cavity pumping systems are based on a surface-driven rotating a rod

string which, in turn, drives a downhole rotor operating within an elastomeric stator (Lea,

Winkler & Snyder; 2003). Progressive Cavity pumps have been used extensively in the

United States for the dewatering of methane coaled-bed wells (Mills & Gaymard, 1996).

There are nearly one thousand methane pumps operating in coal basins across the

United States (predominately in the Black Warrior, Appalachian, San Juan and Raton

Basins) because of the pumps’ ability to adjust from high water rate, often encounter

during initial production, as well as low water rates experienced as the coal seams begin

to water out. Progressive Cavity pumps can lift water with high contents of coal fines,

sand particles, and some gaseous fluid (Klein, 1991).

Hebert (1989) discussed the technical limitation of rod pumps in dewatering coal-

bed wells.

A current jet pump system utilizes concentric tubing string for power fluid and

produced fluid in an open power fluid system. The gas is produced from the casing

annulus. The system allows near complete drawdown since the jet suction pressure is

claimed to be capable of being reduced to near the water vapor pressure at depth that is

usually lower than the casing sales pressure (Lea & Tighe, 1983).

2.3.2.2 Swabbing

Swabbing fluids from a well consists of lowering a swabbing tool down the

tubing and physically lifting the fluids to the surface. The objective is merely to lift the

liquids from the wellbore until the reservoir energy is able to overcome the remaining

hydrostatic head and flow on its own. Swabbing is a very costly procedure that must be

repeated every time the well loads up and with more frequency as the bottomhole

pressure declines. For this reason, swabbing is viewed as only a temporary solution to

23
liquid loading problems and should only be used during the initial stage of liquid loading

where the well will naturally flow for a long period of time. This method is also

applicable in cases where a well is loaded up with kill fluid following a workover or

when a well has loaded up because it was shut-in for an abnormal period of time (Neves

& Brimhal, 1989; Stephenson et al., 2000).

2.3.2.3 Plungers

The principle of the plunger is basically the use of a free piston acting as a

mechanical interface between the formation and the produced liquids, greatly increasing

the well’s lifting efficiency (Beauregard & Ferguson, 1982).

Operation of the system is initialized by closing in the flowline and allowing

formation gas to accumulate in the casing annulus through natural separation. The

annulus acts primarily as a reservoir for storage of this gas. After pressure builds up in

the casing to a certain value, the flowline is opened. The rapid transfer of gas from the

formation creates a high, instantaneous velocity that causes pressure drop across the

plunger and the liquid. The plunger then moves upward with all of the liquids in the

tubing above it (Beauregard & Ferguson, 1982). The gas stored in the tubing-casing

annulus expands, providing the energy required to lift the liquid. As the plunger

approaches the surface, the liquid is produced into the flowline. Additional gas

production is allowed after the plunger reaches the surface. After some time, the flowline

is closed, the buildup stage starts again, and the plunger falls to the bottom of the well,

starting a new cycle (Wiggins et al, 1999).

Beeson et al. (1956) developed empirical correlations for 2-in and 2 ½-in plungers

based on data from 145 wells at the Ventura field in California. The data correlated and

24
application charts are still used in the industry as feasibility criteria to select well

applying plunger lift.

Ferguson and Beauregard (1985) include some practical guidelines to the

selection of plunger lift.

Some static models for plunger lift installations have been proposed and are

widely accepted for design due to their simplicity (Wiggins et al, 1999).

Foss & Gaul (1965) made a force balance on the plunger to determine minimum

casinghead pressure to drive a liquid slug up to the surface. They also worked out the

volume of gas required in each cycle, and the minimum amount of time per cycle based

on estimates for plunger rise and fall velocities. They used an 85 well data set for some

parameters of the model.

Hacksma (1972) used the Foss & Gaul (1965) model to show how to calculate the

minimum gas-liquid ratio required for operation and the optimum gas-liquid ratio that

yields maximum production.

Abercrombie (1980) reworked the Foss & Gaul (1965) model, considering a

smaller plunger fall velocity in the gas.

Dynamic models have also been published to describe the phenomena of a

plunger life cycle. Each dynamic model made different assumptions, and different

experimental and field data were used to prove the validity of each one.

Lea (1982) presented a dynamic model that predicts, at each step, casinghead

pressure, plunger position, and plunger velocity until the slug surfaces. The results

indicated lower operating pressure and lower gas requirement than the static models.

25
White (1982) experimentally evaluated liquid fallback in a reduced scale

apparatus. He concluded that 10% of the initial liquid column fallback for each plunger

run. He included some recommendations to design a hybrid plunger-gas lift system.

Rosina (1983) developed a dynamic model similar to that of Lea (1982), but

taking into account liquid fallback. He also conducted experiments to verify the

prediction of his model.

Mower et al. (1985) conducted a laboratory investigation on gas slippage and

liquid fallback for commercial plungers. They proposed a modified Foss & Gaul (1965)

model incorporating these effects. The model was then adjusted to fit field data from four

wells.

Avery and Evans (1988) proposed a dynamic model for the entire plunger cycle,

incorporating the reservoir performance. They assumed that each cycle started as soon as

the plunger arrived at the bottom.

Marcano and Chacin (1992) presented another dynamic model for the full cycle.

Liquid fallback through plunger was considered according to Mower et al.’s (1985)

empirical data.

Hernandez et al. (1993) conducted experiments to evaluate liquid fallback and

plunger rise velocity.

Gasbarri and Wiggins presented a dynamic model including a reservoir model.

Their model incorporated frictional effect of the liquid slug and the expanding gas above

and below the plunger and considered separator and flowline effect.

Maggard et al. (2000) developed another dynamic model considering a transient

reservoir performance. They concluded that assuming a stabilized reservoir model is a

conservative assumption for plunger lift behavior.

26
Optimization of plunger has been presented based on experimental and simulator

studies. Baruzzi & Alhanti (1995) recommend no perfect seal plunger during buildup

because it obstructs the passage of liquid and gas above the plunger.

Wiggins et al. (1999) suggested that optimum production rates would be achieved

by allowing the well to produce as long as possible prior to shut in. Excessive gas

production periods, however, run the risk of killing the well by building a liquid slug that

is too long to be lifted by the remaining energy stored in the annulus.

Schwall (1989) reported gas production increases of 50 to 100% after plunger lift

installation on gas wells with gas-liquid ratio ranges from 3 Mscf/bbl to 20 Mscf/bbl, and

gas rate between 15 Mscfd and 54 Mscfd located in the South Burns Chapel Field in

northern West Virginia.

Brady & Morrow (1994) evaluated the performance of plunger lift for 130 low-

pressure, tight-sand gas wells located in Ochiltree County, Texas. They concluded that

the total daily production rate increase attributed to the plunger lift was nearly 70 Mscfd

per well, and an incremental 32 Bcf of gross gas reserves are directly attributable to

plunger lift installation.

Schneider and Mackey (2000) presented results in which initial gas production

increased 85% after the wells located in the Eumont gas play at New Mexico were

converted to plunger lift from beam pumps.

2.3.2.4 Downhole Gas Water Separation

Downhole Gas Water Separation (DGWS) are devices that separate gas from

water at the bottom of gas wells. The separated water is reinjected into a non-productive

interval, while the gas is produced to the surface (Rudlop & Miller, 2001).

27
Nichols & Marsh (1997) explained that several available commercial

configurations or devices have been reported to be suitable for re-injecting water into a

lower zone within a gas producing well:

• A conventional insert pump with a “bypass” sub

• A specially designed insert pump with displaces on the downstroke

• Progressive cavity pumps

• Electrical submersible pumps

Grubb and Duval (1992) presented a new water disposal tool called a “Seating

Nipple Bypass.” The bypass tool allows liquid to be lifted up the tubing in the usual way;

however, small drain holes permit the liquid to bypass down past the pump to a point in

the tubing string below the pump intake. A packer provides hydraulic isolation between

production and injection intervals. When the liquid head is sufficiently high, it will then

flow into the disposal zone. The bypass tool was tested in seven well in the Oklahoma

Panhandle and Southwest Kansas, some of which were temporarily abandoned before the

installation. A conventional beam-pumping unit lifted the water. The tool proved

successful in five wells. One well produced 348 Mscfd without water after the installation

and 300 Mscfd and 300 bwpd before the installation.

Klein & Thompson (1992) explained the design criteria and field installation

results for a closed-loop downhole injection system used in a water flooding oil well. The

pumping system consisted of a sucker rod driven progressing cavity pump installed

below the bottom packer. Water from the water source zone entered the pump through a

perforated sub in the tubing string above the pump and was pumped into the lower

injection zone. The pump was able to inject water at its maximum rate-180 bpd- without

28
any mechanical problems. They concluded that the system could be used for dewatering

gas wells.

Nichols & Marsh (1997) presented the results for the DGWS installation in a well

in central Alberta, Canada. A “bypass tool” with a conventional insert pump and gas

powered beam pumping unit was used. With the DGWS system operating, surface

production rates were 777 Mscfd gas and 195 bwpd; without the DGWS, production was

565 Mscfd gas and 440 bwpd. In this installation, wellbore diameter limited the pump

size and its flow capacity.

Rudolph and Miller (2001) reviewed 53 wells with various DGWS installations.

Gas production increased in 29 wells, decreased in 13 wells, and did not change in 11

wells. They concluded that DGWS could work in a low rate water producing gas well

with competent cement sheath, low pressure, and a high-injectivity disposal zone below

the producing interval.

Water rate at the surface was successfully cut from 32 bbls/d to zero while gas production

increased from 300 Mscfd to 400 Mscfd when a DGWS system (Reverse flow injection

pump) was installed in a well at Hugoton Field, Oklahoma (E&P Environment, 2001).

29
CHAPTER 3

MECHANISTIC COMPARISON OF WATER CONING IN OIL AND GAS


WELLS

Water coning in gas wells has been understood as a phenomenon similar to that in

oil well. In contrast to oil wells, relatively few studies have been reported on aspects of

water coning in gas wells.

Muskat (1982) believed that the physical mechanism of water coning in gas wells

is identical to that for oil wells; moreover, he said that water coning would cause less

serious difficulties for wells producing from gas zones than for wells producing oil.

Trimble and DeRose (1976) supported Muskat’s theory with water coning data

and simulation for Todhunters Lake Gas field. They calculated water-free production

rates using the Muskat-Wyckof (1935) model for oil wells in conjunction with the graph

presented by Arthurs (1944) for coning in homogeneous oil sand. The results were

compared with a field study with a commercial numerical simulator showing that the

rates calculated with the Muskat-Wyckof theory were 0.7 to 0.8 those of the coning

numerical model for a 1-year period.

The objective of this study is to compare water coning in gas-water and oil-water

systems. Analytical and numerical models are used to identify possible differences and

similarities between both systems.

3.1 Vertical Equilibrium

A hydrocarbon-water system is in vertical equilibrium when the pressure

drawdown around the wellbore is smaller than the pressure gradient generated by the

density contrast between the hydrocarbon and water at the hydrocarbon-water interface.

Equation 3.1 shows the pressure gradient for gas-water system.

30
∆p = 0.433(γ w − γ g )h g − w ………………………………………………(3.1)

Where ∆p is pressure gradient (psia), γw is water specific gravity, γg is gas specific

gravity, and hg-w is the vertical distance from the reference level to the gas-water

interface, normally from the bottom of the well’s completion to the gas/water contact (ft).

Vertical equilibrium concept is the base for critical rates calculations. Critical

rate, in gas-water systems, is defined as the maximum rate at which gas wells are

produced without production of water.

3.2 Analytical Comparison of Water Coning in Oil and Gas Wells before Water
Breakthrough

Two hydrocarbon systems, oil and gas, in vertical equilibrium with bottom water

are considered to compare water coning in oil and gas wells before breakthrough. The

two systems have the same reservoir properties and thickness, and are perforated at the

top of the producing zone.

well

rw= 0.5 ft

K= 100 md 20 ft
φ=0.2 Oil Gas
P=2000 psi 50 ft
µ= 1.0 cp 0.017 cp
T= 112 oF
ρ= 0.8 gr/cc 0.1 gr/cc

µw=0.56 cp water
ρw= 1.02 gr/cc

re= 1000 ft

Figure 3.1 Theoretical model used to compare analytically water coning in oil and
gas wells before breakthrough.

31
Figure 3.1 shows a sketch of the reservoir system including the properties and

dimensions. The mathematical calculations are included in Appendix A.

A pressure drawdown needed to generate the same static water cone below the

penetrations, and the fluid rate for each system was calculated. For the system of oil and

water and a cone height of 20 ft, a pressure drawdown equal to 2 psi is needed, and the

oil production rate is 6.7 stb/d. In the case of a gas-water system, for the same 20 ft

height of water cone 8 psi pressure drop is needed, and the gas production rate of 1.25

MMscfd.

From this first simple analysis it is evident that it is possible to have a stable water cone

of any given height in the two systems (oil-water and gas-water). For the same cone

height in vertical equilibrium, pressure drop in the gas-water system is four times greater

than the pressure drop in the oil-water system. There is a big difference in the fluids

production rate for gas-water and oil-water system. On the basis of British Thermal Units

(BTU), the energy content of one Mscf of natural gas is about 1/6 of the energy content

of one barrel of oil (Economides, 2001). For this example, the 1.25 MMscf are equivalent

to the BTU content of 208 barrels of oil. Therefore, for the same water cone height, it

would be economically possible to produce gas-water systems at the gas rate below

critical. However, in most cases it would not be not economically possible to produce oil-

water systems without water breakthrough.

3.3 Analytical Comparison of Water Coning in Oil and Gas Wells after Water
Breakthrough

The objective is to compare the shape of oil-water and gas-water interfaces at the

wellbore after water breakthrough. After the water breakthrough, there is a stratified

inflow of oil or gas with the water covering the bottom section of the well completion.

Again, two systems having the same reservoir properties and thickness are compared (oil-
32
water and gas-water). Both systems are totally penetrated. An equation describing

interface shape was derived using the assumptions of Muskat (1982). Figure 2 shows a

sketch of the theoretical model, and Appendix A gives the derivation and mathematical

computations.

In reality the resulting equations will not describe perfectly the inflow at the well.

However, they are useful to compare the coning phenomenon in oil-water and gas-water

systems.
well

oil / gas
h Pw
Pe

ye y=? water

r
r

Figure 3.2 Theoretical model used to compare analytically water coning in oil and
gas wells after breakthrough.

The resulting equations for the water coning analysis are:

For the oil-water system the interface height is described as,

h
y= …………………………………………………………………(3.1)
a 
 + 1
b 

Qo µ o Qw µ w
here a, and b are constants described as, a = b= .
2πφkh 2πφkh

a h − ye
= …….………………………………………………………………(3.2)
b ye

33
For the gas-water system the interface height is represented as,

hp
y= ………………………………………………………………(3.3)
[(a / b) + p ]
Qg µ g Qw µ w
here a, b, and p are calculated using: a = , b= , and
2πφkh 2πφkh

a [1 − ( y e / h)]
= * p e ………………………………………………………………(3.4)
b ( y e / h)

re 1  a  p + a / b 
ln =  p e − p − ln e  ………………………………………….(3.5)
r b b  p + a / b 

From Equation 3.1 it becomes obvious that when the well’s inflow of oil and water

is stratified so the upper and bottom sections of completion produce oil and water

respectively, under steady state flow conditions the interface between the two fluids is

constant and perpendicular to the wellbore because the parameter describing the interface

height are all constant and depends on the system geometry.

For the gas-water system, nevertheless, the interface height depends on the

geometry of the system, and the pressure distribution in the reservoir (Equation 3.3).

In order to demonstrate the model for gas-water systems describing the interface

between gas-water, one example was solved.

The system data are as follow: pe = 2000 psi re = 2000 ft rw = 0.4 ft

h = 50 ft ye = 40 ft µw = 0.498 cp Bw = 1.0

k = 100 md φ = 0.25 µg = 0.017 cp

The procedure is as follows:

1. Assuming a value for the pressure drawdown (300 psi).

2. Calculating the flowing bottom hole pressure ( p w = p e − ∆p = 2000 − 300 = 1700) ,

assuming that pw is constant along the wellbore.

34
3. Computing the water flow rate (Qw) using Darcy’s law equation (Kraft and

Hawkins, 1991):

0.00708khw ( p e − p w ) 0.00708 * 100 * 40 * (2000 − 1700)


Qw = = = 2000
µ w Bw ln(re / rw ) 0.498 * 1.0 * ln(2000 / 0.4)

4. Calculating a/b, using EquationA-16 in Appendix A:

a 1 − ( y e / h)
= pe =
[1 − (40 / 50)]* 2000 = 500 , which is constant for the system
b ( y e / h) (40 / 50)

and independent for the gas rate.

5. Finding Qg, from Equation A-15 in Appendix A:

a Qg µ g Q g * 0.017 * 5.615
= ⇒ 500 = Qg = 5.22 MMscf/d
b Qw µ w 2000 * 0.498

Note that WGR is constant for the system and depends only on the system geometry

(ye, h) and pressure drive (pe).

6. Computing 1/b, using Equation A-17 in Appendix A:

r 
ln e 
1
=  rw 
b   a   p e + ( a / b)  
( p e − p w ) −   ln  
  b   p w + ( a / b)  

 6000 
ln 
1  4 
= = 0.031
b   2000 + 500  
(2000 − 1700) − (500) ln  
  1700 + 500  

7. Assuming pressure values between pe and pw, radii r and the gas-water profile y are

calculated, using Equations A-14 and A-18 respectively in Appendix A. This is the

gas-water interface profile. The equation used to calculate pressure distribution in

the reservoir is:

35
re 1  a  p + a / b 
ln =  p e − p − ln e 
r b b  p + a / b 

6000   2000 + 500 


ln = 0.0312000 − p − 500 ln 
r   p + 500 

The equation used to calculate the gas-water interface profile (height) is:

hp 50 * p
y= ⇒ y=
[(a / b) + p ] [500 + p]
(Note that this pressure distribution does not depend on values of flow rate but only on

their ratio.)

Repeating the same procedure for the oil-water system:

a (h − y e ) (50 − 40)
From Equation A-22 in Appendix A: = = = 0.25
b ye 40

h 50
Using Equation A-26 in Appendix A: y = = = 40
 a  (0.25 + 1)
 + 1
b 

For the oil-water system y remains constant ( y = 40) and independent from radius.

Fluids Interface Height (y) vs radii (r)

40.2
Fluids Interface Height

40.0
39.8
39.6
39.4
(ft)

39.2
39.0
38.8
38.6
38.4
0 500 1000 1500 2000 2500
Radii (ft)

gas-water system oil-water system

Figure 3.3 Shape of the gas-water and oil-water contact for total perforation.

36
Figure 3.3 shows the resulting profiles of the fluid interface in gas-water and oil-

water systems. After breakthrough, the oil-water interface at the well’s completion is

horizontal, while the gas-water interface tends to cone into the water. For this example

the total length of the gas cone is 1.4 ft.

3.4 Numerical Simulation Comparison of Water Coning in Oil and Gas Wells
after Water Breakthrough

One numerical simulator model was built to confirm the previous finding about

the cone shape around the wellbore. Figure 3.4 shows the numerical model with its

properties. Table 3.1 shows fluids properties used, and Appendix B contains Eclipse data

deck for the models.

k= 10 md SGgas= 0.6
Well, rw= 3.3 in
φ=0.25 APIoil=
Pinitial=2300 psi T= 110 oF
Top: 5000 ft

100 layers Gas


of 0.5 ft thick 50 ft
or
Oil

9 layers 5 ft 600 ft
thick, and one
layer 550 ft
thick. Water (W)
5000 ft

Figure 3.4 Numerical model used for comparison of water coning in oil-water and
gas-water systems.

37
Table 3.1 Gas, water and oil properties used for the numerical simulator model

Gas Deviation Factor and Viscosity (Gas-water model)

Press Z Visc
100 0.989 0.0122
300 0.967 0.0124
500 0.947 0.0126
700 0.927 0.0129
900 0.908 0.0133
1100 0.891 0.0137
1300 0.876 0.0141
1500 0.863 0.0146
1700 0.853 0.0151
1900 0.845 0.0157
2100 0.840 0.0163
2300 0.837 0.0167
2500 0.837 0.0177
2700 0.839 0.0184
3200 0.844 0.0202

Gas and Water Relative Permeability (Gas-water model)


Sg Krg Pc
0.00 0.000 0.0
0.10 0.000 0.0
0.20 0.020 0.0
0.30 0.030 0.0
0.40 0.081 0.0
0.50 0.183 0.0
0.60 0.325 0.0
0.70 0.900 0.0

Sw Krw Pc
0.3 0.000 0.0
0.4 0.035 0.0
0.5 0.076 0.0
0.6 0.126 0.0
0.7 0.193 0.0
0.8 0.288 0.0
0.9 0.422 0.0
1.0 1.000 0.0

Oil and Water Relative Permeability (Oil-water model)


Sw Krw Krow Pcow
0.27 0.000 0.900 0
0.35 0.012 0.596 0
0.40 0.032 0.438 0
0.45 0.061 0.304 0
0.50 0.099 0.195 0
0.55 0.147 0.110 0
0.60 0.204 0.049 0
0.65 0.271 0.012 0
0.70 0.347 0.000 0

38
Following similar procedures used for the analytical comparison, again, two

systems having the same reservoir properties and thickness are compared (oil-water and

gas-water). Both systems are totally penetrated and produced at the same water rate. The

cone shape around the wellbore is investigated. Figures 3.5 and 3.6 show the results.

Irreducible water Irreducible water


Saturation Saturation

Swept Zone Swept Zone

Gas-Water Oil-Water
Figure 3.5 Numerical comparison of water coning in oil-water and gas-water systems
after 395 days of production.

Figure 3.5 depicts water saturation in the reservoir after 392 days of production

for gas-water and oil-water systems. The initial water-hydrocarbon contact was at 5050

ft. In both systems the cone is developed almost in the same shape and height.

Figure 3.6 shows a zoom view at the top of the cone for both systems. For the oil-

water system, the cone interface at the top is flat. For the gas-water system, however, the

39
cone interface is cone-down at the top. For this model the total length of the gas cone is

1.5 ft. One can see that the numerical model represents exactly the same behavior

predicted for the analytical model used previously.

Gas-Water System Oil-Water System

Figure 3.6 Zoom view around the wellbore to watch cone shape for the numerical
model after 395 days of production.

From comparison of water coning after breakthrough in gas-water and oil-water

systems, it is possible to conclude that in gas wells, water cone is generated in the same

way as in the oil-water system. The shape at the top of the cone, however, is different in

oil-water than in gas-water systems. For the oil-water system the top of the cone is flat.

For the gas-water system a small inverse gas cone is generated locally around the

40
completion. This inverse cone restricts water inflow to the completions. Also, the inverse

gas cone inhibits upward progress of the water cone.

3.5 Discussion About Water Coning in Oil-Water and Gas-water Systems

The physical analysis of water coning in oil-water and gas-water systems is the

same. In both systems, water coning is generated when the drawdown in the vicinity of

the well is higher then the gravitational gradient due to the density contrast between the

hydrocarbon and the water.

The density difference between gas and water is grater than the density difference

between oil and water by a factor of at least four (Muskat, 1982). Because of that, the

drawdown needed to generate coning in the gas-water system is at least four-time grater

than the one in oil-water system. Pressure distribution, however, is more concentrated

around the wellbore for gas wells that for oil wells (gas flow equations have pressure

square in them, but oil flow equations have liner pressure; inertial effect is important in

gas well, and negligible in oil wells). This property makes water coning greater in gas

wells than in oil wells.

Gas mobility is higher that water mobility. Oil mobility, however, is lower than

water mobility. This situation makes water coning more critical in oil-water system than

in gas-water systems.

Gas compressibility is higher than oil compressibility. Then, gas could expand

larger in the well vicinity than oil. Because of this expansion, gas takes over some extra

portion of the well-completion (the local reverse cone explained in the previous section)

restricting water inflow.

In short, there are factor increasing and decreasing water coning tendency in both

system. The fact that oil-water systems appear more propitious for water coning

41
development should not create the appearance that the phenomena is not important is gas-

water system.

42
CHAPTER 4

EFFECTS INCREASING BOTTOM WATER INFLOW TO GAS WELLS

In contrast to oil wells, relatively few studies have been reported on aspects of

mechanisms of water coning in gas wells. Kabir (1983) investigated water-coning

performance in gas wells in bottom-water drive reservoirs. He built a numerical simulator

model for a gas-water system and concluded that permeability and pay thickness are the

most important variables governing coning phenomenon. Other variables such as

penetration ratio, horizontal to vertical permeability, well spacing, producing rate, and the

impermeable shale barrier have very little influence on both the water-gas ratio response

and the ultimate recovery.

Beattle and Roberts (1996) studied water-coning behavior in naturally fractured

gas reservoirs using a simulator model. They concluded that coning is exacerbated by

large aquifer, high vertical to horizontal permeability, high production rate, and a small

vertical distance between perforations and the gas-water contact. Ultimate gas recovery,

however, was not significantly affected.

McMullan and Bassioni (2000), using a commercial numerical simulator, got

similar results to Kabir (1983) for the insensitivity of ultimate gas recovery with variation

of perforated interval and production rate. They demonstrated that a well in the bottom

water-drive gas reservoir would produce with a small water-gas ratio until nearly its

entire completion interval is surrounded by water.

The objective of this study is to identify and evaluate specific mechanisms

increasing water coning/production in gas wells. Analytical and numerical models are

43
used to identify the mechanisms. The mechanisms investigated are vertical permeability,

aquifer size, Non-Darcy flow effect, density of perforation, and flow behind casing.

4.1 Effect of Vertical Permeability

It is postulated here, in agreement with Beattle and Roberts (1996), that high

vertical permeability should generate early water production in gas reservoirs with

bottom water-drive. Vertical permeability accelerates water coning because high vertical

permeability would reduce the time needed for a water cone to stabilize.

A numerical reservoir model, shown in Figure 4.1, was adopted to evaluate the

effect of vertical permeability in gas wells. Reservoir and fluid properties used in the

model are shown on Figure 4.1 and Table 3.1, respectively. A sample data deck for the

Eclipse reservoir model is contained in Appendix C.

Well, rw = 3.3 in

φ= 25% Swir= 30% 2500 ft


Sgr= 20% S.G.gas=0.6
Pinitial= 2300 psia kr= 10 md

100 layers 30 ft
1 ft thick 100 ft

Gas

9 layers 10 ft,
and one layer 200 ft
110 ft thick
Water
5000 ft

Figure 4.1 Numerical reservoir model used to investigate mechanisms improving


water coning/production (vertical permeability and aquifer size).

Horizontal permeability is set at 10 md, and four different values of vertical

permeability, 1, 3, 5, and 7 md, were considered (Permeability anisotropy, kv/kh, equal to

44
0.1, 0.3, 0.5, and 0.7 respectively). The wells are produced at constant tubing head

pressure of 500 psia (maximum gas rate). The completion penetrates 30% of the gas zone

at the top. The results are shown in Figures 4.2a,b,c, and d.

Figure 4.2-a kv/kh = 0.1 Figure 4.2-b kv/kh = 0.3

Figure 4.2-c kv/kh = 0.5 Figure 4.2-d kv/kh = 0.7

Figure 4.2 Distribution of water saturation after 395 days of gas production.

45
Figure 4.2 depicts water saturation in the reservoir after 395 days of gas

productions for the four values of vertical permeability. The initial water-gas contact was

at 5100 ft. The top of the cone for kv/kh equal to 0.1, 0.3, 0.5, and 0.7 is at 5080 ft, 5038

ft, 5025 ft, and 5021 ft respectively after 760 days of production. For kv/kh equal to 0.1,

and 0.3 the water cone is still below the completion and there is no water production. In

short, Figure 4.2 shows that water coning increases with vertical permeability.

160

140

120
Water Rate (stb/d)

100

80

60

40

20

0
0 1000 2000 3000 4000 5000 6000 7000
Time (Days)

Kv / Kh = 0.1 Kv / Kh = 0.3 Kv / Kh = 0.5 Kv / Kh = 0.7

Figure 4.3 Water rate versus time for different values of permeability anisotropy.

Figure 4.3 shows water rate versus time for the four different values of vertical

permeability. Figure 4.3 shows that water breakthrough time and water rate increase with

permeability anisotropy. The shortest water breakthrough time and highest water rate is

for kv/kh equal to 0.7. The longest water breakthrough and lowest water rate time is for

kv/kh equal to 0.1.

46
From this study, one can say that vertical permeability increases water

coning/production in gas wells. The higher the vertical permeability is, the higher the

water coning/production of the well.

4.2 Aquifer Size Effects

Textbook models of water inflow for material balance computations assume that

the amount of water encroachment into the reservoir is related to the aquifer size (Craft &

Hawkins, 1991). (For example, van Everdinger and Hurst used the term B’ to represent

the volume of aquifer. Fetkovich’s model considers a factor called Wei defined as the

initial encroachable water in place at the initial pressure.)

Effect of aquifer size was investigated using the same numerical model used on

the previous section. Vertical and horizontal permeability are set at 10 and 1 md

respectively (kv/kh equal to 0.1). All parameters in the model were kept constant except

for the aquifer size. VAD is defined as the ratio of the aquifer pore volume to the gas pore

volume. VAD determines the amount of reservoir energy that can be provided by water

drive. The aquifer is represented by setting porosity to 10 (a highly fictitious value for

porosity), for the outermost gridblocks and the thickness of the lowermost gridblocks are

varied from 110 to 710 ft to adjust aquifer volume. VAD is varied from 346 to 1383. A

sample data deck for the Eclipse reservoir model is included in Appendix C. The results

are shown in Figures 4.4-a,b,c, and d.

Figure 4.4 depicts water saturation in the reservoir after 1124.8 days of gas

productions for the four values of VAD. The initial water-gas contact was at 5100 ft. The

top of the cone for VAD equal to 346, 519, 864, and 1383 is at 5046 ft, 5040 ft, 5034 ft,

and 5030 ft respectively; after 760 days of production. Figure 4.4, consequently, shows

that water coning increases with the aquifer size.

47
Figure 4.4-a VAD = 346 Figure 4.4-b VAD = 519

Figure 4.4-c VAD = 864 Figure 4.4-d VAD = 1383

Figure 4.4 Distribution of water saturation after 1124.8 days of gas production.

Figure 4.5 shows water rate versus time for the four different values of vertical

permeability. Figure 4.5 shows that water rate increase with aquifer size. Water

breakthrough time, however, is not affected by aquifer size.

48
160

140

120

Water Rate (stb/d) 100

80

60

40

20

0
0 1000 2000 3000 4000 5000 6000
Time (Days)

Vad = 346 Vad = 519 Vad = 864 Vad = 1383

Figure 4.5 Water rate versus time for different values of aquifer size.

Figures 4.3 and 4.5 show that vertical permeability is more important than aquifer

size in controlling the water breakthrough time. Both aquifer size and vertical

permeability, however, play an important role in increasing water rate.

From this study, one could conclude that aquifer size increases water

coning/production in gas wells without affecting water breakthrough time. The higher the

size of the aquifer is, the higher the water coning/production of the well.

4.3 Non-Darcy Flow Effects

Non-Darcy flow generates an extra pressure drop around the well bore that could

intensify water coning. Non-Darcy flow happens at high flow velocity, which is a

characteristic of gas converging near the well perforations.

The extra pressure drop is a kinetic energy component in the Forchheimer’s

formula (Lee & Wattenbarger, 1996),

dp
− = βρv 2 ……………..………….………..…………………..(4.1)
dL

49
The effect of Non-Darcy flow in water production was studied analytically for two cases

of well completion: complete penetration of the gas and water zones, and penetration of

the gas zone. In the second case the well perforated in only the gas zone. Figure 4.6

illustrates the completion schematic and the production system properties.

rw= 0.5 rw= 0.5 ft

K= 100 Ga K= 100 md
md P=2500 psi
P=2500
o
T= 120 F Gas
40 40 ft
Kh / Kv = Kh / Kv = 10

µw=0.56 cp
µw=0.56 cp ρw= 1.02 gr/cc
ρw= 1.02 gr/cc K= 100 md
K= 100 md 40 40 ft
Wate Bw= 1 0 rb/STB Water
Bw= 1.0 rb/STB

re= 2500 re= 2500 ft

Figure 4.6 Analytical model used to investigate the effect of Non-Darcy in water
production.

4.3.1 Analytical Model

The analytical model of the well inflow comprises the following components:

Gas inflow model (Beggs, H.D., 1984):

1.422Tµ g Zq g
Pe2 − Pw2 =
k g hg
[ln(r / r ) + S + Dq ]
e w g .………..……………………...(4.2)

where: S = S d + S dp + S pp …………………………….………………….(4.3)

and D = D r + D p …………………………………………………………(4.4)

50
Water inflow model (Beggs, H.D., 1984):

0.00708k w hw ( Pe − Pw )
qw = ……………………………………………..….(4.5)
µ w Bw [ln(re / rw ) + S ]

where: S = S d + S dp + S pp …………………..……………………………(4.6)

Skin factor representing mud filtrate invasion (Jones & Watts, 1971):

hg  (rd − rw )  k g 
Sd = 1 − 0.2  − 1 ln(rd / rw ) ………………………………...(4.7)
h per  h per  k d 

Skin factor representing perforation density (McLeod, 1983):

 hg  k k 
S dp = 
 Lpnp
[ ]
 ln(rdp / r p )  g − g  …….……………………………………...(4.8)
  k dp k d 
   

Skin factor due to partial penetration (Saidikowski, 1979):

 hg    hg kH  
S pp =  − 1 ln  − 2 …………………………………………….…(4.9)
 h per    rw kV  
    

Non-Darcy skin around the well (Beggs, H.D., 1984):

2.22 *10 −15 γ g k g β r


Dr = ………………..……………………………..(4.10)
µ g h g rw

2.33 *1010
βr = …………………….……..….……………………….(4.11)
k 1g.2

Non-Darcy skin in the crashed rock around the perforation tunnels (McLeod, 1983):

 β dp  k g h g γ g 
D p = 2.22 *10 −15  2 2   ……………………………………….…...(4.12)
 n p L p rp  µ g 
  

2.6 *10 10
β dp = ……………………………………………..…………(4.13)
k dp

Figure 4.7 shows a sketch for the skin component at the well for a single perforation.

51
Cement

Mud cake
Crashed zone

kdp

rdp
rp
kr

Lp

rw

kd

rd

Filtrate invasion
Casing
Figure 4.7 Skin components at the well for a single perforation for the analytical
model used to investigate Non-Darcy flow effect in water production.

Computation procedure with the analytical model was as follows.

1. Assume constant value for the pressure the drawdown at 100 psia, 300 psia,

500 psia, 1000 psia, and 1500 psia.

2. Calculate gas and water production rates for the initial condition using

Equations 4.2 and 4.5, respectively.

3. Compute the rates for water and gas for several intermediate steps of gas

recovery 10%, 20%, 30%, 40%, 50%, 60%, 70%, 80%, 90%, and 95%. (Note

that the fraction of initial gas zone invaded by water represents the gas

recovery factor.)

The above procedure was repeated for three different scenarios. The scenarios were:

without Non-Darcy and skin effects, including only skin effect, and including both skin

and Non-Darcy effects. The results of the study are shown in Figures 4.8 to 4.11.

52
1,600

Water-Gas Ratio (BLS/MMSCF)


1,400

1,200

1,000

800

600

400

200

0
0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1
Recovery Factor (%)

Draw-Down = 100 psi Draw-Down = 300 psi Draw-Down = 500 psi


Draw-Down = 1000 psi Draw-Down= 1500 psi

Figure 4.8 Water-Gas ratio versus gas recovery factor for total penetration of gas
column without skin and Non-Darcy effect.

Figure 4.8 demonstrates the “delayed” effect of water in a gas well completed in the

gas zone when Non-Darcy and skin are ignored. Not only does the problem occur after

80% of gas recovered but also Water-Gas ratio (WGR) is independent of pressure

drawdown and production rates.

1,600
Water-Gas Ratio (BLS/MMSCF)

1,400

1,200

1,000

800

600

400

200

0
0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1
Recovery Factor (%)

Draw-Down = 100 psi Draw-Down = 300 psi Draw-Down = 500 psi


Draw-Down = 1000 psi Draw-Down = 1500 psi

Figure 4.9 Water-Gas ratio versus gas recovery factor for total penetration of gas
column including mechanical skin only.

53
Figure 4.9 indicates that mechanical skin alone slightly increases WGR.

1,600
Water-Gas Ratio (BLS/MMSCF)

1,400

1,200

1,000

800

600

400

200

0
0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1
Recovery Factor (%)

Draw-Down = 100 psi Draw-Down = 300 psi Draw-Down = 500 psi


Draw-Down = 1000 psi Draw-Down = 1500 psi

Figure 4.10 Water-Gas ratio versus gas recovery factor for total penetration of gas and
water columns, skin and Non-Darcy effect included.

Figure 4.10 indicates that combined effects of skin and Non-Darcy flow would

strongly increase water production in gas wells. Also, WGR increases with increasing

pressure drawdown.

Figure 4.11 shows WGR histories for a gas well penetrating only the gas column.

Reducing well completion to the gas column does not change WGR development; the

WGR history is similar to that of complete penetration. Interestingly, although the

completion bottom is at gas-water contact, the production is practically water-free for

almost half of the recovery. This finding is in agreement with the analytical analysis of

gas-water interface and the inverse internal cone mechanism presented in previous

sections.

54
1,600

Water-Gas Ratio (BLS/MMSCF)


1,400

1,200

1,000

800

600

400

200

0
0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1
Recovery Factor (%)

Draw-Down = 100 psi Draw-Down = 300 psi Draw-Down = 500 psi


Draw-Down = 1000 psi Draw-Down = 1500 psi

Figure 4.11 Water-Gas ratio versus gas recovery factor for wells completed only
through total perforation of the gas column with combined effects of skin and Non-
Darcy.

From this study it is evident that:

• Non-Darcy and distributed mechanical skin increase water gas ratio (WGR) by

reducing gas production rate and increasing water inflow, and the two effects

accelerate water breakthrough to gas well.

• It does not make much difference how much of the well completion is covered by

water as long as the completion is in contact with water.

4.3.2 Numerical Model

The above observations regarding mechanical skin and Non-Darcy (N-D) effects

have been based on a simple analytical modeling. The analytical results are verified with

a commercial numerical simulator for the well-reservoir model shown in Figure 4.1. The

model’s characteristics are: The well totally perforates the gas zone. Mechanical skin is

set equal to five. Horizontal permeability is 10 md. Vertical permeability is 10% of the

55
horizontal (1 md). Frederick and Graves’ (1994) second correlation was used to calculate

N-D effect. The wells were run at constant gas rate of 10 MMscfd. Two scenarios were

considered: one without skin and N-D, and the other one including both (skin and N-D).

A sample data deck for IMEX reservoir model is included in Appendix C. Figures 4.12

and 4.13 show the results.

12

10
Gas Rate (MMscfd)

0
0 500 1000 1500 2000 2500
Time (Days)

Without Skin and N-D Including Skin and N-D

Figure 4.12 Gas rate versus time for the numerical model used to evaluate the effect of
Non-Darcy flow in water production.

Figure 4.12 shows that after 1071 day of production, the well (including skin and

N-D) cannot produce at 10 MMscfd. At this point water production affects gas rate. The

well without skin and N-D is able to produce at 10 MMscfd for 1420 days.

56
250
225
200
Water Rate (stb/d)
175
150
125
100
75
50
25
0
0 100 200 300 400 500 600 700 800 900 1000 1100
Time (Days)

Without Skin and N-D Including Skin and N-D

Figure 4.13 Water rate versus time for the numerical model used to evaluate the effect
of Non-Darcy flow in water production.

Figure 4.13 shows that water rate is always higher for the cases where skin and N-

D are included than when these two phenomenon are ignored. In short, skin and Non-

Darcy effect together increase water production in gas reservoirs with bottom water-

drive. These results are in general agreement with the outcomes from the analytical

model evaluated in the previous section.

4.4 Effect of Perforation Density

Perforations concentrate gas inflow around the well, increase flow velocity, and

further amplify the effect of Non-Darcy flow. The effect is examined here using the

modified analytical model utilized in section 4.3.1 (Figure 4.7). Similar calculation

procedure described on section 4.3.1 was used including skin and Non-Darcy effect. Two

different values of perforation density, four shoots per foot to 12 shoots per foot, were

57
employed. Behavior of the water-gas ratio was evaluated. The results are shown in Figure

4.14.

1,400
Water-Gas Ratio (BLS/MMSCF)

1,200

1,000

800

600

400

200

0
0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1
Recovery Factor (%)

Drawdown = 100 psi (4 spf) Drawdown = 500 psi (4 spf) Drawdown = 1000 psi
Drawdown = 100 psi (12 spf) Drawdown = 500 psi (12 spf) Drawdown = 1000 psi (12 spf)

Figure 4.14 Effect of perforation density on water-gas ratio for a well perforating in
the gas column, skin and Non-Darcy effect are included.

There is a 40 % reduction in water-gas ratio resulting from a three-fold increase in

perforation density. Figure 4.14 shows the effect of decreased pressure drawdown that

significantly reduces WGR. Thus, well perforations increases water production due to

Non-Darcy flow effect; the smaller the perforation density, the higher the water-gas ratio.

4.5 Effect of Flow behind Casing

It is postulated here that a leak in the cemented annulus of the well could increase

water coning in gas wells. Water rate and water breakthrough time with and without

leaking cement (cement channel) were evaluated.

Typically, cement channeling in wells would result from gas invasion to the

annulus after cementing. Hydrostatic pressure of cement slurry is reduced due to the

58
cement changing from liquid to solid. Once developed, the channel would provide a

conduit for water from gas-water contact to the perforations. Figure 4.15 shows the

cement-channeling concept. It is assumed that the channel has a single entrance at its end.

Cement
channel Skin damage
zone
Skin damage
zone

Gas Gas Gas

Cement
channel
Gas-Water
contact

Water Water Water

Figure 4.15-a A channel Figure 4.15-b The well starts Figure 4.15-c Water is
develops in the annulus during producing only gas. A water “sucked” into the channel and
cementing and before cone develops, and its top the well starts producing gas
perforating. The initial gas- reaches the channel. and water.
water contact is below the
channel bottom.

Figure 4.15 Cement channeling as a mechanism enhancing water production in gas


wells.

4.5.1 Cement Leak Model

The channeling effect was simulated by assigning a high vertical permeability

value to the first radial outside the well in the numerical simulator model. It is assumed

that fluids could only enter the channel at the channel end. A relationship between the

size of a channel and permeability in the first grid was developed. Figure 4.16 shows the

modeling concept.

59
casing

channel

First grid with


high vertical
well

Figure 4.16-a Well with a channel in the Figure 4.16-b Simulator’s first grid with high
cemented annulus. vertical permeability.

Figure 4.16 Modeling cement leak in numerical simulator.

The relationship between flow in the channel and the simulator’s first grid was

based on the same value of pressure gradient in both systems. A circular channel with a

single entrance at its end and laminar single-phase flow of water were assumed. Flow

equation for linear flow in both systems was used in the model.

The linear flow equation describing laminar flow through pipe is (Bourgoyne et

al, 1991):

∆p f µv
= ………………………………………………………………(4.15)
∆L 1500d ch2

17.16q
where: v = ……………………………………………………………(4.16)
d ch2

q d ch4
Thus, = 87.41 …………………………………………….……...(4.17)
 ∆p f  µ
 
 ∆L 
 

60
Darcy’s law for linear flow in the simulator’s first grid is (Amyx et al, 1960):

k v1 A1 ∆p
q = 0.001127 ………………………………………………………(4.18)
µ ∆L

π
A1 =
4 *144
(d 1
2
− d w2 ) ………………………………………………………….(4.19)

Including Eq. 4.19 in Eq. 4.18, then:

q k d 2 − d w2
= 6.15 *10 − 6 v1 1
( )
…………….……………………………….…(4.20)
 ∆p  µ
 
 ∆L 

where: kv1 = vertical permeability on the first grid around the wellbore, md

A1 = first grid’s area, in2

d1 = first grid’s diameter, in

dch = channel’s diameter, in

dw = well’s diameter, in

Equations 4.17 and 4.20 should be equal to represent the same behavior in both systems,

then:

87.41
d ch4
= 6.15 *10 16
(
k v1 d 12 − d w2 )
µ µ

d ch4
Thus, k v1 = 1.42 *10 7 …………………………..……………………(4.21)
(d 1
2
− d w2 )

From the numerical model: d w = 8 in d 1 = 10 in

For the purpose of this study, the author will call flow capacity the ratio of flow

rate to the pressure gradient expressed in barrels per day divided by pound per square

inch per foot [(bbl/day)/ (psi/ft)].

61
100,000,000.00

and First Grid Vertical Permeability


10,000,000.00
Flow Capacity [bbl/day]/[psi/ft]
1,000,000.00

100,000.00

10,000.00
[md]

1,000.00

100.00

10.00

1.00

0.10

0.01
0.01 0.1 1 10

Channel Diameter [in]

First Grid Vertical Permeability [md] Flow Capacity [bbl/day/psi]

Figure 4.17 Relationship between channel diameter and equivalent permeability in the
first grid for the leaking cement model.

Figure 4.17 shows the relationship between keq and dch, after the channel values

and well diameter are included in Eq. 4.21. Values of cement leak’s flow capacity using

Eq. 4.17 are also included in Figure 4.17. However, this flow capacity is over calculated

with this equation because the hydrostatic head pressure is not included. The flow

capacity values are included to have an idea about the daily water rate for any channel

size.

A channel with diameter equal to 1.3 inches was assumed. The flow area for this

channel size equals to 4.7% of the total annulus area for 8-inch casing in a 10-inch hole.

From Figure 4.17, the channel’s 1.3-inch diameter has equivalent permeability of

1,000,000 md and flow capacity of 110 [bbl/day]/[psi/ft]. Thus, in the simulator, vertical

permeability of the first grid was set equal to 1,000,000 md.

Three different scenarios, shown in Figure 4.18, were analyzed with the numerical

simulator to investigate water breakthrough: without a channel, channel along the entire

62
gas zone (100 ft), and a channel over 80% (80 ft) of the gas zone. Wells are produced at a

constant gas rate of 25 MMscfd.

kv = 10E+6 md
kv = 10E+6 md from 0 to 80 ft
50 ft 50 ft from 0 to 100 ft 50 ft kr = 0 md
kr = 100 md
kv = 10 md kr = 0 md from 50 to 80 ft
from 50 to 100 ft kv = 10E+6 md
100 ft 100 ft 100 ft from 81 to 85 ft
Gas-Water contact Gas-Water contact

kv = 10E+6 md Gas-Water contact


from 101 to 105 ft
300 ft 300 ft 300 ft

4.18-a No channel. 4.18-b Channel along the gas 4.18-c Channel in 80% of gas
zone (100 ft). zone (80 ft).

Figure 4.18 Values of radial and vertical permeability in the simulator’s first grid to
represent a channel in the cemented annulus.

The modeling concept is shown in Figure 4.18. Vertical permeability was set

equal to 1,000,000 md in the first grid throughout the channel’s length (100 ft or 80 ft).

Radial permeability in the first grid was set equal to zero from the bottom of the

completion (50 ft) to the bottom of channel assuring no radial entrance to the channel.

Also, vertical permeability was set equal to 1,000,000 md 5 ft below the channel end,

without changing radial permeability value, for both cases. Sample data deck for Eclipse

reservoir model is included in Appendix C.

This model only partially represents the situation shown in Figure 4.15 because,

in the numerical model, the pressure difference between the first and second grids is

small, as the simulator models an open hole completion. (For perforated completion, one

63
would expect a large difference between the first and second grids representing the

pressure drop due to the flow in perforations.) Thus, for open-hole completions we would

expect smaller effect of water breakthrough and water production rate than that in the

perforated completions. However, the simulation could give an idea about the

phenomenon shown in Figure 4.15.

4.5.1.1 Effect of Leak Size and Length

Results for the effect of leak length, from the simulation study, are plotted in

Figure 4.19.

160
Water Production Rate (stb/day)

140

120

100

80

60

40

20

0
0 100 200 300 400 500 600 700 800 900 1000
Time (days)

Without Channel Channel 80 ft long Channel 100 ft long

Figure 4.19 Effect of leak length: Behavior of water production rate with and without a
channel in the cemented annulus.

The results can be summarized as follows:

When the channel taps the water zone, water production starts from the first day

of production and increases rapidly until 40 bbl/day after 25 days of production. Then,

water rate tends to stabilize at the value between 50 and 60 bbl/day. Finally, after 625

days of production, the water rate increases exponentially. At this time, the water cone

enters the well completion.

64
For the scenario with the channel ending above the initial gas-water contact (80 ft

long), water production starts after 90 days of production and increases to 30 bbl/day

after 550 days. Next, the water rate tends to stabilize at 30 bbl/day. Finally the water rate

increases following an exponential trend after 700 days of production. (At this time the

water cone reaches the completion.)

Without a channel, water production starts after 625 days of production and

increases in an exponential trend.

Effect of channel size in performance of water production was investigated, too.

Channel diameters of 0.5-inch, 0.9-in, and 1.3-in were selected. The no-channel scenario

was included in the analysis. From Figure 4.17, 25,000 md, 250,000 md, and 1,000,000

md were the equivalent vertical permeability values for the channel diameter selected.

The two channel length-scenarios evaluated previously were considered. Figures 4.20 and

4.21 show the results for the channel in 80% of the gas zone and along the total gas zone,

respectively.

100
Water Production Rate (stb/day)

90
80
70
60
50
40
30
20
10
0
0 100 200 300 400 500 600 700 800 900 1000
Time (days)

Without Channel Channel 80 ft long, channel size: 0.5 in


Channel 80 ft long, channel size: 0.9 in Channel 80 ft long, channel size: 1.3 in

Figure 4.20 Effect of channel size: Behavior of water production rate for a channel in
the cemented annulus above the initial gas-water contact.

65
100

Water Production Rate (stb/day)


90
80
70
60
50
40
30
20
10
0
0 100 200 300 400 500 600 700 800 900 1000
Time (days)

Without Channel Channel 100 ft long, channel size: 0.5 in


Channel 100 ft long, channel size: 0.9 in Channel 100 ft long, channel size: 1.3 in

Figure 4.21 Effect of channel size: Behavior of water production rate for a channel in
the cemented annulus throughout the gas zone ending in the water zone.

Figures 4.20 and 4.21 show similar behavior of water production rates for

different channel sizes. The water rate increases, showing the same pattern described

previously. First, water rate increases linearly; next it stabilizes; and finally it increases

exponentially. However, the size of the channel controls the water rate. The smaller the

channel, the lower the water production rate. The water breakthrough time is not affected

by the channel size.

From this first study, one could make the following comments:

• A channel in the well cemented annulus reduces water breakthrough. This

reduction is a function of the length of the channel: the longer the channel,

the smaller the breakthrough time.

• Channel size controls the amount of water produced without affecting the

water breakthrough time. The smaller the channel size, the lower the water

production rate.

66
• Another interesting observation is that there is a particular pattern for

water production rate when a channel is considered. First, there is no water

production. Next, water production begins and water rate increases almost

linearly. This increment is more dramatic when the channel is originally

into the water zone. Then, there is stabilization of the water rate. Finally,

the water rate increases exponentially.

• The water rate pattern in the presence of a channel is explained as follows:

First, there is no water production, so single-phase gas flows throughout

the channel. Second, water breaks through when the top of the water-cone

reaches the bottom of the channel. Two-phase flow begins (gas and water)

to occur in the channel. Third, the water rate increases because the cone

continues its upward movement. However, an inverted gas cone is

generated at the bottom of the channel (as it was explained in Chapter 2),

so two-phase flow continues in the channel with water rate increasing and

gas rate decreasing. Four, water rate stabilizes. At this point the water

cone eliminates the local gas cone at the bottom of the channel, so single-

phase flow (water) occurs in the channel. Finally, the water rate increases

exponentially when the top of the water-cone reaches the completion.

• The last (exponential) increase of water production is identical in all cases

thus indicating the effect of water coning unrelated to the leak.

4.5.1.2 Diagnosis of Gas Well with Leaking Cement

Based on the results shown in the previous section, one procedure to identify a gas

well with leaking cement was developed:

67
i. Make a Cartesian plot of water production rate versus time and identify early

(prior to exponential) inflow of water;

ii. Analyze early water rate behavior after the breakthrough and before the

exponential increase;

iii. If you see an initial increase of water production followed by rate stabilization,

chances are the well has leaking cement;

iv. Confirm the diagnosis with cement evaluation logs;

v. Verify with completion/production engineers a possibility of early water due to

hydraulic fracturing or water injection wells;

vi. Verify the leak by history matching with the numerical simulator model described

above: Water breakthrough time with the channel length, and water rate with the

channel size and length;

vii. A graph similar to Figure 4.17 could be made for the specific well geometry

evaluating channel size.

68
CHAPTER 5

EFFECT OF NON-DARCY FLOW ON WELL PRODUCTIVITY IN TIGHT GAS


RESERVOIRS

Eight areas account for 81.7 % of the United States’ dry natural gas proved

reserves: Texas, Gulf of Mexico Federal Offshore, Wyoming, New Mexico, Oklahoma,

Colorado, Alaska, and Louisiana (EIA, 2001). These areas had 144,326 producing gas

wells in 1996, but only 366 wells (0.25%) produced more than 12.8 MMscfd (EIA,

2000).

Non-Darcy effect was identified in the previous chapter as a mechanism for

increasing water coning/production in gas reservoirs. Traditionally, the Non-Darcy (N-D)

flow effect in a gas reservoir has been associated only with high gas flow rates.

Moreover, all petroleum engineering’s publications claim that this phenomenon occurs

only near the wellbore and is negligible far away from the wellbore. As a result, the N-D

flow has not been considered in gas wells producing at rates below 10 MMscfd, or it has

been assigned only to the wellbore skin area.

Additional pressure drop generated by the N-D flow is associated with inertial

effects of the fluid flow in porous media (Kats et al., 1959). Forchheimer presented a

flow equation including the N-D flow effect as (Lee & Wattenbarger, 1996),

dp µ
− = v + 3.238 *10 −8 βρv 2 ………………………………………….(5.1)
dL k

where dp/dL= flowing pressure gradient; v= fluid velocity; µ = fluid viscosity; k=

formation permeability; ρv2= inertia flow term; and β= inertia coefficient.

69
In deriving an analytical model for β, many authors considered permeability,

porosity, and tortuosity the most important factors controlling β (Ergun & Orning, 1949;

Irmay, 1958; Bear, 1972; Scheidegger, 1974).

Empirical correlations (Janicek & Katz, 1955; Geertsman, 1974; Pascal et al,

1980; Jones, 1987; Liu et al, 1995; Thauvin & Mohanty, 1998) supported the analytical

models and included rock type as another important factor.

Also, liquid saturation was found to be another important factor affecting inertia

coefficient from lab experiments. β increases with water (immobile) saturation (Evan et

al, 1987; Lombard et al, 1999).

Experimental studies provided data needed for inclusion of liquid saturation in the

equation for inertia coefficient (Geertsman, 1974; Tiss & Evans, 1989).

Frederic and Graves (1994) presented three empirical correlations for a wide

range of permeability. In the actual wells, β can be calculated from the multi-flow rate

tests using Houper’s procedure (Lee & Wattenbarger, 1996).

The object of this study is to identify the effect of N-D in gas wells flowing at low

rates (below 10 MMscfd) and to qualify the effect of N-D on the cumulative gas

recovery.

5.1 Non-Darcy Flow Effect in Low-Rate Gas Wells

Table 5.1 shows data used to evaluate the effect of N-D on the well’s flowing

pressure using the analytical model of the N-D flow effect described in Appendix D.

Three different permeability values were used for the study, 1, 10, and 100 md. Six

porosity values were used, 1, 5, 10, 15, 20, and 25%. Eight values of gas rates were

included in the analysis, 0.1, 0.5, 1, 5, 10, 50, 100, and 1000 MMscfd.

70
Table 5.1 Data used for the analytical model

A = 17,424,000 ft2 T = 580 oF


CA = 31.62 Psc = 14.7 psia
rw = 0.3 ft Tsc = 60 oF
h = 50 ft Pwf = 2500 psia
M = 17.38 lb/lb-mol µ = 0.018978 cp
s=0 hper = 15 ft

Using equations D-4 and D-5, included in Appendix D, a and b were calculated

for the analytical model. F was calculated with equation D-8 in Appendix D. Figures 5.1

to 5.3 show graphs of F versus gas rates for the three permeability values.
F (Fraction of Pressure Drop Generated

1.0
0.9
0.8
by Non-Darcy Flow)

0.7
0.6
0.5
0.4
0.3
0.2
0.1
0.0
0.1 1 10 100 1000
Gas Rate (MMscf/D)

Poro= 1% Poro= 5% Poro= 10% Poro= 15%


Poro= 20% Poro= 25%

Figure 5.1 Fraction of pressure drop generated by N-D flow for a gas well flowing
from a reservoir with permeability 100 md.

Figure 5.1 shows the results for permeability of 100 md. When porosity is 1%, the

contribution to the total pressure drop generated by the inertial component is 50% for the

71
gas rate 6.0 MMscfd. For gas rates higher than 33 MMscfd (when porosity is 25%), the

N-D flow completely controls the total pressure drop.

1.0
F (Fraction of Pressure Drop generated

0.9
0.8
by Non-Darcy flow)

0.7
0.6
0.5
0.4
0.3
0.2
0.1
0.0
0.1 1 10 100 1000
Gas Rate (MMscf/D)

Poro= 1% Poro= 5% Poro= 10% Poro= 15%


Poro= 20% Poro= 25%

Figure 5.2 Fraction of pressure drop generated by N-D flow for a gas well flowing
from a reservoir with permeability 10 md.

Figure 5.2 shows the results for permeability of 10 md. Reducing permeability

from 100 md to 10 md significantly increases the contribution of the N-D flow to the total

pressure drop. N-D flow controls pressure-drop in the system for gas rates greater than

2.2 MMscfd when porosity is 1% and 11 MMscfd when porosity is 25%.

Figure 5.3 shows the results for permeability of 1 md. The inertial component

controls the pressure drop for gas rates higher than 0.7 MMscfd when porosity is 1% and

3.6 MMscfd for porosity 25%.

72
F (Fraction of Pressure Drop Generated
1.0
0.9
0.8

by Non-Darcy Flow)
0.7
0.6
0.5
0.4
0.3
0.2
0.1
0.0
0.1 1 10 100 1000
Gas Rate (MMscf/D)

Poro= 1% Poro= 5% Poro= 10% Poro= 15%


Poro= 20% Poro= 25%

Figure 5.3 Fraction of pressure drop generated by N-D flow for a gas well flowing
from a reservoir with permeability 1 md.

The results show that the N-D flow effect increases with decreasing porosity and

permeability. This observation is physically correct because lower porosity and

permeability somewhat increase flow velocity and the resulting inertial effect.

From this analytical study, one could conclude that not only gas rate, but rock

properties, permeability, and porosity control the contribution of N-D flow effect to the

total pressure drop in gas reservoirs. Even for the low-gas rate, the N-D effect is still

important for wells in low-porosity, low-permeability gas reservoirs. It is possible to have

a gas well flowing less than 1 MMscfd, with the pressure drawdown resulting entirely

from the N-D flow.

5.2 Field Data Analysis

To support the previous observation, multi-rate test field data from three wells,

described by Brar & Aziz (1978), were selected to calculate F. The data is shown in

Table 5.2.

73
Table 5.2 Rock properties and flow rate data for well A-6, A-7, and A-8 from Brar
& Aziz (1978)
Well Porosity Thickness kh Permeability a b q1 q2 q3 q4
Name (%) (ft) (md- (md) (psia2/(MMscfd)) (psia2/(MMscfd)2) (MMscfd) (MMscfd) (MMscfd) (MMscfd)
ft)
A-6 8.3 56 169 3 107,720 24,470 4.194 6.444 8.324 9.812
A-7 8 35 455 13 1,158,690 68790 8.584 9.879 12.867
A-8 67.5 454 2392 5.3 30,150 400 31.612 44.313 56.287 70.265

Using the a and b published values for each well, F was calculated again using

equation D-8 from Appendix D, and the results are shown in Figure 5.4. No attempt has

been made to revise the published values of a and b. The porosity value reported for Well

A-8 seems too high. Although Brar & Aziz (1978) did not explain the high porosity value

for Well A-8, the author believes the reservoir may comprise fractured chalk, or

diatomite.
F (Fraction of Pressure Drop Generated by

0.8

0.7

0.6
Non-Darcy Flow)

0.5

0.4

0.3

0.2

0.1

0.0
1 10 100
Gas Rate (MMscf/D)

Well-A6 Well-A7 Well-A8

Figure 5.4 Fraction of pressure drop generated by Non-Darcy flow for wells A-6, A-
7, and A-8; from Brar & Aziz (1978).

Figure 5.4 shows that N-D flow represents 48% of the total pressure drop when

well A-8 flows at 70.2 MMscfd from a reservoir with 67.5% porosity and permeability

5.3 md. N-D, however, represents 69% of the total pressure drop when well A-6 is
74
flowing at 9.8 MMscfd from a reservoir with 8.3% porosity and permeability 3 md. This

means that for one well flowing at a rate 7.1 times lower, the inertial effect contributes up

to an additional 44% to the total pressure drop. Moreover, Non-Darcy flow represents

37% of the total pressure drop when well A-7 flows at 9.8 MMscfd from a reservoir with

8% porosity and permeability 13 md, but N-D represents 69% of the total pressure drop

when well A-6 is flowing at 9.8 MMscfd from a reservoir with 8.3% porosity and

permeability 3 md. These two wells have similar porosity, and they flowed at almost the

same rate during the test, but N-D flow contributes less to the total pressure drop in well

A-7 that has higher permeability.

To evaluate actual field wells performance, additional multi-rate test data from

various publications (Brar & Aziz, 1978; Lee & Wattenbarger, 1996; Lee, 1982; Energy

Resources and Conservation Board, 1975) are included in Table 5.3 and Figure 5.5.

Figure 5.5 shows exactly the same trend as the analytical model.

Table 5.3 Flow rate and values of a and b for gas well with multi-flow tests.

Well Name a b q1 (MMscfd) q2 (MMscfd) q3 (MMscfd) q4 (MMscfd)


1 Well A-1 (Brar & 56.69 20.68 0.248 0.603 0.864 1.135
Aziz, 1978)
2 Well A-3 (Brar & 107.07 44.29 0.558 0.750 0.923 1.275
Aziz, 1978)
3 Well A-4 (Brar & 39.15 10.23 1.520 2.041 2.688 3.122
Aziz, 1978)
4 Well A-5 (Brar & 91.94 16.70 2.104 3.653 4.026 5.079
Aziz, 1978)
5 Well A-6 (Brar & 107.72 24.47 4.194 6.444 8.324 9.812
Aziz, 1978)
6 Well A-7 (Brar & 1158.69 68.79 8.584 9.879 12.867
Aziz, 1978)
7 Well A-8 (Brar & 30.15 0.40 31.612 44.313 56.287 70.265
Aziz, 1978)
8 Example 7.1 (Lee & 7.75x104 5.00x103 4.288 9.265 15.552 20.177
Wattenbarger, 1996)
9 Example 7.2 (Lee & 2.074x104 2.109x106 0.983 2.631 3.654 4.782
Wattenbarger, 1996)
10 Example 5.2 (Lee, 311700 17080 2.6 3.3 5.0 6.3
1982)
11 Example 5.3 (Lee, 128300 19500 4.5 5.6 6.85 10.8
1982)
12 Example 3.1 (ERCB, 0.0625 0.00084 2.73 3.97 4.44 5.50
1975)

75
0.8

Generated by Non-Darcy Flow)


F (Fraction of Pressure Drop
0.7

0.6

0.5

0.4

0.3

0.2

0.1

0.0
0.1 1 10 100
Gas Rate (MMscf/D)

Well-A6 Well-A7 Well-A8 Well-A5


Well-A4 Well-A3 Well-A1 Example 7.1
Example 7.2 Example 5.2 Example 5.3 Example 3.1

Figure 5.5 Fraction of pressure drop generated by Non-Darcy flow for gas wells –
field data.

5.3 Numerical Simulator Model

A commercial numerical simulator with global and local N-D flow component

was used to investigate Non-Darcy flow effect on gas recovery. The reservoir model has

26 radial grids and 110 vertical layers (Armenta, White, & Wojtanowicz, 2003) to assure

adequate resolution for the near-well coning simulation. Reservoir parameters are

constant throughout the model (porosity = 10%, permeability = 10 md, initial reservoir

pressure = 2300 psia). The gas-water relative permeability curves are for a water-wet

system reported from laboratory data (Cohen, 1989); Gas deviation factor (Dranchuck,

1974) and gas viscosity (Lee et al, 1966) were calculated using published correlations.

Capillary pressure was neglected (set to zero), and relative permeability hysteresis was

not considered (Table 5.4). Well performance was modeled using the Petalas and Aziz

(1997) mechanistic model correlations (Schlumberger, 1998). Inertial coefficient, β, was

calculated using Frederick and Grave’s (Computer Modelling Group Ltd, 2001) second

76
correlation (Equation 5.2). The well perforated 25% of the gas zone. The well is

produced at a constant tubing head pressure of 300 psia. Figure 5.6 shows a sketch of the

reservoir model. A sample data deck for IMEX reservoir model is contained in Appendix

E.

Well

φ= 10% Swir= 30% 2500 ft


Sgr= 20% S.G.gas=0.6
Pinitial= 2300 psia kr= 10 md

100 of 1 ft 25 ft
layers 100 ft

Gas

9 of 10 ft, and
one 710 ft 800 ft
layers
Water
5000 ft

Figure 5.6 Sketch illustrating the simulator model used to investigate N-D flow.

Table 5.4 Gas and water properties used for the numerical simulator model

Gas Deviation Factor and Viscosity Gas and Water Relative Permeability

Press Z Visc Sg Krg Pc


100 0.989 0.0122 0.00 0.000 0.0
300 0.967 0.0124 0.10 0.000 0.0
500 0.947 0.0126 0.20 0.020 0.0
700 0.927 0.0129 0.30 0.030 0.0
900 0.908 0.0133 0.40 0.081 0.0
1100 0.891 0.0137 0.50 0.183 0.0
1300 0.876 0.0141 0.60 0.325 0.0
1500 0.863 0.0146 0.70 0.900 0.0
1700 0.853 0.0151
1900 0.845 0.0157 Sw Krw Pc
2100 0.840 0.0163 0.3 0.000 0.0
2300 0.837 0.0167 0.4 0.035 0.0
2500 0.837 0.0177 0.5 0.076 0.0
2700 0.839 0.0184 0.6 0.126 0.0
3200 0.844 0.0202 0.7 0.193 0.0
0.8 0.288 0.0
0.9 0.422 0.0
1.0 1.000 0.0

77
2.11*1010
Frederick and Grave’s second correlation: β = ……..…………………(5.2)
(k g ) 1.55 (φS g ) 1.0

Where β= inertia coefficient; kg= reservoir effective permeability to gas; φ= porosity, and

Sg= gas saturation.

5.3.1 Volumetric Gas Reservoir

Initially, the global N-D effect was simulated for a volumetric gas reservoir.

Figures 5.7 and 5.8 are the forecast of gas rate and cumulative gas recovery versus time,

respectively.

18

16

14
Gas Rate (MMscf/d)

12

10

0
0 1000 2000 3000 4000 5000 6000 7000 8000 9000
Time (Days)

Without Non-Darcy Including Non-Darcy

Figure 5.7 Gas rate performance with and without N-D flow for a volumetric gas
reservoir.

Figure 5.7 shows that at early time the gas rate is higher when N-D is ignored.

After 1500 days, the situation reverses, and the gas rate becomes higher when N-D is

included. At later times, gas rate is almost the same for both cases. The well life is

slightly longer when N-D is included. This may result from N-D acting like a reservoir’s

78
choke restricting gas rate and delaying gas expansion. In other words, gas expansion

happens faster when N-D is ignored.

Figure 5.8 shows that the final recovery is not affected by the N-D. However,

production time is longer, as was explained previously, when N-D is considered.

90

80

70
Gas Recovery (%)

60

50

40

30

20

10

0
0 1000 2000 3000 4000 5000 6000 7000 8000 9000
Time (Days)

Without Non-Darcy Including Non-Darcy

Figure 5.8 Cumulative gas recovery performance with and without N-D flow for a
volumetric gas reservoir.
1
F (Fraction of Pressure Drop Generated by Non

0.9

0.8

0.7
Darcy Flow)

0.6

0.5

0.4

0.3

0.2

0.1

0
1 10 100
Gas Rate (MMscf/D)

Figure 5.9 Fraction of pressure drop generated by Non-Darcy flow for gas wells –
simulator model.

79
The highest contribution of the Non-Darcy effect to the total pressure drop is

43%. It happens at the beginning of the gas production when the gas rate is 10.2 MMscfd

(Figure 5.9).

5.3.2 Water Drive Gas Reservoir

A gas reservoir with bottom water drive was considered in the analysis. Aquifer

pore volume is 155 times greater than the gas pore volume. The analysis considered the

N-D effect applied at the wellbore (typical for most reservoir simulators), distributed

throughout the reservoir, and entirely disregarded. A sample data deck for IMEX

reservoir model is included in Appendix E.

16

14

12
Gas Rate (MMscf/D)

10

0
0 500 1000 1500 2000 2500 3000 3500 4000
Time (days)

Without N-D Setting N-D at the wellbore Including N-D through the reservoir

Figure 5.10 Gas rate performances with N-D (distributed in the reservoir and assigned
to the wellbore) and without N-D flow for a gas water-drive reservoir.

Figure 5.10 shows the gas rate forecast for the three cases. At early times, all

results are similar to the volumetric scenario. The well without N-D would produce for

3,663 days. The well with N-D distributed throughout the reservoir would stop producing

after 1,882 days because it loads up with water. The well with N-D at the wellbore would

80
produce for 3,952 days. Note that for the cases when N-D is ignored or set at the

wellbore, the gas rate pattern is exactly the same as for the volumetric gas reservoir.

When N-D is at work throughout the reservoir, early liquid loading occurs. In short,

setting N-D only at the wellbore would seriously overestimate well performance.

70

60

50
Gas Recovery (%)

40

30

20

10

0
0 500 1000 1500 2000 2500 3000 3500 4000
Time (Days)

Without N-D Setting N-D at the wellbore Including N-D throughout the reservoir

Figure 5.11 Gas recovery performances with N-D (distributed in the reservoir and
assigned to the wellbore) and without N-D flow for a gas water-drive reservoir.

Figure 5.11 shows gas recovery versus time. The final gas recovery is almost the

same (61%) when N-D is ignored or set at the wellbore. However, when N-D is included

throughout the reservoir, the recovery is significantly lower (42.9%), caused by early

liquid loading of the well. The recovery reduction is 42.2%.

Figure 5.12 shows water rate versus time. Water production is always higher

when N-D is ignored or set at the wellbore than when it is considered globally in the

reservoir. All three wells stopped production due to water loading. However, the well

with N-D distributed in the reservoir is killed early with a lower water rate.

81
200

180

160
Water Rate (stb/d) 140

120

100

80

60

40

20

0
0 1000 2000 3000 4000
Time (Days)

Without N-D Setting N-D at the wellbore Including N-D throughout the reservoir

Figure 5.12 Water rate performances with ND (distributed in the reservoir and
assigned to the wellbore) and without N-D flow for a gas water-drive reservoir.

To explain the global N-D effect on well liquid loading, behavior of the flowing

bottom hole pressure (FBHP) and pressure in the first grid of the simulator model

(pressure before the completion) at the top of well completion were analyzed.

1400
Bottom Hole Flowing Pressure (psia)

1200

1000

800

600

400

200

0
0 1000 2000 3000 4000
Time (Days)

Without N-D Setting N-D at the wellbore Including N-D throughout the reservoir

Figure 5.13 Flowing bottom hole pressure performances with N-D (distributed in the
reservoir and assigned to the wellbore) and without N-D flow.

82
Figure 5.13 shows that FBHP is always higher when N-D is ignored, which

makes physical sense. Also, FBHP is the same for N-D at the wellbore or distributed

throughout the reservoir. After 1,882 days, however, the well with global N-D stops

producing while the other wells continue with increasing flowing pressure due water

inflow.
Flowing Pressure at the Sandface at the Top

1800

1600

1400
of Completion (psia)

1200

1000

800

600

400

200

0
0 1000 2000 3000 4000
Time (Days)

Without N-D Setting N-D at the wellbore Including N-D throughout the reservoir

Figure 5.14 Pressure performances in the first simulator grid (before completion) with
ND (distributed in the reservoir and assigned to the wellbore) and without N-D flow.

Analysis of pressure in the first grid of the simulator model (Figure 5.14) explains

the reason for early termination of production in the gas well with global N-D. Pressure

in the first simulator grid is the pressure before the well completion on the reservoir side.

For the same completion length and gas flow rate, pressure at the first grid of the

simulator should always be lower when N-D is considered. For this example, when N-D

is considered globally, pressure at the first grid of the simulator is always lower than the

non N-D scenario. This is in good agreement with the physical principle explained

83
previously. On the other hand, when N-D is set at the wellbore, pressure at the first grid

of the simulator is always higher than the non N-D scenario. This is contrary to the

physical principle explained previously. In short, setting N-D at the wellbore makes the

reservoir gain pressure instead of losing it at the sandface.

2400

2200

2000
Pressure (psi)

1800

1600

1400

1200
0.01 0.1 1 10 100 1000 10000
Distance From the Wellbore (ft)

Without N-D Setting N-D at the wellbore Including N-D trough the reservoir

Figure 5.15 Pressure distribution on the radial direction at the lower completion layer
after 126 days of production (Wells produced at constant gas rate of 8.0 MMSCFD) with
ND (distributed in the reservoir and assigned to the wellbore) and without N-D flow.

Figure 5.15 shows the pressure distribution on the radial direction at the lower

completion layer after 126 days of constant gas rate (8.00 MMSCFD) when N-D is

considered globally, assigned only at the wellbore, and without considering N-D. The

effect of N-D extends 6 feet from the wellbore. The main effect, however, happens two

feet around the wellbore. Again, pressure distribution around the wellbore is higher when

N-D is assigned to the wellbore than the case when N-D is ignored showing the

erroneous physical behavior for this condition (N-D set at the wellbore). Pressure at 0.01

ft from the wellbore is 500 psi lower when N-D is considered throughout the reservoir

84
than when N-D is ignored. This extra pressure drop in the reservoir makes gas wells

extremely vulnerable to water loading reducing final gas recovery.

From the previous analysis, it is evident that setting N-D at the wellbore to

simulate gas wells’ performance does not properly represent the N-D flow physical

principle. N-D should be distributed throughout the reservoir.

5.4 Results and Discussion

The results of this study emphasize the important physical principle of

considering N-D globally–throughout the reservoir.

Not only gas rate but also porosity and permeability control N-D contribution to

the total pressure drop in gas wells. Contribution of the pressure drop generated by N-D

to the total pressure drop increases when gas rate is increased. Increasing gas rate

increases interstitial gas velocity and the inertial component associated. Reducing

porosity increases contribution of N-D to the total pressure drop. Reduction on porosity

reduces rock-space for the gas to flow increasing, again, gas interstitial velocity.

Reducing permeability increases contribution of N-D to the total pressure drop, also.

Reduction on permeability reduces gas flow ability. At the same gas rate, gas interstitial

velocity increases when permeability is reduced.

The well-accepted assumption in petroleum engineering that assigning N-D at the

wellbore represents this phenomenon is not precise. N-D should be considered globally

throughout the gas reservoir to really evaluate its effect on gas rate and gas recovery.

N-D effect could reduce gas recovery in water-drive gas reservoirs because it

makes the well more sensitive to water loading. Liquid saturation may also increase the

N-D effect (Geertsman, 1974; Evan et al., 1987; Tiss & Evans, 1989; Frederick &

85
Graves, 1994; Lombard et al., 1999). Thus, around the wellbore, the combined effect of

high water saturation due to water coning and N-D could negatively affect gas rate and

gas recovery.

Completion length plays a role on the N-D flow effect. There is no analytical

equation describing this interaction. Some authors (Dake, 1978; Golan, 1991)

recommend changing h for hper in the second terms of the right side of Equation D-3

(Appendix D) to include the partial penetration effect in the N-D component of this

equation. For the field data used in this research, the author could not include the

completion length effect in the analysis.

N-D effect significantly influences gas production performance in fractured well

(Fligelman et al., 1989; Rangel-German, and Samaniego, 2000; Umnuayponwiwat et al.,

2000). Flower et al. (2003) proved that gas rate increased 20% when N-D in the fracture

is reduced. Alvarez et al (2002) explained that N-D should be considered in pressure

transient analysis of hydraulic fractured gas wells. Ignoring N-D for the pressure analysis

resulted on miscalculation of formation permeability, fracture conductivity and length.

From this study it is possible to conclude as follows:

• The Non-Darcy flow effect is important in low-rate gas wells producing from

low-porosity, low-permeability gas reservoirs.

• Setting the N-D flow component at the wellbore does not make reservoir

simulators represent correctly the N-D flow effect in gas wells. N-D flow

should be considered globally to predict correctly the gas rate and recovery.

• Cumulative gas recovery could reduce up to 42.2% when N-D flow effect is

considered throughout the reservoir in gas reservoirs with bottom water drive.

86
CHAPTER 6

WELL COMPLETION LENGTH OPTIMIZATION IN GAS RESERVOIRS


WITH BOTTOM WATER

There is a dilemma in the petroleum industry about the completion length to solve

water production in gas wells. A normal practice is to make a short completion at the top

of the gas zone to delay water coning/production. This short completion, however,

reduces gas inflow and delays gas recovery. Recently, some researchers (McMullan &

Bassiouni, 2000; Armenta, White, and Wojtanowicz, 2003) have proposed that a long

completion should be used to increase gas rates and accelerate gas recovery. The previous

analysis, however, did not include the economic implications of completions length in

gas reservoir.

The objective of this study is to examine the factors that control the value of

water-drive gas wells and propose methods to analyze and optimize completion strategy.

Due to the size of the experimental matrix (20,736 results), one committee member (Dr.

Christopher D. White) helped the author building the statistical model and writing the

computer code to run the statistical model.

6.1 Problem Statement

The dependence of recovery on aquifer strength, reservoir properties and

completion properties is complex. Although water influx traps gas, it sustains reservoir

pressure; although limited completion lengths suppress coning, they lower well

productivity. These tradeoffs can be assessed using numerical simulation and discounting

to account for the desirability of higher gas rates.

87
6.2 Study Approach

A base model for a single well is specified. Many of the properties of this model

are varied over physically reasonable ranges to determine the ranges of relevant reservoir

responses including ultimate cumulative gas production, maximum gas rate, and

discounted net revenue. The responses are examined using analysis of variance, response

surface models, and optimization.

6.2.1 Reservoir Simulation Model

Numerical reservoir simulators can predict the behavior of complex reservoir-well

systems even if the governing partial differential equations are nonlinear. The same

model explained in section 5.3 was used for the study. The model chosen for this study

used 26 cylinders in the radial direction by 110 layers in the vertical direction (McMullan

& Bassiouni, 2000), providing adequate resolution of near-well coning behavior. The

radius of the gas zone is 2,500 ft, and its thickness is 100 ft. The gas zone has 100 grids

in the vertical direction (one foot per grid). The radius of the water zone is 5,000 ft, and

its thickness is varied from 110 to 1410 ft. The water zone has 10 grids in the vertical

direction. Nine of them have a thickness of 10 ft and the bottom grid is varied to

represent the aquifer. The aquifer is represented by setting porosity to one for the

outermost gridblocks and the thickness of the lowermost gridblocks are varied from 110

to 1410 ft to adjust aquifer volume. The gas-water relative permeability curves are for a

water-wet system (Table 5.4) reported from laboratory data (Cohen, 1989). The gas

deviation factor (Dranchuck et al., 1974) and gas viscosity (Lee et al., 1966) were

calculated using published correlations (Table 5.4). Capillary pressure is neglected (set to

zero), and relative permeability hysteresis is not considered. The well performance was

modeled using the Petalas and Aziz (1997) mechanistic model correlations

88
(Schlumberger, 1998). Appendix F includes a sample data deck for the Eclipse reservoir

model. Reservoir properties and economic parameter are the factors varied for the study.

6.2.1.1 Factors Considered

Factors are the parameters that are varied. Five reservoir parameters (initial

pressure, horizontal permeability, permeability anisotropy, aquifer size, and completion

length) and three economic factors (gas price, water disposal cost, and discount rate) are

selected for consideration; each factor is assigned a plausible range. Table 6.1 shows the

factors and the range values for each one.

Table 6.1 Factor descriptions.


# Levels

Levels

Factor Type Symbol Description Units 1 2 3 4


pi Initial Pressure psia 3 1500 2300 3000
Reservoir kh Horizontal Permeability md 3 1 10 100
variables
VAD Aquifer Size ~ 4 100 400 800 1500
kzD Anisotropy Ration ~ 4 0.1 0.3 0.5 1
Cg Gas price $/Mscf 3 1 3.5 6
Economic
variables Cw Water cost $/bbl 3 0.5 1.25 2
d Discount rate annual 4 0 0.06 0.12 0.18
Controllable hpD Completion Fraction ~ 4 0.2 0.5 0.8 1

Factors can be classified by our knowledge and our ability to change them.

Controllable factors can be varied by process implementers. Observable factors can be

measured relatively accurately, but cannot be controlled. Uncertain factors can neither be

measured accurately nor controlled (White & Royer, 2003). For this study, there are four

uncontrollable, uncertain reservoir parameters. Initial pressure (pi) affects the original

gas in place and the absolute open flow potential of the well (Lee & Wattenbarger, 1996);

it has a less important effect on density contrast. Horizontal permeability (kh) affects flow

potential and influences coning behavior by altering the near-well pressure distribution

89
(Kabir, 1983). Permeability anisotropy (kzD = kz/kh) affects coning and crossflow

behavior Battle & Roberts, 1996), and aquifer size (VAD = W/G) determines the amount

of reservoir energy that can be provided by water drive.

There are three economic parameters. Gas price (Cg) and water disposal cost (Cw)

are used to compute the revenues and costs associated directly with production. No

capital costs or other operating costs are considered in this analysis. The discount rate (d)

is used to compute the present value of the gas production less the water disposal costs.

The economic parameters may be difficult to predict, especially gas price. Therefore, it is

reasonable to consider them uncertain and uncontrollable.

The only controllable factor is the completion length (hpD = hp/h). Completion

length should be chosen to minimize water production with acceptable reductions in flow

potential. The completion is assumed to occur over a continuous interval beginning at the

top of the reservoir. The completion length is optimized over the ranges of the uncertain

and/or uncontrollable factors.

6.2.1.2 Responses Considered

Decisions are based on responses obtained by measurement or modeling.

Reservoir studies examine responses that affect project values, e.g., time of water

breakthrough, cumulative recovery (White & Royer, 2003). Three responses were

examined in this study. The ultimate cumulative gas production (GpU) is the total

undiscounted value of a gas stream, whereas the peak rate (qg,max) is positively correlated

to the discounted value. Discounted cash flow (N) measures the net present value of the

production stream. The net present value ignores investments and all operating costs

except for water handling.

90
6.2.2 Statistical Methods

6.2.2.1 Experimental Design

Experimental design methods have found broad application in many disciplines.

In fact, we may view experimentation as part of the scientific process and as one of the

ways to learn about how systems or process work. Generally, we learn through a series of

activities in which we make conjecture about a process, perform experiments to generate

data from the process, and then use the information from the experiment to establish new

conjectures, which lead to new experiments, and so on (Montgomery, 1997).

The purpose of experimental design is to select experiments to provide

unambiguous, accurate estimates of factor effects with a reasonable number of

experiments. In the context of this study, an “experiment” is a numerical simulation. This

correspondence has been widely used, although there are relevant differences between

physical experiments (with nonrepeatable errors) and numerical simulations (Sacks et al.,

1989).

Because the simulations in this study are relatively inexpensive, a full multilevel

factorial is used (Table 6.1). For the five reservoir and completion parameters, this design

requires 576 simulations. The three economic factors increase the number of results for N

36-fold, to 20,736.

6.2.2.2 Statistical Analyses

Although the number of factors is moderately large (8) and the number of

economic responses to be considered is very large (20,736), this amount of data can be

manipulated using public-domain statistical program ( R ) and commercial spreadsheet

(Microsoft excel) software.

91
6.2.2.3 Linear Regression Models

Regression analysis is a statistical technique for investigating and modeling the

relationship between variables (Montgomery & Peck, 1982). The first step in the

statistical analysis of the responses was to formulate a linear model without interaction

among them. This linear model is described by the equation:

r
y = β 0 + ∑ β i xi ……………………………………………………(6.1)
i =1

Where there are r=8 factors xi with coefficients βI; β0 is the intercept. This

equation is often called a “response surface model” (RSM), or simply a “response

model,” in the context of experimental design. This equation (Eqn. 6.1) was used as the

basis for analysis of variance.

Models with interactions are appropriate when the importance of a factor varies

with the values of other factors (Myers & Montgomery, 2002); for example, the

importance of aquifer size commonly depends on the permeability (White & Royer,

2003). A linear regression model with interaction was developed for the responses. The

interaction terms in a linear model have the form βijxixj (Eqn. 6.1) where βij is the

interaction coefficient between two factors, and xi, xj are factors. The coefficients of linear

models are commonly computed using linear least squares method. The last-squares

criterion is a minimization of the sum of the squared differences between the observed

responses, and the predicted responses for each fixed value of the factor (Jensen et al.,

2000).

Two additional complications were encountered when the linear model with

interactions was built. First, the response variance was not uniform. For example, a

subsample of large aquifer will have a larger volume variance than a subsample of

92
smaller aquifer. Such heteroscedacity was eliminated with a variance-stabilizing Box-

Cox transform (Box & Cox, 1964). Second, the responses were not linear with respect to

the factors (or independent variables). This tended to increase estimation error, and could

partly treated using a Box-Tidwell transform on each of the independent variables (Box

& Tidwell, 1962). The resulting form (for a first-order model in the transformed

parameters) is

r
y a = β 0 '+ ∑ β i ' x ib ………………………………………..(6.2)
i =1

Where a is the Box-Cox power and the bi are the Box-Tidwell powers for each factor.

One must have a large number of experiments to estimate these parameters accurately.

The Box-Cox and Box-Tidwell transforms create a more accurate model that better

conforms to the assumptions of least-squares estimates. In general, untransformed

equations are more useful for discussion and transformed equations are better for

modeling.

6.2.2.4 Analysis of Variance

Analysis of variance (ANOVA) was used to discern which factors are

contributing to the variability of a response. The idea of an analysis of variance is to

express a measure of the total variation of a set of data as a sum of terms, which can be

attributed to specific source, or cause, of variation. ANOVA is an excellent procedure to

use to screen variables and is a standard method for analysis of factorial designs (Myers

& Montgomery, 2002).

6.2.2.5 Monte Carlo Simulation

Monte Carlo is a powerful numerical technique for using and characterizing

random variables in computer programs. If we know the cumulative distribution function

93
of the variables, the method enables us to examine the effects of randomness upon the

predicted outcome of numerical models (Jensen et al., 2000). Monte Carlo simulation

(MCS) is simply drawing randomly from the distribution functions for input functions to

estimate an output via a transfer function; it has been widely used in reservoir simulation

(Damsleth et. al., 1992). Although MCS is simple to implement, it is burdensomely

expensive when the transfer function is difficult to evaluate, which is the case for

reservoir simulations. (Typical MCS samples are much large than the 576-point

simulation model sample in this study). Therefore, engineers may use a response surface

model as a proxy for the reservoir simulation when performing MCS (Damsleth et. al.,

1992; White et. al., 2001).

6.2.3 Optimization

Optimization maximizes or minimizes an objective function subject to constraints.

Usually, the factors not being optimized are known (or specified) so that the optimization

can be carried out using standard gradient methods (Dejean & Blanc, 1999; Manceau et.

al, 2001). If uncontrollable factors are uncertain, other approaches can be used to

optimize, including seeking the maximum expected value of the objective function over

the distributions of uncertain factors (Aanonsen et. al., 1995; White & Royer, 2003).

Because the objective function is nonlinear, the optimum for the expected value of the

factors does not optimize the expected value of the objective function.

6.2.4 Workflow

The set of simulation models is specified using a factorial design. Simulation

models are constructed for all design points, making frequent use of “INCLUDE”

capabilities in simulator. A consistent naming convention ensures that all simulation runs

can be uniquely associated with a particular design point (or factor combination). All

94
simulation results can then be parsed to extract production profiles and other relevant

responses (Roman, 1999). The responses are scaled and formatted in the spreadsheet

before being exported to a statistics package (R Core Team, 2000). Response models can

be fit, significant terms identified, and appropriate transforms can be applied. The

resulting linear models are then exported back to the spreadsheet for Monte Carlo

simulation and optimization. Figure 6.1 shows a flow diagram for the workflow used for

this study.

576 RSM files

Result files
Calculations:
•Fit response models
•Identify significant terms
•Apply transforms

Spreadsheet
Spreadsheet
(Excel)
(Excel)
Reservoir Simulator
(Eclipse)
Production profile Calculations:
Calculations: •Monte Carlo Simulation
•Net Present Value Statistics Package •Optimization
•Cumulative recovery (R)

Simulator Models
20,736 results

Figure 6.1 Flow diagram for the workflow used for the study.

95
6.3 Results and Discussion

6.3.1 Linear Models

Equations 6.3, 6.4, and 6.5 show the linear regression models for the ultimate cumulative

gas production (GpU), peak gas rate (qg,max), and discounted cash flow (N) without

interactions.

G pu = −8.98 E 6 + 2.03E 4 * pi + 1.15 E 3 * h pD + 1.04 E 5 * k h − 6.28 E 3 * V AD − 6.45 E 4 * k zD ………………………...(6.3)

q g , max = −12750 + 8.425 * pi + 48.94 * h pD + 1670 * k h + 0.0269 * V AD + 0.6023 * k zD …………………………….(6.4)

N = −83.54 + 0.0449 * pi + 0.1049 * h pD + 0.5265 * k h − 0.0112 * V AD − 0.157 * k zD + 0.2305 * C g − 0.867 * Cw − 0.0322 * d ...(6.5)

GpU increases with initial reservoir pressure, length of completion and horizontal

permeability. GpU decreases with aquifer size and permeability anisotropy (Eqn. 6.3).

The maximum rate qg,max increases with the five reservoir factors included for the

study (Eqn. 6.4).

Finally, N increases with initial reservoir pressure, length of completion,

horizontal permeability, and gas price. N decreases with aquifer size, permeability

anisotropy, water disposal cost, and discount rate (Eqn. 6.5).

The precision of the liner models without interactions is poor; R2 values average

around 0.5 or 0.6. This is not accurate enough for optimization, and improved models

with interactions among the factors are needed.

A more accurate response model is needed to understand response variability and

to optimize. An accurate model for net present value is built by (1) applying a Box-Cox

transform to N, (2) computing maximum likelihood estimates of the Box-Tidwell

transforms (Box & Cox, 1964; Box & Tidwell, 1962), (3) scaling all factors to cover a

unit range, and (4) fitting a model with two-term interactions and quadratic terms.

96
Eqns. 6.6 to 6.12 (Table 6.2) show the relationship among the transformed to

untransformed factors where the superscript t denotes the transformed, scaled factor

values.

pi0.7013 − 168.90
pit = ………………………………………………………(6.6)
105.7

k h−0.3362 − 0.2125
k ht = ………………………………………………………(6.7)
0.787

0.024
k zD − 1.0585
t
k zD = ………………………………………………………(6.8)
0.062

−0.519
VAD − 0.0224
t
VAD = …………………………………………………….(6.9)
0.069

Cg − 1
C gt = ………………………………………………………………(6.10)
5

Cw − 0.5
Cwt = ……………………………………………………………(6.11)
1.5

d 0.5135
dt = ………………………………………………………………(6.12)
0.415

Table 6.2 Factor descriptions including Box-Tidwell power coefficients


# Levels

Levels Box-
Tidwell
Factor Type Symbol Description Units 1 2 3 4 Power

pi Initial Pressure psia 3 1500 2300 3000 0.70


Reservoir kh Horizontal Permeability md 3 1 10 100 -0.34
variables
VAD Aquifer Size ~ 4 100 400 800 1500 -0.52
kzD Anisotropy Ration ~ 4 0.1 0.3 0.5 1 0.02
Cg Gas price $/Mscf 3 1 3.5 6 1.00
Economic
variables Cw Water cost $/bbl 3 0.5 1.25 2 1.00
d Discount rate annual 4 0 0.06 0.12 0.18 0.51
Controllable hpD Completion Fraction ~ 4 0.2 0.5 0.8 1 1.39

97
Equation 6.13 shows the transformed (with Box-Cox and Box-Tidwell

transforms) linear regression model with interactions.

N t = 1.820 + 0.463 * p it − 0.07 * k ht − 0.072 * k zD


t
+ 0.105 *V AD
t
+ 1.25 * C gt − 0.018 * C wt − 0.023 * d t − ...
− 0.065 * h tpD − 0.159( p it ) 2 − 0.184(k ht ) 2 − 0.03(k zD
t
) 2 − 0.006(V AD
t
) 2 − 0.471(C gt ) 2 + 0.0001(C wt ) 2 − ...
− 0.095(d t ) 2 − 0.02(h tpD ) 2 + 0.142( p it * k ht ) + 0.02( p it * k zD
t
) + 0.016( p it *V AD
t
) + 0.14( p it * C gt ) − ...
− 0.005( p it + C wt ) − 0.132( p it * d t ) + 0.051( p it * h tpD ) − 0.127(k ht * k zD
t
) − 0.025(k ht *V AD
t
) − ...
− 0.188(k ht * C gt ) + 0.012(k ht * C wt ) − 0.351(k ht * d t ) + 0.101(k ht * h tpD ) + 0.087(k zD
t t
*V AD ) − ...
− 0.024(k zD
t
* C gt ) − 0.007(k zD
t
* C wt ) + 0.054(k zD
t
* d t ) − 0.015(k zD
t
* h tpD ) + 0.014(V AD
t
* C gt ) + ...
+ 0.01(V AD
t
* C wt ) − 0.106(V AD
t
* d t ) − 0.01(V AD
t
* h tpD ) + 0.013(C gt * C wt ) − 0.12(C gt * d t ) + ...
+ 0.032(C gt * h tpD ) + 0.007(C wt * d t ) − 0.006(C wt * h tpD ) + 0.138(d t * h tpD )............................................................(6.13)

Due to the complexity of the model shown on Eqn. 6.13 (44 terms), it is difficult

to discern the relationship between N and each one of the factors directly, as it was done

for the model without interactions.

The Box-Cox transform stabilizes the variance of the response and makes the

response more nearly normally distributed (Box & Cox, 1964). The Box-Tidwell

transforms maximize the linear correlations between each factor and the response

independently (table 6.2). Box-Tidwell exponents greater than one amplify the effect of

the factor, whereas values between zero and one damp the effect. A power near zero (e.g.,

for anisotropy ratio) should be set to zero and the logarithmic transform used (Box &

Tidwell, 1962). Values less than zero imply a reciprocal relation between the factor and

the response.

The linear model with interactions is quite accurate; R2 > 0.98.

6.3.2 Sensitivities (ANOVA)

Table 6.3 shows the results for the analysis of variance of the linear model with

out interactions (GpU, qg,max, and N ). The importance of a factor is related to the absolute

98
value of its effect. The effect is the change in the response across the range of the factor,

averaged across all levels of other factors.

Table 6.3 Linear sensitivity estimates for models without factors interactions.

Effects of factors across entire range.


Factor

GpU qg,max N
S.C. or Significance Codes
BCF S.C. MMCF/day S.C. MM$ S.C. (ANOVA)
pi 30.49 *** 12.64 *** 0.399 ***
kh 10.33 *** 16.53 *** 0.353 *** Pr(|t|)> Pr(|t|)<= Symbol
kzD -5.81 *** 0.05 -0.101 *** 0 0.001 ***
VAD -8.80 *** 0.04 *** -0.074 *** 0.001 0.01 **
Cg 0.713 *** 0.01 0.05 *
Cw -0.009 ** 0.05 0.1 o
d -0.330 *** 0.1 1 blank
hpD -0.09 3.92 *** 0.070 ***

For cumulative gas production, all effects are highly significant except for

completion length, which has a relatively small effect. This weak effect implies that

varying the completion interval has little effect on cumulative production. For maximum

gas rate, all factors have significant effects except for permeability anisotropy. For net

present value, all factors are significant. The effects of gas price, initial pressure,

horizontal permeability, and discount rate dominate other factors; water disposal cost has

a relatively small effect. All effects were computed over the ranges given in table 6.1.

Table 6.4 shows the results for the analysis of variance of the response model

with interactions. The transformed linear model has a large number of terms. ANOVA

shows that 42 of the 44 terms are retained at the 90% level of significance (Eqn. 6.13).

This is a relatively complex response surface. Commercial spreadsheet (Microsoft excel)

was used to evaluate the model.

99
Table 6.4 Transformed, scaled model for the Box-Cox transform of net present value.

Coefficients for Transformed, Scaled Factors


Regress Residual Factor Coeff. Std. Err. T S.C.
D.F. 44 20692 (Intercept) 1.820 0.004 442.85 ***
2
R 0.9805 pi 0.463 0.005 90.21 ***
Summary 2
Statistics R adj 0.9804 kh -0.070 0.006 -12.07 ***

Linear Terms
F 2.36E+04 kzD -0.072 0.005 -13.35 ***
Pr(>F) 0 VAD 0.105 0.007 16.05 ***
Cg 1.250 0.005 242.33 ***
Residuals Cw -0.018 0.005 -3.46 ***
Min 1Q Median 3Q Max d -0.023 0.005 -4.16 ***
-0.474 -0.026 0.000 0.027 0.582 hpD -0.065 0.006 -11.56 ***
Term 1 Term 2 Coeff. Std. Err. T S.C.
S.C. or Significance Codes pi -0.159 0.004 -43.32 ***
(ANOVA)

Quadratic Terms
kh -0.184 0.004 -43.14 ***
kzD -0.030 0.004 -8.16 ***
Pr(|t|)> Pr(|t|)<= Symbol VAD -0.006 0.005 -1.32
0 0.001 *** Cg -0.471 0.004 -130.59 ***
0.001 0.01 ** Cw 0.000 0.004 -0.07
0.01 0.05 * d -0.095 0.004 -23.10 ***
0.05 0.1 O hpD -0.020 0.004 -4.93 ***
0.1 1 Blank Term 1 Term 2 Coeff. Std. Err. T S.C.
pi kh 0.142 0.002 56.88 ***
pi kzD 0.020 0.003 7.01 ***
pi VAD 0.016 0.003 5.92 ***
pi Cg 0.140 0.003 55.09 ***
pi Cw -0.005 0.003 -2.15 *
pi d -0.132 0.003 -47.95 ***
pi hpD 0.051 0.003 18.81 ***
kh kzD -0.127 0.003 -45.45 ***
kh VAD -0.025 0.003 -9.40 ***
kh Cg -0.188 0.002 -75.15 ***
kh Cw 0.012 0.002 4.91 ***
Two-TermInteractions

kh d -0.351 0.003 -129.65 ***


kh hpD 0.101 0.003 37.81 ***
kzD VAD 0.087 0.003 28.77 ***
kzD Cg -0.024 0.003 -8.48 ***
kzD Cw -0.007 0.003 -2.53 *
kzD d 0.054 0.003 17.47 ***
kzD hpD -0.015 0.003 -4.82 ***
VAD Cg 0.014 0.003 5.03 ***
VAD Cw 0.010 0.003 3.69 ***
VAD d -0.106 0.003 -36.32 ***
VAD hpD -0.010 0.003 -3.49 ***
Cg Cw 0.013 0.003 4.98 ***
Cg d -0.120 0.003 -43.27 ***
Cg hpD 0.032 0.003 11.65 ***
Cw d 0.007 0.003 2.46 *
Cw hpD -0.006 0.003 -2.18 *
d hpD 0.138 0.003 46.50 ***

100
First, the model was transformed back to the original factors, correcting it for bias

introduced by the back transform from the transformed response N0.19 to the original

response N (Jensen et. al., 1987); this correction ranges from about 5 percent at

N = 1 MM$ to less than ½ percent at N = 350 MM$ . Next, graphs of the interaction of N

with respect to the factors were built. Finally, the graphs were analyzed to establish the

response model behavior.

Figures 6.2 to 6.5 show the response model graphs. The combination of

transformations, interactions and a second-order model yields surfaces that are far from

planar (factors not varied are set to their center point value). Visualization of these

surfaces contributes to understanding of the governing factors. Highly nonlinear

functions can be modeled because of the use of the Box-Cox and Box-Tidwell

transforms.

180

160

140
120

N 100
(MM$) 80
60
40
20 2550

0 2025 pi (psia)
100
90
80
70
60

1500
51
41
31
21
11
1

kh (md)

Figure 6.2 Effects of permeability and initial reservoir pressure on net present value.

101
Horizontal permeability is most influential when it is low, and its effect is

comparable to the initial pressure (Figure 6.2).

180
160
140
120
N 100
(MM$) 80
60
40
20 76

0 48
100 hpD
90
80
70
(percent)

60
20

51
41
31
21
11
1
kh (md)

Figure 6.3 Effects of permeability and completion length on net present value.

The effect of completion length appears small compared with horizontal

permeability (figure 6.3), and the permeability effect is largest at low permeability.

Completion length effect is statistically significant. Although small, the completion

length effect is not negligible (table 6.4).

180
160
140
120
N 100
(MM$) 80
60
40
20 76
0 48
hpD
6.0
5.5
5.0
4.5

20 (percent)
4.0
3.5
3.0
2.5
2.0
1.5
1.0

Cg ($/MCF)

Figure 6.4 Effects of gas price and completion length on net present value.

102
Gas price has a larger effect than the completion length (figure 6.4). The effect of

completion length is greater at high gas price; this is a two-term interaction supporting

the interacting, transformed linear model form.

225
200
175
150
N 125
(MM$) 100
75
50
25
0 5
3
0

Cg ($/MCF)
0.027
0.054

0.081

0.108

1
0.135

0.162

d
(fraction)

Figure 6.5 Effects of discount rate and gas price on net present value.

Finally, the economic factors have large effects (figure 6.5; note change in N-

axis).

6.3.3 Monte Carlo Simulation

Monte Carlo simulation reveals the overall distribution of a response, helps

analyze sensitivities, and guides optimization (Damsleth et. al., 1992, White & Royer,

2003; White et. al., 2001). To perform Monte Carlo simulation, distributions on all

uncertain factors must be specified. In this study, beta distributions were used for all

factors (figure 6.6, table 6.5).

Beta distributions (Berry, 1996) are simple to manipulate and interpret: as a and b

increase, the distribution gets narrower, if a is larger than b the distribution peak shifts to

103
the left. The distributions are easily scaled to fit any range. In the illustrative figure

(figure 6.6), the uniform distributions (both parameters equal to 1) are appropriate for the

controllable variables, whereas distributions with a long positive tail (a>b) are well

suited to approximating factors like permeability. The distributions used in this study are

reasonable, but do not have any verifiable physical meaning. Selection of reasonable

factor distributions is discussed in texts on Bayesian statistics (Berry, 1996).

Table 6.5 Parameters for beta distributions of factors

Factor
pi kzD kzD VAD Cg Cw d hpD
Minimum 1500 1 10 100 1 0.5 0 0.2
Design Maximum 3000 100 100 1500 6 2 0.18 1
a 1 2 1 4 10 20 20 1
Beta Dist b 1 5 1 4 10 20 20 1

(aβ,bβ)=(20,20
5
Probability Density

3
(aβ,bβ)=(5,2)

2
(aβ,bβ)=(4,4)

(aβ,bβ)=(1,1)
1

0
0 0.2 0.4 0.6 0.8 1

Scaled value of parameter

Figure 6.6 Beta distributions used for the Monte Carlo simulation.

Using these factor distributions, the distribution of net present value can be

visualized (figure 6.7). Compared to the base case where hpD is allowed to vary randomly

over its entire range, the case with low hpD has a peak at lower N and fewer high N
104
values. Similarly, high hpD is associated with higher N. This shows that, on average,

higher hpD yields higher N.

0.018

0.016
full range hpD
0.014 minimum hpD

0.012

Proportion
0.01

0.008

0.006
maximum hpD
0.004

0.002

0
0 50 100 150 200 250

Net present value (MM$)

Figure 6.7 Monte Carlo simulation of the net present value.

The effects of all factors can be examined by setting each of the factors in to their

P10, P50, and P90 values while allowing the other factors to vary according to their

distributions (table 6.6). Unlike the linear sensitivity analysis (earlier), the Monte Carlo

sensitivity (MCS) method incorporates factor value uncertainty in to the analysis. Table

6.6 shows the results.

Table 6.6 Monte Carlo sensitivity estimates.

Variations and Effects on Net Present Value


(MM$)
Effects
Factor P10 P50 P90 Linear Quad.
pi 69.1 99.3 122.9 53.79 -6.69
kh 95.0 98.5 100.1 5.16 -1.89
VAD 104.1 97.2 93.2 -10.93 2.83
kzD 100.4 97.5 95.9 -4.51 1.39
Cg 74.4 97.6 121.4 47.00 0.56
Cw 98.3 98.0 97.6 -0.66 0.00
d 101.4 97.8 94.5 -6.86 0.26
hpD 93.8 98.1 102.0 8.27 -0.32

105
These results (table 6.6) bear out the importance of initial pressure and gas price.

Compared with the linear sensitivity analysis, MCS estimates lower sensitivity of net

present value to horizontal permeability. The difference is computed from the P90 to the

P10 values, which excludes the extremely low permeability values for which the

permeability sensitivity is greatest (figure 6.2). In general, MCS results differ from linear

sensitivity analyses because unlikely values are down-weighted in MCS. The completion

effect from the MCS appears relatively small (but it is the fourth most important factor).

However, increasing the completion length from 28 (P10) to 92 (P90) percent of the total

interval length increases the average net present value from 93.8 to 102 MM$, a

substantial change (figure 6.8, table 6.6).

140

135 low d, high pi, kh, and VAD

130
Net present value (MM$)

125

120

115
optima
110

105

100
base case
95

90
20 40 60 80 100
Completion length (percent)

Figure 6.8 Optimization of net present considering uncertainty in reservoir and


economic factors (two cases).

106
6.3.4 Optimization

Development teams seek to choose the optimum well configuration for the

prevailing reservoir properties and operating conditions. Response models can be used

for this optimization.

One approach is to differentiate the response model for the objective function

with respect to the controllable parameter, set it equal to zero, and solve for the

controllable parameter (White & Royer, 2003). Here, the model for net present value (Eq.

6.13) is differentiated with respect to the completion length hpD, the differenciate

equation set equal to zero, and then solved for hpD. Eqn. 6.14 shows the resulting

correlation to maximize net present value for any combination of the other parameters.

This correlation is not a function of completion length. This is a mathematical equation

resulting from the statistical function derived for Net Present Value.

h tpD ,opt = 1,294 p it + 2.550k ht − 0.372k zD


t
− 0.254V AD
t
+ 0.803C gt − 0.150C wt + 3.481d t − 1.635 …….(6.14)

Where the superscript t denotes the transformed, scaled factor values. The effects

of these factors are difficult to interpret because of the Box-Tidwell powers (table 6.2),

but the function can be to evaluate to aid understanding (Roman, 1999). The equations

relating transformed to untransformed factors are given in item 6.3.1 (Eqns. 6.6 to 6.12).

Several observations can be made from Eqn. 6.14: as the initial pressure,

permeability anisotropy and water cost increase, the optimal interval is decreased (These

factors have positive Box-Tidwell power coefficient and negative coefficient in Eq. 6.14).

As the gas price and discount rate increase, motivating higher rates, the optimal interval

107
increases (both factors have positive Box-Tidwell power coefficient and positive

coefficient in Eq. 6.14).

Comparison among optimum completion length calculated using Eqn. 6.14 and

fitting responses directly from the data was done, getting good agreement among them

(figure 6.9).

120
Optimal completion length (percent)

100

80

60

40

Using Eqn. (3)


20 Directly fit response surface

0
0 20 40 60 80 100
Horizonal permeability (md)

Figure 6.9 Optimal completion length calculated from the transformed model and a
response model computed from local optimization.

6.4 Implications for Water-Drive Gas Wells

The statistical and optimization analyses shed light on the general problem of gas

completions in the presence of water drives. Aquifer size is the third most important

factor after initial pressure and gas price (table 6.6). Furthermore, the optimal completion

length was often the full interval, even in the presence of large aquifers and higher-than-

average water costs (figure 6.9).

The optimization from the response model (Eqn. 6.14) is evaluated by comparison

with directly simulated results (Figure 6.9), confirming that the optimum completion

108
length is often the full interval (for 55 percent of the cases examined), and the average

optimum length is 80% of the gas zone.

The relative loss of net present value caused by sub-optimal completion length

can be calculated as:

N (h pd )
L =1− ……………………………………………………..(6.15)
N ( h pD ,opt )

0.25

kh
Loss relative to optimized case,

0.2
hpD
fraction of NPV

0.15
pi Cg
VAD d
0.1
kzD

0.05

0
1 2 3 4
Factor Level

Figure 6.10 Relative loss of net present values if completion length is not optimized.

The loss ranges from about 2 to over 20 percent, and the average loss is 10

percent (figure 6.10). The greatest losses due to sub-optimal completion length are for

low pressure, low completion length, and low permeability; losses also increase as the

discount rate increases.

The response models and conclusions from this study can be applied to other

water-drive gas reservoirs in a general sense. However, the statistical models are valid

only over the ranges considered and if the other well and reservoir parameters are similar.

109
CHAPTER 7

DOWNHOLE WATER SINK WELL COMPLETIONS IN GAS RESERVOIR


WITH BOTTOM WATER

Water production reduces gas recovery by shortening the well’s life. Water loads

up the gas well, killing it when a lot of gas remains in the reservoir. Various concepts and

techniques have been used to solve water-loading problems in gas wells (Chapter 2).

Some of them are: pumping units, liquid diverters, gas lifts, concentric dual-tubing

strings, plunger lifts, soap injection, Downhole Gas Water Separation (DGWS), and flow

controllers. All the above-mentioned solutions for water production in gas wells work

inside the wellbore.

Downhole Water Sink (DWS) technology has been successfully proved to control

water coning in oil wells with bottom water drive increasing oil production rate and oil

recovery (Swisher & Wojtanowicz, 1995; Shirman & Wojtanowicz, 1997, and 1998;

Wojtanowicz et al., 1999). DWS works outside the wellbore to solve water production.

The objective of this study is to evaluate DWS performance for different gas

reservoir conditions and to compare DWS wells to the conventional gas wells with no

water control and with water control (using DGWS technology).

7.1 Alternative Design of DWS for Gas Wells

The most-promising configuration of dual (DWS) completion to improve

performances of gas wells was identified qualitatively using several technical

considerations as follows.

DWS has proved successful in oil wells for a few particular designs of dual-

completion. However, Armenta and Wojtanowicz (2002) proved that the mechanism of
110
water coning in gas wells was different than that in oil wells. Therefore, a specific design

of DWS for gas wells was to be different than for oil wells. Three different possible

configurations were evaluated:

• Dual completion without a packer;

• Dual completion with a packer;

• Dual completion with a packer and gravity gas-water separation.

7.1.1 Dual Completion without Packer

Figure 7.1 depicts the DWS configuration including two completions without a

packer.

Gas

Water

Water

Figure 7.1 Dual completion without packer.

For this configuration, one completion is located at the top of the gas zone.

Another is located in the water zone. Gas is produced from the top completion and water

111
from the bottom completion. A pump is located below the lower completion to drain the

water zone and inject the water into a lower disposal zone. This pump generates an

inverse gas cone. Also, the bottom hole pressure at the gas and water completion is the

same.

This configuration gives partial control over the water coning, although some

water is still produced with the gas. The control efficiency, however, would be reduced

with time because (as the gas-water contact moved upward) the amount of water

produced from the top completion would increase and eventually kill the gas production.

The solution here would be a bigger water pump. However, higher pump rate

means the bottom-hole pressure is reduced with time while the amount of water produced

from the top completion increases at the same time. This combination makes the well

very sensitive to liquid loading. In short, this configuration could kill the well early. So, it

would be better to have the two completions isolated to control the vertical movement of

gas-water contact outside the well.

7.1.2 Dual Completion with Packer

Figure 7.2 depicts the DWS configuration with two completions separated with a

packer. The objective is to isolate the bottomhole pressure for the two completions.

Isolating the bottomhole pressure would allow the pump rate to increase when the gas-

water contact moves up without making the well too sensitive to water loading.

Eventually, some water would be produced to the surface from the top completion at later

times.

This configuration allows for better control of water coning in gas wells with time

because it allows two different values of the bottom hole flowing pressures. The top

completion could keep producing gas longer with a small amount of water or even water-

112
free. However, the big disadvantage of this configuration is that some gas could be coned

down to the lower completion. As the gas could not escape, it would create a high

backpressure below the packer reducing the effectiveness of the system. Therefore, a

“venting” system for the gas inflowing the bottom completion is needed to maintain

control of water coning.

Gas

Water

Water

Figure 7.2 Dual completion with packer.

7.1.3 Dual Completion with a Packer and Gravity Gas-Water Separation

Figure 7.3 shows the DWS configuration of two completions with a packer and

gas-water separation at the bottom of the well.

For this configuration, the two completions are separated only with the packer.

This means that the bottom completion section begins close to the end of the top

completion section. The top completion is produced through the annulus between the

113
tubing and the production casing. Also, water with some gas inflows the bottom

completion due to the inverse gas coning. The production strategy ensures using a very

long top completion ,producing water-free gas for most of the time. As water and gas

separate in the well below the packer, gas is produced at the surface, and the water is

injected into a disposal zone.

Gas

Water

Water

Figure 7.3 Dual completion with a packer and gravity gas-water separation.

This configuration would control the water cone ascent outside the well and

maximize the gas production rate at the top completion with no water loading. The gas

production would be maximized due to the longer top completion and the extra gas

production from the bottom completion – thus accelerating gas recovery. The

disadvantage of this configuration is its complexity. However, the design could always be

114
made simple if the water from the bottom completion was lifted to the surface with the

small amount of gas.

From this qualitative analysis the author selected this design (dual completion

with a packer and gravity gas-water separation) as the best configuration of DWS for gas

wells.

7.2 Comparison of Conventional Wells and DWS Wells

7.2.1 Reservoir Simulator Model

Numerical reservoir simulators can predict the behavior of complex reservoir-well

systems even if the governing partial differential equations are nonlinear. This method

was chosen for this study for several reasons.

• Water production in gas reservoirs is a complex problem.

• Water-drive gas reservoirs have two flowing phases, and it is difficult to

analyze this behavior analytically. Actually, there is no analytical model for

water coning in gas wells.

• The gas-water contact location is dynamic, further complicating analysis.

• Modern reservoir simulators (Schlumberger, 1997) integrate reservoir

inflow and tubing outflow models, which is a vital component of gas well

performance prediction (Lee & Wattenbarger, 1996).

A comparison of gas recovery for conventional and DWS wells was performed

using a gas reservoir model shown in Figure 7.4. The “layer cake-type” model consists of

a gas reservoir on the top of an aquifer (McMullan & Bassiouni, 2000). The radius of the

gas zone is 2,500 ft, and its thickness is 100 ft. The gas zone has 100 grids in the vertical

direction (one foot per grid). The radius of the water zone is 5,000 ft, and its thickness is

800 ft. The water zone has 10 grids in the vertical direction. Nine of them have a

115
thickness of 10 ft and the bottom grid is 710 ft thick. The gas-water relative permeability

curves are for a water-wet system (Table 5.4) reported from laboratory data (Cohen,

1989). The gas deviation factor (Dranchuck et al., 1974) and gas viscosity (Lee et al.,

1966) were calculated using published correlations (Table 5.4). Capillary pressure is

neglected (set to zero), and relative permeability hysteresis is not considered. The well

performance was modeled using the Petalas and Aziz (1997) mechanistic model

correlations (Schlumberger, 1998). Appendix F includes a sample data deck for the

Eclipse reservoir model.

Well, rw= 3.3 in

Top: 5000 ft

100 layers hp
1 ft thick 100 ft

Gas (G)

9 layers 1 ft 800 ft
thick, and one
layer 710 ft
thick. Water (W)
5000 ft

Figure 7.4 Simulation model of gas reservoir for DWS evaluation.

116
7.2.2 Reservoir Parameters Selection

Vertical permeability and aquifer size were selected to create a well-reservoir

system with severe water problems. Vertical permeability increases water coning in gas

wells; the higher the vertical permeability is, the more severe the coning becomes

(Beattle & Roberts,1996; Armenta & Wojtanowicz, 2002). A reasonable assumption in

petroleum engineering is that vertical permeability is ten-fold smaller than horizontal

permeability. To create a scenario of severe water coning, vertical permeability was

assumed to be fifty percent of horizontal.

Textbook models of water inflow for material balance computations assume that

the amount of water encroachment into the reservoir is related to the aquifer size (Craft &

Hawkins, 1991). (For example, van Everdinger and Hurst used the term B’ representing

the volume of aquifer. The Fetkovich model considers a factor called Wei defined as the

initial encroachable water in place at the initial pressure.) For this study, we assumed that

the pore volume of the aquifer is 968–fold greater than the gas pore volume a condition

of strong bottom water drive.

The inflow gas rate depends on reservoir permeability, so the rate of recovery is

controlled by the gas rate. Three values of permeability, 1, 10, and 100 md, were selected

for this study.

Water loading kills gas wells causing reduced gas recovery; initial reservoir

pressure plays an important role in this process. To investigate this effect, three different

initial reservoir pressures were considered: low (subnormal), normal, and high

(abnormal). Typically, reservoirs with an initial pressure gradient between 0.43 and 0.5

psi/ft are considered normally pressured (Lee & Wattenbarger, 1996). For this study, the

initial reservoir pressure was calculated assuming 0.3 psi/ft, 0.46 psi/ft, and 0.6 psi/ft

117
values of pore pressure gradients for the subnormal, normal, and abnormal reservoir,

respectively.

Gas recovery from certain water-drive gas reservoirs may be very sensitive to gas

production rate. If practical, the field should be produced at as high a rate as possible.

This may result in a significant increase in gas reserves by lowering the abandonment

pressure (Agarwal et al., 1965).

Simulations for conventional wells were run at constant tubing head pressure

(THP) of 300 psi at a maximum gas rate for the THP.

The DWS well was modeled assuming two wells at the same location; the top-

completion well was produced the same way as the conventional well. The bottom-well

completion was also run at constant THP (300 psi) until there was no more gas inflow to

the bottom completion. Then, the bottom-completion well was produced at a constant

maximum water rate. The length of the bottom completion for the DWS well was set at

30% the length of the top completion.

7.2.3 Conventional Wells Completion Length

The potential benefit of long completion length to increase net present value in

gas wells was identified in Chapter 6. This result agrees with detailed studies of

completion length in gas reservoirs (McMullan & Bassiouni, 2000). For this study, the

well completion length of conventional wells was selected to maximize gas recovery. The

selection was needed to provide an unbiased comparison of the single – and dual –

completed wells and to investigate if DWS gives some extra recovery beyond the

maximum recovery of conventional wells.

The effect of completion length on recovery was simulated for different initial

reservoir pressure and permeability.

118
80

70

60

Gas Recovery (%)


50
40
30
20
10
k = 100 md
0
k = 10 md
5 10 30 k = 1 md
50
70
100
Fraction of Gas Zone Perforated (%)

Figure 7.5 Gas recovery for different completion length in gas reservoirs with subnormal
initial pressure.

Figure 7.5 shows the results for a gas reservoir with subnormal initial reservoir.

Gas recovery increases with permeability. Also, for each permeability value, the

maximum recovery occurs when the gas zone is totally perforated.

70

60
Gas Recovery (%)

50

40

30

20

10
k =100 md
0
k =10 md
5
10 k =1 md
30
50
70
100
Fraction of Gas Zone Perforated (%)

Figure 7.6 Gas recovery for different completion length in gas reservoirs with normal
initial pressure.

119
70

60

Gas Recovery (%)


50

40

30

20

10
k =100 md
0
k =10 md
5
10 k =1 md
30
50
70
100
Fraction of Gas Zone Perforated (%)

Figure 7.7 Gas recovery for different completion length in gas reservoirs with
abnormal initial pressure.

Figures 7.6 and 7.7 confirm the results for normal and abnormal reservoir

pressure; maximum recovery is reached for a totally perforated gas well. For permeability

100 md, however, completion length effect is very small.

2,200
Flowing Bottom Hole Pressure (psia)

2,000
1,800
1,600
1,400
1,200
1,000
800
600
400
200
0
0 1000 2000 3000 4000 5000 6000
Time (days)

k= 1 md k= 10 md k= 100 md

Figure 7.8 Flowing bottom hole pressure versus time (Normal initial pressure; 50%
penetration).

120
The finding can be explained as follows. Gas recovery increases with

permeability because of the larger gas rate and higher flowing bottom hole pressure. The

well can tolerate higher water rates before loading up with liquid. Moreover, gas recovery

is faster at high gas rates.

30,000

25,000
Gas Rate (Mscf/D)

20,000

15,000

10,000

5,000

0
0 1000 2000 3000 4000 5000 6000
Time (days)

k= 1 md k= 10 md k= 100 md

Figure 7.9 Gas rate versus time (Normal initial pressure; 50% penetration).

Figures 7.8, and 7.9 support these observations. (They show the results for the

normal initial reservoir pressure with 50% gas zone penetration.) They show the highest

flowing pressure and gas rate for permeability 100 md.

Overall, shorter completion length gives longer production time for conventional

wells.

From this study, it is possible to conclude that the highest gas recovery is when

the gas zone is totally perforated, particularly for permeability 1 and 10 md. For

permeability 100 md, gas recovery is almost insensitive to length of perforation.

121
7.2.4 Gas Recovery and Production Time Comparison

Gas recovery and production time were calculated for the DWS wells and

compared with the maximum gas recovery for the conventional wells calculated in the

previous section.

60 16000

Total Production Time (Days)


14000
50
12000
Gas Recovery (%)

40 10000

30
8000

6000
20
4000

10 2000

0
0
k = 1md, Low k=1md, Normal k= 1 md, High
k = 1md, Low k= 1 md, Normal k= 1 md, High
Pressure Pressure Pressure
Pressure Pressure Pressure

Conventional Well DWS Well Conventional Well DWS Well

Figure 7.10 Gas recovery and total production time for conventional and DWS wells for
different initial reservoir pressure and permeability 1 md.

Figure 7.10 shows the results for a reservoir with permeability 1 md. Gas

recovery is always higher for DWS compared with the conventional well. (At low initial

reservoir pressure, gas recovery increases from 11% to 28%; at normal initial reservoir

pressure, the increase is from 30% to 48%; at high reservoir pressure the increase is from

37% to 54%.) Furthermore, production time is always longer for DWS compared with the

conventional well. In short, for tight reservoirs, DWS increases gas recovery by

extending the well life.

122
80 8000
70

Total Production Time (Days)


7000
Gas Recovery (%)

60 6000
50
5000
40 4000
30
3000
20 2000
10
1000
0
0
k= 10 md; Low k= 10 md; Normal k= 10 md; High
k= 10 md; Low k=10md; Normal k= 10 md; High
Pressure Pressure Pressure
Pressure Pressure Pressure

Conventional Well DWS Well


Conventional Well DWS Well

Figure 7.11 Gas recovery and total production time for conventional and DWS wells for
different initial reservoir pressure and permeability 10 md.

Figure 7.11 shows similar results when the reservoir permeability is 10 md. Gas

recovery with DWS is higher for all initial reservoir pressures. (At low initial reservoir

pressure, gas recovery increases from 42% to 54%; at normal initial reservoir pressure,

the increase is from 62% to 68%; at high reservoir pressure the increase is from 65% to

69%.) Production time is longer for DWS only for low initial reservoir pressure. It

becomes shorter for the normal and high initial reservoir pressure. Thus, DWS increases

gas recovery by extending the well life only for low-pressure reservoirs. In the normal

and high-pressure reservoir, the DWS advantage is two-fold: it stimulates and accelerates

the recovery.

Figure 7.12 confirms these results for a reservoir with permeability 100 md. Gas

recovery is always higher with DWS, but the improvement is very small. (At low initial

reservoir pressure, gas recovery increases from 65% to 68%; at normal initial reservoir

pressure, the increase is from 68% to 70%; at high reservoir pressure, the increase is from

123
69% to 70%.) Figure 7.12 also shows that production time is always slightly shorter with

DWS, but the difference becomes almost insignificant.

80 4000

Total Production Time (Days)


70 3500
Gas Recovery (%)

60 3000
50 2500
40 2000
30 1500
20 1000
10 500
0 0
k = 100 md, Low k=100 md, k= 100 md, High k = 100 md, Low k=100 md, k= 100 md, High
Pressure Normal Pressure Pressure Pressure Normal Pressure Pressure

Conventional Well DWS Well Conventional Well DWS Well

Figure 7.12 Gas recovery and total production time for conventional and DWS wells for
different initial reservoir pressure and permeability 100 md.

7.2.5 Reservoir Candidates for DWS Application

It is evident from the previous study that gas recovery is higher for DWS wells

than conventional wells. DWS increases gas recovery up to 160% for low-pressure

(subnormal), low-permeability (1 md) gas reservoirs. The advantage, however, reduces to

10% for reservoirs with normal pressure and permeability 10 md, and it almost

disappears when permeability is 100 md for any initial reservoir pressure. There is also

some reduction of production time for permeabilities 10 and 100 md.

Analysis of the production mechanism shows that DWS extends the well life by

preventing early water loading of the well. Figures 7.13 and 7.14 support this conclusion.

(These two figures are for subnormal initial reservoir pressure and permeability 1 md.)

124
3,000

Gas Rate (Mscf/D) 2,500

2,000

1,500

1,000

500

0
0 1000 2000 3000 4000 5000 6000 7000
Time (Days)

DWS-Top Completion Conventional

Figure 7.13 Gas rate history for conventional and DWS wells (Subnormal reservoir
pressure and permeability 1 md).

800

700
Bottom Flowing Pressure (psia)

600

500

400

300

200

100

0
0 1000 2000 3000 4000 5000 6000 7000
Time (Days)

DWS-Top Completion Conventional

Figure 7.14 Flowing bottom hole pressure history for conventional and DWS wells
(Subnormal reservoir pressure and permeability 1 md).

125
Figure 7.13 shows gas rate versus time for the conventional and DWS well. The

gas rate is always higher for DWS because the top completion produces almost water free

most of the time.

Figure 7.14 shows flowing bottom hole pressure of the wells. It shows that the

bottom hole flowing pressure increase is slower for DWS than for conventional wells. In

short, removing the water inflow to the top completion delays liquid loading of the well

and elevates production rate.

From this study, one could conclude that the best reservoir conditions for DWS

would be low-permeability low-pressure gas reservoirs. With conventional technology,

such reservoirs necessitate the use of a lifting technology (i.e. DGWS) to produce gas and

water.

7.3 Comparison of DWS and DGWS

The comparison is made for a gas reservoir with low permeability (1 md) and

subnormal initial pressure. This is the worst-case scenario for conventional gas recovery,

identified in the previous section, where there is a need for DWS or other (DGWS)

technology.

7.3.1 DWS and DGWS Simulation Model

The reservoir simulator model described in section 7.2.1 was also used in this

study.

DWS was simulated using two different wells located at the same place, but with

different completion length and depth. The wells represented the top and bottom

completions of DWS wells. Also, two cases of completion length were considered. In the

first case, the top DWS completion totally penetrates the gas zone (100 ft), and the

bottom completion is 30 feet long with the top located one foot below the bottom of the

126
top completion (DWS-1). (The same configuration was used to compare DWS with

conventional wells.) In the second case, the top and bottom completion length are 70 and

60 feet, respectively (DWS-2). The two wells representing DWS completions produce

simultaneously at constant THP (300 psia). It is assumed that the tubing of the bottom

completion would only produce gas liberated from water (The Tubing Performance

Relationship curves were built for zero water cut condition, only. Bottomhole flowing

pressure for the bottom conditions is controlled by the THP and the gas friction losses,

only. Both, gas and water, are produced from the reservoir and separated at the wellbore).

When the bottom completion stops producing gas, the well is switched to produce at a

constant and maximum water rate.

DGWS was simulated using two different wells at the same place, too. The two

wells had the same completion length and location. One well represents the situation until

the well loads up with water. At this time the first well is shut down and the second well

takes over. The second well models removal of water by downhole separator (DGWS),

i.e. water free production of gas. Both wells are produced at constant THP (300 psia). It is

assumed that the DGWS well produces gas free of water all the time. This is the best

operational performance of DGWS. Two cases with different completion length were

also considered; totally penetrated gas zone (DGWS-1) and 70% penetration (DGWS-2).

Finally, the economic limit of 400Mscfd was set for the DGWS and DWS wells.

Appendix F includes a sample data deck for the Eclipse reservoir model.

7.3.2 DWS vs. DGWS–Comparison Results

Figures 7.15, 7.16, 7.17, and 7.18 summarize the results of the comparison

between DWS and DGWS.

127
PTR [(Production Time Conventional, DWS, or DGWS) /
45 7.0

40
6.0

(Production Time Conventional)]


35
5.0
Gas Recovery (%)

30

25 4.0

20 3.0

15
2.0
10
1.0
5

0 0.0
Gas Zone Totally Gas Zone 70% Gas Zone Totally Gas Zone 70%
Perforated Perforated Perforated Perforated

Conventional DWS DGWS Conventional DWS DGWS

Figure 7.15 Gas recovery and Production Time Ratio (PTR) for conventional, DWS, and
DGWS wells.

Figure 7.15 shows gas recovery and Production Time Ratio (PTR) for the two

cases of well completion.

(Tp ) DWS / DGWS


PTR = …………………………………………………………..(7-1)
(Tp ) conventional

Where:

PTR = Production time ratio,

(Tp)DWS = Production time for DWS wells,

(Tp)DGWS = Production time for DGWS wells,

(Tp)conventional = Production time for conventional wells.

Figure 7.15 shows that DGWS gives the highest gas recovery (41.5%) when the

gas zone is totally penetrated, and DWS gives the highest recovery (40.7%) when 70% of

the gas zone is penetrated. Thus, maximum recovery for DWS and DGWS is almost the

128
same. Moreover, the PTR are 7.4 and 3.5 for DGWS and DWS, respectively. This means

that the same recovery with DGWS takes (6.4/3.5 = 1.83) 1.83 times longer than that

with DWS.

45
DWS-2 DGWS-1
40

35
DGWS-2
Gas Recovery (%)

30
DWS-1
25

20

15

10

5
Conventional

0
0 3000 6000 9000 12000 15000 18000 21000
Time (Days)

DWS-2 DWS-1 DGWS-2 DGWS-1 Conventional Well-1

Figure 7.16 Gas recovery versus time for DWS, DGWS, and conventional wells.

Figure 7.16 gives gas recovery versus time for the wells in all the cases. The

DGWS-1 and DWS-2 designs give maximum final recoveries that are almost equal.

However, DGWS-1 produces 50% longer than DWS-2. Thus, DWS-2 accelerates gas

recovery. One additional observation for DWS is that reducing the length of the top

completion and increasing the length for the bottom completion would increase gas

recovery by 49% (from 27.3% to 40.7%). This is an important observation because it

shows that completion lengths for DWS should be optimized (Armenta & Wojtanowicz,

2003).

129
3,000

2,500

Gas Rate (Mscf/d)


2,000
Conventional

1,500
DWS-2 Top

1,000

500
DWS-2 Bottom DGWS-1

0
0 3000 6000 9000 12000 15000 18000 21000
Time (Days)

Conventional Well-1 DGWS-1 DWS-2 Top DWS-2 Bottom

Figure 7.17 Gas rate history for DWS-2, DGWS-1, and conventional wells.

90

80
DWS-2 Bottom
70
Water Rate (stb/d)

60

50
DGWS-1

40

30

20
Conventional
DWS-2 Top
10

0
0 3000 6000 9000 12000 15000 18000 21000
Time (Days)

Conventional Well-1 DGWS-1 DWS-2 Top DWS-2 Bottom

Figure 7.18 Water rate history for DWS-2, DGWS-1, and conventional wells.

130
The rate decline plots in Figure 7.17 show that the gas rate for DWS-2 is always

higher than that for DGWS-1. Also, the bottom completion of DWS-2 only produces gas

during the initial 28% of the total production time (first 3405 days).

Figure 7.18 is the water production history for the two highest gas recovery cases

(DWS-2 and DGWS-1) and the conventional well. It shows that the bottom completion of

DWS-2 has the highest water rate, and the top completion has the lowest. It means the

DWS-2 produces the lowest amount of water to the surface because most of the water is

injected using the bottom completion.

7.3.3 Discussion about the Packer for DWS Wells

500
Bottom Hole Flowing Pressure (psia)

Conventional DWS-2 Top

400
DGWS-1

300

200

100

DWS-2 Bottom

0
0 2000 4000 6000 8000 10000 12000 14000 16000 18000 20000
Time (Days)

Conventional Well-1 DGWS-1 DWS-2 Top DWS-2 Bottom

Figure 7.19 Bottom hole flowing pressure history for DWS-2, DGWS-1, and
conventional wells.

Figure 7.19 shows bottomhole pressure history for the two highest gas recovery

cases (DWS-2 and DGWS-1) and the conventional well. It shows that bottom hole

pressure for the conventional well increases rapidly due to the water production. Bottom
131
hole pressure for the DWS well is always deferent for the two completions. This

difference is dramatically bigger when the top completion is set to produce at the

maximum water rate releasing the THP restriction for the bottom completion (after 4000

days). This situation would not be possible without a packer. Therefore, as it was

mentioned in section 7.1.3, the packer is needed to guarantee isolation between the two

completions. This isolation is still possible when the two completions are one after the

other (this is the case) giving a better control on the water coning.

From this study, one can say that for the reservoir model used here, DGWS and

DWS could give almost the same final gas recovery, but DWS production time is 35 %

shorter than that for the DGWS well. DWS well, however, would produce little water at

the surface from the top completion, but DGWS well would not lift any water. A packer

between the two completions for the DWS wells is very important giving insulations

between the completions and improving control on the water coning.

132
CHAPTER 8

DESIGN AND PRODUCTION OF DWS GAS WELL

The potential benefit of Downhole Water Sink (DWS) technology in gas wells

was previously identified in Chapter 7. The analysis, however, did not address operating

conditions of DWS in gas reservoir.

The objective of this study is to find out how to produce DWS wells in low

productivity gas reservoirs with bottom water. The operational principle is maximum

final gas recovery. Six factors control DWS operation: water rate from the bottom

completion; top completion length; bottom completion length; distance between the

bottom and the top completion; bottomhole flowing pressure at the bottom completion,

and time to install DWS in gas wells (Note that the variable are not independent as

flowing pressure relates to the completion length, and fluids rates for a given

well/reservoir system). Figure 8.1 depicts four factors considered for the analysis.

Separation between the


Top completion length completions

Water rate at the


bottom completion
Gas

Water

Bottom completion
length

Water

Figure 8.1 Factors used to evaluate DWS performance.

133
The evaluation is done for a low productivity gas reservoir with reservoir

pressure: 1500 psia (Subnormal); depth: 5000 ft; and for two different permeabilities: 1

and 10 md. The well (top completion) is produced at a constant tubing head pressure, 300

psia. The bottom completion is produced even at constant water rate or constant Bottom

Hole Pressure (BHP). The gas-water contact is located at 5100 ft. An identical model to

the one described in section 7.2.1 was used for the study. Table 5.4 shows the fluid

properties, and Appendix F includes a sample data deck for the Eclipse reservoir model.

8.1 Effect of Top Completion Length

55

50
Gas Recovery Factor (%)

45

40
35
30
25
20
15
10
5
0
k= 10 md
Perf.= 20%
Perf.= 40% k= 1 md
Perf.= 60%
Perf.= 80%
Perf.= 100%

Figure 8.2 Gas recovery factor for different length of the top completion.

Figures 8.2 and 8.3 show the results for the top completion length evaluation.

Four different top completion lengths were evaluated (40%, 60%, 80%, and 100%

penetration of the gas zone) for permeability 1 md. Five different top completion lengths

were evaluated (20%, 40%, 60%, 80%, and 100% penetration of the gas zone) for

134
permeability 10 md. Bottom completion is located at the top of the aquifer (at 5100 ft)

penetrating 20 ft of the water zone. The bottom completion length (20 ft) was constant

for each case. Constant water-drainage rate from the bottom completion was used (30 bpd

for permeability 1 md, and 200 bpd for permeability 10 md) for each case (Table 8.1).

Permeability= 1 md Permeability: 10 md

15,000 5,000
Total Production Time (Days)

Total Production Time (Days)

12,000 4,000

9,000 3,000

6,000 2,000

3,000 1,000

0 0
Perf.= Perf.=
Perf.= Perf.=
40% Perf.= 20% Perf.=
60% Perf.= 40% Perf.=
80% 60% Perf.=
100% 80%
100%

Figure 8.3 Total production time for different length of the top completion.

135
Table 8.1 Operation conditions for top completion length evaluation

Permeability 1 md Permeability 10 md
% of gas zone Length / Length / Water % of gas zone Length / Length / Water
penetrated Location - Location - Rate penetrated Location - Location - Rate
Top Complet. Bottom (STB/D) Top Complet. Bottom (STB/D)
(ft) Comp.(ft) (ft) Comp.(ft)

Perf = 40% 40 / (5000- 20 / (5100- 30 Perf = 20% 20 / (5000- 20 / (5100- 300


5040) 5120 5020) 5120

Perf = 60% 60 / (5000- 20 / (5100- 30 Perf = 40% 40 / (5000- 20 / (5100- 300


5060) 5120 5040) 5120

Perf = 80% 80 / (5000- 20 / (5100- 30 Perf = 60% 60 / (5000- 20 / (5100- 300


5080) 5120 5060) 5120

Perf = 100% 100 / (5000- 20 / (5100- 30 Perf = 80% 80 / (5000- 20 / (5100- 300
5100) 5120 5080) 5120

Perf = 100% 100 / (5000- 20 / (5100- 300


5100) 5120

The highest gas recovery for both permeability values happens for the shortest top

completion length (Figures 8.2). Also, the longest production time is for the shortest top

completion (Figures 8.3). This means that the benefit of DWS is reduced for longer top

completion. This effect was also noticed when a comparison of DWS and DGWS was

done (Section 7.3.2.). The longer the top completion is, the closer to the gas-water

contact is the completion. Then for long completions, water inflows the top completion

early. Water rate at the top completion is higher for longer completion, also. Therefore,

higher water-drained rates from the bottom completion are needed to maintain the top

completion water free. In this case, however, to evaluate the effect of the top completion

length alone, the water-drainage rate is constant. In short, DWS delays water loading

longer when short top completion are used.

The benefit of the highest gas recovery for the shortest top completion length is

more evident for permeability 1 md than 10 md (Figure 8.2). This is because of the higher

136
gas mobility related to water. Low permeability delay vertical water movement to the top

completion allowing longer water free production of the top completion.

8.2 Effect of Water-drainage Rate from the Bottom Completion

Four different water-drainage rates were used to evaluate its effects on gas

recovery and production time. Three of them were constant all the time, and the other one

was varied to always produce at maximum water rate from the bottom completion (Table

8.2). Location (at the top of the water zone: 5100 ft), and length (20 ft) for the bottom

completion is constant for all the cases (1 and 10 md). For permeability 1 md, top

completion length was constant penetrating 40% of the gas zone, and the water rates

were: 10 bpd, 20 bpd, 30 bpd, and the maximum water rate (from 32 to 39 bpd). For

permeability 10 md, top completion length was constant penetrating 20% of the gas zone,

and the water rates were: 100 bpd, 200 bpd, 300 bpd, and the maximum water rate (from

300 to 400 bpd).

Table 8.2 Operation conditions for water-drained rate evaluation

Permeability 1 md Permeability 10 md
% of gas Length / Length / Water % of gas Length / Length / Water
zone Location - Location - Rate zone Location - Location - Rate
penetrated Top Complet. Bottom (STB/D) penetrated Top Complet. Bottom (STB/D)
(ft) Comp.(ft) (ft) Comp.(ft)

40% 40 / (5000- 20 / (5100- 10 20% 20 / (5000- 20 / (5100- 100


5040) 5120) 5020) 5120)
40% 40 / (5000- 20 / (5100- 20 20% 20 / (5000- 20 / (5100- 200
5040) 5120) 5020) 5120)
40% 40 / (5000- 20 / (5100- 30 20% 20 / (5000- 20 / (5100- 300
5040) 5120) 5020) 5120)
40% 40 / (5000- 20 / (5100- Qw= Max 20% 20 / (5000- 20 / (5100- Qw= Max
5040) 5120) (32-39) 5020) 5120) (300-400)

137
Table 8.2 shows the operational conditions for the water-drained evaluation, and

Figures 8.4 and 8.5 show the results for this analysis.

60
55
Gas Recovery Factor (%)
50
45
40
35
30
25
20
15
10
5
0
Qw= 10 Qw= 20 k= 10 md
bpd Qw= 30
bpd Qw= k= 1 md
bpd Qw=
Max Qw=
100 bpd Qw=
200 bpd Qw=
(32-39 300 bpd
Max
bpd)
(300-
400 bpd)

Figure 8.4 Gas recovery factor for different water-drained rate.

Permeability: 1 md Permeability: 10 md

16,000 5,000
Total Production Time (Days)
Total Production Time (Days)

4,000
12,000

3,000

8,000

2,000

4,000
1,000

0 0
Qw= 10 Qw= 100
Qw= 20 Qw= 200
bpd Qw= 30 bpd Qw= 300
bpd Qw= Max bpd Qw= Max
bpd bpd
(32-39 (300-400
bpd) bpd)

Figure 8.5 Total production time for different water-drained rate.

138
Gas recovery increases with water-drained rate. The maximum recovery occurs at

the maximum water-drainage rate (Figure 8.4). The effect of water drained in gas

recovery follows the same pattern on both permeabilities. Production time increases with

water-drained rate, also. The longest production time happens at the maximum water-

drainage rate (Figure 8.5). Increasing water-drained rate for permeability 10 md extends

the well life, however, the effect of water drained on total production time is small; It

means that increasing water-drained rate has a dual effect on gas recovery: increases, and

accelerates it at the same time.

Removing water from the top completion delays liquid loading of the well. In

short, the more water is removed from the top completion, the higher and faster/longer

the gas recovery.

8.3 Effect of Separation between the Two Completions

Table 8.3 Operation conditions for evaluation of separation between the


completions.

Permeability 1 md Permeability 10 md
Separation % of gas Length / Length / Water Separation % of gas Length / Length / Water
between the zone Location - Location - Rate between the zone Location - Location - Rate
completions penetrated Top Bottom (STB/D) completions penetrated Top Bottom (STB/D)
Comp. (ft) Comp.(ft) Comp. (ft) Comp.(ft)

0 ft 60% 40 / 20 / (5041- 15 0 ft 40% 20 / 20 / (5021- 150


(5000- 5060) (5000- 5040)
5040) 5020)
20 ft 60% 40 / 20 / (5060- 15 20 ft 40% 20 / 20 / (5040- 150
(5000- 5080) (5000- 5060)
5040) 5020)
40 ft 60% 40 / 20 / (5080- 15 40 ft 40% 20 / 20 / (5060- 150
(5000- 5100) (5000- 5080)
5040) 5020)
60 ft 40% 40 / 20 / (5100- 15 60 ft 40% 20 / 20 / (5080- 150
(5000- 5120) (5000- 5100)
5040) 5020)
80 ft 20% 20 / 20 / (5100- 150
(5000- 5120)
5020)

139
Four (for permeability 1md) and five (for permeability 10 md) different

separation distances between the two completions were evaluated. The top completion

length was constant, perforating 40% (permeability 1 md) and 20% (permeability 10 md)

of the gas zone. Top and bottom completion produced gas from day one. The water-

drainage rate was constant (15 bpd for permeability 1 md and 150 bpd for permeability

10 md) once the bottom completion started producing water (Table 8.3). Figures 8.6 and

8.7 show the results for the evaluation of separation distance between the two

completions.

55
50
45
Gas Recovery Factor (%)

40
35
30
25
20
15
10
5
0
k= 10 md
Separ.= 0 ft
Separ.= 20 ft k= 1 md
Separ.= 40 ft
Separ.= 60 ft
Separ.= 80 ft

Figure 8.6 Gas recovery factor for different separation distance between the
completions.

Gas recovery reduces with the separation between the two completions (Figure

8.6). The highest recovery occurs when the two completions are one after the other. Both

permeabilities values (1 md and 10 md) show the same pattern. Reducing separation

between the completions increases gas recovery because the inverse gas-cone to the

140
bottom completion is more efficient. The reverse gas-cone is needed on the DWS

completion to guarantee water-free production of the top completion.

Permeability 1 md Permeability 10 md

16,000 6,000

14,000
Total Production Time (Days)

Total Production Time (Days)


5,000
12,000
4,000
10,000

8,000 3,000

6,000
2,000
4,000

2,000 1,000

0 0
Separ.= 0 Separ.=
Separ.= Separ.=
ft Separ.= 0 ft Separ.=
20 ft Separ.= 20 ft Separ.=
40 ft 40 ft Separ.=
60 ft 60 ft
80 ft

Figure 8.7 Total production time for different separation distance between the
completions.

DWS extends the well life longer when the two completions are together, also

(Figure 8.7). Delaying water inflows to the top completion retards well liquid loading.

At DWS wells, bottomhole flowing pressure is always different for the two

completions (Section 7.3.3) particularly when the water-drained rate is maximized. The

fact that the two completion are one the other does not change this situation (Figure

7.19).

8.4 Effect of Bottom Completion Length

Four (for permeability 1md) and five (for permeability 10 md) different lengths

for the bottom completion were evaluated. The top completion length was constant,

perforating 40% (permeability 1 md) and 20% (permeability 10 md) of the gas zone. The

141
bottom completion starts at the end of the top completion. Top and bottom completion

begins producing gas from day one. The water-drainage rate was constant (15 bpd for

permeability 1 md and 150 bpd for permeability 10 md) once the bottom completion

started producing water (Table 8.4). Figures 8.8 and 8.9 show the results for the bottom

completion length evaluation.

Table 8.4 Operation conditions for different bottom completion length.

% of gas zone Perforat. Length / Water Rate % of gas zone Perforat. Length / Water Rate
penetrated Length - Top Location - (STB/D) penetrated Length - Top Location - (STB/D)
Comp. (ft) Bottom Comp. (ft) Bottom
Comp. (ft) Comp. (ft)

Perf = 60% 40 20 / (5041- 15 Perf = 40% 20 20 / (5021- 150


5060) 5040)
Perf = 80% 40 40 / (5041- 15 Perf = 60% 20 40 / (5021- 150
5080) 5060)
Perf = 100% 40 60 / (5041- 15 Perf = 80% 20 60 / (5021- 150
5100) 5080)
Perf = 100% 40 80 / (5041- 15 Perf = 100% 20 80 / (5021- 150
plus 10 ft of 5120) 5100)
aquifer
Perf = 100% 20 100 / 150
plus 10 ft of (5021-
aquifer 5120)

55
50
Gas Recovery Factor (%)

45
40
35
30
25
20
15
10
5
0
k= 10 md
Perf.= 20 ft
Perf.= 40 ft k= 1 md
Perf.= 60 ft
Perf.= 80 ft
Perf.= 100 ft

Figure 8.8 Gas recovery factor for evaluation of different length at the bottom
completion.

142
Permeability 1 md Permeability 10 md

6,000
16,000.0

14,000.0
Total Production Time (Days)

Total Production Time (Days)


5,000

12,000.0
4,000
10,000.0

8,000.0 3,000

6,000.0
2,000
4,000.0

2,000.0 1,000

0.0
0
Perf.= 20
Perf.= 40 Perf.=
ft Perf.= 60 Perf.=
ft Perf.= 80 20 ft Perf.=
ft 40 ft Perf.=
ft 60 ft Perf.=
80 ft
100 ft

Figure 8.9 Total production time for evaluation of different length at the bottom
completion.

The highest recovery happens at the shortest bottom completion length. The

longest production time occurs at the shortest completion, also. Long bottom completion

moves the perforation closer to the gas-water contact, increasing water rate and

accelerating the well water load-up. Water inflows the well early.

There is a bias on this bottom completion length analysis because longer bottom

completions allow higher water-drainage rates, also. For this analysis, however, the

water-drainage rate was constant and equal for all the cases. This situation is corrected in

the next item.

8.5 DWS Operational Conditions for Gas Wells

Some generic guidelines to operate DWS in low productivity gas reservoir could

be obtained from the previous study. More modeling, reservoir properties, and production

143
conditions should be done getting a more general idea about how to operate DWS

completion in gas reservoir. Statistical procedure similar than the one used in Chapter 6

could be done getting DWS operational-understanding in gas reservoir.

According to the previous study, DWS for low productivity gas wells with

bottom-water should be operated as follows:

• Water should be drained as much as possible with the bottom completion;

• The top completion should be short, penetrating between 20% to 40% of the

gas zone;

• The two completions should be as close as possible;

• The bottom completion should be short, penetrating between 20 to 40% of

the gas zone, too.

The same numerical reservoir model was used to investigate the maximum gas

recovery for the optimum DWS operation described above. Separation between the two

completions was constant. The two completions are together (The bottom completion

begins when the top completion ends). The top completion is operated at constant tubing

head pressure (300 psia). The bottom completion is operated at constant tubing head

pressure (300 psia) until water production begins; Ones water inflows the bottom

completion this completion is switched to produce at maximum water-drainage (Bottom

hole flowing pressure is assumed constant and equal to 14.7 psia.). This last assumption

could overestimate DWS performance, but in the next item this assumption is removed,

and a more realistic bottom hole flowing pressure is assumed. Perforation length is varied

for the two completions looking for the maximum gas recovery. Table 8.5 shows the

operational conditions for each one of the cases evaluated, and Figures 8.10 to 8.13

shows the results for this evaluations.

144
Table 8.5 Operation conditions for different top completion length, bottom
completion length, and water-drained rate.

Permeability 1 md Permeability 10 md
% of gas Length / Length / Water Separation % of gas Length / Length / Water Separation
zone Location - Location - drained between zone Location - Location - drained between
penetrated Top Comp. Bottom Rate - the two penetrated Top Comp. Bottom Rate - the two
(ft) Comp. Maximum complet. (ft) Comp. Maximu complet. (ft)
(ft) (STB/D) (ft) (ft) m
(STB/D)
Perf = 60% 40 / (5000- 20 / (5041- 1 - 19.2 0 Perf = 60% 30 / (5000- 30 / (5031- 7 - 267.3 0
5040) 5060) 5030) 5060)

Perf = 70% 40 / (5000- 30 / (5041- 1 - 26.9 0 Perf = 70% 30 / (5000- 40 / (5031- 1 - 331.7 0
5040) 5070) 5030) 5070)

Perf = 80% 50 / (5000- 30 / (5051- 1 - 26.2 0 Perf = 40% 20 / (5000- 20 / (5021- 1 - 177.3 0
5050) 5080) 5020) 5040)

Perf = 60% 30 / (5000- 30 / (5031- 1 - 28.2 0 Perf = 50% 20 / (5000- 30 / (5021- 1 - 248.4 0
5030) 5060) 5020) 5050)

Perf = 70% 30 / (5000- 40 / (5031- 1 - 36.3 0 Perf = 60% 20 / (5000- 40 / (5021- 1 - 322.7 0
5030) 5070) 5020) 5060)

Perf = 80% 30 / (5000- 50 / (5031- 1 - 44.0 0 Perf = 70% 20 / (5000- 50 / (5021- 1 - 407.3 0
5030) 5080) 5020) 5070)

Perf = 90% 30 / (5000- 60 / (5031- 1 - 51.6 0 Perf = 80% 20 / (5000- 60 / (5021- 43.2 - 0
5030) 5090) 5020) 5080) 465.2

Perf = 30 / (5000- 70 / (5031- 8.1 - 61.3 0 Perf = 90% 20 / (5000- 70 / (5021- 93.1 - 0
100% 5030) 5100) 5020) 5090) 549.2

Perf = 30 / (5000- 80 / (5031- 31.6 - 84.5 0 Perf = 20 / (5000- 80 / (5021- 167.9 - 0


100% plus 5030) 5110) 100% 5020) 5100) 658.4
10 ft of
aquifer
Perf = 20 / (5000- 90 / (5021- 376.9 - 0
100% plus 5020) 5110) 898.3
10 ft of
aquifer

Figures 8.10 and 8.11 show the results for permeability 1 md. Top completion

length was varied from 20 to 50 feet (20 to 50% gas zone penetration). Bottom

completion length was varied from 20 to 80 feet. Together the two completions penetrate

from 60% to 100% of the gas zone including a case where 10 feet of the aquifer was

perforated, also.

145
65

60

55

50

45
Gas Recovery (%)

40

35

30

25

20

15

10

0
Top= 40 ft, Top=40 ft, Top=50ft, Top=30ft, Top=30ft, Top=30ft, Top=30ft, Top=30ft, Top=30ft,
Bott.=20 ft Bott.=30ft Bott.=30ft Bott.=30ft Bott.=40ft Bott.=50ft Bott.=60ft Bott.=70ft Bott.=80ft

Figure 8.10 Gas recovery for different lengths of top, and bottom completions and
maximum water drained. The two completions are together. Reservoir
permeability is 1 md.

60,000

50,000
Total Production Time (Days)

40,000

30,000

20,000

10,000

0
Top= 40 ft, Top=40 ft, Top=50ft, Top=30ft, Top=30ft, Top=30ft, Top=30ft, Top=30ft, Top=30ft,
Bott.=20 ft Bott.=30ft Bott.=30ft Bott.=30ft Bott.=40ft Bott.=50ft Bott.=60ft Bott.=70ft Bott.=80ft

Figure 8.11 Total production time for different lengths of top and bottom completions
and maximum water drained. The two completions are together. Reservoir
permeability is 1 md.

146
The maximum recovery happens when the top completion penetrates 30 ft and the

bottom completion penetrates 80 ft (Figure 8.10). This is the scenario where 10 ft of the

aquifer were penetrated. Increasing top completion length more than 30 ft gives no extra

recovery. Actually, the lowest recovery happens when the top completion penetrates 50%

of the gas zone. In short, increasing bottom completion length increases gas recovery

when the water-drainage rate is increased at the same time.

For top completion penetration of 30% of the gas zone, the total production time

(TPT) increases when bottom completion is increased from 30 to 50 ft. TPT, however,

decreases when bottom completion length increases from 60 to 80 ft. In short, increasing

bottom completion length and water-drainage rate at the same time increases and

accelerates gas recovery.

70

65

60

55

50
Gas Recovery (%)

45

40

35

30

25

20

15

10

0
Top=30ft, Top=30ft, Top=20ft, Top=20ft, Top=20ft, Top=20ft, Top=20ft, Top=20ft, Top=20ft, Top=20ft,
Bott.=30ft Bott.=40ft Bott.=20ft Bott.=30ft Bott.40ft Bott.=50ft Bott.=60ft Bott.70ft Bott.80ft Bott.=90

Figure 8.12 Gas recovery for different lengths of top, and bottom completions and
maximum water drained. The two completions are together. Reservoir
permeability is 10 md.

147
Figures 8.12 and 8.13 confirm the previous finding. Figures 8.12 and 8.13 show

the results for permeability 10 md. Top completion length was varied from 20 to 30 feet

(20% to 30% gas zone penetration). Bottom completion length varied from 20 to 90 feet.

Together the two completions penetrate from 40% to 100% of the gas zone including a

case where 10 feet of the aquifer was perforated, too.

Figure 8.12 shows gas recovery for the ten cases evaluated. The maximum

recovery occurs when the top completion penetrates 20 ft and the bottom completion

penetrates 90 ft. This is the scenario where 10 feet of the aquifer was penetrated.

Increasing top completion length more than 20 ft gives no extra recovery. Actually, gas

recovery is always lower when the top completion penetrates 30 feet instead of 20 feet of

the gas zone. Again, increasing bottom completion length increases gas recovery when

water-drainage rate is increased at the same time.

7,000

6,000
Total Production Time (days)

5,000

4,000

3,000

2,000

1,000

0
Top=30ft, Top=30ft, Top=20ft, Top=20ft, Top=20ft, Top=20ft, Top=20ft, Top=20ft, Top=20ft, Top=20ft,
Bott.=30ft Bott.=40ft Bott.=20ft Bott.=30ft Bott.40ft Bott.=50ft Bott.=60ft Bott.70ft Bott.80ft Bott.=90

Figure 8.13 Total production time for different lengths of both completions and
maximum water drained. The two completions are together. Reservoir
permeability is 10 md.

148
Figure 8.13 shows Total Production Time (TPT) for the ten cases evaluated. For

top completion penetration of 20% of the gas zone, TPT always decreases when bottom

completion is increased from 20 to 90 ft. Therefore; Increasing bottom completion length,

once more, accelerates gas recovery when water-drainage rate is increased at the same

time.

8.5.1 Effect of Bottom Hole Flowing Pressure at the Bottom Completion

The previous analysis was done assuming bottom hole flowing pressure (BHP)

equal to atmospheric pressure (14.7 psia). This situation would overestimate DWS

performance. Three different values for constant BHP were used to evaluate its effect on

gas recovery and TPT. Table 8.5 shows the operational conditions used for this analysis,

and Figures 8.14 and 8.15 show the results.

Table 8.6 Operation conditions for evaluation of different constant bottomhole


flowing pressure at the bottom completion.

Permeability 1 md Permeability 10 md
Bottomhole Length / Length / Water drained Bottomhole Length / Length / Water drained
Flowing Location - Location - Rate - Flowing Location - Location - Rate -
Pressure Top Comp. Bottom Maximum Pressure Top Comp. Bottom Maximum
(psia) (ft) Comp. (ft) (STB/D) (psia) (ft) Comp. (ft) (STB/D)

BHP= 14.7 30 / (5000- 80 / (5031- 31.6 - 84.5 BHP= 14.7 20 / (5000- 90 / (5021- 376.9 - 898.3
5030) 5110) 5020) 5110)
BHP= 100 30 / (5000- 80 / (5031- 30.2 - 80.3 BHP= 100 20 / (5000- 90 / (5021- 359.2 - 832.6
5030) 5110) 5020) 5110)
BHP= 200 30 / (5000- 80 / (5031- 28.2 - 74.8 BHP= 200 20 / (5000- 90 / (5021- 335.5 - 777.6
5030) 5110) 5020) 5110)
BHP= 300 30 / (5000- 80 / (5031- 26.2 - 68.46 BHP= 300 20 / (5000- 90 / (5021- 310.3 - 714.3
5030) 5110) 5020) 5110)

149
70

60

Gas Recovery (%)


50

40

30

20

10

0 k= 10 md

BHP= 14.7 k= 1 md
BHP=100
psia BHP=200
psia BHP=300
psia
psia

Figure 8.14 Gas recovery for different constant BHP at the bottom completion.

Figure 8.14 shows that increasing BHP at the bottom completion from 14.7 psia

to 300 psia slightly reduces gas recovery (gas recovery reduces from 64.37% to 62.1%

for permeability 1 md, and from 64.37% to 62.1% for permeability 10 md).

Permeability 1 md Permeability 10 md

60,000 6,000
Total Production Time (Days)
Total Production Time (Days)

50,000 5,000

40,000 4,000

30,000 3,000

20,000 2,000

10,000 1,000

0 0
BHP= 14.7 BHP= 14.7
BHP=100 BHP=100
psia BHP=200 psia BHP=200
psia BHP=300 psia
psia BHP=300
psia
psia psia

Figure 8.15 Total Production Time for evaluation of different constant BHP at the
bottom completion.

150
Increasing BHP at the bottom completion from 14.7 psia to 300 psia increases

total production time, particularly for permeability 10 md (Figure 8.15). This is because

less amount of water is drained from the bottom completion when the bottomhole

pressure (BHP) is increased delaying well life. For permeability 1 md, however, the

situation reverses when BHP is increased beyond 100 psia. Increasing BHP at the bottom

completion from 100 psia to 200 psia reduces the amount of water drained increasing the

aquifer effect on the reservoir. Bottom hole pressure at the top completion is higher for

BHP=200 psia than for BHP=100 psia (Figure 8.16). Also, average reservoir pressure is

higher for BHP=200 psia than for BHP=100psia (Figure 8.17). In short, for permeability

1 md, increasing BHP at the bottom completion beyond 100 psia increases aquifer effect

on the reservoir pressure, reducing well life.

900
TopCompletion (BHP= 200 psia)
Bottomhole Flowing Pressure (psia)

800

700

600
TopCompletion (BHP= 100 psia)

500

400

300
Bottom Completion (BHP= 200 psia)

200
Bottom Completion (BHP= 100 psia)
100

0
0 10000 20000 30000 40000 50000 60000

Time (Days)

Top Completion (BHP= 200 psia) Bottom Completion (BHP= 200 psia)
Top Completion (BHP= 100 psia) Bottom Completion (BHP= 100 psia)

Figure 8.16 Flowing Bottomhole Pressure history at the top, and bottom completion for
two different constant BHP at the bottom completion (100 psia, and 200
psia). Permeability is 1 md.

151
1200

1000
Average Reservoir Pressure (psia)

800

600

400

200

0
0 10000 20000 30000 40000 50000 60000

Time (Days)

Reservoir Pressure (BHP= 200 psia) Reservoir Pressure (BHP= 100 psia)

Figure 8.17 Average reservoir for two different constant BHP at the bottom completion
(100 psia, and 200 psia). Permeability is 1 md.

Another important observation is that the BHP at the top and bottom completion

is always different (Figure 8.16). There is a drawdown of at least 150 psia (for BHP at the

bottom completion equal to 200 psia), and 250 psia (for BHP at the bottom completion

equal to 100 psia). It is not possible to have this drawdown for two close-completion

without isolation. Therefore, the packer insulation between the two completions is needed

for the DWS completion in low productivity gas wells to guarantee the drawdown

between the completions. This observation is in general agreement with the discussion

included on section 7.3.3 when DWS was compared with DGWS.

152
8.6 When to Install DWS in Gas Wells

Four different scenarios for “when” DWS should be installed were evaluated:

when water production begins in a top short completion (30% for permeability 1 md and

20% for permeability 10 md), at late time in a totally perforated well, from day one of

production, and after the well die. Water-drainage is maximum all the time for the

scenarios when DWS is installed. The top completion length is 30 feet for permeability 1

md and 20 feet for permeability 10 md. The bottom completion length is 70 feet for

permeability 1 md and 80 feet for permeability 10 md. Table 8.7 includes the operation

conditions for the cases used for this study, and Figures 8.18 and 8.19 show the results.

Table 8.7 Operation conditions for “when” to install DWS in low productivity gas
well.

Permeability 1 md Permeability 10 md
Water Drained Length / Length / When Installing Water Drained Length / Length / When
Rate Location - Location - DWS Rate Location - Location - Installing
Top Comp. Bottom Top Comp. Bottom DWS
(ft) Comp. (ft) (ft) Comp. (ft)

Qw = Max 30 (5000- 70 (5031- After well died Qw = Max 20 / (5000- 80 / (5021- After well
5030) 5100) 5020) 5100) died
Qw = Max 30 (5000- 70 (5031- Late time in a Qw = Max 20 / (5000- 80 / (5021- Late time in
5030) 5100) totally 5020) 5100) a totally
perforated well perforated
well

Qw = Max 30 (5000- 70 (5031- Water Qw = Max 20 / (5000- 80 / (5021- Water


5030) 5100) production starts 5020) 5100) production
in the top short starts in the
completion top short
completion

Qw = Max 30 (5000- 70 (5031- From day one Qw = Max 20 / (5000- 80 / (5021- From day
5030) 5100) 5020) 5100) one

153
60

50

Gas Recovery (%)


40

30

20

10

0
After the k = 10 md
Late in a
well die When
totally From Day k = 1 md
Water After the
Perforated One Late in a
Prod. well die When
totally From Day
begins in a Water
Perforated One
30% Perf. Prod.
begins in a
20% Perf.

Figure 8.18 Gas recovery for different times of installing DWS.

Permeability 1 md Permeability 10 md

60,000 6,000

50,000 5,000
Total Production Time (Days)

Total Production Time (Days)

40,000 4,000

30,000 3,000

20,000 2,000

10,000 1,000

0 0
After the well Late in a When Water From Day After the well Late in a When Water From Day
die totally Prod. begins One die totally Prod. begins One
Perforated in a 30% Perforated in a 30%
Perf. Perf.

Figure 8.19 Total production time for different times of installing DWS.

154
Figure 8.18 shows that: The lowest recovery occurs when DWS is installed after

the well die (Actually, there is no extra recovery when DWS is installed after the well

die); the highest recovery happens when DWS is installed from day one, and when water

production begins (The final recovery is almost the same when DWS is installed from

day one of production or at the beginning of water production in a short top perforated

well); Installing DWS late in a totally perforated well reduces final gas recovery.

Total production time slightly decreases when DWS is installed from day one

than when water production begins; Total production time is shorter when DWS is

installed late in a totally perforated well than when is installed from day one or when

water production begins (Figure 8.19).

Some comments can be made for DWS completion in a low productivity reservoir

from the previous analysis:

• DWS should not be installed after the well die. It is better to use another

technology available solving water production problems such as: gas lift,

pumping units, plunger, soap injection, etc.

• There is no extra benefit installing DWS from day one of well production.

• DWS should be installed early in the well life after water production begins.

Figure 8.20 shows the gas recovery history for the scenarios considered when

permeability is 10 md (the scenario “after the well died” is represented by the

conventional 100% perforated well because there is no extra gas recovery when DWS is

installed after the well has died). It is shown that the final gas recovery is the same when

DWS is installed from day one and when it is installed after water production begins.

155
70
65
60
55
Gas Recovery Factor (%)

50
45
40
35
30
25
20
15
10
5
0
0 1000 2000 3000 4000 5000 6000
Time (Days)

Late in a Totally Perf. Conv. 100% Perf. When Water Prod. Begins in a 20% Perf. From Day One

Figure 8.20 Cumulative gas recovery for different times of installing DWS. Reservoir
permeability is 10 md.

8.7 Recommended DWS Operational Conditions in Gas Wells

According to this study, the best operational conditions for DWS in gas wells are:

• Water should be drained with the bottom completion at the highest rate

possible;

• The top completion should be short, penetrating between 20% to 40% of the

gas zone;

• The two completions should be as close as possible;

• A packer is needed to insolate the completions;

• The bottom completion should be long, penetrating the rest of the gas zone

and even the top of the aquifer;

• DWS should be installed early in the well life after water production begins.

156
• Producing the drained-water at the surface together with the gas from the

bottom completion, instead of injecting the water downhole, has little effect

on the final gas recovery. Therefore, drained water can be lifted to the

surface when there is no deeper injection-zone.

157
CHAPTER 9

CONCLUSIONS AND RECOMMENDATIONS

9.1 Conclusions

• In gas wells, a water cone is generated in the same way as in the oil-water system.

The shape at the top of the cone, however, is different in oil-water than in gas-

water systems. For the oil-water, the top of the cone is flat. For the gas-water

system, a small inverse gas cone is generated locally around the completion. This

inverse cone restricts water inflow to the completions. Also, the inverse gas cone

inhibits upward progress of the water cone.

• Vertical permeability, aquifer size, Non-Darcy flow effect, density of perforation,

and flow behind casing are unique mechanisms improving water

coning/production in gas reservoirs with bottom water drive.

• There is a particular pattern for water production rate at a gas well located in a

water drive reservoir with a channel in the cemented annuls—having a single

entrance at its end-. First, there is no water production. Next, water production

starts and water rate increases almost linearly. This increment is more dramatic

when the channel is originally in the water zone. Then, water rate stabilizes.

Finally, water rate increases exponentially. This pattern is explained because of

the flowing phases (single of two phase flow) in the channel at different

production steps of the well.

• Non-Darcy flow effect is important in low-rate gas wells producing from low-

porosity, low-permeability gas reservoirs. It is possible to have a gas well flowing

158
at 1 MMscfd with 60% of the pressure drop generated by the Non-Darcy flow

effect (porosity 1%, permeability 1 md).

• Setting the Non-Darcy flow component at the wellbore does not make reservoir

simulators represent correctly the Non-Darcy flow effect in gas wells. Non-Darcy

flow should be considered globally (distributed throughout the reservoir) to

correctly predict the gas rate and recovery.

• Cumulative gas recovery could be reduced up to 42.2% when Non-Darcy flow

effect is considered throughout the reservoir in gas reservoirs with bottom water

drive. This is because the well loads up early and is killed for water production.

• The most promising design of Downhole Water Sink (DWS) installation in gas

wells includes dual completion with isolated packer between them and gravity

gas-water separation at the bottom completion. The design allows good control of

water coning outside the well and increases coning of gas and maximum rate at

the top completion with no water loading.

• The highest recovery for a conventional gas well in the low-permeability reservoir

(1-10 md) occurs when the gas zone is totally penetrated. For permeability 100

md, gas recovery becomes almost insensitive to the completion length for

penetration greater than 30%.

• Gas recovery increases with permeability for a gas reservoir with bottom water

drive. In general, high permeability allows higher gas rates with smaller reservoir

drawdown; therefore the well has more energy to produce gas with higher water

cut.

159
• The optimum completion length can be calculated from the model developed

here, for maximum net present value. A “rule of thumb” is to perforate 80% of the

gas zone in a gas reservoir with bottom-water drive.

• Gas recovery with DWS is always higher than recovery with conventional wells.

The best reservoir conditions to apply DWS are when permeability is smaller than

10 md, and reservoir pressure is subnormal (or depleted). For reservoirs with low-

permeability (1 md) and subnormal pressure, gas recovery increases 160% for

DWS completion. This advantage, however, reduces what to 10% for

permeability 10 md and normal reservoir pressure.

• For the reservoir model used here, Downhole Gas-Water Separation (DGWS) and

DWS could give almost the same final gas recovery, but DWS production time is

35 % shorter than that of DGWS wells. Also, the DWS well would produce less

water at the surface because most of the water would inflow the bottom

completion and be injected downhole.

• Packer insulation between the two completions is needed for the DWS

configuration in low productivity gas wells. There should a drawdown between

the completions to guarantee reverse gas cone inflows to the bottom completion

improving control on the water coning.

• The recommended operational conditions for DWS in gas wells located in bottom

water drive reservoirs are: Water would be drained with the bottom completion at

the highest rate possible. The top completion would be short, penetrating between

20% to 40% of the gas zone. The two completions should be as close as possible.

A packer should insolate the two completions. The bottom completion would be

long, penetrating the rest of the gas zone and even the top of the aquifer. DWS

160
would be installed early at the well life after water production begins. Producing

the drained-water at the surface together with the gas from the bottom completion,

instead of injecting the water downhole, has little effect on the final gas recovery.

9.2 Recommendations

• The water rate pattern found in a gas well with leaking cement could be

confirmed using field data. Production data for gas wells with leaking cement

would be analyzed looking for the described pattern.

• Effects of Non-Darcy flow in low-productivity gas wells should be studied

considering a fracture in the well. A normal practice in the industry is to fracture

gas wells with low productivity. Non-Darcy flow distributed in the reservoir and

into the fracture should be considered.

• Effects of a fracture and permeability heterogeneity in water production, and final

gas recovery should be evaluated in water drive gas reservoirs using numerical

simulators.

• More possible configurations for DWS in gas wells should be evaluated. A single

very long completion (totally perforating the gas zone and the top of the aquifer)

without a packer could be one of the many new possibilities.

• Economic evaluation of DWS in gas wells should be done. This evaluation should

consider not only injecting drained-water into a lower zone but lifting water to the

surface, also.

• A combined mechanism of DWS and two fractures (one in the top completion and

the other in the bottom completion) in a low productivity gas well should be

evaluated.

161
• More in-depth study involving different modeling, reservoir properties, and

production conditions should be done getting a better understanding of DWS

operations in gas reservoir.

• More in-depth study involving different modeling, reservoir properties, and

production conditions should be done for comparison of DWS and DGWS

identifying best opportunity for each technology.

• A field pilot project installing DWS in low productivity gas reservoirs should be

conducted. This project should refine the operational optimization performed in

this research, giving new information about the possibilities of DWS in low

productivity gas reservoirs.

162
REFERENCES

Abercrombie, B., 1980, “Plunger Lift,” The Technology of Artificial Lift Methods,” Vol.
2b, K.E. Brown (ed), PennWell Publ. Co., Tulsa, OK (1980), p483-518.

Adams, L.S., and Marsili, D.L., 1992, “Design and Installation of a 20,500-ft Coiled
Tubing Velocity String in the Gomez Field, Pecos County, Texas,” paper SPE
24792, 67th Annual Technical Conference and Exhibition, Washington, D.C.,
October 4-7.

Agarwal, R.G., Al-Hussainy, R., and Ramey, Jr. H.J., 1965, “The Importance of Water
Influx in Gas Reservoir,” Journal of Petroleum Technology, November, 1965,
p1336-42.

Aguilera, R., Conti, J.J., Lagrenade E., 2002, “Reducing Gas Production Decline
Through Dewatering: A Case History From the Naturally Fractured Aguarague
Field, Salta, Argentina,” paper SPE 75512, SPE Gas Technology Symposium,
Calgary, Canada, 30 April-2 May.

Alvarez, C.H., Holditch, S.A, McVay, D.A., 2002, “Effects of Non-Darcy Flow on
Pressure Transient Analysis of Hydraulically Fractured Gas Wells,” paper SPE
77468, Annual Technical Conference and Exhibition, San Antonio, TX, 29
September-2 October.

Amyx, J.W., Bass, D.M., Whitinig, R.L. 1960, “Petroleum Reservoir Engineering,”
McGraw-Hill, New York, p 64-68.

Arcaro, D. P. and Bassiouni, Z. A., 1987, “The Technical And Economic Feasibility of
Enhanced Gas Recovery in The Eugene Island Field by Use a Coproduction
Technique,” Journal of Petroleum Technology (May 1987), p585-90.

Armenta, M., and Wojtanowicz, A.K., 2003, “Incremental Recovery Using Dual-
Completed Wells in Gas Reservoir with Bottom Water Drive: A Feasibility
Study,” paper 2003-194 Canadian International Petroleum Conference-2003,
Calgary, Alberta, Canada, June 10-12.

Armenta, M., White, C., Wojtanowicz, A.K., 2003, “Completion Length Optimization in
Gas Wells,” paper 2003-192 Canadian International Petroleum Conference-2003,
Calgary, Alberta, Canada, June 10-12.

Armenta, M., and Wojtanowicz, A., 2002, “Severity of Water Coning in Gas Wells,”
paper SPE 75720 SPE Gas Technology Symposium, Calgary, Alberta, Canada, 30
April-2 May.

Arthur, M.G., 1944, “Fingering and Coning of Water and Gas in Homogeneous Oil
Sand,” AIME Transactions, Vol. 155, 184-199.

163
Avery, D.J. and Evans, R.D., 1988, “Design Optimization of Plunger Lift Systems,”
paper SPE 17585, International Meeting on Petroleum Engineering of the SPE,
Tianjin, China, Nov. 1-4.

Awadzi, J., Babbitt, J., Holland, S., Snyder, K., Soucer, T., Latter, K., 1999, “Downhole
Capillary Soap Injection Improves Production,” paper SPE 52153, Mid-Continent
Operations Symposium, Oklahoma City, OK, March 28-31.

Baruzzi, J.O.A., Alhanati, F.J.S., 1995, “Optimum Plunger Lift Operation,” paper SPE
29455, Production Operations Symposium, Oklahoma City, OK, April 2-4.

Bear, J., 1972, “Dynamic of Fluids in Porous Media”, Dover Publications, INC., New
York.

Beauregard, E., and Ferguson, P.L., 1982, “Introduction to Plunger Lift: Applications,
Advantages and Limitations,” paper SPE 10882, Rocky Mountain Regional
Meeting of the SPE, Billings, MT, May 19-21.

Beattle, D.R. and Roberts, B.E., 1996, “Water Coning in Naturally Fractured Gas
Reservoirs,” Paper SPE 35643, Gas Technology Conference, Calgary, Alberta,
Canada, 28 April – 1 May.

Beeson, C.M., Knox, D.G., and Stoddard, J.H., 1958, “Short-Cut Design Calculations and
Field Applications of the Plunger Lift Method of Oil Production,” The Petroleum
Engineer, (June-Oct. 1958).

Beggs H.D. 1984, “Gas Production Operation,” Oil and Gas Consultants International,
Inc, Tulsa, Oklahoma, p53-59.

Berry, D. A., 196, “Statistics: A Bayesian Perspective,” Wadsworth Publishing Co.,


Belmont, CA, 518 p.

Bizanti, M.S., and Moonesan, A., 1989, “How to Determine Minimum Flow Rate for
Liquid Removal,” World Oil, (September, 1989), p 71-73.

Bourgoyne, A.T., Chenevert, M.E., Millheim, K.K., Young, F.S. 1991, “Applied Drilling
Engineering,” Society of Petroleum Engineering Textbook Series Volume 2,
Richardson, TX, p137-155.

Box, G. E. P. and Cox D.R., 1964 “An Analysis of Transformations,” J. of the Royal
Statistical Society, 26 No. 2, 211-252

Box, G. E. P. and Tidwell, P.W., 1962 “Transformation of the Independent Variables,”


Technometrics, 4 No. x, 531-550.

Brady, C.L., and Morrow, S.J., 1994, “An Economic Assessment of Artificial Lift in
Low-Pressure Tight Gas Sands in Ochiltree County, Texas,” paper SPE 27932,
SPE Mid-Continent Gas Symposium, Amarillo, TX, May 22-24.
164
Brar, S.G., Aziz, K., 1978, “Analysis of Modified Isochronal Test To Predict The
Stabilized Deliverability Potential of Gas Well Without Using Stabilized Flow
Data,” JPT (Feb.) 297-304; Trans. AIME, p297-304.

Campbell, S., Ramachandran, S., and Bartrip, K., 2001, “Corrosion Inhibition/Foamer
Combination Treatment to Enhance Gas Production,” paper SPE 67325,
Production and Operations Symposium, Oklahoma City, OK, March 24-27.

Chaperon, I., 1986, “Theoretical Study of Coning Toward Horizontal and Vertical Wells
in Anisotropic Formations: Subcritical and Critical Rates,” paper SPE 15377, SPE
Annual Technical Conference and Exhibition, New Orleans, Oct. 5-8.

Cohen, M.F. 1989, “Recovery Optimization in a Bottom/Edge Water-Drive Gas


Reservoir, Soehlingen Schneverdinge,” paper SPE 19068 SPE Gas Technology
Symposium, Dallas, June 7-9.

Coleman, S.B., Hartley, B.C., McCurdy, D.G., and Norris III, H.L., 1991, “A New Look
at Predicting Gas-Well Load-up,” J. Pet. Tech. (Mar. 1991) p329-38.

Computer Modelling Group Ltda, 2001, “User’s Guide, IMEX, Advanced Oil/Gas
Reservoir Simulator,” CMG, p425-26.

Craft B.C. and Hawkins M.F. 1959, “Applied Petroleum Reservoir Engineering,”
Prentice Hall PTR, Englewood Cliffs, NJ, p300-01.

Craft B.C. and Hawkins M.F. 1991, “Applied Petroleum Reservoir Engineering,”
Prentice Hall PTR, Englewood Cliffs, NJ, p226-227; 280-299.

Dake L.P., 1978, “Fundamentals of Reservoir Engineering,” Elsevier Scientific


Publishing Company, New York, p255-258.

Damsleth, E., Hage, A. and Volden, R., 1992: “Maximum Information at Minimum Cost:
A North Sea Field Development Study with Experimental Design,” J. Pet. Tech
(December 1992) 1350-1360.

Dejean, J.-P., and Blanc, G., 1999, “Managing Uncertainties on Production Predictions
Using Integrated Statistical Methods,” Paper SPE 56696, SPE Annual Technical
Conference and Exhibition, Houston, Texas, 3-6 October.

Dranchuck, P.M., Purvis, R.A., and Robinson, D.B., 1974, “Computer Calculations of
Natural Compressibility Factors Using the Standing and Katz Correlations,”
Institute of Petroleum Technical Series.

Economides, M.J., Oligney, R.E., Demarchos, A.S., and Lewis, P.E., 2001, “Natural Gas:
Beyond All Expectations,” Paper SPE 71512, Annual Technical Conference and
Exhibition, New Orleans, 30 September- 3 October.

165
E&P Environment, 2001, “GTI Studies Gas Well Water Management,” J&E
Communication, Inc, Vol. 12 No. 23, p1-4.

Elmer, W.G., 1995, “Tubing Flow Rate Controller: Maximize Gas Well Production From
Start To Finish,” paper SPE 30680, SPE Annual Technical Conference and
Exhibition, Dallas, September 22-25.

Energy Information Administration, 2000, “Distribution of Gas Wells and Production,”


http://www.eia.doe.gov/pub/poi_gas/petrosystem/natural_gas/petrosysgas.html

Energy Information Administration, 2001, “U.S. Crude Oil, Natural Gas, and Natural Gas
Liquids Reserves 2001 Annual Report,”
http://www.eia.doe.gov/pub/oil_gas/natural_gas/data_publications/crude_oil_natu
ral_gas_reserves/current/pdf/ch4.pdf

Energy Information Administration, 2001, “U.S. Natural Gas Markets: Recent Trends
and Prospects For the Future,”
http://tonto.eia.doe.gov/FTPROOT/service/oiaf0102.pdf

Energy Information Administration, 2003, “Annual Energy Outlook 2003 With


Projection to 2025,” www.eia.doe.gov/oiaf/aeo, January.

Energy Resources and Conservation Board, 1975, Theory and Practice of The Testing of
Gas Wells, third edition, Pub. ERCB-75-34, ERCB, Calgary, Alberta, p3-18 to p3-
21.

Ergun, S. and Orning, A.A., 1949, “Fluid Flow Through Ramdomly Packed Collumns
and Fluidized Beds.” Industrial and Engineering Chemistry 41, No 6, p1179-
1184.

Evan, R.D., Hudson, C.S., Greenlee, J.E., 1987, “The Effect of an Immobile Liquid
Saturation on the Non-Darcy Flow Coefficient in Porous Media,” SPE Production
Engineering (November ), p331-38.

Ferguson, P.L., and Beauregard, E., 1985, “How to Tell if Plunger Lift Will Work in
Your Well,” World Oil, August 1, p33-36.

Fligelman, H., Cinco-Ley, H., Ramley Jr., Braester, C., Couri, F., 1989, “Pressure-
Drawdown Test Analysis of a Gas Well Application of New Correlation,” paper
SPE 17551 Facilities Engineering, September (1989) p409.

Flowers, J.R., Hupp, M.T., and Ryan, J.D., 2003, “The Results of Increased Fracture
Conductivity on Well Performance in a Mature East Texas Gas Field,” paper SPE
84307 Annual Technical Conference and Exhibition, Denver, Colorado, October
5-8.

166
Foss, D.L., and Gaul, R.B., 1965, “Plunger-Lift Performance Criteria with Operating
Experience-Ventura Avenue Field,” Drilling and Production Practice, API
(1965), p124-40.

Frederick, D.C., Graves, R.M., 1994, “New Correlations To Predict Non-Darcy Flow
Coefficients at Immobile and Mobile Water Saturation,” paper SPE 28451 Annual
Technical Conference and Exhibition, New Orleans, Sept. 25-28

Gasbarri, S. and Wiggins, M.L., 2002, “A Dynamic Plunger Lift Model for Gas Wells,”
SPE Production and Facilities, May 2001, p89-96.

Geertsma, J., 1974, “Estimating the Coefficient of Inertial Resistance in Fluid Flow
through Porous Media,” SPEJ (Oct. 1974) p445-450.

Girardi, F., Lagrenade, E., Mendoza, E., Marin, H. and Conti, J.J., 2001, “Improvement
of Gas Recovery Factor Through the Application of Dewatering Methodology in
the Huamampampa Sands of the Agurague Field,” paper SPE 69565, SPE Latin
American and Caribbean Petroleum Engineering Conference, Buenos Aires,
Argentina, March 25-28.

Golan M. and Whitson C., 1991, “Well Performance,” Prentice-Hall Inc., New Jersey,
p268-284.

Grubb, A.D., and Duvall, D.K., 1992, “Disposal Tool Technology Extends Gas Well Life
and Enhances Profits,” paper SPE 24796, 67th Annual Technical Conference and
Exhibition of the SPE, Washington, D.C., October 4-7.

Hacksma, J.D., 1972, “Users Guide to Predict Plunger Lift Performance,” Proceeding,
Texas Tech. U. Southwestern Petroleum Short Course, Lubbock, TX.

Hasan, A.R., and Kabir, C.S., 1985, “Determining Bottomhole Pressures in Pumping
Wells,” SPEJ (Dec., 1985) 823-38.

Hebert, D.W., 1989, “A Systematic Approach To Design of Rod Pumps in Coal


Degasification Wells: San Juan Basin, New Mexico,” paper SPE 19011, SPE
Joint Rocky Mountain Regional/Low Permeability Reservoirs Symposium and
Exhibition, Denver, Colorado, March 6-8.

Henderson L.J., 1984, “Deep Sucker Rod Pumping for Gas Well Unloading,” paper SPE
13199, 59th Annual Technical Conference and Exhibition, Houston, TX,
September 16-19.

Hernandez, A., Marcano, L., Caicedo, S., and Carbunaru, R., 1993, “Liquid Fall-back
Measurements in Intermittent Gas Lift with Plunger,” paper SPE 26556, SPE
Annual Technical Conference and Exhibition, Houston, TX, October 3-6.

167
Hoyland, L.A., Papatzacos, P., and Skjaeveland, S.M., 1989, “Critical Rate for Water
Coning: Correlation and Analytical Solution,” SPE Reservoir Engineering, p459-
502, November 1989.

Houpeurt, A., 1959, “On the Flow of Gases in Porous Media,” Revue de L’Institut
Français du Pétrole (1959) XIV (11), p1468-1684.

Hutlas, E.J. and Granberry, W.R., 1972, “A Practical Approach to Removing Gas Well
Liquids,” J. Pet. Tech., (August 1972) 916-22.

Ikoku, C.I., 1984, “Natural Gas Production Engineering,” John Wiley & Sons, New York,
p369.

Inikori, S.O., 2002, “Numerical Study of Water Coning Control With Downhole Water
Sink (DWS) Well Completions in Vertical and Horizontal Well,” PhD
dissertation, Louisiana State University and A&M College, Baton Rouge, LA,
August.

Irmay, S, 1958, “On the Theoretical Derivation of Darcy and Forchheimer Formulas,”
Trans., American Geophysical Union 39, No 4, p702-707.

Janicek, J.D., and Katz, D.L., 1995, “Applications of Unsteady State Gas Flow
Calculations,” Proc., U. of Michigan Research Conference, June 20.

Jensen, J.L., Lake, L.W., Corbett, P.W.M., and Goggin, D.J., 2000, “Statistics for
Petroleum Engineers and Geoscientists,” Elsevier, New York.

Jones, S.C., 1987, “Using the Inertial Coefficient, β, To Characterize Heterogeneity in


Reservoir Rock,” paper SPE 16949 SPE Annual Technical Conference and
Exhibition, Dallas, Sept. 27-30.

Jones, L.G. and Watts, J.W., Feb. 1971, “Estimating Skin Effects in a Partially
Completed Damaged Well,” JPT 249-52; AIME Transactions, 251.

Joshi, S.D., 1991, “Horizontal Well Technology,” PennWell Books, Tulsa, Oklahoma,
p251-267.

Katz, D.L., Cornell, D., Kobayashi, R., Poettman, F.H., Vary, J.A., Elenbans, J.R., and
Weinaug, C.F., 1959, “Handbook of Natural Gas Engineering,” McGraw-Hill
Book Co., Inc., New York, p46-51.

Kabir, C.S., 1983, “Predicting Gas Well Performance Coning Water in Bottom-Water
Drive Reservoirs,” Paper SPE 12068, 58th Annual Technical Conference and
Exhibition, San Francisco, Oct 5-8.

Klein, S.T., 1991, “The Progressing Cavity Pump in Coaled Methane Extraction,” paper
SPE 23454, SPE Eastern Regional Meeting, Lexington, Kentucky, October 22-25.

168
Klein, S.T., Thompson, S., 1992, “Field Study: Utilizing a Progressing Cavity Pump for a
Closed-Loop Downhole Injection System,” paper SPE 24795, 67th Annual
Technical Conference and Exhibition of the SPE, Washington, D.C. October 4-7.

Lea, J.F., 1982, “Dynamic Analysis of Plunger Lift Operations,” Journal of Petroleum
Technology, (Nov. 1982), p2617-2629.

Lea, J.F., Winkler, H.W., and Snyder, R.E., 2003, “What’s new in artificial lift,” World
Oil, (April, 2003), p 59-75.

Lea Jr., J.F., and Tighe, R.E., 1983, “Gas Well Operation With Liquid Production,” Paper
SPE 11583, Production Operation Symposium, Oklahoma City, OK, February 27-
March 1.

Lee J., 1982, Well Testing, Society of Petroleum Engineering of AIME Textbook Series
Volume 1, New York, p82-84.

Lee, A.L., Gonzales, M.H., and Eakin, B.E., 1966, “The Viscosity of Natural Gases,”
Journal of Petroleum Technology, (August 1966).

Lee J. and Wattenbarger R. 1996, “Gas Reservoir Engineering”, Society of Petroleum


Engineering Textbook Series Volume 5, Richardson, Texas, p32; p170-174;
p245.

Libson, T.N., Henry, J.R., 1980, “Case Histories: Identification of and Remedial Action
for Liquid Loading in Gas Wells –Intermediate Shelf Gas Play,” Journal of
Petroleum Technology, (April, 1980), p685-93.

Liu, X., Civan, F., and Evans, R.D., 1995, “Correlation of the Non-Darcy Flow
Coefficient,” J. Cdn. Pet. Tech. (Dec. 1995) 34, No 10, p50-54.

Lombard, J-M., Longeron, D., Kalaydjan, F., 1999, “Influence of Connate Water and
Condensate Saturation on Inertia Effect in Gas Condensate Fields,” paper SPE
56485 SPE Annual Technical Conference and Exhibition, Houston, October 3-6.

Manceau, E., Mezghani M., Zabalza-Mezghani, I., and Roggero, F., 2001, “Combination
of Experimental Design and Joint Modeling Methods for Quantifying the Risk
Associated with Deterministic and Stochastic Uncertainties—An Integrated Test
Study,” paper SPE 71620, SPE Annual Technical Conference and Exhibition,
New Orleans, Louisiana, 30 September-3 October.

Maggard, J.B., Wattenbarger, R.A., and Scott, S.L., 2000, “Modeling Plunger Lift for
Water Removal From Tight Gas Wells,” paper SPE 59747, SPE/CERI Gas
Technology Symposium, Calgary, Alberta Canada, April 3-5.

169
Marcano, L. and Chacin, J., 1992, “Mechanistic Design of Conventional Plunger Lift
Installations,” paper SPE 23682, Second Latin American Petroleum Engineering
Conference of the SPE, Caracas, Venezuela, March 8-11.

McLeod, H.D. Jr. Jan. 1983, “The Effect of Perforating Conditions on Well
Performance,” JPT, p31-39.

McMullan, J.H., Bassiouni, Z., 2000, “Optimization of Gas-Well Completion and


Production Practices,” Paper SPE 58983, International Petroleum Conference and
Exhibition, Mexico, Feb 1-3.

Melton, C.G., and Cook, R.L., 1964, “Water-Lift and Disposal Operations in Low-
Pressure Shallow Gas Wells,” Journal of Petroleum Technology (June 1964),
p619-22.

Meyer, H.I. and Garder, A.O., 1954, “Mechanics of Two Immiscible Fluids in Porous
Media,” Journal of Applied Physics, (November 1954) 25, No. 11, 1400.

Mills, R.A.R., Gaymard, R., 1996, “New Application for Wellbore Progressing Cavity
Pumps,” paper SPE 35541, Intl. Petroleum Conference & Exhibition of Mexico,
Villahermosa, Mexico, March 5-7.

Montgomery, D.C., 1997, “Design and Analysis of Experiments,” 4th ed., John Wiley and
Sons, Inc., New York City.

Mower, L.N., Lea, J.F., Beauregard, E., and Ferguson, P. L., 1985, “Defining the
Characteristics and Performance of Gas Lift Plungers,” paper SPE 14344, SPE
Annual Technical Conference and Exhibition, Las Vegas, NV, Sept. 22-25.

Muskat, M.,1982, “Flow of Homogeneous Fluids,” International Human Resources


Development, Boston, p687-692.

Muskat, M. and Wyckoff, R.D., 1935, “An approximate Theory of Water Coning in Oil
Production,” AIME Transactions, Vol. 114, 144-163.

Myers, R. H. and Montgomery, D. C., 2002, “Response Surface Methodology: Process


and Product optimization Using Designed Experiments,” 2nd ed., John Wiley &
Sons, New York.

National Energy Board of Canada, 1995, “Unconnected Gas Supply Study: Phase I –
Evaluation of Unconnected Reserves in Alberta,” NEB Energy Resources Branch,
January.

Neves, T.R., and Brimhall, R.M., 1989, “Elimination of Liquid Loading in Low-
Productivity Gas Wells,” paper SPE 18833, SPE Production Operation
Symposium, Oklahoma City, OK, March 13-14.

170
Nichol, J.R., and Marsh, J., 1997, “Downhole Gas/Water Separation: Engineering
Assessment and Field Experience,” paper SPE 38828, SPE Annual Technical
Conference and Exhibition, San Antonio, TX, October 5-8.

Nosseir, M.A., Darwich, T.A., Sayyouh, M.H., and El Sallaly, M., 2000, “a New
Approach for Accurate Prediction of Loading in Gas Wells Under Different
Flowing Conditions,” SPE Prod. & Facilities 15 (4), November, p241-46.

Pascal H., Quillian, R.G., Kingston, J., 1980, “Analysis of Vertical Fracture Length and
Non-Darcy Flow Coefficient Using Variable Rate Tests,” paper SPE 9438 Annual
Technical Conference and Exhibition, Dallas, Sept. 21-24.

Petalas, N & Aziz, K, 1997, “A Mechanistic Model for Stabilized Multiphase Flow in
Pipe,” Petroleum Engineering Department, Stanford University, August 1997.

Pigott, M.J., Parker, M.H., Mazzanti, D.V., Dalrymple, L.V., Cox, D.C., and Coyle, R.A.,
2002, “Wellbore Heating To Prevent Liquid Loading,” paper SPE 77649, SPE
Annual Technical Conference and Exhibition, San Antonio, TX, 29 September-2
October.

Putra, S.A., and Christiansen R.L., 2001, “Design of Tubing Collar Inserts for Producing
Gas Wells Bellow Their Critical Rate,” paper SPE 71554, SPE Annual Technical
Conference and Exhibition, New Orleans, Louisiana, September 30- October 3.

R Core Team, 2000, “The R Reference Index: Version 1.1.1.”

Rangel-German, E., and Samaniego V., F, 2000, “On the determination of the skin factor
and the turbulence term coefficient through a single constant gas pressure test,” J.
of Pet. Sci. & Eng., (2000) 26, p121.

Randolph, P.L., Hayden, C.G., and Anhaiser, J.L., 1991, “Maximizing Gas Recovery
From Strong Water Drive Reservoir,” paper SPE 21486, SPE Gas Technology
Symposium, Houston, TX, January 23-25.

Rogers, L.A., 1984, “Test of Secondary Gas Recovery by Coproduction of Gas and
Water From Mt. Selman Field, TX,” paper SPE 12865, SPE/DOE/GRI
Unconventional Gas Recovery Symposium, Pittsburgh, PA, May 13-15.

Roman, S., 1999, “Writing Excel Macros,” O'Reilly and Associates, Sebastopol,
California, p529.

Rosina, L, 1983, “A Study of Plunger Lift Dynamics,” MS Thesis, The University of


Tulsa, Tulsa, OK.

Rudolph J., and Miller J., 2001 “Downhole Produced Water Disposal Improves Gas
Rate,” GasTIPS, pp 21-24, Fall 2001.

171
Sacks, J., S. B. Schiller, and W. J. Welch, 1989, “Designs for Computer Experiments,”
Technometrics (1989) 31 No. 1, 41-47.

Saidikowski, R.M., 1979, “Numerical Simulations of the Combined Effects of Wellbore


Damage and Partial Penetration,” Paper SPE 8204 Annual Fall Technical
Conference and Exhibition, Nevada, Sep 23-26.

Saleh, S., and Al-Jamae’y, M., 1997, “Foam-Assisted Liquid Lifting in Low Pressure Gas
Wells,” paper SPE 37425, Production Operations Symposium, Oklahoma City,
Marc 9-11.

Scheidegger, A.E., 1974, “The Physics of Flow through Porous Media,” University of
Toronto Press, Toronto.

Schlumberger: VFPi User Guide 98A, 1998, Sclumberger GeoQuest, App. N, pN-1 to N-
8.

Schlumberger Technology Co., 1997, Eclipse 100 Reference Manual, Sclumberger


GeoQuest, unpaginated.

Schneider, T.S., and Mackey, Jr. V., 2000, “Plunger Lift Beneficts Bottom Line for a
Southeast New Mexico Operator,” paper SPE 59705, SPE Permian Basin Oil and
Gas Recovery Conference, Midland, TX, March 21-23.

Schols, R.S., 1972, “An Empirical Formula for the Critical Oil Production Rate,” Erdoel
Erdgas, Z, Vol 88, No 1, p6-11, January 1972.

Schwall, G.H., 1989, “Case Histories: Plunger Lift Boosts Production in Deep
Appalachian Gas Wells,” paper SPE 18870, SPE Production Operations
Symposium, Oklahoma City, OK, March 13-14.

Scott, W.S., and Hoffman, C.E., 1999, “An Update On Use of Coiled Tubing for
Completion and Recompletion Strings,” paper SPE 57447, SPE Eastern Regional
Meeting, Charleston, West Virginia, October 21-22.

Shirman, E.I., Wojtanowicz, A.K., 1997, “Water Coning Reversal Using Downhole
Water Sink Theory and Experimental Study,” paper SPE 38792, SPE Annual
Technical Conference & Exhibition, San Antonio, TX, Oct.

Shirman, E.I., Wojtanowicz, A.K., 1998 “More Oil With Less Water Using Downhole
Water Sink Technology: A Feasibility Study,” paper SPE 49052 73rd SPE Annual
Technical Conference & Exhibition, New Orleans, LA, Oct. 27-30.

Silverman, S.A., Butler, W., Ashby, T., and Snider, K., 1997, “Concentric Capillary
Tubing Boosts Production of Low-Pressure Gas Wells,” Hart’s Petroleum
Engineer International, Vol. 70, No 10, October 1997, p71-73.

172
Smith, R.V., 1990, “Practical Natural Gas Engineering,” 2nd Edition, PennWell Books,
Tulsa, 1990.

Stephenson G.B., Rouen R.P., Rosenzweig M.H., 2000, “Gas-Well Dewatering: A


Coordinated Approach,” paper SPE 58984, 2000 SEP International Petroleum
Conference and Exibition, Villahermosa, Mexico, February 1-3.

Sutton, R.P., Cox, S. A., Williams Jr., E. G., Stoltz, R.P., and Gilbert, J.V., 2003, “Gas
Well Performance at Subcritical Rates,” paper SPE 80887, SPE Production and
Operations Symposium, Oklahoma City, OK, March 22-25.

Swisher, M.D. and Wojtanowicz, A.K., 1995, “In Situ-Segregated Production of Oil and
Water – A Production Method with Environmental Merit: Field Application,”
paper SPE 29693 SPE/EPA Exploration & Production Environmental
Conference, Houston, TX, March 27-29.

Swisher, M.D. and Wojtanowicz, A.K., 1995, “New Dual Completion Method Eliminates
Bottom Water Coning,” paper SPE 30697, SPE Annual Technical Conference &
Exhibition, Dallas, TX, Oct. 22-25.

Thauvin, F., and Mohanty, K.K., 1998, “Network Modeling of Non-Darcy Flow through
Porous Media,” Transport in Porous Media, 31, p19-37.

Timble, A.E., DeRose, W.E., 1976, “Field Application of Water-Conning Theory to


Todhunters Lake Gas Field,” Paper SPE 5873, SPE-AIME 46th Annual California
Regional Meeting, Long Beach, April 8-9.

Tiss, M. and Evans, R.D., 1989, “Measurement and Correlation of Non-Darcy Flow
Coefficient in Consolidated Porous Media,” J. Petroleum Science and
Engineering, Vol. 3, Nos. 1-2, p19-33.

Turner, R.G, Hubbard, M.G., and Dukler, A.E., 1969, “Analysis and Prediction of
Minimum Flow Rates for the Continuous Removal of Liquid from Gas Wells,” J.
Pet. Tech. (Nov., 1969) 1475-82.

Umnuayponwiwat, S., Ozkan, E., Pearson, C.M., and Vincent, M., 2000, “Effect of non-
Darcy flow on the interpretation of transient pressure responses of hydraulically
fractured wells,” paper SPE 63176 presented at the SPE Annual Technical
Conference and Exhibition, Dallas, October 1-4.

Upchurch, E.R., 1987, “Expanding the Range for Predicting Critical Flowrates of Gas
Well Producing From Normally Pressured Water Drive Reservoir,” paper SPE
16906, SPE Annual Technical Conference and Exhibition, Dallas, September 27-
30.

Vosika, J.L., 1983, “Use of Foaming Agents to Alleviate Loading in Great Green River
TFG Wells,” paper SPE/DOE 11644, SPE/DOE Symposium on Low Permeability,
Denver, Colorado, March 14-16.
173
Weeks, S., 1982, “Small-Diameter Concentric Tubing Extends Economic Life of High
Water/Sour Gas Edwards Producers,” Journal of Petroleum Technology,
(September, 1982), p1947-50.

White, C., 2002, “PETE-4052 Well Testing,” Syllabus, Louisiana State University, Craft
& Hawkins Petroleum Engineering Department.

White, G.W., 1982, “Combine Gas Lift, Plunger to Increase Production Rate,” World Oil
(Nov. 1982), p69-74.

White, C.D., and Royer, S.A., 2003, “Experimental Design as a Framework for Reservoir
Studies,” paper SPE 79676, SPE Reservoir Simulation Symposium, Houston,
February 3-5.

White, C.D., Willis, B.J., Narayanan, K., and Dutton, S.P., 2001, “Identifying and
Estimating Significant Geologic Parameters with Experimental Design,” SPEJ
(September 2001) 311-324.

Wiggins, M. L., Nguyen, S.H., and Gasbarri, S., 1999, “Optimizing Plunger Lift
Operations in Oil and Gas Wells,” paper SPE 52119, SPE Mid-Continent
Operations Symposium, Oklahoma City, Oklahoma, March 28-31.

Wojtanowicz, A.K., Shirman, E.I., Kurban, H., 1999, “Downhole Water Sink (DWS)
Completion Enhance Oil Recovery in Reservoir With Water Coning Problems,”
paper SPE 56721, SPE Annual Technical Conference & Exhibition, Houston, TX,
Oct. 3-6.

Xu, R., Yang, L., 1995, “A New Binary Surfactant Mixture Improved Foam Performance
in Gas Well Production,” paper SPE 29004, International Symposium on Oilfield
Chemistry, San Antonio, TX, February 14-17.

174
APPENDIX A

ANALYTICAL COMPARISON OF WATER CONING IN OIL AND GAS WELLS

1. Analytical comparison of water coning in oil and gas wells before water
breakthrough

The pressure drop to generate a stable cone height of 20 feet in the oil-water

system is:

∆P = 0.052( ρ w − ρ o )h
∆P = 0.052(8.5 − 6.6) * 20
∆P = 2 psi

The oil production rate for this pressure drop assuming pseudo-steady-state

conditions is:

0.00708 * hko ( pe − p1 )
qo =
µBo * [ln(0.472re / rw ) + S ]

Assuming that the skin effect (S) is generated only by the partial penetration (skin

effects generated by drilling mud and perforation geometry are zero). After Saidikowski

(1979), S can be estimated from the equation:

h   h kH  
S =  t − 1 ln t  − 2

h 
 p    rw kV  

Where: ht is the reservoir thickness, hp is the completed interval, rw is the wellbore

radius, kH is the horizontal permeability, and kV is the vertical permeability.

 50    50  
For this example: S =  − 1 ln  − 2 = 3.9
 20    0.5  

The oil flow rate is:

175
0.00708 * 50 * 100(2000 − 1998)
qo =
0.9 *1.1 * [ln (0.472 *1000 / 0.5) + 3.9]
q o = 6.7 STB / D

Next, it was assumed that the reservoir has gas instead of oil. Then, the value of

the pressure drop and the gas production rate, necessary to generate the same stable cone

height generated for oil-water systems (20 ft), was calculated. The pressure drop to

generate a 20 ft high stable cone is:

∆P = 0.052( ρ w − ρ g )h
∆P = 0.052(8.5 − 0.8) * 20
∆P = 8 psi

The gas production rate for this pressure drop at pseudo-steady-state conditions,

neglecting Non-Darcy flow term, is:

6.88 * 10 −7 * hk g ( p e2 − p12 )
qg =
TZµ * [ln(0.472 * re / rw ) + S ]

Assuming that the skin effect (S) is generated only by the partial penetration (skin

effects generated by drilling mud and perforation geometry are zero). From the previous

calculation, S = 3.9

The gas flow rate is:

6.88 * 10 −7 * 50 * 100 * (2000 2 − 1992 2 )


qg =
572 * 0.84 * 0.017 * [ln(0.472 * 1000 / 0.5) + 3.9]
q g = 1.25 MMSCF / D

176
2. Analytical comparison of water coning in oil and gas wells after water
breakthrough

well

oil / gas
h Pw
Pe

ye y=? water

r
r
Figure A-1 Theoretical model used to compare water coning in oil and gas wells after

breakthrough.

Assumptions: radial flow, isothermal conditions, porosity, and permeability are

the same in the gas and water zone, and steady state conditions.

For gas-water system:

2πr (h − y )kφp ∂p
Qg = ………………………………………………………..(A-1)
µg ∂r

2πrykφ ∂p
Qw = …………………………………………………..…………(A-2)
µ w ∂r

Qg µ w (h − y ) p
R= = ……………………………………………………….(A-3)
Qw µg y

µ w Pe (1 − ( y e / h))
Qg
At re ⇒ R = = …………………………….………...(A-4)
Qw µ g ( y e / h)

Rearranging equation (A-1):

177
Qg µ g ∂p ∂p
= rhp − ryp …………………………………………………...…(A-6)
2πφk ∂r ∂r

Rearranging equation (A-2):

Qw µ w ∂p
= ry ………………………………..…………………………..…(A-7)
2πφk ∂r

Substituting (A-7) in (A-6):

Qg µ g ∂p Q w µ w
= rhp − p …………………………………….……….…….(A-8)
2πφk ∂r 2πφk

Qg µ g
Defining some constants: a= ……………………………….….(A-9)
2πφkh

Qw µ w
b= ……………………………...….(A-10)
2πφkh

Substituting (A-9) and (A-10) in (A-8):

∂p
a = rp − bp ……………………………………………………..………(A-11)
∂r

Rearranging equation (A-11) gives:

1
 p
b ∂r
∂p = …………………………………………..…….……..(A-12)
 a   r
  + p 
 b  

Integrating (A-12):
pe r
p e
∂r
(1 / b) ∫
p
∂p =
[(a / b) + p ] r r ∫ ………………..………………………….…..(A-13)

The solution for (A-13) is:

re 1  a  p + a / b 
ln =  p e − p − ln e  ……..……………………………….. (A-14)
r b  b  p + a / b 

The ratio (a/b) may be found dividing equation (A-9) by equation (A-10):

a Qg µ g
= …………………………………………………..………………(A-15)
b Qw µ w

178
From equation (A-4):

Qg µ g 1 − ( y e / h) a
= pe = ………………………………………..…………(A-16)
Qw µ w ( y e / h) b

The ratio (1/b) can be found from equation (A-14) at the wellbore (r = rw ⇒ p = pw):

 r

ln e

1   rw
= …………………………………………(A-17)
b   a   p e + (a / b)  
( p e − p w ) −   ln  
  b   p w + (a / b)  

Finally, y may be solved from equation (A-3) and (A-15):

Qg µ g (h − y ) p a hp
= = ⇒ y= ……………………………………..(A-18)
Qw µ w y b [(a / b) + p]

Repeating the same analysis for the oil-water system:

2πr (h − y )kφ ∂p
Qo = …………………………………………….……..…..(A-19)
µo ∂r

2πrykφ ∂p
Qw = ………………………………………………………..…..(A-20)
µ w ∂r

Qo µ w (h − y )
R= = ………………………………………………………...(A-21)
Qw µo y

Qo µ o Qw µ w a Qo µ o (h − y e )
If: a = , and b = , then = = ………….……..(A-22)
2πφkh 2πφkh b Qw µ w ye

Qo µ o ∂p ∂p
Rearranging Eq. A-19: = rh − ry ………………………...…..(A-23)
2πφk ∂r ∂r

Integrating (A-23):

a  re ∂r 1 pe
 + 1
b 
∫r r
=
b ∫
p
∂p …………………………………………………….(A-24)

1
 ( p e − p )
r  b
ln e  = ……………………………………………….……..(A-25)
r  a 
 + 1
b 

179
h
Solving for y: y = ……………………………………….……..(A-26)
a 
 + 1
b 

180
APPENDIX B

EXAMPLE ECLIPSE DATA DECK FOR COMPARISON OF WATER CONING


IN OIL AND GAS WELLS AFTER WATER BREAKTHROUGH

GAS-WATER MODEL

Runspec
Title
Comparison of Water Coning in Oil and Gas Wells After Water
Breakthrough
Gas-Water Model

MESSAGES
6* 3*5000 /
Radial
Dimens
-- NR Theta NZ
26 1 128 /
Gas
Water
Field
Regdims
2 /
Welldims
-- Wells Con Group Well in group
2 100 1 2 /
VFPPDIMS
10 10 10 10 0 2 /
Start
1 'Jan' 2002 /
Nstack
300 /
Unifout
-------------------------------------------------------------
Grid
Tops
26*5000 /
Inrad
0.333 /
DRV
0.4170 0.3016 0.4229 0.5929 0.8313 1.166
1.634 2.292 3.213 4.505 6.317 8.857
12.42 17.41 24.41 34.23 48.00 67.30
94.36 132.3 185.5 260.1 364.7 511.4
717.0 2500 /
DZ
3120*0.5
182*5
26*550
/
Equals
'DTHETA' 360 /
'PERMR' 10 /
'PERMTHT' 100 /
'PERMZ' 5 /
'PORO' 0.25 /
'PORO' 0 26 26 1 1 1 100 /
'PORO' 10 26 26 1 1 101 128 /

181
/
INIT
--RPTGRID
--1 /
-------------------------------------------------------------
PROPS
DENSITY
45 64 0.046 /
ROCK
2500 10E-6 /
PVTW
2500 1 2.6E-6 0.68 0 /
PVZG
-- Temperature
120 /
-- Press Z Visc
100 0.989 0.0122
300 0.967 0.0124
500 0.947 0.0126
700 0.927 0.0129
900 0.908 0.0133
1100 0.891 0.0137
1300 0.876 0.0141
1500 0.863 0.0146
1700 0.853 0.0151
1900 0.845 0.0157
2100 0.840 0.0163
2300 0.837 0.0167
2500 0.837 0.0177
2700 0.839 0.0184
3200 0.844 0.0202
/
--Saturation Functions
--Sgc = 0.20
--Krg @ Swir = 0.9
--Swir = 0.3
--Sorg = 0.0
SGFN
--Using Honarpour Equation 71
-- Sg Krg Pc
0.00 0.000 0.0
0.10 0.000 0.0
0.20 0.020 0.0
0.30 0.030 0.0
0.40 0.081 0.0
0.50 0.183 0.0
0.60 0.325 0.0
0.70 0.900 0.0
/
SWFN
--Using Honarpour Equation 67
-- Sw Krw Pc
0.3 0.000 0.0
0.4 0.035 0.0
0.5 0.076 0.0
0.6 0.126 0.0
0.7 0.193 0.0
0.8 0.288 0.0
0.9 0.422 0.0
1.0 1.000 0.0
/

182
-------------------------------------------------------------
REGIONS
Fipnum
2600*1
728*2
/
-------------------------------------------------------------
SOLUTION
EQUIL
5000 1500 5050 0 5050 0 /
RPTSOL
6* 2 2 /
-------------------------------------------------------------
SUMMARY
SEPARATE
RPTONLY
WGPR
/
WWPR
/
WBHP
/
WTHP
/
WGPT
/
WWPT
/
WBP
/
RGIP
/
RPR
1 2 /
TCPU
-------------------------------------------------------------
SCHEDULE
NOECHO
INCLUDE
'WELL-5000-VI.VFP' /
ECHO
RPTSCHED
6* 2 /
RPTRST
4 / restarts once a year
TUNING
0.0007 30.4 0.0007 0.0007 1.2 /
3* 0.00001 3* 0.0001 /
2* 500 1* 100 /
WELSPECS
'P' 'G' 1 1 5000 'GAS' 2* 'STOP' 'YES' /
/
COMPDAT
'P' 1 1 1 100 'OPEN' 2* 0.666 /
/
WCONPROD
'P' 'OPEN' 'THP' 6* 300 1 /
/
WECON
'P' 1* 1000 3* 'WELL' 'YES' /
/

183
TSTEP
6*30.4 /
TSTEP
48*30.4 /
TSTEP
35*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
End

184
ECLIPSE VFP INCLUDED FILE: WELL-5000-VI
VFPPROD
1 5.00000E+003 'GAS' 'WGR' 'OGR' 'THP' '' 'FIELD' 'BHP'/

5.00000E+002 1.00000E+003 3.00000E+003 5.00000E+003


1.00000E+004 1.50000E+004 1.80000E+004 /
3.00000E+002 5.00000E+002 7.00000E+002 /
0.00000E+000 5.00000E-002 1.00000E-001 2.00000E-001
4.00000E-001 6.00000E-001 8.00000E-001 1.00000E+000 /
0.00000E+000 /
0.00000E+000 /

1 1 1 1 3.37024E+002 3.45916E+002 4.25316E+002 5.47796E+002


9.16800E+002 1.30649E+003 1.53942E+003 /
2 1 1 1 5.59849E+002 5.65127E+002 6.15848E+002 7.04360E+002
1.01422E+003 1.37324E+003 1.59511E+003 /
3 1 1 1 7.84870E+002 7.88564E+002 8.24884E+002 8.91574E+002
1.14823E+003 1.47144E+003 1.67903E+003 /
1 2 1 1 1.00767E+003 6.85715E+002 5.26979E+002 6.66317E+002
1.17821E+003 1.69683E+003 2.00157E+003 /
2 2 1 1 1.33083E+003 1.14235E+003 7.95789E+002 8.23119E+002
1.26153E+003 1.75038E+003 2.04461E+003 /
3 2 1 1 1.63681E+003 1.43549E+003 1.08259E+003 1.05816E+003
1.38041E+003 1.83132E+003 2.11135E+003 /
1 3 1 1 1.02840E+003 7.98358E+002 6.46858E+002 7.92196E+002
1.40325E+003 2.01561E+003 2.37484E+003 /
2 3 1 1 1.35532E+003 1.17999E+003 9.33680E+002 9.70272E+002
1.48036E+003 2.06380E+003 2.41335E+003 /
3 3 1 1 1.66413E+003 1.46993E+003 1.24089E+003 1.22716E+003
1.59380E+003 2.13846E+003 2.47443E+003 /
1 4 1 1 1.06877E+003 9.06174E+002 8.40372E+002 1.03062E+003
1.79136E+003 2.60038E+003 3.08950E+003 /
2 4 1 1 1.40292E+003 1.23965E+003 1.14544E+003 1.22814E+003
1.87547E+003 2.65034E+003 3.12890E+003 /
3 4 1 1 1.71647E+003 1.53687E+003 1.43807E+003 1.50399E+003
2.00566E+003 2.72983E+003 3.19348E+003 /
1 5 1 1 1.14745E+003 1.03248E+003 1.14282E+003 1.50309E+003
2.63140E+003 3.81908E+003 4.60402E+003 /
2 5 1 1 1.49259E+003 1.35495E+003 1.42442E+003 1.68890E+003
2.70978E+003 3.86469E+003 4.64024E+003 /
3 5 1 1 1.81241E+003 1.66240E+003 1.68147E+003 1.92590E+003
2.82769E+003 3.93860E+003 4.70113E+003 /
1 6 1 1 1.22282E+003 1.13624E+003 1.39809E+003 1.90174E+003
3.33657E+003 4.76408E+003 5.69293E+003 /
2 6 1 1 1.57486E+003 1.46356E+003 1.65458E+003 2.07013E+003
3.40719E+003 4.80311E+003 5.72329E+003 /
3 6 1 1 1.89758E+003 1.77592E+003 1.89757E+003 2.26855E+003
3.51185E+003 4.86696E+003 5.77621E+003 /
1 7 1 1 1.29426E+003 1.23434E+003 1.62877E+003 2.24629E+003
3.93384E+003 5.78065E+003 7.03960E+003 /
2 7 1 1 1.65009E+003 1.56415E+003 1.86048E+003 2.39607E+003
4.00224E+003 5.81806E+003 7.06883E+003 /
3 7 1 1 1.97324E+003 1.87771E+003 2.09286E+003 2.57229E+003
4.09229E+003 5.87715E+003 7.11864E+003 /
1 8 1 1 1.36153E+003 1.32752E+003 1.83827E+003 2.56051E+003
4.54574E+003 6.91460E+003 8.57619E+003 /
2 8 1 1 1.71853E+003 1.65684E+003 2.04934E+003 2.69480E+003
4.60380E+003 6.95034E+003 8.60433E+003 /
3 8 1 1 2.04060E+003 1.96914E+003 2.27214E+003 2.85658E+003
4.68526E+003 7.00651E+003 8.65222E+003 /

185
EXAMPLE ECLIPSE DATA DECK FOR COMPARISON OF WATER CONING
IN OIL AND GAS WELLS AFTER WATER BREAKTHROUGH

OIL-WATER MODEL
Runspec
Title
Comparison of Water Coning in Oil and Gas Well After Water
Breakthrough
Oil-Water Model

MESSAGES
6* 3*5000 /
Radial
Dimens
-- NR Theta NZ
26 1 128 /
NONNC
Oil
--Gas
--Disgas
Water
Field
Regdims
2 /
Welldims
-- Wells Con Group Well in group
2 100 1 2 /
VFPPDIMS
10 10 10 10 0 2 /
Start
1 'Jan' 2002 /
Nstack
300 /
Unifout
-------------------------------------------------------------
Grid
Tops
26*5000 /
Inrad
0.333 /
DRV
0.4170 0.3016 0.4229 0.5929 0.8313 1.166
1.634 2.292 3.213 4.505 6.317 8.857
12.42 17.41 24.41 34.23 48.00 67.30
94.36 132.3 185.5 260.1 364.7 511.4
717.0 2500 /
DZ
3120*0.5
182*5
26*550
/
Equals
'DTHETA' 360 /
'PERMR' 10 /
'PERMTHT' 100 /
'PERMZ' 5 /
'PORO' 0.25 /
'PORO' 0 26 26 1 1 1 100 /

186
'PORO' 10 26 26 1 1 101 128 /
/
INIT
--RPTGRID
--1 /
-------------------------------------------------------------
PROPS
DENSITY
45 64 0.046 /
ROCK
2500 10E-6 /
PVTW
2500 1 2.6E-6 0.68 0 /

SWOF
-- Sw Krw Krow Pcow
0.27 0.000 0.900 0
0.35 0.012 0.596 0
0.40 0.032 0.438 0
0.45 0.061 0.304 0
0.50 0.099 0.195 0
0.55 0.147 0.110 0
0.60 0.204 0.049 0
0.65 0.271 0.012 0
0.70 0.347 0.000 0 /

PVCDO
2500 1.15 1.5E-5 0.5 0 /
RSCONST
0.379 1000
/
-------------------------------------------------------------
REGIONS
Fipnum
2600*1
728*2
/
-------------------------------------------------------------
SOLUTION
EQUIL
5000 3000 5050 0 100 0 1 1 2* /
RPTSOL
6* 2 2 /
-------------------------------------------------------------
SUMMARY
SEPARATE
RPTONLY
WOPR
/
WWPR
/
WBHP
/
WTHP
/
WOPT
/
WWPT
/
WBP
/

187
RGIP
/
RPR
1 2 /
TCPU
-------------------------------------------------------------
SCHEDULE
NOECHO
--INCLUDE
--'WELL-5000-VI.VFP' /
ECHO
RPTSCHED
6* 2 /
RPTRST
4 / restarts once a year
TUNING
0.0007 30.4 0.0007 0.0007 1.2 /
3* 0.00001 3* 0.0001 /
2* 500 1* 100 /
WELSPECS
'P' 'G' 1 1 5000 'GAS' 2* 'STOP' 'YES' /
/
COMPDAT
'P' 1 1 1 100 'OPEN' 2* 0.666 /
/
WCONPROD
'P' 'OPEN' 'ORAT' 630 /
/
WECON
'P' 2* 1.0 2* 'WELL' 'YES' /
/
TSTEP
6*30.4 /
TSTEP
48*30.4 /
TSTEP
35*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /

188
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
End

189
APPENDIX C

EXAMPLE ECLIPSE DATA DECK FOR EFFECT OF VERTICAL


PERMEABILITY ON WATER CONING
Runspec
Title
Effect of Vertical Permeability on Water Coning
Vertical Permeability equal to 30% Horizontal Permeability

MESSAGES
6* 3*5000 /
Radial
Dimens
-- NR Theta NZ
26 1 110 /
Gas
Water
Field
Regdims
2 /
Welldims
-- Wells Con
1 100 /
VFPPDIMS
10 10 10 10 0 1 /
Start
1 'Jan' 1998 /
Nstack
100 /
Unifout
-------------------------------------------------------------
Grid
Tops
26*5000 /
Inrad
0.333 /
DRV
0.4170 0.3016 0.4229 0.5929 0.8313 1.166
1.634 2.292 3.213 4.505 6.317 8.857
12.42 17.41 24.41 34.23 48.00 67.30
94.36 132.3 185.5 260.1 364.7 511.4
717.0 2500 /
DZ
2600*1
234*10
26*110
/
Equals
'DTHETA' 360 /
'PERMR' 10 /
'PERMTHT' 10 /
'PERMZ' 3 /
'PORO' 0.25 /
'PORO' 0 26 26 1 1 1 100 /
'PORO' 10 26 26 1 1 101 110 /
/

190
INIT
--RPTGRID
--1 /
-------------------------------------------------------------
PROPS
DENSITY
45 64 0.046 /
ROCK
2500 10E-6 /
PVTW
2500 1 2.6E-6 0.68 0 /
PVZG
-- Temperature
120 /
-- Press Z Visc
100 0.989 0.0122
300 0.967 0.0124
500 0.947 0.0126
700 0.927 0.0129
900 0.908 0.0133
1100 0.891 0.0137
1300 0.876 0.0141
1500 0.863 0.0146
1700 0.853 0.0151
1900 0.845 0.0157
2100 0.840 0.0163
2300 0.837 0.0167
2500 0.837 0.0177
2700 0.839 0.0184
/
--Saturation Functions
--Sgc = 0.20
--Krg @ Swir = 0.9
--Swir = 0.3
--Sorg = 0.0
SGFN
--Using Honarpour Equation 71
-- Sg Krg Pc
0.00 0.000 0.0
0.20 0.000 0.0
0.30 0.020 0.0
0.40 0.081 0.0
0.50 0.183 0.0
0.60 0.325 0.0
0.70 0.900 0.0
/
SWFN
--Using Honarpour Equation 67
-- Sw Krw Pc
0.3 0.000 0.0
0.4 0.035 0.0
0.5 0.076 0.0
0.6 0.126 0.0
0.7 0.193 0.0
0.8 0.288 0.0
0.9 0.422 0.0
1.0 1.000 0.0
/

191
-------------------------------------------------------------
REGIONS
Fipnum
2600*1
260*2
/
-------------------------------------------------------------
SOLUTION
EQUIL
5000 2300 5100 0 5100 0 /
RPTSOL
6* 2 2 /
-------------------------------------------------------------
SUMMARY
SEPARATE
RPTONLY
WGPR
/
WWPR
/
WBHP
/
WTHP
/
WGPT
/
WWPT
/
WBP
/
RGIP
/
RPR
1 2 /
TCPU
-------------------------------------------------------------
SCHEDULE
NOECHO
INCLUDE
'WELL-5000-VI.VFP' /
ECHO
RPTSCHED
6* 2 /
RPTRST
4 / restarts once a year
TUNING
0.0007 30.4 0.0007 0.0007 1.2 /
3* 0.00001 3* 0.0001 /
2* 100 /
WELSPECS
'P' 'G' 1 1 5000 'GAS' 2* 'STOP' 'YES' /
/
COMPDAT
'P' 1 1 1 30 'OPEN' 2* 0.666 /
/
WCONPROD
'P' 'OPEN' 'THP' 5* 550 500 1 /
/

192
WECON
'P' 1* 1220 4* 'YES' /
/
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
End

193
EXAMPLE ECLIPSE DATA DECK FOR EFFECT OF AQUIFER SIZE ON
WATER CONING
Runspec
Title
Effect of Aquifer Size on Water Coning
VAD equal to 519

MESSAGES
6* 3*5000 /
Radial
Dimens
-- NR Theta NZ
26 1 110 /
Gas
Water
Field
Regdims
2 /
Welldims
-- Wells Con
1 100 /
VFPPDIMS
10 10 10 10 0 1 /
Start
1 'Jan' 1998 /
Nstack
100 /
Unifout
-------------------------------------------------------------
Grid
Tops
26*5000 /
Inrad
0.333 /
DRV
0.4170 0.3016 0.4229 0.5929 0.8313 1.166
1.634 2.292 3.213 4.505 6.317 8.857
12.42 17.41 24.41 34.23 48.00 67.30
94.36 132.3 185.5 260.1 364.7 511.4
717.0 2500 /
DZ
2600*1
234*10
26*410
/
Equals
'DTHETA' 360 /
'PERMR' 10 /
'PERMTHT' 10 /
'PERMZ' 1 /
'PORO' 0.25 /
'PORO' 0 26 26 1 1 1 100 /
'PORO' 10 26 26 1 1 101 110 /
/
INIT
--RPTGRID
--1 /

194
-------------------------------------------------------------
PROPS
DENSITY
45 64 0.046 /
ROCK
2500 10E-6 /
PVTW
2500 1 2.6E-6 0.68 0 /
PVZG
-- Temperature
120 /
-- Press Z Visc
100 0.989 0.0122
300 0.967 0.0124
500 0.947 0.0126
700 0.927 0.0129
900 0.908 0.0133
1100 0.891 0.0137
1300 0.876 0.0141
1500 0.863 0.0146
1700 0.853 0.0151
1900 0.845 0.0157
2100 0.840 0.0163
2300 0.837 0.0167
2500 0.837 0.0177
2700 0.839 0.0184
/
--Saturation Functions
--Sgc = 0.20
--Krg @ Swir = 0.9
--Swir = 0.3
--Sorg = 0.0
SGFN
--Using Honarpour Equation 71
-- Sg Krg Pc
0.00 0.000 0.0
0.20 0.000 0.0
0.30 0.020 0.0
0.40 0.081 0.0
0.50 0.183 0.0
0.60 0.325 0.0
0.70 0.900 0.0
/
SWFN
--Using Honarpour Equation 67
-- Sw Krw Pc
0.3 0.000 0.0
0.4 0.035 0.0
0.5 0.076 0.0
0.6 0.126 0.0
0.7 0.193 0.0
0.8 0.288 0.0
0.9 0.422 0.0
1.0 1.000 0.0
/
-------------------------------------------------------------
REGIONS
Fipnum

195
2600*1
260*2
/
-------------------------------------------------------------
SOLUTION
EQUIL
5000 2300 5100 0 5100 0 /
RPTSOL
6* 2 2 /
-------------------------------------------------------------
SUMMARY
SEPARATE
RPTONLY
WGPR
/
WWPR
/
WBHP
/
WTHP
/
WGPT
/
WWPT
/
WBP
/
RGIP
/
RPR
1 2 /
TCPU
-------------------------------------------------------------
SCHEDULE
NOECHO
INCLUDE
'WELL-5000-VI.VFP' /
ECHO
RPTSCHED
6* 2 /
RPTRST
4 / restarts once a year
TUNING
0.0007 30.4 0.0007 0.0007 1.2 /
3* 0.00001 3* 0.0001 /
2* 100 /
WELSPECS
'P' 'G' 1 1 5000 'GAS' 2* 'STOP' 'YES' /
/
COMPDAT
'P' 1 1 1 30 'OPEN' 2* 0.666 /
/
WCONPROD
'P' 'OPEN' 'THP' 5* 550 500 1 /
/
WECON
'P' 1* 1220 4* 'YES' /
/

196
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
End

197
EXAMPLE ECLIPSE DATA DECK FOR EFFECT OF FLOW BEHIND CASING
ON WATER CONING
Runspec
Title
Effect of Flow Behind Casing
Channel Size 1.3 inches (Permeability in the first grid 1,000,000 md)
Channel Initially in the Water Zone

6* 3*5000 /
Radial
Dimens
-- NR Theta NZ
26 1 110 /
Gas
Water
Field
Regdims
2 /
Welldims
-- Wells Con
1 100 /
VFPPDIMS
10 10 10 10 0 1 /
Start
1 'Jan' 1998 /
Nstack
100 /
Unifout
-------------------------------------------------------------
Grid
Tops
26*5000 /
Inrad
0.333 /
DRV
0.4170 0.3016 0.4229 0.5929 0.8313 1.166
1.634 2.292 3.213 4.505 6.317 8.857
12.42 17.41 24.41 34.23 48.00 67.30
94.36 132.3 185.5 260.1 364.7 511.4
717.0 2500 /
DZ
2600*1
234*10
26*110
/
Equals
'DTHETA' 360 /
'PERMR' 100 /
'PERMTHT' 100 /
'PERMZ' 10 /
'PORO' 0.25 /
'PORO' 0 26 26 1 1 1 100 /
'PORO' 10 26 26 1 1 101 110 /
'PERMZ' 1000000 1 1 1 1 1 101 /
'PERMR' 0 1 1 1 1 51 100 /

198
/
INIT
--RPTGRID
--1 /
-------------------------------------------------------------
PROPS
DENSITY
45 64 0.046 /
ROCK
2500 10E-6 /
PVTW
2500 1 2.6E-6 0.68 0 /
PVZG
-- Temperature
120 /
-- Press Z Visc
100 0.989 0.0122
300 0.967 0.0124
500 0.947 0.0126
700 0.927 0.0129
900 0.908 0.0133
1100 0.891 0.0137
1300 0.876 0.0141
1500 0.863 0.0146
1700 0.853 0.0151
1900 0.845 0.0157
2100 0.840 0.0163
2300 0.837 0.0167
2500 0.837 0.0177
2700 0.839 0.0184
/
--Saturation Functions
--Sgc = 0.20
--Krg @ Swir = 0.9
--Swir = 0.3
--Sorg = 0.0
SGFN
--Using Honarpour Equation 71
-- Sg Krg Pc
0.00 0.000 0.0
0.20 0.000 0.0
0.30 0.020 0.0
0.40 0.081 0.0
0.50 0.183 0.0
0.60 0.325 0.0
0.70 0.900 0.0
/
SWFN
--Using Honarpour Equation 67
-- Sw Krw Pc
0.3 0.000 0.0
0.4 0.035 0.0
0.5 0.076 0.0
0.6 0.126 0.0
0.7 0.193 0.0
0.8 0.288 0.0
0.9 0.422 0.0

199
1.0 1.000 0.0
/
-------------------------------------------------------------
REGIONS
Fipnum
2600*1
260*2
/
-------------------------------------------------------------
SOLUTION
EQUIL
5000 2500 5100 0 5100 0 /
RPTSOL
6* 2 2 /
-------------------------------------------------------------
SUMMARY
SEPARATE
RPTONLY
WGPR
/
WWPR
/
WBHP
/
WTHP
/
WGPT
/
WWPT
/
WBP
/
RGIP
/
RPR
1 2 /
TCPU
-------------------------------------------------------------
SCHEDULE
NOECHO
INCLUDE
'GWVFP.VFP' /
ECHO
RPTSCHED
6* 2 /
RPTRST
4 / restarts once a year
TUNING
0.0007 30.4 0.0007 0.0007 1.2 /
3* 0.00001 3* 0.0001 /
2* 100 /
WELSPECS
'P' 'G' 1 1 5000 'GAS' 2* 'STOP' 'YES' /
/
COMPDAT
'P' 1 1 1 50 'OPEN' 2* 0.666 /
/
WCONPROD

200
'P' 'OPEN' 'BHP' 2* 25000 2* 2000 1* 1 /
/
WECON
'P' 1* 1220 4* 'YES' /
/
TSTEP
12*30.4 /
TSTEP
12*30.4 /
TSTEP
6*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
End

201
EXAMPLE IMEX DATA DECK FOR EFFECT OF NON-DARCY FLOW ON
WATER CONING
Effect of Non-Darcy Effect on Water Coning
Non-Darcy Flow Effect Distributed in the Reservoir

RESULTS SIMULATOR IMEX


RESULTS SECTION INOUT
**SS-UNKNOWN
** REGDIMS
** 2 /
**SS-ENDUNKNOWN
**SS-UNKNOWN
** INIT
** --RPTGRID
** --1 /
** -------------------------------------------------------------
**SS-ENDUNKNOWN
*DIM *MAX_WELLS 1
*DIM *MAX_LAYERS 100

***********************************************************************
*****
**
** *IO
**
***********************************************************************
*****
*TITLE1

**Effect of Non-Darcy Effect on Water Coning


**Non-Darcy Flow Effect Distributed in the Reservoir
**------------------------------------------------------------
**SS-NOEFFECT
** MESSAGES
** 6* 3*5000 /
**SS-ENDNOEFFECT
**------------------------------------------------------------
*INUNIT *FIELD

*OUTUNIT *FIELD

GRID RADIAL 26 1 110 RW 3.33000000E-1


KDIR DOWN

DI IVAR
0.417 0.3016 0.4229 0.5929 0.8313 1.166 1.634 2.292 3.213 4.505
6.317 8.857
12.42 17.41 24.41 34.23 48. 67.3 94.36 132.3 185.5 260.1 364.7
511.4 717.
2500.

DJ CON 360.

DK KVAR
100*1. 9*10. 210.

202
DTOP
26*5000.

RESULTS SECTION GRID


RESULTS SECTION NETPAY
RESULTS SECTION NETGROSS
RESULTS SECTION POR

**$ RESULTS PROP POR Units: Dimensionless


**$ RESULTS PROP Minimum Value: 0 Maximum Value: 1
POR ALL
2860*1.
MOD 1:26 1:1 1:110 = 0.1
26:26 1:1 1:100 = 0
26:26 1:1 101:110 = 1
RESULTS SECTION PERMS

**$ RESULTS PROP PERMI Units: md


**$ RESULTS PROP Minimum Value: 10 Maximum Value: 10
PERMI ALL
2860*1.
MOD 1:26 1:1 1:110 = 10

**$ RESULTS PROP PERMJ Units: md


**$ RESULTS PROP Minimum Value: 10 Maximum Value: 10
PERMJ ALL
2860*1.
MOD 1:26 1:1 1:110 = 10

**$ RESULTS PROP PERMK Units: md


**$ RESULTS PROP Minimum Value: 1 Maximum Value: 1
PERMK ALL
2860*1.
MOD 1:26 1:1 1:110 = 1
RESULTS SECTION TRANS
RESULTS SECTION FRACS
RESULTS SECTION GRIDNONARRAYS
CPOR MATRIX 1.E-05
PRPOR MATRIX 2500.

RESULTS SECTION VOLMOD


RESULTS SECTION SECTORLEASE
**$ SECTORARRAY 'SECTOR1' Definition.
SECTORARRAY 'SECTOR1' ALL
2600*1 260*0

**$ SECTORARRAY 'SECTOR2' Definition.


SECTORARRAY 'SECTOR2' ALL
2600*0 260*1

RESULTS SECTION ROCKCOMPACTION


RESULTS SECTION GRIDOTHER
RESULTS SECTION MODEL
MODEL *BLACKOIL
**$ OilGas Table 'Table A'

203
*TRES 120.
*PVT *EG 1
** P Rs Bo EG VisO VisG
14.7 5.51 1.0268 5.05973 1.2801 0.011983
213.72 47.23 1.0414 75.1695 1.0556 0.01216
412.74 97.95 1.0599 148.3052 0.8894 0.0124
611.76 153.78 1.0811 224.457 0.7705 0.01268
810.78 213.36 1.1045 303.5186 0.6824 0.012993
1009.8 275.94 1.1299 385.257 0.6146 0.013335
1208.82 341.06 1.1571 469.289 0.5609 0.013705
1407.84 408.36 1.1859 555.068 0.5173 0.014103
1606.86 477.62 1.2163 641.895 0.481 0.014528
1805.88 548.62 1.2481 728.959 0.4504 0.01498
2004.9 621.23 1.2813 815.4 0.4241 0.01546
2203.92 695.32 1.3158 900.389 0.4013 0.015969
2402.94 770.77 1.3515 983.192 0.3813 0.016508
2601.96 847.5 1.3885 1063.222 0.3636 0.017077
2800.98 925.44 1.4265 1140.054 0.3479 0.017678
3000. 1004.5 1.4657 1213.424 0.3337 0.018313
*DENSITY *OIL 50.0004
*DENSITY *GAS 0.046
*DENSITY *WATER 63.9098
*CO 1.777275E-05
*BWI 1.003357
*CW 2.934065E-06
*REFPW 2500.
*VWI 0.658209
*CVW 0

RESULTS SECTION MODELARRAYS


RESULTS SECTION ROCKFLUID
***********************************************************************
*****
**
** *ROCKFLUID
**
***********************************************************************
*****

*ROCKFLUID

*RPT 1
*SWT
0.300000 0.000000 1.000000 0.000000
0.400000 0.035000 0.857142857142857 0.000000
0.500000 0.076000 0.714285714285714 0.000000
0.600000 0.126000 0.571428571428572 0.000000
0.700000 0.193000 0.428571428571429 0.000000
0.800000 0.288000 0.285714285714286 0.000000
0.900000 0.422000 0.142857142857143 0.000000
1.000000 1.000000 0.000000 0.000000

*SGT *NOSWC
0.000000 0.000000 1.000000 0.000000
0.200000 0.000000 0.714285714285714 0.000000
0.300000 0.020000 0.571428571428572 0.000000
0.400000 0.081000 0.428571428571429 0.000000

204
0.500000 0.183000 0.285714285714286 0.000000
0.600000 0.325000 0.142857142857143 0.000000
0.700000 0.900000 0.000000 0.000000

*NONDARCY *FG2
*KROIL *SEGREGATED

RESULTS SECTION ROCKARRAYS


RESULTS SECTION INIT
***********************************************************************
*****
**
** *INITIAL
**
***********************************************************************
*****
*INITIAL
**------------------------------------------------------------
**SS-NOEFFECT
** RPTSOL
** 6* 2 2 /
** -------------------------------------------------------------
**SS-ENDNOEFFECT
**------------------------------------------------------------
*VERTICAL *DEPTH_AVE *WATER_GAS *TRANZONE *EQUIL
**$ Data for PVT Region 1
**$ -------------------------------------
*REFDEPTH 5000.
*REFPRES 2300.
*DWGC 5100.

RESULTS SECTION INITARRAYS

**$ RESULTS PROP PB Units: psi


**$ RESULTS PROP Minimum Value: 0 Maximum Value: 0
PB CON 0
RESULTS SECTION NUMERICAL
*NUMERICAL

RESULTS SECTION NUMARRAYS


RESULTS SECTION GBKEYWORDS
RUN

**SS-UNKNOWN
** RPTRST
** 4 / RESTARTS ONCE A YEAR
**SS-ENDUNKNOWN

DATE 2002 01 01.

**------------------------------------------------------------
**SS-NOEFFECT

205
** NOECHO
**SS-ENDNOEFFECT
**------------------------------------------------------------
PTUBE WATER_GAS 1
DEPTH 5000.
QG
5.E+05 1.E+06 3.E+06 5.E+06 1.E+07 1.5E+07 1.8E+07
WGR
0 5.E-05 1.E-04 0.0002 0.0004 0.0006 0.0008 0.001
WHP
300. 500. 700.
BHPTG
1 1 3.37024000E+02 5.59849000E+02 7.84870000E+02
2 1 1.00767000E+03 1.33083000E+03 1.63681000E+03
3 1 1.02840000E+03 1.35532000E+03 1.66413000E+03
4 1 1.06877000E+03 1.40292000E+03 1.71647000E+03
5 1 1.14745000E+03 1.49259000E+03 1.81241000E+03
6 1 1.22282000E+03 1.57486000E+03 1.89758000E+03
7 1 1.29426000E+03 1.65009000E+03 1.97324000E+03
8 1 1.36153000E+03 1.71853000E+03 2.04060000E+03
1 2 3.45916000E+02 5.65127000E+02 7.88564000E+02
2 2 6.85715000E+02 1.14235000E+03 1.43549000E+03
3 2 7.98357000E+02 1.17999000E+03 1.46993000E+03
4 2 9.06174000E+02 1.23965000E+03 1.53687000E+03
5 2 1.03248000E+03 1.35495000E+03 1.66240000E+03
6 2 1.13624000E+03 1.46356000E+03 1.77592000E+03
7 2 1.23434000E+03 1.56415000E+03 1.87771000E+03
8 2 1.32752000E+03 1.65684000E+03 1.96914000E+03
1 3 4.25316000E+02 6.15848000E+02 8.24883000E+02
2 3 5.26979000E+02 7.95789000E+02 1.08259000E+03
3 3 6.46858000E+02 9.33680000E+02 1.24089000E+03
4 3 8.40372000E+02 1.14544000E+03 1.43807000E+03
5 3 1.14282000E+03 1.42442000E+03 1.68147000E+03
6 3 1.39809000E+03 1.65458000E+03 1.89757000E+03
7 3 1.62877000E+03 1.86048000E+03 2.09286000E+03
8 3 1.83827000E+03 2.04934000E+03 2.27214000E+03
1 4 5.47796000E+02 7.04360000E+02 8.91575000E+02
2 4 6.66316000E+02 8.23118000E+02 1.05816000E+03
3 4 7.92196000E+02 9.70272000E+02 1.22716000E+03
4 4 1.03062000E+03 1.22814000E+03 1.50399000E+03
5 4 1.50309000E+03 1.68890000E+03 1.92590000E+03
6 4 1.90174000E+03 2.07013000E+03 2.26855000E+03
7 4 2.24629000E+03 2.39607000E+03 2.57229000E+03
8 4 2.56051000E+03 2.69480000E+03 2.85658000E+03
1 5 9.16800000E+02 1.01422000E+03 1.14823000E+03
2 5 1.17821000E+03 1.26153000E+03 1.38041000E+03
3 5 1.40325000E+03 1.48036000E+03 1.59380000E+03
4 5 1.79136000E+03 1.87547000E+03 2.00566000E+03
5 5 2.63140000E+03 2.70978000E+03 2.82769000E+03
6 5 3.33657000E+03 3.40719000E+03 3.51185000E+03
7 5 3.93384000E+03 4.00224000E+03 4.09229000E+03
8 5 4.54574000E+03 4.60380000E+03 4.68526000E+03
1 6 1.30649000E+03 1.37324000E+03 1.47144000E+03
2 6 1.69683000E+03 1.75038000E+03 1.83132000E+03
3 6 2.01561000E+03 2.06380000E+03 2.13846000E+03
4 6 2.60038000E+03 2.65034000E+03 2.72983000E+03
5 6 3.81908000E+03 3.86469000E+03 3.93860000E+03
6 6 4.76408000E+03 4.80311000E+03 4.86696000E+03

206
7 6 5.78065000E+03 5.81806000E+03 5.87715000E+03
8 6 6.91460000E+03 6.95034000E+03 7.00651000E+03
1 7 1.53942000E+03 1.59511000E+03 1.67903000E+03
2 7 2.00157000E+03 2.04461000E+03 2.11135000E+03
3 7 2.37484000E+03 2.41335000E+03 2.47443000E+03
4 7 3.08950000E+03 3.12890000E+03 3.19348000E+03
5 7 4.60402000E+03 4.64024000E+03 4.70113000E+03
6 7 5.69293000E+03 5.72329000E+03 5.77622000E+03
7 7 7.03960000E+03 7.06884000E+03 7.11864000E+03
8 7 8.57618000E+03 8.60434000E+03 8.65223000E+03

GROUP 'G' ATTACHTO 'FIELD'

WELL 1 'P' ATTACHTO 'G'


PRODUCER 'P'
PWELLBORE TABLE 5000. 1
OPERATE MAX STG 1.E+07 CONT
OPERATE MIN BHP 14.7 CONT
MONITOR MIN STG 1.2E+06 STOP

GEOMETRY K 0.333 0.37 1. 5.


PERF GEO 'P'
1 1 1 1. OPEN
1 1 2 1. OPEN
1 1 3 1. OPEN
1 1 4 1. OPEN
1 1 5 1. OPEN
1 1 6 1. OPEN
1 1 7 1. OPEN
1 1 8 1. OPEN
1 1 9 1. OPEN
1 1 10 1. OPEN
1 1 11 1. OPEN
1 1 12 1. OPEN
1 1 13 1. OPEN
1 1 14 1. OPEN
1 1 15 1. OPEN
1 1 16 1. OPEN
1 1 17 1. OPEN
1 1 18 1. OPEN
1 1 19 1. OPEN
1 1 20 1. OPEN
1 1 21 1. OPEN
1 1 22 1. OPEN
1 1 23 1. OPEN
1 1 24 1. OPEN
1 1 25 1. OPEN
1 1 26 1. OPEN
1 1 27 1. OPEN
1 1 28 1. OPEN
1 1 29 1. OPEN
1 1 30 1. OPEN
1 1 31 1. OPEN
1 1 32 1. OPEN
1 1 33 1. OPEN
1 1 34 1. OPEN
1 1 35 1. OPEN

207
1 1 36 1. OPEN
1 1 37 1. OPEN
1 1 38 1. OPEN
1 1 39 1. OPEN
1 1 40 1. OPEN
1 1 41 1. OPEN
1 1 42 1. OPEN
1 1 43 1. OPEN
1 1 44 1. OPEN
1 1 45 1. OPEN
1 1 46 1. OPEN
1 1 47 1. OPEN
1 1 48 1. OPEN
1 1 49 1. OPEN
1 1 50 1. OPEN
1 1 51 1. OPEN
1 1 52 1. OPEN
1 1 53 1. OPEN
1 1 54 1. OPEN
1 1 55 1. OPEN
1 1 56 1. OPEN
1 1 57 1. OPEN
1 1 58 1. OPEN
1 1 59 1. OPEN
1 1 60 1. OPEN
1 1 61 1. OPEN
1 1 62 1. OPEN
1 1 63 1. OPEN
1 1 64 1. OPEN
1 1 65 1. OPEN
1 1 66 1. OPEN
1 1 67 1. OPEN
1 1 68 1. OPEN
1 1 69 1. OPEN
1 1 70 1. OPEN
1 1 71 1. OPEN
1 1 72 1. OPEN
1 1 73 1. OPEN
1 1 74 1. OPEN
1 1 75 1. OPEN
1 1 76 1. OPEN
1 1 77 1. OPEN
1 1 78 1. OPEN
1 1 79 1. OPEN
1 1 80 1. OPEN
1 1 81 1. OPEN
1 1 82 1. OPEN
1 1 83 1. OPEN
1 1 84 1. OPEN
1 1 85 1. OPEN
1 1 86 1. OPEN
1 1 87 1. OPEN
1 1 88 1. OPEN
1 1 89 1. OPEN
1 1 90 1. OPEN
1 1 91 1. OPEN
1 1 92 1. OPEN
1 1 93 1. OPEN

208
1 1 94 1. OPEN
1 1 95 1. OPEN
1 1 96 1. OPEN
1 1 97 1. OPEN
1 1 98 1. OPEN
1 1 99 1. OPEN
1 1 100 1. OPEN

XFLOW-MODEL 'P' FULLY-MIXED

OPEN 'P'

TIME 30.4

TIME 60.8

TIME 91.2

TIME 121.6

TIME 152

TIME 182.4

TIME 212.8

TIME 243.2

TIME 273.6

TIME 304

TIME 334.4

TIME 364.8

TIME 395.2

TIME 425.6

TIME 456

TIME 486.4

TIME 516.8

TIME 547.2

TIME 577.6

TIME 608

TIME 638.4

TIME 668.8

TIME 699.2

209
TIME 729.6

TIME 760

TIME 790.4

TIME 820.8

TIME 851.2

TIME 881.6

TIME 912

TIME 942.4

TIME 972.8

TIME 1003.2

TIME 1033.6

TIME 1064

TIME 1094.4

TIME 1124.8

TIME 1155.2

TIME 1185.6

TIME 1216

TIME 1246.4

TIME 1276.8

TIME 1307.2

TIME 1337.6

TIME 1368

TIME 1398.4

TIME 1428.8

TIME 1459.2

TIME 1489.6

TIME 1520

TIME 1550.4

TIME 1580.8

210
TIME 1611.2

TIME 1641.6

TIME 1672

TIME 1702.4

TIME 1732.8

TIME 1763.2

TIME 1793.6

TIME 1824

TIME 1854.4

TIME 1884.8

TIME 1915.2

TIME 1945.6

TIME 1976

TIME 2006.4

TIME 2036.8

TIME 2067.2

TIME 2097.6

TIME 2128

TIME 2158.4

TIME 2188.8

TIME 2219.2

TIME 2249.6

TIME 2280

TIME 2310.4

TIME 2340.8

TIME 2371.2

TIME 2401.6

TIME 2432

TIME 2462.4

211
TIME 2492.8

TIME 2523.2

TIME 2553.6

TIME 2584

TIME 2614.4

TIME 2644.8

TIME 2675.2

TIME 2705.6

TIME 2736

TIME 2766.4

TIME 2796.8

TIME 2827.2

TIME 2857.6

TIME 2888

TIME 2918.4

TIME 2948.8

TIME 2979.2

STOP
***************************** TERMINATE SIMULATION
*****************************

RESULTS SECTION WELLDATA


RESULTS SECTION PERFS

212
APPENDIX D

ANALYTICAL MODEL FOR NON-DARCY EFFECT IN LOW PRODUCTIVITY


GAS RESERVOIRS

Analytical Model of Pressure Drawdown with N-D Flow Effect

For constant-rate production from a well in a gas reservoir with closed outer

boundaries, the late-time (stabilized) solution to the diffusivity equation is (Lee &

Wattenbarger, 1996):

∆p p = p p ( p ) − p p ( p wf ) ………………………………………………………(D-1)

1.422 *10 6 qT   10.06 A  3 


∆p p = 1.151 log 2 
 − + s + Dq  ……………………………(D-2)
kg h   C A rw  4 

Houpeurt (1959) wrote equation 2 in a simple form:

∆p p = p p ( p ) − p p ( p wf ) = aq + bq 2 ………………….………………………….(D-3)

Where,

1.422 *10 6 T   10.06 A  3 


a= 1.151 log 2 
 − + s  ………….…………………………(D-4)
kgh   C A rw  4 

And,

1.422 *10 6 TD
b= ..………………………………………………………..…(D-5)
kgh

Equation D-3 is the basis for Houpeurt’s procedure to analyze well deliverability

tests in gas wells. The coefficient a represents the pressure drop generated by viscous

forces, and b represents the inertial resistance. The N-D flow coefficient, D, is defined in

terms of the inertia coefficient, β,

2.715 *10 −12 βk g Mp sc


D= ……………………………………………………….(D-6)
hµ g ( p wf )rw Tsc

213
This expression is based on an integration of Forchheimer’s equation assuming

steady state flow (Dake, 1978).

Lee and Wattenbarger (1996) recommend using the following correlation for β

calculations (Jones, 1987):

β = 1.88 *10 10 k −1.47 φ −0.53 ……………………………………………………….(D-7)

One analytical model was built, using the equations shown above, to evaluate the

effect of rock properties, porosity and permeability, and the gas flow rate on the N-D

flow. For this model, following Dake (1978) and Golan (1991), h was replaced by hper in

Eq. 5. A new variable, F, was defined (White, 2002). F is the fraction of the total

pressure drop generated by the N-D flow when gas flows through porous media.

Mathematically, F was defined using Eq. 3 as:

bq
F= ……………………………………………………………………(D-8)
a + bq

214
APPENDIX E

EXAMPLE IMEX DATA DECK FOR NON-DARCY FLOW IN LOW


PRODUCTIVITY GAS RESERVOIRS

RESULTS SIMULATOR IMEX


RESULTS SECTION INOUT
**SS-UNKNOWN
** REGDIMS
** 2 /
**SS-ENDUNKNOWN
**SS-UNKNOWN
** INIT
** --RPTGRID
** --1 /
** -------------------------------------------------------------
**SS-ENDUNKNOWN
*DIM *MAX_WELLS 1
*DIM *MAX_LAYERS 100

***********************************************************************
*****
**
** *IO
**
***********************************************************************
*****
*TITLE1 'Non-Darcy Flow Effect in Low-Productivity Gas Reservoir'
**Non-Darcy Effect Distribute in the Reservoir
**Water Drive Gas Reservoir
**------------------------------------------------------------
**SS-NOEFFECT
** MESSAGES
** 6* 3*5000 /
**SS-ENDNOEFFECT
**------------------------------------------------------------
*INUNIT *FIELD

*OUTUNIT *FIELD

GRID RADIAL 26 1 110 RW 3.33000000E-1


KDIR DOWN

DI IVAR
0.417 0.3016 0.4229 0.5929 0.8313 1.166 1.634 2.292 3.213 4.505
6.317 8.857
12.42 17.41 24.41 34.23 48. 67.3 94.36 132.3 185.5 260.1 364.7
511.4 717.
2500.

DJ CON 360.

DK KVAR
100*1. 9*10. 710.

215
DTOP
26*5000.

RESULTS SECTION GRID


RESULTS SECTION NETPAY
RESULTS SECTION NETGROSS
RESULTS SECTION POR

**$ RESULTS PROP POR Units: Dimensionless


**$ RESULTS PROP Minimum Value: 0 Maximum Value: 1
POR ALL
2860*1.
MOD 1:26 1:1 1:110 = 0.1
26:26 1:1 1:100 = 0

RESULTS SECTION PERMS

**$ RESULTS PROP PERMI Units: md


**$ RESULTS PROP Minimum Value: 10 Maximum Value: 10
PERMI ALL
2860*1.
MOD 1:26 1:1 1:110 = 10

**$ RESULTS PROP PERMJ Units: md


**$ RESULTS PROP Minimum Value: 10 Maximum Value: 10
PERMJ ALL
2860*1.
MOD 1:26 1:1 1:110 = 10

**$ RESULTS PROP PERMK Units: md


**$ RESULTS PROP Minimum Value: 5 Maximum Value: 5
PERMK ALL
2860*1.
MOD 1:26 1:1 1:110 = 5
RESULTS SECTION TRANS
RESULTS SECTION FRACS
RESULTS SECTION GRIDNONARRAYS
CPOR MATRIX 1.E-05
PRPOR MATRIX 2500.

RESULTS SECTION VOLMOD


RESULTS SECTION SECTORLEASE
**$ SECTORARRAY 'SECTOR1' Definition.
SECTORARRAY 'SECTOR1' ALL
2600*1 260*0

**$ SECTORARRAY 'SECTOR2' Definition.


SECTORARRAY 'SECTOR2' ALL
2600*0 260*1

RESULTS SECTION ROCKCOMPACTION


RESULTS SECTION GRIDOTHER
RESULTS SECTION MODEL
MODEL *BLACKOIL

216
**$ OilGas Table 'Table A'
*TRES 120.
*PVT *EG 1
** P Rs Bo EG VisO VisG
14.7 10.87 1.0289 5.05973 0.3034 0.011983
213.72 93.23 1.06 75.1695 0.2644 0.01216
412.74 193.36 1.1007 148.3052 0.2378 0.0124
611.76 303.58 1.1482 224.457 0.2184 0.01268
810.78 421.2 1.2014 303.5186 0.2034 0.012993
1009.8 544.75 1.2597 385.257 0.1911 0.013335
1208.82 673.28 1.3225 469.289 0.1809 0.013705
1407.84 806.15 1.3896 555.068 0.1722 0.014103
1606.86 942.87 1.4604 641.895 0.1647 0.014528
1805.88 1083.05 1.535 728.959 0.158 0.01498
2004.9 1226.39 1.6129 815.4 0.1521 0.01546
2203.92 1372.64 1.6942 900.389 0.1469 0.015969
2402.94 1521.59 1.7785 983.192 0.1421 0.016508
2601.96 1673.07 1.8658 1063.222 0.1377 0.017077
2800.98 1826.92 1.956 1140.054 0.1338 0.017678
3000. 1983. 2.0489 1213.424 0.1301 0.018313
*DENSITY *OIL 45.
*DENSITY *GAS 0.046
*DENSITY *WATER 62.6263
*CO 3.E-05
*BWI 1.003357
*CW 2.934065E-06
*REFPW 2500.
*VWI 0.62582
*CVW 0

RESULTS SECTION MODELARRAYS


RESULTS SECTION ROCKFLUID
***********************************************************************
*****
**
** *ROCKFLUID
**
***********************************************************************
*****

*ROCKFLUID

*RPT 1
*SWT
0.300000 0.000000 1.000000 0.000000
0.400000 0.035000 0.857142857142857 0.000000
0.500000 0.076000 0.714285714285714 0.000000
0.600000 0.126000 0.571428571428572 0.000000
0.700000 0.193000 0.428571428571429 0.000000
0.800000 0.288000 0.285714285714286 0.000000
0.900000 0.422000 0.142857142857143 0.000000
1.000000 1.000000 0.000000 0.000000

*SGT *NOSWC
0.000000 0.000000 1.000000 0.000000
0.200000 0.000000 0.714285714285714 0.000000
0.300000 0.020000 0.571428571428572 0.000000

217
0.400000 0.081000 0.428571428571429 0.000000
0.500000 0.183000 0.285714285714286 0.000000
0.600000 0.325000 0.142857142857143 0.000000
0.700000 0.900000 0.000000 0.000000

*NONDARCY *FG1
*KROIL *SEGREGATED

RESULTS SECTION ROCKARRAYS


RESULTS SECTION INIT
***********************************************************************
*****
**
** *INITIAL
**
***********************************************************************
*****
*INITIAL
**------------------------------------------------------------
**SS-NOEFFECT
** RPTSOL
** 6* 2 2 /
** -------------------------------------------------------------
**SS-ENDNOEFFECT
**------------------------------------------------------------
*VERTICAL *DEPTH_AVE *WATER_GAS *TRANZONE *EQUIL
**$ Data for PVT Region 1
**$ -------------------------------------
*REFDEPTH 5000.
*REFPRES 2300.
*DWGC 5100.

RESULTS SECTION INITARRAYS

**$ RESULTS PROP PB Units: psi


**$ RESULTS PROP Minimum Value: 0 Maximum Value: 0
PB CON 0
RESULTS SECTION NUMERICAL
*NUMERICAL

RESULTS SECTION NUMARRAYS


RESULTS SECTION GBKEYWORDS
RUN

**SS-UNKNOWN
** RPTRST
** 4 / RESTARTS ONCE A YEAR
**SS-ENDUNKNOWN

DATE 2002 01 01.

**------------------------------------------------------------

218
**SS-NOEFFECT
** NOECHO
**SS-ENDNOEFFECT
**------------------------------------------------------------
PTUBE WATER_GAS 1
DEPTH 5000.
QG
5.E+05 1.E+06 3.E+06 5.E+06 1.E+07 1.5E+07 1.8E+07
WGR
0 5.E-05 1.E-04 0.0002 0.0004 0.0006 0.0008 0.001
WHP
300. 500. 700.
BHPTG
1 1 3.37024000E+02 5.59849000E+02 7.84870000E+02
2 1 1.00767000E+03 1.33083000E+03 1.63681000E+03
3 1 1.02840000E+03 1.35532000E+03 1.66413000E+03
4 1 1.06877000E+03 1.40292000E+03 1.71647000E+03
5 1 1.14745000E+03 1.49259000E+03 1.81241000E+03
6 1 1.22282000E+03 1.57486000E+03 1.89758000E+03
7 1 1.29426000E+03 1.65009000E+03 1.97324000E+03
8 1 1.36153000E+03 1.71853000E+03 2.04060000E+03
1 2 3.45916000E+02 5.65127000E+02 7.88564000E+02
2 2 6.85715000E+02 1.14235000E+03 1.43549000E+03
3 2 7.98357000E+02 1.17999000E+03 1.46993000E+03
4 2 9.06174000E+02 1.23965000E+03 1.53687000E+03
5 2 1.03248000E+03 1.35495000E+03 1.66240000E+03
6 2 1.13624000E+03 1.46356000E+03 1.77592000E+03
7 2 1.23434000E+03 1.56415000E+03 1.87771000E+03
8 2 1.32752000E+03 1.65684000E+03 1.96914000E+03
1 3 4.25316000E+02 6.15848000E+02 8.24883000E+02
2 3 5.26979000E+02 7.95789000E+02 1.08259000E+03
3 3 6.46858000E+02 9.33680000E+02 1.24089000E+03
4 3 8.40372000E+02 1.14544000E+03 1.43807000E+03
5 3 1.14282000E+03 1.42442000E+03 1.68147000E+03
6 3 1.39809000E+03 1.65458000E+03 1.89757000E+03
7 3 1.62877000E+03 1.86048000E+03 2.09286000E+03
8 3 1.83827000E+03 2.04934000E+03 2.27214000E+03
1 4 5.47796000E+02 7.04360000E+02 8.91575000E+02
2 4 6.66316000E+02 8.23118000E+02 1.05816000E+03
3 4 7.92196000E+02 9.70272000E+02 1.22716000E+03
4 4 1.03062000E+03 1.22814000E+03 1.50399000E+03
5 4 1.50309000E+03 1.68890000E+03 1.92590000E+03
6 4 1.90174000E+03 2.07013000E+03 2.26855000E+03

7 4 2.24629000E+03 2.39607000E+03 2.57229000E+03


8 4 2.56051000E+03 2.69480000E+03 2.85658000E+03
1 5 9.16800000E+02 1.01422000E+03 1.14823000E+03
2 5 1.17821000E+03 1.26153000E+03 1.38041000E+03
3 5 1.40325000E+03 1.48036000E+03 1.59380000E+03
4 5 1.79136000E+03 1.87547000E+03 2.00566000E+03
5 5 2.63140000E+03 2.70978000E+03 2.82769000E+03
6 5 3.33657000E+03 3.40719000E+03 3.51185000E+03
7 5 3.93384000E+03 4.00224000E+03 4.09229000E+03
8 5 4.54574000E+03 4.60380000E+03 4.68526000E+03
1 6 1.30649000E+03 1.37324000E+03 1.47144000E+03
2 6 1.69683000E+03 1.75038000E+03 1.83132000E+03
3 6 2.01561000E+03 2.06380000E+03 2.13846000E+03
4 6 2.60038000E+03 2.65034000E+03 2.72983000E+03

219
5 6 3.81908000E+03 3.86469000E+03 3.93860000E+03
6 6 4.76408000E+03 4.80311000E+03 4.86696000E+03
7 6 5.78065000E+03 5.81806000E+03 5.87715000E+03
8 6 6.91460000E+03 6.95034000E+03 7.00651000E+03
1 7 1.53942000E+03 1.59511000E+03 1.67903000E+03
2 7 2.00157000E+03 2.04461000E+03 2.11135000E+03
3 7 2.37484000E+03 2.41335000E+03 2.47443000E+03
4 7 3.08950000E+03 3.12890000E+03 3.19348000E+03
5 7 4.60402000E+03 4.64024000E+03 4.70113000E+03
6 7 5.69293000E+03 5.72329000E+03 5.77622000E+03
7 7 7.03960000E+03 7.06884000E+03 7.11864000E+03
8 7 8.57618000E+03 8.60434000E+03 8.65223000E+03

GROUP 'G' ATTACHTO 'FIELD'

WELL 1 'P' ATTACHTO 'G'


PRODUCER 'P'
PWELLBORE TABLE 5000. 1
OPERATE MAX STW 3000. CONT
OPERATE MIN WHP IMPLICIT 300. CONT
OPERATE MIN BHP 14.7 CONT
MONITOR MAX WGR 1. STOP
MONITOR MIN STG 0 STOP

GEOMETRY K 0.333 0.37 1. 0.


PERF GEO 'P'
1 1 1 1. OPEN
1 1 2 1. OPEN
1 1 3 1. OPEN
1 1 4 1. OPEN
1 1 5 1. OPEN
1 1 6 1. OPEN
1 1 7 1. OPEN
1 1 8 1. OPEN
1 1 9 1. OPEN
1 1 10 1. OPEN
1 1 11 1. OPEN
1 1 12 1. OPEN
1 1 13 1. OPEN
1 1 14 1. OPEN
1 1 15 1. OPEN
1 1 16 1. OPEN
1 1 17 1. OPEN
1 1 18 1. OPEN
1 1 19 1. OPEN
1 1 20 1. OPEN
1 1 21 1. OPEN
1 1 22 1. OPEN
1 1 23 1. OPEN
1 1 24 1. OPEN
1 1 25 1. OPEN

XFLOW-MODEL 'P' FULLY-MIXED

OPEN 'P'

TIME 30.4

220
TIME 60.8

TIME 91.2

TIME 121.6

TIME 152

TIME 182.4

TIME 212.8

TIME 243.2

TIME 273.6

TIME 304

TIME 334.4

TIME 364.8

TIME 395.2

TIME 425.6

TIME 456

TIME 486.4

TIME 516.8

TIME 547.2

TIME 577.6

TIME 608

TIME 638.4

TIME 668.8

TIME 699.2

TIME 729.6

TIME 760

TIME 790.4

TIME 820.8

TIME 851.2

TIME 881.6

TIME 912

221
TIME 942.4

TIME 972.8

TIME 1003.2

TIME 1033.6

TIME 1064

TIME 1094.4

TIME 1124.8

TIME 1155.2

TIME 1185.6

TIME 1216

TIME 1246.4

TIME 1276.8

TIME 1307.2

TIME 1337.6

TIME 1368

TIME 1398.4

TIME 1428.8

TIME 1459.2

TIME 1489.6

TIME 1520

TIME 1550.4

TIME 1580.8

TIME 1611.2

TIME 1641.6

TIME 1672

TIME 1702.4

TIME 1732.8

TIME 1763.2

TIME 1793.6

222
TIME 1824

TIME 1854.4

TIME 1884.8

TIME 1915.2

TIME 1945.6

TIME 1976

TIME 2006.4

TIME 2036.8

TIME 2067.2

TIME 2097.6

TIME 2128

TIME 2158.4

TIME 2188.8

TIME 2219.2

TIME 2249.6

TIME 2280

TIME 2310.4

TIME 2340.8

TIME 2371.2

TIME 2401.6

TIME 2432

TIME 2462.4

TIME 2492.8

TIME 2523.2

TIME 2553.6

TIME 2584

TIME 2614.4

TIME 2644.8

TIME 2675.2

223
TIME 2705.6

TIME 2736

TIME 2766.4

TIME 2796.8

TIME 2827.2

TIME 2857.6

TIME 2888

TIME 2918.4

TIME 2948.8

TIME 2979.2

TIME 3009.6

TIME 3040

TIME 3070.4

TIME 3100.8

TIME 3131.2

TIME 3161.6

TIME 3192

TIME 3222.4

TIME 3252.8

TIME 3283.2

TIME 3313.6

TIME 3344

TIME 3374.4

TIME 3404.8

TIME 3435.2

TIME 3465.6

TIME 3496

TIME 3526.4

TIME 3556.8

224
TIME 3587.2

TIME 3617.6

TIME 3648

TIME 3678.4

TIME 3708.8

TIME 3739.2

TIME 3769.6

TIME 3800

TIME 3830.4

TIME 3860.8

TIME 3891.2

TIME 3921.6

TIME 3952

TIME 3982.4

TIME 4012.8

TIME 4043.2

TIME 4073.6

TIME 4104

TIME 4134.4

TIME 4164.8

TIME 4195.2

TIME 4225.6

TIME 4256

TIME 4286.4

TIME 4316.8

TIME 4347.2

TIME 4377.6

TIME 4408

TIME 4438.4

225
TIME 4468.8

TIME 4499.2

TIME 4529.6

TIME 4560

TIME 4590.4

TIME 4620.8

TIME 4651.2

TIME 4681.6

TIME 4712

TIME 4742.4

TIME 4772.8

TIME 4803.2

STOP
***************************** TERMINATE SIMULATION
*****************************

RESULTS SECTION WELLDATA


RESULTS SECTION PERFS

226
APPENDIX F

EXAMPLE ECLIPSE DATA DECK FOR COMPARISON OF CONVENTIONAL


WELLS AND DWS WELLS

Runspec
Title
Effect of Completion Length on Conventional Wells
--Normal Reservoir Pressure (2300 psia), Horizontal Permeability 10 md,
--Length of Perforations: 20 ft.
MESSAGES
6* 3*5000 /
Radial
Dimens
-- NR Theta NZ
26 1 110 /
Gas
Water
Field
Regdims
2 /
Welldims
-- Wells Con
1 100 /
VFPPDIMS
10 10 10 10 0 1 /
Start
1 'Jan' 2002 /
Nstack
100 /
Unifout
-------------------------------------------------------------
Grid
Tops
26*5000 /
Inrad
0.333 /
DRV
0.4170 0.3016 0.4229 0.5929 0.8313 1.166
1.634 2.292 3.213 4.505 6.317 8.857
12.42 17.41 24.41 34.23 48.00 67.30
94.36 132.3 185.5 260.1 364.7 511.4
717.0 2500 /
DZ
2600*1
234*10
26*1410
/
Equals
'DTHETA' 360 /
'PERMR' 10 /
'PERMTHT' 10 /
'PERMZ' 5 /
'PORO' 0.25 /
'PORO' 0 26 26 1 1 1 100 /
'PORO' 10 26 26 1 1 101 110 /
/

227
INIT
--RPTGRID
--1 /
-------------------------------------------------------------
PROPS
DENSITY
45 64 0.046 /
ROCK
2500 10E-6 /
PVTW
2500 1 2.6E-6 0.68 0 /
PVZG
-- Temperature
120 /
-- Press Z Visc
100 0.989 0.0122
300 0.967 0.0124
500 0.947 0.0126
700 0.927 0.0129
900 0.908 0.0133
1100 0.891 0.0137
1300 0.876 0.0141
1500 0.863 0.0146
1700 0.853 0.0151
1900 0.845 0.0157
2100 0.840 0.0163
2300 0.837 0.0167
2500 0.837 0.0177
2700 0.839 0.0184
3200 0.844 0.0202
/
--Saturation Functions
--Sgc = 0.20
--Krg @ Swir = 0.9
--Swir = 0.3
--Sorg = 0.0
SGFN
--Using Honarpour Equation 71
-- Sg Krg Pc
0.00 0.000 0.0
0.20 0.000 0.0
0.30 0.020 0.0
0.40 0.081 0.0
0.50 0.183 0.0
0.60 0.325 0.0
0.70 0.900 0.0
/
SWFN
--Using Honarpour Equation 67
-- Sw Krw Pc
0.3 0.000 0.0
0.4 0.035 0.0
0.5 0.076 0.0
0.6 0.126 0.0
0.7 0.193 0.0
0.8 0.288 0.0
0.9 0.422 0.0
1.0 1.000 0.0

228
/
-------------------------------------------------------------
REGIONS
Fipnum
2600*1
260*2
/
-------------------------------------------------------------
SOLUTION
EQUIL
5000 2300 5100 0 5100 0 /
RPTSOL
6* 2 2 /
-------------------------------------------------------------
SUMMARY
SEPARATE
RPTONLY
WGPR
/
WWPR
/
WBHP
/
WTHP
/
WGPT
/
WWPT
/
WBP
/
RGIP
/
RPR
1 2 /
TCPU
-------------------------------------------------------------
SCHEDULE
NOECHO
INCLUDE
'WELL-5000-VI.VFP' /
ECHO
RPTSCHED
6* 2 /
RPTRST
4 / restarts once a year
TUNING
0.0007 30.4 0.0007 0.0007 1.2 /
3* 0.00001 3* 0.0001 /
2* 500 1* 50 /
WELSPECS
'P' 'G' 1 1 5000 'GAS' 2* 'STOP' 'YES' /
/
COMPDAT
'P' 1 1 1 20 'OPEN' 2* 0.666 /
/
WCONPROD
'P' 'OPEN' 'THP' 1* 3000 40000 3* 300 1 /

229
/
WECON
'P' 4* 1.0 'WELL' 'YES' /
/
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
End

230
EXAMPLE ECLIPSE DATA DECK FOR COMPARISON OF DWS AND DGWS
DWS MODEL

Runspec
Title
Comparison of DWS and DGWS
--DWS-2 Model: Top completion 70 ft; Bottom Completion 60 ft
MESSAGES
6* 3*5000 /
Radial
Dimens
-- NR Theta NZ
26 1 110 /
Gas
Water
Field
Regdims
2 /
Welldims
-- Wells Con Group Well in group
2 100 1 2 /
VFPPDIMS
10 10 10 10 0 2 /
Start
1 'Jan' 2002 /
Nstack
300 /
Unifout
-------------------------------------------------------------
Grid
Tops
26*5000 /
Inrad
0.333 /
DRV
0.4170 0.3016 0.4229 0.5929 0.8313 1.166
1.634 2.292 3.213 4.505 6.317 8.857
12.42 17.41 24.41 34.23 48.00 67.30
94.36 132.3 185.5 260.1 364.7 511.4
717.0 2500 /
DZ
2600*1
234*10
26*1410
/
Equals
'DTHETA' 360 /
'PERMR' 1 /
'PERMTHT' 1 /
'PERMZ' .5 /
'PORO' 0.25 /
'PORO' 0 26 26 1 1 1 100 /
'PORO' 10 26 26 1 1 101 110 /
/
INIT

231
--RPTGRID
--1 /
-------------------------------------------------------------
PROPS
DENSITY
45 64 0.046 /
ROCK
2500 10E-6 /
PVTW
2500 1 2.6E-6 0.68 0 /
PVZG
-- Temperature
120 /
-- Press Z Visc
100 0.989 0.0122
300 0.967 0.0124
500 0.947 0.0126
700 0.927 0.0129
900 0.908 0.0133
1100 0.891 0.0137
1300 0.876 0.0141
1500 0.863 0.0146
1700 0.853 0.0151
1900 0.845 0.0157
2100 0.840 0.0163
2300 0.837 0.0167
2500 0.837 0.0177
2700 0.839 0.0184
3200 0.844 0.0202
/

SGFN
--Using Honarpour Equation 71
-- Sg Krg Pc
0.00 0.000 0.0
0.20 0.000 0.0
0.30 0.020 0.0
0.40 0.081 0.0
0.50 0.183 0.0
0.60 0.325 0.0
0.70 0.900 0.0
/
SWFN
--Using Honarpour Equation 67
-- Sw Krw Pc
0.3 0.000 0.0
0.4 0.035 0.0
0.5 0.076 0.0
0.6 0.126 0.0
0.7 0.193 0.0
0.8 0.288 0.0
0.9 0.422 0.0
1.0 1.000 0.0
/
-------------------------------------------------------------
REGIONS
Fipnum
2600*1

232
260*2
/
-------------------------------------------------------------
SOLUTION
EQUIL
5000 1500 5100 0 5100 0 /
RPTSOL
6* 2 2 /
-------------------------------------------------------------
SUMMARY
SEPARATE
RPTONLY
WGPR
/
WWPR
/
WBHP
/
WTHP
/
WGPT
/
WWPT
/
WBP
/
RGIP
/
RPR
1 2 /
TCPU
-------------------------------------------------------------
SCHEDULE
NOECHO
INCLUDE
'WELL-5000-DGWS.VFP' /
ECHO
RPTSCHED
6* 2 /
RPTRST
4 / restarts once a year
TUNING
0.0007 30.4 0.0007 0.0007 1.2 /
3* 0.00001 3* 0.0001 /
2* 500 1* 100 /
WELSPECS
'P' 'G' 1 1 5000 'GAS' 2* 'STOP' 'YES' /
'W' 'G' 1 1 5100 'WATER' 2* 'STOP' 'YES' /
/
COMPDAT
'P' 1 1 1 70 'OPEN' 2* 0.666 /
'W' 1 1 71 103 'OPEN' 2* 0.666 /
/
WCONPROD
'P' 'OPEN' 'THP' 6* 300 1 /
'W' 'OPEN' 'THP' 6* 300 2 /
/
WECON

233
'P' 1* 400 3* 'WELL' 'YES' /
/
TSTEP
35*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
/
WCONPROD
'W' 'OPEN' 'THP' 6* 14.7 2 /
/
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /

234
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /

235
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
End

236
EXAMPLE ECLIPSE DATA DECK FOR COMPARISON OF DWS AND DGWS
DGWS MODEL

Runspec
Title
Comparison of DWS and DGWS
--DGWS-1 Model: Top completion 100 ft
MESSAGES
6* 3*5000 /
Radial
Dimens
-- NR Theta NZ
26 1 110 /
Gas
Water
Field
Regdims
2 /
Welldims
-- Wells Con Group Well in group
2 100 1 2 /
VFPPDIMS
10 10 10 10 0 2 /
Start
1 'Jan' 2002 /
Nstack
800 /
Unifout
-------------------------------------------------------------
Grid
Tops
26*5000 /
Inrad
0.333 /
DRV
0.4170 0.3016 0.4229 0.5929 0.8313 1.166
1.634 2.292 3.213 4.505 6.317 8.857
12.42 17.41 24.41 34.23 48.00 67.30
94.36 132.3 185.5 260.1 364.7 511.4
717.0 2500 /
DZ
2600*1
234*10
26*1410
/
Equals
'DTHETA' 360 /
'PERMR' 1 /
'PERMTHT' 1 /
'PERMZ' .5 /
'PORO' 0.25 /
'PORO' 0 26 26 1 1 1 100 /
'PORO' 10 26 26 1 1 101 110 /
/
INIT
--RPTGRID
--1 /

237
-------------------------------------------------------------
PROPS
DENSITY
45 64 0.046 /
ROCK
2500 10E-6 /
PVTW
2500 1 2.6E-6 0.68 0 /
PVZG
-- Temperature
120 /
-- Press Z Visc
100 0.989 0.0122
300 0.967 0.0124
500 0.947 0.0126
700 0.927 0.0129
900 0.908 0.0133
1100 0.891 0.0137
1300 0.876 0.0141
1500 0.863 0.0146
1700 0.853 0.0151
1900 0.845 0.0157
2100 0.840 0.0163
2300 0.837 0.0167
2500 0.837 0.0177
2700 0.839 0.0184
3200 0.844 0.0202
/
SGFN
--Using Honarpour Equation 71
-- Sg Krg Pc
0.00 0.000 0.0
0.20 0.000 0.0
0.30 0.020 0.0
0.40 0.081 0.0
0.50 0.183 0.0
0.60 0.325 0.0
0.70 0.900 0.0
/
SWFN
--Using Honarpour Equation 67
-- Sw Krw Pc
0.3 0.000 0.0
0.4 0.035 0.0
0.5 0.076 0.0
0.6 0.126 0.0
0.7 0.193 0.0
0.8 0.288 0.0
0.9 0.422 0.0
1.0 1.000 0.0
/
-------------------------------------------------------------
REGIONS
Fipnum
2600*1
260*2
/
-------------------------------------------------------------

238
SOLUTION
EQUIL
5000 1500 5100 0 5100 0 /
RPTSOL
6* 2 2 /
-------------------------------------------------------------
SUMMARY
SEPARATE
RPTONLY
WGPR
/
WWPR
/
WBHP
/
WTHP
/
WGPT
/
WWPT
/
WBP
/
RGIP
/
RPR
1 2 /
TCPU
-------------------------------------------------------------
SCHEDULE
NOECHO
INCLUDE
'WELL-5000-DGWS.VFP' /
ECHO
RPTSCHED
6* 2 /
RPTRST
4 / restarts once a year
TUNING
0.0007 30.4 0.0007 0.0007 1.2 /
3* 0.00001 3* 0.0001 /
2* 1000 1* 500 /
WELSPECS
'P' 'G' 1 1 5000 'GAS' 2* 'STOP' 'YES' /
'W' 'G' 1 1 5000 'WATER' 2* 'STOP' 'YES' /
/
COMPDAT
'P' 1 1 1 100 'OPEN' 2* 0.666 /
'W' 1 1 1 100 'SHUT' 2* 0.666 /
/
WCONPROD
'P' 'OPEN' 'THP' 1* 3000 40000 2* 50 300 1 /
'W' 'SHUT' 'THP' 6* 300 2 /
/
WECON
'P' 1* 400 3* 'WELL' 'YES' /
/
TSTEP

239
48*30.4 /
TSTEP
31*30.4 /
/
COMPDAT
'W' 1 1 1 100 'OPEN' 2* 0.666 /
/
WCONPROD
'W' 'OPEN' 'THP' 6* 300 2 /
'P' 'SHUT' 'THP' 6* 300 1 /
/

TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /

240
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /

241
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
TSTEP
48*30.4 /
End

242
ECLIPSE VFP INCLUDED FILE: WELL-5000-DGWS
VFPPROD

1 5.00000E+003 'GAS' 'WGR' 'OGR' 'THP' '' 'FIELD' 'BHP'/

5.00000E+002 1.00000E+003 3.00000E+003 5.00000E+003


1.00000E+004 1.50000E+004 1.80000E+004 /
3.00000E+002 5.00000E+002 7.00000E+002 /
0.00000E+000 5.00000E-002 1.00000E-001 2.00000E-001
4.00000E-001 6.00000E-001 8.00000E-001 1.00000E+000 /
0.00000E+000 /
0.00000E+000 /

1 1 1 1 3.37024E+002 3.45916E+002 4.25316E+002 5.47796E+002


9.16800E+002 1.30649E+003 1.53942E+003 /
2 1 1 1 5.59849E+002 5.65127E+002 6.15848E+002 7.04360E+002
1.01422E+003 1.37324E+003 1.59511E+003 /
3 1 1 1 7.84870E+002 7.88564E+002 8.24884E+002 8.91574E+002
1.14823E+003 1.47144E+003 1.67903E+003 /
1 2 1 1 1.00767E+003 6.85715E+002 5.26979E+002 6.66317E+002
1.17821E+003 1.69683E+003 2.00157E+003 /
2 2 1 1 1.33083E+003 1.14235E+003 7.95789E+002 8.23119E+002
1.26153E+003 1.75038E+003 2.04461E+003 /
3 2 1 1 1.63681E+003 1.43549E+003 1.08259E+003 1.05816E+003
1.38041E+003 1.83132E+003 2.11135E+003 /
1 3 1 1 1.02840E+003 7.98358E+002 6.46858E+002 7.92196E+002
1.40325E+003 2.01561E+003 2.37484E+003 /
2 3 1 1 1.35532E+003 1.17999E+003 9.33680E+002 9.70272E+002
1.48036E+003 2.06380E+003 2.41335E+003 /
3 3 1 1 1.66413E+003 1.46993E+003 1.24089E+003 1.22716E+003
1.59380E+003 2.13846E+003 2.47443E+003 /
1 4 1 1 1.06877E+003 9.06174E+002 8.40372E+002 1.03062E+003
1.79136E+003 2.60038E+003 3.08950E+003 /
2 4 1 1 1.40292E+003 1.23965E+003 1.14544E+003 1.22814E+003
1.87547E+003 2.65034E+003 3.12890E+003 /
3 4 1 1 1.71647E+003 1.53687E+003 1.43807E+003 1.50399E+003
2.00566E+003 2.72983E+003 3.19348E+003 /
1 5 1 1 1.14745E+003 1.03248E+003 1.14282E+003 1.50309E+003
2.63140E+003 3.81908E+003 4.60402E+003 /
2 5 1 1 1.49259E+003 1.35495E+003 1.42442E+003 1.68890E+003
2.70978E+003 3.86469E+003 4.64024E+003 /
3 5 1 1 1.81241E+003 1.66240E+003 1.68147E+003 1.92590E+003
2.82769E+003 3.93860E+003 4.70113E+003 /
1 6 1 1 1.22282E+003 1.13624E+003 1.39809E+003 1.90174E+003
3.33657E+003 4.76408E+003 5.69293E+003 /
2 6 1 1 1.57486E+003 1.46356E+003 1.65458E+003 2.07013E+003
3.40719E+003 4.80311E+003 5.72329E+003 /
3 6 1 1 1.89758E+003 1.77592E+003 1.89757E+003 2.26855E+003
3.51185E+003 4.86696E+003 5.77621E+003 /
1 7 1 1 1.29426E+003 1.23434E+003 1.62877E+003 2.24629E+003
3.93384E+003 5.78065E+003 7.03960E+003 /
2 7 1 1 1.65009E+003 1.56415E+003 1.86048E+003 2.39607E+003
4.00224E+003 5.81806E+003 7.06883E+003 /
3 7 1 1 1.97324E+003 1.87771E+003 2.09286E+003 2.57229E+003
4.09229E+003 5.87715E+003 7.11864E+003 /
1 8 1 1 1.36153E+003 1.32752E+003 1.83827E+003 2.56051E+003
4.54574E+003 6.91460E+003 8.57619E+003 /

243
2 8 1 1 1.71853E+003 1.65684E+003 2.04934E+003 2.69480E+003
4.60380E+003 6.95034E+003 8.60433E+003 /
3 8 1 1 2.04060E+003 1.96914E+003 2.27214E+003 2.85658E+003
4.68526E+003 7.00651E+003 8.65222E+003 /

VFPPROD

2 5.00000E+003 'GAS' 'WGR' 'OGR' 'THP' '' 'FIELD' 'BHP'/

5.00000E+002 1.00000E+003 3.00000E+003 5.00000E+003


1.00000E+004 1.50000E+004 /
1.00000E+002 3.00000E+002 5.00000E+002 7.00000E+002 /
0.00000E+000 1.20000E+000 /
0.00000E+000 /
0.00000E+000 /

1 1 1 1 1.20764E+002 1.44218E+002 2.88734E+002 4.52423E+002


8.67338E+002 1.27581E+003 /
2 1 1 1 3.37024E+002 3.45916E+002 4.25316E+002 5.47796E+002
9.16800E+002 1.30649E+003 /
3 1 1 1 5.59849E+002 5.65127E+002 6.15848E+002 7.04360E+002
1.01422E+003 1.37324E+003 /
4 1 1 1 7.84870E+002 7.88564E+002 8.24884E+002 8.91574E+002
1.14823E+003 1.47144E+003 /
1 2 1 1 1.20764E+002 1.44218E+002 2.88734E+002 4.52423E+002
8.67338E+002 1.27581E+003 /
2 2 1 1 3.37024E+002 3.45916E+002 4.25316E+002 5.47796E+002
9.16800E+002 1.30649E+003 /
3 2 1 1 5.59849E+002 5.65127E+002 6.15848E+002 7.04360E+002
1.01422E+003 1.37324E+003 /
4 2 1 1 7.84870E+002 7.88564E+002 8.24884E+002 8.91574E+002
1.14823E+003 1.47144E+003 /

244
VITA

Miguel A. Armenta Sanchez, son of Miguel A. Armenta Van-Strahalen and

Salvadora Sanchez de Armenta, was born on April 3, 1964, in Santa Marta, Magdalena,

Colombia.

He received the degree of Bachelor Engineering in Petroleum Engineering from

the Universidad Industrial de Santander, Bucaramanga, Colombia, in June 1986. In June

1996, he received his master’s degree in environmental development from the Pontificia

Universidad Javeriana, Bogotá, Colombia.

He has over fourteen years of industry experience in petroleum engineering

practice working for ECOPETROL (The State Oil Company of Colombia) on drilling

projects. His job experience ranges from designing, supervising on site, and evaluating

drilling operations to solving environmental problems of drilling projects in sensitive

areas like the Amazon rain forest.

He enrolled in the doctoral degree program in petroleum engineering at the Craft

and Hawkins Department of Petroleum Engineering in August 2000. The doctoral degree

is conferred on him at the December 2003 commencement.

245

You might also like