You are on page 1of 22
CARIGALI STANDARD PROCEDURE | procepupe NO: CSP-01 REVISION: 3 UPSTREAM FACILITIES PETRONAS CHANGE ORDER PROCEDURE FOR PETRONAS CARIGALI SDN BHD. KUALA LUMPUR, In the event of any ambiguity, inconsistency or conflict between this procedure and the Contract Document and / or the PETRONAS Technical Standards (PTS), the Contract Document and / or PTS shall take precedence over this procedure. PETRONAS Carigali’s interpretation shall be final (© 2014 PETROLIAM NASIONAL BERHAD (PETRONAS) _Allrihts reserve. Ho part ofthis document may be reproduces, stored ina retrieval system or transmitted in any form or by any means (eletronie, mechanical, photocopying, recording or otherwise) without the permission ofthe copyright owner: CHANGE ORDER PROCEDURE PROCEDURE NO: CSP-01 REVISION: 3 |PSTREAM FACII PETRONAS (ESTREBM FOGEITIES DOCUMENT AUTHORISATION Document Title Change Order Procedure Document ID: CSP-O1 Document Revision: 3 Revision Date: 22nd December 2014 Document Status: Approved for Use Name Signature Position Date Amalit Razak a Abdul Prepared by: Construction Engineer ja DCF/DC, PCSB Esan Emmanuel Edovbiye Staff (Construction) DCF/DC, PCSB Endorsed byr: {|= 12 14 Reviewed by: laa -12:2014} Head (Fabrication) Approved by: | Rozana M Hazizy youl DCF/DC, PCSB Boelgeell CHANGE ORDER PROCEDURE REVISION: 3 UPSTREAM FACILITIES PETRONAS m DOCUMENT REVISION HISTORY 7 arenoveosy fo name [sianavure| _oare | wae | stonarune | oare | name | sicnarune | oare © |ozyo796| wns | we | oxjoras | mre | ere _foryorsse | msm | msm | 07/07/96 1 [22a] ca | cxa | ayosyse | ore | ere _|z5jox90] msm | msm | 23/03/99 [2 |asyonyos | ara] ara | s5youen | ete | exe | 25/0090] wo | wa | 25/00/99 DOCUMENT REVISION LIST SECTION REV DATE DESCRIPTION OF AMENDMENT All 23/03/99. | Revised as per PETRONAS Carigali’s requirement. All 20/07/09 | Revised as per PETRONAS Carigali’s requirement. All 22/12/14 | Revised as per PETRONAS Carigali’s requirement.

You might also like