MEDIDAS

ITEM DESCRIPCION UNID. CANT.


LARGO
OE.2 ESTRUCTURAS
OE.2.1 MOVIMIENTO DE TIERRAS
OE.2.1.1 NIVELACION DE TERRENO m2
CASETA 1 4.30
OE.2.1.2 EXCAVACIONES
OE.2.1.2.1 EXCAVACIONES P/CIMIENTOS DE MANERA MANUAL m3
CORTE 1 - 1 1 4.30
CORTE 2 - 2 1 2.51
1 0.95
CORTE 3 - 3 1 2.01
1 1.03
CORTE 4 - 4 1 0.98
CORTE 5 - 5 1 2.67
OE.2.1.3 RELLENOS
OE.2.1.3.1 RELLENO CON MATERIAL PROPIO m3
CORTE 1 - 1 1 4.30
CORTE 2 - 2 1 2.51
1 0.95
CORTE 3 - 3 1 2.01
1 1.03
CORTE 4 - 4 1 0.98
CORTE 5 - 5 1 2.67
NIVELACION INTERIOR CON PLANCHA
OE.2.1.3.2 m2
COMPACTADORA PARA FALSO PISO
1 2.31
1 2.31
OE.2.1.3.3 ACARREO DE MATERIAL EXCEDENTE D<30 M m3
VOL. EXCAVADO
VIOL. RELLENO -1
ESPONAMIENTO = 1.20
OE.2.1.3.4 ELIMINACION DE MATERIAL EXCEDENTE m3

OE.2.2 OBRAS DE CONCRETO SIMPLE


OE.2.2.1 CIMIENTO C:H:1:10+30% P.G. m3
CORTE 1 - 1 1 4.30
CORTE 2 - 2 1 2.51
1 0.95
CORTE 3 - 3 1 2.01
1 1.03
CORTE 4 - 4 1 0.98
CORTE 5 - 5 1 2.67
OE.2.2.2 SUBCIMIENTO C:H:1:12+30% P.G.
CORTE 1 - 1 1 4.30
CORTE 2 - 2 1 2.51
1 0.95
CORTE 3 - 3 1 2.01
1 1.03
CORTE 4 - 4 1 0.98
CORTE 5 - 5 1 2.67
ENCOFRADO Y DESCENCOFRADO NORMAL DE
OE.2.2.3 m2
CIMIENTO CORRIDO
CORTE 1 - 1 2 4.30
CORTE 2 - 2 2 2.51
2 0.95
CORTE 3 - 3 2 2.01
2 1.03
CORTE 4 - 4 2 0.98
CORTE 5 - 5 2 2.67
OE.2.2.3 SOBRECIMIENTO C:H:1:8+25% P.M.
MEDIDAS
PARCIAL TOTAL
ANCHO ALTO AREA

12.60
2.93 12.60
0.00
9.91
0.50 1.30 2.80
0.50 1.30 1.63
0.50 1.30 0.62
0.40 1.30 1.05
0.40 1.30 0.54
0.40 1.30 0.51
0.80 1.30 2.78

1.72
0.37 0.40 0.64
0.26 0.40 0.26
0.26 0.40 0.10
0.27 0.40 0.22
0.27 0.40 0.11
0.27 0.40 0.11
0.27 0.40 0.29
7.97
2.25 5.20
1.20 2.77

9.91 9.91 9.83


1.72 -1.72

9.83
9.83 9.83

3.81
0.50 0.50 1.08
0.50 0.50 0.63
0.50 0.50 0.24
0.40 0.50 0.40
0.40 0.50 0.21
0.40 0.50 0.20
0.80 0.50 1.07
3.05
0.50 0.40 0.86
0.50 0.40 0.50
0.50 0.40 0.19
0.40 0.40 0.32
0.40 0.40 0.16
0.40 0.40 0.16
0.80 0.40 0.85
14.45
0.50 4.30
0.50 2.51
0.50 0.95
0.50 2.01
0.50 1.03
0.50 0.98
0.50 2.67