You are on page 1of 11

LS INUL MIDDLE - UT600 (D200MM) (8.5 m X 9.

5 m) - ALL PNL2B -IM66 PPV Target :


Jarak ke Station (m): 2100
3

NON DECKING Num of holes blast at same time : 0


DECKING NON BAD BAD Maximum Exp Charge tiap Lubang460(Kgs) :
KEDALAMAN Isian Bawah Control
Isian Atas Control Stemming Isian Control Stemming Isian Control PF Decking
PF Non-Deck
Normal BAD Isian Stemming Isian NON BAD BAD
Deck Stemming Stemming Akhir Stemming Akhir Stemming
(m) (m) meter kg Akhir meter kg meter kg meter kg Kg/m3 Kg/m3 Kg/m3
3 0.5 0.3 10 3.22 1.6 0.6 22 1.62 2.4 0.6 22 2.5 0.134 0.091
3.5 1 0.4 15 3.14 1.5 0.6 22 1.50 2.2 1.3 48 2.3 0.131 0.170
4 1 0.6 20 3.51 1.9 0.6 22 1.85 2.5 1.5 55 2.7 0.131 0.171
4.5 1 0.7 25 3.89 2.2 0.6 22 2.22 2.6 1.9 70 2.8 0.130 0.193
5 1 0.8 30 4.28 2.6 0.6 22 2.60 2.7 2.3 85 2.9 0.128 0.210
5.5 2 1.0 37 4.60 1.9 0.6 22 1.90 2.8 2.7 100 3.1 0.133 0.225
6 2 1.0 37 5.10 2.4 0.6 22 2.40 3.1 2.9 107 3.4 0.122 0.221
6.5 2 1.5 55 5.15 2.2 0.8 30 2.20 3.3 3.2 118 3.6 0.162 0.225
7 2 1.5 55 5.65 2.5 1.0 37 2.50 3.5 3.6 131 3.8 0.163 0.232
7.5 6.5 2 2.0 74 5.70 2.3 1.2 44 2.30 3.7 3.8 140 4.1 3.5 3.1 112.6 3.8 0.195 0.232 0.186
8 7 2 2.5 92 5.75 2.1 1.4 52 2.10 4.0 4.0 148 4.4 3.8 3.3 120.0 4.2 0.223 0.229 0.186
8.5 7.5 2 2.5 92 6.25 2.4 1.6 59 2.40 4.2 4.3 159 4.6 4.0 3.6 131.1 4.4 0.221 0.231 0.191
9 8 2 2.5 92 6.75 2.7 1.8 66 2.70 4.5 4.5 166 5.0 4.3 3.8 138.5 4.7 0.218 0.229 0.191
9.5 8.5 2 2.5 92 7.25 2.9 2.1 78 2.90 4.7 4.8 177 5.2 4.5 4.1 149.6 4.9 0.221 0.231 0.195
10 9 2 2.5 92 7.75 3.3 2.2 81 3.30 5.0 5.0 185 5.5 4.8 4.3 156.9 5.3 0.215 0.229 0.194
10.5 9.5 2 2.5 92 8.25 3.7 2.3 85 3.70 5.2 5.3 196 5.5 5.0 4.6 168.0 5.5 0.209 0.231 0.198
11 2 2.5 92 8.75 3.7 2.8 103 3.70 5.4 5.6 207 6.0 0.220 0.233
11.5 2 2.5 92 9.25 3.8 3.2 118 3.80 5.5 6.0 222 6.1 0.227 0.239
12 2 2.5 92 9.75 4.0 3.5 129 4.00 5.5 6.5 240 6.2 0.229 0.248
12.5 2 2.5 92 10.25 4.1 3.9 144 4.10 5.5 7.0 259 6.2 0.234 0.256
13 2 2.5 92 10.75 4.5 4.0 148 4.50 5.5 7.5 277 6.3 0.229 0.264
13.5 2 2.5 92 11.25 4.8 4.2 155 4.80 5.5 8.0 295 6.3 0.227 0.271
14 2 2.5 92 11.75 4.9 4.6 170 4.90 5.5 8.5 314 6.4 0.232 0.278
14.5 2 2.5 92 12.25 5.0 5.0 185 5.00 5.5 9.0 332 6.4 0.237 0.284
15 2 2.5 92 12.75 5.2 5.3 196 5.20 5.5 9.5 351 6.5 0.238 0.290

Note
15.0
LUBANG PRODUKSI
1. Loading disesuaikan dengan angka actual pita drill, angka di belakang koma semuanya dibulatkan ke LS 0.5 meter ( Contoh: 10.1 m s/d 10.9 m menggunakan isian LS: 10.5m)
2. Minimum waktu gassing adalah 35 menit sebelum di stemming, minimal adalah 20 menit dan harus approval T5
3. Stemming lubang basah 2 meter sisanya drill cutting, kering full drill cutting
4. Pada pembuatan Tie Up, echelon / sayap maksimal adalah 4 lubang dan menggunakan kontrol Zig-Zag (burning front maksimal 4 x spasi). 13.0
5. Pengaturan jumlah kontrol dalam Tie _Up disesuaikan dengan kondisi aktual setelah mendapat approval T5/ B5
6. Plascon mulai digunakan pada kedalaman 5 m bila tidak ada alokasi stemming truck
7. Posisi pemasangan plascon : (5 m - 7 m = 2.6 m), (7.5 m - 9 m = 3.2 m), (9.5 m - 11 m = 3.8 m), (11.5 m - 13 m = 4.2 m), (13.5 m - 15 m = 6 m), (15.5 m - 18 m = 8.5 m)
LUBANG TRIM
1. Plascon mulai digunakan pada kedalaman 6 m 11.0
2. Dibawah 9m = 1/2 Col Charge Explosive (Lubang Produksi)
3. 10m - 12m = 80 kg, 13m - 14m = 100kg, 15m - 16m = 120kg, 17m - 18m = 140kg, 19m - 20m = 160kg, 21m - 22m = 180kg, 23m - 24m = 200kg

START DECKING 11.5M


3
LS INUL MIDDLE - UT600 (D200MM) (8 m X 8.5 m) - IM16 -IM66 PPV Target :
Jarak ke Station (m): 602
Num of holes blast at same time :
DECKING NON - DECKING Maximum Exp Charge tiap Lubang (Kgs) : 50
Dalam Isian Bawah Control
Isian Atas Control Stemming Isian Control PF Decking PF Non-Deck
Lubang Isian Stemming Isian
Deck Stemming Stemming Akhir Stemming
(m) meter kg Akhir meter kg meter kg Kg/m3 Kg/m3
3 0.5 0.3 10 3.22 1.6 0.6 2.4 0.6 22 2.5 0.051 0.109
3.5 1 0.4 15 3.14 1.5 0.6 2.5 1.0 37 2.6 0.062 0.155
4 1 0.6 20 3.51 1.9 0.6 2.7 1.3 48 2.8 0.075 0.176
4.5 1 0.7 25 3.89 2.2 0.6 2.7 1.4 50 2.8 0.082 0.163
5 1 0.8 30 4.28 2.6 0.6 22 2.60 3.0 1.4 50 3.1 0.152 0.147
5.5 2 1.0 37 4.60 1.9 0.6 22 1.90 3.3 1.4 50 3.4 0.158 0.134
6 2 1.0 37 5.10 2.4 0.6 22 2.40 3.5 1.4 50 3.6 0.145 0.122
6.5 2 1.5 55 5.15 2.2 0.8 30 2.20 3.8 1.4 50 3.9 0.192 0.113
7 2 1.5 55 5.65 2.5 1.0 37 2.50 5.5 1.4 50 4.2 0.194 0.105
7.5 2 2.0 74 5.70 2.5 1.0 37 2.50 5.5 1.4 50 4.4 0.217 0.098
8 3 2.5 75 5.75 1.7 0.8 30 1.70 5.5 1.4 50 4.7 0.192 0.092
8.5 3 2.5 75 6.25 2.2 0.8 30 2.20 5.5 1.4 50 5.0 0.181 0.086
9 3 2.5 75 6.75 2.3 1.2 44 2.30 5.5 1.4 50 5.3 0.195 0.082
9.5 3 2.5 92 7.25 2.6 1.4 52 2.60 5.5 1.4 50 5.6 0.223 0.077
10 3 2.5 92 7.75 2.8 1.7 63 2.80 5.5 1.4 50 5.6 0.228 0.073
10.5 3 2.5 92 8.25 3.0 2.0 74 3.00 5.5 1.4 50 5.6 0.233 0.070
11 3 2.5 92 8.75 3.3 2.2 81 3.30 5.5 1.4 50 5.6 0.232 0.067
11.5 3 2.5 92 9.25 3.6 2.4 89 3.60 5.5 1.4 50 5.6 0.231 0.064
12 3 2.5 92 9.75 3.9 2.6 96 3.90 5.5 1.4 50 5.6 0.231 0.061
12.5 3 2.5 92 10.25 4.2 2.8 103 4.20 5.5 1.4 50 5.6 0.230 0.059
13 3 2.5 92 10.75 4.5 3.0 111 4.50 5.5 1.4 50 5.6 0.230 0.056
13.5 3 2.5 92 11.25 4.8 3.2 118 4.80 5.5 1.4 50 5.6 0.229 0.054
14 3 2.5 92 11.75 5.0 3.5 129 5.00 5.5 1.4 50 5.6 0.233 0.052
14.5 3 2.5 92 12.25 5.3 3.7 137 5.30 5.5 1.4 50 5.6 0.232 0.051
15 3 2.5 92 12.75 5.5 4.0 148 5.50 5.5 1.4 50 5.6 0.235 0.049

Note
LUBANG PRODUKSI
1. Loading disesuaikan dengan angka actual pita drill, angka di belakang koma semuanya dibulatkan ke LS 0.5 meter ( Contoh: 10.1 m s/d 10.9 m menggunakan isian LS: 10.5m)
2. Minimum waktu gassing adalah 35 menit sebelum di stemming, minimal adalah 20 menit dan harus approval T5
3. Stemming lubang basah 2 meter sisanya drill cutting, kering full drill cutting
4. Pada pembuatan Tie Up, echelon / sayap maksimal adalah 4 lubang dan menggunakan kontrol Zig-Zag (burning front maksimal 4 x spasi).
5. Pengaturan jumlah kontrol dalam Tie _Up disesuaikan dengan kondisi aktual setelah mendapat approval T5/ B5
6. Plascon mulai digunakan pada kedalaman 5 m bila tidak ada alokasi stemming truck
7. Posisi pemasangan plascon : (5 m - 7 m = 2.6 m), (7.5 m - 9 m = 3.2 m), (9.5 m - 11 m = 3.8 m), (11.5 m - 13 m = 4.2 m), (13.5 m - 15 m = 6 m), (15.5 m - 18 m = 8.5 m)
LUBANG TRIM
1. Plascon mulai digunakan pada kedalaman 6 m
2. Dibawah 9m = 1/2 Col Charge Explosive (Lubang Produksi)
3. 10m - 12m = 80 kg, 13m - 14m = 100kg, 15m - 16m = 120kg, 17m - 18m = 140kg, 19m - 20m = 160kg, 21m - 22m = 180kg, 23m - 24m = 200kg

START DECKING 5M
3
LS INUL MIDDLE - UT600 (D171.45MM) (8 m X 8.5 m) - IM16 -IM66 PPV Target :
Jarak ke Station (m): 602
Num of holes blast at same time :
DECKING NON - DECKING Maximum Exp Charge tiap Lubang (Kgs) : 50
Dalam Isian Bawah Control
Isian Atas Control Stemming Isian Control PF Decking PF Non-Deck
Lubang Isian Stemming Isian
Deck Stemming Stemming Akhir Stemming
(m) meter kg Akhir meter kg meter kg Kg/m3 Kg/m3
3 0.5 0.3 8 3.22 1.6 0.6 16 1.62 2.4 0.6 16 2.5 0.117 0.080
3.5 1 0.4 11 3.14 1.5 0.6 16 1.50 2.5 1.0 27 2.6 0.114 0.114
4 2 0.8 22 3.28 0.7 0.5 14 0.70 2.5 1.5 41 2.7 0.130 0.150
4.5 2 0.8 22 3.78 1.1 0.6 16 1.10 2.6 1.8 50 2.8 0.124 0.163
5 2 0.8 22 4.28 1.4 0.8 22 1.40 2.7 1.8 50 2.9 0.128 0.147
5.5 2.5 0.8 22 4.78 1.4 0.8 22 1.40 3.0 1.8 50 3.2 0.116 0.134
6 2.5 1.0 27 5.10 1.9 0.6 16 1.90 3.2 1.8 50 3.4 0.106 0.122
6.5 3 1.2 33 5.42 1.7 0.6 16 1.70 3.5 1.8 50 3.7 0.111 0.113
7 3 1.2 33 5.92 1.8 1.0 27 1.80 3.5 1.8 50 3.7 0.125 0.105
7.5 2.5 1.5 41 6.15 2.0 1.5 41 2.00 5.5 1.8 50 3.9 0.160 0.098
8 3 2.0 54 6.20 2.0 1.0 27 2.00 5.5 1.8 50 4.1 0.150 0.092
8.5 3 2.0 54 6.70 2.5 1.0 27 2.50 5.5 1.8 50 4.2 0.141 0.086
9 3 2.0 54 7.20 2.5 1.5 41 2.50 5.5 1.8 50 4.4 0.155 0.082
9.5 3 2.2 60 7.52 2.5 1.8 49 2.50 5.5 1.8 50 4.5 0.168 0.077
10 3 2.2 60 8.02 2.6 2.2 60 2.60 5.5 1.8 50 4.7 0.176 0.073
10.5 3 2.5 68 8.25 2.7 2.3 62 2.70 5.5 1.8 50 4.7 0.182 0.070
11 3 2.5 68 8.75 3.0 2.5 68 3.00 5.5 1.8 50 4.9 0.181 0.067
11.5 3 2.8 76 8.98 3.1 2.6 71 3.10 5.5 1.8 50 5.1 0.187 0.064
12 3 2.8 76 9.48 3.4 2.8 76 3.40 5.5 1.8 50 5.3 0.186 0.061
12.5 3 3.5 95 9.35 3.2 2.8 76 3.20 5.5 1.8 50 5.6 0.201 0.059
13 3 3.5 95 9.85 3.5 3.0 81 3.50 5.5 1.8 50 5.7 0.200 0.056
13.5 3 3.5 95 10.35 3.8 3.2 87 3.80 5.5 1.8 50 5.7 0.198 0.054
14 3 3.5 95 10.85 4.1 3.4 92 4.10 5.5 1.8 50 5.7 0.197 0.052
14.5 3 3.5 95 11.35 4.5 3.5 95 4.50 5.5 1.8 50 5.7 0.193 0.051
15 3 3.5 95 11.85 4.8 3.7 100 4.80 5.5 1.8 50 5.7 0.192 0.049

Note
LUBANG PRODUKSI
1. Loading disesuaikan dengan angka actual pita drill, angka di belakang koma semuanya dibulatkan ke LS 0.5 meter ( Contoh: 10.1 m s/d 10.9 m menggunakan isian LS: 10.5m)
2. Minimum waktu gassing adalah 35 menit sebelum di stemming, minimal adalah 20 menit dan harus approval T5
3. Stemming lubang basah 2 meter sisanya drill cutting, kering full drill cutting
4. Pada pembuatan Tie Up, echelon / sayap maksimal adalah 4 lubang dan menggunakan kontrol Zig-Zag (burning front maksimal 4 x spasi).
5. Pengaturan jumlah kontrol dalam Tie _Up disesuaikan dengan kondisi aktual setelah mendapat approval T5/ B5
6. Plascon mulai digunakan pada kedalaman 5 m bila tidak ada alokasi stemming truck
7. Posisi pemasangan plascon : (5 m - 7 m = 2.6 m), (7.5 m - 9 m = 3.2 m), (9.5 m - 11 m = 3.8 m), (11.5 m - 13 m = 4.2 m), (13.5 m - 15 m = 6 m), (15.5 m - 18 m = 8.5 m)
LUBANG TRIM
1. Plascon mulai digunakan pada kedalaman 6 m
2. Dibawah 9m = 1/2 Col Charge Explosive (Lubang Produksi)
3. 10m - 12m = 80 kg, 13m - 14m = 100kg, 15m - 16m = 120kg, 17m - 18m = 140kg, 19m - 20m = 160kg, 21m - 22m = 180kg, 23m - 24m = 200kg

START DECKING 5M
LS INUL MIDDLE - UT600 (D171.45MM) (8 m X 8.5 m) - IM12
-IM66 PPV Target : 3
Jarak ke Station (m): 565
Num of holes blast at same time :
DECKING NON - DECKING Maximum Exp Charge tiap Lubang (Kgs) : 44
Dalam Isian Bawah Control
Isian Atas Control Stemming Isian Control PF Decking PF Non-Deck
Lubang Isian Stemming Isian
Deck Stemming Stemming Akhir Stemming
(m) meter kg Akhir meter kg meter kg Kg/m3 Kg/m3
3 0.5 0.3 8 3.22 1.6 0.6 16 1.62 2.4 0.6 16 2.5 0.117 0.080
3.5 1 0.4 11 3.14 1.5 0.6 16 1.50 2.5 1.0 27 2.6 0.114 0.114
4 2 0.8 22 3.28 0.7 0.5 14 0.70 2.5 1.5 41 2.7 0.130 0.150
4.5 2 0.8 22 3.78 1.1 0.6 16 1.10 2.6 1.6 44 2.8 0.124 0.144
5 2 0.8 22 4.28 1.4 0.8 22 1.40 2.7 1.6 44 2.9 0.128 0.129
5.5 2.5 0.8 22 4.78 1.4 0.8 22 1.40 3.0 1.6 44 3.2 0.116 0.118
6 2.5 1.0 27 5.10 1.9 0.6 16 1.90 3.2 1.6 44 3.4 0.106 0.108
6.5 3 1.2 33 5.42 1.7 0.6 16 1.70 3.5 1.6 44 3.7 0.111 0.100
7 3 1.2 33 5.92 1.8 1.0 27 1.80 3.5 1.6 44 3.7 0.125 0.092
7.5 2.5 1.5 41 6.15 2.0 1.5 41 2.00 5.5 1.6 44 3.9 0.160 0.086
8 3 2.0 54 6.20 2.0 1.0 27 2.00 5.5 1.6 44 4.1 0.150 0.081
8.5 3 2.0 54 6.70 2.5 1.0 27 2.50 5.5 1.6 44 4.2 0.141 0.076
9 3 2.0 54 7.20 2.5 1.5 41 2.50 5.5 1.6 44 4.4 0.155 0.072
9.5 3 2.2 60 7.52 2.5 1.8 49 2.50 5.5 1.6 44 4.5 0.168 0.068
10 3 2.2 60 8.02 2.6 2.2 60 2.60 5.5 1.6 44 4.7 0.176 0.065
10.5 3 2.5 68 8.25 2.7 2.3 62 2.70 5.5 1.6 44 4.7 0.182 0.062
11 3 2.5 68 8.75 3.0 2.5 68 3.00 5.5 1.6 44 4.9 0.181 0.059
11.5 3 2.8 76 8.98 3.1 2.6 71 3.10 5.5 1.6 44 5.1 0.187 0.056
12 3 2.8 76 9.48 3.4 2.8 76 3.40 5.5 1.6 44 5.3 0.186 0.054
12.5 3 3.5 95 9.35 3.2 2.8 76 3.20 5.5 1.6 44 5.6 0.201 0.052
13 3 3.5 95 9.85 3.5 3.0 81 3.50 5.5 1.6 44 5.7 0.200 0.050
13.5 3 3.5 95 10.35 3.8 3.2 87 3.80 5.5 1.6 44 5.7 0.198 0.048
14 3 3.5 95 10.85 4.1 3.4 92 4.10 5.5 1.6 44 5.7 0.197 0.046
14.5 3 3.5 95 11.35 4.5 3.5 95 4.50 5.5 1.6 44 5.7 0.193 0.045
15 3 3.5 95 11.85 4.8 3.7 100 4.80 5.5 1.6 44 5.7 0.192 0.043

Note
LUBANG PRODUKSI
1. Loading disesuaikan dengan angka actual pita drill, angka di belakang koma semuanya dibulatkan ke LS 0.5 meter ( Contoh: 10.1 m s/d 10.9 m menggunakan isian LS: 10.5m)
2. Minimum waktu gassing adalah 35 menit sebelum di stemming, minimal adalah 20 menit dan harus approval T5
3. Stemming lubang basah 2 meter sisanya drill cutting, kering full drill cutting
4. Pada pembuatan Tie Up, echelon / sayap maksimal adalah 4 lubang dan menggunakan kontrol Zig-Zag (burning front maksimal 4 x spasi).
5. Pengaturan jumlah kontrol dalam Tie _Up disesuaikan dengan kondisi aktual setelah mendapat approval T5/ B5
6. Plascon mulai digunakan pada kedalaman 5 m bila tidak ada alokasi stemming truck
7. Posisi pemasangan plascon : (5 m - 7 m = 2.6 m), (7.5 m - 9 m = 3.2 m), (9.5 m - 11 m = 3.8 m), (11.5 m - 13 m = 4.2 m), (13.5 m - 15 m = 6 m), (15.5 m - 18 m = 8.5 m)
LUBANG TRIM
1. Plascon mulai digunakan pada kedalaman 6 m
2. Dibawah 9m = 1/2 Col Charge Explosive (Lubang Produksi)
3. 10m - 12m = 80 kg, 13m - 14m = 100kg, 15m - 16m = 120kg, 17m - 18m = 140kg, 19m - 20m = 160kg, 21m - 22m = 180kg, 23m - 24m = 200kg

START DECKING 5M
3
LS INUL MIDDLE - UT600 (D171.45MM) (8 m X 8.5 m) - IM15 -IM66 PPV Target :
Jarak ke Station (m): 964
Num of holes blast at same time :
DECKING NON - DECKING Maximum Exp Charge tiap Lubang (Kgs) : 128
Dalam Isian Bawah Control
Isian Atas Control Stemming Isian Control PF Decking PF Non-Deck
Lubang Isian Stemming Isian
Deck Stemming Stemming Akhir Stemming
(m) meter kg Akhir meter kg meter kg Kg/m3 Kg/m3
3 0.5 0.3 8 3.22 1.6 0.6 16 1.62 2.4 0.6 16 2.5 0.117 0.080
3.5 1 0.4 11 3.14 1.5 0.6 16 1.50 2.5 1.0 27 2.6 0.114 0.114
4 2 0.8 22 3.28 0.7 0.5 14 0.70 2.5 1.5 41 2.7 0.130 0.150
4.5 2 0.8 22 3.78 1.1 0.6 16 1.10 2.6 1.9 52 2.8 0.124 0.169
5 2 0.8 22 4.28 1.4 0.8 22 1.40 2.7 2.3 62 2.9 0.128 0.184
5.5 2.5 0.8 22 4.78 1.4 0.8 22 1.40 3.0 2.5 68 3.3 0.116 0.181
6 2.5 1.0 27 5.10 1.9 0.6 16 1.90 3.2 2.8 76 3.5 0.106 0.186
6.5 3 1.2 33 5.42 1.7 0.6 16 1.70 3.5 3.0 81 3.8 0.111 0.184
7 3 1.2 33 5.92 1.8 1.0 27 1.80 3.5 3.5 95 3.9 0.125 0.200
7.5 2.5 1.5 41 6.15 2.0 1.5 41 2.00 3.7 3.8 103 4.1 0.160 0.202
8 3 2.0 54 6.20 2.0 1.0 27 2.00 3.9 4.1 111 4.3 0.150 0.205
8.5 3 2.0 54 6.70 2.5 1.0 27 2.50 4.0 4.5 122 4.5 0.141 0.211
9 3 2.0 54 7.20 2.5 1.5 41 2.50 4.2 4.7 128 4.7 0.155 0.209
9.5 3 2.2 60 7.52 2.5 1.8 49 2.50 4.3 4.7 128 4.8 0.168 0.198
10 3 2.2 60 8.02 2.6 2.2 60 2.60 4.5 4.7 128 5.0 0.176 0.188
10.5 3 2.5 68 8.25 2.7 2.3 62 2.70 5.5 4.7 128 5.0 0.182 0.179
11 3 2.5 68 8.75 3.0 2.5 68 3.00 5.5 4.7 128 5.2 0.181 0.171
11.5 3 2.8 76 8.98 3.1 2.6 71 3.10 5.5 4.7 128 5.4 0.187 0.164
12 3 2.8 76 9.48 3.4 2.8 76 3.40 5.5 4.7 128 5.6 0.186 0.157
12.5 3 3.5 95 9.35 3.2 2.8 76 3.20 5.5 4.7 128 5.9 0.201 0.151
13 3 3.5 95 9.85 3.5 3.0 81 3.50 5.5 4.7 128 6.0 0.200 0.145
13.5 3 3.5 95 10.35 3.8 3.2 87 3.80 5.5 4.7 128 6.0 0.198 0.139
14 3 3.5 95 10.85 4.1 3.4 92 4.10 5.5 4.7 128 6.0 0.197 0.135
14.5 3 3.5 95 11.35 4.5 3.5 95 4.50 5.5 4.7 128 6.0 0.193 0.130
15 3 3.5 95 11.85 4.8 3.7 100 4.80 5.5 4.7 128 6.0 0.192 0.126

Note
LUBANG PRODUKSI
1. Loading disesuaikan dengan angka actual pita drill, angka di belakang koma semuanya dibulatkan ke LS 0.5 meter ( Contoh: 10.1 m s/d 10.9 m menggunakan isian LS: 10.5m)
2. Minimum waktu gassing adalah 35 menit sebelum di stemming, minimal adalah 20 menit dan harus approval T5
3. Stemming lubang basah 2 meter sisanya drill cutting, kering full drill cutting
4. Pada pembuatan Tie Up, echelon / sayap maksimal adalah 4 lubang dan menggunakan kontrol Zig-Zag (burning front maksimal 4 x spasi).
5. Pengaturan jumlah kontrol dalam Tie _Up disesuaikan dengan kondisi aktual setelah mendapat approval T5/ B5
6. Plascon mulai digunakan pada kedalaman 5 m bila tidak ada alokasi stemming truck
7. Posisi pemasangan plascon : (5 m - 7 m = 2.6 m), (7.5 m - 9 m = 3.2 m), (9.5 m - 11 m = 3.8 m), (11.5 m - 13 m = 4.2 m), (13.5 m - 15 m = 6 m), (15.5 m - 18 m = 8.5 m)
LUBANG TRIM
1. Plascon mulai digunakan pada kedalaman 6 m
2. Dibawah 9m = 1/2 Col Charge Explosive (Lubang Produksi)
3. 10m - 12m = 80 kg, 13m - 14m = 100kg, 15m - 16m = 120kg, 17m - 18m = 140kg, 19m - 20m = 160kg, 21m - 22m = 180kg, 23m - 24m = 200kg
3
LS INUL MIDDLE - UT600 (D171.45MM) (8 m X 8.5 m) - IM37 -IM66 PPV Target :
Jarak ke Station (m): 1231
Num of holes blast at same time :
DECKING NON - DECKING Maximum Exp Charge tiap Lubang (Kgs) : 209
Dalam Isian Bawah Control
Isian Atas Control Stemming Isian Control PF Decking PF Non-Deck
Lubang Isian Stemming Isian
Deck Stemming Stemming Akhir Stemming
(m) meter kg Akhir meter kg meter kg Kg/m3 Kg/m3
3 0.5 0.3 8 3.22 1.6 0.6 16 1.62 2.4 0.6 16 2.5 0.117 0.080
3.5 1 0.4 11 3.14 1.5 0.6 16 1.50 2.5 1.0 27 2.6 0.114 0.114
4 2 0.8 22 3.28 0.7 0.5 14 0.70 2.5 1.5 41 2.7 0.130 0.150
4.5 2 0.8 22 3.78 1.1 0.6 16 1.10 2.6 1.9 52 2.8 0.124 0.169
5 2 0.8 22 4.28 1.6 0.6 16 1.60 2.7 2.3 62 2.9 0.112 0.184
5.5 2 1.0 27 4.60 1.9 0.6 16 1.90 3.0 2.5 68 3.3 0.116 0.181
6 2.5 1.0 27 5.10 1.9 0.6 16 1.90 3.2 2.8 76 3.5 0.106 0.186
6.5 2.5 1.5 41 5.15 1.9 0.6 16 1.90 3.5 3.0 81 3.8 0.129 0.184
7 2.5 1.5 41 5.65 1.8 1.2 33 1.80 3.5 3.5 95 3.9 0.154 0.200
7.5 2.5 1.5 41 6.15 2.0 1.5 41 2.00 3.7 3.8 103 4.1 0.160 0.202
8 3 2.0 54 6.20 2.0 1.0 27 2.00 3.9 4.1 111 4.3 0.150 0.205
8.5 3 2.0 54 6.70 2.5 1.0 27 2.50 4.0 4.5 122 4.5 0.141 0.211
9 3 2.0 54 7.20 2.5 1.5 41 2.50 4.2 4.8 130 4.7 0.155 0.213
9.5 3 2.2 60 7.52 2.5 1.8 49 2.50 4.3 5.2 141 4.8 0.168 0.218
10 3 2.2 60 8.02 2.6 2.2 60 2.60 4.5 5.5 149 5.1 0.176 0.219
10.5 3 2.5 68 8.25 2.7 2.3 62 2.70 4.5 6.0 163 5.1 0.182 0.228
11 3 2.5 68 8.75 3.0 2.5 68 3.00 4.7 6.3 171 5.3 0.181 0.229
11.5 3 2.8 76 8.98 3.1 2.6 71 3.10 4.9 6.6 179 5.6 0.187 0.229
12 3 2.8 76 9.48 3.4 2.8 76 3.40 5.1 6.9 187 5.8 0.186 0.229
12.5 3 3.5 95 9.35 3.2 2.8 76 3.20 5.4 7.1 193 6.1 0.201 0.227
13 3 3.5 95 9.85 3.5 3.0 81 3.50 5.5 7.5 204 6.3 0.200 0.230
13.5 3 3.5 95 10.35 3.8 3.2 87 3.80 5.5 7.7 209 6.3 0.198 0.227
14 3 3.5 95 10.85 4.1 3.4 92 4.10 5.5 7.7 209 6.3 0.197 0.219
14.5 3 3.5 95 11.35 4.5 3.5 95 4.50 5.5 7.7 209 6.3 0.193 0.212
15 3 3.5 95 11.85 4.8 3.7 100 4.80 5.5 7.7 209 6.3 0.192 0.205

Note
LUBANG PRODUKSI
1. Loading disesuaikan dengan angka actual pita drill, angka di belakang koma semuanya dibulatkan ke LS 0.5 meter ( Contoh: 10.1 m s/d 10.9 m menggunakan isian LS: 10.5m)
2. Minimum waktu gassing adalah 35 menit sebelum di stemming, minimal adalah 20 menit dan harus approval T5
3. Stemming lubang basah 2 meter sisanya drill cutting, kering full drill cutting
4. Pada pembuatan Tie Up, echelon / sayap maksimal adalah 4 lubang dan menggunakan kontrol Zig-Zag (burning front maksimal 4 x spasi).
5. Pengaturan jumlah kontrol dalam Tie _Up disesuaikan dengan kondisi aktual setelah mendapat approval T5/ B5
6. Plascon mulai digunakan pada kedalaman 5 m bila tidak ada alokasi stemming truck
7. Posisi pemasangan plascon : (5 m - 7 m = 2.6 m), (7.5 m - 9 m = 3.2 m), (9.5 m - 11 m = 3.8 m), (11.5 m - 13 m = 4.2 m), (13.5 m - 15 m = 6 m), (15.5 m - 18 m = 8.5 m)
LUBANG TRIM
1. Plascon mulai digunakan pada kedalaman 6 m
2. Dibawah 9m = 1/2 Col Charge Explosive (Lubang Produksi)
3. 10m - 12m = 80 kg, 13m - 14m = 100kg, 15m - 16m = 120kg, 17m - 18m = 140kg, 19m - 20m = 160kg, 21m - 22m = 180kg, 23m - 24m = 200kg
3
LS INUL MIDDLE - UT600 (D200MM) (8 m X 8.5 m) - IM37 -IM66 PPV Target :
Jarak ke Station (m): 1231
Num of holes blast at same time :
DECKING NON - DECKING Maximum Exp Charge tiap Lubang (Kgs) : 209
Dalam Isian Bawah Control
Isian Atas Control Stemming Isian Control PF Decking PF Non-Deck
Lubang Isian Stemming Isian
Deck Stemming Stemming Akhir Stemming
(m) meter kg Akhir meter kg meter kg Kg/m3 Kg/m3
3 0.5 0.3 10 3.22 1.6 0.6 2.4 0.6 22 2.5 0.051 0.109
3.5 1 0.4 15 3.14 1.5 0.6 2.5 1.0 37 2.6 0.062 0.155
4 1 0.6 20 3.51 1.9 0.6 2.7 1.3 48 2.8 0.075 0.176
4.5 1 0.7 25 3.89 2.2 0.6 2.7 1.8 66 2.9 0.082 0.217
5 1 0.8 30 4.28 2.6 0.6 22 2.60 3.0 2.0 74 3.2 0.152 0.217
5.5 2 1.0 37 4.60 1.9 0.6 22 1.90 3.3 2.2 81 3.5 0.158 0.217
6 2 1.0 37 5.10 2.4 0.6 22 2.40 3.5 2.5 92 3.8 0.145 0.226
6.5 2 1.5 55 5.15 2.2 0.8 30 2.20 3.8 2.7 100 4.1 0.192 0.226
7 2 1.5 55 5.65 2.5 1.0 37 2.50 4.1 2.9 107 4.4 0.194 0.225
7.5 2 2.0 74 5.70 2.5 1.0 37 2.50 4.3 3.2 118 4.6 0.217 0.232
8 3 2.5 75 5.75 1.7 0.8 30 1.70 4.6 3.4 126 4.9 0.192 0.231
8.5 3 2.5 75 6.25 2.2 0.8 30 2.20 4.9 3.6 133 5.3 0.181 0.230
9 3 2.5 75 6.75 2.3 1.2 44 2.30 5.2 3.8 140 5.6 0.195 0.229
9.5 3 2.5 92 7.25 2.6 1.4 52 2.60 5.5 4.0 148 5.9 0.223 0.229
10 3 2.5 92 7.75 2.8 1.7 63 2.80 5.5 4.5 166 6.0 0.228 0.244
10.5 3 2.5 92 8.25 3.0 2.0 74 3.00 5.5 5.0 185 6.0 0.233 0.259
11 3 2.5 92 8.75 3.3 2.2 81 3.30 5.5 5.5 203 6.1 0.232 0.272
11.5 3 2.5 92 9.25 3.6 2.4 89 3.60 5.5 5.7 209 6.1 0.231 0.267
12 3 2.5 92 9.75 3.9 2.6 96 3.90 5.5 5.7 209 6.1 0.231 0.256
12.5 3 2.5 92 10.25 4.2 2.8 103 4.20 5.5 5.7 209 6.1 0.230 0.246
13 3 2.5 92 10.75 4.5 3.0 111 4.50 5.5 5.7 209 6.1 0.230 0.236
13.5 3 2.5 92 11.25 4.8 3.2 118 4.80 5.5 5.7 209 6.1 0.229 0.227
14 3 2.5 92 11.75 5.0 3.5 129 5.00 5.5 5.7 209 6.1 0.233 0.219
14.5 3 2.5 92 12.25 5.3 3.7 137 5.30 5.5 5.7 209 6.1 0.232 0.212
15 3 2.5 92 12.75 5.5 4.0 148 5.50 5.5 5.7 209 6.1 0.235 0.205

Note
LUBANG PRODUKSI
1. Loading disesuaikan dengan angka actual pita drill, angka di belakang koma semuanya dibulatkan ke LS 0.5 meter ( Contoh: 10.1 m s/d 10.9 m menggunakan isian LS: 10.5m)
2. Minimum waktu gassing adalah 35 menit sebelum di stemming, minimal adalah 20 menit dan harus approval T5
3. Stemming lubang basah 2 meter sisanya drill cutting, kering full drill cutting
4. Pada pembuatan Tie Up, echelon / sayap maksimal adalah 4 lubang dan menggunakan kontrol Zig-Zag (burning front maksimal 4 x spasi).
5. Pengaturan jumlah kontrol dalam Tie _Up disesuaikan dengan kondisi aktual setelah mendapat approval T5/ B5
6. Plascon mulai digunakan pada kedalaman 5 m bila tidak ada alokasi stemming truck
7. Posisi pemasangan plascon : (5 m - 7 m = 2.6 m), (7.5 m - 9 m = 3.2 m), (9.5 m - 11 m = 3.8 m), (11.5 m - 13 m = 4.2 m), (13.5 m - 15 m = 6 m), (15.5 m - 18 m = 8.5 m)
LUBANG TRIM
1. Plascon mulai digunakan pada kedalaman 6 m
2. Dibawah 9m = 1/2 Col Charge Explosive (Lubang Produksi)
3. 10m - 12m = 80 kg, 13m - 14m = 100kg, 15m - 16m = 120kg, 17m - 18m = 140kg, 19m - 20m = 160kg, 21m - 22m = 180kg, 23m - 24m = 200kg
3
LS INUL MIDDLE - UT600 (D171.45MM) (8 m X 8.5 m) - IM29 -IM66 PPV Target :
Jarak ke Station (m): 1145
Num of holes blast at same time :
DECKING NON - DECKING Maximum Exp Charge tiap Lubang (Kgs) : 181
Dalam Isian Bawah Control
Isian Atas Control Stemming Isian Control PF Decking PF Non-Deck
Lubang Isian Stemming Isian
Deck Stemming Stemming Akhir Stemming
(m) meter kg Akhir meter kg meter kg Kg/m3 Kg/m3
3 0.5 0.3 8 3.22 1.6 0.6 16 1.62 2.4 0.6 16 2.5 0.117 0.080
3.5 1 0.4 11 3.14 1.5 0.6 16 1.50 2.5 1.0 27 2.6 0.114 0.114
4 2 0.8 22 3.28 0.7 0.5 14 0.70 2.5 1.5 41 2.7 0.130 0.150
4.5 2 0.8 22 3.78 1.1 0.6 16 1.10 2.6 1.9 52 2.8 0.124 0.169
5 2 0.8 22 4.28 1.6 0.6 16 1.60 2.7 2.3 62 2.9 0.112 0.184
5.5 2 1.0 27 4.60 1.9 0.6 16 1.90 3.0 2.5 68 3.3 0.116 0.181
6 2.5 1.0 27 5.10 1.9 0.6 16 1.90 3.2 2.8 76 3.5 0.106 0.186
6.5 2.5 1.5 41 5.15 1.9 0.6 16 1.90 3.5 3.0 81 3.8 0.129 0.184
7 2.5 1.5 41 5.65 1.8 1.2 33 1.80 3.5 3.5 95 3.9 0.154 0.200
7.5 2.5 1.5 41 6.15 2.0 1.5 41 2.00 3.7 3.8 103 4.1 0.160 0.202
8 3 2.0 54 6.20 2.0 1.0 27 2.00 3.9 4.1 111 4.3 0.150 0.205
8.5 3 2.0 54 6.70 2.5 1.0 27 2.50 4.0 4.5 122 4.5 0.141 0.211
9 3 2.0 54 7.20 2.5 1.5 41 2.50 4.2 4.8 130 4.7 0.155 0.213
9.5 3 2.2 60 7.52 2.5 1.8 49 2.50 4.3 5.2 141 4.8 0.168 0.218
10 3 2.2 60 8.02 2.6 2.2 60 2.60 4.5 5.5 149 5.1 0.176 0.219
10.5 3 2.5 68 8.25 2.7 2.3 62 2.70 4.5 6.0 163 5.1 0.182 0.228
11 3 2.5 68 8.75 3.0 2.5 68 3.00 4.7 6.3 171 5.3 0.181 0.229
11.5 3 2.8 76 8.98 3.1 2.6 71 3.10 4.9 6.6 179 5.6 0.187 0.229
12 3 2.8 76 9.48 3.4 2.8 76 3.40 5.1 6.7 181 5.8 0.186 0.221
12.5 3 3.5 95 9.35 3.2 2.8 76 3.20 5.5 6.7 181 6.1 0.201 0.213
13 3 3.5 95 9.85 3.5 3.0 81 3.50 5.5 6.7 181 6.2 0.200 0.204
13.5 3 3.5 95 10.35 3.8 3.2 87 3.80 5.5 6.7 181 6.2 0.198 0.197
14 3 3.5 95 10.85 4.1 3.4 92 4.10 5.5 6.7 181 6.2 0.197 0.190
14.5 3 3.5 95 11.35 4.5 3.5 95 4.50 5.5 6.7 181 6.2 0.193 0.183
15 3 3.5 95 11.85 4.8 3.7 100 4.80 5.5 6.7 181 6.2 0.192 0.177

Note
LUBANG PRODUKSI
1. Loading disesuaikan dengan angka actual pita drill, angka di belakang koma semuanya dibulatkan ke LS 0.5 meter ( Contoh: 10.1 m s/d 10.9 m menggunakan isian LS: 10.5m)
2. Minimum waktu gassing adalah 35 menit sebelum di stemming, minimal adalah 20 menit dan harus approval T5
3. Stemming lubang basah 2 meter sisanya drill cutting, kering full drill cutting
4. Pada pembuatan Tie Up, echelon / sayap maksimal adalah 4 lubang dan menggunakan kontrol Zig-Zag (burning front maksimal 4 x spasi).
5. Pengaturan jumlah kontrol dalam Tie _Up disesuaikan dengan kondisi aktual setelah mendapat approval T5/ B5
6. Plascon mulai digunakan pada kedalaman 5 m bila tidak ada alokasi stemming truck
7. Posisi pemasangan plascon : (5 m - 7 m = 2.6 m), (7.5 m - 9 m = 3.2 m), (9.5 m - 11 m = 3.8 m), (11.5 m - 13 m = 4.2 m), (13.5 m - 15 m = 6 m), (15.5 m - 18 m = 8.5 m)
LUBANG TRIM
1. Plascon mulai digunakan pada kedalaman 6 m
2. Dibawah 9m = 1/2 Col Charge Explosive (Lubang Produksi)
3. 10m - 12m = 80 kg, 13m - 14m = 100kg, 15m - 16m = 120kg, 17m - 18m = 140kg, 19m - 20m = 160kg, 21m - 22m = 180kg, 23m - 24m = 200kg
3
LS INUL MIDDLE - UT600 (D200MM) (8 m X 8.5 m) - IM29 -IM66 PPV Target :
Jarak ke Station (m): 1145
Num of holes blast at same time :
DECKING NON - DECKING Maximum Exp Charge tiap Lubang (Kgs) : 181
Dalam Isian Bawah Control
Isian Atas Control Stemming Isian Control PF Decking PF Non-Deck
Lubang Isian Stemming Isian
Deck Stemming Stemming Akhir Stemming
(m) meter kg Akhir meter kg meter kg Kg/m3 Kg/m3
3 0.5 0.3 10 3.22 1.6 0.6 2.4 0.6 22 2.5 0.051 0.109
3.5 1 0.4 15 3.14 1.5 0.6 2.5 1.0 37 2.6 0.062 0.155
4 1 0.6 20 3.51 1.9 0.6 2.7 1.3 48 2.8 0.075 0.176
4.5 1 0.7 25 3.89 2.2 0.6 2.7 1.8 66 2.9 0.082 0.217
5 1 0.8 30 4.28 2.6 0.6 22 2.60 3.0 2.0 74 3.2 0.152 0.217
5.5 2 1.0 37 4.60 1.9 0.6 22 1.90 3.3 2.2 81 3.5 0.158 0.217
6 2 1.0 37 5.10 2.4 0.6 22 2.40 3.5 2.5 92 3.8 0.145 0.226
6.5 2 1.5 55 5.15 2.2 0.8 30 2.20 3.8 2.7 100 4.1 0.192 0.226
7 2 1.5 55 5.65 2.5 1.0 37 2.50 4.1 2.9 107 4.4 0.194 0.225
7.5 2 2.0 74 5.70 2.5 1.0 37 2.50 4.3 3.2 118 4.6 0.217 0.232
8 3 2.5 75 5.75 1.7 0.8 30 1.70 4.6 3.4 126 4.9 0.192 0.231
8.5 3 2.5 75 6.25 2.2 0.8 30 2.20 4.9 3.6 133 5.3 0.181 0.230
9 3 2.5 75 6.75 2.3 1.2 44 2.30 5.2 3.8 140 5.6 0.195 0.229
9.5 3 2.5 92 7.25 2.6 1.4 52 2.60 5.5 4.0 148 5.9 0.223 0.229
10 3 2.5 92 7.75 2.8 1.7 63 2.80 5.5 4.5 166 6.0 0.228 0.244
10.5 3 2.5 92 8.25 3.0 2.0 74 3.00 5.5 4.9 181 6.0 0.233 0.253
11 3 2.5 92 8.75 3.3 2.2 81 3.30 5.5 4.9 181 6.0 0.232 0.242
11.5 3 2.5 92 9.25 3.6 2.4 89 3.60 5.5 4.9 181 6.0 0.231 0.231
12 3 2.5 92 9.75 3.9 2.6 96 3.90 5.5 4.9 181 6.0 0.231 0.221
12.5 3 2.5 92 10.25 4.2 2.8 103 4.20 5.5 4.9 181 6.0 0.230 0.213
13 3 2.5 92 10.75 4.5 3.0 111 4.50 5.5 4.9 181 6.0 0.230 0.204
13.5 3 2.5 92 11.25 4.8 3.2 118 4.80 5.5 4.9 181 6.0 0.229 0.197
14 3 2.5 92 11.75 5.0 3.5 129 5.00 5.5 4.9 181 6.0 0.233 0.190
14.5 3 2.5 92 12.25 5.3 3.7 137 5.30 5.5 4.9 181 6.0 0.232 0.183
15 3 2.5 92 12.75 5.5 4.0 148 5.50 5.5 4.9 181 6.0 0.235 0.177

Note
LUBANG PRODUKSI
1. Loading disesuaikan dengan angka actual pita drill, angka di belakang koma semuanya dibulatkan ke LS 0.5 meter ( Contoh: 10.1 m s/d 10.9 m menggunakan isian LS: 10.5m)
2. Minimum waktu gassing adalah 35 menit sebelum di stemming, minimal adalah 20 menit dan harus approval T5
3. Stemming lubang basah 2 meter sisanya drill cutting, kering full drill cutting
4. Pada pembuatan Tie Up, echelon / sayap maksimal adalah 4 lubang dan menggunakan kontrol Zig-Zag (burning front maksimal 4 x spasi).
5. Pengaturan jumlah kontrol dalam Tie _Up disesuaikan dengan kondisi aktual setelah mendapat approval T5/ B5
6. Plascon mulai digunakan pada kedalaman 5 m bila tidak ada alokasi stemming truck
7. Posisi pemasangan plascon : (5 m - 7 m = 2.6 m), (7.5 m - 9 m = 3.2 m), (9.5 m - 11 m = 3.8 m), (11.5 m - 13 m = 4.2 m), (13.5 m - 15 m = 6 m), (15.5 m - 18 m = 8.5 m)
LUBANG TRIM
1. Plascon mulai digunakan pada kedalaman 6 m
2. Dibawah 9m = 1/2 Col Charge Explosive (Lubang Produksi)
3. 10m - 12m = 80 kg, 13m - 14m = 100kg, 15m - 16m = 120kg, 17m - 18m = 140kg, 19m - 20m = 160kg, 21m - 22m = 180kg, 23m - 24m = 200kg
3
LS INUL MIDDLE - UT600 (D171.45MM) (8 m X 8.5 m) - IM01 -IM66 PPV Target :
Jarak ke Station (m): 450
Num of holes blast at same time :
DECKING NON - DECKING Maximum Exp Charge tiap Lubang (Kgs) : 28
Dalam Isian Bawah Control
Isian Atas Control Stemming Isian Control PF Decking PF Non-Deck
Lubang Isian Stemming Isian
Deck Stemming Stemming Akhir Stemming
(m) meter kg Akhir meter kg meter kg Kg/m3 Kg/m3
3 0.5 0.3 8 3.22 1.6 0.6 16 1.62 2.4 0.6 16 2.5 0.117 0.080
3.5 1 0.4 11 3.14 1.5 0.6 16 1.50 2.5 1.0 27 2.6 0.114 0.114
4 2 0.8 22 3.28 0.7 0.5 14 0.70 2.5 1.0 28 2.6 0.130 0.103
4.5 2 0.8 22 3.78 1.1 0.6 16 1.10 2.6 1.0 28 2.7 0.124 0.091
5 2 0.8 22 4.28 1.4 0.8 22 1.40 2.7 1.0 28 2.8 0.128 0.082
5.5 2.5 0.8 22 4.78 1.4 0.8 22 1.40 3.0 1.0 28 3.1 0.116 0.075
6 2.5 1.0 27 5.10 1.9 0.6 16 1.90 3.2 1.0 28 3.3 0.106 0.068
6.5 3 1.0 27 5.60 1.9 0.6 16 1.90 3.5 1.0 28 3.6 0.098 0.063
7 3 1.0 27 6.10 2.0 1.0 27 2.00 5.5 1.0 28 3.6 0.114 0.059
7.5 2.5 1.5 41 6.15 2.0 1.5 41 2.00 5.5 1.0 28 3.8 0.160 0.055
8 3 2.0 54 6.20 2.0 1.0 27 2.00 5.5 1.0 28 4.0 0.150 0.051
8.5 3 2.0 54 6.70 2.5 1.0 27 2.50 5.5 1.0 28 4.1 0.141 0.048
9 3 2.0 54 7.20 2.5 1.5 41 2.50 5.5 1.0 28 4.3 0.155 0.046
9.5 3 2.2 60 7.52 2.5 1.8 49 2.50 5.5 1.0 28 4.4 0.168 0.043
10 3 2.2 60 8.02 2.6 2.2 60 2.60 5.5 1.0 28 4.6 0.176 0.041
10.5 3 2.5 68 8.25 2.7 2.3 62 2.70 5.5 1.0 28 4.6 0.182 0.039
11 3 2.5 68 8.75 3.0 2.5 68 3.00 5.5 1.0 28 4.8 0.181 0.037
11.5 3 2.8 76 8.98 3.1 2.6 71 3.10 5.5 1.0 28 5.0 0.187 0.036
12 3 2.8 76 9.48 3.4 2.8 76 3.40 5.5 1.0 28 5.2 0.186 0.034
12.5 3 3.5 95 9.35 3.2 2.8 76 3.20 5.5 1.0 28 5.5 0.201 0.033
13 3 3.5 95 9.85 3.5 3.0 81 3.50 5.5 1.0 28 5.6 0.200 0.032
13.5 3 3.5 95 10.35 3.8 3.2 87 3.80 5.5 1.0 28 5.6 0.198 0.030
14 3 3.5 95 10.85 4.1 3.4 92 4.10 5.5 1.0 28 5.6 0.197 0.029
14.5 3 3.5 95 11.35 4.5 3.5 95 4.50 5.5 1.0 28 5.6 0.193 0.028
15 3 3.5 95 11.85 4.8 3.7 100 4.80 5.5 1.0 28 5.6 0.192 0.027

Note
LUBANG PRODUKSI
1. Loading disesuaikan dengan angka actual pita drill, angka di belakang koma semuanya dibulatkan ke LS 0.5 meter ( Contoh: 10.1 m s/d 10.9 m menggunakan isian LS: 10.5m)
2. Minimum waktu gassing adalah 35 menit sebelum di stemming, minimal adalah 20 menit dan harus approval T5
3. Stemming lubang basah 2 meter sisanya drill cutting, kering full drill cutting
4. Pada pembuatan Tie Up, echelon / sayap maksimal adalah 4 lubang dan menggunakan kontrol Zig-Zag (burning front maksimal 4 x spasi).
5. Pengaturan jumlah kontrol dalam Tie _Up disesuaikan dengan kondisi aktual setelah mendapat approval T5/ B5
6. Plascon mulai digunakan pada kedalaman 5 m bila tidak ada alokasi stemming truck
7. Posisi pemasangan plascon : (5 m - 7 m = 2.6 m), (7.5 m - 9 m = 3.2 m), (9.5 m - 11 m = 3.8 m), (11.5 m - 13 m = 4.2 m), (13.5 m - 15 m = 6 m), (15.5 m - 18 m = 8.5 m)
LUBANG TRIM
1. Plascon mulai digunakan pada kedalaman 6 m
2. Dibawah 9m = 1/2 Col Charge Explosive (Lubang Produksi)
3. 10m - 12m = 80 kg, 13m - 14m = 100kg, 15m - 16m = 120kg, 17m - 18m = 140kg, 19m - 20m = 160kg, 21m - 22m = 180kg, 23m - 24m = 200kg

START DECKING 5M
3
LS INUL MIDDLE - UT600 (D171.45MM) (8 m X 8.5 m) - IM10 -IM66 PPV Target :
Jarak ke Station (m): 488
Num of holes blast at same time :
DECKING NON - DECKING Maximum Exp Charge tiap Lubang (Kgs) : 33
Dalam Isian Bawah Control
Isian Atas Control Stemming Isian Control PF Decking PF Non-Deck
Lubang Isian Stemming Isian
Deck Stemming Stemming Akhir Stemming
(m) meter kg Akhir meter kg meter kg Kg/m3 Kg/m3
3 0.5 0.3 8 3.22 1.6 0.6 16 1.62 2.4 0.6 16 2.5 0.117 0.080
3.5 1 0.4 11 3.14 1.5 0.6 16 1.50 2.5 1.0 27 2.6 0.114 0.114
4 2 0.8 22 3.28 0.7 0.5 14 0.70 2.5 1.2 33 2.6 0.130 0.121
4.5 2 0.8 22 3.78 1.1 0.6 16 1.10 2.6 1.2 33 2.7 0.124 0.107
5 2 0.8 22 4.28 1.4 0.8 22 1.40 2.7 1.2 33 2.8 0.128 0.097
5.5 2.5 0.8 22 4.78 1.4 0.8 22 1.40 3.0 1.2 33 3.1 0.116 0.088
6 2.5 1.0 27 5.10 1.9 0.6 16 1.90 3.2 1.2 33 3.3 0.106 0.080
6.5 3 1.2 33 5.42 1.7 0.6 16 1.70 3.5 1.2 33 3.6 0.111 0.074
7 3 1.2 33 5.92 1.8 1.0 27 1.80 5.5 1.2 33 3.6 0.125 0.069
7.5 2.5 1.5 41 6.15 2.0 1.5 41 2.00 5.5 1.2 33 3.8 0.160 0.064
8 3 2.0 54 6.20 2.0 1.0 27 2.00 5.5 1.2 33 4.0 0.150 0.060
8.5 3 2.0 54 6.70 2.5 1.0 27 2.50 5.5 1.2 33 4.1 0.141 0.057
9 3 2.0 54 7.20 2.5 1.5 41 2.50 5.5 1.2 33 4.3 0.155 0.054
9.5 3 2.2 60 7.52 2.5 1.8 49 2.50 5.5 1.2 33 4.4 0.168 0.051
10 3 2.2 60 8.02 2.6 2.2 60 2.60 5.5 1.2 33 4.6 0.176 0.048
10.5 3 2.5 68 8.25 2.7 2.3 62 2.70 5.5 1.2 33 4.6 0.182 0.046
11 3 2.5 68 8.75 3.0 2.5 68 3.00 5.5 1.2 33 4.8 0.181 0.044
11.5 3 2.8 76 8.98 3.1 2.6 71 3.10 5.5 1.2 33 5.0 0.187 0.042
12 3 2.8 76 9.48 3.4 2.8 76 3.40 5.5 1.2 33 5.2 0.186 0.040
12.5 3 3.5 95 9.35 3.2 2.8 76 3.20 5.5 1.2 33 5.5 0.201 0.039
13 3 3.5 95 9.85 3.5 3.0 81 3.50 5.5 1.2 33 5.6 0.200 0.037
13.5 3 3.5 95 10.35 3.8 3.2 87 3.80 5.5 1.2 33 5.6 0.198 0.036
14 3 3.5 95 10.85 4.1 3.4 92 4.10 5.5 1.2 33 5.6 0.197 0.034
14.5 3 3.5 95 11.35 4.5 3.5 95 4.50 5.5 1.2 33 5.6 0.193 0.033
15 3 3.5 95 11.85 4.8 3.7 100 4.80 5.5 1.2 33 5.6 0.192 0.032

Note
LUBANG PRODUKSI
1. Loading disesuaikan dengan angka actual pita drill, angka di belakang koma semuanya dibulatkan ke LS 0.5 meter ( Contoh: 10.1 m s/d 10.9 m menggunakan isian LS: 10.5m)
2. Minimum waktu gassing adalah 35 menit sebelum di stemming, minimal adalah 20 menit dan harus approval T5
3. Stemming lubang basah 2 meter sisanya drill cutting, kering full drill cutting
4. Pada pembuatan Tie Up, echelon / sayap maksimal adalah 4 lubang dan menggunakan kontrol Zig-Zag (burning front maksimal 4 x spasi).
5. Pengaturan jumlah kontrol dalam Tie _Up disesuaikan dengan kondisi aktual setelah mendapat approval T5/ B5
6. Plascon mulai digunakan pada kedalaman 5 m bila tidak ada alokasi stemming truck
7. Posisi pemasangan plascon : (5 m - 7 m = 2.6 m), (7.5 m - 9 m = 3.2 m), (9.5 m - 11 m = 3.8 m), (11.5 m - 13 m = 4.2 m), (13.5 m - 15 m = 6 m), (15.5 m - 18 m = 8.5 m)
LUBANG TRIM
1. Plascon mulai digunakan pada kedalaman 6 m
2. Dibawah 9m = 1/2 Col Charge Explosive (Lubang Produksi)
3. 10m - 12m = 80 kg, 13m - 14m = 100kg, 15m - 16m = 120kg, 17m - 18m = 140kg, 19m - 20m = 160kg, 21m - 22m = 180kg, 23m - 24m = 200kg

START DECKING 5M

You might also like