SITUATIONAL REPORT ON MAJOR ROADS AND BRIDGES DUE TO TYPHOON "OMPONG"


Status as of 12:00 NN September 21, 2018
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)

CAR
Major Roads Leading to Baguio City

1. Kennon Road Not Passable Motorists are advised to take a. Engr. Nora R. Delos Still Not Passable as per e-
alternate route Santos mail received dated September
b. 0917 517 3899 & 21, 2018 @ 10:28 AM
a. Engr. Severino S. Clearing is on-going along
Bangasan K0248+850 (slide),
b. 0919 209 8860 K0246+220 - K0246+240
(slide), K0243+000 -
K0244+605 (debris flow) and
K0246+700 (debris flow)
K0239+220-
K0239+290(Roadslip),
K0237+290-K0237+380(Slide-
Right side),K0237+180-
K0237+260(Slide),
K0236+450( Roadslip),
K0235+504 Approach of Camp
5 Detour (Roadslip),
K0235+450 (Roadslip),
K0234+700 (Roadslip),
K0227+200 (Slide),
K0226+750 (Roadslip),
K0216+090 (Scoured Camp 1
Bridge Abutment A and B)
Alternate Route:
Marcos Highway and
Baguio-Bauang(Naguilian Road
)
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
2. Benguet-Nueva Vizcaya Road
a. K0254+200, Lamut Junction, September 15, 2018 Not Passable Slide Coordinated with private a. MPP HENRY APOSTOL Still One Lane Passable as
Beckel, La Trinidad equipment owners for b. per e-mail received dated
clearing operations 0947 1960 689 September 19, 2018 @ 11:31
AM

Section is under contract.


Section was closed to traffic
today at 07:55AM

Alternate route:
Suyoc- Beckel Provincial Road

b. K0267+300 September 15, 2018 Not Passable Slide Equipment is on standby. a. MPP Arthur Olpindo Still One Lane Passable as
Clearing operations is b. 0918 588 8190 per email received dated
hampered by heavy rains September 18, 2018 @ 2:45
AM
c. K0269+100 September 15, 2018 Not Passable Slide Equipment is on standby. a. MPP Arthur Olpindo Still One Lane Passable as
Clearing operations is b. 0918 588 8190 per email received dated
hampered by heavy rains September 18, 2018 @ 2:45
AM
d. K0270+150 September 15, 2018 Not Passable Mudslide Equipment is on standby. a. MPP Arthur Olpindo Still One Lane Passable as
Clearing operations is b. 0918 588 8190 per email received dated
hampered by heavy rains September 18, 2018 @ 2:45
AM
e. K271+700 September 15, 2018 Not Passable Slide Equipment is on standby. a. MPP Arthur Olpindo Still One Lane Passable as
Clearing operations is b. 0918 588 8190 per email received dated
hampered by heavy rains September 18, 2018 @ 2:45
AM
f. K0289+850, Sitio Indian, Brgy. September 15, 2018 Passable Rock collapse Equipment is on standby. a. MPP Arthur Olpindo Still One Lane Passable as
Ambuklao, Bokod (L=25m,H=5m, Clearing operations is b. 0918 588 8190 per email received dated
W=4m) hampered by heavy rains September 18, 2018 @ 2:45
AM
g. K0298+900, Sitio Bangao, September 15, 2018 Not Passable Rock collapse Equipment is on standby. a. MPP Arthur Olpindo Still One Lane Passable as
Ambuklao, Bokod (L=20m,H=5m, Clearing operations is b. 0918 588 8190 per email received dated
W=6m) hampered by heavy rains September 18, 2018 @ 2:45
AM
h. K0300+000 September 15, 2018 Not Passable Slide Equipment is on standby. a. MPP Arthur Olpindo Still One Lane Passable as
Clearing operations is b. 0918 588 8190 per email received dated
hampered by heavy rains September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
i. K0261+800 Sitio September 16,2018 Not Passable Slide Clearing operations is a. MPP Arthur Olpindo Still One Lane Passable as
Doting,Brgy.Loacan,Itogan (L=150,W=8m,H=4m) hampered by fallen electric b. 0918 588 8190 per email received dated
post September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
j. K0262+250,Sitio September 16,2018 Not Passable Slide a. MPP Arthur Olpindo Still One Lane Passable as
Doting,Brgy.Loacan,Itogon (L=12,W=8m,H=4m) b. 0918 588 8190 per email received dated
September 18, 2018 @ 2:45
AM
k. K0263+500,Sitio September 16,2018 Not Passable Clearing operations is a. MPP Arthur Olpindo Still One Lane Passable as
Anteng,Brgy.Loacan,Itogon hampered by fallen electric b. 0918 588 8190 per email received dated
post September 18, 2018 @ 2:45
AM
l. K0266+000 Sitio Anteng,Brgy. September 16,2018 Not Passable Clearing operations is a. MPP Arthur Olpindo Still One Lane Passable as
Loacan, Itogon hampered by fallen electric b. 0918 588 8190 per email received dated
post September 18, 2018 @ 2:45
AM
m. K0270+600 Sitio Bingo. Brgy. September 16,2018 Not Passable a. MPP Arthur Olpindo Still One Lane Passable as
Loacan,Itogon b. 0918 588 8190 per email received dated
September 18, 2018 @ 2:45
AM
3. Baguio-Bontoc Road
a. K0259+950- K0260+050, La September 15, 2018 Not Passable Fallen trees Clearing operations is on- MPP JEFFERSON TED S. Still One Lane Passable as
Trinidad going PULAY per email received dated
09394639667 September 17, 2018 @ 3:57
AM
b. K0260+900-K0261+000, La September 15, 2018 Not Passable Mudflow Clearing operations is on- MPP JEFFERSON TED S. Still One Lane Passable as
Trinidad going PULAY per email received dated
09394639667 September 17, 2018 @ 3:57
AM
c. K0267+200 Ambassador, September 15, 2018 Not Passable Soil Collapse Clearing operations by DPWH MPP PETER T. SANGGOY, Passable as per email
Tublay Loader is on-going JR. received dated September 16,
0948 268 0672 2018 @ 11:09 PM
d.K0278+870 Topdac, Atok September 15, 2018 Not Passable Soil Collapse Clearing operations by DPWH MPP PETER T. SANGGOY, Passable as per email
Loader is on-going JR. received dated September 16,
0948 268 0672 2018 @ 11:09 PM
e.K0282+900 Topdac, Atok September 15, 2018 Not Passable Soil Collapse Clearing operations by DPWH MPP PETER T. SANGGOY, Passable as per email
Loader is on-going JR. received dated September 16,
0948 268 0672 2018 @ 11:09 PM
f. K0285+150 Abiang, Atok September 15, 2018 Not Passable Rock fall Clearing operations by DPWH MPP PETER T. SANGGOY, Still One Lane Passable as
Loader is on-going JR. per email received dated
0948 268 0672 September 18, 2018 @ 2:45
AM
g.K0285+500 Abiang, Atok September 15, 2018 Not Passable Soil Collapse Clearing operations by DPWH MPP PETER T. SANGGOY, Passable as per email
Loader is on-going JR. received dated September 16,
0948 268 0672 2018 @ 11:09 PM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
h. K0286+250, Abiang, Atok September 15, 2018 Not Passable Soil collapse Clearing operations by DPWH MPP PETER T. SANGGOY, Passable as per email
Loader is on-going JR. received dated September 16,
0948 268 0673 2018 @ 11:09 PM
i. K0286+650, Abiang, Atok September 15, 2018 Not Passable Soil Collapse Clearing operations by DPWH MPP PETER T. SANGGOY, Still One Lane Passable as
Loader is on-going JR. per email received dated
0948 268 0672 September 18, 2018 @ 2:45
AM
j. K0288+150 Abiang, Atok September 15, 2018 Not Passable Soil collapse Clearing operations still is on- MPP PETER T. SANGGOY, One Lane Passable as per
going JR. email received dated
0948 268 0673 September 18, 2018 @ 6:34
PM
k. K0292+020,Atok September 17, 2018 Not Passable Slide Clearing operations still is on- MPP PETER T. SANGGOY, One Lane Passable as per
going JR. email received dated
0948 268 0673 September 18, 2018 @ 6:34
PM
l. K0293+000, Abiang, Atok September 15, 2018 Not Passable Soil Collapse Clearing operation still is on- MPP PETER T. SANGGOY, Passable as per email
going JR. received dated September 18,
0948 268 0672 2018 @ 6:34 PM
m. K0296+860 Paoay, Atok September 15, 2018 Not Passable Soil Collapse Clearing operation still is on- MPP BILLY JUN S. Passable as per email
going DEPALOG received dated September 16,
0917 790 9915 2018 @ 11:09 PM
n. K0302+300-K0302+343, September 15, 2018 Not Passable Rock collapse Clearing operations by DPWH MPP RHODA O. ESTALIN Passable as per email
Cattubo, Atok Loader is on-going received dated September 16,
0946 652 2600 2018 @ 11:09 PM
o. K0306+000 Calasipan, Atok September 15, 2018 Not Passable Rock collapse Clearing operations by DPWH MPP PETER T. SANGGOY, Passable as per email
Loader is on-going JR. received dated September 16,
0948 268 0672 2018 @ 11:09 PM
p. K0309+150 Natubleng, Buguias September 15, 2018 Not Passable Mudslide Clearing operations by DPWH MPP PETER T. SANGGOY, One Lane Passable as per
Backhoe is on-going JR. email received dated
0948 268 0672 September 18, 2018 @ 6:34
PM
q. K0311+400 Natubleng, Buguias September 15, 2018 Not Passable Soil collapse Clearing operations by DPWH MPP PETER T. SANGGOY, Still One Lane Passable as
Backhoe is on-going JR. per email received dated
0948 268 0672 September 18, 2018 @ 6:34
PM
r. K0311+700 Natubleng, Buguias September 15, 2018 Not Passable Slide Clearing operations by DPWH MPP PETER T. SANGGOY, One Lane Passable as per
Backhoe is on-going JR. email received dated
0948 268 0672 September 18, 2018 @ 6:34
PM
s. K0312+700 - K0312+800 September 15, 2018 Not Passable Mudslide Clearing operations by DPWH MPP PETER T. SANGGOY, One Lane Passable as per
Natubleng, Buguias Backhoe is on-going JR. email received dated
0948 268 0672 September 18, 2018 @ 6:34
PM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
t. K0314+050 Colliding, Buguias September 15, 2018 Not Passable Rock Collapse Clearing operations by DPWH MPP PETER T. SANGGOY, One Lane Passable as per
Backhoe is on-going JR. email received dated
0948 268 0672 September 18, 2018 @ 6:34
PM
u. K0320+600 Amgaleyguey, September 15, 2018 Not Passable Soil collapse Clearing operations by DPWH MPP PETER T. SANGGOY, Passable as per email
Buguias Backhoe is on-going JR. received dated September 18,
0948 268 0672 2018 @6:34 PM
v. K0327+000-K0327+100, September 15, 2018 Not Passable Slide Clearing operations by DPWH MPP PETER T. SANGGOY, One Lane Passable as per
Bayoyo, Buguias Backhoe is on-going JR. email received dated
0948 268 0673 September 18, 2018 @ 6:34
PM
w. K0339+400 Bangao, Buguais September 15, 2018 Not Passable Soil collapse Clearing operations by DPWH MPP PETER T. SANGGOY, Still One Lane Passable as
Backhoe is on-going JR. per email received dated
0948 268 0672 September 18, 2018 @ 6:34
PM
x. K0339+600 Bangao, Buguais September 15, 2018 Not Passable Soil collapse Clearing operations by DPWH MPP PETER T. SANGGOY, Still One Lane Passable as
Backhoe is on-going JR. per email received dated
0948 268 0672 September 18, 2018 @ 6:34
PM
y. K0362+680 - K0362+780, Busa September 15, 2018 Not Passable Road Cut Widening works is on hold MPP PETER T. SANGGOY, Still Not Passable as per
Section due to heavy rains JR. email received dated
0948 268 0673 September 21, 2018 @ 10:28
AM

Expected to open on Sept. 24,


2018

Alternate route: Nacagang-


Abatan, Bauko, Maba-ay
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
z. K0371+400, Tiging Section, September 15, 2018 Not Passable Road Cut Clearing operations by private MPP PETER T. SANGGOY, Still Not Passable as per
Sabangan and DPWH equipment is on- JR. email received dated
going 0948 268 0673 September 21, 2018 @ 10:28
AM
Expected to open on Sept. 24,
2018

Alternate route: Nacagang-


Abatan, Bauko, Maba-ay

aa. K0390+200, Tikitik Section September 15, 2018 Not Passable Soil collapse Clearing operations by private MPP PETER T. SANGGOY, Passable as per email
(L=120m,W=7m,H=3 and DPWH equipment is on- JR. received dated September 17,
0m) going 0948 268 0673 2018 @ 3:03 PM
bb. Intermittent Section along September 15, 2018 Not Passable Series of Slides Clearing operations by private MPP ROLDAN V. COLAS Still One Lane Passable as
Chackchakan, Gonogon, Malitep and DPWH equipment is on- 0939 per email received dated
and Palinga-aw going 573 1659 September 18, 2018 @ 6:34
PM
cc. Mt. Data Cliff to Sinto September 15, 2018 Not Passable Series of Slides Clearing operations by private MPP ROLDAN V. COLAS One Lane Passable as per
Boundary and DPWH equipment is on- 0939 email received dated
going 573 1659 September 19, 2018 @ 11:31
AM

Expected to open on Sept. 24,


2018
dd. K0318+190-K0318+244, September 16, 2018 Not Passable Road cut Installation of timber shoring MPP PETER T. SANGGOY, One Lane Passable as per
Palidan, Amgaleyguey, Buguias is on- going JR. email received dated
0948 268 0673 September 20, 2018 @9:31
AM

4. Marcos Highway
a. K0273+850, Tuba, Benguet September 15, 2018 Not Passable Slide Clearing operations by a MPP FRANCISCO ROJO Passable as per email
privately owned equipment is received dated September 16,
on-going 09202157947 2018 @ 11:09 PM
b. 'K0275+150, Tuba, Benguet September 15, 2018 Not Passable Slide Clearing operations by a MPP FRANCISCO ROJO Passable as per email
privately owned equipment is received dated September 16,
on-going 09202157947 2018 @ 11:09 PM
c. K0275+700, Brgy. Poblacion, September 16, 2018 One Lane Slide Clearing operations is on- MPP FRANCISCO ROJO Passable as per email
Tuba, Benguet Passable going with the help of La received dated September 16,
Union 1st and 2nd DEO and 09202157947 2018 @ 11:09 PM
Pangasinan 1st and 2nd DEO

d. K0275+850, Brgy. Poblacion, September 15, 2018 Not Passable Slide Coordinated with private MPP FRANCISCO ROJO Passable as per email
Tuba, Benguet equipment owners for received dated September 16,
clearing operations 09202157947 2018 @ 11:09 PM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
e. K0276+950, Tuba, Benguet September 16, 2018 One Lane Slide Coordinated with private MPP FRANCISCO ROJO Passable as per email
Passable equipment owners for received dated September 16,
clearing operations 09202157947 2018 @ 11:09 PM

Abra DEO
1. Abra-Ilocos Norte Road,
a. K0451+150 - K0451+250 and June 29, 2018 Not Passable Road collapse and Installed warning signs. a. MPP Jun Michael A. Still Not Passable as per e-
K0451+345 - K0451+415, damaged slope Velasco mail received dated September
Nagaparan, Danglas, Abra protection b. 0915-446-2503 21, 2018 @ 10:28 AM
Road section is closed since
Typhoon/Tropical Storm
Henry, Inday, Josie,Habagat
and Karding

Road Section is under


contract.

Alternate route: Abra-Ilocos


Sur road - Mc Arthur
Highway/Manila North Road.

2. Abra - Ilocos Sur Road, Intermittent September 15, 2018 Not Passable Fallen Trees Clearing operations by MPP SOCORRO LITO S. Passable as per email
Section, Tangadan, San Quintin, Abra Maintenance Crew is on- BENEDITO received dated September 16,
goinggoing 09157500166 2018 @ 11:09 PM
3. Abra - Kalinga Road
a. K0446+000 Baquero, Nalbuan September 16,2018 Not Passable Series of Landslides Clearing operations by DPWH MPP ROMMEL MORENO B. Passable as per email
Baay Licuan equipment and Maintenance ORTEGA received dated September 18,
Crew is on-going 09272657188 2018 @ 6:34 PM

b. K0448+350, Lenneng, Baay- September 16,2018 Passable Soil Collapse Clearing operations by MPP ROMMEL MORENO B. Still One Lane Passable as
Licuan, Abra Maintenance Crew is on-going ORTEGA per email received dated
09272657188 September 18, 2018 @ 2:45
AM
c. K0448+450, Lenneng, Baay- September 16,2018 Passable Soil Collapse Clearing operations by MPP ROMMEL MORENO B. Still One Lane Passable as
Licuan, Abra Maintenance Crew is on-going ORTEGA per email received dated
09272657188 September 18, 2018 @ 2:45
AM
d. K0459+500, Cawayan, Baay- September 16,2018 Passable Soil Collapse Clearing operations by MPP ROMMEL MORENO B. Still One Lane Passable as
Licuan, Abra Maintenance Crew is on-going ORTEGA per email received dated
09272657188 September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
e. K0477+150-K477+158, Aguibo, September 16,2018 Not Passable Slide Clearing operations by MPP ROMMEL MORENO B. One Lane Passable as per
Malibkong, Abra Maintenance Crew is on-going ORTEGA email received dated
09272657188 September 19, 2018 @4:50
PM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
f. K0479+950, Poblacion, September 16,2018 Not Passable Soil collapse Clearing operations by MPP ROMMEL MORENO B. One Lane Passable as per
Malibcong, Abra (L=9m,H=3m,W=8m) Maintenance Crew is on-going ORTEGA email received dated
09272657188 September 19, 2018 @ 4:50
PM
g. K0480+100, Duldulao, September 16,2018 Not Passable Slide Clearing operations by MPP ROMMEL MORENO B. One Lane Passable as per
Malibcong, Abra (L=9m,H=3m,W=8m) Maintenance Crew is on-going ORTEGA email received dated
09272657188 September 19, 2018 @ 4:50
PM
h. K0487+300, Gacab, Malibcong, September 16,2018 Not Passable Slide Clearing operations by MPP ROMMEL MORENO B. One Lane Passable as per
Abra (L=9m,H=3m,W=8m) Maintenance Crew is on-going ORTEGA phone call dated September
09272657188 19, 2018 @ 4:50 PM

i. K0475+350 - K0475+430, September 16,2018 Not Passable Slide Clearing operations by a MPP ROMMEL MORENO B. One Lane Passable as per
Aguibo, Malibkong Abra privately owned equipment is ORTEGA phone call dated September
on-going 09272657188 19, 2018 @ 8:38 AM

4. Abra-Cervantes Road, September 17, 2018 Not Passable Damaged slope Warning signs installed MPP ROGELIO D. One Lane Passable as per
K0476+500-K0476+514, Ampalioc, Luba, masonry and collapsed DASALLA email received dated
Abra pavement 09365550189 September 19, 2018 @ 4:50
PM

Apayao 1st DEO


1. Conner-Cabugao Road, Intermittent September 16, 2018 Not Passable Series of Landslides Clearing operations by MPP Oliver T. Pakyo Still One Lane Passable as
Section Maintenance Crew is on-going 09067074275 per email received dated
September 17, 2018 @ 3:03
PM
2. Kabugao - Pudtol Luna - Cagayan
Boundary Road
a. Intermittent Section September 16, 2018 Not Passable Series of Landslides Clearing operations by MPP Oliver T. Pakyo One Lane Passable as per
and Roadslips Maintenance Crew is on-going 09067074275 phone call dated September
19, 2018 @ 4:50 PM

b. K591+980-K609+400, September 17, 2018 Not Passable Series of slides Clearing operations by a MPP Precy D. Buqueg One Lane Passable as per
Intermittent section privately owned equipment is 09066830409 phone call dated September
on- going 19, 2018 @ 4:50 PM

3. Apayao - Ilocos Norte Road, Intemittent September 16, 2018 Not Passable Series of Landslides Clearing operations by MPP Oliver T. Pakyo Still Not Passable as per
Section Maintenance Crew is on-going 09067074275 email received dated
September 21, 2018 @ 10:28
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
Apayao 2nd DEO
1. Claveria-Calanasan Road
a. K0679+500, Baduang section September 14, 2018 Not Passable Slide Further clearing operation is a. MPP Jonathan Suyao Passable as per email
on-going b.09083067543 received dated September 20,
2018 @ 9:31 AM
b. K0632+100, Sta. Elena Section, September 15, 2018 Not Passable Slide Clearing operations by a MPP Jeadica C. Agatep Passable as per email
Calanasan DPWH equipment is on hold 09273993250 received dated September 16,
due to torrential rains 2018 @ 4:24 PM
c. K0639+200, Maragmin Section September 16, 2018 Not Passable Slide Clearing operations by one MPP Jeadica C. Agatep Still One Lane Passable as
(1) DPWH equipment is on- 09273993250 per email received dated
going September 18, 2018 @ 2:45
AM
d. K0641+400-K0642+300, September 16, 2018 Passable Slide Clearing operations by one MPP Jeadica C. Agatep Still One Lane Passable as
Maragmin Section (1) DPWH equipment is on- 09273993250 per email received dated
going September 18, 2018 @ 2:45
AM
e. K0644+000-K0646+100, September 16, 2018 Passable Slide Clearing operations by one MPP Jeadica C. Agatep Still One Lane Passable as
Salagunting Section (1) DPWH equipment is on- 09273993250 per email received dated
going September 18, 2018 @ 2:45
AM
f. K0650+980-K0651+700, September 16, 2018 Passable Slide Clearing operations by one MPP Jeadica C. Agatep Still One Lane Passable as
Carmela Section (1) DPWH equipment is on- 09273993250 per email received dated
going September 18, 2018 @ 2:45
AM
g. K0687+260-K0687+275 September 16, 2018 Not Passable Slide Clearing operations by MPP Jeadica C. Agatep Passable as per email
(L=15m, H=4m, privately owned equipment is 09273993250 received dated September 20,
W=7m) on-going 2018 @ 9:31 AM
h. K0687+480-K0687+490 September 16, 2018 Not Passable Slide Clearing operations by LGU MPP Jeadica C. Agatep Passable as per email
(L=10m, H=4m, equipment is on-going 09273993250 received dated September 20,
W=7m) 2018 @ 9:31 AM
i. K0690+250-K0690+265 September 16, 2018 Not Passable Slide Clearing operations by LGU MPP Jeadica C. Agatep Passable as per email
(L=15m, H=3.5m, equipment is on-going 09273993250 received dated September 20,
W=7m) 2018 @ 9:31 AM

j. K0704+000-K0707, Dallawas September 17, 2018 Not Passable Slide Clearing operations by LGU MPP Jeadica C. Agatep Passable as per email
Section, Intermittent section (L=15m, H=3.5m, equipment is on-going 09273993250 received dated September 20,
W=7m) 2018 @ 9:31 AM

k. K0672+300-K0675+000, Rabaw September 17, 2018 Not Passable Series of slides Clearing operations by MPP Virgilo Salbino Passable as per email
Section, Intermittent section privately owned equipment is 09294961404 received dated September 20,
on-going 2018 @ 9:31 AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
l. K0676+000-K0678+600, Rabaw September 18, 2018 Not Passable Series of slides Clearing operations by MPP Virgilo Salbino Passable as per email
Section privately owned equipment is 09294961404 received dated September 20,
on-going 2018 @ 9:31 AM
2. Kabugao-Pudtol-Luna-Cagayan
Boundary Road
a. K0615+250-K0615+410, Paco September 16, 2018 Not Passable Slide Clearing operations by one a. MPP Jamer B. Macabeo One Lane Passable as per
Section (1) DPWH equipment is on- b.09152709026 email received dated
going September 18, 2018 @ 4:50
PM
b. K0617+325-K0665+400, September 16, 2018 One Lane Series of Fallen Trees Clearing operations by a. MPP Jamer B. Macabeo Still One Lane Passable as
Intermittent Sections Passable Maintenance Crew is on-going b.09152709026 per email received dated
September 18, 2018 @ 2:45
AM
3. Apayao-Ilocos Norte Road
a. K0609+350-K0609+362 September 16, 2018 One Lane Slide Clearing operations by a. MPP Jamer B. Macabeo Still One Lane Passable as
Passable Maintenance Crew is on-going b.09152709026 per e-mail received dated
September 18, 2018 @ 2:45
AM
b. K0610+100-K0610+110 September 16, 2018 One Lane Soil Collapse and Clearing operations by a. MPP Jamer B. Macabeo Still One Lane Passable as
Passable Fallen trees Maintenance Crew is on-going b.09152709026 per e-mail received dated
September 18, 2018 @ 2:45
AM
c. K0619+200-K0619+220,Sadel September 16, 2018 Not Passable Soil Collapse Clearing operations by a. MPP Jamer B. Macabeo One Lane Passable as per
Section Maintenance Crew is on-going b.09152709026 email received dated
September 18, 2018 @ 6:00
AM
d. K0620+025,Sadel Section September 16, 2018 Not Passable Soil Collapse Clearing operations by a. MPP Jamer B. Macabeo One Lane Passable as per
Maintenance Crew is on-going b.09152709026 email received dated
September 18, 2018 @ 6:00
AM
e. K0619+500-K0619+520,Sadel September 16, 2018 Not Passable Soil Collapse Clearing operations by a. MPP Jamer B. Macabeo One Lane Passable as per
Section Maintenance Crew is on-going b.09152709026 email received dated
September 18, 2018 @ 6:00
AM
f. K0621+000-K0621+020,Shop September 16, 2018 Not Passable Soil/Rock Collapse Clearing operations by a. MPP Jamer B. Macabeo One Lane Passable as per
Section Maintenance Crew is on-going b.09152709026 email received dated
September 18, 2018 @ 6:00
AM
g. K0623+600-623+650,Shop September 16, 2018 Not Passable Soil Collapse Clearing operations by a. MPP Jamer B. Macabeo One Lane Passable as per
Section Maintenance Crew is on-going b.09152709026 email received dated
September 18, 2018 @ 6:00
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
h. K0627+970- September 16, 2018 Not Passable Soil Collapse Clearing operations is on- a. MPP Jamer B. Macabeo One Lane Passable as per
K0628+000,Tanglagan Section going with the help of b.09152709026 email received dated
Cagayan 2nd DEO September 18, 2018 @ 6:00
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
i. K0609+380-K0609+410 September 16, 2018 Not Passable Soil Collapse Waiting for any available a. MPP Jamer B. Macabeo One Lane Passable as per
equipment b.09152709026 email received dated
September 18, 2018 @ 6:00
AM

Baguio City DEO


1. Eastern Link Circumferential Road,
a. K0248+700-K0248+715 Baguio September 15, 2018 One Lane Collapsed riprap Clearing operations is on- MPP WARLIE D. CANAO Passable as per email
City Passable going received dated September 18,
0923 136 0561 2018 @ 6:34 PM

b. K0251+750 Baguio City September 15, 2018 Not Passable Fallen Trees Clearing operations is on- MPP WARLIE D. CANAO Passable as per email
going received dated September 19,
0923 136 0561 2018 @11:31 AM
2. Gibraltar Road, K0252+(-020) Baguio September 15, 2018 Not Passable Fallen Trees Clearing operations is MPP WARLIE D. CANAO Passable as per e-mail
city completed received dated September 15,
0923 136 0561 2018 @ 11:37 PM
3. Asin Road, K0309+010 - K0309+070 September 15, 2018 Not Passable Slide Clearing operations is MPP JASON T. DAVID Passable as per e-mail
Baguio City completed received dated September 15,
0948 694 0297 2018 @ 11:37 PM
4. Outlook Drive, K0253+065-K0253+095 September 15, 2018 Not Passable Collapse riprap Clearing operations is on- MPP WARLIE D. CANAO Passable as per email
going received dated September 19,
0923 136 0561 2018 @ 11:31 AM

Benguet 1st DEO


1. Baguio-Bua-Itogon Road,
a. K0257+400 Sitio White Beans, September 15, 2018 Not Passable Slide, damaged Installed Warning Signs MPP JONATHAN SUYAO One Lane Passable as per
Brgy. Ucab, Itogon BENECO Post and 0948 988 3370 email received dated
Roadslip 0908 306 7543 September 20, 2018 @ 2:58
PM
b. K0259+600, Sitio Kiangan September 13, 2018 One Lane Slide Further clearing operations by a. MPP Jonathan Suyao Still Not Passable as per
Village, Brgy. Ucab, Itogon Passable Vol=500cu.m and DPWH equipment and LGU b. 09083067543 email received dated
road cut equipment is on-going September 21, 2018 @ 10:28
AM
c. K0260+800-K0260+900 Sitio September 15, 2018 Not Passable Slide (L=100m, Clearing operations is a. MPP Jonathan Suyao Still Not Passable as per
Goldfield, Brgy. Poblacion, Itogon H=20m, W=8m) hampered by continuous b. 09083067543 email received dated
erosion of soil September 21, 2018 @ 10:28
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
f. K0262+800, Sitio Goldfield, Brgy September 13, 2018 One Lane Slide Further clearing operations by a. MPP Jonathan Suyao Still One Lane Passable as
Poblacion, Itogon Passable Vol=250cu.m DPWH equipment and LGU b.09083067543 per email received dated
equipment is on-going. September 18, 2018 @ 2:45
Clearing operations is AM
hampered by continuous
erosion of soil

2. Pico - Lamtang Road September 15, 2018 Not Passable Fallen Trees Clearing operations is on- MPP ANNE FAYE HANDIG Passable as per email
K0258+900, La Trinidad going 0915 758 0403 received dated September 17,
0947 274 3385 2018 @ 6:59 PM

3. Cong. Andres Acop Cosalan Road September 15, 2018 Not Passable Series of slides Clearing operations by LGU MPP ARTHUR OLPINDO One Lane Passable as per
(formerly Gurel- Bokod- Kabayan- equipment is on-going 0918 588 8190 email received dated
Buguias- Abatan Road), K0305+000 - September 20, 2018 @ 2:58
K0316+500 Bokod PM
4. Asin- Nangalisan- San Pascual Road,

a. K0258+100-K0258+600, September 16, 2018 One Lane Series of slides Clearing operations by MPP ASHLEY R. SANTOS Still One Lane Passable as
Intermittent Section Passable Maintenance crew is on-going 0999 677 6613 per email received dated
September 18, 2018 @ 2:45
AM
b. K0262+800, Brgy. Tadiangan September 16, 2018 One Lane Slide Clearing operations by MPP ASHLEY R. SANTOS Still One Lane Passable as
Passable Maintenance crew is on-going 0999 677 6613 per email received dated
September 18, 2018 @ 2:45
AM
c. K0263+400, Sitio Lasong September 16, 2018 One Lane Fallen Trees Clearing operations by MPP ASHLEY R. SANTOS Still One Lane Passable as
Passable Maintenance crew is on-going 0999 677 6613 per email received dated
September 18, 2018 @ 2:45
AM
d. K0263+450 September 16, 2018 One Lane Fallen Trees Clearing operations by MPP ASHLEY R. SANTOS Still One Lane Passable as
Passable Maintenance crew is on-going 0999 677 6613 per email received dated
September 18, 2018 @ 2:45
AM
e. K0263+500 September 16, 2018 One Lane Fallen Trees Clearing operations by MPP ASHLEY R. SANTOS Still One Lane Passable as
Passable Maintenance crew is on-going 0999 677 6613 per email received dated
September 18, 2018 @ 2:45
AM
f. K0263+550 September 16, 2018 One Lane Fallen Trees Clearing operations by MPP ASHLEY R. SANTOS Still One Lane Passable as
Passable Maintenance crew is on-going 0999 677 6613 per email received dated
September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
g. K0264+500 Sitio Sipitan, Asin, September 16, 2018 Not Passable Slide Clearing operations by MPP ASHLEY R. SANTOS Still One Lane Passable as
Tuba, Benguet (Vol.=100 cu.m.) Maintenance Crew is on-going 0999 677 6613 per email received dated
September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
h. K0265+100, Nangalisan, Tuba September 15, 2018 Passable Slide and fallen trees Clearing operations by MPP EDMUND REYES Still One Lane Passable as
Maintenance Crew is on-going 09461978650 per email received dated
September 18, 2018 @ 2:45
AM
i. K0267+800, Brgy. Coplo, September 15, 2018 Not Passable Slide and fallen trees Clearing operations by MPP EDMUND REYES Still One Lane Passable as
Nangalisan, Tuba Maintenance Crew is on-going 09461978650 per email received dated
September 18, 2018 @ 2:45
AM
j. K0265+100, Nangalisan, Tuba September 16, 2018 Not Passable Slide Clearing ongoing by Private MPP ASHLEY R. SANTOS Still One Lane Passable as
Equipment 0999 677 6613 per email received dated
September 18, 2018 @ 2:45
AM
k. K0261+000 September 16, 2018 Not Passable Slide Clearing ongoing by Private MPP ASHLEY R. SANTOS Still One Lane Passable as
Equipment 0999 677 6613 per email received dated
September 18, 2018 @ 2:45
AM
5. Shilan-Beckel Road,
a.K0261+800 Brgy. Shilan, La September 15, 2018 Passable Slide Equipment is on standby. MPP RICHARD LUMIQUED Still One Lane Passable as
Trinidad Clearing operations is 0999 per email received dated
hampered by heavy rains 328 5593 September 18, 2018 @ 2:45
AM
b. K0262+500 Brgy. Shilan, La September 15, 2018 Passable Slide Equipment is on standby. MPP RICHARD LUMIQUED Still One Lane Passable as
Trinidad Clearing operations is 0999 per email received dated
hampered by heavy rains 328 5593 September 18, 2018 @ 2:45
AM
6. Ambiong-Tawang, K0263+100 September 15, 2018 Not Passable Rockfall Equipment is on standby. MPP RICHARD LUMIQUED Still One Lane Passable as
Clearing operations is 0999 per email received dated
hampered by heavy rains 328 5593 September 18, 2018 @ 2:45
AM
7. City Limit-Sto. Tomas Road, K0263+300 September 15, 2018 Not Passable Soil Collapse and Rock Clearing operations is on- MPP JONATHAN JULIAN One Lane Passable as per
Sitio Bandilan, Tuba Fall going 0949 348 8703 email received dated
September 19, 2018 @ 11:31
AM
8. Cong. Andres Acop Cosalan Road September 18, 2018 Not Passable Slide Clearing operations is on- MPP JONATHAN SUYAO Passable as per email
(formerly Gurel- Bokod- Kabayan- going by privately owned 09489883370 received dated September 21,
Buguias- Abatan Road), equipment 09083067543 2018 @10:28 AM
K0315+300, Bila, Bokod, intermittent
sections

Benguet 2nd DEO


1. Acop-Kapangan-Kibungan-Bakun Road
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
a. K0263+700 Caponga, Tublay September 15, 2018 Not Passable Soil Collapse Clearing operations by private MPP MELVIN CASTILLO Still One Lane Passable as
& government equipments is 0912 376 6841 per email received dated
on-going September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
b. K0264+800, Capongga, Tublay September 15, 2018 Not Passable Flooded Installed warning signs. MPP MELVIN CASTILLO Still Not Passable as per e-
0912 376 6841 mail received dated September
16, 2018 @ 06:00 AM

c. K0268+020 Daclan, Tublay September 15, 2018 Not Passable Soil Collapse Clearing operations by MPP BILLY JUN S. Passable as per e-mail
Maintenance crew is DEPALOG received dated September 15,
completed 0917 790 9915 2018 @ 11:37 PM
d. K0268+326 Daclan, Tublay September 15, 2018 Not Passable Soil Collapse Equipment is on standby. MPP VIRGILIO GALAP Still One Lane Passable as
Clearing operations is 0912 803 3427 per email received dated
hampered by heavy rains September 18, 2018 @ 2:45
AM
e. K0269+855 Daclan, Tublay September 15, 2018 Not Passable Soil Collapse Private equipment is on MPP MELVIN CASTILLO Still One Lane Passable as
standby. Clearing operations 0912 376 6841 per email received dated
is hampered by continuous September 18, 2018 @ 2:45
soil erosion due to heavy AM
rains
f. K0289+350 Cuba, Kapangan September 15, 2018 Not Passable Soil Collapse Clearing operations by Private MPP VIRGILIO GALAP Passable as per e-mail
Equipment and Maintenance 0912 803 3427 received dated September 15,
Crew is completed 2018 @ 11:37 PM

g. K0293+500 - K0294+400 September 15, 2018 Not Passable Soil Collapse and Clearing operations by private MPP VIRGILIO GALAP Still One Lane Passable as
Balakbak, Kapangan fallen debris & government equipments is 0912 803 3427 per email received dated
on-going September 18, 2018 @ 2:45
AM
h. K0296+400 - K0296+425 Beleng- September 15, 2018 Passable Soil Collapse Clearing operations by private MPP MELVIN CASTILLO Still One Lane Passable as
belis, Kapangan, Benguet & government equipments is 0912 376 6841 per email received dated
on-going September 18, 2018 @ 2:45
AM
i. K0307+700 Sagpat, Kibungan, September 15, 2018 Passable Soil Collapse Clearing operations by private MPP VIRGILIO GALAP Still One Lane Passable as
Benguet & government equipments is 0912 803 3427 per email received dated
on-going September 18, 2018 @ 2:45
AM
j. K0308+150 Poblacion, Kibungan September 15, 2018 Not Passable Soil Collapse Clearing operations by private MPP VIRGILIO GALAP Still One Lane Passable as
& government equipments is 0912 803 3428 per email received dated
on-going September 18, 2018 @ 2:45
AM
k. K0309+020 Poblacion, Kibungan, September 15, 2018 Passable Soil Collapse Clearing operations by private MPP VIRGILIO GALAP Still One Lane Passable as
Benguet & government equipments is 0912 803 3427 per email received dated
on-going September 18, 2018 @ 2:45
AM
l. K0309+040 Poblacion, Kibungan September 15, 2018 Not Passable Soil Collapse Clearing operations by private MPP MELVIN CASTILLO Still One Lane Passable as
& government equipments is 0912 376 6841 per email received dated
on-going September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
m. K0310+800 Poblacion, Kibungan September 15, 2018 Passable Soil Collapse and Clearing operations by private MPP VIRGILIO GALAP Still One Lane Passable as
fallen trees & government equipments is 0912 803 3427 per email received dated
on-going September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
n. K0315+000 - K0317+000, September 15, 2018 Not Passable Series of slides and Clearing operations is on- MPP VIRGILIO GALAP Still One Lane Passable as
Intermittent Section, Poblacion, debris flow going 0912 803 3427 per email received dated
Kibungan September 18, 2018 @ 2:45
AM
o. K0345+600 - K0345+670 July 2, 2018 Not Passable Roadslip Installed warning signs. a. MPP Billy Jun S. Still Not Passable as per e-
Bagtangan, Gambang, Bakun, Bailey bridge will be Depalog mail received dated September
Benguet constructed to open the road b. 0918-602-5212 21, 2019 @10:28 AM

Section was closed to traffic


since July 1, 2018 at 2:00 PM.
Section is under contract.

Alternate route: Namagtey-


Madaymen Road.

p. K0318+720 - K0318+730, September 15, 2018 Not Passable Soil collapse Clearing operations is on- MPP MELVIN CASTILLO Still One Lane Passable as
Poblacion, Kibungan going 0912 376 6841 per email received dated
September 18, 2018 @ 2:45
AM
q. K0330+900 - K0330+930 Tabbak, September 15, 2018 Not Passable Soil Collapse Private equipment mobilized MPP BILLY JUN S. Still One Lane Passable as
Kibungan, Benguet for clearing operations DEPALOG per email received dated
0917 790 9915 September 18, 2018 @ 2:45
AM
r. K0339+020 - K0339+980 Malikliko, September 15, 2018 Not Passable Slide and Fallen Trees Clearing operations by LGU MPP MELVIN CASTILLO One Lane Passable as per
Ampusongan, Bakun, Benguet Bakun Equipment is on- going 0912 376 6841 email received dated
September 18, 2018 @ 6:34
PM
s. K0320+400 - K0320+420 Mayos, September 15, 2018 Not Passable Washout Clearing operations by private MPP MELVIN CASTILLO Still One Lane Passable as
Poblacion, Kibungan, Benguet & government equipments is 0912 376 6841 per email received dated
on-going September 18, 2018 @ 2:45
AM
t. K0330+800 - K0330+840 September 15, 2018 Passable Soil Collapse and Clearing operations by private MPP VIRGILIO GALAP Still One Lane Passable as
Tabbak,Kibungan, Benguet fallen trees & government equipments is 0912 803 3427 per email received dated
on-going September 18, 2018 @ 2:45
AM
u. K0344+250 - K0344+320 Liwang, August 27, 2018 Passable Soil Collapse Total clearing by DPWH MPP VIRGILIO GALAP Still One Lane Passable as
Ampusongan, Bakun, Benguet Dumptruck and Payloader is 0912 803 3427 per email received dated
scheduled September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
v. K0348+800, Gakian, Gambang, September 15, 2018 Not Passable Soil Collapse Clearing operations is on hold MPP VIRGILIO GALAP One Lane Passable as per
Bakun due to heavy rains 0912 803 3427 email received dated
September 19, 2018 @ 11:31
AM
w. K0349+300,Gakian, Gambang, September 15, 2018 Not Passable Roadslip Installed warning signs MPP VIRGILIO GALAP One Lane Passable as per
Bakun 0912 803 3427 email received dated
September 19, 2018 @ 11:31
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
x. K0320+400-K0320+420 Mayos, September 18, 2018 Not Passable Washout(L=20, H=15) Widening works is on- going MPP MELVIN CASTILLO One Lane Passable as per
Poblacion, Kibungan, Benguet 0912 376 6841 phone call dated September
19, 2018 @11:45 AM

2. Cong. Andres Acop Cosalan Road September 15, 2018 Not Passable Slide, Soil Collapse Clearing operations is on- MPP MELVIN CASTILLO Passable as per telephone
(formerly Gurel- Bokod- Kabayan- and Rock collapse going 0939 5686 500 call dated September 21,
Buguias- Abatan Road), 2018 @10:28 AM
K0343+400-K0356+300, intermittent
sections
3. Abatan-Mankayan-Cervantes Road
a. K0344+350 Bulalacao, September 15, 2018 Not Passable Soil Collapse Clearing operations by private MPP MELVIN CASTILLO One Lane Passable as per
Mankayan equipment is on- going 0939 5686 500 email received dated
September 18, 2018 @ 2:45
AM
b. K0347+200 Poblacion, September 15, 2018 Not Passable Soil Collapse Clearing operations by private MPP MELVIN CASTILLO One Lane Passable as per
Mankayan equipment is on- going 0912 376 6841 email received dated
September 18, 2018 @ 2:45
AM
c. K0345+000 - K0347+000 September 15, 2018 Passable Soil Collapse Clearing operations by private MPP MELVIN CASTILLO Still One Lane Passable as
various section equipment is on- going 0912 376 6841 per email received dated
September 17, 2018 @ 6:59
PM
d. K0355+459, Abatan to September 16, 2018 Passable Soil Collapse Clearing operations by private MPP MELVIN CASTILLO Still One Lane Passable as
Cervantes Bdry equipment is on- going 0912 376 6841 per email received dated
September 17, 2018 @ 6:59
PM

Ifugao I DEO
1. Banaue-Hungduan-Benguet Boundary
Road
a. K0413+300 Munsoyosoy, Tinoc September 15, 2018 Not Passable Mudflow Clearing operations by MPP JERRY B. One Lane Passable as per
L=20m, H=2m Maintenance Crew is on-going INABIOHAN email received dated
0905 496 2320 September 19, 2018 @ 4:50
PM
b. K0354+250 - K0354+275 September 15, 2018 Not Passable Soil collapse Further clearing operations by MPP JERRY B. Still One Lane Passable as
Bokiawan, Hungduan (L=25m, H=4m) a privately owned equipment INABIOHAN per email received dated
is on- going 0905 496 2320 September 18, 2018 @ 2:45
AM
c. K0358+200 Bokiawan, September 15, 2018 Not Passable Soil collapse Private equipment is on MPP JERRY B. Still One Lane Passable as
Hungduan (L=15m, H=3m) standby. Clearing operations INABIOHAN per email received dated
is hampered by heavy rains 0905 496 2320 September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
d. K0358+350 Bokiawan, September 15, 2018 Not Passable Soil collapse Private equipment is on MPP JERRY B. Still One Lane Passable as
Hungduan (L=18m, H=3m) standby. Clearing operations INABIOHAN per email received dated
is hampered by heavy rains 0905 496 2320 September 18, 2018 @ 2:45
AM
e. K0402+900 Tulludan, Tinoc September 15, 2018 Not Passable Slide Clearing operations can't MPP JERRY B. Still One Lane Passable as
L=40m, H=4m commence due to continous INABIOHAN per email received dated
debris fall & mud flow. Private 0905 496 2320 September 18, 2018 @ 2:45
equipment on stand by. AM

f. K0410+400 Tocucan, Tinoc September 15, 2018 Not Passable Slide Clearing operations by MPP JERRY B. One Lane Passable as per
L=30m, H=5m Maintenance Crew is on-going INABIOHAN email received dated
0905 496 2320 September 19, 2018 @ 4:50
PM
g. K0407+750 - K0407+900 September 15, 2018 Not Passable Soil collapse Clearing operations by MPP JERRY B. Still Not Passable as per
L=150m Maintenance Crew is on-going INABIOHAN email received dated
0905 496 2320 September 21, 2018 @ 10:28
AM
h. K0400+100 Tulludan, Tinoc September 18, 2018 Not Passable Soil Collapse Clearing operations by a MPP JERRY B. One Lane Passable as per
Section L=20m, W=6m, H=3m privately owned equipment is INABIOHAN email received dated
on- going
0905 496 2320 September 19, 2018 @ 4:50
PM

i. K0405+050-K0406+900, September 18, 2018 Not Passable Soil Collapse Clearing operations by a MPP JERRY B. Still Not Passable as per
Tukucan, Tinoc, intermittent privately owned equipment is INABIOHAN email received dated
section on- going 0905 496 2320 September 21, 2018 @
10:28AM
Expected to open today, Sept.
20, 2018

j. K0404+100,Tukucan, Tinoc September 19, 2018 Not Passable Soil Collapse Clearing operations by a MPP JERRY B. Passable as per email
L=30m, W=6m, privately owned equipment is INABIOHAN received dated September 21,
H=2m on- going 0905 496 2320 2018 @ 10:28 AM

2. Kiangan-Tinoc-Buguias Road
a. K0345+700 - K0345+715 September 15, 2018 Not Passable Slide Clearing operations is on hold MPP ALLAN PAUL S. Still One lane Passable as
Binablayan, Tinoc (L=15m, W=5m) due to heavy rains PIGUDO per email received dated
0906 530 8046 September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
b. K0355+000 - K0355+008 Brgy. September 15, 2018 Not Passable Slide Clearing operations is on hold MPP ALLAN PAUL S. Still One lane Passable as
Ap-apid, Tinoc (L=8m, W=6m) due to heavy rains PIGUDO per email received dated
0906 530 8046 September 18, 2018 @ 2:45
AM
c. K0330+020, Julongan, Kiangan September 15, 2018 Not Passable Roadslip MPP ALLAN PAUL S. Still One lane Passable as
(L=20m) PIGUDO per email received dated
0906 530 8046 September 18, 2018 @ 2:45
AM
d. K0335+150, Julongan Section September 15, 2018 Not Passable Fallen trees Clearing done by MPP ALLAN PAUL S. Passable as per email
maintenance laborers PIGUDO received dated September 16,
0906 530 8046 2018 @ 11:09 PM
e. K0 332+500 - k0355+000, September 15, 2018 Not Passable Series of landslides Clearing operation will start MPP ALLAN PAUL S. Still One lane Passable as
Julongan to Ap-apid section as soon as the weather PIGUDO per email received dated
permits 0906 530 8046 September 18, 2018 @ 2:45
AM
f. K0349+800, Binablayan Section September 15, 2018 Not Passable Slide (L=10m, H=3m) Clearing operations by MPP ALLAN PAUL S. Still One lane Passable as
maintenance crew is on- PIGUDO per email received dated
going 0906 530 8046 September 18, 2018 @ 2:45
AM
g. K0349+850, Binablayan September 15, 2018 Not Passable Slide (L=10m, H=3m) Clearing operations by MPP ALLAN PAUL S. Still One lane Passable as
Section maintenance crew is on- PIGUDO per email received dated
going 0906 530 8046 September 18, 2018 @ 2:45
AM
h. K0350+600, Binablayan, September 15, 2018 Not Passable Slide Clearing operations by MPP ALLAN PAUL S. Still One lane Passable as
Section (L=20m, H=5m) maintenance crew is on- PIGUDO per email received dated
going 0906 530 8046 September 18, 2018 @ 2:45
AM
i. K0350+700, Binablayan, Section September 15, 2018 Not Passable Slide Clearing operations by MPP ALLAN PAUL S. Still One lane Passable as
(L=15m, H=4m) maintenance crew is on- PIGUDO per email received dated
going 0906 530 8046 September 18, 2018 @ 2:45
AM
j. K0351+200, Binablayan, Section September 15, 2018 Not Passable Slide Clearing operations by MPP ALLAN PAUL S. Still One lane Passable as
(L=25m, H=2m) maintenance crew is on- PIGUDO per email received dated
going 0906 530 8046 September 18, 2018 @ 2:45
AM
k. K0351+250, Binablayan, September 15, 2018 Not Passable Slide Clearing operations by MPP ALLAN PAUL S. Still One lane Passable as
Section (L=18m, H=2m) maintenance crew is on- PIGUDO per email received dated
going 0906 530 8046 September 18, 2018 @ 2:45
AM
l. K0352+400, Binablayan, Section September 15, 2018 Not Passable Slide Waiting for any available MPP ALLAN PAUL S. Still One lane Passable as
(L=18m, H=5m) equipment PIGUDO per email received dated
0906 530 8046 September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
m. K0354+500, Gumhang Section September 15, 2018 Not Passable Slide Waiting for any available MPP ALLAN PAUL S. Still One lane Passable as
(L=20m, H=5m) equipment PIGUDO per email received dated
0906 530 8046 September 18, 2018 @ 2:45
AM
n. K0354+600, Gumhang Section September 15, 2018 Not Passable Slide Waiting for any available MPP ALLAN PAUL S. Still One lane Passable as
(L=40m, H=4m) equipment PIGUDO per email received dated
0906 530 8046 September 18, 2018 @ 2:45
AM
o. K0357+020, Ap-apid, Tinoc September 15, 2018 Not Passable Slide Waiting for any available MPP ALLAN PAUL S. Still One lane Passable as
(L=19m, H=5m) equipment PIGUDO per email received dated
0906 530 8046 September 18, 2018 @ 2:45
AM
p. K0357+800, Ap-apid, Tinoc September 15, 2018 Not Passable Slide Waiting for any available MPP ALLAN PAUL S. Still One lane Passable as
(L=22m, H=4m) equipment PIGUDO per email received dated
0906 530 8046 September 18, 2018 @ 2:45
AM
q. K0360+800, Impugong, Tinoc September 15, 2018 Not Passable Slide Clearing operations by MPP ALLAN PAUL S. One lane Passable as per
(L=30m, H=1m) Maintenance Crew is on- PIGUDO email received dated
going 0906 530 8046 September 20, 2018 @ 2:58
PM

Open/Close Situation
r. K0357+300, Ap-apid, Tinoc September 16, 2018 Not Passable Road Cut Installed Warning Signs MPP ALLAN PAUL S. One Lane Passable (Light
Section PIGUDO Vehicles only) as per email
0906 530 8046 received dated September 19,
2018 @11:31 AM

Alternate route: Ap- apid


Road

s. K0360+080 September 17, 2018 Not Passable Soil Collapse Clearing operations by MPP ALLAN PAUL S. One Lane Passable as per
(L=70m,H=2m, Maintenance Crew is on- PIGUDO email received dated
W=7m) going 0906 530 8046 September 18, 2018 @ 2:45
AM

Ifugao II DEO
1. Banaue-Mayoyao- A. Lista- Isabela
Road
a. K0347+730 - K0347+755, Brgy. September 12, 2018 Passable Slide Further clearing operations by MPP BENTON B. Still One Lane Passable as
Kinakin, Banaue, Ifugao, (L=25m,H=10m, Maintenance crew and a BUCCAHI, JR. per email received dated
W=8m) privately owned equipment is 09358878220 September 18, 2018 @ 2:45
on- going AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
b. K0348+000-K0390+000 Kinakin September 15, 2018 Not Passable Slide Opening will resume MPP ALLAN PAUL S. Still One Lane Passable as
Banaue-Mayaoyao Section tommorow PIGUDO per email received dated
0906 530 8046 September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
c. K0344+500 September 16, 2018 Not Passable Slide Clearing operations is on- MPP JOHN M. LIMOH Still One Lane Passable as
going 0975 239 2695 per email received dated
September 18, 2018 @ 2:45
AM
d. K0347+380- K0376+000, September 16, 2018 Not Passable Slide Clearing operations is on- MPP BENTON B. Still One Lane Passable as
Kinakin Mongo going BUCCAHI, JR. per email received dated
09358878220 September 18, 2018 @ 2:45
AM
2. Nueva Vizcaya - Ifugao - Mt. Province
Road
a. K0342+350,Viewpoint,Banaue September 15, 2018 Not Passable Slide Clearing operations by MPP JOHN M. LIMOH Passable as per email
privately owned equipment is 0975 239 2695 received dated September 19,
on-going 2018 @ 4:50 PM
b. K0344+000,Viewpoint, Banaue September 15, 2018 Not Passable Slide Clearing operations by MPP JOHN M. LIMOH Passable as per email
privately owned equipment is 0975 239 2695 received dated September 19,
on-going 2018 @ 4:50 PM
c. K0337+360, Amganad, Banaue September 15, 2018 Passable Slide Clearing operations by MPP JOHN M. LIMOH Still One Lane Passable as
privately owned equipment is 0975 239 2695 per email received dated
on-going September 18, 2018 @ 2:45
AM
d. K0340+280, Tam- An, Banaue September 15, 2018 Passable Slide Clearing operations by MPP JOHN M. LIMOH Still One Lane Passable as
privately owned equipment is 0975 239 2695 per email received dated
on-going September 18, 2018 @ 2:45
AM
e. K0342+370, Viewpoint, Banaue September 15, 2018 Passable Slide Clearing operations by MPP JOHN M. LIMOH Still One Lane Passable as
privately owned equipment is 0975 239 2695 per email received dated
on-going September 18, 2018 @ 2:45
AM
f. K0345+800, Viewpoint, Banaue September 15, 2018 Passable Slide Clearing operations by MPP JOHN M. LIMOH Still One Lane Passable as
privately owned equipment is 0975 239 2695 per email received dated
on-going September 18, 2018 @ 2:45
AM
g. K0347+380, Viewpoint, Banaue September 15, 2018 Passable Slide Clearing operations by MPP JOHN M. LIMOH Still One Lane Passable as
privately owned equipment is 0975 239 2695 per email received dated
on-going September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
h. K0347+400, Viewpoint, Banaue September 15, 2018 Passable Slide Clearing operations by MPP JOHN M. LIMOH Still One Lane Passable as
privately owned equipment is 0975 239 2695 per email received dated
on-going September 18, 2018 @ 2:45
AM
i. K0347+820, Viewpoint, Banaue September 15, 2018 Passable Slide Clearing operations by MPP JOHN M. LIMOH Still One Lane Passable as
privately owned equipment is 0975 239 2695 per email received dated
on-going September 18, 2018 @ 2:45
AM
j. K0350+230, Viewpoint, Banaue September 15, 2018 Passable Slide Clearing operations by MPP JOHN M. LIMOH Still One Lane Passable as
privately owned equipment is 0975 239 2695 per email received dated
on-going September 18, 2018 @ 2:45
AM
k. K0350+295, Viewpoint, Banaue September 15, 2018 Passable Slide Clearing operations by MPP JOHN M. LIMOH Still One Lane Passable as
privately owned equipment is 0975 239 2695 per email received dated
on-going September 18, 2018 @ 2:45
AM
l. K0350+550, Viewpoint, Banaue September 15, 2018 Passable Slide Clearing operations by MPP JOHN M. LIMOH Still One Lane Passable as
privately owned equipment is 0975 239 2695 per email received dated
on-going September 18, 2018 @ 2:45
AM
m. K0350+560, Viewpoint, Banaue September 15, 2018 Passable Slide Clearing operations by MPP JOHN M. LIMOH Still One Lane Passable as
privately owned equipment is 0975 239 2695 per email received dated
on-going September 18, 2018 @ 2:45
AM
n. K0350+720, Viewpoint, Banaue September 15, 2018 Passable Slide Clearing operations by MPP JOHN M. LIMOH Still One Lane Passable as
privately owned equipment is 0975 239 2695 per email received dated
on-going September 18, 2018 @ 2:45
AM
o. K0350+810, Viewpoint, Banaue September 15, 2018 Passable Slide Clearing operations by MPP JOHN M. LIMOH Still One Lane Passable as
privately owned equipment is 0975 239 2695 per email received dated
on-going September 18, 2018 @ 2:45
AM
p. K0352+110, Viewpoint, Banaue September 15, 2018 Passable Slide Clearing operations by MPP JOHN M. LIMOH Still One Lane Passable as
privately owned equipment is 0975 239 2695 per email received dated
on-going September 18, 2018 @ 2:45
AM
q. K0353+300-K0358+330 September 15, 2018 Not Passable Series of Slides Clearing will resume MPP JOHN M. LIMOH Passable as per e-mail
tommorow 0975 239 2695 received dated September 18,
2018 @ 6:34 PM
r. K0358+325, Viewpoint, Banaue September 15, 2018 Not Passable Slides Clearing operations by a MPP JOHN M. LIMOH Passable as per email
privately owned equipment is 0975 239 2695 received dated September 19,
on-going 2018 @ 4:50 PM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
3. Banaue-Hungduan-Benguet Boundary
Road
a. K0343+500, Brgy Poblacion, September 15, 2018 Not Passable Slide One lane passable Further MPP BENTON B. Still One Lane Passable as
Banaue clearing operation is on-going BUCCAHI, JR. per email received dated
09358878220 received dated September 19,
2018 @ 4:50 PM

b. K0349+780, Brgy. Ujah, Banaue September 15, 2018 Not Passable Slide One lane passable Further MPP BENTON B. Still One Lane Passable as
clearing operation is on-going BUCCAHI, JR. per email received dated
09358878220 received dated September 19,
2018 @ 4:50 PM

c. K0341+(-210)-K0353+205 September 16, 2018 One Lane Slide One lane passable Further MPP BENTON B. Still One Lane Passable as
Passable clearing operation is on-going BUCCAHI, JR. per email received dated
09358878220 received dated September 19,
2018 @ 4:50 PM

Lower Kalinga DEO


1. Tabuk - Banaue Road via Tanudan
-Barlig Road
a. K0543+200 - K0543+395, September 14, 2018 Not Passable Oversaturation of road Warning signs installed a. DME Liberato E. One Lane Passable as per
Dumanay Section, Tanudan section that is under Agrimor, Jr. email received dated
maintenance/ b. 0905-682-8266 September 19, 2018 @ 4:50
restoration PM

Section is under contract


Reported closed since
Typhoon/Tropical Storm
Henry, Inday, Josie,Habagat
and Karding.

b. K0522+100 - K0522+400 September 15, 2018 Not Passable Soil collapse Clearing operations by a MPP NAP RICHARD B. One Lane Passable as per
Matelled Section (L=20m, H=5m, privately owned equipment is LINGBAWAN email received dated
W=7.5m) on-going 0917 597 September 19, 2018 @4:50
2122 PM
c. K0518+480-K0518+512, September 15, 2018 Not Passable Sinking Pavement Warning signs installed MPP NAP RICHARD B. Still One Lane Passable as
Dupligan Section, Tanudan LINGBAWAN per email received dated
0917 597 September 19, 2018 @4:50
2122 PM
2. Mountain Province-Calanan-Pinukpuk-
Abbut Road
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
a. (Cagaluan- Calanan Section) September 14, 2018 Passable Rock collapse Clearing operations by DPWH a. MPP GERALD L. LICAB One Lane Passable as per
K0482+160 - K0482+168 L=8m,H=2m, equipment and Maintenance b.0935 218 2134 e-mail received dated
Gonogon Section, Tabuk City W=5.5m) crew is completed September 14, 2018 @
5:44PM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
b. K0511+950, Cawagayan September 15, 2018 Not Passable Flash flood debris DPWH equipment mobilized MPP CARLSTON G. SOTO Passable as per email
Section for clearing operations received dated September 19,
0955 663 3440 2018 @ 4;50 PM
c. Tuga Section, Tabuk City September 15, 2018 Not Passable Flooded with road DPWH equipment mobilized MPP CARLSTON G. SOTO Passable as per email
covers for clearing operations received dated September 19,
0955 663 3440 2018 @ 4;50 PM
d. Cagaluan-Calanan Road September 15, 2018 Passable Soil and rock collapse Equipment and Maintenance MPP CARLSTON G. SOTO Still One Lane Passable as
Section, K0487+360 - K0487+375 crew is on standby. Clearing per email received dated
Dalmuno Section, Tabuk City operations is hampered by 0955 663 3440 September 18, 2018 @ 2:45
heavy rains AM

e. K0470+250 - K0470+258 September 15, 2020 Passable Soil Collapse Equipment and Maintenance MPP CARLSTON G. SOTO Still One Lane Passable as
Mosimos Section, Tabuk City crew is on standby. Clearing per email received dated
operations is hampered by 0955 663 3440 September 18, 2018 @ 2:45
heavy rains AM

f. K0529+000-K0535+000, September 15, 2021 Passable Fallen Debris and Equipment and Maintenance MPP CARLSTON G. SOTO Still One Lane Passable as
Turayoc to Catabbogan Section, Fallen Trees crew is on standby. Clearing per email received dated
Pinukpuk operations is hampered by 0955 663 3440 September 18, 2018 @ 2:45
heavy rains AM

g. Cagaluan-Calanan Road September 16, 2018 Passable Soil and rock collapse Clearing operations is MPP CARLSTON G. SOTO Still One Lane Passable as
Section, K0476+800 - K0476+820 completed per email received dated
Gawidan Section, Tabuk City 0955 663 3440 September 18, 2018 @ 2:45
AM
h. K0473+040 September 16, 2018 Passable Leaning big acacia On mobilization of MPP CARLSTON G. SOTO Passable to Light Vehicles
tree maintenance crew as per text message received
0955 663 3440 dated September 18, 2018 @
2:45 AM

3. Bulo National Road, September 15, 2018 Not Passable Fallen Trees Coordinated with private MPP GENIVIEVE B. Passable as per e-mail
K0507+000-K0507+200, Intermittent equipment owners for WANAWAN received dated September 15,
Section, Tabuk clearing operations 0909 989 0607 2018 @ 5:20 PM
4. Balbalan-Pinukpuk Road
a. K0496+000 - K0522+000, September 15, 2018 Not Passable Soil/rock collapse and Clearing operations by a MPP NAP RICHARD B. Passable as per email
Baay-Junction Pinukpuk, fallen trees privately owned equipment is LINGBAWAN received dated September 19,
Intermittent Sections on-going 09176972122 2018 @ 11:31 AM
b. K0498+180, Limus Section September 16, 2018 One Lane Slide Clearing ongoing by Private MPP NAP RICHARD B. Still One Lane Passable as
Pinukpuk Passable Equipment and DPWH Crew LINGBAWAN per email received dated
09176972122 September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
c. K0523+000. Intermittent September 15, 2018 Not Passable Series of Slides Clearing operations by MPP NAP RICHARD B. Passable as per email
section privately owned equipment LINGBAWAN received dated September 20,
and Maintenance Crew is on- 09176972122 2018 @ 2:58 PM
going
5. Kalinga-Cagayan Road
a. K0514+800-K0514+825 September 15, 2021 Passable Roadslip Installed warning signs MPP CARLSTON G. SOTO Still One Lane Passable as
(L=100m, per e-mail received dated
W=1.5m,H=7m) 0955 663 3440 September 18, 2018 @ 2:45
AM
b. K0514+900, Taclobao Section, September 15, 2021 Passable Roadslip Installed warning signs MPP CARLSTON G. SOTO Still One Lane Passable as
Tabuk City (L=60m,W=2.5m,H=6 per e-mail received dated
m) 0955 663 3440 September 18, 2018 @ 2:45
AM
c. K0516+400, Spring Section, September 15, 2021 Passable Slide Clearing operations a MPP CARLSTON G. SOTO Still One Lane Passable as
Tabuk City privately owned per e-mail received dated
equipmentand Maintenance 0955 663 3440 September 18, 2018 @ 2:45
Crew is on-going AM

Upper Kalinga DEO


1. Mt. Province Boundary-Calanan-
Pinukpuk-Abbut Road
a. K0424+110 - K0424+135 July 22, 2018 Not Passable Soil Collapse Clearing operations by a. MPP WILSON IKE W. Passable as per call
Mabongis Section, Bugnay, Butbut, (L= 25m, W= 6m, privately owned equipment is ADDAMO September 19, 2018 @ 9:08
Tinglayan H=4m) on-going b.09369627527/09506661 AM
333
b. K0439+300 - K0439+330 September 15, 2018 Not Passable Soil collapse Clearing operations by MPP PASPAS B. BASILAN One Lane Passable as per
Bangad Section privately owned equipment is call September 19, 2018 @
on-going 0915 782 6505 9:08 AM
c. K0466+800 - K0466+820 September 15, 2018 Not Passable Soil collapse Clearing operations is on hold MPP PASPAS B. BASILAN Still One Lane Passable as
L=20m, W=7m, due to heavy rains per e-mail received dated
H=5m 0915 782 6505 September 18, 2018 @ 2:45
AM
d. K0448+800 - K0448+820 September 15, 2018 Not Passable Soil collapse Clearing operations is on hold MPP PASPAS B. BASILAN Still One Lane Passable as
Malango Section L=20m, H=1.5m, due to heavy rains per e-mail received dated
W=8m 0915 782 6505 September 18, 2018 @ 2:45
AM
e. K0448+970 - K0448+985 September 15, 2018 Not Passable Soil collapse Clearing operations is on hold MPP PASPAS B. BASILAN Still One Lane Passable as
Mallango Section L=15m, H=4m, due to heavy rains per e-mail received dated
W=8m 0915 782 6505 September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
f. K0459+950 - K0459+970 September 15, 2018 Not Passable Soil collapse Clearing operations is on hold MPP PASPAS B. BASILAN Passable as per call
L=20m, H=3m, due to heavy rains September 19, 2018 @ 9:08
W=8m 0915 782 6505 AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
g. K0425+090 September 17, 2018 Not Passable Soil collapse Clearing operations by a. MPP WILSON IKE W. Passable as per email
L=15m, H=2m, privately owned equipment is ADDAMO received dated September 18,
W=6m on-going b.09369627527/09506661 2018 @ 6:34 PM
333
h. K0425+940 September 17, 2018 Not Passable Soil collapse Clearing operations by a. MPP WILSON IKE W. Passable as per email
L=15m, H=2m, privately owned equipment is ADDAMO received dated September 18,
W=6m on-going b.09369627527/09506661 2018 @ 6:34 PM
333
i. K0430+350 September 17, 2018 Not Passable Soil collapse Clearing operations by a. MPP WILSON IKE W. Passable as per call
L=20m, H=3.5m, privately owned equipment is ADDAMO September 19, 2018 @ 9:08
W=6.5m on-going b.09369627527/09506661 AM
333
j. K0431+600 September 17, 2018 Not Passable Soil collapse Clearing operations by a. MPP WILSON IKE W. Passable as per email
L=16m, H=2m, privately owned equipment is ADDAMO received dated September 18,
W=7m on-going b.09369627527/09506661 2018 @ 6:34 PM
333
k. K0431+950 September 17, 2018 Not Passable Sinking Pavement Clearing operations by a. MPP WILSON IKE W. Passable as per email
privately owned equipment is ADDAMO received dated September 18,
on-going b.09369627527/09506661 2018 @ 6:34 PM
333
l. Mabongis Bridge September 17, 2018 Not Passable Structural Failure Installed Warning signs a. MPP WILSON IKE W. Still Not Passable as per
(massive soil collapse) ADDAMO email received dated
b.09369627527/09506661 September 21, 2018 @ 10:28
333 AM
m. K0422+090 September 17, 2018 Not Passable Soil collapse Clearing operations by a. MPP WILSON IKE W. Passable as per email
L=16m, H=4m, privately owned equipment ADDAMO received dated September 18,
W=4m will resume tomorrow b.09369627527/09506661 2018 @ 6:34 PM
morning 333
n. K0429+250, Basao Section September 17, 2018 Not Passable Roadslip Installed Warning signs a. MPP WILSON IKE W. Passable as per call
L=35m, H=12m, ADDAMO September 19, 2018 @ 9:08
Cave-in=2m b.09369627527/09506661 AM
333
o. K0431+020 September 17, 2018 Not Passable Soil collapse Clearing operations by a. MPP WILSON IKE W. Passable as per email
L=23, H=3m, W=4m privately owned equipment ADDAMO received dated September 18,
will resume tomorrow b.09369627527/09506661 2018 @ 6:34 PM
morning 333
p. K0431+300 September 17, 2018 Not Passable Soil collapse Clearing operations by a. MPP WILSON IKE W. Passable as per email
L=17, H=2m, W=4m privately owned equipment ADDAMO received dated September 18,
will resume tomorrow b.09369627527/09506661 2018 @ 6:34 PM
morning 333
q. K0431+900 September 17, 2018 Not Passable Soil collapse Clearing operations by a. MPP WILSON IKE W. Passable as per email
L=25, H=0.3m, privately owned equipment ADDAMO received dated September 18,
W=6m will resume tomorrow b.09369627527/09506661 2018 @ 6:34 PM
morning 333
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
r. K0460+020, Cagaluan Junction September 17, 2018 Not Passable Roadslip Clearing operations by a. MPP WILSON IKE W. One Lane Passable as per
L=25m, H=12m, privately owned equipment ADDAMO email received dated
Cave-in=23 will resume tomorrow b.09369627527/09506661 September 18, 2018 @ 6:34
morning 333 PM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
2. Kalinga- Abra Road
a. K0466+(-031) September 15, 2018 Not Passable Soil collapse Clearing operations is on- MPP RENDYLL JERBE S. Still One Lane Passable as
L=10m, W=7m, going ASBOC per email received dated
H=7m 0917 364 7316 September 19, 2018 @ 4:50
PM
b. K0494+528-K0494+540, September 15, 2018 Not Passable Soil Collapse Equipment is on standby. MPP RENDYLL JERBE S. Still One Lane Passable as
Gusang Section, Balbalan (L= 12m, W= 3m, Clearing operations is ASBOC per email received dated
H=2m) hampered by heavy rains 0915 546 4406 September 19, 2018 @ 4:50
PM
c. K0497+500 - K0497+510 September 15, 2018 Not Passable Soil collapse Clearing operations is on hold MPP RENDYLL JERBE S. Still One Lane Passable as
Pantikian Section L=10m, H=3m, due to heavy rains ASBOC per email received dated
W=7m 0915 546 4406 September 19, 2018 @ 4:50
PM
d. K0469+100,Ableg Section September 17 2018 Not Passable Soil Collapse 'Clearing operations by MPP RENDYLL JERBE S. Passable as per email
(L=30m,W=7m,H=4m privately owned equipment is ASBOC received dated September 17,
) on-going 0915 546 4406 2018 @ 2:00 PM
e. K0469+(-100)Ableg Section September 17 2018 Not Passable Soil Collapse 'Clearing operations by MPP RENDYLL JERBE S. Passable as per email
(L=20,W=4m,H=6m) privately owned equipment is ASBOC received dated September 18,
on-going 0915 546 4406 2018 @ 6:34 PM
f. K0468+400,Ableg Section September 17 2018 Not Passable Soil Collapse 'Clearing operations by MPP RENDYLL JERBE S. Passable as per email
(L=30m,W=10m,H=9 privately owned equipment is ASBOC received dated September 17,
m) on-going 0915 546 4406 2018 @ 2:00 PM
g. K0468+450,Ableg Section September 17 2018 Not Passable Soil Collapse 'Clearing operations by MPP RENDYLL JERBE S. Still One Lane Passable as
(L=50,W=8m,H=2m) privately owned equipment is ASBOC per email received dated
on-going 0915 546 4406 September 19, 2018 @ 4:50
PM
h. K0470+535,Ableg Section September 17 2018 Not Passable Soil/Rock Collapse 'Clearing operations by MPP RENDYLL JERBE S. One Lane Passable as per
(L=20,W=6m,H=5m) privately owned equipment is ASBOC email received dated
on-going 0915 546 4406 September 18, 2018 @ 2:45
AM
i. K0470+750,Ableg Section September 17 2018 Not Passable Soil Collapse 'Clearing operations by MPP RENDYLL JERBE S. One Lane Passable as per
(L=7m,W=3m,H=3m) privately owned equipment is ASBOC email received dated
on-going 0915 546 4406 September 18, 2018 @ 2:45
AM
j. K0471+500,Dolyaw Section September 17 2018 Not Passable Soil Collapse 'Clearing operations by MPP RENDYLL JERBE S. One Lane Passable as per
(L=35m,W=8m,H=8m privately owned equipment is ASBOC email received dated
) on-going 0915 546 4406 September 18, 2018 @ 2:45
AM
k. K0471+550,Dolyaw Section September 17 2018 Not Passable Soil Collapse 'Clearing operations by MPP RENDYLL JERBE S. One Lane Passable as per
(L=30m,W=8m,H=2m privately owned equipment is ASBOC email received dated
) on-going 0915 546 4406 September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
l. K0471+620,Dolyaw Section September 17 2018 Not Passable Soil Collapse 'Clearing operations by MPP RENDYLL JERBE S. One Lane Passable as per
(L=10m,W=7m,H=5.5 privately owned equipment is ASBOC email received dated
m) on-going 0915 546 4406 September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
m. K0472+(-030),Limood Section September 17 2018 Not Passable Soil Collapse 'Clearing operations by MPP RENDYLL JERBE S. Passable as per email
(L=10m,W=10,H=2m) privately owned equipment is ASBOC received dated September 18,
on-going 0915 546 4406 2018 @ 2:45 AM
n. K0473+300,Chigaching Section September 17 2018 Not Passable Soil Collapse 'Clearing operations by MPP RENDYLL JERBE S. Passable as per email
(L=10m,W=10,H=2m) privately owned equipment is ASBOC received dated September 18,
on-going 0915 546 4406 2018 @ 6:34 PM
o. K0493+100,Bissong Section September 17 2018 Not Passable Soil Collapse 'Clearing operations by MPP RENDYLL JERBE S. Passable as per email
(L=40,W=10m,H=7m) privately owned equipment is ASBOC received dated September 18,
on-going 0915 546 4406 2018 @ 2:45 AM
p. K0475+(-50),Simang Section September 17 2018 Not Passable Soil Collapse 'Clearing operations by MPP RENDYLL JERBE S. Still One Lane Passable as
(L=6m,W=3m,H=2m) privately owned equipment is ASBOC per email received dated
on-going 0915 546 4406 September 19, 2018 @ 4:50
PM
q. K0475+080,Simang Section September 17 2018 Not Passable Soil Collapse 'Clearing operations by MPP RENDYLL JERBE S. Still One Lane Passable as
(L=9m,W=3m,H=5m) privately owned equipment is ASBOC per email received dated
on-going 0915 546 4406 September 19, 2018 @ 4:50
PM
r. K0476+400,Balinciagao Norte September 17 2018 Not Passable Soil Collapse 'Clearing operations by MPP RENDYLL JERBE S. Still One Lane Passable as
Section (L=20m,W=4m,H=1.5 privately owned equipment is ASBOC per email received dated
m) on-going 0915 546 4406 September 19, 2018 @ 4:50
PM
s. K0477+400,Balinciagao Norte September 17 2018 Not Passable Soil Collpse 'Clearing operations by MPP RENDYLL JERBE S. Still One Lane Passable as
Section (L=10m,W=4m,h=2.5 privately owned equipment is ASBOC per email received dated
m) on-going 0915 546 4406 September 19, 2018 @ 4:50
PM
t. K0477+930,Balinciagao Norte September 17 2018 Not Passable Soil Collpse 'Clearing operations by MPP RENDYLL JERBE S. Still One Lane Passable as
Section (L=8m,W=3m,h=2m) privately owned equipment is ASBOC per email received dated
on-going 0915 546 4406 September 19, 2018 @ 4:50
PM

3. Lubuagan-Batong Buhay Road, September 15, 2018 Not Passable Soil collapse Clearing operations by MPP RENDYLL JERBE S. Passable as per email
K0461+450 - K0477+600 (int. sections) L=10m, H=2m, privately owned equipment is ASBOC received dated September 20,
W=4m on-going 0917 364 7316 2018 @9:31 AM
4. Balbalan-Pinukpuk Road,
a. K0489+300 Maling Section September 15, 2018 Not Passable Series of soil collapse Clearing operations by MPP JOHN CRISTER B. Still Not Passable as per
privately owned equipment is WACAS email received dated
on-going 0926 0725 656 September 21, 2018 @ 10:28
AM
b. K0489+350, Maling Section September 19, 2018 Not Passable Soil collapse Clearing operations by MPP JOHN CRISTER B. Passable as per email
(L=21m,W=3m,H=8m privately owned equipment is WACAS received dated September 21,
on-going 0926 0725 656 2018 @ 10:28 AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
c. K0489+400, Dao-angan Section September 15, 2018 Not Passable Soil collapse, L=13m, Clearing operations by MPP JOHN CRISTER B. Passable as per email
W=3m, H=7m privately owned equipment is WACAS received dated September 21,
on-going 0926 0725 656 2018 @ 10:28 AM

d. K0489+430, Dao-angan Section September 15, 2018 Not Passable Soil collapse, L=29m, Clearing operations by MPP JOHN CRISTER B. Passable as per email
W=5m, H=6m privately owned equipment is WACAS received dated September 21,
on-going 0926 0725 656 2018 @ 10:28 AM

e. K0490+200, Dao-angan Section September 15, 2018 Not Passable Soil collapse, L=17m, Clearing operations by MPP JOHN CRISTER B. Passable as per email
W=3m, H=8m privately owned equipment is WACAS received dated September 21,
on-going 0926 0725 656 2018 @ 10:28 AM

f. K0490+350 - K0490+370 Dao- September 15, 2018 Not Passable Soil collapse Clearing operations by MPP JOHN CRISTER B. Passable as per email
angan Section L=10m, H=2m, privately owned equipment is WACAS received dated September 21,
W=4m on-going 0926 0725 656 2018 @ 10:28 AM
g. K0490+600, Dao-angan Section September 15, 2018 Not Passable Soil collapse, L=19m, Clearing operations by MPP JOHN CRISTER B. Passable as per email
W=4m, H=7m privately owned equipment is WACAS received dated September 21,
on-going 0926 0725 656 2018 @ 10:28 AM

h. K0491+400, Dao-angan Section September 15, 2018 Not Passable Soil collapse, L=31m, Clearing operations by MPP JOHN CRISTER B. Passable as per email
W=6m, H=8m privately owned equipment is WACAS received dated September 21,
on-going 0926 0725 656 2018 @ 10:28 AM

i. K0493+050, Dao-angan Section September 15, 2018 Not Passable Roadslip Installed Warning Signs MPP JOHN CRISTER B. Passable as per email
WACAS received dated September 21,
0926 0725 656 2018 @ 10:28 AM

Mt. Province 1st DEO


1. Mountain Province-Nueva Viscaya Road

a. K0364+500-K0364+560, September 14, 2018 Not Passable Slope collapse Clearing operations is on- MPP TERESA K. PABLO Still One Lane Passable as
Ambatec Section, Bayyo, Bontoc, L=60m,H=10m, going 0929 138 4657 per email received dated
Mt. Province W=7m) September 18, 2018 @ 2:45
AM
b. Chico Karayan Bridge September 15, 2018 Not Passable Closed to traffic due to Passable as per email
monitoring of bridge received dated September 17,
condition 2018 @ 2:00 PM
c. Samoki to Mt. Polis Section September 15, 2018 Not Passable Series of Slides Equipment is on standby. MPP TERESA K. PABLO Still One Lane Passable as
Clearing operations is 0929 138 4657 per email received dated
hampered by heavy rains September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
2. Mountain Province-Ilocos Sur Rd via
Tue,
a. K0388+250 Beto Section, September 14, 2018 Not Passable Slope collapse Further clearing operations by a. MPP ARNEL A. BELDIO One Lane Passable as per
Tadian, Mt Province L=15m,H=5m, One (1) privately owned email received dated
W=7m) Equipment will mobilize on b. 0946 4683 665 September 18, 2018 @ 2:45
September 15, 2018 AM
Warning signs installed
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
b. K0416+800, Supang Section September 15, 2018 Not Passable Slide Coordinated with private MPP ARNEL A. BELDIO One Lane Passable as per
equipment owners for 0946 4683 665 email received dated
clearing operations September 18, 2018 @ 2:45
AM
3. Mt. Province -Ilocos Sur Road via September 15, 2018 Not Passable Slide Clearing operations by MPP ARNEL A. BELDIO Passable as per email
Kayan, a. K0399+100 - K0399+140 privately owned equipment is 0946 4683 665 received dated September 18,
on-going 2018 @ 6:34 PM
4. Mt. Province-Cagayan via Tabuk-Enrile
Road,
a. K0401+480 - K0401+500 September 15, 2018 Not Passable Slope Collapse Clearing operations by MPP ERVINE A. SAMIDAN Still One Lane Passable as
privately owned equipment is 0907 622 1366 per email received dated
on-going September 18, 2018 @ 2:45
AM
b. K0409+300 - K0409+315 September 15, 2018 Not Passable Slope Collapse Clearing operations by MPP ERVINE A. SAMIDAN Still One Lane Passable as
privately owned equipment is 0907 622 1366 per email received dated
on-going September 18, 2018 @ 2:45
AM
c. K0409+380 - K0409+410 September 15, 2018 Not Passable Slope Collapse Clearing operations by MPP ERVINE A. SAMIDAN Still One Lane Passable as
privately owned equipment is 0907 622 1366 per email received dated
on-going September 18, 2018 @ 2:45
AM
5. Junction Talubin-Barlig-Natonin- September 15, 2018 Not Passable Slide Equipment is on standby. MPP TERESA K. PABLO Still One Lane Passable as
Paracelis-Calaccad Road, Clearing operations is 0929 per email received dated
K0380+950, Pingew Section, Talubin, hampered by heavy rains 138 4657 September 18, 2018 @ 2:45
Bontoc AM
6. Dantay Sagada Road K0385+(-150) September 15, 2018 Not Passable Slope Collapsed Clearing operations by MPP Roldan V. Colas Passable to 4-wheel drive
privately owned equipment is 09395731659 vehicles as per email received
on-going dated September 18, 2018 @
6:00 AM
Alternate route: Balili- Suyo-
Sagada Road

Mt. Province 2nd DEO


1. Junction Talubin-Barlig-Natonin-
Paracelis-Calaccad Road
a. K0472+365 - K0472+410 September 4, 2018 Not Passable Road collapse Construction of retaining wall a. MPP Recto S. Safilo One lane Passable (Light
Bacarri, Paracelis is on-going vehicles only) as per email
b. 0948 270 9538 received dated September 18,
2018 @ 2:45 AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
b. K0426+200 - K0426+280, September 12, 2018 Passable Slide Further clearing operations by a. MPP JERRY S. Still One Lane Passable as
Banao, Natonin (L=80m,W=8m, a privately owned equipment CHIMICAG per email received dated
H=5m) and one (1) DPWH equipment b. 09502134509 September 18, 2018 @ 2:45
is on- going AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
c. K0433+200 - K0433+230 Pudo, September 15, 2018 Not Passable Slide Clearing operations by DPWH MPP RECTO S. SAFILO Still One Lane Passable as
Natonin Equipment and Maintenance 0948 270 9538 per email received dated
Crew is on-going September 18, 2018 @ 2:45
AM
d. Balabag-Poblacion, Natonin September 15, 2018 Not Passable Series of slide/rock fall Clearing operations by DPWH MPP RECTO S. SAFILO Still One Lane Passable as
and fallen trees Equipment and Maintenance 0948 270 9538 per email received dated
Crew is on-going September 18, 2018 @ 2:45
AM
e. K0404+000-K0430+300, Lias, September 16, 2018 Not Passable Series of Clearing operations by DPWH MPP RECTO S. SAFILO Passable as per e-mail
Barlig to tonglayan, Natonin landslide/rockslides Equipment and Maintenance 0948 270 9538 received dated September 16,
and fallen trees at Crew is on-going 2018 @ 4:24 PM
various section

REGION I
Ilocos Norte 2nd DEO
1. Ilocos Norte-Apayao Road,
a. K0 528+400 - K0 528+418 Brgy September 15, 2018 Passable Eroded shoulder Installed Warning Signs a. Sherell P.Pe Benito Passable as per email
Maananteng, Solsona b. 09198748951 received dated September 19,
2018 @ 9:24 AM

Damaged by previous
typhoon.
b. K0 534+650 - K0 534+686 Brgy September 15, 2018 Passable Damaged PCCP and Warning devices were a. Sherell P.Pe Benito Passable as per email
Maananteng, Solsona Slope Protection installed b. 09198748951 received dated September 19,
Collapse 2018 @ 1:36 PM

Damaged by previous
typhoon.
c. K0 536+200 - K0 536+223 Brgy September 15, 2018 Passable Damaged PCCP and Warning devices were a. Sherell P.Pe Benito Passable as per email
Maananteng, Solsona Slope Protection installed b. 09198748951 received dated September 19,
Collapse 2018 @ 1:36 PM

Damaged by previous
typhoon.
d. K0 536+500 - K0 536+536 Brgy September 15, 2018 Passable Damaged PCCP and Warning devices were a. Sherell P.Pe Benito Passable as per email
Maananteng, Solsona Slope Protection installed b. 09198748951 received dated September 19,
Collapse 2018 @ 1:36 PM

Damaged by previous
typhoon.
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
e. K0 539+500 - K0 539+550 September 15, 2018 Not Passable Eroded raodway Warning devices were a. Sherell P.Pe Benito Still Passable to light
(gravel road section) installed b. 09198748951 vehicles (One lane
Passable) as per email
received dated September 19,
2018 @ 4:48 PM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
2. Ilocos Norte-Abra Road a. Sherell P.Pe Benito
b. 09198748951
a. K0532+000 September 18, 2018 Passable Sides Warning devices were Passable to all types of
installed vehicles as per email received
dated September 19,2018 @
9:24 AM

b. K0539+350 September 18, 2018 Not Passable Landslides Warning devices were Passable to all types of
installed vehicles as per email received
dated September 19,2018 @
9:24 AM

Ilocos Sur 2nd DEO


1. Tagudin-Cervantes Road
a. K0364+000 to K0382+000 September 15, 2018 Not Passable Land/rock slides Installed warning signs, Passable as per email
Brgy. Malaya to Brgy. Zigzag, clearing operations on-going received dated September 20,
Cervantes, I.S. 2018 @ 9:07 AM

b.K0321+000 to K0345+000 September 16, 2018 Not Passable Land/rock slides Installed warning signs, Passable as per email
Brgy. Manatong (Intermittent clearing operations on-going received dated September 20,
section) 2018 @ 9:07 AM

c. K0355+400, Brgy. Man-atong September 16, 2018 Not Passable Land/rock slides Installed warning signs, Passable as per email
Bessang Pass- Malaya clearing operations on-going received dated September 20,
2018 @ 9:07 AM

2. Jct. Santiago-Banayoyo-Lidlidda-San September 16, 2018 Not Passable Land/rock slides Installed Warning Signs Passable as per email
Emilio-Quirino Road K0376+400- received dated September 20,
K0394+000 2018 @ 9:07 AM

La Union 1st DEO


1. Manila North Road, MNR KO266+400 September 15, 2018 Not Passable Flooded District Maintenance a. Isabelo Lopez Passable as per email
Engineers (DMEs) and b. received dated September 16,
Maintenance Point Persons 09156179580 2018 @ 9:04 PM
(MPPs) are inspecting AOR
2. Alilem -Sugpon Road, K0317+000 - September 16, 2018 Passable Eroded Shoulder and maintenance crew are a. Isabelo Lopez Still One lane Passable as
K0318+000 with exceptions doing regular maintenance b. per email received dated
activities 09156179580 September 19, 2018 @ 4;48
PM
La Union 2nd DEO
1. Agoo-Baguio City Road (Badiwan, September 15, 2018 Not Passable rock fall Monitoring and installation of a.Nestor Sibayan Passable as per update
Benguet to Baguio City) warning and informative signs b. 09174880716 received dated September 16,
2018 @ 9:04 PM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
2. Rosario-Pugo Access Road, Alipang September 15, 2018 Passable landslide on-going clearing operations a.Nestor Sibayan Passable as per email
Section (KO217+000) b. 09174880716 received dated September 19,
2018 @ 9:24 AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
3. Bauang-Baguio City Road, K0266+750, September 15, 2018 Passable On going construction of a.Nestor Sibayan Still One Lane Passable as
Brgy. Imelda, Naguilian, La Union Reinforced Concrete Box b. 09174880716 per email received dated
Culvert September 19, 2018 @4;48
PM
Baguio East bound vehicles
take old road, Brgy. Imelda,
Naguilian while La Union, west
bound vehicles pass the one
lane to make it two-way
passable to all types of
vehicles.

Pangasinan 1st DEO


1. Alaminos-Bolinao Road, Garrita Bridge July 19, 2018 Not Passable Not related to Pouring of concrete on bridge a. Gerry Y. Sison Not Passable since
(detour), K0329+300 Typhoon Ompong deck is on-going b. 0917 840 5731 Typhoon/Tropical Storm
Henry, Inday, Josie,Habagat
and TS Karding

Closure to heavy vehicles is


not related to Typhoon
Ompong

Bridge is Under contract

Alternate Route for Heavy


Vehicles:
Mabini-Bani Provincial Road or
Burgos-Agno Road

2. Pangasinan-Zambales Road, September 15, 2018 Not Passable Flooding (h=0.6 m) District Maintenance a. Gerry Y. Sison Passable as per email
KO303+500 - KO304+000 Caranglan Engineers (DMEs) and b. 09178405731 received dated September 16,
Section, Mabini Maintenance Point Persons 2018 @ 12:07 PM
(MPPs) are inspecting AOR
and maintenance crew are
doing regular maintenance
activities
3. Bani-Agno Road, KO342+000 - September 15, 2018 Not Passable Flooding (h=0.4 m) District Maintenance a. Wilfred V. Carace Passable as per email
KO344+400, Cayungnan Section Engineers (DMEs) and b.09196149058 received dated September 16,
Maintenance Point Persons 2018 @ 5:00 PM
(MPPs) are inspecting AOR
and maintenance crew are
doing regular maintenance
activities
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
Pangasinan 2nd DEO
1. Pangasinan - Zambales Road
a. Bolo Section September 15, 2018 Not Passable Flooded (h=0.3 m) District Maintenance a. Victoria Visperas Passable as per email
Engineers (DMEs) and b. 09228798533 received dated September 16,
Maintenance Point Persons 2018 @ 9:04 PM
(MPPs) are inspecting AOR
and maintenance crew are
doing regular maintenance
activities
b. Bongalon Section September 15, 2018 Not Passable Flooded (h=0.3 m) District Maintenance a. Victoria Visperas Passable as per email
Engineers (DMEs) and b. 09228798533 received dated September 16,
Maintenance Point Persons 2018 @ 9:04 PM
(MPPs) are inspecting AOR
and maintenance crew are
doing regular maintenance
activities
c. Dulig Section September 15, 2018 Not Passable Flooded (h=0.3 m) District Maintenance a. Victoria Visperas Passable as per email
Engineers (DMEs) and b. 09228798533 received dated September 16,
Maintenance Point Persons 2018 @ 9:04 PM
(MPPs) are inspecting AOR
and maintenance crew are
2. Pangasinan - Tarlac Road doing regular maintenance
a. Bogtong Section, KO172+150 September 15, 2018 Not Passable Flooded (h=0.3 m) District
activitiesMaintenance a. Victoria Visperas Passable as per email
Engineers (DMEs) and b. 09228798533 received dated September 16,
Maintenance Point Persons 2018 @ 9:04 PM
(MPPs) are inspecting AOR
and maintenance crew are
doing regular maintenance
activities
b. Umanday Section, KO195+500 September 15, 2018 Not Passable Flooded (h=0.3 m) District Maintenance a. Victoria Visperas Passable as per email
Engineers (DMEs) and b. 09228798533 received dated September 16,
Maintenance Point Persons 2018 @ 9:04 PM
(MPPs) are inspecting AOR
and maintenance crew are
doing regular maintenance
activities

c. Aguilar Section (KO190+700 September 15, 2018 Not Passable Flooded (h=0.3 m) District Maintenance a. Victoria Visperas Passable as per email
Engineers (DMEs) and b. 09228798533 received dated September 16,
Maintenance Point Persons 2018 @ 9:04 PM
(MPPs) are inspecting AOR
and maintenance crew are
doing regular maintenance
activities
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
3. Pangasinan - La Union Road, Cayanga September 16, 2018 Not Passable Erosion on Bridge Filling of embankment a. Victoria Visperas Passable as per chat
Bridge Approach A materials on-going. b. 09228798533 message received dated
September 17,2018 @ 5:50
PM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
4. Urdaneta-Jct. Dagupan Road September 16, 2018 Not Passable Flooded (h=0.25 m) District Maintenance a. Victoria Visperas Passable as per email
YMCA Tapuac Section Engineers (DMEs) and b. 09228798533 received dated September 19,
Maintenance Point Persons 2018 @ 1:36 PM
(MPPs) are inspecting AOR
and maintenance crew are
doing regular maintenance
activities

Pangasinan 4th DEO


1. Urdaneta Jct.-Dagupan Road
a. K198+500 - K0198+900 September 17, 2018 Not Passable Flooded (h=0.2 m) Barricades and warning signs a. Adonis Ignacio Passable as per email
Maningding, Sta. Barbara installed. b. CP#09204077197 received dated September 17,
2018 @ 4:17 PM

2. Calasiao old Road September 17, 2018 Not Passable Flooded (h=0.4 m) Barricades and warning signs a. Adonis Ignacio Passable as per email
K0204+000 - K0204+150 Bued, Calasiao installed. b. CP#09204077197 received dated September 18,
2018 @ 8:00AM

3. San Carlos-Calasiao Road


a. K0212+800 - K0212+810, September 17, 2018 Not Passable Flooded (h=0.4 m) Barricades and warning signs a. Adonis Ignacio Passable to all types of
Mancup, Calasiao installed. b. CP#09204077197 vehicles as per email
received dated September 18,
2018 @ 4:52 PM

b. K0210+320 - K0210+360, September 17, 2018 Not Passable Flooded (h=0.40 m) Barricades and warning signs a. Adonis Ignacio Passable to all types of
Malabago, Calasiao installed. b. CP#09204077197 vehicles as per email
received dated September 18,
2018 @ 4:52 PM

c. K0213+050 - K0213+300, September 17, 2018 Not Passable Flooded (h=0.30 m) Barricades and warning signs a. Adonis Ignacio Passable to all types of
Poblacion, Calasiao installed. b. CP#09204077197 vehicles as per email
received dated September 18,
2018 @ 4:52 PM

REGION II
Batanes DEO
1. Batan Island along K0023+600 September 15, 2018 Not Passable Road slips and debris Maintenance crew and a. Alfredo T. Cariaso Passable as per email
equipment on stand-by b. 09999924969 received dated September 16,
2018 @ 7:36 PM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
Cagayan 2nd DEO
1. Manila North Road, K0664+500, Calog September 16, 2018 Not Passable Flash flood Barricades and warning signs a. Eugenio L. Lasam Passable to Heavy vehicles
Sur, Abulug, Cagayan installed. b. 09171326026 as per text message received
dated September 16, 2018 @
6:25 AM

Cagayan 3rd DEO


1. Itawes Overflow Bridge, K0519+(-1044) September 15, 2018 Not Passable Flooding Barricades and warning signs a. Eugenio L. Lasam Passable as per email
along Cagayan-Apayao Rd.,Sta. Barbara, installed. b. 09171326026 received dated September 16,
Piat, Cagayan 2018 @ 6:01 PM

2. Peñablanca Callao Cave Road September 15, 2018 Not Passable fallen trees, electric Barricades and warning signs a. Eugenio L. Lasam Passable as per email
posts, cables and installed. b. 09171326026 received dated September 16,
debris in the 2018 @ 6:01 PM
carriageway
Isabela 1st DEO
1. Cabagan-Sta. Maria Bridge September 15, 2018 Not Passable Flooding, 0.3m Maintenance Crew were a. Restituto A. Bentero b. Passable as per telephone
deployed to monitor the area. 09278350283 call dated September 18,
2018 @ 6:00 PM

Nueva Vizcaya 2nd DEO


1. Nueva Vizcaya-Benguet Road, September 15, 2018 Passable Landslide Clearing operations on-going a. DME Christopher One Lane Passable as per
K0261+300 Balasya email received dated
b. 0926 063 3794 September 16, 2018 @ 6:22
AM
2. Daang Maharlika
a. Baliling Sabo Dam September 19, 2018 Silted sabo dam As per email received dated
September 19, 2018 @ 12:07
PM

b. Calitlitan Sabo Dam September 19, 2018 Silted sabo dam As per email received dated
September 19, 2018 @ 12:07
PM

3. Nueva Vizcaya-Pangasinan Road


a.. Baracbac Sabo Dam September 19, 2018 Silted sabo dam As per email received dated
September 19, 2018 @ 12:07
PM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
Quirino DEO
1. NRJ Villa Sur-San Pedro-Cabuaan-
Ysmael-Disimungal Road,
a. K0368+628 - K0369+015 September 15, 2018 Not Passable Flooding (h=0.7m) Maintenance Crew were a. Reynaldo T. Gonzales Passable as per call received
deployed to monitor the area. b. 09175172924 dated September 16, 2018 @
10:43 PM

b. K0375+450 -K0375+500, (Barangay September 15, 2018 Not Passable damaged PCCP Maintenance Crew were a. Reynaldo T. Gonzales Passable as per call received
Cabuaan, Maddela, Quirino) shoulder and slope deployed to monitor the area. b. 09175172924 dated September 16, 2018 @
protection 10:43 PM

2. San Pedro Overflow Bridge at September 15, 2018 Not Passable high water elevation Maintenance Crew were a. Reynaldo T. Gonzales Passable as per email
K0367+768 and now under water deployed to monitor the area. b. 09175172924 received dated September 16,
2018 @ 6:22 AM

3. Jct. Abbag-Guingin Bdry road September 16, 2018 Passable slides at intermittent Maintenance Crew were a. Reynaldo T. Gonzales One Lane Passable as per
(S04754LZ) K0445+000-K0463+900, sections deployed to monitor the area. b. 09175172924 email received dated
Barangay Guingin, Giayan ,Nagtipunan September 16, 2018 @ 6:22
Quirino AM

4. Victoria - Maddela -Alicia - Kasibu bdry September 16, 2018 Passable slides at intermittent Maintenance Crew were a. Reynaldo T. Gonzales One Lane Passable as per
Rd. ,Barangay Jose Ancheta, Maddela, sections deployed to monitor the area. b. 09175172924 email received dated
Quirino, K0383+800 September 16, 2018 @ 6:22
AM

REGION III
Bulacan 1st DEO
1. Bigaa-Plaridel via Malolos Road
a. K0030+392 - K0031+000, Panginay, September 15, 2018 Not Passable Flooded (h=0.7 m) Continuous monitoring and a. Ernesto Daos Passable as per email
Balagtas roving of maintenance crew b. 09222164006 received dated September 16,
along national road 2018 @ 9:56 PM

2. Manila North Road


a. KM28+900 – KM29+400, Bocaue September 15, 2018 Not Passable Flooded (h=0.7 m) Continuous monitoring and a. Ernesto Daos Passable as per email
Balagtas Bdry. roving of maintenance crew b. 09222164006 received dated September 15,
along national road 2018 @ 4:55 PM

Nueva Ecija 1st DEO


AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
1. Daang Maharlika Road, K0176+200- September 15, 2018 Not Passable flooding (h =0.5 m) Clearing of debris completed a. Nestor G. Galapon Passable as per email
K0176+350, Brgy. Puncan,Carranglan and debris flow b. 0915 882 7368 received dated September 15,
2018 @ 4:55 PM

2. Pantabangan-Canili-Basal-Baler Road, September 15, 2018 Not Passable flooding (h =0.6 m) Clearing of debris completed a. Glen Imperio Passable as per email
K0186+500, Brgy. Marikit, Alfonzo and debris flow b. 0905 499 4601 received dated September 15,
Castañeda, 2018 @ 4:55 PM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
3. Jct. Pinagpanaan-Rizal-Pantabangan September 15, 2018 Not Passable collapsed roadway on-going backfilling of road a. Glen Imperio Passable as per email
Road. K0165+360 Brgy. Aya, Pantabangan way b. 0905 499 4601 received dated September 16,
N.E 2018 @ 2:23 PM

Nueva Ecija 2nd DEO

1. Nueva Ecija-Aurora Road, K0161+574, September 15, 2018 Not Passable Cut-off Detour Road Continuous monitoring and a. Eulogio Pesa Passable as per telephone
Brgy. Labi standby of equipment b. 0926 083 7180 call dated September 16, 2018
@ 2:23 PM

Pampanga 1st DEO


1. Sto. Tomas - Minalin Road K0070+900 - September 15, 2018 Not Passable Flooded (h=0.1-0.38 Continuous monitoring a. Michael Torres Passable as per email
K0073+600, San Isidro. Minalin & m) conducted by the b. 0917 507 4929 received dated September 19,
Telacsan Maintenance Staffs and 2018 @ 10:08 PM
Crews
2. Baliwag - Candaba - Sta. Ana Road,
a. K0068+(-348) Bomba Bridge, September 15, 2018 Not Passable Flooded (h=0.6 m) Continuous monitoring a. Michael Torres Still Not Passable as per
San Agustin, Candaba, Pampanga conducted by the b. 0917 507 4929 email received dated
Maintenance Staffs and September 21, 2018 @ 10:41
Crews AM
b. K0070+900 - K0071+050, September 17, 2018 Not Passable Flooded 0.25m Continuous monitoring Passable as per email
Pasig, Candaba, Pampanga underwater conducted by the received dated September 19,
Maintenance Staffs and 2018 @ 4:36 PM
Crews
3. Candaba - San Miguel Road, September 16, 2018 Not Passable Flooded (h=0.50 m) Continuous monitoring a. Michael Torres Still Not Passable as per
K0073+400 - K0073+600 Paralaya, conducted by the b. 0917 507 4929 email received dated
Candaba Pampanga Maintenance Staffs and September 21, 2018 @ 10:41
Crews AM
4. San Simon-Baliuag, K0062+000- September 18, 2018 Not Passable Flooded (h=0.2-0.6 Continuous monitoring Passable as per email
K0065+000, Brgy. San Miguel and San m) conducted by the received dated September 20,
Simon Maintenance Staffs and 2018 @ 11:48 AM
Crews
Tarlac 1st DEO
1. Romulo Highway
a. K0158+000-K0159+000, Brgy. September 15, 2018 Not Passable Flooded (h=1.20 m.) Continuous monitoring a. Renato Z. Martinez Passable as per telephone
Cacamilingan Sur, Camiling conducted by the b. 0917 848 0629 call dated September 16, 2018
Maintenance Staffs and @ 2:23 PM
Crews
b. K0155+900 & K0156+700 September 15, 2018 Not Passable Flooded (h=1.20 m.) Continuous monitoring a. Renato Z. Martinez Passable as per telephone
conducted by the b. 0917 848 0629 call dated September 16, 2018
Maintenance Staffs and @ 2:23 PM
Crews
2. Paniqui-Camiling-Wawa Road
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
a. K0167+500 - K0170+000 Brgy. September 15, 2018 Not Passable Flooded (h=0.8 m.) Continuous monitoring a. Renato Z. Martinez Passable as per telephone
Sawat - Bilad Camiling conducted by the b. 0917 848 0629 call dated September 16, 2018
Maintenance Staffs and @ 2:23 PM
Crews
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
Tarlac 2nd DEO
1. Sta. Rosa - Tarlac Road Lapaz Section, September 16, 2018 Not Passable Flooded (h=.15-0.30 Continuous monitoring by the a. Adrian T. Sevilla Passable as per email
K0129+400-K0130+900 Brgy. San Roque m) Maintenance Staffs and b. 0932 562 4155 received dated September 18,
and San Isidro Lapaz, Tarlac Crews 2018 @ 10:15 AM

2. Concepcion - Lapaz Road, K0136+200 - September 16, 2018 Not Passable Flooded (h=.15-0.30 Continuous monitoring by the a. Adrian T. Sevilla Passable as per email
K0136+426 Brgy. San Isidro lapaz Tarlac m) Maintenance Staffs and b. 0932 562 4155 received dated September 18,
Crews 2018 @ 10:15 AM
3. La-Paz Victoria Road, K0137+500 - September 16, 2018 Not Passable Flooded (h=0.2 m) Continuous monitoring by the a. Adrian T. Sevilla Passable to light vehicles
K0138+100 Brgy. Lomboy & Maintenance Staffs and b. 0932 562 4155 as per email received dated
Matayumtayum Laz Paz Tarlac Crews September 17, 2018 @
10:00AM

4. Tarlac Zambales Road, Brgy. Patling, September 16, 2018 Passable Damaged slope Continuous monitoring a. Adrian T. Sevilla Passable as per email
Capas Tarlac, K0126+300 - K0126+315 protection b. 0932 562 4155 received dated September 16,
L/S 2018 @ 9:56 PM

Zambales 1st DEO


1. Olongapo-Bugallon Road
a. K0213+400, Brgy. Marangla, September 15, 2018 Not Passable Flooded (h=1.0 m.) Continuous monitoring and a. Jessie Rey Lantano Passable as per telephone
Iba, Zambales roving of maintenance crew b. 0907 326 8209 call dated September 16, 2018
along national road. @ 2:23 PM

REGION V
Camarines Sur II DEO
1. Daang Maharlika, K0439+800 September 14, 2018 Passable Fallen Tree Clearing completed a. Rhemy S. Remot Passable as per email
b. 0907-9680537 received dated September 14,
2018 @ 05:53 PM

Catanduanes DEO
1. Catanduanes Circumferential Road

a. K0003+080 September 14, 2018 Passable Rockslide Clearing completed a. Marjorie Gan See Passable as per email
b. K0143+950 September 14, 2018 Passable Rockslide Clearing operation, on-going b. Marjorie
a. 0939-1178155
Gan See received
One Lanedated September
Passable 14,
as per
b. 0939-1178155 2018
email @received
05:53 PM (road
dated
section is under
September contract)
14, 2018 @ 05:53
PM
Sorsogon II DEO
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
1. Daang Maharlika, Bulusan Lake Road, September 14, 2018 Passable Soil Collapse Clearing operation completed a. Roi D. Barcela Passable as per email
Ariman Junction, K0628+600 b. 0907-9680537 received dated September 14,
2018 @ 05:53 PM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
REGION VI
AKLAN DEO
1. Aklan West Road (S00480PN) - Jct. September 14, 2018 Not Passable Road Slip Maintenance Crew deployed a. Welbert Bayaban One Lane Passable as per
Nabas-Malay-Buruanga/Liberted Bdry., to install warning signs and b. 0908 934 9681 email received dated
K0234+(-933) - K0282+172 repair works September 15, 2018 @8:42
PM

REGION VII
Negros Oriental III DEO
1. Dumaguete South Road, Sacsac Bridge September 14, 2018 Passable Road slip , scouring of Installed barriers and warning a. Cetilla Verna A. Tinaya One Lane Passable as per
Approach A, K0045+960 2 meters (right lane) devices, contractor's b. 0915-6965784 email received dated
personnel deployed for traffic September 14, 2018 @ 5:03
management, on-going repiar PM
Road is under contract

REGION VIII
Leyte V DEO
1. Abuyog-Silagao Road, K0968+(-269) - September 14, 2018 Not Passable Major repair of Cadac- Continuous monitoring of a. Leo Gallardo Not passable to all types of
K0995+320 an Bridge road condition b. 0916-9006525 vehicles (not related to TY
Ompong) as per e-mail
received dated Sept. 14, 2018
@ 8:51 AM

Alternate Route:
REGION X Daang Maharlika (Abuyog-
Bukidnon 1st DEO Mahaplag Section)
1. Kapalong-Talaingod-Valencia Road September 14, 2018 Not Passable Road slip with severe Installation barricades; Travel a. Kevin Loyd B. Passable (shoulder portion)
(S00641MN), K1571+(-173) scouring road bed advisory is released Carcueva as per email received dated
(NOT RELATED TO b. 0917-8733-387 September 14, 2018 @ 11:47
OMPONG) AM

2. Jct. SH Impasug-ong-Patulangan By- Not Passable road slip (NOT Travel advisory, released a. Aiza B. Ega Not Passable to Heavy
pass Road, K1478+000 -K1488+000 RELATED TO b. 0997-1143-799 Vehicles since November
(S00610MN) OMPONG) 2017 as per email received
dated September 15, 2018 @
12:00 MN
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
Camiguin DEO
1. Camiguin Circumferential Rad, K4+700- September 13, 2018 Not Passable Uprooted tree Clearing operations by DPWH a. Benjamin S. Babla Passable as per email
K4+705 equipment completed b. 0936-6274911 received dated September 14,
2018 @ 8:11 AM
Closure occurred at Sept. 13,
2018 @ 6:50PM and opened to
Prepared by: Submitted by: Approved by: traffic same day @ 7:35 AM

DARREL B. QUINTINITA
Engineer II

MONAH A. MACABATO DOMINADOR P. AQUINO ERNESTO S. GREGORIO, JR.


Engineer II Engineer V Director IV
Safety and Disaster Management Coordination Division
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
CENTRAL OFFICE
Manila

SITUATIONAL REPORT ON MAJOR ROADS AND BRIDGES DUE TO TYPHOON "OMPONG"


Status as of 6:00 PM September 21, 2018
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)

CAR
Major Roads Leading to Baguio City

1. Kennon Road Not Passable Motorists are advised to take a. Engr. Nora R. Delos Still Not Passable as per e-
alternate route Santos mail received dated September
b. 0917 517 3899 & 21, 2018 @ 2:38 PM
a. Engr. Severino S. Clearing is on-going along
Bangasan K0248+850 (slide),
b. 0919 209 8860 K0246+220 - K0246+240
(slide), K0243+000 -
K0244+605 (debris flow) and
K0246+700 (debris flow)
K0239+220-
K0239+290(Roadslip),
K0237+290-K0237+380(Slide-
Right side),K0237+180-
K0237+260(Slide),
K0236+450( Roadslip),
K0235+504 Approach of Camp
5 Detour (Roadslip),
K0235+450 (Roadslip),
K0234+700 (Roadslip),
K0227+200 (Slide),
K0226+750 (Roadslip),
K0216+090 (Scoured Camp 1
Bridge Abutment A and B)
Alternate Route:
Marcos Highway and
Baguio-Bauang(Naguilian Road
)
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
2. Benguet-Nueva Vizcaya Road
a. K0254+200, Lamut Junction, September 15, 2018 Not Passable Slide Coordinated with private a. MPP HENRY APOSTOL Still One Lane Passable as
Beckel, La Trinidad equipment owners for b. per e-mail received dated
clearing operations 0947 1960 689 September 19, 2018 @ 11:31
AM

Section is under contract.


Section was closed to traffic
today at 07:55AM

Alternate route:
Suyoc- Beckel Provincial Road

b. K0267+300 September 15, 2018 Not Passable Slide Equipment is on standby. a. MPP Arthur Olpindo Still One Lane Passable as
Clearing operations is b. 0918 588 8190 per email received dated
hampered by heavy rains September 18, 2018 @ 2:45
AM
c. K0269+100 September 15, 2018 Not Passable Slide Equipment is on standby. a. MPP Arthur Olpindo Still One Lane Passable as
Clearing operations is b. 0918 588 8190 per email received dated
hampered by heavy rains September 18, 2018 @ 2:45
AM
d. K0270+150 September 15, 2018 Not Passable Mudslide Equipment is on standby. a. MPP Arthur Olpindo Still One Lane Passable as
Clearing operations is b. 0918 588 8190 per email received dated
hampered by heavy rains September 18, 2018 @ 2:45
AM
e. K271+700 September 15, 2018 Not Passable Slide Equipment is on standby. a. MPP Arthur Olpindo Still One Lane Passable as
Clearing operations is b. 0918 588 8190 per email received dated
hampered by heavy rains September 18, 2018 @ 2:45
AM
f. K0289+850, Sitio Indian, Brgy. September 15, 2018 Passable Rock collapse Equipment is on standby. a. MPP Arthur Olpindo Still One Lane Passable as
Ambuklao, Bokod (L=25m,H=5m, Clearing operations is b. 0918 588 8190 per email received dated
W=4m) hampered by heavy rains September 18, 2018 @ 2:45
AM
g. K0298+900, Sitio Bangao, September 15, 2018 Not Passable Rock collapse Equipment is on standby. a. MPP Arthur Olpindo Still One Lane Passable as
Ambuklao, Bokod (L=20m,H=5m, Clearing operations is b. 0918 588 8190 per email received dated
W=6m) hampered by heavy rains September 18, 2018 @ 2:45
AM
h. K0300+000 September 15, 2018 Not Passable Slide Equipment is on standby. a. MPP Arthur Olpindo Still One Lane Passable as
Clearing operations is b. 0918 588 8190 per email received dated
hampered by heavy rains September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
i. K0261+800 Sitio September 16,2018 Not Passable Slide Clearing operations is a. MPP Arthur Olpindo Still One Lane Passable as
Doting,Brgy.Loacan,Itogan (L=150,W=8m,H=4m) hampered by fallen electric b. 0918 588 8190 per email received dated
post September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
j. K0262+250,Sitio September 16,2018 Not Passable Slide a. MPP Arthur Olpindo Still One Lane Passable as
Doting,Brgy.Loacan,Itogon (L=12,W=8m,H=4m) b. 0918 588 8190 per email received dated
September 18, 2018 @ 2:45
AM
k. K0263+500,Sitio September 16,2018 Not Passable Clearing operations is a. MPP Arthur Olpindo Still One Lane Passable as
Anteng,Brgy.Loacan,Itogon hampered by fallen electric b. 0918 588 8190 per email received dated
post September 18, 2018 @ 2:45
AM
l. K0266+000 Sitio Anteng,Brgy. September 16,2018 Not Passable Clearing operations is a. MPP Arthur Olpindo Still One Lane Passable as
Loacan, Itogon hampered by fallen electric b. 0918 588 8190 per email received dated
post September 18, 2018 @ 2:45
AM
m. K0270+600 Sitio Bingo. Brgy. September 16,2018 Not Passable a. MPP Arthur Olpindo Still One Lane Passable as
Loacan,Itogon b. 0918 588 8190 per email received dated
September 18, 2018 @ 2:45
AM
3. Baguio-Bontoc Road
a. K0259+950- K0260+050, La September 15, 2018 Not Passable Fallen trees Clearing operations is on- MPP JEFFERSON TED S. Still One Lane Passable as
Trinidad going PULAY per email received dated
09394639667 September 17, 2018 @ 3:57
AM
b. K0260+900-K0261+000, La September 15, 2018 Not Passable Mudflow Clearing operations is on- MPP JEFFERSON TED S. Still One Lane Passable as
Trinidad going PULAY per email received dated
09394639667 September 17, 2018 @ 3:57
AM
c. K0267+200 Ambassador, September 15, 2018 Not Passable Soil Collapse Clearing operations by DPWH MPP PETER T. SANGGOY, Passable as per email
Tublay Loader is on-going JR. received dated September 16,
0948 268 0672 2018 @ 11:09 PM
d.K0278+870 Topdac, Atok September 15, 2018 Not Passable Soil Collapse Clearing operations by DPWH MPP PETER T. SANGGOY, Passable as per email
Loader is on-going JR. received dated September 16,
0948 268 0672 2018 @ 11:09 PM
e.K0282+900 Topdac, Atok September 15, 2018 Not Passable Soil Collapse Clearing operations by DPWH MPP PETER T. SANGGOY, Passable as per email
Loader is on-going JR. received dated September 16,
0948 268 0672 2018 @ 11:09 PM
f. K0285+150 Abiang, Atok September 15, 2018 Not Passable Rock fall Clearing operations by DPWH MPP PETER T. SANGGOY, Still One Lane Passable as
Loader is on-going JR. per email received dated
0948 268 0672 September 18, 2018 @ 2:45
AM
g.K0285+500 Abiang, Atok September 15, 2018 Not Passable Soil Collapse Clearing operations by DPWH MPP PETER T. SANGGOY, Passable as per email
Loader is on-going JR. received dated September 16,
0948 268 0672 2018 @ 11:09 PM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
h. K0286+250, Abiang, Atok September 15, 2018 Not Passable Soil collapse Clearing operations by DPWH MPP PETER T. SANGGOY, Passable as per email
Loader is on-going JR. received dated September 16,
0948 268 0673 2018 @ 11:09 PM
i. K0286+650, Abiang, Atok September 15, 2018 Not Passable Soil Collapse Clearing operations by DPWH MPP PETER T. SANGGOY, Still One Lane Passable as
Loader is on-going JR. per email received dated
0948 268 0672 September 18, 2018 @ 2:45
AM
j. K0288+150 Abiang, Atok September 15, 2018 Not Passable Soil collapse Clearing operations still is on- MPP PETER T. SANGGOY, One Lane Passable as per
going JR. email received dated
0948 268 0673 September 18, 2018 @ 6:34
PM
k. K0292+020,Atok September 17, 2018 Not Passable Slide Clearing operations still is on- MPP PETER T. SANGGOY, One Lane Passable as per
going JR. email received dated
0948 268 0673 September 18, 2018 @ 6:34
PM
l. K0293+000, Abiang, Atok September 15, 2018 Not Passable Soil Collapse Clearing operation still is on- MPP PETER T. SANGGOY, Passable as per email
going JR. received dated September 18,
0948 268 0672 2018 @ 6:34 PM
m. K0296+860 Paoay, Atok September 15, 2018 Not Passable Soil Collapse Clearing operation still is on- MPP BILLY JUN S. Passable as per email
going DEPALOG received dated September 16,
0917 790 9915 2018 @ 11:09 PM
n. K0302+300-K0302+343, September 15, 2018 Not Passable Rock collapse Clearing operations by DPWH MPP RHODA O. ESTALIN Passable as per email
Cattubo, Atok Loader is on-going received dated September 16,
0946 652 2600 2018 @ 11:09 PM
o. K0306+000 Calasipan, Atok September 15, 2018 Not Passable Rock collapse Clearing operations by DPWH MPP PETER T. SANGGOY, Passable as per email
Loader is on-going JR. received dated September 16,
0948 268 0672 2018 @ 11:09 PM
p. K0309+150 Natubleng, Buguias September 15, 2018 Not Passable Mudslide Clearing operations by DPWH MPP PETER T. SANGGOY, One Lane Passable as per
Backhoe is on-going JR. email received dated
0948 268 0672 September 18, 2018 @ 6:34
PM
q. K0311+400 Natubleng, Buguias September 15, 2018 Not Passable Soil collapse Clearing operations by DPWH MPP PETER T. SANGGOY, Still One Lane Passable as
Backhoe is on-going JR. per email received dated
0948 268 0672 September 18, 2018 @ 6:34
PM
r. K0311+700 Natubleng, Buguias September 15, 2018 Not Passable Slide Clearing operations by DPWH MPP PETER T. SANGGOY, One Lane Passable as per
Backhoe is on-going JR. email received dated
0948 268 0672 September 18, 2018 @ 6:34
PM
s. K0312+700 - K0312+800 September 15, 2018 Not Passable Mudslide Clearing operations by DPWH MPP PETER T. SANGGOY, One Lane Passable as per
Natubleng, Buguias Backhoe is on-going JR. email received dated
0948 268 0672 September 18, 2018 @ 6:34
PM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
t. K0314+050 Colliding, Buguias September 15, 2018 Not Passable Rock Collapse Clearing operations by DPWH MPP PETER T. SANGGOY, One Lane Passable as per
Backhoe is on-going JR. email received dated
0948 268 0672 September 18, 2018 @ 6:34
PM
u. K0320+600 Amgaleyguey, September 15, 2018 Not Passable Soil collapse Clearing operations by DPWH MPP PETER T. SANGGOY, Passable as per email
Buguias Backhoe is on-going JR. received dated September 18,
0948 268 0672 2018 @6:34 PM
v. K0327+000-K0327+100, September 15, 2018 Not Passable Slide Clearing operations by DPWH MPP PETER T. SANGGOY, One Lane Passable as per
Bayoyo, Buguias Backhoe is on-going JR. email received dated
0948 268 0673 September 18, 2018 @ 6:34
PM
w. K0339+400 Bangao, Buguais September 15, 2018 Not Passable Soil collapse Clearing operations by DPWH MPP PETER T. SANGGOY, Still One Lane Passable as
Backhoe is on-going JR. per email received dated
0948 268 0672 September 18, 2018 @ 6:34
PM
x. K0339+600 Bangao, Buguais September 15, 2018 Not Passable Soil collapse Clearing operations by DPWH MPP PETER T. SANGGOY, Still One Lane Passable as
Backhoe is on-going JR. per email received dated
0948 268 0672 September 18, 2018 @ 6:34
PM
y. K0362+680 - K0362+780, Busa September 15, 2018 Not Passable Road Cut Widening works is on hold MPP PETER T. SANGGOY, Still Not Passable as per
Section due to heavy rains JR. email received dated
0948 268 0673 September 21, 2018 @ 2:38
PM

Expected to open on Sept. 24,


2018

Alternate route: Nacagang-


Abatan, Bauko, Maba-ay
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
z. K0371+400, Tiging Section, September 15, 2018 Not Passable Road Cut Clearing operations by private MPP PETER T. SANGGOY, Still Not Passable as per
Sabangan and DPWH equipment is on- JR. email received dated
going 0948 268 0673 September 21, 2018 @ 2:38
PM
Expected to open on Sept. 24,
2018

Alternate route: Nacagang-


Abatan, Bauko, Maba-ay

aa. K0390+200, Tikitik Section September 15, 2018 Not Passable Soil collapse Clearing operations by private MPP PETER T. SANGGOY, Passable as per email
(L=120m,W=7m,H=3 and DPWH equipment is on- JR. received dated September 17,
0m) going 0948 268 0673 2018 @ 3:03 PM
bb. Intermittent Section along September 15, 2018 Not Passable Series of Slides Clearing operations by private MPP ROLDAN V. COLAS Still One Lane Passable as
Chackchakan, Gonogon, Malitep and DPWH equipment is on- 0939 per email received dated
and Palinga-aw going 573 1659 September 18, 2018 @ 6:34
PM
cc. Mt. Data Cliff to Sinto September 15, 2018 Not Passable Series of Slides Clearing operations by private MPP ROLDAN V. COLAS One Lane Passable as per
Boundary and DPWH equipment is on- 0939 email received dated
going 573 1659 September 19, 2018 @ 11:31
AM

Expected to open on Sept. 24,


2018
dd. K0318+190-K0318+244, September 16, 2018 Not Passable Road cut Installation of timber shoring MPP PETER T. SANGGOY, One Lane Passable as per
Palidan, Amgaleyguey, Buguias is on- going JR. email received dated
0948 268 0673 September 20, 2018 @9:31
AM

4. Marcos Highway
a. K0273+850, Tuba, Benguet September 15, 2018 Not Passable Slide Clearing operations by a MPP FRANCISCO ROJO Passable as per email
privately owned equipment is received dated September 16,
on-going 09202157947 2018 @ 11:09 PM
b. 'K0275+150, Tuba, Benguet September 15, 2018 Not Passable Slide Clearing operations by a MPP FRANCISCO ROJO Passable as per email
privately owned equipment is received dated September 16,
on-going 09202157947 2018 @ 11:09 PM
c. K0275+700, Brgy. Poblacion, September 16, 2018 One Lane Slide Clearing operations is on- MPP FRANCISCO ROJO Passable as per email
Tuba, Benguet Passable going with the help of La received dated September 16,
Union 1st and 2nd DEO and 09202157947 2018 @ 11:09 PM
Pangasinan 1st and 2nd DEO

d. K0275+850, Brgy. Poblacion, September 15, 2018 Not Passable Slide Coordinated with private MPP FRANCISCO ROJO Passable as per email
Tuba, Benguet equipment owners for received dated September 16,
clearing operations 09202157947 2018 @ 11:09 PM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
e. K0276+950, Tuba, Benguet September 16, 2018 One Lane Slide Coordinated with private MPP FRANCISCO ROJO Passable as per email
Passable equipment owners for received dated September 16,
clearing operations 09202157947 2018 @ 11:09 PM

Abra DEO
1. Abra-Ilocos Norte Road,
a. K0451+150 - K0451+250 and June 29, 2018 Not Passable Road collapse and Installed warning signs. a. MPP Jun Michael A. Still Not Passable as per e-
K0451+345 - K0451+415, damaged slope Velasco mail received dated September
Nagaparan, Danglas, Abra protection b. 0915-446-2503 21, 2018 @ 2:38 PM
Road section is closed since
Typhoon/Tropical Storm
Henry, Inday, Josie,Habagat
and Karding

Road Section is under


contract.

Alternate route: Abra-Ilocos


Sur road - Mc Arthur
Highway/Manila North Road.

2. Abra - Ilocos Sur Road, Intermittent September 15, 2018 Not Passable Fallen Trees Clearing operations by MPP SOCORRO LITO S. Passable as per email
Section, Tangadan, San Quintin, Abra Maintenance Crew is on- BENEDITO received dated September 16,
goinggoing 09157500166 2018 @ 11:09 PM
3. Abra - Kalinga Road
a. K0446+000 Baquero, Nalbuan September 16,2018 Not Passable Series of Landslides Clearing operations by DPWH MPP ROMMEL MORENO B. Passable as per email
Baay Licuan equipment and Maintenance ORTEGA received dated September 18,
Crew is on-going 09272657188 2018 @ 6:34 PM

b. K0448+350, Lenneng, Baay- September 16,2018 Passable Soil Collapse Clearing operations by MPP ROMMEL MORENO B. Still One Lane Passable as
Licuan, Abra Maintenance Crew is on-going ORTEGA per email received dated
09272657188 September 18, 2018 @ 2:45
AM
c. K0448+450, Lenneng, Baay- September 16,2018 Passable Soil Collapse Clearing operations by MPP ROMMEL MORENO B. Still One Lane Passable as
Licuan, Abra Maintenance Crew is on-going ORTEGA per email received dated
09272657188 September 18, 2018 @ 2:45
AM
d. K0459+500, Cawayan, Baay- September 16,2018 Passable Soil Collapse Clearing operations by MPP ROMMEL MORENO B. Still One Lane Passable as
Licuan, Abra Maintenance Crew is on-going ORTEGA per email received dated
09272657188 September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
e. K0477+150-K477+158, Aguibo, September 16,2018 Not Passable Slide Clearing operations by MPP ROMMEL MORENO B. One Lane Passable as per
Malibkong, Abra Maintenance Crew is on-going ORTEGA email received dated
09272657188 September 19, 2018 @4:50
PM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
f. K0479+950, Poblacion, September 16,2018 Not Passable Soil collapse Clearing operations by MPP ROMMEL MORENO B. One Lane Passable as per
Malibcong, Abra (L=9m,H=3m,W=8m) Maintenance Crew is on-going ORTEGA email received dated
09272657188 September 19, 2018 @ 4:50
PM
g. K0480+100, Duldulao, September 16,2018 Not Passable Slide Clearing operations by MPP ROMMEL MORENO B. One Lane Passable as per
Malibcong, Abra (L=9m,H=3m,W=8m) Maintenance Crew is on-going ORTEGA email received dated
09272657188 September 19, 2018 @ 4:50
PM
h. K0487+300, Gacab, Malibcong, September 16,2018 Not Passable Slide Clearing operations by MPP ROMMEL MORENO B. One Lane Passable as per
Abra (L=9m,H=3m,W=8m) Maintenance Crew is on-going ORTEGA phone call dated September
09272657188 19, 2018 @ 4:50 PM

i. K0475+350 - K0475+430, September 16,2018 Not Passable Slide Clearing operations by a MPP ROMMEL MORENO B. One Lane Passable as per
Aguibo, Malibkong Abra privately owned equipment is ORTEGA phone call dated September
on-going 09272657188 19, 2018 @ 8:38 AM

4. Abra-Cervantes Road, September 17, 2018 Not Passable Damaged slope Warning signs installed MPP ROGELIO D. One Lane Passable as per
K0476+500-K0476+514, Ampalioc, Luba, masonry and collapsed DASALLA email received dated
Abra pavement 09365550189 September 19, 2018 @ 4:50
PM

Apayao 1st DEO


1. Conner-Cabugao Road, Intermittent September 16, 2018 Not Passable Series of Landslides Clearing operations by MPP Oliver T. Pakyo Still One Lane Passable as
Section Maintenance Crew is on-going 09067074275 per email received dated
September 17, 2018 @ 3:03
PM
2. Kabugao - Pudtol Luna - Cagayan
Boundary Road
a. Intermittent Section September 16, 2018 Not Passable Series of Landslides Clearing operations by MPP Oliver T. Pakyo One Lane Passable as per
and Roadslips Maintenance Crew is on-going 09067074275 phone call dated September
19, 2018 @ 4:50 PM

b. K591+980-K609+400, September 17, 2018 Not Passable Series of slides Clearing operations by a MPP Precy D. Buqueg One Lane Passable as per
Intermittent section privately owned equipment is 09066830409 phone call dated September
on- going 19, 2018 @ 4:50 PM

3. Apayao - Ilocos Norte Road, September 16, 2018 Not Passable Series of Landslides Clearing operations by MPP Oliver T. Pakyo Still Not Passable as per
K0614+476-K0638+880 Intemittent Maintenance Crew is on-going 09067074275 email received dated
Section September 21, 2018 @ 2:38
PM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
Apayao 2nd DEO
1. Claveria-Calanasan Road
a. K0679+500, Baduang section September 14, 2018 Not Passable Slide Further clearing operation is a. MPP Jonathan Suyao Passable as per email
on-going b.09083067543 received dated September 20,
2018 @ 9:31 AM
b. K0632+100, Sta. Elena Section, September 15, 2018 Not Passable Slide Clearing operations by a MPP Jeadica C. Agatep Passable as per email
Calanasan DPWH equipment is on hold 09273993250 received dated September 16,
due to torrential rains 2018 @ 4:24 PM
c. K0639+200, Maragmin Section September 16, 2018 Not Passable Slide Clearing operations by one MPP Jeadica C. Agatep Still One Lane Passable as
(1) DPWH equipment is on- 09273993250 per email received dated
going September 18, 2018 @ 2:45
AM
d. K0641+400-K0642+300, September 16, 2018 Passable Slide Clearing operations by one MPP Jeadica C. Agatep Still One Lane Passable as
Maragmin Section (1) DPWH equipment is on- 09273993250 per email received dated
going September 18, 2018 @ 2:45
AM
e. K0644+000-K0646+100, September 16, 2018 Passable Slide Clearing operations by one MPP Jeadica C. Agatep Still One Lane Passable as
Salagunting Section (1) DPWH equipment is on- 09273993250 per email received dated
going September 18, 2018 @ 2:45
AM
f. K0650+980-K0651+700, September 16, 2018 Passable Slide Clearing operations by one MPP Jeadica C. Agatep Still One Lane Passable as
Carmela Section (1) DPWH equipment is on- 09273993250 per email received dated
going September 18, 2018 @ 2:45
AM
g. K0687+260-K0687+275 September 16, 2018 Not Passable Slide Clearing operations by MPP Jeadica C. Agatep Passable as per email
(L=15m, H=4m, privately owned equipment is 09273993250 received dated September 20,
W=7m) on-going 2018 @ 9:31 AM
h. K0687+480-K0687+490 September 16, 2018 Not Passable Slide Clearing operations by LGU MPP Jeadica C. Agatep Passable as per email
(L=10m, H=4m, equipment is on-going 09273993250 received dated September 20,
W=7m) 2018 @ 9:31 AM
i. K0690+250-K0690+265 September 16, 2018 Not Passable Slide Clearing operations by LGU MPP Jeadica C. Agatep Passable as per email
(L=15m, H=3.5m, equipment is on-going 09273993250 received dated September 20,
W=7m) 2018 @ 9:31 AM

j. K0704+000-K0707, Dallawas September 17, 2018 Not Passable Slide Clearing operations by LGU MPP Jeadica C. Agatep Passable as per email
Section, Intermittent section (L=15m, H=3.5m, equipment is on-going 09273993250 received dated September 20,
W=7m) 2018 @ 9:31 AM

k. K0672+300-K0675+000, Rabaw September 17, 2018 Not Passable Series of slides Clearing operations by MPP Virgilo Salbino Passable as per email
Section, Intermittent section privately owned equipment is 09294961404 received dated September 20,
on-going 2018 @ 9:31 AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
l. K0676+000-K0678+600, Rabaw September 18, 2018 Not Passable Series of slides Clearing operations by MPP Virgilo Salbino Passable as per email
Section privately owned equipment is 09294961404 received dated September 20,
on-going 2018 @ 9:31 AM
2. Kabugao-Pudtol-Luna-Cagayan
Boundary Road
a. K0615+250-K0615+410, Paco September 16, 2018 Not Passable Slide Clearing operations by one a. MPP Jamer B. Macabeo One Lane Passable as per
Section (1) DPWH equipment is on- b.09152709026 email received dated
going September 18, 2018 @ 4:50
PM
b. K0617+325-K0665+400, September 16, 2018 One Lane Series of Fallen Trees Clearing operations by a. MPP Jamer B. Macabeo Still One Lane Passable as
Intermittent Sections Passable Maintenance Crew is on-going b.09152709026 per email received dated
September 18, 2018 @ 2:45
AM
3. Apayao-Ilocos Norte Road
a. K0609+350-K0609+362 September 16, 2018 One Lane Slide Clearing operations by a. MPP Jamer B. Macabeo Still One Lane Passable as
Passable Maintenance Crew is on-going b.09152709026 per e-mail received dated
September 18, 2018 @ 2:45
AM
b. K0610+100-K0610+110 September 16, 2018 One Lane Soil Collapse and Clearing operations by a. MPP Jamer B. Macabeo Still One Lane Passable as
Passable Fallen trees Maintenance Crew is on-going b.09152709026 per e-mail received dated
September 18, 2018 @ 2:45
AM
c. K0619+200-K0619+220,Sadel September 16, 2018 Not Passable Soil Collapse Clearing operations by a. MPP Jamer B. Macabeo One Lane Passable as per
Section Maintenance Crew is on-going b.09152709026 email received dated
September 18, 2018 @ 6:00
AM
d. K0620+025,Sadel Section September 16, 2018 Not Passable Soil Collapse Clearing operations by a. MPP Jamer B. Macabeo One Lane Passable as per
Maintenance Crew is on-going b.09152709026 email received dated
September 18, 2018 @ 6:00
AM
e. K0619+500-K0619+520,Sadel September 16, 2018 Not Passable Soil Collapse Clearing operations by a. MPP Jamer B. Macabeo One Lane Passable as per
Section Maintenance Crew is on-going b.09152709026 email received dated
September 18, 2018 @ 6:00
AM
f. K0621+000-K0621+020,Shop September 16, 2018 Not Passable Soil/Rock Collapse Clearing operations by a. MPP Jamer B. Macabeo One Lane Passable as per
Section Maintenance Crew is on-going b.09152709026 email received dated
September 18, 2018 @ 6:00
AM
g. K0623+600-623+650,Shop September 16, 2018 Not Passable Soil Collapse Clearing operations by a. MPP Jamer B. Macabeo One Lane Passable as per
Section Maintenance Crew is on-going b.09152709026 email received dated
September 18, 2018 @ 6:00
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
h. K0627+970- September 16, 2018 Not Passable Soil Collapse Clearing operations is on- a. MPP Jamer B. Macabeo One Lane Passable as per
K0628+000,Tanglagan Section going with the help of b.09152709026 email received dated
Cagayan 2nd DEO September 18, 2018 @ 6:00
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
i. K0609+380-K0609+410 September 16, 2018 Not Passable Soil Collapse Waiting for any available a. MPP Jamer B. Macabeo One Lane Passable as per
equipment b.09152709026 email received dated
September 18, 2018 @ 6:00
AM

Baguio City DEO


1. Eastern Link Circumferential Road,
a. K0248+700-K0248+715 Baguio September 15, 2018 One Lane Collapsed riprap Clearing operations is on- MPP WARLIE D. CANAO Passable as per email
City Passable going received dated September 18,
0923 136 0561 2018 @ 6:34 PM

b. K0251+750 Baguio City September 15, 2018 Not Passable Fallen Trees Clearing operations is on- MPP WARLIE D. CANAO Passable as per email
going received dated September 19,
0923 136 0561 2018 @11:31 AM
2. Gibraltar Road, K0252+(-020) Baguio September 15, 2018 Not Passable Fallen Trees Clearing operations is MPP WARLIE D. CANAO Passable as per e-mail
city completed received dated September 15,
0923 136 0561 2018 @ 11:37 PM
3. Asin Road, K0309+010 - K0309+070 September 15, 2018 Not Passable Slide Clearing operations is MPP JASON T. DAVID Passable as per e-mail
Baguio City completed received dated September 15,
0948 694 0297 2018 @ 11:37 PM
4. Outlook Drive, K0253+065-K0253+095 September 15, 2018 Not Passable Collapse riprap Clearing operations is on- MPP WARLIE D. CANAO Passable as per email
going received dated September 19,
0923 136 0561 2018 @ 11:31 AM

Benguet 1st DEO


1. Baguio-Bua-Itogon Road,
a. K0257+400 Sitio White Beans, September 15, 2018 Not Passable Slide, damaged Installed Warning Signs MPP JONATHAN SUYAO One Lane Passable as per
Brgy. Ucab, Itogon BENECO Post and 0948 988 3370 email received dated
Roadslip 0908 306 7543 September 20, 2018 @ 2:58
PM
b. K0259+600, Sitio Kiangan September 13, 2018 Not Passable Slide Further clearing operations by a. MPP Jonathan Suyao Still Not Passable as per
Village, Brgy. Ucab, Itogon Vol=500cu.m and DPWH equipment and LGU b. 09083067543 email received dated
road cut equipment is on-going September 21, 2018 @ 2:38
PM
c. K0260+800-K0261+450 Sitio September 15, 2018 Not Passable Slide (L=100m, Clearing operations is a. MPP Jonathan Suyao Still Not Passable as per
Goldfield, Brgy. Poblacion, Itogon H=20m, W=8m) hampered by continuous b. 09083067543 email received dated
(Intermittent section) erosion of soil September 21, 2018 @ 2:38
PM
d. K0261+460, Sitio Goldfield, September 21, 2018 Not Passable Roadslip Clearing operations is on hold a. MPP Jonathan Suyao Not Passable as per email
Brgy. Poblacion, Itogon, Benguet due to road cut at b. 09083067543 received dated September 21,
K0259+600 2018 @ 2:38 PM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
e. K0262+800, Sitio Goldfield, September 13, 2018 One Lane Slide Further clearing operations by a. MPP Jonathan Suyao Still One Lane Passable as
Brgy Poblacion, Itogon Passable Vol=250cu.m DPWH equipment and LGU b.09083067543 per email received dated
equipment is on-going. September 18, 2018 @ 2:45
Clearing operations is AM
hampered by continuous
erosion of soil

2. Pico - Lamtang Road September 15, 2018 Not Passable Fallen Trees Clearing operations is on- MPP ANNE FAYE HANDIG Passable as per email
K0258+900, La Trinidad going 0915 758 0403 received dated September 17,
0947 274 3385 2018 @ 6:59 PM

3. Cong. Andres Acop Cosalan Road September 15, 2018 Not Passable Series of slides Clearing operations by LGU MPP ARTHUR OLPINDO One Lane Passable as per
(formerly Gurel- Bokod- Kabayan- equipment is on-going 0918 588 8190 email received dated
Buguias- Abatan Road), K0305+000 - September 20, 2018 @ 2:58
K0316+500 Bokod PM
4. Asin- Nangalisan- San Pascual Road,

a. K0258+100-K0258+600, September 16, 2018 One Lane Series of slides Clearing operations by MPP ASHLEY R. SANTOS Still One Lane Passable as
Intermittent Section Passable Maintenance crew is on-going 0999 677 6613 per email received dated
September 18, 2018 @ 2:45
AM
b. K0262+800, Brgy. Tadiangan September 16, 2018 One Lane Slide Clearing operations by MPP ASHLEY R. SANTOS Still One Lane Passable as
Passable Maintenance crew is on-going 0999 677 6613 per email received dated
September 18, 2018 @ 2:45
AM
c. K0263+400, Sitio Lasong September 16, 2018 One Lane Fallen Trees Clearing operations by MPP ASHLEY R. SANTOS Still One Lane Passable as
Passable Maintenance crew is on-going 0999 677 6613 per email received dated
September 18, 2018 @ 2:45
AM
d. K0263+450 September 16, 2018 One Lane Fallen Trees Clearing operations by MPP ASHLEY R. SANTOS Still One Lane Passable as
Passable Maintenance crew is on-going 0999 677 6613 per email received dated
September 18, 2018 @ 2:45
AM
e. K0263+500 September 16, 2018 One Lane Fallen Trees Clearing operations by MPP ASHLEY R. SANTOS Still One Lane Passable as
Passable Maintenance crew is on-going 0999 677 6613 per email received dated
September 18, 2018 @ 2:45
AM
f. K0263+550 September 16, 2018 One Lane Fallen Trees Clearing operations by MPP ASHLEY R. SANTOS Still One Lane Passable as
Passable Maintenance crew is on-going 0999 677 6613 per email received dated
September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
g. K0264+500 Sitio Sipitan, Asin, September 16, 2018 Not Passable Slide Clearing operations by MPP ASHLEY R. SANTOS Still One Lane Passable as
Tuba, Benguet (Vol.=100 cu.m.) Maintenance Crew is on-going 0999 677 6613 per email received dated
September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
h. K0265+100, Nangalisan, Tuba September 15, 2018 Passable Slide and fallen trees Clearing operations by MPP EDMUND REYES Still One Lane Passable as
Maintenance Crew is on-going 09461978650 per email received dated
September 18, 2018 @ 2:45
AM
i. K0267+800, Brgy. Coplo, September 15, 2018 Not Passable Slide and fallen trees Clearing operations by MPP EDMUND REYES Still One Lane Passable as
Nangalisan, Tuba Maintenance Crew is on-going 09461978650 per email received dated
September 18, 2018 @ 2:45
AM
j. K0265+100, Nangalisan, Tuba September 16, 2018 Not Passable Slide Clearing ongoing by Private MPP ASHLEY R. SANTOS Still One Lane Passable as
Equipment 0999 677 6613 per email received dated
September 18, 2018 @ 2:45
AM
k. K0261+000 September 16, 2018 Not Passable Slide Clearing ongoing by Private MPP ASHLEY R. SANTOS Still One Lane Passable as
Equipment 0999 677 6613 per email received dated
September 18, 2018 @ 2:45
AM
5. Shilan-Beckel Road,
a.K0261+800 Brgy. Shilan, La September 15, 2018 Passable Slide Equipment is on standby. MPP RICHARD LUMIQUED Still One Lane Passable as
Trinidad Clearing operations is 0999 per email received dated
hampered by heavy rains 328 5593 September 18, 2018 @ 2:45
AM
b. K0262+500 Brgy. Shilan, La September 15, 2018 Passable Slide Equipment is on standby. MPP RICHARD LUMIQUED Still One Lane Passable as
Trinidad Clearing operations is 0999 per email received dated
hampered by heavy rains 328 5593 September 18, 2018 @ 2:45
AM
6. Ambiong-Tawang, K0263+100 September 15, 2018 Not Passable Rockfall Equipment is on standby. MPP RICHARD LUMIQUED Still One Lane Passable as
Clearing operations is 0999 per email received dated
hampered by heavy rains 328 5593 September 18, 2018 @ 2:45
AM
7. City Limit-Sto. Tomas Road, K0263+300 September 15, 2018 Not Passable Soil Collapse and Rock Clearing operations is on- MPP JONATHAN JULIAN One Lane Passable as per
Sitio Bandilan, Tuba Fall going 0949 348 8703 email received dated
September 19, 2018 @ 11:31
AM
8. Cong. Andres Acop Cosalan Road September 18, 2018 Not Passable Slide Clearing operations is on- MPP JONATHAN SUYAO Passable as per email
(formerly Gurel- Bokod- Kabayan- going by privately owned 09489883370 received dated September 21,
Buguias- Abatan Road), equipment 09083067543 2018 @10:28 AM
K0315+300, Bila, Bokod, intermittent
sections

Benguet 2nd DEO


1. Acop-Kapangan-Kibungan-Bakun Road
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
a. K0263+700 Caponga, Tublay September 15, 2018 Not Passable Soil Collapse Clearing operations by private MPP MELVIN CASTILLO Still One Lane Passable as
& government equipments is 0912 376 6841 per email received dated
on-going September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
b. K0264+800, Capongga, Tublay September 15, 2018 Not Passable Flooded Installed warning signs. MPP MELVIN CASTILLO Still Not Passable as per e-
0912 376 6841 mail received dated September
16, 2018 @ 06:00 AM

c. K0268+020 Daclan, Tublay September 15, 2018 Not Passable Soil Collapse Clearing operations by MPP BILLY JUN S. Passable as per e-mail
Maintenance crew is DEPALOG received dated September 15,
completed 0917 790 9915 2018 @ 11:37 PM
d. K0268+326 Daclan, Tublay September 15, 2018 Not Passable Soil Collapse Equipment is on standby. MPP VIRGILIO GALAP Still One Lane Passable as
Clearing operations is 0912 803 3427 per email received dated
hampered by heavy rains September 18, 2018 @ 2:45
AM
e. K0269+855 Daclan, Tublay September 15, 2018 Not Passable Soil Collapse Private equipment is on MPP MELVIN CASTILLO Still One Lane Passable as
standby. Clearing operations 0912 376 6841 per email received dated
is hampered by continuous September 18, 2018 @ 2:45
soil erosion due to heavy AM
rains
f. K0289+350 Cuba, Kapangan September 15, 2018 Not Passable Soil Collapse Clearing operations by Private MPP VIRGILIO GALAP Passable as per e-mail
Equipment and Maintenance 0912 803 3427 received dated September 15,
Crew is completed 2018 @ 11:37 PM

g. K0293+500 - K0294+400 September 15, 2018 Not Passable Soil Collapse and Clearing operations by private MPP VIRGILIO GALAP Still One Lane Passable as
Balakbak, Kapangan fallen debris & government equipments is 0912 803 3427 per email received dated
on-going September 18, 2018 @ 2:45
AM
h. K0296+400 - K0296+425 Beleng- September 15, 2018 Passable Soil Collapse Clearing operations by private MPP MELVIN CASTILLO Still One Lane Passable as
belis, Kapangan, Benguet & government equipments is 0912 376 6841 per email received dated
on-going September 18, 2018 @ 2:45
AM
i. K0307+700 Sagpat, Kibungan, September 15, 2018 Passable Soil Collapse Clearing operations by private MPP VIRGILIO GALAP Still One Lane Passable as
Benguet & government equipments is 0912 803 3427 per email received dated
on-going September 18, 2018 @ 2:45
AM
j. K0308+150 Poblacion, Kibungan September 15, 2018 Not Passable Soil Collapse Clearing operations by private MPP VIRGILIO GALAP Still One Lane Passable as
& government equipments is 0912 803 3428 per email received dated
on-going September 18, 2018 @ 2:45
AM
k. K0309+020 Poblacion, Kibungan, September 15, 2018 Passable Soil Collapse Clearing operations by private MPP VIRGILIO GALAP Still One Lane Passable as
Benguet & government equipments is 0912 803 3427 per email received dated
on-going September 18, 2018 @ 2:45
AM
l. K0309+040 Poblacion, Kibungan September 15, 2018 Not Passable Soil Collapse Clearing operations by private MPP MELVIN CASTILLO Still One Lane Passable as
& government equipments is 0912 376 6841 per email received dated
on-going September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
m. K0310+800 Poblacion, Kibungan September 15, 2018 Passable Soil Collapse and Clearing operations by private MPP VIRGILIO GALAP Still One Lane Passable as
fallen trees & government equipments is 0912 803 3427 per email received dated
on-going September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
n. K0315+000 - K0317+000, September 15, 2018 Not Passable Series of slides and Clearing operations is on- MPP VIRGILIO GALAP Still One Lane Passable as
Intermittent Section, Poblacion, debris flow going 0912 803 3427 per email received dated
Kibungan September 18, 2018 @ 2:45
AM
o. K0345+600 - K0345+670 July 2, 2018 Not Passable Roadslip Installed warning signs. a. MPP Billy Jun S. Still Not Passable as per e-
Bagtangan, Gambang, Bakun, Bailey bridge will be Depalog mail received dated September
Benguet constructed to open the road b. 0918-602-5212 21, 2019 @2:38 PM

Section was closed to traffic


since July 1, 2018 at 2:00 PM.
Section is under contract.

Alternate route: Namagtey-


Madaymen Road.

p. K0318+720 - K0318+730, September 15, 2018 Not Passable Soil collapse Clearing operations is on- MPP MELVIN CASTILLO Still One Lane Passable as
Poblacion, Kibungan going 0912 376 6841 per email received dated
September 18, 2018 @ 2:45
AM
q. K0330+900 - K0330+930 Tabbak, September 15, 2018 Not Passable Soil Collapse Private equipment mobilized MPP BILLY JUN S. Still One Lane Passable as
Kibungan, Benguet for clearing operations DEPALOG per email received dated
0917 790 9915 September 18, 2018 @ 2:45
AM
r. K0339+020 - K0339+980 Malikliko, September 15, 2018 Not Passable Slide and Fallen Trees Clearing operations by LGU MPP MELVIN CASTILLO One Lane Passable as per
Ampusongan, Bakun, Benguet Bakun Equipment is on- going 0912 376 6841 email received dated
September 18, 2018 @ 6:34
PM
s. K0320+400 - K0320+420 Mayos, September 15, 2018 Not Passable Washout Clearing operations by private MPP MELVIN CASTILLO Still One Lane Passable as
Poblacion, Kibungan, Benguet & government equipments is 0912 376 6841 per email received dated
on-going September 18, 2018 @ 2:45
AM
t. K0330+800 - K0330+840 September 15, 2018 Passable Soil Collapse and Clearing operations by private MPP VIRGILIO GALAP Still One Lane Passable as
Tabbak,Kibungan, Benguet fallen trees & government equipments is 0912 803 3427 per email received dated
on-going September 18, 2018 @ 2:45
AM
u. K0344+250 - K0344+320 Liwang, August 27, 2018 Passable Soil Collapse Total clearing by DPWH MPP VIRGILIO GALAP Still One Lane Passable as
Ampusongan, Bakun, Benguet Dumptruck and Payloader is 0912 803 3427 per email received dated
scheduled September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
v. K0348+800, Gakian, Gambang, September 15, 2018 Not Passable Soil Collapse Clearing operations is on hold MPP VIRGILIO GALAP One Lane Passable as per
Bakun due to heavy rains 0912 803 3427 email received dated
September 19, 2018 @ 11:31
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
w. K0349+300,Gakian, Gambang, September 15, 2018 Not Passable Roadslip Installed warning signs MPP VIRGILIO GALAP One Lane Passable as per
Bakun 0912 803 3427 email received dated
September 19, 2018 @ 11:31
AM

x. K0320+400-K0320+420 Mayos, September 18, 2018 Not Passable Washout(L=20, H=15) Widening works is on- going MPP MELVIN CASTILLO One Lane Passable as per
Poblacion, Kibungan, Benguet 0912 376 6841 phone call dated September
19, 2018 @11:45 AM

2. Cong. Andres Acop Cosalan Road September 15, 2018 Not Passable Slide, Soil Collapse Clearing operations is on- MPP MELVIN CASTILLO Passable as per telephone
(formerly Gurel- Bokod- Kabayan- and Rock collapse going 0939 5686 500 call dated September 21,
Buguias- Abatan Road), 2018 @10:28 AM
K0343+400-K0356+300, intermittent
sections
3. Abatan-Mankayan-Cervantes Road
a. K0344+350 Bulalacao, September 15, 2018 Not Passable Soil Collapse Clearing operations by private MPP MELVIN CASTILLO One Lane Passable as per
Mankayan equipment is on- going 0939 5686 500 email received dated
September 18, 2018 @ 2:45
AM
b. K0347+200 Poblacion, September 15, 2018 Not Passable Soil Collapse Clearing operations by private MPP MELVIN CASTILLO One Lane Passable as per
Mankayan equipment is on- going 0912 376 6841 email received dated
September 18, 2018 @ 2:45
AM
c. K0345+000 - K0347+000 September 15, 2018 Passable Soil Collapse Clearing operations by private MPP MELVIN CASTILLO Still One Lane Passable as
various section equipment is on- going 0912 376 6841 per email received dated
September 17, 2018 @ 6:59
PM
d. K0355+459, Abatan to September 16, 2018 Passable Soil Collapse Clearing operations by private MPP MELVIN CASTILLO Still One Lane Passable as
Cervantes Bdry equipment is on- going 0912 376 6841 per email received dated
September 17, 2018 @ 6:59
PM

Ifugao I DEO
1. Banaue-Hungduan-Benguet Boundary
Road
a. K0413+300 Munsoyosoy, Tinoc September 15, 2018 Not Passable Mudflow Clearing operations by MPP JERRY B. One Lane Passable as per
L=20m, H=2m Maintenance Crew is on-going INABIOHAN email received dated
0905 496 2320 September 19, 2018 @ 4:50
PM
b. K0354+250 - K0354+275 September 15, 2018 Not Passable Soil collapse Further clearing operations by MPP JERRY B. Still One Lane Passable as
Bokiawan, Hungduan (L=25m, H=4m) a privately owned equipment INABIOHAN per email received dated
is on- going 0905 496 2320 September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
c. K0358+200 Bokiawan, September 15, 2018 Not Passable Soil collapse Private equipment is on MPP JERRY B. Still One Lane Passable as
Hungduan (L=15m, H=3m) standby. Clearing operations INABIOHAN per email received dated
is hampered by heavy rains 0905 496 2320 September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
d. K0358+350 Bokiawan, September 15, 2018 Not Passable Soil collapse Private equipment is on MPP JERRY B. Still One Lane Passable as
Hungduan (L=18m, H=3m) standby. Clearing operations INABIOHAN per email received dated
is hampered by heavy rains 0905 496 2320 September 18, 2018 @ 2:45
AM
e. K0402+900 Tulludan, Tinoc September 15, 2018 Not Passable Slide Clearing operations can't MPP JERRY B. Still One Lane Passable as
L=40m, H=4m commence due to continous INABIOHAN per email received dated
debris fall & mud flow. Private 0905 496 2320 September 18, 2018 @ 2:45
equipment on stand by. AM

f. K0410+400 Tocucan, Tinoc September 15, 2018 Not Passable Slide Clearing operations by MPP JERRY B. One Lane Passable as per
L=30m, H=5m Maintenance Crew is on-going INABIOHAN email received dated
0905 496 2320 September 19, 2018 @ 4:50
PM
g. K0407+750 - K0407+900 September 15, 2018 Not Passable Soil collapse Clearing operations by MPP JERRY B. Still Not Passable as per
L=150m Maintenance Crew is on-going INABIOHAN email received dated
0905 496 2320 September 21, 2018 @ 2:38
PM
h. K0400+100 Tulludan, Tinoc September 18, 2018 Not Passable Soil Collapse Clearing operations by a MPP JERRY B. One Lane Passable as per
Section L=20m, W=6m, H=3m privately owned equipment is INABIOHAN email received dated
on- going
0905 496 2320 September 19, 2018 @ 4:50
PM

i. K0406+100-K0406+900, September 18, 2018 Not Passable Soil Collapse Clearing operations by a MPP JERRY B. Still Not Passable as per
Tukucan, Tinoc, intermittent privately owned equipment is INABIOHAN email received dated
section on- going 0905 496 2320 September 21, 2018 @ 2:38
PM

j. K0404+100,Tukucan, Tinoc September 19, 2018 Not Passable Soil Collapse Clearing operations by a MPP JERRY B. Passable as per email
L=30m, W=6m, privately owned equipment is INABIOHAN received dated September 21,
H=2m on- going 0905 496 2320 2018 @ 10:28 AM

2. Kiangan-Tinoc-Buguias Road
a. K0345+700 - K0345+715 September 15, 2018 Not Passable Slide Clearing operations is on hold MPP ALLAN PAUL S. Still One lane Passable as
Binablayan, Tinoc (L=15m, W=5m) due to heavy rains PIGUDO per email received dated
0906 530 8046 September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
b. K0355+000 - K0355+008 Brgy. September 15, 2018 Not Passable Slide Clearing operations is on hold MPP ALLAN PAUL S. Still One lane Passable as
Ap-apid, Tinoc (L=8m, W=6m) due to heavy rains PIGUDO per email received dated
0906 530 8046 September 18, 2018 @ 2:45
AM
c. K0330+020, Julongan, Kiangan September 15, 2018 Not Passable Roadslip MPP ALLAN PAUL S. Still One lane Passable as
(L=20m) PIGUDO per email received dated
0906 530 8046 September 18, 2018 @ 2:45
AM
d. K0335+150, Julongan Section September 15, 2018 Not Passable Fallen trees Clearing done by MPP ALLAN PAUL S. Passable as per email
maintenance laborers PIGUDO received dated September 16,
0906 530 8046 2018 @ 11:09 PM
e. K0 332+500 - k0355+000, September 15, 2018 Not Passable Series of landslides Clearing operation will start MPP ALLAN PAUL S. Still One lane Passable as
Julongan to Ap-apid section as soon as the weather PIGUDO per email received dated
permits 0906 530 8046 September 18, 2018 @ 2:45
AM
f. K0349+800, Binablayan Section September 15, 2018 Not Passable Slide (L=10m, H=3m) Clearing operations by MPP ALLAN PAUL S. Still One lane Passable as
maintenance crew is on- PIGUDO per email received dated
going 0906 530 8046 September 18, 2018 @ 2:45
AM
g. K0349+850, Binablayan September 15, 2018 Not Passable Slide (L=10m, H=3m) Clearing operations by MPP ALLAN PAUL S. Still One lane Passable as
Section maintenance crew is on- PIGUDO per email received dated
going 0906 530 8046 September 18, 2018 @ 2:45
AM
h. K0350+600, Binablayan, September 15, 2018 Not Passable Slide Clearing operations by MPP ALLAN PAUL S. Still One lane Passable as
Section (L=20m, H=5m) maintenance crew is on- PIGUDO per email received dated
going 0906 530 8046 September 18, 2018 @ 2:45
AM
i. K0350+700, Binablayan, Section September 15, 2018 Not Passable Slide Clearing operations by MPP ALLAN PAUL S. Still One lane Passable as
(L=15m, H=4m) maintenance crew is on- PIGUDO per email received dated
going 0906 530 8046 September 18, 2018 @ 2:45
AM
j. K0351+200, Binablayan, Section September 15, 2018 Not Passable Slide Clearing operations by MPP ALLAN PAUL S. Still One lane Passable as
(L=25m, H=2m) maintenance crew is on- PIGUDO per email received dated
going 0906 530 8046 September 18, 2018 @ 2:45
AM
k. K0351+250, Binablayan, September 15, 2018 Not Passable Slide Clearing operations by MPP ALLAN PAUL S. Still One lane Passable as
Section (L=18m, H=2m) maintenance crew is on- PIGUDO per email received dated
going 0906 530 8046 September 18, 2018 @ 2:45
AM
l. K0352+400, Binablayan, Section September 15, 2018 Not Passable Slide Waiting for any available MPP ALLAN PAUL S. Still One lane Passable as
(L=18m, H=5m) equipment PIGUDO per email received dated
0906 530 8046 September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
m. K0354+500, Gumhang Section September 15, 2018 Not Passable Slide Waiting for any available MPP ALLAN PAUL S. Still One lane Passable as
(L=20m, H=5m) equipment PIGUDO per email received dated
0906 530 8046 September 18, 2018 @ 2:45
AM
n. K0354+600, Gumhang Section September 15, 2018 Not Passable Slide Waiting for any available MPP ALLAN PAUL S. Still One lane Passable as
(L=40m, H=4m) equipment PIGUDO per email received dated
0906 530 8046 September 18, 2018 @ 2:45
AM
o. K0357+020, Ap-apid, Tinoc September 15, 2018 Not Passable Slide Waiting for any available MPP ALLAN PAUL S. Still One lane Passable as
(L=19m, H=5m) equipment PIGUDO per email received dated
0906 530 8046 September 18, 2018 @ 2:45
AM
p. K0357+800, Ap-apid, Tinoc September 15, 2018 Not Passable Slide Waiting for any available MPP ALLAN PAUL S. Still One lane Passable as
(L=22m, H=4m) equipment PIGUDO per email received dated
0906 530 8046 September 18, 2018 @ 2:45
AM
q. K0360+800, Impugong, Tinoc September 15, 2018 Not Passable Slide Clearing operations by MPP ALLAN PAUL S. One lane Passable as per
(L=30m, H=1m) Maintenance Crew is on- PIGUDO email received dated
going 0906 530 8046 September 20, 2018 @ 2:58
PM

Open/Close Situation
r. K0357+300, Ap-apid, Tinoc September 16, 2018 Not Passable Road Cut Installed Warning Signs MPP ALLAN PAUL S. One Lane Passable (Light
Section PIGUDO Vehicles only) as per email
0906 530 8046 received dated September 19,
2018 @11:31 AM

Alternate route: Ap- apid


Road

s. K0360+080 September 17, 2018 Not Passable Soil Collapse Clearing operations by MPP ALLAN PAUL S. One Lane Passable as per
(L=70m,H=2m, Maintenance Crew is on- PIGUDO email received dated
W=7m) going 0906 530 8046 September 18, 2018 @ 2:45
AM

Ifugao II DEO
1. Banaue-Mayoyao- A. Lista- Isabela
Road
a. K0347+730 - K0347+755, Brgy. September 12, 2018 Passable Slide Further clearing operations by MPP BENTON B. Still One Lane Passable as
Kinakin, Banaue, Ifugao, (L=25m,H=10m, Maintenance crew and a BUCCAHI, JR. per email received dated
W=8m) privately owned equipment is 09358878220 September 18, 2018 @ 2:45
on- going AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
b. K0348+000-K0390+000 Kinakin September 15, 2018 Not Passable Slide Opening will resume MPP ALLAN PAUL S. Still One Lane Passable as
Banaue-Mayaoyao Section tommorow PIGUDO per email received dated
0906 530 8046 September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
c. K0344+500 September 16, 2018 Not Passable Slide Clearing operations is on- MPP JOHN M. LIMOH Still One Lane Passable as
going 0975 239 2695 per email received dated
September 18, 2018 @ 2:45
AM
d. K0347+380- K0376+000, September 16, 2018 Not Passable Slide Clearing operations is on- MPP BENTON B. Still One Lane Passable as
Kinakin Mongo going BUCCAHI, JR. per email received dated
09358878220 September 18, 2018 @ 2:45
AM
2. Nueva Vizcaya - Ifugao - Mt. Province
Road
a. K0342+350,Viewpoint,Banaue September 15, 2018 Not Passable Slide Clearing operations by MPP JOHN M. LIMOH Passable as per email
privately owned equipment is 0975 239 2695 received dated September 19,
on-going 2018 @ 4:50 PM
b. K0344+000,Viewpoint, Banaue September 15, 2018 Not Passable Slide Clearing operations by MPP JOHN M. LIMOH Passable as per email
privately owned equipment is 0975 239 2695 received dated September 19,
on-going 2018 @ 4:50 PM
c. K0337+360, Amganad, Banaue September 15, 2018 Passable Slide Clearing operations by MPP JOHN M. LIMOH Still One Lane Passable as
privately owned equipment is 0975 239 2695 per email received dated
on-going September 18, 2018 @ 2:45
AM
d. K0340+280, Tam- An, Banaue September 15, 2018 Passable Slide Clearing operations by MPP JOHN M. LIMOH Still One Lane Passable as
privately owned equipment is 0975 239 2695 per email received dated
on-going September 18, 2018 @ 2:45
AM
e. K0342+370, Viewpoint, Banaue September 15, 2018 Passable Slide Clearing operations by MPP JOHN M. LIMOH Still One Lane Passable as
privately owned equipment is 0975 239 2695 per email received dated
on-going September 18, 2018 @ 2:45
AM
f. K0345+800, Viewpoint, Banaue September 15, 2018 Passable Slide Clearing operations by MPP JOHN M. LIMOH Still One Lane Passable as
privately owned equipment is 0975 239 2695 per email received dated
on-going September 18, 2018 @ 2:45
AM
g. K0347+380, Viewpoint, Banaue September 15, 2018 Passable Slide Clearing operations by MPP JOHN M. LIMOH Still One Lane Passable as
privately owned equipment is 0975 239 2695 per email received dated
on-going September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
h. K0347+400, Viewpoint, Banaue September 15, 2018 Passable Slide Clearing operations by MPP JOHN M. LIMOH Still One Lane Passable as
privately owned equipment is 0975 239 2695 per email received dated
on-going September 18, 2018 @ 2:45
AM
i. K0347+820, Viewpoint, Banaue September 15, 2018 Passable Slide Clearing operations by MPP JOHN M. LIMOH Still One Lane Passable as
privately owned equipment is 0975 239 2695 per email received dated
on-going September 18, 2018 @ 2:45
AM
j. K0350+230, Viewpoint, Banaue September 15, 2018 Passable Slide Clearing operations by MPP JOHN M. LIMOH Still One Lane Passable as
privately owned equipment is 0975 239 2695 per email received dated
on-going September 18, 2018 @ 2:45
AM
k. K0350+295, Viewpoint, Banaue September 15, 2018 Passable Slide Clearing operations by MPP JOHN M. LIMOH Still One Lane Passable as
privately owned equipment is 0975 239 2695 per email received dated
on-going September 18, 2018 @ 2:45
AM
l. K0350+550, Viewpoint, Banaue September 15, 2018 Passable Slide Clearing operations by MPP JOHN M. LIMOH Still One Lane Passable as
privately owned equipment is 0975 239 2695 per email received dated
on-going September 18, 2018 @ 2:45
AM
m. K0350+560, Viewpoint, Banaue September 15, 2018 Passable Slide Clearing operations by MPP JOHN M. LIMOH Still One Lane Passable as
privately owned equipment is 0975 239 2695 per email received dated
on-going September 18, 2018 @ 2:45
AM
n. K0350+720, Viewpoint, Banaue September 15, 2018 Passable Slide Clearing operations by MPP JOHN M. LIMOH Still One Lane Passable as
privately owned equipment is 0975 239 2695 per email received dated
on-going September 18, 2018 @ 2:45
AM
o. K0350+810, Viewpoint, Banaue September 15, 2018 Passable Slide Clearing operations by MPP JOHN M. LIMOH Still One Lane Passable as
privately owned equipment is 0975 239 2695 per email received dated
on-going September 18, 2018 @ 2:45
AM
p. K0352+110, Viewpoint, Banaue September 15, 2018 Passable Slide Clearing operations by MPP JOHN M. LIMOH Still One Lane Passable as
privately owned equipment is 0975 239 2695 per email received dated
on-going September 18, 2018 @ 2:45
AM
q. K0353+300-K0358+330 September 15, 2018 Not Passable Series of Slides Clearing will resume MPP JOHN M. LIMOH Passable as per e-mail
tommorow 0975 239 2695 received dated September 18,
2018 @ 6:34 PM
r. K0358+325, Viewpoint, Banaue September 15, 2018 Not Passable Slides Clearing operations by a MPP JOHN M. LIMOH Passable as per email
privately owned equipment is 0975 239 2695 received dated September 19,
on-going 2018 @ 4:50 PM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
3. Banaue-Hungduan-Benguet Boundary
Road
a. K0343+500, Brgy Poblacion, September 15, 2018 Not Passable Slide One lane passable Further MPP BENTON B. Still One Lane Passable as
Banaue clearing operation is on-going BUCCAHI, JR. per email received dated
09358878220 received dated September 19,
2018 @ 4:50 PM

b. K0349+780, Brgy. Ujah, Banaue September 15, 2018 Not Passable Slide One lane passable Further MPP BENTON B. Still One Lane Passable as
clearing operation is on-going BUCCAHI, JR. per email received dated
09358878220 received dated September 19,
2018 @ 4:50 PM

c. K0341+(-210)-K0353+205 September 16, 2018 One Lane Slide One lane passable Further MPP BENTON B. Still One Lane Passable as
Passable clearing operation is on-going BUCCAHI, JR. per email received dated
09358878220 received dated September 19,
2018 @ 4:50 PM

Lower Kalinga DEO


1. Tabuk - Banaue Road via Tanudan
-Barlig Road
a. K0543+200 - K0543+395, September 14, 2018 Not Passable Oversaturation of road Warning signs installed a. DME Liberato E. One Lane Passable as per
Dumanay Section, Tanudan section that is under Agrimor, Jr. email received dated
maintenance/ b. 0905-682-8266 September 19, 2018 @ 4:50
restoration PM

Section is under contract


Reported closed since
Typhoon/Tropical Storm
Henry, Inday, Josie,Habagat
and Karding.

b. K0522+100 - K0522+400 September 15, 2018 Not Passable Soil collapse Clearing operations by a MPP NAP RICHARD B. One Lane Passable as per
Matelled Section (L=20m, H=5m, privately owned equipment is LINGBAWAN email received dated
W=7.5m) on-going 0917 597 September 19, 2018 @4:50
2122 PM
c. K0518+480-K0518+512, September 15, 2018 Not Passable Sinking Pavement Warning signs installed MPP NAP RICHARD B. Still One Lane Passable as
Dupligan Section, Tanudan LINGBAWAN per email received dated
0917 597 September 19, 2018 @4:50
2122 PM
2. Mountain Province-Calanan-Pinukpuk-
Abbut Road
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
a. (Cagaluan- Calanan Section) September 14, 2018 Passable Rock collapse Clearing operations by DPWH a. MPP GERALD L. LICAB One Lane Passable as per
K0482+160 - K0482+168 L=8m,H=2m, equipment and Maintenance b.0935 218 2134 e-mail received dated
Gonogon Section, Tabuk City W=5.5m) crew is completed September 14, 2018 @
5:44PM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
b. K0511+950, Cawagayan September 15, 2018 Not Passable Flash flood debris DPWH equipment mobilized MPP CARLSTON G. SOTO Passable as per email
Section for clearing operations received dated September 19,
0955 663 3440 2018 @ 4;50 PM
c. Tuga Section, Tabuk City September 15, 2018 Not Passable Flooded with road DPWH equipment mobilized MPP CARLSTON G. SOTO Passable as per email
covers for clearing operations received dated September 19,
0955 663 3440 2018 @ 4;50 PM
d. Cagaluan-Calanan Road September 15, 2018 Passable Soil and rock collapse Equipment and Maintenance MPP CARLSTON G. SOTO Still One Lane Passable as
Section, K0487+360 - K0487+375 crew is on standby. Clearing per email received dated
Dalmuno Section, Tabuk City operations is hampered by 0955 663 3440 September 18, 2018 @ 2:45
heavy rains AM

e. K0470+250 - K0470+258 September 15, 2020 Passable Soil Collapse Equipment and Maintenance MPP CARLSTON G. SOTO Still One Lane Passable as
Mosimos Section, Tabuk City crew is on standby. Clearing per email received dated
operations is hampered by 0955 663 3440 September 18, 2018 @ 2:45
heavy rains AM

f. K0529+000-K0535+000, September 15, 2021 Passable Fallen Debris and Equipment and Maintenance MPP CARLSTON G. SOTO Still One Lane Passable as
Turayoc to Catabbogan Section, Fallen Trees crew is on standby. Clearing per email received dated
Pinukpuk operations is hampered by 0955 663 3440 September 18, 2018 @ 2:45
heavy rains AM

g. Cagaluan-Calanan Road September 16, 2018 Passable Soil and rock collapse Clearing operations is MPP CARLSTON G. SOTO Still One Lane Passable as
Section, K0476+800 - K0476+820 completed per email received dated
Gawidan Section, Tabuk City 0955 663 3440 September 18, 2018 @ 2:45
AM
h. K0473+040 September 16, 2018 Passable Leaning big acacia On mobilization of MPP CARLSTON G. SOTO Passable to Light Vehicles
tree maintenance crew as per text message received
0955 663 3440 dated September 18, 2018 @
2:45 AM

3. Bulo National Road, September 15, 2018 Not Passable Fallen Trees Coordinated with private MPP GENIVIEVE B. Passable as per e-mail
K0507+000-K0507+200, Intermittent equipment owners for WANAWAN received dated September 15,
Section, Tabuk clearing operations 0909 989 0607 2018 @ 5:20 PM
4. Balbalan-Pinukpuk Road
a. K0496+000 - K0522+000, September 15, 2018 Not Passable Soil/rock collapse and Clearing operations by a MPP NAP RICHARD B. Passable as per email
Baay-Junction Pinukpuk, fallen trees privately owned equipment is LINGBAWAN received dated September 19,
Intermittent Sections on-going 09176972122 2018 @ 11:31 AM
b. K0498+180, Limus Section September 16, 2018 One Lane Slide Clearing ongoing by Private MPP NAP RICHARD B. Still One Lane Passable as
Pinukpuk Passable Equipment and DPWH Crew LINGBAWAN per email received dated
09176972122 September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
c. K0523+000. Intermittent September 15, 2018 Not Passable Series of Slides Clearing operations by MPP NAP RICHARD B. Passable as per email
section privately owned equipment LINGBAWAN received dated September 20,
and Maintenance Crew is on- 09176972122 2018 @ 2:58 PM
going
5. Kalinga-Cagayan Road
a. K0514+800-K0514+825 September 15, 2021 Passable Roadslip Installed warning signs MPP CARLSTON G. SOTO Still One Lane Passable as
(L=100m, per e-mail received dated
W=1.5m,H=7m) 0955 663 3440 September 18, 2018 @ 2:45
AM
b. K0514+900, Taclobao Section, September 15, 2021 Passable Roadslip Installed warning signs MPP CARLSTON G. SOTO Still One Lane Passable as
Tabuk City (L=60m,W=2.5m,H=6 per e-mail received dated
m) 0955 663 3440 September 18, 2018 @ 2:45
AM
c. K0516+400, Spring Section, September 15, 2021 Passable Slide Clearing operations a MPP CARLSTON G. SOTO Still One Lane Passable as
Tabuk City privately owned per e-mail received dated
equipmentand Maintenance 0955 663 3440 September 18, 2018 @ 2:45
Crew is on-going AM

Upper Kalinga DEO


1. Mt. Province Boundary-Calanan-
Pinukpuk-Abbut Road
a. K0424+110 - K0424+135 July 22, 2018 Not Passable Soil Collapse Clearing operations by a. MPP WILSON IKE W. Passable as per call
Mabongis Section, Bugnay, Butbut, (L= 25m, W= 6m, privately owned equipment is ADDAMO September 19, 2018 @ 9:08
Tinglayan H=4m) on-going b.09369627527/09506661 AM
333
b. K0439+300 - K0439+330 September 15, 2018 Not Passable Soil collapse Clearing operations by MPP PASPAS B. BASILAN One Lane Passable as per
Bangad Section privately owned equipment is call September 19, 2018 @
on-going 0915 782 6505 9:08 AM
c. K0466+800 - K0466+820 September 15, 2018 Not Passable Soil collapse Clearing operations is on hold MPP PASPAS B. BASILAN Still One Lane Passable as
L=20m, W=7m, due to heavy rains per e-mail received dated
H=5m 0915 782 6505 September 18, 2018 @ 2:45
AM
d. K0448+800 - K0448+820 September 15, 2018 Not Passable Soil collapse Clearing operations is on hold MPP PASPAS B. BASILAN Still One Lane Passable as
Malango Section L=20m, H=1.5m, due to heavy rains per e-mail received dated
W=8m 0915 782 6505 September 18, 2018 @ 2:45
AM
e. K0448+970 - K0448+985 September 15, 2018 Not Passable Soil collapse Clearing operations is on hold MPP PASPAS B. BASILAN Still One Lane Passable as
Mallango Section L=15m, H=4m, due to heavy rains per e-mail received dated
W=8m 0915 782 6505 September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
f. K0459+950 - K0459+970 September 15, 2018 Not Passable Soil collapse Clearing operations is on hold MPP PASPAS B. BASILAN Passable as per call
L=20m, H=3m, due to heavy rains September 19, 2018 @ 9:08
W=8m 0915 782 6505 AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
g. K0425+090 September 17, 2018 Not Passable Soil collapse Clearing operations by a. MPP WILSON IKE W. Passable as per email
L=15m, H=2m, privately owned equipment is ADDAMO received dated September 18,
W=6m on-going b.09369627527/09506661 2018 @ 6:34 PM
333
h. K0425+940 September 17, 2018 Not Passable Soil collapse Clearing operations by a. MPP WILSON IKE W. Passable as per email
L=15m, H=2m, privately owned equipment is ADDAMO received dated September 18,
W=6m on-going b.09369627527/09506661 2018 @ 6:34 PM
333
i. K0430+350 September 17, 2018 Not Passable Soil collapse Clearing operations by a. MPP WILSON IKE W. Passable as per call
L=20m, H=3.5m, privately owned equipment is ADDAMO September 19, 2018 @ 9:08
W=6.5m on-going b.09369627527/09506661 AM
333
j. K0431+600 September 17, 2018 Not Passable Soil collapse Clearing operations by a. MPP WILSON IKE W. Passable as per email
L=16m, H=2m, privately owned equipment is ADDAMO received dated September 18,
W=7m on-going b.09369627527/09506661 2018 @ 6:34 PM
333
k. K0431+950 September 17, 2018 Not Passable Sinking Pavement Clearing operations by a. MPP WILSON IKE W. Passable as per email
privately owned equipment is ADDAMO received dated September 18,
on-going b.09369627527/09506661 2018 @ 6:34 PM
333
l. Mabongis Bridge September 17, 2018 Not Passable Structural Failure Installed Warning signs a. MPP WILSON IKE W. Still Not Passable as per
(massive soil collapse) ADDAMO email received dated
b.09369627527/09506661 September 21, 2018 @ 2:38
333 PM
m. K0422+090 September 17, 2018 Not Passable Soil collapse Clearing operations by a. MPP WILSON IKE W. Passable as per email
L=16m, H=4m, privately owned equipment ADDAMO received dated September 18,
W=4m will resume tomorrow b.09369627527/09506661 2018 @ 6:34 PM
morning 333
n. K0429+250, Basao Section September 17, 2018 Not Passable Roadslip Installed Warning signs a. MPP WILSON IKE W. Passable as per call
L=35m, H=12m, ADDAMO September 19, 2018 @ 9:08
Cave-in=2m b.09369627527/09506661 AM
333
o. K0431+020 September 17, 2018 Not Passable Soil collapse Clearing operations by a. MPP WILSON IKE W. Passable as per email
L=23, H=3m, W=4m privately owned equipment ADDAMO received dated September 18,
will resume tomorrow b.09369627527/09506661 2018 @ 6:34 PM
morning 333
p. K0431+300 September 17, 2018 Not Passable Soil collapse Clearing operations by a. MPP WILSON IKE W. Passable as per email
L=17, H=2m, W=4m privately owned equipment ADDAMO received dated September 18,
will resume tomorrow b.09369627527/09506661 2018 @ 6:34 PM
morning 333
q. K0431+900 September 17, 2018 Not Passable Soil collapse Clearing operations by a. MPP WILSON IKE W. Passable as per email
L=25, H=0.3m, privately owned equipment ADDAMO received dated September 18,
W=6m will resume tomorrow b.09369627527/09506661 2018 @ 6:34 PM
morning 333
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
r. K0460+020, Cagaluan Junction September 17, 2018 Not Passable Roadslip Clearing operations by a. MPP WILSON IKE W. One Lane Passable as per
L=25m, H=12m, privately owned equipment ADDAMO email received dated
Cave-in=23 will resume tomorrow b.09369627527/09506661 September 18, 2018 @ 6:34
morning 333 PM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
2. Kalinga- Abra Road
a. K0466+(-031) September 15, 2018 Not Passable Soil collapse Clearing operations is on- MPP RENDYLL JERBE S. Still One Lane Passable as
L=10m, W=7m, going ASBOC per email received dated
H=7m 0917 364 7316 September 19, 2018 @ 4:50
PM
b. K0494+528-K0494+540, September 15, 2018 Not Passable Soil Collapse Equipment is on standby. MPP RENDYLL JERBE S. Still One Lane Passable as
Gusang Section, Balbalan (L= 12m, W= 3m, Clearing operations is ASBOC per email received dated
H=2m) hampered by heavy rains 0915 546 4406 September 19, 2018 @ 4:50
PM
c. K0497+500 - K0497+510 September 15, 2018 Not Passable Soil collapse Clearing operations is on hold MPP RENDYLL JERBE S. Still One Lane Passable as
Pantikian Section L=10m, H=3m, due to heavy rains ASBOC per email received dated
W=7m 0915 546 4406 September 19, 2018 @ 4:50
PM
d. K0469+100,Ableg Section September 17 2018 Not Passable Soil Collapse 'Clearing operations by MPP RENDYLL JERBE S. Passable as per email
(L=30m,W=7m,H=4m privately owned equipment is ASBOC received dated September 17,
) on-going 0915 546 4406 2018 @ 2:00 PM
e. K0469+(-100)Ableg Section September 17 2018 Not Passable Soil Collapse 'Clearing operations by MPP RENDYLL JERBE S. Passable as per email
(L=20,W=4m,H=6m) privately owned equipment is ASBOC received dated September 18,
on-going 0915 546 4406 2018 @ 6:34 PM
f. K0468+400,Ableg Section September 17 2018 Not Passable Soil Collapse 'Clearing operations by MPP RENDYLL JERBE S. Passable as per email
(L=30m,W=10m,H=9 privately owned equipment is ASBOC received dated September 17,
m) on-going 0915 546 4406 2018 @ 2:00 PM
g. K0468+450,Ableg Section September 17 2018 Not Passable Soil Collapse 'Clearing operations by MPP RENDYLL JERBE S. Still One Lane Passable as
(L=50,W=8m,H=2m) privately owned equipment is ASBOC per email received dated
on-going 0915 546 4406 September 19, 2018 @ 4:50
PM
h. K0470+535,Ableg Section September 17 2018 Not Passable Soil/Rock Collapse 'Clearing operations by MPP RENDYLL JERBE S. One Lane Passable as per
(L=20,W=6m,H=5m) privately owned equipment is ASBOC email received dated
on-going 0915 546 4406 September 18, 2018 @ 2:45
AM
i. K0470+750,Ableg Section September 17 2018 Not Passable Soil Collapse 'Clearing operations by MPP RENDYLL JERBE S. One Lane Passable as per
(L=7m,W=3m,H=3m) privately owned equipment is ASBOC email received dated
on-going 0915 546 4406 September 18, 2018 @ 2:45
AM
j. K0471+500,Dolyaw Section September 17 2018 Not Passable Soil Collapse 'Clearing operations by MPP RENDYLL JERBE S. One Lane Passable as per
(L=35m,W=8m,H=8m privately owned equipment is ASBOC email received dated
) on-going 0915 546 4406 September 18, 2018 @ 2:45
AM
k. K0471+550,Dolyaw Section September 17 2018 Not Passable Soil Collapse 'Clearing operations by MPP RENDYLL JERBE S. One Lane Passable as per
(L=30m,W=8m,H=2m privately owned equipment is ASBOC email received dated
) on-going 0915 546 4406 September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
l. K0471+620,Dolyaw Section September 17 2018 Not Passable Soil Collapse 'Clearing operations by MPP RENDYLL JERBE S. One Lane Passable as per
(L=10m,W=7m,H=5.5 privately owned equipment is ASBOC email received dated
m) on-going 0915 546 4406 September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
m. K0472+(-030),Limood Section September 17 2018 Not Passable Soil Collapse 'Clearing operations by MPP RENDYLL JERBE S. Passable as per email
(L=10m,W=10,H=2m) privately owned equipment is ASBOC received dated September 18,
on-going 0915 546 4406 2018 @ 2:45 AM
n. K0473+300,Chigaching Section September 17 2018 Not Passable Soil Collapse 'Clearing operations by MPP RENDYLL JERBE S. Passable as per email
(L=10m,W=10,H=2m) privately owned equipment is ASBOC received dated September 18,
on-going 0915 546 4406 2018 @ 6:34 PM
o. K0493+100,Bissong Section September 17 2018 Not Passable Soil Collapse 'Clearing operations by MPP RENDYLL JERBE S. Passable as per email
(L=40,W=10m,H=7m) privately owned equipment is ASBOC received dated September 18,
on-going 0915 546 4406 2018 @ 2:45 AM
p. K0475+(-50),Simang Section September 17 2018 Not Passable Soil Collapse 'Clearing operations by MPP RENDYLL JERBE S. Still One Lane Passable as
(L=6m,W=3m,H=2m) privately owned equipment is ASBOC per email received dated
on-going 0915 546 4406 September 19, 2018 @ 4:50
PM
q. K0475+080,Simang Section September 17 2018 Not Passable Soil Collapse 'Clearing operations by MPP RENDYLL JERBE S. Still One Lane Passable as
(L=9m,W=3m,H=5m) privately owned equipment is ASBOC per email received dated
on-going 0915 546 4406 September 19, 2018 @ 4:50
PM
r. K0476+400,Balinciagao Norte September 17 2018 Not Passable Soil Collapse 'Clearing operations by MPP RENDYLL JERBE S. Still One Lane Passable as
Section (L=20m,W=4m,H=1.5 privately owned equipment is ASBOC per email received dated
m) on-going 0915 546 4406 September 19, 2018 @ 4:50
PM
s. K0477+400,Balinciagao Norte September 17 2018 Not Passable Soil Collpse 'Clearing operations by MPP RENDYLL JERBE S. Still One Lane Passable as
Section (L=10m,W=4m,h=2.5 privately owned equipment is ASBOC per email received dated
m) on-going 0915 546 4406 September 19, 2018 @ 4:50
PM
t. K0477+930,Balinciagao Norte September 17 2018 Not Passable Soil Collpse 'Clearing operations by MPP RENDYLL JERBE S. Still One Lane Passable as
Section (L=8m,W=3m,h=2m) privately owned equipment is ASBOC per email received dated
on-going 0915 546 4406 September 19, 2018 @ 4:50
PM

3. Lubuagan-Batong Buhay Road, September 15, 2018 Not Passable Soil collapse Clearing operations by MPP RENDYLL JERBE S. Passable as per email
K0461+450 - K0477+600 (int. sections) L=10m, H=2m, privately owned equipment is ASBOC received dated September 20,
W=4m on-going 0917 364 7316 2018 @9:31 AM
4. Balbalan-Pinukpuk Road,
a. K0489+300 Maling Section September 15, 2018 Not Passable Series of soil collapse Clearing operations by MPP JOHN CRISTER B. Still Not Passable as per
privately owned equipment is WACAS email received dated
on-going 0926 0725 656 September 21, 2018 @ 2:38
PM
b. K0489+350, Maling Section September 19, 2018 Not Passable Soil collapse Clearing operations by MPP JOHN CRISTER B. Passable as per email
(L=21m,W=3m,H=8m privately owned equipment is WACAS received dated September 21,
on-going 0926 0725 656 2018 @ 10:28 AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
c. K0489+400, Dao-angan Section September 15, 2018 Not Passable Soil collapse, L=13m, Clearing operations by MPP JOHN CRISTER B. Passable as per email
W=3m, H=7m privately owned equipment is WACAS received dated September 21,
on-going 0926 0725 656 2018 @ 10:28 AM

d. K0489+430, Dao-angan Section September 15, 2018 Not Passable Soil collapse, L=29m, Clearing operations by MPP JOHN CRISTER B. Passable as per email
W=5m, H=6m privately owned equipment is WACAS received dated September 21,
on-going 0926 0725 656 2018 @ 10:28 AM

e. K0490+200, Dao-angan Section September 15, 2018 Not Passable Soil collapse, L=17m, Clearing operations by MPP JOHN CRISTER B. Passable as per email
W=3m, H=8m privately owned equipment is WACAS received dated September 21,
on-going 0926 0725 656 2018 @ 10:28 AM

f. K0490+350 - K0490+370 Dao- September 15, 2018 Not Passable Soil collapse Clearing operations by MPP JOHN CRISTER B. Passable as per email
angan Section L=10m, H=2m, privately owned equipment is WACAS received dated September 21,
W=4m on-going 0926 0725 656 2018 @ 10:28 AM
g. K0490+600, Dao-angan Section September 15, 2018 Not Passable Soil collapse, L=19m, Clearing operations by MPP JOHN CRISTER B. Passable as per email
W=4m, H=7m privately owned equipment is WACAS received dated September 21,
on-going 0926 0725 656 2018 @ 10:28 AM

h. K0491+400, Dao-angan Section September 15, 2018 Not Passable Soil collapse, L=31m, Clearing operations by MPP JOHN CRISTER B. Passable as per email
W=6m, H=8m privately owned equipment is WACAS received dated September 21,
on-going 0926 0725 656 2018 @ 10:28 AM

i. K0493+050, Dao-angan Section September 15, 2018 Not Passable Roadslip Installed Warning Signs MPP JOHN CRISTER B. Passable as per email
WACAS received dated September 21,
0926 0725 656 2018 @ 10:28 AM

Mt. Province 1st DEO


1. Mountain Province-Nueva Viscaya Road

a. K0364+500-K0364+560, September 14, 2018 Not Passable Slope collapse Clearing operations is on- MPP TERESA K. PABLO Still One Lane Passable as
Ambatec Section, Bayyo, Bontoc, L=60m,H=10m, going 0929 138 4657 per email received dated
Mt. Province W=7m) September 18, 2018 @ 2:45
AM
b. Chico Karayan Bridge September 15, 2018 Not Passable Closed to traffic due to Passable as per email
monitoring of bridge received dated September 17,
condition 2018 @ 2:00 PM
c. Samoki to Mt. Polis Section September 15, 2018 Not Passable Series of Slides Equipment is on standby. MPP TERESA K. PABLO Still One Lane Passable as
Clearing operations is 0929 138 4657 per email received dated
hampered by heavy rains September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
2. Mountain Province-Ilocos Sur Rd via
Tue,
a. K0388+250 Beto Section, September 14, 2018 Not Passable Slope collapse Further clearing operations by a. MPP ARNEL A. BELDIO One Lane Passable as per
Tadian, Mt Province L=15m,H=5m, One (1) privately owned email received dated
W=7m) Equipment will mobilize on b. 0946 4683 665 September 18, 2018 @ 2:45
September 15, 2018 AM
Warning signs installed
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
b. K0416+800, Supang Section September 15, 2018 Not Passable Slide Coordinated with private MPP ARNEL A. BELDIO One Lane Passable as per
equipment owners for 0946 4683 665 email received dated
clearing operations September 18, 2018 @ 2:45
AM
3. Mt. Province -Ilocos Sur Road via September 15, 2018 Not Passable Slide Clearing operations by MPP ARNEL A. BELDIO Passable as per email
Kayan, a. K0399+100 - K0399+140 privately owned equipment is 0946 4683 665 received dated September 18,
on-going 2018 @ 6:34 PM
4. Mt. Province-Cagayan via Tabuk-Enrile
Road,
a. K0401+480 - K0401+500 September 15, 2018 Not Passable Slope Collapse Clearing operations by MPP ERVINE A. SAMIDAN Still One Lane Passable as
privately owned equipment is 0907 622 1366 per email received dated
on-going September 18, 2018 @ 2:45
AM
b. K0409+300 - K0409+315 September 15, 2018 Not Passable Slope Collapse Clearing operations by MPP ERVINE A. SAMIDAN Still One Lane Passable as
privately owned equipment is 0907 622 1366 per email received dated
on-going September 18, 2018 @ 2:45
AM
c. K0409+380 - K0409+410 September 15, 2018 Not Passable Slope Collapse Clearing operations by MPP ERVINE A. SAMIDAN Still One Lane Passable as
privately owned equipment is 0907 622 1366 per email received dated
on-going September 18, 2018 @ 2:45
AM
5. Junction Talubin-Barlig-Natonin- September 15, 2018 Not Passable Slide Equipment is on standby. MPP TERESA K. PABLO Still One Lane Passable as
Paracelis-Calaccad Road, Clearing operations is 0929 per email received dated
K0380+950, Pingew Section, Talubin, hampered by heavy rains 138 4657 September 18, 2018 @ 2:45
Bontoc AM
6. Dantay Sagada Road K0385+(-150) September 15, 2018 Not Passable Slope Collapsed Clearing operations by MPP Roldan V. Colas Passable to 4-wheel drive
privately owned equipment is 09395731659 vehicles as per email received
on-going dated September 18, 2018 @
6:00 AM
Alternate route: Balili- Suyo-
Sagada Road

Mt. Province 2nd DEO


1. Junction Talubin-Barlig-Natonin-
Paracelis-Calaccad Road
a. K0472+365 - K0472+410 September 4, 2018 Not Passable Road collapse Construction of retaining wall a. MPP Recto S. Safilo One lane Passable (Light
Bacarri, Paracelis is on-going vehicles only) as per email
b. 0948 270 9538 received dated September 18,
2018 @ 2:45 AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
b. K0426+200 - K0426+280, September 12, 2018 Passable Slide Further clearing operations by a. MPP JERRY S. Still One Lane Passable as
Banao, Natonin (L=80m,W=8m, a privately owned equipment CHIMICAG per email received dated
H=5m) and one (1) DPWH equipment b. 09502134509 September 18, 2018 @ 2:45
is on- going AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
c. K0433+200 - K0433+230 Pudo, September 15, 2018 Not Passable Slide Clearing operations by DPWH MPP RECTO S. SAFILO Still One Lane Passable as
Natonin Equipment and Maintenance 0948 270 9538 per email received dated
Crew is on-going September 18, 2018 @ 2:45
AM
d. Balabag-Poblacion, Natonin September 15, 2018 Not Passable Series of slide/rock fall Clearing operations by DPWH MPP RECTO S. SAFILO Still One Lane Passable as
and fallen trees Equipment and Maintenance 0948 270 9538 per email received dated
Crew is on-going September 18, 2018 @ 2:45
AM
e. K0404+000-K0430+300, Lias, September 16, 2018 Not Passable Series of Clearing operations by DPWH MPP RECTO S. SAFILO Passable as per e-mail
Barlig to tonglayan, Natonin landslide/rockslides Equipment and Maintenance 0948 270 9538 received dated September 16,
and fallen trees at Crew is on-going 2018 @ 4:24 PM
various section

REGION I
Ilocos Norte 2nd DEO
1. Ilocos Norte-Apayao Road,
a. K0 528+400 - K0 528+418 Brgy September 15, 2018 Passable Eroded shoulder Installed Warning Signs a. Sherell P.Pe Benito Passable as per email
Maananteng, Solsona b. 09198748951 received dated September 19,
2018 @ 9:24 AM

Damaged by previous
typhoon.
b. K0 534+650 - K0 534+686 Brgy September 15, 2018 Passable Damaged PCCP and Warning devices were a. Sherell P.Pe Benito Passable as per email
Maananteng, Solsona Slope Protection installed b. 09198748951 received dated September 19,
Collapse 2018 @ 1:36 PM

Damaged by previous
typhoon.
c. K0 536+200 - K0 536+223 Brgy September 15, 2018 Passable Damaged PCCP and Warning devices were a. Sherell P.Pe Benito Passable as per email
Maananteng, Solsona Slope Protection installed b. 09198748951 received dated September 19,
Collapse 2018 @ 1:36 PM

Damaged by previous
typhoon.
d. K0 536+500 - K0 536+536 Brgy September 15, 2018 Passable Damaged PCCP and Warning devices were a. Sherell P.Pe Benito Passable as per email
Maananteng, Solsona Slope Protection installed b. 09198748951 received dated September 19,
Collapse 2018 @ 1:36 PM

Damaged by previous
typhoon.
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
e. K0 539+500 - K0 539+550 September 15, 2018 Not Passable Eroded raodway Warning devices were a. Sherell P.Pe Benito Still Passable to light
(gravel road section) installed b. 09198748951 vehicles (One lane
Passable) as per email
received dated September 19,
2018 @ 4:48 PM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
2. Ilocos Norte-Abra Road a. Sherell P.Pe Benito
b. 09198748951
a. K0532+000 September 18, 2018 Passable Sides Warning devices were Passable to all types of
installed vehicles as per email received
dated September 19,2018 @
9:24 AM

b. K0539+350 September 18, 2018 Not Passable Landslides Warning devices were Passable to all types of
installed vehicles as per email received
dated September 19,2018 @
9:24 AM

Ilocos Sur 2nd DEO


1. Tagudin-Cervantes Road
a. K0364+000 to K0382+000 September 15, 2018 Not Passable Land/rock slides Installed warning signs, Passable as per email
Brgy. Malaya to Brgy. Zigzag, clearing operations on-going received dated September 20,
Cervantes, I.S. 2018 @ 9:07 AM

b.K0321+000 to K0345+000 September 16, 2018 Not Passable Land/rock slides Installed warning signs, Passable as per email
Brgy. Manatong (Intermittent clearing operations on-going received dated September 20,
section) 2018 @ 9:07 AM

c. K0355+400, Brgy. Man-atong September 16, 2018 Not Passable Land/rock slides Installed warning signs, Passable as per email
Bessang Pass- Malaya clearing operations on-going received dated September 20,
2018 @ 9:07 AM

2. Jct. Santiago-Banayoyo-Lidlidda-San September 16, 2018 Not Passable Land/rock slides Installed Warning Signs Passable as per email
Emilio-Quirino Road K0376+400- received dated September 20,
K0394+000 2018 @ 9:07 AM

La Union 1st DEO


1. Manila North Road, MNR KO266+400 September 15, 2018 Not Passable Flooded District Maintenance a. Isabelo Lopez Passable as per email
Engineers (DMEs) and b. received dated September 16,
Maintenance Point Persons 09156179580 2018 @ 9:04 PM
(MPPs) are inspecting AOR
2. Alilem -Sugpon Road, K0317+000 - September 16, 2018 Passable Eroded Shoulder and maintenance crew are a. Isabelo Lopez Still One lane Passable as
K0318+000 with exceptions doing regular maintenance b. per email received dated
activities 09156179580 September 19, 2018 @ 4;48
PM
La Union 2nd DEO
1. Agoo-Baguio City Road (Badiwan, September 15, 2018 Not Passable rock fall Monitoring and installation of a.Nestor Sibayan Passable as per update
Benguet to Baguio City) warning and informative signs b. 09174880716 received dated September 16,
2018 @ 9:04 PM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
2. Rosario-Pugo Access Road, Alipang September 15, 2018 Passable landslide on-going clearing operations a.Nestor Sibayan Passable as per email
Section (KO217+000) b. 09174880716 received dated September 19,
2018 @ 9:24 AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
3. Bauang-Baguio City Road, K0266+750, September 15, 2018 Passable On going construction of a.Nestor Sibayan Still One Lane Passable as
Brgy. Imelda, Naguilian, La Union Reinforced Concrete Box b. 09174880716 per email received dated
Culvert September 19, 2018 @4;48
PM
Baguio East bound vehicles
take old road, Brgy. Imelda,
Naguilian while La Union, west
bound vehicles pass the one
lane to make it two-way
passable to all types of
vehicles.

Pangasinan 1st DEO


1. Alaminos-Bolinao Road, Garrita Bridge July 19, 2018 Not Passable Not related to Pouring of concrete on bridge a. Gerry Y. Sison Not Passable since
(detour), K0329+300 Typhoon Ompong deck is on-going b. 0917 840 5731 Typhoon/Tropical Storm
Henry, Inday, Josie,Habagat
and TS Karding

Closure to heavy vehicles is


not related to Typhoon
Ompong

Bridge is Under contract

Alternate Route for Heavy


Vehicles:
Mabini-Bani Provincial Road or
Burgos-Agno Road

2. Pangasinan-Zambales Road, September 15, 2018 Not Passable Flooding (h=0.6 m) District Maintenance a. Gerry Y. Sison Passable as per email
KO303+500 - KO304+000 Caranglan Engineers (DMEs) and b. 09178405731 received dated September 16,
Section, Mabini Maintenance Point Persons 2018 @ 12:07 PM
(MPPs) are inspecting AOR
and maintenance crew are
doing regular maintenance
activities
3. Bani-Agno Road, KO342+000 - September 15, 2018 Not Passable Flooding (h=0.4 m) District Maintenance a. Wilfred V. Carace Passable as per email
KO344+400, Cayungnan Section Engineers (DMEs) and b.09196149058 received dated September 16,
Maintenance Point Persons 2018 @ 5:00 PM
(MPPs) are inspecting AOR
and maintenance crew are
doing regular maintenance
activities
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
Pangasinan 2nd DEO
1. Pangasinan - Zambales Road
a. Bolo Section September 15, 2018 Not Passable Flooded (h=0.3 m) District Maintenance a. Victoria Visperas Passable as per email
Engineers (DMEs) and b. 09228798533 received dated September 16,
Maintenance Point Persons 2018 @ 9:04 PM
(MPPs) are inspecting AOR
and maintenance crew are
doing regular maintenance
activities
b. Bongalon Section September 15, 2018 Not Passable Flooded (h=0.3 m) District Maintenance a. Victoria Visperas Passable as per email
Engineers (DMEs) and b. 09228798533 received dated September 16,
Maintenance Point Persons 2018 @ 9:04 PM
(MPPs) are inspecting AOR
and maintenance crew are
doing regular maintenance
activities
c. Dulig Section September 15, 2018 Not Passable Flooded (h=0.3 m) District Maintenance a. Victoria Visperas Passable as per email
Engineers (DMEs) and b. 09228798533 received dated September 16,
Maintenance Point Persons 2018 @ 9:04 PM
(MPPs) are inspecting AOR
and maintenance crew are
2. Pangasinan - Tarlac Road doing regular maintenance
a. Bogtong Section, KO172+150 September 15, 2018 Not Passable Flooded (h=0.3 m) District
activitiesMaintenance a. Victoria Visperas Passable as per email
Engineers (DMEs) and b. 09228798533 received dated September 16,
Maintenance Point Persons 2018 @ 9:04 PM
(MPPs) are inspecting AOR
and maintenance crew are
doing regular maintenance
activities
b. Umanday Section, KO195+500 September 15, 2018 Not Passable Flooded (h=0.3 m) District Maintenance a. Victoria Visperas Passable as per email
Engineers (DMEs) and b. 09228798533 received dated September 16,
Maintenance Point Persons 2018 @ 9:04 PM
(MPPs) are inspecting AOR
and maintenance crew are
doing regular maintenance
activities

c. Aguilar Section (KO190+700 September 15, 2018 Not Passable Flooded (h=0.3 m) District Maintenance a. Victoria Visperas Passable as per email
Engineers (DMEs) and b. 09228798533 received dated September 16,
Maintenance Point Persons 2018 @ 9:04 PM
(MPPs) are inspecting AOR
and maintenance crew are
doing regular maintenance
activities
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
3. Pangasinan - La Union Road, Cayanga September 16, 2018 Not Passable Erosion on Bridge Filling of embankment a. Victoria Visperas Passable as per chat
Bridge Approach A materials on-going. b. 09228798533 message received dated
September 17,2018 @ 5:50
PM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
4. Urdaneta-Jct. Dagupan Road September 16, 2018 Not Passable Flooded (h=0.25 m) District Maintenance a. Victoria Visperas Passable as per email
YMCA Tapuac Section Engineers (DMEs) and b. 09228798533 received dated September 19,
Maintenance Point Persons 2018 @ 1:36 PM
(MPPs) are inspecting AOR
and maintenance crew are
doing regular maintenance
activities

Pangasinan 4th DEO


1. Urdaneta Jct.-Dagupan Road
a. K198+500 - K0198+900 September 17, 2018 Not Passable Flooded (h=0.2 m) Barricades and warning signs a. Adonis Ignacio Passable as per email
Maningding, Sta. Barbara installed. b. CP#09204077197 received dated September 17,
2018 @ 4:17 PM

2. Calasiao old Road September 17, 2018 Not Passable Flooded (h=0.4 m) Barricades and warning signs a. Adonis Ignacio Passable as per email
K0204+000 - K0204+150 Bued, Calasiao installed. b. CP#09204077197 received dated September 18,
2018 @ 8:00AM

3. San Carlos-Calasiao Road


a. K0212+800 - K0212+810, September 17, 2018 Not Passable Flooded (h=0.4 m) Barricades and warning signs a. Adonis Ignacio Passable to all types of
Mancup, Calasiao installed. b. CP#09204077197 vehicles as per email
received dated September 18,
2018 @ 4:52 PM

b. K0210+320 - K0210+360, September 17, 2018 Not Passable Flooded (h=0.40 m) Barricades and warning signs a. Adonis Ignacio Passable to all types of
Malabago, Calasiao installed. b. CP#09204077197 vehicles as per email
received dated September 18,
2018 @ 4:52 PM

c. K0213+050 - K0213+300, September 17, 2018 Not Passable Flooded (h=0.30 m) Barricades and warning signs a. Adonis Ignacio Passable to all types of
Poblacion, Calasiao installed. b. CP#09204077197 vehicles as per email
received dated September 18,
2018 @ 4:52 PM

REGION II
Batanes DEO
1. Batan Island along K0023+600 September 15, 2018 Not Passable Road slips and debris Maintenance crew and a. Alfredo T. Cariaso Passable as per email
equipment on stand-by b. 09999924969 received dated September 16,
2018 @ 7:36 PM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
Cagayan 2nd DEO
1. Manila North Road, K0664+500, Calog September 16, 2018 Not Passable Flash flood Barricades and warning signs a. Eugenio L. Lasam Passable to Heavy vehicles
Sur, Abulug, Cagayan installed. b. 09171326026 as per text message received
dated September 16, 2018 @
6:25 AM

Cagayan 3rd DEO


1. Itawes Overflow Bridge, K0519+(-1044) September 15, 2018 Not Passable Flooding Barricades and warning signs a. Eugenio L. Lasam Passable as per email
along Cagayan-Apayao Rd.,Sta. Barbara, installed. b. 09171326026 received dated September 16,
Piat, Cagayan 2018 @ 6:01 PM

2. Peñablanca Callao Cave Road September 15, 2018 Not Passable fallen trees, electric Barricades and warning signs a. Eugenio L. Lasam Passable as per email
posts, cables and installed. b. 09171326026 received dated September 16,
debris in the 2018 @ 6:01 PM
carriageway
Isabela 1st DEO
1. Cabagan-Sta. Maria Bridge September 15, 2018 Not Passable Flooding, 0.3m Maintenance Crew were a. Restituto A. Bentero b. Passable as per telephone
deployed to monitor the area. 09278350283 call dated September 18,
2018 @ 6:00 PM

Nueva Vizcaya 2nd DEO


1. Nueva Vizcaya-Benguet Road, September 15, 2018 Passable Landslide Clearing operations on-going a. DME Christopher One Lane Passable as per
K0261+300 Balasya email received dated
b. 0926 063 3794 September 16, 2018 @ 6:22
AM
2. Daang Maharlika
a. Baliling Sabo Dam September 19, 2018 Silted sabo dam As per email received dated
September 19, 2018 @ 12:07
PM

b. Calitlitan Sabo Dam September 19, 2018 Silted sabo dam As per email received dated
September 19, 2018 @ 12:07
PM

3. Nueva Vizcaya-Pangasinan Road


a.. Baracbac Sabo Dam September 19, 2018 Silted sabo dam As per email received dated
September 19, 2018 @ 12:07
PM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
Quirino DEO
1. NRJ Villa Sur-San Pedro-Cabuaan-
Ysmael-Disimungal Road,
a. K0368+628 - K0369+015 September 15, 2018 Not Passable Flooding (h=0.7m) Maintenance Crew were a. Reynaldo T. Gonzales Passable as per call received
deployed to monitor the area. b. 09175172924 dated September 16, 2018 @
10:43 PM

b. K0375+450 -K0375+500, (Barangay September 15, 2018 Not Passable damaged PCCP Maintenance Crew were a. Reynaldo T. Gonzales Passable as per call received
Cabuaan, Maddela, Quirino) shoulder and slope deployed to monitor the area. b. 09175172924 dated September 16, 2018 @
protection 10:43 PM

2. San Pedro Overflow Bridge at September 15, 2018 Not Passable high water elevation Maintenance Crew were a. Reynaldo T. Gonzales Passable as per email
K0367+768 and now under water deployed to monitor the area. b. 09175172924 received dated September 16,
2018 @ 6:22 AM

3. Jct. Abbag-Guingin Bdry road September 16, 2018 Passable slides at intermittent Maintenance Crew were a. Reynaldo T. Gonzales One Lane Passable as per
(S04754LZ) K0445+000-K0463+900, sections deployed to monitor the area. b. 09175172924 email received dated
Barangay Guingin, Giayan ,Nagtipunan September 16, 2018 @ 6:22
Quirino AM

4. Victoria - Maddela -Alicia - Kasibu bdry September 16, 2018 Passable slides at intermittent Maintenance Crew were a. Reynaldo T. Gonzales One Lane Passable as per
Rd. ,Barangay Jose Ancheta, Maddela, sections deployed to monitor the area. b. 09175172924 email received dated
Quirino, K0383+800 September 16, 2018 @ 6:22
AM

REGION III
Bulacan 1st DEO
1. Bigaa-Plaridel via Malolos Road
a. K0030+392 - K0031+000, Panginay, September 15, 2018 Not Passable Flooded (h=0.7 m) Continuous monitoring and a. Ernesto Daos Passable as per email
Balagtas roving of maintenance crew b. 09222164006 received dated September 16,
along national road 2018 @ 9:56 PM

2. Manila North Road


a. KM28+900 – KM29+400, Bocaue September 15, 2018 Not Passable Flooded (h=0.7 m) Continuous monitoring and a. Ernesto Daos Passable as per email
Balagtas Bdry. roving of maintenance crew b. 09222164006 received dated September 15,
along national road 2018 @ 4:55 PM

Nueva Ecija 1st DEO


AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
1. Daang Maharlika Road, K0176+200- September 15, 2018 Not Passable flooding (h =0.5 m) Clearing of debris completed a. Nestor G. Galapon Passable as per email
K0176+350, Brgy. Puncan,Carranglan and debris flow b. 0915 882 7368 received dated September 15,
2018 @ 4:55 PM

2. Pantabangan-Canili-Basal-Baler Road, September 15, 2018 Not Passable flooding (h =0.6 m) Clearing of debris completed a. Glen Imperio Passable as per email
K0186+500, Brgy. Marikit, Alfonzo and debris flow b. 0905 499 4601 received dated September 15,
Castañeda, 2018 @ 4:55 PM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
3. Jct. Pinagpanaan-Rizal-Pantabangan September 15, 2018 Not Passable collapsed roadway on-going backfilling of road a. Glen Imperio Passable as per email
Road. K0165+360 Brgy. Aya, Pantabangan way b. 0905 499 4601 received dated September 16,
N.E 2018 @ 2:23 PM

Nueva Ecija 2nd DEO

1. Nueva Ecija-Aurora Road, K0161+574, September 15, 2018 Not Passable Cut-off Detour Road Continuous monitoring and a. Eulogio Pesa Passable as per telephone
Brgy. Labi standby of equipment b. 0926 083 7180 call dated September 16, 2018
@ 2:23 PM

Pampanga 1st DEO


1. Sto. Tomas - Minalin Road K0070+900 - September 15, 2018 Not Passable Flooded (h=0.1-0.38 Continuous monitoring a. Michael Torres Passable as per email
K0073+600, San Isidro. Minalin & m) conducted by the b. 0917 507 4929 received dated September 19,
Telacsan Maintenance Staffs and 2018 @ 10:08 PM
Crews
2. Baliwag - Candaba - Sta. Ana Road,
a. K0068+(-348) Bomba Bridge, September 15, 2018 Not Passable Flooded (h=0.6 m) Continuous monitoring a. Michael Torres Still Not Passable as per
San Agustin, Candaba, Pampanga conducted by the b. 0917 507 4929 email received dated
Maintenance Staffs and September 21, 2018 @ 4:13
Crews PM
b. K0070+900 - K0071+050, September 17, 2018 Not Passable Flooded 0.25m Continuous monitoring Passable as per email
Pasig, Candaba, Pampanga underwater conducted by the received dated September 19,
Maintenance Staffs and 2018 @ 4:36 PM
Crews
3. Candaba - San Miguel Road, September 16, 2018 Not Passable Flooded (h=0.50 m) Continuous monitoring a. Michael Torres Still Not Passable as per
K0073+400 - K0073+600 Paralaya, conducted by the b. 0917 507 4929 email received dated
Candaba Pampanga Maintenance Staffs and September 21, 2018 @ 4:13
Crews PM
4. San Simon-Baliuag, K0062+000- September 18, 2018 Not Passable Flooded (h=0.2-0.6 Continuous monitoring Passable as per email
K0065+000, Brgy. San Miguel and San m) conducted by the received dated September 20,
Simon Maintenance Staffs and 2018 @ 11:48 AM
Crews
Tarlac 1st DEO
1. Romulo Highway
a. K0158+000-K0159+000, Brgy. September 15, 2018 Not Passable Flooded (h=1.20 m.) Continuous monitoring a. Renato Z. Martinez Passable as per telephone
Cacamilingan Sur, Camiling conducted by the b. 0917 848 0629 call dated September 16, 2018
Maintenance Staffs and @ 2:23 PM
Crews
b. K0155+900 & K0156+700 September 15, 2018 Not Passable Flooded (h=1.20 m.) Continuous monitoring a. Renato Z. Martinez Passable as per telephone
conducted by the b. 0917 848 0629 call dated September 16, 2018
Maintenance Staffs and @ 2:23 PM
Crews
2. Paniqui-Camiling-Wawa Road
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
a. K0167+500 - K0170+000 Brgy. September 15, 2018 Not Passable Flooded (h=0.8 m.) Continuous monitoring a. Renato Z. Martinez Passable as per telephone
Sawat - Bilad Camiling conducted by the b. 0917 848 0629 call dated September 16, 2018
Maintenance Staffs and @ 2:23 PM
Crews
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
Tarlac 2nd DEO
1. Sta. Rosa - Tarlac Road Lapaz Section, September 16, 2018 Not Passable Flooded (h=.15-0.30 Continuous monitoring by the a. Adrian T. Sevilla Passable as per email
K0129+400-K0130+900 Brgy. San Roque m) Maintenance Staffs and b. 0932 562 4155 received dated September 18,
and San Isidro Lapaz, Tarlac Crews 2018 @ 10:15 AM

2. Concepcion - Lapaz Road, K0136+200 - September 16, 2018 Not Passable Flooded (h=.15-0.30 Continuous monitoring by the a. Adrian T. Sevilla Passable as per email
K0136+426 Brgy. San Isidro lapaz Tarlac m) Maintenance Staffs and b. 0932 562 4155 received dated September 18,
Crews 2018 @ 10:15 AM
3. La-Paz Victoria Road, K0137+500 - September 16, 2018 Not Passable Flooded (h=0.2 m) Continuous monitoring by the a. Adrian T. Sevilla Passable to light vehicles
K0138+100 Brgy. Lomboy & Maintenance Staffs and b. 0932 562 4155 as per email received dated
Matayumtayum Laz Paz Tarlac Crews September 17, 2018 @
10:00AM

4. Tarlac Zambales Road, Brgy. Patling, September 16, 2018 Passable Damaged slope Continuous monitoring a. Adrian T. Sevilla Passable as per email
Capas Tarlac, K0126+300 - K0126+315 protection b. 0932 562 4155 received dated September 16,
L/S 2018 @ 9:56 PM

Zambales 1st DEO


1. Olongapo-Bugallon Road
a. K0213+400, Brgy. Marangla, September 15, 2018 Not Passable Flooded (h=1.0 m.) Continuous monitoring and a. Jessie Rey Lantano Passable as per telephone
Iba, Zambales roving of maintenance crew b. 0907 326 8209 call dated September 16, 2018
along national road. @ 2:23 PM

REGION V
Camarines Sur II DEO
1. Daang Maharlika, K0439+800 September 14, 2018 Passable Fallen Tree Clearing completed a. Rhemy S. Remot Passable as per email
b. 0907-9680537 received dated September 14,
2018 @ 05:53 PM

Catanduanes DEO
1. Catanduanes Circumferential Road

a. K0003+080 September 14, 2018 Passable Rockslide Clearing completed a. Marjorie Gan See Passable as per email
b. K0143+950 September 14, 2018 Passable Rockslide Clearing operation, on-going b. Marjorie
a. 0939-1178155
Gan See received
One Lanedated September
Passable 14,
as per
b. 0939-1178155 2018
email @received
05:53 PM (road
dated
section is under
September contract)
14, 2018 @ 05:53
PM
Sorsogon II DEO
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
1. Daang Maharlika, Bulusan Lake Road, September 14, 2018 Passable Soil Collapse Clearing operation completed a. Roi D. Barcela Passable as per email
Ariman Junction, K0628+600 b. 0907-9680537 received dated September 14,
2018 @ 05:53 PM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
REGION VI
AKLAN DEO
1. Aklan West Road (S00480PN) - Jct. September 14, 2018 Not Passable Road Slip Maintenance Crew deployed a. Welbert Bayaban One Lane Passable as per
Nabas-Malay-Buruanga/Liberted Bdry., to install warning signs and b. 0908 934 9681 email received dated
K0234+(-933) - K0282+172 repair works September 15, 2018 @8:42
PM

REGION VII
Negros Oriental III DEO
1. Dumaguete South Road, Sacsac Bridge September 14, 2018 Passable Road slip , scouring of Installed barriers and warning a. Cetilla Verna A. Tinaya One Lane Passable as per
Approach A, K0045+960 2 meters (right lane) devices, contractor's b. 0915-6965784 email received dated
personnel deployed for traffic September 14, 2018 @ 5:03
management, on-going repiar PM
Road is under contract

REGION VIII
Leyte V DEO
1. Abuyog-Silagao Road, K0968+(-269) - September 14, 2018 Not Passable Major repair of Cadac- Continuous monitoring of a. Leo Gallardo Not passable to all types of
K0995+320 an Bridge road condition b. 0916-9006525 vehicles (not related to TY
Ompong) as per e-mail
received dated Sept. 14, 2018
@ 8:51 AM

Alternate Route:
REGION X Daang Maharlika (Abuyog-
Bukidnon 1st DEO Mahaplag Section)
1. Kapalong-Talaingod-Valencia Road September 14, 2018 Not Passable Road slip with severe Installation barricades; Travel a. Kevin Loyd B. Passable (shoulder portion)
(S00641MN), K1571+(-173) scouring road bed advisory is released Carcueva as per email received dated
(NOT RELATED TO b. 0917-8733-387 September 14, 2018 @ 11:47
OMPONG) AM

2. Jct. SH Impasug-ong-Patulangan By- Not Passable road slip (NOT Travel advisory, released a. Aiza B. Ega Not Passable to Heavy
pass Road, K1478+000 -K1488+000 RELATED TO b. 0997-1143-799 Vehicles since November
(S00610MN) OMPONG) 2017 as per email received
dated September 15, 2018 @
12:00 MN
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
Camiguin DEO
1. Camiguin Circumferential Rad, K4+700- September 13, 2018 Not Passable Uprooted tree Clearing operations by DPWH a. Benjamin S. Babla Passable as per email
K4+705 equipment completed b. 0936-6274911 received dated September 14,
2018 @ 8:11 AM
Closure occurred at Sept. 13,
2018 @ 6:50PM and opened to
Prepared by: Submitted by: Approved by: traffic same day @ 7:35 AM

DARREL B. QUINTINITA
Engineer II

MONAH A. MACABATO DOMINADOR P. AQUINO ERNESTO S. GREGORIO, JR.


Engineer II Engineer V Director IV
Safety and Disaster Management Coordination Division
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
CENTRAL OFFICE
Manila

SITUATIONAL REPORT ON MAJOR ROADS AND BRIDGES DUE TO TYPHOON "OMPONG"


Status as of 3:00PM October 6, 2018
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)

CAR
Major Roads Leading to Baguio City
1. Kennon Road Not Passable Motorists are advised to take a. Engr. Nora R. Delos Still Not Passable as per e-
alternate route Santos mail received dated October 4,
b. 0917 517 3899 & 2018 @ 3:00 PM
a. Engr. Severino S. Clearing is on-going along
Bangasan K0248+850 (slide),
b. 0919 209 8860 K0246+220 - K0246+240
(slide), K0243+000 -
K0244+605 (debris flow) and
K0246+700 (debris flow)

K0239+220-
K0239+290(Roadslip),
K0237+290-K0237+380(Slide-
Right side),K0237+180-
K0237+260(Slide),
K0236+450( Roadslip),
K0235+504 Approach of Camp
5 Detour (Roadslip),
K0235+450 (Roadslip),
K0234+700 (Roadslip),
K0227+200 (Slide),
K0226+750 (Roadslip),
K0216+090 (Scoured Camp 1
Bridge Abutment A and B)

Alternate Route:
Marcos Highway and
Baguio-Bauang(Naguilian
Road)
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
2. Benguet-Nueva Vizcaya Road
a. K0254+200, Lamut Junction, September 15, 2018 Not Passable Slide Coordinated with private a. MPP HENRY APOSTOL Still One Lane Passable as
Beckel, La Trinidad equipment owners for b. per e-mail received dated
clearing operations 0947 1960 689 September 19, 2018 @ 11:31
AM

Section is under contract.


Section was closed to traffic
today at 07:55AM

Alternate route:
Suyoc- Beckel Provincial Road

b. K0267+300 September 15, 2018 Not Passable Slide Equipment is on standby. a. MPP Arthur Olpindo Still One Lane Passable as
Clearing operations is b. 0918 588 8190 per email received dated
hampered by heavy rains September 18, 2018 @ 2:45
AM
c. K0269+100 September 15, 2018 Not Passable Slide Equipment is on standby. a. MPP Arthur Olpindo Still One Lane Passable as
Clearing operations is b. 0918 588 8190 per email received dated
hampered by heavy rains September 18, 2018 @ 2:45
AM
d. K0270+150 September 15, 2018 Not Passable Mudslide Equipment is on standby. a. MPP Arthur Olpindo Still One Lane Passable as
Clearing operations is b. 0918 588 8190 per email received dated
hampered by heavy rains September 18, 2018 @ 2:45
AM
e. K271+700 September 15, 2018 Not Passable Slide Equipment is on standby. a. MPP Arthur Olpindo Still One Lane Passable as
Clearing operations is b. 0918 588 8190 per email received dated
hampered by heavy rains September 18, 2018 @ 2:45
AM
f. K0289+850, Sitio Indian, Brgy. September 15, 2018 Passable Rock collapse Equipment is on standby. a. MPP Arthur Olpindo Still One Lane Passable as
Ambuklao, Bokod (L=25m,H=5m, Clearing operations is b. 0918 588 8190 per email received dated
W=4m) hampered by heavy rains September 18, 2018 @ 2:45
AM
g. K0298+900, Sitio Bangao, September 15, 2018 Not Passable Rock collapse Equipment is on standby. a. MPP Arthur Olpindo Still One Lane Passable as
Ambuklao, Bokod (L=20m,H=5m, Clearing operations is b. 0918 588 8190 per email received dated
W=6m) hampered by heavy rains September 18, 2018 @ 2:45
AM
h. K0300+000 September 15, 2018 Not Passable Slide Equipment is on standby. a. MPP Arthur Olpindo Still One Lane Passable as
Clearing operations is b. 0918 588 8190 per email received dated
hampered by heavy rains September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
i. K0261+800 Sitio September 16,2018 Not Passable Slide Clearing operations is a. MPP Arthur Olpindo Still One Lane Passable as
Doting,Brgy.Loacan,Itogan (L=150,W=8m,H=4m) hampered by fallen electric b. 0918 588 8190 per email received dated
post September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
j. K0262+250,Sitio September 16,2018 Not Passable Slide a. MPP Arthur Olpindo Still One Lane Passable as
Doting,Brgy.Loacan,Itogon (L=12,W=8m,H=4m) b. 0918 588 8190 per email received dated
September 18, 2018 @ 2:45
AM
k. K0263+500,Sitio September 16,2018 Not Passable Clearing operations is a. MPP Arthur Olpindo Still One Lane Passable as
Anteng,Brgy.Loacan,Itogon hampered by fallen electric b. 0918 588 8190 per email received dated
post September 18, 2018 @ 2:45
AM
l. K0266+000 Sitio Anteng,Brgy. September 16,2018 Not Passable Clearing operations is a. MPP Arthur Olpindo Still One Lane Passable as
Loacan, Itogon hampered by fallen electric b. 0918 588 8190 per email received dated
post September 18, 2018 @ 2:45
AM
m. K0270+600 Sitio Bingo. Brgy. September 16,2018 Not Passable a. MPP Arthur Olpindo Still One Lane Passable as
Loacan,Itogon b. 0918 588 8190 per email received dated
September 18, 2018 @ 2:45
AM
3. Baguio-Bontoc Road
a. K0259+950- K0260+050, La September 15, 2018 Not Passable Fallen trees Clearing operations is on- MPP JEFFERSON TED S. Still One Lane Passable as
Trinidad going PULAY per email received dated
09394639667 September 17, 2018 @ 3:57
AM
b. K0260+900-K0261+000, La September 15, 2018 Not Passable Mudflow Clearing operations is on- MPP JEFFERSON TED S. Still One Lane Passable as
Trinidad going PULAY per email received dated
09394639667 September 17, 2018 @ 3:57
AM
c. K0267+200 Ambassador, September 15, 2018 Not Passable Soil Collapse Clearing operations by DPWH MPP PETER T. SANGGOY, Passable as per email
Tublay Loader is on-going JR. received dated September 16,
0948 268 0672 2018 @ 11:09 PM
d.K0278+870 Topdac, Atok September 15, 2018 Not Passable Soil Collapse Clearing operations by DPWH MPP PETER T. SANGGOY, Passable as per email
Loader is on-going JR. received dated September 16,
0948 268 0672 2018 @ 11:09 PM
e.K0282+900 Topdac, Atok September 15, 2018 Not Passable Soil Collapse Clearing operations by DPWH MPP PETER T. SANGGOY, Passable as per email
Loader is on-going JR. received dated September 16,
0948 268 0672 2018 @ 11:09 PM
f. K0285+150 Abiang, Atok September 15, 2018 Not Passable Rock fall Clearing operations by DPWH MPP PETER T. SANGGOY, Still One Lane Passable as
Loader is on-going JR. per email received dated
0948 268 0672 September 18, 2018 @ 2:45
AM
g.K0285+500 Abiang, Atok September 15, 2018 Not Passable Soil Collapse Clearing operations by DPWH MPP PETER T. SANGGOY, Passable as per email
Loader is on-going JR. received dated September 16,
0948 268 0672 2018 @ 11:09 PM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
h. K0286+250, Abiang, Atok September 15, 2018 Not Passable Soil collapse Clearing operations by DPWH MPP PETER T. SANGGOY, Passable as per email
Loader is on-going JR. received dated September 16,
0948 268 0673 2018 @ 11:09 PM
i. K0286+650, Abiang, Atok September 15, 2018 Not Passable Soil Collapse Clearing operations by DPWH MPP PETER T. SANGGOY, Still One Lane Passable as
Loader is on-going JR. per email received dated
0948 268 0672 September 18, 2018 @ 2:45
AM
j. K0288+150 Abiang, Atok September 15, 2018 Not Passable Soil collapse Clearing operations still is on- MPP PETER T. SANGGOY, One Lane Passable as per
going JR. email received dated
0948 268 0673 September 18, 2018 @ 6:34
PM
k. K0292+020,Atok September 17, 2018 Not Passable Slide Clearing operations still is on- MPP PETER T. SANGGOY, One Lane Passable as per
going JR. email received dated
0948 268 0673 September 18, 2018 @ 6:34
PM
l. K0293+000, Abiang, Atok September 15, 2018 Not Passable Soil Collapse Clearing operation still is on- MPP PETER T. SANGGOY, Passable as per email
going JR. received dated September 18,
0948 268 0672 2018 @ 6:34 PM
m. K0296+860 Paoay, Atok September 15, 2018 Not Passable Soil Collapse Clearing operation still is on- MPP BILLY JUN S. Passable as per email
going DEPALOG received dated September 16,
0917 790 9915 2018 @ 11:09 PM
n. K0302+300-K0302+343, September 15, 2018 Not Passable Rock collapse Clearing operations by DPWH MPP RHODA O. ESTALIN Passable as per email
Cattubo, Atok Loader is on-going received dated September 16,
0946 652 2600 2018 @ 11:09 PM
o. K0306+000 Calasipan, Atok September 15, 2018 Not Passable Rock collapse Clearing operations by DPWH MPP PETER T. SANGGOY, Passable as per email
Loader is on-going JR. received dated September 16,
0948 268 0672 2018 @ 11:09 PM
p. K0309+150 Natubleng, Buguias September 15, 2018 Not Passable Mudslide Clearing operations by DPWH MPP PETER T. SANGGOY, One Lane Passable as per
Backhoe is on-going JR. email received dated
0948 268 0672 September 18, 2018 @ 6:34
PM
q. K0311+400 Natubleng, Buguias September 15, 2018 Not Passable Soil collapse Clearing operations by DPWH MPP PETER T. SANGGOY, Still One Lane Passable as
Backhoe is on-going JR. per email received dated
0948 268 0672 September 18, 2018 @ 6:34
PM
r. K0311+700 Natubleng, Buguias September 15, 2018 Not Passable Slide Clearing operations by DPWH MPP PETER T. SANGGOY, One Lane Passable as per
Backhoe is on-going JR. email received dated
0948 268 0672 September 18, 2018 @ 6:34
PM
s. K0312+700 - K0312+800 September 15, 2018 Not Passable Mudslide Clearing operations by DPWH MPP PETER T. SANGGOY, One Lane Passable as per
Natubleng, Buguias Backhoe is on-going JR. email received dated
0948 268 0672 September 18, 2018 @ 6:34
PM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
t. K0314+050 Colliding, Buguias September 15, 2018 Not Passable Rock Collapse Clearing operations by DPWH MPP PETER T. SANGGOY, One Lane Passable as per
Backhoe is on-going JR. email received dated
0948 268 0672 September 18, 2018 @ 6:34
PM
u. K0320+600 Amgaleyguey, September 15, 2018 Not Passable Soil collapse Clearing operations by DPWH MPP PETER T. SANGGOY, Passable as per email
Buguias Backhoe is on-going JR. received dated September 18,
0948 268 0672 2018 @6:34 PM
v. K0327+000-K0327+100, September 15, 2018 Not Passable Slide Clearing operations by DPWH MPP PETER T. SANGGOY, One Lane Passable as per
Bayoyo, Buguias Backhoe is on-going JR. email received dated
0948 268 0673 September 18, 2018 @ 6:34
PM
w. K0339+400 Bangao, Buguais September 15, 2018 Not Passable Soil collapse Clearing operations by DPWH MPP PETER T. SANGGOY, Still One Lane Passable as
Backhoe is on-going JR. per email received dated
0948 268 0672 September 18, 2018 @ 6:34
PM
x. K0339+600 Bangao, Buguais September 15, 2018 Not Passable Soil collapse Clearing operations by DPWH MPP PETER T. SANGGOY, Still One Lane Passable as
Backhoe is on-going JR. per email received dated
0948 268 0672 September 18, 2018 @ 6:34
PM
y. K0362+680 - K0362+780, Busa September 15, 2018 Not Passable Road Cut On-going excavation of MPP ROLDAN V. COLAS Still Not Passable as per e-
Section footing for gabion mail received dated October 4,
0939-573-1659 2018 @ 3:00 PM

Alternate route: Nacagang-


Abatan, Bauko, Maba-ay

z. K0371+400, Tiging Section, September 15, 2018 Not Passable Road Cut On-going excavation of MPP ROLDAN V. COLAS One Lane Passable as per
Sabangan roadway email received dated
0939-573-1659 September 27, 2018 @ 9:21
AM

Alternate route: Nacagang-


Abatan, Bauko, Maba-ay

aa. K0390+200, Tikitik Section September 15, 2018 Not Passable Soil collapse Clearing operations by private MPP PETER T. SANGGOY, Passable as per email
(L=120m,W=7m,H=3 and DPWH equipment is on- JR. received dated September 17,
0m) going 0948 268 0673 2018 @ 3:03 PM
bb. Intermittent Section along September 15, 2018 Not Passable Series of Slides Clearing operations by private MPP ROLDAN V. COLAS Still One Lane Passable as
Chackchakan, Gonogon, Malitep and DPWH equipment is on- 0939 per email received dated
and Palinga-aw going 573 1659 September 18, 2018 @ 6:34
PM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
cc. Mt. Data Cliff to Sinto September 15, 2018 Not Passable Series of Slides Clearing operations by private MPP ROLDAN V. COLAS One Lane Passable as per
Boundary and DPWH equipment is on- 0939 email received dated
going 573 1659 September 19, 2018 @ 11:31
AM

Expected to open on Sept. 24,


2018
dd. K0318+190-K0318+244, September 16, 2018 Not Passable Road cut Installation of timber shoring MPP PETER T. SANGGOY, One Lane Passable as per
Palidan, Amgaleyguey, Buguias is on- going JR. email received dated
0948 268 0673 September 20, 2018 @9:31
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
4. Marcos Highway
a. K0273+850, Tuba, Benguet September 15, 2018 Not Passable Slide Clearing operations by a MPP FRANCISCO ROJO Passable as per email
privately owned equipment is received dated September 16,
on-going 09202157947 2018 @ 11:09 PM
b. 'K0275+150, Tuba, Benguet September 15, 2018 Not Passable Slide Clearing operations by a MPP FRANCISCO ROJO Passable as per email
privately owned equipment is received dated September 16,
on-going 09202157947 2018 @ 11:09 PM
c. K0275+700, Brgy. Poblacion, September 16, 2018 One Lane Slide Clearing operations is on- MPP FRANCISCO ROJO Passable as per email
Tuba, Benguet Passable going with the help of La received dated September 16,
Union 1st and 2nd DEO and 09202157947 2018 @ 11:09 PM
Pangasinan 1st and 2nd DEO

d. K0275+850, Brgy. Poblacion, September 15, 2018 Not Passable Slide Coordinated with private MPP FRANCISCO ROJO Passable as per email
Tuba, Benguet equipment owners for received dated September 16,
clearing operations 09202157947 2018 @ 11:09 PM
e. K0276+950, Tuba, Benguet September 16, 2018 One Lane Slide Coordinated with private MPP FRANCISCO ROJO Passable as per email
Passable equipment owners for received dated September 16,
clearing operations 09202157947 2018 @ 11:09 PM

Abra DEO
1. Abra-Ilocos Norte Road,
a. K0451+150 - K0451+250 and June 29, 2018 Not Passable Road collapse and Installed warning signs. a. MPP Jun Michael A. One Lane Passable (light
K0451+345 - K0451+415, damaged slope Velasco vehicles) as per e-mail
Nagaparan, Danglas, Abra protection b. 0915-446-2503 received dated September 28,
2018 @2:32 PM

Road Section is under


contract.

2. Abra - Ilocos Sur Road, Intermittent September 15, 2018 Not Passable Fallen Trees Clearing operations by MPP SOCORRO LITO S. Passable as per email
Section, Tangadan, San Quintin, Abra Maintenance Crew is on- BENEDITO received dated September 16,
goinggoing 09157500166 2018 @ 11:09 PM
3. Abra - Kalinga Road
a. K0446+000 Baquero, Nalbuan September 16,2018 Not Passable Series of Landslides Clearing operations by DPWH MPP ROMMEL MORENO B. Passable as per email
Baay Licuan equipment and Maintenance ORTEGA received dated September 18,
Crew is on-going 09272657188 2018 @ 6:34 PM

b. K0448+350, Lenneng, Baay- September 16,2018 Passable Soil Collapse Clearing operations by MPP ROMMEL MORENO B. Still One Lane Passable as
Licuan, Abra Maintenance Crew is on-going ORTEGA per email received dated
09272657188 September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
c. K0448+450, Lenneng, Baay- September 16,2018 Passable Soil Collapse Clearing operations by MPP ROMMEL MORENO B. Still One Lane Passable as
Licuan, Abra Maintenance Crew is on-going ORTEGA per email received dated
09272657188 September 18, 2018 @ 2:45
AM
d. K0459+500, Cawayan, Baay- September 16,2018 Passable Soil Collapse Clearing operations by MPP ROMMEL MORENO B. Still One Lane Passable as
Licuan, Abra Maintenance Crew is on-going ORTEGA per email received dated
09272657188 September 18, 2018 @ 2:45
AM
e. K0477+150-K477+158, Aguibo, September 16,2018 Not Passable Slide Clearing operations by MPP ROMMEL MORENO B. One Lane Passable as per
Malibkong, Abra Maintenance Crew is on-going ORTEGA email received dated
09272657188 September 19, 2018 @4:50
PM
f. K0479+950, Poblacion, September 16,2018 Not Passable Soil collapse Clearing operations by MPP ROMMEL MORENO B. One Lane Passable as per
Malibcong, Abra (L=9m,H=3m,W=8m) Maintenance Crew is on-going ORTEGA email received dated
09272657188 September 19, 2018 @ 4:50
PM
g. K0480+100, Duldulao, September 16,2018 Not Passable Slide Clearing operations by MPP ROMMEL MORENO B. One Lane Passable as per
Malibcong, Abra (L=9m,H=3m,W=8m) Maintenance Crew is on-going ORTEGA email received dated
09272657188 September 19, 2018 @ 4:50
PM
h. K0487+300, Gacab, Malibcong, September 16,2018 Not Passable Slide Clearing operations by MPP ROMMEL MORENO B. Punch Thru Open as per
Abra (L=9m,H=3m,W=8m) Maintenance Crew is on-going ORTEGA email received dated
09272657188 September 24, 2018 @ 8:33
AM
i. K0475+350 - K0475+430, September 16,2018 Not Passable Slide Clearing operations by a MPP ROMMEL MORENO B. One Lane Passable as per
Aguibo, Malibkong Abra privately owned equipment is ORTEGA phone call dated September
on-going 09272657188 19, 2018 @ 8:38 AM

4. Abra-Cervantes Road, September 17, 2018 Not Passable Damaged slope Warning signs installed MPP ROGELIO D. One Lane Passable as per
K0476+500-K0476+514, Ampalioc, Luba, masonry and collapsed DASALLA email received dated
Abra pavement 09365550189 September 19, 2018 @ 4:50
PM

Apayao 1st DEO


1. Conner-Cabugao Road, Intermittent September 16, 2018 Not Passable Series of Landslides Clearing operations by MPP Oliver T. Pakyo Still One Lane Passable as
Section Maintenance Crew is on-going 09067074275 per email received dated
September 17, 2018 @ 3:03
PM
2. Kabugao - Pudtol Luna - Cagayan
Boundary Road
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
a. Intermittent Section September 16, 2018 Not Passable Series of Landslides Clearing operations by MPP Oliver T. Pakyo One Lane Passable as per
and Roadslips Maintenance Crew is on-going 09067074275 phone call dated September
19, 2018 @ 4:50 PM

b. K591+980-K609+400, September 17, 2018 Not Passable Series of slides Clearing operations by a MPP Precy D. Buqueg One Lane Passable as per
Intermittent section privately owned equipment is 09066830409 phone call dated September
on- going 19, 2018 @ 4:50 PM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
3. Apayao - Ilocos Norte Road
a. K0614+476-K0638+880 Intermittent September 16, 2018 Not Passable Series of Landslides Clearing operations by MPP Oliver T. Pakyo One Lane Passable as per
Section Maintenance Crew is on-going 09067074275 call dated September 29, 2018
@10:59 AM
b. K0638+880 - K0645+000 Intermittent September 29 2018 Not Passable Series of slides Clearing operations by MPP Keon C. Deguiom Passable as per e-mail
Section privately owned equipment is 09395459291 received dated September 30,
on-going 2018 @ 2:17 PM (Punch - thru
open)

Expected date of opening:


September 30, 2018

Apayao 2nd DEO


1. Claveria-Calanasan Road
a. K0679+500, Baduang section September 14, 2018 Not Passable Slide Further clearing operation is a. MPP Jonathan Suyao Passable as per email
on-going b.09083067543 received dated September 20,
2018 @ 9:31 AM
b. K0632+100, Sta. Elena Section, September 15, 2018 Not Passable Slide Clearing operations by a MPP Jeadica C. Agatep Passable as per email
Calanasan DPWH equipment is on hold 09273993250 received dated September 16,
due to torrential rains 2018 @ 4:24 PM
c. K0639+200, Maragmin Section September 16, 2018 Not Passable Slide Clearing operations by one MPP Jeadica C. Agatep Still One Lane Passable as
(1) DPWH equipment is on- 09273993250 per email received dated
going September 18, 2018 @ 2:45
AM
d. K0641+400-K0642+300, September 16, 2018 Passable Slide Clearing operations by one MPP Jeadica C. Agatep Still One Lane Passable as
Maragmin Section (1) DPWH equipment is on- 09273993250 per email received dated
going September 18, 2018 @ 2:45
AM
e. K0644+000-K0646+100, September 16, 2018 Passable Slide Clearing operations by one MPP Jeadica C. Agatep Still One Lane Passable as
Salagunting Section (1) DPWH equipment is on- 09273993250 per email received dated
going September 18, 2018 @ 2:45
AM
f. K0650+980-K0651+700, September 16, 2018 Passable Slide Clearing operations by one MPP Jeadica C. Agatep Still One Lane Passable as
Carmela Section (1) DPWH equipment is on- 09273993250 per email received dated
going September 18, 2018 @ 2:45
AM
g. K0687+260-K0687+275 September 16, 2018 Not Passable Slide Clearing operations by MPP Jeadica C. Agatep Passable as per email
(L=15m, H=4m, privately owned equipment is 09273993250 received dated September 20,
W=7m) on-going 2018 @ 9:31 AM
h. K0687+480-K0687+490 September 16, 2018 Not Passable Slide Clearing operations by LGU MPP Jeadica C. Agatep Passable as per email
(L=10m, H=4m, equipment is on-going 09273993250 received dated September 20,
W=7m) 2018 @ 9:31 AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
i. K0690+250-K0690+265 September 16, 2018 Not Passable Slide Clearing operations by LGU MPP Jeadica C. Agatep Passable as per email
(L=15m, H=3.5m, equipment is on-going 09273993250 received dated September 20,
W=7m) 2018 @ 9:31 AM

j. K0704+000-K0707, Dallawas September 17, 2018 Not Passable Slide Clearing operations by LGU MPP Jeadica C. Agatep Passable as per email
Section, Intermittent section (L=15m, H=3.5m, equipment is on-going 09273993250 received dated September 20,
W=7m) 2018 @ 9:31 AM

k. K0672+300-K0675+000, Rabaw September 17, 2018 Not Passable Series of slides Clearing operations by MPP Virgilo Salbino Passable as per email
Section, Intermittent section privately owned equipment is 09294961404 received dated September 20,
on-going 2018 @ 9:31 AM
l. K0676+000-K0678+600, Rabaw September 18, 2018 Not Passable Series of slides Clearing operations by MPP Virgilo Salbino Passable as per email
Section privately owned equipment is 09294961404 received dated September 20,
on-going 2018 @ 9:31 AM
2. Kabugao-Pudtol-Luna-Cagayan
Boundary Road
a. K0615+250-K0615+410, Paco September 16, 2018 Not Passable Slide Clearing operations by one a. MPP Jamer B. Macabeo One Lane Passable as per
Section (1) DPWH equipment is on- b.09152709026 email received dated
going September 18, 2018 @ 4:50
PM
b. K0617+325-K0665+400, September 16, 2018 One Lane Series of Fallen Trees Clearing operations by a. MPP Jamer B. Macabeo Still One Lane Passable as
Intermittent Sections Passable Maintenance Crew is on-going b.09152709026 per email received dated
September 18, 2018 @ 2:45
AM
3. Apayao-Ilocos Norte Road
a. K0609+350-K0609+362 September 16, 2018 One Lane Slide Clearing operations by a. MPP Jamer B. Macabeo Still One Lane Passable as
Passable Maintenance Crew is on-going b.09152709026 per e-mail received dated
September 18, 2018 @ 2:45
AM
b. K0610+100-K0610+110 September 16, 2018 One Lane Soil Collapse and Clearing operations by a. MPP Jamer B. Macabeo Still One Lane Passable as
Passable Fallen trees Maintenance Crew is on-going b.09152709026 per e-mail received dated
September 18, 2018 @ 2:45
AM
c. K0619+200-K0619+220,Sadel September 16, 2018 Not Passable Soil Collapse Clearing operations by a. MPP Jamer B. Macabeo One Lane Passable as per
Section Maintenance Crew is on-going b.09152709026 email received dated
September 18, 2018 @ 6:00
AM
d. K0620+025,Sadel Section September 16, 2018 Not Passable Soil Collapse Clearing operations by a. MPP Jamer B. Macabeo One Lane Passable as per
Maintenance Crew is on-going b.09152709026 email received dated
September 18, 2018 @ 6:00
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
e. K0619+500-K0619+520,Sadel September 16, 2018 Not Passable Soil Collapse Clearing operations by a. MPP Jamer B. Macabeo One Lane Passable as per
Section Maintenance Crew is on-going b.09152709026 email received dated
September 18, 2018 @ 6:00
AM
f. K0621+000-K0621+020,Shop September 16, 2018 Not Passable Soil/Rock Collapse Clearing operations by a. MPP Jamer B. Macabeo One Lane Passable as per
Section Maintenance Crew is on-going b.09152709026 email received dated
September 18, 2018 @ 6:00
AM
g. K0623+600-623+650,Shop September 16, 2018 Not Passable Soil Collapse Clearing operations by a. MPP Jamer B. Macabeo One Lane Passable as per
Section Maintenance Crew is on-going b.09152709026 email received dated
September 18, 2018 @ 6:00
AM
h. K0627+970- September 16, 2018 Not Passable Soil Collapse Clearing operations is on- a. MPP Jamer B. Macabeo One Lane Passable as per
K0628+000,Tanglagan Section going with the help of b.09152709026 email received dated
Cagayan 2nd DEO September 18, 2018 @ 6:00
AM
i. K0609+380-K0609+410 September 16, 2018 Not Passable Soil Collapse Waiting for any available a. MPP Jamer B. Macabeo One Lane Passable as per
equipment b.09152709026 email received dated
September 18, 2018 @ 6:00
AM

Baguio City DEO


1. Eastern Link Circumferential Road,
a. K0248+700-K0248+715 Baguio September 15, 2018 One Lane Collapsed riprap Clearing operations is on- MPP WARLIE D. CANAO Passable as per email
City Passable going received dated September 18,
0923 136 0561 2018 @ 6:34 PM

b. K0251+750 Baguio City September 15, 2018 Not Passable Fallen Trees Clearing operations is on- MPP WARLIE D. CANAO Passable as per email
going received dated September 19,
0923 136 0561 2018 @11:31 AM
2. Gibraltar Road, K0252+(-020) Baguio September 15, 2018 Not Passable Fallen Trees Clearing operations is MPP WARLIE D. CANAO Passable as per e-mail
city completed received dated September 15,
0923 136 0561 2018 @ 11:37 PM
3. Asin Road, K0309+010 - K0309+070 September 15, 2018 Not Passable Slide Clearing operations is MPP JASON T. DAVID Passable as per e-mail
Baguio City completed received dated September 15,
0948 694 0297 2018 @ 11:37 PM
4. Outlook Drive, K0253+065-K0253+095 September 15, 2018 Not Passable Collapse riprap Clearing operations is on- MPP WARLIE D. CANAO Passable as per email
going received dated September 19,
0923 136 0561 2018 @ 11:31 AM

Benguet 1st DEO


1. Baguio-Bua-Itogon Road,
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
a. K0257+400 Sitio White Beans, September 15, 2018 Not Passable Slide, damaged Installed Warning Signs MPP JONATHAN SUYAO One Lane Passable as per
Brgy. Ucab, Itogon BENECO Post and 0948 988 3370 email received dated
Roadslip 0908 306 7543 September 20, 2018 @ 2:58
PM
b. K0259+600, Sitio Kiangan September 13, 2018 Not Passable Slide Clearing operation constraint a. MPP Jonathan Suyao Still Not Passable as per e-
Village, Brgy. Ucab, Itogon Vol=500cu.m and due to retrieval operations at b. 09083067543 mail received dated October 4,
road cut ground zero (Itogon 2018 @ 3:00 PM
Landslide) Alternate Route:
Baguio-Kias-Virac Provincial
Clearing operation is on-going Road (one lane passable at
by DPWH and privately intermittent section)
owned equipment
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
c. K0260+350, Sitio Kiangan September 22, 2018 Not Passable Slide Clearing operations is on hold a. MPP Jonathan Suyao Still Not Passable as per e-
Village, Brgy. Ucab, Itogon, due to road cut at b. 09083067543 mail received dated October 4,
Benguet K0259+600 2018 @ 3:00 PM
Alternate Route:
Baguio-Kias-Virac Provincial
Road (one lane passable at
intermittent section)

d. K0260+800-K0260+900 Sitio September 15, 2018 Not Passable Slide (L=100m, Clearing operations is on hold a. MPP Jonathan Suyao Still Not Passable as per e-
Goldfield, Brgy. Poblacion, Itogon H=20m, W=8m) due to road cut at b. 09083067543 mail received dated October 4,
(Intermittent section) K0259+600 2018 @ 3:00 PM
Alternate Route:
Baguio-Kias-Virac Provincial
Road (one lane passable at
intermittent section)

e. K0261+050, Sitio Goldfield, September 21, 2018 Not Passable Slide Clearing operations is on hold a. MPP Jonathan Suyao Still Not Passable as per e-
Brgy. Poblacion, Itogon due to road cut at b. 09083067543 mail received dated October 4,
K0259+600 2018 @ 3:00 PM
Alternate Route:
Baguio-Kias-Virac Provincial
Road (one lane passable at
intermittent section)
f. K0261+460, Sitio Goldfield, September 21, 2018 Not Passable Roadslip Clearing operations is on hold a. MPP Jonathan Suyao Still Not Passable as per e-
Brgy. Poblacion, Itogon, Benguet due to road cut at b. 09083067543 mail received dated October 4,
K0259+600 2018 @ 3:00 PM
Alternate Route:
Baguio-Kias-Virac Provincial
Road (one lane passable at
intermittent section)
g. K0261+400-K0261+450 Sitio September 21, 2018 Not Passable Slide Clearing operations is on hold a. MPP Jonathan Suyao Still Not Passable as per e-
Goldfield, Brgy. Poblacion, Itogon due to road cut at b. 09083067543 mail received dated October 4,
K0259+600 2018 @ 3:00 PM
Alternate Route:
Baguio-Kias-Virac Provincial
Road (one lane passable at
intermittent section)
h. K0262+800, Sitio Goldfield, September 13, 2018 One Lane Slide Further clearing operations by a. MPP Jonathan Suyao Still One Lane Passable as
Brgy Poblacion, Itogon Passable Vol=250cu.m DPWH equipment and LGU b.09083067543 per email received dated
equipment is on-going. September 18, 2018 @ 2:45
Clearing operations is AM
hampered by continuous
erosion of soil
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
2. Pico - Lamtang Road September 15, 2018 Not Passable Fallen Trees Clearing operations is on- MPP ANNE FAYE HANDIG Passable as per email
K0258+900, La Trinidad going 0915 758 0403 received dated September 17,
0947 274 3385 2018 @ 6:59 PM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
3. Cong. Andres Acop Cosalan Road September 15, 2018 Not Passable Series of slides Clearing operations by LGU MPP ARTHUR OLPINDO One Lane Passable as per
(formerly Gurel- Bokod- Kabayan- equipment is on-going 0918 588 8190 email received dated
Buguias- Abatan Road), K0305+000 - September 20, 2018 @ 2:58
K0316+500 Bokod PM
4. Asin- Nangalisan- San Pascual Road,

a. K0258+100-K0258+600, September 16, 2018 One Lane Series of slides Clearing operations by MPP ASHLEY R. SANTOS Still One Lane Passable as
Intermittent Section Passable Maintenance crew is on-going 0999 677 6613 per email received dated
September 18, 2018 @ 2:45
AM
b. K0262+800, Brgy. Tadiangan September 16, 2018 One Lane Slide Clearing operations by MPP ASHLEY R. SANTOS Still One Lane Passable as
Passable Maintenance crew is on-going 0999 677 6613 per email received dated
September 18, 2018 @ 2:45
AM
c. K0263+400, Sitio Lasong September 16, 2018 One Lane Fallen Trees Clearing operations by MPP ASHLEY R. SANTOS Still One Lane Passable as
Passable Maintenance crew is on-going 0999 677 6613 per email received dated
September 18, 2018 @ 2:45
AM
d. K0263+450 September 16, 2018 One Lane Fallen Trees Clearing operations by MPP ASHLEY R. SANTOS Still One Lane Passable as
Passable Maintenance crew is on-going 0999 677 6613 per email received dated
September 18, 2018 @ 2:45
AM
e. K0263+500 September 16, 2018 One Lane Fallen Trees Clearing operations by MPP ASHLEY R. SANTOS Still One Lane Passable as
Passable Maintenance crew is on-going 0999 677 6613 per email received dated
September 18, 2018 @ 2:45
AM
f. K0263+550 September 16, 2018 One Lane Fallen Trees Clearing operations by MPP ASHLEY R. SANTOS Still One Lane Passable as
Passable Maintenance crew is on-going 0999 677 6613 per email received dated
September 18, 2018 @ 2:45
AM
g. K0264+500 Sitio Sipitan, Asin, September 16, 2018 Not Passable Slide Clearing operations by MPP ASHLEY R. SANTOS Still One Lane Passable as
Tuba, Benguet (Vol.=100 cu.m.) Maintenance Crew is on-going 0999 677 6613 per email received dated
September 18, 2018 @ 2:45
AM
h. K0265+100, Nangalisan, Tuba September 15, 2018 Passable Slide and fallen trees Clearing operations by MPP EDMUND REYES Still One Lane Passable as
Maintenance Crew is on-going 09461978650 per email received dated
September 18, 2018 @ 2:45
AM
i. K0267+800, Brgy. Coplo, September 15, 2018 Not Passable Slide and fallen trees Clearing operations by MPP EDMUND REYES Still One Lane Passable as
Nangalisan, Tuba Maintenance Crew is on-going 09461978650 per email received dated
September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
j. K0265+100, Nangalisan, Tuba September 16, 2018 Not Passable Slide Clearing ongoing by Private MPP ASHLEY R. SANTOS Still One Lane Passable as
Equipment 0999 677 6613 per email received dated
September 18, 2018 @ 2:45
AM
k. K0261+000 September 16, 2018 Not Passable Slide Clearing ongoing by Private MPP ASHLEY R. SANTOS Still One Lane Passable as
Equipment 0999 677 6613 per email received dated
September 18, 2018 @ 2:45
AM
5. Shilan-Beckel Road,
a.K0261+800 Brgy. Shilan, La September 15, 2018 Passable Slide Equipment is on standby. MPP RICHARD LUMIQUED Still One Lane Passable as
Trinidad Clearing operations is 0999 per email received dated
hampered by heavy rains 328 5593 September 18, 2018 @ 2:45
AM
b. K0262+500 Brgy. Shilan, La September 15, 2018 Passable Slide Equipment is on standby. MPP RICHARD LUMIQUED Still One Lane Passable as
Trinidad Clearing operations is 0999 per email received dated
hampered by heavy rains 328 5593 September 18, 2018 @ 2:45
AM
6. Ambiong-Tawang, K0263+100 September 15, 2018 Not Passable Rockfall Equipment is on standby. MPP RICHARD LUMIQUED Still One Lane Passable as
Clearing operations is 0999 per email received dated
hampered by heavy rains 328 5593 September 18, 2018 @ 2:45
AM
7. City Limit-Sto. Tomas Road, K0263+300 September 15, 2018 Not Passable Soil Collapse and Rock Clearing operations is on- MPP JONATHAN JULIAN One Lane Passable as per
Sitio Bandilan, Tuba Fall going 0949 348 8703 email received dated
September 19, 2018 @ 11:31
AM
8. Cong. Andres Acop Cosalan Road September 18, 2018 Not Passable Slide Clearing operations is on- MPP JONATHAN SUYAO Passable as per email
(formerly Gurel- Bokod- Kabayan- going by privately owned 09489883370 received dated September 21,
Buguias- Abatan Road), equipment 09083067543 2018 @10:28 AM
K0315+300, Bila, Bokod, intermittent
sections

Benguet 2nd DEO


1. Acop-Kapangan-Kibungan-Bakun Road

a. K0263+700 Caponga, Tublay September 15, 2018 Not Passable Soil Collapse Clearing operations by private MPP MELVIN CASTILLO Still One Lane Passable as
& government equipments is 0912 376 6841 per email received dated
on-going September 18, 2018 @ 2:45
AM
b. K0264+800, Capongga, Tublay September 15, 2018 Not Passable Flooded Installed warning signs. MPP MELVIN CASTILLO Still Not Passable as per e-
0912 376 6841 mail received dated September
16, 2018 @ 06:00 AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
c. K0268+020 Daclan, Tublay September 15, 2018 Not Passable Soil Collapse Clearing operations by MPP BILLY JUN S. Passable as per e-mail
Maintenance crew is DEPALOG received dated September 15,
completed 0917 790 9915 2018 @ 11:37 PM
d. K0268+326 Daclan, Tublay September 15, 2018 Not Passable Soil Collapse Equipment is on standby. MPP VIRGILIO GALAP Still One Lane Passable as
Clearing operations is 0912 803 3427 per email received dated
hampered by heavy rains September 18, 2018 @ 2:45
AM
e. K0269+855 Daclan, Tublay September 15, 2018 Not Passable Soil Collapse Private equipment is on MPP MELVIN CASTILLO Still One Lane Passable as
standby. Clearing operations 0912 376 6841 per email received dated
is hampered by continuous September 18, 2018 @ 2:45
soil erosion due to heavy AM
rains
f. K0289+350 Cuba, Kapangan September 15, 2018 Not Passable Soil Collapse Clearing operations by Private MPP VIRGILIO GALAP Passable as per e-mail
Equipment and Maintenance 0912 803 3427 received dated September 15,
Crew is completed 2018 @ 11:37 PM

g. K0293+500 - K0294+400 September 15, 2018 Not Passable Soil Collapse and Clearing operations by private MPP VIRGILIO GALAP Still One Lane Passable as
Balakbak, Kapangan fallen debris & government equipments is 0912 803 3427 per email received dated
on-going September 18, 2018 @ 2:45
AM
h. K0296+400 - K0296+425 Beleng- September 15, 2018 Passable Soil Collapse Clearing operations by private MPP MELVIN CASTILLO Still One Lane Passable as
belis, Kapangan, Benguet & government equipments is 0912 376 6841 per email received dated
on-going September 18, 2018 @ 2:45
AM
i. K0307+700 Sagpat, Kibungan, September 15, 2018 Passable Soil Collapse Clearing operations by private MPP VIRGILIO GALAP Still One Lane Passable as
Benguet & government equipments is 0912 803 3427 per email received dated
on-going September 18, 2018 @ 2:45
AM
j. K0308+150 Poblacion, Kibungan September 15, 2018 Not Passable Soil Collapse Clearing operations by private MPP VIRGILIO GALAP Still One Lane Passable as
& government equipments is 0912 803 3428 per email received dated
on-going September 18, 2018 @ 2:45
AM
k. K0309+020 Poblacion, Kibungan, September 15, 2018 Passable Soil Collapse Clearing operations by private MPP VIRGILIO GALAP Still One Lane Passable as
Benguet & government equipments is 0912 803 3427 per email received dated
on-going September 18, 2018 @ 2:45
AM
l. K0309+040 Poblacion, Kibungan September 15, 2018 Not Passable Soil Collapse Clearing operations by private MPP MELVIN CASTILLO Still One Lane Passable as
& government equipments is 0912 376 6841 per email received dated
on-going September 18, 2018 @ 2:45
AM
m. K0310+800 Poblacion, Kibungan September 15, 2018 Passable Soil Collapse and Clearing operations by private MPP VIRGILIO GALAP Still One Lane Passable as
fallen trees & government equipments is 0912 803 3427 per email received dated
on-going September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
n. K0315+000 - K0317+000, September 15, 2018 Not Passable Series of slides and Clearing operations is on- MPP VIRGILIO GALAP Still One Lane Passable as
Intermittent Section, Poblacion, debris flow going 0912 803 3427 per email received dated
Kibungan September 18, 2018 @ 2:45
AM
o. K0345+600 - K0345+670 July 2, 2018 Not Passable Roadslip Installed warning signs. a. MPP Billy Jun S. Passable as per phone call
Bagtangan, Gambang, Bakun, Bailey bridge will be Depalog dated October 2, 2018 @
Benguet constructed to open the road b. 0918-602-5212 10:00 AM

Section was closed to traffic


since July 1, 2018 at 2:00 PM.
Section is under contract.

Alternate route:
Namagtey-Madaymen Road.

p. K0318+720 - K0318+730, September 15, 2018 Not Passable Soil collapse Clearing operations is on- MPP MELVIN CASTILLO Still One Lane Passable as
Poblacion, Kibungan going 0912 376 6841 per email received dated
September 18, 2018 @ 2:45
AM
q. K0330+900 - K0330+930 Tabbak, September 15, 2018 Not Passable Soil Collapse Private equipment mobilized MPP BILLY JUN S. Still One Lane Passable as
Kibungan, Benguet for clearing operations DEPALOG per email received dated
0917 790 9915 September 18, 2018 @ 2:45
AM
r. K0339+020 - K0339+980 Malikliko, September 15, 2018 Not Passable Slide and Fallen Trees Clearing operations by LGU MPP MELVIN CASTILLO One Lane Passable as per
Ampusongan, Bakun, Benguet Bakun Equipment is on- going 0912 376 6841 email received dated
September 18, 2018 @ 6:34
PM
s. K0320+400 - K0320+420 Mayos, September 15, 2018 Not Passable Washout Clearing operations by private MPP MELVIN CASTILLO Still One Lane Passable as
Poblacion, Kibungan, Benguet & government equipments is 0912 376 6841 per email received dated
on-going September 18, 2018 @ 2:45
AM
t. K0330+800 - K0330+840 September 15, 2018 Passable Soil Collapse and Clearing operations by private MPP VIRGILIO GALAP Still One Lane Passable as
Tabbak,Kibungan, Benguet fallen trees & government equipments is 0912 803 3427 per email received dated
on-going September 18, 2018 @ 2:45
AM
u. K0344+250 - K0344+320 Liwang, August 27, 2018 Passable Soil Collapse Total clearing by DPWH MPP VIRGILIO GALAP Still One Lane Passable as
Ampusongan, Bakun, Benguet Dumptruck and Payloader is 0912 803 3427 per email received dated
scheduled September 18, 2018 @ 2:45
AM
v. K0348+800, Gakian, Gambang, September 15, 2018 Not Passable Soil Collapse Clearing operations is on hold MPP VIRGILIO GALAP One Lane Passable as per
Bakun due to heavy rains 0912 803 3427 email received dated
September 19, 2018 @ 11:31
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
w. K0349+300,Gakian, Gambang, September 15, 2018 Not Passable Roadslip Installed warning signs MPP VIRGILIO GALAP One Lane Passable as per
Bakun 0912 803 3427 email received dated
September 19, 2018 @ 11:31
AM

x. K0320+400-K0320+420 Mayos, September 18, 2018 Not Passable Washout(L=20, H=15) Widening works is on- going MPP MELVIN CASTILLO One Lane Passable as per
Poblacion, Kibungan, Benguet 0912 376 6841 phone call dated September
19, 2018 @11:45 AM

2. Cong. Andres Acop Cosalan Road September 15, 2018 Not Passable Slide, Soil Collapse Clearing operations is on- MPP MELVIN CASTILLO Passable as per telephone
(formerly Gurel- Bokod- Kabayan- and Rock collapse going 0939 5686 500 call dated September 21,
Buguias- Abatan Road), 2018 @10:28 AM
K0343+400-K0356+300, intermittent
sections
3. Abatan-Mankayan-Cervantes Road
a. K0344+350 Bulalacao, September 15, 2018 Not Passable Soil Collapse Clearing operations by private MPP MELVIN CASTILLO One Lane Passable as per
Mankayan equipment is on- going 0939 5686 500 email received dated
September 18, 2018 @ 2:45
AM
b. K0347+200 Poblacion, September 15, 2018 Not Passable Soil Collapse Clearing operations by private MPP MELVIN CASTILLO One Lane Passable as per
Mankayan equipment is on- going 0912 376 6841 email received dated
September 18, 2018 @ 2:45
AM
c. K0345+000 - K0347+000 September 15, 2018 Passable Soil Collapse Clearing operations by private MPP MELVIN CASTILLO Still One Lane Passable as
various section equipment is on- going 0912 376 6841 per email received dated
September 17, 2018 @ 6:59
PM
d. K0355+459, Abatan to September 16, 2018 Passable Soil Collapse Clearing operations by private MPP MELVIN CASTILLO Still One Lane Passable as
Cervantes Bdry equipment is on- going 0912 376 6841 per email received dated
September 17, 2018 @ 6:59
PM

Ifugao I DEO
1. Banaue-Hungduan-Benguet Boundary
Road
a. K0413+300 Munsoyosoy, Tinoc September 15, 2018 Not Passable Mudflow Clearing operations by MPP JERRY B. One Lane Passable as per
L=20m, H=2m Maintenance Crew is on-going INABIOHAN email received dated
0905 496 2320 September 19, 2018 @ 4:50
PM
b. K0354+250 - K0354+275 September 15, 2018 Not Passable Soil collapse Further clearing operations by MPP JERRY B. Still One Lane Passable as
Bokiawan, Hungduan (L=25m, H=4m) a privately owned equipment INABIOHAN per email received dated
is on- going 0905 496 2320 September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
c. K0358+200 Bokiawan, September 15, 2018 Not Passable Soil collapse Private equipment is on MPP JERRY B. Still One Lane Passable as
Hungduan (L=15m, H=3m) standby. Clearing operations INABIOHAN per email received dated
is hampered by heavy rains 0905 496 2320 September 18, 2018 @ 2:45
AM
d. K0358+350 Bokiawan, September 15, 2018 Not Passable Soil collapse Private equipment is on MPP JERRY B. Still One Lane Passable as
Hungduan (L=18m, H=3m) standby. Clearing operations INABIOHAN per email received dated
is hampered by heavy rains 0905 496 2320 September 18, 2018 @ 2:45
AM
e. K0402+900 Tulludan, Tinoc September 15, 2018 Not Passable Slide Clearing operations can't MPP JERRY B. Still One Lane Passable as
L=40m, H=4m commence due to continous INABIOHAN per email received dated
debris fall & mud flow. Private 0905 496 2320 September 18, 2018 @ 2:45
equipment on stand by. AM

f. K0410+400 Tocucan, Tinoc September 15, 2018 Not Passable Slide Clearing operations by MPP JERRY B. One Lane Passable as per
L=30m, H=5m Maintenance Crew is on-going INABIOHAN email received dated
0905 496 2320 September 19, 2018 @ 4:50
PM
g. K0407+750 - K0407+900 September 15, 2018 Not Passable Soil collapse Clearing operations by MPP JERRY B. Still Not Passable as per e-
L=150m ; Roadcut Maintenance Crew is on-going INABIOHAN mail received dated October 4,
0905 496 2320 2018 @ 3:00 PM

h. K0400+100 Tulludan, Tinoc September 18, 2018 Not Passable Soil Collapse Clearing operations by a MPP JERRY B. One Lane Passable as per
Section L=20m, W=6m, H=3m privately owned equipment is INABIOHAN email received dated
on- going
0905 496 2320 September 19, 2018 @ 4:50
PM

i. K0406+100-K0406+900, September 18, 2018 Not Passable Soil Collapse Clearing operations by a MPP JERRY B. Passable as per email
Tukucan, Tinoc, intermittent privately owned equipment is INABIOHAN received dated September 22,
section on- going 0905 496 2320 2018 @ 5:56 AM
j. K0404+100,Tukucan, Tinoc September 19, 2018 Not Passable Soil Collapse Clearing operations by a MPP JERRY B. Passable as per email
L=30m, W=6m, privately owned equipment is INABIOHAN received dated September 21,
H=2m on- going 0905 496 2320 2018 @ 10:28 AM

2. Kiangan-Tinoc-Buguias Road
a. K0345+700 - K0345+715 September 15, 2018 Not Passable Slide Clearing operations is on hold MPP ALLAN PAUL S. Still One lane Passable as
Binablayan, Tinoc (L=15m, W=5m) due to heavy rains PIGUDO per email received dated
0906 530 8046 September 18, 2018 @ 2:45
AM
b. K0355+000 - K0355+008 Brgy. September 15, 2018 Not Passable Slide Clearing operations is on hold MPP ALLAN PAUL S. Still One lane Passable as
Ap-apid, Tinoc (L=8m, W=6m) due to heavy rains PIGUDO per email received dated
0906 530 8046 September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
c. K0330+020, Julongan, Kiangan September 15, 2018 Not Passable Roadslip MPP ALLAN PAUL S. Still One lane Passable as
(L=20m) PIGUDO per email received dated
0906 530 8046 September 18, 2018 @ 2:45
AM
d. K0335+150, Julongan Section September 15, 2018 Not Passable Fallen trees Clearing done by MPP ALLAN PAUL S. Passable as per email
maintenance laborers PIGUDO received dated September 16,
0906 530 8046 2018 @ 11:09 PM
e. K0 332+500 - k0355+000, September 15, 2018 Not Passable Series of landslides Clearing operation will start MPP ALLAN PAUL S. Still One lane Passable as
Julongan to Ap-apid section as soon as the weather PIGUDO per email received dated
permits 0906 530 8046 September 18, 2018 @ 2:45
AM
f. K0349+800, Binablayan Section September 15, 2018 Not Passable Slide (L=10m, H=3m) Clearing operations by MPP ALLAN PAUL S. Still One lane Passable as
maintenance crew is on- PIGUDO per email received dated
going 0906 530 8046 September 18, 2018 @ 2:45
AM
g. K0349+850, Binablayan September 15, 2018 Not Passable Slide (L=10m, H=3m) Clearing operations by MPP ALLAN PAUL S. Still One lane Passable as
Section maintenance crew is on- PIGUDO per email received dated
going 0906 530 8046 September 18, 2018 @ 2:45
AM
h. K0350+600, Binablayan, September 15, 2018 Not Passable Slide Clearing operations by MPP ALLAN PAUL S. Still One lane Passable as
Section (L=20m, H=5m) maintenance crew is on- PIGUDO per email received dated
going 0906 530 8046 September 18, 2018 @ 2:45
AM
i. K0350+700, Binablayan, Section September 15, 2018 Not Passable Slide Clearing operations by MPP ALLAN PAUL S. Still One lane Passable as
(L=15m, H=4m) maintenance crew is on- PIGUDO per email received dated
going 0906 530 8046 September 18, 2018 @ 2:45
AM
j. K0351+200, Binablayan, Section September 15, 2018 Not Passable Slide Clearing operations by MPP ALLAN PAUL S. Still One lane Passable as
(L=25m, H=2m) maintenance crew is on- PIGUDO per email received dated
going 0906 530 8046 September 18, 2018 @ 2:45
AM
k. K0351+250, Binablayan, September 15, 2018 Not Passable Slide Clearing operations by MPP ALLAN PAUL S. Still One lane Passable as
Section (L=18m, H=2m) maintenance crew is on- PIGUDO per email received dated
going 0906 530 8046 September 18, 2018 @ 2:45
AM
l. K0352+400, Binablayan, Section September 15, 2018 Not Passable Slide Waiting for any available MPP ALLAN PAUL S. Still One lane Passable as
(L=18m, H=5m) equipment PIGUDO per email received dated
0906 530 8046 September 18, 2018 @ 2:45
AM
m. K0354+500, Gumhang Section September 15, 2018 Not Passable Slide Waiting for any available MPP ALLAN PAUL S. Still One lane Passable as
(L=20m, H=5m) equipment PIGUDO per email received dated
0906 530 8046 September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
n. K0354+600, Gumhang Section September 15, 2018 Not Passable Slide Waiting for any available MPP ALLAN PAUL S. Still One lane Passable as
(L=40m, H=4m) equipment PIGUDO per email received dated
0906 530 8046 September 18, 2018 @ 2:45
AM
o. K0357+020, Ap-apid, Tinoc September 15, 2018 Not Passable Slide Waiting for any available MPP ALLAN PAUL S. Still One lane Passable as
(L=19m, H=5m) equipment PIGUDO per email received dated
0906 530 8046 September 18, 2018 @ 2:45
AM
p. K0357+800, Ap-apid, Tinoc September 15, 2018 Not Passable Slide Waiting for any available MPP ALLAN PAUL S. Still One lane Passable as
(L=22m, H=4m) equipment PIGUDO per email received dated
0906 530 8046 September 18, 2018 @ 2:45
AM
q. K0357+300, Ap-apid, Tinoc September 16, 2018 Not Passable Road Cut Installed Warning Signs MPP ALLAN PAUL S. One Lane Passable (Light
Section PIGUDO Vehicles only) as per email
0906 530 8046 received dated September 19,
2018 @11:31 AM

Alternate route: Ap- apid


Road

r. K0358+970 - K0358+990 October 04, 2018 Not Passable Aggravated Road Slip Installed Warning Signs MPP ALLAN PAUL S. Not Passable as per email
(L=20m,H=10m) PIGUDO received dated October 04,
0906 530 8046 2018 @ 3:00 PM

Section under contract

Alternate Route:
Spring-Landing-Impugong
Municipal Road (One lane
s. K0360+080 September 17, 2018 Not Passable Soil Collapse Clearing operations by MPP ALLAN PAUL S. gravel road)Passable as per
One Lane
(L=70m,H=2m, Maintenance Crew is on- PIGUDO email received dated
W=7m) going 0906 530 8046 September 18, 2018 @ 2:45
AM
t. K0360+800, Impugong, Tinoc September 15, 2018 Not Passable Slide Clearing operations by MPP ALLAN PAUL S. One lane Passable as per
(L=30m, H=1m) Maintenance Crew is on- PIGUDO email received dated
going 0906 530 8046 September 20, 2018 @ 2:58
PM

Open/Close Situation

Ifugao II DEO
1. Banaue-Mayoyao- A. Lista- Isabela
Road
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
a. K0347+730 - K0347+755, Brgy. September 12, 2018 Passable Slide Further clearing operations by MPP BENTON B. Still One Lane Passable as
Kinakin, Banaue, Ifugao, (L=25m,H=10m, Maintenance crew and a BUCCAHI, JR. per email received dated
W=8m) privately owned equipment is 09358878220 September 18, 2018 @ 2:45
on- going AM
b. K0348+000-K0390+000 Kinakin September 15, 2018 Not Passable Slide Opening will resume MPP ALLAN PAUL S. Still One Lane Passable as
Banaue-Mayaoyao Section tommorow PIGUDO per email received dated
0906 530 8046 September 18, 2018 @ 2:45
AM
c. K0344+500 September 16, 2018 Not Passable Slide Clearing operations is on- MPP JOHN M. LIMOH Still One Lane Passable as
going 0975 239 2695 per email received dated
September 18, 2018 @ 2:45
AM
d. K0347+380- K0376+000, September 16, 2018 Not Passable Slide Clearing operations is on- MPP BENTON B. Still One Lane Passable as
Kinakin Mongo going BUCCAHI, JR. per email received dated
09358878220 September 18, 2018 @ 2:45
AM
2. Nueva Vizcaya - Ifugao - Mt. Province
Road
a. K0342+350,Viewpoint,Banaue September 15, 2018 Not Passable Slide Clearing operations by MPP JOHN M. LIMOH Passable as per email
privately owned equipment is 0975 239 2695 received dated September 19,
on-going 2018 @ 4:50 PM

b. K0344+000,Viewpoint, Banaue September 15, 2018 Not Passable Slide Clearing operations by MPP JOHN M. LIMOH Passable as per email
privately owned equipment is 0975 239 2695 received dated September 19,
on-going 2018 @ 4:50 PM

c. K0337+360, Amganad, Banaue September 15, 2018 Passable Slide Clearing operations by MPP JOHN M. LIMOH Still One Lane Passable as
privately owned equipment is 0975 239 2695 per email received dated
on-going September 18, 2018 @ 2:45
AM

d. K0340+280, Tam- An, Banaue September 15, 2018 Passable Slide Clearing operations by MPP JOHN M. LIMOH Still One Lane Passable as
privately owned equipment is 0975 239 2695 per email received dated
on-going September 18, 2018 @ 2:45
AM

e. K0342+370, Viewpoint, Banaue September 15, 2018 Passable Slide Clearing operations by MPP JOHN M. LIMOH Still One Lane Passable as
privately owned equipment is 0975 239 2695 per email received dated
on-going September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
f. K0345+800, Viewpoint, Banaue September 15, 2018 Passable Slide Clearing operations by MPP JOHN M. LIMOH Still One Lane Passable as
privately owned equipment is 0975 239 2695 per email received dated
on-going September 18, 2018 @ 2:45
AM

g. K0347+380, Viewpoint, Banaue September 15, 2018 Passable Slide Clearing operations by MPP JOHN M. LIMOH Still One Lane Passable as
privately owned equipment is 0975 239 2695 per email received dated
on-going September 18, 2018 @ 2:45
AM
h. K0347+400, Viewpoint, Banaue September 15, 2018 Passable Slide Clearing operations by MPP JOHN M. LIMOH Still One Lane Passable as
privately owned equipment is 0975 239 2695 per email received dated
on-going September 18, 2018 @ 2:45
AM
i. K0347+820, Viewpoint, Banaue September 15, 2018 Passable Slide Clearing operations by MPP JOHN M. LIMOH Still One Lane Passable as
privately owned equipment is 0975 239 2695 per email received dated
on-going September 18, 2018 @ 2:45
AM
j. K0350+230, Viewpoint, Banaue September 15, 2018 Passable Slide Clearing operations by MPP JOHN M. LIMOH Still One Lane Passable as
privately owned equipment is 0975 239 2695 per email received dated
on-going September 18, 2018 @ 2:45
AM
k. K0350+295, Viewpoint, Banaue September 15, 2018 Passable Slide Clearing operations by MPP JOHN M. LIMOH Still One Lane Passable as
privately owned equipment is 0975 239 2695 per email received dated
on-going September 18, 2018 @ 2:45
AM
l. K0350+550, Viewpoint, Banaue September 15, 2018 Passable Slide Clearing operations by MPP JOHN M. LIMOH Still One Lane Passable as
privately owned equipment is 0975 239 2695 per email received dated
on-going September 18, 2018 @ 2:45
AM
m. K0350+560, Viewpoint, Banaue September 15, 2018 Passable Slide Clearing operations by MPP JOHN M. LIMOH Still One Lane Passable as
privately owned equipment is 0975 239 2695 per email received dated
on-going September 18, 2018 @ 2:45
AM
n. K0350+720, Viewpoint, Banaue September 15, 2018 Passable Slide Clearing operations by MPP JOHN M. LIMOH Still One Lane Passable as
privately owned equipment is 0975 239 2695 per email received dated
on-going September 18, 2018 @ 2:45
AM
o. K0350+810, Viewpoint, Banaue September 15, 2018 Passable Slide Clearing operations by MPP JOHN M. LIMOH Still One Lane Passable as
privately owned equipment is 0975 239 2695 per email received dated
on-going September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
p. K0352+110, Viewpoint, Banaue September 15, 2018 Passable Slide Clearing operations by MPP JOHN M. LIMOH Still One Lane Passable as
privately owned equipment is 0975 239 2695 per email received dated
on-going September 18, 2018 @ 2:45
AM
q. K0353+300-K0358+330 September 15, 2018 Not Passable Series of Slides Clearing will resume MPP JOHN M. LIMOH Passable as per e-mail
tommorow 0975 239 2695 received dated September 18,
2018 @ 6:34 PM
r. K0358+325, Viewpoint, Banaue September 15, 2018 Not Passable Slides Clearing operations by a MPP JOHN M. LIMOH Passable as per email
privately owned equipment is 0975 239 2695 received dated September 19,
on-going 2018 @ 4:50 PM
3. Banaue-Hungduan-Benguet Boundary
Road
a. K0343+500, Brgy Poblacion, September 15, 2018 Not Passable Slide One lane passable Further MPP BENTON B. Still One Lane Passable as
Banaue clearing operation is on-going BUCCAHI, JR. per email received dated
09358878220 received dated September 19,
2018 @ 4:50 PM

b. K0349+780, Brgy. Ujah, Banaue September 15, 2018 Not Passable Slide One lane passable Further MPP BENTON B. Still One Lane Passable as
clearing operation is on-going BUCCAHI, JR. per email received dated
09358878220 received dated September 19,
2018 @ 4:50 PM

c. K0341+(-210)-K0353+205 September 16, 2018 One Lane Slide One lane passable Further MPP BENTON B. Still One Lane Passable as
Passable clearing operation is on-going BUCCAHI, JR. per email received dated
09358878220 received dated September 19,
2018 @ 4:50 PM

Lower Kalinga DEO


1. Tabuk - Banaue Road via Tanudan
-Barlig Road
a. K0543+200 - K0543+395, September 14, 2018 Not Passable Oversaturation of road Warning signs installed a. DME Liberato E. One Lane Passable as per
Dumanay Section, Tanudan section that is under Agrimor, Jr. email received dated
maintenance/ b. 0905-682-8266 September 19, 2018 @ 4:50
restoration PM

Section is under contract


Reported closed since
Typhoon/Tropical Storm
Henry, Inday, Josie,Habagat
and Karding.
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
b. K0522+100 - K0522+400 September 15, 2018 Not Passable Soil collapse Clearing operations by a MPP NAP RICHARD B. One Lane Passable as per
Matelled Section (L=20m, H=5m, privately owned equipment is LINGBAWAN email received dated
W=7.5m) on-going 0917 597 September 19, 2018 @4:50
2122 PM
c. K0518+480-K0518+512, September 15, 2018 Not Passable Sinking Pavement Warning signs installed MPP NAP RICHARD B. Still One Lane Passable as
Dupligan Section, Tanudan LINGBAWAN per email received dated
0917 597 September 19, 2018 @4:50
2122 PM
2. Mountain Province-Calanan-Pinukpuk-
Abbut Road
a. (Cagaluan- Calanan Section) September 14, 2018 Passable Rock collapse Clearing operations by DPWH a. MPP GERALD L. LICAB One Lane Passable as per
K0482+160 - K0482+168 L=8m,H=2m, equipment and Maintenance b.0935 218 2134 e-mail received dated
Gonogon Section, Tabuk City W=5.5m) crew is completed September 14, 2018 @
5:44PM

b. K0511+950, Cawagayan September 15, 2018 Not Passable Flash flood debris DPWH equipment mobilized MPP CARLSTON G. SOTO Passable as per email
Section for clearing operations received dated September 19,
0955 663 3440 2018 @ 4;50 PM
c. Tuga Section, Tabuk City September 15, 2018 Not Passable Flooded with road DPWH equipment mobilized MPP CARLSTON G. SOTO Passable as per email
covers for clearing operations received dated September 19,
0955 663 3440 2018 @ 4;50 PM
d. Cagaluan-Calanan Road September 15, 2018 Passable Soil and rock collapse Equipment and Maintenance MPP CARLSTON G. SOTO Still One Lane Passable as
Section, K0487+360 - K0487+375 crew is on standby. Clearing per email received dated
Dalmuno Section, Tabuk City operations is hampered by 0955 663 3440 September 18, 2018 @ 2:45
heavy rains AM

e. K0470+250 - K0470+258 September 15, 2020 Passable Soil Collapse Equipment and Maintenance MPP CARLSTON G. SOTO Still One Lane Passable as
Mosimos Section, Tabuk City crew is on standby. Clearing per email received dated
operations is hampered by 0955 663 3440 September 18, 2018 @ 2:45
heavy rains AM

f. K0529+000-K0535+000, September 15, 2021 Passable Fallen Debris and Equipment and Maintenance MPP CARLSTON G. SOTO Still One Lane Passable as
Turayoc to Catabbogan Section, Fallen Trees crew is on standby. Clearing per email received dated
Pinukpuk operations is hampered by 0955 663 3440 September 18, 2018 @ 2:45
heavy rains AM

g. Cagaluan-Calanan Road September 16, 2018 Passable Soil and rock collapse Clearing operations is MPP CARLSTON G. SOTO Still One Lane Passable as
Section, K0476+800 - K0476+820 completed per email received dated
Gawidan Section, Tabuk City 0955 663 3440 September 18, 2018 @ 2:45
AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
h. K0473+040 September 16, 2018 Passable Leaning big acacia On mobilization of MPP CARLSTON G. SOTO Passable to Light Vehicles
tree maintenance crew as per text message received
0955 663 3440 dated September 18, 2018 @
2:45 AM

3. Bulo National Road, September 15, 2018 Not Passable Fallen Trees Coordinated with private MPP GENIVIEVE B. Passable as per e-mail
K0507+000-K0507+200, Intermittent equipment owners for WANAWAN received dated September 15,
Section, Tabuk clearing operations 0909 989 0607 2018 @ 5:20 PM
4. Balbalan-Pinukpuk Road
a. K0496+000 - K0522+000, September 15, 2018 Not Passable Soil/rock collapse and Clearing operations by a MPP NAP RICHARD B. Passable as per email
Baay-Junction Pinukpuk, fallen trees privately owned equipment is LINGBAWAN received dated September 19,
Intermittent Sections on-going 09176972122 2018 @ 11:31 AM
b. K0498+180, Limus Section September 16, 2018 One Lane Slide Clearing ongoing by Private MPP NAP RICHARD B. Still One Lane Passable as
Pinukpuk Passable Equipment and DPWH Crew LINGBAWAN per email received dated
09176972122 September 18, 2018 @ 2:45
AM
c. K0523+000. Intermittent September 15, 2018 Not Passable Series of Slides Clearing operations by MPP NAP RICHARD B. Passable as per email
section privately owned equipment LINGBAWAN received dated September 20,
and Maintenance Crew is on- 09176972122 2018 @ 2:58 PM
going
5. Kalinga-Cagayan Road
a. K0514+800-K0514+825 September 15, 2021 Passable Roadslip Installed warning signs MPP CARLSTON G. SOTO Still One Lane Passable as
(L=100m, per e-mail received dated
W=1.5m,H=7m) 0955 663 3440 September 18, 2018 @ 2:45
AM
b. K0514+900, Taclobao Section, September 15, 2021 Passable Roadslip Installed warning signs MPP CARLSTON G. SOTO Still One Lane Passable as
Tabuk City (L=60m,W=2.5m,H=6 per e-mail received dated
m) 0955 663 3440 September 18, 2018 @ 2:45
AM
c. K0516+400, Spring Section, September 15, 2021 Passable Slide Clearing operations a MPP CARLSTON G. SOTO Still One Lane Passable as
Tabuk City privately owned per e-mail received dated
equipmentand Maintenance 0955 663 3440 September 18, 2018 @ 2:45
Crew is on-going AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
Upper Kalinga DEO
1. Mt. Province Boundary-Calanan-
Pinukpuk-Abbut Road
a. K0424+110 - K0424+135 July 22, 2018 Not Passable Soil Collapse Clearing operations by a. MPP WILSON IKE W. Passable as per call
Mabongis Section, Bugnay, Butbut, (L= 25m, W= 6m, privately owned equipment is ADDAMO September 19, 2018 @ 9:08
Tinglayan H=4m) on-going b.09369627527/09506661 AM
333
b. K0439+300 - K0439+330 September 15, 2018 Not Passable Soil collapse Clearing operations by MPP PASPAS B. BASILAN One Lane Passable as per
Bangad Section privately owned equipment is call September 19, 2018 @
on-going 0915 782 6505 9:08 AM
c. K0466+800 - K0466+820 September 15, 2018 Not Passable Soil collapse Clearing operations is on hold MPP PASPAS B. BASILAN Still One Lane Passable as
L=20m, W=7m, due to heavy rains per e-mail received dated
H=5m 0915 782 6505 September 18, 2018 @ 2:45
AM
d. K0448+800 - K0448+820 September 15, 2018 Not Passable Soil collapse Clearing operations is on hold MPP PASPAS B. BASILAN Still One Lane Passable as
Malango Section L=20m, H=1.5m, due to heavy rains per e-mail received dated
W=8m 0915 782 6505 September 18, 2018 @ 2:45
AM
e. K0448+970 - K0448+985 September 15, 2018 Not Passable Soil collapse Clearing operations is on hold MPP PASPAS B. BASILAN Still One Lane Passable as
Mallango Section L=15m, H=4m, due to heavy rains per e-mail received dated
W=8m 0915 782 6505 September 18, 2018 @ 2:45
AM
f. K0459+950 - K0459+970 September 15, 2018 Not Passable Soil collapse Clearing operations is on hold MPP PASPAS B. BASILAN Passable as per call
L=20m, H=3m, due to heavy rains September 19, 2018 @ 9:08
W=8m 0915 782 6505 AM
g. K0425+090 September 17, 2018 Not Passable Soil collapse Clearing operations by a. MPP WILSON IKE W. Passable as per email
L=15m, H=2m, privately owned equipment is ADDAMO received dated September 18,
W=6m on-going b.09369627527/09506661 2018 @ 6:34 PM
333
h. K0425+940 September 17, 2018 Not Passable Soil collapse Clearing operations by a. MPP WILSON IKE W. Passable as per email
L=15m, H=2m, privately owned equipment is ADDAMO received dated September 18,
W=6m on-going b.09369627527/09506661 2018 @ 6:34 PM
333
i. K0430+350 September 17, 2018 Not Passable Soil collapse Clearing operations by a. MPP WILSON IKE W. Passable as per call
L=20m, H=3.5m, privately owned equipment is ADDAMO September 19, 2018 @ 9:08
W=6.5m on-going b.09369627527/09506661 AM
333
j. K0431+600 September 17, 2018 Not Passable Soil collapse Clearing operations by a. MPP WILSON IKE W. Passable as per email
L=16m, H=2m, privately owned equipment is ADDAMO received dated September 18,
W=7m on-going b.09369627527/09506661 2018 @ 6:34 PM
333
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
k. K0431+950 September 17, 2018 Not Passable Sinking Pavement Clearing operations by a. MPP WILSON IKE W. Passable as per email
privately owned equipment is ADDAMO received dated September 18,
on-going b.09369627527/09506661 2018 @ 6:34 PM
333
l. Mabongis Bridge September 17, 2018 Not Passable Structural Failure Installed Warning signs a. MPP WILSON IKE W. Passable as per phone call
(massive soil collapse) ADDAMO received dated September 22,
b.09369627527/09506661 2018 @ 5:10 PM
333 Mabongis bridge not passable,
however,
Detour bridge was installed
m. K0422+090 September 17, 2018 Not Passable Soil collapse Clearing operations by a. MPP WILSON IKE W. Passable as per email
L=16m, H=4m, privately owned equipment ADDAMO received dated September 18,
W=4m will resume tomorrow b.09369627527/09506661 2018 @ 6:34 PM
morning 333
n. K0429+250, Basao Section September 17, 2018 Not Passable Roadslip Installed Warning signs a. MPP WILSON IKE W. Passable as per call
L=35m, H=12m, ADDAMO September 19, 2018 @ 9:08
Cave-in=2m b.09369627527/09506661 AM
333
o. K0431+020 September 17, 2018 Not Passable Soil collapse Clearing operations by a. MPP WILSON IKE W. Passable as per email
L=23, H=3m, W=4m privately owned equipment ADDAMO received dated September 18,
will resume tomorrow b.09369627527/09506661 2018 @ 6:34 PM
morning 333
p. K0431+300 September 17, 2018 Not Passable Soil collapse Clearing operations by a. MPP WILSON IKE W. Passable as per email
L=17, H=2m, W=4m privately owned equipment ADDAMO received dated September 18,
will resume tomorrow b.09369627527/09506661 2018 @ 6:34 PM
morning 333
q. K0431+900 September 17, 2018 Not Passable Soil collapse Clearing operations by a. MPP WILSON IKE W. Passable as per email
L=25, H=0.3m, privately owned equipment ADDAMO received dated September 18,
W=6m will resume tomorrow b.09369627527/09506661 2018 @ 6:34 PM
morning 333
r. K0460+020, Cagaluan Junction September 17, 2018 Not Passable Roadslip Clearing operations by a. MPP WILSON IKE W. One Lane Passable as per
L=25m, H=12m, privately owned equipment ADDAMO email received dated
Cave-in=23 will resume tomorrow b.09369627527/09506661 September 18, 2018 @ 6:34
morning 333 PM
2. Kalinga- Abra Road
a. K0466+(-031) September 15, 2018 Not Passable Soil collapse Clearing operations is on- MPP RENDYLL JERBE S. Still One Lane Passable as
L=10m, W=7m, going ASBOC per email received dated
H=7m 0917 364 7316 September 19, 2018 @ 4:50
PM
b. K0494+528-K0494+540, September 15, 2018 Not Passable Soil Collapse Equipment is on standby. MPP RENDYLL JERBE S. Still One Lane Passable as
Gusang Section, Balbalan (L= 12m, W= 3m, Clearing operations is ASBOC per email received dated
H=2m) hampered by heavy rains 0915 546 4406 September 19, 2018 @ 4:50
PM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
c. K0497+500 - K0497+510 September 15, 2018 Not Passable Soil collapse Clearing operations is on hold MPP RENDYLL JERBE S. Still One Lane Passable as
Pantikian Section L=10m, H=3m, due to heavy rains ASBOC per email received dated
W=7m 0915 546 4406 September 19, 2018 @ 4:50
PM
d. K0469+100,Ableg Section September 17 2018 Not Passable Soil Collapse 'Clearing operations by MPP RENDYLL JERBE S. Passable as per email
(L=30m,W=7m,H=4m privately owned equipment is ASBOC received dated September 17,
) on-going 0915 546 4406 2018 @ 2:00 PM
e. K0469+(-100)Ableg Section September 17 2018 Not Passable Soil Collapse 'Clearing operations by MPP RENDYLL JERBE S. Passable as per email
(L=20,W=4m,H=6m) privately owned equipment is ASBOC received dated September 18,
on-going 0915 546 4406 2018 @ 6:34 PM
f. K0468+400,Ableg Section September 17 2018 Not Passable Soil Collapse 'Clearing operations by MPP RENDYLL JERBE S. Passable as per email
(L=30m,W=10m,H=9 privately owned equipment is ASBOC received dated September 17,
m) on-going 0915 546 4406 2018 @ 2:00 PM
g. K0468+450,Ableg Section September 17 2018 Not Passable Soil Collapse 'Clearing operations by MPP RENDYLL JERBE S. Still One Lane Passable as
(L=50,W=8m,H=2m) privately owned equipment is ASBOC per email received dated
on-going 0915 546 4406 September 19, 2018 @ 4:50
PM
h. K0470+535,Ableg Section September 17 2018 Not Passable Soil/Rock Collapse 'Clearing operations by MPP RENDYLL JERBE S. One Lane Passable as per
(L=20,W=6m,H=5m) privately owned equipment is ASBOC email received dated
on-going 0915 546 4406 September 18, 2018 @ 2:45
AM
i. K0470+750,Ableg Section September 17 2018 Not Passable Soil Collapse 'Clearing operations by MPP RENDYLL JERBE S. One Lane Passable as per
(L=7m,W=3m,H=3m) privately owned equipment is ASBOC email received dated
on-going 0915 546 4406 September 18, 2018 @ 2:45
AM
j. K0471+500,Dolyaw Section September 17 2018 Not Passable Soil Collapse 'Clearing operations by MPP RENDYLL JERBE S. One Lane Passable as per
(L=35m,W=8m,H=8m privately owned equipment is ASBOC email received dated
) on-going 0915 546 4406 September 18, 2018 @ 2:45
AM
k. K0471+550,Dolyaw Section September 17 2018 Not Passable Soil Collapse 'Clearing operations by MPP RENDYLL JERBE S. One Lane Passable as per
(L=30m,W=8m,H=2m privately owned equipment is ASBOC email received dated
) on-going 0915 546 4406 September 18, 2018 @ 2:45
AM
l. K0471+620,Dolyaw Section September 17 2018 Not Passable Soil Collapse 'Clearing operations by MPP RENDYLL JERBE S. One Lane Passable as per
(L=10m,W=7m,H=5.5 privately owned equipment is ASBOC email received dated
m) on-going 0915 546 4406 September 18, 2018 @ 2:45
AM
m. K0472+(-030),Limood Section September 17 2018 Not Passable Soil Collapse 'Clearing operations by MPP RENDYLL JERBE S. Passable as per email
(L=10m,W=10,H=2m) privately owned equipment is ASBOC received dated September 18,
on-going 0915 546 4406 2018 @ 2:45 AM
n. K0473+300,Chigaching Section September 17 2018 Not Passable Soil Collapse 'Clearing operations by MPP RENDYLL JERBE S. Passable as per email
(L=10m,W=10,H=2m) privately owned equipment is ASBOC received dated September 18,
on-going 0915 546 4406 2018 @ 6:34 PM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
o. K0493+100,Bissong Section September 17 2018 Not Passable Soil Collapse 'Clearing operations by MPP RENDYLL JERBE S. Passable as per email
(L=40,W=10m,H=7m) privately owned equipment is ASBOC received dated September 18,
on-going 0915 546 4406 2018 @ 2:45 AM
p. K0475+(-50),Simang Section September 17 2018 Not Passable Soil Collapse 'Clearing operations by MPP RENDYLL JERBE S. Still One Lane Passable as
(L=6m,W=3m,H=2m) privately owned equipment is ASBOC per email received dated
on-going 0915 546 4406 September 19, 2018 @ 4:50
PM
q. K0475+080,Simang Section September 17 2018 Not Passable Soil Collapse 'Clearing operations by MPP RENDYLL JERBE S. Still One Lane Passable as
(L=9m,W=3m,H=5m) privately owned equipment is ASBOC per email received dated
on-going 0915 546 4406 September 19, 2018 @ 4:50
PM
r. K0476+400,Balinciagao Norte September 17 2018 Not Passable Soil Collapse 'Clearing operations by MPP RENDYLL JERBE S. Still One Lane Passable as
Section (L=20m,W=4m,H=1.5 privately owned equipment is ASBOC per email received dated
m) on-going 0915 546 4406 September 19, 2018 @ 4:50
PM
s. K0477+400,Balinciagao Norte September 17 2018 Not Passable Soil Collpse 'Clearing operations by MPP RENDYLL JERBE S. Still One Lane Passable as
Section (L=10m,W=4m,h=2.5 privately owned equipment is ASBOC per email received dated
m) on-going 0915 546 4406 September 19, 2018 @ 4:50
PM
t. K0477+930,Balinciagao Norte September 17 2018 Not Passable Soil Collpse 'Clearing operations by MPP RENDYLL JERBE S. Still One Lane Passable as
Section (L=8m,W=3m,h=2m) privately owned equipment is ASBOC per email received dated
on-going 0915 546 4406 September 19, 2018 @ 4:50
PM

3. Lubuagan-Batong Buhay Road, September 15, 2018 Not Passable Soil collapse Clearing operations by MPP RENDYLL JERBE S. Passable as per email
K0461+450 - K0477+600 (int. sections) L=10m, H=2m, privately owned equipment is ASBOC received dated September 20,
W=4m on-going 0917 364 7316 2018 @9:31 AM
4. Balbalan-Pinukpuk Road,
a. K0489+300 Maling Section September 15, 2018 Not Passable Series of soil collapse Clearing operations by MPP JOHN CRISTER B. Passable as per email
privately owned equipment is WACAS received dated September 22,
on-going 0926 0725 656 2018 @ 2:20 PM

b. K0489+350, Maling Section September 19, 2018 Not Passable Soil collapse Clearing operations by MPP JOHN CRISTER B. Passable as per email
(L=21m,W=3m,H=8m privately owned equipment is WACAS received dated September 21,
on-going 0926 0725 656 2018 @ 10:28 AM

c. K0489+400, Dao-angan Section September 15, 2018 Not Passable Soil collapse, L=13m, Clearing operations by MPP JOHN CRISTER B. Passable as per email
W=3m, H=7m privately owned equipment is WACAS received dated September 23,
on-going 0926 0725 656 2018 @ 2:55 PM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
d. K0489+430, Dao-angan Section September 15, 2018 Not Passable Soil collapse, L=29m, Clearing operations by MPP JOHN CRISTER B. Passable as per email
W=5m, H=6m privately owned equipment is WACAS received dated September 23,
on-going 0926 0725 656 2018 @ 2:55 PM

e. K0490+200, Dao-angan Section September 15, 2018 Not Passable Soil collapse, L=17m, Clearing operations by MPP JOHN CRISTER B. Passable as per email
W=3m, H=8m privately owned equipment is WACAS received dated September 21,
on-going 0926 0725 656 2018 @ 10:28 AM

f. K0490+350 - K0490+370 Dao- September 15, 2018 Not Passable Soil collapse Clearing operations by MPP JOHN CRISTER B. Passable as per email
angan Section L=10m, H=2m, privately owned equipment is WACAS received dated September 21,
W=4m on-going 0926 0725 656 2018 @ 10:28 AM
g. K0490+600, Dao-angan Section September 15, 2018 Not Passable Soil collapse, L=19m, Clearing operations by MPP JOHN CRISTER B. Passable as per email
W=4m, H=7m privately owned equipment is WACAS received dated September 21,
on-going 0926 0725 656 2018 @ 10:28 AM

h. K0491+400, Dao-angan Section September 15, 2018 Not Passable Soil collapse, L=31m, Clearing operations by MPP JOHN CRISTER B. Passable as per email
W=6m, H=8m privately owned equipment is WACAS received dated September 21,
on-going 0926 0725 656 2018 @ 10:28 AM

i. K0493+050, Dao-angan Section September 15, 2018 Not Passable Roadslip Installed Warning Signs MPP JOHN CRISTER B. Passable as per email
WACAS received dated September 21,
0926 0725 656 2018 @ 10:28 AM

Mt. Province 1st DEO


1. Mountain Province-Nueva Viscaya Road

a. K0364+500-K0364+560, September 14, 2018 Not Passable Slope collapse Clearing operations is on- MPP TERESA K. PABLO Still One Lane Passable as
Ambatec Section, Bayyo, Bontoc, L=60m,H=10m, going 0929 138 4657 per email received dated
Mt. Province W=7m) September 18, 2018 @ 2:45
AM
b. Chico Karayan Bridge September 15, 2018 Not Passable Closed to traffic due to Passable as per email
monitoring of bridge received dated September 17,
condition 2018 @ 2:00 PM
c. Samoki to Mt. Polis Section September 15, 2018 Not Passable Series of Slides Equipment is on standby. MPP TERESA K. PABLO Still One Lane Passable as
Clearing operations is 0929 138 4657 per email received dated
hampered by heavy rains September 18, 2018 @ 2:45
AM
2. Mountain Province-Ilocos Sur Rd via
Tue,
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
a. K0388+250 Beto Section, September 14, 2018 Not Passable Slope collapse Further clearing operations by a. MPP ARNEL A. BELDIO One Lane Passable as per
Tadian, Mt Province L=15m,H=5m, One (1) privately owned email received dated
W=7m) Equipment will mobilize on b. 0946 4683 665 September 18, 2018 @ 2:45
September 15, 2018 AM
Warning signs installed

b. K0416+800, Supang Section September 15, 2018 Not Passable Slide Coordinated with private MPP ARNEL A. BELDIO One Lane Passable as per
equipment owners for 0946 4683 665 email received dated
clearing operations September 18, 2018 @ 2:45
AM
3. Mt. Province -Ilocos Sur Road via September 15, 2018 Not Passable Slide Clearing operations by MPP ARNEL A. BELDIO Passable as per email
Kayan, a. K0399+100 - K0399+140 privately owned equipment is 0946 4683 665 received dated September 18,
on-going 2018 @ 6:34 PM
4. Mt. Province-Cagayan via Tabuk-Enrile
Road,
a. K0401+480 - K0401+500 September 15, 2018 Not Passable Slope Collapse Clearing operations by MPP ERVINE A. SAMIDAN Still One Lane Passable as
privately owned equipment is 0907 622 1366 per email received dated
on-going September 18, 2018 @ 2:45
AM
b. K0409+300 - K0409+315 September 15, 2018 Not Passable Slope Collapse Clearing operations by MPP ERVINE A. SAMIDAN Still One Lane Passable as
privately owned equipment is 0907 622 1366 per email received dated
on-going September 18, 2018 @ 2:45
AM
c. K0409+380 - K0409+410 September 15, 2018 Not Passable Slope Collapse Clearing operations by MPP ERVINE A. SAMIDAN Still One Lane Passable as
privately owned equipment is 0907 622 1366 per email received dated
on-going September 18, 2018 @ 2:45
AM
5. Junction Talubin-Barlig-Natonin- September 15, 2018 Not Passable Slide Equipment is on standby. MPP TERESA K. PABLO Still One Lane Passable as
Paracelis-Calaccad Road, Clearing operations is 0929 per email received dated
K0380+950, Pingew Section, Talubin, hampered by heavy rains 138 4657 September 18, 2018 @ 2:45
Bontoc AM
6. Dantay Sagada Road K0385+(-150) September 15, 2018 Not Passable Slope Collapsed Clearing operations by MPP Roldan V. Colas Passable to 4-wheel drive
privately owned equipment is 09395731659 vehicles as per email received
on-going dated September 18, 2018 @
6:00 AM
Alternate route: Balili- Suyo-
Sagada Road

Mt. Province 2nd DEO


1. Junction Talubin-Barlig-Natonin-
Paracelis-Calaccad Road
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
a. K0472+365 - K0472+410 September 4, 2018 Not Passable Road collapse Construction of retaining wall a. MPP Recto S. Safilo One lane Passable (Light
Bacarri, Paracelis is on-going vehicles only) as per email
b. 0948 270 9538 received dated September 18,
2018 @ 2:45 AM

b. K0426+200 - K0426+280, September 12, 2018 Passable Slide Further clearing operations by a. MPP JERRY S. Still One Lane Passable as
Banao, Natonin (L=80m,W=8m, a privately owned equipment CHIMICAG per email received dated
H=5m) and one (1) DPWH equipment b. 09502134509 September 18, 2018 @ 2:45
is on- going AM

c. K0433+200 - K0433+230 Pudo, September 15, 2018 Not Passable Slide Clearing operations by DPWH MPP RECTO S. SAFILO Still One Lane Passable as
Natonin Equipment and Maintenance 0948 270 9538 per email received dated
Crew is on-going September 18, 2018 @ 2:45
AM
d. Balabag-Poblacion, Natonin September 15, 2018 Not Passable Series of slide/rock fall Clearing operations by DPWH MPP RECTO S. SAFILO Still One Lane Passable as
and fallen trees Equipment and Maintenance 0948 270 9538 per email received dated
Crew is on-going September 18, 2018 @ 2:45
AM
e. K0404+000-K0430+300, Lias, September 16, 2018 Not Passable Series of Clearing operations by DPWH MPP RECTO S. SAFILO Passable as per e-mail
Barlig to tonglayan, Natonin landslide/rockslides Equipment and Maintenance 0948 270 9538 received dated September 16,
and fallen trees at Crew is on-going 2018 @ 4:24 PM
various section
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
REGION I
Ilocos Norte 2nd DEO
1. Ilocos Norte-Apayao Road,
a. K0 528+400 - K0 528+418 Brgy September 15, 2018 Passable Eroded shoulder Installed Warning Signs a. Sherell P.Pe Benito Passable as per email
Maananteng, Solsona b. 09198748951 received dated September 19,
2018 @ 9:24 AM

Damaged by previous
typhoon.
b. K0 534+650 - K0 534+686 Brgy September 15, 2018 Passable Damaged PCCP and Warning devices were a. Sherell P.Pe Benito Passable as per email
Maananteng, Solsona Slope Protection installed b. 09198748951 received dated September 19,
Collapse 2018 @ 1:36 PM

Damaged by previous
typhoon.
c. K0 536+200 - K0 536+223 Brgy September 15, 2018 Passable Damaged PCCP and Warning devices were a. Sherell P.Pe Benito Passable as per email
Maananteng, Solsona Slope Protection installed b. 09198748951 received dated September 19,
Collapse 2018 @ 1:36 PM

Damaged by previous
typhoon.
d. K0 536+500 - K0 536+536 Brgy September 15, 2018 Passable Damaged PCCP and Warning devices were a. Sherell P.Pe Benito Passable as per email
Maananteng, Solsona Slope Protection installed b. 09198748951 received dated September 19,
Collapse 2018 @ 1:36 PM

Damaged by previous
typhoon.
e. K0 539+500 - K0 539+550 September 15, 2018 Not Passable Eroded raodway Warning devices were a. Sherell P.Pe Benito Still Passable to light
(gravel road section) installed b. 09198748951 vehicles (One lane
Passable) as per email
received dated September 19,
2018 @ 4:48 PM

2. Ilocos Norte-Abra Road a. Sherell P.Pe Benito


b. 09198748951
a. K0532+000 September 18, 2018 Passable Sides Warning devices were Passable to all types of
installed vehicles as per email received
dated September 19,2018 @
9:24 AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
b. K0539+350 September 18, 2018 Not Passable Landslides Warning devices were Passable to all types of
installed vehicles as per email received
dated September 19,2018 @
9:24 AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
Ilocos Sur 2nd DEO
1. Tagudin-Cervantes Road
a. K0364+000 to K0382+000 September 15, 2018 Not Passable Land/rock slides Installed warning signs, Passable as per email
Brgy. Malaya to Brgy. Zigzag, clearing operations on-going received dated September 20,
Cervantes, I.S. 2018 @ 9:07 AM
b.K0321+000 to K0345+000 September 16, 2018 Not Passable Land/rock slides Installed warning signs, Passable as per email
Brgy. Manatong (Intermittent clearing operations on-going received dated September 20,
section) 2018 @ 9:07 AM
c. K0355+400, Brgy. Man-atong September 16, 2018 Not Passable Land/rock slides Installed warning signs, Passable as per email
Bessang Pass- Malaya clearing operations on-going received dated September 20,
2018 @ 9:07 AM
2. Jct. Santiago-Banayoyo-Lidlidda-San September 16, 2018 Not Passable Land/rock slides Installed Warning Signs Passable as per email
Emilio-Quirino Road K0376+400- received dated September 20,
K0394+000 2018 @ 9:07 AM

La Union 1st DEO


1. Manila North Road, MNR KO266+400 September 15, 2018 Not Passable Flooded District Maintenance a. Isabelo Lopez Passable as per email
Engineers (DMEs) and b. received dated September 16,
Maintenance Point Persons 09156179580 2018 @ 9:04 PM
(MPPs) are inspecting AOR
2. Alilem -Sugpon Road, K0317+000 - September 16, 2018 Passable Eroded Shoulder and maintenance crew are a. Isabelo Lopez Still One lane Passable as
K0318+000 with exceptions doing regular maintenance b. per email received dated
activities 09156179580 September 19, 2018 @ 4;48
PM
La Union 2nd DEO
1. Agoo-Baguio City Road (Badiwan, September 15, 2018 Not Passable rock fall Monitoring and installation of a.Nestor Sibayan Passable as per update
Benguet to Baguio City) warning and informative signs b. 09174880716 received dated September 16,
2018 @ 9:04 PM
2. Rosario-Pugo Access Road, Alipang September 15, 2018 Passable landslide on-going clearing operations a.Nestor Sibayan Passable as per email
Section (KO217+000) b. 09174880716 received dated September 19,
2018 @ 9:24 AM

3. Bauang-Baguio City Road, K0266+750, September 15, 2018 Passable On going construction of a.Nestor Sibayan Still One Lane Passable as
Brgy. Imelda, Naguilian, La Union Reinforced Concrete Box b. 09174880716 per email received dated
Culvert September 19, 2018 @4;48
PM
Baguio East bound vehicles
take old road, Brgy. Imelda,
Naguilian while La Union, west
bound vehicles pass the one
lane to make it two-way
passable to all types of
vehicles.
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)

Pangasinan 1st DEO


1. Alaminos-Bolinao Road, Garrita Bridge July 19, 2018 Not Passable Not related to Pouring of concrete on bridge a. Gerry Y. Sison Not Passable since
(detour), K0329+300 Typhoon Ompong deck is on-going b. 0917 840 5731 Typhoon/Tropical Storm
Henry, Inday, Josie,Habagat
and TS Karding

Closure to heavy vehicles is


not related to Typhoon
Ompong

Bridge is Under contract

Alternate Route for Heavy


Vehicles:
Mabini-Bani Provincial Road or
Burgos-Agno Road

2. Pangasinan-Zambales Road, September 15, 2018 Not Passable Flooding (h=0.6 m) District Maintenance a. Gerry Y. Sison Passable as per email
KO303+500 - KO304+000 Caranglan Engineers (DMEs) and b. 09178405731 received dated September 16,
Section, Mabini Maintenance Point Persons 2018 @ 12:07 PM
(MPPs) are inspecting AOR
and maintenance crew are
doing regular maintenance
activities
3. Bani-Agno Road, KO342+000 - September 15, 2018 Not Passable Flooding (h=0.4 m) District Maintenance a. Wilfred V. Carace Passable as per email
KO344+400, Cayungnan Section Engineers (DMEs) and b.09196149058 received dated September 16,
Maintenance Point Persons 2018 @ 5:00 PM
(MPPs) are inspecting AOR
and maintenance crew are
doing regular maintenance
activities
Pangasinan 2nd DEO
1. Pangasinan - Zambales Road
a. Bolo Section September 15, 2018 Not Passable Flooded (h=0.3 m) District Maintenance a. Victoria Visperas Passable as per email
Engineers (DMEs) and b. 09228798533 received dated September 16,
Maintenance Point Persons 2018 @ 9:04 PM
(MPPs) are inspecting AOR
and maintenance crew are
doing regular maintenance
activities
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
b. Bongalon Section September 15, 2018 Not Passable Flooded (h=0.3 m) District Maintenance a. Victoria Visperas Passable as per email
Engineers (DMEs) and b. 09228798533 received dated September 16,
Maintenance Point Persons 2018 @ 9:04 PM
(MPPs) are inspecting AOR
and maintenance crew are
doing regular maintenance
activities
c. Dulig Section September 15, 2018 Not Passable Flooded (h=0.3 m) District Maintenance a. Victoria Visperas Passable as per email
Engineers (DMEs) and b. 09228798533 received dated September 16,
Maintenance Point Persons 2018 @ 9:04 PM
(MPPs) are inspecting AOR
and maintenance crew are
2. Pangasinan - Tarlac Road doing regular maintenance
a. Bogtong Section, KO172+150 September 15, 2018 Not Passable Flooded (h=0.3 m) District
activitiesMaintenance a. Victoria Visperas Passable as per email
Engineers (DMEs) and b. 09228798533 received dated September 16,
Maintenance Point Persons 2018 @ 9:04 PM
(MPPs) are inspecting AOR
and maintenance crew are
doing regular maintenance
activities
b. Umanday Section, KO195+500 September 15, 2018 Not Passable Flooded (h=0.3 m) District Maintenance a. Victoria Visperas Passable as per email
Engineers (DMEs) and b. 09228798533 received dated September 16,
Maintenance Point Persons 2018 @ 9:04 PM
(MPPs) are inspecting AOR
and maintenance crew are
doing regular maintenance
activities

c. Aguilar Section (KO190+700 September 15, 2018 Not Passable Flooded (h=0.3 m) District Maintenance a. Victoria Visperas Passable as per email
Engineers (DMEs) and b. 09228798533 received dated September 16,
Maintenance Point Persons 2018 @ 9:04 PM
(MPPs) are inspecting AOR
and maintenance crew are
doing regular maintenance
activities

3. Pangasinan - La Union Road, Cayanga September 16, 2018 Not Passable Erosion on Bridge Filling of embankment a. Victoria Visperas Passable as per chat
Bridge Approach A materials on-going. b. 09228798533 message received dated
September 17,2018 @ 5:50
PM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
4. Urdaneta-Jct. Dagupan Road September 16, 2018 Not Passable Flooded (h=0.25 m) District Maintenance a. Victoria Visperas Passable as per email
YMCA Tapuac Section Engineers (DMEs) and b. 09228798533 received dated September 19,
Maintenance Point Persons 2018 @ 1:36 PM
(MPPs) are inspecting AOR
and maintenance crew are
doing regular maintenance
activities

Pangasinan 4th DEO


1. Urdaneta Jct.-Dagupan Road
a. K198+500 - K0198+900 September 17, 2018 Not Passable Flooded (h=0.2 m) Barricades and warning signs a. Adonis Ignacio Passable as per email
Maningding, Sta. Barbara installed. b. CP#09204077197 received dated September 17,
2018 @ 4:17 PM

2. Calasiao old Road September 17, 2018 Not Passable Flooded (h=0.4 m) Barricades and warning signs a. Adonis Ignacio Passable as per email
K0204+000 - K0204+150 Bued, Calasiao installed. b. CP#09204077197 received dated September 18,
2018 @ 8:00AM

3. San Carlos-Calasiao Road


a. K0212+800 - K0212+810, September 17, 2018 Not Passable Flooded (h=0.4 m) Barricades and warning signs a. Adonis Ignacio Passable to all types of
Mancup, Calasiao installed. b. CP#09204077197 vehicles as per email
received dated September 18,
2018 @ 4:52 PM

b. K0210+320 - K0210+360, September 17, 2018 Not Passable Flooded (h=0.40 m) Barricades and warning signs a. Adonis Ignacio Passable to all types of
Malabago, Calasiao installed. b. CP#09204077197 vehicles as per email
received dated September 18,
2018 @ 4:52 PM

c. K0213+050 - K0213+300, September 17, 2018 Not Passable Flooded (h=0.30 m) Barricades and warning signs a. Adonis Ignacio Passable to all types of
Poblacion, Calasiao installed. b. CP#09204077197 vehicles as per email
received dated September 18,
2018 @ 4:52 PM

REGION II
Batanes DEO
1. Batan Island along K0023+600 September 15, 2018 Not Passable Road slips and debris Maintenance crew and a. Alfredo T. Cariaso Passable as per email
equipment on stand-by b. 09999924969 received dated September 16,
2018 @ 7:36 PM

Cagayan 2nd DEO


AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
1. Manila North Road, K0664+500, Calog September 16, 2018 Not Passable Flash flood Barricades and warning signs a. Eugenio L. Lasam Passable to Heavy vehicles
Sur, Abulug, Cagayan installed. b. 09171326026 as per text message received
dated September 16, 2018 @
6:25 AM

Cagayan 3rd DEO


1. Itawes Overflow Bridge, K0519+(-1044) September 15, 2018 Not Passable Flooding Barricades and warning signs a. Eugenio L. Lasam Passable as per email
along Cagayan-Apayao Rd.,Sta. Barbara, installed. b. 09171326026 received dated September 16,
Piat, Cagayan 2018 @ 6:01 PM

2. Peñablanca Callao Cave Road September 15, 2018 Not Passable fallen trees, electric Barricades and warning signs a. Eugenio L. Lasam Passable as per email
posts, cables and installed. b. 09171326026 received dated September 16,
debris in the 2018 @ 6:01 PM
carriageway
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
Isabela 1st DEO
1. Cabagan-Sta. Maria Bridge September 15, 2018 Not Passable Flooding, 0.3m Maintenance Crew were a. Restituto A. Bentero b. Passable as per telephone
deployed to monitor the area. 09278350283 call dated September 18,
2018 @ 6:00 PM

Nueva Vizcaya 2nd DEO


1. Nueva Vizcaya-Benguet Road, September 15, 2018 Passable Landslide Clearing operations on-going a. DME Christopher One Lane Passable as per
K0261+300 Balasya email received dated
b. 0926 063 3794 September 16, 2018 @ 6:22
AM
2. Daang Maharlika
a. Baliling Sabo Dam September 19, 2018 Silted sabo dam As per email received dated
September 19, 2018 @ 12:07
PM

b. Calitlitan Sabo Dam September 19, 2018 Silted sabo dam As per email received dated
September 19, 2018 @ 12:07
PM

3. Nueva Vizcaya-Pangasinan Road


a.. Baracbac Sabo Dam September 19, 2018 Silted sabo dam As per email received dated
September 19, 2018 @ 12:07
PM

Quirino DEO
1. NRJ Villa Sur-San Pedro-Cabuaan-
Ysmael-Disimungal Road,
a. K0368+628 - K0369+015 September 15, 2018 Not Passable Flooding (h=0.7m) Maintenance Crew were a. Reynaldo T. Gonzales Passable as per call received
deployed to monitor the area. b. 09175172924 dated September 16, 2018 @
10:43 PM

b. K0375+450 -K0375+500, (Barangay September 15, 2018 Not Passable damaged PCCP Maintenance Crew were a. Reynaldo T. Gonzales Passable as per call received
Cabuaan, Maddela, Quirino) shoulder and slope deployed to monitor the area. b. 09175172924 dated September 16, 2018 @
protection 10:43 PM

2. San Pedro Overflow Bridge at September 15, 2018 Not Passable high water elevation Maintenance Crew were a. Reynaldo T. Gonzales Passable as per email
K0367+768 and now under water deployed to monitor the area. b. 09175172924 received dated September 16,
2018 @ 6:22 AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
3. Jct. Abbag-Guingin Bdry road September 16, 2018 Passable slides at intermittent Maintenance Crew were a. Reynaldo T. Gonzales One Lane Passable as per
(S04754LZ) K0445+000-K0463+900, sections deployed to monitor the area. b. 09175172924 chat message received dated
Barangay Guingin, Giayan ,Nagtipunan September 21, 2018 @ 9:22
Quirino PM

4. Victoria - Maddela -Alicia - Kasibu bdry September 16, 2018 Passable slides at intermittent Maintenance Crew were a. Reynaldo T. Gonzales One Lane Passable as per
Rd. ,Barangay Jose Ancheta, Maddela, sections deployed to monitor the area. b. 09175172924 email received dated
Quirino, K0383+800 September 16, 2018 @ 6:22
AM

REGION III
Bulacan 1st DEO
1. Bigaa-Plaridel via Malolos Road
a. K0030+392 - K0031+000, Panginay, September 15, 2018 Not Passable Flooded (h=0.7 m) Continuous monitoring and a. Ernesto Daos Passable as per email
Balagtas roving of maintenance crew b. 09222164006 received dated September 16,
along national road 2018 @ 9:56 PM

2. Manila North Road


a. KM28+900 – KM29+400, Bocaue September 15, 2018 Not Passable Flooded (h=0.7 m) Continuous monitoring and a. Ernesto Daos Passable as per email
Balagtas Bdry. roving of maintenance crew b. 09222164006 received dated September 15,
along national road 2018 @ 4:55 PM

Nueva Ecija 1st DEO


1. Daang Maharlika Road, K0176+200- September 15, 2018 Not Passable flooding (h =0.5 m) Clearing of debris completed a. Nestor G. Galapon Passable as per email
K0176+350, Brgy. Puncan,Carranglan and debris flow b. 0915 882 7368 received dated September 15,
2018 @ 4:55 PM

2. Pantabangan-Canili-Basal-Baler Road, September 15, 2018 Not Passable flooding (h =0.6 m) Clearing of debris completed a. Glen Imperio Passable as per email
K0186+500, Brgy. Marikit, Alfonzo and debris flow b. 0905 499 4601 received dated September 15,
Castañeda, 2018 @ 4:55 PM

3. Jct. Pinagpanaan-Rizal-Pantabangan September 15, 2018 Not Passable collapsed roadway on-going backfilling of road a. Glen Imperio Passable as per email
Road. K0165+360 Brgy. Aya, Pantabangan way b. 0905 499 4601 received dated September 16,
N.E 2018 @ 2:23 PM

Nueva Ecija 2nd DEO

1. Nueva Ecija-Aurora Road, K0161+574, September 15, 2018 Not Passable Cut-off Detour Road Continuous monitoring and a. Eulogio Pesa Passable as per telephone
Brgy. Labi standby of equipment b. 0926 083 7180 call dated September 16, 2018
@ 2:23 PM

Pampanga 1st DEO


AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
1. Sto. Tomas - Minalin Road K0070+900 - September 15, 2018 Not Passable Flooded (h=0.1-0.38 Continuous monitoring Passable as per email
K0073+600, San Isidro. Minalin & m) conducted by the received dated September 19,
Telacsan Maintenance Staffs and 2018 @ 10:08 PM
Crews
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
2. Baliwag - Candaba - Sta. Ana Road,
a. K0068+(-348) Bomba Bridge, September 15, 2018 Not Passable Flooded (h=0.4 m) Continuous monitoring a. 'May C. Beltran Passable to Light Vehicles
San Agustin, Candaba, Pampanga conducted by the b. '0977 609 2033 as per phone call dated
Maintenance Staffs and September 28, 2018 @ 10:29
Crews AM
*Bomba Bridge (under
contract) Temporary open to
light vehicles
*Detour Bridge for repair
b. K0070+900 - K0071+050, September 17, 2018 Not Passable Flooded 0.25m Continuous monitoring Passable as per email
Pasig, Candaba, Pampanga underwater conducted by the received dated September 19,
Maintenance Staffs and 2018 @ 4:36 PM
Crews
3. Candaba - San Miguel Road, September 16, 2018 Not Passable Flooded (h=0.35 m) Continuous monitoring a. 'May C. Beltran Passable to Heavy Vehicles
K0073+400 - K0073+600 Paralaya, conducted by the b. '0977 609 2033 as per email received dated
Candaba Pampanga Maintenance Staffs and September 24, 2018 @ 10:00
Crews AM
4. San Simon-Baliuag, K0062+000- September 18, 2018 Not Passable Flooded (h=0.2-0.6 Continuous monitoring Passable as per email
K0065+000, Brgy. San Miguel and San m) conducted by the received dated September 20,
Simon Maintenance Staffs and 2018 @ 11:48 AM
Crews
Tarlac 1st DEO
1. Romulo Highway
a. K0158+000-K0159+000, Brgy. September 15, 2018 Not Passable Flooded (h=1.20 m.) Continuous monitoring a. Renato Z. Martinez Passable as per telephone
Cacamilingan Sur, Camiling conducted by the b. 0917 848 0629 call dated September 16, 2018
Maintenance Staffs and @ 2:23 PM
Crews
b. K0155+900 & K0156+700 September 15, 2018 Not Passable Flooded (h=1.20 m.) Continuous monitoring a. Renato Z. Martinez Passable as per telephone
conducted by the b. 0917 848 0629 call dated September 16, 2018
Maintenance Staffs and @ 2:23 PM
Crews
2. Paniqui-Camiling-Wawa Road
a. K0167+500 - K0170+000 Brgy. September 15, 2018 Not Passable Flooded (h=0.8 m.) Continuous monitoring a. Renato Z. Martinez Passable as per telephone
Sawat - Bilad Camiling conducted by the b. 0917 848 0629 call dated September 16, 2018
Maintenance Staffs and @ 2:23 PM
Crews
Tarlac 2nd DEO
1. Sta. Rosa - Tarlac Road Lapaz Section, September 16, 2018 Not Passable Flooded (h=.15-0.30 Continuous monitoring by the a. Adrian T. Sevilla Passable as per email
K0129+400-K0130+900 Brgy. San Roque m) Maintenance Staffs and b. 0932 562 4155 received dated September 18,
and San Isidro Lapaz, Tarlac Crews 2018 @ 10:15 AM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
2. Concepcion - Lapaz Road, K0136+200 - September 16, 2018 Not Passable Flooded (h=.15-0.30 Continuous monitoring by the a. Adrian T. Sevilla Passable as per email
K0136+426 Brgy. San Isidro lapaz Tarlac m) Maintenance Staffs and b. 0932 562 4155 received dated September 18,
Crews 2018 @ 10:15 AM
3. La-Paz Victoria Road, K0137+500 - September 16, 2018 Not Passable Flooded (h=0.2 m) Continuous monitoring by the a. Adrian T. Sevilla Passable to light vehicles
K0138+100 Brgy. Lomboy & Maintenance Staffs and b. 0932 562 4155 as per email received dated
Matayumtayum Laz Paz Tarlac Crews September 17, 2018 @
10:00AM

4. Tarlac Zambales Road, Brgy. Patling, September 16, 2018 Passable Damaged slope Continuous monitoring a. Adrian T. Sevilla Passable as per email
Capas Tarlac, K0126+300 - K0126+315 protection b. 0932 562 4155 received dated September 16,
L/S 2018 @ 9:56 PM

Zambales 1st DEO


1. Olongapo-Bugallon Road
a. K0213+400, Brgy. Marangla, September 15, 2018 Not Passable Flooded (h=1.0 m.) Continuous monitoring and a. Jessie Rey Lantano Passable as per telephone
Iba, Zambales roving of maintenance crew b. 0907 326 8209 call dated September 16, 2018
along national road. @ 2:23 PM

REGION V
Camarines Sur II DEO
1. Daang Maharlika, K0439+800 September 14, 2018 Passable Fallen Tree Clearing completed a. Rhemy S. Remot Passable as per email
b. 0907-9680537 received dated September 14,
2018 @ 05:53 PM

Catanduanes DEO Clearing completed


1. Catanduanes Circumferential Road
a. K0003+080 September 14, 2018 Passable Rockslide Clearing completed a. Marjorie Gan See Passable as per email
b. K0143+950 September 14, 2018 Passable Rockslide Clearing operation, on-going b. Marjorie
a. 0939-1178155
Gan See received
One Lanedated September
Passable 14,
as per
b. 0939-1178155 2018
email @received
05:53 PM (road
dated
section is under
September contract)
14, 2018 @ 05:53
PM
Sorsogon II DEO
1. Daang Maharlika, Bulusan Lake Road, September 14, 2018 Passable Soil Collapse Clearing operation completed a. Roi D. Barcela Passable as per email
Ariman Junction, K0628+600 b. 0907-9680537 received dated September 14,
2018 @ 05:53 PM

REGION VI
AKLAN DEO
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
1. Aklan West Road (S00480PN) - Jct. September 14, 2018 Not Passable Road Slip Maintenance Crew deployed a. Welbert Bayaban One Lane Passable as per
Nabas-Malay-Buruanga/Liberted Bdry., to install warning signs and b. 0908 934 9681 email received dated
K0234+(-933) - K0282+172 repair works September 15, 2018 @8:42
PM
AFFECTED AREAS DATE
MAJOR/SECONDARY ROAD/BRIDGE REPORTED ACTION TAKEN PREL. EST. a. POINTMAN
Province/City/Municipality (Barangay, Sta. TO CENTRAL SITUATION DESCRIPTION OF OF b. CONTACT NUMBER REMARKS
Limits) OFFICE DAMAGE (Equipment used/deployed) DAMAGE
(Php)
(1) (2) (4) (5) (6) (7) (8)
REGION VII
Negros Oriental III DEO
1. Dumaguete South Road, Sacsac Bridge September 14, 2018 Passable Road slip , scouring of Installed barriers and warning a. Cetilla Verna A. Tinaya One Lane Passable as per
Approach A, K0045+960 2 meters (right lane) devices, contractor's b. 0915-6965784 email received dated
personnel deployed for traffic September 14, 2018 @ 5:03
management, on-going repiar PM
Road is under contract

REGION VIII
Leyte V DEO
1. Abuyog-Silagao Road, K0968+(-269) - September 14, 2018 Not Passable Major repair of Cadac- Continuous monitoring of a. Leo Gallardo Not passable to all types of
K0995+320 an Bridge road condition b. 0916-9006525 vehicles (not related to TY
Ompong) as per e-mail
received dated Sept. 14, 2018
@ 8:51 AM

Alternate Route:
REGION X Daang Maharlika (Abuyog-
Bukidnon 1st DEO Mahaplag Section)
1. Kapalong-Talaingod-Valencia Road September 14, 2018 Not Passable Road slip with severe Installation barricades; Travel a. Kevin Loyd B. Passable (shoulder portion)
(S00641MN), K1571+(-173) scouring road bed advisory is released Carcueva as per email received dated
(NOT RELATED TO b. 0917-8733-387 September 14, 2018 @ 11:47
OMPONG) AM

2. Jct. SH Impasug-ong-Patulangan By- Not Passable road slip (NOT Travel advisory, released a. Aiza B. Ega Not Passable to Heavy
pass Road, K1478+000 -K1488+000 RELATED TO b. 0997-1143-799 Vehicles since November
(S00610MN) OMPONG) 2017 as per email received
dated September 15, 2018 @
12:00 MN
Camiguin DEO
1. Camiguin Circumferential Rad, K4+700- September 13, 2018 Not Passable Uprooted tree Clearing operations by DPWH a. Benjamin S. Babla Passable as per email
K4+705 equipment completed b. 0936-6274911 received dated September 14,
2018 @ 8:11 AM
Closure occurred at Sept. 13,
2018 @ 6:50PM and opened to
Prepared by: Submitted by: Approved by: traffic same day @ 7:35 AM

KENNETH ECHALICO DOMINADOR P. AQUINO ERNESTO S. GREGORIO, JR.


Engineer II Engineer V Director IV
Safety and Disaster Management Coordination Division