SCHEDULE-B
Sr Description Dia Qty Per Rate Amount
in Figure In words
1 Geological survey for drilling borewell 1.00 2000
Two thousand only 2000.00
Ref, yearly tender 2013-14
2 Drilling of borewell of 150 mm dia. 100.00 260 Two Hundred Sixty only 26000.00
Ref, GSDA approved rate 2008-09
3 P.V.C. casing pipe of 150 mm dia 20.00 440 Four Hundred fourty only 8800.00
Ref, GSDA approved rate 2008-09
6 Construction of platform 0.00 3576.3 Three Thousand Five Hundred seventy six paise
0.00
thirty Only
Ref, GSDA approved rate 2008-09
18 Water level guard 1.00 712.5 Seven Hundred twelve paise fifty Only 712.50
Ref, yearly tender 2013-14
20 H.T. capacitor 1.00 596 Five hundred ninety six only 596.00
Ref, MJP/DSR 2009.10 item no.CP-2
pg.No. 49
21 Starter 1.00 1962 one thousand one hundred sixty two only 1962.00
Ref, PWD elect /DSR 2010-11 item
no.12.5.1 pg.no. 132
22 ELCB + MCB/ELCB+SE & ELR 1.00 1031 one Thousand thirty one only 1031.00
Ref, PWD elect /DSR 2010-11 item
no.5.3.15 pg.no. 65
23 P/F G.I. pipes
b) 40 mm dia 100.00 285 two hundred eighty five Only 28500.00
c) 50 mm dia 235.00 395 three hundred ninety five Only 92825.00
Ref, MJP/DSR 2010-11 item no. 1C
pg.No. 83
24 G.I. Bend
a) 40 mm dia 1.00 116 one hundred sixteen only 116.00
b) 50 mm dia 0.00 176 one hundred seventy six only
SCHEDULE-B
Sr Description Dia Qty Per Rate Amount
in Figure In words
Ref, MJP mech/DSR 2009-10 item no.
PW-1 pg.No.12
25 G.I. Union
a) 40 mm dia 1.00 203 Two hundred three only 203.00
b) 50 mm dia 304 three hundred four only
Ref, MJP mech/DSR 2009-10 item no.
PW-4 pg.No.13
26 supply of Gun metal Gate valve (50 mm) 1.00 936 Nine hundred thirty six only 936.00
Ref, PWD elect /DSR 2010-11 item
no.13.7.22pg.no. 138
27 Supply of armoured cable 2.5 sq.mm. 138.00 178
One hundred seventy Eight only 24564.00
(3 core)
Ref, PWD elect /DSR 2010-11 item
no.7.2.5 pg.no. 85
28 P/Con BB Chamber with RCC cover 1.00 7073
Seven Thousand seventy three only 7073.00
Ref, MJP/DSR 2011-12 item no. 1B
pg.No. 282
Rs TOTAL 249975.50
250000.00
I/We am/are ready to execute works at ___________________ % above / below the estimated cost.
CONTRACOR
Executive Engineer
Water Supply Department,
Thane Municipal Corparation,Thane