Professional Documents
Culture Documents
STANDART OPERASIONAL
No. Dok SOP. 6.1.011
PROSEDURE
Revisi 0
Tgl. Terbit 01 Januari 2015
BOILER DAN ESP UNIT 3
Halaman Page 1 of 2
COLD START-UP BOILER
N PETUGAS
URAIAN Waktu KETERANGAN
O COHA WTP LAB BO TG ADM MEC ELK INC
6 Start IDF A
<100 oC
7 Start SAF A
8 Start IDF B
9 Start SAF B
Setting damper
18 Start Coal Mill ke-1
air system
Setting speed
18.1 Start coal feeder ke-1
coal feeder 5 t/h
Mulai operasikan
Over pressure? Tidak spraying water.
Beban turbin ±10
Ya MW
18.2 Stop 1 burner
Setting damper
21 Start Coal Mill ke-2 air system
Setting speed
21.1 Start coal feeder ke-2 Beban max ±37
Nyala api stabil? Tidak
Tunggu MW
Ya Pressure steam 8
MPa
21.2 Stop 1 atau 2 burner
Beban akan
di maximalkan? Tidak
Tunggu
Ya Setting damper
22 Start Coal Mill ke-3
air system
Nyala api stabil? Tidak Setting speed
22.1 Start coal feeder ke-3 Tunggu Beban maximal
Ya Spraying mode
AUTO
Tempt. Furnace
22.2 Stop semua burner
585 oC
Koordinasi ke
23 Stop pompa solar
boiler unit 1&2
Unit stabil? Tidak
Tunggu
Ya
24 Stop lube oil pump
Selesai 8 Jam
Dibuat Oleh : Diperiksa Oleh : Diketahui Oleh : Disetujui Oleh :
Foreman Supervisor Superintendent Manajer Operasional
Khakim., Relianus., Maryadi Rudangi., Dwi., Arif Rosibel Ompusunggu Ach. Choirul Hudin