SIMPLE INSPECTION UNIT #1 01 APRIL S.D 15 APRIL 2016
DEPT. OPERASIONAL BAGIAN BOILER DAN ESP
Man Power Schedule April 2016
No. Kegiatan Simple Inspection CFK T. Harian total 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 01 Pembuatan andang di dalam furnace 2 4 6 02 Cleaning furnace (water wall) 2 4 6 03 Flushing coal pipe 1 2 3 04 Cleaning coal burner 2 2 4 05 Thickness feed water line, water wall dan superheater tube bersama tim mekanik 1 0 1 06 Pembongkaran andang di dalam furnace 2 2 4 07 Cleaning pipa-pipa superheater 2 2 4 08 Cleaning pipa-pipa Superior Economizer 2 2 4 09 Cleaning superior Air Preheater 2 2 4 10 Cleaning pipa-pipa Subordinate Economizer 2 2 4 11 Cleaning Subordinate Air Preheater 2 2 4 12 Cleaning Ducting Elbow Flue Gas 2 2 4 13 Inspeksi pada ducting IDF A dan B 2 2 4 14 Cleaning Elektroda-elektroda chamber ESP 2 2 4 15 Menguras dan cleaning bak kontrol fan mill A 2 1 3 16 Menguras dan cleaning bak kontrol fan mill B 2 1 3 17 Menguras dan cleaning bak kontrol fan mill C 2 1 3 18 Menutup semua main hole untuk persiapan start-up 2 1 3 19 Cleaning semua area sisa-sisa kegiatan Simple Inspection untuk persiapan start-u 2 6 8
Man Power Schedule April 2016
No. Kegiatan Setelah Simple Inspection CFK T. Harian total 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 20 Pengecatan-pengecatan area Boiler #1 dan #2 0 4 4 RENCANA KERJA SIMPLE INSPECTION UNIT #1 01 APRIL S.D 15 APRIL 2016
DEPT. OPERASIONAL BAGIAN TURBIN DAN GENERATOR
Man Power Schedule
No. Kegiatan CFK T. Harian total 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 01 Cleaning tube condensate tank 2 4 6 02 Cleaning tube oil cooler 1 2 3 03 Cleaning strainer oil cooler 1 2 3 04 Cleaning strainer air generator 1 2 3 05 Cleaning strainer NRV 1 2 3 06 Cleaning strainer magnet BFWP dan Inlet BFWP 1 2 3 07 Cleaning tube air cooler generator 1 2 3 08 Cleaning oil tank 1 2 3 09 Cleaning Deaerator 1 2 3 10 Cleaning Chamber drain CWP 1 2 3 11 Cleaning semua area sisa-sisa kegiatan Simple Inspection untuk persiapan start 2 4 6 RENCANA KERJA MAJOR INSPECTION UNIT #1 01-30 MARET 2017 DEPT. PRODUKSI BAGIAN BOILER DAN ESP
Man Power Maret 2017
No. Kegiatan T. tgl CFK Harian total tgl 1-7 tgl 8-14 tgl 15-21 tgl 22-28 29-30 01 Pembuatan andang di dalam furnace 2 4 6 02 Cleaning furnace (water wall) 2 4 6 03 Flushing coal pipe 1 2 3 04 Cleaning coal burner 2 2 4 05 Thickness feed water line, water wall dan superheater tube 1 0 1 bersama tim mekanik 06 Pembongkaran andang di dalam furnace 2 2 4 07 Cleaning pipa-pipa superheater 2 2 4 08 Cleaning pipa-pipa Superior Economizer 2 2 4 09 Cleaning superior Air Preheater 2 2 4 10 Cleaning pipa-pipa Subordinate Economizer 2 2 4 11 Cleaning Subordinate Air Preheater 2 2 4 12 Cleaning Ducting Elbow Flue Gas 2 2 4 13 Inspeksi pada ducting IDF A dan B 2 2 4 14 Cleaning Elektroda-elektroda chamber ESP 2 2 4 15 Menguras dan cleaning bak kontrol fan mill A 2 1 3 16 Menguras dan cleaning bak kontrol fan mill B 2 1 3 17 Menguras dan cleaning bak kontrol fan mill C 2 1 3 18 Menutup semua main hole untuk persiapan start-up 2 1 3 19 Cleaning semua area sisa-sisa kegiatan Simple Inspection 2 6 8 untuk persiapan start-up RENCANA KERJA SIMPLE INSPECTION UNIT #1 01 MEI S.D 15 MEI 2016
DEPT. OPERASIONAL BAGIAN TURBIN DAN GENERATOR
Man Power Schedule Mei 2016
No. Kegiatan CFK T. Harian total 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 01 Cleaning tube condensate tank 2 4 6 02 Cleaning tube oil cooler 1 2 3 03 Cleaning strainer oil cooler 1 2 3 04 Cleaning strainer air generator 1 2 3 05 Cleaning strainer NRV 1 2 3 06 Cleaning strainer magnet BFWP dan Inlet BFWP 1 2 3 07 Cleaning tube air cooler generator 1 2 3 08 Cleaning oil tank 1 2 3 09 Cleaning Deaerator 1 2 3 10 Cleaning Chamber drain CWP 1 2 3 11 Cleaning semua area sisa-sisa kegiatan Simple Inspection untuk persiapan start 2 4 6