DETAIL ESTIMATION FOR THE CONSTRUCTION OF THE SUPER-STRUCTURE OFAMINITIES BUILDING TOWER OF DEKKO GROUPLTD.

Project Name : Dekko group Ltd.


Client Name : Dekko Group
Project Location : Nayaanpur Bazar, Sreepur, Mawna, Gazipur
Building Name : Aminities Building
Consultant Name : MAK Consultants
Revision: 1.00

Item Rate
Description of Items Quantity Unit Amount (Taka)
No. (Taka)

Supplying and Febrication of 30/24 mm dia anchor bolts,Gusset Plate in RCC and masonry
structure as per approved drawing in accordence with BNBC/ AISC standard procedure
including surface cleaning, Hot-Dip galvanizing of approved quality and also with required pre-
1 installed formwork and supply and carriage of all materials, labours, tools, incidentals, etc all 1,700.00 kg 0.00
complete as per drawings specification and direction of the Engineer-in-charge.Physical
Specifications ASTM F-1554 Grade 36 with Fy= 248 MPa (or equivalent). Material
specfication ASTM A 307 (or equivalent)
Supplying & fabrication of Pipe as per design and in accordence with BNBC/ AISC standard
procedure including surface cleaning & priming with red oxide/gray oxide of approved quality
and also with required pre-installed formwork and supply and carriage of all materials, labours,
2 tools, incidentals, etc all complete as per drawing, specification and direction of the Engineer-in- 5,100.00 kg 0.00
charge. Minimum strength of supplied steel shall be 50,000 psi. Material specfication
ASTM A 53 (or equivalent)
Supplying & fittings of Galvanized Nutbolts and Washers for Connections with necessary
accessories as per design and in accordence with BNBC/ ASTM standard specification and also
with required pre-installed formwork and supply and carriage of all materials, labours, tools,
3 75.00 kg 0.00
incidentals, etc all complete as per drawing, specification and direction of the Engineer-in-
charge. Material Specification ASTM A325/ DIN 8.8. Fy= 640 MPa

Total cost for Steel Super structure = 0.00

Note: a) The Quantity may vary due to site condition. If the volume of work changes than the bill will be adjusted with unit rate.
b) Any item may add or remove with respect to site condition, client demand or design change. That case the bill will be adjusted with respect to unit rate.
c) For additional items like doors canopies etc. above unit price will be applied.