You are on page 1of 31

Hazard Analysis Course, Pisac '12

Example: Debris flow small event calculations


Example:
Debris flow hazard mapping below ‚Spissbach‘
Hazard Analysis Course, Pisac '12
Hazard Analysis Course, Pisac '12
Hazard and Risk Analysis Course, Lauterbrunnen '12

Groups

Group 1: Alejo Cochachín Group 2: Daniel Colonia


Randy Muñoz Ana Mª Ling
Jorge Cuenca Gamaniel Mosqueira

Group 3: Luzmila Dávila Group 4: Jesús Gómez


Martín Salvador Ricardo Ray Villanueva
Nirvana Camargo Sandro Justo Arias

Group 5: Edwin Loarte Group 6: Arnaldo Tacsi


Toribio Reyes Iván Cáceres
Henrry Silva Gysela Ladera

Group 7: Helder Mallqui


Alexzander Santiago Martel
Hernán Loyola
Judith Torres
Hazard Analysis Course, Pisac '12
Hazard Analysis Course, Pisac '12

(Raetzo et al., 2002)


Hazard Analysis Course, Pisac '12

Scenario Rainfall intensity


[mm]

Small ~50 (10mm/h, 5h)


(~30 years return period)
Medium ~60 (12mm/h, 5h)
(~100 years return period)
Large ~70 (14mm/h, 5h)
(~300 years return period)
Hazard Analysis Course, Pisac '12
Hazard Analysis Course, Pisac '12_Debris Flow

small event (30-year repeat period)


Catchment area Rainfall volume Total runoff Runoff Sediment Debris flow
[km2] [m3] volume [m3] contribution to fraction [%] volume [m3]*
debris flow [m3]

Pisac

1) Estimate the area of the catchment


Hazard Analysis Course, Pisac '12_Debris Flow

small event (30-year repeat period)


Catchment area Rainfall volume Total runoff Runoff Sediment Debris flow
[km2] [m3] volume [m3] contribution to fraction [%] volume [m3]*
debris flow [m3]

Pisac 8

Catchment area
km2

1) Estimate the area of the catchment


Hazard Analysis Course, Pisac '12_Debris Flow

small event (30-year repeat period)


Catchment area Rainfall volume Total runoff Runoff Sediment Debris flow
[km2] [m3] volume [m3] contribution to fraction [%] volume [m3]*
debris flow [m3]

Pisac
8 400,000

Rainfall volume small event:


5h * 10mm/h * 8,000,000 m2 = 400,000 m3
(50mm=0,05m)

Rainfall volume medium event:


5h * 12mm/h * 8,000,000 m2 = m3

Rainfall volume large event:


Catchment area
5h * 14mm/h * 8,000,000 m2 = m3
km2

2) Calculate the total runoff using rainfall


intensity and runoff coefficient
Hazard Analysis Course, Pisac '12_Debris Flow

small event (30-year repeat period)


Catchment area Rainfall volume Total runoff Runoff Sediment Debris flow
[km2] [m3] volume [m3] contribution to fraction [%] volume [m3]*
debris flow [m3]

Pisac
8 400,000 80,000

Total runoff volume small event: Runoff coefficient can vary


400,000 m3 * 0.2 = 80,000 m3 strongly depending on the
geologic & geomorphologic
Total runoff volume medium event: characteristics and the
vegetation cover in the
m3 * 0.2 = m3 catchment!

Total runoff volume large event: Flatter areas with more forests
and pastures can have runoff
m3 * 0.2 = m3 coefficients below 0.2.

Here we use: ca. 0.2

2) Calculate the total runoff using rainfall


intensity and runoff coefficient
Hazard Analysis Course, Pisac '12_Debris Flow

small event (30-year repeat period)


Catchment area Rainfall volume Total runoff Runoff Sediment Debris flow
[km2] [m3] volume [m3] contribution to fraction [%] volume [m3]*
debris flow [m3]

Pisac
8 400,000 80,000 20,000 (25%)

E.g. 25% into debris flow (small event):


80,000 m3 * 0.25 = 20,000 m3

E.g. ?% into debris flow (medium event):


m3 * ? = m3

E.g. ?% into debris flow (large event):


Catchment area
m3 * ? = m3
km2

3) Estimate the proportion of the total


runoff that contributes to the debris flow
Hazard Analysis Course, Pisac '12

small event (30-year repeat period)


Catchment area Rainfall volume Total runoff Runoff Sediment Debris flow
[km2] [m3] volume [m3] contribution to fraction [%] volume [m3]*
debris flow [m3]

Pisac
8 400,000 80,000 20,000 20,000 (50%) 40,000

Catchment area
km2

4) Estimate the sediment volume (solid material) of


the catchment and torrent: erosion and entrainment
(first approximation: 50% water, 50% sediment)
Hazard Analysis Course, Pisac '12

In the field
Hazard Analysis Course, Pisac '12

small event (30-year repeat period)


Catchment area Rainfall volume Total runoff Runoff Sediment Debris flow
[km2] [m3] volume [m3] contribution to fraction [%] volume [m3]*
debris flow [m3]

Pisac
8 400,000 80,000 20,000 20,000 (50%) 40,000
Hazard Analysis Course, Pisac '12_DEBRIS FLOWS

small event (30-year repeat period)


Catchment area Rainfall volume Total runoff Runoff Sediment Debris flow
[km2] [m3] volume [m3] contribution to fraction [%] volume [m3]*
debris flow [m3]

Pisac
8 400,000 80,000 20,000 20,000 40,000

Distribution of the material on the debris flow fan:


high
1m
medium
«low» does not exist for debris
flows!
0.5m

Example (small event):


High intensity: 40,000m3 * 50% with 1m flow / deposition height
 affected area = 20,000m2
Medium intensity: 40,000m3 * 50% with 0.5m flow / deposition height
 affected area = 40,000m2
ATTENTION: This is only a rule of thumb and the indicated heights should not be seen
directly as deposition.
Hazard Analysis Course, Pisac '12_DEBRIS FLOWS

small event (30-year repeat period)


Catchment area Rainfall volume Total runoff Runoff Sediment Debris flow
[km2] [m3] volume [m3] contribution to fraction [%] volume [m3]*
debris flow [m3]

Pisac
8 400,000 80,000 20,000 20,000 40,000

Distribution of the material


(small event):

For boundary high/medium


intensity, distribute material with
1m deposition height:

100m x 100m = 10‘000m2

20,000m3 with 1m flow / deposition


height  affected area:
20,000m2

Intensity
high
medium
Hazard Analysis Course, Pisac '12_DEBRIS FLOWS

small event (30-year repeat period)


Catchment area Rainfall volume Total runoff Runoff Sediment Debris flow
[km2] [m3] volume [m3] contribution to fraction [%] volume [m3]*
debris flow [m3]

Pisac
8 400,000 80,000 20,000 20,000 40,000

Distribution of the material


(small event):

For boundary high/medium


intensity, distribute material with
0.5m deposition height:

100m x 100m = 10‘000m2

20,000m3 with 0.5m flow / deposition height 


affected area:
20,000m2 + 40,000m2= 60,000m2

Intensity
high
medium
Hazard Analysis Course, Pisac '12_DEBRIS FLOWS

(example with swiss matrix)


Hazard Analysis Course, Pisac '12_DEBRIS FLOWS
Hazard Analysis Course, Pisac '12_Flood
Hazard Analysis Course, Pisac '12_Flood

medium event (100-year repeat period)


Catchment HQ100 [m3/s] Runoff Overflow
area [km2] capacity [m3/s] [m3/s]

Pisac 7000 1060

Catchment area
km2

2) Calculation of HQ100 and Qmax according to


formulas
Hazard Analysis Course, Pisac '12_Flood
Hazard Analysis Course, Pisac '12_Flood

small event (30-year repeat period)


Catchment HQ100 [m3/s] Runoff Overflow
area [km2] capacity [m3/s] [m3/s]

Pisac 7000 1060

Catchment area
km2

3) Estimate runoff capacity of stream


Hazard Analysis Course, Pisac '12_Flood

Medium event (100-year repeat period)


Catchment HQ100 [m3/s] Runoff Overflow
area [km2] capacity [m3/s] [m3/s]

Pisac 7000 1060

Catchment area
km2

3) Estimate runoff capacity of stream


Hazard Analysis Course, Pisac '12_Flood

Medium event (100-year repeat period)


Catchment HQ100 [m3/s] Runoff Overflow
area [km2] capacity [m3/s] [m3/s]

Pisac 7000 1060

Catchment area
km2

4) Map inundated (flooded) area with


high, medium and low intensity
Hazard Analysis Course, Pisac '12_Flood

Medium event (100-year repeat period)


Catchment HQ100 [m3/s] Runoff Overflow
area [km2] capacity [m3/s] [m3/s]

Pisac 7000 1060

Catchment area
km2

4) Map inundated (flooded) area with


high, medium and low intensity
Hazard Analysis Course, Pisac '12_Flood

Catchment area
km2
Hazard Analysis Course, Pisac '12_Flood

HQ30 = 880 m3/s


HQ100 = 1060 m3/s
HQ300 = 1240 m3/s

Catchment area
km2
Hazard Analysis Course, Pisac '12