Post Relocation
1.0 Relocate Post to the approved area on MO BATELEC Survey and ask for quote
2.0 Relocation of Transformer BATELEC Survey and ask for quote
3.0 Relocation of Primary Wires BATELEC Survey and ask for quote
4.0 Relocation of Cut off breaker BATELEC Survey and ask for quote
5.0 Relocation of Electrical Meter BATELEC Survey and ask for quote
MDP Transfer
6.0 Construction of service entrance post MO Survey and estimate cost
7.0 Rewiring of Service Entrance MO Survey and estimate cost
8.0 Relocation of MDP MO Survey and estimate cost
Genset Transfer
9.0 Relocation of MTS MO Survey and estimate cost
10.0 Relocation of Genset MO Survey and estimate cost
11.0 Construction of Concrete Pad MO Survey and estimate cost
12.0 Rewiring of Branch Circuits MO Survey and estimate cost