"_wrensenve consTaucTiON Sheet 3 of 3
CONSOLIDATED FORMS G95/G96/G97
‘Contact: Durbar Energy Contract No MR8B104
*Tomporary Works llem No. NR@B104/004 ote Ne LS baa
G86 Continued
[Permit Certificate - Temporary Works
|Folowing the ICE's inspection, Ist below any conrecions or modifications fo be made To the works
Jory when al the corrections listed above have been made, shou the ICE sign below:
[Checkers Name Checkers Signature Date
nterserveTemporaiy Works Authorisation this apples only To Temporary works provided by TeTseNve
[The TW, Project Manager and Site Supervisor, undertaking the works are to confirm thatthe permited operation
listed in sheet ', together withthe special candtions need, wll be carried out jn compliance wth this Permit Alt
son betow)
I nterserve TW Name
P-Inerserve Project Manager Name
snterserve Ste Superisor Name,
Permit Handover
se BSG hl
|Where this Permit is to be utised by a ‘an element of the permanent works using temporary
|works provided by others under cur control, Interserve *Equire the permanent works contractor to confirm that they
lunderstand the control measures required, that theyre satisfied with the condition ofthe temporary works and
lundertake to notify us i the condition changes aptfor they become awere of any deficiencies or defecte with the
temporary work
}. Interserve Project Manager Name Signature Date
lz. sub-Contractor!Contractors
Representative Nath ‘Signature Date
[Parmit Validity
[Vaid from time and date) Valid to (time and date)
[Permit to Use/“I Load _[~ _Pour_[~ Strike _[~ Jnload_[~
[Document Control Copies to be issued to: rae
1. Direct labour/Agency labour or subcontractor workforce supervisor
[2 Permit iasued by Tech Services Dept then roturn copy to Pormit Originator
[Quality Control Requirements - Temporary Works
iginalor of the Minimum Quaify Conirol Requirement Site _¢~ Tech Services Dept
[Minimum Quality Control Originator
Name Signature Date
[inspection Log
IFoliowing the TWC's inspection ofthe Safe Syster of Work (MS) and Field Checksts, ist below any corrections
“heels 28 required)
lWhen all the above correctionsimedifications have been made, the TWC and Project Manager must sign below.
Joniy then can the work progress
frwe ‘Nemo Signature
roject Manager Name
Reuiscsn) A_
Ao Pirie PUT Ron OG a THe PVE $0 PL Ws
GZEN CHECLED Foe THe TRACK PRECCIRE — 1EGEPm ~Db6Buy Om
RO Minne OF 4 50st Thee PLATE? a
MATEOAL 1S AOE QUATE
PILING CONTRACT CE HAS Combidaep, THIS Teele pheceyeks
Cre AiTAcHe & A
re Are Feo, UK oid PVE So OR sue et
AWO BNO Whitmire Ake orbtl See eng