You are on page 1of 19

Demanda

Nro. ITEM Proveedor codigo Descripcion Producto


Anual

1 110030 Isoblock Nº 2 - 12.5 x 42 x 100 x un 18400


2 110029 Isoblock Nº 1 - 10 x 42 x 100 x un 16800
3 130008 Hierro aletado 25 mm x 12 ml 240
4 120162 Membrana Ormiflex Cod.10 c/aluminio 4 mm 320
5 160031 Ladrillo de techo ceramico 13 x 25 x 42 x un 12320
6 160022 Ladrillo Portante 12 x 19 x 33 x un 14400
7 160084 Ladrillo Hueco 18 x 18 x 33 x un 12800
8 130007 Hierro aletado 20 mm x 12 ml 248
9 160025 Ladrillo Portante 18 x 19 x 33 x un 7200
10 160116 Ladrillo Hueco 12 x 18 x 33 x un 12800
11 340959 Cemento Albañileria Hidralit x 40 kg 1376
12 130006 Hierro aletado 16 mm x 12 ml 264
13 50003 Leca 3/10 x m3 64
14 160015 Ladrillo Hueco 8 x 18 x 33 x un 14400
15 50002 Leca 3/10 x m3 ( x camion ) 59.2
16 120832 Imprimacion base Solvente Ormiflex A x 18 lts. 161.6
17 410006 klaukol p/porcellanto x 30 kg 304
18 90003 Arena x m3 164.8
19 10030 Cemento Avellaneda x 50 kg 704
20 170082 Vigueta x 5 ml 224
21 90002 Arena x m3 ( x camion ) 144
22 130057 Malla cima 15x15 - 6 mm - 2x5 ml 67.2
23 120267 Membrana Ormiflex Cod. 9 s/aluminio 4 mm 112
24 90012 Arena con bolson contenedor 112
25 20106 weber p/porcellanato x 30 kg 257.6
26 130005 Hierro aletado 12 mm x 12 ml 264
27 160006 Ladrillo vista Cordoba x un 13600
28 170031 Vigueta x 4 ml 288
29 60012 Piedra partida 6/20 x m3 60.8
30 40031 Yeso Premezclado Alpress x 35 kg 329.6
31 170066 Vigueton 0.30 x 3 ml 104
32 230033 Yeso Tuyango Proyectable SG x 30 kg 372.8
33 60011 Piedra partida 6/20 x m3 ( x camion ) 51.2
34 161209 Ladrillo comun x un 14400
35 400035 Sika 1 tambor x 200 kg 30.4
36 130004 Hierro aletado 10 mm x 12 ml 264
37 40001 Yeso Tuyango x 40 kg 294.4
38 650020 Alambre de fardo x kg 1120
39 130027 Alambron (Hierro dulce) 6 mm x kg 1200
40 410004 klaukol impermeable x bls 217.6
41 170055 Vigueton 0.30 x 2 ml 104
42 60009 Cascote Mezcla x m3 70.4
43 190509 weber co.gris impermeable x bls 304
44 130030 Malla cima 15x15 -4.2 mm - 2x5 ml 33.6
45 130031 Malla cima 15x25 - 4 mm - 2x5 ml 33.6
46 60008 Cascote Mezcla x m3 ( x camion ) 62.4
47 130003 Hierro aletado 8 mm x 12 ml 264
48 230021 Tacuru balde x 20 kg 25.6
49 230022 Tacuru tambor x 200 kg 12.8
50 120082 Ceresita tambor x 200 kg 16
51 60013 Isocret agregado ultraliviano bls 170 lts. 67.2
52 30008 Cal Aerea El Milagro x 25 kg 184
53 120081 Ceresita balde x 20 kg 70.4
54 170022 Vigueta x 3 ml 112
55 30074 Cal comun Hirdat Extra x 25 kg 254.4
56 130002 Hierro aletado 6 mm x 12 ml 188.8
57 110042 Poliestireno expandido 1 x 1 x 20 mm 20 kg/m3 176
58 130001 Hierro aletado 4 mm x 12 ml 241.6
59 130018 Clavos punta paris 2 1/2¨ x kg 200
60 400034 Sika 1 x 20 lts 25.6
61 130015 Clavos punta paris 2¨ x kg 192
62 90004 Arena con envase (40 x m3) 171.2
63 160170 Bloque para Muro 8X19X33 176
64 160082 Bloque para muro 19x19x39 x un 112
65 160173 Bloque para muro 9x19x39 x un 128
66 160126 Bloque para muro 14x19x39 x un 92.8
TOTAL 149857.6

Cantidad de
Clasificación
Productos

A 19
B 20
C 27
TOTAL 66

CANTIDAD VALOR MONETARIO


A 20% 70 - 80%
B 30% 15% - 20%
C 50% 5% - 10%
Isocret agregado ultraliviano bls 170 lts.
Arena con bolson contenedor
Arena con envase (40 x m3)
Arena x m3
Arena x m3 ( x camion )
Cascote Mezcla x m3
Cascote Mezcla x m3 ( x camion )
Leca 3/10 x m3
Leca 3/10 x m3 ( x camion )
Piedra partida 6/20 x m3
Piedra partida 6/20 x m3 ( x camion )
Bloque para muro 9x19x39 x un
Bloque para muro 14x19x39 x un
Bloque para muro 19x19x39 x un
Bloque para Muro 8X19X33
Cal Aerea El Milagro x 25 kg
Cal comun Hirdat Extra x 25 kg
Cemento Albañileria Hidralit x 40 kg
Cemento Avellaneda x 50 kg
Ceresita balde x 20 kg
Ceresita tambor x 200 kg
Sika 1 x 20 lts
Sika 1 tambor x 200 kg
Tacuru balde x 20 kg
Tacuru tambor x 200 kg
Alambre de fardo x kg
Alambron (Hierro dulce) 6 mm x kg
Clavos punta paris 2 1/2¨ x kg
Clavos punta paris 2¨ x kg
Hierro aletado 4 mm x 12 ml
Hierro aletado 8 mm x 12 ml
Hierro aletado 10 mm x 12 ml
Hierro aletado 12 mm x 12 ml
Hierro aletado 16 mm x 12 ml
Hierro aletado 20 mm x 12 ml
Hierro aletado 25 mm x 12 ml
Hierro aletado 6 mm x 12 ml
Malla cima 15x15 - 6 mm - 2x5 ml
Malla cima 15x15 -4.2 mm - 2x5 ml
Malla cima 15x25 - 4 mm - 2x5 ml
Isoblock Nº 1 - 10 x 42 x 100 x un
Isoblock Nº 2 - 12.5 x 42 x 100 x un
Ladrillo de techo ceramico 13 x 25 x 42 x un
Vigueta x 5 ml
Vigueta x 3 ml
Vigueta x 4 ml
Vigueton 0.30 x 2 ml
Vigueton 0.30 x 3 ml
Ladrillo comun x un
Ladrillo vista Cordoba x un
Ladrillo Hueco 8 x 18 x 33 x un
Ladrillo Hueco 12 x 18 x 33 x un
Ladrillo Hueco 18 x 18 x 33 x un
Ladrillo Portante 12 x 19 x 33 x un
Ladrillo Portante 18 x 19 x 33 x un
Imprimacion base Solvente Ormiflex A x 18 lts.
Membrana Ormiflex Cod. 9 s/aluminio 4 mm
Membrana Ormiflex Cod.10 c/aluminio 4 mm
Poliestireno expandido 1 x 1 x 20 mm 20 kg/m3
klaukol impermeable x bls
klaukol p/porcellanto x 30 kg
weber co.gris impermeable x bls
weber p/porcellanato x 30 kg
Yeso Premezclado Alpress x 35 kg
Yeso Tuyango Proyectable SG x 30 kg
Yeso Tuyango x 40 kg
A 29%
B 30%
C 41%
100%

Precio % Valor
Unitario
Valor Total
Econ.
% Acum. CLASIFICACIÓN

28.40 S/. 522,560.00 26.80% 26.80%


23.20 S/. 389,760.00 19.99% 46.79%
356.00 S/. 85,440.00 4.38% 51.17%
265.00 S/. 84,800.00 4.35% 55.52%
6.36 S/. 78,355.20 4.02% 59.54%
3.54 S/. 51,042.36 2.62% 62.15%
3.15 S/. 40,366.61 2.07% 64.22%

A
159.71 S/. 39,608.65 2.03% 66.26%
4.00 S/. 28,827.91 1.48% 67.73%
2.15 S/. 27,493.92 1.41% 69.14%
19.63 S/. 27,015.18 1.39% 70.53%
102.16 S/. 26,970.89 1.38% 71.91%
401.57 S/. 25,700.18 1.32% 73.23%
1.71 S/. 24,588.51 1.26% 74.49%
395.64 S/. 23,421.86 1.20% 75.69%
140.14 S/. 22,646.31 1.16% 76.85%
69.71 S/. 21,193.23 1.09% 77.94%
124.83 S/. 20,571.45 1.05% 79.00%
28.98 S/. 20,404.28 1.05% 80.04%
85.97 S/. 19,256.29 0.99% 81.03%
120.00 S/. 17,280.00 0.89% 81.92%
245.17 S/. 16,475.42 0.84% 82.76%
145.79 S/. 16,328.28 0.84% 83.60%
140.00 S/. 15,680.00 0.80% 84.40%
60.29 S/. 15,531.65 0.80% 85.20%
58.06 S/. 15,327.46 0.79% 85.98%
1.12 S/. 15,182.70 0.78% 86.76%

B
51.81 S/. 14,922.68 0.77% 87.53%
235.00 S/. 14,288.00 0.73% 88.26%
40.98 S/. 13,507.29 0.69% 88.95%
124.83 S/. 12,981.98 0.67% 89.62%
33.21 S/. 12,380.18 0.63% 90.25%
220.00 S/. 11,264.00 0.58% 90.83%
0.77 S/. 11,090.27 0.57% 91.40%
361.99 S/. 11,004.58 0.56% 91.97%
40.32 S/. 10,644.23 0.55% 92.51% 19.8
34.39 S/. 10,123.31 0.52% 93.03%
8.46 S/. 9,480.43 0.49% 93.52%
7.54 S/. 9,044.05 0.46% 93.98%
41.22 S/. 8,968.68 0.46% 94.44% 66
83.61 S/. 8,695.48 0.45% 94.89%
120.00 S/. 8,448.00 0.43% 95.32%
25.91 S/. 7,875.86 0.40% 95.72%
234.28 S/. 7,871.81 0.40% 96.13%
215.89 S/. 7,253.90 0.37% 96.50%
110.00 S/. 6,864.00 0.35% 96.85%
25.83 S/. 6,818.42 0.35% 97.20%
262.17 S/. 6,711.65 0.34% 97.55%
488.43 S/. 6,251.90 0.32% 97.87%
363.62 S/. 5,817.93 0.30% 98.16% 98.91%

C
80.00 S/. 5,376.00 0.28% 98.44%
27.33 S/. 5,029.15 0.26% 98.70%
59.17 S/. 4,165.58 0.21% 98.91%
32.97 S/. 3,692.99 0.19% 99.10%
13.41 S/. 3,411.07 0.17% 99.28%
14.93 S/. 2,818.74 0.14% 99.42%
11.54 S/. 2,031.14 0.10% 99.52%
6.86 S/. 1,657.56 0.09% 99.61%
7.71 S/. 1,542.20 0.08% 99.69%
57.06 S/. 1,460.80 0.07% 99.76%
7.45 S/. 1,430.77 0.07% 99.84%
5.00 S/. 856.00 0.04% 99.88%
3.85 S/. 677.74 0.03% 99.92%
5.77 S/. 646.54 0.03% 99.95%
4.22 S/. 540.23 0.03% 99.98%
4.97 S/. 461.39 0.02% 100.00%
S/. 1,949,934.87 100%

% Valor
% del Total
Económico

29% 80.0%
30% 15.7%
41% 4.3%
100.00% 100.00%
9.9

Gráfico

Valor Total % Acum.


522560.00 0.27
389760.00 0.47 GRÁFICO DE CLASIFICACIÓN ABC - PORCENTA
85440.00 0.51
1.2

78355.20 0.60
51042.36 0.62
40366.61 0.64 1
39608.65 0.66
28827.91 0.68
27493.92 0.69
27015.18 0.71 0.8

26970.89 0.72
25700.18 0.73
24588.51 0.74 0.6
23421.86 0.76
22646.31 0.77
21193.23 0.78
0.4
20571.45 0.79
20404.28 0.80
19256.29 0.81
17280.00 0.82 0.2
16475.42 0.83
16328.28 0.84
15680.00 0.84
0
15531.65 0.85
15327.46 0.86 Column K Column L

15182.70 0.87
14922.68 0.88
14288.00 0.88
13507.29 0.89
12981.98 0.90
12380.18 0.90
11264.00 0.91
11090.27 0.91
11004.58 0.92
10644.23 0.93
10123.31 0.93
9480.43 0.94
9044.05 0.94
8968.68 0.94
8695.48 0.95
8448.00 0.95
7875.86 0.96
7871.81 0.96
7253.90 0.96
6864.00 0.97
6818.42 0.97
6711.65 0.98
6251.90 0.98
5817.93 0.98
5376.00 0.98
5029.15 0.99
4165.58 0.99
3692.99 0.99
3411.07 0.99
2818.74 0.99
2031.14 1.00
1657.56 1.00
1542.20 1.00
1460.80 1.00
1430.77 1.00
856.00 1.00
677.74 1.00
646.54 1.00
540.23 1.00
461.39 1.00
FICACIÓN ABC - PORCENTAJE ACUMULADO
250000

200000

150000

100000

50000

Column K Column L
.
COSTOS DE INVENTARIOS

Costo
COSTOS DE PEDIDO Cantidad Unidad
Unitario

Mano de obra 2.50 Hora 6.00


Llamadas telefónicas Horas

Internet PEDIDO 1.80


Energía eléctrica 1.20 KW-H 2.5
Utiles de oficina y suministros (varios)
Mantenimiento de equipos (3%) Horas
Transporte PEDIDO 25.00
COSTO TOTAL POR PEDIDO

COSTOS DE MANTENIMIENTO DE INVENTARIOS

Costo
COSTOS DE MANTENIMIENTO DE INVENTARIOS Cantidad Unidad Unitario

Seguros (2%)
Renta de bodega 1.2 M2 S/. 5
Energía Eléctrica 1.500 KW-H S/5.00
Internet MENSUAL 1.20
Mano de obra 2.5 Horas 3.00
Costo por mantenimiento existencias (3%) S/52.50
Costo por mantenimiento de equipos (3%) 0 Horas
Impresiones
Costo de oportunidad de capital (1%) S/17.50
COSTO TOTAL DE MANTENIMIENTO DE INVENTARIOS
PORCENTAJE DE MANTENIMIENTO DE INVENTARIOS
Demanda Precio
Monto (S/.) Descripcion Producto
mensual Unitario

15.00 Sacos de harina de 20 kg 50 35


0.00

1.80
3.00

0.00
25.00
44.80

Monto (S/.)

0
6
7.50
1.2
8
S/. 53
S/. 0

S/. 17.5
S/. 92
18440.00%
COSTO DE
Valor Total SEGURO
ANUAL
1750 35
Costos por pedido
Mano de obra Minutos
Requisición 7
Solicitud de cotización 4
Selección del proveedor 15
Orden de compra 7
Seguimiento al proveedor 7
Procesamiento de pedido 10
Recepción del pedido 25
Inspección del pedido 25
Ingreso al almacén 18
Total 118
Total en horas 1.9666666667

Energía eléctrica Potencia (Watts)

Computadora 200
Impresora 100
Luminarias 256
Router 6
Total 562

Utiles de oficina y suministros Cantidad


Papel bond 6
Lapicero 1
Lapiz 1
Corrector 1
Resaltador 1
Cinta adhesiva 1
Tinta de impresora 3
Tinta de sellos 1
Otros (2%) VARIOS
Total 15

Mantenimiento de equipos Cantidad


Computadora 1
Impresora 1
TOTAL
Mantenimiento (3%)
Costos por mantenimiento
Mano de obra
Transporte de carga al almacén
Ingreso, codificación y ubicación

Distribución y actualización del registro


Mantenimiento de existencias

Total
Total en horas

Energía eléctrica
Computadora
Impresora
Luminarias
Router
Total

Costo Unitario Monto total Suministros


0.028 0.17 Papel bond
1 0.03 Lapicero
0.5 0.02 Lapiz
2.5 0.17 Corrector
2 0.13 Resaltador
1.5 0.10 Cinta adhesiva
40 0.10 Tinta de impresora
30 0.36 Tinta de sellos
0.02 Otros (2%)
77.528 1.10 Total

Costo Unitario Monto total Mantenimiento de equipos


4000 4000.00 Computadora
1500 1500.00 Impresora
L 5500.00 TOTAL
nto (3%) 165.00 Mantenimiento (3%)
Minutos
20
30

150
100

300
5

Potencia
(Watts)
200
100
256
6
562

Costo
Cantidad Unitario Monto total
6 0.028 0.17
1 1 0.03
1 0.5 0.02
1 2.5 0.17
1 2 0.13
1 1.5 0.10
3 40 0.10
1 30 0.36
VARIOS 0.02
15 77.528 1.10

Cantidad
Costo Unitario
Monto total
1 2500 2500.00
1 250 250.00
TAL 2750.00
iento (3%) 82.50
GRUPO 1 GRUPO2 GRUPO 3 GRUPO 4 GRUPO 5
COSTOS POR PEDIDO

Costo de procesar un pedido a traves de los


Costo de transmitir el pedido al punto de sum
Costo de transportar el pedido
Costo de manejo de materiales en el punto d

Costos de espacio

Costo de capital

Costos de servicio de inventario


COSTOS POR MANTENIMIENTO

Costo de riesgo de inventario


Costos de obsolescencia (14%) NP NP NP NP

Costo de almacenamiento y manejo (3.25%)


Impuesto de propiedad (0.5%)
Seguros (0.25%)

Costo de manufactura del producto


Costo por establecimiento del proceso de pr
TOS DE ORDEN
GRUPO 6 GRUPO 7 GRUPO 8 GRUPO 9 GRUPO 10 GRUPO 11

Costo por el procesamiento


Creación de O/C
Costo para seguimiento de Despacho de la orde

Costo para llevar los registro


Costo de transporte
Costo para la recepción del Costos de recepción

Intereses sobre la deuda. Traslado (2 - 5%) Costo de capital


Costo de Capi

Intereses no aprovechados q Renta Costo variable del espacio


Costo por Sal
El alquiler del almacén. Calefacción Seguros
Costo de mate
El acondicionamiento. Iluminación Impuestos desperdicios
Calefacción. SegurosCosto
(1-3%) pérdidacalidad
de obsolescencia, deterioro y NP
NP

Iluminación. Impuestos (2 - 6%)

Costo por Sup


Limpieza. Obsolescencia (6 - 12%), depreciación,
Mantenimiento.
Protección.
Flete.
Recepción.
Manejo de Materiales.
Impuestos.
Seguros.
Administración.
Preparar y procesar solicitudes de pe
Preparar y procesar informes de recep
Revisar e inspeccionar las existencias
GRUPO 12 GRUPO 13 GRUPO 14
COSTOS DE
TRANSPORT
E
RECEPCION
TIEMPO DEL
COMPRADO
R

ABSOLESCE
NCIA

MANEJO DE
INVENTARIO

OCUPACION

SEGURIDAD
IMPUESTOS
NP NP
CARGOS
ADICIONALE
S DE
SEGURO

You might also like