Professional Documents
Culture Documents
4 Micro-
Micro-Hydro
Contents
1-Nov-05 (13:42)
1
Issues on the Sustainability of Micro-
Micro-Hydro Power
1-Nov-05 (13:42) Technical Issues
– Insufficient site surveys and site evaluation
– Unsuitable design
– Poor quality of equipment
– Inadequate O&M
Organizational/Institutional Issues
– Insufficient social preparation
e7 / PPA Workshop on Renewable Energies
Financial Issues
– Budget limitations
– Lack of funds for O&M, repair and replacement
Insufficient tariff collection
Improper tariff management
3
Insufficient
Insufficient
Poor-Quality Insufficient
Insufficient
Social
SocialPreparation
Preparation Poor-QualityEquipment
Equipment Site
SiteEvaluation
Evaluation
No No
NoTraining
Training
NoTariff
Tariff
e7 / PPA Workshop on Renewable Energies
Management
Management No
NoMoney
Moneyfor
forO&M
O&M
Inadequate
InadequateO&M
O&M
No
NoMonitoring
Monitoring Getting
Gettinginto
intoTrouble
Trouble
No
NoMoney
Moneyfor
forRepairs
Repairs
No
NoRepairs
Repairs
2
Experience in Developing Countries
1-Nov-05 (13:42)
Case 1
Installed capacity: 3 kW
No. of households: 90 HH
Average supply: 33 W
Results of operation:
– Bulbs installed in houses
became gloomy.
e7 / PPA Workshop on Renewable Energies
– Consumers complained of
such insufficient power
supply.
– Consumers did not pay
their electricity tariff
– Finally, the power plant
operation was stopped.
5
3
Experience in Developing Countries
1-Nov-05 (13:42) Case 2
Installed capacity: 3 kW
No. of households: 100 HH
Average supply: 30 W
Result of operation:
– Some consumers installed
refrigerators.
e7 / PPA Workshop on Renewable Energies
Insufficient demand
estimation
No control of the consumers’
electricity use
Improper operation
e7 / PPA Workshop on Renewable Energies
¾ Excessive generation
bypassing the fuses (over-
current protection)
Lack of funds for Repair
¾ Low tariff collection
¾ Poor management of
funds
4
Experience in Developing Countries
1-Nov-05 (13:42)
Case 3
Installed capacity: 550 kW
Grid connected
Result of operation:
– Vibration observed in
turbine and generator.
– Operator continued
e7 / PPA Workshop on Renewable Energies
Inaccurate installation of
turbine and generator
¾ Vibration
¾ Unusual sounds
Inadequate O&M
e7 / PPA Workshop on Renewable Energies
¾ No monitoring/inspection
and proper judgment
¾ No repair/adjustment
before breakdown
10
5
Experience in Developing Countries
1-Nov-05 (13:42)
Case 4
Installed capacity: 550 kW
Grid connected
Result of operation:
– The intake became filled
with sand and soil.
e7 / PPA Workshop on Renewable Energies
11
Case 5
Installed capacity: 100 kW
No. of households: 430 HH
Result of operation:
– Turbine blades were
broken by stone.
e7 / PPA Workshop on Renewable Energies
12
6
Experience in Developing Countries
1-Nov-05 (13:42) What are the causes of the problems in Case 5?
No daily patrols
13
Case 6
Installed capacity: 65 kW
No. of households: 300 HH
Result of operation:
¾ Only half of the households
were targeted to connect in
the initial stage.
e7 / PPA Workshop on Renewable Energies
7
Experience in Developing Countries
1-Nov-05 (13:42) What are the causes of the problems in Case 6?
15
Case 7
Installed capacity: 185 kW
Supply for ice production
Commissioned: 1930
Operating condition:
¾ Still operational
e7 / PPA Workshop on Renewable Energies
16
8
Experience in Developing Countries
1-Nov-05 (13:42) What are the causes of the success in Case 7?
Continuous O&M
¾ Minimal but continuous
O&M
¾ Commercially viable
17
2. Adequate O&M
e7 / PPA Workshop on Renewable Energies
18
9
Flowchart of Implementation Stage
1-Nov-05 (13:42)
Government & Donors Power Utilities Proponent Community
Formulation
Formulationofof
Approval
Approvaland
andRelease
ReleaseofofFunds
Funds O&M
O&MOrganization
Organization
Detailed
DetailedDesign
Design General Assembly
General Assembly
Officers
Officers
Bidding
Bidding&&
Procurement
Procurement Regulation
Regulation
e7 / PPA Workshop on Renewable Energies
Tariff
Tariff Rate
Rate
Technical
Technical Mobilization
Assistance Mobilization
Assistance
Construction
Monitoring Construction Training Operators &
Monitoring Training Operators &
Organization Officers
Manual Organization Officers
Manual
Preparation
Preparation
Commissioning
Commissioning
19
Condition:
Condition:AApower
powerplant
plantisisoperated
operatedand
andmanaged
managedby
by
aalocally established organization
locally established organization
1. Necessity
For sustainable operation of MHP by local people
– For adequate operation and maintenance
– For proper management of O&M organization
For full understanding of the project concept and necessary
e7 / PPA Workshop on Renewable Energies
cooperation
2. When
As early as possible in the implementation stage
– To increase the local people’s sense of ownership.
– To mobilize local people for the construction of plants.
20
10
Formulation of O&M Organization
1-Nov-05 (13:42) 3. Body
Newly established organization,
such as a cooperative union or
a association in the villages.
– All residents involved in the
organization as its members
Existing cooperative union
– If an existing cooperative union or
association is active, it can be an organization for the project.
e7 / PPA Workshop on Renewable Energies
4. Process
To have several consultations inviting the local residents
To discuss the structure of the organization, staff members, rules and
regulations (bylaws), mobilization, tariff rates etc.
To establish the organization by appointing staff members
To approve rules and regulations including the tariff rates
21
5. Organization Officers
1. Chairperson
2. Vice Chairperson
3. Secretary
4. Treasurer
5. Operators/Technicians (3-6 people)
22
11
Mobilization for Construction
1-Nov-05 (13:42)
Mobilization
¾To reduce construction costs
23
Documents
– Facilities Instruction: Detailed instruction prepared by suppliers
– O&M Manual: Brief explanation on practical operation and
maintenance
Considerations
– Easy to understand for local operators who are not skilled
engineers
e7 / PPA Workshop on Renewable Energies
12
Training for O&M and Organization Management
1-Nov-05 (13:42) Purpose:
– To provide operators and officers with the necessary
knowledge and skills in O&M and management for
the project
By whom
– Equipment suppliers, power utilities,
– NGOs and other assisting parties
Considerations:
– On-the-job training (OJT) is effective to educate local
operators and officers.
e7 / PPA Workshop on Renewable Energies
26
13
Operation and Maintenance
1-Nov-05 (13:42)
Flowchart of O&M Stage
DOE, Other Power Utilities Proponent Community
Government & Donors
Power Utilities NGOs & Others (QTP)
Handover
Handover
Operation
Operation&&
Maintenance
Maintenance
Feedback
Management
Management
e7 / PPA Workshop on Renewable Energies
Tariff
Tariff Collection
Collection
Monitoring
Monitoring Monitoring
Monitoring
Bookkeeping
Bookkeeping
Report
Periodic
Periodic Report
Report
Dialog
Dialog with
with
Consumers
Consumers
Repair &
Repair &
Replacement
Replacement
27
Necessity of O&M
28
14
Operation and Maintenance
1-Nov-05 (13:42)
Requirements for Operators:
– Comply with the O&M rules and regulations
– Have knowledge of all plant components and their
functions
– Familiar with measures against various situations to
ensure proper operation and prompt recovery
– Check the conditions of facilities and equipment
e7 / PPA Workshop on Renewable Energies
29
Operation
– Routine operation
Start/stop the facilities
Check the condition of the facilities (before starting,
during operation)
Control and regulate the facilities
– Operation in case of emergency
e7 / PPA Workshop on Renewable Energies
30
15
Operation and Maintenance
1-Nov-05 (13:42)
Maintenance
– Daily patrol/check
To check the condition in any of the facilities,
operators conduct daily patrols and record the
results. Also, they should take measures, if
necessary.
– Periodic inspection
e7 / PPA Workshop on Renewable Energies
Recording
– Operators must record the results of operation and
maintenance work
– Recording will help remind the operators of the
necessary operation and maintenance.
– Recorded data is useful in identifying the causes of
problems in the event of an accident.
e7 / PPA Workshop on Renewable Energies
32
16
Organization Management
1-Nov-05 (13:42)
Flowchart of Management Stage
DOE, Other Power Utilities Proponent Community
Government & Donors
Power Utilities NGOs & Others (QTP)
Handover
Handover
Operation
Operation&&
Maintenance
Maintenance
Feedback
Management
Management
e7 / PPA Workshop on Renewable Energies
Tariff
Tariff Collection
Collection
Monitoring
Monitoring Monitoring
Monitoring
Bookkeeping
Bookkeeping
Report
Periodic
Periodic Report
Report
Dialog
Dialog with
with
Consumers
Consumers
Repair &
Repair &
Replacement
Replacement
33
– Adequate O&M
34
17
Management of O&M Organization
1-Nov-05 (13:42)
Activities of O&M Organization
– Proper O&M for the system
– Collection of electricity tariff from consumers
– Expenditure for necessary repairs and maintenance
– Bookkeeping
– Observation of and guidance for proper use of electricity
– Periodic report on O&M and
e7 / PPA Workshop on Renewable Energies
management
– Installation and operation of
relevant livelihood activities
– Dialog with consumers
35
Tariff collection
– The main and an important source of funds for O&M
– Decide strict rules on tariff collection:
Monthly payment
Disconnection as a penalty for consumers who do
not pay
Charge for reconnection
Withdrawal from the organization
e7 / PPA Workshop on Renewable Energies
Expenditure procedure
– Expenditure plan with consideration of balance:
O&M cost, operational cost and repair cost
– Clarification of expenditure procedure
Person in charge of expenditure
Approval procedure
36
18
Management of O&M Organization
1-Nov-05 (13:42)
Bookkeeping
– For proper financial management
– Transparency to the consumers
37
Remarks
19
Management of O&M Organization
1-Nov-05 (13:42) Dialog with consumers
• Purpose:
– To remove barriers between officers and consumers
To clarify rights and duties of consumers
To ensure acceptance of consumers on demand-
side management
To prevent misunderstanding between officers
e7 / PPA Workshop on Renewable Energies
and consumers
• When:
– Annual general assembly
– Daily patrols
– Tariff collection
– House wiring inspection
39
•Formulation of project
•Social preparation
Implementer/ •Implementation
•Training officers and operators
Support Group •Supervise organization management
•Introduction of livelihood projects
• Support for O&M
e7 / PPA Workshop on Renewable Energies
40
20
Reporting and Monitoring
1-Nov-05 (13:42) Purpose:
– Reporting
Transparent management
Getting assistance from outside the organization
– Monitoring
Technical and institutional assistance
Refining for future projects
Obligations
e7 / PPA Workshop on Renewable Energies
– O&M Organization
Periodic report to assisting agencies and consumers
O&M report
Financial report
Management report
– Assisting agencies:
Periodic monitoring and inspection (visiting site)
– Consumers
Periodic audit
41
42
21
Introduction of
1-Nov-05 (13:42)
Livelihood
Time
43
Remarks
operation
44
22
Introduction of Livelihood Components
1-Nov-05 (13:42)
e7 / PPA Workshop on Renewable Energies
Ice Production
45
46
23
e7/PPA Workshop on Renewable Energy
1-Nov-05 (13:42)
e7 / PPA Workshop on Renewable Energies