DETAILED
PROJECT REPORT
For
M
Y
S
E
R
V
I
BODURKUND C
E
S
K
A
R
Under
A
N
N
A
G
A
NABARD
R
9
4
1
9
0
6
4
R. W. S. DIVISION, GANDERBAL 1
7
2
3. Scheme Category
(Rural / Urban)
5. Type of Scheme
(Lift / Gravity)
6. Type of Source
7. Whether Source is
(Perennial / Seasonal)
(Yes / No)
9. Quantity of water available at source during the lean period of the year.
10. Quantity of water required for the designed population of the scheme.
(Yes / No)
13. Whether the land required for construction / raising infrastructure of the
(Yes / No)
14. Whether a certificate to the effect by the Chief Engineer in case of a NRDWP or
15. Certificate to the effect by the Chief Engineer, in case of NRDWP or a State
Scheme, that the proposed scheme is economical and there is no other viable
16. Certificate to the effect by the Chief Engineer, in case of a NRDWP or a state
that the proposed Scheme is not detrimental to any existing ongoing or proposed
water supply, Irrigation, Flood Control or any other Scheme in the area.
17. Whether safety measures for protecting Public have been envisaged and providing
for in the detailed project report (Refer Regulations on Safety measures issued
(Yes / No)
18. Whether the prescribed fees and Service Charges have been paid by the user
Contd……
20. Whether a copy of the No Object Certificate from the concerned Department /
Agency of the Central Government based in the State, in case of the area
proposed to be covered under the scheme includes the whole or any building or
place in the occupation of the Central Government for Defense purposes, has been
attached.
This information may be given only after a formal State Water Policy is notified by
Public Health Engineering, Irrigation & Flood Control Department.
6. State : J&K
1) Shahpora.
2) Banday Bagh.
3) Bodurkund.
Highway.
10 POPULATION:
a) Present : 10 - 15 Liters/Cap/Day
b) Designed : 70 Lit/Cap/Day
a) Existing : 0.05MGD
Certified that:
SOURCE CERTIFICATE
Certified that:
Economical consideration.
LOCATION:
of Ganderbal some parts of the area are plain and some are
and 20Kms away from Srinagar city. The area falls in the
as middle class.
Left alone without any water for more than a few days
in Kashmir”.
bathing.
PROPOSALS:
distribution of water.
Plant:-
proposed to be constructed.
R.W.S. DIVISION GANDERBAL
5) Construction of 1.00Lac Gallon RCC Service
Reservoir:-
Store Shed:-
Structures:-
Chambers:-
constructed.
TIME OF COMPLETION:-
RECOMMENDATION:-
of scheme.
03. Construction of Intake Channel, Crude Filter & Crate Bund for Taping of 11.57
Source.
12. Provision for Preliminary Survey and Tests of Soil Investigations for 1.50
13. Provision for Road cut berms and Restoration during laying fitting of pipes 20.00
Total 414.38
Add 2.5% for Work Charges and Contingencies except item No. 1 & 14 i.e. 6.99
on D.279.75Lacs
Superintending Engineer,
Hydraulic Circle Srinagar/Ganderbal
Total 90,12,000.00
Say D.94.63Lacs
S. of Pipes
No. Particulars of Line 200mm 150mm 100mm 80mm Remarks
65mm 50mm 40mm 25mm 20mm Remarks
D.I. D.I. D.I. G.I. G.I. G.I. G.I. G.I. G.I.
1. X-Y - 1000 - - - - - - -
2. A–B 800 - - - - - - - -
3. B-C - 700 - - - - - - -
4. C-E - - 900 - - - - - -
5. E-F - - 700 - - - - - -
6. F-G - - - 600 - - - - -
7. B-D - - - - 600 - - - -
Total 800 1700 1600 600 600 1500 4000 4500 6000
S. Name of Village / Census Population as on Present Population 2017 Designed Population 2047 Status of
No. Habitation Code 2011 Census @ 3.63% P.A increase @ 3.63% P.A increase Habitation
national highway
Or : 253699Gallons.
Say : 0.25MGD.
: 454000Liters
: 454.00m3
: 908.00m3/day
(0.785D2)3.5 : 189.16m
... D : 8.30m
RL at X : 1020.00m
RL at Y : 996.00m
Population : 14204Souls
Discharge : 0.0115m3/sec
1.81
Hf : 1000 x 0.0115
0.85 x 1.15
994.62 x (0.15)4.81
= 4.40m
.. . Residual Head at Y
OK.
RL at A : 994.00m
RL at B : 977.50m
Population : 14204Souls
Discharge : 0.0115m3/sec
Peak Factor : 3
1.81
Hf : 800 x 0.034
0.85 x 1.15
994.62 x (0.20)4.81
= 6.279m
.. . Residual Head at B
OK.
RL at B : 977.50m
RL at C : 960.00m
Population : 12275Souls
Discharge : 0.0099m3/sec
Peak Factor : 3
1.81
Hf : 700 x 0.029
0.85 x 1.15
994.62 x (0.15)4.81
= 16.43m
.. . Residual Head at C
OK.
RL at C : 960.00m
RL at E : 929.00m
Population : 5285Souls
Discharge : 0.0042m3/sec
Peak Factor : 3
1.81
Hf : 900 x 0.0128
0.85 x 1.15
994.62 x (0.10)4.81
= 33.81m
.. . Residual Head at E
OK.
RL at E : 929.00m
RL at F : 918.50m
Population : 2039Souls
Discharge : 0.00165m3/sec
Peak Factor : 3
1.81
Hf : 700 x 0.0049
0.85 x 1.15
994.62 x (0.10)4.81
= 4.706m
.. . Residual Head at F
OK.
RL at F : 918.50m
RL at G : 912.00m
Population : 700Souls
Discharge : 0.00567m3/sec
Peak Factor : 3
1.81
Hf : 600 x 0.0017
0.74 x 1.15
994.62 x (0.08)4.81
= 2.173m
.. . Residual Head at G
OK.
RL at B : 977.50m
RL at D : 940.00m
Population : 2033Souls
Discharge : 0.0016m3/sec
Peak Factor : 3
1.81
Hf : 600 x 0.0048
0.74 x 1.15
994.62 x (0.065)4.81
= 38.97m
.. . Residual Head at D
OK.
drains.
cement
Total 8,57,210.00
Say D.11.57Lacs
kinds of Soil.
nominal size)
placing in position.
nominal size.
complete job.
complete job.
complete job.
Transport.
lead of 15Kms.
lead of 15Kms.
Total 23,51,065.00
Add 35% above on all items except item No. 12 & 15 i.e. on 7,96,273.00
D.22,75,065.00
Say D.31.47Lacs
of soil.
Total 13,71,580.00
Add 35% above on all items except item Nos. 11 & 12 i.e. on D.9,66,580.00 3,38,303.00
Cont…
of soil.
plinth level.
size.
sides of single or half brick wall of mix 1:3 M2 715.00 249.60 1,78,464.00
proportions.
G.P. sheet strip water seal 1.25mm (nominal) RM 150.00 350.00 52,500.00
wood).
work).
275gin/sqm.
24. Providing and laying filter media including all M3 15.18 6500.00 98,670.00
Total 35,95,879.00
Add 35% above on all items except item Nos. 24, 25 & 26 i.e. on D.32,21,309.00 11,27,458.00
Cont…
4. Tee D.I.
specials like bends, elbows, tees and Job 1.00 40000.00 40,000.00
D.0.35kg/cm2.
sump.
backwash tank.
30mm tubes fixed with suitable iron Job 1.00 50000.00 50,000.00
accessories.
complete job.
working platform.
Say D.80.72Lacs
All work upto plinth level, 1:4:8mix (1 Cum 17.287 3112.80 53,811.00
position.
formwork for:
07. Form work for Domes, Arches Sqm 157.40 2210.35 3,47,909.00
exceeding 6m span.
size aggregate.
Size).
plinth level.
fillets etc. upto floor V level excluding Cum 1.576 5587.45 8,806.00
0.90 x 0.75m).
bends welded with M.S pieces from one No. 12 700.00 8,400.00
1.5m
18. Providing and mixing of water proofing Kgs 1200.00 43.95 52,740.00
compound.
of 15Kms.
b) Sand & Stone aggregate 20mm size Cum 180.35 207.83 37,482.00
15Kms.
Total 26,79,558.00
Add 35% above on all items except item No. 14, 15, 19 & 22 i.e. on 9,18,805.00
D.26,25,158.00
Say D.35.98Lacs
BODURKUND
PART “A”
02. Providing and laying dry stone soling hand 17.99 M3 344.04/M3 6,189.00
packed.
06. Providing and filling sand in rooms under floors. 23.69 M3 326.75/M3 7,740.00
& formwork.
binding complete.
15. Wood work in frames and doors and windows 0.94 101979.45
and paneled and glazed shutters for doors and 28.55M2 1957.75/M2 55,893.00
18. Providing and fixing wire gauze shutters. 22.84M2 2367.30/M2 54,069.00
20. Providing and fixing 4mm thick glazing of 11.35M2 484.50/M2 5,499.00
coats.
by mechanical transport.
d) Cement & Iron for an average lead of 15Kms 18.75MT 184.76/MT 3,464.00
Total 9,44,104.00
Cont…
02. Providing & laying dry stone soling hand packed. 3.13 M3 344.04/M3 1,077.00
aggregate)
aggregate).
10. Providing and fixing M. S. Lid 0.60 x 0.60m 3Nos. 3000/No. 9,000.00
11. Centering & shuttering including strutting etc. 7.13M2 372.40/M2 2,655.00
binding complete.
15. Providing and mixing water proofing compound. 34.00/Kgs 43.95/Kgs 1,494.00
17. Providing and fixing white vitreous china flat 1No. 1173.10/e 1,173.00
21. Providing and fixing bewelled edge mirror. 1No. 735.70/e 736.00
22. Providing and fixing floor traps. (LMR) 04Nos. 960.15/e 3,841.00
27. Providing and fixing vent pipe 75mm 02M 841.60/M 1,684.00
30. Providing and fixing PVC Waist pipe flexible. 02Nos. 72.53/e 145.00
31. Providing & fixing CP brass stop tape concealed. 02Nos. 65.35/e 131.00
38. Providing / fixing gate valve gun metal. 02/Nos. 374.30/e 749.00
40. Providing / fixing manhole covers with frame 04Nos. 388.00/e 1,552.00
(LMR)
long.
46. Provision for water supply fittings (LMR) 06 Points 2500/p 15,000.00
47. P/F PVC Water Storage Tanks 3 layers. 1000Ltrs. 6.70/Ltr. 6,700.00
waste.
Total 2,67,925.00
Say D.16.36Lacs
(For 100Mtrs)
form work.
propping etc and removal of form work for Sqm 202.05 179.25 36,217.00
foundation footings:
coat.
(50 x 50mm mesh) of approved quality and Sqm 180.00 350.00 63,000.00
transport.
15Kms.
15Kms.
Total 4,27,260.00
Say D.17.30Lacs
02. Providing / laying dry stone soling hand Cum 4.61 344.04 1,586.00
packed on level
cost of formwork.
horizontal soffits.
form work
columns etc
floating cost of neat cement of mix 1:4 Sqm 91.68 219.65 20,138.00
lead of 15Kms.
15Kms.
binding.
Total 2,90,463.00
Add 35% above on items except item No. 9 i.e. on D.2,82,463.00 98,862.00
Say D.19.47Lacs