You are on page 1of 18

TOYO ENGINEERING INDIA PVT. LTD.

11/17/2017
GROUND IMPROVEMENT WORK &
TECHNIQUES

Ground Improvement work TEIPL


1
SUBJECT : GROUND Improvement Techniques
Prepared & Presentation By : Tarun Hazarika
Construction Execution & Planning Department
TOYO TECHNOLOGY CENTRE
Kanjurmarg ( E) , Mumbai
TOYO ENGINEERING INDIA PVT. LTD.

11/17/2017
ABSTRACT
 Ground improvement techniques are often used to improve sub-soil

Ground Improvement work TEIPL


properties in terms of their bearing capacity, shear strength,
settlement characteristics, drainage etc.

 These techniques have a wide range of applicability from course


grained soil or fine grained soil.

 Depending upon the loading condition and nature of soil, a suitable


techniques, which are also economical needs to be adopted.

2
TOYO ENGINEERING INDIA PVT. LTD.

11/17/2017
OBJECTIVES OF GROUND IMPROVEMENTS
TECHNIQUES

Ground Improvement work TEIPL


 Ground improvement techniques are used increasingly for new
projects to allow utilization of site with poor sub-surface conditions.

 Ground improvement is executed to increase the bearing capacity,


reduce the magnitude of settlement and time.

3
TOYO ENGINEERING INDIA PVT. LTD.

11/17/2017
TYPES OF GROUND IMPROVEMENT WORK
 Types of ground improvement can be defined in three categories:
 Ground Reinforcement : Stone Columns, Soil Nails, Micro Piles, Jet

Ground Improvement work TEIPL


Grouting, Ground Anchors, Geosynthetics, Fibers, Lime Columns, Vibro Concrete
Columns, Mechanically Stabilize of Earth & Biotechnical

 Ground Improvement: Surface Compaction, Drainage-Surcharge, Electro-


Osmosis, Compaction Grouting, Blasting & Dynamic Compaction

 Ground Treatment: Soil Cement, Lime Admixture, Flyash, Dewatering,


Heating / Freezing & Vitrification

4
TOYO ENGINEERING INDIA PVT. LTD.

11/17/2017
METHODS OF GROUND IMPROVEMENT WORK
 The methods of ground improvement that is basically adopted
depends on nature of soil strata and purpose of improvement.

Ground Improvement work TEIPL


 The methods of Ground Improvement we have adopted for GLMRF-
Mundra & DCU Coke Handling Project of IOCL Paradip Refinery
due to soil liquefaction properties are as follows:

 Vibro Compaction Techniques


 Vibro Replacement Techniques

5
TOYO ENGINEERING INDIA PVT. LTD.

VIBRO COMPACTION TECHNIQUES

11/17/2017
Ground Improvement work TEIPL
6
TOYO ENGINEERING INDIA PVT. LTD.

CONCEPT OF VIBRO COMPACTION

11/17/2017
 Vibro-compaction is one of the oldest deep compaction methods in
existence and was introduced and developed by Keller in the 1930's,
designed to induce compaction of granular materials. The basic principle

Ground Improvement work TEIPL


behind the process is that particles of non denser state by means of
vibration. Refer to next slide for schematic view for compaction process.
 Vibro-compaction process : Vibrators are first positioned by the crane to the
probe location which is marked by a wooden or steel peg on the ground.
Water supply switched on, the vibrator is lowered into the ground. The
combination of vibration and high-pressure water jetting surrounding the
vibrator, which assists in the penetration process.
 The effect of the compaction becomes visible at the ground surface in the
form of a cone-shaped depression, sand is obtained from the near by vicinity
of Vibro compaction point to use as overfill materials.

7
TOYO ENGINEERING INDIA PVT. LTD.

11/17/2017
VIBRO COMPACTION TECHNIQUES

Ground Improvement work TEIPL


8
TOYO ENGINEERING INDIA PVT. LTD.

VIBRO REPLACEMENT TECHNIQUES (DRY)

11/17/2017
Ground Improvement work TEIPL
9
TOYO ENGINEERING INDIA PVT. LTD.

VIBRO REPLACEMENT TECHNIQUES (WET)

11/17/2017
Ground Improvement work TEIPL
10
TOYO ENGINEERING INDIA PVT. LTD.

CONCEPT OF VIBRO REPLACEMENT

11/17/2017
 The Vibro-replacement technique introduces a coarse grained material
as load bearing elements consisting of gravel or stone aggregate as a
backfill medium. The stone column and the in situ soil form an

Ground Improvement work TEIPL


integrated system having low compressibility and high shear strength.
The excess pore water pressure can dissipate through the stone column,
which also can act as a vertical drain. The settlement expected for the
treated soil is reduced while the rate of settlement is increased when
compared with the untreated soils.
 To form a Vibro-replacement point the vibrator with its follower tubes is
placed over the selected point by means of a suitable supporting crane, after
that starting the vibrator motor is lowered into the ground.
 The construction process of Vibro-replacement columns by means of
top feed wet method with electric depth vibrators. In top feed wet method
of Vibro replacement technique, high-pressure water jets existing at the tip
of the vibrator assist penetration of the Vibro float into the soil. The grading
of the stone usually falls into the range of 75 mm to 12 mm.
11
TOYO ENGINEERING INDIA PVT. LTD.

MAJOR EQUIPMENTS OF GROUND IMPROVEMENT

11/17/2017
WORK

Ground Improvement work TEIPL


12
11/17/2017 Ground Improvement work TEIPL
13
TOYO ENGINEERING INDIA PVT. LTD.
TOYO ENGINEERING INDIA PVT. LTD.

11/17/2017
Ground Improvement work TEIPL
DRIVING FLOTER
PERFORMANCE INDICATOR

14

PRINTING MACHINE
TOYO ENGINEERING INDIA PVT. LTD.

11/17/2017
Ground Improvement work TEIPL
PERFORMANCE
GRAPH

15
TOYO ENGINEERING INDIA PVT. LTD.

11/17/2017
FIELD TEST INVOLVED IN GROUND IMPROVEMENT
WORK
 Plate Load Test - To find out bearing capacity of soil

Ground Improvement work TEIPL


 Soil Penetration Test (Pre & Post) - To find out soil characteristics

 Cone Penetration Test (Pre & Post) - To find out soil characteristics

 Vertical Compression Test - Load Test on improved soil

 Electric Resistivity Test - To find out electric resistivity

 Piezometer Test - To observe ground water table level

 Cross Hole Test - To find out seismic wave

16
TOYO ENGINEERING INDIA PVT. LTD.
LESSON LEARN & CONCLUSION

11/17/2017
 Water logging at site during operation of GI work.
 Solution: Availability of sufficient dewatering pumps & outlet drains.
 Formation of deep holes during GI work operation before completion of job.
 Solution: (1) Proper barricading to avoid man entry to the operation location. (2) Close

Ground Improvement work TEIPL


monitoring of site standby supervisor. (3) Only loader should operate for filling of holes during GI
work (4) After completion of particular location supervisor should ensure for proper vibration &
compaction done in that area with filling.
 Power cable routes to the floater due to continuous operation with water
facility.
 Solution: Power cables should be routed such a way to avoid water touching during operation.
 High water pressure on pipe joints, while pumps are running.
 Solution: Steel whip arrestor to be installed in each & every pipe joints to avoid hit to the workmen
in case of failure of joints during operation.
 Excavated area for GI Vibro replacement work.
 Solution: Proper compaction of entire area including hard barricading required.
 Consumable material stacking & shifting to the designated locations.
 Solution: Proper approach should be prepared to the material stacking area, including shifting to
the location with loader.

17
TOYO ENGINEERING INDIA PVT. LTD.

11/17/2017
Ground Improvement work TEIPL
THANK YOU
18