You are on page 1of 3

HOUSING & DEVELOPMENT BOARD

FORM OF QUOTATION

QUOTATION TO INSTALL FIXED PANELS RAIN SCREEN IN SENGKANG TOWN

To : Housing & Development Board, Singapore

1. Having examined the Invitation to Quote, we hereby offer to provide the


services all in accordance with the Terms and Specifications in the Invitation to
Quote for the Total Lump Sum of:

Dollars : Refer to our Total Quotation Amount submitted via GeBIZ

Name of authorized person : Jeff Jia

NRIC / Passport No. : S2723836Z

Designation / Appointment : Project Manager

Name of Company : Singbuild Construction Pte Ltd

#08-01B Yu Li Building,
Tenderer’s Service Address :
No. 37. Lorong 23, Aljunied Singapore 388371

Telephone and Facsimile Nos. : 9781 2858

Contact Person Jeff Jia (Project Manager) HP: 9781 2858


:
(for clarifications / enquiries) Email: singbuildconstruction@gmail.com
(Name, Designation, Telephone no. and E-mail
address)

2. In the event that there is a discrepancy between the Total Lump Sum Quotation
Price in the Breakdown Cost of Quotation and the Total Quotation Amount
submitted via GeBIZ, we agree that the latter shall prevail.

3. The validity period of this quotation is three (3) calendar months from the date
of closing.

4. The HDB does not bind itself to accept the lowest or any quotation.

5. The quotation sum including all rates and prices submitted by us in this quotation
shall be exclusive of any Goods and Services Tax (hereinafter referred to as
"GST"). Any GST which is payable on taxable goods and services supplied
under the contract shall be separately paid by the HDB.
6. Our Offer together with the HDB’s Letter of Acceptance shall constitute a binding
contract between us and HDB. The contract shall be deemed to be made in
Singapore and shall be subject to, governed by and interpreted in accordance
with the Laws of the Republic of Singapore for every purpose. The application
of the United Nations Convention on Contracts for the International Sale of
Goods 1980 to this Contract is hereby expressly excluded.

7. We shall not, except in the proper performance of our duties under the
contract or with the prior written approval of HDB, during or after the
termination of the contract reproduce, publish use or disclose nor permit such
reproduction, use, publication or disclosure to any person, firm or corporation
of any information relating to the contract, HDB’s policies or such other
information as may be acquired by us pursuant to this contract.

8. We undertake to complete the whole of the Works within a period of Three


months from the date of receipt of your order to commence work, in conformity
with the Term and Specifications, Drawings and in accordance with the
general conditions of this quotation and preliminaries for the lump sum.
FORM OF QUOTATION
ANNEX A

BREAKDOWN OF TOTAL LUMP SUM

The following breakdown shall include the provision of materials, labour, tools,
equipment and all necessary costs for carrying out the works:

S/N Descriptions Quantity Unit Unit Rate Amount

(S$)

1) Fabrication, supply, delivery


and installation of powder
coated Aluminum perforated
panel system including fixings,
fastenings, anchors and 12.00 M2 185.00 $2220.00
brackets and all the related
accessories at Blk 164
Rivervale Crescent MSCP roof
top lift lobby

(Contractor has to confirm the


actual quantities on site.)
2)
Fabrication, supply, delivery
and installation of powder
coated Aluminum vertical fins
system including fixings,
fastenings, anchors and
brackets and all the related
46.00 M2 275.00 $12650.00
accessories at Blk 433A
Sengkang West Way, 3 storey
to 25 storey of the lift lobby

(Contractor has to confirm the


actual quantities on site.)
3)
Dismantle and disposal of
existing Aluminum vertical fins
at Blk 433A Sengkang West LS $90.00
Way, 3, 4 and 6 storey of the
lift lobby

TOTAL LUMP SUM (S$) $14960.00

(to be input into Gebiz)

You might also like