You are on page 1of 7

The Leaners Academy

Project Charter:
Title: PME
Business Case:
Purpose: why we are spending money on this project
Digital Market place to connect the people with trustworthiness with easy access in scrap metal or metal
scrap businesses and also accelerate E Procurement in Pakistan for small and medium enterprises .So
they can actively work. This project will be high profitable business as more and more members should
be alien on this platform.

Team Members:
Irfan Ali
Muhammad Adnan Ashraf
Lehsib Shaf
Ibrar
Team Leader:
Irfan ali
Sponsors:
Irfan Ali
Muhammad Adnan Ashraf
Lehsib Shaf
Ibrar
Farooq Ejaz
Duration:
Eleven Months
Critical to quality:
Measurable characteristics that is significant for customer and
business.
Savings.
We are doing this project to reduce waste and produce
savings.
Constraints:
Timeline or wbs
Other video
It is statement of scope, objectives and participants.

Scope
Objectives:
Digital Market place to connect the people with trustworthiness with easy access in scrap metal or metal
scrap businesses and also accelerate E Procurement in Pakistan for small and medium enterprises .So
they can actively work.

Scope Statement:
What is include:
1. Idea Generation
2. Detailed study of viability
3. Budget
4. Website
5. Mobile app
6. An Office building with proper 3 office rooms, kitchen, waiting area and without furniture.
7. Rental Agreements
8. IT Experts
9. Web designers
10. Electricity connection
11. Renovation
12. Marketing
13. Ups system for backup
14. Office Furniture
15. Other Furniture
16. Electrical Equipment
17. Kitchen accessories
18. Capable team

What is not include :

Deliverables:
A deliverable is a product produced as part of a project which are presents in
followings.
WBS:
Tabular Form :
The Study Academy (Project)
1.0 Idea Generation

2.0 Detail Study of Viability

3.0 Website
3.1 Web designers/IT Experts work
3.1.1 Definition
3.1.2 Wireframes and site Architecture
3.1.3 Visual Design
3.1.4 Site Development
3.1.5 Site Testing
3.1.6 Launch
3.1.7 Site Maintenance.
4.0 Mobile App
4.1 Web designers/IT Experts work
4.1.1 Understanding the Idea
4.1.2 Define the core functionalities
4.1.3 Sketch the app
4.1.4 Plan the app’s ul Flow
4.1.5 Designing the database
4.1.6 UX Wire frames
4.1.7 Researching the Solution
4.1.8 Building the App
5.0 Office Building
5.1 Rental agreements
5.2 Glass Work
5.2.1 Glass walls
5.2.2 Glass doors
5.3 Floor Work
5.3.1 Floor Out Door Tiles
5.3.2 Floor Room Tiles
5.4 Ceiling Work
5.4.1 Room Ceiling work
5.4.2 Out Door Ceiling work
5.5 Electrical Equipment and Electric Work
5.5.1 Room Light work
5.5.2 Out Door Light work
5.5.3 UPS
5.5.4 Fans
5.5.5 Air Conditions
5.5.6 LED TV
5.6 Wooden Work
5.6.1 File Cabinets
5.6.2 Kitchen Cabinets
5.6.3 Doors
5.7 Furniture
5.7.1 Office Furniture
5.7.2 Other Furniture
5.8 Office Equipment
5.8.1 Laptops
5.8.2 Telephone (with line)
5.8.2 Office Stationary
5.8.4 Kitchen Accessories
6.0 Marketing
6.1 Paper Ads
6.1.1 Printing Ads
6.1.2 Flex Panel
6.2 Electronic Ads
6.2.1 Social Media add
6.2.2 Tele marketing
7.0 Staffing
7.1 Admin Staff (IT+Ops)
7.1.1 Interviews
7.1.2 Selection
7.2 Sale Executives
7.2.1 Interviews
7.2.2 Selection
7.3 Training Session
7.3.1 Admin Staff (IT+Ops)
7.3.2 Sales Executives
8.0 Roll Out