Electric station BTS

Daily Report
Date Weather Temperature
2-6-2017 sunny 42
* This report had been prepare at 8:00 AM 3/6 and it is relate to the previous 24hrs from its date.

Shifts schedule :
Day-shift Night-shift Off-shift
Eng. Maythem abd alrazak (7:00am-7:00pm) Eng. Maythem abd alrazak (7:00pm-7:00am) Eng. Osama saleem
Eng. Murtada (6:00am-6:00pm) Tech.Khalid (7:00pm-7:00am) Tech.Majed abd alhafez
Tech.Khalid (7:00am-7:00pm) Fdhil slman(3:00pm-11:00pm) Tech.Hussam kazaal
Nasser kadhm (7:00am-3:00pm) Dhurgam nabel (11:00pm-7:00am) Tech.Abd alkadhm
Hussain asad (7:00am-3:00pm) Eng. Ali Qais
Eng. Abduljabbar

Available generators :
Gen No Gen capacity (KVA) Previous Total hrs Present Total hrs Run time hrs Load%
2 2000 1526:26 1546:59 21:33 (50-60)%
3 1500 3287:25 3301:43 14:18 (50-60)%
4 2000(new engine) 1559:01 1561:35 02:34 (50-60)%
5 1250 4022:57 4022:57 00:00 (0)%
6 1500 383:47 383:47 00:00 (0)%
7 1500 1797:34 1798:43 01:09 (50-60)%
8 1250 2185:35 2185:35 00:00 (0)%
9 2000 3116:38 3129:00 12:22 (50-60)%
10 1500 1774:16 1774:16 00:00 (0)%
11 2000 2835:06 2835:06 00:00 (0)%
Diesel status :
Daily 1 Daily 2 Storage 1 Storage 2 Total Addition consumption
105cm=28.28m3 105cm=28.28m3 158cm=48.744m3 105cm=28.28m3 133.584m3 20.705 m3 12.193 m3

-Available load is 10000 KW.


-Maximum load is 2600 KW.

engineer name Osama Saleem


Date 2-6-2017
Signature