T1
0.25
A1 0.175 m2
0.5 L= 29 m
V1= 5.075 m3
0.45
T2
0.2
A2 0.112 m2
0.4 L= 5.4 m
V2= 0.6048 m3
0.36
T3
0.2
A3= 0.096 m2
0.32 L= 2.16 m
V2= 0.2074 m3
0.4
Total Pondasi = 5.8872 m3
Kuda-kuda
untuk 1 kuda-kuda
Balok tarik 6/12 2 btg
Balok tekan 6/12 2 btg
Tiang raja, skor 6/12 1 btg
Total 2 Kuda-kuda 10 btg
Balok Angin 5/10 2 btg
Gording 5/7 + Balok Nok 26 btg
Penutup Atap
Luas atap 59.616 m2
1 seng 6 kaki 1.19 m2
Total kebutuhan seng 48 lbr
0.15
A= 0.03 m2
0.2 L= 24 m
V1= 0.72 m3
Besi 10 8 btg
Besi 8 8 btg
Slope Kamar
0.15
A 0.03 m2
0.2 L= 8.5 m
V1= 0.255 m3
Besi 10 3 btg
Besi 8 3 btg
Slope Teras
0.1
A= 0.015 m2
0.15 L= 5.4 m
V2= 0.081 m3
Besi 10 2 btg
Besi 8 2 btg
Slope WC
0.1
A= 0.015 m2
0.15 L= 2.16 m
V2= 0.0324 m3
Besi 10 1 btg
Besi 8 1 btg
Besi 10 8 btg
Besi 8 7 btg
0.12
A= 0.0144 m2
0.12 L= 5.3 m
V2= 0.0763 m3
Besi 10 2 btg
Besi 8 2 btg
0.1
A= 0.015 m2
0.15 L= 24.5 m
V2= 0.3675 m3
Besi 10 9 btg
Besi 8 6 btg
0.1
A= 0.015 m2
0.15 L= 10.66 m
V2= 0.1599 m3
Besi 10 4 btg
Besi 8 3 btg
Dinding (Luar)
Luas Dinding
53.9 m2
Ukuran Batako
0.1 mx 0.2 mx 0.4 m 0.08 m2
Ukuran Bata merah
0.05 m x 0.11 mx 0.22 m 0.011 m2
Dinding (Dalam)
Luas Dinding
22.7 m2
Kuda-Kuda Beton
0.1
A= 0.01 m2
0.1 L= 18.64 m
V2= 0.1864 m3
Besi 10 7 btg
Besi 8 4 btg
Dinding Atap
Luas Dinding
8.4 m2
Rabat Lantai
Luas Lantai
35.1 m2
Pemasangan pondasi batu belah campuran 1SP : 4PP
5.88716 Pemasangan pondasi batu belah campuran 1SP : 4PP
Bahan Bangunan
Batu Belah
Portland cement
Pasir Pasang
Pekerja
Tukang batu
0.328 6.13 Konstruksi kuda-kuda konvensional (M3), kayu kelas I, II dan III b
meter
Balok kayu
Besi strip tebal 5 mm
Paku 12 cm
Pekerja
Tukang kayu
Slope Kamar
0.255 Memasang 1 M³ Mutu beton f’c =14,5 MPa (K 175)
Bahan Bangunan
Portland cement
Pasir beton
Kerikil (maksimum 30mm)
Pekerja
Tukang batu
Slope Teras
0.081 Memasang 1 M³ Mutu beton f’c =14,5 MPa (K 175)
Bahan Bangunan
Portland cement
Pasir beton
Kerikil (maksimum 30mm)
Pekerja
Tukang batu
Slope WC
0.0324 Memasang 1 M³ Mutu beton f’c =14,5 MPa (K 175)
Bahan Bangunan
Portland cement
Pasir beton
Kerikil (maksimum 30mm)
Pekerja
Tukang batu
Dinding (Luar)
53.9 Pasangan dinding Batako (10cmx20cmx40cm)==0,08m2
Bahan Bangunan
Batako 10cmx20cmx40cm
Portland cement
Pasir Pasang
Pekerja
Tukang batu
Dinding (Dalam)
22.7 Pasangan dinding Batako (10cmx20cmx40cm)==0,08m2
Bahan Bangunan
Batako 10cmx20cmx40cm
Portland cement
Pasir Pasang
Pekerja
Tukang batu
Kuda-Kuda Beton
0.1864 Memasang 1 M³ Mutu beton f’c =14,5 MPa (K 175)
Bahan Bangunan
Portland cement
Pasir beton
Kerikil (maksimum 30mm)
Pekerja
Tukang batu
Dinding Atap
8.4 Pasangan dinding Batako (10cmx20cmx40cm)==0,08m2
Bahan Bangunan
Batako 10cmx20cmx40cm
Portland cement
Pasir Pasang
Pekerja
Tukang batu
Rabat Lantai
35.1 Beton 1:3:5, tebal 5 cm, untuk plur lantai
Portland cement
Pasir Pasang
Kerikil (maksimum 30mm)
Pekerja
Tukang batu
0
0.07546 A.4.6.1.2.Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jend
0.03773 Balok Kayu
0.03888 Paku 10
0.02419 Lem Kayu
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0
1.6 A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kel
Papan Kayu
Lem Kayu
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
elas II (M3)
0.400 m3
5.460 kg
1.092 kg
0.874 OH
2.621 OH
g gelombang (m2)
47.693 lbr
1.192 kg
7.154 OH
3.577 OH
seng (m')
2.400 lbr
0.320 kg
1.200 OH
0.560 OH
ur lantai
5.533 zak
0.948 m3
1.597 m3
0.073 OH
0.024 OH
ngan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
0.091 m3 Rp 3,750,000
0.094 kg Rp 22,500
0.075 kg Rp 15,000
0.453 OH Rp 92,000
1.358 OH Rp 115,000
0.136 OH Rp 172,500
0.023 OH Rp 138,000
Rp 339,552.00
Rp 2,122.20
Rp 1,131.84
Rp 41,651.71
Rp 156,193.92
Rp 23,429.09
Rp 3,123.88
Rp 567,204.64
Rp 180,000.00
Rp 12,000.00
Rp 147,200.00
Rp 276,000.00
Rp 82,800.00
Rp 11,040.00
Rp 709,040.00
Rp 156,000.00
Rp 43,200.00
Rp 13,248.00
Rp 44,160.00
Rp 99,360.00
Rp 15,897.60
Rp 2,649.60
Rp 374,515.20
Format III-7
BANTUAN STIMULAN PERUMAHAN SWADAYA (BSPS)
Rencana Anggaran dan Biaya (RAB)
Nomor BNBA :
Nomor KTP :
Nama Penerima Bantuan :
Alamat :
Desa / Kelurahan :
Kecamatan :
Kabupaten / Kota :
Jenis Kegiatan : PKRS
SUMBER DANA/BAHAN
HARGA SWADAYA
NO URAIAN PEKERJAAN VOLUME TOTAL HARGA
SATUAN
(Rupiah) (Rupiah) BSPS Memakai Bahan
Dana Tunai
Bangunan Lama
I Pekerjaan Persiapan
Pembongkaran 1.00 Ls Gotong Royong
1 Pondasi 5.89 m3
Batu Belah/ Batu Gunung 7.06 m3 180,000.00 1,271,626.56 1,271,626.56
Semen @ 50 kg 19.19 zak 62,000.00 1,189,912.78 1,189,912.78
Pasir Pasang 3.06 m3 140,000.00 428,585.25 428,585.25
II Pekerjaan Atap
1 Kuda-kuda dan Rangka Atap 0.69 m3
Kayu Rangka Kuda-Kuda 6/12 10.00 Bt 72,000.00 720,000.00 360,000.00 360,000.00
Kayu Gording 5/7 + nok 26.00 Bt 35,000.00 910,000.00 350,000.00 560,000.00
Balok Angin 5/10 2.00 Bt 50,000.00 100,000.00 100,000.00
2 Penutup Atap 59.62 M²
Seng Gelombang 6 kaki (80x180 cm) 48.00 lbr 55,000.00 2,640,000.00 2,640,000.00 -
Bubungan Seng Plat 8.00 m 18,000.00 144,000.00 144,000.00
Listplang papan (2 cm x 20 cm x 4 m) 8.00 Bt 40,000.00 320,000.00 320,000.00
III Pekerjaan Dinding
1 Rangka Dinding
1a Sloof Luar (15 cm x 20 cm) 0.72 m3
Besi beton Φ 10 mm SNI 8.00 Bt 90,000.00 720,000.00 720,000.00 -
Besi beton Φ 8 mm SNI 8.00 Bt 65,000.00 520,000.00 520,000.00 -
Semen @ 50 kg 5.00 Zak 62,000.00 310,000.00 248,000.00 62,000.00
Kerikil (maks 30mm) 0.41 M³ 160,000.00 65,894.40 65,894.40
Pasir Beton 0.39 M³ 140,000.00 54,734.40 54,734.40
1a+ Sloof Kamar (15 cm x 20 cm) 0.26 m3
Besi beton Φ 10 mm SNI 3.00 Bt 90,000.00 270,000.00 270,000.00
Besi beton Φ 8 mm SNI 3.00 Bt 65,000.00 195,000.00 195,000.00
Semen @ 50 kg 1.66 Zak 62,000.00 103,081.20 103,081.20
Kerikil (maks 30mm) 0.15 M³ 160,000.00 23,337.60 23,337.60
Pasir Beton 0.14 M³ 140,000.00 19,385.10 19,385.10
1a+ Sloof Teras 10 cm x 15 cm 0.08 m3
Besi beton Φ 10 mm SNI 2.00 Bt 90,000.00 180,000.00 180,000.00
Besi beton Φ 8 mm SNI 2.00 Bt 65,000.00 130,000.00 130,000.00
Semen @ 50 kg 0.53 Zak 62,000.00 32,743.44 32,743.44
Kerikil (maks 30mm) 0.05 M³ 160,000.00 7,413.12 7,413.12
Pasir Beton 0.04 M³ 140,000.00 6,157.62 6,157.62
1a+ Sloof WC 10 cm x 15 cm 0.03 m3
Besi beton Φ 10 mm SNI 1.00 Bt 90,000.00 90,000.00 90,000.00
Besi beton Φ 8 mm SNI 1.00 Bt 65,000.00 65,000.00 65,000.00
Semen @ 50 kg 0.21 Zak 62,000.00 13,097.38 13,097.38
Kerikil (maks 30mm) 0.02 M³ 160,000.00 2,965.25 2,965.25
Pasir Beton 0.02 M³ 140,000.00 2,463.05 2,463.05
1b Kolom Luar (12 cm x 12 cm x 2,65 m) 0.31 m3
Besi beton Φ 10 mm SNI 8.00 Bt 90,000.00 720,000.00 720,000.00 -
Besi beton Φ 8 mm SNI 7.00 Bt 65,000.00 455,000.00 455,000.00 -
Semen @ 50 kg 2.00 Zak 62,000.00 124,000.00 124,000.00 -
Kerikil (maks 30mm) 0.17 M³ 160,000.00 27,939.23 27,939.23
Pasir Beton 0.17 M³ 140,000.00 23,207.39 23,207.39
1b+ Kolom Dalam (12 cm x 12 cm x 2,65 m) 0.08 m3
Besi beton Φ 10 mm SNI 2.00 Bt 90,000.00 180,000.00 180,000.00
Besi beton Φ 8 mm SNI 2.00 Bt 65,000.00 130,000.00 130,000.00
Semen @ 50 kg 0.50 Zak 62,000.00 30,851.60 30,851.60
Kerikil (maks 30mm) 0.04 M³ 160,000.00 6,984.81 6,984.81
Pasir Beton 0.04 M³ 140,000.00 5,801.85 5,801.85
1c Ring Balok Luar (10 cm x 15 cm) 0.37 m3
Besi beton Φ 10 mm SNI 9.00 Bt 90,000.00 810,000.00 810,000.00 -
Besi beton Φ 8 mm SNI 6.00 Bt 65,000.00 390,000.00 390,000.00 -
Semen @ 50 kg 3.00 Zak 62,000.00 186,000.00 186,000.00 -
Kerikil (maks 30mm) 0.21 M³ 160,000.00 33,633.60 33,633.60
Pasir Beton 0.20 M³ 140,000.00 27,937.35 27,937.35
1c+ Ring Balok Dalam (10 cm x 15 cm) 0.16 m3
Besi beton Φ 10 mm SNI 4.00 Bt 90,000.00 360,000.00 360,000.00
Besi beton Φ 8 mm SNI 3.00 Bt 65,000.00 195,000.00 195,000.00
Semen @ 50 kg 1.04 Zak 62,000.00 64,637.98 64,637.98
Kerikil (maks 30mm) 0.09 M³ 160,000.00 14,634.05 14,634.05
Pasir Beton 0.09 M³ 140,000.00 12,155.60 12,155.60
1c+ Kuda-kuda Beton (10 cm x 10 cm) 0.19 m3
Besi beton Φ 10 mm SNI 7.00 Bt 90,000.00 630,000.00 630,000.00
Besi beton Φ 8 mm SNI 4.00 Bt 65,000.00 260,000.00 260,000.00
Semen @ 50 kg 1.22 Zak 62,000.00 75,350.34 75,350.34
Kerikil (maks 30mm) 0.11 M³ 160,000.00 17,059.33 17,059.33
Pasir Beton 0.10 M³ 140,000.00 14,170.13 14,170.13
2 Dinding Permanen (Luar) 53.90 M²
Batako (10cmx20cmx40cm) 674 Bh 2,900.00 1,954,600.00 1,285,000.00 669,600.00
Semen @ 50 kg 11.00 Zak 62,000.00 682,000.00 620,000.00 62,000.00
Pasir Pasang 2.05 M³ 140,000.00 286,748.00 286,748.00
2+ Dinding Permanen (Dalam) 22.70 M²
Batako 283.75 Bh 2,900.00 822,875.00 822,875.00
Semen @ 50 kg 4.74 Zak 62,000.00 294,146.60 294,146.60
Pasir Pasang 0.86 M³ 140,000.00 120,764.00 120,764.00
2+ Dinding Atap 8.40 M²
Batako 105.00 Bh 2,900.00 304,500.00 304,500.00
Semen @ 50 kg 1.76 Zak 62,000.00 108,847.20 108,847.20
Pasir Pasang 0.32 M³ 140,000.00 44,688.00 44,688.00
3 Pintu dan Jendela
3a Kusen Pintu dan Jendela
Kusen Pintu 6/12 (0,8mx2m) 2.00 Bh 300,000.00 600,000.00 600,000.00 -
Kusen Pintu Kamar 6/12 (0,7mx2m) 2.00 Bh 280,000.00 560,000.00 560,000.00
Kusen Pintu WC 6/12 (0,6mx2m) 1.00 Bh 270,000.00 270,000.00 270,000.00
Kusen Jendela 2 lubang (0,8mx1,2m) 3.00 Bh 250,000.00 750,000.00 500,000.00 250,000.00
Kusen Jendela 1 lubang (0,4mx1,2m) 1.00 Bh 230,000.00 230,000.00 230,000.00
3b Daun Pintu dan Jendela
Daun Pintu /Panel Kayu (0,8mx2m) 2.00 Bh 300,000.00 600,000.00 600,000.00 -
Daun Pintu /Panel Kayu (0,7mx2m) 2.00 Bh 280,000.00 560,000.00 560,000.00
Daun Pintu /Panel Kayu (0,6mx2m) 1.00 Bh 270,000.00 270,000.00 270,000.00
Daun Jendela Kaca 5 mm (0,4mx1,2m) 7.00 Bh 250,000.00 1,750,000.00 1,000,000.00 750,000.00
IV Pekerjaan Lantai, pelur beton 1:3:5, t= 5 cm
Rabat Lantai Tebal 5 cm 35.10 M²
Semen @ 50 kg 6.00 Zak 62,000.00 372,000.00 372,000.00 -
Kerikil (maks 30mm) 1.60 M³ 160,000.00 255,528.00 255,528.00
Pasir Beton 0.95 M³ 140,000.00 132,678.00 132,678.00
V Upah Kerja
Pekerja 50.00 OH 80,000.00 4,000,000.00 4,000,000.00
Tukang 30.00 OH 100,000.00 3,000,000.00 2,500,000.00 500,000.00
VI WC dan lain-lain
Closet Jongkok + Dudukan 1.00 Ls 200,000.00 200,000.00 200,000.00
Pipa paralon 3" + Assessories 1.00 btg 130,000.00 130,000.00 130,000.00
Besi Strip, Paku, engsel, slot pintu, kunci, 1.00 Ls 1,000,000.00 1,000,000.00 1,000,000.00
kawat ikat
Septick Tank 1.00 Ls 600,000.00 600,000.00 600,000.00
JUMLAH 35,229,135.16 15,000,000.00 20,229,135.16 -
Pasangkayu, 2018
Difasilitasi, Diajukan oleh,
Tenaga Fasilitator Lapangan Ketua KPB Penerima Bantuan,
Pasangkayu, 2018
Difasilitasi, Diajukan oleh,
Tenaga Fasilitator Lapangan Ketua KPB Penerima Bantuan,
Nama KPB :
Desa :
Kecamatan :
Kabupaten : Pasangkayu
Tanggal Survey :
Tanggal Dibuat Laporan :
A. Harga Satuan Bahan Bangunan
Disahkan Oleh
Tim Teknis Kabupaten Pasangkayu
KAMARUDDIN, ST.
Nip. 1973 0814 200502 1003
Format III-9
SURVEY TOKO/ PENYEDIA BAHAN BANGUNAN
Berdasarkan Keputusan Bupati Pasangkayu Nomor 206 Tanggal 20 Februari 2018
Tentang Penetapan Standarisasi Satuan Harga Barang dan Jasa Semester I Tahun Anggaran 2018
Nama KPB :
Desa :
Kecamatan :
Kabupaten : Pasangkayu
Tanggal Survey :
Tanggal Dibuat Laporan :
A. Harga Satuan Bahan Bangunan
Disahkan Oleh
Tim Teknis Kabupaten Pasangkayu
KAMARUDDIN, ST.
Nip. 1973 0814 200502 1003
Format III-9
SURVEY TOKO/ PENYEDIA BAHAN BANGUNAN
Berdasarkan Keputusan Bupati Pasangkayu Nomor 206 Tanggal 20 Februari 2018
Tentang Penetapan Standarisasi Satuan Harga Barang dan Jasa Semester I Tahun Anggaran 2018
Nama KPB :
Desa :
Kecamatan :
Kabupaten : Pasangkayu
Tanggal Survey :
Tanggal Dibuat Laporan :
A. Harga Satuan Bahan Bangunan
Disahkan Oleh
Tim Teknis Kabupaten Pasangkayu
KAMARUDDIN, ST.
Nip. 1973 0814 200502 1003