Professional Documents
Culture Documents
4. These standards can be implemented in isolation or in an integrated manner as indicated in the Fig. 1.
5. Our management has decided to adopt one of those standards as the starting point. That is ISO 9001 standard.
6. ISO 9001 is dealing with the QUALITY of an organization. By adopting ISO 9001, Fig 2 - Components of Quality may be:
some of the above mention risks can be eliminated or controlled. ▪ Staff and workers;
▪ Tools, machines and equipment;
7. ISO 9001 does not talk about just the quality of the product or/and the service ▪ Materials & methods;
that the organization delivers. But the quality of everything associated with ▪ The environment (internal/ext.).
the product and service.
8. The components of the ‘Quality’ of our school are indicated in Fig 2 in general.
9. Are we sure about the quality of our school? How do we assure the quality of our school?
10. It is not easy to talk about the quality of an organization (our school) if you take it as a whole. Because it is so
complex and it is not possible to use the same tool(s) for all of its aspects.
11. Therefore, we shall recognize the “PROCESSES” associated with our school. This is called PROCESS APPROACH.
12. Our school comprised of numerous interconnected processes. Some possible examples for those processes are:
Promotion, selection & registering of learners, Recruiting, developing & Staff
evaluating staff, Facility management, Course development & accreditation,
Teaching & assessing the learners, Security, health & safety management and
Feedbacks & complaint management.
13. These are the immediately recognizable processes or the KEY processes of our school.
14. There are some other processes, some of them can be recognized and some are
Fig. 3
hidden. Some examples are: communication, documents & data management,
corrective actions, management review, system auditing. These can be recognized as SUPPORTS or
supporting processes.
15. All of you (management, staff or workers) are falling under one or more of these processes. Try to fill the table in
Fig 3 with regard to the key processes.
16. All these processes are linked in a logical way as in the Fig 4.
17. As you can see, if any of these link or process is weaken, that affect the entire structure or the SYSTEM. This is
called process interaction. Some of these processes very important to achieve customer satisfaction. These are
called Key Processes. Others are Support Processes.
18. These processes are not working in isolation, these are interconnected as mentioned above. The Management
System (MS) of the school is comprised with these interconnected processes.
19. Outside of the management system, the customers exist. Those are leaners, parents or guardians (beneficiaries).
23. The customer satisfaction is fundamental to the success of the business. In achieving customer satisfaction, the
MS should run effectively. Since the MS is consisting of processes, the processes should run effectively.
24. A process receives some inputs and delivers some output. The output becomes the input of the next process. So,
to success a process, the inputs and outputs should be effective.
25. Unfortunately, the outputs are not always desirable. Sometimes we receive undesirable or NONCONFORMING
outputs. It is the responsibility of the process owner to run the process minimizing or avoiding the
nonconforming outputs or nonconformities or NC.
26. Proper planning could avoid NC situations. PLAN is the key word in process management. See the Fig 5.
Plan Plan
Do/Implement Do Plan
Act
Correction PDCA Cycle/Deming Cycle
Corrective
Action
Fig 5 – PDCA Cycle
27. If the gravity of the NC is not significant, a remedial action (‘correction’) may be Fig 6 –Seven Tools for
adequate. If the gravity of the NC is high or critical, or repetitive in nature, a Continual Improvement
1. Quality Policy
correction may not be adequate. In that case, finding of the ROOT CAUSE of the NC 2. Quality Objectives
is to be find out. 3. Corrective Action
28. If an action can be taken to eliminate the root cause, that action is called 4. Risk Assessments
5. Date Analysis
CORRECTIVE ACTION. 6. Internal Audits
29. CA are helping the organizations to improve its processes continually. The 7. Management Review
CONTINUAL IMPROVEMENT (CI) of an organization is a mandatory requirement of
ISO 9001 implementation.
30. Corrective action or CA is one tool of continual improvement. One other tool we have already been discussed
above. That is OBJECTIVES or more appropriately quality objectives. The complete set of tools for continual
improvement is given in Fig 6.
Fig 8 –Some Areas of Data Analysis
31. Continual improvement can be indicated as in Fig. 7.
A. Product/service data
B. Customer date
C. QMS data
D. Risk/Opportunity related data
E. External provider related data
F. Process data
Recruiting,
Leaners & Beneficiaries
Other Stakeholders