Professional Documents
Culture Documents
Tunnelling
With a diameter of 14m the fourth Elbe-
Tunnel-Section is the world’s largest
road tunnel in loose rock. In order to
evaluate the statistical calculations,
INTEGRAL HYDRAULIK was asked by
the project responsible to design and
manufacture an appropriate testing de-
vice. The weight of the overlying ground
was hydraulically simulated on a sec-
tion of the tunnel pipe by 96 hydraulic
cylinders with up to 200.000 kN. More
than 600 sensors were used to ascer-
tain the level of force and distortion.
Steering floods
Regulating flow speeds, maintaining con-
stant water levels and avoiding flooding –
INTEGRAL HYDRAULIK has successfully
designed, manufactured and delivered hy-
draulic solutions for a variety of projects.
In particular, we are experienced in en-
gineering hydraulic systems for floodga-
tes, weir systems and retention basins.
And of course there is a wide range of fur-
ther possible hydraulic applications. All
INTEGRAL HYDRAULIK products are desi-
gned with the user in mind and continuously
have been at the forefront of development
- pioneering new concepts and improving
existing products.