From the grading and site plans it appears that fencing will require removal, however limits of removal are not noted on the demolition plans;
Clarify limits of fence demolition and fence type/size, provide fence installation details and specifications.
Plans should slow limits of pavement removal/saw cutting for proposed water/sewer/storm sewer piping. Plans should show how pavement will be restored following pipe
installation.
Provide notes indicating the size and material of existing water main pipe and the proposed size of valve "T".
Plans should indicate type of water service pipe; specifications are unclear, listing multiple pipe material options.
It appears that the fire hydrants will require bollard protection; provide a detail for bollard placement and a detail for bollard construction.
The pump and piping layout for the Warehouse truck well is not clearly defined, provide more detail in next plan set.
4 of 29 5/12/2019, 1:07 PM
ProjNet: Logged In User https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCo...
Drawing ED-101: Recommend to expand Key Note 1 to tell the contractor to terminate the electrical circuit as required.
Submitted By: Morteza Mostaghim ((540) 665-4031). Submitted On: Apr 24 2019
Is the feeder from Substation to the building in Concrete Encased? It is not clear from the drawing.
Submitted By: Morteza Mostaghim ((540) 665-4031). Submitted On: Apr 24 2019
Electrical Specifications: When editing the specifications, please ensure all measurements are in metric system.
Submitted By: Morteza Mostaghim ((540) 665-4031). Submitted On: Apr 24 2019
I was not able to open the PDF file for electrical design analysis.
Submitted By: Morteza Mostaghim ((540) 665-4031). Submitted On: Apr 24 2019
Drawing XE-101 has a reference to Drawing SE-503. I did not find drawing SE-503 in this submittal.
Submitted By: Morteza Mostaghim ((540) 665-4031). Submitted On: Apr 24 2019
Drawing XE-101 is the compact substation a new one or existing one. How is the power coming to this compact substation?
Submitted By: Morteza Mostaghim ((540) 665-4031). Submitted On: Apr 24 2019