H. QUANTITY OF INGREDIENTS REQUIRED FOR 1 m OF CONCRETE Mix Proportion
3
OPC 53 GRADE 165 Kg/m
1
FLYASH 100 Kg/m3
GGBS 0 Kg/m3
ULTRAFINE SLAG 0 Kg/m3 0
20MM 647 Kg/m3 2.44
10MM 451 Kg/m3 1.70
M. SAND 981 Kg/m3 3.70
WATER 168 Ltr/m3 0.63
ADMIXTURE:- 2.65 Kg/m3
Remarks
1) The above Mix Design is on the basis of our approved sources/suppliers of the material. The same may required
alteration in proportioning of material in case of source changes by keeping the requirements intact as per IS 4926.
2) Qty. of aggregate will be adjusted as per actual yield & raw material properties at plant / Site during the production work.
I. Compressive Strength
24 Hrs : 10.00 N/mm2
3 Days : 21.00 N/mm2
7 Days : 38.8 N/mm2
28 Days : 46.9 N/mm2
QC-Incharge