Professional Documents
Culture Documents
0
NO START PROJECT STEP
1 1-Apr-18 4 unit auto pinning Monitoring
2 1-May-18 Modification manual stamping to auto Comissioning
3 10-May-18 Assembly PT 5013 in line ini Injection Take over
4 20-May-18 Auto test hinge for compact & Cap Take over
5 28-Aug-18 Make Robot 3 Axis Study
6 29-Aug-18 Make Hot Stamping machine Internal in ARPS Study
7 10-Jul-18 Fabrication
Modification manual pinning machine to Auto (CM 4009)
8 15-Sep-18 Commisioning
Modification manual pinning machine to Auto (CM 4008)
9 29-Aug-18 Make auto Flaming machine Part collection
10 Modification Stamping RT type to auto Study
11 Lipstick auto assmbly new project Study
12 Modification RF manual machine to Auto Study
13 Modification KKS Up-Down to Rotary Study
14 Automation by Fanuc Industrial Robot Study
ON ARPS 4.0
PROGRESS FINISH LEADER
monitoring production Line 30-Sep-18 Siswanto
trial for production 30-Sep-18 Fakih
Done 10-Sep-18 Zidni
Done 30-Sep-18 Anton
Pending 30-Nov-18 Zidni
30-Nov-18 Siswanto
Provide transfer unit, rotary table (done), 30-Oct-18 Anton
pinning unit (done)
adding new sensor for detect PIN (done) 19-Oct-18 Ibas
PIC Remark
Siswanto+chamim cek quality, senin start produksi
Suyadi
Monitoring hasil Copy ke Line lain
Siswanto Order MS
Siswanto
Anton Waiting Gripper SMC
Ibas Inisialisasi I/O
Anton
Zidni, Ibas Waiting wiring
Siswanto Sample Product
Zidni
Zidni
Anton, Ibas