AUTOMATION ARPS 4.

0
NO START PROJECT STEP
1 1-Apr-18 4 unit auto pinning Monitoring
2 1-May-18 Modification manual stamping to auto Comissioning
3 10-May-18 Assembly PT 5013 in line ini Injection Take over
4 20-May-18 Auto test hinge for compact & Cap Take over
5 28-Aug-18 Make Robot 3 Axis Study
6 29-Aug-18 Make Hot Stamping machine Internal in ARPS Study
7 10-Jul-18 Fabrication
Modification manual pinning machine to Auto (CM 4009)
8 15-Sep-18 Commisioning
Modification manual pinning machine to Auto (CM 4008)
9 29-Aug-18 Make auto Flaming machine Part collection
10 Modification Stamping RT type to auto Study
11 Lipstick auto assmbly new project Study
12 Modification RF manual machine to Auto Study
13 Modification KKS Up-Down to Rotary Study
14 Automation by Fanuc Industrial Robot Study
ON ARPS 4.0
PROGRESS FINISH LEADER
monitoring production Line 30-Sep-18 Siswanto
trial for production 30-Sep-18 Fakih
Done 10-Sep-18 Zidni
Done 30-Sep-18 Anton
Pending 30-Nov-18 Zidni
30-Nov-18 Siswanto
Provide transfer unit, rotary table (done), 30-Oct-18 Anton
pinning unit (done)
adding new sensor for detect PIN (done) 19-Oct-18 Ibas

Pending 15-Dec-18 Siswanto


Siswanto
Anton
Siswanto
Anton
Riza
December
STEP
W 50 W 51
Plan
STUDY
Actual
Plan
DESIGN
Actual
Plan
PART COLLECTION
Actual
Plan
PURCHASING/RFA
Actual
Plan
FABRICATION
Actual
Plan
TRIAL
Actual
Plan
COMISSIONING
Actual
Plan
MONITORING
Actual
Plan
TAKE OVER
Actual
ber Januari
W 52 W1 W2 W3 W4 W5
Februari Ma
W6 W7 W8 W9 W 10 W 11 W 12
Maret
W 13 W 14 W 15
October
STEP
W 41
Plan
STUDY
Actual
Plan
DESIGN
Actual
Plan
PART COLLECTION
Actual
Plan
PURCHASING/RFA
Actual
Plan
FABRICATION
Actual
Plan
TRIAL
Actual
Plan
COMISSIONING
Actual
Plan
MONITORING
Actual
Plan
TAKE OVER
Actual
October November
W 42 W 43 W 44
November December
W 45 W 46 W 47 W 48 W 49 W 50
mber
W 51 W 52
MOM ( Minutes of meeting)
Waktu : Jum'at / 2 November 2018
Tempat : Ruang Automation
Peserta : Riza, Anton, Ibas, Zidni, Siswanto
Agenda : update automation project

No Description Action Finish Date


1 Project 5013 Auto Stamping Trial produksi min 2 jam 3-Nov-18
Auto Pinning 1-Nov-18
Pasang Roller Monitoring hasil, jika hasilnya OK maka
copy ke magazine yang lain

trial pengurangan Man Power dari 5 ke


4.
2 Balancing Line 1-Nov-18
1. pasang kaca
2. auto pinning
3. buka product dan bersihkan kaca
4. cek product dan packing
Modif Hole Pin Order MS, modifikasi hole pin dengan 2-Nov-18
cara di shock
Ganti Pin Tanpa kepala check pin, butuh lubang lebih besar 1-Nov-18
Mekanik 6-Nov-18
Wiring 8-Nov-18
3 4009 Pinning Instalasi 1-Nov-18
Program 12-Nov-18
Trial 15-Nov-18
Design Opsi 1 5-Nov-18
4 Auto Closer D40 Design Opsi 2 8-Nov-18
Koordinasi Team Produksi 8-Nov-18
meeting)

PIC Remark
Siswanto+chamim cek quality, senin start produksi
Suyadi
Monitoring hasil Copy ke Line lain

Suyadi Monitoring hasil

Siswanto Order MS

Siswanto
Anton Waiting Gripper SMC
Ibas Inisialisasi I/O
Anton
Zidni, Ibas Waiting wiring
Siswanto Sample Product
Zidni
Zidni
Anton, Ibas