No JENIS PEKERJAAN
1 PEKERJAAN PERSIAPAN
A SITE OFFICE
Direksi Kit
1 Office Space c/w room a separator min.100 m2 during engineering and construction
C/W Working equipment furniture , electricity and water expenses ,information, telecommunication & Multimedia equipment, air
conditioning,stationary, safety material consumables & office consumables etc.
2 Warehouse c/w utilities 100 m2
Include electricity and water expenses.
3 Stock yard c/w fences & guard house min. for material & tank plate
4 Site preparation, soil fill, and site grading works
- Land clearing, Grubbing, and Stripping
(Clearing consists of felling, trimming, removing and disposing of trees, shrubs, vegetation and other objectionable materials above the ground level. Grubbing con
and disposal of all stumps, roots, snags and other vegetative matter below the ground level. Stumps and roots shall be removed to a depth of 0.3 meters below th
ground level, except that in areas of excavation, stumps and roots shall be removed to a depth of 0.3 meters below the depth of excavation.)
5 - Demolition work
(buillding demolished : Canteen, Warehouse, MCC Building, Mushola, bridge, post security, shelters, brickwall, waterpond, fence, etc approx. ± 2635m2)
6 MOBILIZATION AND DEMOBILIZATION (MANPOWER AND EQUIPMENT)
7 WORK PERMIT
8 OPERATIONAL CAR (2 UNIT) setara kijang Inova 2018 include BBM, Driver dan maintenance untuk operasional Pertamina di site dan di pusat
9 SOIL TEST
2
UNTU
No JENIS PEKERJAAN
Total 1
2 ENGINEERING
A Detail Engineering
(Include design calculation, specification, equipment data sheet, drawing, prosedur, O&M Manual, HAZOP/HAZID, As Built Drawing)
B PROJECT MANAGEMENT
Total 2
3
UNTU
No JENIS PEKERJAAN
Pile specification:
- Minimum of compressive strength K600, min. allowable Axial load 181.7 ton, min. moment crack 12.5 tonm
3 OFFICE DEPOT LPG & CONTROL ROOM Size: 2 x(10W x 30L), two story building
Pile Foundation dia 300 Spun
Pile specification:
- Minimum of compressive strength K600, min. allowable Axial load 70.75 ton, min. moment crack 3 tonm
II CIVIL WORKS
4
UNTU
No JENIS PEKERJAAN
CONCRETE FOUNDATION
PILECAP
Pilecap, sizes: (4500W x 1300D) mm
f'c = 22.83 Mpa (K-275)
Rebar = D22-150
Formwork = Plywood 12 mm thickness (once used)
TIE BEAM
Pilecap, sizes: (1500W x600D) mm
f'c = 22.83 Mpa (K-275)
Rebar = D22-150
Formwork = Plywood 12 mm thickness (once used)
PEDESTAL
Pedestal: (2100W x 2100D x 450H) mm
f'c = 22.83 Mpa (K-275)
Rebar = Main bar 68-D22, 8P10-125 links
5
UNTU
No JENIS PEKERJAAN
CONCRETE FOUNDATION
6
UNTU
No JENIS PEKERJAAN
7
UNTU
No JENIS PEKERJAAN
Rebar = D13-200
Formwork = Plywood 12 mm thickness (once used)
CONCRETE FOUNDATION
- Foot plate, sizes: (3250W x 2400L x 700D) mm
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
Formwork = Plywood 12 mm thickness (once used)
- Cerucuk gelam diam. 100mm Lmin=4m
8
UNTU
No JENIS PEKERJAAN
6 PIPE SUPPORT
CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Soil excavation
- Soil backfill and compaction
Lean concrete & Sandbedding
- Lean Concrete
- Sand bedding
CONCRETE FOUNDATION
f'c = 18.6 Mpa (K-225)
Rebar = D13-200
Formwork = Plywood 12 mm thickness (once used)
9
UNTU
No JENIS PEKERJAAN
Material specification:
Steel structure material shall be used hot rolled structural steel shapes and plates for buildings and structures shall be mild carbon steel
ASTM A36
CONCRETE FOUNDATION
Foot Plate, sizes: (1500W x 1500L x 300D) mm
f'c = 22.83 Mpa (K-275)
Rebar = D13-175
Formwork = playwood 12 mm thickness (once used)
Cerucuk gelam diam. 100mm Lmin=4m
Pedestal: (300W x 300D x 1000H) mm
f'c = 22.83 Mpa (K-275)
Rebar = 12-D16
Formwork = playwood 12 mm thickness (once used)
10
UNTU
No JENIS PEKERJAAN
8 BOX CULVERT
CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Soil excavation
- Sand fill and compaction 50 Thick
- Soil back fil & compaction
CONCRETE FOUNDATION
- Concrete Slab plate ( 3W x0.2th)m
f'c = 22.83 Mpa (K-275)
Rebar = D16-150 (two layer)
Formwork = Plywood 12 mm thickness (once used)
- Concrete wall plate (1H x0.3th)m
f'c = 22.83 Mpa (K-275)
Rebar = D16-150 (two layer)
Formwork = Plywood 12 mm thickness (once used)
9 CONCRETE ROAD
HEAVY DUTY ROAD :
11
UNTU
No JENIS PEKERJAAN
10 DRAINAGE
- Ditch ( 600W x400D min. x125 thick)mm
CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Soil excavation
12
UNTU
No JENIS PEKERJAAN
13
UNTU
No JENIS PEKERJAAN
CONCRETE FOUNDATION
- Concrete tie beam ( 0.15W x0.20thk)m
f'c = 18.675 Mpa (K-225)
Rebar = 4P12
Formwork = Plywood 12 mm thickness (once used)
13 GATE 2.0 M
Gate h=2.0m, material steel finish paint c/w barbed wire 5 layer and accessories
14
UNTU
No JENIS PEKERJAAN
CIVIL WORKS
- Soil excavation
- Soil back fill & compaction
- Brick protection cover
15 DUCT BANK
CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Soil excavation
- Sand fill and compaction 50 Thick
- Lean conc. 50mm Thick
- Soil back fill & compaction
- PVC 4"
CONCRETE FOUNDATION
f'c = 18.675 Mpa (K-225)
Rebar = D10-200
Formwork = Plywood 12 mm thickness
16 LIGHTING FOUNDATION
CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Soil excavation
- Soil backfill and compaction
15
UNTU
No JENIS PEKERJAAN
CONCRETE FOUNDATION
- Foot plate, sizes: (1200W x 1200L x 250D) mm
f'c = 18.675 Mpa (K-225)
Rebar = D13-250
Formwork = Plywood 12 mm thickness (once used)
- Pedestal: (500W x 500D x750H) mm
f'c = 18.675 Mpa (K-225)
Rebar = 12-D13
Formwork = playwood 12 mm thickness (once used)
16
UNTU
No JENIS PEKERJAAN
1 OFFICE DEPOT LPG & CONTROL ROOM Size: 2 x(10W x 30L), two story building
Office, control room, canteen, lab, mushola
CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Soil excavation
- Soil backfill and compaction
Lean concrete & Sandbedding
- Lean Concrete 50 Thick
- Sand bedding 50 Thick
Concrete U ditch W=300, H=400, T=100 (one layer 10-200)
17
UNTU
No JENIS PEKERJAAN
- Supply and install glazed ceramic tiles sizes (200x200) mm, hight: 2.1 m on wall rooms: toilet
Raised Floor
- UPS room, Panel room, Server room Height 300, panel 600x600 mm
Ceiling Finishes
Complete w/ metal suspension system, metal casing, ceiling joint and all necessary fixing
accessories as specified
- Acoustic Mineral Fiber Board size (600x600) mm or (600x1200) mm of 15mm th'k (min.)
- Moisture resistance mineral Fiber Board or 6mm th'k Glass Reinforced Concrete (GRC) board
Painting Works and Coating
- Prepare and apply one coat primer and two finishing coats of emulsion paint to interior surface
- Prepare and apply one coat primer and two finishing coats of watershield emulsion paint to exterior surface
- Prepare and apply waterproofing finishing coats to top of concrete roof surface
Doors and Windows c/w all necessary fixing accessories.
Glass door & hot-dipgalvanized aluminum frame matterial
- Tempered glass door, double leaf, swing opening, and size: 1.6 m W x 2.1m H
- Tempered glass door, single leaf, swing opening, and size: 0.8m W x 2.1m H
- Clear glass 6 mm thk (1,3 x 0,9) m
PVC panel door and frame c/w all necessary fixing accessories.
Exhaust fan
SANITARY FIXTURES
Supply and install sanitary Appliances complete including all necessary fitting accessories.
- Closet (seat type)
- Urinoir
18
UNTU
No JENIS PEKERJAAN
- Jet washer
- Shower
- Wastafel
Roof drain
- Downspout PVC pipe 4" dia. & fittings
- Strainer/ roof filter
Plumbing
- Conc. Septicktank and absorption system (3m L x 1.8m W x 2.150m H, Thickness : 150 mm)
- pipe 2" dia. & fittings
- pipe 4" dia. & fittings
- Water tank 4KL
REINFORCED CONCRETE
FOOTPLATE
- Pile Cap, sizes: (1200W x 1200L x 250D) mm
f'c = 22.83 Mpa (K-275)
Rebar D13-200
Formwork = Plywood 12 mm thickness (once used)
- Cerucuk gelam diam. 100mm Lmin=4m
PILECAP
- Pile Cap, sizes: (900W x 900L x 600D) mm
f'c = 22.83 Mpa (K-275)
Rebar D16-200
Formwork = Plywood 12 mm thickness (once used)
19
UNTU
No JENIS PEKERJAAN
PEDESTAL
- Pedestal : (400W x 400D x 300H) mm
f'c = 22.83 Mpa (K-275)
Rebar 16D16
Formwork = Plywood 12 mm thickness (once used)
COLUMN
- Pedestal : (400W x 400D x 9000H) mm
f'c = 22.83 Mpa (K-275)
Rebar 16D16
Formwork = Plywood 12 mm thickness (once used)
GROUND FLOOR & FOUNDATION
- Main beam (GB1) (300Wx600D) mm
f'c = 22.83 Mpa (K-275)
Rebar = 8D19
Formwork = Plywood 12 mm thickness (once used)
- Main beam (GB2) 300Wx500D mm
f'c = 22.83 Mpa (K-275)
Rebar = 8D16
Formwork = Plywood 12 mm thickness (once used)
- Second beam (GB3) 250Wx500D mm
f'c = 22.83 Mpa (K-275)
Rebar = 6D16
Formwork = Plywood 12 mm thickness (once used)
- Second beam (GB4) 200Wx350D mm
20
UNTU
No JENIS PEKERJAAN
21
UNTU
No JENIS PEKERJAAN
22
UNTU
No JENIS PEKERJAAN
CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Soil excavation
- Soil backfill and compaction
23
UNTU
No JENIS PEKERJAAN
REINFORCED CONCRETE
Shelter foundation
- Foot Plate fnd size: (1.6W x 1.6L x 0.3Thk) M
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
Formwork = playwood 12 mm thickness (one used)
- Pedestal size: (0.3W x 0.3L x 1.0 Depth) M
f'c = 22.83 Mpa (K-275)
Rebar = 8D13
Formwork = playwood 12 mm thickness (one used)
- Grade beam (TB1) 250Wx400D mm
f'c = 22.83 Mpa (K-275)
Rebar = 6-D13
Formwork = playwood 12 mm thickness (one used)
- Conc. floor 150 mm Thk (2-layer bar)
f'c = 22.83 Mpa (K-275)
Rebar =10-100
Formwork = playwood 12 mm thickness (one used)
- Terrace Conc. floor 100 mm Thk (1-layer bar)
24
UNTU
No JENIS PEKERJAAN
STRUCTURAL STEEL
Steel structure c/w paint
- Column H-200x200x8x12
- Lateral Beam SH-250x125x6x9
- Rafter WF-250x125x6x9
- Overhange Beam SH-200x100x5.5x8
25
UNTU
No JENIS PEKERJAAN
-Grating
Strip plat 5mmx25mm
26
UNTU
No JENIS PEKERJAAN
- Down spout galv. St. pipe Ø 4" STD.& and fitting include clamps
- Roof drain galv. Stl. strainer
- Fascia (zincalume)
CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Soil excavation
- Soil backfill and compaction
Lean concrete & Sandbedding
- Lean Concrete
- Sand bedding
Concrete U ditch W=300, H=400, T=100 (one layer 10-200)
REINFORCED CONCRETE
Shelter foundation, shelter size: (24 W x 12L) M
- Foot plate size: (1.5W x 1.5L x 0.3Thk) M
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
Formwork = playwood 12 mm thickness (one used)
- Pedestal size: (0.3W x 0.3L x 1.4 Depth) M
f'c = 22.83 Mpa (K-275)
Rebar = 8D13
27
UNTU
No JENIS PEKERJAAN
28
UNTU
No JENIS PEKERJAAN
Rebar = D10-200
Formwork = playwood 12 mm thickness (one used)
STRUCTURAL STEEL
Steel structure c/w paint
- Column WF-250x250x9x14
- Column WF-250x250x9x14
- Truss
Beam 100x50x5x6
Angle L50x50x5
Angle L50x50x5
- Rafter WF-250x125x6x9
- Overhange Beam WF-150x75x5x7
- Purlin Lip.Channel C-150x65x20x2.3
- Sagrod dia 10 mm
- Wind Brace dia 16 mm
- Fascia frame angle C100x50x20x3.2
Gutter frame flat-bar 30x3
- Base plate 16 mm thk.
- End plate 14 mm thk
- End plate 14 mm thk
- Stiffener plate 9 mm thk
Stiffener plate 7 mm thk
- Cleat Plate 135mmx120mm, 8mm thk
29
UNTU
No JENIS PEKERJAAN
-Grating
Strip plat 5mmx50mm
CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Soil excavation
- Soil backfill and compaction
30
UNTU
No JENIS PEKERJAAN
REINFORCED CONCRETE
Shelter foundation, shelter size: (5W x 6L) M
- Foot plate size: (1.35 W x 1.35L x 0.3Thk) M
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
Formwork = playwood 12 mm thickness (one used)
- Pedestal size: (0.35W x 0.35L x 1.3Depth) M
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
Formwork = playwood 12 mm thickness (one used)
- Grade beam (250Wx300D) mm
f'c = 22.83 Mpa (K-275)
Rebar = 8-D13
Formwork = playwood 12 mm thickness (one used)
- Grade beam (250Wx300D) mm
f'c = 22.83 Mpa (K-275)
Rebar = 8-D13
Formwork = playwood 12 mm thickness (one used)
- Conc. floor 150 mm Thk (1-layer bar)
31
UNTU
No JENIS PEKERJAAN
32
UNTU
No JENIS PEKERJAAN
Rebar = D13-200
Formwork = playwood 12 mm thickness (one used)
STRUCTURAL STEEL
Steel structure c/w paint
- Column WF-200x200x8x12
- Lateral Beam
Beam 2L 50X50X5
Angle L50x50x5
Angle L50x50x5
- Rafter WF-200x100x5.5x8
- Overhange Beam WF-150x75X5x7
- Purlin Lip.Channel C-150x65x20x2.3
- Sagrod dia 10 mm
- Wind Brace dia 16 mm
- Fascia frame angle L50x50x4
- Gutter frame flat-bar 30x3
- Base plate 16 mm thk.
- End plate 14 mm thk
- End plate 14 mm thk
- Stiffener plate 8 mm thk
Stiffener plate 7 mm thk
- Cleat Plate 135mmx120mm, 8mm thk
- Anchor bolt Dia 16
33
UNTU
No JENIS PEKERJAAN
CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Soil excavation
- Soil backfill and compaction
Lean concrete & Sandbedding
- Lean Concrete
- Sand bedding
REINFORCED CONCRETE
34
UNTU
No JENIS PEKERJAAN
STRUCTURAL STEEL
- Column WF-300x300x10x15
- Lateral Beam
Beam UNP100X50X5X7.5
Angle L50x50x5
35
UNTU
No JENIS PEKERJAAN
Angle L50x50x5
- Rafter SH-350x175x7x11
- Beam (RIDGE) UNP- 200x80x7.5x11
- Overhange Beam SH-200x100x5.5x8
- Purlin Lip.Channel C-150x65x20x2.3
- Sagrod dia 10 mm
- Wind Brace dia 16 mm
- Fascia frame angle C100x50x20x3.2
- Gutter frame flat-bar 30x3
- Base plate 16 mm thk.
- End plate 18 mm thk
- End plate 14 mm thk
- Stiffener plate 11 mm thk
- Stiffener plate 8 mm thk
- Cleat Plate 135mmx120mm, 8 mm thk
- Anchor bolt Dia 22
- HTB Dia 20 mm A325
- HTB Dia 16 mm A325
- BB Dia 12 mm A325
-Grating
Strip plat 5mmx50mm
Strip plat 5mmx25mm
36
UNTU
No JENIS PEKERJAAN
CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Site Clearing
- Soil excavation
- Soil backfill and compaction
Lean concrete & Sandbedding
- Lean Concrete
- Sand bedding
Concrete U ditch W=300, H=400, T=100 (one layer 10-200)
37
UNTU
No JENIS PEKERJAAN
38
UNTU
No JENIS PEKERJAAN
Exhaus fan
SANITARY FIXTURES
Supply and install sanitary Appliances complete including all necessary fitting accessories.
- Closet (seat type)
- Jet washer
Roof drain
- Downspout PVC pipe 4" dia. & fittings
- Strainer/ roof filter
Plumbing
- Conc. Septicktank and absorption system (1.2m L x 1.2m W x 1.2m H, Thickness : 125 mm)
- pipe 2" dia. & fittings
- pipe 4" dia. & fittings
REINFORCED CONCRETE
- Shallow fnd size: (1.2W x 1.2L x 0.3Thk) M
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
Formwork = playwood 12 mm thickness (one used)
Cerucuk gelam diam. 100mm Lmin=4m
- Pedestal size: (0.2W x 0.2L x 1.15) Depth) M
f'c = 22.83 Mpa (K-275)
Rebar = 8D13
Formwork = playwood 12 mm thickness (one used)
39
UNTU
No JENIS PEKERJAAN
40
UNTU
No JENIS PEKERJAAN
CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Site Clearing
- Soil excavation
- Soil backfill and compaction
Lean concrete & Sandbedding
- Lean Concrete
- Sand bedding
REINFORCED CONCRETE
Shelter foundation
- Shallow fnd size: (1.5W x 1.5L x 0.3Thk) M
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
Formwork = playwood 12 mm thickness (once used)
- Pedestal size: (0.25W x 0.25L x 1.0 Depth) M
f'c = 22.83 Mpa (K-275)
Rebar = 8D13
Formwork = playwood 12 mm thickness (once used)
- Grade beam (250Wx300D) mm
f'c = 22.83 Mpa (K-275)
41
UNTU
No JENIS PEKERJAAN
Rebar = 6-D13
Formwork = playwood 12 mm thickness (once used)
- Conc. floor 150 mm Thk (2-layer bar)
f'c = 22.83 Mpa (K-275)
Rebar =D10-125 (2 layer)
Formwork = playwood 12 mm thickness (once used)
STRUCTURAL STEEL
Steel structure c/w paint
- Column WF-150x150x7x10
- Lateral Beam WF-150x75x5x7
- Rafter WF-150x75x5x7
- Purlin Lip.Channel C-150x65x20x2.3
- Sagrod dia 10 mm
- Wind Brace dia 16 mm
- Gutter frame flat-bar 30x3
- Base plate 16 mm thk.
- End plate 14 mm thk
- Stiffener plate 7 mm thk
- Cleat Plate 135mmx120mm
- Anchor bolt Dia 16
- HTB Dia 16 mm A325
- BB Dia 12 mm A325
42
UNTU
No JENIS PEKERJAAN
CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Site Clearing
- Soil excavation
- Soil backfill and compaction
Lean concrete & Sandbedding
- Lean Concrete
- Sand bedding
Concrete U ditch W=300, H=400, T=100 (one layer 10-200)
43
UNTU
No JENIS PEKERJAAN
SANITARY FIXTURES
Roof drain
- Downspout PVC pipe 4" dia. & fittings
- Strainer/ roof filter
REINFORCED CONCRETE
FOOT PLATE
- Foot plate-1, sizes: (2300W x 2300L x 350D) mm
f'c = 22.83 Mpa (K-275)
Rebar = D13-150
44
UNTU
No JENIS PEKERJAAN
PEDESTAL
- Pedestal : (400W x 400D x 1650H) mm
f'c = 22.83 Mpa (K-275)
Rebar =
Formwork = Plywood 12 mm thickness (once used)
COLUMN
- Column : (400W x 400D x 5000H) mm
f'c = 22.83 Mpa (K-275)
Rebar =
Formwork = Plywood 12 mm thickness (once used)
GROUND FLOOR
- Main T-beam (300Wx600D) mm
f'c = 22.83 Mpa (K-275)
Rebar =
Formwork = Plywood 12 mm thickness (once used)
- Main T-beam (300Wx400D) mm
f'c = 22.83 Mpa (K-275)
Rebar =
Formwork = Plywood 12 mm thickness (once used)
45
UNTU
No JENIS PEKERJAAN
46
UNTU
No JENIS PEKERJAAN
47
UNTU
No JENIS PEKERJAAN
- Sand bedding
REINFORCED CONCRETE
- Shallow fnd size: (1.35W x 1.35L x 0.35Thk) M
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
Formwork = Plywood 12 mm thickness (once used)
- Pedestal size: (0.25W x 0.35L x 1.5Depth) M
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
Formwork = Plywood 12 mm thickness (once used)
- Tie beam (TB1) 250Wx400D mm
f'c = 22.83 Mpa (K-275)
Rebar = 6-D13
Formwork = Plywood 12 mm thickness (once used)
- Conc. floor 150 mm Thk (1-layer bar)
f'c = 22.83 Mpa (K-275)
Rebar =D13-150
Formwork = Plywood 12 mm thickness (once used)
- Terrace Conc. floor 100 mm Thk (1-layer bar)
f'c = 22.83 Mpa (K-275)
Rebar =Ø10-200
Formwork = Plywood 12 mm thickness (once used)
- Terrace Conc. floor 100 mm Thk (1-layer bar)
48
UNTU
No JENIS PEKERJAAN
49
UNTU
No JENIS PEKERJAAN
Rebar = D13-125
Formwork = playwood 12 mm thickness (once used)
Steel structure c/w paint
- Column WF-250x125x6x9
- Lateral Beam WF-200x100x5.5x8
- Rafter WF-200x100x5.5x8
- Overhange Beam WF-200x100X5.5x8
- Purlin Lip.Channel C-150x65x20x3.2
- Sagrod dia 10 mm
- Wind Brace dia 16 mm
- Gutter frame flat-bar 30x3
- Base plate 16 mm thk.
- End plate 12 mm thk
- Stiffener plate 9 mm thk
- Cleat Plate 135mmx120mm
- Anchor bolt Dia 22
- HTB Dia 16 mm A325
- BB Dia 12 mm A325
- Grating t=25mm, width 400 mm, galvanized
Sliding Steel Door, Dim 2 x 1.5 m x 2 m, L 65 x 65, Plate thick 3 mm, Frame C 150, C/w Anchor Bolt, and accessories
50
UNTU
No JENIS PEKERJAAN
CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Site Clearing
- Soil excavation
- Soil backfill and compaction
Lean concrete & Sandbedding
- Lean Concrete
- Sand bedding
Concrete U ditch W=300, H=400, T=100 (one layer 10-200)
REINFORCED CONCRETE
Shelter foundation
- Shallow fnd size: (1.5W x 1.5L x 0.3Thk) M
51
UNTU
No JENIS PEKERJAAN
52
UNTU
No JENIS PEKERJAAN
STRUCTURAL STEEL
Steel structure c/w paint
- Column WH-150x150x7x10
- Lateral Beam SH-200x100x5.5x8
- Rafter SH-150x75x5x7
- Overhange Beam SH-150x75x5x7
- Purlin Lip.Channel C-150x50x20x2.3
- Sagrod dia 10 mm
- Wind Brace dia 16 mm
- Gutter frame flat-bar 30x3
- Base plate 24 mm thk.
- End plate 12 mm thk
- Stiffener plate 6 mm thk
- Cleat Plate 135mmx120mm
- Anchor bolt Dia 22
- HTB Dia 14 mm A325
- HTB Dia 14 mm A325
- BB Dia 12 mm A325
53
UNTU
No JENIS PEKERJAAN
CONCRETE FOUNDATION
CONCRETE PLATFORM
PILE CAP (1000W x 1000L x1000 H) mm
f'c = 35 Mpa (K-430)
Rebar = D25-100
Formwork = Plywood 12 mm thickness (once used)
BEAM
Beam type B1 (500W x 800D) mm
f'c = 35 Mpa (K-430)
Rebar = 14-D22
Formwork = Plywood 12 mm thickness (once used)
Beam type B2 (300Wx500D) mm
54
UNTU
No JENIS PEKERJAAN
STEEL STRUCTURE
- Walkway/ catwalk steel structure
- Column WF-150x150x7x10
- Lateral Beam
Bracing
Bracing
- Rafter WF-200x100x5.5x8
- Overhange Beam WF-200x100x5.5x8
- Purlin Lip.Channel C-150x65x20x2.3
- Sagrod dia 10 mm
- Wind Brace dia 16 mm
55
UNTU
No JENIS PEKERJAAN
56
UNTU
No JENIS PEKERJAAN
CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Site Clearing
- Soil excavation
- Soil backfill and compaction
Lean concrete & Sandbedding
- Lean Concrete
- Sand bedding
Concrete U ditch W=300, H=400, T=100 (one layer 10-200)
57
UNTU
No JENIS PEKERJAAN
SANITARY FIXTURES
Supply and install sanitary Appliances complete including all necessary fitting accessories.
- Closet (jongkok)
Roof drain
- Downspout PVC pipe 4" dia. & fittings
- Strainer/ roof filter
Plumbing
- Conc. Septicktank and absorption system (1.2m L x 1.2m W x 1.2m H, Thickness : 125 mm)
- pipe 2" dia. & fittings
- pipe 4" dia. & fittings
58
UNTU
No JENIS PEKERJAAN
REINFORCED CONCRETE
- Shallow fnd size: (1.2W x 1.2L x 0.3Thk) M
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
Formwork = playwood 12 mm thickness (one used)
- Cerucuk gelam diam. 100mm Lmin=4m
- Pedestal size: (0.2W x 0.2L x 1.15) Depth) M
f'c = 22.83 Mpa (K-275)
Rebar = 8D13
Formwork = playwood 12 mm thickness (one used)
- Grade beam (200Wx300D) mm
f'c = 22.83 Mpa (K-275)
Rebar = 8-D13
Formwork = playwood 12 mm thickness (one used)
Formwork = playwood 12 mm thickness (one used)
- Column : (200W x 200D x 3500H) mm
f'c = 22.8 Mpa (K-275)
Rebar = 8D13
Formwork = playwood 12 mm thickness (one used)
- Main-beam (200Wx300D) mm
f'c = 22.83 Mpa (K-275)
Rebar = 6-D13
Formwork = playwood 12 mm thickness (one used)
- cantilever-beam (200Wx250D) mm
59
UNTU
No JENIS PEKERJAAN
CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Site Clearing
- Soil excavation
60
UNTU
No JENIS PEKERJAAN
61
UNTU
No JENIS PEKERJAAN
SANITARY FIXTURES
Supply and install sanitary Appliances complete including all necessary fitting accessories.
- Closet (jongkok)
Roof drain
- Downspout PVC pipe 4" dia. & fittings
- Strainer/ roof filter
Plumbing
- Conc. Septicktank and absorption system (1.2m L x 1.2m W x 1.2m H, Thickness : 125 mm)
- pipe 2" dia. & fittings
- pipe 4" dia. & fittings
REINFORCED CONCRETE
- Shallow fnd size: (1.2W x 1.2L x 0.3Thk) M
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
62
UNTU
No JENIS PEKERJAAN
63
UNTU
No JENIS PEKERJAAN
Rebar = M8-150
Formwork = playwood 12 mm thickness (one used)
- Concrete Roof 100 mm Thk (1-layers re-bar)
f'c = 22.83 Mpa (K-275)
Rebar = P10-150
Formwork = playwood 12 mm thickness (one used)
CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Site Clearing
- Soil excavation
- Soil backfill and compaction
Lean concrete & Sandbedding
- Lean Concrete
- Sand bedding
Concrete U ditch W=300, H=400, T=100 (one layer 10-200)
64
UNTU
No JENIS PEKERJAAN
Roof drain
- Downspout PVC pipe 4" dia. & fittings
- Strainer/ roof filter
REINFORCED CONCRETE
- Shallow fnd size: (1.2W x 1.2L x 0.3Thk) M
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
Formwork = playwood 12 mm thickness (one used)
Cerucuk gelam diam. 100mm Lmin=4m
- Pedestal size: (0.3W x 0.3L x 1.15) Depth) M
f'c = 22.83 Mpa (K-275)
65
UNTU
No JENIS PEKERJAAN
Rebar = 8D16
Formwork = playwood 12 mm thickness (one used)
- Grade beam (200Wx300D) mm
f'c = 22.83 Mpa (K-275)
Rebar = 8-D13
Formwork = playwood 12 mm thickness (one used)
- Column : (300W x 300D x 3500H) mm
f'c = 22.8 Mpa (K-275)
Rebar = 8D16
Formwork = playwood 12 mm thickness (one used)
- Main-beam (200Wx500D) mm
f'c = 22.83 Mpa (K-275)
Rebar = 6-D16
Formwork = playwood 12 mm thickness (one used)
- cantilever-beam (200Wx250D) mm
f'c = 22.83 Mpa (K-275)
Rebar = 4-D13
Formwork = playwood 12 mm thickness (one used)
- Concrete floor 100 mm Thk (1-layers re-bar)
f'c = 22.83 Mpa (K-275)
Rebar = M8-150
Formwork = playwood 12 mm thickness (one used)
- Concrete floor 100 mm Thk (1-layers re-bar)
f'c = 22.83 Mpa (K-275)
66
UNTU
No JENIS PEKERJAAN
Rebar = P10-150
Formwork = playwood 12 mm thickness (one used)
CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Site Clearing
- Soil excavation
- Soil backfill and compaction
Lean concrete & Sandbedding
- Lean Concrete
- Sand bedding
Concrete U ditch W=300, H=400, T=100 (one layer 10-200)
67
UNTU
No JENIS PEKERJAAN
Ceiling Finishes
Complete w/ metal suspension system, metal casing, ceiling joint and all necessary fixing
accessories as specified
- Acoustic Mineral Fiber Board size (600x600) mm or (600x1200) mm of 15mm th'k (min.)
- Moisture resistance mineral Fiber Board or 6mm th'k Glass Reinforced Concrete (GRC) board
Painting Works and Coating
- Prepare and apply one coat primer and two finishing coats of emulsion paint to interior surface
- Prepare and apply one coat primer and two finishing coats of watershield emulsion paint to exterior surface
- Prepare and apply waterproofing finishing coats to top of concrete roof surface
Doors and Windows c/w all necessary fixing accessories.
PVC panel door and frame c/w all necessary fixing accessories.
Exhaus fan
SANITARY FIXTURES
Supply and install sanitary ex….. Appliances complete including all necessary fitting accessories.
- Closet (jongkok)
Roof drain
- Downspout PVC pipe 4" dia. & fittings
- Strainer/ roof filter
Plumbing
- Conc. Septicktank and absorption system (1.2m L x 1.2m W x 1.2m H, Thickness : 125 mm)
- pipe 2" dia. & fittings
- pipe 4" dia. & fittings
68
UNTU
No JENIS PEKERJAAN
REINFORCED CONCRETE
- Shallow fnd size: (1.2W x 1.2L x 0.3Thk) M
f'c = 22.83 Mpa (K-275)
Rebar = D13-200
Formwork = playwood 12 mm thickness (one used)
- Cerucuk gelam diam. 100mm Lmin=4m
- Pedestal size: (0.2W x 0.2L x 1.15) Depth) M
f'c = 22.83 Mpa (K-275)
Rebar = 8D13
Formwork = playwood 12 mm thickness (one used)
- Grade beam (200Wx300D) mm
f'c = 22.83 Mpa (K-275)
Rebar = 8-D13
Formwork = playwood 12 mm thickness (one used)
- Column : (200W x 200D x 3500H) mm
f'c = 22.8 Mpa (K-275)
Rebar = 8D13
Formwork = playwood 12 mm thickness (one used)
- Main-beam (200Wx400D) mm
f'c = 22.83 Mpa (K-275)
Rebar = 6-D13
Formwork = playwood 12 mm thickness (one used)
- cantilever-beam (200Wx250D) mm
f'c = 22.83 Mpa (K-275)
69
UNTU
No JENIS PEKERJAAN
Rebar = 4-D13
Formwork = playwood 12 mm thickness (one used)
- Concrete floor 100 mm Thk (1-layers re-bar)
f'c = 22.83 Mpa (K-275)
Rebar = M8-150
Formwork = playwood 12 mm thickness (one used)
- Concrete Roof 100 mm Thk (1-layers re-bar)
f'c = 22.83 Mpa (K-275)
Rebar = P10-150
Formwork = playwood 12 mm thickness (one used)
CIVIL WORKS
Site preparation-install of bowplank and wood stiffener
- Site Clearing
- Soil excavation
- Soil backfill and compaction
Lean concrete & Sandbedding
- Lean Concrete
- Sand bedding
REINFORCED CONCRETE
Shelter foundation
70
UNTU
No JENIS PEKERJAAN
STRUCTURAL STEEL
Steel structure c/w paint
- Column WF-150x150x7x10
- Lateral Beam WF-150x75x5x7
- Rafter WF-150x75x5x7
- Purlin Lip.Channel C-150x65x20x2.3
71
UNTU
No JENIS PEKERJAAN
- Sagrod dia 10 mm
- Wind Brace dia 16 mm
- Gutter frame flat-bar 30x3
- Base plate 16 mm thk.
- End plate 14 mm thk
- Stiffener plate 7 mm thk
- Cleat Plate 135mmx120mm
- Anchor bolt Dia 16
- HTB Dia 16 mm A325
- BB Dia 12 mm A325
Roof
- Roof corrugated metal sheet, Galvalume 0.55 mm thk
efective wide 950 mm, heigth of wave 38 mm
Brickwall, Plastering & Smooth surface plastering ('acian')
- Brickwall and thin bed mortar, size: (3.38 mtr H x150mm thk) .
- Plastering & smooth surface, 15mm thk
Painting Works and Coating
- Prepare and apply one coat primer and two finishing coats of emulsion paint to interior surface
- Prepare and apply one coat primer and two finishing coats of watershield emulsion paint to exterior surface
Aluminium door...c/w all necessary fixing accessories.
72
UNTU
No JENIS PEKERJAAN
Total 3
A MEKANIKAL
Equipment Name Tag Number
1 ODORIZER INJECTION PACKAGE (Automatic),(include tubing to main header) 100-D-01
2 LPG STORAGE TANK (Construction, Installation, painting & fire system) 200-T-04/05
3 LPG TRUCK FILLING PUMP 300-P-01/02/03
4 LPG TRUCK LOADING ARM LH-300-M-01/02/03
VAPOR LPG TRUCK LOADING ARM
5 AIR COMPRESSOR PACKAGE 400-K-01/02
6 INSTRUMENT AIR RECEIVER 400-V-02
7 UTILITY AIR RECEIVER 400-V-01
8 DIESEL OIL STORAGE TANK 600-T-07
9 JETTY DIESEL OIL STORAGE TANK 500-T-08
10 HSD/SOLAR UNLOADING PUMP 500-P-13/18
11 DIESEL OIL TRANSFER FILTER 500-F-07/500-F-08
12 FIRE WATER TANK 500-T-06
13 SEA WATER FIRE PUMP 500-P-04/05
73
UNTU
No JENIS PEKERJAAN
74
UNTU
No JENIS PEKERJAAN
12 Elbow 45 deg; A234 Gr. WPB; WTMP; SMLS; LR; BE; ASME B16.9. 40
13 Elbow 45 deg; A234 Gr. WPB; WTMP; SMLS; LR; BE; ASME B16.9. 40
14 Elbow 45 deg; A234 Gr. WPB; WTMP; SMLS; LR; BE; ASME B16.9. STD
15 Elbow 90 deg, ASTM A105, SMLS, SW, ASME B16.11 STD
16 Elbow 45 deg; A234 Gr. WPB; WTMP; SMLS; LR; BE; ASME B16.9. STD
17 Elbow 90 deg, ASTM A105, SMLS, SW, ASME B16.11 #3000
18 Elbow 90 deg, ASTM A105, SMLS, SW, ASME B16.11 #3000
19 Elbow 90 deg; A234 Gr. WPB; WTMP; SMLS; LR; BE; ASME B16.9. 80
20 Elbow 90 deg; A234 Gr. WPB; WTMP; SMLS; LR; BE; ASME B16.9. 40
21 Elbow 90 deg; A234 Gr. WPB; WTMP; SMLS; LR; BE; ASME B16.9. 40
22 Elbow 90 deg; A234 Gr. WPB; WTMP; SMLS; LR; BE; ASME B16.9. 40
23 Elbow 90 deg; A234 Gr. WPB; WTMP; SMLS; LR; BE; ASME B16.9. STD
24 Reducer Tee, A234 Gr. WPB, SMLS, BE, WTMP, ASME B16.9 STD
25 Reducer Tee, A234 Gr. WPB, SMLS, BE, WTMP, ASME B16.9 STD
26 Reducer Tee, A234 Gr. WPB, SMLS, BE, WTMP, ASME B16.9 STD
27 Reducer Tee, A234 Gr. WPB, SMLS, BE, WTMP, ASME B16.9 STD
28 Reducer Tee, A234 Gr. WPB, SMLS, BE, WTMP, ASME B16.9 STD
29 Equal Tee, A234 Gr. WPB, SMLS, BE, WTMP, ASME B16.9 40
30 Equal Tee, A234 Gr. WPB, SMLS, BE, WTMP, ASME B16.9 STD
31 Equal Tee, A234 Gr. WPB, SMLS, BE, WTMP, ASME B16.9 STD
32 Ecc. Reducer, A234 Gr. WPB, SMLS, BE, WTMP, ASME B16.9 STD
33 Co. Reducer, A234 Gr. WPB, SMLS, BE, WTMP, ASME B16.9 STD
75
UNTU
No JENIS PEKERJAAN
34 Co. Reducer, A234 Gr. WPB, SMLS, BE, WTMP, ASME B16.9 STD
36 Co. Reducer, A234 Gr. WPB, SMLS, BE, WTMP, ASME B16.9 STD
37 Co. Reducer, A234 Gr. WPB, SMLS, BE, WTMP, ASME B16.9 STD
38 Co. Reducer, A234 Gr. WPB, SMLS, BE, WTMP, ASME B16.9 STD
54 Gasket; Spiral-Wound W:SS304 /F: Flexible Graphite OIR: W/ Non Asbestos Filler; 4.5MM; ASME B 16.20. #300
55 Gasket; Spiral-Wound W:SS304 /F: Flexible Graphite OIR: W/ Non Asbestos Filler; 4.5MM; ASME B 16.20. #300
56 Gasket; Spiral-Wound W:SS304 /F: Flexible Graphite OIR: W/ Non Asbestos Filler; 4.5MM; ASME B 16.20. #300
76
UNTU
No JENIS PEKERJAAN
57 Gasket; Spiral-Wound W:SS304 /F: Flexible Graphite OIR: W/ Non Asbestos Filler; 4.5MM; ASME B 16.20. #300
58 Gasket; Spiral-Wound W:SS304 /F: Flexible Graphite OIR: W/ Non Asbestos Filler; 4.5MM; ASME B 16.20. #300
59 Gasket; Spiral-Wound W:SS304 /F: Flexible Graphite OIR: W/ Non Asbestos Filler; 4.5MM; ASME B 16.20. #300
60 Gasket; Spiral-Wound W:SS304 /F: Flexible Graphite OIR: W/ Non Asbestos Filler; 4.5MM; ASME B 16.20. #300
61 Gasket; Spiral-Wound W:SS304 /F: Flexible Graphite OIR: W/ Non Asbestos Filler; 4.5MM; ASME B 16.20. #300
62 Gasket; Spiral-Wound W:SS304 /F: Flexible Graphite OIR: W/ Non Asbestos Filler; 4.5MM; ASME B 16.20. #300
76 Ball Valve; min. seat rating 1500# CWP; F-Bore; Floating ball; Scrd /SW / Scrd x SW; BB; Replaceable ball & seats; ASTM A105; ASTM A182 3 #800
77
UNTU
No JENIS PEKERJAAN
77 Ball Valve; min. seat rating 1500# CWP; F-Bore; Floating ball; Scrd /SW / Scrd x SW; BB; Replaceable ball & seats; ASTM A105; ASTM A182 3 #800
78 Ball Valve; min. seat rating 1500# CWP; F-Bore; Floating ball; Scrd /SW / Scrd x SW; BB; Replaceable ball & seats; ASTM A105; ASTM A182 3 #800
79 Ball Valve; RF; FE; BB; F-Bore; Side entry; Replaceable ball & seats; Soft seated; ASTM A216 WCB; ASTM A105 + 3 mils ENP ball & seat; AISI #300
80 Ball Valve; RF; FE; BB; F-Bore; Side entry; Replaceable ball & seats; Soft seated; ASTM A216 WCB; ASTM A105 + 3 mils ENP ball & seat; AISI #300
81 Ball Valve; RF; FE; BB; F-Bore; Side entry; Replaceable ball & seats; Soft seated; ASTM A216 WCB; BB; ASTM A105 + 3 mils ENP ball & seat; #300
82 Ball Valve; RF; FE; BB; F-Bore; Side entry; Replaceable ball & seats; Soft seated; ASTM A216 WCB; ASTM A105 + 3 mils ENP ball & seat; AI #300
83 Ball Valve; RF; FE; BB; F-Bore; Side entry; Replaceable ball & seats; Soft seated; ASTM A216 WCB; ASTM A105 + 3 mils ENP ball & seat; AI #300
84 Ball Valve; RF; FE; BB; F-Bore; Side entry; Replaceable ball & seats; Soft seated; ASTM A216 WCB; ASTM A105 + 3 mils ENP ball & seat; AI #300
85 Ball Valve; RF; FE; BB; F-Bore; Side entry; Replaceable ball & seats; Soft seated; ASTM A216 WCB; ASTM A105 + 3 mils ENP ball & seat; AI #300
86 Check Valve; RF: FE; Horizontal swing; BC; Replaceable disc & seat; ASTM A216 WCB body & cap; 11.5-13.5% Cr disc & seat; ASTM A182 #300
87 Check Valve; RF: FE; Horizontal swing; BC; Replaceable disc & seat; ASTM A216 WCB body & cap; 11.5-13.5% Cr disc & seat; ASTM A182 #300
88 Check Valve; RF: FE; Horizontal swing; BC; Replaceable disc & seat; ASTM A216 WCB body & cap; 11.5-13.5% Cr disc & seat; ASTM A182 F #300
89 Check Valve; RF: FE; Horizontal swing; BC; Replaceable disc & seat; ASTM A216 WCB body & cap; 11.5-13.5% Cr disc & seat; ASTM A182 F #300
90 Globe Valve; RF; FE; BB; OS & Y; Rising stem; Plug or semi-plug disc; Replaceable disc & seat; ASTM A216 WCB; 11.5-13.5% Cr Stem, disc & #300
91 Globe Valve; RF; FE; BB; OS & Y; Rising stem; Plug disc; Replaceable disc & seat; ASTM A216 WCB; 11.5-13.5% Cr Stem, disc & seat; Stell #300
92 Globe Valve; RF; FE; BB; OS & Y; Rising stem; Plug disc; Replaceable disc & seat; ASTM A216 WCB; 11.5-13.5% Cr Stem, disc & seat; Stell #300
93 Globe Valve; RF; FE; BB; OS & Y; Rising stem; Plug disc; Replaceable disc & seat; ASTM A216 WCB; 11.5-13.5% Cr Stem, disc & seat; Stell #300
94 Y-Strainer; RF; FE; BC; A216 WCB; Blind Flange with 3/4 Plug; SS Screen; Manufactured Standard. #300
78
UNTU
No JENIS PEKERJAAN
4 12 Elbow 45 deg; A234 Gr. WPB; WTMP; SMLS; LR; BE; ASME B16.9. STD
13 Elbow 45 deg; A234 Gr. WPB; WTMP; SMLS; LR; BE; ASME B16.9. STD
14 Elbow 90 deg; A234 Gr. WPB; WTMP; SMLS; LR; BE; ASME B16.9. STD
15 Elbow 90 deg; A234 Gr. WPB; WTMP; SMLS; LR; BE; ASME B16.9. STD
16 Elbow 90 deg; A234 Gr. WPB; WTMP; SMLS; LR; BE; ASME B16.9. STD
17 Elbow 90 deg; A234 Gr. WPB; WTMP; SMLS; LR; BE; ASME B16.9. STD
18 Elbow 90 deg; A234 Gr. WPB; WTMP; SMLS; LR; BE; ASME B16.9. STD
19 Elbow 90 deg; A234 Gr. WPB; WTMP; SMLS; LR; BE; ASME B16.9. STD
20 Elbow 90 deg; A234 Gr. WPB; WTMP; SMLS; LR; BE; ASME B16.9. STD
21 Elbow 90 deg; A234 Gr. WPB; WTMP; SMLS; LR; BE; ASME B16.9. STD
22 Reducer Tee, A234 Gr. WPB, SMLS, BE, WTMP, ASME B16.9 STD
23 Reducer Tee, A234 Gr. WPB, SMLS, BE, WTMP, ASME B16.9 STD
24 Reducer Tee, A234 Gr. WPB, SMLS, BE, WTMP, ASME B16.9 40
79
UNTU
No JENIS PEKERJAAN
42 Gasket; Spiral-Wound W:SS304 /F: Flexible Graphite OIR: W/ Non Asbestos Filler; 4.5MM; ASME B 16.20. #150
43 Gasket; Spiral-Wound W:SS304 /F: Flexible Graphite OIR: W/ Non Asbestos Filler; 4.5MM; ASME B 16.20. #150
44 Gasket; Spiral-Wound W:SS304 /F: Flexible Graphite OIR: W/ Non Asbestos Filler; 4.5MM; ASME B 16.20. #150
45 Gasket; Spiral-Wound W:SS304 /F: Flexible Graphite OIR: W/ Non Asbestos Filler; 4.5MM; ASME B 16.20. #150
46 Gasket; Spiral-Wound W:SS304 /F: Flexible Graphite OIR: W/ Non Asbestos Filler; 4.5MM; ASME B 16.20. #150
80
UNTU
No JENIS PEKERJAAN
47 Gasket; Spiral-Wound W:SS304 /F: Flexible Graphite OIR: W/ Non Asbestos Filler; 4.5MM; ASME B 16.20. #150
48 Gasket; Spiral-Wound W:SS304 /F: Flexible Graphite OIR: W/ Non Asbestos Filler; 4.5MM; ASME B 16.20. #150
59 Ball Valve; min. seat rating 1500# CWP; F-Bore; Floating ball; Scrd /SW; BB; Replaceable ball & seats; ASTM A105; ASTM A182 316SS ball #1500
60 Ball Valve; min. seat rating 1500# CWP; F-Bore; Floating ball; RF, FE; BB; Replaceable ball & seats; ASTM A105; ASTM A182 316SS ball & s #1500
61 Ball Valve; RF; FE; BB; F-Bore; Side entry; Replaceable ball & seats; Soft seated; ASTM A216 WCB; Reinforced Viton Seats; Floating ball; LO #150
62 Gate Valve; Scrd/SW ends; BB; OS & Y; Rising stem; Type solid wedge; HW operated; ASTM A105 ; 11.5 – 13.5% Cr stem, wedge & seat rin #800
63 Gate Valve; Scrd/SW ends; BB; OS & Y; Rising stem; Type solid wedge; HW operated; ASTM A105 ; 11.5 – 13.5% Cr stem, wedge & seat rin #800
64 Gate Valve ; Scrd/SW ends; BB; OS & Y; Rising stem; Type solid wedge; HW operated; ASTM A105 ; 11.5 – 13.5% Cr stem, wedge & seat ri #800
65 Gate Valve; RF; FE; BB; OS & Y; Rising stem; Type solid wedge; A216 WCB; 11.5-13.5% Cr stem, wedge & seat ring; Stellited wedge & sea #150
66 Gate Valve; RF; FE; BB; OS & Y; Rising stem; Type solid wedge; A216 WCB; 11.5-13.5% Cr stem, wedge & seat ring; Stellited wedge & sea #150
81
UNTU
No JENIS PEKERJAAN
67 Gate Valve; RF; FE; BB; OS & Y; Rising stem; Type solid wedge; A216 WCB; 11.5-13.5% Cr stem, wedge & seat ring; Stellited wedge & sea #150
68 Gate Valve; RF; FE; BB; OS & Y; Rising stem; Type solid wedge; A216 WCB; 11.5-13.5% Cr stem, wedge & seat ring; Stellited wedge & sea #150
69 Gate Valve; RF; FE; BB; OS & Y; Rising stem; Type solid wedge; A216 WCB; 11.5-13.5% Cr stem, wedge & seat ring; Stellited wedge & sea #150
70 Gate Valve; RF; FE; BB; OS & Y; Rising stem; Type solid wedge; A216 WCB; 11.5-13.5% Cr stem, wedge & seat ring; Stellited wedge & sea #150
71 Gate Valve; RF; FE; BB; OS & Y; Rising stem; Type solid wedge; A216 WCB; 11.5-13.5% Cr stem, wedge & seat ring; Stellited wedge & sea #150
72 Gate Valve; RF; FE; BB; OS & Y; Rising stem; Type solid wedge; A216 WCB; 11.5-13.5% Cr stem, wedge & seat ring; Stellited wedge & sea #150
73 Swing Check Valve; Scrd/SW ends; BC; Replaceable disc & seat; A105; 11.5 - 13.5% Cr disc & seat; Stellited disc & seat; API 602. #150
74 Swing Check Valve; Scrd/SW ends; BC; Replaceable disc & seat; A105; 11.5 - 13.5% Cr disc & seat; Stellited disc & seat; API 602. #150
75 Swing Check Valve; Scrd/SW ends; BC; Replaceable disc & seat; A105; 11.5 - 13.5% Cr disc & seat; Stellited disc & seat; API 602. #150
76 Swing Check Valve; Scrd/SW ends; BC; Replaceable disc & seat; A105; 11.5 - 13.5% Cr disc & seat; Stellited disc & seat; API 602. #150
77 Swing Check Valve; Scrd/SW ends; BC; Replaceable disc & seat; A105; 11.5 - 13.5% Cr disc & seat; Stellited disc & seat; API 602. #150
78 Y-Strainer; RF; FE; BC; A216 WCB; Blind Flange with 3/4 Plug; SS Screen; Manufactured Standard. #150
79 Y-Strainer; RF; FE; BC; A216 WCB; Blind Flange with 3/4 Plug; SS Screen; Manufactured Standard. #150
80 Basket-Strainer; RF; FE; BC; A216 WCB; Blind Flange with 3/4 Plug; SS Screen; Manufactured Standard. #150
81 FLEXIBLE HOSE DIESEL (4 METER) #150
82
UNTU
No JENIS PEKERJAAN
17 Gasket; Spiral-Wound W:SS304 /F: Flexible Graphite OIR: W/ Non Asbestos Filler; 4.5MM; ASME B 16.20. #150
18 Gasket; Spiral-Wound W:SS304 /F: Flexible Graphite OIR: W/ Non Asbestos Filler; 4.5MM; ASME B 16.20. #150
23 Ball Valve; min. seat rating 1500# CWP; F-Bore; Floating ball; Scrd /SW; BB; Replaceable ball & seats; ASTM A105; HD Galv.; 316SS ball & #800
24 Ball Valve; RF; FE; BB; F-Bore; Side entry; Replaceable ball & seats; Soft seated; ASTM A216 WCB; Hot dipped galvanized; ASTM A105 + 3 mil #150
25 Ball Valve; RF; FE; BB; F-Bore; Side entry; Replaceable ball & seats; Soft seated; ASTM A216 WCB; Hot dipped galvanized; ASTM A105 + 3 mil #150
83
UNTU
No JENIS PEKERJAAN
26 Ball Valve; RF; FE; BB; F-Bore; Side entry; Replaceable ball & seats; Soft seated; ASTM A216 WCB; Hot dipped galvanized; ASTM A105 + 3 mil #150
1 U Bolt For Pipe, API 5L Gr. B, ERW, BE, STD, ASME B36.10 M 80
2 U Bolt For Pipe, API 5L Gr. B, ERW, BE, STD, ASME B36.10 M 80
3 U Bolt For Pipe, API 5L Gr. B, ERW, BE, STD, ASME B36.10 M 80
4 U Bolt For Pipe, API 5L Gr. B, ERW, BE, STD, ASME B36.10 M STD
5 U Bolt For Pipe, API 5L Gr. B, ERW, BE, STD, ASME B36.10 M STD
6 U Bolt For Pipe, API 5L Gr. B, ERW, BE, STD, ASME B36.10 M STD
7 U Bolt For Pipe, API 5L Gr. B, ERW, BE, STD, ASME B36.10 M STD
8 U Bolt For Pipe, API 5L Gr. B, ERW, BE, STD, ASME B36.10 M STD
9 U Bolt For Pipe, API 5L Gr. B, ERW, BE, STD, ASME B36.10 M STD
10 U Bolt For Pipe, API 5L Gr. B, ERW, BE, STD, ASME B36.10 M STD
Total 4
5 PEKERJAAN ELECTRICAL
84
UNTU
No JENIS PEKERJAAN
3 DISTRIBUTION PANEL
3.2 PDB-01,PDB-07,400 V, 3Ph, 4 Wire, 50Hz, 25 kW, 16 KA
Indoor used (IP 31), Wall Mounting, Plug in Type MCCB for incoming
c/w HOA, Surge Arrester,Voltmeter, Amperemeter & Indicating Lights (for each phase) for Incoming,
Incoming
- 1ea - MCCB 100A
Outgoing
85
UNTU
No JENIS PEKERJAAN
86
UNTU
No JENIS PEKERJAAN
c/w Surge Arrester,Voltmeter, Amperemeter & Indicating Lights (for each phase) for Incoming,
Incoming
- 1ea - MCCB 50A
Outgoing
- 15ea - MCB 10A
3.6 DB-001B, (At Jetty) 400 V, 3Ph, 4 Wire, 50Hz, 16 KA
hazardous area Ex "d",Outdoor used (IP 55), Wall Mounting, Plug in Type MCCB for incoming
c/w Surge Arrester,Voltmeter, Amperemeter & Indicating Lights (for each phase) for Incoming,
Incoming
- 1ea - MCCB 150A
Outgoing
- 15ea - MCB 16A 3P & MCB/ELCB 10A 1P
4 UPS
4.1 UPS AC 20 kVA Uniterruptible Power Supply, Industrial type, UPS system single with By Pass System package,
400V, 3-phase, 50hz input voltage, 1-phase 220V, 50 hz output with, Rectifier type 12-wave thyristor Bridge
Type battery VRLA, 30 minute backup time 1 x 100%, including UPS Distribution Panel
UPS shall be indoor, IP 42 installed in air conditioned room, c/w accessories
4.2 UPS 110 DC, 5 kVA Uniterruptible Power Supply, Industrial type, UPS system single System package,
400V, 3-phase, 50hz input voltage, 1-phase 110V, 50 hz output with, Rectifier type 12-wave thyristor Bridge
Type battery VRLA, 30 minute backup time 1 x 100%, including UPS Distribution Panel
UPS shall be indoor, IP 42 installed in air conditioned room, c/w accessories
5 CAPACITOR BANK
87
UNTU
No JENIS PEKERJAAN
5.1 Capacitor Bank 250 kVAR, 1 step 25 kVAR (10 step) 400 V, 50 Hz, 3Ph, 3W indoor, IP 42, Natural Cooling, c/w power factor
regulator, Internal Fuse Element and accessories
8 OUTDOOR LIGHTING
8.1 Floodlight LED Pole Mounted, min 100 watt, 220 VAC, 50 Hz, Stainless Steel
Lumen Fixture min 12000, front Glass Retaining ring with, high Power Ballast, Lamp, impact,
Resistant Temperature, front Glass
U-Shaped Mounting Bracket made of Pivots around Floodlight axis (infinitely adjustable).
Completed with lighting pole, 10000 mm Height, JB and accessories
8.2 Floodlight LED Pole Mounted, min 100 watt, 220 VAC, 50 Hz, Stainless Steel
Lumen Fixture min 12000, front Glass Retaining ring with, high Power Ballast, Lamp, impact,
Ex 'n' IP65 degree Reflector Broad-Beamed Outdoor, Resistant Temperature, front Glass
88
UNTU
No JENIS PEKERJAAN
U-Shaped Mounting Bracket made of Pivots around Floodlight axis (infinitely adjustable).
Completed with lighting pole, 10000 mm Height, JB and accessories (Ex'e', zone2)
8.3 Street Light LED Min 12000 Lumen, 1000mm Pole Mounted (4 inch), min 100 watt/HSE, 220 VAC, 50 Hz,
Lumen Per Fixture , with, high Power Ballast, (Without External Reflector)
Completed with lighting pole 9000 mm Height, JB and accessories.
8.4 Stanchion lighting, HPS 100 watt, 220 VAC, 50 Hz, pole mounted, 3000 mm Height.
(Ex'e', Zone 1)
9 INDOOR LIGHTING
9.1 Fluorescent Lighting LED Fixtures, min 4200 Lumen, 230 V, 50 Hz, IP41, 1Ph, General Type, with Clear Polycarbonate
Cover and Reflector, c/w M20 Plugged Cable Entry Lamp & control gear, Industrial type, Recessed ceilling
mounting
9.2 Fluorescent Lighting LED Fixtures,min 4200 Lumen, 230 V, 50 Hz, IP41, 1Ph, Increased safety, Zone 1, Ex'd',
General Type, with Clear Polycarbonate, Cover and Reflector, c/w M20 Plugged Cable Entry Lamp &
control gear, Industrial type, Pendant mounting
9.3 Fluorescent Lighting LED Fixtures,min 4200 Lumen, 230 V, 50 Hz, IP41,
General Type, with Clear Polycarbonate, Cover and Reflector, c/w M20 Plugged Cable Entry Lamp &
control gear, Industrial type, Pendant mounting
9.4 Down light LED (min 2600 lumen) 230 V, 50 Hz, Ceiling mounted
9.5 Exit Lamp, 230V, 50Hz, 2x8W, Recessed ceilling, complete with accessories such as cable gland, etc
9.6 Receptacle, Flush Mounted, General Purpuse indoor type, 230 V, 1 P, 20A, 400VA.
9.7 Socket outlet with plug , 2P+E, 230V, 50Hz, 16A, IP65, Industrial Type, Factory Sealed Enclosure. Flush Over,
Screw Type Modular Face Plate, with M32 Cable Gland Entry complete with accessories.
9.8 AC Receptacle, c/w on-off Switch, Flush Mounted, General Purpuse indoor type,
89
UNTU
No JENIS PEKERJAAN
11 POWER CABLE
11.1 4c - 300 mm2, 0.6/1 kV, Type N2XRY, (XLPE/SWA/PVC/Cu).Flame retardant
11.2 4c - 240 mm2, 0.6/1 kV, Type N2XRY, (XLPE/SWA/PVC/Cu).Flame retardant
11.3 4c - 150 mm2, 0.6/1 kV, Type N2XRY, (XLPE/SWA/PVC/Cu).Flame retardant
11.4 4c - 70 mm2, 0.6/1 kV, Type N2XRY, (XLPE/SWA/PVC/Cu).Flame retardant
11.5 4c - 35 mm2, 0.6/1 kV, Type N2XRY, (XLPE/SWA/PVC/Cu).Flame retardant
11.6 4c - 25 mm2, 0.6/1 kV, Type N2XRY, (XLPE/SWA/PVC/Cu).Flame retardant
11.7 4c - 16 mm2, 0.6/1 kV, Type N2XRY, (XLPE/SWA/PVC/Cu).Flame retardant
11.8 4c - 10 mm2, 0.6/1 kV, Type N2XRY, (XLPE/SWA/PVC/Cu).Flame retardant
11.9 4c - 6 mm2, 0.6/1 kV, Type N2XRY, (XLPE/SWA/PVC/Cu).Flame retardant
11.10 3c - 95 mm2, 0.6/1 kV, Type N2XRY, (XLPE/SWA/PVC/Cu).Flame retardant
11.11 3c - 16 mm2, 0.6/1 kV, Type N2XRY, (XLPE/SWA/PVC/Cu).Flame retardant
11.12 3c - 10 mm2, 0.6/1 kV, Type N2XRY, (XLPE/SWA/PVC/Cu).Flame retardant
11.13 3c - 25 mm2, 0.6/1 kV, Type N2XRY, (XLPE/SWA/PVC/Cu).Flame retardant
90
UNTU
No JENIS PEKERJAAN
12 CONTROL CABLE
12.1 10c - 1.5 mm2, Type N2XRY, 0.6/1 kV.
12.2 2c - 1.5 mm2, Type NYY, 0.6/1 kV.
14 GROUNDING CABLE
(0.45/0.75 kV, Cu/PVC/SWA/PVC)
14.1 1C-16 mm²
14.2 1C-25 mm²
14.3 1C-50 mm²
14.4 1C-70 mm²
15 GROUND ROD
15.1 3/4" Dia, 3m Long Ground Rod Copper Clad Steel (for Grounding) include :
91
UNTU
No JENIS PEKERJAAN
Grounding Inspection Pit, Concrete c/w Concrete Cover & Maker Plate, Size 400 mm x 400 mm
Clamp, Solid Copper, 3/4" dia rod to double cable 35 mm2 - 35mm2 c/w U-bolt,nut
Clamp, Solid Copper, 3/4" dia rod to three cable 70 mm2 - 70mm2 - 70mm2, c/w U-Bolt,nut
Grounding Coupling, Solid Copper, 3/4" Dia
Driving Stud Head, 3/4 " Dia
Exothermic Welding Connection for cable 70 mm2
Compression "C" Connection type, Solid Copper
16 CABLE GLAND
Cable Gland Industrial Type made of Nickle & Plate brass.
Completed with heat shrink tube.
16.1 M20
16.2 M25
16.3 M32
16.4 M50
16.5 M63
16.6 M75
Cable Gland Industrial Type made of Nickle & Plate brass , Suitable for Hazardous area zone 2,
T3, Ex'e', Completed with heat shrink tube.
16.7 M20
16.8 M40
16.9 M50
17 BULK MATERIAL
92
UNTU
No JENIS PEKERJAAN
Cable Shoe (Spring Washer, Flat Washer and Blue Plastic Cap, with size as below)
17.1 1,5
17.2 2.5
17.3 4.0
17.4 6.0
17.5 10.0
17.6 16.0
17.7 35.0
17.8 50.0
17.9 70.0
17.10 120.0
17.11 240.0
18 LIGHTNING PROTECTION
18.1 Lightning Protection ESE (Early Streamer Emission) Air Terminal (Radius = 80 m, Level 1) Consist of :
Pole ESE Air Terminal, 30 m of Height c/w Adapter, Mast Bracket, and Clamp 50.0
Down Conductor, Stranded Copper, NYA 1C-95 mm2 120.0
Grounding Inspection Pit, Concrete, c/w Concrete Cover and Marker Plate, Size : 400 mm x 400 mm 2.0
Grounding Rod, Solid Copper, Threaded , 3/4 " Dia, 3000 mm of Length &accessories 2.0
Lightning Event Counter 2.0
93
UNTU
No JENIS PEKERJAAN
Horizontal Air Terminal Base, for Rod 1/2" dia, Hot Dipped Galvanized, c/w cable connector, dynabolt 200.0
Cable Holder / Cable Connector, Hot Dipped Galvanized Steel,Cable Splicer, for Cable size : 50 mm2 12.0
'Crimp Type Terminal Lug, Solid Copper, Size : 35 mm2 c/w Bolt& Nut, 1-Spring, 1-Flat Washer size : M8x25L 12.0
Test Terminal Box Testing Hot Dipped Galvanized Steel Enclosure, c/w all accessories. 24.0
22 JOINT SET
22.1 Joint set, Complete With 6ea Bolt, Nuts & Washers 316 SS.
23 SUPPORT
23.1 Steel angle 50 mm x 50 mm x 6thk, 6000 mm
24 STEEL CONDUIT
94
UNTU
No JENIS PEKERJAAN
All Steel Conduit & Accessories material, complie with ANSI 801/80.5
(IEC 60614/61084/61035) with Galvafroid Metalic Paint, Threaded Conduit Joint and screw covers
Shall be coated with an electrically conductive,.
24.1 3/4 " Diameter (Length 3200 mm) Rigid Steel Conduit,
Hot Dip Galvanized, Complies.
24.2 3/4 " Diameter (Length 3200 mm) PVC Conduit,
25 FLEXIBLE CONDUIT
25.1 3/4" Flexible Conduit, Liquit Tight Galvanized strong steel strip helically wound
with nylon sealing cord heavy duty flexible PVC covered, water tight seal, UL A2066
bonded liquit tight in size 3/4" IEC 529.
26 CONDUIT FITTING
26.1 3/4" PVC "TE"
28 CABLE TIES
Fully Coated Stainless Steel 316 SS Cable Ties.
95
UNTU
No JENIS PEKERJAAN
Total 5
6 PEKERJAAN INSTRUMENT
1 CONTROL SYSTEM
1.1 Jetty Area
1.1.1 Remote Terminal Unit (RTU) System, Classified in Class 1 Div 2
RTU module, 33 MHz, 4 MB ROM, 16 MB RAM, 2 x serial port, 2 x ethernet port, 1 x USB A port, 1 x USB B port, I/O modules, 24 VDC Power Supply, battery for me
terminal wiring, terminal block, grounding etc, Fiber Optic (FO) Converter, Surge Arrester for each I/O, Enclosure for RTU, Panel Dimension (by vendor), outdoor, C
single front door, NEMA4X & 7, the RTU supplied shall meet minimum SIL 2 performance criteria as defined in IEC 61511, Material Cooper-Free Cast almunium (bo
316SS (bolt-nut-hinge), c/w mounting panel.
- Panel Dimension (as minimum): 1000 mm H x 1200 mm W x 300 mm D, include plinth. With plate thickness 2.5mm (top, side, back) and 3 mm (front and door).
- Rack consist of:
- CPU Controller 2.0 EA
- 24 VDC Power Supply 2.0 EA
- Communication Module 2.0 EA
- Analog Input (AI) Module, 24 Vdc, 4-20 mA, 8 Channels 1.0 EA
- Digital Input (DI) Module, 24 Vdc, 8 Channels 1.0 EA
- Digital Output (DO) Module, 24 Vdc, 8 Channels 1.0 EA
96
UNTU
No JENIS PEKERJAAN
97
UNTU
No JENIS PEKERJAAN
98
UNTU
No JENIS PEKERJAAN
buttons and signals received. The Safety Instrumented System shall be designed on a fail-safe basis so that its failure shall place the plant process in safe shutdown
conditions. The SIS supplied shall meet minimum SIL 2 performance criteria as defined in IEC 61511. The offered system shall be furnished with redundant CPU Co
power supply and communication module.
- Panel Dimension (as minimum): 2100 mm H x 800 mm W x 800 mm D, include plinth. With plate thickness 2.5mm (top, side, back) and 3 mm (front and door).
- Consist of:
- Base Module or Chassis 2.0 EA
- Interface Module 2.0 EA
- Power Supply Module 2.0 EA
- CPU Controller 2.0 EA
- Communication Module 2.0 EA
- Analog Input (AI) Module, 24 Vdc, 4-20 mA, 16 Channels 2.0 EA
- Analog Output (AO) Module, 24 Vdc, 4-20 mA, 8 Channels 0.0 EA
- Digital Input (DI) Module, 24 Vdc, 32 Channels 4.0 EA
- Digital Output (DO) Module, 24 Vdc, 32 Channels 2.0 EA
- Surge Arrester for each I/O 1.0 LOT
- Signal/System Cables 1.0 LOT
- Terminal Board For Analog 1.0 LOT
- Terminal Board For Digital 1.0 LOT
- Relay Board For Digital Output 1.0 LOT
- Wiring Check Adapter For Digital Input 1.0 LOT
- Panel Accessories: 1.0 LOT
- Fan
- Ventilation
- Light
99
UNTU
No JENIS PEKERJAAN
- Door Switch
- Lifting Eye
- Cable Duck
- Terminal Block
- Rear and Front Door
- Grounding System
100
UNTU
No JENIS PEKERJAAN
1.2.6 Tas Management System hardware & Software (Tas Ms Software Include Programming (International License))
- Consist of:
A. Main Activities or Services provided at the Terminal, including but not limited to:
- Truck Loading and Unloading
- Pipeline
- Tank to Tank Transfer
B. Main System Functionalities Required, including but not limited to:
- SAP/ERP interface
- Order Management
- Operation (Activity) Scheduling
- Operation (Job) Management
- Report Management
- Master Data Management
- Tank Inventory Management (by ATG)
C. Additional System Functionalities Required, including but not limited to:
101
UNTU
No JENIS PEKERJAAN
102
UNTU
No JENIS PEKERJAAN
- Control board for command and functional configuration to be connected to the client control room
- ASTM F2200-14 Automated Vehicular Gates - Building Design And Construction
- Protection Class IP 44
- Finger-print
- Proximity Card Reader
- Printer Filling Aadvice Note (for Gate-in)
- Printer Dot-Matriks (for Gate-out)
2.2 Hardware
103
UNTU
No JENIS PEKERJAAN
Latest version industrial type, Intel Processor Core-i7, 24" LCD, HDD 1 TB (minimum), RAM 16 GB , 16X DVD +/- RW Drive, GA NVIDIA Quadro K600 1GB, complete
Logic Developer Software, the latest windows based OS (which is compatible with DCS/PLC), MS Office (MS Office and Excell for OWS and EWS, Power Point for EW
Adobe Reader (for all PC's), anti virus, keyboard and mouse USB Port.
104
UNTU
No JENIS PEKERJAAN
- Ventilation
- Light
- Door Switch
- Lifting Eye
- Cable Duck
- Terminal Block
- Rear and Front Door
- Grounding System
5 Fire Alarm Control Panel (FACP) - Ref.: DMI-DSH-60-018-A4 F&G DEVICES REV 0
System Capacity:
- Indoor installation with IP 55 ingress protection as minimum.
- Type: Fire Alarm Panel with Display
- Intelligent Signaling Line Circuits: 1, expandable to 10.
- Intelligent Detectors: 159 per loop.
- Addressable Monitor/Control Modules: 159 per loop.
- Main power supply and battery charger: 220/240 VAC, 50/60 Hz, 1.5 A.
- Output Power: 24 V , 4.5 A (in Alarm)
- Supplied with Power Supply and Network Communication Module.
- Display: Large 16 line, 640 character LCD backlit display
105
UNTU
No JENIS PEKERJAAN
6.2 CPU with minimum 1TB Internal Hardisk, Software CCTV (Digital Video Manager (DVM)) & accessories 1.0 EA
6.3 DVR (Digital Video Recorder) 1.0 EA
6.4 Keyboard & Joystick 1.0 EA
6.5 CCTV Monitor LED 24 inch 1.0 EA
6.6 CCTV Server (Database and Camera Server) 1.0 EA
6.7 CCTV Panel, IP 54 (600mm (W) x 600mm (D) x 700 mm (H) x 2mm (Thk)) 1.0 EA
6.8 Fix CCTV Camera, Weather Proof, IP65 (Angle of View 48' - 2.8" (H)), Resolutions: 5-MP that provide a 180°. 2.0 EA
6.9 PTZ CCTV Camera, Weather Proof, IP65 (Angle of View 48' - 2.8" (H)), Resolution: min. 650TVL 2.0 EA
6.10 PTZ CCTV Camera, Explosion Proof, IP65 (Angle of View 48' - 2.8" (H)), Resolution: min. 650TVL 2.0 EA
6.11 Converter Coaxial to FO 1.0 EA
6.12 CCTV Cable :
- Power Cable 400.0 M
- Ethernet / Data Cable Cat 6 200.0 M
6.13 4" Stanchion Pipe Sch.40 for CCTV Camera Outdoor Support (1Ea = 5m) 6.0 EA
106
UNTU
No JENIS PEKERJAAN
107
UNTU
No JENIS PEKERJAAN
108
UNTU
No JENIS PEKERJAAN
109
UNTU
No JENIS PEKERJAAN
9.5 Analyzer
9.5.1 Dew Point Analyzer - datasheet no.: DMI-DSH-060-014-A4
110
UNTU
No JENIS PEKERJAAN
Vapour Meter
- Coriolis Mass Flowmeter 1.0 EA
Other
- Flow Computer, c/w accessories 1.0 EA
- Standing control panel, c/w accessories 1.0 EA
Vapour Meter
- Coriolis Mass Flowmeter 1.0 EA
111
UNTU
No JENIS PEKERJAAN
Other
- Batch Control Unit, c/w accessories 1.0 EA
- Grounding System, c/w accessories 1.0 EA
Vapour Meter
- Coriolis Mass Flowmeter 1.0 EA
Other
- Batch Control Unit, c/w accessories 1.0 EA
- Grounding System, c/w accessories 1.0 EA
112
UNTU
No JENIS PEKERJAAN
Vapour Meter
- Coriolis Mass Flowmeter 1.0 EA
Other
- Batch Control Unit, c/w accessories 1.0 EA
- Grounding System, c/w accessories 1.0 EA
113
UNTU
No JENIS PEKERJAAN
Size : 4"-150# RF
Size : 10"-150# RF
Size : 16"-150# RF
Size : 3"-300# RF
114
UNTU
No JENIS PEKERJAAN
Break glass type, electrical connection 1/2" NPTF, Relay Contact (SPDT) output (dry contact), DC 125 V, 0.5 Amp as minimum, IP 21 ingress protection, Wall Mount
Capable with looping configuration.
115
UNTU
No JENIS PEKERJAAN
116
UNTU
No JENIS PEKERJAAN
Model VTA
No. of Cable Entries onVTA
Dimension See List Bellow
Terminal
Tag no. Dimension (VTA)
Strip Block
XXX-IJB-X-001 340W x 170H x 150 D mm 14 1
XXX-IJB-X-002 340W x 170H x 150 D mm 14 1
XXX-IJB-X-003 340W x 170H x 150 D mm 14 1
XXX-IJB-X-004 340W x 170H x 150 D mm 14 1
XXX-IJB-X-005 340W x 170H x 150 D mm 14 1
XXX-IJB-X-006 340W x 170H x 150 D mm 14 1
XXX-IJB-X-007 340W x 170H x 150 D mm 21 1
XXX-IJB-X-008 340W x 170H x 150 D mm 21 1
XXX-IJB-X-009 340W x 170H x 150 D mm 21 1
XXX-IJB-X-010 340W x 340H x 150 D mm 24 1
XXX-IJB-X-011 340W x 340H x 150 D mm 24 1
XXX-IJB-X-012 340W x 340H x 150 D mm 24 1
XXX-IJB-X-013 340W x 340H x 150 D mm 24 1
XXX-IJB-X-014 340W x 340H x 150 D mm 24 1
XXX-IJB-X-015 340W x 340H x 150 D mm 24 1
XXX-IJB-X-016 340W x 340H x 150 D mm 24 1
XXX-IJB-X-017 340W x 340H x 150 D mm 24 1
XXX-IJB-X-018 340W x 340H x 150 D mm 36 1
117
UNTU
No JENIS PEKERJAAN
11 CABLE - LPG
11.1 Instrument and Control Cable
Size : 1 Pr x 1.5 mm2
: 7 Pr x 1.5 mm2
: 12 Pr x 1.5 mm2
: 19 Pr x 1.5 mm2
: 1 Pr x 2.5 mm2
: 7 Pr x 2.5 mm2
: 12 Pr x 2.5 mm2
: 19 Pr x 2.5 mm2
118
UNTU
No JENIS PEKERJAAN
11.2 All Critical Safety System Cable ( F&G and ESD System)
Size : 1 PR x 1.5 mm2
: 7 PR x 1.5 mm2
: 12 PR x 1.5 mm2
119
UNTU
No JENIS PEKERJAAN
: 19 PR x 1.5 mm2
: 1 PR x 2.5 mm2
: 12 PR x 2.5 mm2
: 1 TR x 1.5 mm2
: 19 TR x 1.5 mm2
120
UNTU
No JENIS PEKERJAAN
such as:
a) Fire Resistant
b) Sunlight Resistant
c) Proofed against Aliphatic Hydrocarbons
d) Low smoke zero halogen
e) Gas and vapor tight
Armour : Armour shall be Steel Wire Armour (SWA) type and electrically continuous throughout the length of cable
Outer Sheath Colour : Red
Fire Resistant Layer : Mica Glass Type
Fire Resistant Characteristic
- IEC 60331-21 : 1999 (750°C-90 min fire alone).
- BSE 6387 category C.W.Z (950°C-3 Hours fire alone).
- SS 299 part 2 : 1998 (950°C-3 Hours).
Fillers & Binders : Solid,non hygroscopic type and a suitable binder tape
11.3 Serial Link Cable : Flame retardant as per IEC-60332 and Armoured cable,
Size : 2 x 0.35 mm2 (22 AWG)
Service Voltage : 24 VDC System
Insulation Grade : 250 V / 105 degC
Color Wire Cable a) Pair#1 : White/Blue Stripe & Blue/White Stripe
b) Pair#2 : White/Orange Stripe & Orange/White Stripe
Conductor Material a) Cooper cable cores shall be made of circular stranded annealed bare cooper
121
UNTU
No JENIS PEKERJAAN
122
UNTU
No JENIS PEKERJAAN
11.6 Fiber Optic Cable : Single mode, Armoured, Flame Retardant, Black Outer sheath.
Number of Cores : 4 Cores
Core Diameter : 9 micron
Cladding diameter : 125 micron
Attenuation : 0.4 / 0.25 dB/km
Bandwith : ~ 100 TeraHz
Outer Sheath Colour : Black
Armour : Yes (Corrugated Steel Armor)
123
UNTU
No JENIS PEKERJAAN
124
UNTU
No JENIS PEKERJAAN
125
UNTU
No JENIS PEKERJAAN
2" NPT-M
12.11 Conduit Saddle/Clamp c/w Bolt & Nut
Material : Steel
Size : 1" NPT-M
2" NPT-M
126
UNTU
No JENIS PEKERJAAN
Total 6
FIRE PROTECTION
1 FIRE MONITOR
FLOW RATE CAPACITY : 500 gpm (1892 l/min)
SYSTEM MANUAL
127
UNTU
No JENIS PEKERJAAN
3 DELUGE SYSTEM
SYSTEM AUTOMATIC
DELUGE VALVES 8 inch, ANSI 150 RF (Spherical Tank)
DELUGE VALVES 6 inch, ANSI 150 RF (Filling Shed)
DELUGE VALVES 4 inch, ANSI 150 RF (Pump Shelter)
128
UNTU
No JENIS PEKERJAAN
5 SPRINKLER
Sprinkler Head
Type : Pendant
Hazard Class : Light Hazard
Discharge Pattern : Flat
Auto Sprinkler System with a Sealing Plate as an accessories.
Location : Office & Building
129
UNTU
No JENIS PEKERJAAN
WARNING LAMPS WITH INSTRUCTION "CLEaN AGENT RELEaSE" AND "EVACUATE AREA IMMEDIATELY".
AUDIBLE ALARM/SIREN.
BEACON
8 DRY CHEMICAL
Powder Wheels 63 kg (include shelter)
Portable Powder 9 kg
Portable CO2 6 kg
Total 7
Total 8
130
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
1.00 lot
1.00 lot
1.00 lot
30,211.00 m2
1.00 lot
5m2)
1.00 Ls
1.00 Ls
1.00 Ls
1.00 Ls
131
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
1 ls
1 ls
4,200.00 m
750.00 m
132
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
784.00 m
336.00 m
228.00 m
22,658.25 m3
ccordance with ASTM D 1557)
1.00 ls
133
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
581.71 m
900.07 m3
245.77 m3
51.96 m3
51.96 m3
526.50 m3
27.00 m3
39.69 m3
134
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
32.78 m3
233.24 m3
50.29 m
18.78 m3
14.09 m3
4.70 m3
10.83 m3
10.83 m3
135.32 m3
135
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
20.80 m
95.63 m3
58.06 m3
0.58 m3
1.16 m3
39.00 m2
12.80 m'
2.56 m3
57.00 btg
8.96 m3
136
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
147.97 kg
27.65 kg
77.06 kg
46.60 m
23.97 m3
14.59 m3
0.90 m3
1.62 m3
6.24 m3
49.00 btg
137
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
3.25 m3
2.89 m3
329.13 m
626.71 m3
478.11 m3
23.86 m3
23.86 m3
194.42 m3
5,570.36 kg
138
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
32.00 m
77.62 m3
65.71 m3
1.80 m3
1.80 m3
10.80 m3
225.00 btg
1.44 m3
139
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
8,739.67 kg
12.00 m
81.00 m3
1.92 m3
43.08 m3
14.40 m3
7.20 m3
140
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
1,686.80 m3
374.55 m3
584.10 m3
2,500.00 m2
2,152.00 m'
434.00 m
364.56 m3
141
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
20.62 m3
20.62 m3
182.28 m3
97.65 m3
412.00 m
296.64 m3
14.42 m3
14.42 m3
148.32 m3
65.92 m3
696.00 m
417.60 m3
142
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
5.22 m3
342.20 m3
75.40 m3
696.00 m'
20.88 m3
375.00 m
157.00 m3
2.83 m3
135.81 m3
21.20 m3
375.00 m'
21.00 m'
143
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
576.00 m3
576.00 m3
1,200.00 m'
45.00 m
71.78 m3
1.91 m3
1.91 m3
48.83 m3
270.00 m'
19.13 m3
134.00 m
195.37 m3
150.72 m3
144
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
5.66 m3
5.66 m3
24.12 m3
12.56 m3
1.54 m3
32.00 EA
145
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
88.00 m
119.28 m3
81.98 m3
16.40 m3
16.40 m3
88.00 m
560.67 m2
1,121.34 m2
300.00 m2
246.00 m2
26.00 m2
575.00 m2
50.00 m2
146
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
67.20 m2
40.00 m2
609.00 m2
50.00 m2
1,318.00 m2
443.55 m2
384.00 m2
2.00 Unit
12.00 Unit
30.00 unit
5.00 Unit
1.00 Unit
5.00 Set.
3.00 Set.
147
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
5.00 Set.
3.00 Set.
4.00 Set.
140.00 m
14.00 Set.
1.00 Lot
89.00 m'
65.00 m'
1.00 ea
4.50 m3
72.00 btg
13.61 m3
148
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
1.34 m3
40.32 m3
21.60 m3
10.50 m3
6.00 m3
0.70 m3
149
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
38.40 m3
21.60 m3
10.50 m3
6.00 m3
0.70 m3
150
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
33.00 m3
18.00 m3
9.45 m3
6.00 m3
2.52 m3
38.40 m3
151
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
1.41 m3
6.60 m3
carbon steel
1,498.44 kg
2,623.01 kg
42.00 m
64.19 m3
46.65 m3
152
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
8.56 m3
17.13 m3
46.00 m
4.61 m3
1.10 m3
3.90 m3
7.50 m3
1.90 m3
153
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
1.22 m3
6.50 m3
63.00 btg
1.44 m3
1,444.61 kg
1,065.60 kg
426.24 kg
85.20 kg
154
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
710.40 kg
841.12 kg
22.19 kg
54.29 kg
227.36 kg
168.00 kg
98.91 kg
28.91 kg
17.60 kg
24.42 kg
24.00 Ea
168.00 Ea
96.00 Ea
90.00 kg
89.60 m2
14.00 m
28.00 m
155
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
30.00 m
6.00 Ea
84.00 m2
120.00 m
202.43 m3
149.56 m3
8.04 m3
8.04 m3
72.00 m
20.25 m3
3.78 m3
156
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
14.18 m3
81.00 m3
42.19 m3
2.25 m3
1.01 m3
1.69 m3
157
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
5,734.08 kg
10,599.36 kg
1,469.52 kg
475.02 kg
254.48 kg
4,077.70 kg
218.40 kg
4,321.25 kg
133.16 kg
392.03 kg
2,587.20 kg
54.80 kg
354.49 kg
161.74 kg
134.52 kg
46.42 kg
25.11 kg
146.50 kg
158
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
120.00 Ea
720.00 Ea
576.00 Ea
540.00 kg
534.30 m2
41.10 m
61.65 m
108.00 m
18.00 Ea
360.45 m2
30.00 m
30.55 m3
19.31 m3
159
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
5.59 m3
5.59 m3
32.00 m
2.19 m3
0.64 m3
0.75 m3
0.90 m3
3.84 m3
160
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
1.60 m3
1.00 m3
1.27 m3
15.00 btg
6.25 m3
1.05 m3
161
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
938.12 kg
172.80 kg
60.48 kg
36.00 kg
204.48 kg
56.00 kg
480.64 kg
13.32 kg
39.77 kg
145.66 kg
128.00 kg
26.58 kg
33.85 kg
11.21 kg
8.69 kg
2.09 kg
16.28 kg
16.00 Ea
162
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
100.00 Ea
64.00 Ea
59.20 m2
8.00 m
16.00 m
22.00 m
4.00 Ea
16.00 m2
102.00 m
633.42 m3
511.30 m3
23.73 m3
23.73 m3
163
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
16.13 m3
25.60 m3
17.92 m3
48.00 m3
3,102.00 kg
411.84 kg
162.86 kg
164
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
75.40 kg
982.08 kg
295.20 kg
127.80 kg
943.26 kg
22.19 kg
55.24 kg
862.40 kg
376.80 kg
82.07 kg
94.00 kg
25.39 kg
28.55 kg
6.52 kg
24.42 kg
32.00 ea
60.00 ea
60.00 ea
96.00 ea
46.40 kg
55.00 kg
165
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
122.46 m2
15.70 m
31.40 m
36.00 m
6.00 Ea
132.30 m2
24.00 m
33.00 m2
60.43 m3
59.73 m3
3.09 m3
3.09 m3
24.00 m
166
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
47.69 m2
95.37 m2
14.44 m2
1.56 m2
9.03 m2
14.44 m2
29.03 m2
47.69 m2
55.19 m2
36.00 m2
1.00 Unit
1.00 Unit
1.00 Unit
1.00 Unit
167
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
1.00 Unit
1.00 Set.
1.00 Set.
12.00 m
2.00 Set.
1.00 Lot
6.00 m
4.00 m
2.02 m3
36.00 btg
0.18 m3
168
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
1.44 m3
0.64 m3
1.44 m3
0.50 m3
3.60 m3
3.60 m3
169
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
26.00 m
20.00 m2
24.10 m3
19.22 m3
1.38 m3
1.38 m3
1.35 m3
0.13 m3
0.30 m3
170
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
3.00 m3
176.40 kg
56.00 kg
112.00 kg
225.30 kg
2.47 kg
27.15 kg
40.00 kg
8.14 kg
13.19 kg
2.09 kg
12.21 kg
8.00 Ea
40.00 Ea
48.00 Ea
171
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
20.00 m2
5.00 m
5.00 m
6.00 m
2.00 Ea
84.00 m
252.96 m2
156.82 m3
131.43 m3
16.10 m3
16.10 m3
65.60 m
172
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
314.90 m2
629.80 m2
180.00 m2
364.90 m2
264.90 m2
252.96 m2
1.00 Unit
1.00 Unit
1.00 Unit
56.00 m
8.00 Set.
22.22 m3
173
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
397.00 btg
3.17 m3
9.60 m3
16.92 m3
3.60 m3
174
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
21.60 m3
6.00 m3
1.80 m3
12.60 m3
3.00 m3
25.30 m3
175
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
4.20 m3
14.63 m3
141.00 btg
44.00 m'
112.00 m2
93.00 m3
78.42 m3
6.25 m3
8.67 m3
48.00 m'
19.08 m3
10.06 m3
1.33 m3
176
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
1.33 m3
3.83 m3
0.79 m3
4.20 m3
11.48 m3
2.80 m3
1.20 m3
177
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
0.84 m3
0.60 m3
6.50 m3
63.00 btg
6.89 m3
0.42 m3
178
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
674.88 kg
511.20 kg
377.01 kg
153.36 kg
1,081.44 kg
26.63 kg
81.82 kg
172.80 kg
32.71 kg
110.67 kg
23.40 kg
30.52 kg
24.00 Ea
150.00 Ea
120.00 Ea
60.00 m
1.00 Ls
126.00 m
179
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
144.00 m2
18.00 m2
14.40 m
28.80 m
16.00 m
4.00 point
47.00 m
91.76 m2
31.75 m3
23.65 m3
4.59 m3
4.59 m3
39.60 m
4.05 m3
180
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
4.05 m3
3.00 m3
3.84 m3
3.80 m3
1.14 m3
7.20 m3
181
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
567.00 kg
426.00 kg
252.00 kg
100.80 kg
615.04 kg
14.80 kg
37.88 kg
56.52 kg
180.86 kg
128.58 kg
9.54 kg
13.73 kg
24.00 Ea
108.00 Ea
36.00 Ea
60.00 Ea
182
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
60.00 m2
12.40 m
24.80 m
36.00 m
6.00 Ea
60.00 m2
6.00 m3
16.00 m3
6.60 m3
183
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
15.56 m3
3.70 m3
1,498.44 kg
441.00 kg
158.40 kg
42.00 kg
24.00 kg
221.52 kg
85.20 kg
563.25 kg
9.86 kg
37.88 kg
184
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
16.28 kg
50.77 kg
8.69 kg
21.20 kg
16.00 Ea
100.00 Ea
80.00 Ea
4.00 Ea
4.00 Ea
60.00 m2
7.50 m
14.00 m
2.00 Ea
55.00 m2
27.00 m2
185
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
24.00 m
33.00 m2
60.43 m3
59.73 m3
3.09 m3
3.09 m3
24.00 m
47.69 m2
95.37 m2
14.44 m2
1.56 m2
9.03 m2
14.44 m2
29.03 m2
186
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
47.69 m2
55.19 m2
36.00 m2
1.00 Unit
1.00 Unit
1.00 Unit
1.00 Unit
1.00 Unit
1.00 Set.
12.00 m
2.00 Set.
1.00 Lot
6.00 m
4.00 m
187
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
2.59 m3
54.00 btg
0.18 m3
1.44 m3
0.64 m3
1.44 m3
0.50 m3
188
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
3.60 m3
3.60 m3
carbon steel
1,498.44 kg
48.00 m
66.00 m2
120.86 m3
189
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
119.46 m3
6.18 m3
6.18 m3
48.00 m
95.37 m2
190.74 m2
28.88 m2
3.13 m2
18.06 m2
28.88 m2
58.06 m2
95.37 m2
110.37 m2
72.00 m2
190
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
2.00 Unit
2.00 Unit
2.00 Unit
2.00 Unit
2.00 Unit
2.00 Set.
24.00 m
4.00 Set.
2.00 Lot
12.00 m
8.00 m
4.03 m3
191
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
72.00 btg
0.37 m3
2.88 m3
1.28 m3
2.88 m3
1.00 m3
7.20 m3
192
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
7.20 m3
38.00 m
103.13 m2
188.85 m3
186.66 m3
4.20 m3
4.20 m3
26.00 m
112.19 m2
224.37 m2
193
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
50.00 m2
196.19 m2
196.19 m2
84.00 m2
1.00 Unit
6.00 Unit
1.00 Unit
18.00 m
3.00 Set.
3.46 m3
72.00 btg
0.83 m3
194
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
2.40 m3
3.24 m3
4.00 m3
0.60 m3
8.40 m3
8.40 m3
195
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
28.00 m
33.00 m2
60.43 m3
59.73 m3
3.09 m3
3.09 m3
18.00 m
35.25 m2
70.50 m2
19.00 m2
5.00 m2
18.06 m2
196
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
19.00 m2
46.06 m2
35.25 m2
35.25 m2
48.00 m2
2.00 Unit
2.00 Unit
2.00 Set.
12.00 m
3.00 Set.
1.00 Lot
12.00 m
8.00 m
197
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
2.59 m3
54.00 btg
0.28 m3
1.44 m3
0.84 m3
1.92 m3
0.50 m3
198
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
4.80 m3
4.80 m3
26.00 m
20.00 m2
24.10 m3
19.22 m3
1.38 m3
1.38 m3
199
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
1.35 m3
56.00 btg
0.13 m3
0.30 m3
3.00 m3
176.40 kg
56.00 kg
112.00 kg
225.30 kg
200
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
2.47 kg
27.15 kg
40.00 kg
8.14 kg
13.19 kg
2.09 kg
12.21 kg
8.00 Ea
40.00 Ea
48.00 Ea
20.00 m2
60.00 m2
120.00 m2
60.00 m2
60.00 m2
1.00 ea
5.00 m
201
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
5.00 m
6.00 m
2.00 Ea
Capacity
0.45 kg/37.9 m3 1 UNIT
3000 MT 2 UNIT
146 m3/hr (rated) 3 UNIT
50 MT/hr 3 UNIT
3.5 MT/hr
63 Nm3/hr 2 UNIT
13 m3 1 UNIT
1.8 m3 1 UNIT
2 m3 1 UNIT
5 m3 1 UNIT
2 m3/hr 2 UNIT
(Note 1) 2 UNIT
1500 KL 1 UNIT
568 m3/hr 2 UNIT
202
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
454 m3/hr 2 UNIT
12 m3/hr 1 UNIT
30 m3/hr 1 UNIT
60 MT 2 UNIT
350 MT/h 1 UNIT
1 UNIT
1 set
min 40 m3/hr 2 UNIT
DIA
1/2" 12.00 EA
3/4" 12.00 EA
3/4" 18.0 M
1" 18.0 M
2" 78.0 M
3" 20.0 M
4" 228.0 M
6" 930.0 M
8" 30.0 M
10" 40.0 M
203
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
12" 994.0 M
6" 23.0 EA
8" 7.0 EA
10" 5.0 EA
12" 33.0 EA
12" 30.0 EA
1" 9.0 EA
3/4" 9.0 EA
2" 12.0 EA
3" 7.0 EA
4" 39.0 EA
6" 63.0 EA
10" 5.0 EA
6"x4" 2.0 EA
6"x3" 2.00 EA
8"x4" 3.00 EA
12"x8" 3.0 EA
12"x10" 3.0 EA
4" 2.0 EA
6" 5.0 EA
12" 14.0 EA
6"x4" 4.00 EA
2"x1" 2.00 EA
204
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
3"x1" 2.00 EA
4"x3" 8.00 EA
10"x6" 4.00 EA
16" X 12" 2.0 EA
3/4" 30.0 EA
1" 30.0 EA
2" 64.0 EA
3" 16.0 EA
4" 46.0 EA
6" 75.0 EA
8" 16.0 EA
10" 18.0 EA
12" 40.0 EA
12" 19.0 EA
4" 10.0 EA
6" 6.0 EA
2" 2.0 EA
12" 6.0 EA
4" 8.0 EA
3/4" 45.00 EA
1" 45.00 EA
2" 96.00 EA
205
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
3" 24.00 EA
4" 69.00 EA
6" 112.50 EA
8" 24.00 EA
10" 27.00 EA
12" 80.00 EA
3/4" 10.0 EA
1" 4.0 EA
2" 6.0 EA
12"X6" 2.0 EA
12"X4" 16.0 EA
1/2" 27.0 EA
206
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
3/4" 41.0 EA
1" 10.0 EA
2" 35.0 EA
3" 3.0 EA
4" 24.0 EA
6" 22.0 EA
8" 5.0 EA
10" 3.0 EA
12" 18.0 EA
4" 2.00 EA
6" 1.0 EA
8" 3.0 EA
12" 3.0 EA
2" 1.00 EA
4" 8.0 EA
6" 1.00 EA
3" 2.0 EA
10" 3.0 EA
12" 4.0 EA
6" 2.0 EA
3/4" 32.00 EA
207
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
1" 20.0 M
1 1/2" 700.00 M
2" 48.0 M
3" 60.0 M
4" 30.0 M
8" 90.0 M
6" 50.0 M
10" 94.0 M
12" 760.0 M
16" 520 M
10" 12.0 EA
12" 2.0 EA
3" 10.0 EA
2" 10.0 EA
6" 7.0 EA
4" 6.0 EA
8" 22.0 EA
10" 18.0 EA
12" 6.0 EA
16" 24.0 EA
16"x12" 4.0 EA
16"x10" 7.0 EA
10"x8" 5.0 EA
208
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
1 1/2" 18.00 EA
3" 4.0 EA
10" 4.0 EA
16" 2.0 EA
3"x2" 4.00 EA
1 1/2" 60.00 EA
2" 20.0 EA
4" 5.0 EA
3" 18.0 EA
6" 12.0 EA
8" 20.0 EA
10" 29.0 EA
12" 18.0 EA
16" 16.0 EA
2" 6.0 EA
16" 8.0 EA
12" 3.00 EA
1 1/2" 60.00 EA
2" 20.00 EA
4" 5.00 EA
3" 18.00 EA
6" 12.00 EA
209
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
8" 20.00 EA
10 " -16" 63.00 EA
2"x3/4" 6.00 EA
10"x3/4" 18.00 EA
3/4" 6.00 EA
3/4" 30.00 EA
1 1/2" 14.00 EA
2" 6.0 EA
1" 4.00 EA
1 1/2" 10.00 EA
3/4" 16.00 EA
2" 1.0 EA
4" 1.0 EA
210
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
3" 4.0 EA
6" 2.0 EA
8" 5.0 EA
10" 6.0 EA
12" 6.0 EA
16" 3.0 EA
2" 4.00 EA
3" 2.0 EA
6" 1.0 EA
12" 3.00 EA
10" 5.0 EA
3" 1.0 EA
12" 2.0 EA
6" 1.0 EA
4" 1.00 EA
3/4" 66.00 EA
1" 212.00 M
1 1/2" 2.00 M
2" 520.00 M
2" 8.00 EA
1" 24.00 EA
211
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
2" 80.00 EA
1" 4.00 EA
2" 22.00 EA
1"x3/4" 2.00 EA
2"x1 1/2" 2.00 EA
2"x1" 8.00 EA
1" 24.00 EA
2" 84.00 EA
1" 4.00 EA
2" 18.00 EA
1" 24.00 EA
2" 104.00 EA
1" 96.00 EA
2" 516.00 EA
3/4" 38.00 EA
2"x3/4" 66.00 EA
3/4" 66.00 EA
1" 16.00 EA
1 1/2" 2.00 EA
212
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
2" 30.00 EA
1" 42.00 EA
1 1/2" 117.00 EA
2" 108.00 EA
3" 14.00 EA
4" 43.00 EA
8" 20.00 EA
6" 164.00 EA
10" 23.00 EA
12" 193.00 EA
16" 87.00 EA
1.0 Unit
213
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
1.0 Set
1.0 Unit
2.0 Unit
1.0 set
12.0 Unit
2.0 Unit
3.0 Unit
12.0 Unit
6.0 Unit
1.0 Unit
214
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
2.0 Unit
1.0 Unit
2.0 Unit
1.0 Unit
215
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
1.0 Unit
1.0 Unit
1.0 Unit
216
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
1.0 Unit
6.0 Unit
10.0 Unit
2.0 Unit
12.0 Unit
10.0 Unit
217
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
45 Unit
6.0 Unit
82.0 Unit
42.0 Unit
48.0 Unit
34.0 Unit
24.0 Unit
40.0 Unit
12.0 Unit
31.0 Unit
218
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
36.0 Unit
12.0 Unit
8.0 Unit
8 Unit
24.0 Unit
18.0 Unit
920.0 Mtrs
144.0 Mtrs
980.0 Mtrs
468.0 Mtrs
540.0 Mtrs
492.0 Mtrs
156.0 Mtrs
132.0 Mtrs
108.0 Mtrs
1,992.0 Mtrs
312.0 Mtrs
2,688.0 Mtrs
1,176.0 Mtrs
219
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
1,704.0 Mtrs
3,496.0 Mtrs
650.0 Mtrs
1,704.0 Mtrs
1,704.0 Mtrs
1,920.0 Mtrs
1,680.0 Mtrs
1,464.0 Mtrs
440.0 Mtrs
516.0 Mtrs
924.0 Mtrs
1,740.0 Mtrs
44.0 EA
220
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
44.0 EA
18.0 EA
16.0 EA
44.0 EA
44.0 EA
44.0 EA
44.0 EA
36.0 EA
12.0 EA
12.0 EA
8.0 EA
18.0 EA
4.0 EA
12.0 EA
26.0 EA
16.0 EA
221
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
96.0 EA
96.0 EA
43.0 EA
15.0 EA
17.0 EA
46.0 EA
14.0 EA
14.0 EA
34.0 EA
19.0 EA
19.0 EA
2.0 Unit
Mtr
Mtr
Pcs
Pcs
Pcs
36.0 Set
Ea
Mtr
222
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
Mtr
Pcs
Pcs
EA
324.0 m
6.0 EA
9.0 EA
231.0 EA
1,046.0 kg
223
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
192.0 m
1,053.0 m
192.0 m
42.0 EA
24.0 Roll
24.0 Roll
24.0 Roll
24.0 Roll
24.0 Roll
224
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
240.0 EA
240.0 EA
120.0 EA
18.0 Pack
1.00 LOT
, battery for memory backup,
dor), outdoor, Class 1 div 2,
st almunium (body)/
225
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
1.00 LOT
1GB, complete with
wer Point for EWS),
1.00 LOT
tive documents.
em shall be
nt and door).
226
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
1.00 LOT
y parameters, ESD push-
227
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
n safe shutdown
dundant CPU Controller,
nt and door).
228
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
1.00 LOT
nt and door).
229
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
2.00 EA
1.00 EA
1.00 EA
7.00 EA
5.00 EA
1.00 EA
1.00 LOT
230
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
2.00 Set
231
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
1.00 LOT
tanks inventory
232
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
1GB, complete with
wer Point for EWS),
1.00 LOT
1.00 LOT
nt and door).
233
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
1.00 LOT
1.00 LOT
234
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
9.00 EA
10.00 EA
14.00 EA
35.00 EA
42.00 EA
5.00 EA
28.00 EA
1.00 EA
235
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
29.00 EA
35.00 EA
207.00 MTR
9.00 EA
23.00 EA
58.00 EA
35.00 M
23.00 EA
95.00 EA
30.00 EA
95.00 EA
25.00 EA
5.00 M
25.00 EA
25.00 EA
25.00 EA
236
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
78.00 M
35.00 EA
125.00 EA
25.00 EA
125.00 EA
35.00 EA
5.00 M
35.00 EA
35.00 EA
35.00 EA
27.00 EA
8.00 EA
9.00 EA
7.00 EA
2.00 UNIT
237
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
2.00 EA
5.00 EA
5.00 EA
2.00 EA
2.00 EA
1.00 EA
1.00 EA
7.00 EA
4.00 EA
4.00 EA
2.00 EA
238
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
6.00 EA
4.00 EA
1.00 EA
2.00 EA
1.00 EA
1.00 EA
1.00 Set
239
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
3.00 Set
240
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
241
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
2.00 EA
1.00 EA
1.00 EA
1.00 EA
242
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
1.00 EA
1.00 EA
2.00 EA
3.00 EA
6.00 EA
6.00 EA
6.00 EA
iv 2, Gr. IIA, high reliability,
7.00 EA
2.00 EA
243
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
on, Wall Mounted,
5.00 EA
2.00 EA
3.00 EA
2.00 EA
3.00 EA
1.00 EA
ection 1/2" NPT, wall mounted
244
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
245
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
246
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1.00 EA
1,650.00 M
420.00 M
420.00 M
500.00 M
480.00 M
440.00 M
420.00 M
420.00 M
247
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
3,600.00 M
2,600.00 M
2,000.00 M
248
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
1,000.00 M
800.00 M
600.00 M
1,200.00 M
900.00 M
249
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
2,000.00 M
250
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
600.00 M
251
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
100.00 M
10.00 M
10.00 M
4,000.00 M
252
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
168.00 EA
4.00 EA
6.00 EA
4.00 EA
16.00 EA
4.00 Pack
5.00 Pack
4.00 Pack
5.00 Pack
4.00 Pack
6.00 EA
9.00 EA
9.00 EA
9.00 EA
12.00 EA
8.00 Pack
253
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
8.00 Pack
624.00 EA
3.00 Roll
3.00 Roll
108.00 EA
15.00 EA
6.00 EA
4.00 Pack
129.00 EA
5.00 Roll
11.00 EA
254
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
5.00 EA
24.00 EA
24.00 EA
2.00 SET
ection 1/2" NPT.
20.00 EA
20.00 EA
120.00 EA
24.00 EA
255
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
24.00 EA
12.00 EA
12.00 EA
12.00 EA
120.00 EA
120.00 EA
30.00 EA
8.0 SET
256
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
4.0 SET
4.0 SET
1.0 SET
1.0 SET
1.0 SET
257
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
30.0 EA
30.0 EA
4.0 SET
258
RINCIAN RENCANA ANGGARAN BIAYA
UNTUK PEMBANGUNAN TERMINAL LPG PRESSURIZED DUMAI 2 x 3000 MT
HARGA SATUAN
VOLUME MATERIAL JASA
SAT
TOTAL
(X Rp. 1.000) USD (X Rp. 1.000) USD
6.0 EA
8.0 EA
8.0 EA
1 Lot
1 Lot
1 Lot
1 Lot
1 Lot
1 Lot
1 Lot
259
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
260
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
261
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
262
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
263
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
264
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
265
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
266
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
267
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
268
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
269
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
270
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
271
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
272
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
273
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
274
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
275
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
276
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
277
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
278
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
279
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
280
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
281
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
282
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
283
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
284
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
285
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
286
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
287
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
288
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
289
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
290
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
291
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
292
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
293
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
294
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
295
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
296
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
297
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
298
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
299
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
300
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
301
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
302
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
303
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
304
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
305
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
306
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
307
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
308
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
309
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
310
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
311
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
312
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
313
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
314
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
315
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
316
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
317
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
318
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
319
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
320
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
321
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
322
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
323
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
324
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
325
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
326
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
327
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
328
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
329
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
330
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
331
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
332
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
333
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
334
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
335
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
336
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
337
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
338
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
339
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
340
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
341
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
342
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
343
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
344
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
345
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
346
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
347
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
348
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
349
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
350
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
351
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
352
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
353
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
354
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
355
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
356
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
357
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
358
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
359
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
360
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
361
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
362
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
363
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
364
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
365
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
366
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
367
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
368
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
369
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
370
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
371
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
372
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
373
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
374
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
375
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
376
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
377
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
378
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
379
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
380
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
381
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
382
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
383
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
384
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
385
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
386
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
387
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
388
US$ = Rp.
TOTAL HARGA
MATERIAL JASA
(X Rp. 1.000) USD (X Rp. 1.000) USD
389
Sudut 15 Derajat
Perhitungan Gording
L 6m
Jarak C-D
Cos 15 x/r
x 3
r 3.11 M
Jarak D-F
tan 15 y/x
y 0.804 M
Jarak Gording yg direncanakan 1.1 m
3 Buah
Jarak Gording yg sebenernya 1.04 m
Q 11.45 kg/m
Px = q cos 15 11.05 kg/m
Py = q sin 15 2.95 kg/m
Akibat Beban Mati
Mmax1 = 1/8 x q x L2 x 0.8 ( Arah x) 17.67 kgm
Mmax2 = 1/8 x q x L2 x 0.8 ( Arah y) 4.73 kgm
Beban Hidup
P 100.00 kg
Px = P cos 15 96.50 kg 12.1
Py = p sin 15 25.80 kg
Pembebanan
Beban Mati Arah x ( Qx) 11.05 kg/m
Beban Mati Arah Y ( Qy) 2.95 kg/m
Beban Hidup Arah X ( PL x) 96.50 kg
Beban Hidup Arah Y ( PL y) 25.80 kg
Beban Hujan Arah X ( QRx) 28.00 kg/m
Beban Hujan Arah Y ( QRy) 7.49 kg/m
Beban Angin (qW) -18.01 kg/m
4 B1 B4
4 B2 B5
Kombinasi Pembebanan
Akibat Beban Tetap
M= M Beban Mati + M Beban Hidup 4 B3 B6
Mx = Mx1 + Mx2
Mx #REF! kgm 3 3
My = My1 + My2 6
My #REF! kgm
Kontrol Tegangan
Akibat Beban Mati + Hidup
Kontrol Lendutan
14.11 m
BA 1
P1 3.165 Ton
P2 6 Ton
RA Ton