OFFICE OF THE BUILDING OFFICIAL

Municipal Engineer's Office

Name of Owner:
Title of Project:
Location:

CHECKLIST OF BUILDING/FENCING PERMIT REQUIREMENTS

3 cps Lot Plan (w/ Certification of a GE that the proposed


building will not encroach adjoining properties)
6 cps Site Development Plan (including the setback/yard
distances at the front, sides & back w/ Perspective)
5 sets Building Plans/Fencing Plan (3 sets)
Architectural Electrical
Structural Mechanical
Sanitary/Plumbing
5 cps Bill of Materials & Cost Estimates
5 cps Specifications
5 cps Title of property (TCT)
5 cps Deed of Sale/Lease Contract/Contract to Sell
(If the TCT is not in the name of the owner/applicant)
5 cps Tax Declaration and Certificate of Tax Payment (latest)
1 pc. Construction Logbook
2 cps Zoning Clearance
2 cps Fire Clearance
5 cps Application Forms (Bldg., San/Plumbing, Elec'l, Mech'l.)
2 cps Structural Design Computations w/ seismic analysis w/c
conform to the latest NSCP (for 2 storey and above or 1
storey w/ attic/mezzanine/roof deck/penthouse)
2 cps Plate Load Test Analysis (for 3 storeys or 2 storeys w/
attic/mezzanine/roof deck/penthouse)
2 cps Soil Bearing Test Result (for 4 storeys or 3 storeys w/
attic/mezzanine/roof deck/penthouse)
2 cps ECC/ENRO Clearance (for Commercial & Industrial)
2 cps DOLE Clearance (for Industrial Bldgs.)
2 cps HIGHWAY CLEARANCE from DPWH District Office
for lot along National Highway
2 cps Notice to the adjoining owners
2 cps Certification from Barangay Captain
3 cps Application Forms for Fencing Permit
2 cps Photocopy of PRC ID's concern in the application together
with their latest PTR Receipt and 3 specimens of the Prof'l.
Signatories.
NOTE: Provision for Batas Pambansa Blg. 344 (Accessibility Law for
Disabled Persons) should be reflected on the plan of the ffg.type
of building:
a. multiple dwelling Unit d. Industrial
b. High Rise Condominium e Institutional
c. Commercial

;REQUIREMENTS FOR CERTIFICATE OF OCCUPANCY

1 Application for Certificate of Occupancy.


2 Logbook with the Approved Building Plan
3 As-built Plans duly signed & sealed by the Engineer/Architect
In-Charge of the Construction
4 Certificate of Completion duly accomplished by Civil Engineer/
Architect In-Charge of the Construction
5 Fire Safety Certificate

ENGR.LEONCIO B. MOTA
Building Official