Job Title: Street Light foundation Date of Job Analysis:18-05-2019

Projects: BSH HOUSE HOLD APPLIANCES Reference No: 01

Analyst/ Reviewer: PTK / BSH

Description of Job : Street Light foundation

Sequence of job steps Risks identified Precautions advised Responsible


persons

Working outdoors  Heat Stress  Drink plenty of Site Engineer &


Safety officer
water, drinks as
needed.
 Wear cotton cloths
.

Area marking for street  Unwanted material


light foundation  Marking area Site Engineer &
proper cleaning Safety officer
and
housekeeping

Use of hand tools –  Eye injury;


General  Lacerations and  Wear eye protection
hand injuries when using Site Engineer &
hand/power tools Safety officer
which cause flying
debris.
 Tools must be in
good condition and
used for their
intended purpose;
 Wear appropriate
hand protection;
observe good work
practices in ensuring
that work gloves are
in good condition.
 Slip and trip
By using manually hazards  provide
drilling up to 5 feet, in the  Ergonomic SOP,work permit
location. hazards ,Trainings
 Poor posture  competent Site Engineer &
Safety officer
 Dust hazards person , PPE’s

Excavation  Property Damage  Completed mark-


outs of utilities and
excavation permit
 Electrocution prior to start of Site Engineer &
excavation work Safety officer

 Confirm location of
all utilities within
excavation area by
hand digging
 Keep non-essential
personnel away
from work activities
 Wear proper PPE.

 Removed soil to
 Soil collapse
Removed soil to be be 1 m keept if Site Engineer &
cleared in the area by from foundation Safety officer
manually.

 Provide the ppe


 Chemical hazards
Reinforcement to be such us( helmet ,
 Inhalation
made separately and insert jacket , safety
hazards
the same while doing the shoe and gloves)
concrete  dermatitis welfare facility
And making shuttering for the hazards jop rotation ,
concrete by manually. water facility

 Provide dust
By hand mix the concrete  Inhalation mask
hazards
will be poured in the  Full hand rupper
foundation  dermatitis gloves Site Engineer &
hazards Safety officer
 Frequent break
 Slip and trip
hazards
 Poor posture

Site Engineer &


Safety officer
After 8 hours the  Slip and trip  Provide safe
shuttering will be removed. hazards system of work
 Erconamic ,work permit
hazards Hira , JST
 Dust hazards
 Manual hazards

Suggested safe system of work:

Suggested Review date: (if required)

Suggested further job safety instructions: (if required)

Suggested training programs: (Tool Box Talks)

Signed By: Approved By