McMillan Slow Sand Filtration Redevelopment

Traffic Control Plan Proposal


Site Preparation Phase
Presented to:

Area Neighborhood Commission (ANC) 5E

May 21, 2019

1
Agenda

1. Project Location
2. Proposed First Street Road Closure
3. Proposed Sidewalk Closure
4. Proposed Detour for Traffic Flow
5. Proposed Construction Gates
6. Bus Stop Locations
• Bus Stop relocation on the North part of the portion
• Bus Stop relocation on the middle of the project
• Bus Stop relocation on the South Part of the project
7. 6) Fire hydrants

2
1). Project Location

3
1). Proposed First Street Road Closure

 “DO NOT TURN” signs will be placed at the


intersection of First Street/Michigan Ave. and
Channing/First Street to prevent traffic from turning
onto First Street.
North
 Redirect First Street traffic to a “ONE WAY” from
Channing to Bryant Street.

North Capital St
1st St NW

Central
 Project Location

 Road Close to all Traffic


South
 Road Closed to the public except to
Corps of Engineers

Channing St NW

Bryant St NW

4
2). Proposed Sidewalk Closure

 The sidewalk along the west side of 1ST St will


remain open at all the times.
North

 The sidewalk along the north side of Michigan


Ave. will remain open at all times.

North Capital St
 The sidewalk along East side of North Capitol will
1st St NW

Central
remain open at all the times.

South  Project Location

Channing St NW  Sidewalk Closure

Bryant St NW

5
3). Proposed Detour for Traffic Flow

 Detour Traffic – Traveling to the South.


Irving St. • South on 1st St. – west on Michigan Ave. – south
on North Capital St. – east on Channing St. – and
south on 1st St.
1st St.

 Detour Traffic – Traveling to the North.


• West on Bryant St. – north on North Capital St. exit
Irving St. – south on 1st St.
North Capital St

North Parcel

Central Parcel

South Parcel

 Project Location
Channing St.  Proposed Detour to the South.
 Proposed Detour to the North.
Bryant St.

6
4). Proposed Construction Gates

 Four proposed construction gates on 1st St. (1,2,3 & 4)


1 North Parcel
5
 Two proposed construction gates on North Capital (5 &6)
2

North Capital St
3
Central Parcel  Construction Gates
1st St NW

 Project Location

4
6
South Parcel

Channing St NW

Bryant St NW

7
5). Existing-Bus Stop Location

Looking west near Michigan Ave. &


1st St. intersection.
North Parcel Looking west near North Capital St.  No bus stop along 1st St. between
Michigan and Channing Street.
 5 bus stops around the project site.

Looking North on Capital St..

Central Parcel

Looking North on Capital St..

South Parcel  Project


Location

 Existing Bus
Stop

Looking South on Capital St..

8
 Bus Stop Closure – North Parcel

 Temporarily close the bus stops at MICHIGAN AVE


NW + 1ST ST NW during the project duration.
North Parcel
 Temporary close the bus stop at NORTH CAPITOL ST
+ GIRARD ST NE

 Bus Stop MICHIGAN AVE NW + N CAPITOL ST NW is

North Capital
always open
Central Parcel
1st St.

South Parcel  Project Location

 Existing Bus Stop – No Change.


Channing St.
 Temporarily – Close.
Bryant St.

9
 Bus Stop Closure – Central Parcel

 Temporarily close the bus stop at NORTH CAPITOL


ST + DOUGLAS ST

North Parcel

North Capital
Central Parcel
1st St.

 Project Location

 Existing Bus Stop – No Change.


South Parcel
 Temporarily – Close.

Channing St.

Bryant St.

1
10
 Bus Stop Closure – South parcel

 Temporarily close the bus stop at N CAPITOL ST NW +


CHANNING ST NW

North Parcel

North Capital
Central Parcel
1st St.

 Project Location
South Parcel
 Existing Bus Stop – No Change.

Channing St.  Temporarily – Close.

Bryant St.

11
6). Fire Hydrants

 2 Fire hydrants on the same side of


North Parcel
Michigan Avenue.
 10 Fire hydrants around the project on the
opposite side of the street.
 No fire hydrants along 1st St. between
Michigan & Channing St.
Central Parcel

 Project Location
South Parcel
 Fire Hydrants

12