Professional Documents
Culture Documents
2019.05.13 A0-00
DATE:
SITE SURVEY 2019.05.13 A0-01
DATE:
SITE SURVEY 2019.05.13 A0-02
DATE:
LOCATION MAP 2019.05.13 A0-03
DATE:
CONTEXT - AERIAL VIEWS 2019.05.13 A0-04
DATE:
CURRENT COLOR PHOTOGRAPHS 2019.05.13 A0-05
DATE:
CURRENT COLOR PHOTOGRAPHS 2019.05.13 A0-06
DATE:
CURRENT COLOR PHOTOGRAPHS 2019.05.13 A0-07
DATE:
CURRENT COLOR PHOTOGRAPHS 2019.05.13 A0-08
DATE:
CURRENT COLOR PHOTOGRAPHS 2019.05.13 A0-09
DATE:
CURRENT COLOR PHOTOGRAPHS 2019.05.13 A0-10
BOUNDARY AND TOPOGRAPHIC SURVEY
3 STORY BUILDING
MIAMI BEACH CONVENTION CENTER
OF MIAMI BEACH, FL 33139
1901 CONVENTION CENTER DRIVE CITY
( NOT SUBDIVIDED)
NOT A PART OF
THIS SURVEY
NOT A PART OF
THIS SURVEY
APPARENT USE
BY OTHERS
( NOT SUBDIVIDED)
( NOT SUBDIVIDED)
APPARENT USE
BY OTHERS
APPARENT USE
BY OTHERS
DATE:
EXISTING CONDITIONS 2019.05.13 A0-11
FLOOR PLAN
DATE:
EXISTING CONDITIONS 2019.05.13 A0-12
ELEVATION
DATE:
DEMOLITION PLAN 2019.05.13 A0-13
DATE:
DEMOLITION ELEVATION 2019.05.13 A0-14
1 of 2 2 of 2
Planning Department, 1700 Convention Center Drive Planning Department, 1700 Convention Center Drive
Miami Beach, Florida 33139, www.miamibeachfl.gov Miami Beach, Florida 33139, www.miamibeachfl.gov
305.673.7550 305.673.7550
MULTIFAMILY - COMMERCIAL - ZONING DATA SHEET 42 # of parking spaces per level (Provide a
separate chart for a breakdown
ITEM calculation) N/A N/A N/A
Zoning Information
# 43 Parking Space Dimensions 8.5' x 16' (Valet) N/A 8.5' x 16' (Valet)
1 Address: 1701 Convention Center Drive 44 Parking Space configuration
2 Board and file numbers : N/A (45o,60o,90o,Parallel) 90 N/A 90
3 45 ADA Spaces 6 N/A 6
Folio number(s): 02-3227-000-0090
46 Tandem Spaces Per CCC N/A 320
4 Year constructed: N/A Zoning District: CCC Civic and Cenvention Center District
47 Drive aisle width 22' N/A 22'
5 Based Flood Elevation: AE 8 Grade value in NGVD: 8
48 Valet drop off and pick up N/A N/A yes
6 Adjusted grade (Flood+Grade/2): 9' NGVD Lot Area: 110,884 sf
49 Loading zones and Trash collection areas 4 *** N/A 4
7 Lot width: 350' Lot Depth: 318'
50 Bicycle parking, location and Number of
8 Minimum Unit Size N/A Average Unit Size N/A
racks N/A N/A yes
9 Existing use: Parking Proposed use: Hotel
DATE:
ZONING DATA 2019.05.13 A0-15
AREA OF CARL FISHER
CLUB HOUSE : 5,884 SF
Lot area ( not including Convention Center Drive) = ~1,578,800 SF x 2.75 = 4,341,700 SF (Max FAR)
Area of new Convention Center (based upon DRB file) = 1,450,000 SF
Area of Gleason Theater (estimated as noted above) = 123,000 SF
Area of Carl Fisher Club House = ~5,884 SF
Remaining available F.A.R. = (4,341,700 - 1,450,000 - 123,000 - 5,884) = 2,762,816 SF
DATE:
OVERALL FAR CALCULATION 2019.05.13 A1-16
BRIDGE 2 SERVICE ROAD (REAR) TO 2ND FLOOR 2
ABOVE CONVENTION CENTER
350' SKYBRIDGE 350'
5'-8" 17'-9"
3'-0"
1,833 SF
BOH BOH
FRONT HOUSE CIRC 1193 SF CIRCULATION 5954 SF
FRONT HOUSE
28'-5"
BAR
10'-0"
1475 SF
STAIR
5'
STAIR 2
CANOPY BELOW
MEETING
(SIDE, INTERIOR)
LUGGAGE
DROP-OFF
860 SF
BYPASS W
LOADING
PROPOSED
LOADING DOCK CIRCULATION 5954 SF
BOH
BOH
18'-0"
1 1 1 5408 SF 1
1439SF
318'
7'-6"
8'-1"
MEP
2307 SF
21'-8"
MEP
22'-0"
9'-10" 16'-2" WOMEN'S
UP
CIRC STORAGE LOCKERS
21'-0"
DN
DM
BOH 1180 SF
DN
UP
CIRC. 1081 SF
876 SF RETAIL
GROUND FLOOR M
ELECT UP
23205NAVD
SF7'-5
3
23'-0"
30'-11"
DN
UP
STAIR
CARS
94'-6"
22'-0" CARS
TRASH
CIRC CIRCULATION
1468 SF 22'-0" 320 SPACES (6 ADA)
DN
UP
1237 SF
58'-0"
22'-0"
22'-0"
81'-0" CAR CHARGING PORTS
11'-11" 10'-0" 3'-11" 23'-0" 7'-0"
DN
UP
P T
STAIR
RETAIL BOH
4"
3 2758 SF
7'-
10'-
5'-0"10'-0"6'-0" 21'-11"
LEVEL 1 LEVEL 2
FRONT HOUSE: 23,275 SF CIRCULATION : 870 + 1,546 + 2,029 + 1,237 + 5,954 + 1,180 = 12,816 SF
BOH: 1,193 + 1,081 + 2,758 = 5,032 SF BOH : 5,954 + 1,763 + 5,408 + 2,443 + 2,307 + 1,439 = 19,314
RETAIL: 23,514 + 2,157= 25,671 SF MEETING : 15,751 SF
CIRCULATION: 793 + 1,481 + 1,475 + 1,468 + 876 = 6,093 FRONT HOUSE: 16,180 SF
SKYBRIDGE : 1,833 SF
TOTAL GSF ACCOUNTABLE: 60,071 SF
TOTAL GSF ACCOUNTABLE: 65,894 SF
DATE:
FAR DIAGRAM 2019.05.13 A0-17
BRIDGE
BELOW
BRIDGE BELOW 2
350' 350'
STAIR
6'-0"
UP DOWN
CIRC 3740 SF
5'-0"
COFFEE FRONT HOUSE PRE-FUNCTION
10'-0"
10'-0"
OPEN TO BELOW
32771 SF
EVENT
MAN.
STAIR
STAIR
OPEN TO BELOW
BALLROOMS
PLATING
52178 SF KITCHEN OPEN TO BELOW
ENGINEERING STAFF
BREAK
ROOM
BOH BOH
1 1 12658 SF
9761 SF
318'
318'
MOVABLE AIRWALL
CIRCSTAIR
745 SF STORAGE
RESTROOMS
STAIR 2882 SF STAIR 4
OPEN TO BELOW
MEP
377 SF CIRC
1731 SF
DN
UP
BOH
966 SF CIRC
1485 SF
DN
UP
PRE-FUNCTION
COFFEE OPEN TO BELOW
BALCONY
616 SF
FRONT HOUSE : 32,771+ 2,882 = 35,653 SF CIRCULATION 775 + 1,133 + 3,740 + 1,731 + 377 = 7,756 SF
BOH : 9,761 SF OFFICE 1,961 + 1,807 = 3,768 SF
BALLROOM : 52,178 SF BOH 12,658 SF
CIRCULATION : 775 + 3,359 + 745 + 1,485 = 6,364 SF
BALCONY : 616 SF TOTAL GSF ACCOUNTABLE: 24,182 SF
DATE:
FAR DIAGRAM 2019.05.13 A0-18
BRIDGE 2 2
BELOW
350' 350'
0'
CIRC CIRC CIRC UNITS
M W 1125 SF
870 SF
STAIR
BOH 820SF 14259 SF STAIR
1580 SF STAIR
STAIR
CIRC 4574 SF
FRONT HOUSE CIRC
29532 SF 1639 SF MTG
BOH
STAIR
STAIR
MTG 5268 SF
MTG
BOH
MTG 3490 SF MEETING KITCHEN
MEETING 5069 SF
AV / AC
POOL DECK
2835 SF
OPEN TO BELOW FITNESS &
MTG MINI SPA
1 MTG 1 1 1
318'
318'
MOVABLE AIRWALL
MTG MTG CIRC
377 SF M
STAIR
BOH FRONT OF
CIRC HOUSE
501 SF 338SF MEETING MTG
OPEN TO BELOW 1324 SF STAIR
20042SF W
FRONT RESTAURANT
HOUSE CIRC POOL & BAR CIRC
781 SF 1161 SF 1178 SF
LOUNGE
AREA
STAIR
MEETING BAR/
6880 SF LOUNGE
MTG MTG MTG MTG MTG AREA
2 2
LEVEL 4 LEVEL 5
DATE:
FAR DIAGRAM 2019.05.13 A0-19
2 2
350' 350'
0'
0'
CIRC CIRC
UNITS UNITS 413SF UNITS UNITS
413SF 1224 SF BOH
14677 SF 1224 SF 14630 SF
STAIR STAIR 341 SF
BOH
780 SF
CIRC 3043 SF CIRC 3257 SF
OPEN TO
BELOW
OPEN TO
BELOW
1 1 1 1
318'
318'
UNITS
OPEN 16149 SF
TO
BELOW
5'
OPEN TO
BELOW CIRC CIRC 335 SF
1514 SF
22'-0"
22'-0"
STAIR
2 2
LEVEL 6 LEVEL 7
HOTEL UNITS : 14,677+ 1,224 = 15,901 SF HOTEL UNITS : 14,630 + 16,149 + 1,224 = 32,003 SF
CIRCULATION : 413 + 3,043 + 1,514 = 4,970 SF CIRCULATION : 413 + 3,257 + 335 = 4,005 SF
BOH : 341
TOTAL GSF ACCOUNTABLE: 20,871 SF
TOTAL GSF ACCOUNTABLE: 36,349 SF
DATE:
FAR DIAGRAM 2019.05.13 A0-20
2 2
350' 350'
0'
CIRC CIRC
413SF UNITS UNITS 413SF UNITS UNITS BOH
14688 SF 1224 SF BOH 14731 SF 1224 SF
341 SF 341 SF
1 1 1 1
318'
318'
UNITS UNITS
15839 SF 16212 SF
5'
22'-0"
22'-0"
2 2
LEVEL 8 LEVEL 9
HOTEL UNITS : 14,688 + 15,839 + 1,224 = 31,751 SF HOTEL UNITS : 14,731 + 16,212 + 1,224 = 32,167 SF
CIRCULATION : 413 + 3,257 + 335 = 4,005 SF CIRCULATION : 413 + 335 + 3,257 = 4,005 SF
BOH : 341 BOH : 341
DATE:
FAR DIAGRAM 2019.05.13 A0-21
2 2
350' 350'
0'
CIRC CIRC
413SF UNITS UNITS 413SF UNITS UNITS BOH
14838 SF 1224 SF BOH 14861 SF 1224 SF
341 SF 341 SF
1 1 1 1
318'
318'
UNITS UNITS
15927 SF 16246 SF
22'-0"
22'-0"
2 2
LEVEL 10 LEVEL 11
HOTEL UNITS : 14,838 + 15,927 + 1,224 = 31,989 SF HOTEL UNITS : 14,681 + 16,246 + 1,224 = 32,331 SF
CIRCULATION : 413 + 3,257 + 335 = 4,005 SF CIRCULATION : 413 + 3,257 + 335 = 4,005 SF
BOH : 341 BOH : 341
DATE:
FAR DIAGRAM 2019.05.13 A0-22
2
2
350'
350'
0'
0'
CIRC CIRC
UNITS 413SF UNITS UNITS BOH
413SF UNITS BOH 14579 SF 1224 SF
14540 SF 1224 SF 341 SF
341 SF
1 1
1 1
318'
318'
UNITS UNITS
16359 SF
16301 SF
5'
5'
22'-0"
22'-0"
2
2
LEVEL 12 LEVEL 13
HOTEL UNITS : 14,540 + 16,301 + 1,224 = 32,065 SF HOTEL UNITS : 14,579 + 16,359 + 1,224 = 32,162 SF
CIRCULATION : 413 + 3,257 + 335 = 4,005 SF CIRCULATION : 413 + 3,257 + 335 = 4,005 SF
BOH : 341 BOH : 341
DATE:
FAR DIAGRAM 2019.05.13 A0-23
2
2
350'
350'
0'
0'
CIRC CIRC
UNITS UNITS 413SF UNITS UNITS BOH
413SF BOH 15071 SF 1224 SF
14625 SF 1224 SF 341 SF
341 SF
1 1
1 1
318'
UNITS UNITS
16141 SF
16101 SF
5'
5'
22'-0"
22'-0"
2
2
LEVEL 14 LEVEL 15
HOTEL UNITS : 14,625 + 16,101 + 1,224 = 31,950 SF HOTEL UNITS : 15,071 + 16,141 + 1,224 = 32,436 SF
CIRCULATION : 413 + 3,257 + 335 = 4,005 SF CIRCULATION : 413 + 3,257 + 335 = 4,005 SF
BOH : 341 SF BOH : 341
DATE:
FAR DIAGRAM 2019.05.13 A0-24
2 2
350' 350'
0'
0'
CIRC CIRC
413SF UNITS UNITS 413SF UNITS UNITS BOH
15125 SF
BOH 15187 SF 1224 SF 268 SF
1224 SF 341 SF
W
UNITS
5379 SF
1 1 1 1
318'
318'
BOH
889 SF
UNITS
16191 SF
5'
2 2
LEVEL 16 LEVEL 17
HOTEL UNITS : 15,125 + 16,191 + 1,224 = 32,540 SF HOTEL UNITS : 15,187 + 5,379 + 1,224 = 21,790 SF
CIRCULATION : 413 + 3,257 + 335 = 4,005 SF CIRCULATION : 425 + 5,483 + 353 = 6,261 SF
BOH : 341 SF BOH : 268 + 1,365 + 889 = 2,522 SF
DATE:
FAR DIAGRAM 2019.05.13 A0-25
2 2
350' 350'
CIRC. MECHANICAL
414 SF 1875 SF
ELEV
OVER RUN
FILMORE LOADING
FILMORE LOADING
ELEV OVER
RUN BELOW
1 1 1 1
318'
318'
ROOF LEVEL
3
NAVD 196'-516 " LOWER ROOF
SLAB BELOW
1 1
2 2
3 3
4 4
5' 5 5
6 6
7 7
2 2
DATE:
FAR DIAGRAM 2019.05.13 A0-26
TOTAL FAR PROVIDED
UPPER ROOF 0 SF
ROOF 2, 289 SF
LEVEL 17 30,573 SF
LEVEL 16 36,886 SF
LEVEL 15 36,782 SF
LEVEL 14 36,296 SF
LEVEL 13 36,508 SF
LEVEL 12 36,411 SF
LEVEL 11 36,677 SF
LEVEL 10 36,335 SF
LEVEL 9 36,513 SF
LEVEL 8 35,097 SF
LEVEL 7 36,349 SF
LEVEL 6 20,871 SF
LEVEL 5 46,518 SF
LEVEL 4 57,125 SF
LEVEL 3M 24,182 SF
LEVEL 3 104,572 SF
LEVEL 2 65,894 SF
LEVEL 1 60,071 SF
DATE:
FAR DIAGRAM 2019.05.13 A0-27
DATE:
CONTEXT LOCATION PLAN 2019.05.13 A1-00
CCC DISTRICT
0' 10' 20' 50' 100'
DATE:
SITE PLAN 2019.05.13 A1-01
SETBACK DIAGRAM
0' 10' 20' 50' 100'
DATE:
RENDERED SITE PLAN 2019.05.13 A1-02
0' 10' 20' 50' 100'
DATE:
GROUND LEVEL 2019.05.13 A1-03
0' 10' 20' 50' 100'
DATE:
LEVEL 02 - PARKING 2019.05.13 A1-04
0' 10' 20' 50' 100'
DATE:
LEVEL 03 - BALLROOM 2019.05.13 A1-05
0' 10' 20' 50' 100'
DATE:
LEVEL 03 - MEZZANINE 2019.05.13 A1-06
0' 10' 20' 50' 100'
DATE:
LEVEL 04 - MEETING ROOMS 2019.05.13 A1-07
0' 10' 20' 50' 100'
DATE:
LEVEL 05 - POOL DECK 2019.05.13 A1-08
0' 10' 20' 50' 100'
DATE:
LEVEL 06 2019.05.13 A1-09
0' 10' 20' 50' 100'
DATE:
LEVEL 07 2019.05.13 A1-10
0' 10' 20' 50' 100'
DATE:
LEVEL 08 2019.05.13 A1-11
0' 10' 20' 50' 100'
DATE:
LEVEL 09 2019.05.13 A1-12
0' 10' 20' 50' 100'
DATE:
LEVEL 10 2019.05.13 A1-13
0' 10' 20' 50' 100'
DATE:
LEVEL 11 2019.05.13 A1-14
0' 10' 20' 50' 100'
DATE:
LEVEL 12 2019.05.13 A1-15
0' 10' 20' 50' 100'
DATE:
LEVEL 13 2019.05.13 A1-16
0' 10' 20' 50' 100'
DATE:
LEVEL 14 2019.05.13 A1-17
0' 10' 20' 50' 100'
DATE:
LEVEL 15 2019.05.13 A1-18
DATE:
LEVEL 16 2019.05.13 A1-19
DATE:
LEVEL 17 2019.05.13 A1-20
DATE:
ROOF PLAN 2019.05.13 A1-21
DATE:
UPPER ROOF PLAN 2019.05.13 A1-22
A2-08
3'-0"
10' PLANTER
UP DN
UP
34'-11"
33'-2"
GRAB & GO
31'-5"
CHECK-IN DN UP
10' SIDEWALK
UP
UP
5' PLANTER
9' PLANTER
111'-1"
LOBBY LOUNGE / BAR
GROUND FLOOR
3
21,100 SF
BAR BFE+1 NAVD 7'-5 16 "
51'-9"
TERRACE
5'
STAIR 2
FILMORE LOADING
18'-6" 56'-1"
10'-2"
TERRACE
46'-9"
LUGGAGE
DROP-OFF
22'-0"
22'-0"
DRIVEWAY
810 SF
SLOPE 5%
BYPASS
LOADING
15'-0"
15'-0"
19'-0"
A2-06 A2-07
6'-0" 17'-2"
157'-7"
8'-1" 18'-0"
18'-0"
DRIVEWAY
1 SLOPE 5%
M 1
318'
TERRACE
88'-3"
10'-0"
1 14
W
27'-9"
3 12 16
10'-8" DN 24'-2"
UP
(SIDE, INTERIOR)
4 11 17
133'-2"
94'-6"
43'-1"
CARS
117'-0"
73'-4"
5 10 18
13'-10" TRASH 6 19
9
BIKE RACKS
7 22'-0"
UP
8 20
11'-10" RETAIL 21
23,100 SF
22'-0"
81'-0" 22
DN
P T 24'-2"
MIAMI BEACH WELCOME 74'-2"
4"
3 3
34'-11"
22' TERRACE
22'-2"
7'-
10'
CENTER/HOTEL ACCESS USE
39'-10"
22'-9"
DRIVEWAY
SLOPE 5%
-0"
1,500 SF GEN. ELECT. FPL
25'-7"
20'-8"
"
'-6
ALIGN
25
6' PLANTER
10' SIDEWALK
5' PLANTER
22'-10" 84'-0"
263'-10" A2-05
2
17TH STREET (FRONT)
DATE:
B/W PLAN 2019.05.13 A1-23
GROUND LEVEL
TO 2ND FLOOR 2
CONVENTION CENTER
350'
UP DN
DOWN UP
PANTRY
DN UP
DOWN UP
62'-10"
55'-7" 33'-2"
1'
43'-11"
39'-1" 40'-11" 43'-11" 67'-1"
28'-5"
PRE-FUNCTION
9'-9"
17'-10"
15,000 SF
82'-0"
16'
5'
STAIR 2
CANOPY BELOW
FILMORE LOADING
68'-5" 61'-4" 65'-7" 60'-11" 7'-4" 36'-8" 12'-0" 26'-11"
8'-6" M MEN'S
MEETING SPACE MEETING SPACE MEETING SPACE MEETING SPACE LOCKERS
46'-1"
3,936 SF 3,500 SF 3,780 SF 3,520SF 2,160SF
57'-7"
VALET PARKING SPACE DIMENSION W
11'-3"
LEVEL 2
3
NAVD 24'-5 16 "
1 29'-8" PANTRY 1
22'-0" STORAGE PANTRY 27'-8"
318'
1,798 SF 500 SF
MEP
WOMEN'S
UP
LOCKERS
DN
15
DN
UP
2,420 SF
1 14
UP 22'-0" 2 13
91'-5"
3 12 16
DN
DN
UP
4 11 17
94'-6"
12'-0" 5'-0" CARS 5 10 18
6 19
18'-0"
9
7 22'-0"
DN
UP
8 20
320 SPACES (6 ADA) 21
2% SPACES HAVE ELECTRIC
22'-0"
22'-0"
22'-0"
81'-0" 22
CAR CHARGING PORTS
DN
UP
69'-4"
31'-11"
MEP
DATE:
B/W PLAN 2019.05.13 A1-24
LEVEL 02 - PARKING
OUTLINE OF CONVENTION CENTER
BRIDGE BELOW 2
350'
0'
UP DN
DOWN
34'-2"
UP
DN UP
62'-8"
12'-2" 28'-1"
COFFEE
10'-0"
35'-2"
100 OCCS PRE-FUNCTION
EVENT
MAN.
5'
STAIR 2
FILMORE LOADING
5'-0" 26'-2"
51'-8"
79'-0"
242'-9"
103'-1"
25,000 SF 3,500 SF
MAIN BALLROOM PLATING KITCHEN
/ 7 NET = 3,572 OCCS / 100 GROSS
DN
UP
1 = 33 OCCS 1
LEVEL 3
318'
3
NAVD 38'-5 16 "
DN
UP
20'-3"
19'-9"
AIRWALL 4,900 SF M
15
DN
UP
56'-0"
1 14
242'-9" 12'-0" 51'-5"
2 13
W 3 12 16
DN
UP
4 11 17
20,000 SF
94'-6"
CARS
82'-7"
20'-10"
5 10 18
MAIN BALLROOM 6 19
9
/ 7 NET = 2,858 OCCS 12'-1" 7 22'-0"
DN
UP
8 20
21
22'-0"
STORAGE 81'-0" 22
DN
UP
PRE-FUNCTION
COFFEE
35'-9"
36'-4"
31'-10"
100 OCCS
BALCONY
DATE:
B/W PLAN 2019.05.13 A1-25
LEVEL 03 - BALLROOM
OUTLINE OF CONVENTION CENTER
BRIDGE
BELOW
350'
0'
UP DN
GM OFFICE ACCOUNTING
34'-2"
DN UP
1,875 SF 1,600 SF
6'-0"
62'-8"
5'-0"
10'-2" 30'-1"
10'-0"
35'-2"
OPEN TO BELOW
5'
STAIR 2
5'-0" 26'-2"
188'-11"
STAFF
25,000 SF BREAK
MAIN242'-9"
BALLROOM ROOM
5,300 SF
103'-1"
OPEN TO BELOW
ENGINEERING
318'
3,200 SF
OPEN TO BELOW
MOVABLE AIRWALL
20'-3"
19'-9"
15
DN
UP
1 14
STAIR 4
8'
242'-9" 27'-0" 6'-5" 30'-1"
2 13
3 12 16
DN
UP
4 17
MEP 11
98'-11"
OPEN TO BELOW
82'-7"
ELEV. TOP 5
3,550SF 10 18
6 9 19
26'-4" 7 23'-0"
DN
UP
8 20
21
81'-0" 22
23'-0"
UP
DN
23
45'-11"
36'-4"
31'-10"
OPEN TO BELOW
DATE:
B/W PLAN 2019.05.13 A1-26
LEVEL 03 MEZZANINE
OUTLINE OF CONVENTION CENTER
BRIDGE 2
BELOW
350'
UP DN
26'-5"
M W DOWN
18'-0"
DN UP
9'-0"
83'-8" 114'-6" 46'-10" 19'-4"
36'-5"
11'-0" 24'-10"
10'-0"
LEVEL 4
37'-10"
3
NAVD 56'-5 16 " MTG
23'-10" 8'-0"
5'
STAIR 2
FILMORE LOADING
MTG
30'-4"
27'-3"
MTG
27'-9" 10'-4" 25'-6"
2,000 SF
AV / AC
242'-9"
MTG
27'-6"
77'-7"
MTG
32'-6"
MTG OPEN TO BELOW
27'-6"
27'-9"
1 MTG 1
318'
213'-1"
27'-6"
MTG MTG
39'-3"
MTG
STAIR 4
15
DN
UP
8'
26'-1"
MTG
STO.
1 14
10'-8"
2 13
242'-9" 3 12 16
45'-3"
MTG
DN
UP
25'-2"
MTG 4 11 17
94'-6"
M OPEN TO BELOW 10'-4" 5 10 18
36'-5"
6 9 19
7 22'-0"
DN
UP
8 20
W LOUNGE 21
21'-2" AREA
22'-0"
81'-0" 22
DN
UP
73'-7"
8'-11"
55'-5"
BAR/
31'-11"
153'-5" 91'-7"
LOUNGE
28'-1"
MTG MTG MTG MTG MTG AREA
DATE:
B/W PLAN 2019.05.13 A1-27
LEVEL 04 - MEETING
OUTLINE OF CONVENTION CENTER
2
350'
0'
32'-2"
13'-0" UP DN
1 2 3 4 5 6 7 8 9 10 11 12 13
DN
STAIR 2
29'-0"
1S STD STD STD STD STD STD STD STD STD STD STD STD STD
SUITE 370SF 370SF 370SF 370SF 370SF 370SF 370SF 370SF 370SF 370SF 370SF 370SF 370SF 8'-0"10'-8"
HK
DN UP
793 SF
DN
UP
25'-11"
9'-0"
6'-0"
M
10'-0"
2S 14 15 16 17 18 19 20 21 22 23 24 25
SUITE STD STD STD STD STD STD STD STD STD STD STD STD
793 SF 370SF 370SF 370SF 370SF 370SF 370SF 370SF 370SF 370SF 370SF 370SF 370SF W
FILMORE LOADING
40'-8"
121'-5"
LEVEL 5 KITCHEN
3
NAVD 71'-5 16
95'-3"
"
4,800 SF
FITNESS & MINI SPA
6,000 SF
67'-6"
1 1
318'
REST
ROOMS
15
DN
UP
78'-0"
1 14
11' 3 MEAL . 2 13
RESTAURANT REST 3 12 16
4 11 17
94'-6"
9,250 SF 5' 5 18
74'-3" 25'-6" 10
POOL 6 9 19
12,320 SF 7 22'-0"
DN
UP
8 20
144'-10"
21
22'-0"
81'-0" 22
DN
UP
12'
DATE:
B/W PLAN 2019.05.13 A1-28
LEVEL 05 POOL DECK
OUTLINE OF CONVENTION CENTER BELOW
2
350'
0'
32'-2"
1 2 3 13'-0"
4 5 6 7 8 9 10 11 12 13 14 15 16 17
1S
29'-0"
SUITE STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD
793 SF 370 SF 380 SF 380 SF 380 SF 380 SF 380 SF 380 SF 380 SF 380 SF 380 SF 380 SF 380 SF 380 SF 380 SF 380 SF 380 SF 380 SF 8'-0"10'-8"
25'-11"
HK
9'-0"
6'-0"
18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
2S
10'-0"
SUITE STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD LEVEL 6
3
793 SF 370 SF 370 SF 380 SF 380 SF 380 SF 380 SF 380 SF 380 SF 380 SF 380 SF 380 SF 380 SF 380 SF 380 SF 380 SF NAVD 80'-11 16 "
OPEN TO
FILMORE LOADING
BELOW
5'-0"
OPEN TO
BELOW
OPEN TO BELOW
1 1
318'
POOL DECK
15
BELOW 1 14
2 13
3 12 16
4 11 17
94'-6"
OPEN TO 5' 5 10 18
BELOW 6 9 19
7 22'-0"
DN
UP
8 20
21
22'-0"
81'-0" 22
DN
UP
2
DATE:
B/W PLAN 2019.05.13 A1-29
LEVEL 06
OUTLINE OF CONVENTION CENTER BELOW
2
350'
0'
32'-2"
1 2 3 13'-0"
4 5 6 7 8 9 10 11 12 13 14 15 16 17
29'-0"
1S
STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD
SUITE 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 8'-0"10'-8"
792 SF HK
25'-11"
6'-0"
6'-0"
48
18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
STD
2S 370 SF
10'-0"
SUITE STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD LEVEL 7 49
3
792 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF NAVD 90'-5 16 " STD
370 SF
50
5'-0"
ELEC. STD
FILMORE LOADING
370 SF
33 51
STD STD
370 SF 370 SF 5'-0"
34 52
STD STD
370 SF 370 SF
35 53
STD STD
370 SF 370 SF
36 54
STD STD
370 SF 370 SF
37 55
STD STD
370 SF 370 SF
1 STD
38 56
STD
1
318'
370 SF 370 SF
39 57
STD STD
370 SF 370 SF
5'-0" 40 58
STD STD
370 SF 370 SF
41 59
STD 15
STD
370 SF 370 SF
60 1 14
42
STD STD 2 13
370 SF 370 SF
43 61 3 12 16
STD STD
370 SF 370 SF
4 11 17
94'-6"
44
62
STD STD
370 SF 370 SF
5' 5 10 18
45 6 9 19
STD
370 SF 7 8 22'-0" 20
46 63
STD STD 21
370 SF
6'-0" 370 SF
22'-0"
47 64 81'-0" 22
STD STD
370 SF 370 SF
32'-3"
3S 4S
23'-9"
SUITE SUITE
723 SF 723 SF
DATE:
B/W PLAN 2019.05.13 A1-30
LEVEL 07
OUTLINE OF CONVENTION CENTER BELOW
2
350'
0'
1 2 3 13'-0"
4 5 6 7 8 9 10 11 12 13 14 15 16 17
1S
29'-0"
STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD
32'-2"
SUITE 370 SF 8'-0"10'-8"
820 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF
HK
26'-9"
6'-0"
6'-0"
47
STD
2S 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 370 SF
10'-0"
SUITE STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD LEVEL 8 48
3
820 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF NAVD 99'-11 16 " STD
370 SF
49
5'-0"
ELEC. STD
FILMORE LOADING
370 SF
33 50
STD STD
370 SF 370 SF 5'-0"
34 51
STD STD
370 SF 370 SF
35 52
STD STD
370 SF 370 SF
36 53
STD STD
370 SF 370 SF
37 54
STD STD
370 SF 370 SF
38
1 STD
55
STD
1
318'
370 SF 370 SF
5'-0" 39 56
STD STD
370 SF 370 SF
40 57
STD STD
370 SF 370 SF
41 58
STD 15
STD
370 SF 370 SF
42 59 1 14
STD STD 2 13
370 SF 370 SF
43 60 3 12 16
STD STD
370 SF 370 SF
4 11 17
44 61
94'-6"
STD STD 5 10 18
370 SF 370 SF
45 6 19
9
STD
370 SF 7 8 22'-0" 20
46 62
STD STD 21
370 SF 370 SF
6'-0"
22'-0"
63 81'-0" 22
STD
3S 370 SF
35'-6"
SUITE
854 SF
22'-10"
4S
SUITE
716 SF
31'-11"
DATE:
B/W PLAN 2019.05.13 A1-31
LEVEL 08
OUTLINE OF CONVENTION CENTER BELOW
2
350'
0'
1 2 3 4 13'-0"
5 6 7 8 9 10 11 12 13 14 15 16 17 18
29'-0"
1JRS STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD
32'-2"
JR SUITE 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 8'-0"10'-8"
450 SF HK
15'-0"
6'-0"
6'-0"
48
19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
STD
2JRS 370 SF
10'-0"
JR SUITE STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD LEVEL 10 49
3
450 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF NAVD 118'-11 16 " STD
370 SF
50
5'-0"
ELEC. STD
FILMORE LOADING
370 SF
35 51
STD STD
370 SF 370 SF 5'-0"
36 52
STD STD
370 SF 370 SF
37 53
STD STD
370 SF 370 SF
38 54
STD STD
370 SF 370 SF
39 55
STD STD
370 SF 370 SF
40
1 STD
56
STD
1
318'
370 SF 370 SF
5'-0" 41 57
STD STD
370 SF 370 SF
42 58
STD STD
370 SF 370 SF
43 59
STD 15
STD
370 SF 370 SF
44 60 1 14
STD STD 2 13
370 SF 370 SF
45 61 3 12 16
STD STD
370 SF 370 SF
4 11 17
46
94'-6"
STD STD
370 SF 370 SF 5' 5 10 18
47 62 6 19
9
STD
370 SF 7 8 22'-0" 20
63
STD STD 21
370 SF 6'-0" 370 SF
22'-0"
1S 64 81'-0" 22
18'-11"
SUITE STD
470 SF 370 SF
3S
26'-0"
SUITE
18'-8"
2S
SUITE 669 SF
475 SF
36'-5"
DATE:
B/W PLAN 2019.05.13 A1-32
LEVEL 09
OUTLINE OF CONVENTION CENTER BELOW
2
350'
0'
1 2 3 4 13'-0"
5 6 7 8 9 10 11 12 13 14 15 16 17 18
29'-0"
1JRS STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD
32'-2"
JR SUITE 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 8'-0"10'-8"
450 SF HK
15'-0"
6'-0"
6'-0"
48
19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
STD
2JRS 370 SF
10'-0"
JR SUITE STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD LEVEL 10 49
3
450 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF NAVD 118'-11 16 " STD
370 SF
50
5'-0"
ELEC. STD
FILMORE LOADING
370 SF
35 51
STD STD
370 SF 370 SF 5'-0"
36 52
STD STD
370 SF 370 SF
37 53
STD STD
370 SF 370 SF
38 54
STD STD
370 SF 370 SF
39 55
STD STD
370 SF 370 SF
40
1 STD
56
STD
1
318'
370 SF 370 SF
5'-0" 41 57
STD STD
370 SF 370 SF
42 58
STD STD
370 SF 370 SF
43 59
STD 15
STD
370 SF 370 SF
44 60 1 14
STD STD 2 13
370 SF 370 SF
45 61 3 12 16
STD STD
370 SF 370 SF
4 11 17
46
94'-6"
STD STD
370 SF 370 SF 5' 5 10 18
47 62 6 19
9
STD
370 SF 7 8 22'-0" 20
63
STD STD 21
370 SF 6'-0" 370 SF
22'-0"
1S 64 81'-0" 22
18'-11"
SUITE STD
470 SF 370 SF
3S
26'-0"
SUITE
18'-8"
2S
SUITE 669 SF
475 SF
36'-5"
DATE:
B/W PLAN 2019.05.13 A1-33
LEVEL 10
OUTLINE OF CONVENTION CENTER BELOW
2
350'
0'
1 2 3 4 13'-0"
5 6 7 8 9 10 11 12 13 14 15 16 17 18
29'-0"
31'-11"
1JRS STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD
JR SUITE 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 8'-0"10'-8"
476 SF HK
17'-8"
6'-0"
6'-0"
50
19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
STD
2JRS 370 SF
10'-0"
JR SUITE STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD LEVEL 11 51
3
370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF NAVD 128'-5 16 "
476 SF STD
370 SF
52
5'-0"
ELEC. STD
FILMORE LOADING
370 SF
35 53
STD STD
370 SF 370 SF 5'-0"
36 54
STD STD
370 SF 370 SF
37 55
STD STD
370 SF 370 SF
38 56
STD STD
370 SF 370 SF
39 57
STD STD
370 SF 370 SF
1 STD
40
STD
58
1
318'
370 SF 370 SF
5'-0" 41 59
STD STD
370 SF 370 SF
42 60
STD STD
370 SF 370 SF
43 61
STD 15
STD
370 SF 370 SF
62 1 14
44
STD STD 2 13
370 SF 370 SF
45 63 3 12 16
STD STD
370 SF 370 SF 4 17
11
94'-6"
46
STD 5' 5 10 18
370 SF
47 64 6 19
9
STD STD
370 SF 370 SF 7 8 22'-0" 20
48 65
STD STD 21
370 SF
6'-0" 370 SF
22'-0"
49 66 81'-0" 22
STD STD
370 SF 370 SF
25'-4"
3S 4S
SUITE SUITE
774 SF 774 SF
32'-3"
DATE:
B/W PLAN 2019.05.13 A1-34
LEVEL 11
OUTLINE OF CONVENTION CENTER BELOW
2
350'
0'
1S 1 2 3 4 13'-0"
5 6 7 8 9 10 11 12 13 14 15 16 17 18
29'-0"
29'-0"
STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD
SUITE 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 8'-0"10'-8"
465 SF HK
16'-8"
6'-0"
6'-0"
48
2S
SUITE 3S 19 20 21 22 23 24 25 26 27 28 29 30 31 32
STD
370 SF
10'-0"
424 SF LEVEL 12
SUITE STD STD STD STD STD STD STD STD STD STD STD STD STD STD 3
49
525 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF NAVD 137'-11 16 "
STD
370 SF
50
5'-0"
21'-5" ELEC. STD
FILMORE LOADING
370 SF
33 51
STD STD
370 SF 370 SF 5'-0"
34 52
STD STD
370 SF 370 SF
35 53
STD STD
370 SF 370 SF
36 54
STD STD
370 SF 370 SF
37 55
STD STD
370 SF 370 SF
1 STD
38 56
STD
1
318'
370 SF 370 SF
5'-0" 39 57
STD STD
370 SF 370 SF
40 58
STD STD
370 SF 370 SF
41 59
STD 15
STD
370 SF 370 SF
60 1 14
42
STD STD 2 13
370 SF 370 SF
43 61 3 12 16
STD STD
370 SF 370 SF 4 17
11
94'-6"
44
STD STD
370 SF 370 SF 5' 5 10 18
45 62 6 19
9
STD
370 SF 7 8 22'-0" 20
46 63
STD STD 21
370 SF
6'-0" 370 SF
22'-0"
47 64 81'-0" 22
STD STD
370 SF 370 SF
26'-2"
4S 5S
SUITE SUITE
800 SF 800 SF
32'-3"
DATE:
B/W PLAN 2019.05.13 A1-35
LEVEL 12
OUTLINE OF CONVENTION CENTER BELOW
2
350'
0'
17'-5" 1 2 3 4 13'-0"
5 6 7 8 9 10 11 12 13 14 15 16 17 18
29'-5"
29'-0"
1S STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD
SUITE 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 8'-0"10'-8"
487 SF HK
6'-0"
6'-0"
48
2S
SUITE 19 20 21 22 23 24 25 26 27 28 29 30 31 32
STD
3S 370 SF
10'-0"
487 SF SUITE STD STD STD STD STD STD STD STD STD STD STD STD STD STD LEVEL 13 49
3
545 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF NAVD 147'-5 16 " STD
370 SF
50
5'-0"
22'-5" ELEC. STD
FILMORE LOADING
370 SF
33 51
STD STD
370 SF 370 SF 5'-0"
34 52
STD STD
370 SF 370 SF
35 53
STD STD
370 SF 370 SF
36 54
STD STD
370 SF 370 SF
37 55
STD STD
370 SF 370 SF
1 STD
38 56
STD
1
318'
370 SF 370 SF
5'-0" 39 57
STD STD
370 SF 370 SF
40 58
STD STD
370 SF 370 SF
41 59
STD 15
STD
370 SF 370 SF
60 1 14
42
STD STD 2 13
370 SF 370 SF
43 61 3 12 16
STD STD
370 SF 370 SF 4 17
11
94'-6"
44
STD STD
370 SF
370 SF 5' 5 10 18
45 62 6 19
9
STD
370 SF 7 8 22'-0" 20
46 63
STD STD 21
370 SF
6'-0" 370 SF
22'-0"
47 64 81'-0" 22
STD STD
370 SF 370 SF
STD STD
370 SF 370 SF
13'-6"
1JRS 2JRS
JR SUITE JR SUITE
397 SF 397 SF
32'-3"
DATE:
B/W PLAN 2019.05.13 A1-36
LEVEL 13
OUTLINE OF CONVENTION CENTER BELOW
2
350'
0'
1S 1 2 3 4 13'-0"
5 6 7 8 9 10 11 12 13 14 15 16 17 18
29'-0"
SUITE STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD
17'-8"
514 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 8'-0"10'-8"
HK
54'-6"
6'-0"
6'-0"
48
2S
SUITE 19 20 21 22 23 24 25 26 27 28 29 30 31 32
STD
3S
370 SF
10'-0"
414 SF LEVEL 14
SUITE STD STD STD STD STD STD STD STD STD STD STD STD STD STD 3
49
370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF NAVD 156'-11 16 "
565 SF STD
370 SF
50
5'-0"
26'-5" ELEC. STD
FILMORE LOADING
370 SF
33 51
STD STD
370 SF 370 SF 5'-0"
34 52
STD STD
370 SF 370 SF
35 53
STD STD
370 SF 370 SF
36 54
STD STD
370 SF 370 SF
37 55
STD STD
370 SF 370 SF
1 STD
38
STD
56
1
370 SF 370 SF
5'-0" 39 57
STD STD
370 SF 370 SF
40 58
STD STD
370 SF 370 SF
41 59
15
STD STD
370 SF 370 SF
60 1 14
42
STD STD 2 13
370 SF 370 SF
43 61 3 12 16
STD STD
370 SF 370 SF 4 17
11
94'-6"
44 62
STD STD
370 SF 370 SF 5' 5 10 18
45 6 9 19
STD
370 SF 7 8 22'-0" 20
46 63
STD STD 21
370 SF
370 SF
6'-0"
22'-0"
47 81'-0" 22
STD 6S
20'-2"
370 SF SUITE
64 496 SF
STD
370 SF 5S
20'-9"
SUITE
14'-6"
4S
SUITE 405 SF
401 SF
29'-0" 27'-10"
DATE:
B/W PLAN 2019.05.13 A1-37
LEVEL 14
OUTLINE OF CONVENTION CENTER BELOW
2
350'
0'
1 2 3 4 13'-0"
5 6 7 8 9 10 11 12 13 14 15 16 17 18
29'-0"
1S STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD
32'-3"
SUITE 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 8'-0"10'-8"
582 SF HK
19'-2"
6'-0"
6'-0"
50
19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
STD
2S
370 SF
10'-0"
SUITE STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD LEVEL 15 51
3
582 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF NAVD 166'-5 16 " STD
370 SF
52
5'-0"
ELEC. STD
FILMORE LOADING
370 SF
35 53
STD STD
370 SF 370 SF 5'-0"
36 54
STD STD
370 SF 370 SF
37 55
STD STD
370 SF 370 SF
38 56
STD STD
370 SF 370 SF
39 57
STD STD
370 SF 370 SF
1 STD
40 58
STD
1
318'
370 SF 370 SF
5'-0" 41 59
STD STD
370 SF 370 SF
42 60
STD STD
370 SF 370 SF
43 61
15
STD STD
370 SF 370 SF
62 1 14
44
STD STD 2 13
370 SF 370 SF
45 63 3 12 16
STD STD
370 SF 370 SF 4 17
11
94'-6"
46 64
STD STD
370 SF 370 SF 5' 5 10 18
47 6 9 19
STD
370 SF 7 8 22'-0" 20
48 65
STD STD 21
370 SF
370 SF
6'-0"
22'-0"
49
3S
81'-0" 22
STD
20'-2"
370 SF
SUITE
495 SF
66
STD
370 SF
4S
21'-7"
15'-4"
1JRS SUITE
JR SUITE 419 SF
425 SF
29'-0" 27'-9"
DATE:
B/W PLAN 2019.05.13 A1-38
LEVEL 15
OUTLINE OF CONVENTION CENTER BELOW
2
350'
0'
1S 1 2 3 4 13'-0"
5 6 7 8 9 10 11 12 13 14 15 16 17 18
29'-0"
STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD
32'-3"
SUITE 8'-0"10'-8"
610 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF
HK
20'-0"
6'-0"
6'-0"
50
19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
STD
2S
370 SF
10'-0"
SUITE STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD LEVEL 16 51
3
370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF NAVD 175'-11 16 "
610 SF STD
370 SF
52
5'-0"
ELEC. STD
FILMORE LOADING
370 SF
35 53
STD STD
370 SF 370 SF 5'-0"
36 54
STD STD
370 SF 370 SF
37 55
STD STD
370 SF 370 SF
38 56
STD STD
370 SF 370 SF
39 57
STD STD
370 SF 370 SF
1 STD
40 58
STD
1
5'-0"
318'
370 SF 370 SF
41 59
STD STD
370 SF 370 SF
42 60
STD STD
370 SF 370 SF
43 61
15
STD STD
370 SF 370 SF
62 1 14
44
STD STD 2 13
370 SF 370 SF
45 63 3 12 16
STD STD
370 SF 370 SF 4 17
11
94'-6"
46 64
STD STD
370 SF 370 SF 5' 5 10 18
47 6 9 19
STD
370 SF 7 8 22'-0" 20
48 65
STD STD 21
370 SF
370 SF
6'-0"
22'-0"
49
3S
81'-0" 22
STD
20'-2"
370 SF
SUITE
495 SF
66
STD
370 SF
22'-5"
1JRS 4S
16'-2"
JR SUITE SUITE
436 SF
450 SF
29'-0"
DATE:
B/W PLAN 2019.05.13 A1-39
LEVEL 16
OUTLINE OF CONVENTION CENTER BELOW
2
350'
0'
1 2 3 4 13'-0"
5 6 7 8 9 10 11 12 13 14 15 16 17 18
29'-0"
STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD
370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF HK
20'-11"
370 SF 370 SF
8'-0"10'-8"
1S
64'-10"
6'-0"
6'-0"
PRES.
SUITE
1,319 SF LEVEL 17
19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 3
NAVD 185'-11 16 "
10'-0"
STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD
370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF 370 SF
5'-0"
ELEC.
M
FILMORE LOADING
35
STD
370 SF 5'-0"
36
STD
370 SF
37
STD
370 SF
38
STD
370 SF
W
39
STD
6'-0"
370 SF
1 STD
40
1
6'-0" 18'-8"
318'
370 SF
5'-0" 41
STD PANTRY
370 SF
42 600 SF
STD
370 SF
15
VIP
2S
LOUNGE 1 14
940 SF
2 13
64'-10" 3 12 16
4 11 17
94'-6"
5 10 18
6 9 19
94'-0"
7 8 22'-0" 20
21
22'-0"
81'-0" 22
BAR
+ TERRACE
3,493 NET SF 76'-3"
499 OCCS.
18'-7"
2
DATE:
B/W PLAN 2019.05.13 A1-40
LEVEL 17
OUTLINE OF CONVENTION CENTER BELOW
2
350'
0'
CHILLER ROOM
OPEN ELEV
MECHANICAL OVER RUN
SOLAR PANEL AREA ELEV
ROOF OVER RUN
ELEV
OVER RUN
FILMORE LOADING
1 1
318'
ROOF LEVEL
3
NAVD 196'-516 "
15
1 14
2 13
3 12 16
4 11 17
94'-6"
5' 5 10 18
6 9 19
7 8 22'-0" 20
21
22'-0"
81'-0" 22
DATE:
B/W PLAN 2019.05.13 A1-41
ROOF
OUTLINE OF CONVENTION CENTER BELOW
2
350'
T.O. PARAPET
3
NAVD 205'-11 16 "
SOLAR PANEL OPEN
T.O. PARAPET
3
NAVD 205'-11 16 " AREA BELOW MECHANICAL
ROOF BELOW
FILMORE LOADING
ELEV OVER
RUN BELOW
1 1
318'
LOWER ROOF
15
SLAB BELOW
1 14
2 13
3 12 16
4 11 17
94'-6"
5 10 18
6 9 19
7 8 22'-0" 20
21
22'-0"
81'-0" 22
DATE:
B/W PLAN 2019.05.13 A1-42
UPPER ROOF
DATE:
MATERIAL BOARD 2019.05.13 A2-00
DATE:
RENDERED SOUTH ELEVATION 2019.05.13 A2-01
DATE:
RENDERED WEST ELEVATION 2019.05.13 A2-02
DATE:
STREET ELEVATION 2019.05.13 A2-03
17TH STREET
DATE:
STREET ELEVATION 2019.05.13 A2-04
CONVENTION CENTER DRIVE
T.O. PARAPET
3
NAVD 205'-1116"
MECHANICAL AREA BEYOND 9'-6"
ROOF
3
NAVD 196'-516"
N 10'-6"
KEY PLAN LEVEL 17
NTS. S 3
NAVD 185'-1116"
10'
LEVEL 16
3
NAVD 175'-1116"
STUCCO 9'-6"
LIGHT GREY LEVEL 15
3
NAVD 166'-516"
9'-6"
LEVEL 14
3
NAVD 156'-1116"
SLIDING GLASS DOOR 9'-6"
LEVEL 13
3
NAVD 147'-516"
9'-6"
GLASS BALCONY RAILING LEVEL 12
3
NAVD 137'-1116"
9'-6"
LEVEL 11
3
NAVD 128'-516"
9'-6"
LEVEL 10
3
NAVD 118'-1116"
9'-6"
PROPERTY LINE LEVEL 9
3
NAVD 109'-516" 185'
9'-6"
LEVEL 8
3
NAVD 99'-1116"
9'-6"
LEVEL 7
3
NAVD 90'-516"
STOREFRONT FITNESS 9'-6"
LEVEL 6
BEYOND RESTAURANT 3
NAVD 80'-1116"
9'-6"
LEVEL 5
GLASS 5'
3
NAVD 71'-516"
INTERSTITIAL
METAL FIN 10'
COLOR TO COMPLEMENT LEVEL 4
3
CONVENTION CENTER FINS NAVD 56'-516"
LEVEL 3 MEZZ
18'
14'
DATE:
B/W SOUTH ELEVATION 2019.05.13 A2-05
DATE:
B/W WEST ELEVATION 2019.05.13 A2-06
DATE:
B/W EAST ELEVATION 2019.05.13 A2-07
N
T.O. PARAPET
3
NAVD 205'-1116"
MECHANICAL AREA 9'-6"
ROOF
3
NAVD 196'-516"
N
10'-6"
KEY PLAN LEVEL 17
NTS. NAVD 185'-1116"
3
10'
LEVEL 16
3
NAVD 175'-1116"
9'-6"
LEVEL 15
3
NAVD 166'-516"
STUCCO 9'-6"
LEVEL 14
LIGHT GREY NAVD 156'-1116"
3
9'-6"
LEVEL 13
3
NAVD 147'-516"
9'-6"
LEVEL 12
3
NAVD 137'-1116"
9'-6"
LEVEL 11
3
NAVD 128'-516"
9'-6"
LEVEL 10
3
NAVD 118'-1116"
9'-6"
LEVEL 9
3
NAVD 109'-516" 185'
9'-6"
PROPERTY LINE LEVEL 8
3
NAVD 99'-1116"
9'-6"
LEVEL 7 PROPERTY
LINE
3
NAVD 90'-516"
9'-6"
LEVEL 6
19' 3
30'-3" NAVD 80'-1116"
5'
HOTEL ROOMS 9'-6"
LEVEL 5
3
5' NAVD 71'-516"
INTERSTITIAL
10'
LEVEL 4 GLASS
3
NAVD 56'-516"
STUCCO WITH REVEAL
LEVEL 3 MEZZ
18'
METAL FIN
64' 64' LEVEL 3
3
NAVD 38'-516"
5' SETBACK REQUIRED BRIDGE
14'
FOR PODIUM AND TOWER
LEVEL 2
3
NAVD 24'-516"
ALUM. & GLASS RAILING
STUCCO WITH REVEAL 11' 13' EDGE OF
STEPS AS PER FLOOR PLAN BFE+5' SIDEWALK
EDGE OF SIDEWALK 4'GROUND LEVEL
5' 3
BFE+1' NAVD 7'-5 16 "
3'-1" NAVD
SEE SITE PLAN
STEPS AS PER FLOOR PLAN STOREFRONT TYP. 10' SETBACK REQUIRED
NEW PROPOSED ALLEY FOR PODIUM AND TOWER CONVENTION CENTER DRIVE
(SIDE, INTERIOR) ADA RAMP (SIDE, FACING A STREET)
0 30' 60'
DATE:
B/W NORTH ELEVATION 2019.05.13 A2-08
DATE:
2019.05.13 A2-09
ENLARGED GROUND FLOOR ELEVATION
DATE:
ENLARGED GROUND FLOOR ELEVATION 2019.05.13 A2-10
/ STOREFRONT SYSTEM
DATE:
ENLARGED DETAILS 2019.05.13 A2-11
DATE:
FPL BUILDING ELEVATIONS 2019.05.13 A2-12
EL + 24.44' NAVD
TOP OF PARAPET
EL + 22.1' NAVD
TOP OF SLAB
METAL LOUVERS
TYP.
17'-0"
GENERATOR ELECTRICAL FPL
(NEW PROPOSED ALLEY) EL + 7.44' NAVD
GROUND FLOOR
A2-08
5'-8" 17'-9"
5'-6" SIDEWALK
10' PLANTER
UP DN
UP
GRAB & GO
CHECK-IN DN UP
7'-8" PLANTER
10' SIDEWALK
UP
UP
6' PLANTER
LOBBY LOUNGE / BAR
GROUND FLOOR 21,100 SF
BAR BFE+1 NAVD 7'-5 163 "
TERRACE
5'
STAIR 2
FILMORE LOADING
TERRACE
LUGGAGE
DRIVEWAY DROP-OFF
810 SF
SLOPE 5%
BYPASS
LOADING
A2-06 A2-07
18'-0"
DRIVEWAY
1 SLOPE 5%
M 1
318'
7'-6"
8'-1"
21'-8"
TERRACE
9'-10" 16'-2"
21'-0"
DM 15
UP
1 14
GROUND FLOOR W
30'-11"
UP
3 12 16
DN
UP
(SIDE, INTERIOR)
4 11 17
94'-6"
CARS 5 10 18
TRASH 6 19
9
BIKE RACKS
7 22'-0"
UP
8 20
RETAIL
58'-0"
21
23,100 SF
22'-0"
81'-0" 22
DN
P T
MIAMI BEACH WELCOME
4"
3 3
7'-
22' TERRACE
10'-0
CENTER/HOTEL ACCESS USE
5'-0"10'-0"6'-0" 21'-11"
DRIVEWAY
SLOPE 5%
1,500 SF GEN. ELECT. FPL
"
"
'-6
ALIGN
25
6' PLANTER
10' SIDEWALK
5' PLANTER
A2-05
2
17TH STREET (FRONT)
DATE:
FPL BUILDING SECTION 2019.05.13 A2-13
DATE:
SECTION 1-1 2019.05.13 A3-00
DATE:
SECTION 2-2 2019.05.13 A3-01
DATE:
RENDERING 01 2019.05.13 A4-00
DATE:
RENDERING 02 2019.05.13 A4-01
DATE:
RENDERING 03 2019.05.13 A4-02
DATE:
RENDERING 05 2019.05.13 A4-03
DATE:
RENDERING 06 ENLARGED VIEW 2019.05.13 A4-04
DATE:
RENDERING 09 2019.05.13 A4-06
UP DN
DN UP
UP
GLASS AT GROUND LEVEL
UP
UP
UP
UP
DN
ALIGNMENT DIAGRAM DATE:
GROUND LEVEL 2019.05.13 A5-01
637
641 640 638 639
2.26.10C ST.26.08A
2.26.10D 2.26.10E
SERVICE CORRIDOR
A5-02
2.27.13
4,483 SF
2.27.04A 2.27.04B ST.27.09C 2.27.05 ST.27.09D
1-994
STORAGE
2.27.05
311 SF
STORAGE
ELEC. 2.27.04
1,557 SF
2.27.11
996 SF
STAIR
ST.2.27.02
726 SF
1-995
2.27.03
MEP
2.27.03
612 SF
2.27.14
2019.05.13
ELEC.
2.27.02
1,613 SF
DATE:
ELEC.
2.27.01
1,019 SF
SERVICE CORRIDOR
2.27.14
2,467 SF
STAIR
ST.2.27.01 ST.1.27.02
133 SF
MEP
2.28.04
9,987 SF
AREA WAY
2.28.07
3,606 SF
ALIGNMENT DIAGRAM
2.28.04
STAIR
ST.2.28.01
132 SF
LEVEL 2
SERVICE CORRIDOR
1-993
2.28.03
4,745 SF
2.29.21B
ELEVATOR MEETING ROOM 4
EL.28.02 2.29.21
200 SF 3,253 SF
2.29.21A
ELEVATOR
EL.28.01 UP DN
105 SF
STORAGE PANELS
PUBLIC CONCOURSE
2.29.17
78 SF 2.28.01 DN UP
17,666 SF
2.29.20B
MEETING ROOM 3
2.29.20
2,648 SF
STORAGE
2.29.20A
2.29.16
DN
UP
71 SF
STORAGE PANELS
2.29.15
74 SF
2.29.19B
MEETING ROOM 2
2.29.19
DN
UP
2,648 SF
STORAGE
2.29.14
116 SF
2.29.19A
STORAGE PANELS
2.29.13
88 SF
SERVICE CORRIDOR
2.29.09 2.29.18B
4,381 SF
MEETING ROOM 1
2.29.18
2,655 SF
STORAGE
2.29.12
190 SF
2.29.18A
STORAGE
2.29.08 JANITOR
ELEVATOR 74 SF 2.29.06
EL.29.01 282 SF
75 SF ST.29.11B
RESTROOMS 2.29.06
2.29.05
971 SF
2.29.05
STORAGE PANELS
1.29.02 2.29.05
98 SF
STAIR 2.29.03
ST.2.29.01
284 SF RESTROOMS
2.29.03
963 SF 2.29.04
STORAGE
2.29.07 JANITOR
112 SF 2.29.04
257 SF
MEETING ROOM 4
1.29.16
3,092 SF
2.30.09B
2.30.09A
OPEN TO MEETING MEETING ROOM 2
STORAGE 2.30.09
ROOMS BELOW 2.30.14 2,840 SF
117 SF
OM 2 MEETING ROOM 3
1.24.05
3,092 SF
STORAGE PANELS
2.30.13
53 SF
2.30.08B
SERVICE CORRIDOR
2.30.11 2.30.08A
769 SF
MEETING ROOM 1
2.30.08
2,853 SF
STORAGE
2.30.12
153 SF
2.20.03C
ELEVATOR ST.30.12C
EL.30.02
73 SF
STAIR
OPEN STAIR ST.2.30.02
ST.2.30.01 878 SF
615 SF UP DN
ELEVATOR UP
EL.30.01
73 SF DN UP
ESCALATOR
ES.30.02
92 SF
DN
ESCALATOR
ES.30.01
92 SF
ST.30.12D
OUTLINE OF CONVENTION CENTER
DN UP
10'-0"
OUTLINE OF FIN PROJECTION BELOW
UP
DN
UP
DN
DN
UP
UP
DN
OUTLINE OF BUILDING PROJECTION
AT LEVEL 03
DN
UP
DN
UP
ALIGNMENT DIAGRAM DATE:
2019.05.13 A5-03
LEVEL 3
PL
GARAGE
GARAGE
EL + 24.44' NAVD
LEVEL 2
2'-0" 7'-11"
SETBACK LINE
REFER TO LANDSCAPE
DRAWINGS FOR
PLANTINGS, TYP. LOBBY / LOUNGE
BEYOND
16'-4"
16'-4"
19'-11"
42" GLASS
GUARDRAIL
C
L
5'-6"
EXIST. TRAFFIC LANE EXIST TRAFFIC LANE
3'-6"
3'-6"
EL + 7.44' NAVD
GROUND FLOOR
5'-6"
EL + 3.86' NAVD
CROWN OF ROAD DRIVEWAY 5% SLOPE
EXIST. SLOPE
10'-0" SIDEWALK
2'-0" BEYOND
CURB &
GUTTER
PL
SECTION 1 - CONVENTION CENTER DRIVE
PL
GARAGE
EL + 24.44' NAVD
LEVEL 2
5'-8" 17'-9"
5'-6" SIDEWALK
10' PLANTER
UP DN
UP
REFER TO LANDSCAPE
GRAB & GO
CHECK-IN DN UP
7'-8" PLANTER
10' SIDEWALK
UP
UP
6' PLANTER
DRAWINGS FOR
16'-4"
LOBBY LOUNGE / BAR
21,100 SF
PLANTINGS, TYP.
GROUND FLOOR
3
BAR BFE+1 NAVD 7'-5 16 "
TERRACE
5'
STAIR 2
RETAIL TERRACE
20'-4"
LUGGAGE
DRIVEWAY DROP-OFF
810 SF
SLOPE 5%
BYPASS
1
LOADING
A2-0
18'-0"
DRIVEWAY
1 SLOPE 5%
7'-6"
8'-1"
21'-8"
42" GUARDRAIL
TERRACE
9'-10" 16'-2"
21'-0"
DM
UP
CL
5'-6"
GROUND FLOOR W
3 UP ELECT
30'-11"
BFE+1 NAVD 7'-5 16 "
UP
DN
UP
(SIDE, INTERIOR)
CARS
OUTDOOR TERRACE
BIKE RACKS
UP
RETAIL
58'-0"
23,100 SF
11'-11" 10'-0" 3'-11" 23'-0" 7'-0"
DN
P T
"
7'-4
22' TERRACE
10'-0
CENTER/HOTEL ACCESS USE
5'-0"10'-0"6'-0" 21'-11"
DRIVEWAY
SLOPE 5%
1,500 SF
GROUND FLOOR
"
"
'-6
25
6' PLANTER
5'-6"
10' SIDEWALK
5' PLANTER
EL + 3.23' NAVD
4'-0"
A2 05
F.V.
CROWN OF ROAD
EXIST SLOPE
2
2'-0" 10'-0" SIDEWALK KEY PLAN
CURB &
GUTTER
PL