You are on page 1of 8

SURVEILLANCE REPORT

AT PUMP STATION: PS-36& PS-46/1

Client : Public Works Authority – Drainage Networks

Contract
Project Name Title : : Operation
Operation and Maintenance
and Maintenance of
of Pumping Stations Pumping
Stations
Project No. : AA DOM 13-14 M 1576-2.06 G
Project
Location ID : : AA
PS-36 DOM 13-14
& PS-46/1 M 1576-2.06 G

Date : 4th & 28th October 2018

ATTENDANCE

SR.NO. NAME DEPARTMENT/POSITION

1. Shashidhar Hebbal PWA-QA/QC Engineer

2. Syed Shujauddin WBQ-QA/QC Engineer

Inspected By: Witnessed By:

Syed Shujauddin Shashidhar Hebbal


Waagner Biro Qatar PWA-Ashghal

Page 1 of 8
SURVEILLANCE REPORT
AT PUMP STATION: PS-36& PS-46/1

PS46/1 pressure gauge& transmitter calibration verification PS46/1 pump pressure gauge calibration
certificate

PS46/1-Inspect pump checking 46/1 Inspect pump Junctionbox cable checking

Page 2 of 8
SURVEILLANCE REPORT
AT PUMP STATION: PS-36& PS-46/1

PS46/1-Inspection of Overhead crane. PS46/1-Inspection of washwater system.

46/1 Inspect floemeter checking 46/1 Inspect OCU Checking

Page 3 of 8
SURVEILLANCE REPORT
AT PUMP STATION: PS-36& PS-46/1

46/1inspect PM of MCC, verify signals on annunciator 46/1 valvechemper checking

46/1 flowmeter caliberation checking 46/1 firealaram checking

Page 4 of 8
SURVEILLANCE REPORT
AT PUMP STATION: PS-36& PS-46/1

PS36-Pressure Gauges&Transmitters Caliberation Verifications

PS-36 Inspection of Overhead crane PS-36 Inspect OCU Vessels Checking

Page 5 of 8
SURVEILLANCE REPORT
AT PUMP STATION: PS-36& PS-46/1

PS-36 OCU Carbonbed Checking&Cleaning

PS-36 Inspect Lifting Pump checking

Page 6 of 8
SURVEILLANCE REPORT
AT PUMP STATION: PS-36& PS-46/1

PS-36 Inspect MCC Pannel announciator checking PS-36 Inspect FireAlaram Cheaking

PS-36 inspect A/C Checking ps-36 Inspect washwater system

Page 7 of 8
SURVEILLANCE REPORT
AT PUMP STATION: PS-36& PS-46/1

Page 8 of 8