THE DIFFICULTY
AND SPECIAL
PROCEDURE FOR
THE INSTALLATION
OF GRP PIPES
NGHI SON REFINERY & PETROCHEMICAL PROJECT
I. KEY POINT OF
DIFFICULTY OF GRP
INSTALLATION – JOINT
NGHI SON REFINERY & PETROCHEMICAL PROJECT
2. Spools with big size but working in Limited space
SAMPLE
NGHI SON REFINERY & PETROCHEMICAL PROJECT
SAMPLE
NGHI SON REFINERY & PETROCHEMICAL PROJECT
4. If
the weather changes accompanied by rain, flooding
Pipes affect the construction schedule.
NGHI SON REFINERY & PETROCHEMICAL PROJECT
II. CONSTRUCTION
PROCEDURE FOR THE
INSTALLATION OF
GRP PIPES
NGHI SON REFINERY & PETROCHEMICAL PROJECT
1. Positioning/alignment
Chain block
4200
Use 2 frame
structure in both Fabric cable
5020
and sandbags
used to alignment Ø2
40
0
2520
and positioning
600
2000
NGHI SON REFINERY & PETROCHEMICAL PROJECT
3000 3000
Chain block
Chain block
Joint connect
1500
cable steel
Sandbags
NGHI SON REFINERY & PETROCHEMICAL PROJECT
2700
4000
900
1222
1350
1300
600
1000
NGHI SON REFINERY & PETROCHEMICAL PROJECT
3. Joint of branch connection and crossing point
After install
Spool with ecc
reducer and
branch
Scaffolds were
prepared and
available as
temporary, with
sandbags
positioning, and
chain block for
adjusting as
following
NGHI SON REFINERY & PETROCHEMICAL PROJECT
Temporary
Bridge will
be done by
scaffolding
as following