R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: ANK ASK
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26
1 INTRODUCTION:
Aim of this note is to present the design of substructure for fix Pier of the elevated corridor near BKC.
Pier P26 supporting 60 m simply supported spans over Harbour Railway.
P26 supports 60.0m span on BKC side & 31 m on EEH side.
Design of Substructure is covered in this note.
The superstructure ROB is a steel plate girder structure resting on 6 bearings on Pier P26.
Pier P26 also supports 30.75m concrete flyover with two fix bearings.
2 58.00 m 2 28.75 m 2
Fixed
P25 P26 P27
Span Arrangement
Reference Drawings
Reference document:-
- Reference from tender
1 Volume II -Section 2 - Design criteria
2 Volume II -Section 6 - Design data
- Reference Codes-
1 IRC 6:2014 Loads and stress
2 IRC 112:2011 Code of Practic for Concrete Road Bridges:
Limit State Design
3 IRC 78:2014
- Latest geotechnical report
The Pier substructure and foundation shall be designed for the following loads:
a) Sizes of different structural elements
(length) (width) (height)
- Reactangular Pile cap(PC1) &(PC2) 4.6 x 4.6 x 1.8 4 piles
- No of Piers 2
- Pier size = 2 x 1.50 x 8.0905
- Pile dia = 1.2 m
c) Live loads : Class A upto 4 lanes OR Class 70R wheeled and tracked upto 2 lanes.
..(As per tender Cl. 5.3.1 )
d) Bearing Rigidity force ..(As per cl. 211.5 of IRC:6-2014.)
e) Wind load as per IRC 6 Obstructed wind ..(As per cl. 209.3 of IRC:6-2014.)
f) Seismic load for zone III with ..( As per "Design data")
Zone factor = 0.16
Importance factor = 1.2 ..(As per Table 8 of IRC:6-2014.)
i) Maxm Pile capacity is 600 t/m2. Maxm. Limited by recommendations ..(As per tender Cl. 3.7.3 )
including socketing
Capacity considered 481 t As per Geo tech reco.
..(As per bore log detail )
- socketing in rock 5.7 m in soft rock and recommendations of Geotech
8.2
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: ANK ASK
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26
VIEW SHOWING GENERAL ARRANGEMENT OF PIER -P26 :
FIXITY CALCULATION
T = 471.8 cm
L1 = 0m
Lf / T = 2.2 _ For fixed headed pile Fig.2……….IS2911-App-C
Lf = 1038.0 cm
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: ANK ASK
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26
Length of the pile = GL - center of pile embed lvl - 0.75 - thickness of the pilecap / 2
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: ANK ASK
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26
Hence the length of the pile for analysis upto point of fixity
= 10.38 - 0.69 - 1.8 / 2
= 8.8 m
≈ 8.8 m
G.L Ground LVL 5.123
0.69 m
Pile cap top 4.433
1.8 m
Pile cap bottom 2.633
10.4 m
8.80 m
Fixity -5.257
Founding LV -17.577
Tilt and shift in pile:
8.5
8.5.1
The flyover(RC structure) and ROB(Steel structure) has been analysed separately for the
applicable loads and load combinations. The analysis results for respective load cases are used
for analysis and design of substructure-piles, pilecap, pier and piercap.
Sample calculation
DL from 30.75m span = 4388 kN
Longitudinal moment developed for each case is evaluated and applied in respective load case on
the pier cap beam in Midasmodel as shown below.
R2 R3 R4
Reaction 1032 1276 0
Load on P26=R3+R4 = 1276+0 = 1276 kN
Hence Per wheel load=r/2 = 638 kN Used for Transverse analysis
LA-Bearing center to piercap center = 1 m
Hence Longitudinal moment = 638 x 1 = 638 kNm
Per wheel
R2 R3 R4
Reaction 623 656 0
Load on P26=R3+R4 = 656+0 = 656 kN
Hence Per wheel load=r/2 = 328 kN
LA-Bearing center to piercap center = 1 m
Hence Longitudinal moment = 328 x 1 = 328 kNm
per wheel
Reactions at each bearing location are thus obtained and further applied over pier cap at
respective locations for each case.
LL 5 -Class A2 lane:
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: ANK ASK
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26
LL 6 -Class A 1lane:
Thus reactions from above analysis has been applied on piercap at bearing locations in load cases-7 to 13.
Similarly loads per wheel for maximum longitudinal moment are also applied
and the reactions from those are applied on the piercap in primary loadcases(LC-14 to 20)
The piercap beam for P26 is a single beam of 18m length whereas bridge deck is placed off-center.
The live load applied as definced above in LC-7 to LC20 will produce maximum span moment
in the piercap beam.
Another set of live load reactions is applied on the bearing locations near to pier support. These
load cases are LC21 to LC27-with maximum reactions and LC28 to LC34 with maximum longitudinal
moment. These loadcases will produce max shear and max pier and pile loads.
Thus following various load cases are considered:-
4 HORIZONTAL LOADS
4.1 Seismic Forces
4.1.1 Transverse Seismic load : …(As per cl. 219.5.1 of IRC:6-2014.)
T = 7.31
F
F = 971.00 KN Ref Staad analysis in annexure A
E = 34000 N/mm 2 for pile 0.75E = 25500 N/mm2
= 36000 for pier
Hence T = 0.234
Therefore
Sa / g = 2.500
Hence FOR PSC BEAM
Ah = 0.080 Ah = 0.240
The seismic mass for transverse seismic force at P26 is sum of reactions from left side span
of 60.0m and right side span of 32m. Refering to clause:219.8 of IRC:6:2014, the seismic loads has
been increased by 25% for foundation design only.
The total transverse seismic forces are given in the following table
Reaction Reaction Transverse Transverse
Sr. through from Load =Ah Load
Item R3+R4 *(R3+R4)* =Ah*(R3+R4)
No. right Left
span(R4) span(R3) 1.25 *W
For
Foundation
Design For Pier Design
1 D.L. 4388.0 5602.0
2 S.I.D.L 648.0 1260.0
3 S.S.DL 456.0 880.0
5492.0 7742.0 13234.0 1323.4 1058.7
T = 7.31
F
F = 388.00 KN Ref staad analysis in annexure A
E = 34000 N/mm2 for pile 0.75E = 25500 N/mm2
= 36000 for pier
Hence T = 0.371
Therefore
Sa / g = 2.500
Hence FOR PSC BEAM
Ah = 0.080 Ah = 0.240
The seismic mass for longitudinal seismic force at P25 is reaction from 52.67m span
transferred to P25 & P19.Refering to clause:219.8 of IRC:6:2014, the seismic loads has
been increased by 25% for foundation design only.Seismic mass due to Live load has been considered
for two full successive trains on the span which is slightly on conservative side.
Max
70R 2302
Class A 1278
Reaction
Reaction Longi.
from Longi. Load
Sr. from Load =Ah
Item right R2+R3 =Ah*(R2+R3)
No. right *(R2+R3)*
*W
span 1.25
span(R2)
(R3)
For
Foundation
Design For Pier Design
1 D.L. 5602 5602.0
2 S.I.D.L 1260 1260.0
3 S.S.DL 880 880.0
7742.0 7742.0 15484.0 1548.4 1238.7
4 LL 20% load considered
LL-1 1031.0 356.0 1387.0 27.7 22.2
LL-2 2062.0 712.0 2774.0 55.5 44.4
LL-3 2309.0 572.0 2881.0 57.6 46.1
LL-4 1670.0 464.0 2134.0 42.7 34.1
LL-5 1278.0 216.0 1494.0 29.9 23.9
LL-6 639.0 108.0 747.0 14.9 12.0
LL-7 2556.0 432.0 2988.0 59.8 47.8
Considered max value 0.0 0.0
Applied at Pier top 1548 1239
Per pier load applied as = 774.2 kN 619.4
The longitudinal seismic force from ROB between P25-P26 will be transferred to
Fixed pier P26.
4.2 Wind loads …(As per cl. 209 of IRC:6-2014.)
As per table 5 of Cl. 209 of IRC:6, for 10m height of structure, and for basic wind speed of 44 m/s,
the vz = 29.2 m/s for 33 m/sec
In mumbai region the basic wind speed = 44 m/sec
Hence vz = 38.93 m/s
Obstructed area:-
Height of Solid barrier above Roadway = 2.50 m
Height of Superstructure(Girder+Slab etc) = 3.45 m
Total exposed height 5.95 m
(As per clause 209.3.6)
Wind in Transverse direction:-
Contributory Length=(34.5/2)+(60/2) = 45.4 m
Projected area = 5.95 x 45.38 = 270.0 m2
Force = Pz x A x G x Cd
= 0.609 x 292.7 x 2 x 2.1
Gust factor Drag coeff.
Total transverse force = 748.4 KN With Live Load
Applied per pier = 374.2 kN
Wind on Pier:-
Wind on Pier= d = 2.0 Height = 8.091
b = 1.5
d/b = 1.333333 & H/b = 5.4
Drag Coe CD = 1.4 (Table:6-Cl:209.4-IRC:6:2014)
58.00 m 28.75 m
Bearing rigidity force on fixed bearing on 60m span of ROB on Pier P26 due to LL
Evaluation of braking force for Non-Seismic case over fixed brearing on P-26
R3 Fh/2+
Reaction R3= Fh-(R3*m R3*m (R3*m
Fh (LL) DL+LL R3*m min min) max max)
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: ANK ASK
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26
R3 R3= Fh/2+
Reaction DL+ Fh-(R3*m R3*m (R3*m
Fh (0.2LL) 0.2LL R3*m min min) max max)
LL-1 60 200 7942 238.3 -178.3 397.1 427.1
LL-2 80 400 8142 244.3 -164.3 407.1 447.1
LL-3 82 422 8164 244.9 -162.7 408.2 449.3
LL-4 71 311 8053 241.6 -170.5 402.6 438.2
LL-5 33 400 8142 244.3 -211.0 407.1 423.7
LL-6 33 111 7853 235.6 -202.3 392.6 409.3
LL-7 55 443 8185 245.6 -190.2 409.3 437.0
36 WIND IN LONGITUDINAL WL
37 WIND IN TRANVERSE WT
38 BRAKING FORCE/BEARING RIGIDITY FORCE-Non-seismic case BR
39 BRAKING FORCE/BEARING RIGIDITY FORCE-Seismic case BRS
40 SUPERSTRUCTURE DEAD LOAD
41 SIDL-ONLY FLYOVER SIDE
42 SSIDL-ONLY FLYOVER SIDE
43 SUPERSTRUCTURE DEAD LOAD(ONLY ROB)
44 SIDL(ONLY ROB)
45 SSIDL(ONLY ROB)
6 LOAD COMBINATIONS
6.1 Load Factors
1 1 1 1
1 1 0.2 1 1.5
1 1 1 1.25
1 1 1.33
1 1 1 1.33
DL,SIDL SSDL LL
Leading accompany
1 1.2 0
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: ANK ASK
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26
1 1.2 0.75
1 1 0.75
6.2 LOAD COMBINATIONS FOR PILE CAPACITY CHECK:
DL + SIDL + SSDL + WT
900 DL + SIDL + SSDL + LL 1A+WT+BR 914
901 DL + SIDL + SSDL + LL 2A +WT+BR 915
902 DL + SIDL + SSDL + LL 3A+WT+BR 916
903 DL + SIDL + SSDL + LL 4A+WT+BR 917
904 DL + SIDL + SSDL + LL 5A+WT+BR 918
905 DL + SIDL + SSDL + LL 6A+WT+BR 919
906 DL + SIDL + SSDL + LL 7A+WT+BR 920
BASIC COMBINATION
1.35DL + 1.35SIDL + 1.75SSDL
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: ANK ASK
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26
SEISMIC COMBINATION
RARE COMBINATION
300
Page 64
NOTE No. R 0
STRUCTCON DESIGNS P. L. 34
835/N-454 .
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK
7.0
Eccentricities e1 e2 e3 e4 e5
-180 mm -365 mm -610 mm -260 mm -180 mm
Cable No. 10 to 20
Eccentricities e1 e2 e3 e4 e5
180 mm 115 mm -380 mm 0 mm 115 mm
Cable arrangement
at Mid Section
at Left Support Aection
Input Parameters
Concrete:
Fck, Characterstic Compressive strength = 55 Mpa
Ec, Modulus of Elasticity of concrete = 36000.00 MPa Table 6.5, IRC-112
Reinforcement Steel
Grade = Fe500
Fy = 500 Mpa
Es = 2.00E+05 Mpa
Prestresing Steel:
Es = 1.95E+05 Mpa
Fu (Ultimate Strength) = 1860 Mpa
Fy (Yield Strength) = 1570 Mpa
Anchorage Slip = 6 mm
Stressing Type = One end stressing
Relative Humidity = 70 %
Notional size of member = 2*Ac/ u
= 1
Compressive stregnth of concrete at the age of 28 days
= 55 Mpa
Days considered for long term creep and shrinkage
= 20,000 Days
* Cables should be stressed symmetricially in all the stages. i.e 4/6, 13/15, 14, 12/16
STAGE 8 SIDL
STAGE 9 LL
8.3.1 Summary of forces at center of pier cap for ULS load cases
ES = 1.95E+05 Mpa
As the strain values are greater than εpd , hence stresses in cables are=Fpd= 1407.13 Mpa
fcd = a Fck
ɣm
λ*x Cu
Tu
VED = Γt * tef * Z
tef = 137 mm
Z = Side length of wall I defined by the distance between intersection points with adjecent walls
= 3.91 m
VED = 502.89 KN
Ak = (4000-137) X (1500-137)
= 5265269 mm^2
q = 45
= 0.390 mm^/mm
Longitudinal Reinforcement
Spacing between longitudinal bars should not be more than 350mm IRC-112, 16.5.3
Take sapcing as 300mm
Provide additional 22 no.s 25 mm dia. Bars, with main reinforcement
σcp = 4.913
ρt = 0.001
VRdc = 5828 KN
= 0.00129
8.3.2 Summary opf forces at Letf support of pier cap for ULS load cases
ES = 1.95E+05 Mpa
As the strain values are greater than or almost equal to εpd , hence stresses in ca 1407.13 Mpa
fcd = a Fck
ɣm
λ*x Cu
Tu
η*Fcd = 24.57
tef = 137 mm
Z = Side length of wall I defined by the distance between intersection points with adjecent walls
= 3.91 m
VED = 1713.28 KN
Ak = (4000-137) X (1500-137)
= 5265269 mm^2
q = 45
= 1.330 mm^/mm
Longitudinal Reinforcement
= 1.330 mm^/mm
Spacing between longitudinal bars should not be more than 350mm IRC-112, 16.5.3
Take sapcing as 300mm
Provide additional 22 no.s 25 mm dia. Bars, with main reinforcement
σcp = 4.913
ρt = 0.001
VRdc = 5833 KN
where v1 = 0.6*(1-fck/310)
0.49
αcw = 1.2
Hence,
Maximum allowable shear stress = 7.33
= 5.15 mm^/mm
8.3.3 Summary opf forces at Right support of pier cap for ULS load cases
ES = 1.95E+05 Mpa
As the strain values are greater than or almost equal to εpd , hence stresses in
cables are=Fpd= 1407.13 Mpa
fcd = a Fck
ɣm
λ*x Cu
Tu
η*Fcd = 24.57
VED = Γt * tef * Z
tef = 137 mm
Z = Side length of wall I defined by the distance between intersection points with adjecent walls
= 3.91 m
VED = 1042.82 KN
Ak = (4000-137) X (1500-137)
= 5265269 mm^2
q = 45
= 0.809 mm^/mm
Longitudinal Reinforcement
= 0.809 mm^/mm
Spacing between longitudinal bars should not be more than 350mm IRC-112, 16.5.3
Take sapcing as 300mm
Provide additional 22 no.s 25 mm dia. Bars, with main reinforcement
σcp = 4.913
ρt = 0.001
VRdc = 5833 KN
where v1 = 0.6*(1-fck/310)
0.60
αcw = 1.2
Hence,
Maximum allowable shear stress = 8.91 Mpa
= 6.59 mm^/mm
= 5.15 mm^/mm
Fbst = 0.23
3784.914
OR
OK
8.6.3 Calculation of spalling reinforcement
Min Ast in Each direction = 0.03*Pmax/Fyd*γ EC2-2, Annex J
= 545.03 mm^2 IRC SP: 105-2015
Provide 16 dia. 4 no.s in each direction
NOTE No. R 0
STRUCTCON DESIGNS Pvt Ltd. 835/N-455
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 2-Jun-16
BETWEEN BKC AND EEH BY
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK
Cable profile
Cable no. 1 to 9
Eccentricities e1 e2 e3 e4 e5
-180 mm -365 mm -610 mm -260 mm -180 mm
Cable No. 10 to 20
Eccentricities e1 e2 e3 e4 e5
180 mm 115 mm -380 mm 0 mm 115 mm
Cable arrangement
at Mid Section
at Left Support Aection
Input Parameters
Concrete:
Fck, Characterstic Compressive strength = 55 Mpa
Ec, Modulus of Elasticity of concrete = 36000.00 MPa Table 6.5, IRC-112
Reinforcement Steel
Grade = Fe500
Fy = 500 Mpa
Es = 2.00E+05 Mpa
Prestresing Steel:
Es = 1.95E+05 Mpa
Fu (Ultimate Strength) = 1860 Mpa
Fy (Yield Strength) = 1570 Mpa
Relative Humidity = 70 %
Notional size of member = 2*Ac/ u
= 1
Compressive stregnth of concrete at the age of 28 days
= 55 Mpa
Days considered for long term creep and shrinkage
= 20,000 Days
* Cables should be stressed symmetricially in all the stages. i.e 4/6, 13/15, 14, 12/16
PIER
CAP
665 Summation CS 5 J[6] -5.98 0.27 -0.18 -5.70 -6.16
665 Summation CS 5 I[9] -5.86 -0.33 0.38 -6.19 -5.48
PIER
668 Summation CS 5 J[11] -6.01 -0.08 0.21 -6.09 -5.81
CAP
668 Summation CS 5 I[15] -6.05 -1.15 1.28 -7.20 -4.76
671 Summation CS 5 I[12] -5.94 0.68 -0.61 -5.26 -6.55
671 Summation CS 5 J[747] -5.91 0.65 -0.61 -5.26 -6.52
672 Summation CS 5 I[747] -5.91 0.65 -0.61 -5.26 -6.52
RIGHT 672 Summation CS 5 J[379] -5.80 -1.04 1.05 -6.84 -4.75
CANTIL
EVER 673 Summation CS 5 I[379] -5.82 -0.39 0.39 -6.21 -5.43
673 Summation CS 5 J[380] -5.77 -4.91 4.96 -10.70 -0.81
MAX -5.26 -0.81
Max Allowable Compression = 26.40 Mpa OK MIN -10.70 -6.55
Mx Allowable Tension = -2.50 Mpa REVISE
STAGE 8 SIDL
659 Summation CS 8 I[8] -8.97 -4.30 4.35 -13.30 -4.62
LEFT 659 Summation CS 8 J[14] -9.01 -2.76 2.80 -11.80 -6.21
CANTIL 660 Summation CS 8 I[14] -9.01 -2.76 2.80 -11.80 -6.21
EVER 660 Summation CS 8 J[5] -9.09 1.17 -1.16 -7.91 -10.20
661 Summation CS 8 J[378] -9.13 4.50 -4.51 -4.63 -13.60
661 Summation CS 8 I[5] -9.09 1.17 -1.16 -7.91 -10.20
665 Summation CS 8 I[9] -9.28 0.02 0.09 -9.25 -9.19
665 Summation CS 8 J[6] -9.45 -0.49 0.64 -9.94 -8.81
PIER
668 Summation CS 8 J[11] -9.55 -3.10 3.26 -12.60 -6.29
CAP
668 Summation CS 8 I[15] -9.59 -3.76 3.93 -13.30 -5.66
671 Summation CS 8 J[747] -9.35 -0.23 0.31 -9.58 -9.04
671 Summation CS 8 I[12] -9.41 -1.29 1.39 -10.70 -8.02
672 Summation CS 8 J[379] -9.17 1.86 -1.87 -7.31 -11.00
RIGHT 672 Summation CS 8 I[747] -9.35 -0.23 0.31 -9.58 -9.04
CANTIL
673 Summation CS 8 J[380] -9.13 -4.62 4.67 -13.70 -4.46
EVER
673 Summation CS 8 I[379] -9.20 1.88 -1.87 -7.32 -11.10
MAX -4.63 -4.46
Max Allowable Compression = 26.40 Mpa OK MIN -13.70 -13.60
Mx Allowable Tension = -2.50 Mpa OK
STAGE 9 LL
8.3.1 Summary of forces at center of pier cap for ULS load cases
ES = 1.95E+05 Mpa
As the strain values are greater than εpd , hence stresses in cables are=Fpd= 1407.13 Mpa
fcd = a Fck
ɣm
λ*x Cu
Tu
η*Fcd = 24.57
σcp = 4.913
ρt = 0.004
VRdc = 3148 KN
Asw = 0.072*(Fck)^0.5
S* bw Fyk
= 0.00129
VED = Γt * tef * Z
tef = 137 mm
Ak = (4000-137) X (1500-137)
= 5265269 mm^2
q = 45
= 0.390 mm^/m
Longitudinal Reinforcement
Spacing between longitudinal bars should not be more than 350mm IRC-112, 16.5.3
Take sapcing as 300mm
Provide additional 22 no.s 25 mm dia. Bars, with main reinforcement
8.3.2 Summary opf forces at Letf support of pier cap for ULS load cases
ES = 1.95E+05 Mpa
As the strain values are greater than or almost equal to εpd , hence stresses in ca 1407.13 Mpa
fcd = a Fck
ɣm
λ*x Cu
Tu
η*Fcd = 24.57
Section is Cracked.
Fcd = 24.57
σcp = 0.011
ρt = 0.008
VRdc = 18930 KN
Asw = 0.072*(Fck)^0.5
S* bw Fyk
= 0.00129
VED = Γt * tef * Z
tef = 545.454545
this thickness should not b les than twice the distance between edge and centre of longitudinal reinforcement
tef = 137 mm
Ak = (4000-137) X (1500-137)
= 5265269 mm^2
q = 45
Ast = TED
St (2 * Ak * Fyd * cotθ)
= 1.328 mm^/m
Longitudinal Reinforcement
= 1.330 mm^/m
Spacing between longitudinal bars should not be more than 350mm IRC-112, 16.5.3
Take sapcing as 300mm
Provide additional 22 no.s 25 mm dia. Bars, with main reinforcement
ES = 1.95E+05 Mpa
As the strain values are greater than or almost equal to εpd , hence stresses in
cables are=Fpd= 1407.13 Mpa
fcd = a Fck
ɣm
λ*x Cu
Tu
η*Fcd = 24.57
Section is Cracked.
Fcd = 24.57
σcp = 0.011
ρt = 0.004
VRdc = 15542 KN
Asw = 0.072*(Fck)^0.5
S* bw Fyk
= 0.00129
VED = Γt * tef * Z
tef = 545.454545
this thickness should not b les than twice the distance between edge and centre of longitudinal reinforcement
tef = 137 mm
Ak = (4000-137) X (1500-137)
= 5265269 mm^2
q = 45
Ast = TED
St (2 * Ak * Fyd * cotθ)
= 0.808 mm^/mm
Longitudinal Reinforcement
= 0.809 0.000
Spacing between longitudinal bars should not be more than 350mm IRC-112, 16.5.3
Take sapcing as 300mm
Provide additional 22 no.s 25 mm dia. Bars, with main reinforcement
Fbst = 0.26
3784.914
OR
Reinforcement to prevemt bursting should not be less than,
Ast = 0.15*Pmax/Fyd * γ EC2-2, Annex J
= 2725.14 mm^2
Spiral reinforcement provided, 2 X 20 Dia. -10 legs = 6283.19 mm^2 > 2725.14
OK
The support reactions from Midas analysis results are further used
8.3 The following table shows vertical support reactions from Midas Pile Capacity Check
Combination for pile capacity check 357 356 743 744 746 745
L/C Pile-1 Pile-2 Pile-3 Pile-4 Pile-5 Pile-6 Pile-7 Pile-8 *All Loads are in kN
Max Load 3438 4831 5289 4135 2321 2875 3007 2618
Min Load 2141 3570 4292 2853 1452 2011 2045 1280
For PC2
Pile dia = 1.2 m Socketing considered = 3.6 m
534 3395 5902 6461 4864 534 1875 2376 4133 3632
535 4154 5902 6659 5444 535 2080 2313 4217 3984
536 3611 5902 6620 5057 536 1865 2373 4121 3613
537 4004 5902 6751 5312 537 1977 2365 4286 3897
538 4070 5902 6673 5336 538 2112 2412 4255 3955
539 3863 5902 6680 5235 539 1945 2355 4176 3766
540 3788 5902 6556 5240 540 1944 2306 4023 3661
541 3498 5902 6628 5083 541 1774 2327 3964 3412
542 4179 5902 6674 5450 542 2148 2373 4202 3978
543 3574 5902 6431 4955 543 1987 2357 4161 3792
544 4081 5902 6586 5414 544 2076 2280 4145 3941
545 4108 5902 6595 5440 545 2075 2272 4148 3951
546 3832 5902 6494 5170 546 2038 2313 4175 3901
547 3601 5902 6440 4981 547 1986 2348 4164 3802
548 3379 5902 6457 4867 548 1860 2360 4108 3608
549 4140 5902 6615 5477 549 2090 2281 4119 3929
550 3595 5902 6593 5054 550 1883 2347 4082 3618
551 4033 5902 6519 5321 551 2176 2354 4161 3983
552 4073 5902 6550 5375 552 2162 2340 4141 3963
553 3884 5902 6572 5280 553 1995 2302 4087 3781
554 3690 5902 6569 5163 554 1898 2314 4034 3619
555 3478 5902 6592 5066 555 1774 2316 3960 3418
556 4117 5902 6581 5433 556 2146 2325 4120 3941
557 4079 5902 6103 3776 557 2334 3525 3701 2510
558 4543 5902 6361 4188 558 2376 3477 3737 2635
559 4631 5902 6334 4259 559 2435 3444 3710 2701
560 4355 5902 6199 4003 560 2378 3484 3732 2626
561 4167 5902 6076 3847 561 2393 3492 3675 2576
562 3935 5902 6071 3740 562 2274 3488 3585 2371
563 4693 5902 6269 4320 563 2479 3425 3668 2722
564 4151 5902 6230 3933 564 2264 3485 3572 2352
565 4543 5902 6361 4188 565 2376 3477 3737 2635
566 4610 5902 6283 4212 566 2511 3524 3706 2693
567 4403 5902 6290 4111 567 2344 3466 3627 2505
568 4327 5902 6166 4116 568 2343 3418 3474 2400
569 4038 5902 6238 3959 569 2173 3438 3415 2150
570 4719 5902 6284 4326 570 2548 3485 3653 2716
571 4114 5902 6041 3831 571 2386 3469 3612 2530
572 4621 5902 6196 4290 572 2475 3392 3596 2679
573 4648 5902 6205 4316 573 2474 3384 3599 2689
574 4371 5902 6105 4046 574 2437 3425 3626 2639
575 4141 5902 6050 3857 575 2386 3460 3615 2540
576 3919 5902 6067 3743 576 2259 3472 3559 2347
577 4679 5902 6225 4353 577 2490 3393 3570 2667
578 4135 5902 6203 3930 578 2283 3458 3533 2357
579 4572 5902 6129 4197 579 2575 3466 3612 2721
580 4613 5902 6160 4251 580 2561 3452 3592 2702
581 4424 5902 6183 4156 581 2395 3414 3538 2519
582 4229 5902 6179 4039 582 2298 3425 3485 2357
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK
583 4018 5902 6202 3942 583 2173 3428 3411 2157
584 4656 5902 6191 4309 584 2545 3437 3571 2679
585 3540 5902 6493 4900 585 1935 2413 4250 3772
586 4004 5902 6751 5312 586 1977 2365 4286 3897
587 4091 5902 6724 5383 587 2036 2333 4259 3962
588 3816 5902 6588 5127 588 1979 2372 4281 3888
589 3627 5902 6466 4971 589 1994 2380 4224 3837
590 3395 5902 6461 4864 590 1875 2376 4133 3632
591 4154 5902 6659 5444 591 2080 2313 4217 3984
592 3611 5902 6620 5057 592 1865 2373 4121 3613
593 4004 5902 6751 5312 593 1977 2365 4286 3897
594 4070 5902 6673 5336 594 2112 2412 4255 3955
595 3863 5902 6680 5235 595 1945 2355 4176 3766
596 3788 5902 6556 5240 596 1944 2306 4023 3661
597 3498 5902 6628 5083 597 1774 2327 3964 3412
598 4179 5902 6674 5450 598 2148 2373 4202 3978
599 3574 5902 6431 4955 599 1987 2357 4161 3792
600 4081 5902 6586 5414 600 2076 2280 4145 3941
601 4108 5902 6595 5440 601 2075 2272 4148 3951
602 3832 5902 6494 5170 602 2038 2313 4175 3901
603 3601 5902 6440 4981 603 1986 2348 4164 3802
604 3379 5902 6457 4867 604 1860 2360 4108 3608
605 4140 5902 6615 5477 605 2090 2281 4119 3929
606 3595 5902 6593 5054 606 1883 2347 4082 3618
607 4033 5902 6519 5321 607 2176 2354 4161 3983
608 4073 5902 6550 5375 608 2162 2340 4141 3963
609 3884 5902 6572 5280 609 1995 2302 4087 3781
610 3478 5902 6592 5066 610 1774 2316 3960 3418
611 3478 5902 6592 5066 611 1774 2316 3960 3418
612 4117 5902 6581 5433 612 2146 2325 4120 3941
613 4536 5902 5376 4621 613 2663 2839 2996 2820
614 4617 5902 5421 4693 614 2670 2831 3002 2841
615 4632 5902 5416 4705 615 2681 2825 2997 2853
616 4584 5902 5392 4661 616 2671 2832 3001 2840
617 4551 5902 5371 4633 617 2673 2833 2991 2831
618 4511 5902 5370 4615 618 2653 2833 2975 2795
619 4643 5902 5405 4716 619 2688 2822 2990 2856
620 4549 5902 5398 4648 620 2651 2832 2973 2792
621 4617 5902 5421 4693 621 2670 2831 3002 2841
622 4628 5902 5407 4697 622 2694 2839 2997 2851
623 5473 5902 5650 5244 623 3018 2886 3186 3318
624 4579 5902 5387 4680 624 2665 2820 2956 2800
625 4529 5902 5399 4653 625 2635 2824 2946 2757
626 4647 5902 5407 4717 626 2700 2832 2987 2855
627 4542 5902 5365 4631 627 2672 2829 2980 2823
628 4630 5902 5392 4710 628 2687 2816 2977 2849
629 4635 5902 5394 4715 629 2687 2814 2978 2851
630 4587 5902 5376 4668 630 2681 2822 2983 2842
631 4547 5902 5367 4635 631 2672 2828 2981 2825
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK
632 4508 5902 5370 4615 632 2650 2830 2971 2791
633 4640 5902 5397 4721 633 2690 2816 2973 2847
634 4546 5902 5393 4648 634 2654 2827 2966 2793
635 4622 5902 5380 4694 635 2705 2829 2980 2856
636 4629 5902 5386 4704 636 2702 2826 2977 2853
637 4596 5902 5390 4687 637 2673 2820 2967 2821
638 4562 5902 5389 4667 638 2657 2822 2958 2793
639 4525 5902 5393 4650 639 2635 2822 2945 2758
640 4636 5902 5391 4714 640 2700 2824 2973 2849
641 4518 5902 5399 4483 641 2638 2974 3015 2680
642 4599 5902 5444 4554 642 2645 2965 3022 2702
643 4614 5902 5439 4566 643 2656 2960 3017 2713
644 4566 5902 5415 4522 644 2646 2966 3021 2700
645 4533 5902 5394 4495 645 2648 2968 3011 2691
646 4493 5902 5393 4476 646 2628 2967 2995 2656
647 4625 5902 5428 4577 647 2663 2956 3010 2717
648 4531 5902 5421 4510 648 2626 2967 2993 2652
649 4599 5902 5444 4554 649 2645 2965 3022 2702
650 4610 5902 5430 4558 650 2669 2973 3016 2712
651 4574 5902 5431 4541 651 2640 2963 3003 2679
652 4561 5902 5410 4542 652 2640 2955 2976 2661
653 4511 5902 5422 4514 653 2610 2959 2966 2617
654 4629 5902 5430 4578 654 2675 2967 3007 2716
655 4528 5902 5416 4509 655 2629 2962 2986 2653
656 4604 5902 5403 4556 656 2680 2963 3000 2716
657 4611 5902 5409 4565 657 2677 2961 2996 2713
658 4578 5902 5413 4549 658 2648 2954 2987 2681
659 4544 5902 5412 4528 659 2632 2956 2978 2653
660 4508 5902 5416 4511 660 2610 2957 2965 2618
661 4619 5902 5414 4575 661 2675 2958 2993 2709
662 4524 5902 5388 4492 662 2647 2964 3000 2683
663 4612 5902 5415 4572 663 2662 2950 2997 2709
664 4617 5902 5417 4576 664 2662 2949 2998 2711
665 4569 5902 5399 4530 665 2656 2956 3002 2702
666 4529 5902 5390 4497 666 2647 2962 3000 2685
667 4490 5902 5393 4477 667 2625 2964 2991 2651
668 4623 5902 5420 4583 668 2665 2951 2993 2707
501 912.1 242 944 1045 250 1075 1048 107 1054 908 117 915
502 898.6 355 966 1045 250 1075 1049 206 1069 894.6 215 920 *All Loads are in kN
503 893.6 384 972 1045 250 1075 1046 233 1071 889.7 242 922
504 902.9 341 965 1045 250 1075 1047 199 1065 899 208 923
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK
505 907.2 270 947 1045 250 1075 1045 134 1053 903.1 143 914
506 914.2 99 920 1045 250 1075 1047 -33 1047 909.7 -23 910
507 888.5 377 965 1045 250 1075 1040 227 1065 884.7 235 915
508 907.2 217 933 1045 250 1075 1043 82 1046 903 91 908
509 888.1 320 944 1045 250 1075 1037 173 1051 884.1 180 902
510 887.1 330 946 1045 250 1075 1037 182 1053 883.1 189 903
511 897.7 302 947 1045 250 1075 1040 162 1052 893.6 170 910
512 906.2 226 934 1045 250 1075 1042 91 1046 902 100 907
513 914.2 78 917 1045 250 1075 1046 -53 1048 909.6 -43 911
514 885.9 302 936 1045 250 1075 1037 153 1048 881.9 160 896
515 909.3 114 916 1045 250 1075 1049 -24 1050 905 -15 905
516 898.6 355 966 1045 250 1075 1049 206 1069 894.6 215 920
517 894.2 349 960 1045 250 1075 1045 200 1064 890.5 209 915
518 901 236 931 1045 250 1075 1047 91 1051 896.9 100 902
519 897.9 107 904 1045 250 1075 1040 -34 1041 893.6 -25 894
520 910.1 -75 913 1045 250 1075 1048 -212 1069 905.3 -202 928
521 888.3 347 953 1045 250 1075 1041 196 1059 884.6 203 908
522 908.5 100 914 1045 250 1075 1048 -38 1048 904.1 -28 905
523 890 321 946 1045 250 1075 1037 175 1051 886.2 183 905
524 888.4 306 940 1045 250 1075 1036 160 1049 884.6 167 900
525 895.5 205 919 1045 250 1075 1040 61 1042 891.3 69 894
526 902.5 85 907 1045 250 1075 1043 -54 1045 898.1 -45 899
527 909.8 -73 913 1045 250 1075 1047 -208 1067 905.1 -199 927
528 886.7 292 933 1045 250 1075 1036 144 1046 882.9 151 896
529 682.1 -145 697 1045 250 1075 816 -278 862.1 675.4 -271 728
530 671.7 -59 674 1045 250 1075 817 -202 841.38 665.1 -196 693
531 667.9 -37 669 1045 250 1075 814 -181 833.8 661.3 -175 684
532 675 -70 679 1045 250 1075 815 -208 840.78 668.4 -201 698
533 678.3 -124 689 1045 250 1075 813 -257 852.84 671.6 -251 717
534 683.7 -255 730 1045 250 1075 815 -385 901.32 676.7 -378 775
535 664 -41 665 1045 250 1075 810 -186 831 657.5 -180 682
536 679.9 -243 722 1045 250 1075 817 -379 900.43 673 -372 769
537 671.7 -59 674 1045 250 1075 817 -202 841.38 665.1 -196 693
538 668.3 -63 671 1045 250 1075 813 -206 839 661.9 -201 692
539 673.6 -150 690 1045 250 1075 815 -290 865.6 666.9 -284 725
540 671.2 -248 716 1045 250 1075 810 -386 897.08 664.3 -380 765
541 680.5 -388 783 1045 250 1075 816 -522 968.65 673.3 -515 848
542 663.8 -65 667 1045 250 1075 810 -210 837.19 657.4 -205 689
543 678.3 -165 698 1045 250 1075 812 -297 864.4 671.5 -290 732
544 663.7 -85 669 1045 250 1075 807 -227 838.83 657.1 -222 694
545 662.9 -78 667 1045 250 1075 807 -221 836.88 656.3 -216 691
546 671 -99 678 1045 250 1075 810 -236 843.21 664.3 -230 703
547 677.5 -158 696 1045 250 1075 812 -290 862 670.7 -284 728
548 683.7 -271 736 1045 250 1075 815 -401 907.89 676.6 -394 783
549 661.9 -99 669 1045 250 1075 807 -242 842.72 655.4 -238 697
550 679.3 -254 725 1045 250 1075 816 -389 903.63 672.3 -382 773
551 665.1 -85 670 1045 250 1075 807 -225 837.94 658.7 -220 695
552 663.9 -96 671 1045 250 1075 807 -237 841.14 657.4 -232 697
553 669.3 -174 692 1045 250 1075 810 -313 868.19 662.6 -307 730
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK
554 674.7 -265 725 1045 250 1075 812 -401 905.85 667.8 -395 776
555 680.3 -386 782 1045 250 1075 815 -519 966.37 673.1 -513 846
556 662.6 -107 671 1045 250 1075 807 -250 844.59 656.1 -245 700
557 929.4 653 1136 1045 250 1075 1066 518 1185 929.1 528 1069
558 919 740 1180 1045 250 1075 1066 594 1221 918.8 603 1099
559 915.2 761 1190 1045 250 1075 1064 615 1229 915 624 1107
560 922.3 728 1175 1045 250 1075 1064 588 1216 922.1 598 1099
561 925.6 674 1145 1045 250 1075 1063 539 1192 925.3 548 1076
562 931 543 1078 1045 250 1075 1065 411 1141 930.4 421 1021
563 911.2 757 1184 1045 250 1075 1060 610 1223 911.1 618 1101
564 927.2 555 1081 1045 250 1075 1067 417 1145 926.7 427 1020
565 919 740 1180 1045 250 1075 1066 594 1221 918.8 603 1099
566 915.6 735 1174 1045 250 1075 1063 590 1215 915.6 598 1094
567 920.9 648 1126 1045 250 1075 1065 505 1179 920.6 515 1055
568 918.4 550 1070 1045 250 1075 1060 410 1136 918 419 1009
569 927.8 410 1014 1045 250 1075 1066 274 1100 927 284 969
570 911.1 733 1169 1045 250 1075 1060 586 1211 911.1 594 1088
571 925.6 633 1121 1045 250 1075 1061 499 1173 925.2 509 1056
572 911 713 1157 1045 250 1075 1057 569 1200 910.8 577 1078
573 910.2 720 1161 1045 250 1075 1057 575 1203 910 583 1081
574 918.3 699 1154 1045 250 1075 1059 560 1198 918 569 1080
575 924.8 640 1125 1045 250 1075 1061 506 1176 924.4 515 1058
576 931 527 1070 1045 250 1075 1064 395 1135 930.3 405 1015
577 909.2 699 1147 1045 250 1075 1057 553 1193 909.1 561 1068
578 926.5 544 1074 1045 250 1075 1065 407 1140 926 417 1015
579 912.4 713 1158 1045 250 1075 1057 571 1201 912.3 579 1080
580 911.2 702 1150 1045 250 1075 1057 559 1195 911.1 567 1073
581 916.6 624 1109 1045 250 1075 1060 483 1164 916.3 492 1040
582 922 533 1065 1045 250 1075 1062 395 1133 921.5 404 1006
583 927.6 412 1015 1045 250 1075 1065 276 1100 926.8 286 970
584 909.9 691 1142 1045 250 1075 1057 546 1189 909.8 554 1065
585 682.1 -145 697 1045 250 1075 816 -278 862.1 675.4 -271 728
586 671.7 -59 674 1045 250 1075 817 -202 841.38 665.1 -196 693
587 667.9 -37 669 1045 250 1075 814 -181 833.8 661.3 -175 684
588 675 -70 679 1045 250 1075 815 -208 840.78 668.4 -201 698
589 678.3 -124 689 1045 250 1075 813 -257 852.84 671.6 -251 717
590 683.7 -255 730 1045 250 1075 815 -385 901.32 676.7 -378 775
591 664 -41 665 1045 250 1075 810 -186 831 657.5 -180 682
592 679.9 -243 722 1045 250 1075 817 -379 900.43 673 -372 769 *All Loads are in kN
593 671.7 -59 674 1045 250 1075 817 -202 841.38 665.1 -196 693
594 668.3 -63 671 1045 250 1075 813 -206 839 661.9 -201 692
595 673.6 -150 690 1045 250 1075 815 -290 865.6 666.9 -284 725
596 671.2 -248 716 1045 250 1075 810 -386 897.08 664.3 -380 765
597 680.5 -388 783 1045 250 1075 816 -522 968.65 673.3 -515 848
598 663.8 -65 667 1045 250 1075 810 -210 837.19 657.4 -205 689
599 678.3 -165 698 1045 250 1075 812 -297 864.4 671.5 -290 732
600 663.7 -85 669 1045 250 1075 807 -227 838.83 657.1 -222 694
601 662.9 -78 667 1045 250 1075 807 -221 836.88 656.3 -216 691
602 671 -99 678 1045 250 1075 810 -236 843.21 664.3 -230 703
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK
603 677.5 -158 696 1045 250 1075 812 -290 862 670.7 -284 728
604 683.7 -271 736 1045 250 1075 815 -401 907.89 676.6 -394 783
605 661.9 -99 669 1045 250 1075 807 -242 842.72 655.4 -238 697
606 679.3 -254 725 1045 250 1075 816 -389 903.63 672.3 -382 773
607 665.1 -85 670 1045 250 1075 807 -225 837.94 658.7 -220 695
608 663.9 -96 671 1045 250 1075 807 -237 841.14 657.4 -232 697
609 669.3 -174 692 1045 250 1075 810 -313 868.19 662.6 -307 730
610 680.3 -386 782 1045 250 1075 815 -519 966.37 673.1 -513 846
611 680.3 -386 782 1045 250 1075 815 -519 966.37 673.1 -513 846
612 662.6 -107 671 1045 250 1075 807 -250 844.59 656.1 -245 700
613 377.7 366 526 1045 250 1075 510 235 561.74 376.3 238 446
614 375.8 381 535 1045 250 1075 510 249 567.54 374.6 252 451
615 375.2 385 537 1045 250 1075 510 252 568.69 373.9 255 453
616 376.4 379 534 1045 250 1075 510 248 566.77 375.1 251 451
617 377 370 528 1045 250 1075 510 239 562.82 375.7 242 447
618 377.9 347 513 1045 250 1075 510 217 554 376.6 220 436
619 374.5 384 536 1045 250 1075 509 251 567.72 373.2 254 452
620 377.3 349 514 1045 250 1075 510 218 554.78 375.9 221 436
621 375.8 381 535 1045 250 1075 510 249 567.54 374.6 252 451
622 375.3 380 534 1045 250 1075 510 248 566.64 374 251 450
623 356.6 667 756 1045 250 1075 508 518 725.5 356.2 520 630
624 375.8 348 512 1045 250 1075 509 217 553.2 374.4 220 434
625 377.4 324 497 1045 250 1075 510 193 545.31 376 196 424
626 374.5 380 533 1045 250 1075 509 247 565.93 373.2 250 449
627 377 362 523 1045 250 1075 509 232 559.71 375.7 235 443
628 374.5 376 531 1045 250 1075 509 244 564.16 373.2 247 447
629 374.3 377 532 1045 250 1075 509 245 564.62 373 248 448
630 375.7 374 530 1045 250 1075 509 243 563.81 374.4 246 448
631 376.9 364 524 1045 250 1075 509 233 560.15 375.5 236 444
632 377.9 344 511 1045 250 1075 510 214 552.9 376.6 217 435
633 374.2 374 529 1045 250 1075 509 242 563 372.9 244 446
634 377.2 347 512 1045 250 1075 510 216 553.87 375.8 219 435
635 374.7 376 531 1045 250 1075 509 245 564.23 373.4 247 448
636 374.5 374 530 1045 250 1075 508 242 563.32 373.2 245 447
637 375.4 361 521 1045 250 1075 509 229 558.25 374.1 232 440
638 376.4 345 511 1045 250 1075 509 214 552.5 375 217 433
639 377.3 324 497 1045 250 1075 510 193 545.3 375.9 196 424
640 374.3 372 528 1045 250 1075 508 240 562.38 373 243 445
641 450.3 432 624 1045 250 1075 583 301 656 449.4 305 543
642 448.5 447 633 1045 250 1075 583 314 662.29 447.6 318 549
643 447.8 451 635 1045 250 1075 582 318 663.58 447 322 551
644 449.1 445 632 1045 250 1075 583 313 661.5 448.2 317 549
645 449.6 435 626 1045 250 1075 582 305 657.22 448.8 309 545
646 450.6 413 611 1045 250 1075 583 283 647.48 449.6 286 533
647 447.1 450 634 1045 250 1075 582 317 662.6 446.3 321 550
648 449.9 415 612 1045 250 1075 583 284 648.28 449 287 533
649 448.5 447 633 1045 250 1075 583 314 662.29 447.6 318 549
650 447.9 446 632 1045 250 1075 582 314 661.38 447.1 317 548
651 448.8 431 622 1045 250 1075 583 299 654.91 447.9 303 541
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK
652 448.4 414 610 1045 250 1075 582 282 646.67 447.5 286 531
653 450 389 595 1045 250 1075 583 259 637.61 449.1 262 520
654 447.1 446 631 1045 250 1075 582 313 660.65 446.3 316 547
655 449.8 413 610 1045 250 1075 583 282 647.29 448.9 286 532
656 447.3 442 629 1045 250 1075 581 310 658.87 446.5 314 546
657 447.1 440 627 1045 250 1075 581 308 657.88 446.3 312 544
658 448.1 427 619 1045 250 1075 582 295 652.27 447.2 299 538
659 449 411 609 1045 250 1075 582 280 645.84 448.1 283 530
660 450 390 595 1045 250 1075 583 259 637.63 449 263 520
661 446.9 438 626 1045 250 1075 581 306 656.86 446.1 310 543
662 449.6 428 621 1045 250 1075 582 298 653.84 448.7 302 541
663 447.1 442 629 1045 250 1075 581 310 658.78 446.2 313 545
664 447 443 630 1045 250 1075 581 311 659.29 446.1 315 546
665 448.4 440 628 1045 250 1075 582 308 658.37 447.5 312 546
666 449.5 430 622 1045 250 1075 582 299 654.32 448.6 303 541
667 450.6 410 609 1045 250 1075 583 280 646.24 449.6 284 532
668 446.8 440 627 1045 250 1075 581 307 657.48 445.9 311 544
8.1 Pile has been designed for vertical loads on piles (including its self weight) and moments.
Pile is considered to be fixed at depth of fixity. The shear force in horizontal directions at the pile top will
cause moments in pile. Additional moment due to shift or tilt in piles is also considered.
The pile has been designed for vertical loads and the total moment.
Shift considered - 75 mm
Hence Moment due to shift = 6334 x 75 /1000 = 475 kNm
8.3 Table showing design forces for Pile design at bottom of Pile -3
Load *All Loads are in kN
Comb. M Pile bottom
Total & Moments in kNm
Mmt Due to
P Tilt ( P*tilt dist) moment
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK
M Pile bottom Total
Mmt Due to
S.No P Tilt ( P*tilt dist) moment
501 6523 382.7 1053.7 1436.4
502 6860 402.4 1069.3 1471.8
503 6825 400.4 1071.2 1471.6
504 6648 390.0 1065.2 1455.3
505 6488 380.6 1053.1 1433.7
506 6481 380.2 1047.3 1427.6
507 6740 395.4 1065.0 1460.4
508 6442 377.9 1046.0 1424.0
509 6645 389.8 1051.5 1441.3
510 6657 390.5 1052.6 1443.2
511 6525 382.8 1052.2 1435.0
512 6454 378.7 1046.4 1425.1
513 6477 380.0 1047.8 1427.7
514 6682 392.0 1047.9 1439.9
515 6689 392.4 1049.8 1442.2
516 6860 402.4 1069.3 1471.8
517 6758 396.5 1063.7 1460.1
518 6767 397.0 1051.4 1448.4
519 6605 387.5 1040.9 1428.4
520 6700 393.0 1069.3 1462.4
521 6759 396.5 1059.2 1455.7
522 6654 390.4 1048.4 1438.8
523 6557 384.7 1051.3 1436.0
524 6598 387.1 1048.7 1435.8
525 6627 388.8 1042.0 1430.8
526 6623 388.5 1044.7 1433.2
527 6652 390.3 1067.3 1457.6
528 6638 389.5 1046.2 1435.7
529 6493 380.9 862.1 1243.0
530 6751 396.0 841.4 1237.4
531 6724 394.5 833.8 1228.3
532 6588 386.5 840.8 1227.3
533 6466 379.3 852.8 1232.2
534 6461 379.0 901.3 1280.4
535 6659 390.7 831.0 1221.7
536 6620 388.4 900.4 1288.8
537 6751 396.0 841.4 1237.4
538 6673 391.5 839.0 1230.5
539 6680 391.9 865.6 1257.5
540 6556 384.6 897.1 1281.7
541 6628 388.9 968.7 1357.5
542 6674 391.5 837.2 1228.7
543 6431 377.3 864.4 1241.7
544 6586 386.4 838.8 1225.2
545 6595 386.9 836.9 1223.8
546 6494 381.0 843.2 1224.2
547 6440 377.8 862.0 1239.8
548 6457 378.8 907.9 1286.7
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK
685 3051 586 -176 4104 691 -172 4943 694 -283 3890 582 -278
686 2887 591 -244 4042 693 -240 4963 696 -348 3807 586 -343
687 2718 595 -323 3972 695 -319 4960 698 -425 3706 591 -420
688 2534 600 -429 3892 697 -423 4979 701 -528 3621 596 -522
689 3089 585 -186 4119 690 -182 4970 694 -293 3940 581 -289
690 2617 598 -236 3932 695 -231 4839 698 -334 3525 594 -329
691 3058 586 -167 4109 691 -163 4974 694 -274 3924 582 -269
692 3082 585 -160 4118 691 -157 4983 694 -268 3946 581 -264
693 2841 592 -179 4024 693 -174 4895 696 -281 3712 588 -276
694 2641 598 -230 3941 694 -225 4847 698 -329 3547 594 -323 P ML MT
695 2448 603 -328 3862 697 -323 4862 700 -425 3448 599 -419 2448 603 -328
696 3109 584 -179 4130 691 -175 4999 694 -287 3979 580 -283 3862 697 -323
697 2803 701 100 4513 801 107 4737 802 0 3027 699 8 4683 798 -16
698 3207 692 176 4783 801 182 4962 802 67 3385 690 73 2996 700 -85
699 3283 688 195 4774 799 200 4938 800 85 3447 687 91
700 3043 695 166 4639 800 172 4821 800 62 3225 693 68
701 2879 697 119 4504 798 125 4714 799 18 3089 696 26
702 2678 702 5 4391 800 11 4710 801 -93 2996 700 -85
703 3337 685 191 4719 796 196 4882 796 81 3500 683 87
704 2866 699 15 4550 801 22 4848 802 -87 3164 697 -80
705 3207 692 176 4783 801 182 4962 802 67 3385 690 73
706 3264 689 172 4752 799 177 4894 799 63 3406 687 69
707 3084 693 96 4666 800 102 4900 801 -10 3319 692 -4
708 3019 691 11 4488 795 16 4792 796 -93 3323 689 -87
709 2767 699 -111 4436 800 -104 4855 802 -212 3186 697 -205
710 3359 685 170 4749 796 175 4895 797 60 3505 683 65
711 2833 697 83 4442 797 90 4683 798 -16 3075 696 -9
712 3274 685 153 4618 793 158 4818 794 45 3474 683 50
713 3297 684 159 4627 793 164 4827 794 50 3497 682 56
714 3057 691 140 4534 795 146 4739 796 37 3262 689 43
715 2856 697 90 4451 797 96 4692 798 -10 3097 695 -3
716 2663 702 -9 4372 799 -3 4706 800 -107 2998 700 -99
717 3325 683 140 4639 793 145 4843 794 31 3529 682 37
718 2851 698 6 4515 800 12 4825 801 -96 3161 696 -89
719 3232 686 153 4599 793 158 4760 794 46 3393 685 52
720 3267 685 143 4614 793 148 4787 794 36 3441 683 41
721 3103 690 75 4552 795 81 4807 796 -30 3358 688 -24
722 2934 694 -4 4482 797 2 4804 798 -107 3256 692 -100
723 2750 699 -109 4401 799 -103 4823 801 -210 3172 697 -202
724 3305 684 133 4629 793 138 4814 794 25 3491 682 31
wind 725 2518 437 -481 3471 531 -477 4857 536 -578 3904 431 -574
Leading 726 2821 431 -424 3674 531 -421 5026 536 -528 4173 425 -524
727 2878 428 -410 3667 529 -407 5008 534 -514 4219 422 -511
728 2698 433 -431 3565 530 -428 4920 535 -532 4052 427 -528
729 2575 435 -466 3464 529 -463 4840 534 -564 3951 429 -560
730 2424 438 -552 3379 530 -548 4836 535 -648 3881 432 -643
731 2918 426 -413 3625 527 -410 4966 532 -517 4259 420 -515 P ML MT
732 2565 436 -544 3498 531 -541 4940 536 -643 4006 430 -639 2413 438 -563
733 2821 431 -424 3674 531 -421 5026 536 -528 4173 425 -524
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK
734 2864 428 -427 3650 529 -424 4975 534 -531 4188 423 -528 4523 702 113
735 2729 432 -484 3585 530 -480 4979 535 -586 4123 426 -582
736 2680 430 -548 3452 526 -545 4898 532 -648 4126 424 -645 5026 536 -528
737 2491 436 -639 3413 530 -635 4946 536 -737 4023 430 -733
738 2935 425 -428 3648 527 -426 4975 532 -533 4262 420 -530 4280 418 -552
739 2554 436 -551 3472 530 -548 4923 536 -650 4005 429 -646
740 2839 426 -441 3535 525 -439 4874 530 -543 4178 421 -541
741 2866 425 -448 3546 525 -446 4895 530 -551 4214 420 -548
742 2743 429 -499 3500 526 -496 4909 532 -600 4152 423 -597
743 2616 433 -559 3447 528 -556 4907 533 -658 4076 427 -655
744 2478 436 -638 3387 529 -634 4922 535 -735 4012 430 -731
745 2894 425 -456 3558 525 -453 4915 530 -559 4252 419 -557
746 2540 435 -493 3417 528 -490 4817 533 -590 3940 429 -586
747 2871 425 -441 3550 525 -439 4918 530 -545 4239 420 -542
748 2889 425 -437 3557 525 -434 4924 530 -540 4256 419 -538
749 2708 430 -450 3486 526 -448 4858 532 -550 4080 424 -547
750 2558 434 -488 3424 528 -485 4823 533 -586 3957 428 -582
751 2413 438 -563 3365 529 -559 4834 535 -658 3882 432 -654
752 2909 424 -450 3566 525 -448 4937 530 -555 4280 418 -552
753 2878 602 51 4320 701 57 4597 702 -47 3155 601 -41
754 3180 595 108 4523 702 113 4766 703 2 3423 594 8
755 3237 593 122 4516 700 127 4748 701 16 3470 591 21
756 3058 598 101 4415 700 106 4660 701 -1 3303 596 4
757 2935 600 66 4313 699 71 4580 700 -34 3201 598 -28
758 2783 603 -20 4229 700 -14 4577 702 -117 3131 601 -111
759 3278 590 119 4474 697 124 4706 698 13 3510 589 18
760 2924 601 -12 4348 702 -7 4680 703 -113 3257 599 -107
761 3180 595 108 4523 702 113 4766 703 2 3423 594 8
762 3224 593 105 4499 699 110 4715 700 0 3439 592 5
763 3089 597 48 4435 701 54 4719 702 -55 3373 595 -50
764 3040 595 -16 4301 697 -11 4638 698 -117 3377 593 -112
765 2851 601 -107 4262 701 -101 4686 702 -206 3274 599 -200
766 3295 590 104 4497 698 109 4715 699 -3 3513 589 2
767 2914 600 -19 4321 701 -14 4663 702 -120 3255 599 -114
768 3199 591 91 4385 695 95 4615 696 -13 3429 590 -8
769 3226 590 84 4396 695 88 4635 696 -21 3465 589 -16
770 3103 594 33 4349 697 38 4649 698 -70 3403 592 -65
771 2976 597 -27 4297 698 -21 4647 700 -127 3326 596 -122
772 2838 601 -106 4236 700 -100 4662 702 -205 3263 599 -199
773 3254 590 76 4407 695 81 4655 696 -29 3502 588 -24
774 2773 603 -31 4214 700 -25 4574 701 -127 3133 601 -121
775 2662 606 -98 4165 701 -92 4602 703 -193 3100 604 -187
776 2900 600 39 4266 698 44 4557 699 -60 3191 598 -54
777 3231 590 91 4399 695 95 4658 697 -14 3490 589 -9
778 3248 590 95 4406 695 100 4664 697 -10 3507 588 -5
779 3068 595 82 4336 697 87 4598 698 -20 3331 593 -14
780 2918 599 44 4273 698 49 4563 699 -55 3207 598 -49
MY
FZ MX MY MX MY FZ MX MY FZ MX
Load FZ (kN) (kN*
(kN) (kN*m) (kN*m) (kN*m) (kN*m) (kN) (kN*m) (kN*m) (kN) (kN*m)
m)
LL 669 1816 227 -351 2346 282 -349 2750 282 -406 2221 226 -403
Leading 670 1853 224 -422 2304 279 -420 2781 280 -478 2329 222 -475
671 1904 221 -439 2276 277 -438 2758 277 -496 2386 219 -494
672 1855 224 -414 2310 279 -413 2777 280 -470 2321 222 -468
673 1868 224 -368 2317 279 -367 2727 280 -424 2278 223 -422
674 1765 229 -259 2314 281 -257 2648 282 -311 2099 228 -309 P ML MT
675 1942 219 -434 2259 275 -433 2721 275 -491 2405 217 -489 1677 232 -143
676 1756 229 -266 2311 281 -264 2638 282 -318 2083 228 -315 2223 281 -257
677 1853 224 -422 2304 279 -420 2781 280 -478 2329 222 -475 2278 379 130
678 1970 220 -413 2345 277 -412 2754 278 -471 2380 219 -469 1403 332 136
679 1825 225 -343 2295 279 -342 2686 279 -397 2216 224 -395
680 1824 224 -259 2252 276 -258 2552 277 -311 2125 223 -309
681 1677 232 -143 2271 281 -141 2501 281 -192 1907 231 -189
682 2002 218 -410 2311 275 -409 2708 275 -467 2400 217 -466
683 1772 228 -256 2288 280 -255 2603 280 -309 2087 227 -306
684 2026 217 -394 2294 274 -394 2672 274 -452 2404 216 -450
685 2014 217 -385 2282 273 -385 2655 274 -442 2387 216 -440
686 1869 222 -322 2249 276 -321 2608 276 -376 2228 221 -374
687 1785 226 -246 2259 278 -245 2562 278 -298 2087 225 -296
688 1677 231 -145 2262 280 -143 2498 281 -194 1913 230 -191
689 2000 217 -375 2269 273 -375 2637 273 -431 2367 216 -430
690 1862 224 -334 2297 278 -332 2673 279 -388 2238 223 -386
691 1939 218 -397 2230 273 -397 2659 274 -453 2367 217 -452
692 1938 218 -404 2223 273 -403 2661 274 -459 2376 217 -458
693 1906 221 -388 2259 276 -387 2685 276 -444 2332 219 -442
694 1861 224 -340 2289 278 -339 2675 279 -394 2247 223 -392
695 1752 229 -245 2300 281 -243 2627 281 -298 2078 228 -295
696 1952 218 -384 2231 273 -384 2636 273 -439 2357 216 -438
697 1976 326 -27 2790 382 -24 2530 381 -81 1716 327 -78
698 2013 323 -98 2749 380 -95 2561 378 -153 1825 324 -150
699 2064 320 -116 2720 377 -113 2538 376 -171 1882 321 -168
700 2014 323 -90 2755 380 -88 2557 378 -146 1817 324 -142
701 2027 324 -45 2762 380 -42 2507 378 -100 1773 324 -96
703 2102 318 -110 2704 375 -109 2502 374 -166 1900 319 -163
705 2013 323 -98 2749 380 -95 2561 378 -153 1825 324 -150
706 2130 320 -89 2790 378 -87 2535 376 -146 1875 321 -143
707 1985 324 -20 2740 380 -17 2466 378 -73 1711 325 -69
709 1836 331 181 2715 381 184 2282 379 132 1403 332 136
710 2162 317 -86 2755 376 -85 2489 374 -143 1895 318 -140
711 2022 324 -10 2741 379 -8 2453 377 -64 1733 325 -60
712 2099 318 -74 2675 374 -72 2439 372 -128 1863 319 -126
713 2098 317 -80 2668 374 -78 2441 372 -135 1872 318 -132
714 2066 320 -64 2703 376 -62 2465 375 -119 1828 321 -116
715 2021 323 -16 2734 379 -14 2455 377 -70 1742 324 -67
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK
717 2111 317 -60 2675 374 -59 2417 372 -115 1852 318 -112
719 2185 316 -71 2739 374 -69 2453 372 -127 1899 317 -125
720 2174 316 -61 2727 374 -60 2435 372 -117 1882 317 -115
721 2029 321 1 2694 376 3 2389 374 -52 1724 323 -49
723 1837 331 179 2706 381 182 2278 379 130 1408 332 134
724 2159 316 -52 2714 374 -50 2417 372 -107 1863 318 -104
725 1687 162 -519 2007 214 -518 2818 216 -573 2499 159 -572
Wind 726 1715 160 -572 1976 212 -572 2841 215 -627 2580 156 -626
Leadng 727 1753 158 -585 1954 210 -585 2824 213 -641 2623 154 -640
728 1716 160 -567 1980 212 -566 2838 215 -622 2574 157 -620
729 1726 160 -532 1985 212 -532 2801 215 -587 2541 157 -586
730 1648 164 -450 1983 214 -449 2742 216 -502 2408 161 -501
731 1782 156 -582 1942 209 -581 2797 211 -637 2637 153 -636
732 1642 164 -455 1981 214 -454 2734 216 -508 2395 161 -506
733 1715 160 -572 1976 212 -572 2841 215 -627 2580 156 -626
734 1803 157 -566 2007 211 -566 2822 213 -622 2618 154 -621
735 1694 161 -513 1969 212 -513 2770 214 -567 2495 158 -566
736 1693 160 -450 1937 210 -450 2670 212 -502 2427 157 -501
737 1583 166 -363 1951 213 -362 2632 215 -413 2264 163 -411
738 1827 155 -564 1981 209 -564 2787 211 -619 2633 152 -619
739 1654 163 -448 1964 213 -448 2708 215 -500 2398 160 -499
740 1844 155 -552 1968 208 -552 2760 210 -608 2636 152 -607
741 1835 155 -545 1959 208 -545 2747 210 -600 2623 152 -599
742 1727 159 -498 1934 210 -498 2712 212 -551 2504 156 -550
743 1664 162 -441 1942 211 -440 2677 213 -492 2399 159 -491
744 1583 165 -365 1944 213 -364 2629 215 -415 2268 163 -413
745 1825 155 -537 1950 208 -537 2734 210 -592 2609 152 -592
746 1721 160 -506 1970 212 -506 2760 214 -560 2511 157 -559
747 1779 156 -554 1920 208 -554 2750 210 -609 2609 153 -608
748 1779 155 -559 1915 208 -559 2751 210 -613 2615 152 -613
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK
749 1755 157 -547 1942 210 -547 2769 212 -602 2582 154 -601
750 1721 160 -511 1965 211 -510 2762 214 -565 2518 157 -563
751 1639 164 -440 1973 214 -439 2726 216 -492 2392 161 -490
752 1789 155 -544 1921 207 -544 2733 210 -598 2601 152 -598
753 1953 328 20 2748 382 23 2452 380 -32 1657 329 -29
754 1981 325 -33 2717 380 -30 2475 379 -86 1739 326 -83
755 2019 323 -46 2696 378 -44 2458 377 -100 1782 324 -97
756 1982 325 -27 2721 380 -25 2472 379 -81 1733 326 -77
757 1992 325 7 2727 380 10 2435 378 -46 1700 327 -43
759 2048 321 -42 2683 377 -40 2431 375 -96 1796 322 -93
761 1981 325 -33 2717 380 -30 2475 379 -86 1739 326 -83
762 2069 322 -27 2748 379 -24 2456 377 -81 1777 324 -78
763 1960 326 26 2710 380 29 2404 378 -26 1654 327 -23
765 1849 331 176 2692 381 179 2266 379 128 1423 332 132
766 2093 321 -24 2722 377 -22 2421 375 -79 1792 322 -76
768 2110 320 -13 2710 376 -11 2394 374 -67 1795 321 -64
769 2102 320 -6 2700 376 -3 2381 374 -59 1782 321 -57
770 1993 324 41 2676 377 44 2346 376 -10 1663 325 -7
771 1930 327 99 2683 379 101 2311 377 48 1557 328 52
772 1849 331 174 2685 381 178 2263 379 126 1427 332 130
773 2091 320 2 2691 376 4 2368 374 -52 1767 321 -49
774 1905 329 99 2714 382 102 2360 380 49 1551 330 53
775 1789 333 162 2683 383 166 2306 381 114 1412 334 119
776 1987 325 33 2711 380 36 2394 378 -19 1670 327 -16
777 2045 321 -15 2662 376 -13 2384 374 -68 1768 322 -65
778 2045 321 -19 2656 376 -17 2386 374 -72 1774 322 -70
779 2021 323 -8 2683 378 -6 2403 376 -61 1741 324 -58
780 1987 325 28 2706 379 31 2396 378 -24 1677 326 -21
MX MY
Node FX (kN) FZ (kN)
(kN*m) (kN*m)
Refer IRC 112 Table 12.4 Crack width less than 0.2 mm
Mmt due to
Case P Mx Mz R= √Mx2+Mz2 Total Moment LC
tilt/shift
Pmax 6860 1049 206 1069.3 402.4 1471.8 502
Pmin 3379 685 495 845.1 198.2 1043.4 548
Mmax 6717 1067 749 1303.6 394.1 1697.7 558
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK
Mmt due to
Case L/C P Mx Mz R= √Mx2+Mz2 Total Moment LC
tilt/shift
Pmax 4286 1295 397.0 1354.5 251.4 1605.9 530
Pmin 1774 900 260.0 936.8 104.1 1040.9 541
Mmax 4260 1540 323 1573.5 249.9 1823.4 531
Ductile detailing has been carried out in piles as the structure is in seismic zone-III. IRC:112-
Section 17.3.2 has been refered.
= (1 / 5) x 1100
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK
= 220 mm
= 0.06614
Hence wwd = Max(ww req; 0.18)
= 0.18
v) Extent of confinenment
X
0.80 3.00 0.80 Pilecap thk= 1.8 m
1 2
1.95 0.3
4.60
2.4 3.00
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK
Y
Longitudinal
direction
3 4
0.80
0.525 4.60
5
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK
Longitudinal Design:
Load Load on pile Load Load on pile
Comb. 1+3 2+4 Comb. 1+3 2+4
S.No KN KN S.No KN KN
NORMAL Seismic
501 9563 10806 613 10438 9997
502 10168 11678 614 10519 10113
503 10282 11736 615 10534 10121
504 9923 11226 616 10486 10053
505 9677 10863 617 10453 10005
506 9374 10716 618 10413 9985
507 10364 11732 619 10545 10120
508 9608 10796 620 10451 10046
509 10269 11597 621 10519 10113
510 10304 11643 622 10530 10104
511 9944 11160 623 11375 10893
512 9643 10842 624 10481 10067
513 9353 10715 625 10431 10052
514 10345 11716 626 10549 10124
515 9656 11175 627 10444 9996
516 10168 11678 628 10532 10102
517 10255 11608 629 10537 10109
518 9985 11486 630 10489 10044
519 9886 11331 631 10449 10002
520 9508 11220 632 10410 9985
521 10397 11758 633 10542 10118
522 9635 11137 634 10448 10041
523 10206 11388 635 10524 10075
524 10259 11499 636 10531 10089
525 10013 11405 637 10498 10077
526 9759 11247 638 10464 10056
527 9483 11151 639 10427 10043
528 10316 11615 640 10538 10105
529 9442 11393 641 10420 9881
530 9906 12062 642 10501 9998
531 9993 12107 643 10516 10005
532 9718 11716 644 10468 9937
533 9529 11438 645 10435 9889
534 9297 11325 646 10395 9869
535 10056 12103 647 10527 10005
536 9513 11677 648 10433 9931
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK
z = lever arm
z
z = d(1+ √ (1- 4.41 K) ) ≤ 0.95 d
2
z = 0.9891 d ≤ 0.95 d Fs
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK
Ast reqd = M
fyd x z x d
= 6130 x 1000000
435 x 0.950 x 1738
= 8537 mm2 for total width
= 1856 mm2 PER METER
Minimum reinforcement Req.
Ast min = 0.26 x fctm x 1000 x 1738 OR 0.0013 x bt xd
500 10390.25 mm2
= 2981.55 mm2 per metre OR 2258.75 mm2 per metre
= 2981.55 mm2 per metre Required spacing 164.64 mm c/c
= 3828 kNm
Characteristic strength of concrete = 45 N/mm²
Characteristic strength of reinforcement = 500 N/mm²
Design Bending Moment = 3828 KN-m
Width of pile cap in long direction = 4600 mm
Gross Depth of pile Cap = 1800 mm
Clear Cover = 50 mm
Dia of bars in long direction = 25 mm
Stirrups = 0 mm
Effective depth (def) = 1713 mm
dreqd =( M )0.5
fc x b
=( 3828 x 1000000 )0.5= 372.4 mm
6.000 x 4600
dprov = 1800 - 50 - 0 - 12.5 - 25
= 1713 mm
5 1.95
a b
2.4
1.14632 0.9213
Dist between CL of
Pile and face of pier
along b-b axis
2.1213203 Dist between CL of Pile and face
of pier along a-a axis
3
7 8
501 2136 2907.862 4129.93 3358.11 585 1935 2412.9 4250 3772
502 2191 2845.925 4175.9 3521 586 1977 2365.4 4286 3897
503 2268 2803 4141.17 3606.46 587 2036 2332.5 4259 3962
504 2194 2854.661 4169.73 3508.88 588 1979 2372.1 4281 3888
505 2213 2864.988 4095.23 3443.56 589 1994 2380 4224 3837
506 2059 2859.991 3977.57 3176.11 590 1875 2376.2 4133 3632
507 2325 2777.795 4086.52 3634.15 591 2080 2313.1 4217 3984
508 2205 2834.67 4013.74 3383.76 592 1865 2373.2 4121 3613
509 2320 2734.83 3992.88 3578.18 593 1977 2365.4 4286 3897
510 2319 2723.803 3996.13 3591.47 594 2112 2412.5 4255 3955
511 2271 2777.554 4031.94 3525.8 595 1945 2354.5 4176 3766
512 2204 2823.602 4016.93 3397.09 596 1944 2305.7 4023 3661
513 2039 2839.421 3944.82 3144.55 597 1774 2326.6 3964 3412
514 2339 2735.677 3959.09 3562.72 598 2148 2372.8 4202 3978
515 2045 2856.174 3961.8 3151.06 599 1987 2356.7 4161 3792
516 2191 2845.925 4175.9 3521 600 2076 2280.2 4145 3941
517 2367 2907.378 4136.49 3596.43 601 2075 2271.7 4148 3951
518 2149 2831.77 4033.57 3350.92 602 2038 2313 4175 3901
519 2149 2768.081 3833.6 3214 603 1986 2348.3 4164 3802
520 1927 2795.333 3756.81 2888.36 604 1860 2360.4 4108 3608
521 2415 2855.563 4067 3626.46 605 2090 2280.9 4119 3929
522 2069 2821.466 3909.84 3157.7 606 1883 2346.6 4082 3618
523 2451 2830.695 4013.08 3632.9 607 2176 2353.7 4161 3983
524 2433 2812.406 3987.19 3607.5 608 2162 2339.7 4141 3963
525 2215 2763.048 3917.12 3369.56 609 1995 2301.8 4087 3781
526 2089 2778.35 3847.46 3158.11 610 1774 2316.4 3960 3418
527 1927 2782.107 3751.78 2896.73 611 1774 2316.4 3960 3418
528 2411 2793.678 3960.45 3578.09 612 2146 2325.3 4120 3941
529 1935 2412.859 4250.26 3772 613 2663 2838.9 2996 2820
530 1977 2365.374 4285.51 3896.88 614 2670 2830.6 3002 2841
531 2036 2332.507 4258.88 3962.36 615 2681 2824.9 2997 2853
532 1979 2372.071 4280.78 3887.56 616 2671 2831.8 3001 2840
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK
533 1994 2379.989 4223.66 3837.47 617 2673 2833.2 2991 2831
534 1875 2376.158 4133.46 3632.43 618 2653 2832.5 2975 2795
535 2080 2313.141 4217 3983.59 619 2688 2821.6 2990 2856
536 1865 2373.231 4121.36 3613.23 620 2651 2832 2973 2792
537 1977 2365.374 4285.51 3896.88 621 2670 2830.6 3002 2841
538 2112 2412.488 4255.3 3954.67 622 2694 2838.8 2997 2851
539 1945 2354.522 4176.39 3766.45 623 3018 2885.6 3186 3318
540 1944 2305.693 4023.08 3661.5 624 2665 2820.3 2956 2800
541 1774 2326.587 3964.21 3411.82 625 2635 2823.9 2946 2757
542 2148 2372.763 4202 3977.69 626 2700 2831.9 2987 2855
543 1987 2356.745 4161.19 3791.62 627 2672 2829.1 2980 2823
544 2076 2280.201 4145.2 3940.68 628 2687 2815.8 2977 2849
545 2075 2271.747 4147.69 3950.87 629 2687 2814.4 2978 2851
546 2038 2312.956 4175.14 3900.53 630 2681 2821.5 2983 2842
547 1986 2348.259 4163.63 3801.85 631 2672 2827.7 2981 2825
548 1860 2360.387 4108.35 3608.23 632 2650 2829.8 2971 2791
549 2090 2280.851 4119.29 3928.83 633 2690 2815.9 2973 2847
550 1883 2346.622 4081.53 3618.32 634 2654 2827.4 2966 2793
551 2176 2353.697 4160.68 3982.64 635 2705 2828.6 2980 2856
552 2162 2339.676 4140.83 3963.16 636 2702 2826.2 2977 2853
553 1995 2301.835 4087.11 3780.74 637 2673 2819.6 2967 2821
554 1898 2313.567 4033.71 3618.63 638 2657 2821.6 2958 2793
555 1774 2316.447 3960.35 3418.24 639 2635 2822.1 2945 2758
556 2146 2325.318 4120.33 3940.62 640 2700 2823.7 2973 2849
557 2334 3524.684 3701.35 2510.35 641 2638 2973.5 3015 2680
558 2376 3477.2 3736.6 2635.28 642 2645 2965.3 3022 2702
559 2435 3444.333 3710 2700.76 643 2656 2959.6 3017 2713
560 2378 3483.897 3731.87 2626 644 2646 2966.5 3021 2700
561 2393 3491.815 3674.75 2575.87 645 2648 2967.8 3011 2691
562 2274 3487.984 3584.55 2370.83 646 2628 2967.2 2995 2656
563 2479 3424.967 3668.07 2722 647 2663 2956.2 3010 2717
564 2264 3485.057 3572.45 2351.62 648 2626 2966.7 2993 2652
565 2376 3477.2 3736.6 2635.28 649 2645 2965.3 3022 2702
566 2511 3524.314 3706.39 2693.07 650 2669 2973.5 3016 2712
567 2344 3466.347 3627.48 2504.85 651 2640 2963.4 3003 2679
568 2343 3417.519 3474.17 2399.89 652 2640 2954.9 2976 2661
569 2173 3438.413 3415.3 2150.21 653 2610 2958.5 2966 2617
570 2548 3484.589 3653.11 2716.09 654 2675 2966.6 3007 2716
571 2386 3468.571 3612.28 2530 655 2629 2962 2986 2653
572 2475 3392.027 3596.29 2679.08 656 2680 2963.3 3000 2716
573 2474 3383.573 3598.78 2689.27 657 2677 2960.8 2996 2713
574 2437 3424.782 3626.23 2638.92 658 2648 2954.2 2987 2681
575 2386 3460.085 3614.72 2540.24 659 2632 2956.3 2978 2653
576 2259 3472.213 3559.44 2346.63 660 2610 2956.8 2965 2618
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK
577 2490 3392.676 3570.38 2667.23 661 2675 2958.3 2993 2709
578 2283 3458.448 3532.62 2356.71 662 2647 2963.8 3000 2683
579 2575 3465.523 3611.77 2721 663 2662 2950.5 2997 2709
580 2561 3451.502 3591.92 2701.56 664 2662 2949 2998 2711
581 2395 3413.661 3538.2 2519.13 665 2656 2956.2 3002 2702
582 2298 3425.392 3484.8 2357 666 2647 2962.3 3000 2685
583 2173 3428.272 3411.44 2156.64 667 2625 2964.4 2991 2651
584 2545 3437.144 3571.42 2679 668 2665 2950.6 2993 2707
Lets design the reinforcement in two orthogonal directions i.e in x-x and y-y. for max moment =
= 6132.21 kNm
z = lever arm
z
z = d(1+ √ (1- 4.41 K) ) ≤ 0.95 d
2
z = 0.9887 d ≤ 0.95 d Fs
Ast reqd = M
fyd x z x d
= 6132 x 1000000
435 x 0.950 x 1713
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK
The previous section show the reinforcement design of pilecap. The area of steel
provided for both of the pilecaps are governed by the Ast min criteria.
As can be seen, pilecap PC1 the design meoments are higher than PC2, hence crackwidth
only for PC1 has been presented.
Hence the loads on the piles are as follows.
Load Load on pile
Comb. 1 2 3 4 5 6 7 8
S.No KN KN KN KN KN KN KN KN
= 2318 KN-m
= 0.00028
Maximum crack spacing
bar spacing = 170
5(C+f/2) = 465 >= 170 IRC 112 eqn 12.8
Sr.max = 3.4C+ 0.425k1k2F k1 = 1 for epoxy coated
R reff k2 = 0.5
= 204 + 3.4
0.021
= 364.5
Crack width Wk = Sr.max ( ɛsm - ɛcm )
Note No. R 0
STRUCTCON DESIGNS P. L. 835/N-454 37 .
PROJECT : DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR Date Sheet
BETWEEN BKC AND EEH 31-May-16
SUBJECT : Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 By Check
ANK ASK
= 364.5 x 0.000279
= 0.102 mm < 0.2 mm Hence Safe
2
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix 0 ANK ASK
0
Moment-y Moment-z
Elem Stage Part Axial (kN)
(kN*m) (kN*m)
P MT ML
Max P -14034 1286 2299
Miin P -1922 -2184 95
MaxMT -13395 2399 2255
MaxML -5927 -1798 3453
* Construction stage 2 is not considered critical as the pier cap will be supporterd on staging during pretsressing,
which is not simulated in Midas model.
* ULS Partial Safety factor for DL is taken as 1.35 or 1 depending on it's effect i.e adding or relieving to the effect of variable load.
Max P Case
657 Dead Load CS 9 -13982 1105 1743 1.35 -18875 1492 2353
Tendon
657 CS 9 0 0 0 0.9 0 0 0
Primary
Tendon
657 CS 9 -51 -21 554 1.1 -57 -23 610
Secondary
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix 0 ANK ASK
0
Creep
657 CS 9 -1 -70 5 1 -1 -70 5
Secondary
Shrinkage
657 CS 9 0 272 -4 1 0 272 -4
Secondary
657 Summation CS 9 -14034 1286 2299 -18933 1671 2964
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix 0 ANK ASK
0
Interaction Ratio
Pu/fck bd Mu T MuL MuT cap MuLcap
Fck bd2 Fck bd2 MuT cap MuLcap
Min P Case
NED = 0.02 a = 1
NRD
Interaction Ratio
Pu/fck bd Mu T MuL MuT cap MuLcap
Fck bd2 Fck bd2 MuT cap MuLcap
Max MT Case
657 Dead Load -13346 12663 1747 1.35 -18017 17095 2358
CS 10
Tendon
657 0 0 0 0.9 0 0 0
Primary CS 10
Tendon
657 -48 -10011 508 1.1 -53 -11012 559
Secondary
CS 10
Creep
657 -2 244 9 1 -2 244 9
Secondary CS 10
Shrinkage
657 1 -497 -9 1 1 -497 -9
Secondary CS 10
657 Summation CS 10 -13395 2399 2255 -18071 5831 2918
Max ML Case
NRD
fyk = 500
fctm = 3.7
λx = 0.36488
Fs
z
fc = 0.36488 x 24.6 x (1-0.36488/2) = 7.33
z = (1-0.36488/2) x d = 0.818 d
For grade of Concrete M 55
z = = 0.82 d
Fc = = 7.33
Height of Pier = 8.0905 m
cover = 40 mm
13.3 Section Properties
Transverse Direction
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix 0 ANK ASK
0
h = 1.5
Longitudinal
Direction
b= 2
Clear cover = 40 mm
dl /h = 0.035 dt /b = 0.02625
Ductile detailing has been carried out in pier as the structure is in seismic zone-III. IRC:112-
Section 17.2 has been refered.
fck = 55 Mpa
nk = = 19474.37 x 1000
3000000 x 55
Let provide 6 legged 12 dia links Area of links Asw = 678.6 sqmm
= 0.03793796
Moment- Moment-z
Elem Stage Part Axial (kN)
y (kN*m) (kN*m)
658 CS 1 J[379] 0 0 0
P MT ML
Max P -6915 -2608 -88
* Construction stage 2 is not considered critical as the pier cap will be supporterd on staging during pretsressing,
which is not simulated in Midas model.
* ULS Partial Safety factor for DL is taken as 1.35 or 1 depending on it's effect i.e adding or relieving to the effect of variable load.
Max P Case
658 Dead Load CS 10 -6964 -3302 -91 1.35 -9401 -4457 -123
Tendon
658 CS 10 0 0 0 0.9 0 0 0
Primary
Tendon
658 CS 10 48 967 295 1.1 53 1063 325
Secondary
Creep
658 CS 10 2 211 212 1 2 211 212
Secondary
Shrinkage
658 CS 10 -1 -483 -504 1 -1 -483 -504
Secondary
Min P Case
Tendon
658 CS 3 0 0 0 0.9 0 0 0
Primary
Tendon
658 CS 3 25 3054 2983 1.1 27 3359 3281
Secondary
Creep
658 CS 3 0 -7 -9 1 0 -7 -9
Secondary
Shrinkage
658 CS 3 0 61 68 1 0 61 68
Secondary
NED = 0.02 a = 1
NRD
Max MT Case
658 Dead Load CS 10 -6328 -11181 -8546 1.35 -8543 -15095 -11538
Tendon
658 CS 10 0 0 0 0.9 0 0 0
Primary
Tendon
658 CS 10 48 7789 7607 1.1 53 8568 8368
Secondary
Creep
658 CS 10 2 -135 -159 1 2 -135 -159
Secondary
Shrinkage
658 CS 10 -1 320 357 1 -1 320 357
Secondary
Max ML Case
NED = 0.05 a = 1
NRD
Interaction Ratio
Pu/fck bd Mut Mu l MuTcap MuL cap
Fck bd2 Fck bd2 MuTcap MuL cap
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK
fyk = 500
fctm = 3.7
λx = 0.36488
Fs
z
fc = 0.36488 x 24.6 x (1-0.36488/2) = 7.33
z = (1-0.36488/2) x d = 0.818 d
For grade of Concrete M 55
z = = 0.82 d
Fc = = 7.33
Height of Pier = 8.0905 m
cover = 40 mm
15.3 Section Properties
Transverse Direction
h= 2
Longitudinal
Direction
b = 1.5
Clear cover = 40 mm
dl /h = 0.026 dt /b = 0.035
r/fck 0.019
15.4 Effective Length Calculation ( As Per IRC : 112-2011 Cl 11.2.2 Table 11.1)
let= 8.0905*1.5*1000 lel 8.0905*1.3*1000
12135.75 10518
λz = 28.0 λy = 18.2
< 52.65 < 52.65
Check For Second Order moment ( As Per IRC : 112-2011 Cl 11.2.1)
~~~~~~~~~~ ~~~~~~~~~~~~~~~~~
Load case : 2
~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(kn) Mx(knm) My(knm) f0(kn/mý) Xn(m) Yn(m)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL 3699 702 -739 12055.87 1.513 1.592
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 9326.728 kn/mý at Node# 88
Load case : 4
~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(kn) Mx(knm) My(knm) f0(kn/mý) Xn(m) Yn(m)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL 4624 680 -151 8437.728 6.118 1.359
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 7700.324 kn/mý at Node# 79
Load case : 7
~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(kn) Mx(knm) My(knm) f0(kn/mý) Xn(m) Yn(m)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL 2305 366 -391 6337.22 1.644 1.757
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 5027.481 kn/mý at Node# 88
Load case : 8
~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(kn) Mx(knm) My(knm) f0(kn/mý) Xn(m) Yn(m)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL 1277 317 -394 6408.391 1.139 1.416
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 4648.81 kn/mý at Node# 89
BENDING MOMENTS
PIER
BM STRESS SF
DL PT PT SEC SUM TOP BOTTOM DL PT PT SEC
PIER LEFT TOP 2009.5 0.0 0.0 2009.5 1.1 -1.1 -177.7 0.0 0.0
BOTTOM 503.1 0.0 0.0 503.1 0.3 -0.3 -177.7 0.0 0.0
BM STRESS SF
DL PT PT SEC SUM TOP BOTTOM DL PT PT SEC
PIER RIGHT TOP -2480.0 0.0 0.0 -2480.0 1.6 -1.6 177.7 0.0 0.0
BOTTOM -973.7 0.0 0.0 -973.7 0.6 -0.6 177.7 0.0 0.0
AXIAL FORCE
PIER LEFT PIER RIGHT
DL -1752.0 -1497.7
PT 0.0 0.0
PT SEC 0.0 0.0
PIER
BM STRESS SF
DL PT PT SEC SUM TOP BOTTOM DL PT PT SEC
PIER LEFT TOP 2292.1 0.0 -1834.9 457.3 0.2 -0.2 -179.2 0.0 213.6
BOTTOM 773.2 0.0 0.0 773.2 0.4 -0.4 -179.2 0.0 213.6
BM STRESS SF
DL PT PT SEC SUM TOP BOTTOM DL PT PT SEC
PIER RIGHT TOP -2201.8 0.0 2641.2 439.5 0.3 -0.3 179.2 0.0 -213.6
BOTTOM -682.8 0.0 830.2 147.4 0.1 -0.1 179.2 0.0 -213.6
AXIAL FORCE
PIER LEFT PIER RIGHT
DL -1793.6 -1475.2
PT 0.0 0.0
PT SEC -44.8 44.8
PIER
BM STRESS SF
DL PT PT SEC SUM TOP BOTTOM DL PT PT SEC
PIER LEFT TOP 6517.6 0.0 -1825.5 4692.0 2.5 -2.5 -513.0 0.0 212.2
BOTTOM 2168.1 0.0 0.0 2168.1 1.2 -1.2 -513.0 0.0 212.2
BM STRESS SF
DL PT PT SEC SUM TOP BOTTOM DL PT PT SEC
PIER RIGHT TOP -6349.7 0.0 2624.9 -3724.8 2.4 -2.4 513.0 0.0 -212.2
BOTTOM -2000.3 0.0 825.9 -1174.4 0.8 -0.8 513.0 0.0 -212.2
AXIAL FORCE
PIER LEFT PIER RIGHT
DL -5845.5 -3025.3
PT 0.0 0.0
PT SEC -44.4 44.4
PIER
BM STRESS SF
DL PT PT SEC SUM TOP BOTTOM DL PT PT SEC
PIER LEFT TOP 6527.5 0.0 -3145.3 3382.2 1.8 -1.8 -513.8 0.0 365.6
BOTTOM 2171.5 0.0 0.0 2171.5 1.2 -1.2 -513.8 0.0 365.6
BM STRESS SF
DL PT PT SEC SUM TOP BOTTOM DL PT PT SEC
PIER RIGHT TOP -6359.2 0.0 4518.2 -1841.0 1.2 -1.2 513.8 0.0 -365.6
BOTTOM -2003.2 0.0 1418.7 -584.5 0.4 -0.4 513.8 0.0 -365.6
AXIAL FORCE
PIER LEFT PIER RIGHT
DL -5853.3 -3031.7
PT 0.0 0.0
PT SEC -76.2 76.2
PIER
BM STRESS SF
DL PT PT SEC SUM TOP BOTTOM DL PT PT SEC
PIER LEFT TOP 16755.2 0.0 -3223.4 13531.8 7.2 -7.2 -1243.4 0.0 372.0
BOTTOM 6214.1 0.0 0.0 6214.0 3.3 -3.3 -1243.4 0.0 372.0
BM STRESS SF
DL PT PT SEC SUM TOP BOTTOM DL PT PT SEC
PIER RIGHT TOP -14585.5 0.0 4591.3 -9994.2 6.6 -6.6 1243.4 0.0 -372.0
BOTTOM -4044.3 0.0 1437.4 -2607.0 1.7 -1.7 1243.4 0.0 -372.0
AXIAL FORCE
PIER LEFT PIER RIGHT
DL -13182.4 -5692.7
PT 0.0 0.0
PT SEC -75.9 75.9
PIER
BM STRESS SF
DL PT PT SEC SUM TOP BOTTOM DL PT PT SEC
PIER LEFT TOP 16768.4 0.0 -4915.7 11852.7 6.3 -6.3 -1244.4 0.0 568.3
BOTTOM 6218.5 0.0 0.0 6218.5 3.3 -3.3 -1244.4 0.0 568.3
BM STRESS SF
DL PT PT SEC SUM TOP BOTTOM DL PT PT SEC
PIER RIGHT TOP -14598.1 0.0 7011.9 -7586.2 5.0 -5.0 1244.4 0.0 -568.3
BOTTOM -4048.3 0.0 2193.5 -1854.7 1.2 -1.2 1244.4 0.0 -568.3
AXIAL FORCE
PIER LEFT PIER RIGHT
DL -13192.8 -5701.3
PT 0.0 0.0
PT SEC -116.3 116.3
PIER
BM STRESS SF
DL PT PT SEC SUM TOP BOTTOM DL PT PT SEC
PIER LEFT TOP 19618.2 0.0 -4891.1 14727.2 7.9 -7.9 -1456.8 0.0 564.4
BOTTOM 7267.1 0.0 0.0 7267.1 3.9 -3.9 -1456.8 0.0 564.4
BM STRESS SF
DL PT PT SEC SUM TOP BOTTOM DL PT PT SEC
PIER RIGHT TOP -17107.0 0.0 6960.7 -10146.3 6.7 -6.7 1456.8 0.0 -564.4
BOTTOM -4755.9 0.0 2175.9 -2580.0 1.7 -1.7 1456.8 0.0 -564.4
AXIAL FORCE
PIER LEFT PIER RIGHT
DL -15555.7 -6582.5
PT 0.0 0.0
PT SEC -114.8 114.8
661 to 672 = pier cap negative= compression
positive= tension
659.00 SummationCS 3 002(last) I[8] -4.87 0.00 -0.04 0.00 0.00 -0.31
659.00 SummationCS 3 002(last) J[14] -4.89 0.00 0.08 0.00 0.00 -0.29
660.00 SummationCS 3 002(last) J[5] -4.93 0.00 0.55 0.00 0.00 0.88
660.00 SummationCS 3 002(last) I[14] -4.89 0.00 0.08 0.00 0.00 -0.29
661.00 SummationCS 3 002(last) J[378] -4.94 0.00 0.68 0.00 0.00 2.55
661.00 SummationCS 3 002(last) I[5] -4.93 0.00 0.55 0.00 0.00 0.88
665.00 SummationCS 3 002(last) J[6] -4.83 0.00 0.17 0.00 0.00 1.12
665.00 SummationCS 3 002(last) I[9] -4.85 0.00 0.21 0.00 0.00 0.41
668.00 SummationCS 3 002(last) I[15] -4.77 0.00 0.09 0.00 0.00 1.71
668.00 SummationCS 3 002(last) J[11] -4.72 0.00 -0.03 0.00 0.00 1.82
671.00 SummationCS 3 002(last) I[12] -4.71 0.00 -0.14 0.00 0.00 1.05
671.00 SummationCS 3 002(last) J[747] -4.71 0.00 -0.16 0.00 0.00 0.65
672.00 SummationCS 3 002(last) J[379] -4.70 0.00 -0.12 0.00 0.00 -1.22
672.00 SummationCS 3 002(last) I[747] -4.71 0.00 -0.16 0.00 0.00 0.65
673.00 SummationCS 3 002(last) J[380] -4.80 0.00 -0.44 0.00 0.00 0.34
673.00 SummationCS 3 002(last) I[379] -4.80 0.00 -0.49 0.00 0.00 2.58
0.00 2.58
0.00 -1.22
STAGE 4 ROB placed
659.00 SummationCS 4 002(last) I[8] -4.70 0.00 -0.04 0.00 0.00 -0.30
659.00 SummationCS 4 002(last) J[14] -4.71 0.00 0.08 0.00 0.00 -0.28
660.00 SummationCS 4 002(last) J[5] -4.75 0.00 0.78 0.00 0.00 1.81
660.00 SummationCS 4 002(last) I[14] -4.71 0.00 0.33 0.00 0.00 -0.28
661.00 SummationCS 4 002(last) J[378] -4.74 0.00 0.91 0.00 0.00 4.07
661.00 SummationCS 4 002(last) I[5] -4.75 0.00 0.78 0.00 0.00 1.81
665.00 SummationCS 4 002(last) J[6] -4.69 0.00 -0.16 0.00 0.00 -2.05
665.00 SummationCS 4 002(last) I[9] -4.68 0.00 -0.12 0.00 0.00 -1.51
668.00 SummationCS 4 002(last) J[11] -4.67 0.00 -0.12 0.00 0.00 -3.16
668.00 SummationCS 4 002(last) I[15] -4.69 0.00 0.00 0.00 0.00 -2.76
671.00 SummationCS 4 002(last) I[12] -4.61 0.00 0.26 0.00 0.00 -2.84
671.00 SummationCS 4 002(last) J[747] -4.58 0.00 0.24 0.00 0.00 -2.23
672.00 SummationCS 4 002(last) J[379] -4.51 0.00 0.29 0.00 0.00 0.66
672.00 SummationCS 4 002(last) I[747] -4.58 0.00 0.24 0.00 0.00 -2.23
673.00 SummationCS 4 002(last) I[379] -4.63 0.00 -0.48 0.00 0.00 2.48
673.00 SummationCS 4 002(last) J[380] -4.63 0.00 -0.42 0.00 0.00 0.32
0.00 4.07
0.00 -3.16
659.00 SummationCS 5 002(last) I[8] -6.75 0.00 -0.03 0.00 0.00 -0.26
659.00 SummationCS 5 002(last) J[14] -6.77 0.00 0.12 0.00 0.00 -0.20
660.00 SummationCS 5 002(last) J[5] -6.83 0.00 0.97 0.00 0.00 2.30
660.00 SummationCS 5 002(last) I[14] -6.77 0.00 0.36 0.00 0.00 -0.20
661.00 SummationCS 5 002(last) J[378] -6.81 0.00 1.14 0.00 0.00 5.12
661.00 SummationCS 5 002(last) I[5] -6.83 0.00 0.97 0.00 0.00 2.30
665.00 SummationCS 5 002(last) J[6] -6.90 0.00 -0.03 0.00 0.00 2.14
665.00 SummationCS 5 002(last) I[9] -6.91 0.00 0.04 0.00 0.00 2.13
668.00 SummationCS 5 002(last) J[11] -6.82 0.00 -0.14 0.00 0.00 1.58
668.00 SummationCS 5 002(last) I[15] -6.86 0.00 0.07 0.00 0.00 1.87
671.00 SummationCS 5 002(last) I[12] -6.77 0.00 0.15 0.00 0.00 1.40
671.00 SummationCS 5 002(last) J[747] -6.75 0.00 0.12 0.00 0.00 1.72
672.00 SummationCS 5 002(last) I[747] -6.75 0.00 0.12 0.00 0.00 1.72
672.00 SummationCS 5 002(last) J[379] -6.69 0.00 0.11 0.00 0.00 2.72
673.00 SummationCS 5 002(last) I[379] -6.65 0.00 -0.66 0.00 0.00 3.63
673.00 SummationCS 5 002(last) J[380] -6.65 0.00 -0.61 0.00 0.00 0.60
0.00 5.12
0.00 -0.26
659.00 SummationCS 6 002(last) J[14] -6.61 0.00 0.12 0.00 0.00 -0.20
659.00 SummationCS 6 002(last) I[8] -6.59 0.00 -0.03 0.00 0.00 -0.25
660.00 SummationCS 6 002(last) I[14] -6.61 0.00 0.36 0.00 0.00 -0.20
660.00 SummationCS 6 002(last) J[5] -6.66 0.00 0.95 0.00 0.00 2.26
661.00 SummationCS 6 002(last) I[5] -6.66 0.00 0.95 0.00 0.00 2.26
661.00 SummationCS 6 002(last) J[378] -6.64 0.00 1.12 0.00 0.00 5.03
665.00 SummationCS 6 002(last) I[9] -6.94 0.00 -0.24 0.00 0.00 0.65
665.00 SummationCS 6 002(last) J[6] -6.98 0.00 -0.31 0.00 0.00 -0.36
668.00 SummationCS 6 002(last) I[15] -7.03 0.00 -0.20 0.00 0.00 -1.92
668.00 SummationCS 6 002(last) J[11] -6.93 0.00 0.14 0.00 0.00 -0.86
671.00 SummationCS 6 002(last) J[747] -6.73 0.00 0.40 0.00 0.00 2.01
671.00 SummationCS 6 002(last) I[12] -6.78 0.00 0.43 0.00 0.00 0.99
672.00 SummationCS 6 002(last) J[379] -6.62 0.00 0.41 0.00 0.00 6.43
672.00 SummationCS 6 002(last) I[747] -6.73 0.00 0.40 0.00 0.00 2.01
673.00 SummationCS 6 002(last) J[380] -6.50 0.00 -0.60 0.00 0.00 0.59
673.00 SummationCS 6 002(last) I[379] -6.49 0.00 -0.65 0.00 0.00 3.54
0.00 6.43
0.00 -1.92
STAGE 7 Third stage prestressing
659.00 SummationCS 7 002(last) J[14] -10.10 0.00 0.28 0.00 0.00 1.37
659.00 SummationCS 7 002(last) I[8] -10.00 0.00 0.10 0.00 0.00 0.95
660.00 SummationCS 7 002(last) J[5] -10.10 0.00 1.26 0.00 0.00 4.68
660.00 SummationCS 7 002(last) I[14] -10.10 0.00 0.53 0.00 0.00 1.37
661.00 SummationCS 7 002(last) I[5] -10.10 0.00 1.26 0.00 0.00 4.68
661.00 SummationCS 7 002(last) J[378] -10.10 0.00 1.45 0.00 0.00 8.26
665.00 SummationCS 7 002(last) I[9] -10.10 0.00 0.01 0.00 0.00 -2.31
665.00 SummationCS 7 002(last) J[6] -10.10 0.00 -0.11 0.00 0.00 -2.53
668.00 SummationCS 7 002(last) J[11] -9.93 0.00 0.11 0.00 0.00 -2.17
668.00 SummationCS 7 002(last) I[15] -10.10 0.00 -0.10 0.00 0.00 -3.42
671.00 SummationCS 7 002(last) J[747] -9.77 0.00 0.21 0.00 0.00 -0.45
671.00 SummationCS 7 002(last) I[12] -9.81 0.00 0.28 0.00 0.00 -1.03
672.00 SummationCS 7 002(last) I[747] -9.77 0.00 0.21 0.00 0.00 -0.45
672.00 SummationCS 7 002(last) J[379] -9.71 0.00 0.13 0.00 0.00 1.12
673.00 SummationCS 7 002(last) J[380] -9.89 0.00 -0.90 0.00 0.00 1.97
673.00 SummationCS 7 002(last) I[379] -9.85 0.00 -0.95 0.00 0.00 6.33
0.00 8.26
0.00 -3.42
STAGE 8 SIDL
659.00 SummationCS 8 002(last) I[8] -9.81 0.00 0.10 0.00 0.00 0.91
659.00 SummationCS 8 002(last) J[14] -9.84 0.00 0.27 0.00 0.00 1.32
660.00 SummationCS 8 002(last) I[14] -9.84 0.00 0.64 0.00 0.00 1.32
660.00 SummationCS 8 002(last) J[5] -9.88 0.00 1.36 0.00 0.00 5.02
661.00 SummationCS 8 002(last) J[378] -9.81 0.00 1.54 0.00 0.00 8.83
661.00 SummationCS 8 002(last) I[5] -9.88 0.00 1.36 0.00 0.00 5.02
665.00 SummationCS 8 002(last) I[9] -9.87 0.00 -0.18 0.00 0.00 -4.21
665.00 SummationCS 8 002(last) J[6] -9.91 0.00 -0.30 0.00 0.00 -5.12
668.00 SummationCS 8 002(last) J[11] -9.82 0.00 0.14 0.00 0.00 -5.42
668.00 SummationCS 8 002(last) I[15] -9.97 0.00 -0.21 0.00 0.00 -6.76
671.00 SummationCS 8 002(last) J[747] -9.57 0.00 0.44 0.00 0.00 -2.46
671.00 SummationCS 8 002(last) I[12] -9.64 0.00 0.50 0.00 0.00 -3.59
672.00 SummationCS 8 002(last) J[379] -9.44 0.00 0.37 0.00 0.00 1.87
672.00 SummationCS 8 002(last) I[747] -9.57 0.00 0.44 0.00 0.00 -2.46
673.00 SummationCS 8 002(last) J[380] -9.66 0.00 -0.88 0.00 0.00 1.92
673.00 SummationCS 8 002(last) I[379] -9.61 0.00 -0.92 0.00 0.00 6.17
0.00 8.83
0.00 -6.76
STAGE 9 LL
659.00 SummationCS 9 002(last) I[8] -9.67 0.00 0.10 0.00 0.00 0.89
659.00 SummationCS 9 002(last) J[14] -9.69 0.00 0.27 0.00 0.00 1.29
660.00 SummationCS 9 002(last) J[5] -9.73 0.00 1.33 0.00 0.00 4.90
660.00 SummationCS 9 002(last) I[14] -9.69 0.00 0.62 0.00 0.00 1.29
661.00 SummationCS 9 002(last) I[5] -9.73 0.00 1.33 0.00 0.00 4.90
661.00 SummationCS 9 002(last) J[378] -9.65 0.00 1.51 0.00 0.00 8.62
665.00 SummationCS 9 002(last) I[9] -9.77 0.00 -0.32 0.00 0.00 -6.00
665.00 SummationCS 9 002(last) J[6] -9.85 0.00 -0.44 0.00 0.00 -7.38
668.00 SummationCS 9 002(last) J[11] -9.85 0.00 0.07 0.00 0.00 -8.63
668.00 SummationCS 9 002(last) I[15] -9.96 0.00 -0.28 0.00 0.00 -9.54
671.00 SummationCS 9 002(last) I[12] -9.60 0.00 0.74 0.00 0.00 -6.07
671.00 SummationCS 9 002(last) J[747] -9.49 0.00 0.68 0.00 0.00 -4.37
672.00 SummationCS 9 002(last) J[379] -9.28 0.00 0.63 0.00 0.00 2.89
672.00 SummationCS 9 002(last) I[747] -9.49 0.00 0.68 0.00 0.00 -4.37
673.00 SummationCS 9 002(last) J[380] -9.52 0.00 -0.87 0.00 0.00 1.89
673.00 SummationCS 9 002(last) I[379] -9.46 0.00 -0.91 0.00 0.00 6.07
0.00 8.62
0.00 -9.54
Command: ID
Specify poiX = 4.4942 Y = -1.2027 Z = 0
Command: ID
Specify poiX = 4.9942 Y = -1.0893 Z = 0
Command: ID
Specify poiX = 5.2 Y = -1.0506 Z = 0
Command: ID
Specify poiX = 5.4942 Y = -0.998 Z = 0
Command: ID
Specify poiX = 5.9942 Y = -0.9162 Z = 0
Command: ID
Specify poiX = 6.4942 Y = -0.8436 Z = 0
Command: ID
Specify poiX = 6.9942 Y = -0.7803 Z = 0
Command: ID
Specify poiX = 7.4942 Y = -0.7261 Z = 0
Command: ID
Specify poiX = 7.9942 Y = -0.681 Z = 0
Command: ID
Specify poiX = 8.4942 Y = -0.645 Z = 0
Command: ID
Specify poiX = 8.9942 Y = -0.6181 Z = 0
Command: ID
Specify poiX = 9.4942 Y = -0.6001 Z = 0
Command: ID
Specify poiX = 9.9942 Y = -0.5911 Z = 0
Command: ID
Specify poiX = 10.2442 Y = -0.59 Z = 0
Command: ID
Specify poiX = 10.4942 Y = -0.5911 Z = 0
Command: ID
Specify poiX = 10.9942 Y = -0.6001 Z = 0
Command: ID
Specify poiX = 11.4942 Y = -0.6181 Z = 0
Command: ID
Specify poiX = 11.9942 Y = -0.645 Z = 0
Command: ID
Specify poiX = 12.4942 Y = -0.681 Z = 0
Command: ID
Specify poiX = 12.9942 Y = -0.7261 Z = 0
Command: ID
Specify poiX = 13.4942 Y = -0.7803 Z = 0
Command: ID
Specify poiX = 13.9942 Y = -0.8436 Z = 0
Command: ID
Specify poiX = 14.4942 Y = -0.9162 Z = 0
Command: ID
Specify poiX = 14.9942 Y = -0.998 Z = 0
Command: ID
Specify poiX = 15.3 Y = -1.0527 Z = 0
Command: ID
Specify poiX = 15.4942 Y = -1.0893 Z = 0
Command: ID
Specify poiX = 15.9942 Y = -1.19 Z = 0