You are on page 1of 203

NOTE No.

R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: ANK ASK
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

DESIGN OF PILE FOUNDATION FOR


FIXED PIER P26

1 INTRODUCTION:

Aim of this note is to present the design of substructure for fix Pier of the elevated corridor near BKC.
Pier P26 supporting 60 m simply supported spans over Harbour Railway.
P26 supports 60.0m span on BKC side & 31 m on EEH side.
Design of Substructure is covered in this note.
The superstructure ROB is a steel plate girder structure resting on 6 bearings on Pier P26.
Pier P26 also supports 30.75m concrete flyover with two fix bearings.

Length of span c/c of piers at = 60 m Span C/C of bearings 58


left side
Length of span c/c of piers at = 30.8 m Span C/C of bearings 28.8
Right side
Width of the carriageway = 15 m (7.5m + 7.5m)
Total width = 17.2 m
Exp JT Exp JT

2 58.00 m 2 28.75 m 2
Fixed
P25 P26 P27
Span Arrangement

Reference Drawings

1 SC/835/GA-11 General Arrangement : Layout


2 SC/835/GA-12 General Arrangement : Elevations
3 SC/835/GA-17 General Arrangement : Section Details
4 SC/835/RC-653 RC Details of Pile and Pile Cap.

Reference document:-
- Reference from tender
1 Volume II -Section 2 - Design criteria
2 Volume II -Section 6 - Design data
- Reference Codes-
1 IRC 6:2014 Loads and stress
2 IRC 112:2011 Code of Practic for Concrete Road Bridges:
Limit State Design
3 IRC 78:2014
- Latest geotechnical report

1.1 Loading on the structure:

The Pier substructure and foundation shall be designed for the following loads:
a) Sizes of different structural elements
(length) (width) (height)
- Reactangular Pile cap(PC1) &(PC2) 4.6 x 4.6 x 1.8 4 piles

- Pedestal size = 0.85 x 0.85 x 0.3

- Bearing c/c in trans direction to left of P26 = 3.0 m Nos. = 6


- Bearing c/c in trans direction to right of P26 = 4.5 m Nos. = 2
- Pier Cap Size = 4.0 x 23.3 x 1.5
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: ANK ASK
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

- No of Piers 2
- Pier size = 2 x 1.50 x 8.0905
- Pile dia = 1.2 m

b) Superimposed dead load


1 Crash Barriers and medians as indicated in the departmental drawing.
2 Loading of sound barrier & Services 2 KN/m at each k..( As per tender Cl.2.0 table)
3 Wearing coat 90 mm thk ..(As per tender Cl.)

c) Live loads : Class A upto 4 lanes OR Class 70R wheeled and tracked upto 2 lanes.
..(As per tender Cl. 5.3.1 )
d) Bearing Rigidity force ..(As per cl. 211.5 of IRC:6-2014.)

e) Wind load as per IRC 6 Obstructed wind ..(As per cl. 209.3 of IRC:6-2014.)

f) Seismic load for zone III with ..( As per "Design data")
Zone factor = 0.16
Importance factor = 1.2 ..(As per Table 8 of IRC:6-2014.)

g) Centrifugal forces as per the radius of curvatures.


Minimum radius of curvature for pier group = 0 m
covered in this note
- superelevation = 2.5%
- Speed on curves = 80 kmph

h) Unit Weights PSC = 26 kN/m3 ..(As per tender


RCC = 26 provision )
kN/m3
wearing coat = 22 kN/m3
soil sat = 18 kN/m3

i) Maxm Pile capacity is 600 t/m2. Maxm. Limited by recommendations ..(As per tender Cl. 3.7.3 )
including socketing
Capacity considered 481 t As per Geo tech reco.
..(As per bore log detail )
- socketing in rock 5.7 m in soft rock and recommendations of Geotech

TYPICAL CROSS SECTION OF ROB SUPERSTRUCTURE :

8.2
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: ANK ASK
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26
VIEW SHOWING GENERAL ARRANGEMENT OF PIER -P26 :

1.2 SUBSTRUCTURE DESIGN DATA:


R.L. at 0 Remarks
Top of road 16.70
Top of pier cap 12.524
Ht of pedestal.+bearing 0.375
Ground level 5.123
Top of pile cap 4.433 690 Below GL
8.3 3.533
cutoff level 2.708

depth of pile cap 1.800


Height of Pier 8.091
Bore Hole Nos P26
point of fixity -5.257

point of fixity -5.257


Founding LVL -17.577

Pier height 8.091


The R.L. at the top of pier cap is found as follows:
= R.L. at top of road - thickness of wearing coat - Thk of Deck slab-depth of girder - bearing & pedestal
= 16.700 - 0.09 - 0.24 - 3.264 - 0.345 - 0.1875 - 0.05

Design loads: ( As per Design Data given in Tender )


Class A : Class 70R :
Seismic zone: III
Zone factor = 0.16
Importance factor = 1.2
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: ANK ASK
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

Response reduction factor = 3.3

Design constants: As per IRC 112:2011 as per annexure A-2


for Pile
Grade of steel Fe 500 ŋ = 1
Grade of concrete M45 λ = 0.8
Chara. Compressive Strength = 45 kN/m2 xlim = 0.4561
... ŋfcd ŋfcd = 20.1 N/mm2
Fc Fc fyd = 435 N/mm2
Fyk = 500
fctm = 3.3
λx = 0.365
Fs
z
fc = 0.365 x 20.1 x (1-0.365/2) = 6.000
z lim = (1-0.36488/2) x d = 0.818 d
For grade of Concrete z lim = = 0.818 d
M45 Fc = = 6.00
for Pile Cap
Grade of steel Fe 500 ŋ = 1
Grade of concrete M45 λ = 0.8
Chara. Compressive Strength = 45 kN/m2 xlim = 0.4561
... ŋfcd ŋfcd = 20.1 N/mm2
Fc Fc fyd = 435 N/mm2
Fyk = 500
fctm = 3.3
λx = 0.365
Fs
z
fc = 0.36488 x 20.1 x (1-0.365/2) = 6
z lim = (1-0.36488/2) x d = 0.818 d
For grade of Concrete z lim = = 0.818 d
M45 Fc = = 6.00
Pile Geometry

The fixity length of the pile is calculated as follows:


The top of the pile cap lies at 0.690m below GL .

FIXITY CALCULATION

For Stiff normal Clay / Sand

k1 = 0.146 kg/cm3 where Therefore as per cl. C - 1.2,IS 2911


T = ( E * I / k1 ) 1/5 Part 1/sec 2
E = 5000 * sqrt( fck )
= 33541.0 N/mm2
= 335410 kg/cm2
Diameter of pile = 1200 mm
I = 1.02E+11 mm4
= 1.02E+07 cm4
Hence

T = 471.8 cm
L1 = 0m
Lf / T = 2.2 _ For fixed headed pile Fig.2……….IS2911-App-C

Hence the depth of fixity

Lf = 1038.0 cm
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: ANK ASK
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

Point of fixity of = 10.38 m Below GL


pile:
L1 + Lf 10.38 m

Length of the pile = GL - center of pile embed lvl - 0.75 - thickness of the pilecap / 2
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: ANK ASK
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

Hence the length of the pile for analysis upto point of fixity
= 10.38 - 0.69 - 1.8 / 2
= 8.8 m
≈ 8.8 m
G.L Ground LVL 5.123
0.69 m
Pile cap top 4.433
1.8 m
Pile cap bottom 2.633

10.4 m
8.80 m

Fixity -5.257

Founding LV -17.577
Tilt and shift in pile:

Tilt and shift is to be considered in the pile as per IRC78:2014 .


As per cl. 709.1.5.2 max allowable tilt in the pile is 1 in 150 and the maximum allowable shift is 75 mm.
Total shift = 75 mm
Shift in each direction = 53.03 mm
Total tilt = 8.8*1000/150
= 58.7 mm
Adopt shift in each direction = 53.03 mm

2 Analysis and design philosophy:-


The superstructure has been supported on the piercap through bearings.
A portal consisting of two piers has been provided to support the piercap. A two separate pilecaps under
each pier with four piles has been proposed to this portal.
The analysis ans design philosophy for this structure is as below:-

2.1 Geometrical model


1 The structural system consisting of piercap, 2 piers supported on two separate pilecap. Each pilecap is
supporting four piles of 1.2m dia.
2 Piercap,piers are modelled as line elements with material propoerty as concrete.
and 19K15 cables are also modelled and stressesd at appropriate pressure.
3 The pilecap has been modelled as plate elements of thickness 1.8m.
4 Piles of length upto point of fixity are modelled as line elements of circular shape of dia 1.2m
5 The supports to piles has been defined as fixed.
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: ANK ASK
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: ANK ASK
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

2.2 Evaluation of Loads:-


1 Selfweight of modelled elements are defined in Midas by "Selfweight" command.
2 The superstructure dead loads(weight of structure+SIDL+SSDL) are available from
superstructure analysis. These loads are applied on the piercap at bearing locations.
The bearing of left span and right span are spaced at 1m in the longitudinal direction on either side of joint.
Hence the longitudinal moment due to load eccentricity is also applied alongwith
verical loads.
3 The pilecap top is 690 mm below the ground level, hence soil load of 0.69x18=12.42kN/sqm is applied
on pilecap.
4 Subsurface water is not encountered to these borehole locations as per Geotechnical reports.
Hence buoyancy is not considered.
5 The Live loads cases which will give maximum veritical loads and maximum longitudinal moments are
considered in the analysis. The position of a set of load i.e one 70R or one Class-A is
determined for these cases and extrapolated for multilanes. The loads on the bearings are
then determined by applying these loadson the superstructure line model.
6 Casewise these bearing reactions are applied on the piercap.For maximum piercap beam span moment,
the LL are applied towards center of beam.And for maximum shear in beam, LL are applied near to
the pier.
6 A bearing rigidity force is determined as per IRC guidelines and applied on the piercap
7 Wind load in longitudinal and transverse direction is also determined and applied on the pier top as point
loads in Midas.
8 Time period of the system has been evaluated as per IRC:6:2014. A Midasmodel with piles modelled
upto point of fixity has been used to determined the time period.The Seismic loads has been
evaluated in two orthogonal directions with these period and other relevant pararmeters.
These loads are also applied at pier top as point loads in appropriate directions.
9 The above defined loads are then combined in relevant load combinations as per IRC guidelines.
10 The structure is then analysed for these loads and load-combinations.
11 The analysis results are extracted and then further used for checking piles,design of piles,design
of pilecap and design of piers.
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: ANK ASK
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

2.3 VERTICAL LOADS

Self weight of superstructure:


a) DL from superstructure-Reactions on P26

8.5

8.5.1

The flyover(RC structure) and ROB(Steel structure) has been analysed separately for the
applicable loads and load combinations. The analysis results for respective load cases are used
for analysis and design of substructure-piles, pilecap, pier and piercap.

Table showing loads on Piercap from superstructure


DL SIDL SSIDL Total
From 60m span 1 984 368 120 1472
(6 Bearings)
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: ANK ASK
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

2 899 120 153 1172

3 918 142 167 1227 R3


7742 kN
4 918 142 167 1227

5 899 120 153 1172

6 984 368 120 1472


Total 5602 1260 880 7742 R3=
7742 kN
From 30.75m span 1 2194 324 228 2746 R4=
(2 Bearings) 5492 kN
2 2194 324 228 2746
Total 4388 648 456 5492
Longitudinal
moment due to -1214 -612 -424 -2250
eccentricity

Sample calculation
DL from 30.75m span = 4388 kN

DL from 60m span = 5602 kN

Distance between Center of = 1m


Bearings and Pier
Longitudinal moment developed = (4388x -1)+(5602x1)
= 1214 kNm

Longitudinal moment developed for each case is evaluated and applied in respective load case on
the pier cap beam in Midasmodel as shown below.

View showing Dead load applied on Piercap


NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: ANK ASK
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: ANK ASK
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

3 VEHICULAR LIVE LOAD: …(As per cl. 204 of IRC:6-2014.)


Longitudinal analysis
Live load on superstructure.
Trains of 70R and Class-A(single train over the whole width)are run over both spans of 60m and 30.75m
to get maximum load on pier as well as max longitudinal bending moment on the pier. Loading including
impact and longitudinal distance between two successive trains are as per IRC:6:2014.

3.1 70R Vehicle


Two successive trains of 70R vehicles moved over three spans such as to get
maximum vertical reaction on Pier P26.The Midasfile shows the reactions of each load case.
Studying the analysis results, a case with max total reaction on P26 piercap and max longitudinal
moments are identified.

Case with maximum reaction.

Case with Maximum vertical reaction


R2 R3 R4
Max reaction 884 1031 356
Load on P26=R3+R4 = 1031+356 = 1387 kN say = 1390 kN

Per Wheel load = 695 kN

Longitudinal moment = 1031 - 356


X1
2
= 337.5 kNm Per wheel

Case with maximum Longitudinal moment

Case with maximum Longitudinal moment


NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: ANK ASK
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

R2 R3 R4
Reaction 1032 1276 0
Load on P26=R3+R4 = 1276+0 = 1276 kN
Hence Per wheel load=r/2 = 638 kN Used for Transverse analysis
LA-Bearing center to piercap center = 1 m
Hence Longitudinal moment = 638 x 1 = 638 kNm
Per wheel

3.2 One class-A vehicle

Case with maximum reaction.


Similarly three consecutive Class-A vehicles are moved over these spans to get maximum vertical
reaction on P26.
8.5.2

Case with Maximum vertical reaction


R2 R3 R4
Max reaction 561 639 108
Load on P26=R3+R4 = 639+108 = 747 kN
Hence Per wheel load=r/2 = 373.5 kN
Let's apply = 388 kN

Longitudinal moment = 639 - 108


X1
2
= 265.5 kNm Per wheel

Case with maximum Longitudinal moment


Max difference in reactions on pier which will produce maximum longitudinal moment.
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: ANK ASK
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

Case with maximum Longitudinal moment

R2 R3 R4
Reaction 623 656 0
Load on P26=R3+R4 = 656+0 = 656 kN
Hence Per wheel load=r/2 = 328 kN
LA-Bearing center to piercap center = 1 m
Hence Longitudinal moment = 328 x 1 = 328 kNm
per wheel

3.3 Transverse Analysis


Max live load reaction on pier are mainly due to LL on ROB.Moreover Live load applied on
ROB bearings will generate worse effect than applied on flyover bearings which
are near center.
Thus max LL on pier as calculated above are applied to get reactions on six bearings which are
in turn applied on substructure portal to get maximum transverse moments for corresponding loads.

3.4 Following load cases are considered:


Wheel loads are arranged so as to produce max. eccentricity w.r.t.CG of structure
LL-1 Class 70RW-One train LL-5 Class A 2 lane
LL-2 Class 70RW-Two trains LL-6 Class A 1 lane
LL-3 2-Class A+Class 70R LL-7 Class A 4 lane
LL-4 Class 70RW+class A

Reactions at each bearing location are thus obtained and further applied over pier cap at
respective locations for each case.

Cases with Max Reactions

LL 1-Class 70RW 1 lane:

R= 413 1038 -73 12 -2 0


Total = 1388 kN on P26
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: ANK ASK
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

LL 2-Class 70RW 2 lane:

R= 411 1053 -158 697 830 -54


Total = 2779 kN on P26

LL 3 -Class A2+70R lane:

R= 530 758 227 642 840 -55


Total = 2942 kN on P26

LL4 -Class 70RW 1 lane + class A one lane

414 1033 -52 637 155 -21


Total = 2166 kN on P26

LL 5 -Class A2 lane:
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: ANK ASK
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

532 743 313 -42 7 -1


Total = 1552 kN on P26
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: ANK ASK
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

LL 6 -Class A 1lane:

564 248 -43 8 -1 0


Total = 776 kN on P26
LL 7 -Class A4 lane:

533 736 341 540 773 181

Total = 3104 kN on P26

Thus reactions from above analysis has been applied on piercap at bearing locations in load cases-7 to 13.
Similarly loads per wheel for maximum longitudinal moment are also applied
and the reactions from those are applied on the piercap in primary loadcases(LC-14 to 20)

The piercap beam for P26 is a single beam of 18m length whereas bridge deck is placed off-center.
The live load applied as definced above in LC-7 to LC20 will produce maximum span moment
in the piercap beam.
Another set of live load reactions is applied on the bearing locations near to pier support. These
load cases are LC21 to LC27-with maximum reactions and LC28 to LC34 with maximum longitudinal
moment. These loadcases will produce max shear and max pier and pile loads.
Thus following various load cases are considered:-

Loads on bearing which are near to center of piercap


LC7 to LC13 With max reaction

LC14 to LC20 With max longitudinal moment

Loads on bearing which are near to pier


LC21 to LC 27 With max reaction

LC28 to LC34 With max longitudinal moment

4 HORIZONTAL LOADS
4.1 Seismic Forces
4.1.1 Transverse Seismic load : …(As per cl. 219.5.1 of IRC:6-2014.)

Horizontal seismic force


NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: ANK ASK
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26
Feq = Ah x ( Dead load + appropriate live load )

Ah = Horizontal seismic coefficient


= ( Z / 2 ) . ( Sa / g )
(R/I)
Z = Zone factor
= 0.16 for zone III
I = Importance factor
= 1.2
R = Response reduction factor
= 3 ……. For Portal columns without ductile detailing (Table-9) 1
Sa / g = Average response acceleration coefficient for 5% damping depending upon
fundamental period of vibration T.
For rocky or hard soil sites,
Sa / g = 2.5 0.0 < T < 0.4
= 1/T 0.4 < T < 4.0
= 2.5 considered on conservative side
T = 2 x D
1000 F

D = Dead load + live load


= 13234.0 + 554.0 x 0.2 Minm live load considered on conservative side
= 13344.8 KN

F = Horizontal force required to be applied at the centre of the mass of


superstructure for 1mm horizontal deflection at the top of the pier
along the considered direction of horizontal force.

T = 7.31
F
F = 971.00 KN Ref Staad analysis in annexure A
E = 34000 N/mm 2 for pile 0.75E = 25500 N/mm2
= 36000 for pier
Hence T = 0.234
Therefore
Sa / g = 2.500
Hence FOR PSC BEAM
Ah = 0.080 Ah = 0.240

The seismic mass for transverse seismic force at P26 is sum of reactions from left side span
of 60.0m and right side span of 32m. Refering to clause:219.8 of IRC:6:2014, the seismic loads has
been increased by 25% for foundation design only.

The total transverse seismic forces are given in the following table
Reaction Reaction Transverse Transverse
Sr. through from Load =Ah Load
Item R3+R4 *(R3+R4)* =Ah*(R3+R4)
No. right Left
span(R4) span(R3) 1.25 *W

For
Foundation
Design For Pier Design
1 D.L. 4388.0 5602.0
2 S.I.D.L 648.0 1260.0
3 S.S.DL 456.0 880.0
5492.0 7742.0 13234.0 1323.4 1058.7

4 LL 20% load considered


LL-1 884.0 1031 1915.0 38.3 30.6
LL-2 1768.0 2062 3830.0 76.6 61.3
LL-3 2006.0 2309 4315.0 86.3 69.0
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: ANK ASK
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

LL-4 1445.0 1670 3115.0 62.3 49.8


LL-5 1122.0 1278 2400.0 48.0 38.4
LL-6 561.0 639 1200.0 24.0 19.2
LL-7 2244.0 2556 4800.0 96.0 76.8
Considered max value 96.0 76.8
Applied total transverse Seismic Force 1419.4 1135.5
Horizontal load per column of pier frame applied as = 709.7 kN 567.8 kN

4.1.2 Longitudinal Seismic load :

T = 7.31
F
F = 388.00 KN Ref staad analysis in annexure A
E = 34000 N/mm2 for pile 0.75E = 25500 N/mm2
= 36000 for pier
Hence T = 0.371
Therefore
Sa / g = 2.500
Hence FOR PSC BEAM
Ah = 0.080 Ah = 0.240
The seismic mass for longitudinal seismic force at P25 is reaction from 52.67m span
transferred to P25 & P19.Refering to clause:219.8 of IRC:6:2014, the seismic loads has
been increased by 25% for foundation design only.Seismic mass due to Live load has been considered
for two full successive trains on the span which is slightly on conservative side.
Max
70R 2302
Class A 1278
Reaction
Reaction Longi.
from Longi. Load
Sr. from Load =Ah
Item right R2+R3 =Ah*(R2+R3)
No. right *(R2+R3)*
*W
span 1.25
span(R2)
(R3)
For
Foundation
Design For Pier Design
1 D.L. 5602 5602.0
2 S.I.D.L 1260 1260.0
3 S.S.DL 880 880.0
7742.0 7742.0 15484.0 1548.4 1238.7
4 LL 20% load considered
LL-1 1031.0 356.0 1387.0 27.7 22.2
LL-2 2062.0 712.0 2774.0 55.5 44.4
LL-3 2309.0 572.0 2881.0 57.6 46.1
LL-4 1670.0 464.0 2134.0 42.7 34.1
LL-5 1278.0 216.0 1494.0 29.9 23.9
LL-6 639.0 108.0 747.0 14.9 12.0
LL-7 2556.0 432.0 2988.0 59.8 47.8
Considered max value 0.0 0.0
Applied at Pier top 1548 1239
Per pier load applied as = 774.2 kN 619.4
The longitudinal seismic force from ROB between P25-P26 will be transferred to
Fixed pier P26.
4.2 Wind loads …(As per cl. 209 of IRC:6-2014.)
As per table 5 of Cl. 209 of IRC:6, for 10m height of structure, and for basic wind speed of 44 m/s,
the vz = 29.2 m/s for 33 m/sec
In mumbai region the basic wind speed = 44 m/sec
Hence vz = 38.93 m/s

Hence the horizontal wind pressure


= 0.6 * vz2
= 909.5 N/m2 = 0.909 kN/m2
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: ANK ASK
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

Obstructed area:-
Height of Solid barrier above Roadway = 2.50 m
Height of Superstructure(Girder+Slab etc) = 3.45 m
Total exposed height 5.95 m
(As per clause 209.3.6)
Wind in Transverse direction:-
Contributory Length=(34.5/2)+(60/2) = 45.4 m
Projected area = 5.95 x 45.38 = 270.0 m2

Total transverse force = 245.54 KN Without Live Load

Live load case : wind speed 36 m/s


Refering IRC:6:2014-Cl.209.3.6, Live load on a height of 3.0m above the roadway shall be considered.
10
Obstructed Area by vehicle = 45.4 x 0.50 = 22.7 m2
Total Obstructed Area = 270.0 + 22.7 = 292.7 m2

the vz = 29.2 m/s for 33 m/sec


In mumbai region the basic wind speed = 36 m/sec
Hence vz = 31.85 m/s

Hence the horizontal wind pressure


= 0.6 * vz2
= 608.8 N/m2 = 0.609 kN/m2

Force = Pz x A x G x Cd
= 0.609 x 292.7 x 2 x 2.1
Gust factor Drag coeff.
Total transverse force = 748.4 KN With Live Load
Applied per pier = 374.2 kN

Wind in Longitudinal direction:-


Referign to IRC:6:2014:Cl 209.3.4,Longitudinal wind on bridge superstructure shall be take as 25% of
the transverse wind for plate girder bridges.

Hence Longitudinal wind = 0.25 X 748.4


= 187.1 kN
Applied per pier = 93.6 kN

Wind on Pier:-
Wind on Pier= d = 2.0 Height = 8.091
b = 1.5
d/b = 1.333333 & H/b = 5.4
Drag Coe CD = 1.4 (Table:6-Cl:209.4-IRC:6:2014)

Wind on Pier-Transverse direction = 1.4 x 0.91 x 2.0 x 2


= 5.09 KN/m
Wind on Pier- longitudinal direction = 1.4 x 0.91 x 1.5 x 2
= 3.82 KN/m

4.3 Bearing rigidity forces:


…(As per cl. 211 of IRC:6-2014.)
Pier considered in this note has fixed bearings for ROB(60.0m Span) & free bearings for RCC flyover.
Hence the bearing rigidity forces are calculated as per the cl. 211.5.1 of IRC:6-2014.

For Teflon on stainless steel m = 0.03 Min


= 0.05 Max
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: ANK ASK
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

58.00 m 28.75 m

Free Free Fixed Free


R1 R2 R3 R4
= = =
7742 7742 5492
(DL+/SIDL) R4m min
5492X0.03
164.76

Max bearing rigidity force due to DL+SIDL+SSDL-P26-Two bearings = 164.76 kN


= 82.4 kN

Bearing rigidity force on fixed bearing on 60m span of ROB on Pier P26 due to LL

Max Reaction For one Class-A = 387.0 kN


Hence for 4-Class-A = 387.0 x 4= 1548 kN

Max Reaction For one 70R(W) = 857 kN


Hence for 2-70R(W) = 857 x 2= 1714 kN

Hence total Reaction R1 = DL+LL = 7742 + 1714


= 9456.00
Hence Bearing Rigidity Force at P26 on free bearing
= R1xm max
= 9456X0.05
= 472.80 kN
Hence applied at locations of two bearings = 472.80 /2
= 236.40 kN
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: ANK ASK
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

4.4 Braking effect


Two full trains are accomodated over 60m span.
Hence two full trains are assumed for braking load calculations.
(As per IRC 6-2014, cl. 211.2)
For 70R (LL-2)
20% of First train and 10% of succeeding train Load of one 70R = 1000 kN

1st two Lanes 70RW 70RW 1st Train 0.2X1000= 200 kN


20% 10% 2nd 0.1X1000= 100

Other two Lanes 70RW 70RW 3rd 0.05X1000= 50


5% 5% 4th 0.05X1000= 50
R3 Total= 400 kN
R2 (P26)
(P25) Reaction R3:-
For one 70R 1000 kN
For Two 70R 2000.0 kN

For Class A (LL-7)


Load of one Class-A = 554 kN

Class-A Class-A 1st Train 0.2X554= 110.8


1st two Lanes 2nd 0.1X554= 55.4
Class-A Class-A
20% 3rd 0X554= 0
4th 0X554= 0
Class-A Class-A
Other two Lanes 5th 0.05X554= 27.7
Class-A Class-A 5% 6th 0.05X554= 27.7
R2 R3 7th 0.05X554= 27.7
(P25) (P26) 8th 0.05X554= 27.7
Total= 277 kN
Reaction R3:-
For one Class-A 554 kN
For 4-Class-A 2216.0 kN

For one 70R & 2Class A( LL-3)


Load of one 70R = 1000 kN
Load of one Class-A = 554 kN
1st Train 0.2X1000= 200
1st two Lanes 70RW 70RW 2nd 0.1X1000= 100
3rd 0X554= 0
4th 0X554= 0
Class-A Class-A
Other two Lanes 5th 0.05X554= 27.7
Class-A Class-A 5% 6th 0.05X554= 27.7
R2 R3 7th 0.05X554= 27.7
(P25) (P26) 8th 0.05X554= 27.7
Total= 410.8 kN
Reaction R3:-
For one 70R = 1000 kN
For 2-Class-A = 1108.0 kN
Total = 2108 kN

Evaluation of braking force for Non-Seismic case over fixed brearing on P-26

R3 Fh/2+
Reaction R3= Fh-(R3*m R3*m (R3*m
Fh (LL) DL+LL R3*m min min) max max)
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: ANK ASK
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

LL-1 300 1000 8742 262.3 37.7 437.1 587.1


LL-2 400 2000 9742 292.3 107.7 487.1 687.1
LL-3 410.8 2108 9850 295.5 115.3 492.5 697.9
LL-4 355.4 1554 9296 278.9 76.5 464.8 642.5
LL-5 166.2 2000 9742 292.3 -126.1 487.1 570.2
LL-6 166.2 554 8296 248.9 -82.7 414.8 497.9
LL-7 277 2216 9958 298.7 -21.7 497.9 636.4

Thus maximum longitudinal braking force on fixed bearing over P-26


Max force at bearing = 697.9 kN
Applied at 1.2 m above Road Level

Evaluation of braking force for Seismic case

R3 R3= Fh/2+
Reaction DL+ Fh-(R3*m R3*m (R3*m
Fh (0.2LL) 0.2LL R3*m min min) max max)
LL-1 60 200 7942 238.3 -178.3 397.1 427.1
LL-2 80 400 8142 244.3 -164.3 407.1 447.1
LL-3 82 422 8164 244.9 -162.7 408.2 449.3
LL-4 71 311 8053 241.6 -170.5 402.6 438.2
LL-5 33 400 8142 244.3 -211.0 407.1 423.7
LL-6 33 111 7853 235.6 -202.3 392.6 409.3
LL-7 55 443 8185 245.6 -190.2 409.3 437.0

Max force at bearing = 449.3 kN


Applied at 1.2 m above Road Level

One Span dislodged condition


The Piles, pilecap and piers are checked foronly one span loading condition. Two Primary
load cases are defined- Case-98-when only ROB is erected and Case 99-when only flyover is
constructed.For these cases only dead load,SIDL and SSDL on the span are considered.
In these cases due to loading only one side of center of P26, the longitudinal moment on Pile and pilecap
will be maximum and hence the structural elements-piles,pilecap and piers have also been checked
for these cases.

5 INDIVIDUAL LOAD CASES AND THEIR COMBINATIONS


The following load cases are considered.
5.1 PRIMARY LOAD CASES:

1 SEISMIC LOADS IN LOGITUDINAL SL


2 SEISMIC LOADS IN TRANSVERSE TS
3 SELFWEIGHT Selfweight
4 SUPERSTRUCTURE DEAD LOAD DL
5 SIDL SIDL
6 SSIDL SSDL
7 PRESTRESS PT
LL applied towards the center of piercap
Live load cases with maximum verical reaction
8 ONLY ONE 70R NEAR CRASH BARRIER LL1
9 ONE 70R NEAR CRASH BARRIER AND OTHER 70R NEAR CENTRAL MEDIAN LL2
10 2CLASSA NEAR CRASH BARRIER AND ONE 70R NEAR CENTRAL MEDIAN LL3
11 ONE 70R NEAR CRASH BARRIER AND ONE CLASSA NEAR CENTRAL MEDIAN LL4
12 TWO CLASS-A NEAR CRASH PARAPET LL5
13 ONE CLASS-A NEAR CRASH PARAPET LL6
14 TWO CLASS-A NEAR CRASH PARAPET AND ANOTHER SET OF TWO AT CENTRAL MEDIAN LL7
Live load cases with maximum Longitudinal moment
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: ANK ASK
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

15 ONLY ONE 70R NEAR CRASH BARRIER LL1


16 ONE 70R NEAR CRASH BARRIER AND OTHER 70R NEAR CENTRAL MEDIAN LL2
17 2CLASSA NEAR CRASH BARRIER AND ONE 70R NEAR CENTRAL MEDIAN LL3
18 ONE 70R NEAR CRASH BARRIER AND ONE CLASSA NEAR CENTRAL MEDIAN LL4
19 TWO CLASS-A NEAR CRASH PARAPET LL5
20 ONE CLASS-A NEAR CRASH PARAPET LL6
21 TWO CLASS-A NEAR CRASH PARAPET AND ANOTHER SET OF TWO AT CENTRAL MEDIAN LL7

LL applied near to the pier location


Live load cases with maximum verical reaction
22 ONLY ONE 70R NEAR CRASH BARRIER LL1A
23 ONE 70R NEAR CRASH BARRIER AND OTHER 70R NEAR CENTRAL MEDIAN LL2A
24 2CLASSA NEAR CRASH BARRIER AND ONE 70R NEAR CENTRAL MEDIAN LL3A
25 ONE 70R NEAR CRASH BARRIER AND ONE CLASSA NEAR CENTRAL MEDIAN LL4A
26 TWO CLASS-A NEAR CRASH PARAPET LL5A
27 ONE CLASS-A NEAR CRASH PARAPET LL6A
28 TWO CLASS-A NEAR CRASH PARAPET AND ANOTHER SET OF TWO AT CENTRAL MEDIAN LL7A
Live load cases with maximum Longitudinal moment
29 ONLY ONE 70R NEAR CRASH BARRIER LL1A
30 ONE 70R NEAR CRASH BARRIER AND OTHER 70R NEAR CENTRAL MEDIAN LL2A
31 2CLASSA NEAR CRASH BARRIER AND ONE 70R NEAR CENTRAL MEDIAN LL3A
32 ONE 70R NEAR CRASH BARRIER AND ONE CLASSA NEAR CENTRAL MEDIAN LL4A
33 TWO CLASS-A NEAR CRASH PARAPET LL5A
34 ONE CLASS-A NEAR CRASH PARAPET LL6A
35 TWO CLASS-A NEAR CRASH PARAPET AND ANOTHER SET OF TWO AT CENTRAL MEDIAN LL7A

36 WIND IN LONGITUDINAL WL
37 WIND IN TRANVERSE WT
38 BRAKING FORCE/BEARING RIGIDITY FORCE-Non-seismic case BR
39 BRAKING FORCE/BEARING RIGIDITY FORCE-Seismic case BRS
40 SUPERSTRUCTURE DEAD LOAD
41 SIDL-ONLY FLYOVER SIDE
42 SSIDL-ONLY FLYOVER SIDE
43 SUPERSTRUCTURE DEAD LOAD(ONLY ROB)
44 SIDL(ONLY ROB)
45 SSIDL(ONLY ROB)

6 LOAD COMBINATIONS
6.1 Load Factors

DL,SIDL SSDL LL SESIMIC Permissible


stress

1 1 1 1
1 1 0.2 1 1.5
1 1 1 1.25
1 1 1.33
1 1 1 1.33

…(As per . Amendment no. 2 IRC:6-2014/ august 2014.)

DL,SIDL SSDL LL
Leading accompany

1 1.2 0
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: ANK ASK
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

1 1.2 0.75

…(As per . Amendment no. 2 IRC:6-2014/ august 2014.)

DL,SIDL SSDL LL WIND SEISMIC


backfill Leading accompany Leading accompany

1.35 1.75 1.5 1.15 1.5 0.9

1.35 1.75 - 0.2 - - 1.5

1 1 0.75
6.2 LOAD COMBINATIONS FOR PILE CAPACITY CHECK:

DL + SIDL + SSDL(ONLY ROB)


DL + SIDL + SSDL(ONLY FLYOVER)
NORMAL COMBINATION Maximum Reaction Case Maximum Longitudinal Moment Case
Towards ccenter of piercap
DL + SIDL + SSDL
809 DL + SIDL + SSDL + LL 1+BR 823
810 DL + SIDL + SSDL + LL 2+BR 824
811 DL + SIDL + SSDL + LL 3+BR 825
812 DL + SIDL + SSDL + LL 4+BR 826
813 DL + SIDL + SSDL + LL 5+BR 827
814 DL + SIDL + SSDL + LL 6+BR 828
815 DL + SIDL + SSDL + LL 7+BR 829

Near piercap support


816 DL + SIDL + SSDL + LL 1A+BR 830
817 DL + SIDL + SSDL + LL 2A+BR 831
818 DL + SIDL + SSDL + LL 3A+BR 832
819 DL + SIDL + SSDL + LL 4A+BR 833
820 DL + SIDL + SSDL + LL 5A+BR 834
821 DL + SIDL + SSDL + LL 6A+BR 835
822 DL + SIDL + SSDL + LL 7A+BR 836

TRANS SEISMIC COMBINATION


DL + SIDL + SSDL +TS
837 DL + SIDL + SSDL + LL 1(0.2)+TS+BRS 851
838 DL + SIDL + SSDL + LL 2 (0.2)+TS+BRS 852
839 DL + SIDL + SSDL + LL 3 (0.2)+TS+BRS 853
840 DL + SIDL + SSDL + LL 4(0.2)+TS+BRS 854
841 DL + SIDL + SSDL + LL 5 (0.2)+TS+BRS 855
842 DL + SIDL + SSDL + LL 6 (0.2)+TS+BRS 856
843 DL + SIDL + SSDL + LL 7 (0.2)+TS+BRS 857

844 DL + SIDL + SSDL + LL 1A(0.2)+TS+BRS 858


845 DL + SIDL + SSDL + LL 2A (0.2)+TS+BRS 859
846 DL + SIDL + SSDL + LL 3A (0.2)+TS+BRS 860
847 DL + SIDL + SSDL + LL 4A(0.2)+TS+BRS 861
848 DL + SIDL + SSDL + LL 5 A(0.2)+TS+BRS 862
849 DL + SIDL + SSDL + LL 6A (0.2)+TS+BRS 863
850 DL + SIDL + SSDL + LL 7A (0.2)+TS+BRS 864

LONG SEISMIC COMBINATION

DL + SIDL + SSDL +LS


865 DL + SIDL + SSDL + LL 1(0.2)+LS+BRS 879
866 DL + SIDL + SSDL + LL 2 (0.2)+LS+BRS 880
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: ANK ASK
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

867 DL + SIDL + SSDL + LL 3 (0.2)+LS+BRS 881


868 DL + SIDL + SSDL + LL 4(0.2)+LS+BRS 82
869 DL + SIDL + SSDL + LL 5 (0.2)+LS+BRS 883
870 DL + SIDL + SSDL + LL 6 (0.2)+LS+BRS 884
871 DL + SIDL + SSDL + LL 7 (0.2)+LS+BRS 885

872 DL + SIDL + SSDL + LL 1A(0.2)+LS+BRS 886


873 DL + SIDL + SSDL + LL 2A (0.2)+LS+BRS 887
874 DL + SIDL + SSDL + LL 3A (0.2)+LS+BRS 888
875 DL + SIDL + SSDL + LL 4A(0.2)+LS+BRS 889
876 DL + SIDL + SSDL + LL 5 A(0.2)+LS+BRS 890
877 DL + SIDL + SSDL + LL 6A (0.2)+LS+BRS 891
878 DL + SIDL + SSDL + LL 7A (0.2)+LS+BRS 892

Maximum Reaction Case Maximum Longitudinal Moment Case


WIND COMBINATION Transverse wind
DL + SIDL + SSDL + WT
893 DL + SIDL + SSDL + LL 1+WT+BR 907
894 DL + SIDL + SSDL + LL 2 +WT+BR 908
895 DL + SIDL + SSDL + LL 3+WT+BR 909
896 DL + SIDL + SSDL + LL 4+WT+BR 910
897 DL + SIDL + SSDL + LL 5+WT+BR 911
898 DL + SIDL + SSDL + LL 6+WT+BR 912
899 DL + SIDL + SSDL + LL 7+WT+BR 913

DL + SIDL + SSDL + WT
900 DL + SIDL + SSDL + LL 1A+WT+BR 914
901 DL + SIDL + SSDL + LL 2A +WT+BR 915
902 DL + SIDL + SSDL + LL 3A+WT+BR 916
903 DL + SIDL + SSDL + LL 4A+WT+BR 917
904 DL + SIDL + SSDL + LL 5A+WT+BR 918
905 DL + SIDL + SSDL + LL 6A+WT+BR 919
906 DL + SIDL + SSDL + LL 7A+WT+BR 920

With longitudinal wind


DL + SIDL + SSDL + WT
921 DL + SIDL + SSDL + LL 1+WT+BR 936
922 DL + SIDL + SSDL + LL 2 +WT+BR 937
923 DL + SIDL + SSDL + LL 3+WT+BR 938
924 DL + SIDL + SSDL + LL 4+WT+BR 939
925 DL + SIDL + SSDL + LL 5+WT+BR 940
926 DL + SIDL + SSDL + LL 6+WT+BR 941
927 DL + SIDL + SSDL + LL 7+WT+BR 942

928 DL + SIDL + SSDL + WL


929 DL + SIDL + SSDL + LL 1A+WL+BR 943
930 DL + SIDL + SSDL + LL 2A +WL+BR 944
931 DL + SIDL + SSDL + LL 3A+WL+BR 945
932 DL + SIDL + SSDL + LL 4A+WL+BR 946
933 DL + SIDL + SSDL + LL 5A+WL+BR 947
934 DL + SIDL + SSDL + LL 6A+WL+BR 948
935 DL + SIDL + SSDL + LL 7A+WL+BR 949

Combinations for ULS case

BASIC COMBINATION
1.35DL + 1.35SIDL + 1.75SSDL
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: ANK ASK
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

Live load Leading, WT Accompanying

Towards ccenter of piercap


501 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 1 +1.5WT + 1.15BR 515
502 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 2 +1.5WT + 1.15BR 516
503 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 3 +1.5WT + 1.15BR 517
504 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 4 +1.5WT + 1.15BR 518
505 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 5 +1.5WT + 1.15BR 519
506 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 6 +1.5WT + 1.15BR 520
507 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 7 +1.5WT + 1.15BR 521

Near piercap support


508 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 1A +1.5WT + 1.15BR 522
509 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 2A +1.5WT + 1.15BR 523
510 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 3A +1.5WT + 1.15BR 524
511 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 4A +1.5WT + 1.15BR 525
512 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 5A +1.5WT + 1.15BR 526
513 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 6A+1.5WT + 1.15BR 527
514 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 7A +1.5WT + 1.15BR 528

Live load Leading, WL Accompanying

Towards ccenter of piercap


529 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 1 +1.5WL + 1.15BR 543
530 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 2 +1.5WL + 1.15BR 544
531 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 3 +1.5WL + 1.15BR 545
532 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 4 +1.5WL + 1.15BR 546
533 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 5 +1.5WL + 1.15BR 547
534 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 6 +1.5WL + 1.15BR 548
535 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 7 +1.5WL + 1.15BR 549

Near piercap support


536 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 1A +1.5WL + 1.15BR 550
537 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 2A +1.5WL + 1.15BR 551
538 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 3A +1.5WL + 1.15BR 552
539 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 4A +1.5WL + 1.15BR 553
540 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 5A +1.5WL + 1.15BR 554
541 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 6A+1.5WL + 1.15BR 555
542 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 7A +1.5WL + 1.15BR 556

WT load Leading, Live Load Accompanying

Towards ccenter of piercap


557 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 1 +1.5WT + 1.15BR 571
558 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 2 +1.5WT + 1.15BR 572
559 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 3 +1.5WT + 1.15BR 573
560 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 4 +1.5WT + 1.15BR 574
561 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 5 +1.5WT + 1.15BR 575
562 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 6 +1.5WT + 1.15BR 576
563 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 7 +1.5WT + 1.15BR 577

Near piercap support


564 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 1A +1.5WT + 1.15BR 578
565 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 2A +1.5WT + 1.15BR 579
566 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 3A +1.5WT + 1.15BR 580
567 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 4A +1.5WT + 1.15BR 581
568 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 5A +1.5WT + 1.15BR 582
569 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 6A+1.5WT + 1.15BR 583
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: ANK ASK
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

570 1.35DL + 1.35SIDL + 1.75SSDL + 1.5LL 7A +1.5WT + 1.15BR 584

WL load Leading, Live Load Accompanying

Towards ccenter of piercap


585 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 1 +1.5WL + 1.15BR 599
586 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 2 +1.5WL + 1.15BR 600
587 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 3 +1.5WL + 1.15BR 601
588 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 4 +1.5WL + 1.15BR 602
589 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 5 +1.5WL + 1.15BR 603
590 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 6 +1.5WL + 1.15BR 604
591 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 7 +1.5WL + 1.15BR 605

Near piercap support


592 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 1A +1.5WL + 1.15BR 606
593 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 2A +1.5WL + 1.15BR 607
594 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 3A +1.5WL + 1.15BR 608
595 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 4A +1.5WL + 1.15BR 609
596 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 5A +1.5WL + 1.15BR 610
597 1.35DL + 1.35SIDL + 1.75SSDL + 1.15LL 6A+1.5WL + 1.15BR 611
598 1.35DL + 1.35SIDL + 1.75SSDL + 1.5LL 7A +1.5WL + 1.15BR 612

SEISMIC COMBINATION

Transverse Seismic combinations


1.35DL + 1.35SIDL + 1.75SSDL
Towards ccenter of piercap
613 1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 1 +1.5TSL + 0.45LS + BRS 627
614 1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 2 +1.5TSL + 0.45LS + BRS 628
615 1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 3 +1.5TSL + 0.45LS + BRS 629
616 1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 4 +1.5TSL + 0.45LS + BRS 630
617 1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 5 +1.5TSL + 0.45LS + BRS 631
618 1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 6 +1.5TSL + 0.45LS + BRS 632
619 1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 7 +1.5TSL + 0.45LS + BRS 633

Near piercap support


620 1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 1A +1.5TSL + 0.45LS + BRS 634
621 1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 2A +1.5TSL + 0.45LS + BRS 635
622 1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 3A +1.5TSL + 0.45LS + BRS 636
623 1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 4A+1.5TSL + 0.45LS + BRS 637
624 1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 5A +1.5TSL + 0.45LS + BRS 638
625 1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 6A +1.5TSL + 0.45LS + BRS 639
626 1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 7A +1.5TSL + 0.45LS + BRS 640

Longitudinal Seismic combinations


1.35DL + 1.35SIDL + 1.75SSDL
Towards ccenter of piercap
641 1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 1 +1.5LS + 0.45TS + BRS 655
642 1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 2 +1.5LS + 0.45TS + BRS 656
643 1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 3 +1.5LS + 0.45TS + BRS 657
644 1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 4 +1.5LS + 0.45TS + BRS 658
645 1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 5 +1.5LS + 0.45TS + BRS 659
646 1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 6 +1.5LS + 0.45TS + BRS 660
647 1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 7 +1.5LS + 0.45TS + BRS 661

Near piercap support


648 1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 1A +1.5LS + 0.45TS + BRS 662
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: ANK ASK
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

649 1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 2A +1.5LS + 0.45TS + BRS 663


650 1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 3A +1.5LS + 0.45TS + BRS 664
651 1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 4A+1.5LS + 0.45TS + BRS 665
652 1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 5A +1.5LS + 0.45TS + BRS 666
653 1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 6A +1.5LS + 0.45TS + BRS 667
654 1.35DL + 1.35SIDL + 1.75SSDL + 0.2LL 7A +1.5LS + 0.45TS + BRS 668

RARE COMBINATION

Live load Leading, WT Accompanying

Towards ccenter of piercap

669 DL + SIDL + 1.2SSDL + LL 1(1)+0.6WT +BR 683


670 DL + SIDL + SSDL + LL 2(1)+0.6WT+BR 684
671 DL + SIDL + SSDL +LL 3(1)+0.6WT+BR 685
672 DL + SIDL + SSDL + LL 4(1)+0.6WT+BR 686
673 DL + SIDL + SSDL + LL 5(1)+0.6WT+BR 687
674 DL + SIDL + SSDL + LL 6(1)+0.6WT+BR 688
675 DL + SIDL + SSDL +LL 7(1)+0.6WT+BR 689

Near piercap support

676 DL + SIDL + 1.2SSDL + LL 1A(1)+0.6WT +BR 690


677 DL + SIDL + SSDL + LL 2A(1)+0.6WT+BR 691
678 DL + SIDL + SSDL +LL 3A(1)+0.6WT+BR 692
679 DL + SIDL + SSDL + LL 4A(1)+0.6WT+BR 693
680 DL + SIDL + SSDL + LL 5A(1)+0.6WT+BR 694
681 DL + SIDL + SSDL + LL 6A(1)+0.6WT+BR 695
682 DL + SIDL + SSDL +LL 7A(1)+0.6WT+BR 696

Live load Leading, WL Accompanying

Towards ccenter of piercap

697 DL + SIDL + 1.2SSDL + LL 1(1)+0.6WL +BR 711


698 DL + SIDL + SSDL + LL 2(1)+0.6WL+BR 712
699 DL + SIDL + SSDL +LL 3(1)+0.6WL+BR 713
700 DL + SIDL + SSDL + LL 4(1)+0.6WL+BR 714
701 DL + SIDL + SSDL + LL 5(1)+0.6WL+BR 715
702 DL + SIDL + SSDL + LL 6(1)+0.6WL+BR 716
703 DL + SIDL + SSDL +LL 7(1)+0.6WL+BR 717

Near piercap support

704 DL + SIDL + 1.2SSDL + LL 1A(1)+0.6WL +BR 718


705 DL + SIDL + SSDL + LL 2A(1)+0.6WL+BR 719
706 DL + SIDL + SSDL +LL 3A(1)+0.6WL+BR 720
707 DL + SIDL + SSDL + LL 4A(1)+0.6WL+BR 721
708 DL + SIDL + SSDL + LL 5A(1)+0.6WL+BR 722
709 DL + SIDL + SSDL + LL 6A(1)+0.6WL+BR 723
710 DL + SIDL + SSDL +LL 7A(1)+0.6WL+BR 724

WT load Leading, Live Load Accompanying


Towards ccenter of piercap
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: ANK ASK
Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26

725 DL + SIDL + 1.2SSDL + LL 1(0.75)+WT +0.75BR 739


726 DL + SIDL + SSDL + LL 2(0.75)+WT+0.75BR 740
727 DL + SIDL + SSDL +LL 3(0.75)+WT+0.75BR 741
728 DL + SIDL + SSDL + LL 4(0.75)+WT+0.75BR 742
729 DL + SIDL + SSDL + LL 5(0.75)+WT+0.75BR 743
730 DL + SIDL + SSDL + LL 6(0.75)+WT+0.75BR 744
731 DL + SIDL + SSDL +LL 7(0.75)+WT+0.75BR 745

Near piercap support

732 DL + SIDL + 1.2SSDL + LL 1A(0.75)+WT +0.75BR 746


733 DL + SIDL + SSDL + LL 2A(0.75)+WT+0.75BR 747
734 DL + SIDL + SSDL +LL 3A(0.75)+WT+0.75BR 748
735 DL + SIDL + SSDL + LL 4A(0.75)+WT+0.75BR 749
736 DL + SIDL + SSDL + LL 5A(0.75)+WT+0.75BR 750
737 DL + SIDL + SSDL + LL 6A(0.75)+WT+0.75BR 751
738 DL + SIDL + SSDL +LL 7A(0.75)+WT+0.75BR 752

WL load Leading, Live Load Accompanying

Towards ccenter of piercap

753 DL + SIDL + 1.2SSDL + LL 1(0.75)+WL +0.75BR 767


754 DL + SIDL + SSDL + LL 2(0.75)+WL+0.75BR 768
755 DL + SIDL + SSDL +LL 3(0.75)+WL+0.75BR 769
756 DL + SIDL + SSDL + LL 4(0.75)+WL+0.75BR 770
757 DL + SIDL + SSDL + LL 5(0.75)+WL+0.75BR 771
758 DL + SIDL + SSDL + LL 6(0.75)+WL+0.75BR 772
759 DL + SIDL + SSDL +LL 7(0.75)+WL+0.75BR 773

Near piercap support

760 DL + SIDL + 1.2SSDL + LL 1A(0.75)+WL +0.75BR 774


761 DL + SIDL + SSDL + LL 2A(0.75)+WL+0.75BR 775
762 DL + SIDL + SSDL +LL 3A(0.75)+WL+0.75BR 776
763 DL + SIDL + SSDL + LL 4A(0.75)+WL+0.75BR 777
764 DL + SIDL + SSDL + LL 5A(0.75)+WL+0.75BR 778
765 DL + SIDL + SSDL + LL 6A(0.75)+WL+0.75BR 779
766 DL + SIDL + SSDL +LL 7A(0.75)+WL+0.75BR 780
GRADE

300

Page 64
NOTE No. R 0
STRUCTCON DESIGNS P. L. 34
835/N-454 .
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

7.0

Number of cable and their stressing stage is given in table below.

Construction stage analsis is carried out in Midas civil

Steps for construction stage analysis taken listed as following,

Construction Stage Days Case Cables

CS1 0 Both column of portal cast


CS2 15 Piercap of portal cast on staging

1st stage prestress of piercap done


CS3 22 3,7,14,15,16,17,18
CS4 52 Girders from 60m span placed
CS5 59 2nd stage prestressing 2,8,13,19
CS6 89 Girders from 32m span placed
CS7 96 3rd stage prestressing 1,5,9,10,11,12,20
CS8 126 SIDL reaction is applied
CS9 156 Full live load reaction applied
CS10 20156 Long term creep and shrinkage
Total 18 cables + 2 dummy
NOTE No. R 0
STRUCTCON DESIGNS Pvt Ltd. 835/N-455
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 2-Jun-16
BETWEEN BKC AND EEH BY
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

1.0 Post Tensioned Pier Cap Analysis & Design


1.1 Piercap, piers and pile caps are modelled in Midas as line elements.
Pilecap has been modelled with four noded plates supported on piles. Piles of 1.2m dia are modelled
upto point of fixity and defined as fixed supports at that level.
All loads are applied on Piercap and piers appropriately.

Reference Note: 835/N-454

1.1.1 General Data

Pier cap size= 4.00 m X 1.50 m

Post tensioned cables data


Cables = 18 No.s + 2 No.s Dummy
Duct Dia = 107.00 mm
Span length c/c between two piers = 18.02 m
Left side cantilever Length = 3.5 m
Right side cantilever length = 1.8 m
Depth of Pier Cap = 1.5 m
Width of pier cap = 4 m
Grade of concrete (fck) = M 55

Fig. showing general arrangement

Fig. showing general arrangement location of bearings

Permissible stresses in concrete - IRC-112, 12.2.1


Stage Minimum (MPa) Maximum (MPa)
Construction 2.5 -26.40
Service 3.5 -26.40
Cable profile
Cable no. 1 to 9

Eccentricities e1 e2 e3 e4 e5
-180 mm -365 mm -610 mm -260 mm -180 mm

Cable No. 10 to 20

Eccentricities e1 e2 e3 e4 e5
180 mm 115 mm -380 mm 0 mm 115 mm

Cable arrangement

at Mid Section
at Left Support Aection
Input Parameters

Concrete:
Fck, Characterstic Compressive strength = 55 Mpa
Ec, Modulus of Elasticity of concrete = 36000.00 MPa Table 6.5, IRC-112

Reinforcement Steel
Grade = Fe500
Fy = 500 Mpa
Es = 2.00E+05 Mpa

Prestresing Steel:

Type of Prestressing cables used - 19 strands of 15.2 dia. Each


i.e 19 T 15 type anchorage
Area of 1 strand (Astrand) = 140 mm2 IS 14268-1995
Area of one cable = 2660 mm^2
UTS of strand = 1860 Mpa
Jacking force = 0.765 x 1860 = 1423 Mpa
Force per cable = 1422.90 x 2.660 = 3784.914 KN

Es = 1.95E+05 Mpa
Fu (Ultimate Strength) = 1860 Mpa
Fy (Yield Strength) = 1570 Mpa

Sheathing Type - Corugated HDPE


Duct Diameter = 107 mm
As per, IRC-112, Table 7.1
Coefficient of friction (meu) = 0.17
Coefficient of wobble (k) = 0.002 per meter

Anchorage Slip = 6 mm
Stressing Type = One end stressing

Minimum strength of concrete at the time of stressing = 45 MPa


Age of concrete at the time of stressing = 7 days
(assumed minimum age, actual may be more)

Creep & Shrinkage Inputs

Relative Humidity = 70 %
Notional size of member = 2*Ac/ u
= 1
Compressive stregnth of concrete at the age of 28 days
= 55 Mpa
Days considered for long term creep and shrinkage
= 20,000 Days

Graph of time vs Creep Coefficient (Generated through Midas Civil)


Graph of time vs Shrinkage Strain (Generated through Midas Civil)

8.1.2 Construction Stages Data

Number of cable and their stressing stage is given in table below.


Construction stage analsis is carried out in Midas civil

Steps for construction stage analysis taken listed as following,

Construction Stage Days Case Cables

CS1 0 Both column of portal cast 0


CS2 15 Piercap of portal cast on staging 15
CS3 22 1st stage prestress of piercap done 4,6,12,13,14,15,16 7
CS4 32 Girders from 60m span placed 10
CS5 40 2nd stage prestressing 3,7,11,17 8
CS6 50 Girders from 32m span placed 10
CS7 60 3rd stage prestressing 1,2,5,8,9,10,18 10
CS8 90 SIDL reaction is applied 30
CS9 100 Full live load reaction applied 10
CS10 20100 Long term creep and shrinkage 20000
Total 18 cables + 2 dummy

* Cables should be stressed symmetricially in all the stages. i.e 4/6, 13/15, 14, 12/16

8.2 Summary of Stresses at each Stages

Results are Extracted from the midas model.


Sign convention
Negative = Compression
Positive = Tension

Element numbers in Midas

STAGE 2 Pier cap cast on staging

Axial Bend(+z) Bend(-z) TOP BOTTOM


Elem Load Stage Part
(N/mm^2) (N/mm^2) (N/mm^2) (N/mm^2) (N/mm^2)

659 Summation CS 2 J[14] 0.00 0.05 -0.05 0.05 -0.05


LEFT
CANTIL
EVER
LEFT 659 Summation CS 2 I[8] 0.00 0.00 0.00 0.00 0.00
CANTIL 660 Summation CS 2 I[14] 0.00 0.05 -0.05 0.05 -0.05
EVER 660 Summation CS 2 J[5] 0.00 0.32 -0.32 0.32 -0.32
661 Summation CS 2 J[378] 0.00 0.63 -0.63 0.63 -0.63
661 Summation CS 2 I[5] 0.00 0.32 -0.32 0.32 -0.32
665 Summation CS 2 J[6] -0.03 -1.65 1.72 -1.68 1.69
665 Summation CS 2 I[9] -0.03 -0.89 0.93 -0.92 0.90
PIER
668 Summation CS 2 J[11] -0.03 -2.53 2.63 -2.56 2.60
CAP
668 Summation CS 2 I[15] -0.03 -2.30 2.40 -2.33 2.37
671 Summation CS 2 J[747] -0.03 -1.55 1.60 -1.58 1.57
671 Summation CS 2 I[12] -0.03 -1.94 2.01 -1.97 1.98
672 Summation CS 2 J[379] -0.03 1.47 -1.48 1.44 -1.51
RIGHT 672 Summation CS 2 I[747] -0.03 -1.55 1.60 -1.58 1.57
CANTIL
EVER 673 Summation CS 2 I[379] 0.00 0.16 -0.16 0.16 -0.16
673 Summation CS 2 J[380] 0.00 0.00 0.00 0.00 0.00
MAX 1.44 2.60
* At this stage pier will be supported on staging, hence stress check is not required MIN -2.56 -1.51

STAGE 3 First stage prestress

659 Summation CS 3 I[8] -3.66 -3.76 3.80 -7.42 0.14


LEFT 659 Summation CS 3 J[14] -3.67 -3.36 3.40 -7.03 -0.28
CANTIL 660 Summation CS 3 J[5] -3.70 -2.46 2.50 -6.16 -1.20
EVER 660 Summation CS 3 I[14] -3.67 -3.36 3.40 -7.03 -0.28
661 Summation CS 3 J[378] -3.73 -1.32 1.35 -5.05 -2.38
661 Summation CS 3 I[5] -3.70 -2.46 2.50 -6.16 -1.20
665 Summation CS 3 J[6] -3.84 2.60 -2.57 -1.25 -6.42
665 Summation CS 3 I[9] -3.76 1.67 -1.67 -2.10 -5.43
PIER
668 Summation CS 3 I[15] -3.88 2.34 -2.29 -1.54 -6.17
CAP
668 Summation CS 3 J[11] -3.87 1.92 -1.87 -1.95 -5.74
671 Summation CS 3 I[12] -3.84 1.03 -0.99 -2.81 -4.83
671 Summation CS 3 J[747] -3.82 0.60 -0.57 -3.23 -4.39
672 Summation CS 3 J[379] -3.75 -2.02 2.05 -5.77 -1.70
RIGHT 672 Summation CS 3 I[747] -3.82 0.60 -0.57 -3.23 -4.39
CANTIL
EVER 673 Summation CS 3 J[380] -3.76 -3.96 4.00 -7.71 0.24
673 Summation CS 3 I[379] -3.79 -0.81 0.82 -4.60 -2.97
MAX -1.25 0.24
Max Allowable Compression = -26.40 Mpa OK MIN -7.71 -6.42
Mx Allowable Tension = 2.50 Mpa OK

STAGE 4 ROB placed

659 Summation CS 4 I[8] -3.60 -3.70 3.73 -7.30 0.13


LEFT 659 Summation CS 4 J[14] -3.62 -3.30 3.34 -6.92 -0.27
CANTIL 660 Summation CS 4 J[5] -3.65 -1.46 1.48 -5.11 -2.17
EVER 660 Summation CS 4 I[14] -3.62 -3.30 3.34 -6.92 -0.27
661 Summation CS 4 J[378] -3.68 0.32 -0.31 -3.36 -3.99
661 Summation CS 4 I[5] -3.65 -1.46 1.48 -5.11 -2.17
665 Summation CS 4 J[6] -3.86 -0.34 0.39 -4.20 -3.47
665 Summation CS 4 I[9] -3.77 -0.07 0.09 -3.84 -3.68
PIER
668 Summation CS 4 J[11] -3.92 -2.72 2.83 -6.64 -1.08
CAP
668 Summation CS 4 I[15] -3.92 -1.86 1.95 -5.77 -1.96
671 Summation CS 4 I[12] -3.86 -2.38 2.45 -6.24 -1.41
671 Summation CS 4 J[747] -3.83 -1.73 1.79 -5.57 -2.05
672 Summation CS 4 J[379] -3.74 0.56 -0.56 -3.18 -4.31
RIGHT 672 Summation CS 4 I[747] -3.83 -1.73 1.79 -5.57 -2.05
CANTIL
EVER 673 Summation CS 4 I[379] -3.73 -0.79 0.80 -4.52 -2.93
673 Summation CS 4 J[380] -3.69 -3.88 3.92 -7.58 0.23
MAX -3.18 0.23
Max Allowable Compression = -26.40 Mpa OK MIN -7.58 -4.31
Mx Allowable Tension = 2.50 Mpa OK
STAGE 5 Second stage prestressing

659 Summation CS 5 I[8] -5.64 -4.65 4.70 -10.30 -0.94


LEFT 659 Summation CS 5 J[14] -5.66 -3.90 3.95 -9.57 -1.71
CANTIL 660 Summation CS 5 J[5] -5.72 -1.53 1.56 -7.25 -4.16
EVER 660 Summation CS 5 I[14] -5.66 -3.90 3.95 -9.57 -1.71
661 Summation CS 5 J[378] -5.76 0.72 -0.72 -5.04 -6.48
661 Summation CS 5 I[5] -5.72 -1.53 1.56 -7.25 -4.16
665 Summation CS 5 J[6] -5.94 2.09 -2.03 -3.84 -7.96
665 Summation CS 5 I[9] -5.82 1.69 -1.66 -4.14 -7.48
PIER
668 Summation CS 5 J[11] -6.00 -0.22 0.35 -6.22 -5.65
CAP
668 Summation CS 5 I[15] -6.01 0.73 -0.62 -5.27 -6.62
671 Summation CS 5 I[12] -5.94 -0.56 0.65 -6.50 -5.29
671 Summation CS 5 J[747] -5.91 -0.31 0.37 -6.22 -5.54
672 Summation CS 5 I[747] -5.91 -0.31 0.37 -6.22 -5.54
RIGHT 672 Summation CS 5 J[379] -5.79 -0.73 0.74 -6.52 -5.06
CANTIL
EVER 673 Summation CS 5 I[379] -5.82 -0.39 0.39 -6.21 -5.43
673 Summation CS 5 J[380] -5.77 -4.91 4.96 -10.70 -0.81
MAX -3.84 -0.81
Max Allowable Compression = -26.40 Mpa OK MIN -10.70 -7.96
Mx Allowable Tension = 2.50 Mpa OK

STAGE 6 Other span placed

659 Summation CS 6 J[14] -5.59 -3.86 3.91 -9.45 -1.68


LEFT 659 Summation CS 6 I[8] -5.57 -4.59 4.64 -10.20 -0.93
CANTIL 660 Summation CS 6 I[14] -5.59 -3.86 3.91 -9.45 -1.68
EVER 660 Summation CS 6 J[5] -5.65 -1.51 1.53 -7.15 -4.12
661 Summation CS 6 I[5] -5.65 -1.51 1.53 -7.15 -4.12
661 Summation CS 6 J[378] -5.69 0.73 -0.73 -4.96 -6.42
665 Summation CS 6 I[9] -5.86 -2.06 2.08 -7.92 -3.79
665 Summation CS 6 J[6] -6.01 -2.62 2.66 -8.63 -3.34
PIER
668 Summation CS 6 I[15] -6.10 -5.28 5.35 -11.40 -0.75
CAP
668 Summation CS 6 J[11] -6.07 -4.68 4.78 -10.80 -1.28
671 Summation CS 6 J[747] -5.91 -1.70 1.75 -7.61 -4.16
671 Summation CS 6 I[12] -5.95 -2.73 2.81 -8.69 -3.15
672 Summation CS 6 J[379] -5.78 1.50 -1.51 -4.28 -7.29
RIGHT 672 Summation CS 6 I[747] -5.91 -1.70 1.75 -7.61 -4.16
CANTIL
673 Summation CS 6 J[380] -5.69 -4.84 4.89 -10.50 -0.80
EVER
673 Summation CS 6 I[379] -5.75 -0.38 0.39 -6.13 -5.36
MAX -4.28 -0.75
Max Allowable Compression = -26.40 Mpa OK MIN -11.40 -7.29
Mx Allowable Tension = 2.50 Mpa OK

STAGE 7 Third stage prestressing

659 Summation CS 7 J[14] -9.11 -2.78 2.81 -11.90 -6.30


LEFT 659 Summation CS 7 I[8] -9.07 -4.34 4.39 -13.40 -4.68
CANTIL 660 Summation CS 7 J[5] -9.19 0.76 -0.74 -8.43 -9.94
EVER 660 Summation CS 7 I[14] -9.11 -2.78 2.81 -11.90 -6.30
661 Summation CS 7 I[5] -9.19 0.76 -0.74 -8.43 -9.94
661 Summation CS 7 J[378] -9.25 3.83 -3.83 -5.42 -13.10
665 Summation CS 7 I[9] -9.33 1.50 -1.37 -7.83 -10.70
665 Summation CS 7 J[6] -9.49 1.67 -1.47 -7.82 -11.00
PIER
668 Summation CS 7 J[11] -9.56 -0.35 0.61 -9.91 -8.95
CAP
668 Summation CS 7 I[15] -9.60 -0.82 1.07 -10.40 -8.54
671 Summation CS 7 J[747] -9.40 1.13 -1.00 -8.27 -10.40
671 Summation CS 7 I[12] -9.45 0.65 -0.47 -8.80 -9.91
672 Summation CS 7 I[747] -9.40 1.13 -1.00 -8.27 -10.40
RIGHT 672 Summation CS 7 J[379] -9.25 0.42 -0.43 -8.83 -9.69
CANTIL
EVER
RIGHT
CANTIL
673 Summation CS 7 J[380] -9.24 -4.67 4.72 -13.90 -4.52
EVER
673 Summation CS 7 I[379] -9.31 1.91 -1.90 -7.40 -11.20
MAX -5.42 -4.52
Max Allowable Compression = -26.40 Mpa OK MIN -13.90 -13.10
Mx Allowable Tension = 2.50 Mpa OK

STAGE 8 SIDL

659 Summation CS 8 I[8] -8.97 -4.30 4.35 -13.30 -4.62


LEFT 659 Summation CS 8 J[14] -9.01 -2.76 2.80 -11.80 -6.21
CANTIL 660 Summation CS 8 I[14] -9.01 -2.76 2.80 -11.80 -6.21
EVER 660 Summation CS 8 J[5] -9.09 1.19 -1.18 -7.90 -10.30
661 Summation CS 8 J[378] -9.14 4.53 -4.54 -4.61 -13.70
661 Summation CS 8 I[5] -9.09 1.19 -1.18 -7.90 -10.30
665 Summation CS 8 I[9] -9.28 0.04 0.04 -9.24 -9.24
665 Summation CS 8 J[6] -9.46 -0.47 0.59 -9.92 -8.86
PIER
668 Summation CS 8 J[11] -9.55 -3.11 3.27 -12.70 -6.28
CAP
668 Summation CS 8 I[15] -9.59 -3.73 3.87 -13.30 -5.73
671 Summation CS 8 J[747] -9.35 -0.24 0.33 -9.59 -9.01
671 Summation CS 8 I[12] -9.41 -1.31 1.43 -10.70 -7.97
672 Summation CS 8 J[379] -9.17 1.86 -1.87 -7.31 -11.00
RIGHT 672 Summation CS 8 I[747] -9.35 -0.24 0.33 -9.59 -9.01
CANTIL
673 Summation CS 8 J[380] -9.13 -4.62 4.67 -13.70 -4.46
EVER
673 Summation CS 8 I[379] -9.20 1.88 -1.87 -7.32 -11.10
MAX -4.61 -4.46
Max Allowable Compression = -26.40 Mpa OK MIN -13.70 -13.70
Mx Allowable Tension = 2.50 Mpa OK

STAGE 9 LL

659 Summation CS 9 I[8] -8.89 -4.28 4.32 -13.20 -4.57


LEFT 659 Summation CS 9 J[14] -8.93 -2.75 2.79 -11.70 -6.15
CANTIL 660 Summation CS 9 J[5] -9.01 1.12 -1.11 -7.89 -10.10
EVER 660 Summation CS 9 I[14] -8.93 -2.75 2.79 -11.70 -6.15
661 Summation CS 9 I[5] -9.01 1.12 -1.11 -7.89 -10.10
661 Summation CS 9 J[378] -9.06 4.41 -4.41 -4.65 -13.50
665 Summation CS 9 I[9] -9.27 -1.58 1.61 -10.80 -7.66
665 Summation CS 9 J[6] -9.46 -2.55 2.60 -12.00 -6.87
PIER
668 Summation CS 9 J[11] -9.59 -6.14 6.18 -15.70 -3.40
CAP
668 Summation CS 9 I[15] -9.62 -6.35 6.38 -16.00 -3.24
671 Summation CS 9 I[12] -9.41 -3.45 3.50 -12.90 -5.91
671 Summation CS 9 J[747] -9.33 -1.73 1.78 -11.10 -7.55
672 Summation CS 9 J[379] -9.12 3.44 -3.44 -5.68 -12.60
RIGHT 672 Summation CS 9 I[747] -9.33 -1.73 1.78 -11.10 -7.55
CANTIL
673 Summation CS 9 J[380] -9.05 -4.58 4.63 -13.60 -4.42
EVER
673 Summation CS 9 I[379] -9.12 1.85 -1.84 -7.26 -11.00
MAX -4.65 -3.24
Max Allowable Compression = -26.40 Mpa OK MIN -16.00 -13.50
Mx Allowable Tension = 2.50 Mpa OK

STAGE 10 LONG TERM CREEP & SHRINKAGE

659 Summation CS 10 I[8] -8.19 -3.95 4.00 -12.10 -4.20


LEFT 659 Summation CS 10 J[14] -8.23 -2.56 2.59 -10.80 -5.64
CANTIL 660 Summation CS 10 J[5] -8.30 1.09 -1.08 -7.21 -9.37
EVER 660 Summation CS 10 I[14] -8.23 -2.56 2.59 -10.80 -5.64
661 Summation CS 10 I[5] -8.30 1.09 -1.08 -7.21 -9.37
661 Summation CS 10 J[378] -8.33 4.17 -4.18 -4.16 -12.50
665 Summation CS 10 I[9] -8.53 -2.29 2.31 -10.80 -6.22
665 Summation CS 10 J[6] -8.70 -3.52 3.54 -12.20 -5.16
PIER
668 Summation CS 10 J[11] -8.83 -7.11 7.12 -15.90 -1.71
CAP
668 Summation CS 10 I[15] -8.86 -7.35 7.35 -16.20 -1.50
671 Summation CS 10 I[12] -8.65 -4.18 4.21 -12.80 -4.44
PIER
CAP

671 Summation CS 10 J[747] -8.56 -2.35 2.38 -10.90 -6.18


672 Summation CS 10 J[379] -8.38 3.79 -3.79 -4.59 -12.20
RIGHT 672 Summation CS 10 I[747] -8.56 -2.35 2.38 -10.90 -6.18
CANTIL
EVER 673 Summation CS 10 I[379] -8.37 1.69 -1.69 -6.67 -10.10
673 Summation CS 10 J[380] -8.30 -4.18 4.22 -12.50 -4.08
MAX -4.16 -1.50
Max Allowable Compression = -26.40 Mpa OK MIN -16.20 -12.50
Mx Allowable Tension = 2.50 Mpa OK

8.3 Ultimate Limit State

Load Factors - Ultimate Limit State for Strength


Basic combination Seismic Combination
Dead Load 1.35 1.35
SIDL 1.35 1.35
SIDL surfacing 1.75 1.75
Live load (Leading) 1.5 -
Live load (Accompanying) 1.15 0.2
Prestressing 1 1
Wind (Leading) 1.5 -
Wind (Accompanying) 0.9 -

8.3.1 Summary of forces at center of pier cap for ULS load cases

BMD Under selft weight

Shear-z Torsion Moment-y Moment-z


Elem Load Axial (kN) Shear-y (kN)
(kN) (kN*m) (kN*m) (kN*m)
668 501 -58812 44 -2438 -611 18947 -1772
668 502 -58998 46 -2261 -922 20072 -1767
668 503 -59044 46 -1911 -874 20810 -1768
668 504 -58979 45 -2239 -917 20152 -1768
668 505 -58857 43 -2088 -562 19686 -1773
668 506 -58564 44 -1937 -643 17113 -1771
668 507 -59029 49 -1876 -1102 20925 -1762
668 508 -58763 43 -2357 -141 18689 -1774
668 509 -58930 49 -2190 -724 19718 -1762
668 510 -58946 49 -1840 -1054 20197 -1761
668 511 -58906 45 -2183 -485 19731 -1770
668 512 -58779 43 -2006 -470 19168 -1773
668 513 -58528 44 -1878 -620 16943 -1771
668 514 -58894 50 -1846 -1079 20103 -1760
668 515 -58584 47 -2331 -810 18003 -1765
668 516 -58998 46 -2261 -922 20072 -1767
668 517 -58978 47 -2182 -948 20470 -1765
668 518 -58789 47 -2210 -991 19356 -1765
668 519 -58563 51 -1952 -1256 18477 -1757
668 520 -58255 50 -1793 -1053 15827 -1759
668 521 -58968 48 -2093 -995 20623 -1763
668 522 -58558 45 -2262 -399 17826 -1769
668 523 -58925 46 -2462 -425 19643 -1767
668 524 -58899 47 -2095 -817 19947 -1764
668 525 -58731 49 -2153 -759 18993 -1762
668 526 -58529 49 -1893 -953 18127 -1761
668 527 -58260 50 -1753 -1057 15830 -1759
668 528 -58872 49 -2009 -954 19977 -1761
668 529 -58701 32 -2125 -778 18408 -1360
668 530 -58844 34 -1990 -1017 19270 -1356
668 531 -58878 34 -1721 -980 19836 -1358
668 532 -58828 34 -1973 -1013 19332 -1358
668 533 -58735 32 -1857 -741 18974 -1362
668 534 -58511 33 -1741 -803 17002 -1360
668 535 -58867 36 -1695 -1155 19925 -1353
668 536 -58526 35 -2043 -931 17684 -1355
668 537 -58844 34 -1990 -1017 19270 -1356
668 538 -58828 35 -1929 -1036 19576 -1355
668 539 -58683 35 -1950 -1069 18721 -1355
668 540 -58510 38 -1753 -1273 18048 -1349
668 541 -58273 37 -1631 -1117 16016 -1351
668 542 -58820 36 -1861 -1073 19693 -1354
668 543 -58663 31 -2063 -418 18210 -1362
668 544 -58791 36 -1935 -865 18999 -1353
668 545 -58803 36 -1667 -1118 19366 -1352
668 546 -58773 33 -1930 -681 19009 -1359
668 547 -58675 32 -1795 -670 18578 -1362
668 548 -58483 33 -1696 -785 16872 -1360
668 549 -58764 37 -1672 -1137 19294 -1351
668 550 -58506 33 -1990 -616 17548 -1358
668 551 -58787 34 -2143 -636 18941 -1357
668 552 -58767 35 -1863 -936 19175 -1355
668 553 -58639 36 -1907 -892 18443 -1353
668 554 -58484 37 -1708 -1041 17779 -1352
668 555 -58277 37 -1600 -1120 16019 -1350
668 556 -58747 36 -1796 -1041 19198 -1352
668 557 -58682 39 -2361 -861 18001 -1347
668 558 -58825 41 -2225 -1100 18864 -1343
668 559 -58860 40 -1956 -1062 19430 -1344
668 560 -58810 40 -2208 -1096 18926 -1344
668 561 -58717 38 -2092 -824 18568 -1348
668 562 -58492 39 -1977 -886 16596 -1346
668 563 -58849 43 -1930 -1237 19518 -1340
668 564 -58507 42 -2279 -1014 17278 -1342
668 565 -58825 41 -2225 -1100 18864 -1343
668 566 -58809 42 -2164 -1119 19169 -1342
668 567 -58665 42 -2186 -1152 18315 -1341
668 568 -58491 45 -1988 -1355 17641 -1336
668 569 -58255 44 -1866 -1200 15610 -1337
668 570 -58802 42 -2096 -1156 19286 -1340
668 571 -58645 38 -2298 -500 17804 -1349
668 572 -58772 43 -2171 -948 18593 -1340
668 573 -58785 43 -1902 -1201 18960 -1339
668 574 -58754 40 -2165 -764 18603 -1345
668 575 -58657 38 -2030 -753 18171 -1348
668 576 -58465 39 -1931 -868 16466 -1346
668 577 -58745 44 -1907 -1220 18888 -1338
668 578 -58487 40 -2225 -698 17142 -1345
668 579 -58769 41 -2379 -719 18535 -1343
668 580 -58749 42 -2098 -1019 18768 -1341
668 581 -58620 43 -2142 -974 18037 -1339
668 582 -58465 43 -1943 -1123 17373 -1339
668 583 -58259 44 -1836 -1203 15612 -1337
668 584 -58728 43 -2031 -1124 18791 -1339
668 585 -58701 32 -2125 -778 18408 -1360
668 586 -58844 34 -1990 -1017 19270 -1356
668 587 -58878 34 -1721 -980 19836 -1358
668 588 -58828 34 -1973 -1013 19332 -1358
668 589 -58735 32 -1857 -741 18974 -1362
668 590 -58511 33 -1741 -803 17002 -1360
668 591 -58867 36 -1695 -1155 19925 -1353
668 592 -58526 35 -2043 -931 17684 -1355
668 593 -58844 34 -1990 -1017 19270 -1356
668 594 -58828 35 -1929 -1036 19576 -1355
668 595 -58683 35 -1950 -1069 18721 -1355
668 596 -58510 38 -1753 -1273 18048 -1349
668 597 -58273 37 -1631 -1117 16016 -1351
668 598 -58820 36 -1861 -1073 19693 -1354
668 599 -58663 31 -2063 -418 18210 -1362
668 600 -58791 36 -1935 -865 18999 -1353
668 601 -58803 36 -1667 -1118 19366 -1352
668 602 -58773 33 -1930 -681 19009 -1359
668 603 -58675 32 -1795 -670 18578 -1362
668 604 -58483 33 -1696 -785 16872 -1360
668 605 -58764 37 -1672 -1137 19294 -1351
668 606 -58506 33 -1990 -616 17548 -1358
668 607 -58787 34 -2143 -636 18941 -1357
668 608 -58767 35 -1863 -936 19175 -1355
668 609 -58639 36 -1907 -892 18443 -1353
668 610 -58277 37 -1600 -1120 16019 -1350
668 611 -58277 37 -1600 -1120 16019 -1350
668 612 -58747 36 -1796 -1041 19198 -1352
668 613 -58331 27 -1748 -1194 16101 -727
668 614 -58356 27 -1724 -1235 16251 -727
668 615 -58362 27 -1678 -1229 16349 -727
668 616 -58354 27 -1721 -1235 16262 -727
668 617 -58337 26 -1701 -1187 16199 -728
668 618 -58298 27 -1681 -1198 15856 -727
668 619 -58360 27 -1673 -1259 16365 -726
668 620 -58301 27 -1734 -1221 15975 -726
668 621 -58356 27 -1724 -1235 16251 -727
668 622 -58353 27 -1714 -1239 16304 -726
668 623 -58831 28 -2447 -1237 19769 -725
668 624 -58298 28 -1683 -1280 16038 -725
668 625 -58257 27 -1662 -1253 15685 -726
668 626 -58352 27 -1702 -1245 16324 -726
668 627 -58325 26 -1737 -1131 16066 -728
668 628 -58347 27 -1715 -1209 16204 -726
668 629 -58349 27 -1668 -1253 16268 -726
668 630 -58344 27 -1714 -1177 16205 -727
668 631 -58327 26 -1690 -1175 16130 -728
668 632 -58294 27 -1673 -1195 15834 -727
668 633 -58342 27 -1669 -1256 16255 -726
668 634 -58298 27 -1724 -1166 15951 -727
668 635 -58346 27 -1751 -1169 16194 -727
668 636 -58343 27 -1702 -1221 16234 -726
668 637 -58321 27 -1710 -1214 16107 -726
668 638 -58294 27 -1675 -1240 15992 -726
668 639 -58258 27 -1657 -1253 15685 -726
668 640 -58339 27 -1691 -1240 16238 -726
668 641 -58334 28 -1754 -1198 16090 -735
668 642 -58358 29 -1730 -1240 16240 -734
668 643 -58364 29 -1684 -1233 16338 -734
668 644 -58356 29 -1728 -1239 16251 -735
668 645 -58340 28 -1707 -1192 16188 -735
668 646 -58301 28 -1687 -1203 15845 -735
668 647 -58362 29 -1679 -1264 16354 -734
668 648 -58303 29 -1740 -1225 15964 -734
668 649 -58358 29 -1730 -1240 16240 -734
668 650 -58356 29 -1720 -1243 16293 -734
668 651 -58331 29 -1724 -1249 16144 -734
668 652 -58300 29 -1689 -1284 16027 -733
668 653 -58259 29 -1668 -1257 15674 -733
668 654 -58354 29 -1708 -1250 16313 -734
668 655 -58300 28 -1731 -1170 15940 -735
668 656 -58349 29 -1757 -1174 16183 -734
668 657 -58345 29 -1708 -1226 16223 -734
668 658 -58323 29 -1716 -1218 16096 -734
668 659 -58296 29 -1681 -1244 15981 -733
668 660 -58260 29 -1663 -1258 15674 -733
668 661 -58342 29 -1697 -1244 16227 -734
668 662 -58327 28 -1743 -1136 16056 -735
668 663 -58349 29 -1721 -1213 16193 -734
668 664 -58351 29 -1674 -1257 16257 -734
668 665 -58346 28 -1720 -1182 16195 -735
668 666 -58329 28 -1697 -1180 16119 -735
668 667 -58296 28 -1679 -1200 15823 -735
668 668 -58344 29 -1675 -1261 16244 -733

MAX -58255 51 -1600 -141 20925 -725


MIN -59044 26 -2462 -1355 15610 -1774

8.3.1.1 Moment capacity of a section at mid span

Moment Capacity of Prestressed Section

Area of layer 1 cables = 23940 mm^2


Area of layer 2 cables = 23940 mm^2

Total Force in layer 1 cable after losses = 23845 KN


Total Force in layer 2 cable after losses = 23845 KN

ES = 1.95E+05 Mpa

Prestrain in Layer 1 cables = Fs / Es = 0.0051


Prestrain in Layer 2 cables = Fs / Es = 0.0051

Ultimate stress in cable (Fpk) = 1860 Mpa


Stress at 0.1 % Proof force = 0.87 * Fpk = 1618.2 Mpa

Fpd = 1618.2 = 1407.13 Mpa


1.15
Yield Strain, εpd

εpd = Fpd = 0.0072


ES
Fig. A2-4 , IRC-112-2011

CG Of cables from top at mid sec


1245 mm
485
CG Of cables from top at Left support sec
872.5 mm
385
230
140

Left Support Mid Section

Neutral Axis Location at = 821.18 mm ….After iterations

Final Steel Strain = Prestrain + Bending Strain

Final Strain in Layer 1 cables = 0.0051 + 0.00230


= 0.0074 > εpd

Final Strain in Layer 2 cables = 0.0051 + 0.001316


= 0.0064 ~ εpd

As the strain values are greater than εpd , hence stresses in cables are=Fpd= 1407.13 Mpa

Thus Total force in steel , Tu = ε*Es*A


= 64555.55 KN

Total Compressive force in concrete

fcd = a Fck
ɣm

λ*x Cu

Tu

λ = 0.8 for Fck < 60 Mpa IRC-112, A2.9

Fcd = a Fck IRC-112, 6.4.2.8


γm

γm = 1.5 for basic and seismic combination IRC-112, 6.4.2.8


α = 0.67

Fcd = 24.57 Mpa


η = 1 for Fck < 60 Mpa IRC-112, A2.9
η*Fcd = 24.57

Compressive Force, Cu = η*Fcd*λ*x*b


= 64555.55 KN

Tu = Cu i.e Tu - Cu = 0.00 Goal Seek this to 0 by Changing cell E775

Ultimate Moment Capacity = Σ(Fs*As*(d-0.4*x)) OR η*Fcd*λ*x*b*Z


= 59693 KN-M

Ultimate Moment = 20925 KN-M < Ultimate Moment Capacity


OK
8.3.1.2 Torsional Moment

TED = Design torsion


= 1355 KN-M

Tt = shear stress due to torsion


= TED
2*Ak*tef

VED = Γt * tef * Z

Torsional Inertia ofr section


b = 4000 mm
d = 1500 mm
b/d = 2.67
torsional constant = 0.254

Torsional Inertia ofr section = β*b*d^3


3.429E+12 mm^4
tef = A/W 545.4545455
this thickness should not b les than twice the distance between edge and centre of longitudinal reinforcement

effective cover = 50 + 12.5 + 6 68.5


as 2 * effective cover > 545.5

tef = 137 mm

Z = Side length of wall I defined by the distance between intersection points with adjecent walls
= 3.91 m

VED = 502.89 KN

Ak = (4000-137) X (1500-137)
= 5265269 mm^2

q = 45

Ast = TED * cotθ


St (2 * Ak * Fyd )

= 0.390 mm^/mm

The required torsional reinforcement should be 2 legged only.

Longitudinal Reinforcement

Asl = TED * Cotθ


uk (2 * Ak * Fyd )
= 0.390 mm^/mm

Asl = 4293 mm^2

Spacing between longitudinal bars should not be more than 350mm IRC-112, 16.5.3
Take sapcing as 300mm
Provide additional 22 no.s 25 mm dia. Bars, with main reinforcement

Torsional Resisting Capacity


Trdmax = 2 * ν * αcw * fcd * Ak * tef * sinθ * cosθ

= 6485.56 KN-M > 1355.26 KN-M

Safe in torsional resistance

As per Cl. 10.5.2.1, (4), IRC-112

TED VED = 0.718 < 1


+
TRd MAX VRd MAX

8.3.1.3 Shear Capacity

Equivalent Shear Due to torsion = 502.89 KN


Total Design shear = 2964 KN

Flexural Tensile stress = 5.360 Mpa

Allowable tensile stress = 2.33 Mpa

The Section is Cracked

Elements not requiring shear reinforcement IRC-112, 10.3.2


K = 1+ (200/d)^0.5
= 1.01

Fcd = 24.57 Mpa

σcp = Min of NED/AC & 0.2 * Fcd


7.948 & 4.91

σcp = 4.913

ρt = Min of Asl/(b*d) & 0.02


0.001 & 0.02

ρt = 0.001

VRdc = 5490 KN IRC-112,Cl. 10.3.2


Eq. 10.1

vmin = 0.234 Eq. 10.3

VRdc (MIN) = 5828 KN Eq. 10.1

VRdc = 5828 KN

As, VRdc > Design shear


Provide minimum Reinforcement
Asw = 0.072*(Fck)^0.5
S* bw Fyk

= 0.00129

The maximum spacing


Slmax = 0.75d*(1+cota) IRC-112, 16.5.2, Eq. 16.6
= 1125.00 mm
lets assume spacing as, 200 mm

Asw = 5.15 mm^2/mm


S

Provide 12mm dia, 8 legged stirrups at 160 mm c-c.

8.3.2 Summary opf forces at Letf support of pier cap for ULS load cases

Shear-z Torsion Moment-y Moment-z


Elem Load Axial (kN) Shear-y (kN)
(kN) (kN*m) (kN*m) (kN*m)
662 501 -57912 580 -9585 2820 -17607 409
662 502 -57994 581 -11549 3453 -18320 414
662 503 -58016 581 -11709 3853 -18542 415
662 504 -57987 581 -10585 3361 -18343 413
662 505 -57934 580 -9745 3220 -17829 409
662 506 -57798 580 -9123 2803 -16559 409
662 507 -58011 581 -11593 4108 -18740 419
662 508 -57892 580 -9512 3297 -17425 409
662 509 -57967 581 -11315 4550 -18071 419
662 510 -57974 581 -11411 4617 -18159 420
662 511 -57957 581 -10377 3921 -18060 414
662 512 -57899 580 -9608 3364 -17512 410
662 513 -57782 580 -9072 2828 -16416 409
662 514 -57951 581 -11232 4389 -18655 420
662 515 -57807 581 -9482 2613 -18132 411
662 516 -57994 581 -11549 3453 -18320 414
662 517 -57989 581 -10643 3222 -20248 414
662 518 -57901 581 -10295 3098 -19085 414
662 519 -57799 581 -9598 3315 -18512 417
662 520 -57656 581 -8982 2371 -17279 413
662 521 -57986 581 -10925 3687 -20237 417
662 522 -57796 581 -9421 3040 -17914 410
662 523 -57968 581 -10372 3795 -19486 415
662 524 -57956 581 -10437 3797 -19688 416
662 525 -57877 581 -10121 3414 -18732 416
662 526 -57783 581 -9484 2851 -18111 414
662 527 -57658 581 -8949 2363 -17040 413
662 528 -57943 581 -10629 3907 -19593 418
662 529 -57860 445 -9278 2556 -16083 315
662 530 -57923 445 -10784 3041 -16630 319
662 531 -57940 445 -10907 3348 -16800 319
662 532 -57918 445 -10045 2971 -16647 318
662 533 -57877 445 -9401 2862 -16253 315
662 534 -57773 445 -8924 2543 -15280 315
662 535 -57936 446 -10818 3543 -16952 322
662 536 -57779 445 -9200 2397 -16486 317
662 537 -57923 445 -10784 3041 -16630 319
662 538 -57919 445 -10089 2864 -18108 319
662 539 -57852 445 -9822 2769 -17216 319
662 540 -57774 446 -9288 2935 -16777 322
662 541 -57663 445 -8816 2212 -15831 318
662 542 -57916 446 -10306 3220 -18100 321
662 543 -57844 445 -9222 2921 -15944 315
662 544 -57902 446 -10604 3882 -16439 323
662 545 -57907 446 -10678 3934 -16506 324
662 546 -57894 445 -9886 3400 -16430 319
662 547 -57850 445 -9296 2973 -16011 316
662 548 -57760 445 -8885 2562 -15170 315
662 549 -57890 446 -10541 3759 -16887 324
662 550 -57771 445 -9152 2724 -16319 316
662 551 -57903 445 -9882 3303 -17524 320
662 552 -57894 445 -9932 3305 -17678 321
662 553 -57833 446 -9689 3011 -16946 320
662 554 -57761 445 -9201 2580 -16470 319
662 555 -57665 445 -8791 2205 -15648 318
662 556 -57884 446 -10078 3389 -17606 322
662 557 -57854 445 -9578 2527 -18705 319
662 558 -57917 446 -11084 3013 -19252 323
662 559 -57934 446 -11206 3320 -19422 323
662 560 -57912 446 -10345 2942 -19270 322
662 561 -57871 445 -9700 2834 -18876 319
662 562 -57767 445 -9224 2514 -17902 318
662 563 -57930 446 -11118 3515 -19574 326
662 564 -57773 446 -9499 2368 -19108 320
662 565 -57917 446 -11084 3013 -19252 323
662 566 -57913 446 -10389 2836 -20730 323
662 567 -57845 446 -10122 2741 -19839 322
662 568 -57768 446 -9588 2907 -19399 325
662 569 -57657 446 -9116 2183 -18454 321
662 570 -57910 446 -10605 3192 -20722 325
662 571 -57838 445 -9522 2893 -18566 319
662 572 -57896 446 -10904 3854 -19061 327
662 573 -57901 446 -10978 3905 -19128 327
662 574 -57888 446 -10185 3371 -19053 322
662 575 -57844 445 -9595 2945 -18633 319
662 576 -57754 445 -9184 2533 -17793 318
662 577 -57884 446 -10841 3731 -19509 327
662 578 -57765 445 -9452 2696 -18941 319
662 579 -57897 446 -10181 3275 -20146 323
662 580 -57888 446 -10231 3277 -20301 324
662 581 -57827 446 -9989 2982 -19568 324
662 582 -57755 446 -9501 2551 -19092 323
662 583 -57659 446 -9090 2177 -18270 322
662 584 -57878 446 -10378 3361 -20228 325
662 585 -57860 445 -9278 2556 -16083 315
662 586 -57923 445 -10784 3041 -16630 319
662 587 -57940 445 -10907 3348 -16800 319
662 588 -57918 445 -10045 2971 -16647 318
662 589 -57877 445 -9401 2862 -16253 315
662 590 -57773 445 -8924 2543 -15280 315
662 591 -57936 446 -10818 3543 -16952 322
662 592 -57779 445 -9200 2397 -16486 317
662 593 -57923 445 -10784 3041 -16630 319
662 594 -57919 445 -10089 2864 -18108 319
662 595 -57852 445 -9822 2769 -17216 319
662 596 -57774 446 -9288 2935 -16777 322
662 597 -57663 445 -8816 2212 -15831 318
662 598 -57916 446 -10306 3220 -18100 321
662 599 -57844 445 -9222 2921 -15944 315
662 600 -57902 446 -10604 3882 -16439 323
662 601 -57907 446 -10678 3934 -16506 324
662 602 -57894 445 -9886 3400 -16430 319
662 603 -57850 445 -9296 2973 -16011 316
662 604 -57760 445 -8885 2562 -15170 315
662 605 -57890 446 -10541 3759 -16887 324
662 606 -57771 445 -9152 2724 -16319 316
662 607 -57903 445 -9882 3303 -17524 320
662 608 -57894 445 -9932 3305 -17678 321
662 609 -57833 446 -9689 3011 -16946 320
662 610 -57665 445 -8791 2205 -15648 318
662 611 -57665 445 -8791 2205 -15648 318
662 612 -57884 446 -10078 3389 -17606 322
662 613 -57697 176 -9039 2084 -17232 182
662 614 -57708 176 -9301 2168 -17327 183
662 615 -57711 176 -9322 2222 -17357 183
662 616 -57707 176 -9173 2156 -17330 183
662 617 -57700 176 -9061 2137 -17262 182
662 618 -57682 176 -8978 2082 -17093 182
662 619 -57710 176 -9307 2256 -17383 184
662 620 -57683 176 -9026 2056 -17302 183
662 621 -57708 176 -9301 2168 -17327 183
662 622 -57707 176 -9180 2138 -17584 183
662 623 -57928 177 -10737 2793 -21122 187
662 624 -57682 176 -9041 2150 -17353 184
662 625 -57663 176 -8959 2024 -17189 183
662 626 -57707 176 -9218 2199 -17583 183
662 627 -57694 176 -9030 2147 -17208 182
662 628 -57704 176 -9270 2315 -17294 184
662 629 -57705 176 -9283 2324 -17306 184
662 630 -57703 176 -9145 2231 -17293 183
662 631 -57695 176 -9042 2157 -17220 183
662 632 -57680 176 -8971 2085 -17074 182
662 633 -57702 176 -9259 2293 -17372 184
662 634 -57681 176 -9017 2113 -17273 183
662 635 -57704 176 -9144 2214 -17483 183
662 636 -57703 176 -9153 2214 -17510 183
662 637 -57692 176 -9111 2163 -17382 183
662 638 -57680 176 -9026 2088 -17300 183
662 639 -57663 176 -8954 2023 -17157 183
662 640 -57701 176 -9178 2229 -17497 184
662 641 -57698 177 -9050 2083 -17320 183
662 642 -57709 178 -9312 2167 -17415 183
662 643 -57712 178 -9333 2221 -17445 183
662 644 -57708 177 -9183 2155 -17418 183
662 645 -57701 177 -9071 2136 -17350 183
662 646 -57683 177 -8988 2080 -17181 183
662 647 -57712 178 -9317 2255 -17471 184
662 648 -57684 177 -9036 2055 -17390 183
662 649 -57709 178 -9312 2167 -17415 183
662 650 -57709 178 -9191 2136 -17672 183
662 651 -57697 178 -9144 2120 -17517 183
662 652 -57683 178 -9051 2149 -17441 184
662 653 -57664 178 -8969 2023 -17277 183
662 654 -57708 178 -9228 2198 -17671 184
662 655 -57683 177 -9028 2112 -17361 183
662 656 -57706 178 -9155 2213 -17571 183
662 657 -57704 178 -9163 2213 -17598 184
662 658 -57694 178 -9121 2162 -17470 184
662 659 -57681 178 -9036 2087 -17388 183
662 660 -57664 178 -8965 2022 -17245 183
662 661 -57702 178 -9189 2228 -17585 184
662 662 -57696 177 -9040 2146 -17296 183
662 663 -57706 178 -9280 2313 -17382 184
662 664 -57707 178 -9293 2322 -17394 184
662 665 -57704 177 -9155 2230 -17381 183
662 666 -57697 177 -9053 2155 -17308 183
662 667 -57681 177 -8981 2084 -17162 183
662 668 -57704 178 -9269 2292 -17460 184
MAX -57656 581 -8791 4617 -15170 420
MIN -58016 176 -11709 2022 -21122 182

8.3.2.1 Moment capacity of a section at left support

Moment Capacity of Prestressed Section

Area of layer 1 cables = 23940 mm^2


Area of layer 2 cables = 23940 mm^2

Total Force in layer 1 cable after losses = 23845 KN


Total Force in layer 2 cable after losses = 23845 KN

ES = 1.95E+05 Mpa

Prestrain in Layer 1 cables = Fs / Es = 0.0051


Prestrain in Layer 2 cables = Fs / Es = 0.0051

Ultimate stress in cable (Fpk) = 1860 Mpa


Stress at 0.1 % Proof force = 0.87 * Fpk = 1618.2 Mpa

Fpd = 1618.2 = 1407.13 Mpa


1.15
Yield Strain, εpd

εpd = Fpd = 0.0072


ES

Fig. A2-4 , IRC-112-2011

CG Of cables from top at mid sec


1245 mm
485
CG Of cables from top at Left support sec
872.5 mm
385
230
140

Left Support Mid Section

Neutral Axis Location at = 779.15 mm ….After iterations


Final Steel Strain = Prestrain + Bending Strain

Final Strain in Layer 1 cables = 0.0051 + 0.00151


= 0.0066 ~ εpd

Final Strain in Layer 2 cables = 0.0051 + -0.000670


= 0.0044 ~ εpd

As the strain values are greater than or almost equal to εpd , hence stresses in ca 1407.13 Mpa

Thus Total force in steel , Tu = ε*Es*A X 47880


= 51605.13 KN

Total Compressive force in concrete

fcd = a Fck
ɣm

λ*x Cu

Tu

λ = 0.8 for Fck < 60 Mpa IRC-112, A2.9

Fcd = a Fck IRC-112, 6.4.2.8


γm

γm = 1.5 for basic and seismic combination IRC-112, 6.4.2.8


α = 0.67

Fcd = 24.57 Mpa


η = 1 for Fck < 60 Mpa IRC-112, A2.9

η*Fcd = 24.57

Compressive Force, Cu = η*Fcd*λ*x*b


= 61251.50 KN

Tu = Cu i.e Tu - Cu = -9646.37 Goal Seek this to 0 by Changing cell E775

Ultimate Moment Capacity = Σ(Fs*As*(d-0.4*x)) OR η*Fcd*λ*x*b*Z


= 49335 KN-M

Ultimate Moment = 21122 KN-M < Ultimate Moment Capacity


OK
8.3.2.2 Torsional Moment

TED = Design torsion


= 4617 KN-M

Tt = shear stress due to torsion


= TED
2*Ak*tef
VED = Γt * tef * Z

Torsional Inertia ofr section


b = 4000 mm
d = 1500 mm
b/d = 2.67
torsional constant = 0.254

Torsional Inertia ofr section = β*b*d^3


3.429E+12 mm^4
tef = A/W 545.4545455
this thickness should not b les than twice the distance between edge and centre of longitudinal reinforcement

effective cover = 50 + 12.5 + 6 68.5


as 2 * effective cover > 545.5

tef = 137 mm

Z = Side length of wall I defined by the distance between intersection points with adjecent walls
= 3.91 m

VED = 1713.28 KN

Ak = (4000-137) X (1500-137)
= 5265269 mm^2

q = 45

Ast = TED * cotθ


St (2 * Ak * Fyd )

= 1.330 mm^/mm

The required torsional reinforcement should be 2 legged only.

Longitudinal Reinforcement

Asl = TED * Cotθ


uk (2 * Ak * Fyd )

= 1.330 mm^/mm

Asl = 10638 mm^2

Spacing between longitudinal bars should not be more than 350mm IRC-112, 16.5.3
Take sapcing as 300mm
Provide additional 22 no.s 25 mm dia. Bars, with main reinforcement

Torsional Resisting Capacity


Trdmax = 2 * ν * αcw * fcd * Ak * tef * sinθ * cosθ

= 6485.56 KN-M > 4617.22 KN-M

Safe in torsional resistance

As per Cl. 10.5.2.1, (4), IRC-112

TED VED = 3.013 < 1


+
TRd MAX VRd MAX
8.3.2.3 Shear Capacity

* Equivalent Shear Due to torsion = 1713.28 KN


Total Design shear = 13422 KN

* Flexural Tensile stress = 5.360 Mpa

Allowable tensile stress = 2.33 Mpa

The Section is Cracked

* Elements not requiring shear reinforcement IRC-112, 10.3.2


K = 1+ (200/d)^0.5
= 1.02

Fcd = 24.57 Mpa

σcp = Min of NED/AC & 0.2 * Fcd


7.948 & 4.91

σcp = 4.913

ρt = Min of Asl/(b*d) & 0.02


0.001 & 0.02

ρt = 0.001

VRdc = 5493 KN IRC-112,Cl. 10.3.2


Eq. 10.1

vmin = 0.235 Eq. 10.3

VRdc (MIN) = 5833 KN Eq. 10.1

VRdc = 5833 KN

As, VRdc < Design shear


Design the shear reinforcement

* Applied shear stress vED = VED = 4 Mpa


b*z

Maximum allowable shear stress = αcw * 0.225* v1 * Fck

where v1 = 0.6*(1-fck/310)
0.49
αcw = 1.2
Hence,
Maximum allowable shear stress = 7.33

Applied shear stress is less than allowable shear stress

* Is allowable shear stress less than = αcw * 0.155* v1 * Fck


= 5.05
YES, Take theta as 21.8

* Shear Reinforcement Asw = Shear stress * bw Fywd = 0.87*Fyk


S Fywd * cot(theta) = 435 Mpa
= 14.15 mm^/mm

* Minimum shear Reinforcement

Asw = 0.072*(Fck)^0.5 * bw IRC-112, Eq. 16.5


s Fyk

= 5.15 mm^/mm

* The maximum spacing


Slmax = 0.75d*(1+cota) IRC-112, 16.5.2, Eq. 16.6
= 1125.00 mm
lets assume spacing as, 200 mm

Asw = 5.65 mm^2/mm


S

Provide 12mm dia, 8 legged stirrups at 160 mm c-c.

8.3.3 Summary opf forces at Right support of pier cap for ULS load cases

Shear-z Torsion Moment-y Moment-z


Elem Load Axial (kN) Shear-y (kN)
(kN) (kN*m) (kN*m) (kN*m)
672 501 -57336 -307 4868 -1632 4826 -1176
672 502 -57522 -305 5064 -1944 4715 -1187
672 503 -57567 -305 5149 -2318 4770 -1183
672 504 -57502 -306 5059 -1938 4772 -1183
672 505 -57381 -308 4953 -2006 4882 -1172
672 506 -57089 -307 4409 -1555 4253 -1178
672 507 -57552 -302 5155 -2545 4789 -1196
672 508 -57287 -308 4774 -2085 4591 -1170
672 509 -57453 -302 4958 -2668 4459 -1196
672 510 -57469 -302 4962 -2693 4410 -1197
672 511 -57430 -306 4941 -2428 4537 -1179
672 512 -57303 -308 4777 -2110 4542 -1171
672 513 -57053 -307 4305 -1560 4013 -1178
672 514 -57418 -301 4930 -2718 4472 -1201
672 515 -57109 -304 4351 -1499 3811 -1191
672 516 -57522 -305 5064 -1944 4715 -1187
672 517 -57501 -304 5343 -2304 5727 -1190
672 518 -57313 -304 4699 -1870 4175 -1192
672 519 -57088 -300 4301 -2050 3581 -1208
672 520 -56781 -301 3705 -1316 2878 -1205
672 521 -57491 -303 5300 -2600 5532 -1194
672 522 -57083 -306 4295 -1700 3684 -1182
672 523 -57448 -305 5265 -2810 5569 -1185
672 524 -57422 -304 5177 -2801 5347 -1190
672 525 -57255 -302 4600 -2279 3973 -1197
672 526 -57054 -302 4209 -1854 3445 -1200
672 527 -56786 -301 3695 -1353 2822 -1207
672 528 -57396 -302 5080 -2779 5089 -1197
672 529 -57225 -237 4679 -1561 3836 -895
672 530 -57367 -235 4830 -1800 3751 -904
672 531 -57402 -235 4895 -2087 3793 -900
672 532 -57352 -235 4826 -1796 3795 -901
672 533 -57259 -237 4744 -1848 3879 -892
672 534 -57036 -236 4327 -1502 3396 -897
672 535 -57391 -233 4899 -2261 3808 -910
672 536 -57051 -234 4283 -1459 3058 -907
672 537 -57367 -235 4830 -1800 3751 -904
672 538 -57351 -234 5044 -2076 4527 -906
672 539 -57208 -234 4550 -1744 3337 -907
672 540 -57034 -231 4244 -1882 2882 -919
672 541 -56799 -232 3787 -1319 2342 -917
672 542 -57344 -233 5010 -2304 4377 -909
672 543 -57187 -238 4607 -1908 3656 -890
672 544 -57315 -233 4748 -2355 3555 -910
672 545 -57327 -233 4751 -2374 3517 -911
672 546 -57297 -236 4735 -2172 3614 -897
672 547 -57200 -237 4610 -1927 3618 -891
672 548 -57008 -236 4247 -1506 3213 -897
672 549 -57288 -232 4727 -2394 3564 -914
672 550 -57031 -236 4240 -1613 2961 -899
672 551 -57311 -235 4983 -2464 4406 -902
672 552 -57291 -234 4916 -2457 4235 -906
672 553 -57163 -233 4474 -2057 3182 -911
672 554 -57009 -233 4174 -1731 2777 -914
672 555 -56803 -232 3780 -1347 2300 -918
672 556 -57271 -233 4842 -2440 4038 -911
672 557 -57207 -230 4444 -1644 4958 -925
672 558 -57349 -228 4595 -1883 4873 -934
672 559 -57384 -229 4660 -2169 4915 -930
672 560 -57334 -229 4591 -1879 4917 -930
672 561 -57241 -231 4509 -1931 5001 -922
672 562 -57017 -230 4092 -1585 4518 -926
672 563 -57373 -226 4664 -2344 4930 -940
672 564 -57033 -228 4048 -1541 4180 -937
672 565 -57349 -228 4595 -1883 4873 -934
672 566 -57333 -228 4809 -2159 5649 -936
672 567 -57190 -227 4315 -1827 4459 -937
672 568 -57016 -225 4009 -1965 4004 -949
672 569 -56781 -225 3552 -1402 3464 -947
672 570 -57325 -227 4775 -2386 5499 -939
672 571 -57169 -231 4372 -1991 4778 -920
672 572 -57297 -226 4513 -2438 4677 -940
672 573 -57309 -226 4516 -2457 4639 -941
672 574 -57279 -229 4500 -2254 4736 -927
672 575 -57182 -231 4375 -2010 4740 -921
672 576 -56990 -230 4012 -1589 4335 -927
672 577 -57270 -226 4491 -2477 4686 -944
672 578 -57013 -229 4005 -1696 4083 -929
672 579 -57293 -228 4748 -2547 5528 -931
672 580 -57273 -227 4681 -2540 5357 -936
672 581 -57145 -226 4239 -2140 4304 -941
672 582 -56991 -226 3939 -1814 3899 -944
672 583 -56785 -225 3545 -1430 3422 -948
672 584 -57253 -226 4606 -2523 5160 -941
672 585 -57225 -237 4679 -1561 3836 -895
672 586 -57367 -235 4830 -1800 3751 -904
672 587 -57402 -235 4895 -2087 3793 -900
672 588 -57352 -235 4826 -1796 3795 -901
672 589 -57259 -237 4744 -1848 3879 -892
672 590 -57036 -236 4327 -1502 3396 -897
672 591 -57391 -233 4899 -2261 3808 -910
672 592 -57051 -234 4283 -1459 3058 -907
672 593 -57367 -235 4830 -1800 3751 -904
672 594 -57351 -234 5044 -2076 4527 -906
672 595 -57208 -234 4550 -1744 3337 -907
672 596 -57034 -231 4244 -1882 2882 -919
672 597 -56799 -232 3787 -1319 2342 -917
672 598 -57344 -233 5010 -2304 4377 -909
672 599 -57187 -238 4607 -1908 3656 -890
672 600 -57315 -233 4748 -2355 3555 -910
672 601 -57327 -233 4751 -2374 3517 -911
672 602 -57297 -236 4735 -2172 3614 -897
672 603 -57200 -237 4610 -1927 3618 -891
672 604 -57008 -236 4247 -1506 3213 -897
672 605 -57288 -232 4727 -2394 3564 -914
672 606 -57031 -236 4240 -1613 2961 -899
672 607 -57311 -235 4983 -2464 4406 -902
672 608 -57291 -234 4916 -2457 4235 -906
672 609 -57163 -233 4474 -2057 3182 -911
672 610 -56803 -232 3780 -1347 2300 -918
672 611 -56803 -232 3780 -1347 2300 -918
672 612 -57271 -233 4842 -2440 4038 -911
672 613 -56860 -124 3686 -1339 3392 -518
672 614 -56885 -124 3712 -1381 3377 -519
672 615 -56891 -124 3723 -1431 3385 -519
672 616 -56883 -124 3711 -1380 3385 -519
672 617 -56866 -125 3697 -1389 3400 -517
672 618 -56828 -124 3624 -1329 3316 -518
672 619 -56889 -124 3724 -1461 3387 -520
672 620 -56830 -124 3617 -1321 3257 -520
672 621 -56885 -124 3712 -1381 3377 -519
672 622 -56882 -124 3749 -1429 3512 -520
672 623 -57358 -123 4775 -2244 5017 -521
672 624 -56827 -123 3610 -1395 3226 -522
672 625 -56786 -124 3531 -1297 3132 -522
672 626 -56881 -124 3743 -1468 3486 -520
672 627 -56854 -125 3673 -1399 3361 -517
672 628 -56876 -124 3698 -1477 3343 -520
672 629 -56878 -124 3698 -1481 3337 -521
672 630 -56873 -124 3695 -1445 3354 -518
672 631 -56856 -125 3674 -1403 3354 -517
672 632 -56823 -124 3611 -1330 3284 -518
672 633 -56871 -124 3694 -1484 3345 -521
672 634 -56827 -124 3609 -1348 3240 -518
672 635 -56875 -124 3739 -1496 3491 -519
672 636 -56872 -124 3727 -1495 3462 -520
672 637 -56850 -124 3650 -1425 3278 -520
672 638 -56823 -124 3598 -1369 3208 -521
672 639 -56787 -124 3529 -1302 3125 -522
672 640 -56868 -124 3714 -1492 3427 -520
672 641 -56860 -125 3679 -1344 3422 -524
672 642 -56885 -125 3706 -1385 3407 -526
672 643 -56891 -125 3717 -1435 3414 -525
672 644 -56882 -125 3705 -1384 3414 -525
672 645 -56866 -125 3691 -1393 3429 -523
672 646 -56827 -125 3618 -1333 3345 -524
672 647 -56889 -124 3718 -1465 3417 -527
672 648 -56830 -125 3611 -1326 3286 -526
672 649 -56885 -125 3706 -1385 3407 -526
672 650 -56882 -125 3743 -1433 3542 -526
672 651 -56857 -125 3657 -1375 3335 -526
672 652 -56827 -124 3604 -1399 3256 -528
672 653 -56786 -124 3524 -1301 3162 -528
672 654 -56881 -124 3737 -1473 3516 -526
672 655 -56827 -125 3603 -1353 3269 -525
672 656 -56875 -125 3732 -1501 3521 -525
672 657 -56872 -125 3721 -1499 3491 -526
672 658 -56850 -124 3644 -1430 3308 -527
672 659 -56823 -124 3592 -1373 3238 -527
672 660 -56787 -124 3523 -1306 3154 -528
672 661 -56868 -124 3708 -1496 3457 -527
672 662 -56854 -125 3667 -1404 3390 -523
672 663 -56876 -124 3692 -1482 3373 -527
672 664 -56878 -124 3692 -1485 3366 -527
672 665 -56873 -125 3689 -1450 3383 -524
672 666 -56856 -125 3667 -1407 3384 -523
672 667 -56823 -125 3604 -1334 3313 -524
672 668 -56871 -124 3688 -1488 3374 -527

MAX -56781 -123 5343 -1297 5727 -517


MIN -57567 -308 3523 -2810 2300 -1208

8.3.3.1 Moment capacity of a section at right support

Moment Capacity of Prestressed Section

Area of layer 1 cables = 23940 mm^2


Area of layer 2 cables = 23940 mm^2

Total Force in layer 1 cable after losses = 23845 KN


Total Force in layer 2 cable after losses = 23845 KN

ES = 1.95E+05 Mpa

Prestrain in Layer 1 cables = Fs / Es = 0.0051


Prestrain in Layer 2 cables = Fs / Es = 0.0051

Ultimate stress in cable (Fpk) = 1860 Mpa


Stress at 0.1 % Proof force = 0.87 * Fpk = 1618.2 Mpa

Fpd = 1618.2 = 1407.13 Mpa


1.15
Yield Strain, εpd

εpd = Fpd = 0.0072


ES

Fig. A2-4 , IRC-112-2011

CG Of cables from top at mid sec


1245 mm
115
CG Of cables from top at Right support sec
872.5 mm
570
230
140

Right Support Mid Section

Neutral Axis Location at = 705.23 mm ….After iterations

Final Steel Strain = Prestrain + Bending Strain

Final Strain in Layer 1 cables = 0.0051 + 0.00112


= 0.0062 ~ εpd

Final Strain in Layer 2 cables = 0.0051 + 0.000545


= 0.0057 ~ εpd

As the strain values are greater than or almost equal to εpd , hence stresses in
cables are=Fpd= 1407.13 Mpa

Thus Total force in steel , Tu = ε*Es*A X 47880


= 55440.59 KN

Total Compressive force in concrete

fcd = a Fck
ɣm

λ*x Cu

Tu

λ = 0.8 for Fck < 60 Mpa IRC-112, A2.9

Fcd = a Fck IRC-112, 6.4.2.8


γm

γm = 1.5 for basic and seismic combination IRC-112, 6.4.2.8


α = 0.67

Fcd = 24.57 Mpa


η = 1 for Fck < 60 Mpa IRC-112, A2.9

η*Fcd = 24.57

Compressive Force, Cu = η*Fcd*λ*x*b


= 55440.59 KN

Tu = Cu i.e Tu - Cu = 0.00 Goal Seek this to 0 by Changing cell E775

Ultimate Moment Capacity = Σ(Fs*As*(d-0.4*x)) OR η*Fcd*λ*x*b*Z


= 32886 KN-M

Ultimate Moment = 5727 KN-M < Ultimate Moment Capacity


OK
8.3.2.2 Torsional Moment
TED = Design torsion
= 2810 KN-M

Tt = shear stress due to torsion


= TED
2*Ak*tef

VED = Γt * tef * Z

Torsional Inertia ofr section


b = 4000 mm
d = 1500 mm
b/d = 2.67
torsional constant = 0.254

Torsional Inertia ofr section = β*b*d^3


3.429E+12 mm^4
tef = A/W 545.4545455
this thickness should not b les than twice the distance between edge and centre of longitudinal reinforcement

effective cover = 50 + 12.5 + 6 68.5


as 2 * effective cover > 545.5

tef = 137 mm

Z = Side length of wall I defined by the distance between intersection points with adjecent walls
= 3.91 m

VED = 1042.82 KN

Ak = (4000-137) X (1500-137)
= 5265269 mm^2

q = 45

Ast = TED * cotθ


St (2 * Ak * Fyd )

= 0.809 mm^/mm

The required torsional reinforcement should be 2 legged only.

Longitudinal Reinforcement

Asl = TED * Cotθ


uk (2 * Ak * Fyd )

= 0.809 mm^/mm

Asl = 6475 mm^2

Spacing between longitudinal bars should not be more than 350mm IRC-112, 16.5.3
Take sapcing as 300mm
Provide additional 22 no.s 25 mm dia. Bars, with main reinforcement

Torsional Resisting Capacity


Trdmax = 2 * ν * αcw * fcd * Ak * tef * sinθ * cosθ

= 6485.56 KN-M > 2810.36 KN-M


Safe in torsional resistance

As per Cl. 10.5.2.1, (4), IRC-112

TED VED = 1.528 < 1


+
TRd MAX VRd MAX

8.3.2.3 Shear Capacity

* Equivalent Shear Due to torsion = 1042.82 KN


Total Design shear = 6386 KN

* Flexural Tensile stress = 5.360 Mpa

Allowable tensile stress = 2.33 Mpa

The Section is Cracked

* Elements not requiring shear reinforcement IRC-112, 10.3.2


K = 1+ (200/d)^0.5
= 1.01

Fcd = 24.57 Mpa

σcp = Min of NED/AC & 0.2 * Fcd


7.948 & 4.91

σcp = 4.913

ρt = Min of Asl/(b*d) & 0.02


0.001 & 0.02

ρt = 0.001

VRdc = 5492 KN IRC-112,Cl. 10.3.2


Eq. 10.1

vmin = 0.235 Eq. 10.3

VRdc (MIN) = 5833 KN Eq. 10.1

VRdc = 5833 KN

As, VRdc < Design shear


Design the shear reinforcement

* Applied shear stress vED = VED = 2 Mpa


b*z

Maximum allowable shear stress = αcw * 0.225* v1 * Fck

where v1 = 0.6*(1-fck/310)
0.60
αcw = 1.2
Hence,
Maximum allowable shear stress = 8.91 Mpa

Applied shear stress is less than allowable shear stress

* Is allowable shear stress less than = αcw * 0.155* v1 * Fck


= 6.14
YES, Take theta as 21.8

* Shear Reinforcement Asw = Shear stress * bw Fywd = 0.87*Fyk


S Fywd * cot(theta) = 435 Mpa

= 6.59 mm^/mm

* Minimum shear Reinforcement

Asw = 0.072*(Fck)^0.5 * bw IRC-112, Eq. 16.5


s Fyk

= 5.15 mm^/mm

* The maximum spacing


Slmax = 0.75d*(1+cota) IRC-112, 16.5.2, Eq. 16.6
= 0.00 mm
lets assume spacing as, 200 mm

Asw = 5.65 mm^2/mm


S

Provide 12mm dia, 8 legged stirrups at 160 mm c-c.

8.4 Minimum Untensioned Reinforcement


Surface Reinforcemnt
As.sur = 0.01*Act.ext 23739.13 mm^2 IRC-112, Cl. 16.5.4
A.ct.ext = area of the cover portion outside stirrups.
433600 mm^2

As.sur = 4336 mm^2

Provide 25 dia. Bars 30 no.s, including torsional steel

8.5 Servicabiliy Limit State


8.5.1 Stress check at pier cap center-servicability rare combionation

Axial Bend(+z) Bend(-z) TOP BOTTOM


Elem Load
(N/mm^2) (N/mm^2) (N/mm^2) (N/mm^2) (N/mm^2)
668 669 -9.33 -6.95 6.68 -16.60 -2.95
668 670 -9.34 -7.55 7.26 -17.20 -2.37
668 671 -9.34 -7.90 7.60 -17.50 -2.04
668 672 -9.34 -7.58 7.28 -17.20 -2.35
668 673 -9.34 -7.30 7.01 -16.90 -2.62
668 674 -9.32 -5.99 5.76 -15.60 -3.85
668 675 -9.34 -7.94 7.64 -17.60 -2.00
668 676 -9.32 -6.39 6.15 -16.00 -3.47
668 677 -9.34 -7.55 7.26 -17.20 -2.37
668 678 -9.34 -7.71 7.41 -17.30 -2.22
668 679 -9.33 -7.11 6.84 -16.70 -2.79
668 680 -9.32 -6.59 6.33 -16.20 -3.28
668 681 -9.31 -5.24 5.04 -14.80 -4.56
668 682 -9.34 -7.77 7.47 -17.40 -2.16
668 683 -9.32 -6.30 6.06 -15.90 -3.56
668 684 -9.34 -7.32 7.03 -16.90 -2.60
668 685 -9.34 -7.43 7.15 -17.10 -2.49
668 686 -9.33 -6.92 6.65 -16.50 -2.97
668 687 -9.32 -6.41 6.17 -16.00 -3.45
668 688 -9.31 -5.25 5.05 -14.80 -4.55
668 689 -9.34 -7.43 7.14 -17.10 -2.49
668 690 -9.33 -6.80 6.54 -16.40 -3.08
668 691 -9.34 -7.35 7.07 -17.00 -2.56
668 692 -9.34 -7.57 7.28 -17.20 -2.35
668 693 -9.34 -7.35 7.06 -17.00 -2.57
668 694 -9.33 -7.02 6.75 -16.60 -2.87
668 695 -9.32 -5.90 5.67 -15.50 -3.94
668 696 -9.34 -7.50 7.21 -17.10 -2.42
668 697 -9.33 -6.81 6.55 -16.40 -3.08
668 698 -9.34 -7.42 7.13 -17.10 -2.51
668 699 -9.34 -7.77 7.47 -17.40 -2.17
668 700 -9.34 -7.44 7.15 -17.10 -2.48
668 701 -9.34 -7.16 6.88 -16.80 -2.75
668 702 -9.32 -5.86 5.63 -15.50 -3.98
668 703 -9.34 -7.80 7.50 -17.40 -2.13
668 704 -9.32 -6.26 6.02 -15.90 -3.60
668 705 -9.34 -7.42 7.13 -17.10 -2.51
668 706 -9.34 -7.57 7.28 -17.20 -2.35
668 707 -9.33 -6.97 6.70 -16.60 -2.92
668 708 -9.32 -6.45 6.20 -16.10 -3.41
668 709 -9.31 -5.11 4.91 -14.70 -4.69
668 710 -9.34 -7.63 7.34 -17.30 -2.30
668 711 -9.33 -6.67 6.41 -16.30 -3.22
668 712 -9.34 -7.22 6.94 -16.90 -2.69
668 713 -9.34 -7.44 7.15 -17.10 -2.48
668 714 -9.34 -7.21 6.93 -16.80 -2.70
668 715 -9.33 -6.88 6.62 -16.50 -3.01
668 716 -9.32 -5.76 5.54 -15.40 -4.07
668 717 -9.34 -7.36 7.08 -17.00 -2.55
668 718 -9.32 -6.16 5.93 -15.80 -3.69
668 719 -9.34 -7.18 6.90 -16.80 -2.73
668 720 -9.34 -7.30 7.01 -16.90 -2.62
668 721 -9.33 -6.78 6.52 -16.40 -3.11
668 722 -9.32 -6.28 6.03 -15.90 -3.58
668 723 -9.31 -5.11 4.91 -14.70 -4.69
668 724 -9.34 -7.29 7.01 -16.90 -2.62
668 725 -9.33 -6.63 6.37 -16.20 -3.17
668 726 -9.33 -7.09 6.81 -16.60 -2.74
668 727 -9.34 -7.35 7.06 -16.90 -2.49
668 728 -9.33 -7.10 6.83 -16.70 -2.73
668 729 -9.33 -6.89 6.63 -16.40 -2.92
668 730 -9.32 -5.92 5.69 -15.50 -3.85
668 731 -9.34 -7.38 7.09 -16.90 -2.46
668 732 -9.32 -6.22 5.98 -15.80 -3.56
668 733 -9.33 -7.09 6.81 -16.60 -2.74
668 734 -9.33 -7.20 6.93 -16.80 -2.63
668 735 -9.33 -6.75 6.49 -16.30 -3.05
668 736 -9.32 -6.36 6.12 -15.90 -3.42
668 737 -9.31 -5.35 5.15 -14.90 -4.38
668 738 -9.33 -7.25 6.97 -16.80 -2.58
668 739 -9.32 -6.15 5.91 -15.70 -3.63
668 740 -9.33 -6.91 6.64 -16.50 -2.91
668 741 -9.33 -7.00 6.73 -16.50 -2.83
668 742 -9.32 -6.61 6.35 -16.20 -3.19
668 743 -9.32 -6.23 5.99 -15.80 -3.55
668 744 -9.31 -5.36 5.15 -14.90 -4.38
668 745 -9.33 -6.99 6.72 -16.50 -2.83
668 746 -9.33 -6.52 6.27 -16.10 -3.27
668 747 -9.33 -6.94 6.67 -16.50 -2.88
668 748 -9.33 -7.10 6.83 -16.70 -2.73
668 749 -9.33 -6.93 6.66 -16.50 -2.89
668 750 -9.33 -6.69 6.43 -16.20 -3.12
668 751 -9.32 -5.84 5.62 -15.40 -3.92
668 752 -9.33 -7.05 6.77 -16.60 -2.78
668 753 -9.33 -6.40 6.15 -15.90 -3.39
668 754 -9.33 -6.86 6.59 -16.40 -2.96
668 755 -9.34 -7.12 6.84 -16.70 -2.71
668 756 -9.33 -6.87 6.61 -16.40 -2.94
668 757 -9.33 -6.66 6.41 -16.20 -3.14
668 758 -9.32 -5.69 5.47 -15.20 -4.07
668 759 -9.33 -7.15 6.87 -16.70 -2.68
668 760 -9.32 -5.99 5.76 -15.50 -3.78
668 761 -9.33 -6.86 6.59 -16.40 -2.96
668 762 -9.33 -6.97 6.71 -16.50 -2.85
668 763 -9.33 -6.52 6.27 -16.10 -3.27
668 764 -9.32 -6.13 5.90 -15.70 -3.64
668 765 -9.31 -5.12 4.93 -14.70 -4.60
668 766 -9.33 -7.02 6.75 -16.60 -2.80
668 767 -9.32 -5.92 5.69 -15.50 -3.85
668 768 -9.33 -6.68 6.42 -16.20 -3.13
668 769 -9.33 -6.77 6.51 -16.30 -3.04
668 770 -9.32 -6.38 6.13 -15.90 -3.41
668 771 -9.32 -6.00 5.77 -15.50 -3.77
668 772 -9.31 -5.13 4.93 -14.70 -4.60
668 773 -9.33 -6.76 6.50 -16.30 -3.05
668 774 -9.32 -5.62 5.40 -15.20 -4.14
668 775 -9.31 -5.16 4.96 -14.70 -4.57
668 776 -9.32 -6.29 6.05 -15.80 -3.49
668 777 -9.33 -6.71 6.45 -16.30 -3.10
668 778 -9.33 -6.87 6.61 -16.40 -2.94
668 779 -9.33 -6.70 6.44 -16.30 -3.11
668 780 -9.33 -6.46 6.21 -16.00 -3.34
max -14.70 -2.00
min -17.60 -4.69
OK OK

Max Allowable Compression = -26.40 Mpa OK


Mx Allowable Tension = 3.50 Mpa OK

8.5.2 Stress check at pier cap left support-servicability rare combionation

Axial Bend(+z) Bend(-z) TOP BOTTOM


Elem Load
(N/mm^2) (N/mm^2) (N/mm^2) (N/mm^2) (N/mm^2)
662 669.00 -9.28 7.93 -7.85 -1.28 -17.10
662 670.00 -9.28 8.24 -8.16 -0.97 -17.40
662 671.00 -9.29 8.34 -8.26 -0.88 -17.50
662 672.00 -9.28 8.25 -8.17 -0.96 -17.40
662 673.00 -9.28 8.03 -7.95 -1.18 -17.20
662 674.00 -9.26 7.47 -7.39 -1.73 -16.60
662 675.00 -9.29 8.43 -8.34 -0.79 -17.60
662 676.00 -9.26 8.16 -8.08 -1.03 -17.30
662 677.00 -9.28 8.24 -8.16 -0.97 -17.40
662 678.00 -9.28 9.10 -9.00 -0.12 -18.20
662 679.00 -9.27 8.58 -8.49 -0.62 -17.70
662 680.00 -9.26 8.33 -8.24 -0.87 -17.40
662 681.00 -9.25 7.79 -7.71 -1.39 -16.90
662 682.00 -9.28 9.09 -9.00 -0.12 -18.20
662 683.00 -9.26 8.07 -7.98 -1.13 -17.20
662 684.00 -9.28 8.76 -8.67 -0.45 -17.90
662 685.00 -9.28 8.85 -8.76 -0.36 -18.00
662 686.00 -9.27 8.43 -8.34 -0.78 -17.50
662 687.00 -9.26 8.15 -8.07 -1.04 -17.30
662 688.00 -9.25 7.68 -7.60 -1.50 -16.80
662 689.00 -9.28 8.81 -8.72 -0.40 -17.90
662 690.00 -9.27 7.85 -7.77 -1.36 -17.00
662 691.00 -9.28 8.14 -8.05 -1.08 -17.30
662 692.00 -9.28 8.17 -8.09 -1.04 -17.30
662 693.00 -9.28 8.13 -8.05 -1.08 -17.30
662 694.00 -9.27 7.89 -7.81 -1.32 -17.00
662 695.00 -9.26 7.40 -7.33 -1.79 -16.50
662 696.00 -9.28 8.39 -8.31 -0.82 -17.50
662 697.00 -9.27 8.62 -8.54 -0.58 -17.70
662 698.00 -9.28 8.94 -8.85 -0.28 -18.10
662 699.00 -9.29 9.04 -8.94 -0.18 -18.20
662 700.00 -9.28 8.95 -8.86 -0.27 -18.10
662 701.00 -9.28 8.72 -8.63 -0.49 -17.80
662 702.00 -9.26 8.16 -8.08 -1.03 -17.30
662 703.00 -9.29 9.12 -9.03 -0.09 -18.20
662 704.00 -9.26 8.86 -8.77 -0.34 -18.00
662 705.00 -9.28 8.94 -8.85 -0.28 -18.10
662 706.00 -9.28 9.79 -9.69 0.58 -18.90
662 707.00 -9.27 9.28 -9.18 0.07 -18.40
662 708.00 -9.26 9.02 -8.93 -0.17 -18.10
662 709.00 -9.25 8.48 -8.39 -0.70 -17.60
662 710.00 -9.28 9.79 -9.68 0.57 -18.90
662 711.00 -9.27 8.54 -8.46 -0.66 -17.70
662 712.00 -9.28 8.83 -8.74 -0.38 -18.00
662 713.00 -9.28 8.87 -8.78 -0.35 -18.00
662 714.00 -9.28 8.82 -8.73 -0.39 -17.90
662 715.00 -9.27 8.58 -8.49 -0.62 -17.70
662 716.00 -9.26 8.10 -8.02 -1.09 -17.20
662 717.00 -9.28 9.09 -8.99 -0.12 -18.20
662 718.00 -9.26 8.76 -8.67 -0.44 -17.90
662 719.00 -9.28 9.45 -9.36 0.24 -18.60
662 720.00 -9.28 9.54 -9.44 0.33 -18.70
662 721.00 -9.27 9.12 -9.03 -0.08 -18.20
662 722.00 -9.26 8.85 -8.76 -0.35 -17.90
662 723.00 -9.25 8.37 -8.29 -0.81 -17.50
662 724.00 -9.28 9.50 -9.40 0.29 -18.60
662 725.00 -9.27 7.24 -7.17 -1.98 -16.40
662 726.00 -9.28 7.48 -7.40 -1.75 -16.60
662 727.00 -9.28 7.55 -7.47 -1.67 -16.70
662 728.00 -9.28 7.49 -7.41 -1.74 -16.60
662 729.00 -9.27 7.32 -7.24 -1.90 -16.50
662 730.00 -9.26 6.90 -6.83 -2.31 -16.00
662 731.00 -9.28 7.62 -7.54 -1.61 -16.80
662 732.00 -9.26 7.42 -7.34 -1.79 -16.60
662 733.00 -9.28 7.48 -7.40 -1.75 -16.60
662 734.00 -9.28 8.12 -8.03 -1.11 -17.30
662 735.00 -9.27 7.73 -7.65 -1.49 -16.90
662 736.00 -9.26 7.54 -7.46 -1.67 -16.70
662 737.00 -9.25 7.13 -7.06 -2.06 -16.30
662 738.00 -9.28 8.11 -8.03 -1.11 -17.30
662 739.00 -9.26 7.34 -7.27 -1.86 -16.50
662 740.00 -9.27 7.86 -7.78 -1.36 -17.00
662 741.00 -9.27 7.93 -7.85 -1.29 -17.10
662 742.00 -9.27 7.61 -7.54 -1.60 -16.80
662 743.00 -9.26 7.41 -7.33 -1.80 -16.50
662 744.00 -9.25 7.05 -6.98 -2.14 -16.20
662 745.00 -9.27 7.90 -7.82 -1.32 -17.00
662 746.00 -9.27 7.18 -7.11 -2.03 -16.30
662 747.00 -9.27 7.40 -7.32 -1.83 -16.50
662 748.00 -9.27 7.43 -7.35 -1.80 -16.60
662 749.00 -9.27 7.39 -7.32 -1.83 -16.50
662 750.00 -9.27 7.21 -7.14 -2.01 -16.40
662 751.00 -9.26 6.85 -6.78 -2.36 -16.00
662 752.00 -9.27 7.59 -7.51 -1.63 -16.70
662 753.00 -9.27 8.40 -8.31 -0.82 -17.50
662 754.00 -9.28 8.64 -8.55 -0.59 -17.80
662 755.00 -9.28 8.71 -8.62 -0.52 -17.80
662 756.00 -9.27 8.64 -8.55 -0.58 -17.80
662 757.00 -9.27 8.47 -8.39 -0.75 -17.60
662 758.00 -9.26 8.05 -7.97 -1.16 -17.20
662 759.00 -9.28 8.77 -8.68 -0.45 -17.90
662 760.00 -9.26 8.57 -8.49 -0.64 -17.70
662 761.00 -9.28 8.64 -8.55 -0.59 -17.80
662 762.00 -9.27 9.27 -9.18 0.05 -18.40
662 763.00 -9.27 8.89 -8.80 -0.33 -18.00
662 764.00 -9.26 8.70 -8.61 -0.51 -17.80
662 765.00 -9.25 8.29 -8.21 -0.91 -17.40
662 766.00 -9.27 9.27 -9.18 0.05 -18.40
662 767.00 -9.26 8.50 -8.41 -0.71 -17.60
662 768.00 -9.27 9.02 -8.93 -0.20 -18.20
662 769.00 -9.27 9.09 -9.00 -0.13 -18.20
662 770.00 -9.27 8.77 -8.68 -0.44 -17.90
662 771.00 -9.26 8.57 -8.48 -0.64 -17.70
662 772.00 -9.25 8.21 -8.13 -0.99 -17.30
662 773.00 -9.27 9.06 -8.96 -0.16 -18.20
662 774.00 -9.26 8.01 -7.92 -1.20 -17.10
662 775.00 -9.25 7.71 -7.63 -1.49 -16.80
662 776.00 -9.27 8.34 -8.25 -0.88 -17.50
662 777.00 -9.27 8.55 -8.47 -0.67 -17.70
662 778.00 -9.27 8.58 -8.49 -0.64 -17.70
662 779.00 -9.27 8.55 -8.46 -0.67 -17.70
662 780.00 -9.27 8.37 -8.28 -0.85 -17.50
max 0.58 -16.00
min -2.36 -18.90
OK OK

Max Allowable Compression = -26.40 Mpa OK


Mx Allowable Tension = 3.50 Mpa OK

8.5.3 Stress check at pier cap right support-servicability rare combionation

Axial Bend(+z) Bend(-z) TOP BOTTOM


Elem Load
(N/mm^2) (N/mm^2) (N/mm^2) (N/mm^2) (N/mm^2)
672 669.00 -9.10 -1.14 1.11 -10.40 -8.20
672 670.00 -9.10 -1.20 1.16 -10.50 -8.16
672 671.00 -9.11 -1.25 1.21 -10.60 -8.11
672 672.00 -9.10 -1.21 1.18 -10.50 -8.14
672 673.00 -9.10 -1.19 1.16 -10.50 -8.15
672 674.00 -9.08 -0.74 0.72 -10.00 -8.57
672 675.00 -9.11 -1.25 1.21 -10.60 -8.11
672 676.00 -9.08 -0.56 0.54 -9.85 -8.75
672 677.00 -9.10 -1.20 1.16 -10.50 -8.16
672 678.00 -9.10 -1.64 1.59 -11.00 -7.72
672 679.00 -9.09 -0.84 0.81 -10.10 -8.49
672 680.00 -9.08 -0.44 0.43 -9.73 -8.86
672 681.00 -9.07 0.05 -0.05 -9.22 -9.33
672 682.00 -9.10 -1.55 1.50 -10.90 -7.81
672 683.00 -9.08 -0.49 0.47 -9.78 -8.82
672 684.00 -9.10 -1.54 1.49 -10.90 -7.82
672 685.00 -9.10 -1.43 1.38 -10.70 -7.93
672 686.00 -9.09 -0.71 0.69 -10.00 -8.61
672 687.00 -9.08 -0.36 0.35 -9.65 -8.94
672 688.00 -9.07 0.08 -0.07 -9.20 -9.35
672 689.00 -9.10 -1.29 1.25 -10.60 -8.05
672 690.00 -9.09 -1.01 0.98 -10.30 -8.32
672 691.00 -9.10 -1.04 1.01 -10.40 -8.30
672 692.00 -9.10 -1.03 1.00 -10.30 -8.31
672 693.00 -9.10 -1.07 1.03 -10.40 -8.27
672 694.00 -9.09 -1.00 0.97 -10.30 -8.34
672 695.00 -9.08 -0.61 0.59 -9.90 -8.70
672 696.00 -9.10 -1.03 1.00 -10.30 -8.31
672 697.00 -9.09 -1.52 1.47 -10.80 -7.83
672 698.00 -9.10 -1.57 1.52 -10.90 -7.79
672 699.00 -9.11 -1.62 1.57 -10.90 -7.74
672 700.00 -9.10 -1.59 1.54 -10.90 -7.77
672 701.00 -9.10 -1.57 1.52 -10.90 -7.79
672 702.00 -9.08 -1.12 1.08 -10.40 -8.21
672 703.00 -9.11 -1.62 1.57 -10.90 -7.74
672 704.00 -9.08 -0.93 0.90 -10.20 -8.39
672 705.00 -9.10 -1.57 1.52 -10.90 -7.79
672 706.00 -9.10 -2.01 1.95 -11.30 -7.36
672 707.00 -9.09 -1.21 1.17 -10.50 -8.13
672 708.00 -9.08 -0.82 0.79 -10.10 -8.50
672 709.00 -9.07 -0.32 0.31 -9.60 -8.97
672 710.00 -9.10 -1.92 1.86 -11.20 -7.45
672 711.00 -9.09 -1.39 1.34 -10.70 -7.96
672 712.00 -9.10 -1.42 1.37 -10.70 -7.94
672 713.00 -9.10 -1.41 1.36 -10.70 -7.95
672 714.00 -9.10 -1.44 1.40 -10.80 -7.91
672 715.00 -9.09 -1.37 1.33 -10.70 -7.97
672 716.00 -9.08 -0.99 0.96 -10.30 -8.33
672 717.00 -9.10 -1.40 1.36 -10.70 -7.95
672 718.00 -9.08 -0.86 0.83 -10.20 -8.46
672 719.00 -9.10 -1.92 1.86 -11.20 -7.45
672 720.00 -9.10 -1.80 1.74 -11.10 -7.56

672 721.00 -9.09 -1.09 1.06 -10.40 -8.25

672 722.00 -9.08 -0.74 0.71 -10.00 -8.58


672 723.00 -9.07 -0.30 0.29 -9.58 -8.99
672 724.00 -9.10 -1.67 1.62 -11.00 -7.69
672 725.00 -9.09 -0.56 0.54 -9.80 -8.71
672 726.00 -9.10 -0.60 0.58 -9.85 -8.68
672 727.00 -9.10 -0.63 0.61 -9.89 -8.64
672 728.00 -9.10 -0.61 0.59 -9.86 -8.66
672 729.00 -9.09 -0.59 0.58 -9.84 -8.67
672 730.00 -9.08 -0.25 0.25 -9.49 -8.99
672 731.00 -9.10 -0.63 0.62 -9.89 -8.64
672 732.00 -9.08 -0.12 0.11 -9.35 -9.13
672 733.00 -9.10 -0.60 0.58 -9.85 -8.68
672 734.00 -9.10 -0.93 0.90 -10.20 -8.35
672 735.00 -9.09 -0.33 0.32 -9.57 -8.93
672 736.00 -9.08 -0.03 0.03 -9.27 -9.21
672 737.00 -9.07 0.34 -0.33 -8.88 -9.56
672 738.00 -9.10 -0.86 0.83 -10.10 -8.42
672 739.00 -9.08 -0.06 0.06 -9.30 -9.18
672 740.00 -9.09 -0.85 0.83 -10.10 -8.42
672 741.00 -9.09 -0.77 0.74 -10.00 -8.51
672 742.00 -9.09 -0.23 0.23 -9.48 -9.02
672 743.00 -9.08 0.03 -0.03 -9.20 -9.27
672 744.00 -9.07 0.36 -0.35 -8.87 -9.57
672 745.00 -9.09 -0.67 0.65 -9.92 -8.60
672 746.00 -9.09 -0.46 0.44 -9.70 -8.80
672 747.00 -9.09 -0.48 0.47 -9.73 -8.78
672 748.00 -9.09 -0.47 0.46 -9.72 -8.80
672 749.00 -9.09 -0.50 0.48 -9.75 -8.77
672 750.00 -9.09 -0.45 0.43 -9.69 -8.81
672 751.00 -9.08 -0.16 0.15 -9.39 -9.08
672 752.00 -9.09 -0.47 0.46 -9.72 -8.79
672 753.00 -9.09 -1.18 1.14 -10.40 -8.10
672 754.00 -9.10 -1.22 1.18 -10.50 -8.07
672 755.00 -9.10 -1.26 1.22 -10.50 -8.03
672 756.00 -9.09 -1.23 1.19 -10.50 -8.06
672 757.00 -9.09 -1.22 1.18 -10.50 -8.07
672 758.00 -9.08 -0.88 0.85 -10.10 -8.39
672 759.00 -9.10 -1.26 1.22 -10.50 -8.03
672 760.00 -9.08 -0.74 0.72 -9.98 -8.52
672 761.00 -9.10 -1.22 1.18 -10.50 -8.07
672 762.00 -9.10 -1.55 1.50 -10.80 -7.75
672 763.00 -9.09 -0.95 0.92 -10.20 -8.32
672 764.00 -9.08 -0.66 0.64 -9.89 -8.60
672 765.00 -9.07 -0.28 0.27 -9.51 -8.95
672 766.00 -9.09 -1.48 1.44 -10.70 -7.81
672 767.00 -9.08 -0.69 0.67 -9.92 -8.57
672 768.00 -9.09 -1.48 1.43 -10.70 -7.82
672 769.00 -9.09 -1.39 1.35 -10.60 -7.90
672 770.00 -9.09 -0.86 0.83 -10.10 -8.41
672 771.00 -9.08 -0.59 0.58 -9.83 -8.66
672 772.00 -9.07 -0.27 0.26 -9.49 -8.97
672 773.00 -9.09 -1.29 1.25 -10.50 -7.99
672 774.00 -9.08 -0.78 0.76 -10.00 -8.48
672 775.00 -9.07 -0.18 0.18 -9.41 -9.05
672 776.00 -9.09 -1.08 1.05 -10.30 -8.20
672 777.00 -9.09 -1.11 1.07 -10.40 -8.18
672 778.00 -9.09 -1.10 1.06 -10.30 -8.19
672 779.00 -9.09 -1.12 1.09 -10.40 -8.16
672 780.00 -9.09 -1.07 1.04 -10.30 -8.21
max -8.87 -7.36
min -11.30 -9.57
OK OK

Max Allowable Compression = -26.40 Mpa OK


Mx Allowable Tension = 3.50 Mpa OK

8.6 End Block Design


8.6.1 Calculation of stress behind anchorage as per annex J of EC2-2

Pmax < or = Fck(t)


C*C'

Fck(t) = Concrete strength at the time of tensioning (Cylinder strength)


= 36.00 Mpa
C & C' = Dimensions of thr associated rectangle
= 396 X 396

Pmax = 24.14 Mpa < 36.00 Mpa


C*C' OK

8.6.2 Calculation of Bursting Reinforcement

2 Ypo = width of Bearing plate


= 292.5 mm.
2 Yo = width of End Block
= 720.0 mm.
For Ypo = 146.3 = 0.4063
Yo 360.0

Fbst = 0.2300 IRC-112, Table 13.1


Pk

Pk = Max. prestressing force at anchorage end


= 3784.91 KN

Fbst = 0.23
3784.914

Fbst = 0.230 x 3784.914


= 870.53 KN

Permissible stress for Fe - 415 steel = 0.87 x 415


= 361.05 Mpa
Fyd is restricted to 250 to avoid crack width check.
Area of steel required = 870530.22 = 3482.12 mm^2
250
Provided SPIRAL
f 16 , 8 rounds 2 no

Area of steel provided = 201.062 x 8 x 2


= 3216.99 cm2.
< 3482.12 cm2. ... UNSAFE

Provided in the region 0.2Yo to 2Yo, i.e 0.072m to 0.72m

OR

Reinforcement to prevemt bursting should not be less than,


Ast = 0.15*Pmax/Fyd * γ EC2-2, Annex J
= 2725.14 mm^2 IRC SP: 105-2015

Fyd is restricted to 250 to avoid crack width check.

Spiral reinforcement provided, 2 X 16 Dia. -8 legs = 3216.99 mm^2 > 2725.14

OK
8.6.3 Calculation of spalling reinforcement
Min Ast in Each direction = 0.03*Pmax/Fyd*γ EC2-2, Annex J
= 545.03 mm^2 IRC SP: 105-2015
Provide 16 dia. 4 no.s in each direction
NOTE No. R 0
STRUCTCON DESIGNS Pvt Ltd. 835/N-455
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 2-Jun-16
BETWEEN BKC AND EEH BY
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

1.0 Post Tensioned Pier Cap Analysis & Design


1.1 Piercap, piers and pile caps are modelled in Midas as line elements.
Pilecap has been modelled with four noded plates supported on piles. Piles of 1.2m dia are modelled
upto point of fixity and defined as fixed supports at that level.
All loads are applied on Piercap and piers appropriately.

Reference Note: 835/N-454

1.1.1 General Data

Pier cap size= 4.00 m X 1.50 m

Post tensioned cables data


Cables = 18 No.s + 2 No.s Dummy
Duct Dia = 107.00 mm
Span length c/c between two piers = 18.02 m
Left side cantilever Length = 3.5 m
Right side cantilever length = 1.8 m
Depth of Pier Cap = 1.5 m
Width of pier cap = 4 m
Grade of concrete (fck) = M 55

Fig. showing general arrangement

Permissible stresses in concrete - IRC-112, 12.2.1


Stage Minimum (MPa) Maximum (MPa)
Construction -2.5 26.40
Service -3.5 26.40

Cable profile
Cable no. 1 to 9

Eccentricities e1 e2 e3 e4 e5
-180 mm -365 mm -610 mm -260 mm -180 mm

Cable No. 10 to 20
Eccentricities e1 e2 e3 e4 e5
180 mm 115 mm -380 mm 0 mm 115 mm

Cable arrangement

at Mid Section
at Left Support Aection
Input Parameters

Concrete:
Fck, Characterstic Compressive strength = 55 Mpa
Ec, Modulus of Elasticity of concrete = 36000.00 MPa Table 6.5, IRC-112

Reinforcement Steel
Grade = Fe500
Fy = 500 Mpa
Es = 2.00E+05 Mpa

Prestresing Steel:

Type of Prestressing cables used - 19 strands of 15.2 dia. Each


i.e 19 T 15 type anchorage
Area of 1 strand (Astrand) = 140 mm2
Area of one cable = 2660 mm^2
UTS of strand = 1860 Mpa
Jacking force = 0.765 x 1860 = 1423 Mpa
Force per cable = 1422.90 x 2.660 = 3784.914 KN

Es = 1.95E+05 Mpa
Fu (Ultimate Strength) = 1860 Mpa
Fy (Yield Strength) = 1570 Mpa

Sheathing Type - Corugated HDPE


Ducty Diameter = 107 mm
As per, IRC-112, Table 7.1
Coefficient of friction (meu) = 0.17
Coefficient of wobble (k) = 0.002 per meter
Anchorage Slip = 6 mm
Stressing Type = One end stressing

Minimum strength of concrete at the time of stressing = 40 MPa


Age of concrete at the time of stressing = 7 days
(assumed minimum age, actual may be more)

Creep & Shrinkage Inputs

Relative Humidity = 70 %
Notional size of member = 2*Ac/ u
= 1
Compressive stregnth of concrete at the age of 28 days
= 55 Mpa
Days considered for long term creep and shrinkage
= 20,000 Days

Graph of time vs Creep Coefficient (Generated through Midas Civil)

Graph of time vs Shrinkage Strain (Generated through Midas Civil)


8.1.2 Construction Stages Data

Number of cable and their stressing stage is given in table below.


Construction stage analsis is carried out in Midas civil

Steps for construction stage analysis taken listed as following,

Construction Stage Days Case Cables

CS1 0 Both column of portal cast 0


CS2 15 Piercap of portal cast on staging 15
CS3 22 1st stage prestress of piercap done 4,6,12,13,14,15,16 7
CS4 52 Girders from 60m span placed 30
CS5 59 2nd stage prestressing 3,7,11,17 7
CS6 89 Girders from 32m span placed 30
CS7 96 3rd stage prestressing 1,2,5,8,9,10,18 7
CS8 126 SIDL reaction is applied 30
CS9 156 Full live load reaction applied 30
CS10 20156 Long term creep and shrinkage 20000
Total 18 cables + 2 dummy

* Cables should be stressed symmetricially in all the stages. i.e 4/6, 13/15, 14, 12/16

8.2 Summary of Stresses at each Stages

Results are Extracted from the midas model.


Sign convention
Negative = Compression
Positive = Tension

Element numbers in Midas

STAGE 2 Pier cap cast on staging

Axial Bend(+z) Bend(-z) TOP BOTTOM


Elem Load Stage Part
(N/mm^2) (N/mm^2) (N/mm^2) (N/mm^2) (N/mm^2)

659 Summation CS 2 J[14] 0.00 0.05 -0.05 0.05 -0.05


LEFT 659 Summation CS 2 I[8] 0.00 0.00 0.00 0.00 0.00
CANTIL 660 Summation CS 2 I[14] 0.00 0.05 -0.05 0.05 -0.05
EVER 660 Summation CS 2 J[5] 0.00 0.32 -0.32 0.32 -0.32
661 Summation CS 2 J[378] 0.00 0.63 -0.63 0.63 -0.63
661 Summation CS 2 I[5] 0.00 0.32 -0.32 0.32 -0.32
665 Summation CS 2 J[6] -0.03 -1.65 1.72 -1.68 1.69
665 Summation CS 2 I[9] -0.03 -0.89 0.93 -0.92 0.90
PIER
668 Summation CS 2 J[11] -0.03 -2.53 2.63 -2.56 2.60
CAP
668 Summation CS 2 I[15] -0.03 -2.30 2.40 -2.33 2.37
671 Summation CS 2 J[747] -0.03 -1.55 1.60 -1.58 1.57
PIER
CAP

671 Summation CS 2 I[12] -0.03 -1.94 2.01 -1.97 1.98


672 Summation CS 2 J[379] -0.03 1.47 -1.48 1.44 -1.51
RIGHT 672 Summation CS 2 I[747] -0.03 -1.55 1.60 -1.58 1.57
CANTIL
EVER 673 Summation CS 2 I[379] 0.00 0.16 -0.16 0.16 -0.16
673 Summation CS 2 J[380] 0.00 0.00 0.00 0.00 0.00
MAX 1.44 2.60
* At this stage pier will be supported on staging, hence stress check is not required MIN -2.56 -1.51

STAGE 3 First stage prestress

659 Summation CS 3 I[8] -3.66 -3.76 3.80 -7.42 0.14


LEFT 659 Summation CS 3 J[14] -3.67 -3.36 3.40 -7.03 -0.28
CANTIL 660 Summation CS 3 J[5] -3.70 -2.46 2.50 -6.16 -1.20
EVER 660 Summation CS 3 I[14] -3.67 -3.36 3.40 -7.03 -0.28
661 Summation CS 3 J[378] -3.73 -1.32 1.35 -5.05 -2.38
661 Summation CS 3 I[5] -3.70 -2.46 2.50 -6.16 -1.20
665 Summation CS 3 J[6] -3.84 2.60 -2.57 -1.25 -6.42
665 Summation CS 3 I[9] -3.76 1.67 -1.67 -2.10 -5.43
PIER Summation CS 3
668 I[15] -3.88 2.34 -2.29 -1.54 -6.17
CAP
668 Summation CS 3 J[11] -3.87 1.92 -1.87 -1.95 -5.74
671 Summation CS 3 I[12] -3.84 1.03 -0.99 -2.81 -4.83
671 Summation CS 3 J[747] -3.82 0.60 -0.57 -3.23 -4.39
672 Summation CS 3 J[379] -3.75 -2.02 2.05 -5.77 -1.70
RIGHT 672 Summation CS 3 I[747] -3.82 0.60 -0.57 -3.23 -4.39
CANTIL
EVER 673 Summation CS 3 J[380] -3.76 -3.96 4.00 -7.71 0.24
673 Summation CS 3 I[379] -3.79 -0.81 0.82 -4.60 -2.97
MAX -1.25 0.24
Max Allowable Compression = 26.40 Mpa OK MIN -7.71 -6.42
Mx Allowable Tension = -2.50 Mpa REVISE

STAGE 4 ROB placed

659 Summation CS 4 I[8] -3.60 -3.70 3.73 -7.30 0.13


LEFT 659 Summation CS 4 J[14] -3.62 -3.30 3.34 -6.92 -0.27
CANTIL 660 Summation CS 4 J[5] -3.65 -2.41 2.45 -6.06 -1.19
EVER 660 Summation CS 4 I[14] -3.62 -3.30 3.34 -6.92 -0.27
661 Summation CS 4 J[378] -3.67 -1.29 1.32 -4.96 -2.36
661 Summation CS 4 I[5] -3.65 -2.41 2.45 -6.06 -1.19
665 Summation CS 4 J[6] -3.90 -2.16 2.24 -6.06 -1.67
665 Summation CS 4 I[9] -3.80 -2.08 2.13 -5.89 -1.67
PIER Summation CS 4 J[11]
668 -3.93 -2.58 2.69 -6.51 -1.23
CAP
668 Summation CS 4 I[15] -3.96 -3.74 3.86 -7.70 -0.10
671 Summation CS 4 I[12] -3.86 -1.13 1.19 -4.99 -2.66
671 Summation CS 4 J[747] -3.83 -0.77 0.81 -4.60 -3.02
672 Summation CS 4 J[379] -3.76 0.25 -0.25 -3.50 -4.00
RIGHT 672 Summation CS 4 I[747] -3.83 -0.77 0.81 -4.60 -3.02
CANTIL
EVER 673 Summation CS 4 I[379] -3.73 -0.79 0.80 -4.52 -2.93
673 Summation CS 4 J[380] -3.69 -3.88 3.92 -7.58 0.23
MAX -3.50 0.23
Max Allowable Compression = 26.40 Mpa OK MIN -7.70 -4.00
Mx Allowable Tension = -2.50 Mpa REVISE

STAGE 5 Second stage prestressing

659 Summation CS 5 I[8] -5.64 -4.65 4.70 -10.30 -0.94


LEFT 659 Summation CS 5 J[14] -5.66 -3.90 3.95 -9.57 -1.71
CANTIL 660 Summation CS 5 J[5] -5.71 -2.49 2.53 -8.20 -3.18
EVER 660 Summation CS 5 I[14] -5.66 -3.90 3.95 -9.57 -1.71
661 Summation CS 5 J[378] -5.75 -0.89 0.91 -6.64 -4.84
661 Summation CS 5 I[5] -5.71 -2.49 2.53 -8.20 -3.18

PIER
CAP
665 Summation CS 5 J[6] -5.98 0.27 -0.18 -5.70 -6.16
665 Summation CS 5 I[9] -5.86 -0.33 0.38 -6.19 -5.48
PIER
668 Summation CS 5 J[11] -6.01 -0.08 0.21 -6.09 -5.81
CAP
668 Summation CS 5 I[15] -6.05 -1.15 1.28 -7.20 -4.76
671 Summation CS 5 I[12] -5.94 0.68 -0.61 -5.26 -6.55
671 Summation CS 5 J[747] -5.91 0.65 -0.61 -5.26 -6.52
672 Summation CS 5 I[747] -5.91 0.65 -0.61 -5.26 -6.52
RIGHT 672 Summation CS 5 J[379] -5.80 -1.04 1.05 -6.84 -4.75
CANTIL
EVER 673 Summation CS 5 I[379] -5.82 -0.39 0.39 -6.21 -5.43
673 Summation CS 5 J[380] -5.77 -4.91 4.96 -10.70 -0.81
MAX -5.26 -0.81
Max Allowable Compression = 26.40 Mpa OK MIN -10.70 -6.55
Mx Allowable Tension = -2.50 Mpa REVISE

STAGE 6 Other span placed

659 Summation CS 6 J[14] -5.59 -3.86 3.91 -9.45 -1.68


LEFT 659 Summation CS 6 I[8] -5.57 -4.59 4.64 -10.20 -0.93
CANTIL 660 Summation CS 6 I[14] -5.59 -3.86 3.91 -9.45 -1.68
EVER 660 Summation CS 6 J[5] -5.65 -1.52 1.55 -7.17 -4.10
661 Summation CS 6 I[5] -5.65 -1.52 1.55 -7.17 -4.10
661 Summation CS 6 J[378] -5.69 0.70 -0.70 -4.99 -6.39
665 Summation CS 6 I[9] -5.86 -2.07 2.12 -7.93 -3.74
665 Summation CS 6 J[6] -6.00 -2.64 2.72 -8.64 -3.28
PIER
668 Summation CS 6 I[15] -6.09 -5.30 5.41 -11.40 -0.68
CAP
668 Summation CS 6 J[11] -6.07 -4.68 4.78 -10.70 -1.29
671 Summation CS 6 J[747] -5.91 -1.69 1.73 -7.60 -4.18
671 Summation CS 6 I[12] -5.96 -2.72 2.77 -8.67 -3.19
672 Summation CS 6 J[379] -5.78 1.50 -1.50 -4.29 -7.29
RIGHT 672 Summation CS 6 I[747] -5.91 -1.69 1.73 -7.60 -4.18
CANTIL
673 Summation CS 6 J[380] -5.69 -4.84 4.89 -10.50 -0.80
EVER
673 Summation CS 6 I[379] -5.75 -0.38 0.39 -6.13 -5.36
MAX -4.29 -0.68
Max Allowable Compression = 26.40 Mpa OK MIN -11.40 -7.29
Mx Allowable Tension = -2.50 Mpa REVISE

STAGE 7 Third stage prestressing

659 Summation CS 7 J[14] -9.11 -2.78 2.81 -11.90 -6.30


LEFT 659 Summation CS 7 I[8] -9.07 -4.34 4.39 -13.40 -4.68
CANTIL 660 Summation CS 7 J[5] -9.19 0.74 -0.73 -8.45 -9.92
EVER 660 Summation CS 7 I[14] -9.11 -2.78 2.81 -11.90 -6.30
661 Summation CS 7 I[5] -9.19 0.74 -0.73 -8.45 -9.92
661 Summation CS 7 J[378] -9.25 3.80 -3.80 -5.45 -13.00
665 Summation CS 7 I[9] -9.33 1.48 -1.33 -7.84 -10.70
665 Summation CS 7 J[6] -9.48 1.65 -1.41 -7.84 -10.90
PIER
668 Summation CS 7 J[11] -9.56 -0.34 0.60 -9.91 -8.96
CAP
668 Summation CS 7 I[15] -9.60 -0.85 1.13 -10.40 -8.47
671 Summation CS 7 J[747] -9.41 1.14 -1.03 -8.26 -10.40
671 Summation CS 7 I[12] -9.45 0.67 -0.50 -8.79 -9.95
672 Summation CS 7 I[747] -9.41 1.14 -1.03 -8.26 -10.40
RIGHT 672 Summation CS 7 J[379] -9.25 0.42 -0.43 -8.84 -9.68
CANTIL
673 Summation CS 7 J[380] -9.24 -4.67 4.72 -13.90 -4.52
EVER
673 Summation CS 7 I[379] -9.31 1.91 -1.90 -7.40 -11.20
MAX -5.45 -4.52
Max Allowable Compression = 26.40 Mpa OK MIN -13.90 -13.00
Mx Allowable Tension = -2.50 Mpa OK

STAGE 8 SIDL
659 Summation CS 8 I[8] -8.97 -4.30 4.35 -13.30 -4.62
LEFT 659 Summation CS 8 J[14] -9.01 -2.76 2.80 -11.80 -6.21
CANTIL 660 Summation CS 8 I[14] -9.01 -2.76 2.80 -11.80 -6.21
EVER 660 Summation CS 8 J[5] -9.09 1.17 -1.16 -7.91 -10.20
661 Summation CS 8 J[378] -9.13 4.50 -4.51 -4.63 -13.60
661 Summation CS 8 I[5] -9.09 1.17 -1.16 -7.91 -10.20
665 Summation CS 8 I[9] -9.28 0.02 0.09 -9.25 -9.19
665 Summation CS 8 J[6] -9.45 -0.49 0.64 -9.94 -8.81
PIER
668 Summation CS 8 J[11] -9.55 -3.10 3.26 -12.60 -6.29
CAP
668 Summation CS 8 I[15] -9.59 -3.76 3.93 -13.30 -5.66
671 Summation CS 8 J[747] -9.35 -0.23 0.31 -9.58 -9.04
671 Summation CS 8 I[12] -9.41 -1.29 1.39 -10.70 -8.02
672 Summation CS 8 J[379] -9.17 1.86 -1.87 -7.31 -11.00
RIGHT 672 Summation CS 8 I[747] -9.35 -0.23 0.31 -9.58 -9.04
CANTIL
673 Summation CS 8 J[380] -9.13 -4.62 4.67 -13.70 -4.46
EVER
673 Summation CS 8 I[379] -9.20 1.88 -1.87 -7.32 -11.10
MAX -4.63 -4.46
Max Allowable Compression = 26.40 Mpa OK MIN -13.70 -13.60
Mx Allowable Tension = -2.50 Mpa OK

STAGE 9 LL

659 Summation CS 9 I[8] -8.89 -4.28 4.32 -13.20 -4.57


LEFT 659 Summation CS 9 J[14] -8.93 -2.75 2.79 -11.70 -6.15
CANTIL 660 Summation CS 9 J[5] -9.01 1.11 -1.09 -7.90 -10.10
EVER 660 Summation CS 9 I[14] -8.93 -2.75 2.79 -11.70 -6.15
661 Summation CS 9 I[5] -9.01 1.11 -1.09 -7.90 -10.10
661 Summation CS 9 J[378] -9.06 4.38 -4.38 -4.68 -13.40
665 Summation CS 9 I[9] -9.27 -1.59 1.66 -10.90 -7.61
665 Summation CS 9 J[6] -9.46 -2.57 2.65 -12.00 -6.81
PIER
668 Summation CS 9 J[11] -9.59 -6.13 6.17 -15.70 -3.41
CAP
668 Summation CS 9 I[15] -9.61 -6.37 6.44 -16.00 -3.17
671 Summation CS 9 I[12] -9.41 -3.43 3.46 -12.80 -5.95
671 Summation CS 9 J[747] -9.33 -1.72 1.76 -11.10 -7.57
672 Summation CS 9 J[379] -9.12 3.44 -3.44 -5.69 -12.60
RIGHT 672 Summation CS 9 I[747] -9.33 -1.72 1.76 -11.10 -7.57
CANTIL
673 Summation CS 9 J[380] -9.05 -4.58 4.63 -13.60 -4.42
EVER
673 Summation CS 9 I[379] -9.12 1.85 -1.84 -7.26 -11.00
MAX -4.68 -3.17
Max Allowable Compression = 26.40 Mpa OK MIN -16.00 -13.40
Mx Allowable Tension = -2.50 Mpa OK

STAGE 10 LONG TERM CREEP & SHRINKAGE

659 Summation CS 10 I[8] -8.19 -3.95 4.00 -12.10 -4.20


LEFT 659 Summation CS 10 J[14] -8.23 -2.56 2.59 -10.80 -5.64
CANTIL 660 Summation CS 10 J[5] -8.30 1.07 -1.06 -7.22 -9.36
EVER 660 Summation CS 10 I[14] -8.23 -2.56 2.59 -10.80 -5.64
661 Summation CS 10 I[5] -8.30 1.07 -1.06 -7.22 -9.36
661 Summation CS 10 J[378] -8.33 4.14 -4.15 -4.18 -12.50
665 Summation CS 10 I[9] -8.53 -2.31 2.35 -10.80 -6.17
665 Summation CS 10 J[6] -8.69 -3.54 3.59 -12.20 -5.10
PIER Summation CS 10 J[11]
668 -8.83 -7.10 7.11 -15.90 -1.71
CAP
668 Summation CS 10 I[15] -8.85 -7.38 7.41 -16.20 -1.44
671 Summation CS 10 I[12] -8.65 -4.17 4.18 -12.80 -4.47
671 Summation CS 10 J[747] -8.57 -2.34 2.36 -10.90 -6.21
672 Summation CS 10 J[379] -8.38 3.78 -3.79 -4.60 -12.20
RIGHT 672 Summation CS 10 I[747] -8.57 -2.34 2.36 -10.90 -6.21
CANTIL
EVER 673 Summation CS 10 I[379] -8.37 1.69 -1.69 -6.67 -10.10
673 Summation CS 10 J[380] -8.30 -4.18 4.22 -12.50 -4.08
MAX -4.18 -1.44
Max Allowable Compression = 26.40 Mpa OK MIN -16.20 -12.50
Mx Allowable Tension = -2.50 Mpa OK

8.3 Ultimate Limit State

Load Factors - Ultimate Limit State for Strength


Basic combination Seismic Combination
Dead Load 1.35 1.35
SIDL 1.35 1.35
SIDL surfacing 1.75 1.75
Live load (Leading) 1.5 -
Live load (Accompanying) 1.15 0.2
Prestressing 1 1
Wind (Leading) 1.5 -
Wind (Accompanying) 0.9 -

8.3.1 Summary of forces at center of pier cap for ULS load cases

BMD Under selft weight

Shear-z Torsion Moment-y Moment-z


Elem Load Axial (kN) Shear-y (kN)
(kN) (kN*m) (kN*m) (kN*m)
668 501 -58812 44 -2438 -611 18947 -1772
668 502 -58998 46 -2261 -922 20072 -1767
668 503 -59044 46 -1911 -874 20810 -1768
668 504 -58979 45 -2239 -917 20152 -1768
668 505 -58857 43 -2088 -562 19686 -1773
668 506 -58564 44 -1937 -643 17113 -1771
668 507 -59029 49 -1876 -1102 20925 -1762
668 508 -58763 43 -2357 -141 18689 -1774
668 509 -58930 49 -2190 -724 19718 -1762
668 510 -58946 49 -1840 -1054 20197 -1761
668 511 -58906 45 -2183 -485 19731 -1770
668 512 -58779 43 -2006 -470 19168 -1773
668 513 -58528 44 -1878 -620 16943 -1771
668 514 -58894 50 -1846 -1079 20103 -1760
668 515 -58584 47 -2331 -810 18003 -1765
668 516 -58998 46 -2261 -922 20072 -1767
668 517 -58978 47 -2182 -948 20470 -1765
668 518 -58789 47 -2210 -991 19356 -1765
668 519 -58563 51 -1952 -1256 18477 -1757
668 520 -58255 50 -1793 -1053 15827 -1759
668 521 -58968 48 -2093 -995 20623 -1763
668 522 -58558 45 -2262 -399 17826 -1769
668 523 -58925 46 -2462 -425 19643 -1767
668 524 -58899 47 -2095 -817 19947 -1764
668 525 -58731 49 -2153 -759 18993 -1762
668 526 -58529 49 -1893 -953 18127 -1761
668 527 -58260 50 -1753 -1057 15830 -1759
668 528 -58872 49 -2009 -954 19977 -1761
668 529 -58701 32 -2125 -778 18408 -1360
668 530 -58844 34 -1990 -1017 19270 -1356
668 531 -58878 34 -1721 -980 19836 -1358
668 532 -58828 34 -1973 -1013 19332 -1358
668 533 -58735 32 -1857 -741 18974 -1362
668 534 -58511 33 -1741 -803 17002 -1360
668 535 -58867 36 -1695 -1155 19925 -1353
668 536 -58526 35 -2043 -931 17684 -1355
668 537 -58844 34 -1990 -1017 19270 -1356
668 538 -58828 35 -1929 -1036 19576 -1355
668 539 -58683 35 -1950 -1069 18721 -1355
668 540 -58510 38 -1753 -1273 18048 -1349
668 541 -58273 37 -1631 -1117 16016 -1351
668 542 -58820 36 -1861 -1073 19693 -1354
668 543 -58663 31 -2063 -418 18210 -1362
668 544 -58791 36 -1935 -865 18999 -1353
668 545 -58803 36 -1667 -1118 19366 -1352
668 546 -58773 33 -1930 -681 19009 -1359
668 547 -58675 32 -1795 -670 18578 -1362
668 548 -58483 33 -1696 -785 16872 -1360
668 549 -58764 37 -1672 -1137 19294 -1351
668 550 -58506 33 -1990 -616 17548 -1358
668 551 -58787 34 -2143 -636 18941 -1357
668 552 -58767 35 -1863 -936 19175 -1355
668 553 -58639 36 -1907 -892 18443 -1353
668 554 -58484 37 -1708 -1041 17779 -1352
668 555 -58277 37 -1600 -1120 16019 -1350
668 556 -58747 36 -1796 -1041 19198 -1352
668 557 -58682 39 -2361 -861 18001 -1347
668 558 -58825 41 -2225 -1100 18864 -1343
668 559 -58860 40 -1956 -1062 19430 -1344
668 560 -58810 40 -2208 -1096 18926 -1344
668 561 -58717 38 -2092 -824 18568 -1348
668 562 -58492 39 -1977 -886 16596 -1346
668 563 -58849 43 -1930 -1237 19518 -1340
668 564 -58507 42 -2279 -1014 17278 -1342
668 565 -58825 41 -2225 -1100 18864 -1343
668 566 -58809 42 -2164 -1119 19169 -1342
668 567 -58665 42 -2186 -1152 18315 -1341
668 568 -58491 45 -1988 -1355 17641 -1336
668 569 -58255 44 -1866 -1200 15610 -1337
668 570 -58802 42 -2096 -1156 19286 -1340
668 571 -58645 38 -2298 -500 17804 -1349
668 572 -58772 43 -2171 -948 18593 -1340
668 573 -58785 43 -1902 -1201 18960 -1339
668 574 -58754 40 -2165 -764 18603 -1345
668 575 -58657 38 -2030 -753 18171 -1348
668 576 -58465 39 -1931 -868 16466 -1346
668 577 -58745 44 -1907 -1220 18888 -1338
668 578 -58487 40 -2225 -698 17142 -1345
668 579 -58769 41 -2379 -719 18535 -1343
668 580 -58749 42 -2098 -1019 18768 -1341
668 581 -58620 43 -2142 -974 18037 -1339
668 582 -58465 43 -1943 -1123 17373 -1339
668 583 -58259 44 -1836 -1203 15612 -1337
668 584 -58728 43 -2031 -1124 18791 -1339
668 585 -58701 32 -2125 -778 18408 -1360
668 586 -58844 34 -1990 -1017 19270 -1356
668 587 -58878 34 -1721 -980 19836 -1358
668 588 -58828 34 -1973 -1013 19332 -1358
668 589 -58735 32 -1857 -741 18974 -1362
668 590 -58511 33 -1741 -803 17002 -1360
668 591 -58867 36 -1695 -1155 19925 -1353
668 592 -58526 35 -2043 -931 17684 -1355
668 593 -58844 34 -1990 -1017 19270 -1356
668 594 -58828 35 -1929 -1036 19576 -1355
668 595 -58683 35 -1950 -1069 18721 -1355
668 596 -58510 38 -1753 -1273 18048 -1349
668 597 -58273 37 -1631 -1117 16016 -1351
668 598 -58820 36 -1861 -1073 19693 -1354
668 599 -58663 31 -2063 -418 18210 -1362
668 600 -58791 36 -1935 -865 18999 -1353
668 601 -58803 36 -1667 -1118 19366 -1352
668 602 -58773 33 -1930 -681 19009 -1359
668 603 -58675 32 -1795 -670 18578 -1362
668 604 -58483 33 -1696 -785 16872 -1360
668 605 -58764 37 -1672 -1137 19294 -1351
668 606 -58506 33 -1990 -616 17548 -1358
668 607 -58787 34 -2143 -636 18941 -1357
668 608 -58767 35 -1863 -936 19175 -1355
668 609 -58639 36 -1907 -892 18443 -1353
668 610 -58277 37 -1600 -1120 16019 -1350
668 611 -58277 37 -1600 -1120 16019 -1350
668 612 -58747 36 -1796 -1041 19198 -1352
668 613 -58331 27 -1748 -1194 16101 -727
668 614 -58356 27 -1724 -1235 16251 -727
668 615 -58362 27 -1678 -1229 16349 -727
668 616 -58354 27 -1721 -1235 16262 -727
668 617 -58337 26 -1701 -1187 16199 -728
668 618 -58298 27 -1681 -1198 15856 -727
668 619 -58360 27 -1673 -1259 16365 -726
668 620 -58301 27 -1734 -1221 15975 -726
668 621 -58356 27 -1724 -1235 16251 -727
668 622 -58353 27 -1714 -1239 16304 -726
668 623 -58831 28 -2447 -1237 19769 -725
668 624 -58298 28 -1683 -1280 16038 -725
668 625 -58257 27 -1662 -1253 15685 -726
668 626 -58352 27 -1702 -1245 16324 -726
668 627 -58325 26 -1737 -1131 16066 -728
668 628 -58347 27 -1715 -1209 16204 -726
668 629 -58349 27 -1668 -1253 16268 -726
668 630 -58344 27 -1714 -1177 16205 -727
668 631 -58327 26 -1690 -1175 16130 -728
668 632 -58294 27 -1673 -1195 15834 -727
668 633 -58342 27 -1669 -1256 16255 -726
668 634 -58298 27 -1724 -1166 15951 -727
668 635 -58346 27 -1751 -1169 16194 -727
668 636 -58343 27 -1702 -1221 16234 -726
668 637 -58321 27 -1710 -1214 16107 -726
668 638 -58294 27 -1675 -1240 15992 -726
668 639 -58258 27 -1657 -1253 15685 -726
668 640 -58339 27 -1691 -1240 16238 -726
668 641 -58334 28 -1754 -1198 16090 -735
668 642 -58358 29 -1730 -1240 16240 -734
668 643 -58364 29 -1684 -1233 16338 -734
668 644 -58356 29 -1728 -1239 16251 -735
668 645 -58340 28 -1707 -1192 16188 -735
668 646 -58301 28 -1687 -1203 15845 -735
668 647 -58362 29 -1679 -1264 16354 -734
668 648 -58303 29 -1740 -1225 15964 -734
668 649 -58358 29 -1730 -1240 16240 -734
668 650 -58356 29 -1720 -1243 16293 -734
668 651 -58331 29 -1724 -1249 16144 -734
668 652 -58300 29 -1689 -1284 16027 -733
668 653 -58259 29 -1668 -1257 15674 -733
668 654 -58354 29 -1708 -1250 16313 -734
668 655 -58300 28 -1731 -1170 15940 -735
668 656 -58349 29 -1757 -1174 16183 -734
668 657 -58345 29 -1708 -1226 16223 -734
668 658 -58323 29 -1716 -1218 16096 -734
668 659 -58296 29 -1681 -1244 15981 -733
668 660 -58260 29 -1663 -1258 15674 -733
668 661 -58342 29 -1697 -1244 16227 -734
668 662 -58327 28 -1743 -1136 16056 -735
668 663 -58349 29 -1721 -1213 16193 -734
668 664 -58351 29 -1674 -1257 16257 -734
668 665 -58346 28 -1720 -1182 16195 -735
668 666 -58329 28 -1697 -1180 16119 -735
668 667 -58296 28 -1679 -1200 15823 -735
668 668 -58344 29 -1675 -1261 16244 -733

MAX -58255 51 -1600 -141 20925 -725


MIN -59044 26 -2462 -1355 15610 -1774

8.3.1.1 Moment capacity of a section at mid span

Moment Capacity of Prestressed Section

Area of layer 1 cables = 23940 mm^2


Area of layer 2 cables = 23940 mm^2

Total Force in layer 1 cable after losses = 23845 KN


Total Force in layer 2 cable after losses = 23845 KN

ES = 1.95E+05 Mpa

Prestrain in Layer 1 cables = Fs / Es = 0.0051


Prestrain in Layer 2 cables = Fs / Es = 0.0051

Ultimate stress in cable (Fpk) = 1860 Mpa


Stress at 0.1 % Proof force = 0.87 * Fpk = 1618.2 Mpa

Fpd = 1618.2 = 1407.13 Mpa


1.15
Yield Strain, εpd

εpd = Fpd = 0.0072


ES
Fig. A2-4 , IRC-112-2011

CG Of cables from top at mid sec


1245 mm
115
CG Of cables from top at Left support sec
1102.5 mm
340
230
140

Left Support Mid Section

Neutral Axis Location at = 821.18 mm ….After iterations

Final Steel Strain = Prestrain + Bending Strain

Final Strain in Layer 1 cables = 0.0051 + 0.00230


= 0.0074 > εpd

Final Strain in Layer 2 cables = 0.0051 + 0.001316


= 0.0064 ~ εpd

As the strain values are greater than εpd , hence stresses in cables are=Fpd= 1407.13 Mpa

Thus Total force in steel , Tu = ε*Es*A


= 64555.55 KN

Total Compressive force in concrete

fcd = a Fck
ɣm

λ*x Cu

Tu

λ = 0.8 for Fck < 60 Mpa IRC-112, A2.9

Fcd = a Fck IRC-112, 6.4.2.8


γm

γm = 1.5 for basic and seismic combination IRC-112, 6.4.2.8


α = 0.67
Fcd = 24.57 Mpa
η = 1 for Fck < 60 Mpa IRC-112, A2.9

η*Fcd = 24.57

Compressive Force, Cu = η*Fcd*λ*x*b


= 64555.55 KN

Tu = Cu i.e Tu - Cu = 0.00 Goal Seek this to 0 by Changing cell E775

Ultimate Moment Capacity = Σ(Fs*As*(d-0.4*x)) OR η*Fcd*λ*x*b*Z


= 59693 KN-M

Ultimate Moment = 20925 KN-M < Ultimate Moment Capacity


OK

8.3.1.2 Shear Capacity

Design shear = 2462 KN

Flexural Tensile stress = 5.360 Mpa

Allowable tensile stress = 2.33 Mpa

The Section is Cracked

Elements not requiring shear reinforcement IRC-112, 10.3.2


K = 1+ (200/d)^0.5
= 1.01

Fcd = 24.57 Mpa

σcp = Min of NED/AC & 0.2 * Fcd


7.948 & 4.91

σcp = 4.913

ρt = Min of Asl/(b*d) & 0.02


0.004 & 0.02

ρt = 0.004

VRdc = 3148 KN IRC-112,Cl. 10.3.2


(Considering b as 2m, i.e supported width) Eq. 10.1

vmin = 0.235 Eq. 10.3

VRdc (MIN) = 5829 KN Eq. 10.1

VRdc = 3148 KN

As, VRdc > Design shear


Provide minimum Reinforcement

Asw = 0.072*(Fck)^0.5
S* bw Fyk
= 0.00129

The maximum spacing


Slmax = 0.75d*(1+cota) IRC-112, 16.5.2, Eq. 16.6
= 1125.00 mm
lets assume spacing as, 200 mm

Asw = 5.15 mm^2/m


S

8.3.1.3 Torsional Moment

TED = Design torsion


= 1355 KN-M

Tt = shear stress due to torsion


= TED
2*Ak*tef

VED = Γt * tef * Z

Torsional Inertia ofr section


b = 4000 mm
d = 1500 mm
b/d = 2.67
torsional constant = 0.254

Torsional Inertia ofr section = β*b*d^3


3.429E+12 mm^4
tef = A/W 545.4545455
this thickness should not b les than twice the distance between edge and centre of longitudinal reinforcement

effective cover = 50 + 12.5 + 6 68.5


as 2 * effective cover > 545.5

tef = 137 mm

Ak = (4000-137) X (1500-137)
= 5265269 mm^2

q = 45

Ast = TED * cotθ


St (2 * Ak * Fyd )

= 0.390 mm^/m

Total shear reinforcemenrt required including for shear


= 5.15 + 0.390
= 5.54 mm^2/m
Provide 16mm dia. 8 legged stirrups at 200 mm c-c

Astprovided = 8.04 mm^2/mm


St

Longitudinal Reinforcement

Asl = TED * Cotθ


uk (2 * Ak * Fyd )
= 0.390 mm^/m

Asl = 4293.35348 mm^2

Spacing between longitudinal bars should not be more than 350mm IRC-112, 16.5.3
Take sapcing as 300mm
Provide additional 22 no.s 25 mm dia. Bars, with main reinforcement

Torsional Resisting Capacity


Trdmax = 2 * ν * αcw * fcd * Ak * tef * sinθ * cosθ

= 6485.56 KN-M > 1355.26 KN-M

Safe in torsional resistance

8.3.2 Summary opf forces at Letf support of pier cap for ULS load cases

Shear-z Torsion Moment-y Moment-z


Elem Load Axial (kN) Shear-y (kN)
(kN) (kN*m) (kN*m) (kN*m)
662 501 -57912 580 -9585 2820 -17607 409
662 502 -58002 580 -9607 2820 -12756 119
662 503 -57994 581 -11549 3453 -18320 414
662 504 -58084 581 -11571 3453 -12486 124
662 505 -58016 581 -11709 3853 -18542 415
662 506 -58106 581 -11731 3853 -12628 124
662 507 -57987 581 -10585 3361 -18343 413
662 508 -58077 581 -10607 3361 -12991 122
662 509 -57934 580 -9745 3220 -17829 409
662 510 -58024 580 -9766 3220 -12898 119
662 511 -57798 580 -9123 2803 -16559 409
662 512 -57888 580 -9145 2803 -11938 118
662 513 -58011 581 -11593 4108 -18740 419
662 514 -58101 581 -11615 4108 -12885 128
662 515 -57892 580 -9512 3297 -17425 409
662 516 -57981 580 -9534 3297 -12610 119
662 517 -57967 581 -11315 4550 -18071 419
662 518 -58056 581 -11336 4550 -12355 129
662 519 -57974 581 -11411 4617 -18159 420
662 520 -58063 581 -11432 4617 -12394 129
662 521 -57957 581 -10377 3921 -18060 414
662 522 -58047 581 -10399 3921 -12812 123
662 523 -57899 580 -9608 3364 -17512 410
662 524 -57989 580 -9630 3364 -12649 119
662 525 -57782 580 -9072 2828 -16416 409
662 526 -57872 580 -9093 2828 -11822 118
662 527 -57951 581 -11232 4389 -18655 420
662 528 -58041 581 -11254 4389 -12980 129
662 529 -57807 581 -9482 2613 -18132 411
662 530 -57897 581 -9504 2613 -13332 121
662 531 -57994 581 -11549 3453 -18320 414
662 532 -58084 581 -11571 3453 -12486 124
662 533 -57989 581 -10643 3222 -20248 414
662 534 -58079 581 -10665 3222 -14867 124
662 535 -57901 581 -10295 3098 -19085 414
662 536 -57991 581 -10316 3098 -13879 123
662 537 -57799 581 -9598 3315 -18512 417
662 538 -57889 581 -9620 3315 -13654 127
662 539 -57656 581 -8982 2371 -17279 413
662 540 -57745 581 -9004 2371 -12729 122
662 541 -57986 581 -10925 3687 -20237 417
662 542 -58075 581 -10947 3687 -14716 126
662 543 -57796 581 -9421 3040 -17914 410
662 544 -57886 581 -9442 3040 -13145 120
662 545 -57968 581 -10372 3795 -19486 415
662 546 -58058 581 -10394 3795 -14241 124
662 547 -57956 581 -10437 3797 -19688 416
662 548 -58046 581 -10459 3797 -14410 126
662 549 -57877 581 -10121 3414 -18732 416
662 550 -57966 581 -10143 3414 -13613 125
662 551 -57783 581 -9484 2851 -18111 414
662 552 -57873 581 -9506 2851 -13310 124
662 553 -57658 581 -8949 2363 -17040 413
662 554 -57748 581 -8971 2363 -12506 123
662 555 -57943 581 -10629 3907 -19593 418
662 556 -58033 581 -10650 3907 -14220 127
662 557 -57860 445 -9278 2556 -16083 315
662 558 -57950 445 -9300 2556 -11385 93
662 559 -57923 445 -10784 3041 -16630 319
662 560 -58013 445 -10806 3041 -11179 96
662 561 -57940 445 -10907 3348 -16800 319
662 562 -58030 445 -10928 3348 -11288 97
662 563 -57918 445 -10045 2971 -16647 318
662 564 -58008 445 -10067 2971 -11566 95
662 565 -57877 445 -9401 2862 -16253 315
662 566 -57967 445 -9422 2862 -11494 93
662 567 -57773 445 -8924 2543 -15280 315
662 568 -57863 445 -8946 2543 -10759 92
662 569 -57936 446 -10818 3543 -16952 322
662 570 -58026 446 -10840 3543 -11484 100
662 571 -57779 445 -9200 2397 -16486 317
662 572 -57869 445 -9221 2397 -11827 94
662 573 -57923 445 -10784 3041 -16630 319
662 574 -58013 445 -10806 3041 -11179 96
662 575 -57919 445 -10089 2864 -18108 319
662 576 -58009 445 -10111 2864 -13004 96
662 577 -57852 445 -9822 2769 -17216 319
662 578 -57941 445 -9844 2769 -12246 96
662 579 -57774 446 -9288 2935 -16777 322
662 580 -57864 446 -9310 2935 -12074 99
662 581 -57663 445 -8816 2212 -15831 318
662 582 -57753 445 -8838 2212 -11365 95
662 583 -57916 446 -10306 3220 -18100 321
662 584 -58006 446 -10328 3220 -12888 98
662 585 -57844 445 -9222 2921 -15944 315
662 586 -57934 445 -9244 2921 -11274 93
662 587 -57902 446 -10604 3882 -16439 323
662 588 -57992 446 -10626 3882 -11078 100
662 589 -57907 446 -10678 3934 -16506 324
662 590 -57997 446 -10700 3934 -11108 101
662 591 -57894 445 -9886 3400 -16430 319
662 592 -57984 445 -9907 3400 -11429 96
662 593 -57850 445 -9296 2973 -16011 316
662 594 -57940 445 -9318 2973 -11304 93
662 595 -57760 445 -8885 2562 -15170 315
662 596 -57850 445 -8906 2562 -10669 92
662 597 -57890 446 -10541 3759 -16887 324
662 598 -57980 446 -10563 3759 -11557 101
662 599 -57771 445 -9152 2724 -16319 316
662 600 -57861 445 -9174 2724 -11684 93
662 601 -57903 445 -9882 3303 -17524 320
662 602 -57993 445 -9903 3303 -12524 97
662 603 -57894 445 -9932 3305 -17678 321
662 604 -57984 445 -9954 3305 -12654 98
662 605 -57833 446 -9689 3011 -16946 320
662 606 -57923 446 -9711 3011 -12042 98
662 607 -57761 445 -9201 2580 -16470 319
662 608 -57851 445 -9223 2580 -11811 96
662 609 -57665 445 -8791 2205 -15648 318
662 610 -57755 445 -8813 2205 -11194 96
662 611 -57884 446 -10078 3389 -17606 322
662 612 -57974 446 -10100 3389 -12508 99
662 613 -57854 445 -9578 2527 -18705 319
662 614 -57943 445 -9599 2527 -13858 96
662 615 -57917 446 -11084 3013 -19252 323
662 616 -58007 446 -11106 3013 -13651 100
662 617 -57934 446 -11206 3320 -19422 323
662 618 -58024 446 -11228 3320 -13760 100
662 619 -57912 446 -10345 2942 -19270 322
662 620 -58001 446 -10366 2942 -14038 99
662 621 -57871 445 -9700 2834 -18876 319
662 622 -57960 445 -9722 2834 -13967 96
662 623 -57767 445 -9224 2514 -17902 318
662 624 -57857 445 -9246 2514 -13231 96
662 625 -57930 446 -11118 3515 -19574 326
662 626 -58020 446 -11139 3515 -13957 103
662 627 -57773 446 -9499 2368 -19108 320
662 628 -57863 446 -9521 2368 -14299 97
662 629 -57917 446 -11084 3013 -19252 323
662 630 -58007 446 -11106 3013 -13651 100
662 631 -57913 446 -10389 2836 -20730 323
662 632 -58003 446 -10411 2836 -15477 100
662 633 -57845 446 -10122 2741 -19839 322
662 634 -57935 446 -10144 2741 -14719 99
662 635 -57768 446 -9588 2907 -19399 325
662 636 -57857 446 -9610 2907 -14546 102
662 637 -57657 446 -9116 2183 -18454 321
662 638 -57747 446 -9137 2183 -13837 99
662 639 -57910 446 -10605 3192 -20722 325
662 640 -58000 446 -10627 3192 -15360 102
662 641 -57838 445 -9522 2893 -18566 319
662 642 -57928 445 -9544 2893 -13746 96
662 643 -57896 446 -10904 3854 -19061 327
662 644 -57985 446 -10926 3854 -13551 104
662 645 -57901 446 -10978 3905 -19128 327
662 646 -57991 446 -10999 3905 -13581 104
662 647 -57888 446 -10185 3371 -19053 322
662 648 -57978 446 -10207 3371 -13901 99
662 649 -57844 445 -9595 2945 -18633 319
662 650 -57933 445 -9617 2945 -13776 96
662 651 -57754 445 -9184 2533 -17793 318
662 652 -57844 445 -9206 2533 -13142 96
662 653 -57884 446 -10841 3731 -19509 327
662 654 -57973 446 -10863 3731 -14030 104
662 655 -57765 445 -9452 2696 -18941 319
662 656 -57854 445 -9474 2696 -14156 97
662 657 -57897 446 -10181 3275 -20146 323
662 658 -57987 446 -10203 3275 -14996 100
662 659 -57888 446 -10231 3277 -20301 324
662 660 -57977 446 -10253 3277 -15126 101
662 661 -57827 446 -9989 2982 -19568 324
662 662 -57916 446 -10010 2982 -14515 101
662 663 -57755 446 -9501 2551 -19092 323
662 664 -57845 446 -9522 2551 -14283 100
662 665 -57659 446 -9090 2177 -18270 322
662 666 -57749 446 -9112 2177 -13666 99
662 667 -57878 446 -10378 3361 -20228 325
662 668 -57967 446 -10400 3361 -14980 103

MAX -57656 581 -8791 4617 -10669 420


MIN -58106 445 -11731 2177 -20730 92

8.3.2.1 Moment capacity of a section at left support

Moment Capacity of Prestressed Section

Area of layer 1 cables = 23940 mm^2


Area of layer 2 cables = 23940 mm^2

Total Force in layer 1 cable after losses = 23845 KN


Total Force in layer 2 cable after losses = 23845 KN

ES = 1.95E+05 Mpa

Prestrain in Layer 1 cables = Fs / Es = 0.0051


Prestrain in Layer 2 cables = Fs / Es = 0.0051

Ultimate stress in cable (Fpk) = 1860 Mpa


Stress at 0.1 % Proof force = 0.87 * Fpk = 1618.2 Mpa

Fpd = 1618.2 = 1407.13 Mpa


1.15
Yield Strain, εpd

εpd = Fpd = 0.0072


ES

Fig. A2-4 , IRC-112-2011

CG Of cables from top at mid sec


1245 mm
115
CG Of cables from top at Left support sec
1102.5 mm
340
230
140

Left Support Mid Section

Neutral Axis Location at = 779.15 mm ….After iterations

Final Steel Strain = Prestrain + Bending Strain

Final Strain in Layer 1 cables = 0.0051 + 0.00171


= 0.0068 ~ εpd

Final Strain in Layer 2 cables = 0.0051 + 0.001194


= 0.0063 ~ εpd

As the strain values are greater than or almost equal to εpd , hence stresses in ca 1407.13 Mpa

Thus Total force in steel , Tu = ε*Es*A X 47880


= 61251.50 KN

Total Compressive force in concrete

fcd = a Fck
ɣm

λ*x Cu

Tu

λ = 0.8 for Fck < 60 Mpa IRC-112, A2.9

Fcd = a Fck IRC-112, 6.4.2.8


γm

γm = 1.5 for basic and seismic combination IRC-112, 6.4.2.8


α = 0.67

Fcd = 24.57 Mpa


η = 1 for Fck < 60 Mpa IRC-112, A2.9

η*Fcd = 24.57

Compressive Force, Cu = η*Fcd*λ*x*b


= 61251.50 KN

Tu = Cu i.e Tu - Cu = 0.00 Goal Seek this to 0 by Changing cell E775

Ultimate Moment Capacity = Σ(Fs*As*(d-0.4*x)) OR η*Fcd*λ*x*b*Z


= 57446 KN-M

Ultimate Moment = 20730 KN-M < Ultimate Moment Capacity


OK
8.3.2.2 Shear Capacity

Design shear = 11730.84 KN

Flexural Tensile stress = 4.670 Mpa

Allowable tensile stress = 2.33 Mpa

Section is Cracked.

Elements not requiring shear reinforcement


K = 1+ (200/d)^0.5 IRC-112, 10.3.2
= 1+(200/0.8)^0.5
= 16.81

Fcd = 24.57

σcp = Min of NED/AC & 0.2 * Fcd


0.011 & 4.91

σcp = 0.011

ρt = Min of Asl/(b*d) & 0.02


0.008 & 0.02

ρt = 0.008

VRdc = 18930 KN IRC-112,Cl. 10.3.2


Eq. 10.1

vmin = 15 Eq. 10.3

VRdc(min) = 18930 KN Eq. 10.1

VRdc = 18930 KN

As, VRdc < Design shear


Provide minimum Reinforcement

Asw = 0.072*(Fck)^0.5
S* bw Fyk

= 0.00129

The maximum spacing


Slmax = 0.75d*(1+cota) IRC-112, 16.5.2, Eq. 16.6
= 826.88 mm

lets assume spacing as, 200 mm

Asw = 5.15 mm^2/m


S

8.3.2.3 Torsional Moment

TED = Design torsion


= 4617 KN-M

Tt = shear stress due to torsion


= TED
2*Ak*tef

VED = Γt * tef * Z

Torsional Inertia ofr section


b = 4000 mm
d = 1500 mm
b/d = 2.67
torsional constant = 0.254

Torsional Inertia ofr section = β*b*d^3


3.429E+12 mm^4

tef = 545.454545
this thickness should not b les than twice the distance between edge and centre of longitudinal reinforcement

effective cover = 50 + 12.5 + 6 68.5


as 2 * effective cover > 545.5

tef = 137 mm

Ak = (4000-137) X (1500-137)
= 5265269 mm^2

q = 45

Ast = TED
St (2 * Ak * Fyd * cotθ)

= 1.328 mm^/m

Total shear reinforcemenrt required including for shear


= 5.15 + 1.328
= 6.47 mm^2/m
Provide 16mm dia. 8 legged stirrups at 200 mm c-c

Astprovided = 8.04 mm^2/mm


St

Longitudinal Reinforcement

Asl = TED * Cotθ


uk (2 * Ak * Fyd )

= 1.330 mm^/m

Asl = 10637.8018 mm^2

Spacing between longitudinal bars should not be more than 350mm IRC-112, 16.5.3
Take sapcing as 300mm
Provide additional 22 no.s 25 mm dia. Bars, with main reinforcement

Torsional Resisting Capacity


Trdmax = 2 * ν * αcw * fcd * Ak * tef * sinθ * cosθ

= 6485.56 > 4617.22

Safe in torsional resistance


8.3.3 Summary opf forces at Right support of pier cap for ULS load cases

Shear-z Torsion Moment-y Moment-z


Elem Load Axial (kN) Shear-y (kN)
(kN) (kN*m) (kN*m) (kN*m)
672 501 -57336 -307 4868 -1632 4826 -1176
672 502 -57522 -305 5064 -1944 4715 -1187
672 503 -57567 -305 5149 -2318 4770 -1183
672 504 -57502 -306 5059 -1938 4772 -1183
672 505 -57381 -308 4953 -2006 4882 -1172
672 506 -57089 -307 4409 -1555 4253 -1178
672 507 -57552 -302 5155 -2545 4789 -1196
672 508 -57287 -308 4774 -2085 4591 -1170
672 509 -57453 -302 4958 -2668 4459 -1196
672 510 -57469 -302 4962 -2693 4410 -1197
672 511 -57430 -306 4941 -2428 4537 -1179
672 512 -57303 -308 4777 -2110 4542 -1171
672 513 -57053 -307 4305 -1560 4013 -1178
672 514 -57418 -301 4930 -2718 4472 -1201
672 515 -57109 -304 4351 -1499 3811 -1191
672 516 -57522 -305 5064 -1944 4715 -1187
672 517 -57501 -304 5343 -2304 5727 -1190
672 518 -57313 -304 4699 -1870 4175 -1192
672 519 -57088 -300 4301 -2050 3581 -1208
672 520 -56781 -301 3705 -1316 2878 -1205
672 521 -57491 -303 5300 -2600 5532 -1194
672 522 -57083 -306 4295 -1700 3684 -1182
672 523 -57448 -305 5265 -2810 5569 -1185
672 524 -57422 -304 5177 -2801 5347 -1190
672 525 -57255 -302 4600 -2279 3973 -1197
672 526 -57054 -302 4209 -1854 3445 -1200
672 527 -56786 -301 3695 -1353 2822 -1207
672 528 -57396 -302 5080 -2779 5089 -1197
672 529 -57225 -237 4679 -1561 3836 -895
672 530 -57367 -235 4830 -1800 3751 -904
672 531 -57402 -235 4895 -2087 3793 -900
672 532 -57352 -235 4826 -1796 3795 -901
672 533 -57259 -237 4744 -1848 3879 -892
672 534 -57036 -236 4327 -1502 3396 -897
672 535 -57391 -233 4899 -2261 3808 -910
672 536 -57051 -234 4283 -1459 3058 -907
672 537 -57367 -235 4830 -1800 3751 -904
672 538 -57351 -234 5044 -2076 4527 -906
672 539 -57208 -234 4550 -1744 3337 -907
672 540 -57034 -231 4244 -1882 2882 -919
672 541 -56799 -232 3787 -1319 2342 -917
672 542 -57344 -233 5010 -2304 4377 -909
672 543 -57187 -238 4607 -1908 3656 -890
672 544 -57315 -233 4748 -2355 3555 -910
672 545 -57327 -233 4751 -2374 3517 -911
672 546 -57297 -236 4735 -2172 3614 -897
672 547 -57200 -237 4610 -1927 3618 -891
672 548 -57008 -236 4247 -1506 3213 -897
672 549 -57288 -232 4727 -2394 3564 -914
672 550 -57031 -236 4240 -1613 2961 -899
672 551 -57311 -235 4983 -2464 4406 -902
672 552 -57291 -234 4916 -2457 4235 -906
672 553 -57163 -233 4474 -2057 3182 -911
672 554 -57009 -233 4174 -1731 2777 -914
672 555 -56803 -232 3780 -1347 2300 -918
672 556 -57271 -233 4842 -2440 4038 -911
672 557 -57207 -230 4444 -1644 4958 -925
672 558 -57349 -228 4595 -1883 4873 -934
672 559 -57384 -229 4660 -2169 4915 -930
672 560 -57334 -229 4591 -1879 4917 -930
672 561 -57241 -231 4509 -1931 5001 -922
672 562 -57017 -230 4092 -1585 4518 -926
672 563 -57373 -226 4664 -2344 4930 -940
672 564 -57033 -228 4048 -1541 4180 -937
672 565 -57349 -228 4595 -1883 4873 -934
672 566 -57333 -228 4809 -2159 5649 -936
672 567 -57190 -227 4315 -1827 4459 -937
672 568 -57016 -225 4009 -1965 4004 -949
672 569 -56781 -225 3552 -1402 3464 -947
672 570 -57325 -227 4775 -2386 5499 -939
672 571 -57169 -231 4372 -1991 4778 -920
672 572 -57297 -226 4513 -2438 4677 -940
672 573 -57309 -226 4516 -2457 4639 -941
672 574 -57279 -229 4500 -2254 4736 -927
672 575 -57182 -231 4375 -2010 4740 -921
672 576 -56990 -230 4012 -1589 4335 -927
672 577 -57270 -226 4491 -2477 4686 -944
672 578 -57013 -229 4005 -1696 4083 -929
672 579 -57293 -228 4748 -2547 5528 -931
672 580 -57273 -227 4681 -2540 5357 -936
672 581 -57145 -226 4239 -2140 4304 -941
672 582 -56991 -226 3939 -1814 3899 -944
672 583 -56785 -225 3545 -1430 3422 -948
672 584 -57253 -226 4606 -2523 5160 -941
672 585 -57225 -237 4679 -1561 3836 -895
672 586 -57367 -235 4830 -1800 3751 -904
672 587 -57402 -235 4895 -2087 3793 -900
672 588 -57352 -235 4826 -1796 3795 -901
672 589 -57259 -237 4744 -1848 3879 -892
672 590 -57036 -236 4327 -1502 3396 -897
672 591 -57391 -233 4899 -2261 3808 -910
672 592 -57051 -234 4283 -1459 3058 -907
672 593 -57367 -235 4830 -1800 3751 -904
672 594 -57351 -234 5044 -2076 4527 -906
672 595 -57208 -234 4550 -1744 3337 -907
672 596 -57034 -231 4244 -1882 2882 -919
672 597 -56799 -232 3787 -1319 2342 -917
672 598 -57344 -233 5010 -2304 4377 -909
672 599 -57187 -238 4607 -1908 3656 -890
672 600 -57315 -233 4748 -2355 3555 -910
672 601 -57327 -233 4751 -2374 3517 -911
672 602 -57297 -236 4735 -2172 3614 -897
672 603 -57200 -237 4610 -1927 3618 -891
672 604 -57008 -236 4247 -1506 3213 -897
672 605 -57288 -232 4727 -2394 3564 -914
672 606 -57031 -236 4240 -1613 2961 -899
672 607 -57311 -235 4983 -2464 4406 -902
672 608 -57291 -234 4916 -2457 4235 -906
672 609 -57163 -233 4474 -2057 3182 -911
672 610 -56803 -232 3780 -1347 2300 -918
672 611 -56803 -232 3780 -1347 2300 -918
672 612 -57271 -233 4842 -2440 4038 -911
672 613 -56860 -124 3686 -1339 3392 -518
672 614 -56885 -124 3712 -1381 3377 -519
672 615 -56891 -124 3723 -1431 3385 -519
672 616 -56883 -124 3711 -1380 3385 -519
672 617 -56866 -125 3697 -1389 3400 -517
672 618 -56828 -124 3624 -1329 3316 -518
672 619 -56889 -124 3724 -1461 3387 -520
672 620 -56830 -124 3617 -1321 3257 -520
672 621 -56885 -124 3712 -1381 3377 -519
672 622 -56882 -124 3749 -1429 3512 -520
672 623 -57358 -123 4775 -2244 5017 -521
672 624 -56827 -123 3610 -1395 3226 -522
672 625 -56786 -124 3531 -1297 3132 -522
672 626 -56881 -124 3743 -1468 3486 -520
672 627 -56854 -125 3673 -1399 3361 -517
672 628 -56876 -124 3698 -1477 3343 -520
672 629 -56878 -124 3698 -1481 3337 -521
672 630 -56873 -124 3695 -1445 3354 -518
672 631 -56856 -125 3674 -1403 3354 -517
672 632 -56823 -124 3611 -1330 3284 -518
672 633 -56871 -124 3694 -1484 3345 -521
672 634 -56827 -124 3609 -1348 3240 -518
672 635 -56875 -124 3739 -1496 3491 -519
672 636 -56872 -124 3727 -1495 3462 -520
672 637 -56850 -124 3650 -1425 3278 -520
672 638 -56823 -124 3598 -1369 3208 -521
672 639 -56787 -124 3529 -1302 3125 -522
672 640 -56868 -124 3714 -1492 3427 -520
672 641 -56860 -125 3679 -1344 3422 -524
672 642 -56885 -125 3706 -1385 3407 -526
672 643 -56891 -125 3717 -1435 3414 -525
672 644 -56882 -125 3705 -1384 3414 -525
672 645 -56866 -125 3691 -1393 3429 -523
672 646 -56827 -125 3618 -1333 3345 -524
672 647 -56889 -124 3718 -1465 3417 -527
672 648 -56830 -125 3611 -1326 3286 -526
672 649 -56885 -125 3706 -1385 3407 -526
672 650 -56882 -125 3743 -1433 3542 -526
672 651 -56857 -125 3657 -1375 3335 -526
672 652 -56827 -124 3604 -1399 3256 -528
672 653 -56786 -124 3524 -1301 3162 -528
672 654 -56881 -124 3737 -1473 3516 -526
672 655 -56827 -125 3603 -1353 3269 -525
672 656 -56875 -125 3732 -1501 3521 -525
672 657 -56872 -125 3721 -1499 3491 -526
672 658 -56850 -124 3644 -1430 3308 -527
672 659 -56823 -124 3592 -1373 3238 -527
672 660 -56787 -124 3523 -1306 3154 -528
672 661 -56868 -124 3708 -1496 3457 -527
672 662 -56854 -125 3667 -1404 3390 -523
672 663 -56876 -124 3692 -1482 3373 -527
672 664 -56878 -124 3692 -1485 3366 -527
672 665 -56873 -125 3689 -1450 3383 -524
672 666 -56856 -125 3667 -1407 3384 -523
672 667 -56823 -125 3604 -1334 3313 -524
672 668 -56871 -124 3688 -1488 3374 -527

MAX -56781 -123 5343 -1297 5727 -517


MIN -57567 -308 3523 -2810 2300 -1208

8.3.3.1 Moment capacity of a section at right support

Moment Capacity of Prestressed Section


Area of layer 1 cables = 23940 mm^2
Area of layer 2 cables = 23940 mm^2

Total Force in layer 1 cable after losses = 23845 KN


Total Force in layer 2 cable after losses = 23845 KN

ES = 1.95E+05 Mpa

Prestrain in Layer 1 cables = Fs / Es = 0.0051


Prestrain in Layer 2 cables = Fs / Es = 0.0051

Ultimate stress in cable (Fpk) = 1860 Mpa


Stress at 0.1 % Proof force = 0.87 * Fpk = 1618.2 Mpa

Fpd = 1618.2 = 1407.13 Mpa


1.15
Yield Strain, εpd

εpd = Fpd = 0.0072


ES

Fig. A2-4 , IRC-112-2011

CG Of cables from top at mid sec


1245 mm
115
CG Of cables from top at Right support sec
872.5 mm
570
230
140

Right Support Mid Section

Neutral Axis Location at = 705.23 mm ….After iterations

Final Steel Strain = Prestrain + Bending Strain

Final Strain in Layer 1 cables = 0.0051 + 0.00112


= 0.0062 ~ εpd
Final Strain in Layer 2 cables = 0.0051 + 0.000545
= 0.0057 ~ εpd

As the strain values are greater than or almost equal to εpd , hence stresses in
cables are=Fpd= 1407.13 Mpa

Thus Total force in steel , Tu = ε*Es*A X 47880


= 55440.59 KN

Total Compressive force in concrete

fcd = a Fck
ɣm

λ*x Cu

Tu

λ = 0.8 for Fck < 60 Mpa IRC-112, A2.9

Fcd = a Fck IRC-112, 6.4.2.8


γm

γm = 1.5 for basic and seismic combination IRC-112, 6.4.2.8


α = 0.67

Fcd = 24.57 Mpa


η = 1 for Fck < 60 Mpa IRC-112, A2.9

η*Fcd = 24.57

Compressive Force, Cu = η*Fcd*λ*x*b


= 55440.59 KN

Tu = Cu i.e Tu - Cu = 0.00 Goal Seek this to 0 by Changing cell E775

Ultimate Moment Capacity = Σ(Fs*As*(d-0.4*x)) OR η*Fcd*λ*x*b*Z


= 32886 KN-M

Ultimate Moment = 5727 KN-M < Ultimate Moment Capacity


OK

8.3.3.2 Shear Capacity

Design shear = 5343.37 KN

Flexural Tensile stress = 5.500 Mpa

Allowable tensile stress = 2.15 Mpa

Section is Cracked.

Elements not requiring shear reinforcement IRC-112, 10.3.2


K = 1+ (200/d)^0.5
= 1+(200/0.8)^0.5
= 16.81

Fcd = 24.57

σcp = Min of NED/AC & 0.2 * Fcd


0.011 & 4.91

σcp = 0.011

ρt = Min of Asl/(b*d) & 0.02


0.004 & 0.02

ρt = 0.004

VRdc = 15542 KN IRC-112,Cl. 10.3.2


Eq. 10.1

vmin = 15 Eq. 10.3

VRdc(min) = 45334 KN Eq. 10.1

VRdc = 15542 KN

As, VRdc > Design shear


Provide minimum Reinforcement

Asw = 0.072*(Fck)^0.5
S* bw Fyk

= 0.00129

The maximum spacing


Slmax = 0.75d*(1+cota) IRC-112, 16.5.2, Eq. 16.6
= 654.38 mm

lets assume spacing as, 200 mm

Asw = 6.03 mm^2/mm


S

8.3.3.3 Torsional Moment

TED = Design torsion


= 2810 KN-M

Tt = shear stress due to torsion


= TED
2*Ak*tef

VED = Γt * tef * Z

Torsional Inertia of section


b = 4000 mm
d = 1500 mm
b/d = 2.67
torsional constant = 0.254
Torsional Inertia ofr section = β*b*d^3
3.429E+12 mm^4

tef = 545.454545
this thickness should not b les than twice the distance between edge and centre of longitudinal reinforcement

effective cover = 50 + 12.5 + 6 68.5


as 2 * effective cover > 545.5

tef = 137 mm

Ak = (4000-137) X (1500-137)
= 5265269 mm^2

q = 45

Ast = TED
St (2 * Ak * Fyd * cotθ)

= 0.808 mm^/mm

Total shear reinforcemenrt required including for shear


= 6.03 + 0.808
= 6.84 mm^2/m
Provide 16mm dia. 8 legged stirrups at 200 mm c-c

Astprovided = 8.04 mm^2/mm


St

Astprovided = 2.26 mm^2/mm

Longitudinal Reinforcement

Asl = TED * Cotθ


uk (2 * Ak * Fyd )

= 0.809 0.000

Asl = 8902.99197 mm^2

Spacing between longitudinal bars should not be more than 350mm IRC-112, 16.5.3
Take sapcing as 300mm
Provide additional 22 no.s 25 mm dia. Bars, with main reinforcement

Torsional Resisting Capacity


Trdmax = 2 * ν * αcw * fcd * Ak * tef * sinθ * cosθ

= 6485.56 > 2810

8.4 Minimum Untensioned Reinforcement

Asmin = 0.26*(Fctm/Fyk)* bt*d 23739.13 mm^2 IRC-112,cl. 16.5.1.1


or or
0.0013bt*d 7540 mm^2

Asmin = 23739.13 mm^2

Provide 25 dia. Bars 70 no.s, including torsional steel

8.5 Servicabiliy Limit State


8.5.1 Stress check at pier cap center-servicability rare combionation
Axial Bend(+z) Bend(-z) TOP BOTTOM
Elem Load
(N/mm^2) (N/mm^2) (N/mm^2) (N/mm^2) (N/mm^2)

668 669 -9.33 -6.95 6.68 -16.60 -2.95


668 670 -9.34 -7.55 7.26 -17.20 -2.37
668 671 -9.34 -7.90 7.60 -17.50 -2.04
668 672 -9.34 -7.58 7.28 -17.20 -2.35
668 673 -9.34 -7.30 7.01 -16.90 -2.62
668 674 -9.32 -5.99 5.76 -15.60 -3.85
668 675 -9.34 -7.94 7.64 -17.60 -2.00
668 676 -9.32 -6.39 6.15 -16.00 -3.47
668 677 -9.34 -7.55 7.26 -17.20 -2.37
668 678 -9.34 -7.71 7.41 -17.30 -2.22
668 679 -9.33 -7.11 6.84 -16.70 -2.79
668 680 -9.32 -6.59 6.33 -16.20 -3.28
668 681 -9.31 -5.24 5.04 -14.80 -4.56
668 682 -9.34 -7.77 7.47 -17.40 -2.16
668 683 -9.32 -6.30 6.06 -15.90 -3.56
668 684 -9.34 -7.32 7.03 -16.90 -2.60
668 685 -9.34 -7.43 7.15 -17.10 -2.49
668 686 -9.33 -6.92 6.65 -16.50 -2.97
668 687 -9.32 -6.41 6.17 -16.00 -3.45
668 688 -9.31 -5.25 5.05 -14.80 -4.55
668 689 -9.34 -7.43 7.14 -17.10 -2.49
668 690 -9.33 -6.80 6.54 -16.40 -3.08
668 691 -9.34 -7.35 7.07 -17.00 -2.56
668 692 -9.34 -7.57 7.28 -17.20 -2.35
668 693 -9.34 -7.35 7.06 -17.00 -2.57
668 694 -9.33 -7.02 6.75 -16.60 -2.87
668 695 -9.32 -5.90 5.67 -15.50 -3.94
668 696 -9.34 -7.50 7.21 -17.10 -2.42
668 697 -9.33 -6.81 6.55 -16.40 -3.08
668 698 -9.34 -7.42 7.13 -17.10 -2.51
668 699 -9.34 -7.77 7.47 -17.40 -2.17
668 700 -9.34 -7.44 7.15 -17.10 -2.48
668 701 -9.34 -7.16 6.88 -16.80 -2.75
668 702 -9.32 -5.86 5.63 -15.50 -3.98
668 703 -9.34 -7.80 7.50 -17.40 -2.13
668 704 -9.32 -6.26 6.02 -15.90 -3.60
668 705 -9.34 -7.42 7.13 -17.10 -2.51
668 706 -9.34 -7.57 7.28 -17.20 -2.35
668 707 -9.33 -6.97 6.70 -16.60 -2.92
668 708 -9.32 -6.45 6.20 -16.10 -3.41
668 709 -9.31 -5.11 4.91 -14.70 -4.69
668 710 -9.34 -7.63 7.34 -17.30 -2.30
668 711 -9.33 -6.67 6.41 -16.30 -3.22
668 712 -9.34 -7.22 6.94 -16.90 -2.69
668 713 -9.34 -7.44 7.15 -17.10 -2.48
668 714 -9.34 -7.21 6.93 -16.80 -2.70
668 715 -9.33 -6.88 6.62 -16.50 -3.01
668 716 -9.32 -5.76 5.54 -15.40 -4.07
668 717 -9.34 -7.36 7.08 -17.00 -2.55
668 718 -9.32 -6.16 5.93 -15.80 -3.69
668 719 -9.34 -7.18 6.90 -16.80 -2.73
668 720 -9.34 -7.30 7.01 -16.90 -2.62
668 721 -9.33 -6.78 6.52 -16.40 -3.11
668 722 -9.32 -6.28 6.03 -15.90 -3.58
668 723 -9.31 -5.11 4.91 -14.70 -4.69
668 724 -9.34 -7.29 7.01 -16.90 -2.62
668 725 -9.33 -6.63 6.37 -16.20 -3.17
668 726 -9.33 -7.09 6.81 -16.60 -2.74
668 727 -9.34 -7.35 7.06 -16.90 -2.49
668 728 -9.33 -7.10 6.83 -16.70 -2.73
668 729 -9.33 -6.89 6.63 -16.40 -2.92
668 730 -9.32 -5.92 5.69 -15.50 -3.85
668 731 -9.34 -7.38 7.09 -16.90 -2.46
668 732 -9.32 -6.22 5.98 -15.80 -3.56
668 733 -9.33 -7.09 6.81 -16.60 -2.74
668 734 -9.33 -7.20 6.93 -16.80 -2.63
668 735 -9.33 -6.75 6.49 -16.30 -3.05
668 736 -9.32 -6.36 6.12 -15.90 -3.42
668 737 -9.31 -5.35 5.15 -14.90 -4.38
668 738 -9.33 -7.25 6.97 -16.80 -2.58
668 739 -9.32 -6.15 5.91 -15.70 -3.63
668 740 -9.33 -6.91 6.64 -16.50 -2.91
668 741 -9.33 -7.00 6.73 -16.50 -2.83
668 742 -9.32 -6.61 6.35 -16.20 -3.19
668 743 -9.32 -6.23 5.99 -15.80 -3.55
668 744 -9.31 -5.36 5.15 -14.90 -4.38
668 745 -9.33 -6.99 6.72 -16.50 -2.83
668 746 -9.33 -6.52 6.27 -16.10 -3.27
668 747 -9.33 -6.94 6.67 -16.50 -2.88
668 748 -9.33 -7.10 6.83 -16.70 -2.73
668 749 -9.33 -6.93 6.66 -16.50 -2.89
668 750 -9.33 -6.69 6.43 -16.20 -3.12
668 751 -9.32 -5.84 5.62 -15.40 -3.92
668 752 -9.33 -7.05 6.77 -16.60 -2.78
668 753 -9.33 -6.40 6.15 -15.90 -3.39
668 754 -9.33 -6.86 6.59 -16.40 -2.96
668 755 -9.34 -7.12 6.84 -16.70 -2.71
668 756 -9.33 -6.87 6.61 -16.40 -2.94
668 757 -9.33 -6.66 6.41 -16.20 -3.14
668 758 -9.32 -5.69 5.47 -15.20 -4.07
668 759 -9.33 -7.15 6.87 -16.70 -2.68
668 760 -9.32 -5.99 5.76 -15.50 -3.78
668 761 -9.33 -6.86 6.59 -16.40 -2.96
668 762 -9.33 -6.97 6.71 -16.50 -2.85
668 763 -9.33 -6.52 6.27 -16.10 -3.27
668 764 -9.32 -6.13 5.90 -15.70 -3.64
668 765 -9.31 -5.12 4.93 -14.70 -4.60
668 766 -9.33 -7.02 6.75 -16.60 -2.80
668 767 -9.32 -5.92 5.69 -15.50 -3.85
668 768 -9.33 -6.68 6.42 -16.20 -3.13
668 769 -9.33 -6.77 6.51 -16.30 -3.04
668 770 -9.32 -6.38 6.13 -15.90 -3.41
668 771 -9.32 -6.00 5.77 -15.50 -3.77
668 772 -9.31 -5.13 4.93 -14.70 -4.60
668 773 -9.33 -6.76 6.50 -16.30 -3.05
668 774 -9.32 -5.62 5.40 -15.20 -4.14
668 775 -9.31 -5.16 4.96 -14.70 -4.57
668 776 -9.32 -6.29 6.05 -15.80 -3.49
668 777 -9.33 -6.71 6.45 -16.30 -3.10
668 778 -9.33 -6.87 6.61 -16.40 -2.94
668 779 -9.33 -6.70 6.44 -16.30 -3.11
668 780 -9.33 -6.46 6.21 -16.00 -3.34
max -14.70 -2.00
min -17.60 -4.69
OK OK
Max Allowable Compression = 26.40 Mpa OK
Mx Allowable Tension = -3.50 Mpa OK

8.5.2 Stress check at pier cap left support-servicability rare combionation

Axial Bend(+z) Bend(-z) TOP BOTTOM


Elem Load
(N/mm^2) (N/mm^2) (N/mm^2) (N/mm^2) (N/mm^2)

662 669.00 -9.28 7.93 -7.85 -1.28 -17.10


662 670.00 -9.28 8.24 -8.16 -0.97 -17.40
662 671.00 -9.29 8.34 -8.26 -0.88 -17.50
662 672.00 -9.28 8.25 -8.17 -0.96 -17.40
662 673.00 -9.28 8.03 -7.95 -1.18 -17.20
662 674.00 -9.26 7.47 -7.39 -1.73 -16.60
662 675.00 -9.29 8.43 -8.34 -0.79 -17.60
662 676.00 -9.26 8.16 -8.08 -1.03 -17.30
662 677.00 -9.28 8.24 -8.16 -0.97 -17.40
662 678.00 -9.28 9.10 -9.00 -0.12 -18.20
662 679.00 -9.27 8.58 -8.49 -0.62 -17.70
662 680.00 -9.26 8.33 -8.24 -0.87 -17.40
662 681.00 -9.25 7.79 -7.71 -1.39 -16.90
662 682.00 -9.28 9.09 -9.00 -0.12 -18.20
662 683.00 -9.26 8.07 -7.98 -1.13 -17.20
662 684.00 -9.28 8.76 -8.67 -0.45 -17.90
662 685.00 -9.28 8.85 -8.76 -0.36 -18.00
662 686.00 -9.27 8.43 -8.34 -0.78 -17.50
662 687.00 -9.26 8.15 -8.07 -1.04 -17.30
662 688.00 -9.25 7.68 -7.60 -1.50 -16.80
662 689.00 -9.28 8.81 -8.72 -0.40 -17.90
662 690.00 -9.27 7.85 -7.77 -1.36 -17.00
662 691.00 -9.28 8.14 -8.05 -1.08 -17.30
662 692.00 -9.28 8.17 -8.09 -1.04 -17.30
662 693.00 -9.28 8.13 -8.05 -1.08 -17.30
662 694.00 -9.27 7.89 -7.81 -1.32 -17.00
662 695.00 -9.26 7.40 -7.33 -1.79 -16.50
662 696.00 -9.28 8.39 -8.31 -0.82 -17.50
662 697.00 -9.27 8.62 -8.54 -0.58 -17.70
662 698.00 -9.28 8.94 -8.85 -0.28 -18.10
662 699.00 -9.29 9.04 -8.94 -0.18 -18.20
662 700.00 -9.28 8.95 -8.86 -0.27 -18.10
662 701.00 -9.28 8.72 -8.63 -0.49 -17.80
662 702.00 -9.26 8.16 -8.08 -1.03 -17.30
662 703.00 -9.29 9.12 -9.03 -0.09 -18.20
662 704.00 -9.26 8.86 -8.77 -0.34 -18.00
662 705.00 -9.28 8.94 -8.85 -0.28 -18.10
662 706.00 -9.28 9.79 -9.69 0.58 -18.90
662 707.00 -9.27 9.28 -9.18 0.07 -18.40
662 708.00 -9.26 9.02 -8.93 -0.17 -18.10
662 709.00 -9.25 8.48 -8.39 -0.70 -17.60
662 710.00 -9.28 9.79 -9.68 0.57 -18.90
662 711.00 -9.27 8.54 -8.46 -0.66 -17.70
662 712.00 -9.28 8.83 -8.74 -0.38 -18.00
662 713.00 -9.28 8.87 -8.78 -0.35 -18.00
662 714.00 -9.28 8.82 -8.73 -0.39 -17.90
662 715.00 -9.27 8.58 -8.49 -0.62 -17.70
662 716.00 -9.26 8.10 -8.02 -1.09 -17.20
662 717.00 -9.28 9.09 -8.99 -0.12 -18.20
662 718.00 -9.26 8.76 -8.67 -0.44 -17.90
662 719.00 -9.28 9.45 -9.36 0.24 -18.60
662 720.00 -9.28 9.54 -9.44 0.33 -18.70
662 721.00 -9.27 9.12 -9.03 -0.08 -18.20
662 722.00 -9.26 8.85 -8.76 -0.35 -17.90
662 723.00 -9.25 8.37 -8.29 -0.81 -17.50
662 724.00 -9.28 9.50 -9.40 0.29 -18.60
662 725.00 -9.27 7.24 -7.17 -1.98 -16.40
662 726.00 -9.28 7.48 -7.40 -1.75 -16.60
662 727.00 -9.28 7.55 -7.47 -1.67 -16.70
662 728.00 -9.28 7.49 -7.41 -1.74 -16.60
662 729.00 -9.27 7.32 -7.24 -1.90 -16.50
662 730.00 -9.26 6.90 -6.83 -2.31 -16.00
662 731.00 -9.28 7.62 -7.54 -1.61 -16.80
662 732.00 -9.26 7.42 -7.34 -1.79 -16.60
662 733.00 -9.28 7.48 -7.40 -1.75 -16.60
662 734.00 -9.28 8.12 -8.03 -1.11 -17.30
662 735.00 -9.27 7.73 -7.65 -1.49 -16.90
662 736.00 -9.26 7.54 -7.46 -1.67 -16.70
662 737.00 -9.25 7.13 -7.06 -2.06 -16.30
662 738.00 -9.28 8.11 -8.03 -1.11 -17.30
662 739.00 -9.26 7.34 -7.27 -1.86 -16.50
662 740.00 -9.27 7.86 -7.78 -1.36 -17.00
662 741.00 -9.27 7.93 -7.85 -1.29 -17.10
662 742.00 -9.27 7.61 -7.54 -1.60 -16.80
662 743.00 -9.26 7.41 -7.33 -1.80 -16.50
662 744.00 -9.25 7.05 -6.98 -2.14 -16.20
662 745.00 -9.27 7.90 -7.82 -1.32 -17.00
662 746.00 -9.27 7.18 -7.11 -2.03 -16.30
662 747.00 -9.27 7.40 -7.32 -1.83 -16.50
662 748.00 -9.27 7.43 -7.35 -1.80 -16.60
662 749.00 -9.27 7.39 -7.32 -1.83 -16.50
662 750.00 -9.27 7.21 -7.14 -2.01 -16.40
662 751.00 -9.26 6.85 -6.78 -2.36 -16.00
662 752.00 -9.27 7.59 -7.51 -1.63 -16.70
662 753.00 -9.27 8.40 -8.31 -0.82 -17.50
662 754.00 -9.28 8.64 -8.55 -0.59 -17.80
662 755.00 -9.28 8.71 -8.62 -0.52 -17.80
662 756.00 -9.27 8.64 -8.55 -0.58 -17.80
662 757.00 -9.27 8.47 -8.39 -0.75 -17.60
662 758.00 -9.26 8.05 -7.97 -1.16 -17.20
662 759.00 -9.28 8.77 -8.68 -0.45 -17.90
662 760.00 -9.26 8.57 -8.49 -0.64 -17.70
662 761.00 -9.28 8.64 -8.55 -0.59 -17.80
662 762.00 -9.27 9.27 -9.18 0.05 -18.40
662 763.00 -9.27 8.89 -8.80 -0.33 -18.00
662 764.00 -9.26 8.70 -8.61 -0.51 -17.80
662 765.00 -9.25 8.29 -8.21 -0.91 -17.40
662 766.00 -9.27 9.27 -9.18 0.05 -18.40
662 767.00 -9.26 8.50 -8.41 -0.71 -17.60
662 768.00 -9.27 9.02 -8.93 -0.20 -18.20
662 769.00 -9.27 9.09 -9.00 -0.13 -18.20
662 770.00 -9.27 8.77 -8.68 -0.44 -17.90
662 771.00 -9.26 8.57 -8.48 -0.64 -17.70
662 772.00 -9.25 8.21 -8.13 -0.99 -17.30
662 773.00 -9.27 9.06 -8.96 -0.16 -18.20
662 774.00 -9.26 8.01 -7.92 -1.20 -17.10
662 775.00 -9.25 7.71 -7.63 -1.49 -16.80
662 776.00 -9.27 8.34 -8.25 -0.88 -17.50
662 777.00 -9.27 8.55 -8.47 -0.67 -17.70
662 778.00 -9.27 8.58 -8.49 -0.64 -17.70
662 779.00 -9.27 8.55 -8.46 -0.67 -17.70
662 780.00 -9.27 8.37 -8.28 -0.85 -17.50
max 0.58 -16.00
min -2.36 -18.90
OK OK

Max Allowable Compression = 26.40 Mpa OK


Mx Allowable Tension = -3.50 Mpa OK

8.5.3 Stress check at pier cap right support-servicability rare combionation

Axial Bend(+z) Bend(-z) TOP BOTTOM


Elem Load
(N/mm^2) (N/mm^2) (N/mm^2) (N/mm^2) (N/mm^2)
672 669.00 -9.10 -1.14 1.11 -10.40 -8.20
672 670.00 -9.10 -1.20 1.16 -10.50 -8.16
672 671.00 -9.11 -1.25 1.21 -10.60 -8.11
672 672.00 -9.10 -1.21 1.18 -10.50 -8.14
672 673.00 -9.10 -1.19 1.16 -10.50 -8.15
672 674.00 -9.08 -0.74 0.72 -10.00 -8.57
672 675.00 -9.11 -1.25 1.21 -10.60 -8.11
672 676.00 -9.08 -0.56 0.54 -9.85 -8.75
672 677.00 -9.10 -1.20 1.16 -10.50 -8.16
672 678.00 -9.10 -1.64 1.59 -11.00 -7.72
672 679.00 -9.09 -0.84 0.81 -10.10 -8.49
672 680.00 -9.08 -0.44 0.43 -9.73 -8.86
672 681.00 -9.07 0.05 -0.05 -9.22 -9.33
672 682.00 -9.10 -1.55 1.50 -10.90 -7.81
672 683.00 -9.08 -0.49 0.47 -9.78 -8.82
672 684.00 -9.10 -1.54 1.49 -10.90 -7.82
672 685.00 -9.10 -1.43 1.38 -10.70 -7.93
672 686.00 -9.09 -0.71 0.69 -10.00 -8.61
672 687.00 -9.08 -0.36 0.35 -9.65 -8.94
672 688.00 -9.07 0.08 -0.07 -9.20 -9.35
672 689.00 -9.10 -1.29 1.25 -10.60 -8.05
672 690.00 -9.09 -1.01 0.98 -10.30 -8.32
672 691.00 -9.10 -1.04 1.01 -10.40 -8.30
672 692.00 -9.10 -1.03 1.00 -10.30 -8.31
672 693.00 -9.10 -1.07 1.03 -10.40 -8.27
672 694.00 -9.09 -1.00 0.97 -10.30 -8.34
672 695.00 -9.08 -0.61 0.59 -9.90 -8.70
672 696.00 -9.10 -1.03 1.00 -10.30 -8.31
672 697.00 -9.09 -1.52 1.47 -10.80 -7.83
672 698.00 -9.10 -1.57 1.52 -10.90 -7.79
672 699.00 -9.11 -1.62 1.57 -10.90 -7.74
672 700.00 -9.10 -1.59 1.54 -10.90 -7.77
672 701.00 -9.10 -1.57 1.52 -10.90 -7.79
672 702.00 -9.08 -1.12 1.08 -10.40 -8.21
672 703.00 -9.11 -1.62 1.57 -10.90 -7.74
672 704.00 -9.08 -0.93 0.90 -10.20 -8.39
672 705.00 -9.10 -1.57 1.52 -10.90 -7.79
672 706.00 -9.10 -2.01 1.95 -11.30 -7.36
672 707.00 -9.09 -1.21 1.17 -10.50 -8.13
672 708.00 -9.08 -0.82 0.79 -10.10 -8.50
672 709.00 -9.07 -0.32 0.31 -9.60 -8.97
672 710.00 -9.10 -1.92 1.86 -11.20 -7.45
672 711.00 -9.09 -1.39 1.34 -10.70 -7.96
672 712.00 -9.10 -1.42 1.37 -10.70 -7.94
672 713.00 -9.10 -1.41 1.36 -10.70 -7.95
672 714.00 -9.10 -1.44 1.40 -10.80 -7.91
672 715.00 -9.09 -1.37 1.33 -10.70 -7.97
672 716.00 -9.08 -0.99 0.96 -10.30 -8.33
672 717.00 -9.10 -1.40 1.36 -10.70 -7.95
672 718.00 -9.08 -0.86 0.83 -10.20 -8.46
672 719.00 -9.10 -1.92 1.86 -11.20 -7.45
672 720.00 -9.10 -1.80 1.74 -11.10 -7.56
672 721.00 -9.09 -1.09 1.06 -10.40 -8.25
672 722.00 -9.08 -0.74 0.71 -10.00 -8.58
672 723.00 -9.07 -0.30 0.29 -9.58 -8.99
672 724.00 -9.10 -1.67 1.62 -11.00 -7.69
672 725.00 -9.09 -0.56 0.54 -9.80 -8.71
672 726.00 -9.10 -0.60 0.58 -9.85 -8.68
672 727.00 -9.10 -0.63 0.61 -9.89 -8.64
672 728.00 -9.10 -0.61 0.59 -9.86 -8.66
672 729.00 -9.09 -0.59 0.58 -9.84 -8.67
672 730.00 -9.08 -0.25 0.25 -9.49 -8.99
672 731.00 -9.10 -0.63 0.62 -9.89 -8.64
672 732.00 -9.08 -0.12 0.11 -9.35 -9.13
672 733.00 -9.10 -0.60 0.58 -9.85 -8.68
672 734.00 -9.10 -0.93 0.90 -10.20 -8.35
672 735.00 -9.09 -0.33 0.32 -9.57 -8.93
672 736.00 -9.08 -0.03 0.03 -9.27 -9.21
672 737.00 -9.07 0.34 -0.33 -8.88 -9.56
672 738.00 -9.10 -0.86 0.83 -10.10 -8.42
672 739.00 -9.08 -0.06 0.06 -9.30 -9.18
672 740.00 -9.09 -0.85 0.83 -10.10 -8.42
672 741.00 -9.09 -0.77 0.74 -10.00 -8.51
672 742.00 -9.09 -0.23 0.23 -9.48 -9.02
672 743.00 -9.08 0.03 -0.03 -9.20 -9.27
672 744.00 -9.07 0.36 -0.35 -8.87 -9.57
672 745.00 -9.09 -0.67 0.65 -9.92 -8.60
672 746.00 -9.09 -0.46 0.44 -9.70 -8.80
672 747.00 -9.09 -0.48 0.47 -9.73 -8.78
672 748.00 -9.09 -0.47 0.46 -9.72 -8.80
672 749.00 -9.09 -0.50 0.48 -9.75 -8.77
672 750.00 -9.09 -0.45 0.43 -9.69 -8.81
672 751.00 -9.08 -0.16 0.15 -9.39 -9.08
672 752.00 -9.09 -0.47 0.46 -9.72 -8.79
672 753.00 -9.09 -1.18 1.14 -10.40 -8.10
672 754.00 -9.10 -1.22 1.18 -10.50 -8.07
672 755.00 -9.10 -1.26 1.22 -10.50 -8.03
672 756.00 -9.09 -1.23 1.19 -10.50 -8.06
672 757.00 -9.09 -1.22 1.18 -10.50 -8.07
672 758.00 -9.08 -0.88 0.85 -10.10 -8.39
672 759.00 -9.10 -1.26 1.22 -10.50 -8.03
672 760.00 -9.08 -0.74 0.72 -9.98 -8.52
672 761.00 -9.10 -1.22 1.18 -10.50 -8.07
672 762.00 -9.10 -1.55 1.50 -10.80 -7.75
672 763.00 -9.09 -0.95 0.92 -10.20 -8.32
672 764.00 -9.08 -0.66 0.64 -9.89 -8.60
672 765.00 -9.07 -0.28 0.27 -9.51 -8.95
672 766.00 -9.09 -1.48 1.44 -10.70 -7.81
672 767.00 -9.08 -0.69 0.67 -9.92 -8.57
672 768.00 -9.09 -1.48 1.43 -10.70 -7.82
672 769.00 -9.09 -1.39 1.35 -10.60 -7.90
672 770.00 -9.09 -0.86 0.83 -10.10 -8.41
672 771.00 -9.08 -0.59 0.58 -9.83 -8.66
672 772.00 -9.07 -0.27 0.26 -9.49 -8.97
672 773.00 -9.09 -1.29 1.25 -10.50 -7.99
672 774.00 -9.08 -0.78 0.76 -10.00 -8.48
672 775.00 -9.07 -0.18 0.18 -9.41 -9.05
672 776.00 -9.09 -1.08 1.05 -10.30 -8.20
672 777.00 -9.09 -1.11 1.07 -10.40 -8.18
672 778.00 -9.09 -1.10 1.06 -10.30 -8.19
672 779.00 -9.09 -1.12 1.09 -10.40 -8.16
672 780.00 -9.09 -1.07 1.04 -10.30 -8.21
max -8.87 -7.36
min -11.30 -9.57
OK OK

Max Allowable Compression = 26.40 Mpa OK


Mx Allowable Tension = -3.50 Mpa OK

8.6 End Block Design

8.6.1 Calculation of stress behind anchorage as per annex J of EC2-2

Pmax < or = Fck(t)


C*C'

Fck(t) = Concrete strength at the time of tensioning (Cylinder strength)


= 32.00 Mpa
C & C' = Dimensions of thr associated rectangle
= 396 X 396

Pmax = 24.14 Mpa < 32.00 Mpa


C*C' OK

8.6.2 Calculation of Bursting Reinforcement

2 Ypo = width of Bearing plate


= 292.5 mm.
2 Yo = width of End Block
= 4000.0 mm.
For Ypo = 146.3 = 0.0731
Yo 2000.0

Fbst = 0.2600 IRC-112, Table 13.1


Pk

Pk = Max. prestressing force at anchorage end


= 3784.91 KN

Fbst = 0.26
3784.914

Fbst = 0.260 x 3784.914


= 984.08 KN

Permissible stress for Fe - 415 steel = 0.87 x 415


= 361.05 Mpa

Area of steel required = 984077.64 = 2725.60 mm^2


361.05
Provided SPIRAL
f 20 , 10 rounds 2 no

Area of steel provided = 314.159 x 10 x 2


= 6283.19 cm2.
> 2725.60 cm2. ... SAFE

Provided in the region 0.2Yo to 2Yo, i.e 0.4m to 4m

OR
Reinforcement to prevemt bursting should not be less than,
Ast = 0.15*Pmax/Fyd * γ EC2-2, Annex J
= 2725.14 mm^2

Fyd is restricted to 250 to avoid crack width check.

Spiral reinforcement provided, 2 X 20 Dia. -10 legs = 6283.19 mm^2 > 2725.14

OK

8.6.3 Calculation of spalling reinforcement


Min Ast in Each direction = 0.03*Pmax/Fyd*γ EC2-2, Annex J
= 545.03 mm^2
Provide 16 dia. 4 no.s in each direction
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

Forces in pile during construction stages Pile No. 1 to 8

Axial Moment-y Moment-z Axial Moment-y Moment-z


Elem Stage Part Elem Stage Part
(kN) (kN*m) (kN*m) (kN) (kN*m) (kN*m)
1 CS 1 I[308] -392 7 7 1 CS 2 I[308] -952 208 15
1 CS 1 J[381] -656 -4 -3 1 CS 2 J[381] -1217 -219 -1
2 CS 1 I[160] -392 -7 7 2 CS 2 I[160] -747 182 14
2 CS 1 J[356] -656 4 -3 2 CS 2 J[356] -1011 -217 0
3 CS 1 I[294] -392 7 -7 3 CS 2 I[294] -986 208 -13
3 CS 1 J[382] -656 -4 3 3 CS 2 J[382] -1250 -220 3
4 CS 1 I[146] -392 -7 -7 4 CS 2 I[146] -780 181 -12
4 CS 1 J[357] -656 4 3 4 CS 2 J[357] -1045 -217 2
5 CS 1 I[676] -392 7 7 5 CS 2 I[676] -753 -187 10
5 CS 1 J[743] -656 -4 -3 5 CS 2 J[743] -1018 214 -1
6 CS 1 I[525] -392 -7 7 6 CS 2 I[525] -864 -209 10
6 CS 1 J[745] -656 4 -3 6 CS 2 J[745] -1128 215 -1
7 CS 1 I[662] -392 7 -7 7 CS 2 I[662] -720 -187 -12
7 CS 1 J[744] -656 -4 3 7 CS 2 J[744] -985 215 -1
8 CS 1 I[511] -392 -7 -7 8 CS 2 I[511] -831 -209 -12
8 CS 1 J[746] -656 4 3 8 CS 2 J[746] -1095 215 -1

1 CS 3 I[308] -622 -307 10 1 CS 4 I[308] -2358 91 6


1 CS 3 J[381] -887 367 -1 1 CS 4 J[381] -2623 -58 -45
2 CS 3 I[160] -1153 -333 13 2 CS 4 I[160] -2441 -6 7
2 CS 3 J[356] -1417 368 -2 2 CS 4 J[356] -2706 -24 -46
3 CS 3 I[294] -592 -308 -12 3 CS 4 I[294] -1300 76 -76
3 CS 3 J[382] -856 367 -1 3 CS 4 J[382] -1565 -51 -19
4 CS 3 I[146] -1123 -333 -15 4 CS 4 I[146] -1383 10 -78
4 CS 3 J[357] -1387 368 1 4 CS 4 J[357] -1648 -32 -18
5 CS 3 I[676] -1013 331 12 5 CS 4 I[676] -1730 -27 1
5 CS 3 J[743] -1277 -365 1 5 CS 4 J[743] -1994 27 -29
6 CS 3 I[525] -529 312 10 6 CS 4 I[525] -1380 -76 -4
6 CS 3 J[745] -793 -367 2 6 CS 4 J[745] -1644 38 -27
7 CS 3 I[662] -1043 332 -10 7 CS 4 I[662] -996 -37 -44
7 CS 3 J[744] -1307 -366 1 7 CS 4 J[744] -1261 32 -21
8 CS 3 I[511] -559 311 -8 8 CS 4 I[511] -646 -66 -40
8 CS 3 J[746] -823 -367 0 8 CS 4 J[746] -911 32 -23

1 CS 5 I[308] -2160 -236 4 1 CS 6 I[308] -2713 234 58


1 CS 5 J[381] -2425 314 -46 1 CS 6 J[381] -2977 -194 -29
2 CS 5 I[160] -2685 -334 7 2 CS 6 I[160] -2831 101 62
2 CS 5 J[356] -2950 347 -47 2 CS 6 J[356] -3095 -144 -30
3 CS 5 I[294] -1062 -252 -76 3 CS 6 I[294] -2519 229 -70
3 CS 5 J[382] -1326 321 -21 3 CS 6 J[382] -2783 -192 18
4 CS 5 I[146] -1587 -318 -80 4 CS 6 I[146] -2637 105 -73
4 CS 5 J[357] -1851 339 -19 4 CS 6 J[357] -2902 -147 20
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

5 CS 5 I[676] -1894 303 2 5 CS 6 I[676] -1638 -138 24


5 CS 5 J[743] -2159 -341 -28 5 CS 6 J[743] -1903 163 -13
6 CS 5 I[525] -1169 254 -4 6 CS 6 I[525] -1519 -196 21
6 CS 5 J[745] -1434 -332 -25 6 CS 6 J[745] -1784 175 -11
7 CS 5 I[662] -1201 293 -43 7 CS 6 I[662] -1443 -142 -35
7 CS 5 J[744] -1465 -337 -20 7 CS 6 J[744] -1707 165 0
8 CS 5 I[511] -476 264 -37 8 CS 6 I[511] -1323 -193 -32
8 CS 5 J[746] -741 -337 -23 8 CS 6 J[746] -1588 174 -1
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

1 CS 7 I[308] -2351 -392 54 1 CS 8 I[308] -3217 -132 67


1 CS 7 J[381] -2616 514 -30 1 CS 8 J[381] -3481 234 -44
2 CS 7 I[160] -3278 -526 61 2 CS 8 I[160] -3870 -304 73
2 CS 7 J[356] -3542 563 -34 2 CS 8 J[356] -4134 301 -47
3 CS 7 I[294] -2080 -397 -71 3 CS 8 I[294] -2781 -139 -95
3 CS 7 J[382] -2345 516 15 3 CS 8 J[382] -3045 237 18
4 CS 7 I[146] -3007 -521 -78 4 CS 8 I[146] -3434 -296 -101
4 CS 7 J[357] -3271 561 19 4 CS 8 J[357] -3698 297 22
5 CS 7 I[676] -1951 490 27 5 CS 8 I[676] -2237 253 29
5 CS 7 J[743] -2216 -541 -11 5 CS 8 J[743] -2502 -276 -19
6 CS 7 I[525] -1121 434 22 6 CS 8 I[525] -1588 181 23
6 CS 7 J[745] -1385 -530 -8 6 CS 8 J[745] -1852 -258 -16
7 CS 7 I[662] -1833 488 -33 7 CS 8 I[662] -1952 249 -45
7 CS 7 J[744] -2097 -540 3 7 CS 8 J[744] -2217 -274 0
8 CS 7 I[511] -1002 437 -28 8 CS 8 I[511] -1303 186 -40
8 CS 7 J[746] -1267 -531 0 8 CS 8 J[746] -1567 -261 -3

1 CS 9 I[308] -3988 147 72 1 CS 10 I[308] -3998 211 52


1 CS 9 J[381] -4253 -67 -60 1 CS 10 J[381] -4262 -136 -37
2 CS 9 I[160] -4357 -58 77 2 CS 10 I[160] -4331 45 59
2 CS 9 J[356] -4622 15 -62 2 CS 10 J[356] -4596 -96 -40
3 CS 9 I[294] -3254 135 -120 3 CS 10 I[294] -3278 197 -97
3 CS 9 J[382] -3518 -61 16 3 CS 10 J[382] -3543 -130 -5
4 CS 9 I[146] -3623 -46 -125 4 CS 10 I[146] -3612 59 -104
4 CS 9 J[357] -3887 10 19 4 CS 10 J[357] -3876 -104 -1
5 CS 9 I[676] -2541 -3 27 5 CS 10 I[676] -2542 -106 8
5 CS 9 J[743] -2805 10 -32 5 CS 10 J[743] -2806 122 -10
6 CS 9 I[525] -2085 -93 21 6 CS 10 I[525] -2103 -157 -1
6 CS 9 J[745] -2350 36 -29 6 CS 10 J[745] -2367 105 -6
7 CS 9 I[662] -1965 -11 -62 7 CS 10 I[662] -1949 -117 -42
7 CS 9 J[744] -2229 14 -6 7 CS 10 J[744] -2213 127 -28
8 CS 9 I[511] -1509 -84 -56 8 CS 10 I[511] -1510 -146 -34
8 CS 9 J[746] -1774 32 -9 8 CS 10 J[746] -1775 99 -31

Max compressive force = -4622 KN ML 15 MT -62.48


Max tensile force = -476 KN ML 264 MT -37

Max MT = 563 KN-M P -3542 MT -34


Min MT = -541 KN-M P -2216 MT -11

Max ML = 77 KN-M P -4357 ML -58


Min ML = -125 KN-M P -3623 ML -46

8.2 Piles,Piercap and piers are modelled in Midas as line elements.


Pilecap has been modelled with four noded plates supported on piles. Piles of 1.2m dia are modelled
upto point of fixity and defined as fixed supports at that level.
All loads are applied on Piercap and piers appropriately.Support reactions are further used for design of piles
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

Thickness of soil layer on pilecap 690 mm


Hence soil load on pilecap applied in Midas model= 0.69 x 18 = 12.42 kN/sqm
Vertically downwards

The support reactions from Midas analysis results are further used

8.3 The following table shows vertical support reactions from Midas Pile Capacity Check
Combination for pile capacity check 357 356 743 744 746 745

L/C Pile-1 Pile-2 Pile-3 Pile-4 Pile-5 Pile-6 Pile-7 Pile-8 *All Loads are in kN

809 2882 4311 4561 3133 2111 2656 2359 1814


810 3286 4581 4785 3490 2148 2614 2390 1923
811 3362 4571 4762 3552 2199 2586 2366 1980
812 3122 4436 4644 3330 2150 2620 2386 1915
813 2958 4301 4538 3195 2163 2627 2336 1871
814 2756 4188 4533 3101 2059 2624 2257 1693
815 3416 4516 4706 3606 2237 2569 2330 1999
816 2912 4239 4507 3180 2157 2607 2282 1832
817 3353 4416 4642 3580 2234 2540 2268 1961
818 3376 4425 4650 3602 2233 2533 2270 1970
819 3136 4331 4562 3368 2201 2569 2294 1926
820 2935 4248 4515 3203 2156 2599 2284 1840
821 2742 4169 4530 3103 2047 2610 2236 1672
822 3404 4437 4667 3634 2247 2541 2245 1951
823 2945 4347 4671 3269 2051 2621 2247 1676
825 3286 4581 4785 3490 2148 2614 2390 1923
826 3343 4549 4717 3511 2265 2655 2363 1973
827 3163 4463 4723 3424 2120 2605 2295 1810
828 3098 4285 4616 3428 2119 2562 2161 1718
829 2846 4233 4679 3291 1972 2581 2110 1501
830 3438 4546 4718 3610 2297 2621 2317 1993
831 2930 4312 4648 3266 2067 2598 2212 1681
832 3311 4396 4584 3498 2321 2604 2281 1998
833 3346 4411 4611 3546 2309 2592 2264 1981
834 3182 4349 4630 3463 2164 2559 2217 1822
835 3013 4279 4627 3361 2080 2569 2171 1681
836 2829 4199 4647 3277 1972 2572 2107 1507
837 3384 4426 4638 3596 2295 2580 2246 1961
838 2915 3765 4303 3454 2052 2394 2096 1754
839 2996 3819 4348 3525 2060 2385 2102 1776
840 3011 3817 4343 3537 2070 2380 2097 1787
841 2963 3790 4319 3493 2060 2387 2101 1774
842 2931 3763 4298 3466 2063 2388 2091 1766
843 2890 3740 4297 3447 2042 2387 2075 1730
844 3022 3806 4332 3548 2078 2376 2090 1791
845 2921 3750 4292 3463 2062 2384 2080 1758
846 3010 3786 4319 3543 2077 2371 2077 1784
847 3014 3787 4321 3547 2077 2369 2078 1785
848 2966 3769 4303 3501 2071 2376 2083 1777
849 2926 3752 4294 3468 2062 2383 2081 1760
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

850 2887 3736 4297 3448 2040 2385 2071 1726


851 3020 3790 4324 3554 2080 2371 2073 1782
852 2928 3772 4325 3481 2040 2387 2073 1727
853 2996 3819 4348 3525 2060 2385 2102 1776
854 3008 3812 4334 3529 2083 2394 2096 1786
855 2972 3795 4335 3512 2054 2384 2083 1753
856 2959 3760 4314 3513 2054 2375 2056 1735
857 2908 3749 4326 3485 2025 2379 2046 1692 *All Loads are in kN
858 3027 3812 4334 3549 2090 2387 2087 1790
859 2925 3765 4320 3480 2044 2382 2066 1728
860 3001 3782 4307 3527 2094 2383 2080 1791
861 3008 3785 4313 3536 2092 2381 2077 1788
862 2975 3772 4317 3520 2063 2374 2067 1756
863 2942 3758 4316 3499 2046 2376 2058 1728
864 2905 3742 4320 3482 2025 2377 2045 1693
865 3016 3788 4318 3546 2089 2379 2073 1784
866 2904 3860 4318 3361 2036 2484 2109 1661
867 2984 3914 4363 3433 2043 2475 2115 1683
868 2999 3913 4358 3445 2053 2470 2110 1694
869 2951 3886 4335 3401 2044 2476 2114 1681
870 2919 3859 4313 3374 2046 2478 2104 1672
871 2878 3836 4313 3355 2025 2477 2088 1637
872 3010 3901 4347 3456 2061 2466 2103 1698
873 2909 3846 4307 3371 2045 2474 2093 1665
874 2998 3881 4334 3451 2060 2460 2091 1690
875 3002 3883 4336 3455 2060 2459 2091 1692
876 2954 3864 4318 3408 2054 2466 2096 1683
877 2914 3848 4309 3375 2045 2472 2094 1666
878 2876 3832 4312 3355 2023 2474 2084 1633
879 3008 3886 4339 3462 2063 2461 2086 1688
880 2916 3868 4340 3388 2024 2477 2086 1634
881 2984 3914 4363 3433 2043 2475 2115 1683
882 2996 3908 4349 3437 2067 2483 2110 1693
883 2960 3891 4351 3419 2038 2473 2096 1660
884 2947 3855 4329 3420 2037 2465 2069 1642
885 2896 3845 4342 3393 2008 2468 2059 1598
886 3015 3907 4350 3457 2073 2477 2100 1697
887 2913 3861 4336 3388 2027 2472 2079 1634
888 2989 3878 4323 3434 2078 2473 2093 1698
889 2996 3880 4328 3444 2075 2471 2090 1694
890 2963 3868 4332 3427 2046 2464 2080 1663
891 2930 3854 4331 3407 2030 2466 2071 1634
892 2893 3838 4335 3390 2008 2467 2058 1600
893 3004 3883 4333 3454 2073 2468 2086 1690
894 2281 3712 5065 3634 1592 2134 2976 2434
895 2685 3982 5289 3991 1629 2093 3007 2543
896 2761 3973 5265 4053 1680 2064 2983 2600
897 2521 3838 5148 3831 1630 2098 3002 2534
898 2357 3703 5041 3696 1643 2105 2953 2491
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

899 2155 3590 5037 3602 1540 2102 2874 2313


900 2815 3917 5209 4107 1718 2047 2947 2618
901 2311 3640 5010 3681 1638 2085 2898 2451
902 2752 3817 5145 4080 1715 2019 2885 2581
903 2775 3826 5154 4103 1714 2011 2887 2590
904 2535 3732 5066 3868 1682 2047 2911 2546
905 2334 3649 5019 3704 1637 2078 2901 2460
906 2141 3570 5033 3604 1527 2088 2853 2292
907 2803 3838 5170 4135 1727 2019 2862 2570
908 2343 3748 5175 3770 1532 2099 2864 2296
909 2685 3982 5289 3991 1629 2093 3007 2543
910 2742 3951 5221 4012 1746 2134 2980 2593
911 2562 3864 5227 3925 1601 2083 2912 2429
912 2497 3687 5119 3929 1600 2041 2778 2338
913 2245 3634 5182 3792 1452 2059 2727 2121
914 2837 3947 5222 4111 1778 2099 2934 2613
915 2329 3713 5152 3767 1547 2076 2829 2300
916 2710 3798 5087 3999 1802 2082 2898 2617
917 2745 3812 5114 4047 1790 2070 2881 2600
918 2581 3751 5134 3964 1645 2037 2834 2442
919 2412 3680 5131 3862 1561 2048 2788 2301
920 2228 3600 5150 3778 1453 2050 2724 2126
921 2783 3827 5141 4097 1775 2058 2863 2581
922 2641 4561 4805 2884 1858 2875 2610 1593
923 3044 4831 5029 3242 1895 2834 2641 1702
924 3120 4822 5005 3304 1946 2805 2617 1758
925 2881 4687 4888 3082 1897 2840 2637 1693
926 2717 4552 4781 2946 1910 2847 2587 1650
927 2515 4439 4777 2853 1806 2843 2508 1472
928 3175 4767 4949 3357 1984 2788 2581 1777
929 2671 4489 4751 2932 1904 2826 2533 1610
930 3112 4666 4886 3331 1981 2760 2519 1740
931 3135 4675 4894 3353 1980 2752 2521 1748
932 2895 4581 4806 3119 1948 2788 2545 1705
933 2694 4498 4759 2954 1903 2819 2535 1619
934 2501 4420 4773 2855 1793 2829 2487 1451
935 3163 4687 4910 3386 1994 2760 2496 1729
936 2703 4597 4915 3021 1798 2841 2498 1455
937 3044 4831 5029 3242 1895 2834 2641 1702
938 3102 4800 4961 3263 2012 2875 2614 1752
939 2922 4713 4967 3176 1867 2824 2546 1588
940 2857 4536 4859 3180 1866 2782 2412 1497
941 2605 4484 4922 3043 1719 2800 2361 1280
942 3197 4796 4962 3362 2044 2840 2568 1772
943 2689 4563 4892 3018 1814 2818 2463 1459
944 3069 4647 4827 3250 2068 2824 2532 1776
945 3105 4661 4854 3297 2056 2811 2515 1759
946 2941 4600 4874 3215 1911 2779 2468 1601
947 2771 4529 4871 3113 1827 2789 2422 1460
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

948 2587 4449 4890 3029 1719 2791 2358 1285


949 3143 4676 4881 3347 2042 2799 2497 1740

Max Load 3438 4831 5289 4135 2321 2875 3007 2618
Min Load 2141 3570 4292 2853 1452 2011 2045 1280

PC1 Seismic/Wind Normal Case PC2 Seismic/Wind Normal case


Max Pile load 5289 kN 4785 kn 3007 kN 2656 kn

Min Pile load 2141 kN 2742 kn 1280 kN 1501 kn

9.4 Evaluation of Pile capacity


For PC1
Pile dia = 1.2 m Socketing considered = 4.5 m

Refereing to Geo-technical report, recommended design parameters are


Safe end bearing = 200 T/m2
Safe Friction = 15 T/m3
Hence pile capacity
p /4 x d2 x 200 + p x d x 4.5 x 15
0.7855 x 1.44 x 200 + 3.14 x 1.2 x 4.5 x 15
226.224 + 255
480.73 t ( For 4.5 m socketing )
Recommended pile capacity 481 t Limiting 600 t/m² (As per tender)
as per soil report
i.e. in nonseismic cases the permissible pile load
= 4807 kN

and in seismic/Wind cases permissible pile load


= 4807.3 x 1.25
= 6009.1 kN

Check for pile max and min loads


Max Pile loads Capacity Check
Normal case 4785 4807 OK
809 to 836

Seismic cases 4638 6009 OK


(837 to 892)

Wind cases 5289 6009 OK


(893 to 849)

Minimum pile load = 2141.3 KN


Minimum pile loads are greater than zero, hence No tension in Pile

For PC2
Pile dia = 1.2 m Socketing considered = 3.6 m

Refereing to Geo-technical report, recommended design parameters are


Safe end bearing = 200 T/m2
Safe Friction = 15 T/m3
Hence pile capacity
p /4 x d2 x 200 + p x d x 3.6 x 15
0.7855 x 1.44 x 200 + 3.14 x 1.2 x 3.6 x 15
226.224 + 204
429.83 t ( For 3.6 m socketing )
Recommended pile capacity 430 t Limiting 600 t/m² (As per tender)
as per soil report
i.e. in nonseismic cases the permissible pile load
= 4298 kN

and in seismic/Wind cases permissible pile load


= 4298.3 x 1.25
= 5372.8 kN
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

Check for pile max and min loads


Max Pile loads Capacity Check
Normal case 2656 4298 OK
809 to 836

Seismic cases 2580 5373 OK


(837 to 892)

Wind cases 3007 5373 OK


(893 to 849)

Minimum pile load = 1279.7 KN


Minimum pile loads are greater than zero, hence No tension in Pile

8.5 Forces for pile design

8.5.1 Pile loads ULS CASE


Table showing Pile reactions at point of fixity of Pile for ULS load cases:
*All Loads are in kN
L/C Pile-1 Pile-2 Pile-3 Pile-4 L/C Pile-5 Pile-6 Pile-7 Pile-8
501 3661 5902 6523 4282 501 2136 2908 4130 3358
502 4266 5902 6860 4819 502 2191 2846 4176 3521
503 4380 5902 6825 4912 503 2268 2803 4141 3606
504 4021 5902 6648 4578 504 2194 2855 4170 3509
505 3775 5902 6488 4375 505 2213 2865 4095 3444
506 3472 5902 6481 4235 506 2059 2860 3978 3176
507 4462 5902 6740 4992 507 2325 2778 4087 3634
508 3706 5902 6442 4354 508 2205 2835 4014 3384
509 4367 5902 6645 4952 509 2320 2735 3993 3578
510 4402 5902 6657 4986 510 2319 2724 3996 3591
511 4042 5902 6525 4634 511 2271 2778 4032 3526
512 3741 5902 6454 4387 512 2204 2824 4017 3397
513 3451 5902 6477 4238 513 2039 2839 3945 3145
514 4443 5902 6682 5034 514 2339 2736 3959 3563
515 3754 5902 6689 4487 515 2045 2856 3962 3151
516 4266 5902 6860 4819 516 2191 2846 4176 3521
517 4353 5902 6758 4850 517 2367 2907 4136 3596
518 4083 5902 6767 4719 518 2149 2832 4034 3351
519 3984 5902 6605 4726 519 2149 2768 3834 3214
520 3606 5902 6700 4520 520 1927 2795 3757 2888
521 4495 5902 6759 4999 521 2415 2856 4067 3626
522 3733 5902 6654 4483 522 2069 2821 3910 3158
523 4304 5902 6557 4831 523 2451 2831 4013 3633
524 4357 5902 6598 4902 524 2433 2812 3987 3608
525 4111 5902 6627 4778 525 2215 2763 3917 3370
526 3857 5902 6623 4625 526 2089 2778 3847 3158
527 3581 5902 6652 4499 527 1927 2782 3752 2897
528 4414 5902 6638 4977 528 2411 2794 3960 3578
529 3540 5902 6493 4900 529 1935 2413 4250 3772
530 4004 5902 6751 5312 530 1977 2365 4286 3897
531 4091 5902 6724 5383 531 2036 2333 4259 3962
532 3816 5902 6588 5127 532 1979 2372 4281 3888
533 3627 5902 6466 4971 533 1994 2380 4224 3837
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

534 3395 5902 6461 4864 534 1875 2376 4133 3632
535 4154 5902 6659 5444 535 2080 2313 4217 3984
536 3611 5902 6620 5057 536 1865 2373 4121 3613
537 4004 5902 6751 5312 537 1977 2365 4286 3897
538 4070 5902 6673 5336 538 2112 2412 4255 3955
539 3863 5902 6680 5235 539 1945 2355 4176 3766
540 3788 5902 6556 5240 540 1944 2306 4023 3661
541 3498 5902 6628 5083 541 1774 2327 3964 3412
542 4179 5902 6674 5450 542 2148 2373 4202 3978
543 3574 5902 6431 4955 543 1987 2357 4161 3792
544 4081 5902 6586 5414 544 2076 2280 4145 3941
545 4108 5902 6595 5440 545 2075 2272 4148 3951
546 3832 5902 6494 5170 546 2038 2313 4175 3901
547 3601 5902 6440 4981 547 1986 2348 4164 3802
548 3379 5902 6457 4867 548 1860 2360 4108 3608
549 4140 5902 6615 5477 549 2090 2281 4119 3929
550 3595 5902 6593 5054 550 1883 2347 4082 3618
551 4033 5902 6519 5321 551 2176 2354 4161 3983
552 4073 5902 6550 5375 552 2162 2340 4141 3963
553 3884 5902 6572 5280 553 1995 2302 4087 3781
554 3690 5902 6569 5163 554 1898 2314 4034 3619
555 3478 5902 6592 5066 555 1774 2316 3960 3418
556 4117 5902 6581 5433 556 2146 2325 4120 3941
557 4079 5902 6103 3776 557 2334 3525 3701 2510
558 4543 5902 6361 4188 558 2376 3477 3737 2635
559 4631 5902 6334 4259 559 2435 3444 3710 2701
560 4355 5902 6199 4003 560 2378 3484 3732 2626
561 4167 5902 6076 3847 561 2393 3492 3675 2576
562 3935 5902 6071 3740 562 2274 3488 3585 2371
563 4693 5902 6269 4320 563 2479 3425 3668 2722
564 4151 5902 6230 3933 564 2264 3485 3572 2352
565 4543 5902 6361 4188 565 2376 3477 3737 2635
566 4610 5902 6283 4212 566 2511 3524 3706 2693
567 4403 5902 6290 4111 567 2344 3466 3627 2505
568 4327 5902 6166 4116 568 2343 3418 3474 2400
569 4038 5902 6238 3959 569 2173 3438 3415 2150
570 4719 5902 6284 4326 570 2548 3485 3653 2716
571 4114 5902 6041 3831 571 2386 3469 3612 2530
572 4621 5902 6196 4290 572 2475 3392 3596 2679
573 4648 5902 6205 4316 573 2474 3384 3599 2689
574 4371 5902 6105 4046 574 2437 3425 3626 2639
575 4141 5902 6050 3857 575 2386 3460 3615 2540
576 3919 5902 6067 3743 576 2259 3472 3559 2347
577 4679 5902 6225 4353 577 2490 3393 3570 2667
578 4135 5902 6203 3930 578 2283 3458 3533 2357
579 4572 5902 6129 4197 579 2575 3466 3612 2721
580 4613 5902 6160 4251 580 2561 3452 3592 2702
581 4424 5902 6183 4156 581 2395 3414 3538 2519
582 4229 5902 6179 4039 582 2298 3425 3485 2357
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

583 4018 5902 6202 3942 583 2173 3428 3411 2157
584 4656 5902 6191 4309 584 2545 3437 3571 2679
585 3540 5902 6493 4900 585 1935 2413 4250 3772
586 4004 5902 6751 5312 586 1977 2365 4286 3897
587 4091 5902 6724 5383 587 2036 2333 4259 3962
588 3816 5902 6588 5127 588 1979 2372 4281 3888
589 3627 5902 6466 4971 589 1994 2380 4224 3837
590 3395 5902 6461 4864 590 1875 2376 4133 3632
591 4154 5902 6659 5444 591 2080 2313 4217 3984
592 3611 5902 6620 5057 592 1865 2373 4121 3613
593 4004 5902 6751 5312 593 1977 2365 4286 3897
594 4070 5902 6673 5336 594 2112 2412 4255 3955
595 3863 5902 6680 5235 595 1945 2355 4176 3766
596 3788 5902 6556 5240 596 1944 2306 4023 3661
597 3498 5902 6628 5083 597 1774 2327 3964 3412
598 4179 5902 6674 5450 598 2148 2373 4202 3978
599 3574 5902 6431 4955 599 1987 2357 4161 3792
600 4081 5902 6586 5414 600 2076 2280 4145 3941
601 4108 5902 6595 5440 601 2075 2272 4148 3951
602 3832 5902 6494 5170 602 2038 2313 4175 3901
603 3601 5902 6440 4981 603 1986 2348 4164 3802
604 3379 5902 6457 4867 604 1860 2360 4108 3608
605 4140 5902 6615 5477 605 2090 2281 4119 3929
606 3595 5902 6593 5054 606 1883 2347 4082 3618
607 4033 5902 6519 5321 607 2176 2354 4161 3983
608 4073 5902 6550 5375 608 2162 2340 4141 3963
609 3884 5902 6572 5280 609 1995 2302 4087 3781
610 3478 5902 6592 5066 610 1774 2316 3960 3418
611 3478 5902 6592 5066 611 1774 2316 3960 3418
612 4117 5902 6581 5433 612 2146 2325 4120 3941
613 4536 5902 5376 4621 613 2663 2839 2996 2820
614 4617 5902 5421 4693 614 2670 2831 3002 2841
615 4632 5902 5416 4705 615 2681 2825 2997 2853
616 4584 5902 5392 4661 616 2671 2832 3001 2840
617 4551 5902 5371 4633 617 2673 2833 2991 2831
618 4511 5902 5370 4615 618 2653 2833 2975 2795
619 4643 5902 5405 4716 619 2688 2822 2990 2856
620 4549 5902 5398 4648 620 2651 2832 2973 2792
621 4617 5902 5421 4693 621 2670 2831 3002 2841
622 4628 5902 5407 4697 622 2694 2839 2997 2851
623 5473 5902 5650 5244 623 3018 2886 3186 3318
624 4579 5902 5387 4680 624 2665 2820 2956 2800
625 4529 5902 5399 4653 625 2635 2824 2946 2757
626 4647 5902 5407 4717 626 2700 2832 2987 2855
627 4542 5902 5365 4631 627 2672 2829 2980 2823
628 4630 5902 5392 4710 628 2687 2816 2977 2849
629 4635 5902 5394 4715 629 2687 2814 2978 2851
630 4587 5902 5376 4668 630 2681 2822 2983 2842
631 4547 5902 5367 4635 631 2672 2828 2981 2825
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

632 4508 5902 5370 4615 632 2650 2830 2971 2791
633 4640 5902 5397 4721 633 2690 2816 2973 2847
634 4546 5902 5393 4648 634 2654 2827 2966 2793
635 4622 5902 5380 4694 635 2705 2829 2980 2856
636 4629 5902 5386 4704 636 2702 2826 2977 2853
637 4596 5902 5390 4687 637 2673 2820 2967 2821
638 4562 5902 5389 4667 638 2657 2822 2958 2793
639 4525 5902 5393 4650 639 2635 2822 2945 2758
640 4636 5902 5391 4714 640 2700 2824 2973 2849
641 4518 5902 5399 4483 641 2638 2974 3015 2680
642 4599 5902 5444 4554 642 2645 2965 3022 2702
643 4614 5902 5439 4566 643 2656 2960 3017 2713
644 4566 5902 5415 4522 644 2646 2966 3021 2700
645 4533 5902 5394 4495 645 2648 2968 3011 2691
646 4493 5902 5393 4476 646 2628 2967 2995 2656
647 4625 5902 5428 4577 647 2663 2956 3010 2717
648 4531 5902 5421 4510 648 2626 2967 2993 2652
649 4599 5902 5444 4554 649 2645 2965 3022 2702
650 4610 5902 5430 4558 650 2669 2973 3016 2712
651 4574 5902 5431 4541 651 2640 2963 3003 2679
652 4561 5902 5410 4542 652 2640 2955 2976 2661
653 4511 5902 5422 4514 653 2610 2959 2966 2617
654 4629 5902 5430 4578 654 2675 2967 3007 2716
655 4528 5902 5416 4509 655 2629 2962 2986 2653
656 4604 5902 5403 4556 656 2680 2963 3000 2716
657 4611 5902 5409 4565 657 2677 2961 2996 2713
658 4578 5902 5413 4549 658 2648 2954 2987 2681
659 4544 5902 5412 4528 659 2632 2956 2978 2653
660 4508 5902 5416 4511 660 2610 2957 2965 2618
661 4619 5902 5414 4575 661 2675 2958 2993 2709
662 4524 5902 5388 4492 662 2647 2964 3000 2683
663 4612 5902 5415 4572 663 2662 2950 2997 2709
664 4617 5902 5417 4576 664 2662 2949 2998 2711
665 4569 5902 5399 4530 665 2656 2956 3002 2702
666 4529 5902 5390 4497 666 2647 2962 3000 2685
667 4490 5902 5393 4477 667 2625 2964 2991 2651
668 4623 5902 5420 4583 668 2665 2951 2993 2707

Max 5473 5902 6860 5477


Min 1774 2272 2945 2150

8.5.2 Support moments Mx & Mz


Table showing moments at bottom of pile in two orthoginal directions
L/C Pile-1 Pile-2 Pile-3 Pile-4
R=sqrt( R=sqrt(
R=sqrt(M R=sqrt(Mx
Mx Mz x2+Mz2) Mx Mz 2+Mz2) Mx Mz Mx2+M Mx Mz Mx2+
z2) Mz2)

501 912.1 242 944 1045 250 1075 1048 107 1054 908 117 915
502 898.6 355 966 1045 250 1075 1049 206 1069 894.6 215 920 *All Loads are in kN
503 893.6 384 972 1045 250 1075 1046 233 1071 889.7 242 922
504 902.9 341 965 1045 250 1075 1047 199 1065 899 208 923
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

505 907.2 270 947 1045 250 1075 1045 134 1053 903.1 143 914
506 914.2 99 920 1045 250 1075 1047 -33 1047 909.7 -23 910
507 888.5 377 965 1045 250 1075 1040 227 1065 884.7 235 915
508 907.2 217 933 1045 250 1075 1043 82 1046 903 91 908
509 888.1 320 944 1045 250 1075 1037 173 1051 884.1 180 902
510 887.1 330 946 1045 250 1075 1037 182 1053 883.1 189 903
511 897.7 302 947 1045 250 1075 1040 162 1052 893.6 170 910
512 906.2 226 934 1045 250 1075 1042 91 1046 902 100 907
513 914.2 78 917 1045 250 1075 1046 -53 1048 909.6 -43 911
514 885.9 302 936 1045 250 1075 1037 153 1048 881.9 160 896
515 909.3 114 916 1045 250 1075 1049 -24 1050 905 -15 905
516 898.6 355 966 1045 250 1075 1049 206 1069 894.6 215 920
517 894.2 349 960 1045 250 1075 1045 200 1064 890.5 209 915
518 901 236 931 1045 250 1075 1047 91 1051 896.9 100 902
519 897.9 107 904 1045 250 1075 1040 -34 1041 893.6 -25 894
520 910.1 -75 913 1045 250 1075 1048 -212 1069 905.3 -202 928
521 888.3 347 953 1045 250 1075 1041 196 1059 884.6 203 908
522 908.5 100 914 1045 250 1075 1048 -38 1048 904.1 -28 905
523 890 321 946 1045 250 1075 1037 175 1051 886.2 183 905
524 888.4 306 940 1045 250 1075 1036 160 1049 884.6 167 900
525 895.5 205 919 1045 250 1075 1040 61 1042 891.3 69 894
526 902.5 85 907 1045 250 1075 1043 -54 1045 898.1 -45 899
527 909.8 -73 913 1045 250 1075 1047 -208 1067 905.1 -199 927
528 886.7 292 933 1045 250 1075 1036 144 1046 882.9 151 896
529 682.1 -145 697 1045 250 1075 816 -278 862.1 675.4 -271 728
530 671.7 -59 674 1045 250 1075 817 -202 841.38 665.1 -196 693
531 667.9 -37 669 1045 250 1075 814 -181 833.8 661.3 -175 684
532 675 -70 679 1045 250 1075 815 -208 840.78 668.4 -201 698
533 678.3 -124 689 1045 250 1075 813 -257 852.84 671.6 -251 717
534 683.7 -255 730 1045 250 1075 815 -385 901.32 676.7 -378 775
535 664 -41 665 1045 250 1075 810 -186 831 657.5 -180 682
536 679.9 -243 722 1045 250 1075 817 -379 900.43 673 -372 769
537 671.7 -59 674 1045 250 1075 817 -202 841.38 665.1 -196 693
538 668.3 -63 671 1045 250 1075 813 -206 839 661.9 -201 692
539 673.6 -150 690 1045 250 1075 815 -290 865.6 666.9 -284 725
540 671.2 -248 716 1045 250 1075 810 -386 897.08 664.3 -380 765
541 680.5 -388 783 1045 250 1075 816 -522 968.65 673.3 -515 848
542 663.8 -65 667 1045 250 1075 810 -210 837.19 657.4 -205 689
543 678.3 -165 698 1045 250 1075 812 -297 864.4 671.5 -290 732
544 663.7 -85 669 1045 250 1075 807 -227 838.83 657.1 -222 694
545 662.9 -78 667 1045 250 1075 807 -221 836.88 656.3 -216 691
546 671 -99 678 1045 250 1075 810 -236 843.21 664.3 -230 703
547 677.5 -158 696 1045 250 1075 812 -290 862 670.7 -284 728
548 683.7 -271 736 1045 250 1075 815 -401 907.89 676.6 -394 783
549 661.9 -99 669 1045 250 1075 807 -242 842.72 655.4 -238 697
550 679.3 -254 725 1045 250 1075 816 -389 903.63 672.3 -382 773
551 665.1 -85 670 1045 250 1075 807 -225 837.94 658.7 -220 695
552 663.9 -96 671 1045 250 1075 807 -237 841.14 657.4 -232 697
553 669.3 -174 692 1045 250 1075 810 -313 868.19 662.6 -307 730
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

554 674.7 -265 725 1045 250 1075 812 -401 905.85 667.8 -395 776
555 680.3 -386 782 1045 250 1075 815 -519 966.37 673.1 -513 846
556 662.6 -107 671 1045 250 1075 807 -250 844.59 656.1 -245 700
557 929.4 653 1136 1045 250 1075 1066 518 1185 929.1 528 1069
558 919 740 1180 1045 250 1075 1066 594 1221 918.8 603 1099
559 915.2 761 1190 1045 250 1075 1064 615 1229 915 624 1107
560 922.3 728 1175 1045 250 1075 1064 588 1216 922.1 598 1099
561 925.6 674 1145 1045 250 1075 1063 539 1192 925.3 548 1076
562 931 543 1078 1045 250 1075 1065 411 1141 930.4 421 1021
563 911.2 757 1184 1045 250 1075 1060 610 1223 911.1 618 1101
564 927.2 555 1081 1045 250 1075 1067 417 1145 926.7 427 1020
565 919 740 1180 1045 250 1075 1066 594 1221 918.8 603 1099
566 915.6 735 1174 1045 250 1075 1063 590 1215 915.6 598 1094
567 920.9 648 1126 1045 250 1075 1065 505 1179 920.6 515 1055
568 918.4 550 1070 1045 250 1075 1060 410 1136 918 419 1009
569 927.8 410 1014 1045 250 1075 1066 274 1100 927 284 969
570 911.1 733 1169 1045 250 1075 1060 586 1211 911.1 594 1088
571 925.6 633 1121 1045 250 1075 1061 499 1173 925.2 509 1056
572 911 713 1157 1045 250 1075 1057 569 1200 910.8 577 1078
573 910.2 720 1161 1045 250 1075 1057 575 1203 910 583 1081
574 918.3 699 1154 1045 250 1075 1059 560 1198 918 569 1080
575 924.8 640 1125 1045 250 1075 1061 506 1176 924.4 515 1058
576 931 527 1070 1045 250 1075 1064 395 1135 930.3 405 1015
577 909.2 699 1147 1045 250 1075 1057 553 1193 909.1 561 1068
578 926.5 544 1074 1045 250 1075 1065 407 1140 926 417 1015
579 912.4 713 1158 1045 250 1075 1057 571 1201 912.3 579 1080
580 911.2 702 1150 1045 250 1075 1057 559 1195 911.1 567 1073
581 916.6 624 1109 1045 250 1075 1060 483 1164 916.3 492 1040
582 922 533 1065 1045 250 1075 1062 395 1133 921.5 404 1006
583 927.6 412 1015 1045 250 1075 1065 276 1100 926.8 286 970
584 909.9 691 1142 1045 250 1075 1057 546 1189 909.8 554 1065
585 682.1 -145 697 1045 250 1075 816 -278 862.1 675.4 -271 728
586 671.7 -59 674 1045 250 1075 817 -202 841.38 665.1 -196 693
587 667.9 -37 669 1045 250 1075 814 -181 833.8 661.3 -175 684
588 675 -70 679 1045 250 1075 815 -208 840.78 668.4 -201 698
589 678.3 -124 689 1045 250 1075 813 -257 852.84 671.6 -251 717
590 683.7 -255 730 1045 250 1075 815 -385 901.32 676.7 -378 775
591 664 -41 665 1045 250 1075 810 -186 831 657.5 -180 682
592 679.9 -243 722 1045 250 1075 817 -379 900.43 673 -372 769 *All Loads are in kN
593 671.7 -59 674 1045 250 1075 817 -202 841.38 665.1 -196 693
594 668.3 -63 671 1045 250 1075 813 -206 839 661.9 -201 692
595 673.6 -150 690 1045 250 1075 815 -290 865.6 666.9 -284 725
596 671.2 -248 716 1045 250 1075 810 -386 897.08 664.3 -380 765
597 680.5 -388 783 1045 250 1075 816 -522 968.65 673.3 -515 848
598 663.8 -65 667 1045 250 1075 810 -210 837.19 657.4 -205 689
599 678.3 -165 698 1045 250 1075 812 -297 864.4 671.5 -290 732
600 663.7 -85 669 1045 250 1075 807 -227 838.83 657.1 -222 694
601 662.9 -78 667 1045 250 1075 807 -221 836.88 656.3 -216 691
602 671 -99 678 1045 250 1075 810 -236 843.21 664.3 -230 703
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

603 677.5 -158 696 1045 250 1075 812 -290 862 670.7 -284 728
604 683.7 -271 736 1045 250 1075 815 -401 907.89 676.6 -394 783
605 661.9 -99 669 1045 250 1075 807 -242 842.72 655.4 -238 697
606 679.3 -254 725 1045 250 1075 816 -389 903.63 672.3 -382 773
607 665.1 -85 670 1045 250 1075 807 -225 837.94 658.7 -220 695
608 663.9 -96 671 1045 250 1075 807 -237 841.14 657.4 -232 697
609 669.3 -174 692 1045 250 1075 810 -313 868.19 662.6 -307 730
610 680.3 -386 782 1045 250 1075 815 -519 966.37 673.1 -513 846
611 680.3 -386 782 1045 250 1075 815 -519 966.37 673.1 -513 846
612 662.6 -107 671 1045 250 1075 807 -250 844.59 656.1 -245 700
613 377.7 366 526 1045 250 1075 510 235 561.74 376.3 238 446
614 375.8 381 535 1045 250 1075 510 249 567.54 374.6 252 451
615 375.2 385 537 1045 250 1075 510 252 568.69 373.9 255 453
616 376.4 379 534 1045 250 1075 510 248 566.77 375.1 251 451
617 377 370 528 1045 250 1075 510 239 562.82 375.7 242 447
618 377.9 347 513 1045 250 1075 510 217 554 376.6 220 436
619 374.5 384 536 1045 250 1075 509 251 567.72 373.2 254 452
620 377.3 349 514 1045 250 1075 510 218 554.78 375.9 221 436
621 375.8 381 535 1045 250 1075 510 249 567.54 374.6 252 451
622 375.3 380 534 1045 250 1075 510 248 566.64 374 251 450
623 356.6 667 756 1045 250 1075 508 518 725.5 356.2 520 630
624 375.8 348 512 1045 250 1075 509 217 553.2 374.4 220 434
625 377.4 324 497 1045 250 1075 510 193 545.31 376 196 424
626 374.5 380 533 1045 250 1075 509 247 565.93 373.2 250 449
627 377 362 523 1045 250 1075 509 232 559.71 375.7 235 443
628 374.5 376 531 1045 250 1075 509 244 564.16 373.2 247 447
629 374.3 377 532 1045 250 1075 509 245 564.62 373 248 448
630 375.7 374 530 1045 250 1075 509 243 563.81 374.4 246 448
631 376.9 364 524 1045 250 1075 509 233 560.15 375.5 236 444
632 377.9 344 511 1045 250 1075 510 214 552.9 376.6 217 435
633 374.2 374 529 1045 250 1075 509 242 563 372.9 244 446
634 377.2 347 512 1045 250 1075 510 216 553.87 375.8 219 435
635 374.7 376 531 1045 250 1075 509 245 564.23 373.4 247 448
636 374.5 374 530 1045 250 1075 508 242 563.32 373.2 245 447
637 375.4 361 521 1045 250 1075 509 229 558.25 374.1 232 440
638 376.4 345 511 1045 250 1075 509 214 552.5 375 217 433
639 377.3 324 497 1045 250 1075 510 193 545.3 375.9 196 424
640 374.3 372 528 1045 250 1075 508 240 562.38 373 243 445
641 450.3 432 624 1045 250 1075 583 301 656 449.4 305 543
642 448.5 447 633 1045 250 1075 583 314 662.29 447.6 318 549
643 447.8 451 635 1045 250 1075 582 318 663.58 447 322 551
644 449.1 445 632 1045 250 1075 583 313 661.5 448.2 317 549
645 449.6 435 626 1045 250 1075 582 305 657.22 448.8 309 545
646 450.6 413 611 1045 250 1075 583 283 647.48 449.6 286 533
647 447.1 450 634 1045 250 1075 582 317 662.6 446.3 321 550
648 449.9 415 612 1045 250 1075 583 284 648.28 449 287 533
649 448.5 447 633 1045 250 1075 583 314 662.29 447.6 318 549
650 447.9 446 632 1045 250 1075 582 314 661.38 447.1 317 548
651 448.8 431 622 1045 250 1075 583 299 654.91 447.9 303 541
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

652 448.4 414 610 1045 250 1075 582 282 646.67 447.5 286 531
653 450 389 595 1045 250 1075 583 259 637.61 449.1 262 520
654 447.1 446 631 1045 250 1075 582 313 660.65 446.3 316 547
655 449.8 413 610 1045 250 1075 583 282 647.29 448.9 286 532
656 447.3 442 629 1045 250 1075 581 310 658.87 446.5 314 546
657 447.1 440 627 1045 250 1075 581 308 657.88 446.3 312 544
658 448.1 427 619 1045 250 1075 582 295 652.27 447.2 299 538
659 449 411 609 1045 250 1075 582 280 645.84 448.1 283 530
660 450 390 595 1045 250 1075 583 259 637.63 449 263 520
661 446.9 438 626 1045 250 1075 581 306 656.86 446.1 310 543
662 449.6 428 621 1045 250 1075 582 298 653.84 448.7 302 541
663 447.1 442 629 1045 250 1075 581 310 658.78 446.2 313 545
664 447 443 630 1045 250 1075 581 311 659.29 446.1 315 546
665 448.4 440 628 1045 250 1075 582 308 658.37 447.5 312 546
666 449.5 430 622 1045 250 1075 582 299 654.32 448.6 303 541
667 450.6 410 609 1045 250 1075 583 280 646.24 449.6 284 532
668 446.8 440 627 1045 250 1075 581 307 657.48 445.9 311 544

Max= 1190.43 1075.019 1229 1107

Max Moment at Pile Bottom = 1228.5

9.0 Pile Reinforcement design: ULS condition

8.1 Pile has been designed for vertical loads on piles (including its self weight) and moments.
Pile is considered to be fixed at depth of fixity. The shear force in horizontal directions at the pile top will
cause moments in pile. Additional moment due to shift or tilt in piles is also considered.
The pile has been designed for vertical loads and the total moment.

L = centreline of pile cap to


centreline of socketing le = 0.7l0
= 8.80
8.80
t = pile cap thk 1.8 6.16 m
t1 = socketing thk 0
(conservative side)
Shift to be considered = 58.7 mm

8.2 Sample Calculations:-

L/C 559 Pile -P3


Bending moments Mx = 1064
Mz= 615
R2= 1063.5847 ^2 + 614.881 ^2
R= 1228.5 kNm

Verical Load = Pile reaction at bottom of Pile in ULS case


6334 kN

Shift considered - 75 mm
Hence Moment due to shift = 6334 x 75 /1000 = 475 kNm

Hence Total Moment = 1228.5 + 475


= 1703.6 kNm

8.3 Table showing design forces for Pile design at bottom of Pile -3
Load *All Loads are in kN
Comb. M Pile bottom
Total & Moments in kNm
Mmt Due to
P Tilt ( P*tilt dist) moment
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK
M Pile bottom Total
Mmt Due to
S.No P Tilt ( P*tilt dist) moment
501 6523 382.7 1053.7 1436.4
502 6860 402.4 1069.3 1471.8
503 6825 400.4 1071.2 1471.6
504 6648 390.0 1065.2 1455.3
505 6488 380.6 1053.1 1433.7
506 6481 380.2 1047.3 1427.6
507 6740 395.4 1065.0 1460.4
508 6442 377.9 1046.0 1424.0
509 6645 389.8 1051.5 1441.3
510 6657 390.5 1052.6 1443.2
511 6525 382.8 1052.2 1435.0
512 6454 378.7 1046.4 1425.1
513 6477 380.0 1047.8 1427.7
514 6682 392.0 1047.9 1439.9
515 6689 392.4 1049.8 1442.2
516 6860 402.4 1069.3 1471.8
517 6758 396.5 1063.7 1460.1
518 6767 397.0 1051.4 1448.4
519 6605 387.5 1040.9 1428.4
520 6700 393.0 1069.3 1462.4
521 6759 396.5 1059.2 1455.7
522 6654 390.4 1048.4 1438.8
523 6557 384.7 1051.3 1436.0
524 6598 387.1 1048.7 1435.8
525 6627 388.8 1042.0 1430.8
526 6623 388.5 1044.7 1433.2
527 6652 390.3 1067.3 1457.6
528 6638 389.5 1046.2 1435.7
529 6493 380.9 862.1 1243.0
530 6751 396.0 841.4 1237.4
531 6724 394.5 833.8 1228.3
532 6588 386.5 840.8 1227.3
533 6466 379.3 852.8 1232.2
534 6461 379.0 901.3 1280.4
535 6659 390.7 831.0 1221.7
536 6620 388.4 900.4 1288.8
537 6751 396.0 841.4 1237.4
538 6673 391.5 839.0 1230.5
539 6680 391.9 865.6 1257.5
540 6556 384.6 897.1 1281.7
541 6628 388.9 968.7 1357.5
542 6674 391.5 837.2 1228.7
543 6431 377.3 864.4 1241.7
544 6586 386.4 838.8 1225.2
545 6595 386.9 836.9 1223.8
546 6494 381.0 843.2 1224.2
547 6440 377.8 862.0 1239.8
548 6457 378.8 907.9 1286.7
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

549 6615 388.1 842.7 1230.8


550 6593 386.8 903.6 1290.4
551 6519 382.5 837.9 1220.4
552 6550 384.3 841.1 1225.4
553 6572 385.6 868.2 1253.8
554 6569 385.4 905.9 1291.2
555 6592 386.7 966.4 1353.1
556 6581 386.1 844.6 1230.7
557 6103 358.0 1184.8 1542.9
558 6361 373.2 1220.7 1593.9
559 6334 371.6 1228.5 1600.1
560 6199 363.6 1216.1 1579.8
561 6076 356.5 1191.6 1548.0
562 6071 356.2 1141.1 1497.3
563 6269 367.8 1222.8 1590.6
564 6230 365.5 1145.3 1510.8
565 6361 373.2 1220.7 1593.9
566 6283 368.6 1215.5 1584.1
567 6290 369.0 1179.0 1548.0
568 6166 361.7 1136.3 1498.0
569 6238 366.0 1100.2 1466.2
570 6284 368.6 1211.3 1579.9
571 6041 354.4 1172.9 1527.3
572 6196 363.5 1200.4 1563.9
573 6205 364.1 1203.3 1567.4
574 6105 358.1 1198.0 1556.2
575 6050 354.9 1175.5 1530.5
576 6067 355.9 1135.2 1491.1
577 6225 365.2 1192.9 1558.1
578 6203 363.9 1140.3 1504.3
579 6129 359.6 1200.9 1560.5
580 6160 361.4 1195.2 1556.6
581 6183 362.7 1164.4 1527.1
582 6179 362.5 1132.9 1495.4
583 6202 363.8 1099.9 1463.7
584 6191 363.2 1189.4 1552.6
585 6493 380.9 862.1 1243.0
586 6751 396.0 841.4 1237.4
587 6724 394.5 833.8 1228.3
588 6588 386.5 840.8 1227.3
589 6466 379.3 852.8 1232.2
590 6461 379.0 901.3 1280.4
591 6659 390.7 831.0 1221.7
592 6620 388.4 900.4 1288.8
593 6751 396.0 841.4 1237.4
594 6673 391.5 839.0 1230.5
595 6680 391.9 865.6 1257.5
596 6556 384.6 897.1 1281.7
597 6628 388.9 968.7 1357.5
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

598 6674 391.5 837.2 1228.7


599 6431 377.3 864.4 1241.7
600 6586 386.4 838.8 1225.2
601 6595 386.9 836.9 1223.8
602 6494 381.0 843.2 1224.2
603 6440 377.8 862.0 1239.8
604 6457 378.8 907.9 1286.7
605 6615 388.1 842.7 1230.8
606 6593 386.8 903.6 1290.4
607 6519 382.5 837.9 1220.4
608 6550 384.3 841.1 1225.4
609 6572 385.6 868.2 1253.8
610 6592 386.7 966.4 1353.1
611 6592 386.7 966.4 1353.1
612 6581 386.1 844.6 1230.7
613 5376 315.4 561.7 877.1
614 5421 318.0 567.5 885.5
615 5416 317.7 568.7 886.4
616 5392 316.4 566.8 883.1
617 5371 315.1 562.8 877.9
618 5370 315.1 554.0 869.1
619 5405 317.1 567.7 884.8
620 5398 316.7 554.8 871.5
621 5421 318.0 567.5 885.5
622 5407 317.2 566.6 883.9
623 5650 331.4 725.5 1056.9
624 5387 316.0 553.2 869.2
625 5399 316.8 545.3 862.1
626 5407 317.2 565.9 883.2
627 5365 314.7 559.7 874.5
628 5392 316.3 564.2 880.5
629 5394 316.4 564.6 881.0
630 5376 315.4 563.8 879.2
631 5367 314.8 560.1 875.0
632 5370 315.0 552.9 867.9
633 5397 316.6 563.0 879.6
634 5393 316.4 553.9 870.3
635 5380 315.6 564.2 879.9
636 5386 316.0 563.3 879.3
637 5390 316.2 558.2 874.4
638 5389 316.2 552.5 868.7
639 5393 316.4 545.3 861.7
640 5391 316.3 562.4 878.7
641 5399 316.7 656.0 972.7
642 5444 319.4 662.3 981.7
643 5439 319.1 663.6 982.7
644 5415 317.7 661.5 979.2
645 5394 316.5 657.2 973.7
646 5393 316.4 647.5 963.9
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

647 5428 318.4 662.6 981.0


648 5421 318.0 648.3 966.3
649 5444 319.4 662.3 981.7
650 5430 318.6 661.4 979.9
651 5431 318.6 654.9 973.5
652 5410 317.4 646.7 964.0
653 5422 318.1 637.6 955.7
654 5430 318.6 660.7 979.2
655 5416 317.8 647.3 965.0
656 5403 317.0 658.9 975.9
657 5409 317.3 657.9 975.2
658 5413 317.5 652.3 969.8
659 5412 317.5 645.8 963.3
660 5416 317.7 637.6 955.4
661 5414 317.6 656.9 974.5
662 5388 316.1 653.8 969.9
663 5415 317.7 658.8 976.5
664 5417 317.8 659.3 977.1
665 5399 316.7 658.4 975.1
666 5390 316.2 654.3 970.5
667 5393 316.4 646.2 962.6
668 5420 318.0 657.5 975.5

Max P 6860 LC 502


Min P 1774 LC 610
Max Moment 1600 LC 559

10 PILE STRESS CHECK

SLS Rare combination results

PILE 1 PILE 2 PILE 3 PILE 4


MY
FZ MX MY MX MY FZ MX MY FZ MX
Load FZ (kN) (kN*
(kN) (kN*m) (kN*m) (kN*m) (kN*m) (kN) (kN*m) (kN*m) (kN) (kN*m)
m)
669 2587 602 -219 4004 698 -214 4893 702 -318 3477 598 -312
LL 670 2991 593 -143 4274 699 -139 5118 702 -252 3835 589 -246
Leading 671 3067 589 -125 4265 697 -120 5094 700 -234 3897 585 -228
672 2827 596 -153 4129 697 -148 4977 701 -257 3674 592 -251
673 2663 598 -200 3995 696 -195 4870 699 -300 3539 594 -294
674 2462 603 -314 3882 697 -309 4866 701 -411 3446 599 -405
675 3121 586 -129 4209 693 -125 5038 696 -238 3950 582 -233
676 2650 600 -304 4040 699 -299 5004 703 -406 3613 596 -399
677 2991 593 -143 4274 699 -139 5118 702 -252 3835 589 -246
678 3049 590 -147 4243 696 -143 5050 699 -256 3856 586 -251
679 2869 594 -223 4156 698 -218 5056 701 -329 3768 590 -323
680 2803 592 -309 3978 693 -304 4948 696 -412 3773 588 -407
681 2551 600 -430 3926 698 -425 5011 702 -530 3636 596 -524
682 3143 586 -149 4239 694 -145 5051 697 -259 3955 582 -254
683 2636 599 -314 4005 698 -308 4981 701 -415 3611 595 -408
684 3016 587 -167 4090 691 -163 4916 694 -272 3843 583 -268
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

685 3051 586 -176 4104 691 -172 4943 694 -283 3890 582 -278
686 2887 591 -244 4042 693 -240 4963 696 -348 3807 586 -343
687 2718 595 -323 3972 695 -319 4960 698 -425 3706 591 -420
688 2534 600 -429 3892 697 -423 4979 701 -528 3621 596 -522
689 3089 585 -186 4119 690 -182 4970 694 -293 3940 581 -289
690 2617 598 -236 3932 695 -231 4839 698 -334 3525 594 -329
691 3058 586 -167 4109 691 -163 4974 694 -274 3924 582 -269
692 3082 585 -160 4118 691 -157 4983 694 -268 3946 581 -264
693 2841 592 -179 4024 693 -174 4895 696 -281 3712 588 -276
694 2641 598 -230 3941 694 -225 4847 698 -329 3547 594 -323 P ML MT
695 2448 603 -328 3862 697 -323 4862 700 -425 3448 599 -419 2448 603 -328
696 3109 584 -179 4130 691 -175 4999 694 -287 3979 580 -283 3862 697 -323
697 2803 701 100 4513 801 107 4737 802 0 3027 699 8 4683 798 -16
698 3207 692 176 4783 801 182 4962 802 67 3385 690 73 2996 700 -85
699 3283 688 195 4774 799 200 4938 800 85 3447 687 91
700 3043 695 166 4639 800 172 4821 800 62 3225 693 68
701 2879 697 119 4504 798 125 4714 799 18 3089 696 26
702 2678 702 5 4391 800 11 4710 801 -93 2996 700 -85
703 3337 685 191 4719 796 196 4882 796 81 3500 683 87
704 2866 699 15 4550 801 22 4848 802 -87 3164 697 -80
705 3207 692 176 4783 801 182 4962 802 67 3385 690 73
706 3264 689 172 4752 799 177 4894 799 63 3406 687 69
707 3084 693 96 4666 800 102 4900 801 -10 3319 692 -4
708 3019 691 11 4488 795 16 4792 796 -93 3323 689 -87
709 2767 699 -111 4436 800 -104 4855 802 -212 3186 697 -205
710 3359 685 170 4749 796 175 4895 797 60 3505 683 65
711 2833 697 83 4442 797 90 4683 798 -16 3075 696 -9
712 3274 685 153 4618 793 158 4818 794 45 3474 683 50
713 3297 684 159 4627 793 164 4827 794 50 3497 682 56
714 3057 691 140 4534 795 146 4739 796 37 3262 689 43
715 2856 697 90 4451 797 96 4692 798 -10 3097 695 -3
716 2663 702 -9 4372 799 -3 4706 800 -107 2998 700 -99
717 3325 683 140 4639 793 145 4843 794 31 3529 682 37
718 2851 698 6 4515 800 12 4825 801 -96 3161 696 -89
719 3232 686 153 4599 793 158 4760 794 46 3393 685 52
720 3267 685 143 4614 793 148 4787 794 36 3441 683 41
721 3103 690 75 4552 795 81 4807 796 -30 3358 688 -24
722 2934 694 -4 4482 797 2 4804 798 -107 3256 692 -100
723 2750 699 -109 4401 799 -103 4823 801 -210 3172 697 -202
724 3305 684 133 4629 793 138 4814 794 25 3491 682 31
wind 725 2518 437 -481 3471 531 -477 4857 536 -578 3904 431 -574
Leading 726 2821 431 -424 3674 531 -421 5026 536 -528 4173 425 -524
727 2878 428 -410 3667 529 -407 5008 534 -514 4219 422 -511
728 2698 433 -431 3565 530 -428 4920 535 -532 4052 427 -528
729 2575 435 -466 3464 529 -463 4840 534 -564 3951 429 -560
730 2424 438 -552 3379 530 -548 4836 535 -648 3881 432 -643
731 2918 426 -413 3625 527 -410 4966 532 -517 4259 420 -515 P ML MT
732 2565 436 -544 3498 531 -541 4940 536 -643 4006 430 -639 2413 438 -563
733 2821 431 -424 3674 531 -421 5026 536 -528 4173 425 -524
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

734 2864 428 -427 3650 529 -424 4975 534 -531 4188 423 -528 4523 702 113
735 2729 432 -484 3585 530 -480 4979 535 -586 4123 426 -582
736 2680 430 -548 3452 526 -545 4898 532 -648 4126 424 -645 5026 536 -528
737 2491 436 -639 3413 530 -635 4946 536 -737 4023 430 -733
738 2935 425 -428 3648 527 -426 4975 532 -533 4262 420 -530 4280 418 -552
739 2554 436 -551 3472 530 -548 4923 536 -650 4005 429 -646
740 2839 426 -441 3535 525 -439 4874 530 -543 4178 421 -541
741 2866 425 -448 3546 525 -446 4895 530 -551 4214 420 -548
742 2743 429 -499 3500 526 -496 4909 532 -600 4152 423 -597
743 2616 433 -559 3447 528 -556 4907 533 -658 4076 427 -655
744 2478 436 -638 3387 529 -634 4922 535 -735 4012 430 -731
745 2894 425 -456 3558 525 -453 4915 530 -559 4252 419 -557
746 2540 435 -493 3417 528 -490 4817 533 -590 3940 429 -586
747 2871 425 -441 3550 525 -439 4918 530 -545 4239 420 -542
748 2889 425 -437 3557 525 -434 4924 530 -540 4256 419 -538
749 2708 430 -450 3486 526 -448 4858 532 -550 4080 424 -547
750 2558 434 -488 3424 528 -485 4823 533 -586 3957 428 -582
751 2413 438 -563 3365 529 -559 4834 535 -658 3882 432 -654
752 2909 424 -450 3566 525 -448 4937 530 -555 4280 418 -552
753 2878 602 51 4320 701 57 4597 702 -47 3155 601 -41
754 3180 595 108 4523 702 113 4766 703 2 3423 594 8
755 3237 593 122 4516 700 127 4748 701 16 3470 591 21
756 3058 598 101 4415 700 106 4660 701 -1 3303 596 4
757 2935 600 66 4313 699 71 4580 700 -34 3201 598 -28
758 2783 603 -20 4229 700 -14 4577 702 -117 3131 601 -111
759 3278 590 119 4474 697 124 4706 698 13 3510 589 18
760 2924 601 -12 4348 702 -7 4680 703 -113 3257 599 -107
761 3180 595 108 4523 702 113 4766 703 2 3423 594 8
762 3224 593 105 4499 699 110 4715 700 0 3439 592 5
763 3089 597 48 4435 701 54 4719 702 -55 3373 595 -50
764 3040 595 -16 4301 697 -11 4638 698 -117 3377 593 -112
765 2851 601 -107 4262 701 -101 4686 702 -206 3274 599 -200
766 3295 590 104 4497 698 109 4715 699 -3 3513 589 2
767 2914 600 -19 4321 701 -14 4663 702 -120 3255 599 -114
768 3199 591 91 4385 695 95 4615 696 -13 3429 590 -8
769 3226 590 84 4396 695 88 4635 696 -21 3465 589 -16
770 3103 594 33 4349 697 38 4649 698 -70 3403 592 -65
771 2976 597 -27 4297 698 -21 4647 700 -127 3326 596 -122
772 2838 601 -106 4236 700 -100 4662 702 -205 3263 599 -199
773 3254 590 76 4407 695 81 4655 696 -29 3502 588 -24
774 2773 603 -31 4214 700 -25 4574 701 -127 3133 601 -121
775 2662 606 -98 4165 701 -92 4602 703 -193 3100 604 -187
776 2900 600 39 4266 698 44 4557 699 -60 3191 598 -54
777 3231 590 91 4399 695 95 4658 697 -14 3490 589 -9
778 3248 590 95 4406 695 100 4664 697 -10 3507 588 -5
779 3068 595 82 4336 697 87 4598 698 -20 3331 593 -14
780 2918 599 44 4273 698 49 4563 699 -55 3207 598 -49

PILE 5 PILE 6 PILE 7 PILE 8


NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

MY
FZ MX MY MX MY FZ MX MY FZ MX
Load FZ (kN) (kN*
(kN) (kN*m) (kN*m) (kN*m) (kN*m) (kN) (kN*m) (kN*m) (kN) (kN*m)
m)
LL 669 1816 227 -351 2346 282 -349 2750 282 -406 2221 226 -403

Leading 670 1853 224 -422 2304 279 -420 2781 280 -478 2329 222 -475

671 1904 221 -439 2276 277 -438 2758 277 -496 2386 219 -494

672 1855 224 -414 2310 279 -413 2777 280 -470 2321 222 -468

673 1868 224 -368 2317 279 -367 2727 280 -424 2278 223 -422

674 1765 229 -259 2314 281 -257 2648 282 -311 2099 228 -309 P ML MT
675 1942 219 -434 2259 275 -433 2721 275 -491 2405 217 -489 1677 232 -143
676 1756 229 -266 2311 281 -264 2638 282 -318 2083 228 -315 2223 281 -257
677 1853 224 -422 2304 279 -420 2781 280 -478 2329 222 -475 2278 379 130
678 1970 220 -413 2345 277 -412 2754 278 -471 2380 219 -469 1403 332 136
679 1825 225 -343 2295 279 -342 2686 279 -397 2216 224 -395

680 1824 224 -259 2252 276 -258 2552 277 -311 2125 223 -309

681 1677 232 -143 2271 281 -141 2501 281 -192 1907 231 -189

682 2002 218 -410 2311 275 -409 2708 275 -467 2400 217 -466

683 1772 228 -256 2288 280 -255 2603 280 -309 2087 227 -306

684 2026 217 -394 2294 274 -394 2672 274 -452 2404 216 -450

685 2014 217 -385 2282 273 -385 2655 274 -442 2387 216 -440

686 1869 222 -322 2249 276 -321 2608 276 -376 2228 221 -374

687 1785 226 -246 2259 278 -245 2562 278 -298 2087 225 -296

688 1677 231 -145 2262 280 -143 2498 281 -194 1913 230 -191

689 2000 217 -375 2269 273 -375 2637 273 -431 2367 216 -430

690 1862 224 -334 2297 278 -332 2673 279 -388 2238 223 -386

691 1939 218 -397 2230 273 -397 2659 274 -453 2367 217 -452

692 1938 218 -404 2223 273 -403 2661 274 -459 2376 217 -458

693 1906 221 -388 2259 276 -387 2685 276 -444 2332 219 -442

694 1861 224 -340 2289 278 -339 2675 279 -394 2247 223 -392

695 1752 229 -245 2300 281 -243 2627 281 -298 2078 228 -295

696 1952 218 -384 2231 273 -384 2636 273 -439 2357 216 -438

697 1976 326 -27 2790 382 -24 2530 381 -81 1716 327 -78

698 2013 323 -98 2749 380 -95 2561 378 -153 1825 324 -150

699 2064 320 -116 2720 377 -113 2538 376 -171 1882 321 -168

700 2014 323 -90 2755 380 -88 2557 378 -146 1817 324 -142

701 2027 324 -45 2762 380 -42 2507 378 -100 1773 324 -96

702 1924 328 65 2758 382 68 2429 380 13 1595 329 17

703 2102 318 -110 2704 375 -109 2502 374 -166 1900 319 -163

704 1915 328 58 2756 382 61 2418 380 6 1578 329 10

705 2013 323 -98 2749 380 -95 2561 378 -153 1825 324 -150

706 2130 320 -89 2790 378 -87 2535 376 -146 1875 321 -143

707 1985 324 -20 2740 380 -17 2466 378 -73 1711 325 -69

708 1984 324 65 2697 377 67 2333 375 13 1620 325 17

709 1836 331 181 2715 381 184 2282 379 132 1403 332 136

710 2162 317 -86 2755 376 -85 2489 374 -143 1895 318 -140

711 2022 324 -10 2741 379 -8 2453 377 -64 1733 325 -60

712 2099 318 -74 2675 374 -72 2439 372 -128 1863 319 -126

713 2098 317 -80 2668 374 -78 2441 372 -135 1872 318 -132

714 2066 320 -64 2703 376 -62 2465 375 -119 1828 321 -116

715 2021 323 -16 2734 379 -14 2455 377 -70 1742 324 -67
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

716 1911 328 78 2745 382 81 2407 380 27 1574 330 31

717 2111 317 -60 2675 374 -59 2417 372 -115 1852 318 -112

718 1931 327 67 2733 381 70 2384 378 16 1582 328 20

719 2185 316 -71 2739 374 -69 2453 372 -127 1899 317 -125

720 2174 316 -61 2727 374 -60 2435 372 -117 1882 317 -115

721 2029 321 1 2694 376 3 2389 374 -52 1724 323 -49

722 1944 326 77 2704 379 80 2342 376 27 1583 327 30

723 1837 331 179 2706 381 182 2278 379 130 1408 332 134

724 2159 316 -52 2714 374 -50 2417 372 -107 1863 318 -104

725 1687 162 -519 2007 214 -518 2818 216 -573 2499 159 -572

Wind 726 1715 160 -572 1976 212 -572 2841 215 -627 2580 156 -626

Leadng 727 1753 158 -585 1954 210 -585 2824 213 -641 2623 154 -640

728 1716 160 -567 1980 212 -566 2838 215 -622 2574 157 -620

729 1726 160 -532 1985 212 -532 2801 215 -587 2541 157 -586

730 1648 164 -450 1983 214 -449 2742 216 -502 2408 161 -501

731 1782 156 -582 1942 209 -581 2797 211 -637 2637 153 -636

732 1642 164 -455 1981 214 -454 2734 216 -508 2395 161 -506

733 1715 160 -572 1976 212 -572 2841 215 -627 2580 156 -626

734 1803 157 -566 2007 211 -566 2822 213 -622 2618 154 -621

735 1694 161 -513 1969 212 -513 2770 214 -567 2495 158 -566

736 1693 160 -450 1937 210 -450 2670 212 -502 2427 157 -501

737 1583 166 -363 1951 213 -362 2632 215 -413 2264 163 -411

738 1827 155 -564 1981 209 -564 2787 211 -619 2633 152 -619

739 1654 163 -448 1964 213 -448 2708 215 -500 2398 160 -499

740 1844 155 -552 1968 208 -552 2760 210 -608 2636 152 -607

741 1835 155 -545 1959 208 -545 2747 210 -600 2623 152 -599

742 1727 159 -498 1934 210 -498 2712 212 -551 2504 156 -550

743 1664 162 -441 1942 211 -440 2677 213 -492 2399 159 -491

744 1583 165 -365 1944 213 -364 2629 215 -415 2268 163 -413

745 1825 155 -537 1950 208 -537 2734 210 -592 2609 152 -592

746 1721 160 -506 1970 212 -506 2760 214 -560 2511 157 -559

747 1779 156 -554 1920 208 -554 2750 210 -609 2609 153 -608

748 1779 155 -559 1915 208 -559 2751 210 -613 2615 152 -613
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

749 1755 157 -547 1942 210 -547 2769 212 -602 2582 154 -601

750 1721 160 -511 1965 211 -510 2762 214 -565 2518 157 -563

751 1639 164 -440 1973 214 -439 2726 216 -492 2392 161 -490

752 1789 155 -544 1921 207 -544 2733 210 -598 2601 152 -598

753 1953 328 20 2748 382 23 2452 380 -32 1657 329 -29

754 1981 325 -33 2717 380 -30 2475 379 -86 1739 326 -83

755 2019 323 -46 2696 378 -44 2458 377 -100 1782 324 -97

756 1982 325 -27 2721 380 -25 2472 379 -81 1733 326 -77

757 1992 325 7 2727 380 10 2435 378 -46 1700 327 -43

758 1914 329 89 2724 382 92 2376 380 38 1567 330 42

759 2048 321 -42 2683 377 -40 2431 375 -96 1796 322 -93

760 1908 329 84 2722 382 87 2368 380 33 1554 330 37

761 1981 325 -33 2717 380 -30 2475 379 -86 1739 326 -83

762 2069 322 -27 2748 379 -24 2456 377 -81 1777 324 -78

763 1960 326 26 2710 380 29 2404 378 -26 1654 327 -23

764 1959 325 89 2678 378 92 2304 376 39 1585 327 42

765 1849 331 176 2692 381 179 2266 379 128 1423 332 132

766 2093 321 -24 2722 377 -22 2421 375 -79 1792 322 -76

767 1920 328 91 2705 381 94 2342 379 40 1557 329 44

768 2110 320 -13 2710 376 -11 2394 374 -67 1795 321 -64

769 2102 320 -6 2700 376 -3 2381 374 -59 1782 321 -57

770 1993 324 41 2676 377 44 2346 376 -10 1663 325 -7

771 1930 327 99 2683 379 101 2311 377 48 1557 328 52

772 1849 331 174 2685 381 178 2263 379 126 1427 332 130

773 2091 320 2 2691 376 4 2368 374 -52 1767 321 -49

774 1905 329 99 2714 382 102 2360 380 49 1551 330 53

775 1789 333 162 2683 383 166 2306 381 114 1412 334 119

776 1987 325 33 2711 380 36 2394 378 -19 1670 327 -16

777 2045 321 -15 2662 376 -13 2384 374 -68 1768 322 -65

778 2045 321 -19 2656 376 -17 2386 374 -72 1774 322 -70

779 2021 323 -8 2683 378 -6 2403 376 -61 1741 324 -58

780 1987 325 28 2706 379 31 2396 378 -24 1677 326 -21

10.2 Crack Width check

Load Combination 5000 Quasi Permanent Comb

MX MY
Node FX (kN) FZ (kN)
(kN*m) (kN*m)

356 -44 4084 -64 -198


357 -43 3642 35 -196
381 -12 3632 -62 -101
382 -13 3190 34 -103
743 36 2442 -36 175
744 36 2139 14 173
745 20 1969 -34 126
746 21 1666 12 127
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

Quasi Permanent combination P ML MT


LC 5000 4084 -198 -64

Governing case 2000


crack width = 3*acr* em on safe side without stiffening effect
Bar spacing 94.26 mm
Bar dia 16 mm
fy = 500 n/mm2
C min = 75 mm clear cover
a cr = 96.3 mm
d = 1200 mm over all depth
a' = 1200 mm depth upto location under consideration
x = 643.0 mm depth of NA
s st = 0.0 N/mm2
e1 = 0.000E+00
es = 0.000E+00
em = 0.000E+00
crack width = 0.0000 < 0.2 hence OK

Refer BT annexure sst = 0.0

Spacing of bar = 120.0 mm

Refer IRC 112 Table 12.4 Crack width less than 0.2 mm

10.3 Design of pile

Pile Loads - PC1-

Mmt due to
Case P Mx Mz R= √Mx2+Mz2 Total Moment LC
tilt/shift
Pmax 6860 1049 206 1069.3 402.4 1471.8 502
Pmin 3379 685 495 845.1 198.2 1043.4 548
Mmax 6717 1067 749 1303.6 394.1 1697.7 558
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

Pile loads - PC2-

Mmt due to
Case L/C P Mx Mz R= √Mx2+Mz2 Total Moment LC
tilt/shift
Pmax 4286 1295 397.0 1354.5 251.4 1605.9 530
Pmin 1774 900 260.0 936.8 104.1 1040.9 541
Mmax 4260 1540 323 1573.5 249.9 1823.4 531

Grade 45 mpa D= 1200 mm fyd= 435


Ac= PI()/4*1200*1200
= 1130973.4
Reinforcement required is checked using charts of Design Aids to IS 456.
d'/ D = 0.1 chart 60
d'/ D = 0.05 chart 59
M Mu/ Fck D ³ P Pu/fck D ² r / fck
PC1 1471.8 0.019 6859.55 0.106 0.005 ____Pmax
1043.4 0.013 3378.83 0.052 0.003 ____Pmin
1697.7 0.022 6717.00 0.104 0.005 _____Max Moment

PC2 1605.9 0.021 4285.51 0.066 0.0185 ____Pmax


1040.9 0.013 1774.20 0.027 0.015 ____Pmin
1823.4 0.023 4260.00 0.066 0.0185 _____Max Moment

As min = max(0.1 x NED / fyd, or 0.002Ac) As per IRC 112:2011 CL.16.2.2


N ed design axial compressive force

0.1 x NED / fyd = (0.1 x6859.551532x1000)/435= 1576.9 sqmm

0.002Ac = 0.002x1130973.4= 2261.9 sqmm

Hence As min = max of above two 2261.95 sqmm


r= 0.019 x 45 = 0.833 %
Ast = 0.833 x 1130973.4 /100 = 9415 mm2
provide 20 dia bar with 32 nos.

Ast provided = 10053 mm2

10.4 DUCTILE DETAILING IN PILES

Ductile detailing has been carried out in piles as the structure is in seismic zone-III. IRC:112-
Section 17.3.2 has been refered.

i) Check for Confinement reinforment requirement:-

nk = NED / AC fck > 0.08

NED = Design value of applied axial force


= 8189 kN Max axial force extracted from Midas analysis results

AC = 0.7854 x 1200 ^2 sqmm


= 1130976 sqmm

fck = 45 Mpa fcd= 20.1


fyd = 435 Mpa
nk = = 8189 x 1000
1130976 x 45

= 0.161 >0.08, Hence,Confinement in Pile is required

ii) Spacing SL required :- Clause 17.2.1.3


i) 5 x Min Longitudianl Bar Dia
100 mm
ii) 1/5 X core dia
Core Domensions b= 1200 - 100 = 1100 mm
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

= (1 / 5) x 1100
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

= 220 mm

Therefore SL = Min of I & II 100


Provide = 90 mm C/C

iii) For Circular hoops the minimum design confining R/F

wwd = Max(1.4ww req; 0.18)

Ac +0.13 x fyd (rL-0.01)


ww req = 0.37 nk
Acc fcd

Ac = Gross area of conrete section = 1130976 sqmm

Acc = Confined core Area = 0.7854x1100^2= 950334 sqmm

rL= R/F ratio of longitudinal Reinofrcement= 0.833

1130976 +0.13 x 435 X 0.0083 -0.01


ww req = 0.37 0.1609
950334 20.1

= 0.06614
Hence wwd = Max(ww req; 0.18)
= 0.18

iv) Evaluation of Area of link required


……Refer 17.2.1.1-(4)
Dsp=Diameter of spiral or hoop bar
= 1100 mm
wwd = rwx fyd/fc
4*Asp fyd
0.18 x
= SL x Dsp fcd

0.18 = 4*Asw 435


x
90 x 1100 20.1

0.18 = 0.0002186039 X 4 X Asp

Asp= 205.85172 sqmm

Dia of hoop reqd 16.189 mm Hence provide 16

Hence, Provide links 16 dia at 90 c/c

v) Extent of confinenment

Refer Clause 17.2.1.4


nk = 0.1609 nk<0.3

Extent of confinement = 3 X Dia


3600 mm from pile head

11.0 Pilecap design:PC1


The pilecap has been designed for the pile loads which are extracted from
Midas analysis results.The mometns at the face of pier has been determined in longitudinal and
Transverse direction.For these moment pilecap reinforcement has been designed.

X
0.80 3.00 0.80 Pilecap thk= 1.8 m

0.80 Dist between CL of piles


& face of pier

1 2
1.95 0.3

4.60
2.4 3.00
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

Y
Longitudinal
direction

3 4
0.80

0.525 4.60

Dist between CL of piles


& face of pier

5
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

Longitudinal Design:
Load Load on pile Load Load on pile
Comb. 1+3 2+4 Comb. 1+3 2+4
S.No KN KN S.No KN KN
NORMAL Seismic
501 9563 10806 613 10438 9997
502 10168 11678 614 10519 10113
503 10282 11736 615 10534 10121
504 9923 11226 616 10486 10053
505 9677 10863 617 10453 10005
506 9374 10716 618 10413 9985
507 10364 11732 619 10545 10120
508 9608 10796 620 10451 10046
509 10269 11597 621 10519 10113
510 10304 11643 622 10530 10104
511 9944 11160 623 11375 10893
512 9643 10842 624 10481 10067
513 9353 10715 625 10431 10052
514 10345 11716 626 10549 10124
515 9656 11175 627 10444 9996
516 10168 11678 628 10532 10102
517 10255 11608 629 10537 10109
518 9985 11486 630 10489 10044
519 9886 11331 631 10449 10002
520 9508 11220 632 10410 9985
521 10397 11758 633 10542 10118
522 9635 11137 634 10448 10041
523 10206 11388 635 10524 10075
524 10259 11499 636 10531 10089
525 10013 11405 637 10498 10077
526 9759 11247 638 10464 10056
527 9483 11151 639 10427 10043
528 10316 11615 640 10538 10105
529 9442 11393 641 10420 9881
530 9906 12062 642 10501 9998
531 9993 12107 643 10516 10005
532 9718 11716 644 10468 9937
533 9529 11438 645 10435 9889
534 9297 11325 646 10395 9869
535 10056 12103 647 10527 10005
536 9513 11677 648 10433 9931
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

537 9906 12062 649 10501 9998


538 9972 12008 650 10512 9988
539 9765 11915 651 10476 9972
540 9690 11796 652 10463 9951
541 9400 11711 653 10413 9937
542 10081 12123 654 10531 10008
543 9476 11386 655 10430 9926
544 9983 12000 656 10506 9959
545 10010 12035 657 10513 9974
546 9734 11665 658 10480 9961
547 9503 11421 659 10446 9940
548 9281 11324 660 10410 9927
549 10042 12092 661 10521 9989
550 9497 11647 662 10426 9880
551 9935 11840 663 10514 9987
552 9975 11925 664 10519 9993
553 9786 11853 665 10471 9929
554 9592 11732 666 10431 9886
555 9380 11658 667 10392 9869
556 10019 12014 668 10525 10003
557 9981 9879
558 10445 10549
559 10533 10593
560 10257 10202
561 10069 9924
562 9837 9811
563 10595 10589
564 10053 10163
565 10445 10549
566 10512 10495
567 10305 10401
568 10229 10282
569 9940 10197
570 10621 10609
571 10016 9872
572 10523 10486
573 10550 10521
574 10273 10151
575 10043 9907
576 9821 9810
577 10581 10578
578 10037 10133
579 10474 10326
580 10515 10411
581 10326 10339
582 10131 10218
583 9920 10144
584 10558 10500
585 9442 11393
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

586 9906 12062


587 9993 12107
588 9718 11716
589 9529 11438
590 9297 11325
591 10056 12103
592 9513 11677
593 9906 12062
594 9972 12008
595 9765 11915
596 9690 11796
597 9400 11711
598 10081 12123
599 9476 11386
600 9983 12000
601 10010 12035
602 9734 11665
603 9503 11421
604 9281 11324
605 10042 12092
606 9497 11647
607 9935 11840
608 9975 11925
609 9786 11853
610 9380 11658
611 9380 11658
612 10019 12014

Case 598 governs


Moment @ the face of the pier due to pile 1+3 or 2+4
= 12123 x 0.525 - 4.60 x 1.325 ^ 2 x 26 x 1.8
2
- 4.6 x 1.325 ^ 2 x 18 x 1
2
= 6365 - 243.48763
= 6121 KN-m
Characteristic strength of concrete = 45 N/mm²
Characteristic strength of reinforcement = 500 N/mm²
Design Bending Moment = 6130 KN-m
Length of pile cap in trans direction = 4600 mm
Gross Depth of pile Cap = 1800 mm
Clear Cover = 50 mm
Dia of bars in trans direction = 25 mm
Stirrups = 0 mm
Effective depth (def) = 1738 mm
dreqd =( M )0.5
fc x b
=( 6130 x 1000000 )0.5= 471.3 mm
6.000 x 4600
dprov = 1800 - 50 - 0 - 0- 12.5
= 1738 mm
Mlim = R b d² = 83321.8 KN-m > 6130
K = Neutral axis constant ŋfcd
K = Mu/bd²fck = 0.0098 Fc Fc

z = lever arm
z
z = d(1+ √ (1- 4.41 K) ) ≤ 0.95 d
2
z = 0.9891 d ≤ 0.95 d Fs
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

Ast reqd = M
fyd x z x d
= 6130 x 1000000
435 x 0.950 x 1738
= 8537 mm2 for total width
= 1856 mm2 PER METER
Minimum reinforcement Req.
Ast min = 0.26 x fctm x 1000 x 1738 OR 0.0013 x bt xd
500 10390.25 mm2
= 2981.55 mm2 per metre OR 2258.75 mm2 per metre
= 2981.55 mm2 per metre Required spacing 164.64 mm c/c

Provided 25 mm dia bar @ 150 mm c/c spacing


Total no of bars 31
No of bars provided 31
Ast pro = 3310.6 mm2 per metre = 15228.75 mm2 (For entire width)

Check For shear:


Critical section for shear lies at deff from the face of the pier
deff = 1738 mm
This is beyond pile centreline.
Hence No shear in Longitudinal direction

11.2 Transverse design


Along Transverse direction of pilecap, bending moments are evaluated. The reinforcement has been
designed for the those forces.

Load Load on pile Load Load on pile


Comb. 1+2 3+4 Comb. 1+2 3+4
S.No KN KN S.No KN KN
NORMAL Seismic
501 12425 7943 613 10168 11678
502 12762 9085 614 10255 11608
503 12727 9292 615 9985 11486
504 12550 8599 616 9886 11331
505 12390 8150 617 9508 11220
506 12383 7707 618 10397 11758
507 12642 9453 619 9635 11137
508 12344 8059 620 10206 11388
509 12547 9319 621 10259 11499
510 12559 9388 622 10013 11405
511 12427 8676 623 9759 11247
512 12356 8128 624 9483 11151
513 12379 7689 625 10316 11615
514 12584 9478 626 9442 11393
515 12591 8241 627 9906 12062
516 12762 9085 628 4342 8182
517 12660 9203 629 4524 8210
518 12669 8802 630 9476 11386
519 12507 8710 631 9983 12000
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

520 12602 8127 632 10010 12035


521 12661 9493 633 9734 11665
522 12556 8216 634 9503 11421
523 12459 9134 635 9281 11324
524 12500 9259 636 10042 12092
525 12529 8888 637 9497 11647
526 12525 8482 638 9935 11840
527 12554 8079 639 9975 11925
528 12540 9390 640 9786 11853
529 12395 8440 641 9592 11732
530 12653 9315
531 12626 9474
532 12490 8943
533 12368 8598
534 12363 8259
535 12561 9598
536 12522 8668
537 12653 9315
538 12575 9406
539 12582 9098
540 12458 9028
541 12530 8581
542 12576 9629
543 12333 8529 Load Load on pile
544 12488 9495 Comb. 1+2 3+4
545 12497 9548 S.No KN KN
546 12396 9002
547 12342 8582 613 11278 9157
548 12359 8245 614 11323 9309
549 12517 9617 615 11318 9337
550 12495 8649 616 11294 9245
551 12421 9353 617 11273 9185
552 12452 9448 618 11272 9126
553 12474 9164 619 11307 9358
554 12471 8853 620 11300 9197
555 12494 8544 621 11323 9309
556 12483 9550 622 11309 9325
557 12005 7856 623 11552 10717
558 12263 8731 624 11289 9259
559 12236 8890 625 11301 9182
560 12101 8358 626 11309 9364
561 11978 8014 627 11267 9173
562 11973 7675 628 11294 9341
563 12171 9013 629 11296 9350
564 12132 8084 630 11278 9255
565 12263 8731 631 11269 9182
566 12185 8821 632 11272 9123
567 12192 8514 633 11299 9362
568 12068 8444 634 11295 9194
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

569 12140 7996 635 11282 9316


570 12186 9044 636 11288 9333
571 11943 7945 637 11292 9283
572 12098 8911 638 11291 9229
573 12107 8963 639 11295 9175
574 12007 8418 640 11293 9350
575 11952 7997 641 11301 9001
576 11969 7661 642 11346 9153
577 12127 9032 643 11341 9181
578 12105 8065 644 11317 9088
579 12031 8769 645 11296 9028
580 12062 8864 646 11295 8969
581 12085 8580 647 11330 9202
582 12081 8269 648 11323 9040
583 12104 7960 649 11346 9153
584 12093 8965 650 11332 9169
585 12395 8440 651 11333 9115
586 12653 9315 652 11312 9103
587 12626 9474 653 11324 9025
588 12490 8943 654 11332 9207
589 12368 8598 655 11318 9037
590 12363 8259 656 11305 9160
591 12561 9598 657 11311 9176
592 12522 8668 658 11315 9127
593 12653 9315 659 11314 9073
594 12575 9406 660 11318 9019
595 12582 9098 661 11316 9194
596 12458 9028 662 11290 9016
597 12530 8581 663 11317 9184
598 12576 9629 664 11319 9193
599 12333 8529 665 11301 9098
600 12488 9495 666 11292 9025
601 12497 9548 667 11295 8967
602 12396 9002 668 11322 9205
603 12342 8582
604 12359 8245
605 12517 9617
606 12495 8649
607 12421 9353
608 12452 9448
609 12474 9164
610 12494 8544
611 12494 8544
612 12483 9550

Moment @ the face of the pier due to pile 1+2 or 3+4


= 12762 x 0.300
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

= 3828 kNm
Characteristic strength of concrete = 45 N/mm²
Characteristic strength of reinforcement = 500 N/mm²
Design Bending Moment = 3828 KN-m
Width of pile cap in long direction = 4600 mm
Gross Depth of pile Cap = 1800 mm
Clear Cover = 50 mm
Dia of bars in long direction = 25 mm
Stirrups = 0 mm
Effective depth (def) = 1713 mm

dreqd =( M )0.5
fc x b
=( 3828 x 1000000 )0.5= 372.4 mm
6.000 x 4600
dprov = 1800 - 50 - 0 - 12.5 - 25
= 1713 mm

Mlim = R b d² = 80941.3 KN-m > 3828

K = Neutral axis constant


K = Mu/bd²fck = 0.0063
z = lever arm
z = d(1+ √ (1- 4.41 K) ) ≤ 0.95 d
2
z = 0.9930 d ≤ 0.95 d
Ast reqd = M
fyd x z x d
= 3828.5 x 1000000
435 x 0.950 x 1712.5
= 5410 mm2 for total width
= 1176 mm2 PER METER
Minimum reinforcement Req.
Ast min = 0.26 x fctm x 1000 x 1713 OR 0.0013 x bt xd
500 10240.75 mm2
= 2938.65 mm2 per metre OR 2226.25 mm2 per metre
= 2938.65 mm2 per metre
Reinforcement Required
= 2938.7 mm2 per metre spacing 167 mm c/c
provide 25 mm dia bar @ 150 mm c/c spacing

No of bars provided 30 spacing 154.31


Ast pro = 3203.9 mm2 per metre

Check For shear:


Critical section for shear lies at deff from the face of the pier
deff = 1713 mm
This is beyond pile centreline.
Hence No shear in transverse direction

11.3 Pilecap design:PC2


Design moments in pilecap PC2 has been evaluated from the pile loads in ULS cases.
The mometns at the face of pier has been determined. Then the resultant moment @ the two orthogonal
directions of pilecap has been evaluated.For these moment pilecap reinforcement has been designed.
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

5 1.95

a b
2.4

1.14632 0.9213
Dist between CL of
Pile and face of pier
along b-b axis
2.1213203 Dist between CL of Pile and face
of pier along a-a axis

3
7 8

Pile loads ULS CASE


b a
Table showing Pile reactions at point of fixity of Pile for ULS load cases:
*All Loads are in kN
L/C Pile-5 Pile-6 Pile-7 Pile-8 L/C Pile-5 Pile-6 Pile-7 Pile-8

501 2136 2907.862 4129.93 3358.11 585 1935 2412.9 4250 3772
502 2191 2845.925 4175.9 3521 586 1977 2365.4 4286 3897
503 2268 2803 4141.17 3606.46 587 2036 2332.5 4259 3962
504 2194 2854.661 4169.73 3508.88 588 1979 2372.1 4281 3888
505 2213 2864.988 4095.23 3443.56 589 1994 2380 4224 3837
506 2059 2859.991 3977.57 3176.11 590 1875 2376.2 4133 3632
507 2325 2777.795 4086.52 3634.15 591 2080 2313.1 4217 3984
508 2205 2834.67 4013.74 3383.76 592 1865 2373.2 4121 3613
509 2320 2734.83 3992.88 3578.18 593 1977 2365.4 4286 3897
510 2319 2723.803 3996.13 3591.47 594 2112 2412.5 4255 3955
511 2271 2777.554 4031.94 3525.8 595 1945 2354.5 4176 3766
512 2204 2823.602 4016.93 3397.09 596 1944 2305.7 4023 3661
513 2039 2839.421 3944.82 3144.55 597 1774 2326.6 3964 3412
514 2339 2735.677 3959.09 3562.72 598 2148 2372.8 4202 3978
515 2045 2856.174 3961.8 3151.06 599 1987 2356.7 4161 3792
516 2191 2845.925 4175.9 3521 600 2076 2280.2 4145 3941
517 2367 2907.378 4136.49 3596.43 601 2075 2271.7 4148 3951
518 2149 2831.77 4033.57 3350.92 602 2038 2313 4175 3901
519 2149 2768.081 3833.6 3214 603 1986 2348.3 4164 3802
520 1927 2795.333 3756.81 2888.36 604 1860 2360.4 4108 3608
521 2415 2855.563 4067 3626.46 605 2090 2280.9 4119 3929
522 2069 2821.466 3909.84 3157.7 606 1883 2346.6 4082 3618
523 2451 2830.695 4013.08 3632.9 607 2176 2353.7 4161 3983
524 2433 2812.406 3987.19 3607.5 608 2162 2339.7 4141 3963
525 2215 2763.048 3917.12 3369.56 609 1995 2301.8 4087 3781
526 2089 2778.35 3847.46 3158.11 610 1774 2316.4 3960 3418
527 1927 2782.107 3751.78 2896.73 611 1774 2316.4 3960 3418
528 2411 2793.678 3960.45 3578.09 612 2146 2325.3 4120 3941
529 1935 2412.859 4250.26 3772 613 2663 2838.9 2996 2820
530 1977 2365.374 4285.51 3896.88 614 2670 2830.6 3002 2841
531 2036 2332.507 4258.88 3962.36 615 2681 2824.9 2997 2853
532 1979 2372.071 4280.78 3887.56 616 2671 2831.8 3001 2840
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

533 1994 2379.989 4223.66 3837.47 617 2673 2833.2 2991 2831
534 1875 2376.158 4133.46 3632.43 618 2653 2832.5 2975 2795
535 2080 2313.141 4217 3983.59 619 2688 2821.6 2990 2856
536 1865 2373.231 4121.36 3613.23 620 2651 2832 2973 2792
537 1977 2365.374 4285.51 3896.88 621 2670 2830.6 3002 2841
538 2112 2412.488 4255.3 3954.67 622 2694 2838.8 2997 2851
539 1945 2354.522 4176.39 3766.45 623 3018 2885.6 3186 3318
540 1944 2305.693 4023.08 3661.5 624 2665 2820.3 2956 2800
541 1774 2326.587 3964.21 3411.82 625 2635 2823.9 2946 2757
542 2148 2372.763 4202 3977.69 626 2700 2831.9 2987 2855
543 1987 2356.745 4161.19 3791.62 627 2672 2829.1 2980 2823
544 2076 2280.201 4145.2 3940.68 628 2687 2815.8 2977 2849
545 2075 2271.747 4147.69 3950.87 629 2687 2814.4 2978 2851
546 2038 2312.956 4175.14 3900.53 630 2681 2821.5 2983 2842
547 1986 2348.259 4163.63 3801.85 631 2672 2827.7 2981 2825
548 1860 2360.387 4108.35 3608.23 632 2650 2829.8 2971 2791
549 2090 2280.851 4119.29 3928.83 633 2690 2815.9 2973 2847
550 1883 2346.622 4081.53 3618.32 634 2654 2827.4 2966 2793
551 2176 2353.697 4160.68 3982.64 635 2705 2828.6 2980 2856
552 2162 2339.676 4140.83 3963.16 636 2702 2826.2 2977 2853
553 1995 2301.835 4087.11 3780.74 637 2673 2819.6 2967 2821
554 1898 2313.567 4033.71 3618.63 638 2657 2821.6 2958 2793
555 1774 2316.447 3960.35 3418.24 639 2635 2822.1 2945 2758
556 2146 2325.318 4120.33 3940.62 640 2700 2823.7 2973 2849
557 2334 3524.684 3701.35 2510.35 641 2638 2973.5 3015 2680
558 2376 3477.2 3736.6 2635.28 642 2645 2965.3 3022 2702
559 2435 3444.333 3710 2700.76 643 2656 2959.6 3017 2713
560 2378 3483.897 3731.87 2626 644 2646 2966.5 3021 2700
561 2393 3491.815 3674.75 2575.87 645 2648 2967.8 3011 2691
562 2274 3487.984 3584.55 2370.83 646 2628 2967.2 2995 2656
563 2479 3424.967 3668.07 2722 647 2663 2956.2 3010 2717
564 2264 3485.057 3572.45 2351.62 648 2626 2966.7 2993 2652
565 2376 3477.2 3736.6 2635.28 649 2645 2965.3 3022 2702
566 2511 3524.314 3706.39 2693.07 650 2669 2973.5 3016 2712
567 2344 3466.347 3627.48 2504.85 651 2640 2963.4 3003 2679
568 2343 3417.519 3474.17 2399.89 652 2640 2954.9 2976 2661
569 2173 3438.413 3415.3 2150.21 653 2610 2958.5 2966 2617
570 2548 3484.589 3653.11 2716.09 654 2675 2966.6 3007 2716
571 2386 3468.571 3612.28 2530 655 2629 2962 2986 2653
572 2475 3392.027 3596.29 2679.08 656 2680 2963.3 3000 2716
573 2474 3383.573 3598.78 2689.27 657 2677 2960.8 2996 2713
574 2437 3424.782 3626.23 2638.92 658 2648 2954.2 2987 2681
575 2386 3460.085 3614.72 2540.24 659 2632 2956.3 2978 2653
576 2259 3472.213 3559.44 2346.63 660 2610 2956.8 2965 2618
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

577 2490 3392.676 3570.38 2667.23 661 2675 2958.3 2993 2709
578 2283 3458.448 3532.62 2356.71 662 2647 2963.8 3000 2683
579 2575 3465.523 3611.77 2721 663 2662 2950.5 2997 2709
580 2561 3451.502 3591.92 2701.56 664 2662 2949 2998 2711
581 2395 3413.661 3538.2 2519.13 665 2656 2956.2 3002 2702
582 2298 3425.392 3484.8 2357 666 2647 2962.3 3000 2685
583 2173 3428.272 3411.44 2156.64 667 2625 2964.4 2991 2651
584 2545 3437.144 3571.42 2679 668 2665 2950.6 2993 2707

3018 3524.684 4285.51 3983.59


1774 2271.747 2945.24 2150.21

11.4 Longitudinal & Transverse Design:

Moment @ the face of the pier due to pile 6 or 7 @ a-a axis


= 4286 x 1.146 = 4176 x 1.146
= 4912.6 kNm = 4787.0 kNm

Moment @ the face of the pier due to pile 5 or 8 @ b-b axis


= 3984 x 0.921 = 3521 x 0.921

= 3670.2 kNm = 3244.1 kNm

Resultant moment @ x-x & y-y axis

= sqrt( 4912.6^2 + 3670.2^2) = sqrt( 4787^2 + 3244.1^2)


= 6132 kNm = 5782.7 kNm

Lets design the reinforcement in two orthogonal directions i.e in x-x and y-y. for max moment =
= 6132.21 kNm

Characteristic strength of concrete = 45 N/mm²


Characteristic strength of reinforcement = 500 N/mm²
Design Bending Moment = 6132 KN-m
Length of pile cap in trans direction = 4600 mm
Gross Depth of pile Cap = 1800 mm
Clear Cover = 75 mm
Dia of bars in trans direction = 25 mm
Stirrups = 0 mm
Effective depth (def) = 1713 mm
dreqd =( M )0.5
fc x b
=( 6132 x 1000000 )0.5= 471.4 mm
6.000 x 4600
dprov = 1800 - 75 - 0 - 0- 12.5
= 1713 mm
Mlim = R b d² = 80941.3 KN-m > 6132
K = Neutral axis constant ŋfcd
K = Mu/bd²fck = 0.0101 Fc Fc

z = lever arm
z
z = d(1+ √ (1- 4.41 K) ) ≤ 0.95 d
2
z = 0.9887 d ≤ 0.95 d Fs

Ast reqd = M
fyd x z x d
= 6132 x 1000000
435 x 0.950 x 1713
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

= 8665 mm2 for total width


= 1884 mm2 PER METER
Minimum reinforcement Req.
Ast min = 0.26 x fctm x 1000 x 1713 OR 0.0013 x bt xd
500 10240.75 mm2
= 2938.65 mm2 per metre OR 2226.25 mm2 per metre
= 2938.65 mm2 per metre Required spacing 167 mm c/c

Provided 25 mm dia bar @ 150 mm c/c spacing


Total no of bars 31
No of bars provided 31
Ast pro = 3310.6 mm2 per metre = 15228.75 mm2 (For entire width)

Check For shear:


Critical section for shear lies at deff from the face of the pier
deff = 1713
This is beyond pile centreline.
Hence No shear in Longitudinal direction
Note No. R 0
STRUCTCON DESIGNS P. L. 835/N-454 34 .
PROJECT : DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR Date Sheet
BETWEEN BKC AND EEH 31-May-16
SUBJECT : Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 By Check
ANK ASK

12.0 Crack Width checks

The previous section show the reinforcement design of pilecap. The area of steel
provided for both of the pilecaps are governed by the Ast min criteria.
As can be seen, pilecap PC1 the design meoments are higher than PC2, hence crackwidth
only for PC1 has been presented.
Hence the loads on the piles are as follows.
Load Load on pile
Comb. 1 2 3 4 5 6 7 8
S.No KN KN KN KN KN KN KN KN

5000 3632 4083 3191 3642 2442 1969 2134 1667

For Longitudinal Design


Load Load on pile Load Load on pile
Comb. 1+3 2+4 Comb. Max (1+3),(5+7) Max(2+4),(6+8)
S.No KN KN S.No kN KN
202 6823 7725 5000 6823 7725

Longitudinal Direction: Case 5000

Moment @ the face of the pier due to pile 1+3+5+7 or 2+4+6+8


= 7725 x 0.30

= 2318 KN-m

Crack width calculation:


Crack width = Sr.max ( ɛsm - ɛcm )
Where, (Refer IRC:112-2011,Clause12.3.4)
Sr.max = maximum crack spacing
ɛsm = mean strain in reinforcement under loading
ɛcm = mean strain in concrete between crack

Characteristic strength of concrete fck = 45 N/mm²


Characteristic strength of reinforcement fy = 500 N/mm²
Design Bending Moment M = 2318 KN-m
Width of pile cap b = 4600 mm
Gross Depth of pile Cap h = 1800 mm
Clear Cover = 50
cover for crack width Cr = 60 mm
Dia of bars in trans direction = 16 mm
Effective depth deff = 1738 mm
Modulus of elasticity of reinforcement Es = 200000 N/mm²
Modulus of elasticity of concrete Ecm = 13600 N/mm²
Note No. R 0
STRUCTCON DESIGNS P. L. 835/N-454 35 .
PROJECT : DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR Date Sheet
BETWEEN BKC AND EEH 31-May-16
SUBJECT : Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 By Check
ANK ASK
Area of reinforcement provided Ast = 15228.75 mm²
Spacing provided to main bar = 150 mm
Ratio of reinforcement provided = 0.1905
Calculation of depth of neutral axis b x² = m Ast ( d - x )
2
Note No. R 0
STRUCTCON DESIGNS P. L. 835/N-454 36 .
PROJECT : DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR Date Sheet
BETWEEN BKC AND EEH 31-May-16
SUBJECT : Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 By Check
ANK ASK
4600 * x 2
= 10 x 15229 ( 1738 - x )
2
2300 * x2 = 2.65E+08 - ### x
2300 x2 + ### - ###
x = -372.3 OR x = 306.1
x = 306.1 mm by trial and error
Design constants:
Grade of steel Fe500 ... σst = 240 N/mm2
Grade of concrete M45 ... σcb = 15.00 N/mm2
... m = 10
j = 1 - n = 0.941 <= 0.95
3
Stress in reinforcement provided
σst = M
Ast j d
= 2318 x 1000000
15229 x 0.941 x 1738
= 93.05 N/mm2

IRC 112 eqn 12.6

hc.eff = lesser of i. 2.5(h-d) = 156.3 mm


ii. (h-x)/3 = 498 mm
iii. h/2 = 900 mm
Es 200000 14.7 IRC 112 eqn 12.7
αe = = =
Ecm 13600
As 15228.75 0.0212
ρp.eff = = =
Ac.eff 718750
kt = 0.5
fct.eff = 3.3 N/mm2
= -0.00005 <= 0.00028
ɛsm - ɛcm

= 0.00028
Maximum crack spacing
bar spacing = 170
5(C+f/2) = 465 >= 170 IRC 112 eqn 12.8
Sr.max = 3.4C+ 0.425k1k2F k1 = 1 for epoxy coated
R reff k2 = 0.5
= 204 + 3.4
0.021
= 364.5
Crack width Wk = Sr.max ( ɛsm - ɛcm )
Note No. R 0
STRUCTCON DESIGNS P. L. 835/N-454 37 .
PROJECT : DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR Date Sheet
BETWEEN BKC AND EEH 31-May-16
SUBJECT : Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 By Check
ANK ASK
= 364.5 x 0.000279
= 0.102 mm < 0.2 mm Hence Safe

2
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix 0 ANK ASK
0

13.1 Forces during construction stages

Moment-y Moment-z
Elem Stage Part Axial (kN)
(kN*m) (kN*m)

657 CS 1 I[17] -636 0 0


657 CS 1 J[378] 0 0 0
657 CS 2 I[17] -2533 162 -104
657 CS 2 J[378] -1898 1660 -104
657 CS 3 I[17] -2558 311 94
657 CS 3 J[378] -1922 -2184 95
657 CS 4 I[17] -6551 420 3314
657 CS 4 J[378] -5915 724 3326
657 CS 5 I[17] -6563 435 3441
657 CS 5 J[378] -5927 -1798 3453
657 CS 6 I[17] -9768 1024 605
657 CS 6 J[378] -9132 2244 608
657 CS 7 I[17] -9785 944 847
657 CS 7 J[378] -9149 -2675 851
657 CS 8 I[17] -12112 1089 1365
657 CS 8 J[378] -11477 -670 1371
657 CS 9 I[17] -14034 1286 2299
657 CS 9 J[378] -13398 1542 2306
657 CS 10 I[17] -14031 1512 2249
657 CS 10 J[378] -13395 2399 2255

P MT ML
Max P -14034 1286 2299
Miin P -1922 -2184 95
MaxMT -13395 2399 2255
MaxML -5927 -1798 3453

* Construction stage 2 is not considered critical as the pier cap will be supporterd on staging during pretsressing,
which is not simulated in Midas model.
* ULS Partial Safety factor for DL is taken as 1.35 or 1 depending on it's effect i.e adding or relieving to the effect of variable load.

Max P Case

Axial Moment-y Moment-z Moment-y Moment-z


Elem Load Stage ULS Factors Axial (kN)
(kN) (kN*m) (kN*m) (kN*m) (kN*m)

657 Dead Load CS 9 -13982 1105 1743 1.35 -18875 1492 2353

Tendon
657 CS 9 0 0 0 0.9 0 0 0
Primary
Tendon
657 CS 9 -51 -21 554 1.1 -57 -23 610
Secondary
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix 0 ANK ASK
0
Creep
657 CS 9 -1 -70 5 1 -1 -70 5
Secondary
Shrinkage
657 CS 9 0 272 -4 1 0 272 -4
Secondary
657 Summation CS 9 -14034 1286 2299 -18933 1671 2964
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix 0 ANK ASK
0

NED = 0.22 a = 1.10


NRD

Interaction Ratio
Pu/fck bd Mu T MuL MuT cap MuLcap
Fck bd2 Fck bd2 MuT cap MuLcap

0.115 0.048 0.048 11880 15840 0.141 0.187 0.275

Min P Case

Axial Moment-y Moment-z Moment-y Moment-z


Elem Load Stage ULS Factors Axial (kN)
(kN) (kN*m) (kN*m) (kN*m) (kN*m)

657 Dead Load CS 3 -1898 1719 -103 1 -1898 1719 -103


Tendon
657 0 0 0 0.9 0 0 0
Primary CS 3
Tendon
657 -25 -3821 199 1.1 -27 -4203 219
Secondary CS 3
Creep
657 0 13 1 1 0 13 1
Secondary CS 3
Shrinkage
657 0 -95 -2 1 0 -95 -2
Secondary
CS 3
657 Summation CS 3 -1922 -2184 95 -1925 -2566 115

NED = 0.02 a = 1
NRD

Interaction Ratio
Pu/fck bd Mu T MuL MuT cap MuLcap
Fck bd2 Fck bd2 MuT cap MuLcap

0.012 0.020 0.020 4950 6600 0.518 0.017 0.536

Max MT Case

Axial Moment-y Moment-z Moment-y Moment-z


Elem Load Stage ULS Factors Axial (kN)
(kN) (kN*m) (kN*m) (kN*m) (kN*m)

657 Dead Load -13346 12663 1747 1.35 -18017 17095 2358
CS 10
Tendon
657 0 0 0 0.9 0 0 0
Primary CS 10
Tendon
657 -48 -10011 508 1.1 -53 -11012 559
Secondary
CS 10
Creep
657 -2 244 9 1 -2 244 9
Secondary CS 10
Shrinkage
657 1 -497 -9 1 1 -497 -9
Secondary CS 10
657 Summation CS 10 -13395 2399 2255 -18071 5831 2918

NED = 0.21 a = 1.09


NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix 0 ANK ASK
0
NRD

Pu/fck bd Mu T MuL MuT cap MuLcap Interaction Ratio

Fck bd2 Fck bd2 MuT cap MuLcap

0.110 0.050 0.050 12375 16500 0.471 0.177 0.592

Max ML Case

Axial Moment-y Moment-z Moment-y Moment-z


Elem Load Stage ULS Factors Axial (kN)
(kN) (kN*m) (kN*m) (kN*m) (kN*m)
657 Dead Load CS 5 -5891 4596 3127 1.35 -7953 6205 4221
Tendon
657 CS 5 0 0 0 0.9 0 0 0
Primary
Tendon
657 CS 5 -36 -6295 324 1.1 -40 -6924 357
Secondary
Creep
657 CS 5 0 38 5 1 0 38 5
Secondary
Shrinkage
657 CS 5 0 -138 -3 1 0 -138 -3
Secondary
657 Summation CS 5 -5927 -1798 3453 -7992 -818 4580

NED = 0.42 a = 1.26

NRD

Pu/fck bd Mu T MuL MuT cap MuLcap Interaction Ratio

Fck bd2 Fck bd2 MuT cap MuLcap

0.048 0.038 0.038 9405 12540 0.087 0.365 0.326

13.2 Design constants: As per IRC 112:2011 as per annexure A-2


Grade of steel Fe 500 ŋ = 1
λ = 0.8
ŋfcd grade = 55 kN/m2 x = 0.4561
ŋfcd = 24.566667 N/mm2
Fc Fc
fyd = 435 N/mm2

fyk = 500
fctm = 3.7
λx = 0.36488
Fs
z
fc = 0.36488 x 24.6 x (1-0.36488/2) = 7.33
z = (1-0.36488/2) x d = 0.818 d
For grade of Concrete M 55
z = = 0.82 d
Fc = = 7.33
Height of Pier = 8.0905 m
cover = 40 mm
13.3 Section Properties
Transverse Direction
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix 0 ANK ASK
0

h = 1.5
Longitudinal
Direction

b= 2

A = 1500 x 2000 = 3.00E+06 mm2


It = 1.5 x 2 ^3/12 x 10^12 = 1.00E+12 mm4
Il = 2 x 1.5 ^3/12 x 10^12 = 5.6250E+11 mm4
rt =sqrt (It/A) = sqrt(1000000000000/3000000) 577 mm
r l =sqrt (Il/A) = sqrt(562500000000/3000000) 433 mm

Clear cover = 40 mm
dl /h = 0.035 dt /b = 0.02625

Provide Minimum Steel (IRC 112:2011 cl 16.2.2)


32 nos 25 dia for transverse mom
32 nos 25 dia each for long As min = max(0.1 x NED / fyd,0.002Ac)
= 31440 mm2 0.1 x NED / fyd = 4477 mm2
= 0.524% for transverse mom 0.002Ac = 6000
0.524% for long mom As min = 6000
r t/fck = 0.0095
r l/fck = 0.0095 As min
31440 > 6000 mm2
13.4 Effective Length Calculation ( As Per IRC : 112-2011 Cl 11.2.2 Table 11.1)
let= 8.0905*2*1000 lel 8.0905*1.3*1000
16181 10517.65
λz = 28.0 λy = 24.3
< 32.42 < 32.42
Check For Second Order moment ( As Per IRC : 112-2011 Cl 11.2.1)

λlim = 20. ABC / √ n


Where A= 1 / (1 + 0.2 fef ) A= 0.721
B= √ ( 1 + 2w) B= 1.05 based on minm 0.5% reinf
C= 1.7 - rm C= 1.1
fef= f( ∞ ,t 0) M0 EQP/M0ED
f( ∞ ,t 0) = 2.9 Table 6.9 IRC 112
n= NED / (Ac / fcd) consider r m = 0.6 on conservative side
n= 0.26
fef= 1.930
λlim = 32.42
since λlim > λz/ λy Hence Second Order Moment to be be ignored
Second order factor long direction 0
transverse dir 0

13.5 Biaxial Bending Interaction Ratio ( As Per IRC : 112-2011 Cl 8.3.2.4)

NRD = Ac.fcd + As fyd


NRD = 87376.4
Interaction Ratio
a a
MEDy MEDz ≤ 1
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix 0 ANK ASK
0 ≤ 1
MRDy MRDz

For Rectangular cross section


NED/NRD 0.1 0.7 1
a= 1.0 1.5 2

13.6 Pier design forces


Pier design forces are extraced form Midas for ULS cases.
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix 0 ANK ASK
0
Table showing design froces from Midas for Pier-1:-
case N ED MT ML ML MT Total NED a
second ord ML MT NRD

501 17335 2711 3571 0 0 3571 2711 0.198 1.082


502 19218 2892 2941 0 0 2941 2892 0.220 1.100
503 19376 2929 2541 0 0 2541 2929 0.222 1.101
504 18304 2866 3033 0 0 3033 2866 0.209 1.091
505 17493 2748 3171 0 0 3171 2748 0.200 1.084
506 16874 2632 3588 0 0 3588 2632 0.193 1.078
507 19370 2899 2024 0 0 2024 2899 0.222 1.101
508 17263 2702 3094 0 0 3094 2702 0.198 1.081
509 18991 2866 1848 0 0 1848 2866 0.217 1.098
510 19085 2895 1781 0 0 1781 2895 0.218 1.099
511 18101 2836 2472 0 0 2472 2836 0.207 1.089
512 17357 2731 3026 0 0 3026 2731 0.199 1.082
513 16822 2632 3563 0 0 3563 2632 0.193 1.077
514 19217 2812 1707 0 0 1707 2812 0.220 1.100
515 17853 2578 3448 0 0 3448 2578 0.204 1.087
516 19218 2892 2941 0 0 2941 2892 0.220 1.100
517 19188 2689 2524 0 0 2524 2689 0.220 1.100
518 18666 2716 2964 0 0 2964 2716 0.214 1.095
519 18146 2574 2434 0 0 2434 2574 0.208 1.090
520 17579 2451 3375 0 0 3375 2451 0.201 1.084
521 19474 2694 2061 0 0 2061 2694 0.223 1.102
522 17741 2581 3351 0 0 3351 2581 0.203 1.086
523 18689 2680 1957 0 0 1957 2680 0.214 1.095
524 18876 2683 1859 0 0 1859 2683 0.216 1.097
525 18442 2699 2341 0 0 2341 2699 0.211 1.093
526 17925 2583 2805 0 0 2805 2583 0.205 1.088
527 17433 2475 3294 0 0 3294 2475 0.200 1.083
528 19071 2683 1751 0 0 1751 2683 0.218 1.099
529 17032 3642 2344 0 0 2344 3642 0.195 1.079
530 18476 3781 1862 0 0 1862 3781 0.211 1.093
531 18597 3809 1555 0 0 1555 3809 0.213 1.094
532 17775 3761 1931 0 0 1931 3761 0.203 1.086
533 17153 3670 2038 0 0 2038 3670 0.196 1.080
534 16679 3582 2357 0 0 2357 3582 0.191 1.076
535 18592 3786 1158 0 0 1158 3786 0.213 1.094
536 17429 3540 2250 0 0 2250 3540 0.199 1.083
537 18476 3781 1862 0 0 1862 3781 0.211 1.093
538 18452 3625 1541 0 0 1541 3625 0.211 1.093
539 18052 3646 1879 0 0 1879 3646 0.207 1.089
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix 0 ANK ASK
0
540 17654 3537 1472 0 0 1472 3537 0.202 1.085
541 17219 3443 2194 0 0 2194 3443 0.197 1.081
542 18672 3629 1187 0 0 1187 3629 0.214 1.095
543 16976 3635 1978 0 0 1978 3635 0.194 1.079
544 18301 3761 1023 0 0 1023 3761 0.209 1.091
545 18373 3783 972 0 0 972 3783 0.210 1.092
546 17619 3737 1502 0 0 1502 3737 0.202 1.085
547 17049 3657 1927 0 0 1927 3657 0.195 1.079
548 16639 3581 2338 0 0 2338 3581 0.190 1.075
549 18475 3719 915 0 0 915 3719 0.211 1.093
550 17343 3542 2176 0 0 2176 3542 0.198 1.082
551 18070 3618 1107 0 0 1107 3618 0.207 1.089
552 18213 3620 1032 0 0 1032 3620 0.208 1.090
553 17881 3632 1401 0 0 1401 3632 0.205 1.087
554 17485 3543 1757 0 0 1757 3543 0.200 1.083
555 17107 3461 2132 0 0 2132 3461 0.196 1.080
556 18363 3621 949 0 0 949 3621 0.210 1.092
557 17332 1268 3777 0 0 3777 1268 0.198 1.082
558 18775 1407 3295 0 0 3295 1407 0.215 1.096
559 18897 1435 2988 0 0 2988 1435 0.216 1.097
560 18075 1387 3364 0 0 3364 1387 0.207 1.089
561 17453 1296 3471 0 0 3471 1296 0.200 1.083
562 16978 1207 3790 0 0 3790 1207 0.194 1.079
563 18892 1412 2591 0 0 2591 1412 0.216 1.097
564 17729 1166 3683 0 0 3683 1166 0.203 1.086
565 18775 1407 3295 0 0 3295 1407 0.215 1.096
566 18752 1250 2974 0 0 2974 1250 0.215 1.096
567 18352 1272 3312 0 0 3312 1272 0.210 1.092
568 17953 1163 2905 0 0 2905 1163 0.205 1.088
569 17519 1069 3627 0 0 3627 1069 0.200 1.084
570 18972 1255 2620 0 0 2620 1255 0.217 1.098
571 17276 1260 3411 0 0 3411 1260 0.198 1.081
572 18601 1387 2456 0 0 2456 1387 0.213 1.094
573 18673 1409 2405 0 0 2405 1409 0.214 1.095
574 17919 1363 2935 0 0 2935 1363 0.205 1.088
575 17348 1283 3360 0 0 3360 1283 0.199 1.082
576 16939 1207 3771 0 0 3771 1207 0.194 1.078
577 18775 1345 2348 0 0 2348 1345 0.215 1.096
578 17643 1168 3609 0 0 3609 1168 0.202 1.085
579 18370 1244 2540 0 0 2540 1244 0.210 1.092
580 18513 1246 2465 0 0 2465 1246 0.212 1.093
581 18180 1258 2834 0 0 2834 1258 0.208 1.090
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix 0 ANK ASK
0
582 17784 1169 3190 0 0 3190 1169 0.204 1.086
583 17406 1087 3565 0 0 3565 1087 0.199 1.083
584 18662 1246 2382 0 0 2382 1246 0.214 1.095
585 17032 3642 2344 0 0 2344 3642 0.195 1.079
586 18476 3781 1862 0 0 1862 3781 0.211 1.093
587 18597 3809 1555 0 0 1555 3809 0.213 1.094
588 17775 3761 1931 0 0 1931 3761 0.203 1.086
589 17153 3670 2038 0 0 2038 3670 0.196 1.080
590 16679 3582 2357 0 0 2357 3582 0.191 1.076
591 18592 3786 1158 0 0 1158 3786 0.213 1.094
592 17429 3540 2250 0 0 2250 3540 0.199 1.083
593 18476 3781 1862 0 0 1862 3781 0.211 1.093
594 18452 3625 1541 0 0 1541 3625 0.211 1.093
595 18052 3646 1879 0 0 1879 3646 0.207 1.089
596 17654 3537 1472 0 0 1472 3537 0.202 1.085
597 17219 3443 2194 0 0 2194 3443 0.197 1.081
598 18672 3629 1187 0 0 1187 3629 0.214 1.095
599 16976 3635 1978 0 0 1978 3635 0.194 1.079
600 18301 3761 1023 0 0 1023 3761 0.209 1.091
601 18373 3783 972 0 0 972 3783 0.210 1.092
602 17619 3737 1502 0 0 1502 3737 0.202 1.085
603 17049 3657 1927 0 0 1927 3657 0.195 1.079
604 16639 3581 2338 0 0 2338 3581 0.190 1.075
605 18475 3719 915 0 0 915 3719 0.211 1.093
606 17343 3542 2176 0 0 2176 3542 0.198 1.082
607 18070 3618 1107 0 0 1107 3618 0.207 1.089
608 18213 3620 1032 0 0 1032 3620 0.208 1.090
609 17881 3632 1401 0 0 1401 3632 0.205 1.087
610 17107 3461 2132 0 0 2132 3461 0.196 1.080
611 17107 3461 2132 0 0 2132 3461 0.196 1.080
612 18363 3621 949 0 0 949 3621 0.210 1.092
613 16791 1432 768 0 0 768 1432 0.192 1.077
614 17042 1456 684 0 0 684 1456 0.195 1.079
615 17063 1461 630 0 0 630 1461 0.195 1.079
616 16920 1453 696 0 0 696 1453 0.194 1.078
617 16812 1437 714 0 0 714 1437 0.192 1.077
618 16729 1422 770 0 0 770 1422 0.191 1.076
619 17062 1457 561 0 0 561 1457 0.195 1.079
620 16860 1415 751 0 0 751 1415 0.193 1.077
621 17042 1456 684 0 0 684 1456 0.195 1.079
622 17038 1429 628 0 0 628 1429 0.195 1.079
623 19213 1520 327 0 0 327 1520 0.220 1.100
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix 0 ANK ASK
0
624 16899 1414 616 0 0 616 1414 0.193 1.078
625 16823 1398 741 0 0 741 1398 0.193 1.077
626 17076 1430 566 0 0 566 1430 0.195 1.080
627 16781 1431 704 0 0 704 1431 0.192 1.077
628 17011 1453 538 0 0 538 1453 0.195 1.079
629 17024 1457 529 0 0 529 1457 0.195 1.079
630 16893 1449 621 0 0 621 1449 0.193 1.078
631 16794 1435 695 0 0 695 1435 0.192 1.077
632 16722 1422 767 0 0 767 1422 0.191 1.076
633 17042 1446 519 0 0 519 1446 0.195 1.079
634 16845 1415 738 0 0 738 1415 0.193 1.077
635 16971 1428 552 0 0 552 1428 0.194 1.079
636 16996 1429 539 0 0 539 1429 0.195 1.079
637 16938 1431 604 0 0 604 1431 0.194 1.078
638 16869 1415 665 0 0 665 1415 0.193 1.078
639 16804 1401 731 0 0 731 1401 0.192 1.077
640 17022 1429 525 0 0 525 1429 0.195 1.079
641 16801 1292 1016 0 0 1016 1292 0.192 1.077
642 17052 1316 932 0 0 932 1316 0.195 1.079
643 17073 1321 879 0 0 879 1321 0.195 1.079
644 16930 1312 944 0 0 944 1312 0.194 1.078
645 16822 1297 963 0 0 963 1297 0.193 1.077
646 16740 1281 1018 0 0 1018 1281 0.192 1.076
647 17072 1317 810 0 0 810 1317 0.195 1.079
648 16870 1274 999 0 0 999 1274 0.193 1.078
649 17052 1316 932 0 0 932 1316 0.195 1.079
650 17048 1289 876 0 0 876 1289 0.195 1.079
651 16978 1292 935 0 0 935 1292 0.194 1.079
652 16909 1273 864 0 0 864 1273 0.194 1.078
653 16834 1257 990 0 0 990 1257 0.193 1.077
654 17086 1289 815 0 0 815 1289 0.196 1.080
655 16855 1274 987 0 0 987 1274 0.193 1.077
656 16982 1288 801 0 0 801 1288 0.194 1.079
657 17006 1288 788 0 0 788 1288 0.195 1.079
658 16949 1290 852 0 0 852 1290 0.194 1.078
659 16880 1275 914 0 0 914 1275 0.193 1.078
660 16814 1260 979 0 0 979 1260 0.192 1.077
661 17032 1288 773 0 0 773 1288 0.195 1.079
662 16791 1290 952 0 0 952 1290 0.192 1.077
663 17022 1312 786 0 0 786 1312 0.195 1.079
664 17034 1316 777 0 0 777 1316 0.195 1.079
665 16903 1308 869 0 0 869 1308 0.193 1.078
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix 0 ANK ASK
0
666 16804 1294 943 0 0 943 1294 0.192 1.077
667 16733 1281 1015 0 0 1015 1281 0.192 1.076
668 17052 1305 767 0 0 767 1305 0.195 1.079

13.7 Design check for Pier


Table showing moment capacities and interaction ratios :-
case Pu/fck bd Mu l Mut MuL cap MuTcap ML MT
Fck bd2 Fck bd2 MuL cap MuTcap Interaction Ratio

501 0.105 0.039 0.039 9653 12870 0.370 0.211 0.526


502 0.116 0.041 0.041 10148 13530 0.290 0.214 0.439
503 0.117 0.041 0.041 10148 13530 0.250 0.216 0.403
504 0.111 0.040 0.040 9900 13200 0.306 0.217 0.464
505 0.106 0.039 0.039 9653 12870 0.329 0.214 0.487
506 0.102 0.039 0.039 9653 12870 0.372 0.205 0.525
507 0.117 0.041 0.041 10148 13530 0.199 0.214 0.353
508 0.105 0.039 0.039 9653 12870 0.321 0.210 0.477
509 0.115 0.041 0.041 10148 13530 0.182 0.212 0.336
510 0.116 0.041 0.041 10148 13530 0.175 0.214 0.332
511 0.110 0.040 0.040 9900 13200 0.250 0.215 0.408
512 0.105 0.039 0.039 9653 12870 0.314 0.212 0.472
513 0.102 0.039 0.039 9653 12870 0.369 0.204 0.523
514 0.116 0.041 0.041 10148 13530 0.168 0.208 0.318
515 0.108 0.039 0.039 9653 12870 0.357 0.200 0.501
516 0.116 0.041 0.041 10148 13530 0.290 0.214 0.439
517 0.116 0.041 0.041 10148 13530 0.249 0.199 0.386
518 0.113 0.040 0.040 9900 13200 0.299 0.206 0.444
519 0.110 0.040 0.040 9900 13200 0.246 0.195 0.385
520 0.107 0.039 0.039 9653 12870 0.350 0.190 0.486
521 0.118 0.041 0.041 10148 13530 0.203 0.199 0.341
522 0.108 0.039 0.039 9653 12870 0.347 0.201 0.492
523 0.113 0.040 0.040 9900 13200 0.198 0.203 0.344
524 0.114 0.040 0.040 9900 13200 0.188 0.203 0.334
525 0.112 0.040 0.040 9900 13200 0.236 0.204 0.383
526 0.109 0.040 0.040 9900 13200 0.283 0.196 0.423
527 0.106 0.039 0.039 9653 12870 0.341 0.192 0.480
528 0.116 0.041 0.041 10148 13530 0.173 0.198 0.314
529 0.103 0.039 0.039 9653 12870 0.243 0.283 0.473
530 0.112 0.040 0.040 9900 13200 0.188 0.286 0.416
531 0.113 0.040 0.040 9900 13200 0.157 0.289 0.389
532 0.108 0.039 0.039 9653 12870 0.200 0.292 0.437
533 0.104 0.039 0.039 9653 12870 0.211 0.285 0.444
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix 0 ANK ASK
0
534 0.101 0.038 0.038 9405 12540 0.251 0.286 0.485
535 0.113 0.040 0.040 9900 13200 0.117 0.287 0.351
536 0.106 0.039 0.039 9653 12870 0.233 0.275 0.454
537 0.112 0.040 0.040 9900 13200 0.188 0.286 0.416
538 0.112 0.040 0.040 9900 13200 0.156 0.275 0.375
539 0.109 0.040 0.040 9900 13200 0.190 0.276 0.410
540 0.107 0.039 0.039 9653 12870 0.153 0.275 0.376
contunued……..

Table showing moment capacities and interaction ratios :-


case Pu/fck bd Mu l Mut MuL cap MuTcap ML MT
Fck bd2 Fck bd2 MuL cap MuTcap Interaction Ratio
541 0.104 0.039 0.039 9653 12870 0.227 0.268 0.442
542 0.113 0.040 0.040 9900 13200 0.120 0.275 0.341
543 0.103 0.039 0.039 9653 12870 0.205 0.282 0.437
544 0.111 0.040 0.040 9900 13200 0.103 0.285 0.338
545 0.111 0.040 0.040 9900 13200 0.098 0.287 0.335
546 0.107 0.039 0.039 9653 12870 0.156 0.290 0.394
547 0.103 0.039 0.039 9653 12870 0.200 0.284 0.433
548 0.101 0.038 0.038 9405 12540 0.249 0.286 0.484
549 0.112 0.040 0.040 9900 13200 0.092 0.282 0.325
550 0.105 0.039 0.039 9653 12870 0.225 0.275 0.447
551 0.110 0.040 0.040 9900 13200 0.112 0.274 0.336
552 0.110 0.040 0.040 9900 13200 0.104 0.274 0.329
553 0.108 0.040 0.040 9900 13200 0.142 0.275 0.365
554 0.106 0.039 0.039 9653 12870 0.182 0.275 0.405
555 0.104 0.039 0.039 9653 12870 0.221 0.269 0.438
556 0.111 0.040 0.040 9900 13200 0.096 0.274 0.321
557 0.105 0.039 0.039 9653 12870 0.391 0.099 0.444
558 0.114 0.040 0.040 9900 13200 0.333 0.107 0.386
559 0.115 0.040 0.040 9900 13200 0.302 0.109 0.356
560 0.110 0.040 0.040 9900 13200 0.340 0.105 0.395
561 0.106 0.039 0.039 9653 12870 0.360 0.101 0.413
562 0.103 0.039 0.039 9653 12870 0.393 0.094 0.443
563 0.114 0.040 0.040 9900 13200 0.262 0.107 0.316
564 0.107 0.039 0.039 9653 12870 0.382 0.091 0.425
565 0.114 0.040 0.040 9900 13200 0.333 0.107 0.386
566 0.114 0.040 0.040 9900 13200 0.300 0.095 0.343
567 0.111 0.040 0.040 9900 13200 0.335 0.096 0.380
568 0.109 0.040 0.040 9900 13200 0.293 0.088 0.335
569 0.106 0.039 0.039 9653 12870 0.376 0.083 0.414
570 0.115 0.041 0.041 10148 13530 0.258 0.093 0.300
571 0.105 0.039 0.039 9653 12870 0.353 0.098 0.406
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix 0 ANK ASK
0
572 0.113 0.040 0.040 9900 13200 0.248 0.105 0.303
573 0.113 0.040 0.040 9900 13200 0.243 0.107 0.299
574 0.109 0.040 0.040 9900 13200 0.296 0.103 0.351
575 0.105 0.039 0.039 9653 12870 0.348 0.100 0.402
576 0.103 0.039 0.039 9653 12870 0.391 0.094 0.441
577 0.114 0.040 0.040 9900 13200 0.237 0.102 0.289
578 0.107 0.039 0.039 9653 12870 0.374 0.091 0.418
579 0.111 0.040 0.040 9900 13200 0.257 0.094 0.302
580 0.112 0.040 0.040 9900 13200 0.249 0.094 0.294

case Pu/fck bd Mu l Mut MuL cap MuTcap ML MT


Fck bd2 Fck bd2 MuL cap MuTcap Interaction Ratio
581 0.110 0.040 0.040 9900 13200 0.286 0.095 0.333
582 0.108 0.039 0.039 9653 12870 0.331 0.091 0.374
583 0.105 0.039 0.039 9653 12870 0.369 0.084 0.409
584 0.113 0.040 0.040 9900 13200 0.241 0.094 0.286
585 0.103 0.039 0.039 9653 12870 0.243 0.283 0.473
586 0.112 0.040 0.040 9900 13200 0.188 0.286 0.416
587 0.113 0.040 0.040 9900 13200 0.157 0.289 0.389
588 0.108 0.039 0.039 9653 12870 0.200 0.292 0.437
589 0.104 0.039 0.039 9653 12870 0.211 0.285 0.444
590 0.101 0.038 0.038 9405 12540 0.251 0.286 0.485
591 0.113 0.040 0.040 9900 13200 0.117 0.287 0.351
592 0.106 0.039 0.039 9653 12870 0.233 0.275 0.454
593 0.112 0.040 0.040 9900 13200 0.188 0.286 0.416
594 0.112 0.040 0.040 9900 13200 0.156 0.275 0.375
595 0.109 0.040 0.040 9900 13200 0.190 0.276 0.410
596 0.107 0.039 0.039 9653 12870 0.153 0.275 0.376
597 0.104 0.039 0.039 9653 12870 0.227 0.268 0.442
598 0.113 0.040 0.040 9900 13200 0.120 0.275 0.341
599 0.103 0.039 0.039 9653 12870 0.205 0.282 0.437
600 0.111 0.040 0.040 9900 13200 0.103 0.285 0.338
601 0.111 0.040 0.040 9900 13200 0.098 0.287 0.335
602 0.107 0.039 0.039 9653 12870 0.156 0.290 0.394
603 0.103 0.039 0.039 9653 12870 0.200 0.284 0.433
604 0.101 0.038 0.038 9405 12540 0.249 0.286 0.484
605 0.112 0.040 0.040 9900 13200 0.092 0.282 0.325
606 0.105 0.039 0.039 9653 12870 0.225 0.275 0.447
607 0.110 0.040 0.040 9900 13200 0.112 0.274 0.336
608 0.110 0.040 0.040 9900 13200 0.104 0.274 0.329
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix 0 ANK ASK
0
609 0.108 0.040 0.040 9900 13200 0.142 0.275 0.365
610 0.104 0.039 0.039 9653 12870 0.221 0.269 0.438
611 0.104 0.039 0.039 9653 12870 0.221 0.269 0.438
612 0.111 0.040 0.040 9900 13200 0.096 0.274 0.321
613 0.102 0.039 0.039 9653 12870 0.080 0.111 0.159
614 0.103 0.039 0.039 9653 12870 0.071 0.113 0.153
615 0.103 0.039 0.039 9653 12870 0.065 0.114 0.148
616 0.103 0.039 0.039 9653 12870 0.072 0.113 0.154
617 0.102 0.039 0.039 9653 12870 0.074 0.112 0.155
618 0.101 0.038 0.038 9405 12540 0.082 0.113 0.164
619 0.103 0.039 0.039 9653 12870 0.058 0.113 0.142
620 0.102 0.039 0.039 9653 12870 0.078 0.110 0.156
621 0.103 0.039 0.039 9653 12870 0.071 0.113 0.153
622 0.103 0.039 0.039 9653 12870 0.065 0.111 0.146
623 0.116 0.041 0.041 10148 13530 0.032 0.112 0.113
624 0.102 0.039 0.039 9653 12870 0.064 0.110 0.144
625 0.102 0.039 0.039 9653 12870 0.077 0.109 0.155
626 0.103 0.039 0.039 9653 12870 0.059 0.111 0.140
627 0.102 0.038 0.038 9405 12540 0.075 0.114 0.158
628 0.103 0.039 0.039 9653 12870 0.056 0.113 0.139
629 0.103 0.039 0.039 9653 12870 0.055 0.113 0.139
630 0.102 0.039 0.039 9653 12870 0.064 0.113 0.147
631 0.102 0.039 0.039 9653 12870 0.072 0.111 0.153
632 0.101 0.038 0.038 9405 12540 0.082 0.113 0.163
633 0.103 0.039 0.039 9653 12870 0.054 0.112 0.137
634 0.102 0.039 0.039 9653 12870 0.076 0.110 0.155
635 0.103 0.039 0.039 9653 12870 0.057 0.111 0.139
636 0.103 0.039 0.039 9653 12870 0.056 0.111 0.138
637 0.103 0.039 0.039 9653 12870 0.063 0.111 0.144
638 0.102 0.039 0.039 9653 12870 0.069 0.110 0.149
639 0.102 0.039 0.039 9653 12870 0.076 0.109 0.154
640 0.103 0.039 0.039 9653 12870 0.054 0.111 0.137
641 0.102 0.039 0.039 9653 12870 0.105 0.100 0.173
642 0.103 0.039 0.039 9653 12870 0.097 0.102 0.166
643 0.103 0.039 0.039 9653 12870 0.091 0.103 0.161
644 0.103 0.039 0.039 9653 12870 0.098 0.102 0.167
645 0.102 0.039 0.039 9653 12870 0.100 0.101 0.168
646 0.101 0.038 0.038 9405 12540 0.108 0.102 0.177
647 0.103 0.039 0.039 9653 12870 0.084 0.102 0.154
648 0.102 0.039 0.039 9653 12870 0.104 0.099 0.170
649 0.103 0.039 0.039 9653 12870 0.097 0.102 0.166
650 0.103 0.039 0.039 9653 12870 0.091 0.100 0.158
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix 0 ANK ASK
0
651 0.103 0.039 0.039 9653 12870 0.097 0.100 0.164
652 0.102 0.039 0.039 9653 12870 0.090 0.099 0.157
653 0.102 0.039 0.039 9653 12870 0.103 0.098 0.168
654 0.104 0.039 0.039 9653 12870 0.084 0.100 0.153
655 0.102 0.039 0.039 9653 12870 0.102 0.099 0.168
656 0.103 0.039 0.039 9653 12870 0.083 0.100 0.152
657 0.103 0.039 0.039 9653 12870 0.082 0.100 0.150
658 0.103 0.039 0.039 9653 12870 0.088 0.100 0.157
659 0.102 0.039 0.039 9653 12870 0.095 0.099 0.162
660 0.102 0.039 0.039 9653 12870 0.101 0.098 0.167
661 0.103 0.039 0.039 9653 12870 0.080 0.100 0.149
662 0.102 0.039 0.039 9653 12870 0.099 0.100 0.167
663 0.103 0.039 0.039 9653 12870 0.081 0.102 0.152
664 0.103 0.039 0.039 9653 12870 0.081 0.102 0.151
665 0.102 0.039 0.039 9653 12870 0.090 0.102 0.160
666 0.102 0.039 0.039 9653 12870 0.098 0.101 0.166
667 0.101 0.038 0.038 9405 12540 0.108 0.102 0.177
668 0.103 0.039 0.039 9653 12870 0.079 0.101 0.150

Max Interaction ratio= 0.526 < 1.00 Hence OK


NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix 0 ANK ASK
0

13.8 SLS Rare Combination Results


ELEMENT 657 = P-1

Axial Moment-y Moment-z


Elem Load
(kN) (kN*m) (kN*m)

657 669 -12715 1887 -2137


657 670 -13971 2007 -1717
657 671 -14076 2032 -1450
657 672 -13361 1990 -1778
657 673 -12820 1911 -1870

657 674 -12408 1834 -2148


657 675 -14072 2012 -1105
657 676 -13060 1798 -2054
657 677 -13971 2007 -1717
657 678 -13950 1872 -1438

657 679 -13602 1890 -1732


657 680 -13256 1795 -1378
657 681 -12878 1714 -2006
657 682 -14141 1875 -1130
657 683 -12986 1800 -1990

657 684 -13618 1866 -1061


657 685 -13742 1868 -995
657 686 -13453 1878 -1316
657 687 -13109 1801 -1626
657 688 -12780 1729 -1952

657 689 -13872 1868 -923


657 690 -12667 1880 -1818
657 691 -13819 1990 -988
657 692 -13881 2009 -943
657 693 -13225 1970 -1404

657 694 -12730 1900 -1773


657 695 -12373 1834 -2131
657 696 -13970 1954 -894
657 697 -12835 937 -2710
657 698 -14090 1058 -2290
657 699 -14196 1082 -2023

657 700 -13481 1041 -2351


657 701 -12940 961 -2443
657 702 -12527 884 -2721
657 703 -14192 1062 -1678
657 704 -13180 849 -2628

657 705 -14090 1058 -2290


NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix 0 ANK ASK
0
657 706 -14070 922 -2012
657 707 -13722 940 -2305
657 708 -13375 846 -1952

657 709 -12997 764 -2579


657 710 -14261 926 -1703
657 711 -12786 931 -2392
657 712 -13938 1040 -1561
657 713 -14001 1060 -1516

657 714 -13345 1020 -1977


657 715 -12849 950 -2347
657 716 -12493 884 -2705
657 717 -14090 1004 -1467
657 718 -13105 850 -2563

657 719 -13738 916 -1634


657 720 -13862 918 -1569
657 721 -13573 929 -1890
657 722 -13228 851 -2199
657 723 -12900 780 -2525

657 724 -13992 918 -1497


657 725 -12504 2506 -1260
657 726 -13446 2597 -945
657 727 -13525 2615 -745
657 728 -12989 2584 -991
657 729 -12583 2525 -1060
657 730 -12274 2467 -1269
657 731 -13522 2600 -486
657 732 -12763 2440 -1199
657 733 -13446 2597 -945
657 734 -13430 2495 -737

657 735 -13169 2509 -956


657 736 -12910 2438 -692
657 737 -12626 2377 -1162
657 738 -13574 2498 -505
657 739 -12707 2442 -1150

657 740 -13181 2491 -453


657 741 -13274 2492 -404
657 742 -13058 2500 -645
657 743 -12799 2442 -877
657 744 -12553 2388 -1122

657 745 -13372 2493 -350


657 746 -12468 2502 -1021
657 747 -13332 2584 -398
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix 0 ANK ASK
0
657 748 -13379 2598 -365
657 749 -12887 2569 -711
657 750 -12515 2516 -988

657 751 -12248 2467 -1256


657 752 -13445 2557 -328
657 753 -12704 924 -2216
657 754 -13645 1014 -1901
657 755 -13724 1033 -1701

657 756 -13188 1001 -1946


657 757 -12783 942 -2015
657 758 -12473 884 -2224
657 759 -13721 1018 -1442
657 760 -12963 857 -2154

657 761 -13645 1014 -1901


657 762 -13630 912 -1692
657 763 -13369 926 -1912
657 764 -13109 855 -1647
657 765 -12826 794 -2118

657 766 -13773 915 -1461


657 767 -12907 859 -2106
657 768 -13381 908 -1409
657 769 -13474 910 -1360
657 770 -13257 918 -1600
657 771 -12999 859 -1833
657 772 -12753 806 -2077
657 773 -13572 910 -1305
657 774 -12447 884 -2212
657 775 -12283 884 -2402
657 776 -12668 919 -1977

657 777 -13531 1001 -1354


657 778 -13579 1016 -1320
657 779 -13087 986 -1666
657 780 -12715 934 -1943

14.0 DUCTILE DETAILING IN PIERS

Ductile detailing has been carried out in pier as the structure is in seismic zone-III. IRC:112-
Section 17.2 has been refered.

14.1 Check for Confinement reinforment requirement:-

nk = NED / AC fck > 0.08

NED = Design value of applied axial force


= 19474.37 kN Max axial force extracted from MIDAS analysis results
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix 0 ANK ASK
0

AC = 2.00 x 1.5 sqm


= 3 sqm

fck = 55 Mpa

nk = = 19474.37 x 1000
3000000 x 55

= 0.12 >0.08, Hence,Confinement in Pier is required

Let provide 6 legged 12 dia links Area of links Asw = 678.6 sqmm

14.2 Spacing SL required :- Cluase 17.2.1.3


i) 5 x Min Longitudianl Bar Dia
100 mm
ii) 1/5 X smallest core dimensions
Core Domensions b= 1500 - 80 = 1420 mm
d= 2000 - 80 = 1920 mm
= (1 / 5) x 1420
= 284 mm
Therefore SL = Min of i & ii 100
Provide = 100 mm C/C

14.3 Volumetric ratio of transverse reinforment rw = Asw 678.6


=
SL x b 100 x 1420
= 0.0047789

14.4 For rectangular stirrups the minimum design confining R/F

wwd = Max(ww req; 0.12)

Ac +0.13 x fyd (rL-0.01)


ww req = 0.37 nk
Acc fcd

Ac = Gross area of conrete section = 3.00E+06 sqmm

Acc = Confined core Area = 1420x1920= 2726400 sqmm

rL= R/F ratio of longitudinal Reinofrcement= 0.524%

3.0E+06 +0.13 x 435.0 0.524% -0.01


ww req = 0.37 0.1180265 X
2.7E+06 24.5667

= 0.03793796

Hence wwd = Max(ww req; 0.12)


= 0.12

14.5 Evaluation of Area of link required about tranverse direction


……Refer 17.2.1.1-(4)
b=Dimension of concrete core perpendicuar to the confiment direction under considerarion
= 1420 mm
wwd = rwx fyd/fc
Asw fyd
0.12 x
= SL x b fc

0.12 = Asw 435.0


x
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fix 0 ANK ASK
0
x
100 x 1420 24.567

0.12 = 0.0001246966 X Asw

Asw= 962.34 sqmm

No. of legs required = 8.509 provide 8


Dia = 12 mm
Hence, Provide links 12 dia 8 legged 100 c/c

14.5.1 Extent of confinenment

Refer Clause 17.2.1.4


nk = 0.118026 nk<0.3

Extent of coninement is the larger of below two:-

1) Depth of pier section within the plane of ben = 1420 mm


(Perpendicular to the axis of rotation of hinge)
2) Dist from the point of max design to the point where design moment is 80% of the max moment
Provide confining reinforcement for the whole height of column

14.6 Evaluation of Area of link required about Longitudinal direction


……Refer 17.2.1.1-(4)
b=Dimension of concrete core perpendicuar to the confiment direction under considerarion
= 1920 mm
wwd = rwx fyd/fc
Asw fyd
0.12 x
= SL x b fcd

0.12 = Asw 435


x
100 x 1920 24.567

0.12 = 9.729076893256E-05 X Asw

Asw= 1233 sqmm

No. of legs required = 10.9 provide 10

Hence, Provide links 12 dia 10 legged 100 c/c


NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

Forces during construction stages

Moment- Moment-z
Elem Stage Part Axial (kN)
y (kN*m) (kN*m)

658 CS 1 I[377] -636 0 0

658 CS 1 J[379] 0 0 0

658 CS 2 I[377] -2236 -390 -265

658 CS 2 J[379] -1601 -1411 -1360

658 CS 3 I[377] -2212 -44 -185

658 CS 3 J[379] -1576 1658 1639

658 CS 4 I[377] -3821 -2529 642

658 CS 4 J[379] -3185 -2728 412

658 CS 5 I[377] -3809 -2303 699

658 CS 5 J[379] -3173 -771 2323

658 CS 6 I[377] -4992 -1146 -335

658 CS 6 J[379] -4356 -1977 -1229

658 CS 7 I[377] -4975 -708 -220

658 CS 7 J[379] -4339 1763 2424

658 CS 8 I[377] -5891 -1384 -184

658 CS 8 J[379] -5255 -180 1099

658 CS 9 I[377] -6912 -2377 86

658 CS 9 J[379] -6276 -2547 -106


658 CS 10 I[377] -6915 -2608 -88
658 CS 10 J[379] -6279 -3208 -741

P MT ML
Max P -6915 -2608 -88

Miin P -1576 1658 1639

MaxMT -6279 -3208 -88

MaxML -4339 1763 2424

* Construction stage 2 is not considered critical as the pier cap will be supporterd on staging during pretsressing,
which is not simulated in Midas model.
* ULS Partial Safety factor for DL is taken as 1.35 or 1 depending on it's effect i.e adding or relieving to the effect of variable load.

Max P Case

Axial Moment- Moment-z ULS Axial Moment-y Moment-z


Elem Load Stage
(kN) y (kN*m) (kN*m) Factors (kN) (kN*m) (kN*m)
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

658 Dead Load CS 10 -6964 -3302 -91 1.35 -9401 -4457 -123

Tendon
658 CS 10 0 0 0 0.9 0 0 0
Primary

Tendon
658 CS 10 48 967 295 1.1 53 1063 325
Secondary

Creep
658 CS 10 2 211 212 1 2 211 212
Secondary

Shrinkage
658 CS 10 -1 -483 -504 1 -1 -483 -504
Secondary

658 Summation CS 10 -6915 -2608 -88 -9348 -3667 -90

NED = 0.11 a = 1.01


NRD

Pu/fck bd Mut Mu l MuTcap MuL cap Interaction Ratio


Fck bd2 Fck bd2 MuTcap MuL cap

0.057 0.040 0.040 9900 13200 0.370 0.007 0.375

Min P Case

Axial Moment- Moment-z ULS Axial Moment-y Moment-z


Elem Load Stage
(kN) y (kN*m) (kN*m) Factors (kN) (kN*m) (kN*m)

658 Dead Load CS 3 -1600 -1449 -1402 1 -1600 -1449 -1402

Tendon
658 CS 3 0 0 0 0.9 0 0 0
Primary

Tendon
658 CS 3 25 3054 2983 1.1 27 3359 3281
Secondary

Creep
658 CS 3 0 -7 -9 1 0 -7 -9
Secondary

Shrinkage
658 CS 3 0 61 68 1 0 61 68
Secondary

658 Summation CS 3 -1576 1658 1639 -1573 1964 1938

NED = 0.02 a = 1
NRD

Pu/fck bd Mut Mu l MuTcap MuL cap Interaction Ratio


Fck bd2 Fck bd2 MuTcap MuL cap

0.010 0.020 0.020 4950 6600 0.397 0.294 0.690


NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

Max MT Case

Axial Moment- Moment-z ULS Axial Moment-y Moment-z


Elem Load Stage
(kN) y (kN*m) (kN*m) Factors (kN) (kN*m) (kN*m)

658 Dead Load CS 10 -6328 -11181 -8546 1.35 -8543 -15095 -11538

Tendon
658 CS 10 0 0 0 0.9 0 0 0
Primary

Tendon
658 CS 10 48 7789 7607 1.1 53 8568 8368
Secondary

Creep
658 CS 10 2 -135 -159 1 2 -135 -159
Secondary

Shrinkage
658 CS 10 -1 320 357 1 -1 320 357
Secondary

658 Summation CS 10 -6279 -3208 -741 -8489 -6342 -2971

NED = 0.10 a = 1.00


NRD

Pu/fck bd Mut Mu l MuTcap MuL cap


Interaction Ratio
Fck bd2 Fck bd2 MuTcap MuL cap

0.051 0.038 0.038 9405 12540 0.674 0.237 0.912

Max ML Case

Axial Moment- Moment-z ULS Axial Moment-y Moment-z


Elem Load Stage
(kN) y (kN*m) (kN*m) Factors (kN) (kN*m) (kN*m)

658 Dead Load CS 7 -4392 -6991 -6134 1 -4392 -6991 -6134


Tendon
658 CS 7 0 0 0 0.9 0 0 0
Primary
Tendon
658 CS 7 52 8672 8470 1.1 57 9539 9317
Secondary
Creep
658 CS 7 1 -23 -30 1 1 -23 -30
Secondary
Shrinkage
658 CS 7 0 105 118 1 0 105 118
Secondary
658 Summation CS 7 -4339 1763 2424 -4334 2630 3271

NED = 0.05 a = 1
NRD

Interaction Ratio
Pu/fck bd Mut Mu l MuTcap MuL cap
Fck bd2 Fck bd2 MuTcap MuL cap
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

0.026 0.028 0.028 6930 9240 0.380 0.354 0.734

15.2 Design constants: As per IRC 112:2011 as per annexure A-2


Grade of steel Fe 500 ŋ = 1
λ = 0.8
ŋfcd grade = 55 N/mm2 x = 0.4561
ŋfcd = 24.566667 N/mm2
Fc Fc
fyd = 435 N/mm2

fyk = 500
fctm = 3.7
λx = 0.36488
Fs
z
fc = 0.36488 x 24.6 x (1-0.36488/2) = 7.33
z = (1-0.36488/2) x d = 0.818 d
For grade of Concrete M 55
z = = 0.82 d
Fc = = 7.33
Height of Pier = 8.0905 m
cover = 40 mm
15.3 Section Properties

Transverse Direction

h= 2
Longitudinal
Direction

b = 1.5

A = 2000 x 1500 = 3.00E+06 mm2


It = 2 x 1.5 ^3/12 x 10^12 = 5.63E+11 mm4
Il = 1.5 x 2 ^3/12 x 10^12 = 1.0000E+12 mm4
r t =sqrt (It/A) = sqrt(562500000000/3000000) 433 mm
rl =sqrt (Il/A) = sqrt(1000000000000/3000000) 577 mm

Clear cover = 40 mm
dl /h = 0.026 dt /b = 0.035

Provide Minimum Steel (IRC 112:2011 cl 16.2.2)


32 nos 25 dia for transverse mom
32 nos 25 dia each for long As min = max(0.1 x NED / fyd,0.002Ac)
= 31440 mm2 0.1 x NED / fyd = 2294 mm2
= 0.524% for transverse mom 0.002Ac = 6000
0.524% for long mom As min = 6000
r t/fck = 0.0095
r l/fck = 0.0095
Additional reinforcement at top = 0 tor 0= 0 mm2
Total reinforcment= 31440+0 = 31440 r = 1.048
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

r/fck 0.019
15.4 Effective Length Calculation ( As Per IRC : 112-2011 Cl 11.2.2 Table 11.1)
let= 8.0905*1.5*1000 lel 8.0905*1.3*1000
12135.75 10518
λz = 28.0 λy = 18.2
< 52.65 < 52.65
Check For Second Order moment ( As Per IRC : 112-2011 Cl 11.2.1)

λlim = 20. ABC / √ n


Where A= 1 / (1 + 0.2 fef ) A= 0.838
B= √ ( 1 + 2w) B= 1.05 based on minm 0.5% reinf
C= 1.7 - rm C= 1.1
fef= f( ∞ ,t 0) M0 EQP/M0ED
f( ∞ ,t 0) = 2.9 Table 6.3 IRC 112
n= NED / (Ac / fcd) consider r m = 0.6 on conservative side
n= 0.14
fef= 0.963
λlim = 52.65
since λlim > λz/ λy Hence Second Order Moment to be be ignored
Second order factor long direction 0
transverse dir 0

1.0 Biaxial Bending Interaction Ratio ( As Per IRC : 112-2011 Cl 8.3.2.4)

NRD = Ac.fcd + As fyd


72927.6 + 13676.4
NRD = 86604.0 kN
Interaction Ratio
a a
MEDy MEDz ≤ 1
MRDy MRDz

For Rectangular cross section


NED/NRD 0.1 0.7 1
a= 1.0 1.5 2

15.6 Pier design forces


Pier design forces are extraced form STAAD for ULS cases.

Table showing design froces from STAAD for Pier-2 :-


case N ED MT ML ML MT Total NED a
My Mz second ord ML MT NRD
NORMAL
501 9498.93 523 997 0 0 997 523 0.110 1.008
502 9700.95 217 790 0 0 790 217 0.112 1.010
503 9786.03 111 590 0 0 590 111 0.113 1.011
504 9694.08 226 807 0 0 807 226 0.112 1.010
505 9584.08 195 796 0 0 796 195 0.111 1.009
506 9039.2 724 918 0 0 918 724 0.104 1.004
507 9790.89 345 464 0 0 464 345 0.113 1.011
508 9403.85 169 724 0 0 724 169 0.109 1.007
509 9593.01 399 349 0 0 349 399 0.111 1.009
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

510 9597.54 414 319 0 0 319 414 0.111 1.009


511 9573.71 162 512 0 0 512 162 0.111 1.009
512 9408.38 153 694 0 0 694 153 0.109 1.007
513 8934.93 747 887 0 0 887 747 0.103 1.003
514 9563.79 465 336 0 0 336 465 0.110 1.009
515 8981.47 692 996 0 0 996 692 0.104 1.003
516 9700.95 217 790 0 0 790 217 0.112 1.010
517 9974.6 241 754 0 0 754 241 0.115 1.013
518 9332.38 306 823 0 0 823 306 0.108 1.006
519 8931.21 192 658 0 0 658 192 0.103 1.003
520 8334.37 992 942 0 0 942 992 0.096 1.000
521 9931.03 496 572 0 0 572 496 0.115 1.012
522 8925.33 555 872 0 0 872 555 0.103 1.003
523 9894.19 639 446 0 0 446 639 0.114 1.012
524 9806.81 619 422 0 0 422 619 0.113 1.011
525 9232.2 28 561 0 0 561 28 0.107 1.006
526 8839.91 411 742 0 0 742 411 0.102 1.002
527 8324.68 971 903 0 0 903 971 0.096 1.000
528 9710.54 590 406 0 0 406 590 0.112 1.010
529 9336.63 779 163 0 0 163 779 0.108 1.007
530 9491.51 544 321 0 0 321 544 0.110 1.008
531 9556.74 293 475 0 0 475 293 0.110 1.009
532 9486.25 552 308 0 0 308 552 0.110 1.008
533 9401.92 528 316 0 0 316 528 0.109 1.007
534 8984.17 933 223 0 0 223 933 0.104 1.003
535 9560.46 114 571 0 0 571 114 0.110 1.009
536 8939.91 909 163 0 0 163 909 0.103 1.003
537 9491.51 544 321 0 0 321 544 0.110 1.008
538 9701.31 194 349 0 0 349 194 0.112 1.010
539 9208.94 613 296 0 0 296 613 0.106 1.005
540 8901.38 525 423 0 0 423 525 0.103 1.002
541 8443.81 1139 205 0 0 205 1139 0.097 1.000
542 9667.91 2 489 0 0 489 2 0.112 1.010
543 9263.73 508 372 0 0 372 508 0.107 1.006
544 9408.76 73 659 0 0 659 73 0.109 1.007
545 9412.23 61 682 0 0 682 61 0.109 1.007
546 9393.96 254 535 0 0 535 254 0.108 1.007
547 9267.21 496 395 0 0 395 496 0.107 1.006
548 8904.23 951 247 0 0 247 951 0.103 1.002
549 9386.36 22 669 0 0 669 22 0.108 1.007
550 8896.88 804 258 0 0 258 804 0.103 1.002
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

551 9639.66 112 585 0 0 585 112 0.111 1.009


552 9572.68 96 603 0 0 603 96 0.111 1.009
553 9132.14 357 497 0 0 497 357 0.105 1.005
554 8831.38 693 358 0 0 358 693 0.102 1.002
555 8436.37 1123 235 0 0 235 1123 0.097 1.000
556 9498.86 74 616 0 0 616 74 0.110 1.008
557 9037.07 203 2464 0 0 2464 203 0.104 1.004
558 9191.95 32 2306 0 0 2306 32 0.106 1.005
559 9257.18 284 2152 0 0 2152 284 0.107 1.006
560 9186.69 25 2319 0 0 2319 25 0.106 1.005
561 9102.35 49 2310 0 0 2310 49 0.105 1.004
562 8684.61 356 2403 0 0 2403 356 0.100 1.000
563 9260.9 463 2056 0 0 2056 463 0.107 1.006
564 8640.35 332 2464 0 0 2464 332 0.100 1.000
565 9191.95 32 2306 0 0 2306 32 0.106 1.005
566 9401.75 383 2278 0 0 2278 383 0.109 1.007
567 8909.38 36 2331 0 0 2331 36 0.103 1.002
568 8601.82 51 2204 0 0 2204 51 0.099 1.000
569 8144.24 562 2422 0 0 2422 562 0.094 1.000
570 9368.35 579 2138 0 0 2138 579 0.108 1.007
571 8964.17 69 2255 0 0 2255 69 0.104 1.003
572 9109.2 504 1967 0 0 1967 504 0.105 1.004
573 9112.67 516 1945 0 0 1945 516 0.105 1.004
574 9094.4 323 2092 0 0 2092 323 0.105 1.004
575 8967.65 81 2232 0 0 2232 81 0.104 1.003
576 8604.67 374 2380 0 0 2380 374 0.099 1.000
577 9086.8 555 1958 0 0 1958 555 0.105 1.004
578 8597.31 227 2369 0 0 2369 227 0.099 1.000
579 9340.1 688 2042 0 0 2042 688 0.108 1.007
580 9273.11 673 2024 0 0 2024 673 0.107 1.006
581 8832.58 220 2130 0 0 2130 220 0.102 1.002
582 8531.82 116 2269 0 0 2269 116 0.099 1.000
583 8136.81 546 2392 0 0 2392 546 0.094 1.000
584 9199.3 651 2011 0 0 2011 651 0.106 1.005
585 9336.63 779 163 0 0 163 779 0.108 1.007
586 9491.51 544 321 0 0 321 544 0.110 1.008
587 9556.74 293 475 0 0 475 293 0.110 1.009
588 9486.25 552 308 0 0 308 552 0.110 1.008
589 9401.92 528 316 0 0 316 528 0.109 1.007
590 8984.17 933 223 0 0 223 933 0.104 1.003
591 9560.46 114 571 0 0 571 114 0.110 1.009
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

592 8939.91 909 163 0 0 163 909 0.103 1.003


593 9491.51 544 321 0 0 321 544 0.110 1.008
594 9701.31 194 349 0 0 349 194 0.112 1.010
595 9208.94 613 296 0 0 296 613 0.106 1.005
596 8901.38 525 423 0 0 423 525 0.103 1.002
597 8443.81 1139 205 0 0 205 1139 0.097 1.000
598 9667.91 2 489 0 0 489 2 0.112 1.010
599 9263.73 508 372 0 0 372 508 0.107 1.006
600 9408.76 73 659 0 0 659 73 0.109 1.007
601 9412.23 61 682 0 0 682 61 0.109 1.007
602 9393.96 254 535 0 0 535 254 0.108 1.007
603 9267.21 496 395 0 0 395 496 0.107 1.006
604 8904.23 951 247 0 0 247 951 0.103 1.002
605 9386.36 22 669 0 0 669 22 0.108 1.007
606 8896.88 804 258 0 0 258 804 0.103 1.002
607 9639.66 112 585 0 0 585 112 0.111 1.009
608 9572.68 96 603 0 0 603 96 0.111 1.009
609 9132.14 357 497 0 0 497 357 0.105 1.005
610 8436.37 1123 235 0 0 235 1123 0.097 1.000
611 8436.37 1123 235 0 0 235 1123 0.097 1.000
612 9498.86 74 616 0 0 616 74 0.110 1.008
613 8284.06 1013 901 0 0 901 1013 0.096 1.000
614 8311 1054 873 0 0 873 1054 0.096 1.000
615 8322.34 1098 847 0 0 847 1098 0.096 1.000
616 8310.08 1053 876 0 0 876 1053 0.096 1.000
617 8295.42 1057 874 0 0 874 1057 0.096 1.000
618 8222.76 986 890 0 0 890 986 0.095 1.000
619 8322.99 1129 830 0 0 830 1129 0.096 1.000
620 8215.07 990 901 0 0 901 990 0.095 1.000
621 8311 1054 873 0 0 873 1054 0.096 1.000
622 8347.48 1115 868 0 0 868 1115 0.096 1.000
623 9374.51 2144 699 0 0 699 2144 0.108 1.007
624 8208.37 1057 856 0 0 856 1057 0.095 1.000
625 8128.79 950 893 0 0 893 950 0.094 1.000
626 8341.68 1149 844 0 0 844 1149 0.096 1.000
627 8271.38 1060 864 0 0 864 1060 0.096 1.000
628 8296.61 1136 814 0 0 814 1136 0.096 1.000
629 8297.21 1138 810 0 0 810 1138 0.096 1.000
630 8294.03 1104 836 0 0 836 1104 0.096 1.000
631 8271.99 1062 860 0 0 860 1062 0.096 1.000
632 8208.86 983 886 0 0 886 983 0.095 1.000
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

633 8292.71 1145 813 0 0 813 1145 0.096 1.000


634 8207.58 1009 884 0 0 884 1009 0.095 1.000
635 8336.76 1168 827 0 0 827 1168 0.096 1.000
636 8325.11 1165 824 0 0 824 1165 0.096 1.000
637 8248.5 1086 843 0 0 843 1086 0.095 1.000
638 8196.19 1028 867 0 0 867 1028 0.095 1.000
639 8127.49 953 888 0 0 888 953 0.094 1.000
640 8312.28 1161 822 0 0 822 1161 0.096 1.000
641 8273.7 920 1158 0 0 1158 920 0.096 1.000
642 8300.63 961 1131 0 0 1131 961 0.096 1.000
643 8311.97 1005 1104 0 0 1104 1005 0.096 1.000
644 8299.72 960 1133 0 0 1133 960 0.096 1.000
645 8285.05 964 1132 0 0 1132 964 0.096 1.000
646 8212.4 893 1148 0 0 1148 893 0.095 1.000
647 8312.62 1036 1087 0 0 1087 1036 0.096 1.000
648 8204.7 897 1158 0 0 1158 897 0.095 1.000
649 8300.63 961 1131 0 0 1131 961 0.096 1.000
650 8337.12 1022 1126 0 0 1126 1022 0.096 1.000
651 8251.49 949 1135 0 0 1135 949 0.095 1.000
652 8198 964 1113 0 0 1113 964 0.095 1.000
653 8118.42 857 1151 0 0 1151 857 0.094 1.000
654 8331.31 1056 1102 0 0 1102 1056 0.096 1.000
655 8197.22 916 1142 0 0 1142 916 0.095 1.000
656 8326.4 1075 1085 0 0 1085 1075 0.096 1.000
657 8314.75 1072 1082 0 0 1082 1072 0.096 1.000
658 8238.13 993 1100 0 0 1100 993 0.095 1.000
659 8185.83 935 1124 0 0 1124 935 0.095 1.000
660 8117.13 860 1146 0 0 1146 860 0.094 1.000
661 8301.91 1068 1080 0 0 1080 1068 0.096 1.000
662 8261.02 967 1122 0 0 1122 967 0.095 1.000
663 8286.24 1043 1072 0 0 1072 1043 0.096 1.000
664 8286.84 1045 1068 0 0 1068 1045 0.096 1.000
665 8283.67 1011 1094 0 0 1094 1011 0.096 1.000
666 8261.62 969 1118 0 0 1118 969 0.095 1.000
667 8198.5 890 1144 0 0 1144 890 0.095 1.000
668 8282.34 1051.7 1070.32 0 0 1070 1051.7 0.096 1.000

15.7 Design check for Pier


Table showing moment capacities and interaction ratios :-
case Pu/fck bd Mu l Mut MuL cap MuTcap ML MT
Fck bd2 Fck bd2 MuL cap MuTcap Interaction Ratio
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

501 0.058 0.044 0.044 14520 10890 0.069 0.048 0.114


502 0.059 0.044 0.044 14520 10890 0.054 0.020 0.072
503 0.059 0.045 0.045 14850 11138 0.040 0.010 0.048
504 0.059 0.044 0.044 14520 10890 0.056 0.021 0.074
505 0.058 0.044 0.044 14520 10890 0.055 0.018 0.071
506 0.055 0.042 0.042 13860 10395 0.066 0.070 0.134
507 0.059 0.045 0.045 14850 11138 0.031 0.031 0.060
508 0.057 0.043 0.043 14190 10643 0.051 0.016 0.065
509 0.058 0.044 0.044 14520 10890 0.024 0.037 0.059
510 0.058 0.044 0.044 14520 10890 0.022 0.038 0.058
511 0.058 0.044 0.044 14520 10890 0.035 0.015 0.049
512 0.057 0.043 0.043 14190 10643 0.049 0.014 0.062
513 0.054 0.042 0.042 13860 10395 0.064 0.072 0.135
514 0.058 0.044 0.044 14520 10890 0.023 0.043 0.064
515 0.054 0.042 0.042 13860 10395 0.072 0.067 0.137
516 0.059 0.044 0.044 14520 10890 0.054 0.020 0.072
517 0.060 0.045 0.045 14850 11138 0.051 0.022 0.069
518 0.057 0.043 0.043 14190 10643 0.058 0.029 0.085
519 0.054 0.042 0.042 13860 10395 0.047 0.018 0.065
520 0.051 0.039 0.039 12870 9653 0.073 0.103 0.176
521 0.060 0.045 0.045 14850 11138 0.038 0.045 0.080
522 0.054 0.042 0.042 13860 10395 0.063 0.053 0.116
523 0.060 0.045 0.045 14850 11138 0.030 0.057 0.084
524 0.059 0.045 0.045 14850 11138 0.028 0.056 0.081
525 0.056 0.043 0.043 14190 10643 0.040 0.003 0.041
526 0.054 0.041 0.041 13530 10148 0.055 0.040 0.095
527 0.050 0.039 0.039 12870 9653 0.070 0.101 0.171
528 0.059 0.044 0.044 14520 10890 0.028 0.054 0.080
529 0.057 0.043 0.043 14190 10643 0.011 0.073 0.083
530 0.058 0.044 0.044 14520 10890 0.022 0.050 0.070
531 0.058 0.044 0.044 14520 10890 0.033 0.027 0.058
532 0.057 0.044 0.044 14520 10890 0.021 0.051 0.070
533 0.057 0.043 0.043 14190 10643 0.022 0.050 0.070
534 0.054 0.042 0.042 13860 10395 0.016 0.090 0.105
535 0.058 0.044 0.044 14520 10890 0.039 0.010 0.048
536 0.054 0.042 0.042 13860 10395 0.012 0.087 0.098
537 0.058 0.044 0.044 14520 10890 0.022 0.050 0.070
538 0.059 0.044 0.044 14520 10890 0.024 0.018 0.040
539 0.056 0.043 0.043 14190 10643 0.021 0.058 0.077
540 0.054 0.041 0.041 13530 10148 0.031 0.052 0.082
541 0.051 0.040 0.040 13200 9900 0.016 0.115 0.131
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

542 0.059 0.044 0.044 14520 10890 0.034 0.000 0.033


543 0.056 0.043 0.043 14190 10643 0.026 0.048 0.073
544 0.057 0.043 0.043 14190 10643 0.046 0.007 0.052
545 0.057 0.043 0.043 14190 10643 0.048 0.006 0.053
546 0.057 0.043 0.043 14190 10643 0.038 0.024 0.060
547 0.056 0.043 0.043 14190 10643 0.028 0.047 0.073
548 0.054 0.041 0.041 13530 10148 0.018 0.094 0.111
549 0.057 0.043 0.043 14190 10643 0.047 0.002 0.048
550 0.054 0.041 0.041 13530 10148 0.019 0.079 0.098
551 0.058 0.044 0.044 14520 10890 0.040 0.010 0.049
552 0.058 0.044 0.044 14520 10890 0.042 0.009 0.049
553 0.055 0.042 0.042 13860 10395 0.036 0.034 0.069
554 0.054 0.041 0.041 13530 10148 0.026 0.068 0.094
555 0.051 0.040 0.040 13200 9900 0.018 0.113 0.131
556 0.058 0.044 0.044 14520 10890 0.042 0.007 0.048
557 0.055 0.042 0.042 13860 10395 0.178 0.019 0.196
558 0.056 0.042 0.042 13860 10395 0.166 0.003 0.168
559 0.056 0.043 0.043 14190 10643 0.152 0.027 0.176
560 0.056 0.042 0.042 13860 10395 0.167 0.002 0.168
561 0.055 0.042 0.042 13860 10395 0.167 0.005 0.170
562 0.053 0.041 0.041 13530 10148 0.178 0.035 0.213
563 0.056 0.043 0.043 14190 10643 0.145 0.043 0.186
564 0.052 0.041 0.041 13530 10148 0.182 0.033 0.215
565 0.056 0.042 0.042 13860 10395 0.166 0.003 0.168
566 0.057 0.043 0.043 14190 10643 0.161 0.036 0.194
567 0.054 0.041 0.041 13530 10148 0.172 0.004 0.175
568 0.052 0.040 0.040 13200 9900 0.167 0.005 0.172
569 0.049 0.039 0.039 12870 9653 0.188 0.058 0.246
570 0.057 0.043 0.043 14190 10643 0.151 0.054 0.202
571 0.054 0.042 0.042 13860 10395 0.163 0.007 0.168
572 0.055 0.042 0.042 13860 10395 0.142 0.048 0.189
573 0.055 0.042 0.042 13860 10395 0.140 0.050 0.188
574 0.055 0.042 0.042 13860 10395 0.151 0.031 0.180
575 0.054 0.042 0.042 13860 10395 0.161 0.008 0.168
576 0.052 0.040 0.040 13200 9900 0.180 0.038 0.218
577 0.055 0.042 0.042 13860 10395 0.141 0.053 0.193
578 0.052 0.040 0.040 13200 9900 0.179 0.023 0.202
579 0.057 0.043 0.043 14190 10643 0.144 0.065 0.206
580 0.056 0.043 0.043 14190 10643 0.143 0.063 0.203
581 0.054 0.041 0.041 13530 10148 0.157 0.022 0.179
582 0.052 0.040 0.040 13200 9900 0.172 0.012 0.184
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

583 0.049 0.039 0.039 12870 9653 0.186 0.057 0.242


584 0.056 0.043 0.043 14190 10643 0.142 0.061 0.201
585 0.057 0.043 0.043 14190 10643 0.011 0.073 0.083
586 0.058 0.044 0.044 14520 10890 0.022 0.050 0.070
587 0.058 0.044 0.044 14520 10890 0.033 0.027 0.058
588 0.057 0.044 0.044 14520 10890 0.021 0.051 0.070
589 0.057 0.043 0.043 14190 10643 0.022 0.050 0.070
590 0.054 0.042 0.042 13860 10395 0.016 0.090 0.105
591 0.058 0.044 0.044 14520 10890 0.039 0.010 0.048
592 0.054 0.042 0.042 13860 10395 0.012 0.087 0.098
593 0.058 0.044 0.044 14520 10890 0.022 0.050 0.070
594 0.059 0.044 0.044 14520 10890 0.024 0.018 0.040
595 0.056 0.043 0.043 14190 10643 0.021 0.058 0.077
596 0.054 0.041 0.041 13530 10148 0.031 0.052 0.082
597 0.051 0.040 0.040 13200 9900 0.016 0.115 0.131
598 0.059 0.044 0.044 14520 10890 0.034 0.000 0.033
599 0.056 0.043 0.043 14190 10643 0.026 0.048 0.073
600 0.057 0.043 0.043 14190 10643 0.046 0.007 0.052
601 0.057 0.043 0.043 14190 10643 0.048 0.006 0.053
602 0.057 0.043 0.043 14190 10643 0.038 0.024 0.060
603 0.056 0.043 0.043 14190 10643 0.028 0.047 0.073
604 0.054 0.041 0.041 13530 10148 0.018 0.094 0.111
605 0.057 0.043 0.043 14190 10643 0.047 0.002 0.048
606 0.054 0.041 0.041 13530 10148 0.019 0.079 0.098
607 0.058 0.044 0.044 14520 10890 0.040 0.010 0.049
608 0.058 0.044 0.044 14520 10890 0.042 0.009 0.049
609 0.055 0.042 0.042 13860 10395 0.036 0.034 0.069
610 0.051 0.040 0.040 13200 9900 0.018 0.113 0.131
611 0.051 0.040 0.040 13200 9900 0.018 0.113 0.131
612 0.058 0.044 0.044 14520 10890 0.042 0.007 0.048
613 0.050 0.039 0.039 12870 9653 0.070 0.105 0.175
614 0.050 0.039 0.039 12870 9653 0.068 0.109 0.177
615 0.050 0.039 0.039 12870 9653 0.066 0.114 0.179
616 0.050 0.039 0.039 12870 9653 0.068 0.109 0.177
617 0.050 0.039 0.039 12870 9653 0.068 0.109 0.177
618 0.050 0.039 0.039 12870 9653 0.069 0.102 0.171
619 0.050 0.039 0.039 12870 9653 0.064 0.117 0.181
620 0.050 0.039 0.039 12870 9653 0.070 0.103 0.173
621 0.050 0.039 0.039 12870 9653 0.068 0.109 0.177
622 0.051 0.040 0.040 13200 9900 0.066 0.113 0.178
623 0.057 0.043 0.043 14190 10643 0.049 0.201 0.248
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

624 0.050 0.039 0.039 12870 9653 0.066 0.110 0.176


625 0.049 0.039 0.039 12870 9653 0.069 0.098 0.168
626 0.051 0.039 0.039 12870 9653 0.066 0.119 0.185
627 0.050 0.039 0.039 12870 9653 0.067 0.110 0.177
628 0.050 0.039 0.039 12870 9653 0.063 0.118 0.181
629 0.050 0.039 0.039 12870 9653 0.063 0.118 0.181
630 0.050 0.039 0.039 12870 9653 0.065 0.114 0.179
631 0.050 0.039 0.039 12870 9653 0.067 0.110 0.177
632 0.050 0.039 0.039 12870 9653 0.069 0.102 0.171
633 0.050 0.039 0.039 12870 9653 0.063 0.119 0.182
634 0.050 0.039 0.039 12870 9653 0.069 0.105 0.173
635 0.051 0.039 0.039 12870 9653 0.064 0.121 0.185
636 0.050 0.039 0.039 12870 9653 0.064 0.121 0.185
637 0.050 0.039 0.039 12870 9653 0.065 0.113 0.178
638 0.050 0.039 0.039 12870 9653 0.067 0.106 0.174
639 0.049 0.039 0.039 12870 9653 0.069 0.099 0.168
640 0.050 0.039 0.039 12870 9653 0.064 0.120 0.184
641 0.050 0.039 0.039 12870 9653 0.090 0.095 0.185
642 0.050 0.039 0.039 12870 9653 0.088 0.100 0.187
643 0.050 0.039 0.039 12870 9653 0.086 0.104 0.190
644 0.050 0.039 0.039 12870 9653 0.088 0.099 0.187
645 0.050 0.039 0.039 12870 9653 0.088 0.100 0.188
646 0.050 0.039 0.039 12870 9653 0.089 0.093 0.182
647 0.050 0.039 0.039 12870 9653 0.084 0.107 0.192
648 0.050 0.039 0.039 12870 9653 0.090 0.093 0.183
649 0.050 0.039 0.039 12870 9653 0.088 0.100 0.187
650 0.051 0.039 0.039 12870 9653 0.087 0.106 0.193
651 0.050 0.039 0.039 12870 9653 0.088 0.098 0.187
652 0.050 0.039 0.039 12870 9653 0.086 0.100 0.186
653 0.049 0.039 0.039 12870 9653 0.089 0.089 0.178
654 0.050 0.039 0.039 12870 9653 0.086 0.109 0.195
655 0.050 0.039 0.039 12870 9653 0.089 0.095 0.184
656 0.050 0.039 0.039 12870 9653 0.084 0.111 0.196
657 0.050 0.039 0.039 12870 9653 0.084 0.111 0.195
658 0.050 0.039 0.039 12870 9653 0.085 0.103 0.188
659 0.050 0.039 0.039 12870 9653 0.087 0.097 0.184
660 0.049 0.039 0.039 12870 9653 0.089 0.089 0.178
661 0.050 0.039 0.039 12870 9653 0.084 0.111 0.195
662 0.050 0.039 0.039 12870 9653 0.087 0.100 0.187
663 0.050 0.039 0.039 12870 9653 0.083 0.108 0.191
664 0.050 0.039 0.039 12870 9653 0.083 0.108 0.191
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

665 0.050 0.039 0.039 12870 9653 0.085 0.105 0.190


666 0.050 0.039 0.039 12870 9653 0.087 0.100 0.187
667 0.050 0.039 0.039 12870 9653 0.089 0.092 0.181
668 0.050 0.039 0.039 12870 9653 0.083 0.109 0.192

Max Interaction ratio= 0.248 < 1.00 Hence OK

15.8 SLS Rare Combination Results


ELEMENT 658 = P-2

Axial Moment- Moment-z


Elem Load
(kN) y (kN*m) (kN*m)

658 669 -6886 468 -605

658 670 -7020 264 -468


658 671 -7077 46 -334
658 672 -7016 271 -479
658 673 -6943 250 -471

658 674 -6579 602 -552


658 675 -7080 -110 -250
658 676 -6541 581 -605
658 677 -7020 264 -468
658 678 -7203 -41 -443
658 679 -6775 324 -489

658 680 -6507 248 -379


658 681 -6109 781 -568
658 682 -7174 -211 -322
658 683 -6503 490 -522

658 684 -7149 -306 -238


658 685 -7091 -293 -222
658 686 -6708 101 -315
658 687 -6446 394 -435
658 688 -6103 767 -542
658 689 -7027 -274 -211
658 690 -6822 233 -423

658 691 -6948 -146 -173


658 692 -6951 -156 -153
658 693 -6936 12 -282
658 694 -6825 222 -403
658 695 -6510 618 -532
658 696 -6929 -190 -165
658 697 -6766 238 -1656

658 698 -6901 34 -1518


NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

658 699 -6957 -185 -1384


658 700 -6896 40 -1529
658 701 -6823 19 -1522
658 702 -6459 372 -1603
658 703 -6961 -341 -1301
658 704 -6421 351 -1655
658 705 -6901 34 -1518

658 706 -7083 -271 -1494


658 707 -6655 93 -1540
658 708 -6387 17 -1430
658 709 -5990 550 -1619
658 710 -7054 -442 -1372
658 711 -6703 2 -1474
658 712 -6829 -377 -1224
658 713 -6832 -387 -1204
658 714 -6816 -219 -1332
658 715 -6706 -9 -1454
658 716 -6390 387 -1583

658 717 -6809 -421 -1215


658 718 -6384 259 -1573
658 719 -7029 -537 -1288
658 720 -6971 -523 -1273
658 721 -6588 -130 -1365
658 722 -6327 163 -1486
658 723 -5983 537 -1593
658 724 -6907 -504 -1262
658 725 -6764 620 189
658 726 -6865 467 292

658 727 -6908 303 392


658 728 -6862 472 284
658 729 -6807 456 289
658 730 -6534 720 229
658 731 -6910 186 455
658 732 -6505 705 189
658 733 -6865 467 292

658 734 -7002 238 310


658 735 -6681 511 276
658 736 -6480 454 359
658 737 -6182 854 216
658 738 -6980 110 402
658 739 -6477 636 251
NOTE No. R 0
STRUCTCON DESIGNS P. L. 835/N-454
DATE SHEET
PROJECT: DESIGN & CONSTRUCTION OF ELEVATED CONNECTOR 31-May-16
BETWEEN BKC AND EEH BY CHKD
SUBJECT: Design of Pier, Pile Cap & Pile foundation for Fixed Pier P 26 ANK ASK

658 740 -6962 39 464


658 741 -6918 49 476
658 742 -6631 344 407
658 743 -6435 564 316
658 744 -6177 844 236
658 745 -6870 63 485
658 746 -6717 443 325

658 747 -6811 159 513


658 748 -6814 151 528
658 749 -6802 278 431
658 750 -6719 435 340
658 751 -6482 732 244
658 752 -6797 126 519
658 753 -6565 236 -1562
658 754 -6666 82 -1459
658 755 -6708 -82 -1359
658 756 -6662 87 -1467
658 757 -6607 71 -1462

658 758 -6335 336 -1523


658 759 -6710 -198 -1296
658 760 -6306 320 -1562
658 761 -6666 82 -1459
658 762 -6802 -146 -1441
658 763 -6481 127 -1475
658 764 -6281 70 -1393
658 765 -5982 470 -1535
658 766 -6781 -274 -1350
658 767 -6278 252 -1500

658 768 -6762 -346 -1287


658 769 -6718 -335 -1275
658 770 -6431 -40 -1344
658 771 -6235 179 -1435
658 772 -5977 460 -1515
658 773 -6670 -321 -1267
658 774 -6283 348 -1507

658 775 -5943 660 -1562


658 776 -6517 59 -1426
658 777 -6612 -225 -1238
658 778 -6614 -233 -1224
658 779 -6602 -107 -1320
658 780 -6519 51 -1411
ANNEXURE PILE BT
@ 34 .
pile
~~~~
Analysis of Section under Bending + Thrust
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

~~~~~~~~~~ ~~~~~~~~~~~~~~~~~

Concrete :Inst.Modulus,Ei = 3.1E+07 kn/mý Deferred Modulus = 3.1E+07 kn/mý


Shrk.Strain,shr = 0 Allow.Tensile stress,ft = 0 kn/mý

Rebars : Total nr = 30 Mod.of Elasticity,Er = 2.17E+08 kn/mý


As/Ac = .89 %

Node coordinates : Ac = 1.13 mý


~~~~~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Node# X(m) Y(m) Node# X(m) Y(m)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
1 0 .6 7 .043 .823
13 .166 1.014 19 .351 1.146
25 .571 1.199 31 .796 1.167
37 .993 1.053 43 1.133 .875
49 1.197 .657 55 1.176 .431
61 1.072 .229 67 .9 .08
73 .685 .006 79 .459 .017
85 .252 .111 91 .095 .276
97 .011 .486
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Reinforcement Details : 35 .
~~~~~~~~~~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Bar# X(m) Y(m) Area(mý) Bar# X(m) Y(m) Area(mý)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
R 1 .09 .6 .000335 R 5 .259 .979 .000335
R 9 .653 1.107 .000335 R 13 1.013 .9 .000335
R 17 1.099 .494 .000335 R 21 .855 .158 .000335
R 25 .442 .115 .000335 R 29 .134 .393 .000335
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Characteristics of Total Section :


~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
At = 1.1905 mý Xc = .6 m Yc = .6 m

Ix = .10949 m4 Iy = .10949 m4 Ixy = 0 m4

Load case : 1 PC1


~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(kn) Mx(knm) My(knm) f0(kn/mý) Xn(m) Yn(m)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL 2138 608 -745 14312.75 1.042 1.277
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 9982.312 kn/mý at Node# 89

Max.Tensile stress = 67764.13 kn/mý in Rebar# 13

Max.Compressive stress = 58614.47 kn/mý in Rebar# 28

Load case : 2
~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(kn) Mx(knm) My(knm) f0(kn/mý) Xn(m) Yn(m)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL 3699 702 -739 12055.87 1.513 1.592
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 9326.728 kn/mý at Node# 88

Max.Tensile stress = 20013.31 kn/mý in Rebar# 12

Max.Compressive stress = 58241.87 kn/mý in Rebar# 27


Load case : 3
~~~~~~~~~~~~~ 36 .
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(kn) Mx(knm) My(knm) f0(kn/mý) Xn(m) Yn(m)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL 2018 443 -1082 18375.43 .707 1.728
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 13248.9 kn/mý at Node# 94

Max.Tensile stress = 125337.8 kn/mý in Rebar# 14

Max.Compressive stress = 75013.7 kn/mý in Rebar# 29

Load case : 4
~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(kn) Mx(knm) My(knm) f0(kn/mý) Xn(m) Yn(m)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL 4624 680 -151 8437.728 6.118 1.359
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 7700.324 kn/mý at Node# 79

Max.Compressive stress = 49795.66 kn/mý in Rebar# 25

Load case : 5 PC2


~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(kn) Mx(knm) My(knm) f0(kn/mý) Xn(m) Yn(m)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL 1645 246 -285 4454.175 1.596 1.849
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 3545.853 kn/mý at Node# 89

Max.Tensile stress = 3785.429 kn/mý in Rebar# 13

Max.Compressive stress = 22453.03 kn/mý in Rebar# 28


Load case : 6 37 .
~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(kn) Mx(knm) My(knm) f0(kn/mý) Xn(m) Yn(m)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL 2474 290 -20 3776.823 20.677 1.426
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 3670.644 kn/mý at Node# 76

Max.Compressive stress = 24018.37 kn/mý in Rebar# 24

Load case : 7
~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(kn) Mx(knm) My(knm) f0(kn/mý) Xn(m) Yn(m)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL 2305 366 -391 6337.22 1.644 1.757
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 5027.481 kn/mý at Node# 88

Max.Tensile stress = 5757.927 kn/mý in Rebar# 12

Max.Compressive stress = 31798.73 kn/mý in Rebar# 27

Load case : 8
~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(kn) Mx(knm) My(knm) f0(kn/mý) Xn(m) Yn(m)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL 1277 317 -394 6408.391 1.139 1.416
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 4648.81 kn/mý at Node# 89

Max.Tensile stress = 23517.46 kn/mý in Rebar# 13

Max.Compressive stress = 27968.6 kn/mý in Rebar# 28


Load case : 9 CONSTRUCTION CASE 38 .
~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(kn) Mx(knm) My(knm) f0(kn/mý) Xn(m) Yn(m)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL -242 1021 -240 21647.16 1.681 .395
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress in Concrete = 14817.43 kn/mý at Node# 79

Max.Tensile stress = 332781.1 kn/mý in Rebar# 10

Max.Compressive stress = 67582.05 kn/mý in Rebar# 25

Load case : 5000 QUASI PERMANENT CASE


~~~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
LdType N(kn) Mx(knm) My(knm) f0(kn/mý) Xn(m) Yn(m)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
VL 4208 461 -64 6411.488 10.969 1.523
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Max. Compressive stress
CROSS SECTIONAL PROPERTIES
PIER CAP PIER LEFT PIER RIGHT
A 6.0 M^2 4.7 M^2 4.7 M^2
I 0.1 M^4 2.2 M^4 1.5 M^4
Z 0.1 M^3 1.9 M^3 1.5 M^3

BENDING MOMENTS

STAGE 2 Pier cap cast on staging


PIER CAP
BM STRESS SF
DL PT PT SEC SUM P P (SEC) TOP BOTTOM DL PT PT SEC
659.0 0M -69.7 0.0 0.0 -69.7 0.0 0.0 -0.5 0.5 139.4 0.0 0.0
660.0 2M -435.5 0.0 0.0 -435.5 0.0 0.0 -3.3 3.3 348.4 0.0 0.0
661.0 3.5M -3130.0 0.0 0.0 -3130.0 0.0 0.0 -23.8 23.8 487.7 0.0 0.0
665.0 8M 1601.9 0.0 0.0 1601.9 0.0 0.0 12.2 -12.2 -598.3 0.0 0.0
668.0 12.5M 2884.2 0.0 0.0 2884.2 0.0 0.0 21.9 -21.9 28.5 0.0 0.0
671.0 17M 1655.8 0.0 0.0 1655.8 0.0 0.0 12.6 -12.6 585.7 0.0 0.0
672.0 21.5M -2414.2 0.0 0.0 -2414.2 0.0 0.0 -18.3 18.3 1215.4 0.0 0.0
673.0 22.4M -225.0 0.0 0.0 -225.0 0.0 0.0 -1.7 1.7 0.0 0.0 0.0
673.0 23.3M 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

PIER
BM STRESS SF
DL PT PT SEC SUM TOP BOTTOM DL PT PT SEC
PIER LEFT TOP 2009.5 0.0 0.0 2009.5 1.1 -1.1 -177.7 0.0 0.0
BOTTOM 503.1 0.0 0.0 503.1 0.3 -0.3 -177.7 0.0 0.0

BM STRESS SF
DL PT PT SEC SUM TOP BOTTOM DL PT PT SEC
PIER RIGHT TOP -2480.0 0.0 0.0 -2480.0 1.6 -1.6 177.7 0.0 0.0
BOTTOM -973.7 0.0 0.0 -973.7 0.6 -0.6 177.7 0.0 0.0

AXIAL FORCE
PIER LEFT PIER RIGHT
DL -1752.0 -1497.7
PT 0.0 0.0
PT SEC 0.0 0.0

STAGE 3 First stage prestress


PIER CAP
BM STRESS SF
DL PT PT SEC SUM P P (SEC) TOP BOTTOM DL PT PT SEC
659.0 0M -69.9 1344.7 0.0 1274.8 -5394.1 0.0 10.6 -8.8 139.8 -1228.1 0.0
660.0 2M -436.8 2668.7 0.0 2232.0 -5648.8 0.0 17.9 -16.0 349.4 -969.4 0.0
661.0 3.5M -3140.0 3155.0 947.0 962.0 -6014.2 0.0 8.3 -6.3 489.2 720.6 0.0
665.0 8M 1606.6 -1904.1 1051.3 753.8 -6643.8 109.1 6.8 -4.6 -600.0 708.6 -23.1
668.0 12.5M 2892.7 -3608.5 1154.7 439.0 -6657.5 109.1 4.4 -2.2 28.6 45.7 -23.0
671.0 17M 1660.6 -2568.5 1246.6 338.7 -6534.2 109.1 3.6 -1.5 587.4 -535.3 -23.0
672.0 21.5M -2421.3 1252.9 1349.9 181.5 -6323.4 109.1 2.4 -0.3 1218.9 -1056.1 -22.9
673.0 22.4M -225.0 3154.5 0.0 2929.5 -6253.8 0.0 23.3 -21.2 0.0 -1060.5 0.0
673.0 23.3M 0.0 3154.5 0.0 3154.5 -6253.8 0.0 25.0 -22.9 0.0 -1060.5 0.0

PIER
BM STRESS SF
DL PT PT SEC SUM TOP BOTTOM DL PT PT SEC
PIER LEFT TOP 2292.1 0.0 -1834.9 457.3 0.2 -0.2 -179.2 0.0 213.6
BOTTOM 773.2 0.0 0.0 773.2 0.4 -0.4 -179.2 0.0 213.6

BM STRESS SF
DL PT PT SEC SUM TOP BOTTOM DL PT PT SEC
PIER RIGHT TOP -2201.8 0.0 2641.2 439.5 0.3 -0.3 179.2 0.0 -213.6
BOTTOM -682.8 0.0 830.2 147.4 0.1 -0.1 179.2 0.0 -213.6

AXIAL FORCE
PIER LEFT PIER RIGHT
DL -1793.6 -1475.2
PT 0.0 0.0
PT SEC -44.8 44.8

STAGE 4 ROB placed


PIER CAP
BM STRESS SF
DL PT PT SEC SUM P P (SEC) TOP BOTTOM DL PT PT SEC
659.0 0M -69.9 1326.7 0.0 1256.9 -5322.3 0.0 10.4 -8.7 139.8 -1211.7 0.0
660.0 2M -1912.8 2645.2 0.0 732.4 -5599.0 0.0 6.5 -4.6 1333.4 -960.9 0.0
661.0 3.5M -3130.0 3139.5 0.0 9.5 -5984.6 0.0 1.1 0.9 1473.2 717.1 0.0
665.0 8M 4825.9 -1883.8 1053.3 3995.5 -6572.9 109.2 31.4 -29.3 -1850.4 701.1 -23.1
668.0 12.5M 8986.5 -3662.7 1156.8 6480.6 -6757.6 109.2 50.3 -48.1 -304.2 46.4 -23.0
671.0 17M 4505.5 -2548.6 1248.8 3205.6 -6483.5 109.2 25.4 -23.3 2137.6 -531.1 -23.0
672.0 21.5M -6581.8 1240.1 1352.1 -3989.6 -6258.8 109.2 -29.3 31.3 2768.8 -1045.4 -22.9
673.0 22.4M -225.0 3078.1 0.0 2853.1 -6102.4 0.0 22.7 -20.6 0.0 -1034.8 0.0
673.0 23.3M 0.0 3078.1 0.0 3078.1 -6102.4 0.0 24.4 -22.4 0.0 -1034.8 0.0

PIER
BM STRESS SF
DL PT PT SEC SUM TOP BOTTOM DL PT PT SEC
PIER LEFT TOP 6517.6 0.0 -1825.5 4692.0 2.5 -2.5 -513.0 0.0 212.2
BOTTOM 2168.1 0.0 0.0 2168.1 1.2 -1.2 -513.0 0.0 212.2

BM STRESS SF
DL PT PT SEC SUM TOP BOTTOM DL PT PT SEC
PIER RIGHT TOP -6349.7 0.0 2624.9 -3724.8 2.4 -2.4 513.0 0.0 -212.2
BOTTOM -2000.3 0.0 825.9 -1174.4 0.8 -0.8 513.0 0.0 -212.2

AXIAL FORCE
PIER LEFT PIER RIGHT
DL -5845.5 -3025.3
PT 0.0 0.0
PT SEC -44.4 44.4

STAGE 5 Second stage prestressing


PIER CAP
BM STRESS SF
DL PT PT SEC SUM P P (SEC) TOP BOTTOM DL PT PT SEC
659.0 0M -70.1 5202.8 0.0 5132.7 -21062.1 0.0 42.5 -35.5 140.2 -4763.4 0.0
660.0 2M -1914.0 10195.4 0.0 8281.4 -21776.1 0.0 66.5 -59.3 1334.4 -3763.2 0.0
661.0 3.5M -9875.0 12014.1 3198.0 5337.1 -23108.6 0.0 44.4 -36.7 1474.6 2766.4 0.0
665.0 8M 4815.3 -7374.5 4048.0 1488.8 -25966.7 419.9 15.6 -7.0 -1851.7 2769.6 -87.8
668.0 12.5M 8978.0 -13899.8 4442.6 -479.2 -25874.9 419.9 0.6 7.9 -304.0 177.7 -87.6
671.0 17M 4493.1 -9923.8 4793.0 -637.7 -25475.4 420.0 -0.7 9.0 2139.1 -2087.0 -87.5
672.0 21.5M -6605.1 4837.9 5188.2 3421.0 -24639.9 420.0 30.0 -21.9 2772.1 -4115.4 -87.4
673.0 22.4M -225.0 11962.6 0.0 11737.6 -23931.8 0.0 93.1 -85.1 0.0 -4058.2 0.0
673.0 23.3M 0.0 11962.6 0.0 11962.6 -23931.8 0.0 94.8 -86.9 0.0 -4058.2 0.0

PIER
BM STRESS SF
DL PT PT SEC SUM TOP BOTTOM DL PT PT SEC
PIER LEFT TOP 6527.5 0.0 -3145.3 3382.2 1.8 -1.8 -513.8 0.0 365.6
BOTTOM 2171.5 0.0 0.0 2171.5 1.2 -1.2 -513.8 0.0 365.6
BM STRESS SF
DL PT PT SEC SUM TOP BOTTOM DL PT PT SEC
PIER RIGHT TOP -6359.2 0.0 4518.2 -1841.0 1.2 -1.2 513.8 0.0 -365.6
BOTTOM -2003.2 0.0 1418.7 -584.5 0.4 -0.4 513.8 0.0 -365.6

AXIAL FORCE
PIER LEFT PIER RIGHT
DL -5853.3 -3031.7
PT 0.0 0.0
PT SEC -76.2 76.2

STAGE 6 Other span placed


PIER CAP
BM STRESS SF
DL PT PT SEC SUM P P (SEC) TOP BOTTOM DL PT PT SEC
659.0 0M -70.4 4479.5 0.0 4409.1 -18181.1 0.0 36.5 -30.5 140.8 -4113.1 0.0
660.0 2M -3392.0 8811.7 0.0 5419.8 -18870.1 0.0 44.3 -38.0 2320.0 -3259.9 0.0
661.0 3.5M -3130.0 10422.9 0.0 7292.9 -20101.0 0.0 58.7 -52.0 2460.7 2406.4 0.0
665.0 8M 13517.0 -6471.2 3610.2 10655.9 -22847.4 372.9 84.7 -77.2 -4188.9 2436.9 -76.3
668.0 12.5M 20499.7 -12636.1 3953.1 11816.6 -23590.1 373.0 93.6 -85.9 473.9 162.0 -76.2
671.0 17M 8317.9 -8626.6 4257.8 3949.1 -22204.2 373.0 33.6 -26.4 4802.9 -1819.0 -76.2
672.0 21.5M -14826.7 4212.7 4602.9 -6011.0 -21513.0 372.9 -42.1 49.2 5438.6 -3593.1 -76.4
673.0 22.4M -225.0 10193.6 0.0 9968.6 -20444.9 0.0 79.1 -72.3 0.0 -3466.9 0.0
673.0 23.3M 0.0 10193.6 0.0 10193.6 -20444.9 0.0 80.8 -74.0 0.0 -3466.9 0.0

PIER
BM STRESS SF
DL PT PT SEC SUM TOP BOTTOM DL PT PT SEC
PIER LEFT TOP 16755.2 0.0 -3223.4 13531.8 7.2 -7.2 -1243.4 0.0 372.0
BOTTOM 6214.1 0.0 0.0 6214.0 3.3 -3.3 -1243.4 0.0 372.0

BM STRESS SF
DL PT PT SEC SUM TOP BOTTOM DL PT PT SEC
PIER RIGHT TOP -14585.5 0.0 4591.3 -9994.2 6.6 -6.6 1243.4 0.0 -372.0
BOTTOM -4044.3 0.0 1437.4 -2607.0 1.7 -1.7 1243.4 0.0 -372.0

AXIAL FORCE
PIER LEFT PIER RIGHT
DL -13182.4 -5692.7
PT 0.0 0.0
PT SEC -75.9 75.9

STAGE 7 Third stage prestressing


PIER CAP
BM STRESS SF
DL PT PT SEC SUM P P (SEC) TOP BOTTOM DL PT PT SEC
659.0 0M -70.8 9354.2 0.0 9283.4 -38348.9 0.0 76.9 -64.1 141.6 -8664.0 0.0
660.0 2M -3394.5 18111.7 0.0 14717.2 -39169.9 0.0 118.3 -105.2 2322.0 -6776.4 0.0
661.0 3.5M -3130.0 21282.8 6047.0 24199.8 -41447.8 0.0 190.7 -176.9 2463.6 4961.1 0.0
665.0 8M 20486.9 -13476.0 4636.8 11647.7 -48045.6 669.0 96.3 -80.6 -4071.8 5124.6 -64.5
668.0 12.5M 26935.1 -25518.2 4929.5 6346.4 -48082.8 669.0 56.1 -40.3 594.4 330.3 -65.3
671.0 17M 14265.4 -17930.8 5191.7 1526.2 -46606.3 668.9 19.2 -3.9 4926.2 -3818.0 -65.8
672.0 21.5M -9445.4 8725.9 5490.8 4771.2 -45006.3 668.9 43.6 -28.8 5565.8 -7516.9 -66.2
673.0 22.4M -225.0 21065.5 0.0 20840.5 -42672.6 0.0 165.4 -151.1 0.0 -7236.1 0.0
673.0 23.3M 0.0 21065.5 0.0 21065.5 -42672.6 0.0 167.1 -152.9 0.0 -7236.1 0.0

PIER
BM STRESS SF
DL PT PT SEC SUM TOP BOTTOM DL PT PT SEC
PIER LEFT TOP 16768.4 0.0 -4915.7 11852.7 6.3 -6.3 -1244.4 0.0 568.3
BOTTOM 6218.5 0.0 0.0 6218.5 3.3 -3.3 -1244.4 0.0 568.3

BM STRESS SF
DL PT PT SEC SUM TOP BOTTOM DL PT PT SEC
PIER RIGHT TOP -14598.1 0.0 7011.9 -7586.2 5.0 -5.0 1244.4 0.0 -568.3
BOTTOM -4048.3 0.0 2193.5 -1854.7 1.2 -1.2 1244.4 0.0 -568.3

AXIAL FORCE
PIER LEFT PIER RIGHT
DL -13192.8 -5701.3
PT 0.0 0.0
PT SEC -116.3 116.3

STAGE 8 Service stage


PIER CAP
BM STRESS SF
DL PT PT SEC SUM P P (SEC) TOP BOTTOM DL PT PT SEC
659.0 0M 0.0 15365.7 0.0 15365.7 -31004.7 0.0 121.9 -111.5 0.0 -5257.6 0.0
660.0 2M 0.0 15365.7 0.0 15365.7 -31004.7 0.0 121.9 -111.5 0.0 -5257.6 0.0
661.0 3.5M -3130.0 15365.7 0.0 12235.7 -31004.7 0.0 98.1 -87.7 0.0 -5257.6 0.0
665.0 8M 0.0 15365.7 0.0 15365.7 -31004.7 0.0 121.9 -111.5 0.0 -5257.6 0.0
668.0 12.5M 0.0 15365.7 0.0 15365.7 -31004.7 0.0 121.9 -111.5 0.0 -5257.6 0.0
671.0 17M 0.0 15365.7 0.0 15365.7 -31004.7 0.0 121.9 -111.5 0.0 -5257.6 0.0
672.0 21.5M 0.0 15365.7 0.0 15365.7 -31004.7 0.0 121.9 -111.5 0.0 -5257.6 0.0
673.0 22.4M -225.0 15365.7 0.0 15140.7 -31004.7 0.0 120.1 -109.8 0.0 -5257.6 0.0
673.0 23.3M 0.0 15365.7 0.0 15365.7 -31004.7 0.0 121.9 -111.5 0.0 -5257.6 0.0

PIER
BM STRESS SF
DL PT PT SEC SUM TOP BOTTOM DL PT PT SEC
PIER LEFT TOP 19618.2 0.0 -4891.1 14727.2 7.9 -7.9 -1456.8 0.0 564.4
BOTTOM 7267.1 0.0 0.0 7267.1 3.9 -3.9 -1456.8 0.0 564.4

BM STRESS SF
DL PT PT SEC SUM TOP BOTTOM DL PT PT SEC
PIER RIGHT TOP -17107.0 0.0 6960.7 -10146.3 6.7 -6.7 1456.8 0.0 -564.4
BOTTOM -4755.9 0.0 2175.9 -2580.0 1.7 -1.7 1456.8 0.0 -564.4

AXIAL FORCE
PIER LEFT PIER RIGHT
DL -15555.7 -6582.5
PT 0.0 0.0
PT SEC -114.8 114.8
661 to 672 = pier cap negative= compression
positive= tension

STAGE 2 Pier cap cast on staging


Cb(min/m
Axial Bend(+z) Bend(-z) Cb1(-y+z) Cb3(+y-z)
ax)
Elem Load Stage Step Part (N/mm^2 (N/mm^2 (N/mm^2 (N/mm^2 (N/mm^2
(N/mm^2
) ) ) ) )
)
659.00 SummationCS 2 002(last) J[14] 0.00 0.00 0.03 0.00 0.00 0.05
659.00 SummationCS 2 002(last) I[8] 0.00 0.00 0.00 0.00 0.00 0.00
660.00 SummationCS 2 002(last) I[14] 0.00 0.00 0.03 0.00 0.00 0.05
660.00 SummationCS 2 002(last) J[5] 0.00 0.00 0.09 0.00 0.00 0.29
661.00 SummationCS 2 002(last) J[378] 0.00 0.00 0.12 0.00 0.00 0.56
661.00 SummationCS 2 002(last) I[5] 0.00 0.00 0.09 0.00 0.00 0.29
665.00 SummationCS 2 002(last) J[6] -0.07 0.00 -0.15 0.00 0.00 -0.53
665.00 SummationCS 2 002(last) I[9] -0.07 0.00 -0.20 0.00 0.00 0.17
668.00 SummationCS 2 002(last) J[11] -0.07 0.00 0.01 0.00 0.00 -1.39
668.00 SummationCS 2 002(last) I[15] -0.07 0.00 -0.08 0.00 0.00 -1.14
671.00 SummationCS 2 002(last) J[747] -0.07 0.00 0.15 0.00 0.00 -0.55
671.00 SummationCS 2 002(last) I[12] -0.07 0.00 0.11 0.00 0.00 -0.90
672.00 SummationCS 2 002(last) J[379] -0.07 0.00 0.30 0.00 0.00 2.11
672.00 SummationCS 2 002(last) I[747] -0.07 0.00 0.15 0.00 0.00 -0.55
673.00 SummationCS 2 002(last) I[379] 0.00 0.00 -0.06 0.00 0.00 0.15
673.00 SummationCS 2 002(last) J[380] 0.00 0.00 0.00 0.00 0.00 0.00
0.00 2.11
0.00 -1.39

STAGE 3 First stage prestress

659.00 SummationCS 3 002(last) I[8] -4.87 0.00 -0.04 0.00 0.00 -0.31
659.00 SummationCS 3 002(last) J[14] -4.89 0.00 0.08 0.00 0.00 -0.29
660.00 SummationCS 3 002(last) J[5] -4.93 0.00 0.55 0.00 0.00 0.88
660.00 SummationCS 3 002(last) I[14] -4.89 0.00 0.08 0.00 0.00 -0.29
661.00 SummationCS 3 002(last) J[378] -4.94 0.00 0.68 0.00 0.00 2.55
661.00 SummationCS 3 002(last) I[5] -4.93 0.00 0.55 0.00 0.00 0.88
665.00 SummationCS 3 002(last) J[6] -4.83 0.00 0.17 0.00 0.00 1.12
665.00 SummationCS 3 002(last) I[9] -4.85 0.00 0.21 0.00 0.00 0.41
668.00 SummationCS 3 002(last) I[15] -4.77 0.00 0.09 0.00 0.00 1.71
668.00 SummationCS 3 002(last) J[11] -4.72 0.00 -0.03 0.00 0.00 1.82
671.00 SummationCS 3 002(last) I[12] -4.71 0.00 -0.14 0.00 0.00 1.05
671.00 SummationCS 3 002(last) J[747] -4.71 0.00 -0.16 0.00 0.00 0.65
672.00 SummationCS 3 002(last) J[379] -4.70 0.00 -0.12 0.00 0.00 -1.22
672.00 SummationCS 3 002(last) I[747] -4.71 0.00 -0.16 0.00 0.00 0.65
673.00 SummationCS 3 002(last) J[380] -4.80 0.00 -0.44 0.00 0.00 0.34
673.00 SummationCS 3 002(last) I[379] -4.80 0.00 -0.49 0.00 0.00 2.58
0.00 2.58
0.00 -1.22
STAGE 4 ROB placed

659.00 SummationCS 4 002(last) I[8] -4.70 0.00 -0.04 0.00 0.00 -0.30
659.00 SummationCS 4 002(last) J[14] -4.71 0.00 0.08 0.00 0.00 -0.28
660.00 SummationCS 4 002(last) J[5] -4.75 0.00 0.78 0.00 0.00 1.81
660.00 SummationCS 4 002(last) I[14] -4.71 0.00 0.33 0.00 0.00 -0.28
661.00 SummationCS 4 002(last) J[378] -4.74 0.00 0.91 0.00 0.00 4.07
661.00 SummationCS 4 002(last) I[5] -4.75 0.00 0.78 0.00 0.00 1.81
665.00 SummationCS 4 002(last) J[6] -4.69 0.00 -0.16 0.00 0.00 -2.05
665.00 SummationCS 4 002(last) I[9] -4.68 0.00 -0.12 0.00 0.00 -1.51
668.00 SummationCS 4 002(last) J[11] -4.67 0.00 -0.12 0.00 0.00 -3.16
668.00 SummationCS 4 002(last) I[15] -4.69 0.00 0.00 0.00 0.00 -2.76
671.00 SummationCS 4 002(last) I[12] -4.61 0.00 0.26 0.00 0.00 -2.84
671.00 SummationCS 4 002(last) J[747] -4.58 0.00 0.24 0.00 0.00 -2.23
672.00 SummationCS 4 002(last) J[379] -4.51 0.00 0.29 0.00 0.00 0.66
672.00 SummationCS 4 002(last) I[747] -4.58 0.00 0.24 0.00 0.00 -2.23
673.00 SummationCS 4 002(last) I[379] -4.63 0.00 -0.48 0.00 0.00 2.48
673.00 SummationCS 4 002(last) J[380] -4.63 0.00 -0.42 0.00 0.00 0.32
0.00 4.07
0.00 -3.16

STAGE 5 Second stage prestressing

659.00 SummationCS 5 002(last) I[8] -6.75 0.00 -0.03 0.00 0.00 -0.26
659.00 SummationCS 5 002(last) J[14] -6.77 0.00 0.12 0.00 0.00 -0.20
660.00 SummationCS 5 002(last) J[5] -6.83 0.00 0.97 0.00 0.00 2.30
660.00 SummationCS 5 002(last) I[14] -6.77 0.00 0.36 0.00 0.00 -0.20
661.00 SummationCS 5 002(last) J[378] -6.81 0.00 1.14 0.00 0.00 5.12
661.00 SummationCS 5 002(last) I[5] -6.83 0.00 0.97 0.00 0.00 2.30
665.00 SummationCS 5 002(last) J[6] -6.90 0.00 -0.03 0.00 0.00 2.14
665.00 SummationCS 5 002(last) I[9] -6.91 0.00 0.04 0.00 0.00 2.13
668.00 SummationCS 5 002(last) J[11] -6.82 0.00 -0.14 0.00 0.00 1.58
668.00 SummationCS 5 002(last) I[15] -6.86 0.00 0.07 0.00 0.00 1.87
671.00 SummationCS 5 002(last) I[12] -6.77 0.00 0.15 0.00 0.00 1.40
671.00 SummationCS 5 002(last) J[747] -6.75 0.00 0.12 0.00 0.00 1.72
672.00 SummationCS 5 002(last) I[747] -6.75 0.00 0.12 0.00 0.00 1.72
672.00 SummationCS 5 002(last) J[379] -6.69 0.00 0.11 0.00 0.00 2.72
673.00 SummationCS 5 002(last) I[379] -6.65 0.00 -0.66 0.00 0.00 3.63
673.00 SummationCS 5 002(last) J[380] -6.65 0.00 -0.61 0.00 0.00 0.60
0.00 5.12
0.00 -0.26

STAGE 6 Other span placed

659.00 SummationCS 6 002(last) J[14] -6.61 0.00 0.12 0.00 0.00 -0.20
659.00 SummationCS 6 002(last) I[8] -6.59 0.00 -0.03 0.00 0.00 -0.25
660.00 SummationCS 6 002(last) I[14] -6.61 0.00 0.36 0.00 0.00 -0.20
660.00 SummationCS 6 002(last) J[5] -6.66 0.00 0.95 0.00 0.00 2.26
661.00 SummationCS 6 002(last) I[5] -6.66 0.00 0.95 0.00 0.00 2.26
661.00 SummationCS 6 002(last) J[378] -6.64 0.00 1.12 0.00 0.00 5.03
665.00 SummationCS 6 002(last) I[9] -6.94 0.00 -0.24 0.00 0.00 0.65
665.00 SummationCS 6 002(last) J[6] -6.98 0.00 -0.31 0.00 0.00 -0.36
668.00 SummationCS 6 002(last) I[15] -7.03 0.00 -0.20 0.00 0.00 -1.92
668.00 SummationCS 6 002(last) J[11] -6.93 0.00 0.14 0.00 0.00 -0.86
671.00 SummationCS 6 002(last) J[747] -6.73 0.00 0.40 0.00 0.00 2.01
671.00 SummationCS 6 002(last) I[12] -6.78 0.00 0.43 0.00 0.00 0.99
672.00 SummationCS 6 002(last) J[379] -6.62 0.00 0.41 0.00 0.00 6.43
672.00 SummationCS 6 002(last) I[747] -6.73 0.00 0.40 0.00 0.00 2.01
673.00 SummationCS 6 002(last) J[380] -6.50 0.00 -0.60 0.00 0.00 0.59
673.00 SummationCS 6 002(last) I[379] -6.49 0.00 -0.65 0.00 0.00 3.54
0.00 6.43
0.00 -1.92
STAGE 7 Third stage prestressing

659.00 SummationCS 7 002(last) J[14] -10.10 0.00 0.28 0.00 0.00 1.37
659.00 SummationCS 7 002(last) I[8] -10.00 0.00 0.10 0.00 0.00 0.95
660.00 SummationCS 7 002(last) J[5] -10.10 0.00 1.26 0.00 0.00 4.68
660.00 SummationCS 7 002(last) I[14] -10.10 0.00 0.53 0.00 0.00 1.37
661.00 SummationCS 7 002(last) I[5] -10.10 0.00 1.26 0.00 0.00 4.68
661.00 SummationCS 7 002(last) J[378] -10.10 0.00 1.45 0.00 0.00 8.26
665.00 SummationCS 7 002(last) I[9] -10.10 0.00 0.01 0.00 0.00 -2.31
665.00 SummationCS 7 002(last) J[6] -10.10 0.00 -0.11 0.00 0.00 -2.53
668.00 SummationCS 7 002(last) J[11] -9.93 0.00 0.11 0.00 0.00 -2.17
668.00 SummationCS 7 002(last) I[15] -10.10 0.00 -0.10 0.00 0.00 -3.42
671.00 SummationCS 7 002(last) J[747] -9.77 0.00 0.21 0.00 0.00 -0.45
671.00 SummationCS 7 002(last) I[12] -9.81 0.00 0.28 0.00 0.00 -1.03
672.00 SummationCS 7 002(last) I[747] -9.77 0.00 0.21 0.00 0.00 -0.45
672.00 SummationCS 7 002(last) J[379] -9.71 0.00 0.13 0.00 0.00 1.12
673.00 SummationCS 7 002(last) J[380] -9.89 0.00 -0.90 0.00 0.00 1.97
673.00 SummationCS 7 002(last) I[379] -9.85 0.00 -0.95 0.00 0.00 6.33
0.00 8.26
0.00 -3.42
STAGE 8 SIDL

659.00 SummationCS 8 002(last) I[8] -9.81 0.00 0.10 0.00 0.00 0.91
659.00 SummationCS 8 002(last) J[14] -9.84 0.00 0.27 0.00 0.00 1.32
660.00 SummationCS 8 002(last) I[14] -9.84 0.00 0.64 0.00 0.00 1.32
660.00 SummationCS 8 002(last) J[5] -9.88 0.00 1.36 0.00 0.00 5.02
661.00 SummationCS 8 002(last) J[378] -9.81 0.00 1.54 0.00 0.00 8.83
661.00 SummationCS 8 002(last) I[5] -9.88 0.00 1.36 0.00 0.00 5.02
665.00 SummationCS 8 002(last) I[9] -9.87 0.00 -0.18 0.00 0.00 -4.21
665.00 SummationCS 8 002(last) J[6] -9.91 0.00 -0.30 0.00 0.00 -5.12
668.00 SummationCS 8 002(last) J[11] -9.82 0.00 0.14 0.00 0.00 -5.42
668.00 SummationCS 8 002(last) I[15] -9.97 0.00 -0.21 0.00 0.00 -6.76
671.00 SummationCS 8 002(last) J[747] -9.57 0.00 0.44 0.00 0.00 -2.46
671.00 SummationCS 8 002(last) I[12] -9.64 0.00 0.50 0.00 0.00 -3.59
672.00 SummationCS 8 002(last) J[379] -9.44 0.00 0.37 0.00 0.00 1.87
672.00 SummationCS 8 002(last) I[747] -9.57 0.00 0.44 0.00 0.00 -2.46
673.00 SummationCS 8 002(last) J[380] -9.66 0.00 -0.88 0.00 0.00 1.92
673.00 SummationCS 8 002(last) I[379] -9.61 0.00 -0.92 0.00 0.00 6.17
0.00 8.83
0.00 -6.76

STAGE 9 LL

659.00 SummationCS 9 002(last) I[8] -9.67 0.00 0.10 0.00 0.00 0.89
659.00 SummationCS 9 002(last) J[14] -9.69 0.00 0.27 0.00 0.00 1.29
660.00 SummationCS 9 002(last) J[5] -9.73 0.00 1.33 0.00 0.00 4.90
660.00 SummationCS 9 002(last) I[14] -9.69 0.00 0.62 0.00 0.00 1.29
661.00 SummationCS 9 002(last) I[5] -9.73 0.00 1.33 0.00 0.00 4.90
661.00 SummationCS 9 002(last) J[378] -9.65 0.00 1.51 0.00 0.00 8.62
665.00 SummationCS 9 002(last) I[9] -9.77 0.00 -0.32 0.00 0.00 -6.00
665.00 SummationCS 9 002(last) J[6] -9.85 0.00 -0.44 0.00 0.00 -7.38
668.00 SummationCS 9 002(last) J[11] -9.85 0.00 0.07 0.00 0.00 -8.63
668.00 SummationCS 9 002(last) I[15] -9.96 0.00 -0.28 0.00 0.00 -9.54
671.00 SummationCS 9 002(last) I[12] -9.60 0.00 0.74 0.00 0.00 -6.07
671.00 SummationCS 9 002(last) J[747] -9.49 0.00 0.68 0.00 0.00 -4.37
672.00 SummationCS 9 002(last) J[379] -9.28 0.00 0.63 0.00 0.00 2.89
672.00 SummationCS 9 002(last) I[747] -9.49 0.00 0.68 0.00 0.00 -4.37
673.00 SummationCS 9 002(last) J[380] -9.52 0.00 -0.87 0.00 0.00 1.89
673.00 SummationCS 9 002(last) I[379] -9.46 0.00 -0.91 0.00 0.00 6.07
0.00 8.62
0.00 -9.54
Command: ID
Specify poiX = 4.4942 Y = -1.2027 Z = 0
Command: ID
Specify poiX = 4.9942 Y = -1.0893 Z = 0
Command: ID
Specify poiX = 5.2 Y = -1.0506 Z = 0
Command: ID
Specify poiX = 5.4942 Y = -0.998 Z = 0
Command: ID
Specify poiX = 5.9942 Y = -0.9162 Z = 0
Command: ID
Specify poiX = 6.4942 Y = -0.8436 Z = 0
Command: ID
Specify poiX = 6.9942 Y = -0.7803 Z = 0
Command: ID
Specify poiX = 7.4942 Y = -0.7261 Z = 0
Command: ID
Specify poiX = 7.9942 Y = -0.681 Z = 0
Command: ID
Specify poiX = 8.4942 Y = -0.645 Z = 0
Command: ID
Specify poiX = 8.9942 Y = -0.6181 Z = 0
Command: ID
Specify poiX = 9.4942 Y = -0.6001 Z = 0
Command: ID
Specify poiX = 9.9942 Y = -0.5911 Z = 0
Command: ID
Specify poiX = 10.2442 Y = -0.59 Z = 0
Command: ID
Specify poiX = 10.4942 Y = -0.5911 Z = 0
Command: ID
Specify poiX = 10.9942 Y = -0.6001 Z = 0
Command: ID
Specify poiX = 11.4942 Y = -0.6181 Z = 0
Command: ID
Specify poiX = 11.9942 Y = -0.645 Z = 0
Command: ID
Specify poiX = 12.4942 Y = -0.681 Z = 0
Command: ID
Specify poiX = 12.9942 Y = -0.7261 Z = 0
Command: ID
Specify poiX = 13.4942 Y = -0.7803 Z = 0
Command: ID
Specify poiX = 13.9942 Y = -0.8436 Z = 0
Command: ID
Specify poiX = 14.4942 Y = -0.9162 Z = 0
Command: ID
Specify poiX = 14.9942 Y = -0.998 Z = 0
Command: ID
Specify poiX = 15.3 Y = -1.0527 Z = 0
Command: ID
Specify poiX = 15.4942 Y = -1.0893 Z = 0
Command: ID
Specify poiX = 15.9942 Y = -1.19 Z = 0

4.4942 -0.375 -1.2027 4.4942 0 -1.2027


4.9942 -0.375 -1.0893 4.9942 0 -1.0893
5.2 -0.375 -1.0506 5.2 0 -1.0506
5.4942 -0.375 -0.998 5.4942 0 -0.998
5.9942 -0.375 -0.9162 5.9942 0 -0.9162
6.4942 -0.375 -0.8436 6.4942 0 -0.8436
6.9942 -0.375 -0.7803 6.9942 0 -0.7803
7.4942 -0.375 -0.7261 7.4942 0 -0.7261
7.9942 -0.375 -0.681 7.9942 0 -0.681
8.4942 -0.375 -0.645 8.4942 0 -0.645
8.9942 -0.375 -0.6181 8.9942 0 -0.6181
9.4942 -0.375 -0.6001 9.4942 0 -0.6001
9.9942 -0.375 -0.5911 9.9942 0 -0.5911
10.2442 -0.375 -0.59 10.2442 0 -0.59
10.4942 -0.375 -0.5911 10.4942 0 -0.5911
10.9942 -0.375 -0.6001 10.9942 0 -0.6001
11.4942 -0.375 -0.6181 11.4942 0 -0.6181
11.9942 -0.375 -0.645 11.9942 0 -0.645
12.4942 -0.375 -0.681 12.4942 0 -0.681
12.9942 -0.375 -0.7261 12.9942 0 -0.7261
13.4942 -0.375 -0.7803 13.4942 0 -0.7803
13.9942 -0.375 -0.8436 13.9942 0 -0.8436
14.4942 -0.375 -0.9162 14.4942 0 -0.9162
14.9942 -0.375 -0.998 14.9942 0 -0.998
15.3 -0.375 -1.0527 15.3 0 -1.0527
15.4942 -0.375 -1.0893 15.4942 0 -1.0893
15.9942 -0.375 -1.19 15.9942 0 -1.19
4.4942 0.375 -1.2027
4.9942 0.375 -1.0893
5.2 0.375 -1.0506
5.4942 0.375 -0.998
5.9942 0.375 -0.9162
6.4942 0.375 -0.8436
6.9942 0.375 -0.7803
7.4942 0.375 -0.7261
7.9942 0.375 -0.681
8.4942 0.375 -0.645
8.9942 0.375 -0.6181
9.4942 0.375 -0.6001
9.9942 0.375 -0.5911
10.2442 0.375 -0.59
10.4942 0.375 -0.5911
10.9942 0.375 -0.6001
11.4942 0.375 -0.6181
11.9942 0.375 -0.645
12.4942 0.375 -0.681
12.9942 0.375 -0.7261
13.4942 0.375 -0.7803
13.9942 0.375 -0.8436
14.4942 0.375 -0.9162
14.9942 0.375 -0.998
15.3 0.375 -1.0527
15.4942 0.375 -1.0893
15.9942 0.375 -1.19