You are on page 1of 632

SCHEDULE ALAT

Pekerjaan : Pengembangan Fasilitas Pelabuhan Perikanan Cikidang


Lokasi : Pelabuhan Perikanan Cikidang, Desa Babakan Pangandaran
Tahun Anggaran : 2019

NO URAIAN / NAMA ALAT Jumlah Satuan


1 2 3 4 5 6 7

1 Pompa Air 2.00 bh 2 2 2 2 2 2 2


2 Stamper 2.00 bh 2 2 2 2
3 Mesin Molen 4.00 bh 4 4 4 4 4 4
4 Gerobak Dorong 8.00 bh 8 8 8 8 8 8
5 Mobil Pick up 2.00 Unit 2 2 2 2 2 2 2
8 Bar Banding 2.00 bh 2 2 2 2 2 2
9 Bar Cutter 2.00 bh 2 2 2 2 2 2
10 Concrette Vibrator 2.00 bh 2 2 2 2 2 2
11 Theodolith 2.00 bh 2 2 2 2 2 2 2
12 Automatic Level 2.00 bh 2 2 2 2 2 2 2
13 Genset 2.00 bh 2 2 2 2 2 2 2
14 Pompa Engine 2.00 bh 2 2 2 2
15 Bor listrik 10.00 bh 10 10 10 10 10 10
16 Las Listrik 4.00 bh 4 4 4 4 4
17 Cutter Well 4.00 bh 4 4 4 4 4 4
18 Echosounder 1.00 set 1 1 1 1 1
19 Excavator PC 200 2.00 unit 2 2 2 2 2
20 Wheel Loader 1.00 unit 1 1 1 1 1 1
21 Dumptruck 6.00 unit 6 6 6 6 6 6
22 Bulldozer 1.00 unit 1 1 1 1 1 1
E ALAT

MINGGU KE
KETERANGAN
8 9 10 11 12 13 14 15 16 17 18 19 20 21

2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2
4 4 4 4 4 4 4 4 4 4 4 4 4 4
8 8 8 8 8 8 8 8 8 8 8 8 8 8
2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2
10 10 10 10 10 10 10 10 10 10 10 10 10 10
4 4 4 4 4 4 4 4 4 4 4 4 4 4
4 4 4 4 4 4 4 4 4 4 4 4 4 4
1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1 1 1 1 1
6 6 6 6 6 6 6 6 6 6 6 6 6 6
1 1 1 1 1 1 1 1 1 1 1 1 1 1

Bandung, ...... 2019


PT. ..........................
-
-
-
-
...............................
Direktur
TIME SCHEDULE TENAGA KERJA
Pekerjaan : Pengembangan Fasilitas Pelabuhan Perikanan Cikidang
Lokasi : Pelabuhan Perikanan Cikidang, Desa Babakan Pangandaran
Tahun Anggaran : 2019

MINGGU KE
NO JENIS / NAMA BAHAN Jumlah
1 2 3 4 5 6 7 8 9 10 11

1Mandor 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
2 Kep. Tukang Gali Tanah 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
3 Kep. Tukang Batu 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
4 Kep. Tukang Kayu 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
5 Kep. Tukang Besi 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
6 Kep. Tukang Cat 1.00
7 Kep. Tukang Listrik 1.00 1.00 1.00 1.00 1.00
8 Kep. Tukang Pipa 1.00 1.00 1.00 1.00 1.00
9 Tukang Gali Tanah 40.00 10.00 10.00 40.00 40.00 40.00 40.00 40.00
10 Tukang Batu 30.00 10.00 10.00 30.00 30.00 30.00 30.00 30.00 30.00
11 Tukang Kayu 50.00 10.00 10.00 10.00 50.00 50.00 50.00 50.00 50.00
12 Tukang Besi 50.00 10.00 10.00 10.00 50.00 50.00 50.00 50.00 50.00
13 Tukang Cat 20.00
14 Tukang Listrik 10.00 2.00 5.00 5.00 5.00
15 Tukang Pipa 10.00 2.00 5.00 5.00 5.00
16 Pekerja 20.00 4.00 4.00 4.00 10.00 10.00 20.00 20.00 20.00 20.00 20.00 20.00
17 Surveyor Geodesi 4.00 2.00 2.00 2.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00
MINGGU KE
KETERANGAN
12 13 14 15 16 17 18 19 20 21

#REF! 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00


1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
1.00 1.00 1.00 1.00
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00


50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00
50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00
10.00 10.00 20.00 20.00
5.00 5.00 5.00 10.00 10.00 10.00 10.00 10.00
5.00 5.00 5.00 10.00 10.00 10.00 10.00 10.00
20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 10.00 10.00
4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 2.00 2.00
Bandung, ...... 2019
PT. ..........................

...............................
Direktur
TIME SCHEDULE BAHAN
Pekerjaan : Pengembangan Fasilitas Pelabuhan Perikanan Cikidang
Lokasi : Pelabuhan Perikanan Cikidang, Desa Babakan Pangandaran
Tahun Anggaran : 2019

MINGGU KE
No Uraian Pekerjaan
1 2 3 4 5 6 7 8 9 10 11 12

1 Beton Redimix #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
1 Tiang pancang 40X40 #REF! #REF! #REF! #REF!
2 Besi #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
3 Bataco #REF! #REF! #REF! #REF! #REF! #REF! #REF!
4 Semen #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
5 Kerawangan #REF! #REF! #REF! #REF! #REF!
6 Dinding Beton Ringan #REF! #REF! #REF! #REF! #REF!
7 Keramik Lantai 40 x 40 #REF!
8 Pasir #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
9 Kayu merant #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
10 Triplek Phenol Film #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
11 Water proofing Bitumen
12 Water proofing Coatng #REF!
13 Water proofing Membran #REF!
AN

GU KE
KETERANGAN
13 14 15 16 17 18 19 20 21

#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF!


#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!

#REF! #REF! #REF!


#REF! #REF! #REF! #REF! #REF!

Jakarta, 4 FEBRUARI 2015


PT. TOTAL BOANERGES INDONESIA

Ir. Andy K. Manik


Direktur
Daftar Kuantitas dan Harga
Daftar Kuantitas dan Harga
Pengembangan Fasilitas Pelabuhan Perikanan

Satuan
NO Jenis Barang/Jasa Unit
A Pekerjaan Persiapan
1 Mobilisasi dan Demobilisasi Peralatan Ls
2 Pengukuran dan pemasangan Bowplank-pada revetment m
3 Direksi keet m2
4 Barak kerja dan Gudang m2
5 Survey Bathymetri termasuk hasil ukur kubikasi Ls
Perawatan Buangan material gali pada area buangan Dgn papan
6 m2
kayu kelas III
Perawatam area buangan dgn menanam pohon pinus
7 (penggantian pohon) tinggi pohon 2 m (termasuk menggali, tanah btg
subur, - tanam dan bambu penguat )
Perawatam area buangan dgn menanam Batang kelapa tinggi
8 pohon 1 m (termasuk menggali, tanah subur, -tanam dan bambu btg
penguat ).
9 Pembuatan jalan kerja dari are galian ke pembuangan m2

B Pekerjaan Perluasan Kolam


B.1 Pekerjaan galian pasir dan pemindahan
1 Galian pasir dan membuang ke area buangan pada Lapisan-01 m3

2 Galian pasir dan membuang ke area buangan pada Lapisan-02 m3

B.2 Pekerjaan revetment


B.2.1 Revetment type-1&2 panjang 246 m
1 Pasangan Armour 20-40 Kg/Unit (Interlocking) m3
2 Pasangan Batu Belah Spesi 1Pc 4Ps m3
3 Pipa PVC Drain 2,5 m
4 Plesteran Tebal 3 cm Spesi 1Pc 4Ps m2
5 Siar Spesi 1Pc 2Ps m2
6 Cleat Besi 16 mm Galvanised Modifies bh
7 Papan Kayu Kelas III Delatasi t = 20 mm m2
8 Pasangan Geotekstile Non Woven m2

B.2.2 Revetment type-3&4 panjang 229,5 m


1 Pasangan Armour 20-40 Kg/Unit (Interlocking) m3
2 Pasangan Batu Belah Spesi 1Pc 4Ps m3
3 Pipa PVC Drain 2,5 m
4 Plesteran Tebal 3 cm Spesi 1Pc 4Ps m2
5 Siar Spesi 1Pc 2Ps m2
6 Cleat Besi 16 mm Galvanised Modifies bh
7 Papan Kayu Kelas III Delatasi t = 20 mm m2
8 Pasangan Geotekstile Non Woven m2

B.2.3 Revetment type-3 panjang 120 m


1 Pasangan Armour 20-40 Kg/Unit (Interlocking) m3
2 Pasangan Batu Belah Spesi 1Pc 4Ps m3
3 Pipa PVC Drain 2,5 m
4 Plesteran Tebal 3 cm Spesi 1Pc 4Ps m2
5 Cleat Besi 16 mm Galvanised Modifies bh
6 Papan Kayu Kelas III Delatasi t = 20 mm m2
7 Pasangan Geotekstile Non Woven m2

C Pekerjaan Perkerasan jalan


C.1 Beton rigid jalan
1 Beton K 225 tebal 20 cm lebar 600 cm (ready mix ) m3
2 Wire Mesh M-8 pcs
3 Bekisting Multipleks m2

C.2 Perkerasan berbutir


1 Lapisan sirtu t15 cm m3

C.3 Dinding penahan area landing fish


1 Pasangan Batu Belah Spesi 1Pc 4Ps m3
2 Plesteran Tebal 3 cm Spesi 1Pc 4Ps m2
3 Pasangan Geotekstile Non Woven m2

C.4 Pekerjaan Rip Penahan Sedimen panjang 16 m


1 Pasangan Armour 20-40 Kg/Unit (Interlocking) m3

D Pekerjaan Sign Post


D.1 Balk Beton 20x20 cm
1 Beton K-225 m3
2 Pembesian polos dan ulir Kg
3 Pasangan pondasi batu belah 1pc4ps m3
4 Plesteran t3cm 1pc 2ps m2
5 Acian dinding m2
6 Cat dinding m2
7 Pembesian rangka siku 70.70.2,3 dan 50.50.2,3 kg
8 Cat minyak rangka siku m2
9 Automatic schakelar sensor cahaya bh
10 Lampu sorot LED setara 50 watt bh
Font Stainless modif Plat t0,35 mm termasuk duco dan finish cat
11 set
minyak spray Type Tulisan PPI CIKIDANG
D.2 LPJU Solar Cell
1 LPJU Solar cell unit
- Tiang Hot dip galvanized octagonal pole tinggi 7 m
- LED Chip 30WDC
- Solar panel modul ST-100 Polycystaline
- Battery bank 80 AH - VRLA deep cycle
- Box panel powder coating
- Pondasi beton bertulang 30x30x50 cm
Kuantitas dan Harga
Kuantitas dan Harga
itas Pelabuhan Perikanan Cikidang

Volume Harga Satuan Jumlah Keterangan

1.00 45,000,000.00 45,000,000.00 Lumpsum


207.00 30,009.76 6,212,020.32 Harga Satuan
16.00 563,853.51 9,021,656.16 Harga Satuan
16.00 563,853.51 9,021,656.16 Harga Satuan
1.00 173,299,985.31 173,299,985.31 Lumpsum
570.00 270,000.00 153,900,000.00 Harga Satuan

300.00 650,000.00 195,000,000.00 Harga Satuan

300.00 1,000,000.00 300,000,000.00 Harga Satuan

3,546.42 24,000.00 85,114,080.00 Harga Satuan


JUMLAH 976,569,397.95

19,052.75 27,161.57 517,502,679.03 Harga Satuan

71,890.45 27,161.57 1,952,657,777.57 Harga Satuan


JUMLAH 2,470,160,456.60

1,318.56 392,646.40 517,727,837.18 Harga Satuan


836.26 549,302.04 459,359,323.97 Harga Satuan
273.24 25,585.00 6,990,845.40 Harga Satuan
1,546.38 72,000.00 111,339,360.00 Harga Satuan
438.18 52,200.00 22,872,996.00 Harga Satuan
25.00 250,000.00 6,250,000.00 Harga Satuan
75.97 270,000.00 20,511,900.00 Harga Satuan
4,113.12 24,000.00 98,714,880.00 Harga Satuan
JUMLAH 1,243,767,142.55

1,230.12 392,646.40 483,002,189.57 Harga Satuan


707.05 549,302.04 388,384,007.38 Harga Satuan
273.24 25,585.00 6,990,845.40 Harga Satuan
1,362.00 72,000.00 98,064,000.00 Harga Satuan
368.45 52,200.00 19,233,090.00 Harga Satuan
25.00 250,000.00 6,250,000.00 Harga Satuan
75.97 270,000.00 20,511,900.00 Harga Satuan
3,837.24 24,000.00 92,093,760.00 Harga Satuan
JUMLAH 1,114,529,792.35

643.20 392,646.40 252,550,164.48 Harga Satuan


408.00 549,302.04 224,115,232.32 Harga Satuan
141.24 25,585.00 3,613,625.40 Harga Satuan
1,036.68 72,000.00 74,640,960.00 Harga Satuan
10.00 250,000.00 2,500,000.00 Harga Satuan
39.27 270,000.00 10,602,900.00 Harga Satuan
2,006.40 24,000.00 48,153,600.00 Harga Satuan
JUMLAH 616,176,482.20

588.00 1,073,806.80 631,398,398.40 Harga Satuan


259.00 16,802.47 4,351,839.73 Harga Satuan
65.33 31,685.06 2,069,984.97 Harga Satuan
JUMLAH 637,820,223.10

367.50 341,607.86 125,540,888.55 Harga Satuan


JUMLAH 125,540,888.55

20.00 549,302.04 10,986,040.80 Harga Satuan


26.00 72,000.00 1,872,000.00 Harga Satuan
86.00 24,000.00 2,064,000.00 Harga Satuan
JUMLAH 14,922,040.80

37.83 392,646.40 14,853,813.31 Harga Satuan


JUMLAH 14,853,813.31

0.60 1,073,806.80 644,284.08 Harga Satuan


98.15 15,113.31 1,483,371.38 Harga Satuan
6.00 549,302.04 3,295,812.24 Harga Satuan
13.50 72,000.00 972,000.00 Harga Satuan
13.50 52,200.00 704,700.00 Harga Satuan
13.50 57,000.00 769,500.00 Harga Satuan
164.15 19,652.16 3,225,902.06 Harga Satuan
5.57 58,600.00 326,402.00 Harga Satuan
1.00 350,000.00 350,000.00 Harga Satuan
4.00 500,000.00 2,000,000.00 Harga Satuan
11.00 2,500,000.00 27,500,000.00 Harga Satuan
JUMLAH 41,271,971.76
4.00 13,427,176.78 53,708,707.12 Harga Satuan
1.00 3,500,000.00 3,500,000.00
1.00 175,000.00 175,000.00
1.00 4,500,000.00 4,500,000.00
1.00 3,500,000.00 3,500,000.00
1.00 750,000.00 750,000.00
1.00 1,002,176.78 1,002,176.78
JUMLAH 53,708,707.12
REKAPITULAS

PEKERJAAN : Pengembangan Fasilitas Pelabuhan Perikanan Cikidang


LOKASI : Pelabuhan Perikanan Cikidang, Desa Babakan Pangandaran
TAHUN ANGGARAN : 2019
WAKTU PELAKSANAAN : 150 (seratus lima puluh) hari kalender sejak SPMK

NO. URAIAN PEKERJAAN

A Pekerjaan Persiapan

B Pekerjaan Perluasan Kolam

B.1 Pekerjaan galian pasir dan pemindahan

B.2 Pekerjaan revetment

B.2.1 Revetment type-1&2 panjang 246 m

B.2.2 Revetment type-3&4 panjang 229,5 m

B.2.3 Revetment type-3 panjang 120 m

C Pekerjaan Perkerasan jalan

C.1 Beton rigid jalan

C.2 Perkerasan berbutir

C.3 Dinding penahan area landing fish

C.4 Pekerjaan Rip Penahan Sedimen panjang 16 m

D Pekerjaan Sign Post

D.1 Balk Beton 20x20 cm

D.2 LPJU Solar Cell


Terbilang:
REKAPITULASI

ngembangan Fasilitas Pelabuhan Perikanan Cikidang


abuhan Perikanan Cikidang, Desa Babakan Pangandaran

0 (seratus lima puluh) hari kalender sejak SPMK

JUML
URAIAN PEKERJAAN

Rp.

r dan pemindahan Rp.

panjang 246 m Rp.

panjang 229,5 m Rp.

njang 120 m Rp.

Rp.

Rp.

landing fish Rp.

n Sedimen panjang 16 m Rp.

Rp.

Rp.
JUMLAH TOTAL Rp.
PPN (10%) Rp.
JUMLAH TOTAL Rp.
DIBULATKAN Rp.

Bandung, ...... 20
Dibuat Oleh
Penawar
PT. .........................

...............................
Direktur
JUMLAH TOTAL
( Rp )

976,569,398

2,470,160,457

1,243,767,143

1,114,529,792

616,176,482

637,820,223

125,540,889

14,922,041

14,853,813

41,271,972

53,708,707
7,309,320,916
730,932,092
8,040,253,008
8,040,250,000

andung, ...... 2019


buat Oleh

T. ..........................

.............................
ANALISA HARGA SATUAN PE

Pekerjaan : Pengembangan Fasilitas Pelabuhan Perikanan Cikidang


Lokasi : Pelabuhan Perikanan Cikidang, Desa Babakan Pangandaran
T. A : 2019

MATERIAL
No. URAIAN PEKERJAAN

KOEF. SAT.

1 Pengukuran dan Pasang Bouwplank / m'


Bahan
- Papan terentang 2/20 0.002 m3
- Kaso 4/6 0.002 m3
- Paku 5/7 0.050 kg
- Peralatan bantu 1.000 ls

Upah
- Pekerja 0.072 hari
- Tukang 0.036 hari
- Kepala tukang 0.009 hari
- Mandor 0.001 hari

2 Direksi Keet / m2
Bahan
- Kayu Merant 0.032 m3
- Paku 1.500 kg
- Asbes Gelombang 1.041 lbr
- Triplex 4 mm 0.833 lbr
- Portland Cement 0.600 sak
- Pasir Pasang 0.120 m3
- Bataco 25.000 bh
- Peralatan bantu 1.000 ls
MATERIAL
No. URAIAN PEKERJAAN

KOEF. SAT.

Upah
- Pekerja 0.562 hari
- Tukang 0.337 hari
- Kepala Tukang 0.084 hari
- Mandor 0.016 hari

3 Pagar Pengaman Proyek / m'


Bahan
- Kayu 0.042 m3
- Paku 0.100 kg
- Seng gelombang 1.250 lbr
- Pengecatan bagian luar 0.500 kg
- Peralatan bantu 1.000 ls

Upah
- Pekerja 0.150 hari
- Tukang 0.090 hari
- Kepala Tukang 0.022 hari
- Mandor 0.004 hari

4 Pengupasan Lahan / m2
Bahan
- Peralatan bantu 1.000 ls

Upah
- Pekerja 0.054 hari
- Tukang 0.018 hari
- Kepala Tukang 0.004 hari
- Mandor - hari

5 Bak. Kontrol saluran terbuka 45x45x50 cm (Inc.galian)/bh


MATERIAL
No. URAIAN PEKERJAAN

KOEF. SAT.

Bahan
- Beton K-250 0.216 m3
- Besi (100 kg/m^3) 21.616 kg
- Kawat Beton 0.432 kg
- Bekistng 0.960 m2

Upah
- Upah Galian 0.324 m3
- Pekerja 1.080 hari
- Tukang 0.720 hari
- Kepala Tukang 0.180 hari
- Mandor 0.036 hari

6 Kansteen ( Terpasang ) / m'


Bahan
- Kanstein 1.666 bh
- Mortar 0.006 m3

Upah
- Pekerja 0.144 hari
- Tukang batu 0.054 hari
- Kepala tukang 0.013 hari
- Mandor 0.002 hari

7 Paving blok / m2
Bahan
- Paving t = 6 cm 1.000 m2
- Pasir Urug 0.070 m3

Upah
- Pekerja 0.120 hari
- Tukang batu 0.060 hari
MATERIAL
No. URAIAN PEKERJAAN

KOEF. SAT.

- Kepala tukang 0.015 hari


- Mandor 0.003 hari

8 Galian Tanah Biasa / m3


Bahan
- Peralatan bantu 1.000 ls

Upah
- Pekerja 0.450 hari
- Tukang 0.225 hari
- Kepala Tukang 0.056 hari
- Mandor 0.011 hari

9 Buang Tanah / m3
Bahan
- Peralatan bantu 1.000 ls

Upah
- Pekerja 0.225 hari
- Tukang - hari
- Kepala Tukang - hari
- Mandor 0.022 hari

10 Urugan Pasir / m3
Bahan
- Pasir urug 1.200 m3
- Peralatan bantu 1.000 ls

Upah
- Pekerja 0.360 hari
- Tukang 0.090 hari
- Kepala Tukang - hari
MATERIAL
No. URAIAN PEKERJAAN

KOEF. SAT.

- Mandor 0.036 hari

11 Urugan Tanah / m3
Bahan
- Tanah Urugan 1.200 m3
- Stamper 1.000 jam

Upah
- Pekerja 0.180 hari
- Tukang 0.090 hari
- Kepala Tukang - hari
- Mandor 0.018 hari

12 Pondasi Batu Kali 1 : 4


Bahan
- Batu kali 1.2000 m3
- Portland cement (PC) 163.0000 kg
Pasir Pasang 0.5200 m3
Upah
- Tukang batu 0.6000 org/hr
- Kepala tukang 0.0600 org/hr
- Pekerja 1.5000 org/hr
- Mandor 0.0750 org/hr
MATERIAL
No. URAIAN PEKERJAAN

KOEF. SAT.

13 Pondasi Bronjong 1m3


Bahan
- Kawat bronjong no 10 4 mm 7.2030 kg
- Batu kali 1.2000 m3

Upah
- Tukang besi 0.4000 org/hr
- Tukang batu 0.3900 org/hr
- Kepala tukang 0.0390 org/hr
- Pekerja 1.5600 org/hr
- Mandor 0.0195 org/hr

12 Urugan Tanah Kembali / m3


Bahan
- Peralatan bantu 1.000 ls

Upah
- Pekerja 0.240 hari
- Tukang 0.060 hari
- Kepala Tukang - hari
- Mandor 0.024 hari

13 Urugan Sirtu / m3
Bahan
- Sirtu 1.150 m3
- Peralatan bantu 1.000 ls

Upah
- Pekerja 0.480 hari
- Tukang 0.120 hari
- Kepala Tukang - hari
- Mandor 0.048 hari
MATERIAL
No. URAIAN PEKERJAAN

KOEF. SAT.

14 Rabat Beton 1:3:5 ( Lantai Kerja ) / m3


Bahan
- Batu Pecah / Split 0.928 m3
- Pasir Beton 0.557 m3
- Semen PC 4.642 sak
- Concrete Mixer 0.166 hari
- Air Kerja 50.000 ltr

Upah
- Pekerja 0.900 hari
- Tukang batu 0.450 hari
- Kepala Tukang 0.112 hari
- Mandor 0.022 hari

15 Saluran Precast 40x40 (incld. galian) / m'


Bahan
- Beton 0.096 m3
- Bekistng 2.480 m2
- Besi beton 8.074 kg
- Kawat Beton 0.161 kg

Upah
- Upah Galian 1.000 ls
- Pekerja 0.600 hari
- Tukang 0.300 hari
- Kepala Tukang 0.075 hari
- Mandor 0.015 hari

16 Baja / kg
Bahan
- Baja 1.000 kg
MATERIAL
No. URAIAN PEKERJAAN

KOEF. SAT.

- Alat bantu 1.000 ls

Upah
- Pekerja 0.021 hari
- Tukang besi 0.014 hari
- Kepala Tukang Besi 0.003 hari
- Mandor - hari
MATERIAL
No. URAIAN PEKERJAAN

KOEF. SAT.

17 Readymix K-350 /m3

Bahan
- Beton Readymix K-350 1.050 m3

Alat
- Concrete Vibrator 0.100 hari

Upah
- Pekerja 0.360 hari
- Tukang Batu 0.240 hari
- Kepala Tukang Batu 0.060 hari
- Mandor 0.012 hari

18 Readymix K-225 /m3

Bahan
- Beton Readymix K-225 1.050 m3

Alat
- Concrete Vibrator 0.066 hari

Upah
- Pekerja 0.360 hari
- Tukang Batu 0.240 hari
- Kepala Tukang Batu 0.060 hari
- Mandor 0.012 hari

19 Buis Beton Cerobong Sampah 1m

Bahan
- Beton Readymix K-350 0.231 m3
MATERIAL
No. URAIAN PEKERJAAN

KOEF. SAT.

Besi D 10 + Begel + Bendrat 24.000 kg


Besi Clam 15.000 kg
Alat
- Concrete Vibrator 0.466 hari
- Moulding 2.514 m2

Upah
- Pekerja 0.360 hari
- Tukang Batu 0.240 hari
- Kepala Tukang Batu 0.060 hari
- Mandor 0.012 hari

20 Besi Beton /kg


Bahan
- Besi beton 1.050 kg
- Kawat bendrat 0.015 kg

Alat
Peralatan bantu 1.000 ls

Upah
- Pekerja 0.015 hari
- Tukang besi 0.010 hari
- Kepala Tukang Besi 0.002 hari
- Mandor 0.0004 hari

21 Bekisting Balok /m2

Bahan
- Kayu Rangka Bekistng 0.002 m3
- Multplex Phenol Film 12 mm 0.048 lbr
MATERIAL
No. URAIAN PEKERJAAN

KOEF. SAT.

Alat
- Peralatan bantu 1.000 ls

Upah
Upah Pasang
- Pekerja 0.026 hari
- Tukang Kayu 0.017 hari
- Kepala Tukang Kayu 0.004 hari
- Mandor 0.001 hari
Upah Bongkar
- Pekerja 0.020 hari
- Tukang Kayu 0.013 hari
- Kepala Tukang Kayu 0.003 hari
- Mandor 0.001 hari
MATERIAL
No. URAIAN PEKERJAAN

KOEF. SAT.

22 Bekisting Plat / m2

Bahan
- Kayu Rangka Bekistng 0.002 m3
- Multplex Phenol Film 12 mm 0.064 lbr

Alat
- Peralatan bantu 1.000 ls

Upah
Upah Pasang
- Pekerja 0.026 hari
- Tukang Kayu 0.017 hari
- Kepala Tukang Kayu 0.004 hari
- Mandor 0.001 hari
Upah Bongkar
- Pekerja 0.020 hari
- Tukang Kayu 0.013 hari
- Kepala Tukang Kayu 0.003 hari
- Mandor 0.001 hari

23 Bekisting Kolom / m2

Bahan
- Kayu Rangka Bekistng 0.002 m3
- Multplex Phenol Film 12 mm 0.048 lbr

Alat
- Peralatan bantu 1.000 ls

Upah
Upah Pasang
MATERIAL
No. URAIAN PEKERJAAN

KOEF. SAT.

- Pekerja 0.026 hari


- Tukang Kayu 0.017 hari
- Kepala Tukang Kayu 0.004 hari
- Mandor 0.001 hari
Upah Bongkar
- Pekerja 0.020 hari
- Tukang Kayu 0.013 hari
- Kepala Tukang Kayu 0.003 hari
- Mandor 0.001 hari

24 Wiremesh / kg
Bahan
- Wiremesh 1.050 kg

Alat
Peralatan bantu 1.000 ls

Upah
- Pekerja 0.004 hari
- Tukang besi 0.009 hari
- Kepala Tukang Besi 0.002 hari
- Mandor 0.0004 hari

25 Grouting Kolom / m3
Bahan
- Semen Groutng 1,795.774 kg
- Air Bersih 20.000 ltr

Alat
Peralatan bantu 1.000 ls
MATERIAL
No. URAIAN PEKERJAAN

KOEF. SAT.

Upah
- Pekerja 2.250 hari
- Tukang 2.250 hari
- Kepala Tukang 0.562 hari
- Mandor 0.112 hari
MATERIAL
No. URAIAN PEKERJAAN

KOEF. SAT.

26 Grouting Joint / m3
Bahan
- Semen Groutng 566.182 kg
- Batu Pecah / Screening 0.728 m3
- Air Bersih 20.000 ltr

Alat
Peralatan bantu 1.000 ls

Upah
- Pekerja 2.571 hari
- Tukang 2.571 hari
- Kepala Tukang 0.642 hari
- Mandor 0.1280 hari

27 Pasangan Turap Batu Kali


Bahan
- Pasir Pasang 0.522 m3
- Semen PC 162.860 kg
- Batu Kali 1.100 m3

Alat
Peralatan bantu 1.000 ls

Upah
- Pekerja 0.424 hari
- Tukang 0.212 hari
- Kepala Tukang 0.106 hari
- Mandor 0.0530 hari

28 Bekisting Pile Cap / m2


MATERIAL
No. URAIAN PEKERJAAN

KOEF. SAT.

Bahan
- Kayu Rangka Bekistng 0.010 m3
- Multpleks t= 9 mm 0.191 lbr

Alat
- Peralatan bantu 1.000 ls

Upah
Upah Pasang
- Pekerja 0.166 hari
- Tukang Kayu 0.157 hari
- Kepala Tukang Kayu 0.014 hari
- Mandor 0.014 hari
Upah Bongkar
- Pekerja 0.130 hari
- Tukang Kayu 0.123 hari
- Kepala Tukang Kayu 0.013 hari
- Mandor 0.001 hari

29 Bekisting Tangga / m2

Bahan
- Kayu Rangka Bekistng 0.010 m3
- Multplex Phenol Film 12 mm 0.191 lbr

Alat
- Peralatan bantu (Scafolding Dll) 0.750 set

Upah
Upah Pasang
- Pekerja 0.160 hari
- Tukang Kayu 0.090 hari
MATERIAL
No. URAIAN PEKERJAAN

KOEF. SAT.

- Kepala Tukang Kayu 0.010 hari


- Mandor 0.010 hari
Upah Bongkar
- Pekerja 0.100 hari
- Tukang Kayu 0.050 hari
- Kepala Tukang Kayu 0.005 hari
- Mandor 0.008 hari
HARGA SATUAN PEKERJAAN

KEUNTUNGAN
MATERIAL + UPAH PEMBORONG
TOTAL HARGA
KET.
HARGA SATUAN JUMLAH HARGA 10%
( Rp ) ( Rp ) ( Rp ) ( Rp )

30,009.76
11,600.00 1,160.00 12,760.00
2,700,000.00 5,400.00
2,350,000.00 4,700.00
20,000.00 1,000.00
500.00 500.00

15,681.60 1,568.16 17,249.76


123,700.00 8,906.40
143,700.00 5,173.20
158,700.00 1,428.30
173,700.00 173.70

563,853.51
378,537.80 37,853.78 416,391.58
2,350,000.00 75,200.00
20,000.00 30,000.00
63,700.00 66,311.70
87,700.00 73,054.10
73,100.00 43,860.00
242,600.00 29,112.00
2,400.00 60,000.00
1,000.00 1,000.00
KEUNTUNGAN
MATERIAL + UPAH PEMBORONG
TOTAL HARGA
KET.
HARGA SATUAN JUMLAH HARGA 10%
( Rp ) ( Rp ) ( Rp ) ( Rp )

134,056.30 13,405.63 147,461.93


123,700.00 69,519.40
143,700.00 48,426.90
158,700.00 13,330.80
173,700.00 2,779.20

257,124.12
198,075.00 19,807.50 217,882.50
2,350,000.00 98,700.00
20,000.00 2,000.00
63,700.00 79,625.00
34,500.00 17,250.00
500.00 500.00

35,674.20 3,567.42 39,241.62


123,700.00 18,555.00
143,700.00 12,933.00
158,700.00 3,491.40
173,700.00 694.80

16,391.32
5,000.00 500.00 5,500.00
5,000.00 5,000.00

9,901.20 990.12 10,891.32


123,700.00 6,679.80
143,700.00 2,586.60
158,700.00 634.80
173,700.00 -

804,614.44
KEUNTUNGAN
MATERIAL + UPAH PEMBORONG
TOTAL HARGA
KET.
HARGA SATUAN JUMLAH HARGA 10%
( Rp ) ( Rp ) ( Rp ) ( Rp )
423,843.20 42,384.32 466,227.52
836,000.00 180,576.00
9,200.00 198,867.20
25,000.00 10,800.00
35,000.00 33,600.00

307,624.48 30,762.44 338,386.92


110,324.94 35,745.28
123,700.00 133,596.00
143,700.00 103,464.00
158,700.00 28,566.00
173,700.00 6,253.20

80,486.31
45,186.28 4,518.62 49,704.90
25,000.00 41,650.00
589,380.00 3,536.28

27,983.10 2,798.31 30,781.41


123,700.00 17,812.80
143,700.00 7,759.80
158,700.00 2,063.10
173,700.00 347.40

130,302.26
92,089.00 9,208.90 101,297.90
80,000.00 80,000.00
172,700.00 12,089.00

26,367.60 2,636.76 29,004.36


123,700.00 14,844.00
143,700.00 8,622.00
KEUNTUNGAN
MATERIAL + UPAH PEMBORONG
TOTAL HARGA
KET.
HARGA SATUAN JUMLAH HARGA 10%
( Rp ) ( Rp ) ( Rp ) ( Rp )
158,700.00 2,380.50
173,700.00 521.10

110,324.94
1,500.00 150.00 1,650.00
1,500.00 1,500.00

98,795.40 9,879.54 108,674.94


123,700.00 55,665.00
143,700.00 32,332.50
158,700.00 8,887.20
173,700.00 1,910.70

45,269.29
5,000.00 500.00 5,500.00
5,000.00 5,000.00

36,153.90 3,615.39 39,769.29


143,700.00 32,332.50
143,700.00 -
158,700.00 -
173,700.00 3,821.40

300,254.02
209,240.00 20,924.00 230,164.00
172,700.00 207,240.00
2,000.00 2,000.00

63,718.20 6,371.82 70,090.02


123,700.00 44,532.00
143,700.00 12,933.00
158,700.00 -
KEUNTUNGAN
MATERIAL + UPAH PEMBORONG
TOTAL HARGA
KET.
HARGA SATUAN JUMLAH HARGA 10%
( Rp ) ( Rp ) ( Rp ) ( Rp )
173,700.00 6,253.20

152,859.41
100,637.50 10,063.75 110,701.25
66,000.00 79,200.00
21,437.50 21,437.50

38,325.60 3,832.56 42,158.16


123,700.00 22,266.00
143,700.00 12,933.00
158,700.00 -
173,700.00 3,126.60

549,302.04
437,732.04 - 437,732.04
167,012.00 200,414.40
1,025.00 167,075.00
135,082.00 70,242.64
111,570.00 - 111,570.00
55,000.00 33,000.00
57,000.00 3,420.00
47,000.00 70,500.00
62,000.00 4,650.00
KEUNTUNGAN
MATERIAL + UPAH PEMBORONG
TOTAL HARGA
KET.
HARGA SATUAN JUMLAH HARGA 10%
( Rp ) ( Rp ) ( Rp ) ( Rp )
392,646.40
272,444.40 - 272,444.40
10,000.00 72,030.00
167,012.00 200,414.40

120,202.00 - 120,202.00
55,000.00 22,000.00
55,000.00 21,450.00
57,000.00 2,223.00
47,000.00 73,320.00
62,000.00 1,209.00

47,826.68
1,000.00 100.00 1,100.00
1,000.00 1,000.00

42,478.80 4,247.88 46,726.68


123,700.00 29,688.00
143,700.00 8,622.00
158,700.00 -
173,700.00 4,168.80

341,607.86
225,595.00 22,559.50 248,154.50
195,300.00 224,595.00
1,000.00 1,000.00

84,957.60 8,495.76 93,453.36


123,700.00 59,376.00
143,700.00 17,244.00
158,700.00 -
173,700.00 8,337.60
KEUNTUNGAN
MATERIAL + UPAH PEMBORONG
TOTAL HARGA
KET.
HARGA SATUAN JUMLAH HARGA 10%
( Rp ) ( Rp ) ( Rp ) ( Rp )

1,002,176.78
717,300.40 71,730.04 789,030.44
230,000.00 213,440.00
242,600.00 135,128.20
73,100.00 339,330.20
147,000.00 24,402.00
100.00 5,000.00

193,769.40 19,376.94 213,146.34


123,700.00 111,330.00
143,700.00 64,665.00
158,700.00 17,774.40
173,700.00 3,821.40

536,277.21
245,361.80 24,536.18 269,897.98
836,000.00 80,256.00
35,000.00 86,800.00
9,200.00 74,280.80
25,000.00 4,025.00

242,162.94 24,216.29 266,379.23


110,324.94 110,324.94
123,700.00 74,220.00
143,700.00 43,110.00
158,700.00 11,902.50
173,700.00 2,605.50

19,652.16
12,780.00 1,278.00 14,058.00
12,730.00 12,730.00
KEUNTUNGAN
MATERIAL + UPAH PEMBORONG
TOTAL HARGA
KET.
HARGA SATUAN JUMLAH HARGA 10%
( Rp ) ( Rp ) ( Rp ) ( Rp )
50.00 50.00

5,085.60 508.56 5,594.16


123,700.00 2,597.70
143,700.00 2,011.80
158,700.00 476.10
173,700.00 -
KEUNTUNGAN
MATERIAL + UPAH PEMBORONG
TOTAL HARGA
KET.
HARGA SATUAN JUMLAH HARGA 10%
( Rp ) ( Rp ) ( Rp ) ( Rp )
1,078,205.04

877,800.00 87,780.00 965,580.00


836,000.00 877,800.00

11,760.00 1,176.00 12,936.00


117,600.00 11,760.00

90,626.40 9,062.64 99,689.04


123,700.00 44,532.00
143,700.00 34,488.00
158,700.00 9,522.00
173,700.00 2,084.40

1,073,806.80

877,800.00 87,780.00 965,580.00


836,000.00 877,800.00

7,761.60 776.16 8,537.76


117,600.00 7,761.60

90,626.40 9,062.64 99,689.04


123,700.00 44,532.00
143,700.00 34,488.00
158,700.00 9,522.00
173,700.00 2,084.40

847,488.04

551,916.00 55,191.60 607,107.60


836,000.00 193,116.00
KEUNTUNGAN
MATERIAL + UPAH PEMBORONG
TOTAL HARGA
KET.
HARGA SATUAN JUMLAH HARGA 10%
( Rp ) ( Rp ) ( Rp ) ( Rp )
9,200.00 220,800.00
9,200.00 138,000.00
127,901.28 12,790.12 140,691.40
117,600.00 54,801.60
29,073.74 73,099.68

90,626.40 9,062.64 99,689.04


123,700.00 44,532.00
143,700.00 34,488.00
158,700.00 9,522.00
173,700.00 2,084.40

15,113.31
10,035.00 1,003.50 11,038.50
9,200.00 9,660.00
25,000.00 375.00

25.00 2.50 27.50


25.00 25.00

3,679.38 367.93 4,047.31


123,700.00 1,855.50
143,700.00 1,437.00
158,700.00 317.40
173,700.00 69.48

29,073.74

14,471.18 1,447.11 15,918.29


2,700,000.00 5,400.00
190,000.00 9,071.18
KEUNTUNGAN
MATERIAL + UPAH PEMBORONG
TOTAL HARGA
KET.
HARGA SATUAN JUMLAH HARGA 10%
( Rp ) ( Rp ) ( Rp ) ( Rp )
500.00 50.00 550.00
500.00 500.00

11,459.50 1,145.95 12,605.45


6,467.60
123,700.00 3,216.20
143,700.00 2,442.90
158,700.00 634.80
173,700.00 173.70
4,991.90
123,700.00 2,474.00
143,700.00 1,868.10
158,700.00 476.10
173,700.00 173.70
KEUNTUNGAN
MATERIAL + UPAH PEMBORONG
TOTAL HARGA
KET.
HARGA SATUAN JUMLAH HARGA 10%
( Rp ) ( Rp ) ( Rp ) ( Rp )
31,685.06

17,494.90 1,749.49 19,244.39


2,700,000.00 5,400.00
190,000.00 12,094.90

500.00 50.00 550.00


500.00 500.00

10,809.70 1,080.97 11,890.67


6,293.90
123,700.00 3,216.20
143,700.00 2,442.90
158,700.00 634.80
173,700.00 173.70
4,515.80
123,700.00 2,474.00
143,700.00 1,868.10
158,700.00 476.10
173,700.00 173.70

28,358.96

14,471.18 1,447.11 15,918.29


2,700,000.00 5,400.00
190,000.00 9,071.18

500.00 50.00 550.00


500.00 500.00

10,809.70 1,080.97 11,890.67


6,293.90
KEUNTUNGAN
MATERIAL + UPAH PEMBORONG
TOTAL HARGA
KET.
HARGA SATUAN JUMLAH HARGA 10%
( Rp ) ( Rp ) ( Rp ) ( Rp )
123,700.00 3,216.20
143,700.00 2,442.90
158,700.00 634.80
173,700.00 173.70
4,515.80
123,700.00 2,474.00
143,700.00 1,868.10
158,700.00 476.10
173,700.00 173.70

16,802.47
12,600.00 1,260.00 13,860.00
12,000.00 12,600.00

500.00 50.00 550.00


500.00 500.00

2,174.98 217.49 2,392.47


123,700.00 494.80
143,700.00 1,293.30
158,700.00 317.40
173,700.00 69.48

9,480,569.34
7,903,405.60 790,340.56 8,693,746.16
4,400.00 7,901,405.60
100.00 2,000.00

5,000.00 500.00 5,500.00


5,000.00 5,000.00
KEUNTUNGAN
MATERIAL + UPAH PEMBORONG
TOTAL HARGA
KET.
HARGA SATUAN JUMLAH HARGA 10%
( Rp ) ( Rp ) ( Rp ) ( Rp )

710,293.80 71,029.38 781,323.18


123,700.00 278,325.00
143,700.00 323,325.00
158,700.00 89,189.40
173,700.00 19,454.40
KEUNTUNGAN
MATERIAL + UPAH PEMBORONG
TOTAL HARGA
KET.
HARGA SATUAN JUMLAH HARGA 10%
( Rp ) ( Rp ) ( Rp ) ( Rp )
3,865,009.72
2,697,040.80 269,704.08 2,966,744.88
4,400.00 2,491,200.80
280,000.00 203,840.00
100.00 2,000.00

5,000.00 500.00 5,500.00


5,000.00 5,000.00

811,604.40 81,160.44 892,764.84


123,700.00 318,032.70
143,700.00 369,452.70
158,700.00 101,885.40
173,700.00 22,233.60

750,475.02
572,308.52 57,230.85 629,539.37
242,600.00 126,637.20
1,462.00 238,101.32
188,700.00 207,570.00

1,000.00 100.00 1,100.00


1,000.00 1,000.00

108,941.50 10,894.15 119,835.65


123,700.00 52,448.80
143,700.00 30,464.40
158,700.00 16,822.20
173,700.00 9,206.10

143,729.69
KEUNTUNGAN
MATERIAL + UPAH PEMBORONG
TOTAL HARGA
KET.
HARGA SATUAN JUMLAH HARGA 10%
( Rp ) ( Rp ) ( Rp ) ( Rp )
49,916.66 4,991.66 54,908.32
2,700,000.00 27,000.00
120,000.00 22,916.66

1,500.00 150.00 1,650.00


1,500.00 1,500.00

79,246.70 7,924.67 87,171.37


45,316.90
123,700.00 20,534.20
143,700.00 22,560.90
158,700.00 2,221.80
173,700.00 2,431.80
33,929.80
123,700.00 16,081.00
143,700.00 17,675.10
158,700.00 2,063.10
173,700.00 173.70

139,383.85

63,284.72 6,328.47 69,613.19


2,700,000.00 27,000.00
190,000.00 36,284.72

67,500.00 6,750.00 74,250.00


90,000.00 67,500.00

55,256.60 - 55,256.60
34,312.00
123,700.00 19,792.00
143,700.00 12,933.00
KEUNTUNGAN
MATERIAL + UPAH PEMBORONG
TOTAL HARGA
KET.
HARGA SATUAN JUMLAH HARGA 10%
( Rp ) ( Rp ) ( Rp ) ( Rp )
158,700.00 1,587.00
173,700.00 1,737.00
20,944.60
123,700.00 12,370.00
143,700.00 7,185.00
158,700.00 793.50
173,700.00 1,389.60

Bandung, ...... 2019


..........................

............................
Direktur
FORMULIR REKAPITULASI PERHITUNGAN TINGKAT KOMPONEN DALAM NEGERI (TKDN)

Nama Penyedia Jasa : PT. TOTAL BOANERGES INDONESIA


Alamat : Jl. Tebet Raya No. 34 B RT. 009/004 Tebet Timur - Tebet - Jakarta Selatan
Paket Pekerjaan : RANCACILI - JAWA BARAT
Proyek/ Satuan Kerja : Satuan Kerja Pengembangan Kawasan Permukiman Perkotaan Strategis, Ditjen. Cipta Karya Kementerian Pekerjaan Umum
No. Pengadaan :
Nilai Gabungan Barang/Jasa (Rp.)
Uraian Pekerjaan Total TKDN Gabungan
DN LN Rp % KDN % TKDN Rp %
Barang Barang
I. Material Langsung (Bahan Baku) Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
II. Peralatan (Barang Jadi) Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
A. Sub-Total Barang Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Jasa Jasa
III. Manajemen Proyek dan Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
Perekayasaan
IV. Alat Kerja/Fasilitas Kerja Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
V. Konstruksi dan Fabrikasi Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
VI. Jasa Umum Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
B. Sub-Total Jasa Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509
C. Total Biaya (A + B) Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509

FORMULASI PERHITUNGAN : Jakarta, 4 FEBRUARI 2015


Nilai Barang Total - Nilai Barang Luar Negeri PT. TOTAL BOANERGES INDONESIA
% TKDN (Gabungan Barang dan Jasa) = Nilai Gabungan Barang dan Jasa
= Err:509

Nilai Jasa Total - Nilai Jasa Luar Negeri


Nilai Gabungan Barang dan Jasa
Err:509 Ir. Andy K. Manik
Direktur
MASTER SCHEDULE

Pekerjaan : RUSUNAWA
Lokasi : RANCACILI - JAWA BARAT
Tahun Anggaran : 2014

DURASI MINGGU PELAKSANAAN


BOBOT
No. JENIS PEKERJAAN KETERANGAN
(%)
(MINGGU) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
100 %

PEKERJAAN PERSIAPAN STANDART 155,000,000.00 Err:509 33 ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###

PEKERJAAN STANDART

PEKERJAAN STRUKTUR STANDART

A.1. PEKERJAAN STRUKTUR 12,756,019,814.90 Err:509 23 ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###

80 %
PEKERJAAN ARSITEKTUR STANDART

A.1. PEKERJAAN LANTAI #REF! #REF! 14 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
A.2. PEKERJAAN DINDING

A.2.A. PEK. PASANGAN DAN PLESTERAN Err:509 Err:509 20 ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
A.2.B. PEK. KUSEN PINTU / JENDELA + ASSESORIES Err:509 Err:509

A.3. PEKERJAAN PLAFOND Err:509 Err:509

A.4. PEKERJAAN UTILITAS Err:509 Err:509

A.5. PEKERJAAN FINISHING


60 %

A.5.A. PEKERJAAN PENGECATAN Err:509 Err:509

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL

A.1. PEKERJAAN INSTALASI PLAMBING 56,752,000.00 Err:509 10 ### ### ### ### ### ### ### ### ### ###
A.2. PEKERJAAN INSTALASI ELEKTRIKAL 37,899,700.00 Err:509 10 ### ### ### ### ### ### ### ### ### ###

PEKERJAAN NON STANDART 40 %

PEKERJAAN STRUKTUR NON STANDART

B.1. PEKERJAAN PONDASI BANGUNAN (*) 3,581,820,000.00 Err:509 12 ### ### ### ### ### ### ### ### ### ### ### ###
B.2. PEKERJAAN SEPTIC TANK BIO 2 (DUA) UNIT - Err:509

B.3. PEKERJAAN SUMUR RESAPAN 2 (DUA) UNIT - Err:509

PEKERJAAN ARSITEKTUR NON STANDART

B.1. PEKERJAAN SKYLIGHT Err:509 Err:509 23 ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### 20 %
B.2. PEKERJAAN ATAP CANOPY ENTRANCE Err:509 Err:509

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL

B.1. PEKERJAAN PEMADAM KEBAKARAN - Err:509

B.2. PEKERJAAN INSTALASI ELEKTRONIK - Err:509

B.3. PEKERJAAN SARANA DAN PRASARANA LINGKUNGAN (LUAR BANGUNAN) - Err:509

0%
RENCANA PROGRESS MINGGUAN Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

KUMULATIF RENCANA PROGRESS MINGGUAN 0.000 0.000 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Jakarta, 4 FEBRUARI 2015


Keterangan : PT. TOTAL BOANERGES INDONESIA
Mgg 32 = 1 hari kalender

Ir. Andy K. Manik


Direktur

59/632
DAFTAR KOMPONEN KOLOM PRECAST
Pekerjaan : RUMAH SUSUN SEDERHANA SEWA
Lokasi Bandung

QUANTITY QUANTITY
DIMENSI (M) JUMLAH PRECAST / 1 TOTAL
NO. TYPE KOMPONEN TOTAL NOS PRECAST

L B H Lt.DASAR Lt.1 Lt.2 Lt.3 Lt.4 Lt.5 Lt.6 Lt.7 Lt.8 Lt.atap (M3) (M3)

A KOLOM
1 K-1- 400x400 L=3,35 M 0.4 0.4 3.35 6 6.00 0.536 3.22
2 K-2 600x600 L=3,35 M 0.6 0.6 3.35 21 9 30.00 1.206 36.18
3 K-2A 600x600 L=3,35 M 0.6 0.6 3.35 24 24 48.00 1.206 57.89
4 K-3A 800x800 L=3,35 M 0.8 0.8 3.35 3 3 6.00 2.144 12.86
6 K-2 600x600 L=2,9 M 0.6 0.6 2.9 9 9 9 9 9 9 9 9 72.00 1.044 75.17
7 K-2A 600x600 L= 2,9 M 0.6 0.6 2.9 24 24 24 24 24 24 24 24 192.00 1.044 200.45
8 K-3A 800x800 L=2,9 M 0.8 0.8 2.9 3 3 3 3 3 3 3 3 24.00 1.856 44.54
9 K-L 300x500 L=3,35 M 0.3 0.5 3.35 8 8 16.00 0.21 3.36
10 K-L 300x500 L=2,9 M 0.3 0.5 2.9 8 8 8 8 8 8 8 56.00 0.21 11.76
TOTAL
54.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 450.00 445.43
KUBIKASI
DAFTAR KOMPONEN BALOK PRECAST
Pekerjaan : RUMAH SUSUN SEDERHANA SEWA Rancacili
Lokasi Bandung

QUANTITY QUANTITY TOTAL


DIMENSI (M)
PRECAST / 1 NOS PRECAST
NO. TYPE KOMPONEN TOTAL
B H P Lt.1 Lt.2 Lt.3 Lt.4 Lt.5 Lt.6 Lt.7 Lt.8 Atap (M3) (M3)

B. BALOK
1 B-1A 400X600 L=5,44 M 0.40 0.60 5.440 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 18.00 162.00 1.31 211.51
2 B-1Aa 400X600 L=5,34 M 0.40 0.60 5.340 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 6.00 38.00 1.28 48.70
3 B-1B 400X600 L=7,976 M 0.40 0.60 7.976 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 36.00 1.91 68.91
4 B-1C 400X600 L=4,72 M 0.40 0.60 4.720 12.00 12.00 1.13 13.59
5 B-1D 400X600 L= 6,44 M 0.40 0.60 6.440 6.00 6.00 1.55 9.27
6 B-1E 400X600 L= 2,49 M 0.40 0.60 2.490 6.00 6.00 0.60 3.59
7 B-1F 400X600 L= 7,078 M 0.40 0.60 7.078 6.00 6.00 1.70 10.19
8 B-1G 400X600 L= 1,708 M 0.40 0.60 1.708 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 54.00 0.41 22.14
9 B-1H 300X600 L= 3,298 M 0.30 0.60 3.298 12.00 12.00 0.59 7.12
10 B-2C 300X600 L= 5,44 M 0.30 0.60 5.440 12.00 1 1.00 1.00 1.00 1.00 1.00 1.00 19.00 0.59 11.28
11 B-2Cc 300X600 L= 5,24 M 0.30 0.60 5.240 2.00 1 1.00 1.00 1.00 6.00 0.98 5.88
12 B-2A 300X600 L= 7 M 0.30 0.60 7.000 8.00 8.00 8.00 8.00 8.00 8.00 8.00 56.00 0.94 52.82
13 B-2Aa 300X600 L= 7 M 0.30 0.60 7.000 1.00 2.00 2.00 2.00 1.00 1.00 1.00 10.00 1.26 12.60
14 B-2B 300X600 L= 7 M 0.30 0.60 7.000 2.00 2.00 2.00 2.00 2.00 2.00 2.00 14.00 1.26 17.64
15 B-4 200X600 L= 5,68 M 0.20 0.60 5.680 12.00 12.00 12.00 12.00 12.00 12.00 12.00 84.00 1.26 105.84
16 B-4A 200X600 L= 1,22 M 0.20 0.60 1.220 6.00 6.00 6.00 6.00 6.00 6.00 6.00 42.00 0.68 28.63
17 B-1Bb 400X600 L= 7,8 0.40 0.60 7.800 2 2.00 0.15 0.29
18 B-2Ac 300X600 L= 7.87 M 0.30 0.60 7.870 4.00 4.00 1.87 7.49
19 B-2Ad 300X600 L= 6.944 M 0.30 0.60 6.944 3.00 3.00 1.42 4.25
20 B-2Ae 300X600 L= 7,135 M 0.30 0.60 7.135 3.00 3.00 1.25 3.75
21 B-2d 300X600 L= 7,84 M 0.30 0.60 7.840 4.00 4.00 1.28 5.14
22 B-3A 200X600 L= 11,7 M 0.20 0.60 11.700 6.00 6.00 1.41 8.47
23 B-3Aa 200X600 L= 8 M 0.20 0.60 8.000 6.00 6.00 1.40 8.42
24 B-3Ab 200X600 L= 12 M 0.20 0.60 12.000 6.00 6.00 0.96 5.76
25 BL1-250X450 L=1,2 M 0.25 0.45 1.200 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 18.00 1.44 25.92
26 BL2-250X450 L= 0,86 M 0.25 0.45 0.860 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 9.00 0.14 1.22
27 BL3-250X450 L=2 M 0.25 0.45 2.000 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 36.00 0.10 3.48

95.00 70.00 70.00 70.00 70.00 70.00 70.00 70.00 75.00 660.00 TOTAL KUBIKASI 673.27
ANALISA VOLUME BETON (Vc) + VOLUME BAJA TULANGAN (kg)

STRUKTUR ATAS (komponen kolom) PRECAST


Jumlah Dimensi
No Komponen
(bh) B (m) H (m) L (m)

Kolom 30/50
K-1- 400x400 L=3,35 M 6.00 0.4 0.4 3.35
K-2 600x600 L=3,35 M 30.00 0.6 0.6 3.35
K-2A 600x600 L=3,35 M 48.00 0.6 0.6 3.35
K-3A 800x800 L=3,35 M 6.00 0.8 0.8 3.35
K-2 600x600 L=2,9 M 72.00 0.6 0.6 2.9
K-2A 600x600 L= 2,9 M 192.00 0.6 0.6 2.9
K-3A 800x800 L=2,9 M 24.00 0.8 0.8 2.9
K-L 300x500 L=3,35 M 16.00 0.3 0.5 3.35
K-L 300x500 L=2,9 M 56.00 0.3 0.5 2.9

REKAPITULASI ANALISA VOLUME BETON (Vc) + VOLUME BAJA TULANGAN (kg)

STRUKTUR ATAS (komponen kolom) PRECAST


Jumlah Beton (Vc) Grouting Ba
No Komponen
(bh) m3 (zak) f6
2.660
1 Kolom
K-1- 400x400 L=3,35 M 6.00 3.22 20.77
K-2 600x600 L=3,35 M 30.00 36.18 103.83
K-2A 600x600 L=3,35 M 48.00 57.89 166.12
K-3A 800x800 L=3,35 M 6.00 12.86 20.77
K-2 600x600 L=2,9 M 72.00 75.17 249.19
K-2A 600x600 L= 2,9 M 192.00 200.45 664.49
K-3A 800x800 L=2,9 M 24.00 44.54 83.06
K-L 300x500 L=3,35 M 16.00 11.26 55.37
K-L 300x500 L=2,9 M 56.00 34.16 193.81

Total 475.72 1,557.41 0.00


Waste (2%) 9.51 31.15 0.00
Grand Total 485.24 1,588.56 0.00
n tul yg dibutuhkan
( - ) waste/btg 0.00
( + ) waste/btg 0.00
ANALISA VOLUME BETON (Vc) + VOLUME BAJA TULANGAN (kg)

STRUKTUR ATAS (komponen balok) PRECAST

Jumlah
No Komponen
Dimensi
(bh) B (m) H (m) L (m)

2 Balok 30/45
B-1A 400X600 L=5,44 M 162.00 0.40 0.60 5.44
B-1Aa 400X600 L=5,34 M 38.00 0.40 0.60 5.34
B-1B 400X600 L=7,976 M 36.00 0.40 0.60 7.98
B-1C 400X600 L=4,72 M 12.00 0.40 0.60 4.72
B-1D 400X600 L= 6,44 M 6.00 0.40 0.60 6.44
B-1E 400X600 L= 2,49 M 6.00 0.40 0.60 2.49
B-1F 400X600 L= 7,078 M 6.00 0.40 0.60 7.08
B-1G 400X600 L= 1,708 M 54.00 0.40 0.60 1.71
B-1H 300X600 L= 3,298 M 12.00 0.30 0.60 3.30
B-2C 300X600 L= 5,44 M 19.00 0.30 0.60 5.44
B-2Cc 300X600 L= 5,24 M 6.00 0.30 0.60 5.24
B-2A 300X600 L= 7 M 56.00 0.30 0.60 7.00
B-2Aa 300X600 L= 7 M 10.00 0.30 0.60 7.00
B-2B 300X600 L= 7 M 14.00 0.30 0.60 7.00
B-4 200X600 L= 5,68 M 84.00 0.20 0.60 5.68
B-4A 200X600 L= 1,22 M 42.00 0.20 0.60 1.22
B-1Bb 400X600 L= 7,8 2.00 0.40 0.60 7.80
B-2Ac 300X600 L= 7.87 M 4.00 0.30 0.60 7.87
B-2Ad 300X600 L= 6.944 M 3.00 0.30 0.60 6.94
B-2Ae 300X600 L= 7,135 M 3.00 0.30 0.60 7.14
B-2d 300X600 L= 7,84 M 4.00 0.30 0.60 7.84
B-3A 200X600 L= 11,7 M 6.00 0.20 0.60 11.70
B-3Aa 200X600 L= 8 M 6.00 0.20 0.60 8.00
B-3Ab 200X600 L= 12 M 6.00 0.20 0.60 12.00
BL1-250X450 L=1,2 M 18.00 0.25 0.45 1.20
BL2-250X450 L= 0,86 M 9.00 0.25 0.45 0.86
BL3-250X450 L=2 M 36.00 0.25 0.45 2.00

REKAPITULASI ANALISA VOLUME BETON (Vc) + VOLUME BAJA TULANGAN (kg)

STRUKTUR ATAS (komponen balok) PRECAST


Jumlah Beton (Vc) Baja Tulangan (
No Komponen
(bh) m 3
f6 f8
2.660 4.740
2 Balok 30/45
B-1A 400X600 L=5,44 M 162.00 211.51
B-1Aa 400X600 L=5,34 M 38.00 48.70
B-1B 400X600 L=7,976 M 36.00 68.91
B-1C 400X600 L=4,72 M 12.00 13.59
B-1D 400X600 L= 6,44 M 6.00 9.27
B-1E 400X600 L= 2,49 M 6.00 3.59
B-1F 400X600 L= 7,078 M 6.00 10.19
B-1G 400X600 L= 1,708 M 54.00 22.14
B-1H 300X600 L= 3,298 M 12.00 7.12
B-2C 300X600 L= 5,44 M 19.00 18.60
B-2Cc 300X600 L= 5,24 M 6.00 5.66
B-2A 300X600 L= 7 M 56.00 70.56
B-2Aa 300X600 L= 7 M 10.00 12.60
B-2B 300X600 L= 7 M 14.00 17.64
B-4 200X600 L= 5,68 M 84.00 57.25
B-4A 200X600 L= 1,22 M 42.00 6.15

Total 583.49 0.00 0.00


Waste (2%) 11.67 0.00 0.00
Grand Total 595.16 0.00 0.00
n tul yg dibutuhkan
( - ) waste/btg 0.00 0.00
( + ) waste/btg 0.00 0.00
GRAND TOTAL ANALISA VOLUME BETON (Vc) + VOLUME BAJA TULANGAN (kg)

PEKERJAAN STRUKTUR BAWAH & ATAS (PRECAST)


Proyek RUSUNAWA PU TIPE 24

Beton (Vc) Grouting Baja Tulangan (


No Komponen
m 3
(zak) f6 f8
#REF! #REF!

1 Komponen Pondasi Sumuran 0.00

2 Komponen Pile Cap 0.00

3 Komponen Tie Beam (Sloof) 0.00

4 Komponen Kolom 475.72

5 Komponen Balok 583.49 0.00

6 Komponen Pelat lantai #REF! #REF!

7 Komponen Dinding Geser (SW) #REF!

8 Komponen Tangga 0.00

9 Komponen Grountank 0.00

Total #REF! 1,557.41 0.00 #REF!


Waste (2%) 0.00 0.00 0.00 0.00
Grand Total #REF! 1,557.41 0.00 #REF!
Tonase 0.00 #REF!
n tul yg dibutuhkan
( - ) waste/btg #REF! #REF!
( + ) waste/btg #REF! #REF!

STR ATAS 0.00 #REF!


STR BWH 0.00
nsi Beton (Vc) Grouting Baja Tulangan (Ws)/kg

L stirup m3 (bh) f6 f8 D10 D13 D16


0.222 0.395 0.617 1.040 1.580

1.44 0.54 6 24.03


3.38 1.21 18 29.91 70.36
3.38 1.21 16 29.91 70.36
5.74 2.14 18 48.82 119.39
3.38 1.04 10 25.73 63.32
3.38 1.04 16 25.73 63.32
5.74 1.86 18 41.73 107.45
2.60 0.70 10 23.63 54.08
2.60 0.61 10 20.42 48.67

Baja Tulangan (Ws)/kg Bendrat


f8 D10 D13 D16 D19 D22 (kg)
4.740 7.400 12.480 18.960 26.760 35.760 25.000

144.16 - 279.11 6.35


897.23 2,110.68 5,469.49 127.16
1,435.56 3,377.09 7,792.82 189.08
292.90 716.35 1,093.90 31.55
1,852.81 4,559.07 6,411.05 192.34
4,940.84 12,157.52 27,051.72 662.25
1,001.61 2,578.87 3,796.28 110.65
378.10 865.28 1,226.68 37.05
1,143.67 2,725.63 3,731.41 114.01

0.00 12,086.88 29,090.48 0.00 279.11 56,573.36 1,470.45


0.00 241.74 581.81 0.00 5.58 1,131.47 29.41
0.00 12,328.62 29,672.29 0.00 284.69 57,704.83 1,499.86

0.00 1,634.00 2,331.00 0.00 11.00 1,583.00 59.00


0.00 1,667.00 2,378.00 0.00 11.00 1,614.00 60.00
nsi Penulangan Balok Beton (Vc) Baja Tula
L stirup tump Lap m3 f6 f8
jml tot dia jml tot dia 0.222 0.395
22 22 19.00
2.21 8.00 D22 6.00 D22 1.31
2.21 8.00 D22 6.00 D22 1.28
2.21 9.00 D22 6.00 D22 1.91
2.21 6.00 D22 6.00 D22 1.13
2.21 6.00 D22 6.00 D22 1.55
2.21 9.00 D22 6.00 D22 0.60
2.21 9.00 D22 6.00 D22 1.70
2.21 13.00 D22 6.00 D22 0.41
1.91 6.00 D22 6.00 D22 0.59
1.91 6.00 D22 6.00 D22 0.98
1.91 6.00 D22 6.00 D22 0.94
1.91 8.00 D22 6.00 D22 1.26
1.91 8.00 D22 6.00 D22 1.26
1.91 8.00 D22 6.00 D22 1.26
1.61 6.00 D22 6.00 D22 0.68
1.61 6.00 D22 6.00 D22 0.15
1.86 10.00 D22 6.00 D22 1.87
1.66 6.00 D22 6.00 D22 1.42
1.66 10.00 D22 6.00 D22 1.25
1.66 10.00 D22 6.00 D22 1.28
1.66 6.00 D22 6.00 D22 1.41
1.46 6.00 D22 6.00 D22 1.40
1.46 6.00 D22 6.00 D22 0.96
1.46 6.00 D22 6.00 D22 1.44
1.24 6.00 D19 6.00 D19 0.14
1.24 6.00 D19 6.00 D19 0.10
1.24 6.00 D19 6.00 D19 0.23

Baja Tulangan (Ws)/kg Bendrat


D10 D13 D16 D19 D22 (kg)
7.400 12.480 18.960 26.760 35.760 25.000

11,319.79 13,152.46 367.08


2,603.56 3,028.52 84.48
3,495.06 4,496.99 119.88
724.22 761.13 22.28
492.72 518.95 15.18
223.34 234.53 6.87
525.37 665.20 17.86
1,495.81 1,724.95 48.31
473.56 532.30 15.09
1,151.78 1,388.57 38.11
356.67 422.40 11.69
4,250.41 5,848.19 151.48
759.00 1,044.32 27.05
1,062.60 1,462.05 37.87
4,481.05 6,409.27 163.35
743.21 692.67 21.54

34,158.17 0.00 0.00 0.00 42,382.50 1,148.11


683.16 0.00 0.00 0.00 847.65 22.96
34,841.33 0.00 0.00 0.00 43,230.15 1,171.07

4,616.00 0.00 0.00 0.00 1,186.00 46.00


4,709.00 0.00 0.00 0.00 1,209.00 47.00
ECAST)

Baja Tulangan (Ws)/kg Bendrat


D10 D13 D16 D19 D22 (roll) 0.02
#REF! #REF! #REF! #REF! #REF! 25.000

0.00

0.00

0.00

12,086.88 0.00 241.74

34,158.17 0.00 683.16

#REF! #REF!

#REF! #REF!

0.00 0.00 0.00

0.00 0.00

#REF! #REF! 0.00 0.00 0.00 #REF!


0.00 0.00 0.00 0.00 0.00 0.00
#REF! #REF! 0.00 0.00 0.00 #REF! TONASE
#REF! #REF! 0.00 0.00 0.00 #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!


#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! 0.00 0.00 #REF!


0.00 0.00 0.00 0.00 0.00
s)/kg Bendrat Total Bekisting

D19 D22 (kg) Vc-m3 Ws-kg Grout-zak (M2)


2.230 2.980 0.02

46.52 1.06 0.54 71.60 0.4020 5.36


182.32 4.24 1.21 286.82 1.2061 8.04
162.35 3.94 1.21 266.55 1.0721 8.04
182.32 5.26 2.14 355.78 1.2061 10.72
89.04 2.67 1.04 180.77 0.6700 6.96
140.89 3.45 1.04 233.40 1.0721 6.96
158.18 4.61 1.86 311.98 1.2061 9.28
76.67 2.32 0.70 156.69 0.6700 6.03
66.63 2.04 0.61 137.76 0.6700 5.22
Baja Tulangan (Ws)/kg Bendrat Total
D10 D13 D16 D19 D22 (kg) Vc-m3 Ws-kg
0.617 1.040 1.580 2.230 2.980 0.02

69.88 81.19 2.27 1.31 153.33


68.51 79.70 2.22 1.28 150.44
97.08 124.92 3.33 1.91 225.33
60.35 63.43 1.86 1.13 125.64
82.12 86.49 2.53 1.55 171.14
37.22 39.09 1.14 0.60 77.46
87.56 110.87 2.98 1.70 201.41
27.70 31.94 0.89 0.41 60.54
39.46 44.36 1.26 0.59 85.08
60.62 73.08 2.01 0.98 135.71
59.44 70.40 1.95 0.94 131.79
75.90 104.43 2.70 1.26 183.04
75.90 104.43 2.70 1.26 183.04
75.90 104.43 2.70 1.26 183.04
53.35 76.30 1.94 0.68 131.59
17.70 16.49 0.51 0.15 34.70
80.82 127.97 3.13 1.87 211.93
73.33 105.67 2.68 1.42 181.68
66.18 113.94 2.70 1.25 182.83
66.18 117.07 2.75 1.28 186.01
73.33 105.27 2.68 1.41 181.28
93.42 157.03 3.76 1.40 254.21
64.69 107.41 2.58 0.96 174.69
94.32 161.05 3.83 1.44 259.20
11.80 12.16 0.36 0.14 24.31
11.03 8.74 0.30 0.10 20.07
17.15 20.18 0.56 0.23 37.90
PO1

f6 0 #REF!

#REF! #REF! f8 #REF! #REF!

d10 #REF! #REF!

d13 #REF! #REF!

d16 0 #REF!

0 #REF! d19 0 #REF!

17079.08445 #REF! bendrad #REF!

TONASE
HCWS t = 15 cm )
Pekerjaan : RUMAH SUSUN SEDERHANA SEWA Rancacili
Lokasi Bandung

QUANTITY QUANTITY
DIMENSI (M) JUMLAH TOTAL PRECAST / 1 TOTAL
NO. TYPE KOMPONEN NOS PRECAST
P L T Lt.dsr/1 Lt.2 Lt.3 Lt.4 Lt.5 Lt.6 Lt.7 Lt.8 Dak Top (M2) (M3) (M3)

C PLAT (SLAB) ( HCWS )


1 HCWS LT. 1 - - 0.15 604.00 604.00 - 90.60
2 HCWS LT. 2 - - 0.15 604.00 604.00 - 90.60
3 HCWS LT. 3 - - 0.15 604.00 604.00 - 90.60
4 HCWS LT. 4 - - 0.15 604.00 604.00 - 90.60
5 HCWS LT. 5 - - 0.15 604.00 604.00 - 90.60
6 HCWS LT. 6 - - 0.15 604.00 604.00 - 90.60
7 HCWS LT. 7 - - 0.15 604.00 604.00 - 90.60
8 HCWS LT. 8 - - 0.15 604.00 604.00 - 90.60
9 HCWS LT. ATAP - - 0.15 604.00 604.00 - 90.60

TOTAL
604.00 604.00 604.00 604.00 604.00 604.00 604.00 604.00 - 5,436.00 815.40
KUBIKASI
DAFTAR HARGA PERALATAN

Pekerjaan : RUSUNAWA
Lokasi : RANCACILI - JAWA BARAT
Tahun Anggaran : 2014

No. JENIS / MACAM ALAT SATUAN HARGA SATUAN KETERANGAN

1 Beton Molen / Concrete Mixer hari 147,000.00 1 hari = 8 jam kerja


2 Bor Listrik hari 73,500.00
3 Concrete Vibrator hari 117,600.00
4 Crane Pancang hari 2,940,000.00
5 Generator Set hari 117,600.00
6 Gerinda / Metabo hari 49,000.00
7 Mesin Las hari 147,000.00
8 Mobil Minibus Panther hari 294,000.00
9 Mobil Pick Up hari 196,000.00
10 Mobile Crane hari 1,960,000.00
11 Motor Roda Dua hari 49,000.00
12 Scaffolding / Perancah set/hr 4,900.00
13 Stamper / Compactor hari 171,500.00
14 Theodolit hari 73,500.00
15 Trafo Las hari 73,500.00
16 Trowell hari 98,000.00
17 Truck Crane hari 1,176,000.00
18 Waterpass hari 73,500.00
19 Cetakan / Moulding set/hr 11,760.00

Jakarta, 4 FEBRUARI 2015


PT. TOTAL BOANERGES INDONESIA

Ir. Andy K. Manik


Direktur
REKAPITUL

BILL OF QUANTIT

Pekerjaan : RUSUNAWA
Lokasi : RANCACILI - JAWA BARAT
Tahun Anggaran : 2014
Zone : 3-4
Pondasi : Tiang Pancang 40x40, Kedalaman = 30 M

No. JENIS PEKERJAAN

I. PEKERJAAN PERSIAPAN

I.A. PEKERJAAN PERSIAPAN STANDART

II. PEKERJAAN 1 TWIN BLOK

II.A. PEKERJAAN STANDART

2.1.A. PEKERJAAN STRUKTUR STANDART


A.1. PEKERJAAN STRUKTUR

2.2.A. PEKERJAAN ARSITEKTUR STANDART


A.1. PEKERJAAN LANTAI
A.2. PEKERJAAN DINDING
0.00 PEK. PASANGAN DAN PLESTERAN
A.2.B. PEK. KUSEN PINTU / JENDELA + ASSESORIES
A.3. PEKERJAAN PLAFOND
A.4. PEKERJAAN UTILITAS
A.5. PEKERJAAN FINISHING
A.5.A. PEKERJAAN PENGECATAN

2.3.A. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


A.1. PEKERJAAN INSTALASI PLAMBING
A.2. PEKERJAAN INSTALASI ELEKTRIKAL

REKAPITULASI PEK. STRUKTUR, ARSITEKTUR, M/E (ZONE 3 - 4) 75/632


No. JENIS PEKERJAAN

II.B. PEKERJAAN NON STANDART

2.1.B. PEKERJAAN STRUKTUR NON STANDART


B.1. PEKERJAAN PONDASI BANGUNAN (*)
B.2. PEKERJAAN SEPTIC TANK BIO 2 (DUA) UNIT
B.3. PEKERJAAN SUMUR RESAPAN 2 (DUA) UNIT

2.2.B. PEKERJAAN ARSITEKTUR NON STANDART


B.1. PEKERJAAN SKYLIGHT
B.2. PEKERJAAN ATAP CANOPY ENTRANCE

2.3.B. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


B.1. PEKERJAAN PEMADAM KEBAKARAN
B.2. PEKERJAAN INSTALASI ELEKTRONIK
B.3. PEKERJAAN SARANA DAN PRASARANA LINGKUNGAN (LUAR BANGUNAN)

Terbilang : Sembilan Belas Milyar Tujuh Ratus Enam Puluh Sem

REKAPITULASI PEK. STRUKTUR, ARSITEKTUR, M/E (ZONE 3 - 4) 76/632


R E KAP ITU LAS I

BILL OF QUANTITY (BOQ)

ITEM PEKERJAAN DENGAN


JUMLAH HARGA KONTRAK LUMPSUM
ERJAAN
( Rp. ) JUMLAH HARGA
( Rp. )

TOTAL I : Rp 155,000,000.00 Rp 155,000,000.00

Rp 155,000,000.00 Rp 155,000,000.00

TOTAL II : Err:509 Err:509

SUB TOTAL II.A : Err:509 Err:509

Rp 12,756,019,814.90 Rp 12,756,019,814.90
Rp 12,756,019,814.90 Rp 12,756,019,814.90

Err:509 Err:509
#REF! #REF!
Err:509 Err:509
Err:509
Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509

Rp 94,651,700.00 Rp 94,651,700.00
Rp 56,752,000.00 Rp 56,752,000.00
Rp 37,899,700.00 Rp 37,899,700.00

REKAPITULASI PEK. STRUKTUR, ARSITEKTUR, M/E (ZONE 3 - 4) 77/632


ITEM PEKERJAAN DENGAN
JUMLAH HARGA KONTRAK LUMPSUM
ERJAAN
( Rp. ) JUMLAH HARGA
( Rp. )

SUB TOTAL II.B : Err:509 Err:509

Rp 3,581,820,000.00 Rp -
Rp 3,581,820,000.00 Rp -
Rp - Rp -
Rp - Rp -

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509

Rp - Rp -
Rp - Rp -
Rp - Rp -
GKUNGAN (LUAR BANGUNAN) Rp - Rp -

TOTAL I + II : Err:509 Err:509

DIBULATKAN : Err:509 Err:509

PPN 10 % : Err:509 Err:509

TOTAL : Err:509 Err:509


DI BULATKAN : Err:509 Err:509

mbilan Belas Milyar Tujuh Ratus Enam Puluh Sembilan Juta Enam Ratus Lima Belas Ribu Rupiah

Jakarta, 4 FEBRUARI 2015


PT. TOTAL BOANERGES INDONESIA

Ir. Andy K. Manik


Direktur

REKAPITULASI PEK. STRUKTUR, ARSITEKTUR, M/E (ZONE 3 - 4) 78/632


OQ)

ITEM PEKERJAAN DENGAN


KONTRAK UNIT PRICES
JUMLAH HARGA
( Rp. )

Rp -

Rp -

Err:509

Err:509

Rp -

Err:509

Rp -

REKAPITULASI PEK. STRUKTUR, ARSITEKTUR, M/E (ZONE 3 - 4) 79/632


ITEM PEKERJAAN DENGAN
KONTRAK UNIT PRICES
JUMLAH HARGA
( Rp. )

Rp 3,581,820,000.00

Rp 3,581,820,000.00
Rp 3,581,820,000.00

Rp -

Rp -

Err:509

Err:509

Err:509

Err:509
Err:509

Enam Ratus Lima Belas Ribu Rupiah

PT. TOTAL BOANERGES INDONESIA

REKAPITULASI PEK. STRUKTUR, ARSITEKTUR, M/E (ZONE 3 - 4) 80/632


R E KAP ITU LAS I
B I LL O F Q UANTITY ( B O Q ) - P E K E R JAAN PERSIAPA

Pekerjaan : RUSUNAWA
Lokasi : RANCACILI - JAWA BARAT
Tahun Anggaran : 2014

I. PEKERJAAN PERSIAPAN

No. URAIAN PEKERJAAN

A. PEKERJAAN PERSIAPAN

SUB TOTAL :

REKAP PEK. PERSIAPAN


R E KAP ITU LAS I
ITY ( B O Q ) - P E K E R JAAN PERSIAPAN

JUMLAH HARGA
( Rp. )

155,000,000.00

155,000,000.00

REKAP PEK. PERSIAPAN


R E KAP ITU LAS I
B I LL O F Q UANTITY ( B O Q ) - P E K E R JAAN STR

Pekerjaan : RUSUNAWA
Lokasi : RANCACILI - JAWA BARAT
Tahun Anggaran : 2014

2.1. PEKERJAAN STRUKTUR

No. URAIAN PEKERJAAN

2.1.A PEKERJAAN STRUKTUR NON STANDART


A.1 PEKERJAAN PONDASI BANGUNAN (*)
A.2 PEKERJAAN SEPTIC TANK BIO 2 (DUA) UNIT
A.3 PEKERJAAN SUMUR RESAPAN 2 (DUA) UNIT

2.1.B PEKERJAAN STRUKTUR STANDART


B1 LANTAI BASEMENT /DASAR
B2 LANTAI 1 + 0.00 m
B3 LANTAI 2
B4 LANTAI 3
B5 LANTAI 4
B6 LANTAI 5
B7 LANTAI 6
B8 LANTAI 7
B9 LANTAI 8
B10 LANTAI ATAP
B11 LANTAI ATAP RUANG MESIN

REKAP PEK. ARSITEKTUR


E KAP ITU LAS I
( B O Q ) - P E K E R JAAN STRUKTUR

JUMLAH HARGA
AN PEKERJAAN
(Rp.)

3,581,820,000.00
Rp 3,581,820,000.00
Rp -
Rp -

12,756,019,814.90
Rp 2,617,794,422.34
Rp 1,645,470,592.08
Rp 1,108,291,448.44
Rp 1,097,485,196.99
Rp 1,095,180,657.36
Rp 1,083,310,345.87
Rp 1,082,091,211.35
Rp 1,082,091,211.35
Rp 1,082,091,211.35
Rp 835,930,776.46
Rp 26,282,741.31

SUB TOTAL : Rp 16,337,839,814.90

REKAP PEK. ARSITEKTUR


BILL OF QUANTITY (BOQ)
P E K E R JAAN STRUKTUR

Pekerjaan : RUSUNAWA
Lokasi : RANCACILI - JAWA BARAT
Tahun Anggaran : 2014

2.1. PEKERJAAN STRUKTUR

NO. URAIAN PEKERJAAN VOLUME UNIT

2.1.A PEKERJAAN STRUKTUR NON STANDART

A.1 PEKERJAAN PONDASI BANGUNAN (*)

1 Tiang pancang uk. 40X40 cm, pjg. 30 M : 297.0 8,910.00 M'


2 Ongkos Pemancangan Tiang 8,910.00 M'
3 Pemotongan kepala tiang pancang 297.00 Titik

A.2 PEKERJAAN SEPTIC TANK BIO 2 (DUA) UNIT

1 (satu) unit Septic Tank Bio :

1 Plat bawah t = 15 cm ( bawah )


- Beton K-350 - M3
- Besi 116 Kg/M 3
- kg
- Bekisting Pelat m2 - m2
2 Plat penutup atap t = 15 cm
- Beton K-350 - M3
- Besi 116 Kg/M 3
- kg
- Bekisting Pelat m2 - m2
3 Pasir Urug - M3
4 Galian tanah - M3
5 Pas bata Bak Kontrol + tutup plat 3 mm (lengkap terpasang) - Unit
6 Pipa PVC + galian (terpasang) - M
7 Pipa vent PVC 3 " - Unit

A.3 PEKERJAAN SUMUR RESAPAN 2 (DUA) UNIT

1 (satu) unit Pekerjaan Sumur Resapan (2.7x1.1x2.35 m) :

PEKERJAAN STRUKTUR 85/632


NO. URAIAN PEKERJAAN VOLUME UNIT

1 Galian tanah - M3
2 Urugan tanah kembali dengan pasir - M3
3 Sirtu t=30 cm - M3
4 Plat penutup atap t = 15 cm
- Beton K-350 - M3
- Besi 116 kg/m3 - kg
- Bekisting Pelat - m2
5 Pas bata Bak Kontrol + tutup plat 3 mm (lengkap terpasang) - Unit

2.1.B PEKERJAAN STRUKTUR STANDART

B1 LANTAI BASEMENT /DASAR


B1.1 Galian, pasir urug dan lantai kerja
1 Galian tanah dibawah Pile Cap 418.70 M3
3 Galian tanah dibawah Tied beam 85.53 M3
4 Urug pasir dibawah Pile Cap t=10 cm 30.34 M3
5 Lantai kerja dibawah Pile Cap t=5 cm (1:3:5) 15.17 M3
6 Urug pasir dibawah Tie beam t=10 cm 14.26 M3
7 Lantai kerja dibawah Tie beam t=5 cm (1:3:5) 7.13 M3
8 Rollag Beton K 175 28.35 m3
9 Urug tanah bawah pelat lantai basement/dasar 147.22 m3
10 Urug pasir dibawah pelat beton t=10 cm 124.57 m3
11 Lantai kerja dibawah pelat beton t=5 cm (1:3:5) 56.62 m3

B1.2 Beton Pile Cap, Tie Beam dan Pelat Basement/Dasar


12 Pile Cap PC- 2 = 18 buah 100 Kg/M3
- Beton K-300 + integrated waterproofing 18.00 M3
- Besi beton 1,800.00 kg
- Bekisting 72.00 M2
13 Pile Cap PC- 7 = 17 buah 102 Kg/M3
- Beton K-300 133.28 M3
- Besi beton 13,594.56 kg
- Bekisting 190.40 M2
14 Pile Cap PC- 8 = 5 buah 116 Kg/M3
- Beton K-300 34.20 M3
- Besi beton 3,967.20 kg
- Bekisting 47.00 M2
15 Pile Cap PC- 11 = 6 buah 96 Kg/M3

PEKERJAAN STRUKTUR 86/632


NO. URAIAN PEKERJAAN VOLUME UNIT

- Beton K-300 80.64 M3


- Besi beton 7,741.44 kg
- Bekisting 74.40 M2
16 Pile Cap PC- 24 = 6 buah 85.00 Kg/M3

- Beton K-300 93.84 M3


- Besi beton 7,976.40 kg
- Bekisting 75.60 M2
17 Pile Cap PC- 36 = 1 buah 85.00 Kg/M3
- Beton K-300 33.24 M3
- Besi beton 2,825.40 kg
- Bekisting 23.40 M2
18 Tie Beam SL1 265.00 Kg/M3
- Beton K-300 51.32 M3
- Besi beton 13,599.75 kg
- Bekisting 359.24 M2
19 Pelat Lantai Basement t = 12m 102 Kg/M3
- Beton K-300 135.89 M3
- Besi beton 13,861.07 kg
B1.3 Kolom beton
PEKERJAAN PRODUKSI KOMPONEN KOLOM
20 K-1- 400x400 L=3,35 M 6.00 Bh
21 K-2 600x600 L=3,35 M 21.00 Bh
22 K-2A 600x600 L=3,35 M 24.00 Bh
23 K-3A 800x800 L=3,35 M 3.00 Bh
K-L 300x500 L=3,35 M 8.00 Bh

24 PEKERJAAN EREKSI + JOINT KOLOM


1. Pekerjaan Ereksi (Instal Komponen) 54.00 Bh
2. Pekerjaan Joint Komponen 54.00 Bh

PEKERJAAN SHEAR WALL


1. Beton 28.80 m3
2. Besi 5,720.00 kg
3. Bekisting 179.20 m2

25 Tangga Type ( 2 buah )


Tangga Type 1 ( 1 buah )
* Plat tangga t = 15 cm 252 Kg/M3
- Beton K-350 1.17 M3
- Besi beton 294.84 kg

PEKERJAAN STRUKTUR 87/632


NO. URAIAN PEKERJAAN VOLUME UNIT

- Bekisting 7.80 M2
* Anak tangga 73 Kg/M3
- Beton K-350 0.90 M3
- Besi beton 65.48 kg
- Bekisting 4.59 M2
* Bordes tangga 252 Kg/M3

- Beton K-350 1.09 M3


- Besi beton 275.18 kg
- Bekisting 7.28 M2
* Balok Tangga 30 x 60 89 Kg/M3

- Beton K-350 1.19 M3


- Besi beton 105.73 kg
- Bekisting 8.32 M2
* Kolom Tangga 15 x 30 668 Kg/M3

- Beton K-350 0.40 M3


- Besi beton 264.34 kg
- Bekisting 7.92 M2

B2 LANTAI 1 + 0.00 m
B2.1 Pelat lantai
1 HCWS tebal = 150 mm 1,203.00 M2

B2.2 Kolom
2 K-2 600x600 L=2,9 M 9.00 Bh
K-2A 600x600 L= 2,9 M 24.00 Bh
K-3A 800x800 L=2,9 M 3.00 Bh
K-L 300x500 L=2,9 M 8.00 Bh

B2.3 Balok Lantai


5 B-1A 400X600 L=5,44 M 18.00 Bh
B-1Aa 400X600 L=5,34 M 4.00 Bh
B-1B 400X600 L=7,976 M 4.00 Bh
B-1C 400X600 L=4,72 M 12.00 Bh
B-1D 400X600 L= 6,44 M 6.00 Bh
B-1E 400X600 L= 2,49 M 6.00 Bh
B-1F 400X600 L= 7,078 M 6.00 Bh
B-1G 400X600 L= 1,708 M 6.00 Bh
B-1H 300X600 L= 3,298 M 12.00 Bh
B-2C 300X600 L= 5,44 M 12.00 Bh
B-2Cc 300X600 L= 5,24 M 2.00 Bh

PEKERJAAN STRUKTUR 88/632


NO. URAIAN PEKERJAAN VOLUME UNIT

BL1-250X450 L=1,2 M 2.00 Bh


BL2-250X450 L= 0,86 M 1.00 Bh
BL3-250X450 L=2 M 4.00 Bh

PEKERJAAN EREKSI + JOINT


1. Pekerjaan Ereksi (Instal Komponen)
- Ereksi / instal Kolom 44.00 Bh
- Ereksi / instal Balok 95.00 Bh
2. Pekerjaan Joint
- Joint Kolom 44.00 Bh
- Joint Balok 95.00 Bh

PEKERJAAN SHEAR WALL


1. Beton 6.30 m3
2. Besi 4,912.00 kg
3. Bekisting 154.35 m2

B2.4 Tangga Type ( 2 buah )


10 Tangga Type 1 ( 1 buah )
* Plat tangga t = 15 cm 252 Kg/M3
- Beton K-350 1.17 M3
- Besi beton 294.84 kg
- Bekisting 7.28 M2
* Anak tangga 73 Kg/M3
- Beton K-350 0.82 M3
- Besi beton 59.79 kg
- Bekisting 4.33 M2
* Bordes tangga 252 Kg/M3

- Beton K-350 1.09 M3


- Besi beton 275.18 kg
- Bekisting 8.32 M2
* Balok Tangga 30 x 60 89 Kg/M3

- Beton K-350 1.19 M3


- Besi beton 105.73 kg
- Bekisting 8.32 M2
* Kolom Tangga 30 x 30 cm 474 Kg/M3

- Beton K-350 0.43 M3


- Besi beton 204.70 kg
- Bekisting 7.20 M2

PEKERJAAN STRUKTUR 89/632


NO. URAIAN PEKERJAAN VOLUME UNIT

B3 LANTAI 2
B3.1 Pelat lantai
1 HCWS tebal = 150 mm 604.00 M2

B3.2 Kolom
2 K-2 600x600 L=2,9 M 9.00 Bh
K-2A 600x600 L= 2,9 M 24.00 Bh
K-3A 800x800 L=2,9 M 3.00 Bh
K-L 300x500 L=2,9 M 8.00 Bh

B3.3 Balok Lantai


B-1A 400X600 L=5,44 M 18.00 Bh
B-1Aa 400X600 L=5,34 M 4.00 Bh
B-1B 400X600 L=7,976 M 4.00 Bh
B-1G 400X600 L= 1,708 M 6.00 Bh
B-2C 300X600 L= 5,44 M 1.00 Bh
B-2Cc 300X600 L= 5,24 M 1.00 Bh
B-2A 300X600 L= 7 M 8.00 Bh
B-2Aa 300X600 L= 7 M 1.00 Bh
B-2B 300X600 L= 7 M 2.00 Bh
B-4 200X600 L= 5,68 M 12.00 Bh
B-4A 200X600 L= 1,22 M 6.00 Bh
BL1-250X450 L=1,2 M 2.00 Bh
BL2-250X450 L= 0,86 M 1.00 Bh
BL3-250X450 L=2 M 4.00 Bh

PEKERJAAN EREKSI + JOINT


1. Pekerjaan Ereksi (Instal Komponen)
- Ereksi / instal Kolom 44.00 Bh
- Ereksi / instal Balok 70.00 Bh
2. Pekerjaan Joint
- Joint Kolom 44.00 Bh
- Joint Balok 70.00 Bh

PEKERJAAN SHEAR WALL


1. Beton 6.30 m3
2. Besi 4,912.00 kg
3. Bekisting 154.35 m2

B2.4 Tangga Type ( 2 buah )

PEKERJAAN STRUKTUR 90/632


NO. URAIAN PEKERJAAN VOLUME UNIT

10 Tangga Type 1 ( 1 buah )


* Plat tangga t = 15 cm 252 Kg/M3
- Beton K-350 1.17 M3
- Besi beton 294.84 kg
- Bekisting 7.28 M2
* Anak tangga 73 Kg/M3

- Beton K-350 0.82 M3


- Besi beton 59.79 kg
- Bekisting 4.33 M2
* Bordes tangga 252 Kg/M3

- Beton K-350 1.09 M3


- Besi beton 275.18 kg
- Bekisting 8.32 M2
* Balok Tangga 30 x 60 89 Kg/M3

- Beton K-350 1.19 M3


- Besi beton 105.73 kg
- Bekisting 8.32 M2
* Kolom Tangga 30 x 30 cm 474 Kg/M3

- Beton K-350 0.43 M3


- Besi beton 204.70 kg
- Bekisting 7.20 M2

B4 LANTAI 3
B4.1 PEKERJAAN PRODUKSI KOMPONEN PELAT
1 HCWS tebal = 150 mm 604.00 M2

B4.2 PEKERJAAN PRODUKSI KOMPONEN KOLOM


2 K-2 600x600 L=2,9 M 9.00 Bh
K-2A 600x600 L= 2,9 M 24.00 Bh
K-3A 800x800 L=2,9 M 3.00 Bh
K-L 300x500 L=2,9 M 8.00 Bh

B4.3 PEKERJAAN PRODUKSI KOMPONEN BALOK


5 B-1A 400X600 L=5,44 M 18.00 Bh
B-1Aa 400X600 L=5,34 M 4.00 Bh
B-1B 400X600 L=7,976 M 4.00 Bh
B-1G 400X600 L= 1,708 M 6.00 Bh
6 B-2C 300X600 L= 5,44 M 1.00 Bh
B-2A 300X600 L= 7 M 8.00 Bh
B-2Aa 300X600 L= 7 M 2.00 Bh

PEKERJAAN STRUKTUR 91/632


NO. URAIAN PEKERJAAN VOLUME UNIT

B-2B 300X600 L= 7 M 2.00 Bh


7 B-4 200X600 L= 5,68 M 12.00 Bh
B-4A 200X600 L= 1,22 M 6.00 Bh
BL1-250X450 L=1,2 M 2.00 Bh
BL2-250X450 L= 0,86 M 1.00 Bh
BL3-250X450 L=2 M 4.00 Bh

PEKERJAAN EREKSI + JOINT


1. Pekerjaan Ereksi (Instal Komponen)
- Ereksi / instal Kolom 36.00 Bh
- Ereksi / instal Balok 70.00 Bh
2. Pekerjaan Joint
- Joint Kolom 36.00 Bh
- Joint Balok 70.00 Bh

PEKERJAAN SHEAR WALL


1. Beton 6.30 m3
2. Besi 4,312.00 kg
3. Bekisting 154.35 m2

B4.4 Tangga Type ( 2 buah )


10 Tangga Type 1 ( 1 buah )
* Plat tangga t = 15 cm 252 Kg/M3
- Beton K-350 1.17 M3
- Besi beton 294.84 kg
- Bekisting 7.28 M2
* Anak tangga 73 Kg/M3
- Beton K-350 0.82 M3
- Besi beton 59.79 kg
- Bekisting 4.33 M2
* Bordes tangga 252 Kg/M3
- Beton K-350 1.09 M3
- Besi beton 275.18 kg
- Bekisting 8.32 M2
* Balok Tangga 30 x 60 89 Kg/M3
- Beton K-350 1.19 M3
- Besi beton 105.73 kg
- Bekisting 8.32 M2
* Kolom Tangga 30 x 30 cm 474 Kg/M3

- Beton K-350 0.43 M3

PEKERJAAN STRUKTUR 92/632


NO. URAIAN PEKERJAAN VOLUME UNIT

- Besi beton 204.70 kg


- Bekisting 7.20 M2

B5 LANTAI 4
B5.1 PEKERJAAN PRODUKSI KOMPONEN PELAT
1 HCWS tebal = 150 mm 604.00 M2

B5.2 PEKERJAAN PRODUKSI KOMPONEN KOLOM


2 K-2 600x600 L=2,9 M 9.00 Bh
K-2A 600x600 L= 2,9 M 24.00 Bh
K-3A 800x800 L=2,9 M 3.00 Bh
K-L 300x500 L=2,9 M 8.00 Bh

B5.3 PEKERJAAN PRODUKSI KOMPONEN BALOK


5 B-1A 400X600 L=5,44 M 18.00 Bh
B-1Aa 400X600 L=5,34 M 4.00 Bh
B-1B 400X600 L=7,976 M 4.00 Bh
B-1G 400X600 L= 1,708 M 6.00 Bh
6 B-2C 300X600 L= 5,44 M 1.00 Bh
B-2A 300X600 L= 7 M 8.00 Bh
B-2Aa 300X600 L= 7 M 2.00 Bh
B-2B 300X600 L= 7 M 2.00 Bh
7 B-4 200X600 L= 5,68 M 12.00 Bh
B-4A 200X600 L= 1,22 M 6.00 Bh
BL1-250X450 L=1,2 M 2.00 Bh
BL2-250X450 L= 0,86 M 1.00 Bh
BL3-250X450 L=2 M 4.00 Bh

PEKERJAAN EREKSI + JOINT


1. Pekerjaan Ereksi (Instal Komponen)
- Ereksi / instal Kolom 44.00 Bh
- Ereksi / instal Balok 70.00 Bh
2. Pekerjaan Joint
- Joint Kolom 44.00 Bh
- Joint Balok 70.00 Bh

PEKERJAAN SHEAR WALL


1. Beton 6.30 m3
2. Besi 3,840.00 kg
3. Bekisting 154.35 m2

PEKERJAAN STRUKTUR 93/632


NO. URAIAN PEKERJAAN VOLUME UNIT

B5.4 Tangga Type ( 2 buah )


10 Tangga Type 1 ( 1 buah )
* Plat tangga t = 15 cm 252 Kg/M3
- Beton K-350 1.17 M3
- Besi beton 294.84 kg
- Bekisting 7.28 M2
* Anak tangga 73 Kg/M3

- Beton K-350 0.82 M3


- Besi beton 59.79 kg
- Bekisting 4.33 M2
* Bordes tangga 252 Kg/M3
- Beton K-350 1.09 M3
- Besi beton 275.18 kg
- Bekisting 8.32 M2
* Balok Tangga 30 x 60 89 Kg/M3
- Beton K-350 1.19 M3
- Besi beton 105.73 kg
- Bekisting 8.32 M2
* Kolom Tangga 30 x 30 cm 474 Kg/M3
- Beton K-350 0.43 M3
- Besi beton 204.70 kg
- Bekisting 7.20 M2

B6 LANTAI 5
B6.1 PEKERJAAN PRODUKSI KOMPONEN PELAT
1 HCWS tebal = 150 mm 604.00 M2

B6.2 PEKERJAAN PRODUKSI KOMPONEN KOLOM


2 K-2 600x600 L=2,9 M 9.00 Bh
K-2A 600x600 L= 2,9 M 24.00 Bh
K-3A 800x800 L=2,9 M 3.00 Bh
K-L 300x500 L=2,9 M 8.00 Bh

B6.3 PEKERJAAN PRODUKSI KOMPONEN BALOK


5 B-1A 400X600 L=5,44 M 18.00 Bh
B-1Aa 400X600 L=5,34 M 4.00 Bh
B-1B 400X600 L=7,976 M 4.00 Bh
B-1G 400X600 L= 1,708 M 6.00 Bh
6 B-2C 300X600 L= 5,44 M 1.00 Bh

PEKERJAAN STRUKTUR 94/632


NO. URAIAN PEKERJAAN VOLUME UNIT

B-2A 300X600 L= 7 M 8.00 Bh


B-2Aa 300X600 L= 7 M 2.00 Bh
B-2B 300X600 L= 7 M 2.00 Bh
7 B-4 200X600 L= 5,68 M 12.00 Bh
B-4A 200X600 L= 1,22 M 6.00 Bh
BL1-250X450 L=1,2 M 2.00 Bh
BL2-250X450 L= 0,86 M 1.00 Bh
BL3-250X450 L=2 M 4.00 Bh

PEKERJAAN EREKSI + JOINT


1. Pekerjaan Ereksi (Instal Komponen)
- Ereksi / instal Kolom 44.00 Bh
- Ereksi / instal Balok 70.00 Bh
2. Pekerjaan Joint
- Joint Kolom 44.00 Bh
- Joint Balok 70.00 Bh

PEKERJAAN SHEAR WALL


1. Beton 6.30 m3
2. Besi 2,952.00 kg
3. Bekisting 154.35 m2

B6.4 Tangga Type ( 2 buah )


10 Tangga Type 1 ( 1 buah )
* Plat tangga t = 15 cm 252 Kg/M3
- Beton K-350 1.17 M3
- Besi beton 294.84 kg
- Bekisting 7.28 M2
* Anak tangga 73 Kg/M3

- Beton K-350 0.82 M3


- Besi beton 59.79 kg
- Bekisting 4.33 M2
* Bordes tangga 252 Kg/M3

- Beton K-350 1.09 M3


- Besi beton 275.18 kg
- Bekisting 8.32 M2
* Balok Tangga 30 x 60 89 Kg/M3

- Beton K-350 1.19 M3


- Besi beton 105.73 kg
- Bekisting 8.32 M2

PEKERJAAN STRUKTUR 95/632


NO. URAIAN PEKERJAAN VOLUME UNIT

* Kolom Tangga 30 x 30 cm 474 Kg/M3


- Beton K-350 0.43 M3
- Besi beton 204.70 kg
- Bekisting 7.20 M2

B7 LANTAI 6
B7.1 PEKERJAAN PRODUKSI KOMPONEN PELAT
1 HCWS tebal = 150 mm 604.00 M2

B7.2 PEKERJAAN PRODUKSI KOMPONEN KOLOM


2 K-2 600x600 L=2,9 M 9.00 Bh
K-2A 600x600 L= 2,9 M 24.00 Bh
K-3A 800x800 L=2,9 M 3.00 Bh
K-L 300x500 L=2,9 M 8.00 Bh

B7.3 PEKERJAAN PRODUKSI KOMPONEN BALOK


5 B-1A 400X600 L=5,44 M 18.00 Bh
B-1Aa 400X600 L=5,34 M 4.00 Bh
B-1B 400X600 L=7,976 M 4.00 Bh
B-1G 400X600 L= 1,708 M 6.00 Bh
6 B-2C 300X600 L= 5,44 M 1.00 Bh
B-2Cc 300X600 L= 5,24 M 1.00 Bh
B-2A 300X600 L= 7 M 8.00 Bh
B-2Aa 300X600 L= 7 M 1.00 Bh
7 B-2B 300X600 L= 7 M 2.00 Bh
B-4 200X600 L= 5,68 M 12.00 Bh
B-4A 200X600 L= 1,22 M 6.00 Bh
BL1-250X450 L=1,2 M 2.00 Bh
BL2-250X450 L= 0,86 M 1.00 Bh
BL3-250X450 L=2 M 4.00 Bh

PEKERJAAN EREKSI + JOINT


1. Pekerjaan Ereksi (Instal Komponen)
- Ereksi / instal Kolom 44.00 Bh
- Ereksi / instal Balok 70.00 Bh
2. Pekerjaan Joint
- Joint Kolom 44.00 Bh
- Joint Balok 70.00 Bh

PEKERJAAN SHEAR WALL

PEKERJAAN STRUKTUR 96/632


NO. URAIAN PEKERJAAN VOLUME UNIT

1. Beton 6.30 m3
2. Besi 2,952.00 kg
3. Bekisting 154.35 m2

B7.4 Tangga Type ( 2 buah )


10 Tangga Type 1 ( 1 buah )
* Plat tangga t = 15 cm 252 Kg/M3
- Beton K-350 1.17 M3
- Besi beton 294.84 kg
- Bekisting 7.28 M2
* Anak tangga 73 Kg/M3

- Beton K-350 0.82 M3


- Besi beton 59.79 kg
- Bekisting 4.33 M2
* Bordes tangga 252 Kg/M3

- Beton K-350 1.09 M3


- Besi beton 275.18 kg
- Bekisting 8.32 M2
* Balok Tangga 30 x 60 89 Kg/M3

- Beton K-350 1.19 M3


- Besi beton 105.73 kg
- Bekisting 8.32 M2
* Kolom Tangga 30 x 30 cm 474 Kg/M3

- Beton K-350 0.43 M3


- Besi beton 204.70 kg
- Bekisting 7.20 M2

B8 LANTAI 7
B8.1 PEKERJAAN PRODUKSI KOMPONEN PELAT
1 HCWS tebal = 150 mm 604.00 M2

B8.2 PEKERJAAN PRODUKSI KOMPONEN KOLOM


2 K-2 600x600 L=2,9 M 9.00 Bh
K-2A 600x600 L= 2,9 M 24.00 Bh
K-3A 800x800 L=2,9 M 3.00 Bh
K-L 300x500 L=2,9 M 8.00 Bh

B8.3 PEKERJAAN PRODUKSI KOMPONEN BALOK


5 B-1A 400X600 L=5,44 M 18.00 Bh
B-1Aa 400X600 L=5,34 M 4.00 Bh

PEKERJAAN STRUKTUR 97/632


NO. URAIAN PEKERJAAN VOLUME UNIT

B-1B 400X600 L=7,976 M 4.00 Bh


B-1G 400X600 L= 1,708 M 6.00 Bh
6 B-2C 300X600 L= 5,44 M 1.00 Bh
B-2Cc 300X600 L= 5,24 M 1.00 Bh
B-2A 300X600 L= 7 M 8.00 Bh
B-2Aa 300X600 L= 7 M 1.00 Bh
7 B-2B 300X600 L= 7 M 2.00 Bh
B-4 200X600 L= 5,68 M 12.00 Bh
B-4Besi beton 6.00 Bh
BL1-250X450 L=1,2 M 2.00 Bh
BL2-250X450 L= 0,86 M 1.00 Bh
BL3-250X450 L=2 M 4.00 Bh

PEKERJAAN EREKSI + JOINT


1. Pekerjaan Ereksi (Instal Komponen)
- Ereksi / instal Kolom 44.00 Bh
- Ereksi / instal Balok 70.00 Bh
2. Pekerjaan Joint
- Joint Kolom 44.00 Bh
- Joint Balok 70.00 Bh

PEKERJAAN SHEAR WALL


1. Beton 6.30 m3
2. Besi 2,952.00 kg
3. Bekisting 154.35 m2

B8.4 Tangga Type ( 2 buah )


10 Tangga Type 1 ( 1 buah )
* Plat tangga t = 15 cm 252 Kg/M3
- Beton K-350 1.17 M3
- Besi beton 294.84 kg
- Bekisting 7.28 M2
* Anak tangga 73 Kg/M3

- Beton K-350 0.82 M3


- Besi beton 59.79 kg
- Bekisting 4.33 M2
* Bordes tangga 252 Kg/M3

- Beton K-350 1.09 M3


- Besi beton 275.18 kg
- Bekisting 8.32 M2

PEKERJAAN STRUKTUR 98/632


NO. URAIAN PEKERJAAN VOLUME UNIT

* Balok Tangga 30 x 60 89 Kg/M3


- Beton K-350 1.19 M3
- Besi beton 105.73 kg
- Bekisting 8.32 M2
* Kolom Tangga 30 x 30 cm 474 Kg/M3
- Beton K-350 0.43 M3
- Besi beton 204.70 kg
- Bekisting 7.20 M2

B9 LANTAI 8
B9.1 PEKERJAAN PRODUKSI KOMPONEN PELAT
1 HCWS tebal = 150 mm 604.00 M2

B9.2 PEKERJAAN PRODUKSI KOMPONEN KOLOM


2 K-2 600x600 L=2,9 M 9.00 Bh
K-2A 600x600 L= 2,9 M 24.00 Bh
K-3A 800x800 L=2,9 M 3.00 Bh
K-L 300x500 L=2,9 M 8.00 Bh

B9.3 PEKERJAAN PRODUKSI KOMPONEN BALOK


5 B-1A 400X600 L=5,44 M 18.00 Bh
B-1Aa 400X600 L=5,34 M 4.00 Bh
B-1B 400X600 L=7,976 M 4.00 Bh
B-1G 400X600 L= 1,708 M 6.00 Bh
6 B-2C 300X600 L= 5,44 M 1.00 Bh
B-2Cc 300X600 L= 5,24 M 1.00 Bh
B-2A 300X600 L= 7 M 8.00 Bh
B-2Aa 300X600 L= 7 M 1.00 Bh
7 B-2B 300X600 L= 7 M 2.00 Bh
B-4 200X600 L= 5,68 M 12.00 Bh
B-4A 200X600 L= 1,22 M 6.00 Bh
BL1-250X450 L=1,2 M 2.00 Bh
BL2-250X450 L= 0,86 M 1.00 Bh
BL3-250X450 L=2 M 4.00 Bh

PEKERJAAN EREKSI + JOINT


1. Pekerjaan Ereksi (Instal Komponen)
- Ereksi / instal Kolom 44.00 Bh
- Ereksi / instal Balok 70.00 Bh
2. Pekerjaan Joint

PEKERJAAN STRUKTUR 99/632


NO. URAIAN PEKERJAAN VOLUME UNIT

- Joint Kolom 44.00 Bh


- Joint Balok 70.00 Bh

PEKERJAAN SHEAR WALL


1. Beton 6.30 m3
2. Besi 2,952.00 kg
3. Bekisting 154.35 m2

B9.4 Tangga Type ( 1 buah )


10 Tangga Type 1 ( 1 buah )
* Plat tangga t = 15 cm 252 Kg/M3
- Beton K-350 1.17 M3
- Besi beton 294.84 kg
- Bekisting 7.28 M2
* Anak tangga 73 Kg/M3

- Beton K-350 0.82 M3


- Besi beton 59.79 kg
- Bekisting 4.33 M2
* Bordes tangga 252 Kg/M3

- Beton K-350 1.09 M3


- Besi beton 275.18 kg
- Bekisting 8.32 M2
* Balok Tangga 30 x 60 89 Kg/M3
- Beton K-350 1.19 M3
- Besi beton 105.73 kg
- Bekisting 8.32 M2
* Kolom Tangga 30 x 30 cm 474 Kg/M3
- Beton K-350 0.43 M3
- Besi beton 204.70 kg
- Bekisting 7.20 M2

B10 LANTAI ATAP


B10.1 PEKERJAAN PRODUKSI KOMPONEN PELAT
1 HCWS tebal = 150 mm 604.00 M2

B10.2 PEKERJAAN PRODUKSI KOMPONEN KOLOM


2 K-L 300x500 L=3,35 M 8.00 Bh

B10.3 PEKERJAAN PRODUKSI KOMPONEN BALOK


3 B-1A 400X600 L=5,44 M 18.00 Bh

PEKERJAAN STRUKTUR 100/632


NO. URAIAN PEKERJAAN VOLUME UNIT

B-1Aa 400X600 L=5,34 M 6.00 Bh


B-1B 400X600 L=7,976 M 4.00 Bh
B-1G 400X600 L= 1,708 M 6.00 Bh
4 B-1Bb 400X600 L= 7,8 2.00 Bh
B-2Ac 300X600 L= 7.87 M 4.00 Bh
B-2Ad 300X600 L= 6.944 M 3.00 Bh
B-2Ae 300X600 L= 7,135 M 3.00 Bh
5 B-2d 300X600 L= 7,84 M 4.00 Bh
B-3A 200X600 L= 11,7 M 6.00 Bh
B-3Aa 200X600 L= 8 M 6.00 Bh
B-3Ab 200X600 L= 12 M 6.00 Bh
BL1-250X450 L=1,2 M 2.00 Bh
BL2-250X450 L= 0,86 M 1.00 Bh
BL3-250X450 L=2 M 4.00 Bh

PEKERJAAN EREKSI + JOINT


1. Pekerjaan Ereksi (Instal Komponen)
- Ereksi / instal Kolom 8.00 Bh
- Ereksi / instal Balok 68.00 Bh
2. Pekerjaan Joint
- Joint Kolom 8.00 Bh
- Joint Balok 68.00 Bh

B11 LANTAI ATAP RUANG MESIN


B11.1 Pelat lantai
1 Pelat Lantai t = 13 cm 91 Kg/M3
- Beton K-350 2.95 M3
- Besi beton 269.76 kg
- Bekisting 22.68 m2
B12.2 Balok Lantai
2 Balok B3 Atap R Mesin Lift 268 Kg/M3
- Beton K-350 2.00 M3
- Besi beton 535.46 kg
- Bekisting 19.31 M2

PEKERJAAN STRUKTUR 101/632


F QUANTITY (BOQ)
R JAAN STRUKTUR

HARGA SATUAN JUMLAH HARGA


( Rp. ) ( Rp. )

TOTAL 3,581,820,000.00

SUB TOTAL 3,581,820,000.00

325,000.00 2,895,750,000.00
75,000.00 668,250,000.00
60,000.00 17,820,000.00

SUB TOTAL -

1,078,205.04 -
15,113.31 -
139,383.85 -

1,078,205.04 -
15,113.31 -
139,383.85 -
300,254.02 -
110,324.94 -
1,000,000.00 -
65,000.00 -
250,000.00 -

SUB TOTAL -

PEKERJAAN STRUKTUR 102/632


HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )

110,324.94 -
47,826.68 -
341,607.86 -

1,078,205.04 -
15,113.31 -
139,383.85 -
1,000,000.00 -

TOTAL 12,756,019,814.90

SUB TOTAL 2,617,794,422.34

62,406.30 26,129,767.44
62,406.30 5,337,798.06
148,383.40 4,501,358.82
641,151.39 9,724,984.28
148,383.40 2,115,279.56
641,151.39 4,569,966.82
746,653.25 21,167,619.58
70,883.45 10,435,263.04
148,383.40 18,483,882.72
641,151.39 36,303,274.00

1,293,846.05 23,289,228.86
15,113.31 27,203,958.00
215,594.54 15,522,806.52

1,293,846.05 172,443,801.28
15,113.31 205,458,799.59
215,594.54 41,049,199.46

1,293,846.05 44,249,534.84
15,113.31 59,957,523.43
215,594.54 10,132,943.15

PEKERJAAN STRUKTUR 103/632


HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )

1,293,846.05 104,335,745.31
15,113.31 116,998,782.57
215,594.54 16,040,233.40

1,293,846.05 121,414,513.14
15,113.31 120,549,805.88
215,594.54 16,298,946.85

1,293,846.05 43,007,442.64
15,113.31 42,701,146.07
215,594.54 5,044,912.12

1,293,846.05 66,399,920.41
15,113.31 205,537,192.33
215,594.54 77,449,878.92

1,293,846.05 175,824,362.23
15,113.31 209,486,581.34

1,896,933.22 11,381,599.31
5,781,527.91 121,412,086.08
5,510,629.62 132,255,110.92
8,073,127.11 24,219,381.32
3,286,324.12 26,290,592.99

383,105.11 20,687,675.67
117,508.05 6,345,434.59

1,290,812.14 37,175,389.66
13,367.47 76,461,916.39
260,946.71 46,761,651.03

55,637,131.70
27,818,565.85

1,078,205.04 1,261,499.90
15,113.31 4,456,008.32

PEKERJAAN STRUKTUR 104/632


HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )

209,075.78 1,630,791.08

1,078,205.04 967,149.92
15,113.31 989,634.65
209,075.78 959,657.83

1,078,205.04 1,177,399.90
15,113.31 4,158,941.10
209,075.78 1,522,071.67

1,078,205.04 1,280,907.59
15,113.31 1,597,960.49
209,075.78 1,738,674.18

1,078,205.04 426,969.20
15,113.31 3,995,019.84
209,075.78 1,655,880.17

SUB TOTAL 1,645,470,592.08

700,000.00 842,100,000.00

4,103,701.51 36,933,313.56
4,807,228.40 115,373,481.63
7,043,341.57 21,130,024.71
2,875,939.44 23,007,515.54

4,176,296.19 75,173,331.49
4,098,765.47 16,395,061.88
6,124,157.47 24,496,629.89
3,526,345.91 42,316,150.88
4,802,951.48 28,817,708.89
2,015,833.83 12,095,002.99
5,455,403.35 32,732,420.12
1,485,834.26 8,915,005.59
2,151,110.87 25,813,330.41
3,477,955.42 41,735,465.08
3,364,922.13 6,729,844.26

PEKERJAAN STRUKTUR 105/632


HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )

575,801.46 1,151,602.91
451,732.41 451,732.41
915,967.85 3,663,871.41

383,105.11 16,856,624.62
298,042.90 28,314,075.22

117,508.05 5,170,354.11
722,631.46 68,649,988.88

-
1,290,812.14 8,132,116.49
13,367.47 65,661,002.32
260,946.71 40,277,125.20

53,377,811.59
26,688,905.80

1,078,205.04 1,261,499.90
15,113.31 4,456,008.32
209,075.78 1,522,071.67

1,078,205.04 883,049.93
15,113.31 903,579.46
209,075.78 905,298.13

1,078,205.04 1,177,399.90
15,113.31 4,158,941.10
209,075.78 1,738,674.18

1,078,205.04 1,280,907.59
15,113.31 1,597,960.49
209,075.78 1,738,674.18

1,078,205.04 465,784.58
15,113.31 3,093,710.75
209,075.78 1,505,345.61

PEKERJAAN STRUKTUR 106/632


HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )

SUB TOTAL 1,108,291,448.44

700,000.00 422,800,000.00

4,103,701.51 36,933,313.56
4,807,228.40 115,373,481.63
7,043,341.57 21,130,024.71
2,875,939.44 23,007,515.54

4,176,296.19 75,173,331.49
4,098,765.47 16,395,061.88
6,124,157.47 24,496,629.89
1,485,834.26 8,915,005.59
3,477,955.42 3,477,955.42
3,364,922.13 3,364,922.13
4,584,056.65 36,672,453.17
4,584,056.65 4,584,056.65
4,584,056.65 9,168,113.29
3,012,549.12 36,150,589.41
743,257.98 4,459,547.88
575,801.46 1,151,602.91
451,732.41 451,732.41
915,967.85 3,663,871.41

383,105.11 16,856,624.62
298,042.90 20,863,002.79

117,508.05 5,170,354.11
722,631.46 50,584,202.33

1,290,812.14 8,132,116.49
13,367.47 65,661,002.32
260,946.71 40,277,125.20

53,377,811.59

PEKERJAAN STRUKTUR 107/632


HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )

26,688,905.80

1,078,205.04 1,261,499.90
15,113.31 4,456,008.32
209,075.78 1,522,071.67

1,078,205.04 883,049.93
15,113.31 903,579.46
209,075.78 905,298.13

1,078,205.04 1,177,399.90
15,113.31 4,158,941.10
209,075.78 1,738,674.18

1,078,205.04 1,280,907.59
15,113.31 1,597,960.49
209,075.78 1,738,674.18

1,078,205.04 465,784.58
15,113.31 3,093,710.75
209,075.78 1,505,345.61

SUB TOTAL 1,097,485,196.99

700,000.00 422,800,000.00

4,103,701.51 36,933,313.56
4,807,228.40 115,373,481.63
7,043,341.57 21,130,024.71
2,875,939.44 23,007,515.54

4,176,296.19 75,173,331.49
4,098,765.47 16,395,061.88
6,124,157.47 24,496,629.89
1,485,834.26 8,915,005.59
3,477,955.42 3,477,955.42
4,584,056.65 36,672,453.17
4,584,056.65 9,168,113.29

PEKERJAAN STRUKTUR 108/632


HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )

4,584,056.65 9,168,113.29
3,012,549.12 36,150,589.41
743,257.98 4,459,547.88
575,801.46 1,151,602.91
451,732.41 451,732.41
915,967.85 3,663,871.41

383,105.11 13,791,783.78
298,042.90 20,863,002.79

117,508.05 4,230,289.72
722,631.46 50,584,202.33

1,290,812.14 8,132,116.49
13,367.47 57,640,521.58
260,946.71 40,277,125.20

53,377,811.59
26,688,905.80

1,078,205.04 1,261,499.90
15,113.31 4,456,008.32
209,075.78 1,522,071.67

1,078,205.04 883,049.93
15,113.31 903,579.46
209,075.78 905,298.13

1,078,205.04 1,177,399.90
15,113.31 4,158,941.10
209,075.78 1,738,674.18

1,078,205.04 1,280,907.59
15,113.31 1,597,960.49
209,075.78 1,738,674.18

1,078,205.04 465,784.58

PEKERJAAN STRUKTUR 109/632


HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )

15,113.31 3,093,710.75
209,075.78 1,505,345.61

SUB TOTAL 1,095,180,657.36

700,000.00 422,800,000.00

4,103,701.51 36,933,313.56
4,807,228.40 115,373,481.63
7,043,341.57 21,130,024.71
2,875,939.44 23,007,515.54

4,176,296.19 75,173,331.49
4,098,765.47 16,395,061.88
6,124,157.47 24,496,629.89
1,485,834.26 8,915,005.59
3,477,955.42 3,477,955.42
4,584,056.65 36,672,453.17
4,584,056.65 9,168,113.29
4,584,056.65 9,168,113.29
3,012,549.12 36,150,589.41
743,257.98 4,459,547.88
575,801.46 1,151,602.91
451,732.41 451,732.41
915,967.85 3,663,871.41

383,105.11 16,856,624.62
298,042.90 20,863,002.79

117,508.05 5,170,354.11
722,631.46 50,584,202.33

1,290,812.14 8,132,116.49
13,367.47 51,331,076.74
260,946.71 40,277,125.20

PEKERJAAN STRUKTUR 110/632


HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )

53,377,811.59
26,688,905.80

1,078,205.04 1,261,499.90
15,113.31 4,456,008.32
209,075.78 1,522,071.67

1,078,205.04 883,049.93
15,113.31 903,579.46
209,075.78 905,298.13

1,078,205.04 1,177,399.90
15,113.31 4,158,941.10
209,075.78 1,738,674.18

1,078,205.04 1,280,907.59
15,113.31 1,597,960.49
209,075.78 1,738,674.18

1,078,205.04 465,784.58
15,113.31 3,093,710.75
209,075.78 1,505,345.61

SUB TOTAL 1,083,310,345.87

700,000.00 422,800,000.00

4,103,701.51 36,933,313.56
4,807,228.40 115,373,481.63
7,043,341.57 21,130,024.71
2,875,939.44 23,007,515.54

4,176,296.19 75,173,331.49
4,098,765.47 16,395,061.88
6,124,157.47 24,496,629.89
1,485,834.26 8,915,005.59
3,477,955.42 3,477,955.42

PEKERJAAN STRUKTUR 111/632


HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )

4,584,056.65 36,672,453.17
4,584,056.65 9,168,113.29
4,584,056.65 9,168,113.29
3,012,549.12 36,150,589.41
743,257.98 4,459,547.88
575,801.46 1,151,602.91
451,732.41 451,732.41
915,967.85 3,663,871.41

383,105.11 16,856,624.62
298,042.90 20,863,002.79

117,508.05 5,170,354.11
722,631.46 50,584,202.33

1,290,812.14 8,132,116.49
13,367.47 39,460,765.24
260,946.71 40,277,125.20

53,377,811.59
26,688,905.80

1,078,205.04 1,261,499.90
15,113.31 4,456,008.32
209,075.78 1,522,071.67

1,078,205.04 883,049.93
15,113.31 903,579.46
209,075.78 905,298.13

1,078,205.04 1,177,399.90
15,113.31 4,158,941.10
209,075.78 1,738,674.18

1,078,205.04 1,280,907.59
15,113.31 1,597,960.49
209,075.78 1,738,674.18

PEKERJAAN STRUKTUR 112/632


HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )

1,078,205.04 465,784.58
15,113.31 3,093,710.75
209,075.78 1,505,345.61

SUB TOTAL 1,082,091,211.35

700,000.00 422,800,000.00

4,103,701.51 36,933,313.56
4,807,228.40 115,373,481.63
7,043,341.57 21,130,024.71
2,875,939.44 23,007,515.54

4,176,296.19 75,173,331.49
4,098,765.47 16,395,061.88
6,124,157.47 24,496,629.89
1,485,834.26 8,915,005.59
3,477,955.42 3,477,955.42
3,364,922.13 3,364,922.13
4,584,056.65 36,672,453.17
4,584,056.65 4,584,056.65
4,584,056.65 9,168,113.29
3,012,549.12 36,150,589.41
743,257.98 4,459,547.88
575,801.46 1,151,602.91
451,732.41 451,732.41
915,967.85 3,663,871.41

383,105.11 16,856,624.62
298,042.90 20,863,002.79

117,508.05 5,170,354.11
722,631.46 50,584,202.33

PEKERJAAN STRUKTUR 113/632


HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )

1,290,812.14 8,132,116.49
13,367.47 39,460,765.24
260,946.71 40,277,125.20

53,377,811.59
26,688,905.80

1,078,205.04 1,261,499.90
15,113.31 4,456,008.32
209,075.78 1,522,071.67

1,078,205.04 883,049.93
15,113.31 903,579.46
209,075.78 905,298.13

1,078,205.04 1,177,399.90
15,113.31 4,158,941.10
209,075.78 1,738,674.18

1,078,205.04 1,280,907.59
15,113.31 1,597,960.49
209,075.78 1,738,674.18

1,078,205.04 465,784.58
15,113.31 3,093,710.75
209,075.78 1,505,345.61

SUB TOTAL 1,082,091,211.35

700,000.00 422,800,000.00

4,103,701.51 36,933,313.56
4,807,228.40 115,373,481.63
7,043,341.57 21,130,024.71
2,875,939.44 23,007,515.54

4,176,296.19 75,173,331.49
4,098,765.47 16,395,061.88

PEKERJAAN STRUKTUR 114/632


HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )

6,124,157.47 24,496,629.89
1,485,834.26 8,915,005.59
3,477,955.42 3,477,955.42
3,364,922.13 3,364,922.13
4,584,056.65 36,672,453.17
4,584,056.65 4,584,056.65
4,584,056.65 9,168,113.29
3,012,549.12 36,150,589.41
743,257.98 4,459,547.88
575,801.46 1,151,602.91
451,732.41 451,732.41
915,967.85 3,663,871.41

383,105.11 16,856,624.62
298,042.90 20,863,002.79

117,508.05 5,170,354.11
722,631.46 50,584,202.33

1,290,812.14 8,132,116.49
13,367.47 39,460,765.24
260,946.71 40,277,125.20

53,377,811.59
26,688,905.80

1,078,205.04 1,261,499.90
15,113.31 4,456,008.32
209,075.78 1,522,071.67

1,078,205.04 883,049.93
15,113.31 903,579.46
209,075.78 905,298.13

1,078,205.04 1,177,399.90
15,113.31 4,158,941.10
209,075.78 1,738,674.18

PEKERJAAN STRUKTUR 115/632


HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )

1,078,205.04 1,280,907.59
15,113.31 1,597,960.49
209,075.78 1,738,674.18

1,078,205.04 465,784.58
15,113.31 3,093,710.75
209,075.78 1,505,345.61

SUB TOTAL 1,082,091,211.35

700,000.00 422,800,000.00

4,103,701.51 36,933,313.56
4,807,228.40 115,373,481.63
7,043,341.57 21,130,024.71
2,875,939.44 23,007,515.54

4,176,296.19 75,173,331.49
4,098,765.47 16,395,061.88
6,124,157.47 24,496,629.89
1,485,834.26 8,915,005.59
3,477,955.42 3,477,955.42
3,364,922.13 3,364,922.13
4,584,056.65 36,672,453.17
4,584,056.65 4,584,056.65
4,584,056.65 9,168,113.29
3,012,549.12 36,150,589.41
743,257.98 4,459,547.88
575,801.46 1,151,602.91
451,732.41 451,732.41
915,967.85 3,663,871.41

383,105.11 16,856,624.62
298,042.90 20,863,002.79

PEKERJAAN STRUKTUR 116/632


HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )

117,508.05 5,170,354.11
722,631.46 50,584,202.33

1,290,812.14 8,132,116.49
13,367.47 39,460,765.24
260,946.71 40,277,125.20

53,377,811.59
26,688,905.80

1,078,205.04 1,261,499.90
15,113.31 4,456,008.32
209,075.78 1,522,071.67

1,078,205.04 883,049.93
15,113.31 903,579.46
209,075.78 905,298.13

1,078,205.04 1,177,399.90
15,113.31 4,158,941.10
209,075.78 1,738,674.18

1,078,205.04 1,280,907.59
15,113.31 1,597,960.49
209,075.78 1,738,674.18

1,078,205.04 465,784.58
15,113.31 3,093,710.75
209,075.78 1,505,345.61

SUB TOTAL 835,930,776.46

700,000.00 422,800,000.00

3,286,324.12 26,290,592.99

4,176,296.19 75,173,331.49

PEKERJAAN STRUKTUR 117/632


HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )

4,098,765.47 24,592,592.83
6,124,157.47 24,496,629.89
1,485,834.26 8,915,005.59
5,876,626.40 11,753,252.80
4,829,998.31 19,319,993.24
4,564,272.22 13,692,816.67
4,664,711.68 13,994,135.04
4,815,435.46 19,261,741.83
5,966,419.34 35,798,516.06
4,095,326.60 24,571,959.57
6,098,706.69 36,592,240.11
575,801.46 1,151,602.91
451,732.41 451,732.41
915,967.85 3,663,871.41

383,105.11 3,064,840.84
298,042.90 20,266,917.00

117,508.05 940,064.38
722,631.46 49,138,939.41

SUB TOTAL 26,282,741.31

1,078,205.04 3,178,979.74
15,113.31 4,076,946.19
209,075.78 4,741,838.68

1,078,205.04 2,154,253.67
15,113.31 8,092,633.43
209,075.78 4,038,089.61

PEKERJAAN STRUKTUR 118/632


BILL OF QUANTITY (BOQ)
P E K E R JAAN STRUKTUR

Pekerjaan : RUSUNAWA
Lokasi : RANCACILI - JAWA BARAT
Tahun Anggaran : 2014

2.1. PEKERJAAN STRUKTUR

NO. URAIAN PEKERJAAN VOLUME UNIT

2.1.A PEKERJAAN STRUKTUR NON STANDART

A.1 PEKERJAAN PONDASI BANGUNAN (*)

1 Tiang pancang uk. 45X45 cm, pjg. 32 M : 183.0 5,856.00 M'


2 Ongkos Pemancangan Tiang 5,856.00 M'
3 Pemotongan kepala tiang pancang 183.00 Titik

A.2 PEKERJAAN SEPTIC TANK BIO 2 (DUA) UNIT

1 (satu) unit Septic Tank Bio :

1 Plat bawah t = 15 cm ( bawah )


- Beton K-350 - M3
- Besi 116 Kg/M 3
- kg
- Bekisting Pelat m2 - m2
2 Plat penutup atap t = 15 cm
- Beton K-350 - M3
- Besi 116 Kg/M 3
- kg
- Bekisting Pelat m2 - m2
3 Pasir Urug - M3
4 Galian tanah - M3
5 Pas bata Bak Kontrol + tutup plat 3 mm (lengkap terpasang) - Unit
6 Pipa PVC + galian (terpasang) - M
7 Pipa vent PVC 3 " - Unit

A.3 PEKERJAAN SUMUR RESAPAN 2 (DUA) UNIT

1 (satu) unit Pekerjaan Sumur Resapan (2.7x1.1x2.35 m) :

PEKERJAAN STRUKTUR 119/632


NO. URAIAN PEKERJAAN VOLUME UNIT

1 Galian tanah - M3
2 Urugan tanah kembali dengan pasir - M3
3 Sirtu t=30 cm - M3
4 Plat penutup atap t = 15 cm
- Beton K-350 - M3
- Besi 116 kg/m3 - kg
- Bekisting Pelat - m2
5 Pas bata Bak Kontrol + tutup plat 3 mm (lengkap terpasang) - Unit

2.1.B PEKERJAAN STRUKTUR STANDART

B1 LANTAI BASEMENT /DASAR


B1.1 Galian, pasir urug dan lantai kerja
1 Galian tanah dibawah Pile Cap 418.70 M3
3 Galian tanah dibawah Tied beam 85.53 M3
4 Urug pasir dibawah Pile Cap t=10 cm 30.34 M3
5 Lantai kerja dibawah Pile Cap t=5 cm (1:3:5) 15.17 M3
6 Urug pasir dibawah Tie beam t=10 cm 14.26 M3
7 Lantai kerja dibawah Tie beam t=5 cm (1:3:5) 7.13 M3
8 Rollag Beton K 175 28.35 m3
9 Urug tanah bawah pelat lantai basement/dasar 147.22 m3
10 Urug pasir dibawah pelat beton t=10 cm 124.57 m3
11 Lantai kerja dibawah pelat beton t=5 cm (1:3:5) 56.62 m3

B1.2 Beton Pile Cap, Tie Beam dan Pelat Basement/Dasar


12 Pile Cap PC- 1= 8 buah 100 Kg/M3
- Beton K-300 + integrated waterproofing 18.00 M3
- Besi beton 1,800.00 kg
- Bekisting 72.00 M2
13 Pile Cap PC- 2 = 39 buah 102 Kg/M3
- Beton K-300 133.28 M3
- Besi beton 13,594.56 kg
- Bekisting 190.40 M2
14 Pile Cap PC- 3 = 27 buah 116 Kg/M3
- Beton K-300 34.20 M3
- Besi beton 3,967.20 kg
- Bekisting 47.00 M2
15 Pile Cap PC- 4 = 4 buah 96 Kg/M3

PEKERJAAN STRUKTUR 120/632


NO. URAIAN PEKERJAAN VOLUME UNIT

- Beton K-300 80.64 M3


- Besi beton 7,741.44 kg
- Bekisting 74.40 M2
16 Pile Cap PC- 24 = 6 buah 85.00 Kg/M 3

- Beton K-300 93.84 M3


- Besi beton 7,976.40 kg
- Bekisting 75.60 M2
17 Pile Cap PC- 36 = 1 buah 85.00 Kg/M3
- Beton K-300 33.24 M3
- Besi beton 2,825.40 kg
- Bekisting 23.40 M2
18 Tie Beam TB1 463 m' 265.00 Kg/M3
- Beton K-300 51.32 M3
- Besi beton 13,599.75 kg
- Bekisting 359.24 M2
19 Tie Beam TB2 101.19 265.00 Kg/M3
- Beton K-300 51.32 M3
- Besi beton 13,599.75 kg
- Bekisting 359.24 M2
20 Tie Beam TB3 265.00 Kg/M3
- Beton K-300 51.32 M3
- Besi beton 13,599.75 kg
- Bekisting 359.24 M2
21 Tie Beam TB4 265.00 Kg/M3
- Beton K-300 51.32 M3
- Besi beton 13,599.75 kg
- Bekisting 359.24 M2
19 Pelat Lantai Basement t = 12m 102 Kg/M3
- Beton K-300 135.89 M3
- Besi beton 13,861.07 kg
B1.3 Kolom beton
PEKERJAAN PRODUKSI KOMPONEN KOLOM
20 K-1- 400x400 L=3,35 M 6.00 Bh
21 K-2 600x600 L=3,35 M 21.00 Bh
22 K-2A 600x600 L=3,35 M 24.00 Bh
23 K-3A 800x800 L=3,35 M 3.00 Bh
K-L 300x500 L=3,35 M 8.00 Bh

24 PEKERJAAN EREKSI + JOINT KOLOM


1. Pekerjaan Ereksi (Instal Komponen) 54.00 Bh

PEKERJAAN STRUKTUR 121/632


NO. URAIAN PEKERJAAN VOLUME UNIT

2. Pekerjaan Joint Komponen 54.00 Bh

PEKERJAAN SHEAR WALL


1. Beton 28.80 m3
2. Besi 5,720.00 kg
3. Bekisting 179.20 m2

25 Tangga Type ( 2 buah )


Tangga Type 1 ( 1 buah )
* Plat tangga t = 15 cm 252 Kg/M3
- Beton K-350 1.17 M3
- Besi beton 294.84 kg
- Bekisting 7.80 M2
* Anak tangga 73 Kg/M 3

- Beton K-350 0.90 M3


- Besi beton 65.48 kg
- Bekisting 4.59 M2
* Bordes tangga 252 Kg/M 3

- Beton K-350 1.09 M3


- Besi beton 275.18 kg
- Bekisting 7.28 M2
* Balok Tangga 30 x 60 89 Kg/M 3

- Beton K-350 1.19 M3


- Besi beton 105.73 kg
- Bekisting 8.32 M2
* Kolom Tangga 15 x 30 668 Kg/M 3

- Beton K-350 0.40 M3


- Besi beton 264.34 kg
- Bekisting 7.92 M2

B2 LANTAI 1 + 0.00 m
B2.1 Pelat lantai
1 HCWS tebal = 150 mm 1,203.00 M2

B2.2 Kolom
2 K-2 600x600 L=2,9 M 9.00 Bh
K-2A 600x600 L= 2,9 M 24.00 Bh
K-3A 800x800 L=2,9 M 3.00 Bh
K-L 300x500 L=2,9 M 8.00 Bh

PEKERJAAN STRUKTUR 122/632


NO. URAIAN PEKERJAAN VOLUME UNIT

B2.3 Balok Lantai


5 B-1A 400X600 L=5,44 M 18.00 Bh
B-1Aa 400X600 L=5,34 M 4.00 Bh
B-1B 400X600 L=7,976 M 4.00 Bh
B-1C 400X600 L=4,72 M 12.00 Bh
B-1D 400X600 L= 6,44 M 6.00 Bh
B-1E 400X600 L= 2,49 M 6.00 Bh
B-1F 400X600 L= 7,078 M 6.00 Bh
B-1G 400X600 L= 1,708 M 6.00 Bh
B-1H 300X600 L= 3,298 M 12.00 Bh
B-2C 300X600 L= 5,44 M 12.00 Bh
B-2Cc 300X600 L= 5,24 M 2.00 Bh
BL1-250X450 L=1,2 M 2.00 Bh
BL2-250X450 L= 0,86 M 1.00 Bh
BL3-250X450 L=2 M 4.00 Bh

PEKERJAAN EREKSI + JOINT


1. Pekerjaan Ereksi (Instal Komponen)
- Ereksi / instal Kolom 44.00 Bh
- Ereksi / instal Balok 95.00 Bh
2. Pekerjaan Joint
- Joint Kolom 44.00 Bh
- Joint Balok 95.00 Bh

PEKERJAAN SHEAR WALL


1. Beton 6.30 m3
2. Besi 4,912.00 kg
3. Bekisting 154.35 m2

B2.4 Tangga Type ( 2 buah )


10 Tangga Type 1 ( 1 buah )
* Plat tangga t = 15 cm 252 Kg/M3
- Beton K-350 1.17 M3
- Besi beton 294.84 kg
- Bekisting 7.28 M2
* Anak tangga 73 Kg/M 3

- Beton K-350 0.82 M3


- Besi beton 59.79 kg
- Bekisting 4.33 M2
* Bordes tangga 252 Kg/M 3

PEKERJAAN STRUKTUR 123/632


NO. URAIAN PEKERJAAN VOLUME UNIT

- Beton K-350 1.09 M3


- Besi beton 275.18 kg
- Bekisting 8.32 M2
* Balok Tangga 30 x 60 89 Kg/M 3

- Beton K-350 1.19 M3


- Besi beton 105.73 kg
- Bekisting 8.32 M2
* Kolom Tangga 30 x 30 cm 474 Kg/M 3

- Beton K-350 0.43 M3


- Besi beton 204.70 kg
- Bekisting 7.20 M2

B3 LANTAI 2
B3.1 Pelat lantai
1 HCWS tebal = 150 mm 604.00 M2

B3.2 Kolom
2 K-2 600x600 L=2,9 M 9.00 Bh
K-2A 600x600 L= 2,9 M 24.00 Bh
K-3A 800x800 L=2,9 M 3.00 Bh
K-L 300x500 L=2,9 M 8.00 Bh

B3.3 Balok Lantai


B-1A 400X600 L=5,44 M 18.00 Bh
B-1Aa 400X600 L=5,34 M 4.00 Bh
B-1B 400X600 L=7,976 M 4.00 Bh
B-1G 400X600 L= 1,708 M 6.00 Bh
B-2C 300X600 L= 5,44 M 1.00 Bh
B-2Cc 300X600 L= 5,24 M 1.00 Bh
B-2A 300X600 L= 7 M 8.00 Bh
B-2Aa 300X600 L= 7 M 1.00 Bh
B-2B 300X600 L= 7 M 2.00 Bh
B-4 200X600 L= 5,68 M 12.00 Bh
B-4A 200X600 L= 1,22 M 6.00 Bh
BL1-250X450 L=1,2 M 2.00 Bh
BL2-250X450 L= 0,86 M 1.00 Bh
BL3-250X450 L=2 M 4.00 Bh

PEKERJAAN EREKSI + JOINT


1. Pekerjaan Ereksi (Instal Komponen)

PEKERJAAN STRUKTUR 124/632


NO. URAIAN PEKERJAAN VOLUME UNIT

- Ereksi / instal Kolom 44.00 Bh


- Ereksi / instal Balok 70.00 Bh
2. Pekerjaan Joint
- Joint Kolom 44.00 Bh
- Joint Balok 70.00 Bh

PEKERJAAN SHEAR WALL


1. Beton 6.30 m3
2. Besi 4,912.00 kg
3. Bekisting 154.35 m2

B2.4 Tangga Type ( 2 buah )


10 Tangga Type 1 ( 1 buah )
* Plat tangga t = 15 cm 252 Kg/M3
- Beton K-350 1.17 M3
- Besi beton 294.84 kg
- Bekisting 7.28 M2
* Anak tangga 73 Kg/M 3

- Beton K-350 0.82 M3


- Besi beton 59.79 kg
- Bekisting 4.33 M2
* Bordes tangga 252 Kg/M 3

- Beton K-350 1.09 M3


- Besi beton 275.18 kg
- Bekisting 8.32 M2
* Balok Tangga 30 x 60 89 Kg/M 3

- Beton K-350 1.19 M3


- Besi beton 105.73 kg
- Bekisting 8.32 M2
* Kolom Tangga 30 x 30 cm 474 Kg/M 3

- Beton K-350 0.43 M3


- Besi beton 204.70 kg
- Bekisting 7.20 M2

B4 LANTAI 3
B4.1 PEKERJAAN PRODUKSI KOMPONEN PELAT
1 HCWS tebal = 150 mm 604.00 M2

B4.2 PEKERJAAN PRODUKSI KOMPONEN KOLOM


2 K-2 600x600 L=2,9 M 9.00 Bh

PEKERJAAN STRUKTUR 125/632


NO. URAIAN PEKERJAAN VOLUME UNIT

K-2A 600x600 L= 2,9 M 24.00 Bh


K-3A 800x800 L=2,9 M 3.00 Bh
K-L 300x500 L=2,9 M 8.00 Bh

B4.3 PEKERJAAN PRODUKSI KOMPONEN BALOK


5 B-1A 400X600 L=5,44 M 18.00 Bh
B-1Aa 400X600 L=5,34 M 4.00 Bh
B-1B 400X600 L=7,976 M 4.00 Bh
B-1G 400X600 L= 1,708 M 6.00 Bh
6 B-2C 300X600 L= 5,44 M 1.00 Bh
B-2A 300X600 L= 7 M 8.00 Bh
B-2Aa 300X600 L= 7 M 2.00 Bh
B-2B 300X600 L= 7 M 2.00 Bh
7 B-4 200X600 L= 5,68 M 12.00 Bh
B-4A 200X600 L= 1,22 M 6.00 Bh
BL1-250X450 L=1,2 M 2.00 Bh
BL2-250X450 L= 0,86 M 1.00 Bh
BL3-250X450 L=2 M 4.00 Bh

PEKERJAAN EREKSI + JOINT


1. Pekerjaan Ereksi (Instal Komponen)
- Ereksi / instal Kolom 36.00 Bh
- Ereksi / instal Balok 70.00 Bh
2. Pekerjaan Joint
- Joint Kolom 36.00 Bh
- Joint Balok 70.00 Bh

PEKERJAAN SHEAR WALL


1. Beton 6.30 m3
2. Besi 4,312.00 kg
3. Bekisting 154.35 m2

B4.4 Tangga Type ( 2 buah )


10 Tangga Type 1 ( 1 buah )
* Plat tangga t = 15 cm 252 Kg/M3
- Beton K-350 1.17 M3
- Besi beton 294.84 kg
- Bekisting 7.28 M2
* Anak tangga 73 Kg/M 3

- Beton K-350 0.82 M3

PEKERJAAN STRUKTUR 126/632


NO. URAIAN PEKERJAAN VOLUME UNIT

- Besi beton 59.79 kg


- Bekisting 4.33 M2
* Bordes tangga 252 Kg/M 3

- Beton K-350 1.09 M3


- Besi beton 275.18 kg
- Bekisting 8.32 M2
* Balok Tangga 30 x 60 89 Kg/M 3

- Beton K-350 1.19 M3


- Besi beton 105.73 kg
- Bekisting 8.32 M2
* Kolom Tangga 30 x 30 cm 474 Kg/M 3

- Beton K-350 0.43 M3


- Besi beton 204.70 kg
- Bekisting 7.20 M2

B5 LANTAI 4
B5.1 PEKERJAAN PRODUKSI KOMPONEN PELAT
1 HCWS tebal = 150 mm 604.00 M2

B5.2 PEKERJAAN PRODUKSI KOMPONEN KOLOM


2 K-2 600x600 L=2,9 M 9.00 Bh
K-2A 600x600 L= 2,9 M 24.00 Bh
K-3A 800x800 L=2,9 M 3.00 Bh
K-L 300x500 L=2,9 M 8.00 Bh

B5.3 PEKERJAAN PRODUKSI KOMPONEN BALOK


5 B-1A 400X600 L=5,44 M 18.00 Bh
B-1Aa 400X600 L=5,34 M 4.00 Bh
B-1B 400X600 L=7,976 M 4.00 Bh
B-1G 400X600 L= 1,708 M 6.00 Bh
6 B-2C 300X600 L= 5,44 M 1.00 Bh
B-2A 300X600 L= 7 M 8.00 Bh
B-2Aa 300X600 L= 7 M 2.00 Bh
B-2B 300X600 L= 7 M 2.00 Bh
7 B-4 200X600 L= 5,68 M 12.00 Bh
B-4A 200X600 L= 1,22 M 6.00 Bh
BL1-250X450 L=1,2 M 2.00 Bh
BL2-250X450 L= 0,86 M 1.00 Bh
BL3-250X450 L=2 M 4.00 Bh

PEKERJAAN STRUKTUR 127/632


NO. URAIAN PEKERJAAN VOLUME UNIT

PEKERJAAN EREKSI + JOINT


1. Pekerjaan Ereksi (Instal Komponen)
- Ereksi / instal Kolom 44.00 Bh
- Ereksi / instal Balok 70.00 Bh
2. Pekerjaan Joint
- Joint Kolom 44.00 Bh
- Joint Balok 70.00 Bh

PEKERJAAN SHEAR WALL


1. Beton 6.30 m3
2. Besi 3,840.00 kg
3. Bekisting 154.35 m2

B5.4 Tangga Type ( 2 buah )


10 Tangga Type 1 ( 1 buah )
* Plat tangga t = 15 cm 252 Kg/M3
- Beton K-350 1.17 M3
- Besi beton 294.84 kg
- Bekisting 7.28 M2
* Anak tangga 73 Kg/M3
- Beton K-350 0.82 M3
- Besi beton 59.79 kg
- Bekisting 4.33 M2
* Bordes tangga 252 Kg/M3
- Beton K-350 1.09 M3
- Besi beton 275.18 kg
- Bekisting 8.32 M2
* Balok Tangga 30 x 60 89 Kg/M 3

- Beton K-350 1.19 M3


- Besi beton 105.73 kg
- Bekisting 8.32 M2
* Kolom Tangga 30 x 30 cm 474 Kg/M 3

- Beton K-350 0.43 M3


- Besi beton 204.70 kg
- Bekisting 7.20 M2

B6 LANTAI 5
B6.1 PEKERJAAN PRODUKSI KOMPONEN PELAT
1 HCWS tebal = 150 mm 604.00 M2

PEKERJAAN STRUKTUR 128/632


NO. URAIAN PEKERJAAN VOLUME UNIT

B6.2 PEKERJAAN PRODUKSI KOMPONEN KOLOM


2 K-2 600x600 L=2,9 M 9.00 Bh
K-2A 600x600 L= 2,9 M 24.00 Bh
K-3A 800x800 L=2,9 M 3.00 Bh
K-L 300x500 L=2,9 M 8.00 Bh

B6.3 PEKERJAAN PRODUKSI KOMPONEN BALOK


5 B-1A 400X600 L=5,44 M 18.00 Bh
B-1Aa 400X600 L=5,34 M 4.00 Bh
B-1B 400X600 L=7,976 M 4.00 Bh
B-1G 400X600 L= 1,708 M 6.00 Bh
6 B-2C 300X600 L= 5,44 M 1.00 Bh
B-2A 300X600 L= 7 M 8.00 Bh
B-2Aa 300X600 L= 7 M 2.00 Bh
B-2B 300X600 L= 7 M 2.00 Bh
7 B-4 200X600 L= 5,68 M 12.00 Bh
B-4A 200X600 L= 1,22 M 6.00 Bh
BL1-250X450 L=1,2 M 2.00 Bh
BL2-250X450 L= 0,86 M 1.00 Bh
BL3-250X450 L=2 M 4.00 Bh

PEKERJAAN EREKSI + JOINT


1. Pekerjaan Ereksi (Instal Komponen)
- Ereksi / instal Kolom 44.00 Bh
- Ereksi / instal Balok 70.00 Bh
2. Pekerjaan Joint
- Joint Kolom 44.00 Bh
- Joint Balok 70.00 Bh

PEKERJAAN SHEAR WALL


1. Beton 6.30 m3
2. Besi 2,952.00 kg
3. Bekisting 154.35 m2

B6.4 Tangga Type ( 2 buah )


10 Tangga Type 1 ( 1 buah )
* Plat tangga t = 15 cm 252 Kg/M3
- Beton K-350 1.17 M3
- Besi beton 294.84 kg
- Bekisting 7.28 M2

PEKERJAAN STRUKTUR 129/632


NO. URAIAN PEKERJAAN VOLUME UNIT

* Anak tangga 73 Kg/M3


- Beton K-350 0.82 M3
- Besi beton 59.79 kg
- Bekisting 4.33 M2
* Bordes tangga 252 Kg/M3
- Beton K-350 1.09 M3
- Besi beton 275.18 kg
- Bekisting 8.32 M2
* Balok Tangga 30 x 60 89 Kg/M3
- Beton K-350 1.19 M3
- Besi beton 105.73 kg
- Bekisting 8.32 M2
* Kolom Tangga 30 x 30 cm 474 Kg/M3
- Beton K-350 0.43 M3
- Besi beton 204.70 kg
- Bekisting 7.20 M2

B7 LANTAI 6
B7.1 PEKERJAAN PRODUKSI KOMPONEN PELAT
1 HCWS tebal = 150 mm 604.00 M2

B7.2 PEKERJAAN PRODUKSI KOMPONEN KOLOM


2 K-2 600x600 L=2,9 M 9.00 Bh
K-2A 600x600 L= 2,9 M 24.00 Bh
K-3A 800x800 L=2,9 M 3.00 Bh
K-L 300x500 L=2,9 M 8.00 Bh

B7.3 PEKERJAAN PRODUKSI KOMPONEN BALOK


5 B-1A 400X600 L=5,44 M 18.00 Bh
B-1Aa 400X600 L=5,34 M 4.00 Bh
B-1B 400X600 L=7,976 M 4.00 Bh
B-1G 400X600 L= 1,708 M 6.00 Bh
6 B-2C 300X600 L= 5,44 M 1.00 Bh
B-2Cc 300X600 L= 5,24 M 1.00 Bh
B-2A 300X600 L= 7 M 8.00 Bh
B-2Aa 300X600 L= 7 M 1.00 Bh
7 B-2B 300X600 L= 7 M 2.00 Bh
B-4 200X600 L= 5,68 M 12.00 Bh
B-4A 200X600 L= 1,22 M 6.00 Bh
BL1-250X450 L=1,2 M 2.00 Bh

PEKERJAAN STRUKTUR 130/632


NO. URAIAN PEKERJAAN VOLUME UNIT

BL2-250X450 L= 0,86 M 1.00 Bh


BL3-250X450 L=2 M 4.00 Bh

PEKERJAAN EREKSI + JOINT


1. Pekerjaan Ereksi (Instal Komponen)
- Ereksi / instal Kolom 44.00 Bh
- Ereksi / instal Balok 70.00 Bh
2. Pekerjaan Joint
- Joint Kolom 44.00 Bh
- Joint Balok 70.00 Bh

PEKERJAAN SHEAR WALL


1. Beton 6.30 m3
2. Besi 2,952.00 kg
3. Bekisting 154.35 m2

B7.4 Tangga Type ( 2 buah )


10 Tangga Type 1 ( 1 buah )
* Plat tangga t = 15 cm 252 Kg/M3
- Beton K-350 1.17 M3
- Besi beton 294.84 kg
- Bekisting 7.28 M2
* Anak tangga 73 Kg/M 3

- Beton K-350 0.82 M3


- Besi beton 59.79 kg
- Bekisting 4.33 M2
* Bordes tangga 252 Kg/M 3

- Beton K-350 1.09 M3


- Besi beton 275.18 kg
- Bekisting 8.32 M2
* Balok Tangga 30 x 60 89 Kg/M3
- Beton K-350 1.19 M3
- Besi beton 105.73 kg
- Bekisting 8.32 M2
* Kolom Tangga 30 x 30 cm 474 Kg/M3
- Beton K-350 0.43 M3
- Besi beton 204.70 kg
- Bekisting 7.20 M2

B8 LANTAI 7

PEKERJAAN STRUKTUR 131/632


NO. URAIAN PEKERJAAN VOLUME UNIT

B8.1 PEKERJAAN PRODUKSI KOMPONEN PELAT


1 HCWS tebal = 150 mm 604.00 M2

B8.2 PEKERJAAN PRODUKSI KOMPONEN KOLOM


2 K-2 600x600 L=2,9 M 9.00 Bh
K-2A 600x600 L= 2,9 M 24.00 Bh
K-3A 800x800 L=2,9 M 3.00 Bh
K-L 300x500 L=2,9 M 8.00 Bh

B8.3 PEKERJAAN PRODUKSI KOMPONEN BALOK


5 B-1A 400X600 L=5,44 M 18.00 Bh
B-1Aa 400X600 L=5,34 M 4.00 Bh
B-1B 400X600 L=7,976 M 4.00 Bh
B-1G 400X600 L= 1,708 M 6.00 Bh
6 B-2C 300X600 L= 5,44 M 1.00 Bh
B-2Cc 300X600 L= 5,24 M 1.00 Bh
B-2A 300X600 L= 7 M 8.00 Bh
B-2Aa 300X600 L= 7 M 1.00 Bh
7 B-2B 300X600 L= 7 M 2.00 Bh
B-4 200X600 L= 5,68 M 12.00 Bh
B-4Besi beton 6.00 Bh
BL1-250X450 L=1,2 M 2.00 Bh
BL2-250X450 L= 0,86 M 1.00 Bh
BL3-250X450 L=2 M 4.00 Bh

PEKERJAAN EREKSI + JOINT


1. Pekerjaan Ereksi (Instal Komponen)
- Ereksi / instal Kolom 44.00 Bh
- Ereksi / instal Balok 70.00 Bh
2. Pekerjaan Joint
- Joint Kolom 44.00 Bh
- Joint Balok 70.00 Bh

PEKERJAAN SHEAR WALL


1. Beton 6.30 m3
2. Besi 2,952.00 kg
3. Bekisting 154.35 m2

B8.4 Tangga Type ( 2 buah )


10 Tangga Type 1 ( 1 buah )

PEKERJAAN STRUKTUR 132/632


NO. URAIAN PEKERJAAN VOLUME UNIT

* Plat tangga t = 15 cm 252 Kg/M3


- Beton K-350 1.17 M3
- Besi beton 294.84 kg
- Bekisting 7.28 M2
* Anak tangga 73 Kg/M3
- Beton K-350 0.82 M3
- Besi beton 59.79 kg
- Bekisting 4.33 M2
* Bordes tangga 252 Kg/M3
- Beton K-350 1.09 M3
- Besi beton 275.18 kg
- Bekisting 8.32 M2
* Balok Tangga 30 x 60 89 Kg/M3
- Beton K-350 1.19 M3
- Besi beton 105.73 kg
- Bekisting 8.32 M2
* Kolom Tangga 30 x 30 cm 474 Kg/M 3

- Beton K-350 0.43 M3


- Besi beton 204.70 kg
- Bekisting 7.20 M2

B9 LANTAI 8
B9.1 PEKERJAAN PRODUKSI KOMPONEN PELAT
1 HCWS tebal = 150 mm 604.00 M2

B9.2 PEKERJAAN PRODUKSI KOMPONEN KOLOM


2 K-2 600x600 L=2,9 M 9.00 Bh
K-2A 600x600 L= 2,9 M 24.00 Bh
K-3A 800x800 L=2,9 M 3.00 Bh
K-L 300x500 L=2,9 M 8.00 Bh

B9.3 PEKERJAAN PRODUKSI KOMPONEN BALOK


5 B-1A 400X600 L=5,44 M 18.00 Bh
B-1Aa 400X600 L=5,34 M 4.00 Bh
B-1B 400X600 L=7,976 M 4.00 Bh
B-1G 400X600 L= 1,708 M 6.00 Bh
6 B-2C 300X600 L= 5,44 M 1.00 Bh
B-2Cc 300X600 L= 5,24 M 1.00 Bh
B-2A 300X600 L= 7 M 8.00 Bh
B-2Aa 300X600 L= 7 M 1.00 Bh

PEKERJAAN STRUKTUR 133/632


NO. URAIAN PEKERJAAN VOLUME UNIT

7 B-2B 300X600 L= 7 M 2.00 Bh


B-4 200X600 L= 5,68 M 12.00 Bh
B-4A 200X600 L= 1,22 M 6.00 Bh
BL1-250X450 L=1,2 M 2.00 Bh
BL2-250X450 L= 0,86 M 1.00 Bh
BL3-250X450 L=2 M 4.00 Bh

PEKERJAAN EREKSI + JOINT


1. Pekerjaan Ereksi (Instal Komponen)
- Ereksi / instal Kolom 44.00 Bh
- Ereksi / instal Balok 70.00 Bh
2. Pekerjaan Joint
- Joint Kolom 44.00 Bh
- Joint Balok 70.00 Bh

PEKERJAAN SHEAR WALL


1. Beton 6.30 m3
2. Besi 2,952.00 kg
3. Bekisting 154.35 m2

B9.4 Tangga Type ( 1 buah )


10 Tangga Type 1 ( 1 buah )
* Plat tangga t = 15 cm 252 Kg/M3
- Beton K-350 1.17 M3
- Besi beton 294.84 kg
- Bekisting 7.28 M2
* Anak tangga 73 Kg/M3
- Beton K-350 0.82 M3
- Besi beton 59.79 kg
- Bekisting 4.33 M2
* Bordes tangga 252 Kg/M3
- Beton K-350 1.09 M3
- Besi beton 275.18 kg
- Bekisting 8.32 M2
* Balok Tangga 30 x 60 89 Kg/M3
- Beton K-350 1.19 M3
- Besi beton 105.73 kg
- Bekisting 8.32 M2
* Kolom Tangga 30 x 30 cm 474 Kg/M 3

- Beton K-350 0.43 M3

PEKERJAAN STRUKTUR 134/632


NO. URAIAN PEKERJAAN VOLUME UNIT

- Besi beton 204.70 kg


- Bekisting 7.20 M2

B10 LANTAI ATAP


B10.1 PEKERJAAN PRODUKSI KOMPONEN PELAT
1 HCWS tebal = 150 mm 604.00 M2

B10.2 PEKERJAAN PRODUKSI KOMPONEN KOLOM


2 K-L 300x500 L=3,35 M 8.00 Bh

B10.3 PEKERJAAN PRODUKSI KOMPONEN BALOK


3 B-1A 400X600 L=5,44 M 18.00 Bh
B-1Aa 400X600 L=5,34 M 6.00 Bh
B-1B 400X600 L=7,976 M 4.00 Bh
B-1G 400X600 L= 1,708 M 6.00 Bh
4 B-1Bb 400X600 L= 7,8 2.00 Bh
B-2Ac 300X600 L= 7.87 M 4.00 Bh
B-2Ad 300X600 L= 6.944 M 3.00 Bh
B-2Ae 300X600 L= 7,135 M 3.00 Bh
5 B-2d 300X600 L= 7,84 M 4.00 Bh
B-3A 200X600 L= 11,7 M 6.00 Bh
B-3Aa 200X600 L= 8 M 6.00 Bh
B-3Ab 200X600 L= 12 M 6.00 Bh
BL1-250X450 L=1,2 M 2.00 Bh
BL2-250X450 L= 0,86 M 1.00 Bh
BL3-250X450 L=2 M 4.00 Bh

PEKERJAAN EREKSI + JOINT


1. Pekerjaan Ereksi (Instal Komponen)
- Ereksi / instal Kolom 8.00 Bh
- Ereksi / instal Balok 68.00 Bh
2. Pekerjaan Joint
- Joint Kolom 8.00 Bh
- Joint Balok 68.00 Bh

B11 LANTAI ATAP RUANG MESIN


B11.1 Pelat lantai
1 Pelat Lantai t = 13 cm 91 Kg/M3
- Beton K-350 2.95 M3
- Besi beton 269.76 kg

PEKERJAAN STRUKTUR 135/632


NO. URAIAN PEKERJAAN VOLUME UNIT

- Bekisting 22.68 m2
B12.2 Balok Lantai
2 Balok B3 Atap R Mesin Lift 268 Kg/M3
- Beton K-350 2.00 M3
- Besi beton 535.46 kg
- Bekisting 19.31 M2

PEKERJAAN STRUKTUR 136/632


QUANTITY (BOQ)
R JAAN STRUKTUR

HARGA SATUAN JUMLAH HARGA


( Rp. ) ( Rp. )

TOTAL 2,353,380,000.00

SUB TOTAL 2,353,380,000.00

325,000.00 1,903,200,000.00
75,000.00 439,200,000.00
60,000.00 10,980,000.00

SUB TOTAL -

1,078,205.04 -
15,113.31 -
139,383.85 -

1,078,205.04 -
15,113.31 -
139,383.85 -
300,254.02 -
110,324.94 -
1,000,000.00 -
65,000.00 -
250,000.00 -

SUB TOTAL -

PEKERJAAN STRUKTUR 137/632


HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )

110,324.94 -
47,826.68 -
341,607.86 -

1,078,205.04 -
15,113.31 -
139,383.85 -
1,000,000.00 -

TOTAL 13,804,180,789.91

SUB TOTAL 3,665,955,397.34

62,406.30 26,129,767.44
62,406.30 5,337,798.06
148,383.40 4,501,358.82
641,151.39 9,724,984.28
148,383.40 2,115,279.56
641,151.39 4,569,966.82
746,653.25 21,167,619.58
70,883.45 10,435,263.04
148,383.40 18,483,882.72
641,151.39 36,303,274.00

1,293,846.05 23,289,228.86
15,113.31 27,203,958.00
215,594.54 15,522,806.52

1,293,846.05 172,443,801.28
15,113.31 205,458,799.59
215,594.54 41,049,199.46

1,293,846.05 44,249,534.84
15,113.31 59,957,523.43
215,594.54 10,132,943.15

PEKERJAAN STRUKTUR 138/632


HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )

1,293,846.05 104,335,745.31
15,113.31 116,998,782.57
215,594.54 16,040,233.40

1,293,846.05 121,414,513.14
15,113.31 120,549,805.88
215,594.54 16,298,946.85

1,293,846.05 43,007,442.64
15,113.31 42,701,146.07
215,594.54 5,044,912.12

1,293,846.05 66,399,920.41
15,113.31 205,537,192.33
215,594.54 77,449,878.92

1,293,846.05 66,399,920.41
15,113.31 205,537,192.33
215,594.54 77,449,878.92

1,293,846.05 66,399,920.41
15,113.31 205,537,192.33
215,594.54 77,449,878.92

1,293,846.05 66,399,920.41
15,113.31 205,537,192.33
215,594.54 77,449,878.92

1,293,846.05 175,824,362.23
15,113.31 209,486,581.34

1,896,933.22 11,381,599.31
5,781,527.91 121,412,086.08
5,510,629.62 132,255,110.92
8,073,127.11 24,219,381.32
3,286,324.12 26,290,592.99

383,105.11 20,687,675.67

PEKERJAAN STRUKTUR 139/632


HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )

117,508.05 6,345,434.59

1,290,812.14 37,175,389.66
13,367.47 76,461,916.39
260,946.71 46,761,651.03

55,637,131.70
27,818,565.85

1,078,205.04 1,261,499.90
15,113.31 4,456,008.32
209,075.78 1,630,791.08

1,078,205.04 967,149.92
15,113.31 989,634.65
209,075.78 959,657.83

1,078,205.04 1,177,399.90
15,113.31 4,158,941.10
209,075.78 1,522,071.67

1,078,205.04 1,280,907.59
15,113.31 1,597,960.49
209,075.78 1,738,674.18

1,078,205.04 426,969.20
15,113.31 3,995,019.84
209,075.78 1,655,880.17

SUB TOTAL 1,645,470,592.08

700,000.00 842,100,000.00

4,103,701.51 36,933,313.56
4,807,228.40 115,373,481.63
7,043,341.57 21,130,024.71
2,875,939.44 23,007,515.54

PEKERJAAN STRUKTUR 140/632


HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )

4,176,296.19 75,173,331.49
4,098,765.47 16,395,061.88
6,124,157.47 24,496,629.89
3,526,345.91 42,316,150.88
4,802,951.48 28,817,708.89
2,015,833.83 12,095,002.99
5,455,403.35 32,732,420.12
1,485,834.26 8,915,005.59
2,151,110.87 25,813,330.41
3,477,955.42 41,735,465.08
3,364,922.13 6,729,844.26
575,801.46 1,151,602.91
451,732.41 451,732.41
915,967.85 3,663,871.41

383,105.11 16,856,624.62
298,042.90 28,314,075.22

117,508.05 5,170,354.11
722,631.46 68,649,988.88

-
1,290,812.14 8,132,116.49
13,367.47 65,661,002.32
260,946.71 40,277,125.20

53,377,811.59
26,688,905.80

1,078,205.04 1,261,499.90
15,113.31 4,456,008.32
209,075.78 1,522,071.67

1,078,205.04 883,049.93
15,113.31 903,579.46
209,075.78 905,298.13

PEKERJAAN STRUKTUR 141/632


HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )

1,078,205.04 1,177,399.90
15,113.31 4,158,941.10
209,075.78 1,738,674.18

1,078,205.04 1,280,907.59
15,113.31 1,597,960.49
209,075.78 1,738,674.18

1,078,205.04 465,784.58
15,113.31 3,093,710.75
209,075.78 1,505,345.61

SUB TOTAL 1,108,291,448.44

700,000.00 422,800,000.00

4,103,701.51 36,933,313.56
4,807,228.40 115,373,481.63
7,043,341.57 21,130,024.71
2,875,939.44 23,007,515.54

4,176,296.19 75,173,331.49
4,098,765.47 16,395,061.88
6,124,157.47 24,496,629.89
1,485,834.26 8,915,005.59
3,477,955.42 3,477,955.42
3,364,922.13 3,364,922.13
4,584,056.65 36,672,453.17
4,584,056.65 4,584,056.65
4,584,056.65 9,168,113.29
3,012,549.12 36,150,589.41
743,257.98 4,459,547.88
575,801.46 1,151,602.91
451,732.41 451,732.41
915,967.85 3,663,871.41

PEKERJAAN STRUKTUR 142/632


HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )

383,105.11 16,856,624.62
298,042.90 20,863,002.79

117,508.05 5,170,354.11
722,631.46 50,584,202.33

1,290,812.14 8,132,116.49
13,367.47 65,661,002.32
260,946.71 40,277,125.20

53,377,811.59
26,688,905.80

1,078,205.04 1,261,499.90
15,113.31 4,456,008.32
209,075.78 1,522,071.67

1,078,205.04 883,049.93
15,113.31 903,579.46
209,075.78 905,298.13

1,078,205.04 1,177,399.90
15,113.31 4,158,941.10
209,075.78 1,738,674.18

1,078,205.04 1,280,907.59
15,113.31 1,597,960.49
209,075.78 1,738,674.18

1,078,205.04 465,784.58
15,113.31 3,093,710.75
209,075.78 1,505,345.61

SUB TOTAL 1,097,485,196.99

700,000.00 422,800,000.00

4,103,701.51 36,933,313.56

PEKERJAAN STRUKTUR 143/632


HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )

4,807,228.40 115,373,481.63
7,043,341.57 21,130,024.71
2,875,939.44 23,007,515.54

4,176,296.19 75,173,331.49
4,098,765.47 16,395,061.88
6,124,157.47 24,496,629.89
1,485,834.26 8,915,005.59
3,477,955.42 3,477,955.42
4,584,056.65 36,672,453.17
4,584,056.65 9,168,113.29
4,584,056.65 9,168,113.29
3,012,549.12 36,150,589.41
743,257.98 4,459,547.88
575,801.46 1,151,602.91
451,732.41 451,732.41
915,967.85 3,663,871.41

383,105.11 13,791,783.78
298,042.90 20,863,002.79

117,508.05 4,230,289.72
722,631.46 50,584,202.33

1,290,812.14 8,132,116.49
13,367.47 57,640,521.58
260,946.71 40,277,125.20

53,377,811.59
26,688,905.80

1,078,205.04 1,261,499.90
15,113.31 4,456,008.32
209,075.78 1,522,071.67

1,078,205.04 883,049.93

PEKERJAAN STRUKTUR 144/632


HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )

15,113.31 903,579.46
209,075.78 905,298.13

1,078,205.04 1,177,399.90
15,113.31 4,158,941.10
209,075.78 1,738,674.18

1,078,205.04 1,280,907.59
15,113.31 1,597,960.49
209,075.78 1,738,674.18

1,078,205.04 465,784.58
15,113.31 3,093,710.75
209,075.78 1,505,345.61

SUB TOTAL 1,095,180,657.36

700,000.00 422,800,000.00

4,103,701.51 36,933,313.56
4,807,228.40 115,373,481.63
7,043,341.57 21,130,024.71
2,875,939.44 23,007,515.54

4,176,296.19 75,173,331.49
4,098,765.47 16,395,061.88
6,124,157.47 24,496,629.89
1,485,834.26 8,915,005.59
3,477,955.42 3,477,955.42
4,584,056.65 36,672,453.17
4,584,056.65 9,168,113.29
4,584,056.65 9,168,113.29
3,012,549.12 36,150,589.41
743,257.98 4,459,547.88
575,801.46 1,151,602.91
451,732.41 451,732.41
915,967.85 3,663,871.41

PEKERJAAN STRUKTUR 145/632


HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )

383,105.11 16,856,624.62
298,042.90 20,863,002.79

117,508.05 5,170,354.11
722,631.46 50,584,202.33

1,290,812.14 8,132,116.49
13,367.47 51,331,076.74
260,946.71 40,277,125.20

53,377,811.59
26,688,905.80

1,078,205.04 1,261,499.90
15,113.31 4,456,008.32
209,075.78 1,522,071.67

1,078,205.04 883,049.93
15,113.31 903,579.46
209,075.78 905,298.13

1,078,205.04 1,177,399.90
15,113.31 4,158,941.10
209,075.78 1,738,674.18

1,078,205.04 1,280,907.59
15,113.31 1,597,960.49
209,075.78 1,738,674.18

1,078,205.04 465,784.58
15,113.31 3,093,710.75
209,075.78 1,505,345.61

SUB TOTAL 1,083,310,345.87

700,000.00 422,800,000.00

PEKERJAAN STRUKTUR 146/632


HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )

4,103,701.51 36,933,313.56
4,807,228.40 115,373,481.63
7,043,341.57 21,130,024.71
2,875,939.44 23,007,515.54

4,176,296.19 75,173,331.49
4,098,765.47 16,395,061.88
6,124,157.47 24,496,629.89
1,485,834.26 8,915,005.59
3,477,955.42 3,477,955.42
4,584,056.65 36,672,453.17
4,584,056.65 9,168,113.29
4,584,056.65 9,168,113.29
3,012,549.12 36,150,589.41
743,257.98 4,459,547.88
575,801.46 1,151,602.91
451,732.41 451,732.41
915,967.85 3,663,871.41

383,105.11 16,856,624.62
298,042.90 20,863,002.79

117,508.05 5,170,354.11
722,631.46 50,584,202.33

1,290,812.14 8,132,116.49
13,367.47 39,460,765.24
260,946.71 40,277,125.20

53,377,811.59
26,688,905.80

1,078,205.04 1,261,499.90
15,113.31 4,456,008.32
209,075.78 1,522,071.67

PEKERJAAN STRUKTUR 147/632


HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )

1,078,205.04 883,049.93
15,113.31 903,579.46
209,075.78 905,298.13

1,078,205.04 1,177,399.90
15,113.31 4,158,941.10
209,075.78 1,738,674.18

1,078,205.04 1,280,907.59
15,113.31 1,597,960.49
209,075.78 1,738,674.18

1,078,205.04 465,784.58
15,113.31 3,093,710.75
209,075.78 1,505,345.61

SUB TOTAL 1,082,091,211.35

700,000.00 422,800,000.00

4,103,701.51 36,933,313.56
4,807,228.40 115,373,481.63
7,043,341.57 21,130,024.71
2,875,939.44 23,007,515.54

4,176,296.19 75,173,331.49
4,098,765.47 16,395,061.88
6,124,157.47 24,496,629.89
1,485,834.26 8,915,005.59
3,477,955.42 3,477,955.42
3,364,922.13 3,364,922.13
4,584,056.65 36,672,453.17
4,584,056.65 4,584,056.65
4,584,056.65 9,168,113.29
3,012,549.12 36,150,589.41
743,257.98 4,459,547.88
575,801.46 1,151,602.91

PEKERJAAN STRUKTUR 148/632


HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )

451,732.41 451,732.41
915,967.85 3,663,871.41

383,105.11 16,856,624.62
298,042.90 20,863,002.79

117,508.05 5,170,354.11
722,631.46 50,584,202.33

1,290,812.14 8,132,116.49
13,367.47 39,460,765.24
260,946.71 40,277,125.20

53,377,811.59
26,688,905.80

1,078,205.04 1,261,499.90
15,113.31 4,456,008.32
209,075.78 1,522,071.67

1,078,205.04 883,049.93
15,113.31 903,579.46
209,075.78 905,298.13

1,078,205.04 1,177,399.90
15,113.31 4,158,941.10
209,075.78 1,738,674.18

1,078,205.04 1,280,907.59
15,113.31 1,597,960.49
209,075.78 1,738,674.18

1,078,205.04 465,784.58
15,113.31 3,093,710.75
209,075.78 1,505,345.61

SUB TOTAL 1,082,091,211.35

PEKERJAAN STRUKTUR 149/632


HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )

700,000.00 422,800,000.00

4,103,701.51 36,933,313.56
4,807,228.40 115,373,481.63
7,043,341.57 21,130,024.71
2,875,939.44 23,007,515.54

4,176,296.19 75,173,331.49
4,098,765.47 16,395,061.88
6,124,157.47 24,496,629.89
1,485,834.26 8,915,005.59
3,477,955.42 3,477,955.42
3,364,922.13 3,364,922.13
4,584,056.65 36,672,453.17
4,584,056.65 4,584,056.65
4,584,056.65 9,168,113.29
3,012,549.12 36,150,589.41
743,257.98 4,459,547.88
575,801.46 1,151,602.91
451,732.41 451,732.41
915,967.85 3,663,871.41

383,105.11 16,856,624.62
298,042.90 20,863,002.79

117,508.05 5,170,354.11
722,631.46 50,584,202.33

1,290,812.14 8,132,116.49
13,367.47 39,460,765.24
260,946.71 40,277,125.20

53,377,811.59
26,688,905.80

PEKERJAAN STRUKTUR 150/632


HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )

1,078,205.04 1,261,499.90
15,113.31 4,456,008.32
209,075.78 1,522,071.67

1,078,205.04 883,049.93
15,113.31 903,579.46
209,075.78 905,298.13

1,078,205.04 1,177,399.90
15,113.31 4,158,941.10
209,075.78 1,738,674.18

1,078,205.04 1,280,907.59
15,113.31 1,597,960.49
209,075.78 1,738,674.18

1,078,205.04 465,784.58
15,113.31 3,093,710.75
209,075.78 1,505,345.61

SUB TOTAL 1,082,091,211.35

700,000.00 422,800,000.00

4,103,701.51 36,933,313.56
4,807,228.40 115,373,481.63
7,043,341.57 21,130,024.71
2,875,939.44 23,007,515.54

4,176,296.19 75,173,331.49
4,098,765.47 16,395,061.88
6,124,157.47 24,496,629.89
1,485,834.26 8,915,005.59
3,477,955.42 3,477,955.42
3,364,922.13 3,364,922.13
4,584,056.65 36,672,453.17
4,584,056.65 4,584,056.65

PEKERJAAN STRUKTUR 151/632


HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )

4,584,056.65 9,168,113.29
3,012,549.12 36,150,589.41
743,257.98 4,459,547.88
575,801.46 1,151,602.91
451,732.41 451,732.41
915,967.85 3,663,871.41

383,105.11 16,856,624.62
298,042.90 20,863,002.79

117,508.05 5,170,354.11
722,631.46 50,584,202.33

1,290,812.14 8,132,116.49
13,367.47 39,460,765.24
260,946.71 40,277,125.20

53,377,811.59
26,688,905.80

1,078,205.04 1,261,499.90
15,113.31 4,456,008.32
209,075.78 1,522,071.67

1,078,205.04 883,049.93
15,113.31 903,579.46
209,075.78 905,298.13

1,078,205.04 1,177,399.90
15,113.31 4,158,941.10
209,075.78 1,738,674.18

1,078,205.04 1,280,907.59
15,113.31 1,597,960.49
209,075.78 1,738,674.18

1,078,205.04 465,784.58

PEKERJAAN STRUKTUR 152/632


HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )

15,113.31 3,093,710.75
209,075.78 1,505,345.61

SUB TOTAL 835,930,776.46

700,000.00 422,800,000.00

3,286,324.12 26,290,592.99

4,176,296.19 75,173,331.49
4,098,765.47 24,592,592.83
6,124,157.47 24,496,629.89
1,485,834.26 8,915,005.59
5,876,626.40 11,753,252.80
4,829,998.31 19,319,993.24
4,564,272.22 13,692,816.67
4,664,711.68 13,994,135.04
4,815,435.46 19,261,741.83
5,966,419.34 35,798,516.06
4,095,326.60 24,571,959.57
6,098,706.69 36,592,240.11
575,801.46 1,151,602.91
451,732.41 451,732.41
915,967.85 3,663,871.41

383,105.11 3,064,840.84
298,042.90 20,266,917.00

117,508.05 940,064.38
722,631.46 49,138,939.41

SUB TOTAL 26,282,741.31

1,078,205.04 3,178,979.74
15,113.31 4,076,946.19

PEKERJAAN STRUKTUR 153/632


HARGA SATUAN JUMLAH HARGA
( Rp. ) ( Rp. )

209,075.78 4,741,838.68

1,078,205.04 2,154,253.67
15,113.31 8,092,633.43
209,075.78 4,038,089.61

PEKERJAAN STRUKTUR 154/632


REKAPITULASI RENCANA ANGGARAN BIAYA
Pekerjaan : RUSUNAWA APRA 02 TAHAP 3
Lokasi : Rancacili Jawa Barat
Tahun Anggaran : 2018

No. URAIAN PEKERJAAN

I PEKERJAAN PERSIAPAN

II PEKERJAAN ARSITEKTUR
A. LANTAI DASAR
A.1 PEKERJAAN LANTAI
A.2 PEKERJAAN DINDING
A.3 PEKERJAAN PASANGAN DAN PLESTERAN
A.5 PEKERJAAN PLAFOND
A.7 PEKERJAAN PENGECATAN
A.8 PEKERJAAN LAIN-LAIN

B. LANTAI DUA
B.2 PEKERJAAN DINDING
B.3 PEKERJAAN PASANGAN DAN PLESTERAN
B.4 PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES
B.5 PEKERJAAN PLAFOND
B.7 PEKERJAAN PENGECATAN
B.8 PEKERJAAN LAIN-LAIN

C. LANTAI TIGA
C.2 PEKERJAAN DINDING
C.3 PEKERJAAN PASANGAN DAN PLESTERAN
C.4 PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES
C.5 PEKERJAAN PLAFOND
C.8 PEKERJAAN LAIN-LAIN

D. LANTAI EMPAT
D.2 PEKERJAAN DINDING
D.3 PEKERJAAN PASANGAN DAN PLESTERAN
D.5 PEKERJAAN PLAFOND
D.7 PEKERJAAN PENGECATAN
D.8 PEKERJAAN LAIN-LAIN

E. LANTAI LIMA
E.1 PEKERJAAN LANTAI
E.2 PEKERJAAN DINDING
E.3 PEKERJAAN PASANGAN DAN PLESTERAN
E.4 PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES
E.5 PEKERJAAN PLAFOND
E.6 PEKERJAAN UTILITAS
E.7 PEKERJAAN PENGECATAN
E.8 PEKERJAAN LAIN-LAIN
F. LANTAI ENAM
F.1 PEKERJAAN LANTAI
F.2 PEKERJAAN DINDING
F.3 PEKERJAAN PASANGAN DAN PLESTERAN
F.4 PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES
F.5 PEKERJAAN PLAFOND
F.6 PEKERJAAN UTILITAS
F.7 PEKERJAAN PENGECATAN
F.8 PEKERJAAN LAIN-LAIN

G. LANTAI TUJUH
G.1 PEKERJAAN LANTAI
G.2 PEKERJAAN DINDING
G.3 PEKERJAAN PASANGAN DAN PLESTERAN
G.4 PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES
G.5 PEKERJAAN PLAFOND
G.6 PEKERJAAN UTILITAS
G.7 PEKERJAAN PENGECATAN
G.8 PEKERJAAN LAIN-LAIN

H. LANTAI DELAPAN
H.1 PEKERJAAN LANTAI
H.2 PEKERJAAN DINDING
H.3 PEKERJAAN PASANGAN DAN PLESTERAN
H.4 PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES
H.5 PEKERJAAN PLAFOND
H.6 PEKERJAAN UTILITAS
H.7 PEKERJAAN PENGECATAN
H.8 PEKERJAAN LAIN-LAIN

I. LANTAI SEMBILAN
I.1 PEKERJAAN LANTAI
I.2 PEKERJAAN DINDING
I.3 PEKERJAAN PASANGAN DAN PLESTERAN
I.4 PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES
I.5 PEKERJAAN PLAFOND
I.6 PEKERJAAN UTILITAS
I.7 PEKERJAAN PENGECATAN
I.8 PEKERJAAN LAIN-LAIN

J. LANTAI ATAP
J.1 PEKERJAAN LANTAI
J.3 PEKERJAAN PASANGAN DAN PLESTERAN
J.4 PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES
J.5 PEKERJAAN PENGECATAN
III PEKERJAAN STRUKUR
K PEKERJAAN GROUND WATER TANK (GWT) 2 Unit

II PEKERJAAN MEKANIKAL, ELEKTRIKAL & PLUMBING


L PEKERJAAN MEP
L.1 PEKERJAAN PLUMBING
L.2 PEKERJAAN PEMADAM KEBAKARAN
L.3 PEKERJAAN ELEKTRIKAL
L.4 PEKERJAAN ELEKTRONIK
L.5 PEKERJAAN TRANSPORTASI DALAM GEDUNG

TERBILANG :
LASI RENCANA ANGGARAN BIAYA
: RUSUNAWA APRA 02 TAHAP 3
: Rancacili Jawa Barat

JUMLAH HARGA
SUB TOTAL (Rp.)
(Rp.)

155,000,000.00 155,000,000.00

13,087,018,946.49
355,399,020.05
15,182,360.00
1,166,200.00
67,573,080.00
8,950,580.00
220,405,648.05
42,121,152.00

402,942,232.58
1,166,200.00
79,056,876.00
347,000.00
16,948,910.00
300,131,474.58
5,291,772.00

405,287,047.58
1,166,200.00
77,388,432.00
17,451,640.00
308,897,483.58
383,292.00

414,357,051.58
499,800.00
73,395,516.00
17,451,640.00
322,626,803.58
383,292.00

2,132,009,909.98
24,334,710.00
499,800.00
941,597,537.10
613,691,400.00
66,389,781.10
201,765,000.00
282,486,434.58
1,245,247.20
2,095,134,629.47
25,059,240.00
499,800.00
848,870,000.59
630,618,400.00
67,010,886.10
207,826,300.00
289,030,163.58
26,219,839.20

2,256,565,061.47
28,755,240.00
499,800.00
944,511,022.59
625,332,500.00
67,010,886.10
207,826,300.00
356,409,473.58
26,219,839.20

2,277,711,125.30
201,998,394.42
499,800.00
921,460,315.10
608,405,500.00
16,533,110.00
201,765,000.00
300,605,486.58
26,443,519.20

2,323,433,447.81
202,652,064.42
499,800.00
899,843,320.59
625,332,500.00
66,928,710.02
207,826,300.00
294,130,913.58
26,219,839.20

424,179,420.68
149,727,162.90
203,337,071.41
43,706,100.00
27,409,086.37
306,970,745.55 306,970,745.55

4,401,472,616.84
4,401,472,616.84
1,168,165,736.22
1,307,506,555.63
1,544,677,325.00
381,123,000.00

JUMLAH TOTAL 17,950,462,308.88


PPN 10% 1,795,046,230.89
GRAND TOTAL 19,745,508,539.77
DIBULATKAN 19,745,508,000.00

Bandung, 20 Agustus 2018


Pejabat Pembuat Komitmen
RENCANA ANGGARAN BIAYA
P E K E R JAAN PERSIAPAN
Pekerjaan : RUSUNAWA APRA 02
Lokasi : Rancacili Jawa Barat
Tahun Anggaran : 2018

0. PEKERJAAN PERSIAPAN

HARGA SATUAN
NO. URAIAN P E K E R JAAN VOL. SAT.
( Rp. )

0 PEKERJAAN PERSIAPAN

1 Gudang Kerja 14.00 M2 650,000.00


2 Foto Proyek 3 Fase (warna) 3.00 Set 300,000.00
3 Air Kerja 1.00 LS 8,000,000.00
4 Listrik Kerja 1.00 LS 12,000,000.00
5 Pagar Seng 1.00 LS 5,000,000.00
6 Alat bantu lift barang proyek (hoist) 4.00 Titik 30,000,000.00
A ANGGARAN BIAYA
AAN PERSIAPAN

JUMLAH HARGA
( Rp. )

155,000,000.00

9,100,000.00
900,000.00
8,000,000.00
12,000,000.00
5,000,000.00
120,000,000.00
RENCANA ANGGARAN BIAYA (

Pekerjaan
Lokasi
Tahun Anggaran

No Uraian Pekerjaan

A. LANTAI DASAR

A.1. PEKERJAAN LANTAI


1 Pasang keramik tangga teras 30x30 UNPolished Roman
2 Pasang keramik ramp 30x30 UNPolished Roman
3 Stair nossing tangga teras 10x30
4 Step nossing ramp 10x30

A.2. PEKERJAAN DINDING


1 Topian dan sirip beton jendela J1 (termasuk bekistng dan pembesian)
2 Topian beton jendela BV (termasuk bekistng dan pembesian)
3 Dinding bagian dalam /bata ringan t.10cm di smoke lobby

A.3 PEKERJAAN PASANGAN DAN PLESTERAN


1 Tali air
2 Plesteran topian beton 1SP : 5PP
3 Acian topian beton
4 Plesteran dinding Eksterior
5 Acian dinding Eksterior
6 Plint keramik utk dalam ruangan 10x30 Roman
7 Plint keramik utk tangga

A.5. PEKERJAAN PLAFOND


1 Plafond GRC T=4.5 mm rangka hollow grid 60x60
2 List plafond kayu 3/3

A.7 PEKERJAAN PENGECATAN


1 Pengecatan dinding dalam Interior ICI Dulux
2 Pengecatan dinding luar Exterior Weather Coat ICI Dulux
3 Pengecatan plafond Interior ICI Dulux
4 Pengecatan topian beton Exterior Weather Coat ICI Dulux
5 Pengecatan plat tangga Interior ICI Dulux
6 Pengecatan kolom Interior ICI Dulux
A.8 PEKERJAAN LAIN-LAIN
1 Railing Teras
2 Railing Ramp
3 Sewa Perancah (scaffolding) untuk 4 bulan

B. LANTAI DUA

B.4 PEKERJAAN DINDING


1 Topian beton jendela J1
2 Topian beton jendela BV
3 Dinding bagian dalam /bata ringan t.10cm di smoke lobby

B.3 PEKERJAAN PASANGAN DAN PLESTERAN


1 Tali air
2 Plesteran topian beton 1SP : 5PP
3 Acian topian beton
4 Plesteran dinding Eksterior
5 Acian dinding Eksterior
6 Dinding bagian luar /bata ringan t.10cm diarea mainhole gedung
7 Plesteran dinding
8 Acian dinding
9 Tralis Pipa stainlees 2 inch SS 304
10 Plint keramik utk dalam ruangan 10x30 Roman
11 Plint keramik utk tangga
12 Pekerjaan Pasang Glasbok uk (2.00x0.8) meter untuk pencahayaan 3 unit
13 Pekerjaan bongkaran dinding untuk glasbok

B.4 PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES


- RO 900x160

B.5 PEKERJAAN PLAFOND


1 Plafond GRC T=4.5 mm rangka hollow grid 60x60
2 List plafond 3/3

B.7 PEKERJAAN PENGECATAN


1 Pengecatan dinding dalam Interior ICI Dulux
2 Pengecatan dinding luar Exterior Weather Coat ICI Dulux
3 Pengecatan plafond Interior ICI Dulux
4 Pengecatan topian beton Exterior Weather Coat ICI Dulux
5 Pengecatan plat tangga Interior ICI Dulux
6 Pengecatan kolom Interior ICI Dulux
7 Pengecatan balok Interior ICI Dulux
8 Pengecatan dinding area dekat mainhole gedung

B.8 PEKERJAAN LAIN-LAIN


1 Sewa Perancah (scaffolding) untuk 4 bulan
2 penutup dengan grill shaf pipa dengan baja siku
3 partsi shap pipa dengan GRC T =4.5 mm rangka hollow grid 60x60
4 Pintu Type P8a

C. LANTAI TIGA

C.2. PEKERJAAN DINDING


1 Topian beton jendela J1
2 Topian beton jendela BV
3 Dinding bagian dalam /bata ringan t.10cm di smoke lobby

C.3 PEKERJAAN PASANGAN DAN PLESTERAN


1 Tali air
2 Plesteran topian beton 1SP : 5PP
3 Acian topian beton
4 Plesteran dinding Eksterior
5 Acian dinding Eksterior
6 Dinding bagian luar /bata ringan t.10cm mainhole gedung
7 Plesteran dinding
8 Acian dinding
9 Tralis Pipa stainlees 2 inch SS 304
10 Plint keramik utk dalam ruangan 10x30 Roman
11 Plint keramik utk tangga 10x30 roman

C.5 PEKERJAAN PLAFOND


1 Plafond GRC T=4.5 mm rangka hollow grid 60x60
2 List plafond 3/3

C.7 PEKERJAAN PENGECATAN


1 Pengecatan dinding dalam Interior ICI Dulux
2 Pengecatan dinding luar Exterior Weather Coat ICI Dulux
3 Pengecatan plafond Interior ICI Dulux
4 Pengecatan topian beton Exterior Weather Coat ICI Dulux
5 Pengecatan plat tangga Interior ICI Dulux
6 Pengecatan kolom Interior ICI Dulux
7 Pengecatan balok Interior ICI Dulux
8 Pengecatan dinding area dekat mainhole gedung

C.8 PEKERJAAN LAIN-LAIN


1 Sewa Perancah (scaffolding) untuk 4 bulan
3 penutup dg grill shaf pipa dengan baja siku

D. LANTAI EMPAT

D.2. PEKERJAAN DINDING


1 Topian beton jendela J1
2 Topian beton jendela BV
3 Dinding bagian dalam /bata ringan t.10cm di smoke lobby
D.3 PEKERJAAN PASANGAN DAN PLESTERAN
1 Tali air
2 Plesteran topian beton 1SP : 5PP
3 Acian topian beton
4 Plesteran dinding Eksterior
5 Acian dinding Eksterior
6 Dinding bagian luar /bata ringan t.10cm diarea mainhole gedung
7 Plesteran dinding
8 Acian dinding
9 Tralis Pipa stainlees 2 inch SS 304
10 Plint keramik utk dalam ruangan 10x30 Roman
11 Plint keramik utk tangga

D.5. PEKERJAAN PLAFOND


1 Plafond GRC T=4.5 mm rangka hollow grid 60x60
2 List plafond 3/3

D.7 PEKERJAAN PENGECATAN


1 Pengecatan dinding dalam Interior ICI Dulux
2 Pengecatan dinding luar Exterior Weather Coat ICI Dulux
3 Pengecatan plafond Interior ICI Dulux
4 Pengecatan topian beton Exterior Weather Coat ICI Dulux
5 Pengecatan plat tangga Interior ICI Dulux
6 Pengecatan kolom Interior ICI Dulux
7 Pengecatan balok Interior ICI Dulux
8 Pengecatan dinding area dekat mainhole gedung

D.8 PEKERJAAN LAIN-LAIN


1 Sewa Perancah (scaffolding) untuk 4 bulan
2 penutup dg grill shaf pipa dengan baja siku

E. LANTAI LIMA
A.1. PEKERJAAN LANTAI
1 Pasang keramik toilet 20x20 UNPolished Roman
2 Waterproofing coatng

E.2. PEKERJAAN DINDING


1 Topian beton jendela J1
2 Topian beton jendela BV
3 Dinding bagian dalam /bata ringan t.10cm di smoke lobby

E.3 PEKERJAAN PASANGAN DAN PLESTERAN


1 Plesteran dinding 1SP : 5PP tebal 15 mm
2 Acian dinding
3 Pasangan dinding keramik 20x25 Roman
4 Border keramik 10x25 Roman
5 Plint keramik di koridor 10x30 satara Roman
6 Tali air
7 Plesteran topian beton 1SP : 5PP
8 Acian topian beton
9 Dinding bagian luar /bata ringan t.10cm diarea mainhole gedung
10 Plesteran dinding
11 Acian dinding
12 Tralis Pipa stainlees 2 inch SS 304
13 Plint keramik utk dalam ruangan 10x30 Roman
14 Plint keramik utk tangga
15 Pekerjaan Pasang Glasbok uk (2.00x0.8) meter untuk pencahayaan 3 unit
16 Pekerjaan bongkaran dinding untuk glasbok

E..4 PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES


1 Type 1
- Pintu Type P1 900x2500
- Pintu Type P2 900x2500+600x400
- Pintu Type P3 700x2500+600x400+600x1200
- Pintu Type P4 700x2000
- RO 900x160
- Jendela Type J1 800x1020+800x420
2 Type 2
- Pintu Type P1 900x2500
- Pintu Type P2 900x2500+600x400
- Pintu Type P3 700x2500
- Pintu Type P4 700x2000
- RO 900x160
- Jendela Type J1 800x1020+800x420
3 Type 3
- Pintu Type P1 900x2500+600x400+600x1200
- Pintu Type P2 900x2500+600x400
- Pintu Type P3 700x2500+600x400+600x1200
- Pintu Type P4 700x2000
- RO 900x160
- Jendela Type J1 800x1020+800x420
4 Type 4
- Pintu Type P1 900x2500
- Pintu Type P2 700x2500+600x400+600x1200
- Pintu Type P3 700x2000
- RO 900x160
- Jendela Type J1 800x1020+800x420
- Jendela Bovenlight BV 800x420
5 Type 5
- Pintu Type P1 900x2500
- Pintu Type P2 700x2500+600x400+600x1200
- Pintu Type P3 700x2000
- RO 900x160
- Jendela Type J1 800x1020+800x420
6 Type 6
- Pintu Type P1 900x2500
- Pintu Type P2 900x2500+600x400
- Pintu Type P3 700x2500+600x400+600x1200
- Pintu Type P4 700x2000
- RO 900x160
- Jendela Type J1 800x1020+800x420
7 P5 1000x2500
8 P5a 1000x2150
9 P7 1800x2500
10 P8 900x2500
11 P8a 900x2500
12 PS 600x900
13 Pekerjaan perapihan kusen, jendela (sealen) dan bongkaran pipa

E.5. PEKERJAAN PLAFOND


1 Plafond GRC T=4.5 mm rangka hollow grid 60x60
2 Plafond ekspose fin acian
3 List plafond 3/3

E.6. PEKERJAAN UTILITAS


1 Closet Duduk, CW 660 NJ / SW 660 J
2 Faucet TOTO T 23 B 13 V7N
3 Floor drain TX1BV1 ex TOTO
4 Meja beton+keramik Type 1
5 Meja beton+keramik Type 2
6 Meja beton+keramik Type 3
7 Meja beton+keramik Type 4
8 Meja beton+keramik Type 5
9 Meja beton+keramik Type 6
10 Kitchen Zink Ex. Lokal

E.7 PEKERJAAN PENGECATAN


1 Pengecatan dinding dalam Interior ICI Dulux
2 Pengecatan dinding luar Exterior Weather Coat ICI Dulux
3 Pengecatan plafond Interior ICI Dulux
4 Pengecatan topian beton Exterior Weather Coat ICI Dulux
5 Pengecatan plat tangga Interior ICI Dulux
6 Pengecatan kolom Interior ICI Dulux
7 Pengecatan balok Interior ICI Dulux
8 Pengecatan dinding area dekat mainhole gedung

B.8 PEKERJAAN LAIN-LAIN


1 Sewa Perancah (scaffolding) untuk 4 bulan
2 Penutupan tangga bordes dg beton
Beton mutu f’c = 29,05 MPa (K 350)
3 Penutupan void bordes tangga dengan grill
4 penutup dg grill shaf pipa dengan baja siku
5 partsi shap pipa dengan GRC T =4.5 mm rangka hollow grid 60x60

F. LANTAI ENAM
F.1. PEKERJAAN LANTAI
1 Pasang keramik toilet 20x20 UNPolished Roman
2 Waterproofing coatng

F.2. PEKERJAAN DINDING


1 Topian beton jendela J1
2 Topian beton jendela BV
3 Dinding bagian dalam /bata ringan t.10cm di smoke lobby

F.3 PEKERJAAN PASANGAN DAN PLESTERAN


1 Plesteran dinding 1SP : 5PP tebal 15 mm
2 Acian dinding
3 Pasangan dinding keramik 20x25 Roman
4 Border keramik 10x25 Roman
5 Plint keramik di koridor 10x30 Roman
6 Tali air
7 Plesteran topian beton 1SP : 5PP
8 Acian topian beton
9 Dinding bagian luar /bata ringan t.10cm diarea mainhole gedung
10 Plesteran dinding
11 Acian dinding
12 Tralis Pipa stainlees 2 inch SS 304
13 Plint keramik utk dalam ruangan 10x30 Roman
14 Plint keramik utk tangga

F.4 PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES


1 Type 1
- Pintu Type P1 900x2500
- Pintu Type P2 900x2500+600x400
- Pintu Type P3 700x2500+600x400+600x1200
- Pintu Type P4 700x2000
- RO 900x160
- Jendela Type J1 800x1020+800x420
2 Type 2
- Pintu Type P1 900x2500
- Pintu Type P2 900x2500+600x400
- Pintu Type P3 700x2500
- Pintu Type P4 700x2000
- RO 900x160
- Jendela Type J1 800x1020+800x420
3 Type 3
- Pintu Type P1 900x2500+600x400+600x1200
- Pintu Type P2 900x2500+600x400
- Pintu Type P3 700x2500+600x400+600x1200
- Pintu Type P4 700x2000
- RO 900x160
- Jendela Type J1 800x1020+800x420
4 Type 4
- Pintu Type P1 900x2500
- Pintu Type P2 700x2500+600x400+600x1200
- Pintu Type P3 700x2000
- RO 900x160
- Jendela Type J1 800x1020+800x420
- Jendela Bovenlight BV 800x420
5 Type 5
- Pintu Type P1 900x2500
- Pintu Type P2 700x2500+600x400+600x1200
- Pintu Type P3 700x2000
- RO 900x160
- Jendela Type J1 800x1020+800x420
6 Type 6
- Pintu Type P1 900x2500
- Pintu Type P2 900x2500+600x400
- Pintu Type P3 700x2500+600x400+600x1200
- Pintu Type P4 700x2000
- RO 900x160
- Jendela Type J1 800x1020+800x420
7 P5 1000x2500
8 P5a 1000x2150
9 P7 1800x2500
10 P8 900x2500
11 P8a 900x2500
12 PS 600x900
13 Pekerjaan perapihan kusen, jendela (sealen) dan bongkaran pipa

F.5 PEKERJAAN PLAFOND


1 Plafond GRC T=4.5 mm rangka hollow grid 60x60
2 Plafond ekspose fin acian
3 List plafond 3/3

F.6 PEKERJAAN UTILITAS


1 Closet Duduk, CW 660 NJ / SW 660 J
2 Faucet TOTO T 23 B 13 V7N
3 Floor drain TX1BV1 ex TOTO
4 Meja beton+keramik Type 1
5 Meja beton+keramik Type 2
6 Meja beton+keramik Type 3
7 Meja beton+keramik Type 4
8 Meja beton+keramik Type 5
9 Meja beton+keramik Type 6
10 Kitchen Zink Ex. Lokal

F.7 PEKERJAAN PENGECATAN


1 Pengecatan dinding dalam Interior ICI Dulux
2 Pengecatan dinding luar Exterior Weather Coat ICI Dulux
3 Pengecatan plafond Interior ICI Dulux
4 Pengecatan topian beton Exterior Weather Coat ICI Dulux
5 Pengecatan plat tangga Interior ICI Dulux
6 Pengecatan kolom Interior ICI Dulux
7 Pengecatan balok Interior ICI Dulux
8 Pengecatan dinding area dekat mainhole gedung

F.8 PEKERJAAN LAIN-LAIN


1 Railing tangga darurat
2 Sewa Perancah (scaffolding) untuk 4 bulan
3 Penutupan tangga bordes dg beton
Beton mutu f’c = 29,05 MPa (K 350)
4 Penutupan void bordes tangga dengan grill
5 penutup dg grill shaf pipa dengan baja siku

G. LANTAI TUJUH
G.1. PEKERJAAN LANTAI
1 Pasang keramik toilet 20x20 UNPolished Roman
2 Waterproofing coatng
3 Pasang keramik tangga 30x30 UNPolished Roman
4 Stair nossing

G.2. PEKERJAAN DINDING


1 Topian beton jendela J1
2 Topian beton jendela BV
3 Dinding bagian dalam /bata ringan t.10cm di smoke lobby

G.3 PEKERJAAN PASANGAN DAN PLESTERAN


1 Plesteran dinding 1SP : 5PP tebal 15 mm
2 Acian dinding
3 Pasangan dinding keramik 20x25 Roman
4 Border keramik 10x25 Roman
5 Plint keramik di koridor 10x30 Roman
6 Tali air
7 Plesteran topian beton 1SP : 5PP
8 Acian topian beton
9 Dinding bagian luar /bata ringan t.10cm diarea mainhole gedung
10 Plesteran dinding
11 Acian dinding
12 Tralis Pipa stainlees 2 inch SS 304
13 Plint keramik utk dalam ruangan 10x30 Roman

G.4 PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES


1 Type 1
- Pintu Type P1 900x2500
- Pintu Type P2 900x2500+600x400
- Pintu Type P3 700x2500+600x400+600x1200
- Pintu Type P4 700x2000
- RO 900x160
- Jendela Type J1 800x1020+800x420
2 Type 2
- Pintu Type P1 900x2500
- Pintu Type P2 900x2500+600x400
- Pintu Type P3 700x2500
- Pintu Type P4 700x2000
- RO 900x160
- Jendela Type J1 800x1020+800x420
3 Type 3
- Pintu Type P1 900x2500+600x400+600x1200
- Pintu Type P2 900x2500+600x400
- Pintu Type P3 700x2500+600x400+600x1200
- Pintu Type P4 700x2000
- RO 900x160
- Jendela Type J1 800x1020+800x420
4 Type 4
- Pintu Type P1 900x2500
- Pintu Type P2 700x2500+600x400+600x1200
- Pintu Type P3 700x2000
- RO 900x160
- Jendela Type J1 800x1020+800x420
- Jendela Bovenlight BV 800x420
5 Type 5
- Pintu Type P1 900x2500
- Pintu Type P2 700x2500+600x400+600x1200
- Pintu Type P3 700x2000
- RO 900x160
- Jendela Type J1 800x1020+800x420
6 Type 6
- Pintu Type P1 900x2500
- Pintu Type P2 900x2500+600x400
- Pintu Type P3 700x2500+600x400+600x1200
- Pintu Type P4 700x2000
- RO 900x160
- Jendela Type J1 800x1020+800x420
7 P5 1000x2500
8 P5a 1000x2150
9 P7 1800x2500
10 P8 900x2500
11 P8a 900x2500
12 PS 600x900
13 Pekerjaan perapihan kusen, jendela (sealen) dan bongkaran pipa

G.5 PEKERJAAN PLAFOND


1 Plafond GRC T=4.5 mm rangka hollow grid 60x60
2 Plafond ekspose fin acian
3 List plafond 3/3

G.6 PEKERJAAN UTILITAS


1 Closet Duduk, CW 660 NJ / SW 660 J
2 Faucet TOTO T 23 B 13 V7N
3 Floor drain TX1BV1 ex TOTO
4 Meja beton+keramik Type 1
5 Meja beton+keramik Type 2
6 Meja beton+keramik Type 3
7 Meja beton+keramik Type 4
8 Meja beton+keramik Type 5
9 Meja beton+keramik Type 6
10 Kitchen Zink Ex. Lokal

G.7 PEKERJAAN PENGECATAN


1 Pengecatan dinding dalam Interior ICI Dulux
2 Pengecatan dinding luar Exterior Weather Coat ICI Dulux
3 Pengecatan plafond Interior ICI Dulux
4 Pengecatan topian beton Exterior Weather Coat ICI Dulux
5 Pengecatan plat tangga Interior ICI Dulux
6 Pengecatan kolom Interior ICI Dulux
7 Pengecatan balok Interior ICI Dulux
8 Pengecatan dinding area dekat mainhole gedung

G.8 PEKERJAAN LAIN-LAIN


1 Railing tangga darurat
2 Sewa Perancah (scaffolding) untuk 4 bulan
3 Penutupan tangga bordes dg beton
Beton mutu f’c = 29,05 MPa (K 350)
4 Penutupan void bordes tangga dengan grill
5 penutup dg grill shaf pipa dengan baja siku

H. LANTAI DELAPAN
H.1. PEKERJAAN LANTAI
1 Pasang keramik 30x30 Polished Ex. Roman A
2 Pasang keramik 30x30 UNPolished Ex. Roman B
3 Pasang keramik toilet 20x20 UNPolished Ex. Roman B
4 Waterproofing coatng
5 Pasang keramik tangga 30x30 UNPolished Ex. Roman B
6 Stair nossing

H.2. PEKERJAAN DINDING


1 Topian beton jendela J1
2 Topian beton jendela BV
3 Dinding bagian dalam /bata ringan t.10cm di smoke lobby

H.3 PEKERJAAN PASANGAN DAN PLESTERAN


1 Plesteran dinding 1SP : 5PP tebal 15 mm
2 Acian dinding
3 Pasangan dinding keramik 20x25 Ex. Roman B
4 Border keramik 10x25 Ex. Roman B
5 Plint keramik 10x30 Ex. Roman B
6 Tali air
7 Plesteran topian beton 1SP : 5PP
8 Acian topian beton
9 Dinding bagian luar /bata ringan t.10cm diarea mainhole gedung
10 Plesteran dinding
11 Acian dinding
12 Tralis Pipa stainlees 2 inch SS 304
13 Plint keramik utk dalam ruangan 10x30 Ex. Roman
14 Plint keramik utk tangga
15 Pekerjaan Pasang Glasbok uk (2.00x0.8) meter untuk pencahayaan 3 unit
16 Pekerjaan bongkaran dinding untuk glasbok

H.4 PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES


1 Type 1
- Pintu Type P1 900x2500
- Pintu Type P2 900x2500+600x400
- Pintu Type P3 700x2500+600x400+600x1200
- Pintu Type P4 700x2000
- RO 900x160
- Jendela Type J1 800x1020+800x420
2 Type 2
- Pintu Type P1 900x2500
- Pintu Type P2 900x2500+600x400
- Pintu Type P3 700x2500
- Pintu Type P4 700x2000
- RO 900x160
- Jendela Type J1 800x1020+800x420
3 Type 3
- Pintu Type P1 900x2500+600x400+600x1200
- Pintu Type P2 900x2500+600x400
- Pintu Type P3 700x2500+600x400+600x1200
- Pintu Type P4 700x2000
- RO 900x160
- Jendela Type J1 800x1020+800x420
4 Type 4
- Pintu Type P1 900x2500
- Pintu Type P2 700x2500+600x400+600x1200
- Pintu Type P3 700x2000
- RO 900x160
- Jendela Type J1 800x1020+800x420
- Jendela Bovenlight BV 800x420
5 Type 5
- Pintu Type P1 900x2500
- Pintu Type P2 700x2500+600x400+600x1200
- Pintu Type P3 700x2000
- RO 900x160
- Jendela Type J1 800x1020+800x420
6 Type 6
- Pintu Type P1 900x2500
- Pintu Type P2 900x2500+600x400
- Pintu Type P3 700x2500+600x400+600x1200
- Pintu Type P4 700x2000
- RO 900x160
- Jendela Type J1 800x1020+800x420
7 P5 1000x2500
8 P5a 1000x2150
9 P7 1800x2500
10 P8 900x2500
11 P8a 900x2500
12 PS 600x900
13 Pekerjaan perapihan kusen, jendela (sealen) dan bongkaran pipa

H.5 PEKERJAAN PLAFOND


1 Plafond GRC T=4.5 mm rangka hollow grid 60x60
2 List plafond 3/3

H.6 PEKERJAAN UTILITAS


1 Closet Duduk, CW 660 NJ / SW 660 J
2 Faucet TOTO T 23 B 13 V7N
3 Floor drain TX1BV1 ex TOTO
4 Meja beton+keramik Type 1
5 Meja beton+keramik Type 2
6 Meja beton+keramik Type 3
7 Meja beton+keramik Type 4
8 Meja beton+keramik Type 5
9 Meja beton+keramik Type 6
10 Kitchen Zink Ex. Lokal

H.7 PEKERJAAN PENGECATAN


1 Pengecatan dinding dalam Interior ICI Dulux
2 Pengecatan dinding luar Exterior Weather Coat ICI Dulux
3 Pengecatan plafond Interior ICI Dulux
4 Pengecatan topian beton Exterior Weather Coat ICI Dulux
5 Pengecatan plat tangga Interior ICI Dulux
6 Pengecatan kolom Interior ICI Dulux
7 Pengecatan balok Interior ICI Dulux
8 Pengecatan dinding area dekat mainhole gedung

H.8 PEKERJAAN LAIN-LAIN


1 Railing tangga darurat
2 Sewa Perancah (scaffolding) untuk 4 bulan
3 Penutupan tangga bordes dg beton
Beton mutu f’c = 29,05 MPa (K 350)
4 Penutupan void bordes tangga dengan grill
5 penutup dg grill shaf pipa dengan baja siku
6 partsi shap pipa dengan GRC T =4.5 mm rangka hollow grid 60x60

I. LANTAI SEMBILAN
I.1. PEKERJAAN LANTAI
1 Pasang keramik 30x30 Polished Roman
2 Pasang keramik 30x30 UNPolished Roman
3 Pasang keramik toilet 20x20 UNPolished Roman
4 Waterproofing coatng
5 Pasang keramik tangga 30x30 UNPolished Roman
6 Stair nossing

I.2. PEKERJAAN DINDING


1 Topian beton jendela J1
2 Topian beton jendela BV
3 Dinding bagian dalam /bata ringan t.10cm di smoke lobby

I.3 PEKERJAAN PASANGAN DAN PLESTERAN


1 Plesteran dinding 1SP : 5PP tebal 15 mm
2 Acian dinding
3 Pasangan dinding keramik 20x25 Roman
4 Border keramik 10x25 Roman
5 Plint keramik 10x30 Roman
6 Tali air
7 Plesteran topian beton 1SP : 5PP
8 Acian topian beton
9 Dinding bagian luar /bata ringan t.10cm diarea mainhole gedung
10 Plesteran dinding
11 Acian dinding
12 Tralis Pipa stainlees 2 inch SS 304
13 Plint keramik utk dalam ruangan 10x30 Roman
14 Plint keramik utk tangga 10x 30 Roman
I.4 PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES
1 Type 1
- Pintu Type P1 900x2500
- Pintu Type P2 900x2500+600x400
- Pintu Type P3 700x2500+600x400+600x1200
- Pintu Type P4 700x2000
- RO 900x160
- Jendela Type J1 800x1020+800x420
2 Type 2
- Pintu Type P1 900x2500
- Pintu Type P2 900x2500+600x400
- Pintu Type P3 700x2500
- Pintu Type P4 700x2000
- RO 900x160
- Jendela Type J1 800x1020+800x420
3 Type 3
- Pintu Type P1 900x2500+600x400+600x1200
- Pintu Type P2 900x2500+600x400
- Pintu Type P3 700x2500+600x400+600x1200
- Pintu Type P4 700x2000
- RO 900x160
- Jendela Type J1 800x1020+800x420
4 Type 4
- Pintu Type P1 900x2500
- Pintu Type P2 700x2500+600x400+600x1200
- Pintu Type P3 700x2000
- RO 900x160
- Jendela Type J1 800x1020+800x420
- Jendela Bovenlight BV 800x420
5 Type 5
- Pintu Type P1 900x2500
- Pintu Type P2 700x2500+600x400+600x1200
- Pintu Type P3 700x2000
- RO 900x160
- Jendela Type J1 800x1020+800x420
6 Type 6
- Pintu Type P1 900x2500
- Pintu Type P2 900x2500+600x400
- Pintu Type P3 700x2500+600x400+600x1200
- Pintu Type P4 700x2000
- RO 900x160
- Jendela Type J1 800x1020+800x420
7 P5 1000x2500
8 P5a 1000x2150
9 P7 1800x2500
10 P8 900x2500
11 P8a 900x2500
12 PS 600x900
13 Pekerjaan finishing kusen, jendela (sealen) dan bongkaran pipa

I.5. PEKERJAAN PLAFOND


1 Plafond GRC T=4.5 mm rangka hollow grid 60x60
2 List plafond 3/3

I.6. PEKERJAAN UTILITAS


1 Closet Duduk, CW 660 NJ / SW 660 J
2 Faucet TOTO T 23 B 13 V7N
3 Floor drain TX1BV1 TOTO
4 Meja beton+keramik Type 1
5 Meja beton+keramik Type 2
6 Meja beton+keramik Type 3
7 Meja beton+keramik Type 4
8 Meja beton+keramik Type 5
9 Meja beton+keramik Type 6
10 Kitchen Zink Ex. Lokal

I.7 PEKERJAAN PENGECATAN


1 Pengecatan dinding dalam Interior ICI Dulux
2 Pengecatan dinding luar Exterior Weather Coat ICI Dulux
3 Pengecatan plafond Interior ICI Dulux
4 Pengecatan topian beton Exterior Weather Coat ICI Dulux
5 Pengecatan plat tangga Interior ICI Dulux
6 Pengecatan kolom Interior ICI Dulux
7 Pengecatan balok Interior ICI Dulux
8 Pengecatan dinding area dekat mainhole gedung

I.8 PEKERJAAN LAIN-LAIN


1 Railing tangga darurat
2 Sewa Perancah (scaffolding) untuk 4 bulan
3 Penutupan tangga bordes dg beton
Beton mutu f’c = 29,05 MPa (K 350)
4 Penutupan void bordes tangga dengan grill
5 penutup dg grill shaf pipa dengan baja siku

J. LANTAI ATAP
J.1. PEKERJAAN LANTAI
1 Pasang keramik 30x30 UNPolished Roman
2 Waterproofing membran

J.3 PEKERJAAN PASANGAN DAN PLESTERAN


1 Plesteran dinding 1SP : 5PP tebal 15 mm
2 Plesteran dinding bawah atap 1SP : 5PP tebal 15 mm
3 Plesteran dinding parapet 1SP : 5PP tebal 15 mm t. 1.2m
4 Plesteran dinding parapet 1SP : 5PP tebal 15 mm t. 0.3m
5 Acian dinding
6 Acian dinding dibawah atap
7 Acian dinding parapet t. 1.2m
8 Acian dinding parapet t. 0.3m
9 Tali air
10 Ring balk parapet
11 penutup dg grill shaf pipa dengan baja siku
12 Plint keramik utk dalam ruangan 10x30 Ex. Roman

J.4. PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES


1 P5a 1000x2150
2 PS 600x900
3 Pekerjaan finishing kusen, jendela (sealen) dan bongkaran pipa

J.5 PEKERJAAN PENGECATAN


1 Pengecatan dinding dalam Interior ICI Dulux
2 Pengecatan dinding luar Exterior Weather Coat ICI Dulux
3 Pengecatan dinding parapet t. 1.2m Exterior Weather Coat ICI Dulux
4 Pengecatan dinding parapet t. 0.3m Ex. Exterior Weather Coat ICI Dulux
5 Pengecatan kolom Interior ICI Dulux
6 Pengecatan balok Interior ICI Dulux
NA ANGGARAN BIAYA ( R A B)

: PEMBANGUNAN APARTEMEN RAKYAT RANCACILI 02.05


: RANCACILI JAWA BARAT
: 2018

Harga Satuan Jumlah Harga


Volume Sat
(Rp.) (Rp.)

SUB TOTAL 355,399,020.05

SUB TOTAL 15,182,360.00


47.72 m2 165,500.00 7,897,660.00
15.18 m2 165,500.00 2,512,290.00
35.35 m' 67,000.00 2,368,450.00
35.88 m' 67,000.00 2,403,960.00

SUB TOTAL 1,166,200.00


0 bh 1,238,100.00 -
0 bh 805,400.00 -
1.4 m2 833,000.00 1,166,200.00

SUB TOTAL 67,573,080.00


0 m' 49,100.00 -
0 m2 72,000.00 -
0 m2 52,200.00 -
0 m2 72,000.00 -
0 m2 52,200.00 -
804.1 m 82,800.00 66,579,480.00
12 m 82,800.00 993,600.00

SUB TOTAL 8,950,580.00


45.95 m2 93,200.00 4,282,540.00
122.2 m' 38,200.00 4,668,040.00

SUB TOTAL 220,405,648.05


4115.595 m2 37,800.00 155,569,491.00
0 m2 57,000.00 -###
1405.77625 m2 37,800.00 53,138,342.25
0 m2 57,000.00 -
29.466 m2 37,800.00 1,113,814.80
280 m2 37,800.00 10,584,000.00
SUB TOTAL 42,121,152.00
43.98 m 662,400.00 29,132,352.00
22 m 590,400.00 12,988,800.00
0 unit 550,000.00 -

SUB TOTAL 402,942,232.58


1
SUB TOTAL 1,166,200.00
0 bh 1,238,100.00 -
0 bh 805,400.00 -
1.4 m2 833,000.00 1,166,200.00

SUB TOTAL 79,056,876.00


0 m' 49,100.00 -
0 m2 72,000.00 -
0 m2 52,200.00 -
0 m2 72,000.00 -
0 m2 52,200.00 -
10.8 m2 82,800.00 894,240.00
21.6 m2 82,800.00 1,788,480.00
21.6 m2 52,200.00 1,127,520.00
4.81 m2 805,200.00 3,873,012.00 3
804.1 m 82,800.00 66,579,480.00
12 m 82,800.00 993,600.00
120 bh 30,500.00 3,660,000.00
4.6 m2 30,500.00 140,544.00

SUB TOTAL 347,000.00


###
1 bh 347,000.00 347,000.00
3
SUB TOTAL 16,948,910.00 1
87.175 m2 93,200.00 8,124,710.00
###
231 m' 38,200.00 8,824,200.00

SUB TOTAL 300,131,474.58


6015.5 m2 37,800.00 227,385,900.00
0 m2 57,000.00 -
1308.9621 m2 37,800.00 49,478,767.38
0 m2 57,000.00 - 4
29.466 m2 37,800.00 1,113,814.80 4
152.72 m2 37,800.00 5,772,816.00 4
411.738 m2 37,800.00 15,563,696.40 4
21.6 m2 37,800.00 816,480.00

SUB TOTAL 5,291,772.00


0 unit 550,000.00 -
10.92 kg 35,100.00 383,292.00
2.4 m2 93,200.00 223,680.00
1 bh 4,684,800.00 4,684,800.00

SUB TOTAL 405,287,047.58

SUB TOTAL 1,166,200.00


0 bh 1,238,100.00 -
0 bh 805,400.00 -
1.4 m2 833,000.00 1,166,200.00

SUB TOTAL 77,388,432.00


0 m' 49,100.00 -
0 m2 72,000.00 -
0 m2 52,200.00 -
0 m2 72,000.00 -
0 m2 52,200.00 -
10.8 m2 82,800.00 894,240.00
21.6 m2 82,800.00 1,788,480.00 1
21.6 m2 52,200.00 1,127,520.00
4.81 m2 805,200.00 3,873,012.00
829.85 m 82,800.00 68,711,580.00
12 m 82,800.00 993,600.00

SUB TOTAL 17,451,640.00


89.7 m2 93,200.00 8,360,040.00
238 m' 38,200.00 9,091,600.00

SUB TOTAL 308,897,483.58###


6215.905 m2 37,800.00 234,961,209.00###
0 m2 57,000.00 -###
1320.4621 m2 37,800.00 49,913,467.38###
0 m2 57,000.00 -
29.466 m2 37,800.00 1,113,814.80
172.72 m2 37,800.00 6,528,816.00
411.738 m2 37,800.00 15,563,696.40
21.6 m2 37,800.00 816,480.00

SUB TOTAL 383,292.00


0 unit 500,000.00 -
10.92 kg 35,100.00 383,292.00

SUB TOTAL 414,357,051.58

SUB TOTAL 499,800.00


0 bh 1,238,100.00 -
0 bh 805,400.00 -
0.6 m2 833,000.00 499,800.00 1
SUB TOTAL 73,395,516.00
0 m' 49,100.00 - 5
0 m2 72,000.00 -
0 m2 52,200.00 -
0 m2 72,000.00 -
0 m2 52,200.00 -
4.8 m2 82,800.00 397,440.00 1
9.6 m2 82,800.00 794,880.00
9.6 m2 52,200.00 501,120.00
2.48 m 805,200.00 1,996,896.00
829.85 m 82,800.00 68,711,580.00
12 m 82,800.00 993,600.00

SUB TOTAL 17,451,640.00


89.7 m2 93,200.00 8,360,040.00
238 m' 38,200.00 9,091,600.00

SUB TOTAL 322,626,803.58


6215.905 m2 37,800.00 234,961,209.00
0 m2 57,000.00 -
1320.4621 m2 37,800.00 49,913,467.38
235.56 m2 57,000.00 13,426,920.00
29.466 m2 37,800.00 1,113,814.80
172.72 m2 37,800.00 6,528,816.00
431.738 m2 37,800.00 16,319,696.40
9.6 m2 37,800.00 362,880.00

SUB TOTAL 383,292.00


0 unit 550,000.00 -
10.92 kg 35,100.00 383,292.00

SUB TOTAL 2,132,009,909.98


SUB TOTAL 24,334,710.00
100.9 m2 173,200.00 17,475,880.00
135.55 m2 50,600.00 6,858,830.00
-
SUB TOTAL 499,800.00
0 bh 1,238,100.00 -
0 bh 805,400.00 -
0.6 m2 833,000.00 499,800.00

0 SUB TOTAL 941,597,537.10


5500.7 m2 72,000.00 396,050,400.00
5500.7 m2 52,200.00 287,136,540.00
344.19 m2 196,300.00 67,564,497.00
208.6 m' 99,500.00 20,755,700.00
90.38732 m' 82,800.00 7,484,070.10
0 m' 49,100.00 -
0 m2 72,000.00 -
0 m2 52,200.00 -
4.8 m2 82,800.00 397,440.00
9.6 m2 82,800.00 794,880.00
9.6 m2 52,200.00 501,120.00
2.48 m2 805,200.00 1,996,896.00
804.1 m 82,800.00 66,579,480.00
12 m 82,800.00 993,600.00
120 bh 30,500.00 3,660,000.00
4.608 m2 30,500.00 140,544.00
###
###
SUB TOTAL 613,691,400.00

10 bh 2,692,500.00 26,925,000.00
10 bh 3,043,600.00 30,436,000.00
10 bh 3,805,300.00 38,053,000.00
10 bh 809,200.00 8,092,000.00
10 bh 379,400.00 3,794,000.00
10 bh 2,542,100.00 25,421,000.00
-
4 bh 2,692,500.00 10,770,000.00
4 bh 3,043,600.00 12,174,400.00
4 bh 2,524,800.00 10,099,200.00
4 bh 809,200.00 3,236,800.00
4 bh 379,400.00 1,517,600.00
4 bh 2,542,100.00 10,168,400.00
-
13 bh 3,805,300.00 49,468,900.00
13 bh 3,043,600.00 39,566,800.00
13 bh 3,805,300.00 49,468,900.00
13 bh 809,200.00 10,519,600.00
13 bh 379,400.00 4,932,200.00
26 bh 2,542,100.00 66,094,600.00
-
4 bh 2,692,500.00 10,770,000.00
4 bh 3,704,400.00 14,817,600.00
4 bh 809,200.00 3,236,800.00
4 bh 379,400.00 1,517,600.00
4 bh 2,542,100.00 10,168,400.00
4 bh 680,800.00 2,723,200.00
-
4 bh 2,692,500.00 10,770,000.00
2 bh 3,805,300.00 7,610,600.00
2 bh 3,805,300.00 7,610,600.00
2 bh 379,400.00 758,800.00
2 bh 2,542,100.00 5,084,200.00
-
2 bh 2,692,500.00 5,385,000.00
1 bh 3,043,600.00 3,043,600.00
1 bh 3,704,400.00 3,704,400.00
1 bh 809,200.00 809,200.00
1 bh 379,400.00 379,400.00
4 bh 2,542,100.00 10,168,400.00
3 bh 3,889,700.00 11,669,100.00
4 bh 5,099,000.00 20,396,000.00
1 bh 6,369,600.00 6,369,600.00
2 bh 3,555,200.00 7,110,400.00
1 bh 4,684,800.00 4,684,800.00
33 bh 1,914,100.00 63,165,300.00
1 ls 1,000,000.00 1,000,000.00

SUB TOTAL 66,389,781.10


80.175 m2 93,200.00 7,472,310.00
1221.79 m2 41,000.00 50,093,271.10
231 m' 38,200.00 8,824,200.00

SUB TOTAL 201,765,000.00


33 bh 3,295,400.00 108,748,200.00
37 bh 378,000.00 13,986,000.00
35 bh 421,900.00 14,766,500.00
10 bh 1,420,600.00 14,206,000.00
4 bh 1,343,700.00 5,374,800.00
13 bh 1,329,600.00 17,284,800.00
2 bh 1,250,600.00 2,501,200.00
2 bh 1,459,700.00 2,919,400.00
1 bh 1,613,300.00 1,613,300.00
32 bh 636,400.00 20,364,800.00

SUB TOTAL 282,486,434.58


5500.7 m2 37,800.00 207,926,460.00
0 m2 57,000.00 -
1328.9621 m2 37,800.00 50,234,767.38
0 m2 57,000.00 -
29.466 m2 37,800.00 1,113,814.80
172.72 m2 37,800.00 6,528,816.00
431.738 m2 37,800.00 16,319,696.40
9.6 m2 37,800.00 362,880.00

SUB TOTAL 1,245,247.20


0 unit 550,000.00 -
-
0.382 M3 1,238,100.00 472,954.20
4.71 kg 35,100.00 165,321.00
10.92 kg 35,100.00 383,292.00
2.4 m2 93,200.00 223,680.00

SUB TOTAL 2,095,134,629.47


SUB TOTAL 25,059,240.00
103.9 m2 173,200.00 17,995,480.00
139.6 m2 50,600.00 7,063,760.00

SUB TOTAL 499,800.00


0 bh 1,238,100.00 -
0 bh 805,400.00 -
0.6 m2 833,000.00 499,800.00

SUB TOTAL 848,870,000.59


5437.105 m2 72,000.00 391,471,560.00
5437.105 m2 52,200.00 283,816,881.00
354.585 m2 196,300.00 69,605,035.50
214.9 m' 99,500.00 21,382,550.00
90.15046 m' 82,800.00 7,464,458.09
0 m' 49,100.00 -
0 m2 72,000.00 -
0 m2 52,200.00 -
4.8 m2 833,000.00 3,998,400.00 1
9.6 m2 52,200.00 501,120.00
9.6 m2 52,200.00 501,120.00
2.48 m2 805,200.00 1,996,896.00
810.85 m 82,800.00 67,138,380.00
12 m 82,800.00 993,600.00

SUB TOTAL 630,618,400.00

10 bh 2,692,500.00 26,925,000.00
10 bh 3,043,600.00 30,436,000.00
10 bh 3,805,300.00 38,053,000.00
10 bh 809,200.00 8,092,000.00
10 bh 379,400.00 3,794,000.00
10 bh 2,542,100.00 25,421,000.00
-
4 bh 2,692,500.00 10,770,000.00
4 bh 3,043,600.00 12,174,400.00
4 bh 2,524,800.00 10,099,200.00
4 bh 809,200.00 3,236,800.00
4 bh 379,400.00 1,517,600.00
4 bh 2,542,100.00 10,168,400.00
- -
14 bh 3,805,300.00 53,274,200.00
14 bh 3,043,600.00 42,610,400.00
14 bh 3,805,300.00 53,274,200.00
14 bh 809,200.00 11,328,800.00
14 bh 379,400.00 5,311,600.00
28 bh 2,542,100.00 71,178,800.00
- -
4 bh 2,692,500.00 10,770,000.00
4 bh 3,704,400.00 14,817,600.00
4 bh 809,200.00 3,236,800.00
4 bh 379,400.00 1,517,600.00
4 bh 2,542,100.00 10,168,400.00
4 bh 680,800.00 2,723,200.00
- -
4 bh 2,692,500.00 10,770,000.00
2 bh 3,805,300.00 7,610,600.00
2 bh 3,805,300.00 7,610,600.00
2 bh 379,400.00 758,800.00
2 bh 2,542,100.00 5,084,200.00
- -
2 bh 2,692,500.00 5,385,000.00
1 bh 3,043,600.00 3,043,600.00
1 bh 3,704,400.00 3,704,400.00
1 bh 809,200.00 809,200.00
1 bh 379,400.00 379,400.00
4 bh 2,542,100.00 10,168,400.00
3 bh 3,889,700.00 11,669,100.00
4 bh 5,099,000.00 20,396,000.00
1 bh 6,369,600.00 6,369,600.00
2 bh 3,555,200.00 7,110,400.00
1 bh 4,684,800.00 4,684,800.00
33 bh 1,914,100.00 63,165,300.00
1 ls 1,000,000.00 1,000,000.00

SUB TOTAL 67,010,886.10


89.7 m2 93,200.00 8,360,040.00
1208.7621 m2 41,000.00 49,559,246.10
238 m' 38,200.00 9,091,600.00

SUB TOTAL 207,826,300.00


34 bh 3,295,400.00 112,043,600.00
38 bh 378,000.00 14,364,000.00
36 bh 421,900.00 15,188,400.00
10 bh 1,420,600.00 14,206,000.00
4 bh 1,343,700.00 5,374,800.00
14 bh 1,329,600.00 18,614,400.00
2 bh 1,250,600.00 2,501,200.00
2 bh 1,459,700.00 2,919,400.00
1 bh 1,613,300.00 1,613,300.00
33 bh 636,400.00 21,001,200.00

SUB TOTAL 289,030,163.58


5437.105 m2 37,800.00 205,522,569.00
0 m2 57,000.00 -
1210.4621 m2 37,800.00 45,755,467.38
235.56 m2 57,000.00 13,426,920.00
29.466 m2 37,800.00 1,113,814.80
172.72 m2 37,800.00 6,528,816.00
431.738 m2 37,800.00 16,319,696.40
9.6 m2 37,800.00 362,880.00

SUB TOTAL 26,219,839.20


42.68 m 590,400.00 25,198,272.00
0 unit 550,000.00 -
-
0.382 M3 1,238,100.00 472,954.20
4.71 kg 35,100.00 165,321.00
10.92 kg 35,100.00 383,292.00

SUB TOTAL 2,256,565,061.47


SUB TOTAL 28,755,240.00
103.9 m2 173,200.00 17,995,480.00
139.6 m2 50,600.00 7,063,760.00
36.64 m2 -
60 m' 61,600.00 3,696,000.00

0 SUB TOTAL 499,800.00


0 bh 1,238,100.00 -
0 bh 805,400.00 -
0.6 m2 833,000.00 499,800.00

0 SUB TOTAL 944,511,022.59


6194.415 m2 72,000.00 445,997,880.00
6194.415 m2 52,200.00 323,348,463.00
354.585 m2 196,300.00 69,605,035.50
214.9 m' 99,500.00 21,382,550.00
92.15046 m' 82,800.00 7,630,058.09
0 m' 49,100.00 -###
0 m2 72,000.00 -
0 m2 52,200.00 -
4.8 m2 833,000.00 3,998,400.00
9.6 m2 52,200.00 501,120.00
9.6 m2 52,200.00 501,120.00
2.48 m2 809,200.00 2,006,816.00
839.85 m 82,800.00 69,539,580.00

SUB TOTAL 625,332,500.00

10 bh 2,692,500.00 26,925,000.00
10 bh 3,043,600.00 30,436,000.00
10 bh 3,805,300.00 38,053,000.00
10 bh 809,200.00 8,092,000.00
10 bh 379,400.00 3,794,000.00
10 bh 2,542,100.00 25,421,000.00
-
4 bh 2,692,500.00 10,770,000.00
4 bh 3,043,600.00 12,174,400.00
4 bh 2,524,800.00 10,099,200.00
4 bh 809,200.00 3,236,800.00
4 bh 379,400.00 1,517,600.00
4 bh 2,542,100.00 10,168,400.00
-
14 bh 3,805,300.00 53,274,200.00
14 bh 3,043,600.00 42,610,400.00
14 bh 3,805,300.00 53,274,200.00
14 bh 809,200.00 11,328,800.00
14 bh 379,400.00 5,311,600.00
28 bh 2,542,100.00 71,178,800.00
-
4 bh 2,692,500.00 10,770,000.00
4 bh 3,805,300.00 15,221,200.00
4 bh 809,200.00 3,236,800.00
4 bh 379,400.00 1,517,600.00
4 bh 2,542,100.00 10,168,400.00
4 bh 680,800.00 2,723,200.00
-
4 bh 2,692,500.00 10,770,000.00
2 bh 3,805,300.00 7,610,600.00
2 bh 809,200.00 1,618,400.00
2 bh 379,400.00 758,800.00
2 bh 2,542,100.00 5,084,200.00
-
2 bh 2,692,500.00 5,385,000.00
1 bh 3,043,600.00 3,043,600.00
1 bh 3,805,300.00 3,805,300.00
1 bh 809,200.00 809,200.00
1 bh 379,400.00 379,400.00
4 bh 2,542,100.00 10,168,400.00
3 bh 3,889,700.00 11,669,100.00
4 bh 5,099,000.00 20,396,000.00
1 bh 6,369,600.00 6,369,600.00
2 bh 3,656,100.00 7,312,200.00
1 bh 4,684,800.00 4,684,800.00
33 bh 1,914,100.00 63,165,300.00
1 ls 1,000,000.00 1,000,000.00

SUB TOTAL 67,010,886.10


89.7 m2 93,200.00 8,360,040.00
1208.7621 m2 41,000.00 49,559,246.10
238 m' 38,200.00 9,091,600.00

SUB TOTAL 207,826,300.00


34 bh 3,295,400.00 112,043,600.00
38 bh 378,000.00 14,364,000.00
36 bh 421,900.00 15,188,400.00
10 bh 1,420,600.00 14,206,000.00
4 bh 1,343,700.00 5,374,800.00
14 bh 1,329,600.00 18,614,400.00
2 bh 1,250,600.00 2,501,200.00
2 bh 1,459,700.00 2,919,400.00
1 bh 1,613,300.00 1,613,300.00
33 bh 636,400.00 21,001,200.00

SUB TOTAL 356,409,473.58


6115.905 m2 37,800.00 231,181,209.00
725.31 m2 57,000.00 41,342,670.00
1220.4621 m2 37,800.00 46,133,467.38
235.56 m2 57,000.00 13,426,920.00
29.466 m2 37,800.00 1,113,814.80
172.72 m2 37,800.00 6,528,816.00
431.738 m2 37,800.00 16,319,696.40
9.6 m2 37,800.00 362,880.00

SUB TOTAL 26,219,839.20


42.68 m 590,400.00 25,198,272.00
0 unit 550,000.00 -
- -
0.382 M3 1,238,100.00 472,954.20
4.71 kg 35,100.00 165,321.00
10.92 kg 35,100.00 383,292.00

SUB TOTAL 2,277,711,125.30


SUB TOTAL 201,998,394.42
516.14421 m2 158,200.00 81,654,014.02
465.892 m2 165,500.00 77,105,126.00
100 m2 173,200.00 17,320,000.00
135.55 m2 111,800.00 15,154,490.00
36.642 m2 158,200.00 5,796,764.40
60 m' 82,800.00 4,968,000.00
-
0 SUB TOTAL 499,800.00
0 bh 1,238,100.00 -
0 bh 805,400.00 -
0.6 m2 833,000.00 499,800.00

0 SUB TOTAL 921,460,315.10


6000.04 m2 72,000.00 432,002,880.00
6000.04 m2 52,200.00 313,202,088.00
344.19 m2 196,300.00 67,564,497.00
208.6 m' 99,500.00 20,755,700.00
95.38732 m' 82,800.00 7,898,070.10
0 m' 49,100.00 -
0 m2 72,000.00 -
0 m2 52,200.00 -
4.8 m2 833,000.00 3,998,400.00
9.6 m2 52,200.00 501,120.00
9.6 m2 52,200.00 501,120.00
2.48 m2 809,200.00 2,006,816.00
824.1 m 82,800.00 68,235,480.00
12 m 82,800.00 993,600.00
120 bh 30,500.00 3,660,000.00
4.608 m2 30,500.00 140,544.00

SUB TOTAL 608,405,500.00

10 bh 2,692,500.00 26,925,000.00
10 bh 3,043,600.00 30,436,000.00
10 bh 3,805,300.00 38,053,000.00
10 bh 809,200.00 8,092,000.00
10 bh 379,400.00 3,794,000.00
10 bh 2,542,100.00 25,421,000.00
- -
4 bh 2,692,500.00 10,770,000.00
4 bh 3,043,600.00 12,174,400.00
4 bh 2,524,800.00 10,099,200.00
4 bh 809,200.00 3,236,800.00
4 bh 379,400.00 1,517,600.00
4 bh 2,542,100.00 10,168,400.00
- -
13 bh 3,805,300.00 49,468,900.00
13 bh 3,043,600.00 39,566,800.00
13 bh 3,805,300.00 49,468,900.00
13 bh 809,200.00 10,519,600.00
13 bh 379,400.00 4,932,200.00
26 bh 2,542,100.00 66,094,600.00
- -
4 bh 2,692,500.00 10,770,000.00
4 bh 3,805,300.00 15,221,200.00
4 bh 809,200.00 3,236,800.00
4 bh 379,400.00 1,517,600.00
4 bh 2,542,100.00 10,168,400.00
4 bh 680,800.00 2,723,200.00
- -
4 bh 2,692,500.00 10,770,000.00
2 bh 3,805,300.00 7,610,600.00
2 bh 809,200.00 1,618,400.00
2 bh 379,400.00 758,800.00
2 bh 2,542,100.00 5,084,200.00
- -
2 bh 2,692,500.00 5,385,000.00
1 bh 3,043,600.00 3,043,600.00
1 bh 3,805,300.00 3,805,300.00
1 bh 809,200.00 809,200.00
1 bh 379,400.00 379,400.00
4 bh 2,542,100.00 10,168,400.00
3 bh 3,889,700.00 11,669,100.00
4 bh 5,099,000.00 20,396,000.00
1 bh 6,369,600.00 6,369,600.00
2 bh 3,656,100.00 7,312,200.00
1 bh 4,684,800.00 4,684,800.00
33 bh 1,914,100.00 63,165,300.00
1 ls 1,000,000.00 1,000,000.00

SUB TOTAL 16,533,110.00


87.175 m2 93,200.00 8,124,710.00
231 m' 38,200.00 8,408,400.00

SUB TOTAL 201,765,000.00


33 bh 3,295,400.00 108,748,200.00
37 bh 378,000.00 13,986,000.00
35 bh 421,900.00 14,766,500.00
10 bh 1,420,600.00 14,206,000.00
4 bh 1,343,700.00 5,374,800.00
13 bh 1,329,600.00 17,284,800.00
2 bh 1,250,600.00 2,501,200.00
2 bh 1,459,700.00 2,919,400.00
1 bh 1,613,300.00 1,613,300.00
32 bh 636,400.00 20,364,800.00

SUB TOTAL 300,605,486.58


6000.04 m2 37,800.00 226,801,512.00
0 m2 57,000.00 -
1308.9621 m2 37,800.00 49,478,767.38
0 m2 57,000.00 -
29.466 m2 37,800.00 1,113,814.80
172.72 m2 37,800.00 6,528,816.00
431.738 m2 37,800.00 16,319,696.40
9.6 m2 37,800.00 362,880.00

SUB TOTAL 26,443,519.20


42.68 m 590,400.00 25,198,272.00
0 unit 550,000.00 -
- -
0.382 M3 1,238,100.00 472,954.20
4.71 kg 35,100.00 165,321.00
10.92 kg 35,100.00 383,292.00
2.4 m2 93,200.00 223,680.00

SUB TOTAL 2,323,433,447.81


SUB TOTAL 202,652,064.42
513.14421 m2 158,200.00 81,179,414.02
465.892 m2 165,500.00 77,105,126.00
103.9 m2 173,200.00 17,995,480.00
139.6 m2 111,800.00 15,607,280.00
36.642 m2 158,200.00 5,796,764.40
60 m' 82,800.00 4,968,000.00

0 SUB TOTAL 499,800.00


0 bh 1,238,100.00 -
0 bh 805,400.00 -
0.6 m2 833,000.00 499,800.00

SUB TOTAL 899,843,320.59


5820.105 m2 72,000.00 419,047,560.00
5820.105 m2 52,200.00 303,809,481.00
354.585 m2 196,300.00 69,605,035.50
214.9 m' 99,500.00 21,382,550.00
92.15046 m' 82,800.00 7,630,058.09
0 m' 49,100.00 -
0 m2 72,000.00 -
0 m2 52,200.00 -
4.8 m2 833,000.00 3,998,400.00
9.6 m2 52,200.00 501,120.00
9.6 m2 52,200.00 501,120.00
2.48 m2 809,200.00 2,006,816.00
849.85 m 82,800.00 70,367,580.00
12 m 82,800.00 993,600.00
SUB TOTAL 625,332,500.00

10 bh 2,692,500.00 26,925,000.00
10 bh 3,043,600.00 30,436,000.00
10 bh 3,805,300.00 38,053,000.00
10 bh 809,200.00 8,092,000.00
10 bh 379,400.00 3,794,000.00
10 bh 2,542,100.00 25,421,000.00
- -
4 bh 2,692,500.00 10,770,000.00
4 bh 3,043,600.00 12,174,400.00
4 bh 2,524,800.00 10,099,200.00
4 bh 809,200.00 3,236,800.00
4 bh 379,400.00 1,517,600.00
4 bh 2,542,100.00 10,168,400.00
- -
14 bh 3,805,300.00 53,274,200.00
14 bh 3,043,600.00 42,610,400.00
14 bh 3,805,300.00 53,274,200.00
14 bh 809,200.00 11,328,800.00
14 bh 379,400.00 5,311,600.00
28 bh 2,542,100.00 71,178,800.00
- -
4 bh 2,692,500.00 10,770,000.00
4 bh 3,805,300.00 15,221,200.00
4 bh 809,200.00 3,236,800.00
4 bh 379,400.00 1,517,600.00
4 bh 2,542,100.00 10,168,400.00
4 bh 680,800.00 2,723,200.00
- -
4 bh 2,692,500.00 10,770,000.00
2 bh 3,805,300.00 7,610,600.00
2 bh 809,200.00 1,618,400.00
2 bh 379,400.00 758,800.00
2 bh 2,542,100.00 5,084,200.00
- -
2 bh 2,692,500.00 5,385,000.00
1 bh 3,043,600.00 3,043,600.00
1 bh 3,805,300.00 3,805,300.00
1 bh 809,200.00 809,200.00
1 bh 379,400.00 379,400.00
4 bh 2,542,100.00 10,168,400.00
3 bh 3,889,700.00 11,669,100.00
4 bh 5,099,000.00 20,396,000.00
1 bh 6,369,600.00 6,369,600.00
2 bh 3,656,100.00 7,312,200.00
1 bh 4,684,800.00 4,684,800.00
33 bh 1,914,100.00 63,165,300.00
1 ls 1,000,000.00 1,000,000.00

SUB TOTAL 66,928,710.02


620.57 m2 93,200.00 57,837,110.02
238 m' 38,200.00 9,091,600.00

SUB TOTAL 207,826,300.00


34 bh 3,295,400.00 112,043,600.00
38 bh 378,000.00 14,364,000.00
36 bh 421,900.00 15,188,400.00
10 bh 1,420,600.00 14,206,000.00
4 bh 1,343,700.00 5,374,800.00
14 bh 1,329,600.00 18,614,400.00
2 bh 1,250,600.00 2,501,200.00
2 bh 1,459,700.00 2,919,400.00
1 bh 1,613,300.00 1,613,300.00
33 bh 636,400.00 21,001,200.00

SUB TOTAL 294,130,913.58


5820.105 m2 37,800.00 219,999,969.00
0 m2 57,000.00 -
1317.6121 m2 37,800.00 49,805,737.38
0 m2 57,000.00 -
29.466 m2 37,800.00 1,113,814.80
172.72 m2 37,800.00 6,528,816.00
431.738 m2 37,800.00 16,319,696.40
9.6 m2 37,800.00 362,880.00

SUB TOTAL 26,219,839.20


42.68 m 590,400.00 25,198,272.00
0 unit 550,000.00 -
- -
0.382 M3 1,238,100.00 472,954.20
4.71 kg 35,100.00 165,321.00
10.92 kg 35,100.00 383,292.00

SUB TOTAL 424,179,420.68


SUB TOTAL 149,727,162.90
409.8318 m2 165,500.00 67,827,162.90
1000 m2 81,900.00 81,900,000.00

SUB TOTAL 203,337,071.41


503.69793 m2 72,000.00 36,266,250.96
505.3525 m2 72,000.00 36,385,380.00
557.97 m2 72,000.00 40,173,840.00
36.09 m2 72,000.00 2,598,480.00
508.69793 m2 52,200.00 26,554,031.95
505.3525 m2 52,200.00 26,379,400.50
537.97 m2 52,200.00 28,082,034.00
36.09 m2 52,200.00 1,883,898.00
0 m' 52,200.00 -
4.2 m3 49,100.00 206,220.00###
10.92 kg 30,800.00 336,336.00###
54 m 82,800.00 4,471,200.00###

SUB TOTAL 43,706,100.00###


8 bh 5,099,000.00 40,792,000.00
1 bh 1,914,100.00 1,914,100.00
1 ls 1,000,000.00 1,000,000.00 1

SUB TOTAL 27,409,086.37


260.309805 m2 37,800.00 9,839,710.63
0 m2 57,000.00 -
0 m2 57,000.00 -
0 m2 57,000.00 -
24.792 m2 37,800.00 937,137.60
440.0 m 37,800.00 16,632,238.14
RENCANA ANGGARAN BIAYA

Pekerjaan : RUSUNAWA APRA 02


Lokasi : Rancacili Jawa Barat
Tahun Anggaran : 2018

PEKERJAAN GROUND WATER TANK

NO. URAIAN PEKERJAAN VOLUME

A.1 PEKERJAAN STRUKTUR GROUND WATER TANK (GWT) 2 Unit


(Ukuran P= 7 M, L= 6 M, T= 3 M
1 Galian, pasir urug dan lantai kerja
a Galian tanah Bak 273.00
b Urugan Kembali dipadatkan 12.60
c Pembuangan Tanah Keluar Lokasi Proyek 260.40
d Urugan pasir Urug dibawah Dasar Bak 8.40
e Lantai kerja dibawah Pile Cap t=5 cm (1:3:5) 4.20
2 Lantai Bak GWT, Tebal 25 cm
a Beton mutu f’c = 21 MPa (K 250) 21.00
b Besi beton 2,540.11
c Bekisting Perimeter Pelat 3.25
d Waterstop 26.00
3 Dinding Bak GWT, Tebal 25 cm
a Beton mutu f’c = 21 MPa (K 250) 39.00
b Besi beton 4,717.34
c Bekisting Dinding 171.60
4 Pelat atas Bak GWT, Tebal 15 cm
a Beton mutu f’c = 21 MPa (K 250) 12.60
b Besi beton 1,394.03
c Bekisting Pelat 42.00
d Tutup Manhole Besi 4.00
5 Waterproofing Integral
Merk Ex. Sika atau fosroc, 3 Ltr / m3 Beton 360.00
AN BIAYA

HARGA SATUAN JUMLAH HARGA


UNIT
( Rp. ) ( Rp. )

SUB TOTAL 306,970,745.55

M3 81,675.00 22,297,275.00
M3 22,000.00 277,200.00
M3 30,000.00 7,812,000.00
M3 224,400.00 1,884,960.00
M3 881,978.84 3,704,311.11

M3 1,155,503.44 24,265,572.22
kg 14,049.75 35,687,885.18
m2 161,645.00 525,346.25
m1 146,190.00 3,800,940.00

M3 1,155,503.44 45,064,634.13
kg 14,049.75 66,277,501.05
m2 233,942.50 40,144,533.00

M3 1,155,503.44 14,559,343.33
kg 14,049.75 19,585,739.27
m2 221,035.83 9,283,505.00
Bh 250,000.00 1,000,000.00

Liter 30,000.00 10,800,000.00


REKAPITULASI
RENCANA ANGGARAN BIAYA

Pekerjaan : Pekerjaan Review Apartemen Rancacili 02 Tahap 3


Lokasi : Rancacili, Bandung, Jawa Barat
Sumber Dana : APBD Kota Bandung Tahun Anggaran 2018

NO. URAIAN PEKERJAAN

I PEKERJAAN PLUMBING

II PEKERJAAN PEMADAM KEBAKARAN

III PEKERJAAN ELEKTRIKAL

IV PEKERJAAN ELEKTRONIK

V PEKERJAAN TRANSPORTASI DALAM GEDUNG

TOTAL

TOTAL BIAYA KONTRUKSI MEKANIKAL DAN ELEKTRIKAL


JUMLAH HARGA

Rp 1,168,165,736.22

Rp 1,307,506,555.63

Rp 1,544,677,325.00

Rp 381,123,000.00

Rp -

Rp 4,401,472,616.84

Rp 4,401,472,616.84
DAFTAR HARGA SATUAN PEKERJAAN
JUMLAH
U R A I A N
NO HARGA
(Rp.)
A B C
A Pekerjaan Persiapan
1 Pengukuran dan pemasangan 1 m’ Bouwplank Rp. 57,458.50
2 Pembuatan 1 m2 kantor sementara lantai plesteran Rp. 1,256,981.00
3 Pembersihan 1 m2 lapangan dan perataan Rp. 16,500.00
B Pekerjaan Tanah
4 Penggalian 1 m3 tanah biasa sedalam 1 m Rp. 66,000.00
5 Penggalian 1 m3 tanah biasa sedalam 2 m Rp. 81,675.00
6 Penggalian 1 m3 tanah biasa sedalam 3 m Rp. 97,680.00
7 Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galian Rp. 22,000.00
8 Pengurugan & Pemadatan tanah 1 m3 tanah ( per 20 cm) Rp. 136,620.00
9 Pengurugan 1 m3 dengan pasir urug Rp. 224,400.00
C Pekerjaan Pondasi
10 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP Rp. 898,672.50
11 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP Rp. 842,407.50
12 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP Rp. 803,401.50
13 Pemasangan 1 m3 batu kosong (anstamping) Rp. 414,727.50
D Pekerjaan Beton
14 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0.87 Rp. 881,978.84
15 Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), slump (12 +2) cm, w/c = 0,66 Rp. 1,069,683.65
16 Membuat 1 m3 beton mutu f’c = 19,3 MPa (K 225), slump (12 +2) cm, w/c = 0,58 Rp. 1,136,589.84
17 Membuat 1 m3 beton mutu f’c = 21,7 MPa (K 250), slump (12 +2) cm, w/c = 0,56 Rp. 1,155,503.44
18 Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275), slump (12 +2) cm, w/c = 0,53 Rp. 1,187,984.29
19 Membuat 1 m3 beton mutu f’c = 29,05 MPa (K 350), slump (12 +2) cm, w/c = 0,48 Rp. 1,249,487.18
20 Pembesian 1 kg dengan besi polos atau besi ulir Rp. 14,049.75
21 Pemasangan 1 m2 bekisting untuk pondasi Rp. 161,645.00
22 Pemasangan 1 m2 bekisting untuk sloof Rp. 171,022.50
23 Pemasangan 1 m2 bekisting untuk kolom Rp. 210,035.83
24 Pemasangan 1 m2 bekisting untuk balok Rp. 236,930.83
25 Pemasangan 1 m2 bekisting untuk lantai Rp. 221,035.83
26 Pemasangan 1 m2 bekisting untuk dinding Rp. 233,942.50
27 Pemasangan 1 m2 bekisting untuk tangga Rp. 202,959.17
E Pekerjaan Besi dan Alumunium
28 Pemasangan 1 kg besi profil Rp. 28,682.50
29 Pemasangan 1 kg rangka kuda-kuda baja IWF Rp. 28,682.50
30 Pengerjaan 100 kg pekerjaan perakitan Rp. 38,582.50
31 Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku Rp. 884,592.50
32 Pengerjaan 10 cm pengelasan dengan las listrik Rp. 34,441.00
F Pekerjaan Pasangan Dinding
33 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP : 3PP Rp. 126,450.50
34 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP : 5PP Rp. 119,867.00
35 Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15 mm Rp. 55,680.90
36 Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm Rp. 52,097.10
37 Pemasangan 1 m2 plesteran ciprat 1SP : 2PP Rp. 48,114.00
38 Pemasangan 1 m2 acian Rp. 23,512.50
G Pekerjaan Penutup Lantai dan Dinding
39 Pemasangan 1m2 lantai Keramik 30x30 cm Polished Rp. 223,107.50
40 Pemasangan 1m2 lantai Keramik 25x25 cm Unpolished Rp. 236,307.50
41 Pemasangan 1m2 lantai Granit Polished 60x60 cm Dbondi Bone GT602110R Ex. Roman Granit (3) Rp. 151,882.50
JUMLAH
U R A I A N
NO HARGA
(Rp.)
A B C
A Pekerjaan Persiapan
42 Pemasangan 1m2 lantai Keramik berglazuur 30x30 cm Vivaz Bianco G337106 Ex. Roman (4) Rp. 151,882.50
JUMLAH
U R A I A N
NO HARGA
(Rp.)
A B C
A Pekerjaan Persiapan
43 Pemasangan 1m2 Lantai Keramik berglazuur anti slip 30x30 cm Rocktile Anthraxcite G330604 Ex. Roman (5) Rp. 151,882.50
44 Pemasangan 1 m’ plint keramik ukuran 5x20 cm Rp. 24,406.80
45 Pemasangan 1 m2 dinding keramik 25cm x 50cm Rp. 331,314.50
46 Pemasangan 1 m2 dinding keramik HT 30cm x 30cm Rp. 587,614.50
47 Pemasangan 1 m2 dinding batu paras Rp. 134,310.00
48 Pemasangan 1 m2 lantai vynil ukuran 30cmx30cm Rp. 44,137.50
49 Pemasangan 1m2 floor harderner Rp. 80,740.00
H Pekerjaan Langit-langit
50 Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm Rp. 47,712.50
51 Pemasangan 1 m’ list langit-langit kayu profil Rp. 23,155.00
I Pekerjaan Atap
52 Pemasangan 1 m2 Atap metal Sheet Rp. 212,135.00
53 Pemasangan 1 m’ nok genteng metal Rp. 158,207.50
54 Pemasangan 1 m2 alumunium foil/sisalation Rp. 66,082.50
J Pekerjaan Kusen, Pintu & Jendela
55 Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I Rp. 14,647,875.00
56 Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II / III Rp. 8,685,875.00
57 Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II Rp. 369,517.50
58 Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II Rp. 369,517.50
59 Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II Rp. 677,050.00
60 Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II Rp. 498,630.00
61 Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau II Rp. 801,130.00
62 Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90 cm) Rp. 560,560.00
63 Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III Rp. 7,874,900.00
K Pekerjaan Kunci dan Kaca
64 Pemasangan 1 buah kunci tanam antik Rp. 79,695.00
65 Pemasangan 1 buah kunci tanam biasa Rp. 63,525.00
66 Pemasangan 1 buah kunci silinder Rp. 62,782.50
67 Pemasangan 1 buah engsel pintu Rp. 19,932.00
68 Pemasangan 1 buah engsel jendela kupu-kupu Rp. 13,282.50
69 Pemasangan 1 buah engsel angin Rp. 33,082.50
70 Pemasangan 1 buah spring knip Rp. 21,120.00
71 Pemasangan 1 m2 kaca tebal 5 mm Rp. 146,982.00
L Pekerjaan Pengecatan
72 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) Rp. 41,475.50
73 Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup) Rp. 56,661.00
74 Pelaburan 1 m2 bidang kayu dengan politur Rp. 90,970.00
75 Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup), Interior Rp. 31,391.25
76 Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup), Exterior Rp. 59,111.25
77 Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup) Rp. 19,882.50
M Pekerjaan saniter
78 Pemasangan 1 buah closet duduk/monoblock Rp. 4,029,025.00
79 Pemasangan 1 buah closet jongkok porslen Rp. 294,525.00
80 Pemasangan 1 buah urinoir Rp. 3,341,140.00
81 Pemasangan 1 buah wastafel Rp. 2,226,235.00
82 Pemasangan 1 buah bak cuci piring stainlessteel Rp. 42,075.00
83 Pemasangan 1 buah floor drain Rp. 458,425.00
84 Pemasangan 1 buah Jet Washer Rp. 450,725.00
85 Pemasangan 1 buah Kran dinding Rp. 331,925.00
86 Pemasangan 1 buah Penyekat Urinoir Rp. 1,328,525.00
JUMLAH
U R A I A N
NO HARGA
(Rp.)
A B C
A Pekerjaan Persiapan
87 Memasang 1m' saluran keliling uk. Lebar 40 cm tinggi 40 cm Rp. 2,176,291.21
88 Pemasangan 1 M' Grill Besi lebar 20cm Rp. 211,585.00
89 Memasang 1 bh kran westafel diameter ¾" atau ½" Rp. 866,800.00

90 Pemasangan 1 M' Kusen Plat Besi Rp. 323,257.00


91 Pemasangan 1 m2 Pintu Besi Plat Baja Tebal 2 mm Rangkap, Rangka Besi Siku Rp. 974,792.50
92 Pemasangan 1 Pasang Lever Handle (Pintu Besi) Rp. 448,525.00
93 Pemasangan 1 buah Mortise + Cylinder Lock Rp. 228,525.00
94 Pemasangan 1m rel pintu atas (Pintu Besi) Rp. 1,107,782.50
95 Pemasangan 1m rel pintu bawah (Pintu Besi) Rp. 557,782.50
96 Pemasangan 1 M' Kusen Aluminium Rp. 206,995.25
97 Pemasangan 1 Pasang Lever Handle (Pintu Kayu / Pintu Aluminium) Rp. 228,525.00
98 Pemasangan 1 buah engsel pintu kupu-kupu 4" Rp. 41,932.00
99 1 M² Pasang grill wiremesh Rp. 157,080.00
100 Pemasangan 1 m2 kaca tebal 5 mm Rp. 173,382.00
101 Membuat 1 m3 lantai kerja beton 1:2:3 Rp. 908,242.50
102 Pemadatan tanah 1 m3 tanah ( per 20 cm) Rp. 49,500.00
103 Pemasangan 1 m2 jaring kawat baja (wiremesh) Rp. 112,640.00
104 Pengurugan 1 m3 sirtu padat Rp. 242,550.00
105 1m' Joint Sealant Rp. 8,994.56
106 1m' Water stop PVC lebar 320mm Rp. 146,190.00
107 1 Bulan Pelaporan dan Dokumentasi Rp. 2,211,000.00
108 1 Set As Built Drawing (1 Set + 2 Copy) Rp. 10,560,000.00
109 1 Bulan Penyediaan Listrik Kerja Rp. 18,443,700.00
110 1 Ls Penyediaan Air Kerja Rp. 15,262,500.00
111 Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter Rp. 249,920.00
112 Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter Rp. 315,513.00
113 1 BUAH DAUN PINTU DOUBLE TEAKWOOD RANGKA KAYU MERANTI Rp. 798,561.50
ANALISA HARGA SATUAN PEKERJAAN

Harga Satuan Jumlah


NO URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
a b c d e f = (dxe)
A. 2.2.1.4. Pengukuran dan pemasangan 1 m’ Bouwplank
A TENAGA KERJA
1 Pekerja OH 0.1000 75,000.00 7,500.00
2 Tukang Kayu OH 0.1000 100,000.00 10,000.00
3 Kepala Tukang OH 0.0100 125,000.00 1,250.00
4 Mandor OH 0.0050 150,000.00 750.00
Jumlah Harga Tenaga Kerja 19,500.00
B BAHAN
1 Kayu 5/7 m3 0.0120 1,705,000.00 20,460.00
2 Paku biasa 2” – 5” kg 0.0200 17,000.00 340.00
3 Kayu papan 3/20 m3 0.0070 1,705,000.00 11,935.00
Jumlah Harga Bahan 32,735.00
C PERALATAN

Jumlah Harga Peralatan


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 52,235.00
E Overhead + Profit (10%) 10% 5,223.50
F Harga Satuan Pekerjaan ( D + E ) 57,458.50

A. 2.2.1.5 Pembuatan 1 m2 kantor sementara lantai plesteran


A TENAGA KERJA
1 Pekerja OH 2.0000 75,000.00 150,000.00
2 Tukang Kayu OH 2.0000 100,000.00 200,000.00
3 Tukang Batu OH 1.0000 100,000.00 100,000.00
4 Kepala Tukang OH 0.3000 125,000.00 37,500.00
5 Mandor OH 0.0500 150,000.00 7,500.00
Jumlah Harga Tenaga Kerja 495,000.00
B BAHAN
1 Dolken kayu 8-10/400 cm btg 1.2500 25,000.00 31,250.00
2 Kayu m3 0.1800 1,705,000.00 306,900.00
3 Paku biasa kg 0.0800 17,000.00 1,360.00
4 Besi strip kg 1.1000 12,500.00 13,750.00
5 Semen portland kg 35.0000 1,500.00 52,500.00
6 Pasir pasang m3 0.1500 210,000.00 31,500.00
7 Pasir beton m3 0.1000 220,000.00 22,000.00
8 Koral beton m3 0.1500 230,000.00 34,500.00
9 Bata merah bh 30.0000 700.00 21,000.00
10 Seng plat lbr 0.2500 65,000.00 16,250.00
11 Jendela Nako bh 0.2000 450,000.00 90,000.00
12 Kaca polos m2 0.0800 105,000.00 8,400.00
13 Kunci tanam bh 0.1500 100,000.00 15,000.00
14 Plywood 4 mm lbr 0.0600 55,000.00 3,300.00
Jumlah Harga Bahan 647,710.00
C PERALATAN
Harga Satuan Jumlah
NO URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
a b c d e f = (dxe)
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 1,142,710.00
E Overhead + Profit (10%) 10% 114,271.00
F Harga Satuan Pekerjaan ( D + E ) 1,256,981.00

A. 2.2.1.9. Pembersihan 1 m2 lapangan dan perataan


A TENAGA KERJA
1 Pekerja OH 0.1000 75,000.00 7,500.00
2 Mandor OH 0.0500 150,000.00 7,500.00
Jumlah Harga Tenaga Kerja 15,000.00
B BAHAN

Jumlah Harga Bahan


C PERALATAN

Jumlah Harga Peralatan


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 15,000.00
E Overhead + Profit (10%) 10% 1,500.00
F Harga Satuan Pekerjaan ( D + E ) 16,500.00

A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m
A TENAGA KERJA
1 Pekerja OH 0.7500 75,000.00 56,250.00
2 Mandor OH 0.0250 150,000.00 3,750.00
Jumlah Harga Tenaga Kerja 60,000.00
B BAHAN
Jumlah Harga Bahan
C PERALATAN
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 60,000.00
E Overhead + Profit (10%) 10% 6,000.00
F Harga Satuan Pekerjaan ( D + E ) 66,000.00

A.2.3.1.2. Penggalian 1 m3 tanah biasa sedalam 2 m


A TENAGA KERJA
1 Pekerja OH 0.9000 75,000.00 67,500.00
2 Mandor OH 0.0450 150,000.00 6,750.00
Jumlah Harga Tenaga Kerja 74,250.00
B BAHAN
Jumlah Harga Bahan
C PERALATAN
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 74,250.00
E Overhead + Profit (10%) 10% 7,425.00
F Harga Satuan Pekerjaan ( D + E ) 81,675.00
Harga Satuan Jumlah
NO URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
a b c d e f = (dxe)

A.2.3.1.3. Penggalian 1 m3 tanah biasa sedalam 3 m


A TENAGA KERJA
1 Pekerja OH 1.0500 75,000.00 78,750.00
2 Mandor OH 0.0670 150,000.00 10,050.00

Jumlah Harga Tenaga Kerja 88,800.00


B BAHAN

Jumlah Harga Bahan -


C PERALATAN

Jumlah Harga Peralatan


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 88,800.00
E Overhead + Profit (10%) 10% 8,880.00
F Harga Satuan Pekerjaan ( D + E ) 97,680.00

A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah 22,000.00


Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galian

A.2.3.1.10. Pengurugan & Pemadatan tanah 1 m3 tanah ( per 20 cm)


A TENAGA KERJA
1 Pekerja OH 0.5000 75,000.00 37,500.00
2 Mandor OH 0.0500 150,000.00 7,500.00
Jumlah Harga Tenaga Kerja 45,000.00
B BAHAN
1 Tanah Urug OH 1.2000 66,000.00 79,200.00
Jumlah Harga Bahan 79,200.00
C PERALATAN
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 124,200.00
E Overhead + Profit (10%) 10% 12,420.00
F Harga Satuan Pekerjaan ( D + E ) 136,620.00

A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug


A TENAGA KERJA
1 Pekerja OH 0.3000 75,000.00 22,500.00
2 Mandor OH 0.0100 150,000.00 1,500.00
Jumlah Harga Tenaga Kerja 24,000.00
B BAHAN
1 Pasir urug m3 1.2000 150,000.00 180,000.00
Jumlah Harga Bahan 180,000.00
C PERALATAN
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 204,000.00
E Overhead + Profit (10%) 10% 20,400.00
F Harga Satuan Pekerjaan ( D + E ) 224,400.00
Harga Satuan Jumlah
NO URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
a b c d e f = (dxe)

A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI


A.3.2.1.1. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP
A TENAGA KERJA
1 Pekerja OH 1.5000 75,000.00 112,500.00
2 Tukang batu OH 0.7500 100,000.00 75,000.00
3 Kepala tukang OH 0.0750 125,000.00 9,375.00
4 Mandor OH 0.0750 150,000.00 11,250.00
Jumlah Harga Tenaga Kerja 208,125.00
B BAHAN
1 Batu belah m3 1.2000 170,000.00 204,000.00
2 Semen portland kg 202.0000 1,500.00 303,000.00
3 Pasir pasang m3 0.4850 210,000.00 101,850.00
Jumlah Harga Bahan 608,850.00
C PERALATAN
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 816,975.00
E Overhead + Profit (10%) 10% 81,697.50
F Harga Satuan Pekerjaan ( D + E ) 898,672.50

A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP


A TENAGA KERJA
1 Pekerja OH 1.5000 75,000.00 112,500.00
2 Tukang batu OH 0.7500 100,000.00 75,000.00
3 Kepala tukang OH 0.0750 125,000.00 9,375.00
4 Mandor OH 0.0750 150,000.00 11,250.00

Jumlah Harga Tenaga Kerja 208,125.00


B BAHAN
1 Batu belah m3 1.2000 170,000.00 204,000.00
2 Semen portland kg 163.0000 1,500.00 244,500.00
3 Pasir pasang m3 0.5200 210,000.00 109,200.00

Jumlah Harga Bahan 557,700.00


C PERALATAN

Jumlah Harga Peralatan


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 765,825.00
E Overhead + Profit (10%) 10% 76,582.50
F Harga Satuan Pekerjaan ( D + E ) 842,407.50

A.3.2.1.3. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP


A TENAGA KERJA
1 Pekerja OH 1.5000 75,000.00 112,500.00
2 Tukang batu OH 0.7500 100,000.00 75,000.00
3 Kepala tukang OH 0.0750 125,000.00 9,375.00
4 Mandor OH 0.0750 150,000.00 11,250.00
Harga Satuan Jumlah
NO URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
a b c d e f = (dxe)
Jumlah Harga Tenaga Kerja 208,125.00
B BAHAN
1 Batu belah m3 1.2000 170,000.00 204,000.00
2 Semen portland kg 136.0000 1,500.00 204,000.00
3 Pasir pasang m3 0.5440 210,000.00 114,240.00
Jumlah Harga Bahan 522,240.00
C PERALATAN
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 730,365.00
E Overhead + Profit (10%) 10% 73,036.50
F Harga Satuan Pekerjaan ( D + E ) 803,401.50

A.3.2.1.9. Pemasangan 1 m3 batu kosong (anstamping)


A TENAGA KERJA
1 Pekerja OH 0.7800 75,000.00 58,500.00
2 Tukang batu OH 0.3900 100,000.00 39,000.00
3 Kepala tukang OH 0.0390 125,000.00 4,875.00
4 Mandor OH 0.0390 150,000.00 5,850.00
Jumlah Harga Tenaga Kerja 108,225.00
B BAHAN
1 Batu belah m3 1.2000 170,000.00 204,000.00
2 Pasir urug m3 0.4320 150,000.00 64,800.00
Jumlah Harga Bahan 268,800.00
C PERALATAN
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 377,025.00
E Overhead + Profit (10%) 10% 37,702.50
F Harga Satuan Pekerjaan ( D + E ) 414,727.50

A.4.1.1 HARGA SATUAN PEKERJAAN BETON


A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0.87
A TENAGA KERJA
1 Pekerja OH 1.2000 75,000.00 90,000.00
2 Tukang batu OH 0.2000 100,000.00 20,000.00
3 Kepala tukang OH 0.0200 125,000.00 2,500.00
4 Mandor OH 0.0600 150,000.00 9,000.00
Jumlah Harga Tenaga Kerja 121,500.00
B BAHAN
1 Semen portland kg 230.0000 1,500.00 345,000.00
2 Pasir beton m3 0.6379 220,000.00 140,328.57
3 Kerikil max. 30 m m3 0.7607 230,000.00 174,970.37
4 Air ltr 200.0000 100.00 20,000.00
Jumlah Harga Bahan 680,298.94
C PERALATAN

Jumlah Harga Peralatan


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 801,798.94
Harga Satuan Jumlah
NO URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
a b c d e f = (dxe)
E Overhead + Profit (10%) 10% 80,179.89
F Harga Satuan Pekerjaan ( D + E ) 881,978.84

A.4.1.1.5 Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), slump (12 +2) cm, w/c = 0,66
A TENAGA KERJA
1 Pekerja OH 1.6500 75,000.00 123,750.00
2 Tukang batu OH 0.2750 100,000.00 27,500.00
3 Kepala tukang OH 0.0280 125,000.00 3,500.00
4 Mandor OH 0.0830 150,000.00 12,450.00
Jumlah Harga Tenaga Kerja 167,200.00
B BAHAN
1 Semen portland kg 326.0000 1,500.00 489,000.00
2 Pasir beton m3 0.5429 220,000.00 119,428.57
3 Kerikil max. 30 m m3 0.7622 230,000.00 175,311.11
4 Air ltr 215.0000 100.00 21,500.00
Jumlah Harga Bahan 805,239.68
C PERALATAN
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 972,439.68
E Overhead + Profit (10%) 10% 97,243.97
F Harga Satuan Pekerjaan ( D + E ) 1,069,683.65

A.4.1.1.7 Membuat 1 m3 beton mutu f’c = 19,3 MPa (K 225), slump (12 +2) cm, w/c = 0,58
A TENAGA KERJA
1 Pekerja OH 1.6500 75,000.00 123,750.00
2 Tukang batu OH 0.2750 100,000.00 27,500.00
3 Kepala tukang OH 0.0280 125,000.00 3,500.00
4 Mandor OH 0.0830 150,000.00 12,450.00

Jumlah Harga Tenaga Kerja 167,200.00


B BAHAN
1 Semen portland kg 371.0000 1,500.00 556,500.00
2 Pasir beton m3 0.4986 220,000.00 109,685.71
3 Kerikil max. 30 m m3 0.7756 230,000.00 178,377.78
4 Air ltr 215.0000 100.00 21,500.00
Jumlah Harga Bahan 866,063.49
C PERALATAN

Jumlah Harga Peralatan


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 1,033,263.49
E Overhead + Profit (10%) 10% 103,326.35
F Harga Satuan Pekerjaan ( D + E ) 1,136,589.84

A.4.1.1.8 Membuat 1 m3 beton mutu f’c = 21,7 MPa (K 250), slump (12 +2) cm, w/c = 0,56
A TENAGA KERJA
1 Pekerja OH 1.6500 75,000.00 123,750.00
2 Tukang batu OH 0.2750 100,000.00 27,500.00
Harga Satuan Jumlah
NO URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
a b c d e f = (dxe)
3 Kepala tukang OH 0.0280 125,000.00 3,500.00
4 Mandor OH 0.0830 150,000.00 12,450.00
Jumlah Harga Tenaga Kerja 167,200.00
B BAHAN
1 Semen portland kg 384.0000 1,500.00 576,000.00
2 Pasir beton m3 0.4943 220,000.00 108,742.86
3 Kerikil max. 30 m m3 0.7696 230,000.00 177,014.81
4 Air ltr 215.0000 100.00 21,500.00
Jumlah Harga Bahan 883,257.67
C PERALATAN
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 1,050,457.67
E Overhead + Profit (10%) 10% 105,045.77
F Harga Satuan Pekerjaan ( D + E ) 1,155,503.44

A.4.1.1.9 Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275), slump (12 +2) cm, w/c = 0,53
A TENAGA KERJA
1 Pekerja OH 1.6500 75,000.00 123,750.00
2 Tukang batu OH 0.2750 100,000.00 27,500.00
3 Kepala tukang OH 0.0280 125,000.00 3,500.00
4 Mandor OH 0.0830 150,000.00 12,450.00
Jumlah Harga Tenaga Kerja 167,200.00
B BAHAN
1 Semen portland kg 406.0000 1,500.00 609,000.00
2 Pasir beton m3 0.4886 220,000.00 107,485.71
3 Kerikil max. 30 m m3 0.7600 230,000.00 174,800.00
4 Air ltr 215.0000 100.00 21,500.00
Jumlah Harga Bahan 912,785.71
C PERALATAN

Jumlah Harga Peralatan


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 1,079,985.71
E Overhead + Profit (10%) 10% 107,998.57
F Harga Satuan Pekerjaan ( D + E ) 1,187,984.29

A.4.1.1.10 Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (12 +2) cm, w/c = 0,52
A TENAGA KERJA
1 Pekerja OH 1.6500 75,000.00 123,750.00
2 Tukang batu OH 0.2750 100,000.00 27,500.00
3 Kepala tukang OH 0.0280 125,000.00 3,500.00
4 Mandor OH 0.0830 150,000.00 12,450.00
Jumlah Harga Tenaga Kerja 167,200.00
B BAHAN
1 Semen portland kg 413.0000 1,500.00 619,500.00
2 Pasir beton m3 0.4864 220,000.00 107,014.29
3 Kerikil max. 30 m m3 0.7563 230,000.00 173,948.15
4 Air ltr 215.0000 100.00 21,500.00
Harga Satuan Jumlah
NO URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
a b c d e f = (dxe)
Jumlah Harga Bahan 921,962.43
C PERALATAN
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 1,089,162.43
E Overhead + Profit (10%) 10% 108,916.24
F Harga Satuan Pekerjaan ( D + E ) 1,198,078.68

A.4.1.1.11 Membuat 1 m3 beton mutu f’c = 29,05 MPa (K 350), slump (12 +2) cm, w/c = 0,48
A TENAGA KERJA
1 Pekerja OH 1.6500 75,000.00 123,750.00
2 Tukang batu OH 0.2750 100,000.00 27,500.00
3 Kepala tukang OH 0.0280 125,000.00 3,500.00
4 Mandor OH 0.0830 150,000.00 12,450.00
Jumlah Harga Tenaga Kerja 167,200.00
B BAHAN
1 Semen portland kg 448.0000 1,500.00 672,000.00
2 Pasir beton m3 0.4764 220,000.00 104,814.29
3 Kerikil max. 30 m m3 0.7408 230,000.00 170,383.15
4 Air ltr 215.0000 100.00 21,500.00
Jumlah Harga Bahan 968,697.43
C PERALATAN
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 1,135,897.43
E Overhead + Profit (10%) 10% 113,589.74
F Harga Satuan Pekerjaan ( D + E ) 1,249,487.18

A.4.1.1.17 Pembesian 1 kg dengan besi polos atau besi ulir


A TENAGA KERJA
1 Pekerja OH 0.0070 75,000.00 525.00
2 Tukang besi OH 0.0070 100,000.00 700.00
3 Kepala tukang OH 0.0007 125,000.00 87.50
4 Mandor OH 0.0004 150,000.00 60.00
Jumlah Harga Tenaga Kerja 1,372.50
B BAHAN
1 Besi beton polos/ulir kg 1.0500 10,500.00 11,025.00
2 Kawat beton kg 0.0150 25,000.00 375.00
Jumlah Harga Bahan 11,400.00
C PERALATAN
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 12,772.50
E Overhead + Profit (10%) 10% 1,277.25
F Harga Satuan Pekerjaan ( D + E ) 14,049.75

A.4.1.1.20 Pemasangan 1 m2 bekisting untuk pondasi


A TENAGA KERJA
1 Pekerja OH 0.5200 75,000.00 39,000.00
2 Tukang kayu OH 0.2600 100,000.00 26,000.00
Harga Satuan Jumlah
NO URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
a b c d e f = (dxe)
3 Kepala tukang OH 0.0260 125,000.00 3,250.00
4 Mandor OH 0.0260 150,000.00 3,900.00
Jumlah Harga Tenaga Kerja 72,150.00
B BAHAN
1 Kayu kelas III m3 0.0400 1,705,000.00 68,200.00
2 Paku 5-10 cm kg 0.3000 17,000.00 5,100.00
3 Minyak bekisting ltr 0.1000 15,000.00 1,500.00
Jumlah Harga Bahan 74,800.00
C PERALATAN
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 146,950.00
E Overhead + Profit (10%) 10% 14,695.00
F Harga Satuan Pekerjaan ( D + E ) 161,645.00

A.4.1.1.21 Pemasangan 1 m2 bekisting untuk sloof


A TENAGA KERJA
1 Pekerja OH 0.5200 75,000.00 39,000.00
2 Tukang kayu OH 0.2600 100,000.00 26,000.00
3 Kepala tukang OH 0.0260 125,000.00 3,250.00
4 Mandor OH 0.0260 150,000.00 3,900.00
Jumlah Harga Tenaga Kerja 72,150.00
B BAHAN
1 Kayu kelas III m3 0.0450 1,705,000.00 76,725.00
2 Paku 5-10 cm kg 0.3000 17,000.00 5,100.00
3 Minyak bekisting ltr 0.1000 15,000.00 1,500.00
Jumlah Harga Bahan 83,325.00
C PERALATAN
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 155,475.00
E Overhead + Profit (10%) 10% 15,547.50
F Harga Satuan Pekerjaan ( D + E ) 171,022.50

A.4.1.1.22 Pemasangan 1 m2 bekisting untuk kolom


A TENAGA KERJA
1 Pekerja OH 0.6600 75,000.00 49,500.00
2 Tukang kayu OH 0.3300 100,000.00 33,000.00
3 Kepala tukang OH 0.0330 125,000.00 4,125.00
4 Mandor OH 0.0330 150,000.00 4,950.00
Jumlah Harga Tenaga Kerja 91,575.00
B BAHAN 3x pakai
1 Kayu kelas III m3 0.0133 1,705,000.00 22,733.33
2 Paku 5-10 cm kg 0.4000 17,000.00 6,800.00
3 Minyak bekisting ltr 0.2000 15,000.00 3,000.00
4 Balok kayu kelas II m3 0.0050 4,450,000.00 22,250.00
5 Plywood tebal 9 mm lbr 0.1167 125,000.00 14,583.33
6 alat scafolding Ls 1.0000 30,000.00 30,000.00
Jumlah Harga Bahan 99,366.67
Harga Satuan Jumlah
NO URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
a b c d e f = (dxe)
C PERALATAN
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 190,941.67
E Overhead + Profit (10%) 10% 19,094.17
F Harga Satuan Pekerjaan ( D + E ) 210,035.83

A.4.1.1.23 Pemasangan 1 m2 bekisting untuk balok


A TENAGA KERJA
1 Pekerja OH 0.6600 75,000.00 49,500.00
2 Tukang kayu OH 0.3300 100,000.00 33,000.00
3 Kepala tukang OH 0.0330 125,000.00 4,125.00
4 Mandor OH 0.0330 150,000.00 4,950.00
Jumlah Harga Tenaga Kerja 91,575.00
B BAHAN 3x pakai
1 Kayu kelas III m3 0.0133 1,705,000.00 22,733.33
2 Paku 5-10 cm kg 0.4000 17,000.00 6,800.00
3 Minyak bekisting ltr 0.2000 15,000.00 3,000.00
4 Balok kayu kelas II m3 0.0060 4,450,000.00 26,700.00
5 Plywood tebal 9 mm lbr 0.1167 125,000.00 14,583.33
6 alat scafolding Ls 1.0000 50,000.00 50,000.00
Jumlah Harga Bahan 123,816.67
C PERALATAN
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 215,391.67
E Overhead + Profit (10%) 10% 21,539.17
F Harga Satuan Pekerjaan ( D + E ) 236,930.83

A.4.1.1.24 Pemasangan 1 m2 bekisting untuk lantai


A TENAGA KERJA
1 Pekerja OH 0.6600 75,000.00 49,500.00
2 Tukang kayu OH 0.3300 100,000.00 33,000.00
3 Kepala tukang OH 0.0330 125,000.00 4,125.00
4 Mandor OH 0.0330 150,000.00 4,950.00
Jumlah Harga Tenaga Kerja 91,575.00
B BAHAN 3x pakai
1 Kayu kelas III m3 0.0133 1,705,000.00 22,733.33
2 Paku 5-10 cm kg 0.4000 17,000.00 6,800.00
3 Minyak bekisting ltr 0.2000 15,000.00 3,000.00
4 Balok kayu kelas II m3 0.0050 4,450,000.00 22,250.00
5 Plywood tebal 9 mm lbr 0.1167 125,000.00 14,583.33
6 alat scafolding Ls 1.0000 40,000.00 40,000.00
Jumlah Harga Bahan 109,366.67
C PERALATAN
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 200,941.67
E Overhead + Profit (10%) 10% 20,094.17
F Harga Satuan Pekerjaan ( D + E ) 221,035.83
Harga Satuan Jumlah
NO URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
a b c d e f = (dxe)

A.4.1.1.25 Pemasangan 1 m2 bekisting untuk dinding


A TENAGA KERJA
1 Pekerja OH 0.6600 75,000.00 49,500.00
2 Tukang kayu OH 0.3300 100,000.00 33,000.00
3 Kepala tukang OH 0.0330 125,000.00 4,125.00
4 Mandor OH 0.0330 150,000.00 4,950.00
Jumlah Harga Tenaga Kerja 91,575.00
B BAHAN 3x pakai
1 Kayu kelas III m3 0.0100 1,705,000.00 17,050.00
2 Paku 5-10 cm kg 0.4000 17,000.00 6,800.00
3 Minyak bekisting ltr 0.2000 15,000.00 3,000.00
4 Balok kayu kelas II m3 0.0067 4,450,000.00 29,666.67
5 Plywood tebal 9 mm lbr 0.1167 125,000.00 14,583.33
6 alat scafolding Ls 1.0000 30,000.00 30,000.00
7 Penjaga jarak bekisting / spacer bh 4.0000 5,000.00 20,000.00
Jumlah Harga Bahan 121,100.00
C PERALATAN

Jumlah Harga Peralatan


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 212,675.00
E Overhead + Profit (10%) 10% 21,267.50
F Harga Satuan Pekerjaan ( D + E ) 233,942.50

A.4.1.1.26 Pemasangan 1 m2 bekisting untuk tangga


A TENAGA KERJA
1 Pekerja OH 0.6600 75,000.00 49,500.00
2 Tukang kayu OH 0.3300 100,000.00 33,000.00
3 Kepala tukang OH 0.0330 125,000.00 4,125.00
4 Mandor OH 0.0330 150,000.00 4,950.00
Jumlah Harga Tenaga Kerja 91,575.00
B BAHAN 3x pakai
1 Kayu kelas III m3 0.0100 1,705,000.00 17,050.00
2 Paku 5-10 cm kg 0.4000 17,000.00 6,800.00
3 Minyak bekisting ltr 0.1500 15,000.00 2,250.00
4 Balok kayu kelas II m3 0.0050 4,450,000.00 22,250.00
5 Plywood tebal 9 mm lbr 0.1167 125,000.00 14,583.33
6 alat scafolding Ls 1.0000 30,000.00 30,000.00
Jumlah Harga Bahan 92,933.33
C PERALATAN
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 184,508.33
E Overhead + Profit (10%) 10% 18,450.83
F Harga Satuan Pekerjaan ( D + E ) 202,959.17
Harga Satuan Jumlah
NO URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
a b c d e f = (dxe)

A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM


A.4.2.1.1 Pemasangan 1 kg besi profil
A TENAGA KERJA
1 Pekerja OH 0.0600 75,000.00 4,500.00
2 Tukang las konstruksi OH 0.0600 100,000.00 6,000.00
3 Kepala tukang OH 0.0060 125,000.00 750.00
4 Mandor OH 0.0030 150,000.00 450.00
Jumlah Harga Tenaga Kerja 11,700.00
B BAHAN
1 Besi profil kg 1.1500 12,500.00 14,375.00
Jumlah Harga Bahan 14,375.00
C PERALATAN
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 26,075.00
E Overhead + Profit (10%) 10% 2,607.50
F Harga Satuan Pekerjaan ( D + E ) 28,682.50

A.4.2.1.2 Pemasangan 1 kg rangka kuda-kuda baja IWF


A TENAGA KERJA
1 Pekerja OH 0.0600 75,000.00 4,500.00
2 Tukang las konstruksi OH 0.0600 100,000.00 6,000.00
3 Kepala tukang OH 0.0060 125,000.00 750.00
4 Mandor OH 0.0030 150,000.00 450.00
Jumlah Harga Tenaga Kerja 11,700.00
B BAHAN
1 Besi profil kg 1.1500 12,500.00 14,375.00
Jumlah Harga Bahan 14,375.00
C PERALATAN
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 26,075.00
E Overhead + Profit (10%) 10% 2,607.50
F Harga Satuan Pekerjaan ( D + E ) 28,682.50

A.4.2.1.3 Pengerjaan 100 kg pekerjaan perakitan


A TENAGA KERJA
1 Pekerja OH 0.1000 75,000.00 7,500.00
2 Tukang las konstruksi OH 0.1000 100,000.00 10,000.00
3 Kepala tukang OH 0.0010 125,000.00 125.00
4 Mandor OH 0.0050 150,000.00 750.00
Jumlah Harga Tenaga Kerja 18,375.00
B BAHAN
1 Solar ltr 1.0000 11,700.00 11,700.00
2 Minyak pelumas ltr 0.1000 50,000.00 5,000.00
Jumlah Harga Bahan 16,700.00
C PERALATAN
Jumlah Harga Peralatan
Harga Satuan Jumlah
NO URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
a b c d e f = (dxe)
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 35,075.00
E Overhead + Profit (10%) 10% 3,507.50
F Harga Satuan Pekerjaan ( D + E ) 38,582.50
G Untuk Pekerjaan 1 kg perakitan = F : 100 100 385.83

A.4.2.1.4 Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
A TENAGA KERJA
1 Pekerja OH 1.0500 75,000.00 78,750.00
2 Tukang las biasa OH 1.0500 100,000.00 105,000.00
3 Kepala tukang OH 0.1050 125,000.00 13,125.00
4 Mandor OH 0.0520 150,000.00 7,800.00
Jumlah Harga Tenaga Kerja 204,675.00
B BAHAN
1 Besi siku L 30.30.3 kg 15.0000 12,500.00 187,500.00
2 Besi plat baja kg 32.8000 12,500.00 410,000.00
3 Kawat las kg 0.0500 40,000.00 2,000.00
Jumlah Harga Bahan 599,500.00
C PERALATAN
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 804,175.00
E Overhead + Profit (10%) 10% 80,417.50
F Harga Satuan Pekerjaan ( D + E ) 884,592.50

A.4.2.1.5 Pengerjaan 10 cm pengelasan dengan las listrik


A TENAGA KERJA
1 Pekerja OH 0.0400 75,000.00 3,000.00
2 Tukang besi konstruksi OH 0.0200 100,000.00 2,000.00
3 Kepala tukang OH 0.0020 125,000.00 250.00
4 Mandor OH 0.0020 150,000.00 300.00
Jumlah Harga Tenaga Kerja 5,550.00
B BAHAN
1 Kawat las listrik kg 0.4000 40,000.00 16,000.00
2 Solar ltr 0.3000 11,700.00 3,510.00
3 Minyak pelumas ltr 0.0400 50,000.00 2,000.00
Jumlah Harga Bahan 21,510.00
C PERALATAN
1 Sewa alat jam 0.1700 25,000.00 4,250.00
Jumlah Harga Peralatan 4,250.00
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 31,310.00
E Overhead + Profit (10%) 10% 3,131.00
F Harga Satuan Pekerjaan ( D + E ) 34,441.00
F Harga Satuan Pekerjaan per M' = F : 10 3,444.10
Harga Satuan Jumlah
NO URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
a b c d e f = (dxe)

A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


A.4.4.1.8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP : 3PP
A TENAGA KERJA
1 Pekerja OH 0.3000 75,000.00 22,500.00
2 Tukang OH 0.1000 100,000.00 10,000.00
3 Kepala tukang OH 0.0100 125,000.00 1,250.00
4 Mandor OH 0.0150 150,000.00 2,250.00
Jumlah Harga Tenaga Kerja 36,000.00
B BAHAN
1 Bata merah bh 70.0000 700.00 49,000.00
2 Semen Portlan kg 14.3700 1,500.00 21,555.00
3 Pasir Pasang m3 0.0400 210,000.00 8,400.00
Jumlah Harga Bahan 78,955.00
C PERALATAN
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 114,955.00
E Overhead + Profit (10%) 10% 11,495.50
F Harga Satuan Pekerjaan ( D + E ) 126,450.50

A.4.4.1.10 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP : 5PP
A TENAGA KERJA
1 Pekerja OH 0.3000 75,000.00 22,500.00
2 Tukang OH 0.1000 100,000.00 10,000.00
3 Kepala tukang OH 0.0100 125,000.00 1,250.00
4 Mandor OH 0.0150 150,000.00 2,250.00
Jumlah Harga Tenaga Kerja 36,000.00
B BAHAN
1 Bata merah bh 70.0000 700.00 49,000.00
2 Semen Portlan kg 9.6800 1,500.00 14,520.00
3 Pasir Pasang m3 0.0450 210,000.00 9,450.00
Jumlah Harga Bahan 72,970.00
C PERALATAN
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 108,970.00
E Overhead + Profit (10%) 10% 10,897.00
F Harga Satuan Pekerjaan ( D + E ) 119,867.00

A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


A.4.4.2.3 Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15 mm
A TENAGA KERJA
1 Pekerja OH 0.2000 75,000.00 15,000.00
2 Tukang OH 0.1500 100,000.00 15,000.00
3 Kepala tukang OH 0.0150 125,000.00 1,875.00
4 Mandor OH 0.0150 150,000.00 2,250.00
Jumlah Harga Tenaga Kerja 34,125.00
B BAHAN
1 Semen Portlan kg 7.7760 1,500.00 11,664.00
Harga Satuan Jumlah
NO URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
a b c d e f = (dxe)
2 Pasir Pasang m3 0.0230 210,000.00 4,830.00
Jumlah Harga Bahan 16,494.00
C PERALATAN
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 50,619.00
E Overhead + Profit (10%) 10% 5,061.90
F Harga Satuan Pekerjaan ( D + E ) 55,680.90

A.4.4.2.5 Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm


A TENAGA KERJA
1 Pekerja OH 0.2000 75,000.00 15,000.00
2 Tukang OH 0.1500 100,000.00 15,000.00
3 Kepala tukang OH 0.0150 125,000.00 1,875.00
4 Mandor OH 0.0150 150,000.00 2,250.00
Jumlah Harga Tenaga Kerja 34,125.00
B BAHAN
1 Semen Portlan kg 5.1840 1,500.00 7,776.00
2 Pasir Pasang m3 0.0260 210,000.00 5,460.00
Jumlah Harga Bahan 13,236.00
C PERALATAN
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 47,361.00
E Overhead + Profit (10%) 10% 4,736.10
F Harga Satuan Pekerjaan ( D + E ) 52,097.10

A.4.4.2.23 Pemasangan 1 m2 plesteran ciprat 1SP : 2PP


A TENAGA KERJA
1 Pekerja OH 0.3000 75,000.00 22,500.00
2 Tukang OH 0.1000 100,000.00 10,000.00
3 Kepala tukang OH 0.0100 125,000.00 1,250.00
4 Mandor OH 0.0150 150,000.00 2,250.00
Jumlah Harga Tenaga Kerja 36,000.00
B BAHAN
1 Semen Portlan kg 4.3200 1,500.00 6,480.00
2 Pasir Pasang m3 0.0060 210,000.00 1,260.00
Jumlah Harga Bahan 7,740.00
C PERALATAN
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 43,740.00
E Overhead + Profit (10%) 10% 4,374.00
F Harga Satuan Pekerjaan ( D + E ) 48,114.00

A.4.4.2.27 Pemasangan 1 m2 acian


A TENAGA KERJA
1 Pekerja OH 0.0500 75,000.00 3,750.00
2 Tukang OH 0.1000 100,000.00 10,000.00
3 Kepala tukang OH 0.0100 125,000.00 1,250.00
4 Mandor OH 0.0100 150,000.00 1,500.00
Harga Satuan Jumlah
NO URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
a b c d e f = (dxe)
Jumlah Harga Tenaga Kerja 16,500.00
B BAHAN
1 Semen Portlan kg 3.2500 1,500.00 4,875.00
Jumlah Harga Bahan 4,875.00
C PERALATAN
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 21,375.00
E Overhead + Profit (10%) 10% 2,137.50
F Harga Satuan Pekerjaan ( D + E ) 23,512.50

A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


A.4.4.3.35 Pemasangan 1m2 lantai Keramik 30x30 cm Polished
A TENAGA KERJA
1 Pekerja OH 0.3500 75,000.00 26,250.00
2 Tukang OH 0.3500 100,000.00 35,000.00
3 Kepala tukang OH 0.0350 125,000.00 4,375.00
4 Mandor OH 0.0350 150,000.00 5,250.00
Jumlah Harga Tenaga Kerja 70,875.00
B BAHAN
1 Keramik 30x30 cm polished m2 1.0000 91,000.00 91,000.00
2 Semen Portlan kg 10.0000 1,500.00 15,000.00
3 Pasir Pasang m3 0.0450 210,000.00 9,450.00
4 Semen warna kg 1.5000 11,000.00 16,500.00
Jumlah Harga Bahan 131,950.00
C PERALATAN
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 202,825.00
E Overhead + Profit (10%) 10% 20,282.50
F Harga Satuan Pekerjaan ( D + E ) 223,107.50

A.4.4.3.35 Pemasangan 1m2 lantai Keramik 25x25 cm Unpolished


A TENAGA KERJA
1 Pekerja OH 0.3500 75,000.00 26,250.00
2 Tukang OH 0.3500 100,000.00 35,000.00
3 Kepala tukang OH 0.0350 125,000.00 4,375.00
4 Mandor OH 0.0350 150,000.00 5,250.00
Jumlah Harga Tenaga Kerja 70,875.00
B BAHAN
1 Keramik 20x20 cm unpolished m2 1.0000 103,000.00 103,000.00
2 Semen Portlan kg 10.0000 1,500.00 15,000.00
3 Pasir Pasang m3 0.0450 210,000.00 9,450.00
4 Semen warna kg 1.5000 11,000.00 16,500.00
Jumlah Harga Bahan 143,950.00
C PERALATAN
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 214,825.00
E Overhead + Profit (10%) 10% 21,482.50
Harga Satuan Jumlah
NO URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
a b c d e f = (dxe)
F Harga Satuan Pekerjaan ( D + E ) 236,307.50

A.4.4.3.35 Pemasangan 1m2 lantai Granit Polished 60x60 cm Dbondi Bone GT602110R Ex. Roman Granit (3)
A TENAGA KERJA
1 Pekerja OH 0.7000 75,000.00 52,500.00
2 Tukang OH 0.3500 100,000.00 35,000.00
3 Kepala tukang OH 0.0350 125,000.00 4,375.00
4 Mandor OH 0.0350 150,000.00 5,250.00
Jumlah Harga Tenaga Kerja 97,125.00
B BAHAN
1 Granit Berglazuur 60x60 cm m2 1.0000 -
2 Semen Portlan kg 10.0000 1,500.00 15,000.00
3 Pasir Pasang m3 0.0450 210,000.00 9,450.00
4 Semen warna kg 1.5000 11,000.00 16,500.00
Jumlah Harga Bahan 40,950.00
C PERALATAN
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 138,075.00
E Overhead + Profit (10%) 10% 13,807.50
F Harga Satuan Pekerjaan ( D + E ) 151,882.50

A.4.4.3.35 Pemasangan 1m2 lantai Keramik berglazuur 30x30 cm Vivaz Bianco G337106 Ex. Roman (4)
A TENAGA KERJA
1 Pekerja OH 0.7000 75,000.00 52,500.00
2 Tukang OH 0.3500 100,000.00 35,000.00
3 Kepala tukang OH 0.0350 125,000.00 4,375.00
4 Mandor OH 0.0350 150,000.00 5,250.00
Jumlah Harga Tenaga Kerja 97,125.00
B BAHAN
1 Keramik Berglazuur 30x30 cm m2 1.0000 -
2 Semen Portlan kg 10.0000 1,500.00 15,000.00
3 Pasir Pasang m3 0.0450 210,000.00 9,450.00
4 Semen warna kg 1.5000 11,000.00 16,500.00
Jumlah Harga Bahan 40,950.00
C PERALATAN
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 138,075.00
E Overhead + Profit (10%) 10% 13,807.50
F Harga Satuan Pekerjaan ( D + E ) 151,882.50

A.4.4.3.35 Pemasangan 1m2 Lantai Keramik berglazuur anti slip 30x30 cm Rocktile Anthraxcite G330604 Ex. Roman (5)
A TENAGA KERJA
1 Pekerja OH 0.7000 75,000.00 52,500.00
2 Tukang OH 0.3500 100,000.00 35,000.00
3 Kepala tukang OH 0.0350 125,000.00 4,375.00
4 Mandor OH 0.0350 150,000.00 5,250.00
Jumlah Harga Tenaga Kerja 97,125.00
Harga Satuan Jumlah
NO URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
a b c d e f = (dxe)
B BAHAN
1 Keramik Berglazuur anti slip 30x30 cm m2 1.0000 -
2 Semen Portlan kg 10.0000 1,500.00 15,000.00
3 Pasir Pasang m3 0.0450 210,000.00 9,450.00
4 Semen warna kg 1.5000 11,000.00 16,500.00
Jumlah Harga Bahan 40,950.00
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 138,075.00
E Overhead + Profit (10%) 10% 13,807.50
F Harga Satuan Pekerjaan ( D + E ) 151,882.50

A.4.4.3.41 Pemasangan 1 m’ plint keramik ukuran 5x20 cm


A TENAGA KERJA
1 Pekerja OH 0.0900 75,000.00 6,750.00
2 Tukang OH 0.0900 100,000.00 9,000.00
3 Kepala tukang OH 0.0350 125,000.00 4,375.00
4 Mandor OH 0.0050 150,000.00 750.00

Jumlah Harga Tenaga Kerja 20,875.00


B BAHAN
1 Keramik 20x20 cm m' 1.0000 -
2 Semen Portlan kg 0.5700 1,500.00 855.00
3 Pasir Pasang m3 0.0015 210,000.00 315.00
4 Semen warna kg 0.0130 11,000.00 143.00

Jumlah Harga Bahan 1,313.00


C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 22,188.00
E Overhead + Profit (10%) 10% 2,218.80
F Harga Satuan Pekerjaan ( D + E ) 24,406.80

A.4.4.3.54 Pemasangan 1 m2 dinding keramik 25cm x 50cm


A TENAGA KERJA
1 Pekerja OH 0.4500 75,000.00 33,750.00
2 Tukang OH 0.4500 100,000.00 45,000.00
3 Kepala tukang OH 0.0450 125,000.00 5,625.00
4 Mandor OH 0.0450 150,000.00 6,750.00
Jumlah Harga Tenaga Kerja 91,125.00
B BAHAN
1 Keramik 25x50 cm m2 1.0000 171,000.00 171,000.00
2 Semen Portlan kg 9.3000 1,500.00 13,950.00
3 Pasir Pasang m3 0.0180 210,000.00 3,780.00
4 Semen warna kg 1.9400 11,000.00 21,340.00
Harga Satuan Jumlah
NO URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
a b c d e f = (dxe)
Jumlah Harga Bahan 210,070.00
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 301,195.00
E Overhead + Profit (10%) 10% 30,119.50
F Harga Satuan Pekerjaan ( D + E ) 331,314.50

A.4.4.3.54 Pemasangan 1 m2 dinding keramik HT 30cm x 30cm


A TENAGA KERJA
1 Pekerja OH 0.4500 75,000.00 33,750.00
2 Tukang OH 0.4500 100,000.00 45,000.00
3 Kepala tukang OH 0.0450 125,000.00 5,625.00
4 Mandor OH 0.0450 150,000.00 6,750.00
Jumlah Harga Tenaga Kerja 91,125.00
B BAHAN
1 Keramik HT 30x30 cm m2 1.0000 404,000.00 404,000.00
2 Semen Portlan kg 9.3000 1,500.00 13,950.00
3 Pasir Pasang m3 0.0180 210,000.00 3,780.00
4 Semen warna kg 1.9400 11,000.00 21,340.00
Jumlah Harga Bahan 443,070.00
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 534,195.00
E Overhead + Profit (10%) 10% 53,419.50
F Harga Satuan Pekerjaan ( D + E ) 587,614.50

A.4.4.3.57 Pemasangan 1 m2 dinding batu paras


A TENAGA KERJA
1 Pekerja OH 0.7000 75,000.00 52,500.00
2 Tukang OH 0.3500 100,000.00 35,000.00
3 Kepala tukang OH 0.0350 125,000.00 4,375.00
4 Mandor OH 0.0350 150,000.00 5,250.00
Jumlah Harga Tenaga Kerja 97,125.00
B BAHAN
1 Keramik 20x20 cm m2 1.1000 -
2 Semen Portlan kg 11.7500 1,500.00 17,625.00
3 Pasir Pasang m3 0.0350 210,000.00 7,350.00
Jumlah Harga Bahan 24,975.00
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 122,100.00
E Overhead + Profit (10%) 10% 12,210.00
F Harga Satuan Pekerjaan ( D + E ) 134,310.00
Harga Satuan Jumlah
NO URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
a b c d e f = (dxe)

A.4.4.3.59 Pemasangan 1 m2 lantai vynil ukuran 30cmx30cm


A TENAGA KERJA
1 Pekerja OH 0.1500 75,000.00 11,250.00
2 Tukang OH 0.1500 100,000.00 15,000.00
3 Kepala tukang OH 0.0150 125,000.00 1,875.00
4 Mandor OH 0.0800 150,000.00 12,000.00
Jumlah Harga Tenaga Kerja 40,125.00
B BAHAN
1 Vinyl m2 1.0500 -
2 Lem kg 0.3500 -
Jumlah Harga Bahan -
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 40,125.00
E Overhead + Profit (10%) 10% 4,012.50
F Harga Satuan Pekerjaan ( D + E ) 44,137.50

A.4.4.3.61 Pemasangan 1m2 floor harderner


A TENAGA KERJA
1 Pekerja OH 0.1200 75,000.00 9,000.00
2 Tukang OH 0.1200 100,000.00 12,000.00
3 Kepala tukang OH 0.0120 125,000.00 1,500.00
4 Mandor OH 0.0060 150,000.00 900.00
Jumlah Harga Tenaga Kerja 23,400.00
B BAHAN
1 Floorhardener kg 5.0000 10,000.00 50,000.00
Jumlah Harga Bahan 50,000.00
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 73,400.00
E Overhead + Profit (10%) 10% 7,340.00
F Harga Satuan Pekerjaan ( D + E ) 80,740.00

A.4.5.1 SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)


A.4.5.1.7 Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm
A TENAGA KERJA
1 Pekerja OH 0.1000 75,000.00 7,500.00
2 Tukang OH 0.0500 100,000.00 5,000.00
3 Kepala tukang OH 0.0050 125,000.00 625.00
4 Mandor OH 0.0050 150,000.00 750.00
Jumlah Harga Tenaga Kerja 13,875.00
B BAHAN
1 Gypsumboard lbr 0.3640 75,000.00 27,300.00
2 Paku skrup kg 0.1100 20,000.00 2,200.00
Harga Satuan Jumlah
NO URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
a b c d e f = (dxe)
Jumlah Harga Bahan 29,500.00
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 43,375.00
E Overhead + Profit (10%) 10% 4,337.50
F Harga Satuan Pekerjaan ( D + E ) 47,712.50

A.4.5.1.9 Pemasangan 1 m’ list langit-langit kayu profil


A TENAGA KERJA
1 Pekerja OH 0.0500 75,000.00 3,750.00
2 Tukang OH 0.0500 100,000.00 5,000.00
3 Kepala tukang OH 0.0050 125,000.00 625.00
4 Mandor OH 0.0030 150,000.00 450.00
Jumlah Harga Tenaga Kerja 9,825.00
B BAHAN
1 List kayu profil m' 1.0500 10,500.00 11,025.00
2 Paku kg 0.0100 20,000.00 200.00
Jumlah Harga Bahan 11,225.00
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 21,050.00
E Overhead + Profit (10%) 10% 2,105.00
F Harga Satuan Pekerjaan ( D + E ) 23,155.00

A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP


A.4.5.2.32 Pemasangan 1 m2 Atap metal Sheet
A TENAGA KERJA
1 Pekerja OH 0.2000 75,000.00 15,000.00
2 Tukang OH 0.1000 100,000.00 10,000.00
3 Kepala tukang OH 0.0100 125,000.00 1,250.00
4 Mandor OH 0.0100 150,000.00 1,500.00
Jumlah Harga Tenaga Kerja 27,750.00
B BAHAN
1 Atap metal Sheet m2 1.0200 155,000.00 158,100.00
2 Paku biasa 1/2-1" kg 0.2000 35,000.00 7,000.00
Jumlah Harga Bahan 165,100.00
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 192,850.00
E Overhead + Profit (10%) 10% 19,285.00
F Harga Satuan Pekerjaan ( D + E ) 212,135.00
Harga Satuan Jumlah
NO URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
a b c d e f = (dxe)

A.4.5.2.36 Pemasangan 1 m’ nok genteng metal


A TENAGA KERJA
1 Pekerja OH 0.2500 75,000.00 18,750.00
2 Tukang OH 0.1500 100,000.00 15,000.00
3 Kepala tukang OH 0.0150 125,000.00 1,875.00
4 Mandor OH 0.0130 150,000.00 1,950.00
Jumlah Harga Tenaga Kerja 37,575.00
B BAHAN
1 Nok genteng metal m1 1.1000 95,000.00 104,500.00
2 Paku biasa ½”-1” kg 0.0500 35,000.00 1,750.00
Jumlah Harga Bahan 106,250.00
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 143,825.00
E Overhead + Profit (10%) 10% 14,382.50
F Harga Satuan Pekerjaan ( D + E ) 158,207.50

A.4.5.2.42 Pemasangan 1 m2 alumunium foil/sisalation


A TENAGA KERJA
1 Pekerja OH 0.1500 75,000.00 11,250.00
2 Tukang OH 0.0500 100,000.00 5,000.00
3 Kepala tukang OH 0.0050 125,000.00 625.00
4 Mandor OH 0.0080 150,000.00 1,200.00
Jumlah Harga Tenaga Kerja 18,075.00
B BAHAN
1 Aluminium foil m2 1.0500 10,000.00 10,500.00
2 Roofmesh m2 1.0500 12,500.00 13,125.00
3 Glasswool m2 1.0500 17,500.00 18,375.00
Jumlah Harga Bahan 42,000.00
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 60,075.00
E Overhead + Profit (10%) 10% 6,007.50
F Harga Satuan Pekerjaan ( D + E ) 66,082.50

A.4.6.1 HARGA SATUAN PEKERJAAN KAYU


A.4.6.1.1 Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I
A TENAGA KERJA
1 Pekerja OH 7.0000 75,000.00 525,000.00
2 Tukang OH 21.0000 100,000.00 2,100,000.00
3 Kepala tukang OH 2.1000 125,000.00 262,500.00
4 Mandor OH 0.3500 150,000.00 52,500.00
Jumlah Harga Tenaga Kerja 2,940,000.00
Harga Satuan Jumlah
NO URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
a b c d e f = (dxe)
B BAHAN
1 Balok kayu M3 1.1000 9,400,000.00 10,340,000.00
2 Paku 10 cm KG 1.2500 17,000.00 21,250.00
3 Lem kayu KG 1.0000 15,000.00 15,000.00
Jumlah Harga Bahan 10,376,250.00
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 13,316,250.00
E Overhead + Profit (10%) 10% 1,331,625.00
F Harga Satuan Pekerjaan ( D + E ) 14,647,875.00

A.4.6.1.2 Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II / III
A TENAGA KERJA
1 Pekerja OH 6.0000 75,000.00 450,000.00
2 Tukang OH 18.0000 100,000.00 1,800,000.00
3 Kepala tukang OH 1.8000 125,000.00 225,000.00
4 Mandor OH 0.3000 150,000.00 45,000.00
Jumlah Harga Tenaga Kerja 2,520,000.00
B BAHAN
1 Balok kayu M3 1.2000 4,450,000.00 5,340,000.00
2 Paku 10 cm KG 1.2500 17,000.00 21,250.00
3 Lem kayu KG 1.0000 15,000.00 15,000.00
Jumlah Harga Bahan 5,376,250.00
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 7,896,250.00
E Overhead + Profit (10%) 10% 789,625.00
F Harga Satuan Pekerjaan ( D + E ) 8,685,875.00

A.4.6.1.3 Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II


A TENAGA KERJA
1 Pekerja OH 0.3500 75,000.00 26,250.00
2 Tukang OH 1.0500 100,000.00 105,000.00
3 Kepala tukang OH 0.1050 125,000.00 13,125.00
4 Mandor OH 0.0180 150,000.00 2,700.00
Jumlah Harga Tenaga Kerja 147,075.00
B BAHAN
1 Papan kayu M3 0.0400 4,700,000.00 188,000.00
2 Paku 5-7 cm KG 0.0500 17,000.00 850.00
Jumlah Harga Bahan 188,850.00
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 335,925.00
E Overhead + Profit (10%) 10% 33,592.50
Harga Satuan Jumlah
NO URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
a b c d e f = (dxe)
F Harga Satuan Pekerjaan ( D + E ) 369,517.50

A.4.6.1.5 Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II
A TENAGA KERJA
1 Pekerja OH 1.0000 75,000.00 75,000.00
2 Tukang OH 3.0000 100,000.00 300,000.00
3 Kepala tukang OH 0.3000 125,000.00 37,500.00
4 Mandor OH 0.0500 150,000.00 7,500.00
Jumlah Harga Tenaga Kerja 420,000.00
B BAHAN
1 Papan kayu M3 0.0400 4,700,000.00 188,000.00
2 Lem kayu KG 0.5000 15,000.00 7,500.00
Jumlah Harga Bahan 195,500.00
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 615,500.00
E Overhead + Profit (10%) 10% 61,550.00
F Harga Satuan Pekerjaan ( D + E ) 677,050.00

A.4.6.1.6 Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II
A TENAGA KERJA
1 Pekerja OH 0.8000 75,000.00 60,000.00
2 Tukang OH 2.4000 100,000.00 240,000.00
3 Kepala tukang OH 0.2400 125,000.00 30,000.00
4 Mandor OH 0.0400 150,000.00 6,000.00
Jumlah Harga Tenaga Kerja 336,000.00
B BAHAN
1 Papan kayu M3 0.0240 4,700,000.00 112,800.00
2 Lem kayu KG 0.3000 15,000.00 4,500.00
Jumlah Harga Bahan 117,300.00
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 453,300.00
E Overhead + Profit (10%) 10% 45,330.00
F Harga Satuan Pekerjaan ( D + E ) 498,630.00

A.4.6.1.7 Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau II
A TENAGA KERJA
1 Pekerja OH 1.0000 75,000.00 75,000.00
2 Tukang OH 3.0000 100,000.00 300,000.00
3 Kepala tukang OH 0.3000 125,000.00 37,500.00
4 Mandor OH 0.0500 150,000.00 7,500.00
Jumlah Harga Tenaga Kerja 420,000.00
B BAHAN
1 Papan kayu M3 0.0640 4,700,000.00 300,800.00
2 Lem kayu KG 0.5000 15,000.00 7,500.00
Jumlah Harga Bahan 308,300.00
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 728,300.00
E Overhead + Profit (10%) 10% 72,830.00
F Harga Satuan Pekerjaan ( D + E ) 801,130.00
Harga Satuan Jumlah
NO URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
a b c d e f = (dxe)

A.4.6.1.8 Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90 cm)
A TENAGA KERJA
1 Pekerja OH 0.7000 75,000.00 52,500.00
2 Tukang OH 2.1000 100,000.00 210,000.00
3 Kepala tukang OH 0.2100 125,000.00 26,250.00
4 Mandor OH 0.0350 150,000.00 5,250.00
Jumlah Harga Tenaga Kerja 294,000.00
B BAHAN
1 Papan kayu m3 0.0250 4,700,000.00 117,500.00
2 Paku 1 cm – 2,5 cm kg 0.0300 20,000.00 600.00
3 Lem kayu kg 0.5000 15,000.00 7,500.00
4 Plywood tebal 4 mm uk. 90x220 cm lbr 1.0000 90,000.00 90,000.00
Jumlah Harga Bahan 215,600.00
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 509,600.00
E Overhead + Profit (10%) 10% 50,960.00
F Harga Satuan Pekerjaan ( D + E ) 560,560.00

A.4.6.1.13 Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III


A TENAGA KERJA
1 Pekerja OH 4.0000 75,000.00 300,000.00
2 Tukang OH 12.0000 100,000.00 1,200,000.00
3 Kepala tukang OH 1.2000 125,000.00 150,000.00
4 Mandor OH 0.2000 150,000.00 30,000.00
Jumlah Harga Tenaga Kerja 1,680,000.00
B BAHAN
1 Balok kayu m3 1.1000 4,700,000.00 5,170,000.00
2 Besi strip tebal 5mm kg 15.0000 15,000.00 225,000.00
3 Paku 12 cm kg 5.6000 15,000.00 84,000.00
Jumlah Harga Bahan 5,479,000.00
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 7,159,000.00
E Overhead + Profit (10%) 10% 715,900.00
F Harga Satuan Pekerjaan ( D + E ) 7,874,900.00

A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA


A.4.6.2.1 Pemasangan 1 buah kunci tanam antik
A TENAGA KERJA
1 Pekerja OH 0.0600 75,000.00 4,500.00
2 Tukang OH 0.6000 100,000.00 60,000.00
3 Kepala tukang OH 0.0600 125,000.00 7,500.00
4 Mandor OH 0.0030 150,000.00 450.00
Jumlah Harga Tenaga Kerja 72,450.00
B BAHAN
1 Kunci tanam antik bh 1.0000 -
Jumlah Harga Bahan -
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 72,450.00
Harga Satuan Jumlah
NO URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
a b c d e f = (dxe)
E Overhead + Profit (10%) 10% 7,245.00
F Harga Satuan Pekerjaan ( D + E ) 79,695.00

A.4.6.2.2 Pemasangan 1 buah kunci tanam biasa


A TENAGA KERJA
1 Pekerja OH 0.0100 75,000.00 750.00
2 Tukang OH 0.5000 100,000.00 50,000.00
3 Kepala tukang OH 0.0500 125,000.00 6,250.00
4 Mandor OH 0.0050 150,000.00 750.00
Jumlah Harga Tenaga Kerja 57,750.00
B BAHAN
1 Kunci tanam biasa bh 1.0000 -
Jumlah Harga Bahan -
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 57,750.00
E Overhead + Profit (10%) 10% 5,775.00
F Harga Satuan Pekerjaan ( D + E ) 63,525.00

A.4.6.2.4 Pemasangan 1 buah kunci silinder


A TENAGA KERJA
1 Pekerja OH 0.0050 75,000.00 375.00
2 Tukang OH 0.5000 100,000.00 50,000.00
3 Kepala tukang OH 0.0500 125,000.00 6,250.00
4 Mandor OH 0.0030 150,000.00 450.00
Jumlah Harga Tenaga Kerja 57,075.00
B BAHAN
1 Kunci silinder bh 1.0000 -
Jumlah Harga Bahan -
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 57,075.00
E Overhead + Profit (10%) 10% 5,707.50
F Harga Satuan Pekerjaan ( D + E ) 62,782.50

A.4.6.2.5 Pemasangan 1 buah engsel pintu


A TENAGA KERJA
1 Pekerja OH 0.0150 75,000.00 1,125.00
2 Tukang OH 0.1500 100,000.00 15,000.00
3 Kepala tukang OH 0.0150 125,000.00 1,875.00
4 Mandor OH 0.0008 150,000.00 120.00
Jumlah Harga Tenaga Kerja 18,120.00
B BAHAN
1 Engsel pintu bh 1.0000 -
Jumlah Harga Bahan -
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 18,120.00
E Overhead + Profit (10%) 10% 1,812.00
F Harga Satuan Pekerjaan ( D + E ) 19,932.00

A.4.6.2.6 Pemasangan 1 buah engsel jendela kupu-kupu


Harga Satuan Jumlah
NO URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
a b c d e f = (dxe)
A TENAGA KERJA
1 Pekerja OH 0.0100 75,000.00 750.00
2 Tukang OH 0.1000 100,000.00 10,000.00
3 Kepala tukang OH 0.0100 125,000.00 1,250.00
4 Mandor OH 0.0005 150,000.00 75.00
Jumlah Harga Tenaga Kerja 12,075.00
B BAHAN
1 Engsel jendela kupu-kupu bh 1.0000 -
Jumlah Harga Bahan -
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 12,075.00
E Overhead + Profit (10%) 10% 1,207.50
F Harga Satuan Pekerjaan ( D + E ) 13,282.50

A.4.6.2.7 Pemasangan 1 buah engsel angin


A TENAGA KERJA
1 Pekerja OH 0.1000 75,000.00 7,500.00
2 Tukang OH 0.2000 100,000.00 20,000.00
3 Kepala tukang OH 0.0200 125,000.00 2,500.00
4 Mandor OH 0.0005 150,000.00 75.00
Jumlah Harga Tenaga Kerja 30,075.00
B BAHAN
1 Engsel angin bh 1.0000 -
Jumlah Harga Bahan -
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 30,075.00
E Overhead + Profit (10%) 10% 3,007.50
F Harga Satuan Pekerjaan ( D + E ) 33,082.50

A.4.6.2.8 Pemasangan 1 buah spring knip


A TENAGA KERJA
1 Pekerja OH 0.0150 75,000.00 1,125.00
2 Tukang OH 0.1500 100,000.00 15,000.00
3 Kepala tukang OH 0.0150 125,000.00 1,875.00
4 Mandor OH 0.0080 150,000.00 1,200.00
Jumlah Harga Tenaga Kerja 19,200.00
B BAHAN
1 Spring kenip bh 1.0000 -
Jumlah Harga Bahan -
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 19,200.00
E Overhead + Profit (10%) 10% 1,920.00
F Harga Satuan Pekerjaan ( D + E ) 21,120.00

A.4.6.2.17 Pemasangan 1 m2 kaca tebal 5 mm


A TENAGA KERJA
1 Pekerja OH 0.0150 75,000.00 1,125.00
2 Tukang OH 0.1500 100,000.00 15,000.00
3 Kepala tukang OH 0.0150 125,000.00 1,875.00
Harga Satuan Jumlah
NO URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
a b c d e f = (dxe)
4 Mandor OH 0.0008 150,000.00 120.00
Jumlah Harga Tenaga Kerja 18,120.00
B BAHAN
1 Kaca polos 5 mm m2 1.1000 105,000.00 115,500.00
Jumlah Harga Bahan 115,500.00
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 133,620.00
E Overhead + Profit (10%) 10% 13,362.00
F Harga Satuan Pekerjaan ( D + E ) 146,982.00

A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN


A.4.7.1.4 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
A TENAGA KERJA
1 Pekerja OH 0.0700 75,000.00 5,250.00
2 Tukang OH 0.0090 100,000.00 900.00
3 Kepala tukang OH 0.0060 125,000.00 750.00
4 Mandor OH 0.0030 150,000.00 450.00
Jumlah Harga Tenaga Kerja 7,350.00
B BAHAN
1 Cat menie kg 0.2000 20,000.00 4,000.00
2 Plamuur kg 0.1500 25,000.00 3,750.00
3 Cat dasar kg 0.1700 49,500.00 8,415.00
4 Cat penutup kg 0.2600 49,500.00 12,870.00
5 Kuas bh 0.0100 12,000.00 120.00
6 Pengencer kg 0.0300 20,000.00 600.00
7 Ampelas lbr 0.2000 3,000.00 600.00
Jumlah Harga Bahan 30,355.00
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 37,705.00
E Overhead + Profit (10%) 10% 3,770.50
F Harga Satuan Pekerjaan ( D + E ) 41,475.50

A.4.7.1.5 Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup)
A TENAGA KERJA
1 Pekerja OH 0.0700 75,000.00 5,250.00
2 Tukang OH 0.1050 100,000.00 10,500.00
3 Kepala tukang OH 0.0040 125,000.00 500.00
4 Mandor OH 0.0030 150,000.00 450.00
Jumlah Harga Tenaga Kerja 16,700.00
B BAHAN
1 Cat menie kg 0.2000 20,000.00 4,000.00
2 Plamuur kg 0.1500 25,000.00 3,750.00
3 Cat dasar kg 0.1700 49,500.00 8,415.00
4 Cat penutup kg 0.3500 49,500.00 17,325.00
5 Kuas bh 0.0100 12,000.00 120.00
6 Pengencer kg 0.0300 20,000.00 600.00
7 Ampelas lbr 0.2000 3,000.00 600.00
Jumlah Harga Bahan 34,810.00
C PERALATAN
Harga Satuan Jumlah
NO URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
a b c d e f = (dxe)

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 51,510.00
E Overhead + Profit (10%) 10% 5,151.00
F Harga Satuan Pekerjaan ( D + E ) 56,661.00

A.4.7.1.7 Pelaburan 1 m2 bidang kayu dengan politur


A TENAGA KERJA
1 Pekerja OH 0.0400 75,000.00 3,000.00
2 Tukang OH 0.0600 100,000.00 6,000.00
3 Kepala tukang OH 0.0160 125,000.00 2,000.00
4 Mandor OH 0.0030 150,000.00 450.00
Jumlah Harga Tenaga Kerja 11,450.00
B BAHAN
1 Politur ltr 0.1500 125,000.00 18,750.00
2 Politur jadi ltr 0.3720 125,000.00 46,500.00
3 Ampelas lbr 2.0000 3,000.00 6,000.00
Jumlah Harga Bahan 71,250.00
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 82,700.00
E Overhead + Profit (10%) 10% 8,270.00
F Harga Satuan Pekerjaan ( D + E ) 90,970.00

A.4.7.1.10 Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup), Interior
A TENAGA KERJA
1 Pekerja OH 0.0200 75,000.00 1,500.00
2 Tukang OH 0.0630 100,000.00 6,300.00
3 Kepala tukang OH 0.0063 125,000.00 787.50
4 Mandor OH 0.0030 150,000.00 450.00
Jumlah Harga Tenaga Kerja 9,037.50
B BAHAN
1 Plamuur kg 0.1000 15,000.00 1,500.00
2 Cat dasar kg 0.1000 50,000.00 5,000.00
3 Cat penutup kg 0.2600 50,000.00 13,000.00
Jumlah Harga Bahan 19,500.00
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 28,537.50
E Overhead + Profit (10%) 10% 2,853.75
F Harga Satuan Pekerjaan ( D + E ) 31,391.25

A.4.7.1.10 Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup), Exterior
A TENAGA KERJA
1 Pekerja OH 0.0200 75,000.00 1,500.00
2 Tukang OH 0.0630 100,000.00 6,300.00
3 Kepala tukang OH 0.0063 125,000.00 787.50
4 Mandor OH 0.0030 150,000.00 450.00
Jumlah Harga Tenaga Kerja 9,037.50
B BAHAN
1 Plamuur kg 0.1000 15,000.00 1,500.00
2 Cat dasar kg 0.1000 120,000.00 12,000.00
3 Cat penutup kg 0.2600 120,000.00 31,200.00
Harga Satuan Jumlah
NO URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
a b c d e f = (dxe)
Jumlah Harga Bahan 44,700.00
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 53,737.50
E Overhead + Profit (10%) 10% 5,373.75
F Harga Satuan Pekerjaan ( D + E ) 59,111.25

A.4.7.1.11 Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup)
A TENAGA KERJA
1 Pekerja OH 0.0280 75,000.00 2,100.00
2 Tukang OH 0.0420 100,000.00 4,200.00
3 Kepala tukang OH 0.0042 125,000.00 525.00
4 Mandor OH 0.0030 150,000.00 450.00
Jumlah Harga Tenaga Kerja 7,275.00
B BAHAN
1 Cat dasar kg 0.1200 15,000.00 1,800.00
2 Cat penutup kg 0.1800 50,000.00 9,000.00
Jumlah Harga Bahan 10,800.00
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 18,075.00
E Overhead + Profit (10%) 10% 1,807.50
F Harga Satuan Pekerjaan ( D + E ) 19,882.50

A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


A.5.1.1.1 Pemasangan 1 buah closet duduk/monoblock
A TENAGA KERJA
1 Pekerja OH 3.3000 75,000.00 247,500.00
2 Tukang OH 1.1000 100,000.00 110,000.00
3 Kepala tukang OH 0.0100 125,000.00 1,250.00
4 Mandor OH 0.1600 150,000.00 24,000.00
Jumlah Harga Tenaga Kerja 382,750.00
B BAHAN
1 Closet duduk unit 1.0000 3,280,000.00 3,280,000.00
Jumlah Harga Bahan 3,280,000.00
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 3,662,750.00
E Overhead + Profit (10%) 10% 366,275.00
F Harga Satuan Pekerjaan ( D + E ) 4,029,025.00

A.5.1.1.2 Pemasangan 1 buah closet jongkok porslen


A TENAGA KERJA
1 Pekerja OH 1.0000 75,000.00 75,000.00
2 Tukang OH 1.5000 100,000.00 150,000.00
3 Kepala tukang OH 0.1500 125,000.00 18,750.00
4 Mandor OH 0.1600 150,000.00 24,000.00
Jumlah Harga Tenaga Kerja 267,750.00
B BAHAN
1 Closet jongkok unit 1.0000 -
2 Semen Portland kg 6.0000 -
3 Pasir pasang m3 0.0100 -
Harga Satuan Jumlah
NO URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
a b c d e f = (dxe)
Jumlah Harga Bahan -
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 267,750.00
E Overhead + Profit (10%) 10% 26,775.00
F Harga Satuan Pekerjaan ( D + E ) 294,525.00

A.5.1.1.4 Pemasangan 1 buah urinoir


A TENAGA KERJA
1 Pekerja OH 1.0000 111,000.00 111,000.00
2 Tukang OH 1.0000 139,000.00 139,000.00
3 Kepala tukang OH 0.1000 166,000.00 16,600.00
4 Mandor OH 0.0500 194,000.00 9,700.00
Jumlah Harga Tenaga Kerja 276,300.00
B BAHAN
1 Urinoir unit 1.0000 2,750,000.00 2,750,000.00
2 Semen Portland kg 6.0000 1,500.00 9,000.00
3 Pasir pasang m3 0.0100 210,000.00 2,100.00
Jumlah Harga Bahan 2,761,100.00
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 3,037,400.00
E Overhead + Profit (10%) 10% 303,740.00
F Harga Satuan Pekerjaan ( D + E ) 3,341,140.00

A.5.1.1.5 Pemasangan 1 buah wastafel


A TENAGA KERJA
1 Pekerja OH 1.2000 75,000.00 90,000.00
2 Tukang OH 1.4500 100,000.00 145,000.00
3 Kepala tukang OH 0.1500 125,000.00 18,750.00
4 Mandor OH 0.0600 150,000.00 9,000.00
Jumlah Harga Tenaga Kerja 262,750.00
B BAHAN
1 Wastafel unit 1.0000 1,750,000.00 1,750,000.00
2 Semen Portland kg 6.0000 1,500.00 9,000.00
3 Pasir pasang m3 0.0100 210,000.00 2,100.00
Jumlah Harga Bahan 1,761,100.00
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 2,023,850.00
E Overhead + Profit (10%) 10% 202,385.00
F Harga Satuan Pekerjaan ( D + E ) 2,226,235.00

A.5.1.1.12 Pemasangan 1 buah bak cuci piring stainlessteel


A TENAGA KERJA
1 Pekerja OH 0.0300 75,000.00 2,250.00
2 Tukang OH 0.3000 100,000.00 30,000.00
3 Kepala tukang OH 0.0300 125,000.00 3,750.00
4 Mandor OH 0.0150 150,000.00 2,250.00
Jumlah Harga Tenaga Kerja 38,250.00
Harga Satuan Jumlah
NO URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
a b c d e f = (dxe)
B BAHAN
1 Bak cuci piring unit 1.0000 -
2 Waterdrain bh 1.0000 -
Jumlah Harga Bahan -
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 38,250.00
E Overhead + Profit (10%) 10% 3,825.00
F Harga Satuan Pekerjaan ( D + E ) 42,075.00

A.5.1.1.14 Pemasangan 1 buah floor drain


A TENAGA KERJA
1 Pekerja OH 0.0100 75,000.00 750.00
2 Tukang OH 0.1000 100,000.00 10,000.00
3 Kepala tukang OH 0.0100 125,000.00 1,250.00
4 Mandor OH 0.0050 150,000.00 750.00
Jumlah Harga Tenaga Kerja 12,750.00
B BAHAN
1 Floor drain unit 1.0000 404,000.00 404,000.00
Jumlah Harga Bahan 404,000.00
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 416,750.00
E Overhead + Profit (10%) 10% 41,675.00
F Harga Satuan Pekerjaan ( D + E ) 458,425.00

A.5.1.1.14 Pemasangan 1 buah Jet Washer


A TENAGA KERJA
1 Pekerja OH 0.0100 75,000.00 750.00
2 Tukang OH 0.1000 100,000.00 10,000.00
3 Kepala tukang OH 0.0100 125,000.00 1,250.00
4 Mandor OH 0.0050 150,000.00 750.00
Jumlah Harga Tenaga Kerja 12,750.00
B BAHAN
1 Jet washer bh 1.0000 397,000.00 397,000.00
Jumlah Harga Bahan 397,000.00
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 409,750.00
E Overhead + Profit (10%) 10% 40,975.00
F Harga Satuan Pekerjaan ( D + E ) 450,725.00

A.5.1.1.14 Pemasangan 1 buah Kran dinding


A TENAGA KERJA
1 Pekerja OH 0.0100 75,000.00 750.00
2 Tukang OH 0.1000 100,000.00 10,000.00
3 Kepala tukang OH 0.0100 125,000.00 1,250.00
4 Mandor OH 0.0050 150,000.00 750.00
Jumlah Harga Tenaga Kerja 12,750.00
B BAHAN
1 Kran dinding bh 1.0000 289,000.00 289,000.00
Jumlah Harga Bahan 289,000.00
Harga Satuan Jumlah
NO URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
a b c d e f = (dxe)
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 301,750.00
E Overhead + Profit (10%) 10% 30,175.00
F Harga Satuan Pekerjaan ( D + E ) 331,925.00

A.5.1.1.14 Pemasangan 1 buah Penyekat Urinoir


A TENAGA KERJA
1 Pekerja OH 0.0100 75,000.00 750.00
2 Tukang OH 0.1000 100,000.00 10,000.00
3 Kepala tukang OH 0.0100 125,000.00 1,250.00
4 Mandor OH 0.0050 150,000.00 750.00
Jumlah Harga Tenaga Kerja 12,750.00
B BAHAN
1 Penyekat Urinoir bh 1.0000 1,195,000.00 1,195,000.00
Jumlah Harga Bahan 1,195,000.00
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 1,207,750.00
E Overhead + Profit (10%) 10% 120,775.00
F Harga Satuan Pekerjaan ( D + E ) 1,328,525.00
A.5.1.1.14 Memasang 1m' saluran keliling uk. Lebar 40 cm tinggi 40 cm
A TENAGA KERJA
1 Pekerja OH 0.3000 75,000.00 22,500.00
2 Tukang OH 0.1000 100,000.00 10,000.00
3 Kepala tukang OH 0.0100 125,000.00 1,250.00
4 Mandor OH 0.0150 150,000.00 2,250.00
Jumlah Harga Tenaga Kerja 36,000.00
B BAHAN
1 Galian Tanah m2 0.300 57,458.50 17,237.55
2 Pas. Bata m2 1.000 224,400.00 224,400.00
3 Plesteran + Acian m2 1.000 1,645,809.00 1,645,809.00
4 Gravel U-30 cm m' 1.000 55,000.00 55,000.00

Jumlah Harga Bahan 1,942,446.55


C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 1,978,446.55
E Overhead + Profit (10%) 10% 197,844.66
F Harga Satuan Pekerjaan ( D + E ) 2,176,291.21

2 Pemasangan 1 M' Grill Besi lebar 20cm


A TENAGA KERJA
1 Pekerja OH 0.2500 75,000.00 18,750.00
2 Tukang OH 0.2500 100,000.00 25,000.00
3 Kepala tukang OH 0.0250 125,000.00 3,125.00
4 Mandor OH 0.0250 150,000.00 3,750.00
Jumlah Harga Tenaga Kerja 50,625.00
Harga Satuan Jumlah
NO URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
a b c d e f = (dxe)
B BAHAN
1 Besi siku 40.40.4 kg 4.8400 12,500.00 60,500.00
2 Plat strip 25.3 kg 4.7400 12,500.00 59,250.00
3 Assesories (kawat las, baut dll) ls 1.0000 11,975.00 11,975.00
Jumlah Harga Bahan 131,725.00
C PERALATAN
1 Alat las, dll ls 1.0000 10,000.00 10,000.00
Jumlah Harga Peralatan 10,000.00
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 192,350.00
E Overhead + Profit (10%) 10% 19,235.00
F Harga Satuan Pekerjaan ( D + E ) 211,585.00

#REF! Memasang 1 bh kran westafel diameter ¾" atau ½"


A TENAGA KERJA
1 Pekerja OH 0.010 75,000.00 750.00
2 Tukang OH 0.100 100,000.00 10,000.00
3 Kepala tukang OH 0.010 125,000.00 1,250.00
4 Mandor OH 0.005 150,000.00 750.00
Jumlah Harga Tenaga Kerja 12,750.00
B BAHAN
1 Kran air bh 1.000 775,000.00 775,000.00
2 Seal tape bh 0.025 10,000.00 250.00
Jumlah Harga Bahan 775,250.00
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 788,000.00
E Overhead + Profit (10%) 10% 78,800.00
F Harga Satuan Pekerjaan ( D + E ) 866,800.00

#REF! Pemasangan 1 M' Kusen Plat Besi


A TENAGA KERJA
1 Pekerja OH 0.4200 75,000.00 31,500.00
2 Tukang OH 0.4200 100,000.00 42,000.00
3 Kepala tukang OH 0.0420 125,000.00 5,250.00
4 Mandor OH 0.0208 150,000.00 3,120.00
Jumlah Harga Tenaga Kerja 81,870.00
B BAHAN
1 Besi plat baja Kg 14.0000 15,000.00 210,000.00
2 Kawat las Kg 0.0500 40,000.00 2,000.00
Jumlah Harga Bahan 212,000.00
C PERALATAN
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 293,870.00
E Overhead + Profit (10%) 10% 29,387.00
F Harga Satuan Pekerjaan ( D + E ) 323,257.00

1 Pemasangan 1 m2 Pintu Besi Plat Baja Tebal 2 mm Rangkap, Rangka Besi Siku
Harga Satuan Jumlah
NO URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
a b c d e f = (dxe)
A TENAGA KERJA
1 Pekerja OH 1.0500 75,000.00 78,750.00
2 Tukang OH 1.0500 100,000.00 105,000.00
3 Kepala tukang OH 0.1050 125,000.00 13,125.00
4 Mandor OH 0.0520 150,000.00 7,800.00
Jumlah Harga Tenaga Kerja 204,675.00
B BAHAN
1 Besi siku L 30.30.3 Kg 15.0000 12,500.00 187,500.00
2 Besi plat baja Kg 32.8000 15,000.00 492,000.00
3 Kawat las Kg 0.0500 40,000.00 2,000.00
Jumlah Harga Bahan 681,500.00
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 886,175.00
E Overhead + Profit (10%) 10% 88,617.50
F Harga Satuan Pekerjaan ( D + E ) 974,792.50

2 Pemasangan 1 Pasang Lever Handle (Pintu Besi)


A TENAGA KERJA
1 Pekerja OH 0.0100 75,000.00 750.00
2 Tukang OH 0.5000 100,000.00 50,000.00
3 Kepala tukang OH 0.0500 125,000.00 6,250.00
4 Mandor OH 0.0050 150,000.00 750.00
Jumlah Harga Tenaga Kerja 57,750.00
B BAHAN
1 Lever Handle (pintu besi) bh 1.0000 350,000.00 350,000.00
Jumlah Harga Bahan 350,000.00
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 407,750.00
E Overhead + Profit (10%) 10% 40,775.00
F Harga Satuan Pekerjaan ( D + E ) 448,525.00

3 Pemasangan 1 buah Mortise + Cylinder Lock


A TENAGA KERJA
1 Pekerja OH 0.0100 75,000.00 750.00
2 Tukang OH 0.5000 100,000.00 50,000.00
3 Kepala tukang OH 0.0500 125,000.00 6,250.00
4 Mandor OH 0.0050 150,000.00 750.00
Jumlah Harga Tenaga Kerja 57,750.00
B BAHAN
1 Mortise + Cylinder Lock bh 1.0000 150,000.00 150,000.00
Jumlah Harga Bahan 150,000.00
C PERALATAN

Jumlah Harga Peralatan -


Harga Satuan Jumlah
NO URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
a b c d e f = (dxe)
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 207,750.00
E Overhead + Profit (10%) 10% 20,775.00
F Harga Satuan Pekerjaan ( D + E ) 228,525.00

4 Pemasangan 1m rel pintu atas (Pintu Besi)


A TENAGA KERJA
1 Pekerja OH 0.0050 75,000.00 375.00
2 Tukang OH 0.5000 100,000.00 50,000.00
3 Kepala tukang OH 0.0500 125,000.00 6,250.00
4 Mandor OH 0.0030 150,000.00 450.00
Jumlah Harga Tenaga Kerja 57,075.00
B BAHAN
1 Rel atas m 1.0000 950,000.00 950,000.00
Jumlah Harga Bahan 950,000.00
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 1,007,075.00
E Overhead + Profit (10%) 10% 100,707.50
F Harga Satuan Pekerjaan ( D + E ) 1,107,782.50

5 Pemasangan 1m rel pintu bawah (Pintu Besi)


A TENAGA KERJA
1 Pekerja OH 0.0050 75,000.00 375.00
2 Tukang OH 0.5000 100,000.00 50,000.00
3 Kepala tukang OH 0.0500 125,000.00 6,250.00
4 Mandor OH 0.0030 150,000.00 450.00
Jumlah Harga Tenaga Kerja 57,075.00
B BAHAN
1 Rel atas m 1.0000 450,000.00 450,000.00
Jumlah Harga Bahan 450,000.00
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 507,075.00
E Overhead + Profit (10%) 10% 50,707.50
F Harga Satuan Pekerjaan ( D + E ) 557,782.50

1 Pemasangan 1 M' Kusen Aluminium


A TENAGA KERJA
1 Pekerja OH 0.0430 75,000.00 3,225.00
2 Tukang OH 0.0430 100,000.00 4,300.00
3 Kepala tukang OH 0.0043 125,000.00 537.50
4 Mandor OH 0.0021 150,000.00 315.00
Jumlah Harga Tenaga Kerja 8,377.50
B BAHAN
1 Profil alluminium 4" M' 1.1000 150,000.00 165,000.00
2 Skrup fixer Bh 2.0000 5,000.00 10,000.00
Harga Satuan Jumlah
NO URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
a b c d e f = (dxe)
3 Sealant Tube 0.0600 80,000.00 4,800.00
Jumlah Harga Bahan 179,800.00
C PERALATAN
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 188,177.50
E Overhead + Profit (10%) 10% 18,817.75
F Harga Satuan Pekerjaan ( D + E ) 206,995.25
2 Pemasangan 1 Pasang Lever Handle (Pintu Kayu / Pintu Aluminium)
A TENAGA KERJA
1 Pekerja OH 0.0100 75,000.00 750.00
2 Tukang OH 0.5000 100,000.00 50,000.00
3 Kepala tukang OH 0.0500 125,000.00 6,250.00
4 Mandor OH 0.0050 150,000.00 750.00
Jumlah Harga Tenaga Kerja 57,750.00
B BAHAN
1 Lever Handle bh 1.0000 150,000.00 150,000.00
Jumlah Harga Bahan 150,000.00
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 207,750.00
E Overhead + Profit (10%) 10% 20,775.00
F Harga Satuan Pekerjaan ( D + E ) 228,525.00

3 Pemasangan 1 buah engsel pintu kupu-kupu 4"


A TENAGA KERJA
1 Pekerja OH 0.0150 75,000.00 1,125.00
2 Tukang OH 0.1500 100,000.00 15,000.00
3 Kepala tukang OH 0.0150 125,000.00 1,875.00
4 Mandor OH 0.0008 150,000.00 120.00
Jumlah Harga Tenaga Kerja 18,120.00
B BAHAN
1 Engsel pintu bh 1.0000 20,000.00 20,000.00
Jumlah Harga Bahan 20,000.00
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 38,120.00
E Overhead + Profit (10%) 10% 3,812.00
F Harga Satuan Pekerjaan ( D + E ) 41,932.00

4 1 M² Pasang grill wiremesh


A TENAGA KERJA
1 Pekerja OH 0.200 75,000.00 15,000.00
2 Tukang OH 0.400 100,000.00 40,000.00
3 Kepala tukang OH 0.040 125,000.00 5,000.00
4 Mandor OH 0.0020 150,000.00 300.00
Jumlah Harga Tenaga Kerja 60,300.00
Harga Satuan Jumlah
NO URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
a b c d e f = (dxe)
B BAHAN
1 wire mesh m8 m2 1.1000 75,000.00 82,500.00
2 Besi Siku 30.30.3 kg 10.8800 12,500.00 136,000.00
3 Skrup bh 8.0000 5,000.00 40,000.00

Jumlah Harga Bahan 82,500.00


C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 142,800.00
E Overhead + Profit (10%) 10% 14,280.00
F Harga Satuan Pekerjaan ( D + E ) 157,080.00

3 Pemasangan 1 m2 kaca tebal 5 mm


A TENAGA KERJA
1 Pekerja OH 0.0150 75,000.00 1,125.00
2 Tukang OH 0.1500 100,000.00 15,000.00
3 Kepala tukang OH 0.0150 125,000.00 1,875.00
4 Mandor OH 0.0008 150,000.00 120.00
Jumlah Harga Tenaga Kerja 18,120.00
B BAHAN
1 Kaca polos 5 mm m2 1.1000 105,000.00 115,500.00
2 Sealant/karet kaca m' 4.0000 6,000.00 24,000.00
Jumlah Harga Bahan 139,500.00
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 157,620.00
E Overhead + Profit (10%) 10% 15,762.00
F Harga Satuan Pekerjaan ( D + E ) 173,382.00

A.4.1.1.4 Membuat 1 m3 lantai kerja beton 1:2:3


A TENAGA KERJA
1 Pekerja OH 1.6500 75,000.00 123,750.00
2 Tukang batu OH 0.2500 100,000.00 25,000.00
3 Kepala tukang OH 0.0250 125,000.00 3,125.00
4 Mandor OH 0.0800 150,000.00 12,000.00
Jumlah Harga Tenaga Kerja 163,875.00
B BAHAN
1 Semen portland kg 232.0000 1,500.00 348,000.00
2 Pasir beton m3 0.5200 220,000.00 114,400.00
3 Kerikil max. 30 m m3 0.7800 230,000.00 179,400.00
4 Air lt 200.0000 100.00 20,000.00
Jumlah Harga Bahan 661,800.00
C PERALATAN

Jumlah Harga Peralatan


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 825,675.00
E Overhead + Profit (10%) 10% 82,567.50
F Harga Satuan Pekerjaan ( D + E ) 908,242.50
Harga Satuan Jumlah
NO URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
a b c d e f = (dxe)
5 Pemadatan tanah 1 m3 tanah ( per 20 cm)
A TENAGA KERJA
1 Pekerja OH 0.5000 75,000.00 37,500.00
2 Mandor OH 0.0500 150,000.00 7,500.00
Jumlah Harga Tenaga Kerja 45,000.00
B BAHAN

Jumlah Harga Bahan -


C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 45,000.00
E Overhead + Profit (10%) 10% 4,500.00
F Harga Satuan Pekerjaan ( D + E ) 49,500.00

6 Pemasangan 1 m2 jaring kawat baja (wiremesh)


A TENAGA KERJA
1 Pekerja OH 0.0250 75,000.00 1,875.00
2 Tukang besi OH 0.0250 100,000.00 2,500.00
3 Kepala tukang OH 0.0250 125,000.00 3,125.00
4 Mandor OH 0.0010 150,000.00 150.00
Jumlah Harga Tenaga Kerja 7,650.00
B BAHAN
1 Wiremesh M10 kg 1.1000 85,000.00 93,500.00
2 Kawat beton kg 0.0500 25,000.00 1,250.00
Jumlah Harga Bahan 94,750.00
C PERALATAN

Jumlah Harga Peralatan


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 102,400.00
E Overhead + Profit (10%) 10% 10,240.00
F Harga Satuan Pekerjaan ( D + E ) 112,640.00

3 Pengurugan 1 m3 sirtu padat


A TENAGA KERJA
1 Pekerja OH 0.2500 75,000.00 18,750.00
2 Mandor OH 0.0250 150,000.00 3,750.00
Jumlah Harga Tenaga Kerja 22,500.00
B BAHAN
1 Sirtu m3 1.2000 165,000.00 198,000.00
Jumlah Harga Bahan 198,000.00
C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 220,500.00
E Overhead + Profit (10%) 10% 22,050.00
F Harga Satuan Pekerjaan ( D + E ) 242,550.00
Harga Satuan Jumlah
NO URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
a b c d e f = (dxe)
4 1m' Joint Sealant
A TENAGA KERJA
1 Pekerja OH 0.0200 75,000.00 1,500.00
2 Mandor OH 0.0100 150,000.00 1,500.00
Jumlah Harga Tenaga Kerja 3,000.00
B BAHAN
1 Joint Sealant kg 0.1375 5,000.00 687.50

Jumlah Harga Bahan 687.50


C PERALATAN
1 concrete cutter jam 0.0456 62,500.00 2,850.00
2 Air Compesor jam 0.0200 62,500.00 1,250.00
3 Alat Bantu % 5.0000 389.38 389.38

Jumlah Harga Peralatan 4,489.38


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 8,176.88
E Overhead + Profit (10%) 10% 817.69
F Harga Satuan Pekerjaan ( D + E ) 8,994.56

1 1m' Water stop PVC lebar 320mm


A TENAGA KERJA
1 Pekerja OH 0.0800 75,000.00 6,000.00
2 Tukang besi OH 0.0400 100,000.00 4,000.00
3 Kepala tukang OH 0.0040 125,000.00 500.00
4 Mandor OH 0.0040 150,000.00 600.00
Jumlah Harga Tenaga Kerja 11,100.00
B BAHAN
1 Water Stop PVC lebar 320mm m 1.0500 116,000.00 121,800.00

Jumlah Harga Bahan 121,800.00


C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 132,900.00
E Overhead + Profit (10%) 10% 13,290.00
F Harga Satuan Pekerjaan ( D + E ) 146,190.00

A. ANALISA PEKERJAAN PERSIAPAN


1 1 Bulan Pelaporan dan Dokumentasi
A. BAHAN :
Sewa Alat / Kamera 2.0000 unit 150,000.00 300,000.00
Cuci cetak 90.0000 bh 2,000.00 180,000.00
Kertas A4 2.0000 rim 40,000.00 80,000.00
Sewa Komputer 2.0000 unit 450,000.00 900,000.00
Sewa Printer A3 1.0000 unit 250,000.00 250,000.00
Sewa Printer A4 2.0000 unit 150,000.00 300,000.00
Jumlah Harga Bahan 2,010,000.00
B. TENAGA :
Harga Satuan Jumlah
NO URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
a b c d e f = (dxe)

Jumlah Harga Tenaga Kerja


C PERALATAN

Jumlah Harga Peralatan


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 2,010,000.00
E Overhead + Profit (10%) 10% 201,000.00
F Harga Satuan Pekerjaan ( D + E ) 2,211,000.00

2 1 Set As Built Drawing (1 Set + 2 Copy)


A. BAHAN :
1 Cetak Kertas A3 1.0000 ls 4,500,000.00 4,500,000.00
2 Cetak (poto copy) 2 x 1.0000 ls 4,800,000.00 4,800,000.00
3 Penjilidan 3.0000 buku 100,000.00 300,000.00
Jumlah Harga Bahan 9,600,000.00
B. TENAGA :

Jumlah Harga Tenaga Kerja


C PERALATAN

Jumlah Harga Peralatan


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 9,600,000.00
E Overhead + Profit (10%) 10% 960,000.00
F Harga Satuan Pekerjaan ( D + E ) 10,560,000.00

3 1 Bulan Penyediaan Listrik Kerja


A. BAHAN :
1 Sewa Generator 30.0000 hr 250,000.00 7,500,000.00
2 Bahan bakar solar 182.0000 ltr 13,500.00 2,457,000.00
3 Pengkabelan 30% dari total biaya 1.0000 ls 2,250,000.00 2,250,000.00
Jumlah Harga Bahan 12,207,000.00
B. TENAGA :
1 Operator Listrik 30.0000 hr 152,000.00 4,560,000.00
Jumlah Harga Tenaga Kerja 4,560,000.00
C PERALATAN

Jumlah Harga Peralatan


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 16,767,000.00
E Overhead + Profit (10%) 10% 1,676,700.00
F Harga Satuan Pekerjaan ( D + E ) 18,443,700.00

4 1 Ls Penyediaan Air Kerja


A. BAHAN :
1 Bor Pantek + pemipaan dalam sumur 1.0000 ls 7,500,000.00 7,500,000.00
2 Pemipaan site 50.0000 mtr 27,500.00 1,375,000.00
3 Pompa hisap Grunpos 450 watt 1.0000 ls 3,500,000.00 3,500,000.00
4 Tempat Penampungan air 1.0000 ls 1,500,000.00 1,500,000.00
Jumlah Harga Bahan 13,875,000.00
Harga Satuan Jumlah
NO URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
a b c d e f = (dxe)
B. TENAGA :

Jumlah Harga Tenaga Kerja


C PERALATAN

Jumlah Harga Peralatan


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 13,875,000.00
E Overhead + Profit (10%) 10% 1,387,500.00
F Harga Satuan Pekerjaan ( D + E ) 15,262,500.00

5 Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter


A TENAGA KERJA
1 Pekerja OH 0.4000 75,000.00 30,000.00
2 Tukang Kayu OH 0.2000 100,000.00 20,000.00
3 Kepala Tukang OH 0.0200 125,000.00 2,500.00
4 Mandor OH 0.0200 150,000.00 3,000.00
Jumlah Harga Tenaga Kerja 55,500.00
B BAHAN
1 Dolken kayu 8-10/400 cm btg 1.2500 25,000.00 31,250.00
2 Semen portland kg 5.0000 1,500.00 7,500.00
3 Pasir beton m3 0.0050 220,000.00 1,100.00
4 Koral beton m3 0.0090 230,000.00 2,070.00
5 Kayu 5/7 m3 0.0720 1,705,000.00 122,760.00
6 Paku biasa 2” – 5” kg 0.0600 17,000.00 1,020.00
7 Residu ltr 0.4000 15,000.00 6,000.00
Jumlah Harga Bahan 171,700.00
C PERALATAN

Jumlah Harga Peralatan


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 227,200.00
E Overhead + Profit (10%) 10% 22,720.00
F Harga Satuan Pekerjaan ( D + E ) 249,920.00

6 Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter


A TENAGA KERJA
1 Pekerja OH 0.2000 75,000.00 15,000.00
2 Tukang Kayu OH 0.4000 100,000.00 40,000.00
3 Kepala Tukang OH 0.0200 125,000.00 2,500.00
4 Mandor OH 0.0200 150,000.00 3,000.00
Jumlah Harga Tenaga Kerja 60,500.00
B BAHAN
1 Dolken kayu 8-10/400 cm btg 1.2500 25,000.00 31,250.00
2 Semen portland kg 2.5000 1,500.00 3,750.00
3 Seng gelombang lbr 1.2000 46,000.00 55,200.00
4 Pasir beton m3 0.0050 220,000.00 1,100.00
5 Koral beton m3 0.0090 230,000.00 2,070.00
6 Kayu 5/7 m3 0.0720 1,705,000.00 122,760.00
7 Paku biasa 2” – 5” kg 0.0600 20,000.00 1,200.00
Harga Satuan Jumlah
NO URAIAN SATUAN KOEFISIEN
(Rp.) (Rp.)
a b c d e f = (dxe)
8 Meni besi ltr 0.4500 20,000.00 9,000.00
Jumlah Harga Bahan 226,330.00
C PERALATAN

Jumlah Harga Peralatan


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 286,830.00
E Overhead + Profit (10%) 10% 28,683.00
F Harga Satuan Pekerjaan ( D + E ) 315,513.00

3 1 BUAH DAUN PINTU DOUBLE TEAKWOOD RANGKA KAYU MERANTI


A TENAGA KERJA
1 Pekerja OH 0.0474 75,000.00 3,555.00
2 Tukang OH 2.0000 100,000.00 200,000.00
3 Kepala tukang OH 0.7500 125,000.00 93,750.00
4 Mandor OH 0.1000 150,000.00 15,000.00
Jumlah Harga Tenaga Kerja 312,305.00
B BAHAN
1 Kayu Meranti m3 0.0474 4,650,000.00 220,410.00
2 Teakwood 4 mm lbr 2.0000 90,000.00 180,000.00
3 Lem putih (FOX) kg 0.7500 15,000.00 11,250.00
4 Paku tripleks kg 0.1000 20,000.00 2,000.00

Jumlah Harga Bahan 413,660.00


C PERALATAN

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan & Peralatan ( A + B + C ) 725,965.00
E Overhead + Profit (10%) 10% 72,596.50
F Harga Satuan Pekerjaan ( D + E ) 798,561.50
HITUNGAN
P E K E R JAAN ARSITEKTUR

Pekerjaan : RUSUNAWA
Lokasi : RANCACILI - JAWA BARAT
Tahun Anggaran : 2016

2.2. PEKERJAAN ARSITEKTUR


2.2.A. PEKERJAAN ARSITEKTUR STANDART

NO. J E N I S P E K E R JAAN VOL. SAT.

2.2.A. PEKERJAAN ARSITEKTUR STANDART

A.1. LANTAI DASAR


A.1. PEKERJAAN LANTAI
1 Pasang perataan lantai (screed 1:3, t=3 cm + aci) 1,439.29 m2
2 Pasang keramik 30x30 Polished 920.35 m2
luas total 1,439.29
26.46 5.40
16.50 5.50
260.57 14.20
4.02 1.50
28.80 4.80
538.19 15.97
253.50 19.50
28.80 4.80
258.66 17.13
27.75 3.00
32.32 2.30
12.52 1.90
2.33 1.00
(0.45) 0.60
(7.50) 0.50
(14.33) 2.87
(10.63) 2.50
(6.76) 1.38
(2.00) 1.00
(4.73) 1.35
(4.73) 1.35
3 Pasang keramik 30x30 UNPolished 465.89 m2
7.20 2.40
3.38 2.25
6.75 1.50
9.00 1.50
103.00
62.65
255.92
4.50 1.50
13.50 1.50
4 Pasang keramik toilet 20x20 UNPolished 53.05 m2
type 1 15.00 2.00
type 2 7.50 2.50
type 3 21.00 2.00
type 4 3.60 2.40
type 5 3.75 2.50
type 6 2.20 1.00
5 Waterproofing coating 71.38 m2
type 1 20.25 2.00
type 2 9.90 2.50
type 3 28.35 2.00
type 4 4.77 2.40
type 5 4.95 2.50
type 6 3.16 1.00
1 Pasang keramik teras 30x30 UNPolished 190.97 m2
13.78
5.49
52.04
49.70
24.98
24.56
15.93
2.35
2.14

1 Pasangan keramik tangga 36.64 m2


bordes 4.79 1.45
anak tangga 13.54 0.17
2 tangga teras 47.72 m2
tangga 1 1.35
tangga 2 2.03
tangga 3 5.20
tangga 4 4.05
tangga 5 16.20
tangga 6 18.90
3 ramp 15.18 m2
4 Stair nossing 60.00 m'
5 Stair nossing ramp 35.88 m1

A.2. PEKERJAAN DINDING


1 Dinding bata bagian luar 631.07 m2
754.42 3.35
pengurangan (123.35)
type 1 (12.80)
RO 900x160 (7.20) 0.90
Jendela J1 800x1000+800x400 (4.00) 0.80
(1.60) 0.80
type 2 (5.12)
RO 900x160 (2.88) 0.90
Jendela J1 800x1000+800x400 (1.60) 0.80
(0.64) 0.80
type 3 (25.76)
RO 900x160 (10.08) 0.90
Jendela J1 800x1000+800x400 (11.20) 0.80
(4.48) 0.80
type 4 (4.00)
RO 900x160 (1.44) 0.90
Jendela J1 800x1000+800x400 (1.60) 0.80
(0.64) 0.80
Bovenlight BV 800x400 (0.32) 0.80
type 5 (3.68)
RO 900x160 (1.44) 0.90
Jendela J1 800x1000+800x400 (1.60) 0.80
(0.64) 0.80
type 6 (4.80)
RO 900x160 (1.44) 0.90
Jendela J1 800x1000+800x400 (2.40) 0.80
(0.96) 0.80
lain2 (67.19)
P5 1000x2500 (5.00) 1.00
P5a 1000x2150 - 1.00
P6 1800x2500 (9.00) 1.80
P7 1800x2500 (4.50) 1.80
P7a 1800x2150 (11.61) 1.80
P8 900x2500 (2.25) 0.90
PR 1800x2150 (34.83) 1.80
2 Dinding bata bagian dalam 1,887.41 m2
type 1 410.25 3.00
type 2 183.90 3.00
type 3 767.55 3.00
type 4 98.70 3.00
type 5 101.55 3.00
type 6 81.30 3.00
lain2 440.55 3.00
pengurangan (196.39)
type 1 (47.15)
P1 900x2500 (11.25) 0.90
P2 900x2500+800x400 (11.25) 0.90
(1.60) 0.80
P3 900x2500+600x400+600x1200 (11.25) 0.90
(1.20) 0.60
(3.60) 0.60
P4 700x2000 (7.00) 0.70
type 2 (18.86)
P1 900x2500 (4.50) 0.90
P2 900x2500+800x400 (4.50) 0.90
(0.64) 0.80
P3 900x2500+600x400+600x1200 (4.50) 0.90
(0.48) 0.60
(1.44) 0.60
P4 700x2000 (2.80) 0.70
type 3 (66.01)
P1 900x2500 (15.75) 0.90
P2 900x2500+800x400 (15.75) 0.90
(2.24) 0.80
P3 900x2500+600x400+600x1200 (15.75) 0.90
(1.68) 0.60
(5.04) 0.60
P4 700x2000 (9.80) 0.70
type 4 (10.28)
P1 900x2500 (4.50) 0.90
P2 900x2500+800x400 (2.25) 0.90
(0.32) 0.80
P3 900x2500+600x400+600x1200 (2.25) 0.90
(0.24) 0.60
(0.72) 0.60
P4 700x2000 - 0.70
type 5 (10.28)
P1 900x2500 (4.50) 0.90
P2 900x2500+800x400 (2.25) 0.90
(0.32) 0.80
P3 900x2500+600x400+600x1200 (2.25) 0.90
(0.24) 0.60
(0.72) 0.60
P4 700x2000 - 0.70
type 6 (9.43)
P1 900x2500 (2.25) 0.90
P2 900x2500+800x400 (2.25) 0.90
(0.32) 0.80
P3 900x2500+600x400+600x1200 (2.25) 0.90
(0.24) 0.60
(0.72) 0.60
P4 700x2000 (1.40) 0.70
lain2 (34.38)
P5 1000x2500 (7.50) 1.00
P5a 1000x2150 (6.45) 1.00
P6 1800x2500 (4.50) 1.80
P7 1800x2500 (4.50) 1.80
P7a 1800x2150 - 1.80
P8 900x2500 (2.25) 0.90
PR 1800x2150 - 1.80
PS 600x900 (9.18) 0.60
3 kolom praktis Dinding bata bagian luar 0.10 0.10
4 kolom praktis Dinding bata bagian dalam 0.10 0.10

1 Plesteran dan acian tangga 29.47 m2


plat tangga bawah 4.76 3.97
plat tangga atas 3.96 3.30
Bordes 4.79 1.45
anak tangga 1.22 0.03

A.2.A. PEKERJAAN PASANGAN DAN PLESTERAN


1 Plesteran dan acian 4,744.67 m2
2 Pasangan dinding keramik 20x25 182.00 m2
type 1 57.75 1.65
type 2 26.40 1.65
type 3 80.85 1.65
type 4 12.87 1.65
type 5 13.20 1.65
type 6 10.56 1.65
lain2 -
pengurangan (19.64)
P4 700x2000 (19.64) 0.70
3 Border keramik 10x25 110.30 m2
type 1 35.00 1.65
type 2 16.00 1.65
type 3 49.00 1.65
type 4 7.80 1.65
type 5 8.00 1.65
type 6 6.40 1.65
lain2 0.00 0.00
pengurangan (11.90)
P4 700x2000 (11.90) 0.70
4 Pasangan plin keramik 10x30 80.64 m'
type 1 12.35 24.70
type 2 4.64 23.20
type 3 17.92 25.60
type 4 2.71 27.06
type 5 2.45 24.50
type 6 3.92 39.24
lain1 16.74 167.39
lain2 2.74 27.40
lain3 2.51 25.14
lain4 28.98 289.83
pengurangan (14.33)
type 1 (2.70)
P1 900x2500 (0.45) 0.90
P2 900x2500+800x400 (0.45) 0.90
(0.40) 0.80
P3 900x2500+600x400+600x1200 (0.45) 0.90
(0.30) 0.60
(0.30) 0.60
P4 700x2000 (0.35) 0.70
type 2 (1.08)
P1 900x2500 (0.18) 0.90
P2 900x2500+800x400 (0.18) 0.90
(0.16) 0.80
P3 900x2500+600x400+600x1200 (0.18) 0.90
(0.12) 0.60
(0.12) 0.60
P4 700x2000 (0.14) 0.70
type 3 (3.78)
P1 900x2500 (0.63) 0.90
P2 900x2500+800x400 (0.63) 0.90
(0.56) 0.80
P3 900x2500+600x400+600x1200 (0.63) 0.90
(0.42) 0.60
(0.42) 0.60
P4 700x2000 (0.49) 0.70
type 4 (0.63)
P1 900x2500 (0.18) 0.90
P2 900x2500+800x400 (0.09) 0.90
(0.08) 0.80
P3 900x2500+600x400+600x1200 (0.09) 0.90
(0.06) 0.60
(0.06) 0.60
P4 700x2000 (0.07) 0.70
type 5 (0.63)
P1 900x2500 (0.18) 0.90
P2 900x2500+800x400 (0.09) 0.90
(0.08) 0.80
P3 900x2500+600x400+600x1200 (0.09) 0.90
(0.06) 0.60
(0.06) 0.60
P4 700x2000 (0.07) 0.70
type 6 (5.51)
P1 900x2500 (0.09) 0.90
P2 900x2500+800x400 (0.09) 0.90
(0.08) 0.80
P3 900x2500+600x400+600x1200 (0.09) 0.90
(0.06) 0.60
(0.06) 0.60
P4 700x2000 (0.07) 0.70
P5 1000x2500 (0.50) 1.00
P5a 1000x2150 (0.30) 1.00
P6 1800x2500 (0.54) 1.80
P7 1800x2500 (0.36) 1.80
P7a 1800x2150 (0.54) 1.80
P8 900x2500 (0.09) 0.90
PR 1800x2150 (1.62) 1.80
PS 600x900 (1.02) 0.60
5 Tali air 3,777.72 m'
6 Topian beton + finish+cat 101.78 m2
type 1
Jendela J1 800x1000+800x400 18.06 0.80
0.00 - 0.80
type 2
Jendela J1 800x1000+800x400 7.22 0.80
0.00 0.80
type 3
Jendela J1 800x1000+800x400 50.57 0.80
0.00 0.80
type 4
Jendela J1 800x1000+800x400 7.22 0.80
0.00 0.80
Bovenlight BV 800x400 0.64 0.80
type 5
Jendela J1 800x1000+800x400 7.22 0.80
0.00 0.80
type 6
Jendela J1 800x1000+800x400 10.84 0.80
0.00 0.80
lain2
P5 1000x2500 - 1.00
P5a 1000x2150 - 1.00
P6 1800x2500 - 1.80
P7 1800x2500 - 1.80
P7a 1800x2150 - 1.80
P8 900x2500 - 0.90
PR 1800x2150 - 1.80

1 Perapihan kolom k-1 0.40


k-2 0.60
k-2a 0.60
k-3a 0.80
K-l 0.30

A.2.B. PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES


1 P1 900x2500 19.00 bh
2 P2 900x2500+800x400 17.00 bh
3 P3 900x2500+600x400+600x1200 17.00 bh
4 P4 700x2000 15.00 bh
5 P5 1000x2500 5.00 bh
6 P5a 1000x2150 3.00 bh
7 P6 1800x2500 3.00 bh
8 P7 1800x2500 2.00 bh
9 P7a 1800x2150 3.00 bh
10 P8 900x2500 2.00 bh
11 PR 1800x2150 9.00 bh
12 PS 600x900 17.00 bh
13 RO 900x160 17.00 bh
14 Jendela J1 800x1000+800x400 28.00 bh
15 Bovenlight BV 800x400 1.00 bh

A.3. PEKERJAAN PLAFOND


1 Plafon GRC T=4.5 mm rangka hollow grid 60x60 45.95 m2
type 1 15.00 2.00
type 2 7.50 2.50
type 3 21.00 2.00
type 4 3.60 2.40
type 5 3.75 2.50
type 6 2.20 1.00
sharf 50x95 (6.65) 0.95
sharf 60x75 (0.45) 0.60
2 Plafon ekspose fin cat 1,396.83 m2
26.46 5.40
16.50 5.50
260.57 14.20
4.02 1.50
691.60 13.00
28.80 4.80
28.80 4.80
286.43 17.10
21.00 2.10
29.70 4.50
7.25 2.30
45.21 6.60
47.36 2.85
(14.07) 2.87
(14.70) 4.20
(14.70) 4.20
(0.45) 0.60
(7.00) 0.50

3 List gypsum 122.20 m'


type 1 35.00 2.00
type 2 16.00 2.50
type 3 49.00 2.00
type 4 7.80 2.40
type 5 8.00 2.50
type 6 6.40 1.00

A.4. PEKERJAAN UTILITAS


1 Closet Duduk 18.00 bh
type 1 5.00 3.00
type 2 2.00 3.00
type 3 7.00 3.00
type 4 1.00 3.00
type 5 1.00 3.00
type 6 1.00 3.00
mushola 1.00 3.00
2 Kran air 1/2 22.00 bh
type 1 5.00 0.00
type 2 2.00 0.90
type 3 7.00 0.90
type 4 1.00 0.80
type 5 1.00 0.90
type 6 1.00 0.60
mushola 5.00 0.60
3 Floor drain 20.00 bh
type 1 5.00 0.00
type 2 2.00 0.90
type 3 7.00 0.90
type 4 1.00 0.80
type 5 1.00 0.90
type 6 1.00 0.60
mushola 3.00 0.60
4 Meja beton+keramik 15.04 m2
type 1 600x1350 4.05 0.60
type 2 600x1050 1.26 0.60
type 3 600x1750 7.35 0.60
type 4 600x1450 0.87 0.60
type 5 600x1350 0.81 0.60
type 6 600x1170 0.70 0.60
5 Kitchen zink 17.00 bh

A.5. PEKERJAAN FINISHING


A.5.A. PEKERJAAN PENGECATAN
1 Pengecatan dinding dalam 4,113.60 m2
2 Pengecatan dinding luar 631.07 m2
3 Pengecatan plafon 1,442.78 m2
1 Pengecatan plat tangga 29.47 m2

A.5.B. PEKERJAAN LAIN-LAIN


1 Railing tangga darurat 42.68 m
42.68 2
2 Railing Teras 43.98 m

3 Urugan tanah ramp 4.06 m3

4 Urugan pasir ramp 0.34 m3

A.6 LANTAI ATAP

B.1. LANTAI DUA


B.1. PEKERJAAN LANTAI
1 Pasang perataan lantai (screed 1:3, t=3 cm + aci) 1,082.94 m2
2 Pasang keramik 30x30 Polished 516.14 m2
luas total 1,082.94
26.46 5.40
16.50 5.50
260.57 14.20
4.02 1.50
28.80 4.80
538.19 15.97
253.50 19.50
28.80 4.80
44.10 14.70
10.26 1.90
(0.45) 0.60
(16.00) 0.50
(3.15) 0.85
(41.47) 3.19
(13.58) 2.72
(8.32) 2.60
(10.05) 1.50
(10.80) 1.20
(10.05) 1.50
(14.40) 1.20
3 Pasang keramik 30x30 UNPolished 465.89 m2
7.20 2.40
3.38 2.25
6.75 1.50
9.00 1.50
103.00
62.65
255.92
4.50 1.50
13.50 1.50
4 Pasang keramik toilet 20x20 UNPolished 100.90 m2
type 1 30.00 2.00
type 2 15.00 2.50
type 3 39.00 2.00
type 4 7.20 2.40
type 5 7.50 2.50
type 6 2.20 1.00
5 Waterproofing coating 135.55 m2
type 1 40.50 2.00
type 2 19.80 2.50
type 3 52.65 2.00
type 4 9.54 2.40
type 5 9.90 2.50
type 6 3.16 1.00
6 Pasangan keramik tangga 36.64 m2
bordes 4.79 1.45
anak tangga 13.54 0.17
7 Stair nossing 60.00 m'
B.2. PEKERJAAN DINDING
1 Dinding bata bagian luar 704.85 m2
808.69 3.35
pengurangan (103.84)
type 1 (25.60)
RO 900x160 (14.40) 0.90
Jendela J1 800x1000+800x400 (8.00) 0.80
(3.20) 0.80
type 2 (10.24)
RO 900x160 (5.76) 0.90
Jendela J1 800x1000+800x400 (3.20) 0.80
(1.28) 0.80
type 3 (47.84)
RO 900x160 (18.72) 0.90
Jendela J1 800x1000+800x400 (20.80) 0.80
(8.32) 0.80
type 4 (8.00)
RO 900x160 (2.88) 0.90
Jendela J1 800x1000+800x400 (3.20) 0.80
(1.28) 0.80
Bovenlight BV 800x400 (0.64) 0.80
type 5 (7.36)
RO 900x160 (2.88) 0.90
Jendela J1 800x1000+800x400 (3.20) 0.80
(1.28) 0.80
type 6 (4.80)
RO 900x160 (1.44) 0.90
Jendela J1 800x1000+800x400 (2.40) 0.80
(0.96) 0.80
2 Dinding bata bagian dalam 2,929.22 m2
type 1 817.50 3.00
type 2 367.80 3.00
type 3 1,425.45 3.00
type 4 197.40 3.00
type 5 203.10 3.00
type 6 81.30 3.00
lain2 192.60 3.00
pengurangan (355.93)
type 1 (94.30)
P1 900x2500 (22.50) 0.90
P2 900x2500+800x400 (22.50) 0.90
(3.20) 0.80
P3 900x2500+600x400+600x1200 (22.50) 0.90
(2.40) 0.60
(7.20) 0.60
P4 700x2000 (14.00) 0.70
type 2 (37.72)
P1 900x2500 (9.00) 0.90
P2 900x2500+800x400 (9.00) 0.90
(1.28) 0.80
P3 900x2500+600x400+600x1200 (9.00) 0.90
(0.96) 0.60
(2.88) 0.60
P4 700x2000 (5.60) 0.70
type 3 (122.59)
P1 900x2500 (29.25) 0.90
P2 900x2500+800x400 (29.25) 0.90
(4.16) 0.80
P3 900x2500+600x400+600x1200 (29.25) 0.90
(3.12) 0.60
(9.36) 0.60
P4 700x2000 (18.20) 0.70
type 4 (23.36)
P1 900x2500 (9.00) 0.90
P2 900x2500+800x400 (4.50) 0.90
(0.64) 0.80
P3 900x2500+600x400+600x1200 (4.50) 0.90
(0.48) 0.60
(1.44) 0.60
P4 700x2000 (2.80) 0.70
type 5 (23.36)
P1 900x2500 (9.00) 0.90
P2 900x2500+800x400 (4.50) 0.90
(0.64) 0.80
P3 900x2500+600x400+600x1200 (4.50) 0.90
(0.48) 0.60
(1.44) 0.60
P4 700x2000 (2.80) 0.70
type 6 (9.43)
P1 900x2500 (2.25) 0.90
P2 900x2500+800x400 (2.25) 0.90
(0.32) 0.80
P3 900x2500+600x400+600x1200 (2.25) 0.90
(0.24) 0.60
(0.72) 0.60
P4 700x2000 (1.40) 0.70
lain2 (45.17)
P5 1000x2500 (7.50) 1.00
P5a 1000x2150 (8.60) 1.00
P7 1800x2500 (4.50) 1.80
P8 900x2500 (4.50) 0.90
P8a 900x2500 (2.25) 0.90
PS 600x900 (17.82) 0.60
3 kolom praktis Dinding bata bagian luar 0.10 0.10
4 kolom praktis Dinding bata bagian dalam 0.10 0.10

B.2.A. PEKERJAAN PASANGAN DAN PLESTERAN


1 Plesteran dan acian 6,715.35 m2
2 Pasangan dinding keramik 20x25 344.19 m2
type 1 115.50 1.65
type 2 52.80 1.65
type 3 150.15 1.65
type 4 25.74 1.65
type 5 26.40 1.65
type 6 10.56 1.65
lain2 -
pengurangan (36.96)
P4 700x2000 (36.96) 0.70
3 Border keramik 10x25 208.60 m2
type 1 70.00 1.65
type 2 32.00 1.65
type 3 91.00 1.65
type 4 15.60 1.65
type 5 16.00 1.65
type 6 6.40 1.65
lain2 0.00 0.00
pengurangan (22.40)
P4 700x2000 (22.40) 0.70
4 Pasangan plin keramik 10x30 95.39 m'
type 1 24.70 24.70
type 2 9.28 23.20
type 3 33.28 25.60
type 4 5.41 27.06
type 5 4.90 24.50
type 6 3.92 39.24
lain1 20.00 200.00
lain2 14.66 146.62
pengurangan (20.77)
type 1 (5.40)
P1 900x2500 (0.90) 0.90
P2 900x2500+800x400 (0.90) 0.90
(0.80) 0.80
P3 900x2500+600x400+600x1200 (0.90) 0.90
(0.60) 0.60
(0.60) 0.60
P4 700x2000 (0.70) 0.70
type 2 (2.16)
P1 900x2500 (0.36) 0.90
P2 900x2500+800x400 (0.36) 0.90
(0.32) 0.80
P3 900x2500+600x400+600x1200 (0.36) 0.90
(0.24) 0.60
(0.24) 0.60
P4 700x2000 (0.28) 0.70
type 3 (7.02)
P1 900x2500 (1.17) 0.90
P2 900x2500+800x400 (1.17) 0.90
(1.04) 0.80
P3 900x2500+600x400+600x1200 (1.17) 0.90
(0.78) 0.60
(0.78) 0.60
P4 700x2000 (0.91) 0.70
type 4 (1.26)
P1 900x2500 (0.36) 0.90
P2 900x2500+800x400 (0.18) 0.90
(0.16) 0.80
P3 900x2500+600x400+600x1200 (0.18) 0.90
(0.12) 0.60
(0.12) 0.60
P4 700x2000 (0.14) 0.70
type 5 (1.26)
P1 900x2500 (0.36) 0.90
P2 900x2500+800x400 (0.18) 0.90
(0.16) 0.80
P3 900x2500+600x400+600x1200 (0.18) 0.90
(0.12) 0.60
(0.12) 0.60
P4 700x2000 (0.14) 0.70
type 6 (3.67)
P1 900x2500 (0.09) 0.90
P2 900x2500+800x400 (0.09) 0.90
(0.08) 0.80
P3 900x2500+600x400+600x1200 (0.09) 0.90
(0.06) 0.60
(0.06) 0.60
P4 700x2000 (0.07) 0.70
P5 1000x2500 (0.30) 1.00
P5a 1000x2150 (0.40) 1.00
P7 1800x2500 (0.18) 1.80
P8 900x2500 (0.18) 0.90
P8a 900x2500 (0.09) 0.90
PS 600x900 (1.98) 0.60
5 Tali air 5,451.11 m'
6 Topian beton + finish+cat 197.49 m2
type 1
Jendela J1 800x1000+800x400 36.12 0.80
0.00 0.80
type 2
Jendela J1 800x1000+800x400 14.45 0.80
0.00 0.80
type 3
Jendela J1 800x1000+800x400 93.91 0.80
0.00 10.40 0.80
type 4
Jendela J1 800x1000+800x400 14.45 0.80
0.00 1.60 0.80
Bovenlight BV 800x400 1.28 0.80
type 5
Jendela J1 800x1000+800x400 14.45 0.80
0.00 0.80
type 6
Jendela J1 800x1000+800x400 10.84 0.80
7 Plesteran dan acian tangga 29.47 m2
plat tangga bawah 4.76 3.97
plat tangga atas 3.96 3.30
Bordes 4.79 1.45
anak tangga 1.22 0.03

8 Perapihan kolom k-2 0.60


k-2a 0.60
k-3a 0.80
k-l 0.30

9 Perapihan balok b-1a 0.40


b-1Aa 0.40
b-1B 0.40
b-1C 0.40
b-1D 0.40
b-1E 0.40
b-1F 0.40
b-1G 0.40
b-1H 0.40
b-2C 0.40
b-2Cc 0.40
bl1 0.25
bl2 0.25

B.2.B. PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES


1 P1 900x2500 36.00 bh
2 P2 900x2500+800x400 32.00 bh
3 P3 900x2500+600x400+600x1200 32.00 bh
4 P4 700x2000 32.00 bh
5 P5 1000x2500 3.00 bh
6 P5a 1000x2150 4.00 bh
7 P7 1800x2500 1.00 bh
8 P8 900x2500 2.00 bh
9 P8a 900x2500 1.00 bh
10 PS 600x900 33.00 bh
11 RO 900x160 32.00 bh
12 Jendela J1 800x1000+800x400 51.00 bh
13 Bovenlight BV 800x400 2.00 bh

B.3. PEKERJAAN PLAFOND


1 Plafon GRC T=4.5 mm rangka hollow grid 60x60 87.18 m2
type 1 30.00 2.00
type 2 15.00 2.50
type 3 39.00 2.00
type 4 7.20 2.40
type 5 7.50 2.50
type 6 2.20 1.00
sharf 50x95 (12.83) 0.95
sharf 60x75 (0.90) 0.60
2 Plafon ekspose fin cat 1,241.79 m2
26.46 5.40
16.50 5.50
260.57 14.20
4.02 1.50
691.60 13.00
28.80 4.80
28.80 4.80
294.65 14.20
23.03 4.70
18.00 6.00
(14.07) 2.87
(14.70) 4.20
(5.60) 2.00
(14.70) 4.20
(0.90) 0.60
(13.50) 0.50

3 List gypsum 231.00 m'


type 1 70.00 2.00
type 2 32.00 2.50
type 3 91.00 2.00
type 4 15.60 2.40
type 5 16.00 2.50
type 6 6.40 1.00
B.4. PEKERJAAN UTILITAS
1 Closet Duduk 33.00 bh
type 1 10.00 3.00
type 2 4.00 3.00
type 3 13.00 3.00
type 4 2.00 3.00
type 5 2.00 3.00
type 6 1.00 3.00
mushola 1.00 3.00
2 Kran air 1/2 37.00 bh
type 1 10.00 0.00
type 2 4.00 0.90
type 3 13.00 0.90
type 4 2.00 0.80
type 5 2.00 0.90
type 6 1.00 0.60
mushola 5.00 0.60
3 Floor drain 35.00 bh
type 1 10.00 0.00
type 2 4.00 0.90
type 3 13.00 0.90
type 4 2.00 0.80
type 5 2.00 0.90
type 6 1.00 0.60
mushola 3.00 0.60
4 Meja beton+keramik 28.33 m2
type 1 600x1350 8.10 0.60
type 2 600x1050 2.52 0.60
type 3 600x1750 13.65 0.60
type 4 600x1450 1.74 0.60
type 5 600x1350 1.62 0.60
type 6 600x1170 0.70 0.60
5 Kitchen zink 32.00 bh
B.5. PEKERJAAN FINISHING
B.5.A. PEKERJAAN PENGECATAN
1 Pengecatan dinding dalam 6,010.50 m2
2 Pengecatan dinding luar 704.85 m2
3 Pengecatan plafon 1,328.96 m2
4 Pengecatan plat tangga 29.47 m2

B.5.B. PEKERJAAN LAIN-LAIN


1 Railing tangga darurat 42.68 m
42.68 2
C.1. LANTAI TIGA
C.1. PEKERJAAN LANTAI
1 Pasang perataan lantai (screed 1:3, t=3 cm + aci) 1,082.94 m2
2 Pasang keramik 30x30 Polished 513.14 m2
luas total 1,082.94
26.46 5.40
16.50 5.50
260.57 14.20
4.02 1.50
28.80 4.80
538.19 15.97
253.50 19.50
28.80 4.80
44.10 14.70
10.26 1.90
(0.45) 0.60
(16.00) 0.50
(3.15) 0.85
(41.47) 3.19
(13.58) 2.72
(8.32) 2.60
(10.05) 1.50
(10.80) 1.20
(10.05) 1.50
(14.40) 1.20
3 Pasang keramik 30x30 UNPolished 465.89 m2
7.20 2.40
3.38 2.25
6.75 1.50
9.00 1.50
103.00
62.65
255.92
4.50 1.50
13.50 1.50
4 Pasang keramik toilet 20x20 UNPolished 103.90 m2
type 1 30.00 2.00
type 2 15.00 2.50
type 3 42.00 2.00
type 4 7.20 2.40
type 5 7.50 2.50
type 6 2.20 1.00
5 Waterproofing coating 139.60 m2
type 1 40.50 2.00
type 2 19.80 2.50
type 3 56.70 2.00
type 4 9.54 2.40
type 5 9.90 2.50
type 6 3.16 1.00
1 Pasangan keramik tangga 36.64 m2
bordes 4.79 1.45
anak tangga 13.54 0.17
2 Stair nossing 60.00 m'

C.2. PEKERJAAN DINDING


1 Dinding bata bagian luar 725.31 m2
832.83 3.45
pengurangan (107.52)
type 1 (25.60)
RO 900x160 (14.40) 0.90
Jendela J1 800x1000+800x400 (8.00) 0.80
(3.20) 0.80
type 2 (10.24)
RO 900x160 (5.76) 0.90
Jendela J1 800x1000+800x400 (3.20) 0.80
(1.28) 0.80
type 3 (51.52)
RO 900x160 (20.16) 0.90
Jendela J1 800x1000+800x400 (22.40) 0.80
(8.96) 0.80
type 4 (8.00)
RO 900x160 (2.88) 0.90
Jendela J1 800x1000+800x400 (3.20) 0.80
(1.28) 0.80
Bovenlight BV 800x400 (0.64) 0.80
type 5 (7.36)
RO 900x160 (2.88) 0.90
Jendela J1 800x1000+800x400 (3.20) 0.80
(1.28) 0.80
type 6 (4.80)
RO 900x160 (1.44) 0.90
Jendela J1 800x1000+800x400 (2.40) 0.80
(0.96) 0.80
2 Dinding bata bagian dalam 3,035.04 m2
type 1 817.50 3.00
type 2 367.80 3.00
type 3 1,535.10 3.00
type 4 197.40 3.00
type 5 203.10 3.00
type 6 81.30 3.00
lain2 192.60 3.00
pengurangan (359.76)
type 1 (94.30)
P1 900x2500 (22.50) 0.90
P2 900x2500+800x400 (22.50) 0.90
(3.20) 0.80
P3 900x2500+600x400+600x1200 (22.50) 0.90
(2.40) 0.60
(7.20) 0.60
P4 700x2000 (14.00) 0.70
type 2 (37.72)
P1 900x2500 (9.00) 0.90
P2 900x2500+800x400 (9.00) 0.90
(1.28) 0.80
P3 900x2500+600x400+600x1200 (9.00) 0.90
(0.96) 0.60
(2.88) 0.60
P4 700x2000 (5.60) 0.70
type 3 (132.02)
P1 900x2500 (31.50) 0.90
P2 900x2500+800x400 (31.50) 0.90
(4.48) 0.80
P3 900x2500+600x400+600x1200 (31.50) 0.90
(3.36) 0.60
(10.08) 0.60
P4 700x2000 (19.60) 0.70
type 4 (20.56)
P1 900x2500 (9.00) 0.90
P2 900x2500+800x400 (4.50) 0.90
(0.64) 0.80
P3 900x2500+600x400+600x1200 (4.50) 0.90
(0.48) 0.60
(1.44) 0.60
P4 700x2000 - 0.70
type 5 (20.56)
P1 900x2500 (9.00) 0.90
P2 900x2500+800x400 (4.50) 0.90
(0.64) 0.80
P3 900x2500+600x400+600x1200 (4.50) 0.90
(0.48) 0.60
(1.44) 0.60
P4 700x2000 - 0.70
type 6 (9.43)
P1 900x2500 (2.25) 0.90
P2 900x2500+800x400 (2.25) 0.90
(0.32) 0.80
P3 900x2500+600x400+600x1200 (2.25) 0.90
(0.24) 0.60
(0.72) 0.60
P4 700x2000 (1.40) 0.70
lain2 (45.17)
P5 1000x2500 (7.50) 1.00
P5a 1000x2150 (8.60) 1.00
P7 1800x2500 (4.50) 1.80
P8 900x2500 (4.50) 0.90
P8a 900x2500 (2.25) 0.90
PS 600x900 (17.82) 0.60
3 kolom praktis Dinding bata bagian luar 0.10 0.10
4 kolom praktis Dinding bata bagian dalam 0.10 0.10

C.2.A. PEKERJAAN PASANGAN DAN PLESTERAN


1 Plesteran dan acian 6,951.22 m2
2 Pasangan dinding keramik 20x25 354.59 m2
type 1 115.50 1.65
type 2 52.80 1.65
type 3 161.70 1.65
type 4 25.74 1.65
type 5 26.40 1.65
type 6 10.56 1.65
lain2 -
pengurangan (38.12)
P4 700x2000 (38.12) 0.70
3 Border keramik 10x25 214.90 m2
type 1 70.00 1.65
type 2 32.00 1.65
type 3 98.00 1.65
type 4 15.60 1.65
type 5 16.00 1.65
type 6 6.40 1.65
lain2 0.00 0.00
pengurangan (23.10)
P4 700x2000 (23.10) 0.70
4 Pasangan plin keramik 10x30 92.15 m'
type 1 24.70 24.70
type 2 9.28 23.20
type 3 35.84 25.60
type 4 5.41 27.06
type 5 4.90 24.50
type 6 3.92 39.24
lain1 29.40 294.05
pengurangan (21.31)
type 1 (5.40)
P1 900x2500 (0.90) 0.90
P2 900x2500+800x400 (0.90) 0.90
(0.80) 0.80
P3 900x2500+600x400+600x1200 (0.90) 0.90
(0.60) 0.60
(0.60) 0.60
P4 700x2000 (0.70) 0.70
type 2 (2.16)
P1 900x2500 (0.36) 0.90
P2 900x2500+800x400 (0.36) 0.90
(0.32) 0.80
P3 900x2500+600x400+600x1200 (0.36) 0.90
(0.24) 0.60
(0.24) 0.60
P4 700x2000 (0.28) 0.70
type 3 (7.56)
P1 900x2500 (1.26) 0.90
P2 900x2500+800x400 (1.26) 0.90
(1.12) 0.80
P3 900x2500+600x400+600x1200 (1.26) 0.90
(0.84) 0.60
(0.84) 0.60
P4 700x2000 (0.98) 0.70
type 4 (1.26)
P1 900x2500 (0.36) 0.90
P2 900x2500+800x400 (0.18) 0.90
(0.16) 0.80
P3 900x2500+600x400+600x1200 (0.18) 0.90
(0.12) 0.60
(0.12) 0.60
P4 700x2000 (0.14) 0.70
type 5 (1.26)
P1 900x2500 (0.36) 0.90
P2 900x2500+800x400 (0.18) 0.90
(0.16) 0.80
P3 900x2500+600x400+600x1200 (0.18) 0.90
(0.12) 0.60
(0.12) 0.60
P4 700x2000 (0.14) 0.70
type 6 (3.67)
P1 900x2500 (0.09) 0.90
P2 900x2500+800x400 (0.09) 0.90
(0.08) 0.80
P3 900x2500+600x400+600x1200 (0.09) 0.90
(0.06) 0.60
(0.06) 0.60
P4 700x2000 (0.07) 0.70
P5 1000x2500 (0.30) 1.00
P5a 1000x2150 (0.40) 1.00
P7 1800x2500 (0.18) 1.80
P8 900x2500 (0.18) 0.90
P8a 900x2500 (0.09) 0.90
PS 600x900 (1.98) 0.60
5 Tali air 5,640.53 m'
6 Topian beton + finish+cat 309.07 m2
type 1
RO 900x160 35.26 0.90
Jendela J1 800x1000+800x400 36.12 0.80
0.00 0.80
type 2
RO 900x160 14.10 0.90
Jendela J1 800x1000+800x400 14.45 0.80
0.00 0.80
type 3
RO 900x160 49.36 0.90
Jendela J1 800x1000+800x400 101.14 0.80
0.00 0.80
type 4
RO 900x160 7.05 0.90
Jendela J1 800x1000+800x400 14.45 0.80
0.00 0.80
Bovenlight BV 800x400 1.28 0.80
type 5
RO 900x160 7.05 0.90
Jendela J1 800x1000+800x400 14.45 0.80
0.00 0.80
type 6
RO 900x160 3.53 0.90
Jendela J1 800x1000+800x400 10.84 0.80
1 Plesteran dan acian tangga 29.47 m2
plat tangga bawah 4.76 3.97
plat tangga atas 3.96 3.30
Bordes 4.79 1.45
anak tangga 1.22 0.03

2 Perapihan Kolom k-2 0.60


k-2a 0.60
k-3a 0.80
k-l 0.30

3 Perapihan balok b-1a 0.40


b-1Aa 0.40
b-1B 0.40
b-1G 0.40
b-2C 0.30
b-2Cc 0.30
b-2A 0.30
b-2Aa 0.30
b-2B 0.30
b-4 0.20
b-4A 0.20
bl1 0.20
bl2 0.25
bl3 0.25

C.2.B. PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES


1 P1 900x2500 37.00 bh
2 P2 900x2500+800x400 33.00 bh
3 P3 900x2500+600x400+600x1200 33.00 bh
4 P4 700x2000 29.00 bh
5 P5 1000x2500 3.00 bh
6 P5a 1000x2150 4.00 bh
7 P7 1800x2500 1.00 bh
8 P8 900x2500 2.00 bh
9 P8a 900x2500 1.00 bh
10 PS 600x900 33.00 bh
11 RO 900x160 33.00 bh
12 Jendela J1 800x1000+800x400 53.00 bh
13 Bovenlight BV 800x400 2.00 bh

C.3. PEKERJAAN PLAFOND


1 Plafon GRC T=4.5 mm rangka hollow grid 60x60 89.70 m2
type 1 30.00 2.00
type 2 15.00 2.50
type 3 42.00 2.00
type 4 7.20 2.40
type 5 7.50 2.50
type 6 2.20 1.00
sharf 50x95 (13.30) 0.95
sharf 60x75 (0.90) 0.60
2 Plafon ekspose fin cat 1,238.76 m2
26.46 5.40
16.50 5.50
260.57 14.20
4.02 1.50
691.60 13.00
28.80 4.80
28.80 4.80
294.65 14.20
23.03 4.70
18.00 6.00
(14.07) 2.87
(14.70) 4.20
(5.60) 2.00
(14.70) 4.20
(0.90) 0.60
(14.00) 0.50

3 List gypsum 238.00 m'


type 1 70.00 2.00
type 2 32.00 2.50
type 3 98.00 2.00
type 4 15.60 2.40
type 5 16.00 2.50
type 6 6.40 1.00
C.4. PEKERJAAN UTILITAS
1 Closet Duduk 34.00 bh
type 1 10.00 3.00
type 2 4.00 3.00
type 3 14.00 3.00
type 4 2.00 3.00
type 5 2.00 3.00
type 6 1.00 3.00
mushola 1.00 3.00
2 Kran air 1/2 38.00 bh
type 1 10.00 0.00
type 2 4.00 0.90
type 3 14.00 0.90
type 4 2.00 0.80
type 5 2.00 0.90
type 6 1.00 0.60
mushola 5.00 0.60
3 Floor drain 36.00 bh
type 1 10.00 0.00
type 2 4.00 0.90
type 3 14.00 0.90
type 4 2.00 0.80
type 5 2.00 0.90
type 6 1.00 0.60
mushola 3.00 0.60
4 Meja beton+keramik 29.38 m2
type 1 600x1350 8.10 0.60
type 2 600x1050 2.52 0.60
type 3 600x1750 14.70 0.60
type 4 600x1450 1.74 0.60
type 5 600x1350 1.62 0.60
type 6 600x1170 0.70 0.60
5 Kitchen zink 33.00 bh
C.5. PEKERJAAN FINISHING
C.5.A. PEKERJAAN PENGECATAN
1 Pengecatan dinding dalam 6,225.91 m2
2 Pengecatan dinding luar 725.31 m2
3 Pengecatan plafon 1,328.46 m2
4 Pengecatan plat tangga 29.47 m2

C.5.B. PEKERJAAN LAIN-LAIN


1 Railing tangga darurat 42.68 m
42.68 2
J.1 LANTAI ATAP

B.1. PEKERJAAN LANTAI


1 Pasang perataan lantai (screed 1:3, t=3 cm + aci) 409.83 m2
2 Pasang keramik 30x30 Polished 409.83 m2
luas total 204.92
118.95
157.03
15.38
(39.47)
(46.98)
C.2. PEKERJAAN DINDING
1 Dinding bata bagian luar 278.31 m2
286.91 4.03
P5a 1000x2150 (8.60) 1.00

2 Dinding bata bagian dalam 230.39 m2


96.48 3.50
31.95 3.50
12.98 3.50
87.44 3.50
19.29 3.50
P5a 1000x2150 (17.20) 1.00
PS 600x900 (0.54) 0.60

1 Dinding bata bagian bawah atap 267.68 m2


51.92 0.60
52.11 0.60
52.72 0.60
50.78 0.60
60.15 0.60

3 kolom praktis Dinding bata bagian luar 0.10 0.10


4 kolom praktis Dinding bata bagian dalam 0.10 0.10

C.2.A. PEKERJAAN PASANGAN DAN PLESTERAN


1 Plesteran dan acian 508.70 m2
2 Pasangan plin keramik 10x30 11.83 m'
7.12 71.19
2.93 29.32
1.78 17.76
3 Tali air 763.05 m'

2 Perapihan Kolom k-l 0.30

3 Perapihan balok 0.40


0.40
0.40
0.40
0.40
0.30
0.30
0.30
0.30
0.20
0.20
0.20
0.25
0.25
0.25

C.2.B. PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES


1 P5a 1000x2150 8.00 bh

C.5. PEKERJAAN FINISHING


C.5.A. PEKERJAAN PENGECATAN
1 Pengecatan dinding dalam 230.39 m2
2 Pengecatan dinding luar 278.31 m2

1 Waterproofing membran 1,082.94 m2


R

HARGA SATUAN JUMLAH HARGA


(Rp.) (Rp.)

TOTAL #REF!

SUB TOTAL #REF!

4.90
3.00
18.35
2.68
6.00
33.70
13.00
6.00
15.10
9.25
14.05
6.59
2.33
0.75 1.00
1.00 15.00
4.99
4.25
4.90
2.00
3.50
3.50

3.00 1.00
1.50 1.00
1.50 3.00
3.00 2.00

1.50 2.00
3.00 3.00

1.50 5.00 1.00


1.50 2.00 1.00
1.50 7.00 1.00
1.50 1.00 0.00
1.50 1.00 1.00
2.20 1.00 0.00

1.50 5.00 1.00


1.50 2.00 1.00
1.50 7.00 1.00
1.50 1.00 0.00
1.50 1.00 1.00
2.20 1.00 0.00
3.30
0.30 1.20 24.00

5.50 1.38 2.00


25.00
1.38 13.00 2.00

SUB TOTAL #REF!

225.20

5.00
1.60 5.00 1.00
1.00 5.00 1.00
0.40 5.00 1.00
2.00
1.60 2.00 1.00
1.00 2.00 1.00
0.40 2.00 1.00
7.00
1.60 7.00 1.00
1.00 7.00 2.00
0.40 7.00 2.00
1.00
1.60 1.00 1.00
1.00 1.00 2.00
0.40 1.00 2.00
0.40 1.00 1.00
1.00
1.60 1.00 1.00
1.00 1.00 2.00
0.40 1.00 2.00
1.00
1.60 1.00 1.00
1.00 1.00 3.00
0.40 1.00 3.00
1.00
2.50 1.00 2.00
2.15 1.00 0.00
2.50 1.00 2.00
2.50 1.00 1.00
2.15 1.00 3.00
2.50 1.00 1.00
2.15 1.00 9.00

27.35 5.00
30.65 2.00
36.55 7.00
32.90 1.00
33.85 1.00
27.10 1.00
146.85 1.00

5.00
2.50 5.00 1.00
2.50 5.00 1.00
0.40 5.00 1.00
2.50 5.00 1.00
0.40 5.00 1.00
1.20 5.00 1.00
2.00 5.00 1.00
2.00
2.50 2.00 1.00
2.50 2.00 1.00
0.40 2.00 1.00
2.50 2.00 1.00
0.40 2.00 1.00
1.20 2.00 1.00
2.00 2.00 1.00
7.00
2.50 7.00 1.00
2.50 7.00 1.00
0.40 7.00 1.00
2.50 7.00 1.00
0.40 7.00 1.00
1.20 7.00 1.00
2.00 7.00 1.00
1.00
2.50 1.00 2.00
2.50 1.00 1.00
0.40 1.00 1.00
2.50 1.00 1.00
0.40 1.00 1.00
1.20 1.00 1.00
2.00 1.00 0.00
1.00
2.50 1.00 2.00
2.50 1.00 1.00
0.40 1.00 1.00
2.50 1.00 1.00
0.40 1.00 1.00
1.20 1.00 1.00
2.00 1.00 0.00
1.00
2.50 1.00 1.00
2.50 1.00 1.00
0.40 1.00 1.00
2.50 1.00 1.00
0.40 1.00 1.00
1.20 1.00 1.00
2.00 1.00 1.00
1.00
2.50 1.00 3.00
2.15 1.00 3.00
2.50 1.00 1.00
2.50 1.00 1.00
2.15 1.00 0.00
2.50 1.00 1.00
2.15 1.00 0.00
0.90 1.00 17.00
4.00 63.11 2.52 m3
4.00 188.74 7.55 m3

1.20
1.20
3.30
24.00 2.00

SUB TOTAL #REF!

7.00 5.00
8.00 2.00
7.00 7.00
7.80 1.00
8.00 1.00
6.40 1.00

1.65 17.00 1.00

7.00 5.00
8.00 2.00
7.00 7.00
7.80 1.00
8.00 1.00
6.40 1.00
0.00 0.00

1.65 17.00 1.00

0.10 5.00
0.10 2.00
0.10 7.00
0.10 1.00
0.10 1.00
0.10 1.00
0.10
0.10
0.10
0.10

5.00
0.10 5.00 1.00
0.10 5.00 1.00
0.10 5.00 1.00
0.10 5.00 1.00
0.10 5.00 1.00
0.10 5.00 1.00
0.10 5.00 1.00
2.00
0.10 2.00 1.00
0.10 2.00 1.00
0.10 2.00 1.00
0.10 2.00 1.00
0.10 2.00 1.00
0.10 2.00 1.00
0.10 2.00 1.00
7.00
0.10 7.00 1.00
0.10 7.00 1.00
0.10 7.00 1.00
0.10 7.00 1.00
0.10 7.00 1.00
0.10 7.00 1.00
0.10 7.00 1.00
1.00
0.10 1.00 2.00
0.10 1.00 1.00
0.10 1.00 1.00
0.10 1.00 1.00
0.10 1.00 1.00
0.10 1.00 1.00
0.10 1.00 1.00
1.00
0.10 1.00 2.00
0.10 1.00 1.00
0.10 1.00 1.00
0.10 1.00 1.00
0.10 1.00 1.00
0.10 1.00 1.00
0.10 1.00 1.00
1.00
0.10 1.00 1.00
0.10 1.00 1.00
0.10 1.00 1.00
0.10 1.00 1.00
0.10 1.00 1.00
0.10 1.00 1.00
0.10 1.00 1.00
0.10 1.00 5.00
0.10 1.00 3.00
0.10 1.00 3.00
0.10 1.00 2.00
0.10 1.00 3.00
0.10 1.00 1.00
0.10 1.00 9.00
0.10 1.00 17.00

5.00 0.00
0.06 0.40 1.70 5.00 1.00
5.00 1.00
2.00 0.00
0.06 0.40 1.70 2.00 1.00
0.50 2.00 1.00
7.00 0.00
0.06 0.40 1.70 7.00 2.00
0.50 7.00 2.00
1.00 0.00
0.06 0.40 1.70 1.00 2.00
0.50 1.00 2.00
0.06 0.40 0.50 1.00 1.00
1.00 0.00
0.06 0.40 1.70 1.00 2.00
0.50 1.00 2.00
1.00 0.00
0.06 0.40 1.70 1.00 3.00
0.50 1.00 3.00
1.00 0.00
0.50 1.00 0.00
0.50 1.00 0.00
0.50 1.00 0.00
0.50 1.00 0.00
0.50 1.00 0.00
0.50 1.00 0.00
0.50 1.00 0.00

0.40 4.00 6.00 19.20 m2


0.60 4.00 21.00 100.80 m2
0.60 4.00 24.00 115.20 m2
0.80 4.00 3.00 19.20 m2
0.50 4.00 8.00 25.60 m2

SUB TOTAL #REF!

SUB TOTAL #REF!

1.50 5.00 1.00


1.50 2.00 1.00
1.50 7.00 1.00
1.50 1.00 0.00
1.50 1.00 1.00
2.20 1.00 0.00
0.50 14.00 0.00
0.75 1.00 0.00

4.90
3.00
18.35
2.68
53.20
6.00
6.00
16.75
10.00
6.60
3.15
6.85
16.62
4.90
3.50
3.50
0.75 1.00
1.00 14.00

1.50 5.00 1.00


1.50 2.00 1.00
1.50 7.00 1.00
1.50 1.00 -
1.50 1.00 1.00
2.20 1.00 -

SUB TOTAL #REF!

27.35 5.00 1.00


30.65 2.00 1.00
36.55 7.00 1.00
32.90 1.00 1.00
33.85 1.00 1.00
27.10 1.00 1.00
146.85 1.00 1.00

27.35 5.00 1.00


30.65 2.00 1.00
36.55 7.00 1.00
32.90 1.00 1.00
33.85 1.00 1.00
27.10 1.00 1.00
146.85 1.00 5.00

27.35 5.00 1.00


30.65 2.00 1.00
36.55 7.00 1.00
32.90 1.00 1.00
33.85 1.00 1.00
27.10 1.00 1.00
146.85 1.00 3.00

1.35 5.00 1.00


1.05 2.00 1.00
1.75 7.00 1.00
1.45 1.00 1.00
1.35 1.00 1.00
1.17 1.00 1.00

SUB TOTAL #REF!


SUB TOTAL #REF!

21.34 1.00

4.9 0.60 1.38 2

4.9 0.05 1.38 2

SUB TOTAL 2.00

SUB TOTAL #REF!

4.90
3.00
18.35
2.68
6.00
33.70
13.00
6.00
3.00
5.40
0.75 1.00
1.00 32.00
1.85 2.00
6.50 2.00
4.99
3.20
3.35 2.00
4.50 2.00
3.35 2.00
6.00 2.00

3.00 1.00
1.50 1.00
1.50 3.00
3.00 2.00

1.50 2.00
3.00 3.00

1.50 10.00 1.00


1.50 4.00 1.00
1.50 13.00 1.00
1.50 2.00 0.00
1.50 2.00 1.00
2.20 1.00 0.00

1.50 10.00 1.00


1.50 4.00 1.00
1.50 13.00 1.00
1.50 2.00 0.00
1.50 2.00 1.00
2.20 1.00 0.00

3.30
0.30 1.20 24.00
25.00
SUB TOTAL #REF!

241.40

10.00
1.60 10.00 1.00
1.00 10.00 1.00
0.40 10.00 1.00
4.00
1.60 4.00 1.00
1.00 4.00 1.00
0.40 4.00 1.00
13.00
1.60 13.00 1.00
1.00 13.00 2.00
0.40 13.00 2.00
2.00
1.60 2.00 1.00
1.00 2.00 2.00
0.40 2.00 2.00
0.40 2.00 1.00
2.00
1.60 2.00 1.00
1.00 2.00 2.00
0.40 2.00 2.00
1.00
1.60 1.00 1.00
1.00 1.00 3.00
0.40 1.00 3.00

27.25 10.00
30.65 4.00
36.55 13.00
32.90 2.00
33.85 2.00
27.10 1.00
64.20 1.00

10.00
2.50 10.00 1.00
2.50 10.00 1.00
0.40 10.00 1.00
2.50 10.00 1.00
0.40 10.00 1.00
1.20 10.00 1.00
2.00 10.00 1.00
4.00
2.50 4.00 1.00
2.50 4.00 1.00
0.40 4.00 1.00
2.50 4.00 1.00
0.40 4.00 1.00
1.20 4.00 1.00
2.00 4.00 1.00
13.00
2.50 13.00 1.00
2.50 13.00 1.00
0.40 13.00 1.00
2.50 13.00 1.00
0.40 13.00 1.00
1.20 13.00 1.00
2.00 13.00 1.00
2.00
2.50 2.00 2.00
2.50 2.00 1.00
0.40 2.00 1.00
2.50 2.00 1.00
0.40 2.00 1.00
1.20 2.00 1.00
2.00 2.00 1.00
2.00
2.50 2.00 2.00
2.50 2.00 1.00
0.40 2.00 1.00
2.50 2.00 1.00
0.40 2.00 1.00
1.20 2.00 1.00
2.00 2.00 1.00
1.00
2.50 1.00 1.00
2.50 1.00 1.00
0.40 1.00 1.00
2.50 1.00 1.00
0.40 1.00 1.00
1.20 1.00 1.00
2.00 1.00 1.00
1.00
2.50 1.00 3.00
2.15 1.00 4.00
2.50 1.00 1.00
2.50 1.00 2.00
2.50 1.00 1.00
0.90 1.00 33.00
3.40 70.49 2.40 m3
3.40 292.92 9.96 m3

SUB TOTAL #REF!

7.00 10.00
8.00 4.00
7.00 13.00
7.80 2.00
8.00 2.00
6.40 1.00
1.65 32.00 1.00

7.00 10.00
8.00 4.00
7.00 13.00
7.80 2.00
8.00 2.00
6.40 1.00
0.00 0.00

1.65 32.00 1.00

0.10 10.00
0.10 4.00
0.10 13.00
0.10 2.00
0.10 2.00
0.10 1.00
0.10
0.10

10.00
0.10 10.00 1.00
0.10 10.00 1.00
0.10 10.00 1.00
0.10 10.00 1.00
0.10 10.00 1.00
0.10 10.00 1.00
0.10 10.00 1.00
4.00
0.10 4.00 1.00
0.10 4.00 1.00
0.10 4.00 1.00
0.10 4.00 1.00
0.10 4.00 1.00
0.10 4.00 1.00
0.10 4.00 1.00
13.00
0.10 13.00 1.00
0.10 13.00 1.00
0.10 13.00 1.00
0.10 13.00 1.00
0.10 13.00 1.00
0.10 13.00 1.00
0.10 13.00 1.00
2.00
0.10 2.00 2.00
0.10 2.00 1.00
0.10 2.00 1.00
0.10 2.00 1.00
0.10 2.00 1.00
0.10 2.00 1.00
0.10 2.00 1.00
2.00
0.10 2.00 2.00
0.10 2.00 1.00
0.10 2.00 1.00
0.10 2.00 1.00
0.10 2.00 1.00
0.10 2.00 1.00
0.10 2.00 1.00
1.00
0.10 1.00 1.00
0.10 1.00 1.00
0.10 1.00 1.00
0.10 1.00 1.00
0.10 1.00 1.00
0.10 1.00 1.00
0.10 1.00 1.00
0.10 1.00 3.00
0.10 1.00 4.00
0.10 1.00 1.00
0.10 1.00 2.00
0.10 1.00 1.00
0.10 1.00 33.00

10.00 0.00
0.06 0.40 1.70 10.00 1.00
0.50 10.00 1.00
4.00 0.00
0.06 0.40 1.70 4.00 1.00
0.50 4.00 1.00
13.00 0.00
0.06 0.40 1.70 13.00 2.00
0.50 13.00 2.00
2.00 0.00
0.06 0.40 1.70 2.00 2.00
0.50 2.00 2.00
0.06 0.40 0.50 2.00 1.00
2.00 0.00
0.06 0.40 1.70 2.00 2.00
0.50 2.00 2.00
1.00 0.00
0.06 0.40 1.70 1.00 3.00

1.20
1.20
3.30
24.00 2.00

0.60 3.40 9.00 36.72 172.72


0.60 3.40 24.00 97.92
0.80 3.40 3.00 16.32
0.50 3.40 8.00 21.76

0.60 5.44 18.00 97.92 431.74


0.60 5.34 4.00 21.36
0.60 7.98 4.00 31.90
0.60 4.72 12.00 56.64
0.60 6.44 6.00 38.64
0.60 2.49 6.00 14.94
0.60 7.08 6.00 42.47
0.60 1.71 6.00 10.25
0.60 3.30 12.00 39.58
0.60 5.44 12.00 65.28
0.60 5.24 2.00 10.48
0.45 1.20 2.00 1.68
0.45 0.86 1.00 0.60

SUB TOTAL -

SUB TOTAL #REF!

1.50 10.00 1.00


1.50 4.00 1.00
1.50 13.00 1.00
1.50 2.00 0.00
1.50 2.00 1.00
2.20 1.00 0.00
0.50 27.00 0.00
0.75 2.00 0.00

4.90
3.00
18.35
2.68
53.20
6.00
6.00
20.75
4.90
3.00
4.90
3.50
2.80
3.50
0.75 2.00
1.00 27.00

1.50 10.00 1.00


1.50 4.00 1.00
1.50 13.00 1.00
1.50 2.00 -
1.50 2.00 1.00
2.20 1.00 -
SUB TOTAL -

27.25 10.00 1.00


30.65 4.00 1.00
36.55 13.00 1.00
32.90 2.00 1.00
33.85 2.00 1.00
27.10 1.00 1.00
64.20 1.00 1.00

27.25 10.00 1.00


30.65 4.00 1.00
36.55 13.00 1.00
32.90 2.00 1.00
33.85 2.00 1.00
27.10 1.00 1.00
64.20 1.00 5.00

27.25 10.00 1.00


30.65 4.00 1.00
36.55 13.00 1.00
32.90 2.00 1.00
33.85 2.00 1.00
27.10 1.00 1.00
64.20 1.00 3.00

1.35 10.00 1.00


1.05 4.00 1.00
1.75 13.00 1.00
1.45 2.00 1.00
1.35 2.00 1.00
1.17 1.00 1.00
SUB TOTAL #REF!
SUB TOTAL -

21.34 1.00

SUB TOTAL -

4.90
3.00
18.35
2.68
6.00
33.70
13.00
6.00
3.00
5.40
0.75 1.00
1.00 32.00
1.85 2.00
6.50 2.00
4.99
3.20
3.35 2.00
4.50 2.00
3.35 2.00
6.00 2.00

3.00 1.00
1.50 1.00
1.50 3.00
3.00 2.00

1.50 2.00
3.00 3.00

1.50 10.00 1.00


1.50 4.00 1.00
1.50 14.00 1.00
1.50 2.00 0.00
1.50 2.00 1.00
2.20 1.00 0.00

1.50 10.00 1.00


1.50 4.00 1.00
1.50 14.00 1.00
1.50 2.00 0.00
1.50 2.00 1.00
2.20 1.00 0.00

3.30
0.30 1.20 24.00
25.00

SUB TOTAL -

241.40

10.00
1.60 10.00 1.00 493.90
1.00 10.00 1.00
0.40 10.00 1.00
4.00
1.60 4.00 1.00
1.00 4.00 1.00
0.40 4.00 1.00
14.00
1.60 14.00 1.00
1.00 14.00 2.00
0.40 14.00 2.00
2.00
1.60 2.00 1.00
1.00 2.00 2.00
0.40 2.00 2.00
0.40 2.00 1.00
2.00
1.60 2.00 1.00
1.00 2.00 2.00
0.40 2.00 2.00
1.00
1.60 1.00 1.00
1.00 1.00 3.00
0.40 1.00 3.00
252.50
27.25 10.00
30.65 4.00
36.55 14.00
32.90 2.00
33.85 2.00
27.10 1.00
64.20 1.00

10.00
2.50 10.00 1.00
2.50 10.00 1.00
0.40 10.00 1.00
2.50 10.00 1.00
0.40 10.00 1.00
1.20 10.00 1.00
2.00 10.00 1.00
4.00
2.50 4.00 1.00
2.50 4.00 1.00
0.40 4.00 1.00
2.50 4.00 1.00
0.40 4.00 1.00
1.20 4.00 1.00
2.00 4.00 1.00
14.00
2.50 14.00 1.00
2.50 14.00 1.00
0.40 14.00 1.00
2.50 14.00 1.00
0.40 14.00 1.00
1.20 14.00 1.00
2.00 14.00 1.00
2.00
2.50 2.00 2.00
2.50 2.00 1.00
0.40 2.00 1.00
2.50 2.00 1.00
0.40 2.00 1.00
1.20 2.00 1.00
2.00 2.00 0.00
2.00
2.50 2.00 2.00
2.50 2.00 1.00
0.40 2.00 1.00
2.50 2.00 1.00
0.40 2.00 1.00
1.20 2.00 1.00
2.00 2.00 0.00
1.00
2.50 1.00 1.00
2.50 1.00 1.00
0.40 1.00 1.00
2.50 1.00 1.00
0.40 1.00 1.00
1.20 1.00 1.00
2.00 1.00 1.00
1.00
2.50 1.00 3.00
2.15 1.00 4.00
2.50 1.00 1.00
2.50 1.00 2.00
2.50 1.00 1.00
0.90 1.00 33.00
3.40 72.53 2.47 m3
3.40 303.50 10.32 m3

SUB TOTAL -

7.00 10.00
8.00 4.00
7.00 14.00
7.80 2.00
8.00 2.00
6.40 1.00

1.65 33.00 1.00

7.00 10.00
8.00 4.00
7.00 14.00
7.80 2.00
8.00 2.00
6.40 1.00
0.00 0.00

1.65 33.00 1.00

0.10 10.00
0.10 4.00
0.10 14.00
0.10 2.00
0.10 2.00
0.10 1.00
0.10

10.00
0.10 10.00 1.00
0.10 10.00 1.00
0.10 10.00 1.00
0.10 10.00 1.00
0.10 10.00 1.00
0.10 10.00 1.00
0.10 10.00 1.00
4.00
0.10 4.00 1.00
0.10 4.00 1.00
0.10 4.00 1.00
0.10 4.00 1.00
0.10 4.00 1.00
0.10 4.00 1.00
0.10 4.00 1.00
14.00
0.10 14.00 1.00
0.10 14.00 1.00
0.10 14.00 1.00
0.10 14.00 1.00
0.10 14.00 1.00
0.10 14.00 1.00
0.10 14.00 1.00
2.00
0.10 2.00 2.00
0.10 2.00 1.00
0.10 2.00 1.00
0.10 2.00 1.00
0.10 2.00 1.00
0.10 2.00 1.00
0.10 2.00 1.00
2.00
0.10 2.00 2.00
0.10 2.00 1.00
0.10 2.00 1.00
0.10 2.00 1.00
0.10 2.00 1.00
0.10 2.00 1.00
0.10 2.00 1.00
1.00
0.10 1.00 1.00
0.10 1.00 1.00
0.10 1.00 1.00
0.10 1.00 1.00
0.10 1.00 1.00
0.10 1.00 1.00
0.10 1.00 1.00
0.10 1.00 3.00
0.10 1.00 4.00
0.10 1.00 1.00
0.10 1.00 2.00
0.10 1.00 1.00
0.10 1.00 33.00

10.00 0.00
0.06 0.40 1.60 10.00 1.00
0.06 0.40 1.70 10.00 1.00
0.50 10.00 1.00
4.00 0.00
0.06 0.40 1.60 4.00 1.00
0.06 0.40 1.70 4.00 1.00
0.50 4.00 1.00
14.00 0.00
0.06 0.40 1.60 14.00 1.00
0.06 0.40 1.70 14.00 2.00
0.50 14.00 2.00
2.00 0.00
0.06 0.40 1.60 2.00 1.00
0.06 0.40 1.70 2.00 2.00
0.50 2.00 2.00
0.06 0.40 0.50 2.00 1.00
2.00 0.00
0.06 0.40 1.60 2.00 1.00
0.06 0.40 1.70 2.00 2.00
0.50 2.00 2.00
1.00 0.00
0.06 0.40 1.60 1.00 1.00
0.06 0.40 1.70 1.00 3.00

1.20
1.20
3.30
24.00 2.00

0.60 3.40 9.00 36.72 172.72


0.60 3.40 24.00 97.92
0.80 3.40 3.00 16.32
0.50 3.40 8.00 21.76

0.60 5.44 18.00 97.92 308.45


0.60 5.34 4.00 21.36
0.60 7.98 4.00 31.90
0.60 1.71 6.00 10.25
0.60 5.44 1.00 4.90
0.60 5.24 1.00 4.72
0.60 7.00 8.00 50.40
0.60 7.00 1.00 6.30
0.60 7.00 2.00 12.60
0.60 5.68 12.00 54.53
0.60 1.22 6.00 5.86
0.45 1.20 2.00 1.56
0.45 0.86 1.00 0.60
0.45 2.00 4.00 5.56

SUB TOTAL -

SUB TOTAL -

1.50 10.00 1.00


1.50 4.00 1.00
1.50 14.00 1.00
1.50 2.00 0.00
1.50 2.00 1.00
2.20 1.00 0.00
0.50 28.00 0.00
0.75 2.00 0.00

4.90
3.00
18.35
2.68
53.20
6.00
6.00
20.75
4.90
3.00
4.90
3.50
2.80
3.50
0.75 2.00
1.00 28.00

1.50 10.00 1.00


1.50 4.00 1.00
1.50 14.00 1.00
1.50 2.00 -
1.50 2.00 1.00
2.20 1.00 -
SUB TOTAL -

27.25 10.00 1.00


30.65 4.00 1.00
36.55 14.00 1.00
32.90 2.00 1.00
33.85 2.00 1.00
27.10 1.00 1.00
64.20 1.00 1.00

27.25 10.00 1.00


30.65 4.00 1.00
36.55 14.00 1.00
32.90 2.00 1.00
33.85 2.00 1.00
27.10 1.00 1.00
64.20 1.00 5.00

27.25 10.00 1.00


30.65 4.00 1.00
36.55 14.00 1.00
32.90 2.00 1.00
33.85 2.00 1.00
27.10 1.00 1.00
64.20 1.00 3.00

1.35 10.00 1.00


1.05 4.00 1.00
1.75 14.00 1.00
1.45 2.00 1.00
1.35 2.00 1.00
1.17 1.00 1.00
SUB TOTAL -
SUB TOTAL -

21.34 1.00
SUB TOTAL #REF!

SUB TOTAL -

SUB TOTAL -

71.19
2.15 1.00 4.00

70.89
27.57
9.13
3.71
24.98
5.51
2.15 1.00 8.00
0.90 1.00 1.00

6.80
59.84
61.42
62.13
61.19
70.89

3.40 27.83 0.95 m3


3.40 23.04 0.78 m3

SUB TOTAL -

0.10
0.10
0.10

0.50 4.03 8.00 25.79 25.79

0.60 5.44 18.00 97.92 442.32


0.60 5.34 6.00 32.04
0.60 7.98 4.00 31.90
0.60 1.71 6.00 10.25
0.60 7.80 2.00 15.60
0.60 7.87 4.00 28.33
0.60 6.94 3.00 18.75
0.60 7.14 3.00 19.26
0.60 7.84 4.00 28.22
0.60 11.70 6.00 56.16
0.60 8.00 6.00 38.40
0.60 12.00 6.00 57.60
0.45 1.20 2.00 1.68
0.45 0.86 1.00 0.60
0.45 2.00 4.00 5.60

SUB TOTAL -

SUB TOTAL -
SUB TOTAL -
REKAPITULASI RENCANA ANGGARAN BIAYA
P E K E R JAAN ARSITEKTUR

Pekerjaan : RUSUNAWA APRA 02


Lokasi : Rancacili Jawa Barat
Tahun Anggaran : 2016

2.2. PEKERJAAN ARSITEKTUR

No. URAIAN PEKERJAAN

2.2.A. PEKERJAAN ARSITEKTUR STANDART

#REF! #REF! SUB TOTAL


#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
4 #REF! #REF!
5 #REF! #REF!

#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
4 #REF! #REF!
5 #REF! #REF!
#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
4 #REF! #REF!
5 #REF! #REF!
6 #REF! #REF!
7 #REF! #REF!
8 #REF! #REF!
9 #REF! #REF!
No. URAIAN PEKERJAAN

10 #REF! #REF!
11 #REF! #REF!
12 #REF! #REF!
13 #REF! #REF!
14 #REF! #REF!

#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!

#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
4 #REF! #REF!
5 #REF! #REF!

#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!

#REF! #REF! SUB TOTAL


#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
4 #REF! #REF!

#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
No. URAIAN PEKERJAAN

4 #REF! #REF!
5 #REF! #REF!
#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
4 #REF! #REF!
5 #REF! #REF!
6 #REF! #REF!
7 #REF! #REF!
8 #REF! #REF!
9 #REF! #REF!
10 #REF! #REF!
11 #REF! #REF!
12 #REF! #REF!
13 #REF! #REF!

#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!

#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
4 #REF! #REF!
5 #REF! #REF!

#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!

#REF! #REF!
1 #REF! #REF!

#REF! #REF! SUB TOTAL


#REF! #REF!
1 #REF! #REF!
No. URAIAN PEKERJAAN

2 #REF! #REF!
3 #REF! #REF!
4 #REF! #REF!
5 #REF! #REF!

#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
4 #REF! #REF!
5 #REF! #REF!
#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
4 #REF! #REF!
5 #REF! #REF!
6 #REF! #REF!
7 #REF! #REF!
8 #REF! #REF!
9 #REF! #REF!
10 #REF! #REF!
11 #REF! #REF!
12 #REF! #REF!
13 #REF! #REF!

#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!

#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
4 #REF! #REF!
5 #REF! #REF!
No. URAIAN PEKERJAAN

#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!

#REF! #REF!
1 #REF! #REF!

#REF! #REF! SUB TOTAL


#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
4 #REF! #REF!
5 #REF! #REF!

#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
4 #REF! #REF!
5 #REF! #REF!
#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
4 #REF! #REF!
5 #REF! #REF!
6 #REF! #REF!
7 #REF! #REF!
8 #REF! #REF!
9 #REF! #REF!
10 #REF! #REF!
11 #REF! #REF!
12 #REF! #REF!
13 #REF! #REF!
No. URAIAN PEKERJAAN

#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!

#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
4 #REF! #REF!
5 #REF! #REF!

#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
#REF! #REF!
1 #REF! #REF!

#REF! #REF! SUB TOTAL


#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
4 #REF! #REF!

#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
4 #REF! #REF!
5 #REF! #REF!
#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
No. URAIAN PEKERJAAN

4 #REF! #REF!
5 #REF! #REF!
6 #REF! #REF!
7 #REF! #REF!
8 #REF! #REF!
9 #REF! #REF!
10 #REF! #REF!
11 #REF! #REF!
12 #REF! #REF!
13 #REF! #REF!

#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!

#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
4 #REF! #REF!
5 #REF! #REF!

#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!

#REF! #REF!
1 #REF! #REF!

#REF! #REF! SUB TOTAL


#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
4 #REF! #REF!
5 #REF! #REF!

#REF! #REF!
No. URAIAN PEKERJAAN

1 #REF! #REF!
2 #REF! #REF!
#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
4 #REF! #REF!
5 #REF! #REF!
#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
4 #REF! #REF!
5 #REF! #REF!
6 #REF! #REF!
7 #REF! #REF!
8 #REF! #REF!
9 #REF! #REF!
10 #REF! #REF!
11 #REF! #REF!
12 #REF! #REF!
13 #REF! #REF!

#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!

#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
4 #REF! #REF!
5 #REF! #REF!

#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
#REF! #REF!
No. URAIAN PEKERJAAN

1 #REF! #REF!

#REF! #REF! SUB TOTAL


#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
4 #REF! #REF!
5 #REF! #REF!

#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
4 #REF! #REF!
5 #REF! #REF!
#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
4 #REF! #REF!
5 #REF! #REF!
6 #REF! #REF!
7 #REF! #REF!
8 #REF! #REF!
9 #REF! #REF!
10 #REF! #REF!
11 #REF! #REF!
12 #REF! #REF!
13 #REF! #REF!

#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!

#REF! #REF!
No. URAIAN PEKERJAAN

1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
4 #REF! #REF!
5 #REF! #REF!

#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
#REF! #REF!
1 #REF! #REF!

#REF! #REF! SUB TOTAL


#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
4 #REF! #REF!

#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
4 #REF! #REF!
5 #REF! #REF!
#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
4 #REF! #REF!
5 #REF! #REF!
6 #REF! #REF!
7 #REF! #REF!
8 #REF! #REF!
9 #REF! #REF!
10 #REF! #REF!
No. URAIAN PEKERJAAN

11 #REF! #REF!
12 #REF! #REF!
13 #REF! #REF!

#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!

#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
4 #REF! #REF!
5 #REF! #REF!

#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
#REF! #REF!
1 #REF! #REF!

#REF! #REF! SUB TOTAL


#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
4 #REF! #REF!
5 #REF! #REF!

#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
4 #REF! #REF!
5 #REF! #REF!
No. URAIAN PEKERJAAN

#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
4 #REF! #REF!
5 #REF! #REF!
6 #REF! #REF!
7 #REF! #REF!
8 #REF! #REF!
9 #REF! #REF!
10 #REF! #REF!
11 #REF! #REF!
12 #REF! #REF!
13 #REF! #REF!

#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!

#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
4 #REF! #REF!
5 #REF! #REF!

#REF! #REF!
1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
#REF! #REF!
1 #REF! #REF!

#REF! #REF! SUB TOTAL


1 #REF! #REF!
2 #REF! #REF!
3 #REF! #REF!
4 #REF! #REF!
5 #REF! #REF!
No. URAIAN PEKERJAAN

6 #REF! #REF!
7 #REF! #REF!
8 #REF! #REF!
I RENCANA ANGGARAN BIAYA
JAAN ARSITEKTUR

JUMLAH HARGA
(Rp.)

#REF!

#REF!
JUMLAH HARGA
(Rp.)

#REF!
JUMLAH HARGA
(Rp.)

#REF!
JUMLAH HARGA
(Rp.)
JUMLAH HARGA
(Rp.)

#REF!
JUMLAH HARGA
(Rp.)

#REF!
JUMLAH HARGA
(Rp.)

#REF!
JUMLAH HARGA
(Rp.)
JUMLAH HARGA
(Rp.)

#REF!
JUMLAH HARGA
(Rp.)

#REF!
JUMLAH HARGA
(Rp.)

#REF!
JUMLAH HARGA
(Rp.)

#REF!
JUMLAH HARGA
(Rp.)
BILL OF QUANTITY (BOQ)
P E K E R JAAN ARSITEKTUR

Pekerjaan : RUSUNAWA
Lokasi : RANCACILI - JAWA BARAT
Tahun Anggaran : 2014

2.2. PEKERJAAN ARSITEKTUR


2.2.A. PEKERJAAN ARSITEKTUR STANDART

NO. J E N I S P E K E R JAAN VOL. SAT.

2.2.A. PEKERJAAN ARSITEKTUR STANDART

A.1. PEKERJAAN LANTAI

I LANTAI DASAR
A.1. PEKERJAAN LANTAI
1 Pasang perataan lantai (screed 1:3, t=3 cm + aci) - M2
2 Pasang keramik lantai hunian termasuk selasar dan hall 40x40 - M2
3 Pasang lantai keramik km/wc 30x30 ad. 5 cm (kasar) - M2
4 Pasang keramik 40x40 area hall lift - M2
5 Pasang keramik tangga 40x40 - M2
6 Pasang Step nozing 10 x 40 cm - M'
A.2. PEKERJAAN DINDING
A.2.A. PEKERJAAN PASANGAN DAN PLESTERAN
1 Pasangan dinding batako 1:4 termasuk tangga + sekeliling lift - M2
2 Plester + aci dinding batako exterior/dind. Terluar - M2
3 Plester + aci dinding batako interior/dind. Bag dalam - M2
4 Perapihan kolom beton - M2
5 Perapihan pelat beton bawah tangga + bordes - M2
6 Perapihan balok beton + balok tangga - M2
7 Perapihan pelat beton - M2
8 Pas. Railling besi tangga nempel dinding + finish cat (terpasang) - M1
9 Pas. Railling besi tangga + kaki termasuk landasan + finish cat (terpasang) - M1
10 Pas. Keramik 25x40 dinding Lift T=4,0 M - M2

PEK. ARSITEKTUR 344/632


2.2. PEKERJAAN ARSITEKTUR
2.2.A. PEKERJAAN ARSITEKTUR STANDART

NO. J E N I S P E K E R JAAN VOL. SAT.

11 Area Fasade :

- Dinding Fasade dari panel precast beton ringan area sekeliling tangga dan lift sisi luar 144.02 M2

- Kolom praktis & balok praktis 15/15, balok praktis kerawang 10/20 - M3
- Pas. Kerawang 20x20 (type R8, R9 dan R10) 124.08 M2
- Pas. Kerawang 20x20 (area tangga) 30.00 M2
A.2.B. PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES
Kusen alum. + daun pintu double multiplek t=9 mm + lapis teakwood t=4 mm (terpasang)
1 - Unit
type P1
2 Kusen alum. + daun pintu kaca t=5 mm (terpasang) type P2 - Unit
3 Kusen PVC + Daun Pintu PVC (terpasang) type P3 - Unit
4 Kusen aluminium + daun pintu type P1 (1 unit) + partisi (terpasang) type 1 hunian - Unit
5 Kusen aluminium + daun pintu type P1 (2 unit) + partisi (terpasang) type 2 hunian - Unit
6 Kusen aluminium + daun pintu type P1 (3 unit) + partisi (terpasang) type 3 hunian - Unit
7 Kusen Aluminium + Daun jendela (terpasang) type J1 - Unit
8 Kusen Aluminium + Daun jendela (terpasang) type J2 - Unit
9 Kusen Aluminium + Jendela bouvenligh (terpasang) type BV - Unit
10 Kusen Baja + Pintu Kebakaran (terpasang) type PB - Unit
A.3. PEKERJAAN PLAFOND
Penutup plafond Flat Pull system GRC T=4MM + rangka metal furring uk 60x120 cm
1 - M2
(KM/WC)
2 List plafond 3/3 - M'
A.4. PEKERJAAN UTILITAS
1 Pasang closet duduk (standart) - Buah

2 Wastafel + kran (terpasang) - Buah

3 Pasang shower + kran type double (terpasang) - Buah


Meja dapur beton dilapis keramik + kitchen zink + kran leher angsa (terpasang) pada
4 - Buah
hunian type 1

Meja dapur beton dilapis keramik + kitchen zink + kran leher angsa (terpasang) pada
5 - Buah
hunian type 2

Meja dapur beton dilapis keramik + kitchen zink + kran leher angsa (terpasang) pada
6 - Buah
hunian type 3

PEK. ARSITEKTUR 345/632


2.2. PEKERJAAN ARSITEKTUR
2.2.A. PEKERJAAN ARSITEKTUR STANDART

NO. J E N I S P E K E R JAAN VOL. SAT.

Pasangan peninggian lantai T= 10 cm di bawah dan samping meja dapur (1:2:3)


7 - M2
termasuk perapihan + keramik tanggulan pada hunian
8 Pasangan floor drain stainless - Buah
A.5. PEKERJAAN FINISHING

A.5.A. PEKERJAAN PENGECATAN

1 Cat dinding bag. Luar (exterior) - M2


2 Cat dinding bag. Dalam (interior) - M2
3 Cat kolom beton (eksterior) - M2
4 Cat kolom beton (interior) - M2
5 Cat balok beton + pelat bawah tangga - M2
6 Cat plafond expose (seluruh ruangan di lt. dasar) - M2
7 Area Fasade :
- Cat kolom praktis & balok praktis 15/15, balok praktis kerawang 10/20 (eksterior) - M2

II LANTAI SATU
A.1. PEKERJAAN LANTAI
1 Pasang keramik lantai hunian termasuk selasar dan hall 40x40 - M2
2 Pasang lantai keramik km/wc 30x30 ad. 5 cm (kasar) - M2
3 Pasang keramik tangga 40x40 - M2
4 Pasang Step nozing 10 x 40 cm - M'
5 Pasang rabat beton pada area tempat bak bunga tengah - M2
6 Pasang keramik motif batu belah 30x30 area tengah - M2
7 Waterproofing (bitumen) tahap 1 di atas lantai beton - M2
Beton pengisi ( K-225 ) lantai daerah km/wc T = 15 cm + tanggulan T = 20 cm sekeliling
8 - M3
km/wc (beton ready mix)

9 Waterproofing (liquid/cement base) tahap 2 di atas beton pengisi km/wc - M2

10 Waterproofing (liquid/cement base) di dinding km/wc T = 60 cm - M2


11 Waterproofing (liquid/cement base) di daerah lantai balkon, termasuk dinding T = 15 cm - M2
12 Screed + Waterproofing (liquid/cement base) di daerah bak bunga - M2
13 Waterproofing (liquid/cement base) di daerah area tengah + bak bunga tengah - M2
A.2. PEKERJAAN DINDING

PEK. ARSITEKTUR 346/632


2.2. PEKERJAAN ARSITEKTUR
2.2.A. PEKERJAAN ARSITEKTUR STANDART

NO. J E N I S P E K E R JAAN VOL. SAT.

A.2.A. PEKERJAAN PASANGAN DAN PLESTERAN


1 Pasangan dind. batako 1:4 termasuk tangga + dind shaft - M2
2 Plester + aci dinding batako exterior/dind. Terluar - M2
3 Plester + aci dinding batako interior/dind. Bag dalam - M2
4 Plester + aci dinding traslam - M2
Kolom praktis & balok praktis 15/15, balok praktis kerawang 10/20 termasuk opening
5 - M3
kusen aluminium
6 Perapihan kolom beton - M2
7 Perapihan pelat beton bawah tangga + bordes - M2
8 Perapihan balok beton + balok tangga termasuk balok koridor/selasar - M2
9 Perapihan pelat beton hunian + pelat koridor.selasar + bak bunga - M2
10 Pas. Railling besi tangga nempel dinding + finish cat (terpasang) - M1
11 Pas. Railling besi tangga + kaki termasuk landasan + finish cat (terpasang) - M1
12 Pas. Keramik 25x40 dinding Lift T=3,5 M - M2
13 Pas. Keramik 25x40 dinding km/wc T = 2.8 M - M2
14 Pas. Keramik 25x40, dinding pantry T = 0,80 M - M2
15 Area Fasade :

- Dinding Fasade dari panel precast beton ringan termasuk dind lift sisi luar 131.57 M2

- Kolom praktis & balok praktis 15/15, balok praktis kerawang 10/20 - M3
- Pas. Kerawang 20x20 (type R1, R2, R2', R3, R4, R5 dan R6) 71.84 M2
- Pas. Kerawang 20x20 (area tangga) 26.25 M2
A.2.B. PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES
Kusen alum. + daun pintu double multiplek t=9 mm + lapis teakwood t=4 mm (terpasang)
1 - Unit
type P1
2 Kusen alum. + daun pintu kaca t=5 mm (terpasang) type P2 - Unit
3 Kusen PVC + Daun Pintu PVC (terpasang) type P3 - Unit
4 Kusen aluminium + daun pintu type P1 (1 unit) + partisi (terpasang) type 1 hunian - Unit
5 Kusen aluminium + daun pintu type P1 (2 unit) + partisi (terpasang) type 2 hunian - Unit
6 Kusen aluminium + daun pintu type P1 (3 unit) + partisi (terpasang) type 3 hunian - Unit
7 Kusen Aluminium + Daun jendela (terpasang) type J1 - Unit
8 Kusen Aluminium + Daun jendela (terpasang) type J2 - Unit
9 Kusen Aluminium + Jendela bouvenligh (terpasang) type BV - Unit

PEK. ARSITEKTUR 347/632


2.2. PEKERJAAN ARSITEKTUR
2.2.A. PEKERJAAN ARSITEKTUR STANDART

NO. J E N I S P E K E R JAAN VOL. SAT.

10 Kusen Baja + Pintu Kebakaran (terpasang) type PB - Unit


A.3. PEKERJAAN PLAFOND
Penutup plafond Flat Pull system GRC T=4MM + rangka metal furring uk 60x120 cm
1 - M2
(KM/WC)
2 List plafond 3/3 - M'
A.4. PEKERJAAN UTILITAS
1 Pasang closet duduk (standart) - Buah

2 Wastafel + kran (terpasang) - Buah

3 Pasang shower + kran type double (terpasang) - Buah


Meja dapur beton dilapis keramik + kitchen zink + kran leher angsa (terpasang) pada
4 - Buah
hunian type 1

Meja dapur beton dilapis keramik + kitchen zink + kran leher angsa (terpasang) pada
5 - Buah
hunian type 2

Meja dapur beton dilapis keramik + kitchen zink + kran leher angsa (terpasang) pada
6 - Buah
hunian type 3

Pasangan peninggian lantai T= 10 cm di bawah dan samping meja dapur (1:2:3)


7 - M2
termasuk perapihan + keramik tanggulan pada hunian
8 Pasangan floor drain stainless - Buah
A.5. PEKERJAAN FINISHING

A.5.A. PEKERJAAN PENGECATAN

1 Cat dinding bag. Luar (exterior) - M2


2 Cat dinding bag. Dalam (interior) - M2
3 Cat kolom beton (eksterior) - M2
4 Cat kolom beton (interior) - M2
5 Cat balok beton + pelat bawah tangga - M2
6 Cat plafond expose (seluruh ruangan di lt. satu termasuk bak bunga) - M2

7 Cat plafond GRC (km/wc) - M2

8 Cat list plafond kayu - M2


9 Area Fasade :
- Cat dinding bag. Luar (exterior) - M2

PEK. ARSITEKTUR 348/632


2.2. PEKERJAAN ARSITEKTUR
2.2.A. PEKERJAAN ARSITEKTUR STANDART

NO. J E N I S P E K E R JAAN VOL. SAT.

- Cat dinding bag. Dalam (interior) - M2


- Cat kolom praktis & balok praktis 15/15, balok praktis kerawang 10/20 (eksterior) - M2

III LANTAI DUA


A.1. PEKERJAAN LANTAI
1 Pasang keramik lantai hunian termasuk selasar dan hall 40x40 - M2
2 Pasang lantai keramik km/wc 30x30 ad. 5 cm (kasar) - M2
3 Pasang keramik tangga 40x40 - M2
4 Pasang Step nozing 10 x 40 cm - M'
5 Waterproofing (bitumen) tahap 1 di atas lantai beton - M2
Beton pengisi ( K-225 ) lantai daerah km/wc T = 15 cm + tanggulan T = 20 cm sekeliling
6 - M3
km/wc
7 Waterproofing (liquid/cement base) tahap 2 di atas beton pengisi km/wc - M2
8 Waterproofing (liquid/cement base) di dinding km/wc T = 60 cm - M2
9 Waterproofing (liquid/cement base) di daerah lantai balkon, termasuk dinding T = 15 cm - M2
10 Screed + Waterproofing (liquid/cement base) di daerah bak bunga - M2
A.2. PEKERJAAN DINDING
A.2.A. PEKERJAAN PASANGAN DAN PLESTERAN
1 Pasangan dind. batako 1:4 termasuk tangga + dind shaft - M2
2 Plester + aci dinding batako exterior/dind. Terluar - M2
3 Plester + aci dinding batako interior/dind. Bag dalam - M2
4 Plester + aci dinding traslam - M2
Kolom praktis & balok praktis 15/15, balok praktis kerawang 10/20 termasuk opening
5 - M2
kusen aluminium
6 Perapihan kolom beton - M2
7 Perapihan pelat beton bawah tangga + bordes - M2
8 Perapihan balok beton + balok tangga termasuk balok koridor/selasar - M2
9 Perapihan pelat beton hunian + pelat koridor.selasar + bak bunga - M2
10 Pas. Railling besi tangga nempel dinding + finish cat (terpasang) - M2
11 Pas. Railling besi tangga + kaki termasuk landasan + finish cat (terpasang) - M2
12 Pas. Keramik 25x40 dinding Lift T=3,5 M - M2
13 Pas. Keramik 25x40 dinding km/wc T = 2.8 M - M2
14 Pas. Keramik 25x40, dinding pantry T = 0,80 M - M2

PEK. ARSITEKTUR 349/632


2.2. PEKERJAAN ARSITEKTUR
2.2.A. PEKERJAAN ARSITEKTUR STANDART

NO. J E N I S P E K E R JAAN VOL. SAT.

15 Area Fasade :
- Dinding Fasade dari panel precast beton ringan termasuk dind lift sisi luar 131.57 M2
- Kolom praktis & balok praktis 15/15, balok praktis kerawang 10/20 - M3
- Pas. Kerawang 20x20 (type R1, R2, R2', R3, R4, R5, R6 dan R7) 145.37 M2
- Pas. Kerawang 20x20 (area tangga) 26.25 M2
A.2.B. PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES
Kusen alum. + daun pintu double multiplek t=9 mm + lapis teakwood t=4 mm (terpasang)
1 - Unit
type P1
2 Kusen alum. + daun pintu kaca t=5 mm (terpasang) type P2 - Unit
3 Kusen PVC + Daun Pintu PVC (terpasang) type P3 - Unit
4 Kusen aluminium + daun pintu type P1 (1 unit) + partisi (terpasang) type 1 hunian - Unit
5 Kusen aluminium + daun pintu type P1 (2 unit) + partisi (terpasang) type 2 hunian - Unit
6 Kusen aluminium + daun pintu type P1 (3 unit) + partisi (terpasang) type 3 hunian - Unit
7 Kusen Aluminium + Daun jendela (terpasang) type J1 - Unit
8 Kusen Aluminium + Daun jendela (terpasang) type J2 - Unit
9 Kusen Aluminium + Daun jendela bouvenligh (terpasang) type BV - Unit
10 Kusen Baja + Pintu Kebakaran (terpasang) type PB - Unit
A.3. PEKERJAAN PLAFOND
Penutup plafond Flat Pull system GRC T=4MM + rangka metal furring uk 60x120 cm
1 - M2
(KM/WC)
2 List plafond 3/3 - M2
A.4. PEKERJAAN UTILITAS
1 Pasang closet duduk (standart) - M2
2 Wastafel + kran (terpasang) - M2
3 Pasang shower + kran type double (terpasang) - M2
Meja dapur beton dilapis keramik + kitchen zink + kran leher angsa (terpasang) pada
4 - M2
hunian type 1

Meja dapur beton dilapis keramik + kitchen zink + kran leher angsa (terpasang) pada
5 - M2
hunian type 2

Meja dapur beton dilapis keramik + kitchen zink + kran leher angsa (terpasang) pada
6 - M2
hunian type 3

Pasangan peninggian lantai T= 10 cm di bawah dan samping meja dapur (1:2:3)


7 - M2
termasuk perapihan + keramik tanggulan pada hunian
8 Pasangan floor drain stainless - M2

PEK. ARSITEKTUR 350/632


2.2. PEKERJAAN ARSITEKTUR
2.2.A. PEKERJAAN ARSITEKTUR STANDART

NO. J E N I S P E K E R JAAN VOL. SAT.

A.5. PEKERJAAN FINISHING

A.5.A. PEKERJAAN PENGECATAN

1 Cat dinding bag. Luar (exterior) - M2


2 Cat dinding bag. Dalam (interior) - M2
3 Cat kolom beton (eksterior) - M2
4 Cat kolom beton (interior) - M2
5 Cat balok beton + pelat bawah tangga - M2
6 Cat plafond expose (seluruh ruangan di lt. dua termasuk bak bunga) - M2
7 Cat plafond GRC (km/wc) - M2
8 Cat list plafond kayu - M2
9 Area Fasade :
- Cat dinding bag. Luar (exterior) - M2
- Cat dinding bag. Dalam (interior) - M2
- Cat kolom praktis & balok praktis 15/15, balok praktis kerawang 10/20 (eksterior) - M2

IV LANTAI TIGA
A.1. PEKERJAAN LANTAI
1 Pasang keramik lantai hunian termasuk selasar dan hall 40x40 - M2
2 Pasang lantai keramik km/wc 30x30 ad. 5 cm (kasar) - M2
3 Pasang keramik tangga 40x40 - M2
4 Pasang Step nozing 10 x 40 cm - M'
5 Waterproofing (bitumen) tahap 1 di atas lantai beton - M2
Beton pengisi ( K-225 ) lantai daerah km/wc T = 15 cm + tanggulan T = 20 cm sekeliling
6 - M3
km/wc
7 Waterproofing (liquid/cement base) tahap 2 di atas beton pengisi km/wc - M2
8 Waterproofing (liquid/cement base) di dinding km/wc T = 60 cm - M2
9 Waterproofing (liquid/cement base) di daerah lantai balkon, termasuk dinding T = 15 cm - M2
10 Screed + Waterproofing (liquid/cement base) di daerah bak bunga - M2
11 Screed + Waterproofing (liquid/cement base) di daerah as A-C ( pelat lt.4 ) - M2
A.2. PEKERJAAN DINDING
A.2.A. PEKERJAAN PASANGAN DAN PLESTERAN
1 Pasangan dind. batako 1:4 termasuk tangga + dind shaft - M2

PEK. ARSITEKTUR 351/632


2.2. PEKERJAAN ARSITEKTUR
2.2.A. PEKERJAAN ARSITEKTUR STANDART

NO. J E N I S P E K E R JAAN VOL. SAT.

2 Plester + aci dinding batako exterior/dind. Terluar - M2


3 Plester + aci dinding batako interior/dind. Bag dalam - M2
4 Plester + aci dinding traslam - M2
Kolom praktis & balok praktis 15/15, balok praktis kerawang 10/20 termasuk opening
5 - M3
kusen aluminium
6 Perapihan kolom beton - M2
7 Perapihan pelat beton bawah tangga + bordes - M2
8 Perapihan balok beton + balok tangga termasuk balok koridor/selasar - M2
9 Perapihan pelat beton hunian + pelat koridor.selasar + bak bunga - M2
10 Pas. Railling besi tangga nempel dinding + finish cat (terpasang) - M1
11 Pas. Railling besi tangga + kaki termasuk landasan + finish cat (terpasang) - M1
12 Pas. Keramik 25x40 dinding Lift T=3,5 M - M2
13 Pas. Keramik 25x40 dinding km/wc T = 2.8 M - M2
14 Pas. Keramik 25x40, dinding pantry T = 0,80 M - M2
15 Area Fasade :
- Dinding Fasade dari panel precast beton ringan termasuk dind lift sisi luar 131.57 M2
- Kolom praktis & balok praktis 15/15, balok praktis kerawang 10/20 - M3
- Pas. Kerawang 20x20 (type R1, R2, R2', R3, R4, R6 dan R7) 137.87 M2
- Pas. Kerawang 20x20 (area tangga) 26.25 M2
A.2.B. PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES
Kusen alum. + daun pintu double multiplek t=9 mm + lapis teakwood t=4 mm (terpasang)
1 - Unit
type P1
2 Kusen alum. + daun pintu kaca t=5 mm (terpasang) type P2 - Unit
3 Kusen PVC + Daun Pintu PVC (terpasang) type P3 - Unit
4 Kusen aluminium + daun pintu type P1 (1 unit) + partisi (terpasang) type 1 hunian - Unit
5 Kusen aluminium + daun pintu type P1 (2 unit) + partisi (terpasang) type 2 hunian - Unit
6 Kusen aluminium + daun pintu type P1 (3 unit) + partisi (terpasang) type 3 hunian - Unit
7 Kusen Aluminium + Daun jendela (terpasang) type J1 - Unit
8 Kusen Aluminium + Daun jendela (terpasang) type J2 - Unit
9 Kusen Aluminium + Daun jendela bouvenligh (terpasang) type BV - Unit
10 Kusen Baja + Pintu Kebakaran (terpasang) type PB - Unit
A.3. PEKERJAAN PLAFOND

PEK. ARSITEKTUR 352/632


2.2. PEKERJAAN ARSITEKTUR
2.2.A. PEKERJAAN ARSITEKTUR STANDART

NO. J E N I S P E K E R JAAN VOL. SAT.

Penutup plafond Flat Pull system GRC T=4MM + rangka metal furring uk 60x120 cm
1 - M2
(KM/WC)

2 List plafond 3/3 - M'

A.4. PEKERJAAN UTILITAS


1 Pasang closet duduk (standart) - Buah
2 Wastafel + kran (terpasang) - Buah
3 Pasang shower + kran type double (terpasang) - Buah
Meja dapur beton dilapis keramik + kitchen zink + kran leher angsa (terpasang) pada
4 - Buah
hunian type 1

Meja dapur beton dilapis keramik + kitchen zink + kran leher angsa (terpasang) pada
5 - Buah
hunian type 2

Meja dapur beton dilapis keramik + kitchen zink + kran leher angsa (terpasang) pada
6 - Buah
hunian type 3

Pasangan peninggian lantai T= 10 cm di bawah dan samping meja dapur (1:2:3)


7 - Buah
termasuk perapihan + keramik tanggulan pada hunian
8 Pasangan floor drain stainless - Buah
A.5. PEKERJAAN FINISHING

A.5.A. PEKERJAAN PENGECATAN

1 Cat dinding bag. Luar (exterior) - M2


2 Cat dinding bag. Dalam (interior) - M2

3 Cat kolom beton (eksterior) - M2

4 Cat kolom beton (interior) - M2


5 Cat balok beton + pelat bawah tangga - M2
6 Cat plafond expose (seluruh ruangan di lt. tiga termasuk bak bunga) - M2
7 Cat plafond GRC (km/wc) - M2
8 Cat list plafond kayu - M2

9 Area Fasade :

- Cat dinding bag. Luar (exterior) - M2

- Cat dinding bag. Dalam (interior) - M2

PEK. ARSITEKTUR 353/632


2.2. PEKERJAAN ARSITEKTUR
2.2.A. PEKERJAAN ARSITEKTUR STANDART

NO. J E N I S P E K E R JAAN VOL. SAT.

- Cat kolom praktis & balok praktis 15/15, balok praktis kerawang 10/20 (eksterior) - M2

V LANTAI EMPAT
A.1. PEKERJAAN LANTAI
1 Pasang keramik lantai hunian termasuk selasar dan hall 40x40 - M2
2 Pasang lantai keramik km/wc 30x30 ad. 5 cm (kasar) - M2
3 Pasang keramik tangga 40x40 - M2
4 Pasang Step nozing 10 x 40 cm - M'
5 Waterproofing (bitumen) tahap 1 di atas lantai beton - M2
Beton pengisi ( K-225 ) lantai daerah km/wc T = 15 cm + tanggulan T = 20 cm sekeliling
6 - M3
km/wc
7 Waterproofing (liquid/cement base) tahap 2 di atas beton pengisi km/wc - M2
8 Waterproofing (liquid/cement base) di dinding km/wc T = 60 cm - M2
9 Waterproofing (liquid/cement base) di daerah lantai balkon, termasuk dinding T = 15 cm - M2
10 Screed + Waterproofing (liquid/cement base) di daerah bak bunga - M2
A.2. PEKERJAAN DINDING
A.2.A. PEKERJAAN PASANGAN DAN PLESTERAN
1 Pasangan dind. batako 1:4 termasuk tangga + dind shaft - M2
2 Plester + aci dinding batako exterior/dind. Terluar - M2
3 Plester + aci dinding batako interior/dind. Bag dalam - M2
4 Plester + aci dinding traslam - M2
Kolom praktis & balok praktis 15/15, balok praktis kerawang 10/20 termasuk opening
5 - M3
kusen aluminium
6 Perapihan kolom beton - M2
7 Perapihan pelat beton bawah tangga + bordes - M2
8 Perapihan balok beton + balok tangga termasuk balok koridor/selasar - M2
9 Perapihan pelat beton hunian + pelat koridor.selasar + bak bunga - M2
10 Pas. Railling besi tangga nempel dinding + finish cat (terpasang) - M1
11 Pas. Railling besi tangga + kaki termasuk landasan + finish cat (terpasang) - M1
12 Pas. Keramik 25x40 dinding Lift T=3,5 M - M2
13 Pas. Keramik 25x40 dinding km/wc T = 2.8 M - M2
14 Pas. Keramik 25x40, dinding pantry T = 0,80 M - M2
15 Area Fasade :

PEK. ARSITEKTUR 354/632


2.2. PEKERJAAN ARSITEKTUR
2.2.A. PEKERJAAN ARSITEKTUR STANDART

NO. J E N I S P E K E R JAAN VOL. SAT.

- Dinding Fasade dari panel precast beton ringan termasuk dind lift sisi luar 131.57 M2
- Kolom praktis & balok praktis 15/15, balok praktis kerawang 10/20 - M3
- Pas. Kerawang 20x20 (type R1, R2, R2', R3, R4, R6 dan R7) 143.27 M2
- Pas. Kerawang 20x20 (area tangga) 26.25 M2
A.2.B. PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES

Kusen alum. + daun pintu double multiplek t=9 mm + lapis teakwood t=4 mm (terpasang)
1 - Unit
type P1

2 Kusen alum. + daun pintu kaca t=5 mm (terpasang) type P2 - Unit


3 Kusen PVC + Daun Pintu PVC (terpasang) type P3 - Unit
4 Kusen aluminium + daun pintu type P1 (1 unit) + partisi (terpasang) type 1 hunian - Unit
5 Kusen aluminium + daun pintu type P1 (2 unit) + partisi (terpasang) type 2 hunian - Unit
6 Kusen aluminium + daun pintu type P1 (3 unit) + partisi (terpasang) type 3 hunian - Unit
7 Kusen Aluminium + Daun jendela (terpasang) type J1 - Unit
8 Kusen Aluminium + Daun jendela (terpasang) type J2 - Unit
9 Kusen Aluminium + Daun jendela bouvenligh (terpasang) type BV - Unit
10 Kusen Baja + Pintu Kebakaran (terpasang) type PB - Unit
A.3. PEKERJAAN PLAFOND
Penutup plafond Flat Pull system GRC T=4MM + rangka metal furring uk 60x120 cm
1 - M2
(KM/WC)

2 List plafond 3/3 - M'

A.4. PEKERJAAN UTILITAS


1 Pasang closet duduk (standart) - Buah
2 Wastafel + kran (terpasang) - Buah
3 Pasang shower + kran type double (terpasang) - Buah
Meja dapur beton dilapis keramik + kitchen zink + kran leher angsa (terpasang) pada
4 - Buah
hunian type 1

Meja dapur beton dilapis keramik + kitchen zink + kran leher angsa (terpasang) pada
5 - Buah
hunian type 2

Meja dapur beton dilapis keramik + kitchen zink + kran leher angsa (terpasang) pada
6 - Buah
hunian type 3

Pasangan peninggian lantai T= 10 cm di bawah dan samping meja dapur (1:2:3)


7 - Buah
termasuk perapihan + keramik tanggulan pada hunian
8 Pasangan floor drain stainless - Buah

PEK. ARSITEKTUR 355/632


2.2. PEKERJAAN ARSITEKTUR
2.2.A. PEKERJAAN ARSITEKTUR STANDART

NO. J E N I S P E K E R JAAN VOL. SAT.

A.5. PEKERJAAN FINISHING

A.5.A. PEKERJAAN PENGECATAN

1 Cat dinding bag. Luar (exterior) - M2


2 Cat dinding bag. Dalam (interior) - M2
3 Cat kolom beton (eksterior) - M2
4 Cat kolom beton (interior) - M2
5 Cat balok beton + pelat bawah tangga - M2
6 Cat plafond expose (seluruh ruangan di lt. empat termasuk bak bunga) - M2
7 Cat plafond GRC (km/wc) - M2
8 Cat list plafond kayu - M2
9 Area Fasade :
- Cat dinding bag. Luar (exterior) - M2
- Cat dinding bag. Dalam (interior) - M2
- Cat kolom praktis & balok praktis 15/15, balok praktis kerawang 10/20 (eksterior) - M2

VI LANTAI LIMA
A.1. PEKERJAAN LANTAI
1 Pasang keramik lantai hunian termasuk selasar dan hall 40x40 - M2
2 Pasang lantai keramik km/wc 30x30 ad. 5 cm (kasar) - M2
3 Pasang keramik tangga 40x40 - M2
4 Pasang Step nozing 10 x 40 cm - M'
5 Waterproofing (bitumen) tahap 1 di atas lantai beton - M2
Beton pengisi ( K-225 ) lantai daerah km/wc T = 15 cm + tanggulan T = 20 cm sekeliling
6 - M3
km/wc
7 Waterproofing (liquid/cement base) tahap 2 di atas beton pengisi km/wc - M2
8 Waterproofing (liquid/cement base) di dinding km/wc T = 60 cm - M2
9 Waterproofing (liquid/cement base) di daerah lantai balkon, termasuk dinding T = 15 cm - M2
10 Screed + Waterproofing (liquid/cement base) di daerah bak bunga - M2
A.2. PEKERJAAN DINDING
A.2.A. PEKERJAAN PASANGAN DAN PLESTERAN
1 Pasangan dind. batako 1:4 termasuk tangga + dind shaft - M2
2 Plester + aci dinding batako exterior/dind. Terluar - M2

PEK. ARSITEKTUR 356/632


2.2. PEKERJAAN ARSITEKTUR
2.2.A. PEKERJAAN ARSITEKTUR STANDART

NO. J E N I S P E K E R JAAN VOL. SAT.

3 Plester + aci dinding batako interior/dind. Bag dalam - M2


4 Plester + aci dinding traslam - M2
Kolom praktis & balok praktis 15/15, balok praktis kerawang 10/20 termasuk opening
5 - M3
kusen aluminium
6 Perapihan kolom beton - M2
7 Perapihan pelat beton bawah tangga + bordes - M2
8 Perapihan balok beton + balok tangga termasuk balok koridor/selasar - M2
9 Perapihan pelat beton hunian + pelat koridor.selasar + bak bunga - M2
10 Pas. Railling besi tangga nempel dinding + finish cat (terpasang) - M1
11 Pas. Railling besi tangga + kaki termasuk landasan + finish cat (terpasang) - M1
12 Pas. Keramik 25x40 dinding Lift T=3,5 M - M2
13 Pas. Keramik 25x40 dinding km/wc T = 2.8 M - M2
14 Pas. Keramik 25x40, dinding pantry T = 0,80 M - M2
15 Area Fasade :
- Dinding Fasade dari panel precast beton ringan termasuk dind lift sisi luar 131.57 M2
- Kolom praktis & balok praktis 15/15, balok praktis kerawang 10/20 - M3
- Pas. Kerawang 20x20 (type R1, R2, R2', R3, R4, R6 dan R7) 143.27 M2
- Pas. Kerawang 20x20 (area tangga) 26.25 M2
A.2.B. PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES
Kusen alum. + daun pintu double multiplek t=9 mm + lapis teakwood t=4 mm (terpasang)
1 - Unit
type P1
2 Kusen alum. + daun pintu kaca t=5 mm (terpasang) type P2 - Unit
3 Kusen PVC + Daun Pintu PVC (terpasang) type P3 - Unit
4 Kusen aluminium + daun pintu type P1 (1 unit) + partisi (terpasang) type 1 hunian - Unit
5 Kusen aluminium + daun pintu type P1 (2 unit) + partisi (terpasang) type 2 hunian - Unit
6 Kusen aluminium + daun pintu type P1 (3 unit) + partisi (terpasang) type 3 hunian - Unit
7 Kusen Aluminium + Daun jendela (terpasang) type J1 - Unit
8 Kusen Aluminium + Daun jendela (terpasang) type J2 - Unit
9 Kusen Aluminium + Daun jendela bouvenligh (terpasang) type BV - Unit
10 Kusen Baja + Pintu Kebakaran (terpasang) type PB - Unit
A.3. PEKERJAAN PLAFOND
Penutup plafond Flat Pull system GRC T=4MM + rangka metal furring uk 60x120 cm
1 - M2
(KM/WC)

PEK. ARSITEKTUR 357/632


2.2. PEKERJAAN ARSITEKTUR
2.2.A. PEKERJAAN ARSITEKTUR STANDART

NO. J E N I S P E K E R JAAN VOL. SAT.

2 List plafond 3/3 - M'

A.4. PEKERJAAN UTILITAS


1 Pasang closet duduk (standart) - Buah
2 Wastafel + kran (terpasang) - Buah
3 Pasang shower + kran type double (terpasang) - Buah
Meja dapur beton dilapis keramik + kitchen zink + kran leher angsa (terpasang) pada
4 - Buah
hunian type 1

Meja dapur beton dilapis keramik + kitchen zink + kran leher angsa (terpasang) pada
5 - Buah
hunian type 2

Meja dapur beton dilapis keramik + kitchen zink + kran leher angsa (terpasang) pada
6 - Buah
hunian type 3

Pasangan peninggian lantai T= 10 cm di bawah dan samping meja dapur (1:2:3)


7 - Buah
termasuk perapihan + keramik tanggulan pada hunian
8 Pasangan floor drain stainless - Buah
A.5. PEKERJAAN FINISHING

A.5.A. PEKERJAAN PENGECATAN

1 Cat dinding bag. Luar (exterior) - M2


2 Cat dinding bag. Dalam (interior) - M2
3 Cat kolom beton (eksterior) - M2
4 Cat kolom beton (interior) - M2
5 Cat balok beton + pelat bawah tangga - M2
6 Cat plafond expose (seluruh ruangan di lt. lima termasuk bak bunga) - M2
7 Cat plafond GRC (km/wc) - M2
8 Cat list plafond kayu - M2
9 Area Fasade :
- Cat dinding bag. Luar (exterior) - M2
- Cat dinding bag. Dalam (interior) - M2
- Cat kolom praktis & balok praktis 15/15, balok praktis kerawang 10/20 (eksterior) - M2

VII LANTAI ENAM


A.1. PEKERJAAN LANTAI
1 Pasang keramik lantai hunian termasuk selasar dan hall 40x40 - M2

PEK. ARSITEKTUR 358/632


2.2. PEKERJAAN ARSITEKTUR
2.2.A. PEKERJAAN ARSITEKTUR STANDART

NO. J E N I S P E K E R JAAN VOL. SAT.

2 Pasang lantai keramik km/wc 30x30 ad. 5 cm (kasar) - M2


3 Pasang keramik tangga 40x40 - M2
4 Pasang Step nozing 10 x 40 cm - M'
5 Waterproofing (bitumen) tahap 1 di atas lantai beton - M2
Beton pengisi ( K-225 ) lantai daerah km/wc T = 15 cm + tanggulan T = 20 cm sekeliling
6 - M3
km/wc
7 Waterproofing (liquid/cement base) tahap 2 di atas beton pengisi km/wc - M2
8 Waterproofing (liquid/cement base) di dinding km/wc T = 60 cm - M2
9 Waterproofing (liquid/cement base) di daerah lantai balkon, termasuk dinding T = 15 cm - M2
10 Screed + Waterproofing (liquid/cement base) di daerah bak bunga - M2
11 Screed + Waterproofing (liquid/cement base) di daerah as M - O ( pelat lt.7 ) - M2
A.2. PEKERJAAN DINDING
A.2.A. PEKERJAAN PASANGAN DAN PLESTERAN
1 Pasangan dind. batako 1:4 termasuk tangga + dind shaft - M2
2 Plester + aci dinding batako exterior/dind. Terluar - M2
3 Plester + aci dinding batako interior/dind. Bag dalam - M2
4 Plester + aci dinding traslam - M2
Kolom praktis & balok praktis 15/15, balok praktis kerawang 10/20 termasuk opening
5 - M3
kusen aluminium
6 Perapihan kolom beton - M2
7 Perapihan pelat beton bawah tangga + bordes - M2
8 Perapihan balok beton + balok tangga termasuk balok koridor/selasar - M2
9 Perapihan pelat beton hunian + pelat koridor.selasar + bak bunga - M2
10 Pas. Railling besi tangga nempel dinding + finish cat (terpasang) - M1
11 Pas. Railling besi tangga + kaki termasuk landasan + finish cat (terpasang) - M1
12 Pas. Keramik 25x40 dinding Lift T=3,5 M - M2
13 Pas. Keramik 25x40 dinding km/wc T = 2.8 M - M2
14 Pas. Keramik 25x40, dinding pantry T = 0,80 M - M2
15 Area Fasade :
- Dinding Fasade dari panel precast beton ringan termasuk dind lift sisi luar 131.57 M2
- Kolom praktis & balok praktis 15/15, balok praktis kerawang 10/20 - M3
- Pas. Kerawang 20x20 (type R1, R2, R2', R3, R4, R6 dan R7) 136.57 M2
- Pas. Kerawang 20x20 (area tangga) 26.25 M2

PEK. ARSITEKTUR 359/632


2.2. PEKERJAAN ARSITEKTUR
2.2.A. PEKERJAAN ARSITEKTUR STANDART

NO. J E N I S P E K E R JAAN VOL. SAT.

A.2.B. PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES


Kusen alum. + daun pintu double multiplek t=9 mm + lapis teakwood t=4 mm (terpasang)
1 - Unit
type P1
2 Kusen alum. + daun pintu kaca t=5 mm (terpasang) type P2 - Unit
3 Kusen PVC + Daun Pintu PVC (terpasang) type P3 - Unit
4 Kusen aluminium + daun pintu type P1 (1 unit) + partisi (terpasang) type 1 hunian - Unit
5 Kusen aluminium + daun pintu type P1 (2 unit) + partisi (terpasang) type 2 hunian - Unit
6 Kusen aluminium + daun pintu type P1 (3 unit) + partisi (terpasang) type 3 hunian - Unit
7 Kusen Aluminium + Daun jendela (terpasang) type J1 - Unit
8 Kusen Aluminium + Daun jendela (terpasang) type J2 - Unit
9 Kusen Aluminium + Daun jendela bouvenligh (terpasang) type BV - Unit
10 Kusen Baja + Pintu Kebakaran (terpasang) type PB - Unit
A.3. PEKERJAAN PLAFOND
Penutup plafond Flat Pull system GRC T=4MM + rangka metal furring uk 60x120 cm
1 - M2
(KM/WC)

2 List plafond 3/3 - M'

A.4. PEKERJAAN UTILITAS


1 Pasang closet duduk (standart) - Buah
2 Wastafel + kran (terpasang) - Buah
3 Pasang shower + kran type double (terpasang) - Buah
Meja dapur beton dilapis keramik + kitchen zink + kran leher angsa (terpasang) pada
4 - Buah
hunian type 1

Meja dapur beton dilapis keramik + kitchen zink + kran leher angsa (terpasang) pada
5 - Buah
hunian type 2

Meja dapur beton dilapis keramik + kitchen zink + kran leher angsa (terpasang) pada
6 - Buah
hunian type 3

Pasangan peninggian lantai T= 10 cm di bawah dan samping meja dapur (1:2:3)


7 - Buah
termasuk perapihan + keramik tanggulan pada hunian
8 Pasangan floor drain stainless - Buah
A.5. PEKERJAAN FINISHING

A.5.A. PEKERJAAN PENGECATAN

1 Cat dinding bag. Luar (exterior) - M2

PEK. ARSITEKTUR 360/632


2.2. PEKERJAAN ARSITEKTUR
2.2.A. PEKERJAAN ARSITEKTUR STANDART

NO. J E N I S P E K E R JAAN VOL. SAT.

2 Cat dinding bag. Dalam (interior) - M2


3 Cat kolom beton (eksterior) - M2
4 Cat kolom beton (interior) - M2
5 Cat balok beton + pelat bawah tangga - M2
6 Cat plafond expose (seluruh ruangan di lt. enam termasuk bak bunga) - M2
7 Cat plafond GRC (km/wc) - M2
8 Cat list plafond kayu - M2
9 Area Fasade :
- Cat dinding bag. Luar (exterior) - M2
- Cat dinding bag. Dalam (interior) - M2
- Cat kolom praktis & balok praktis 15/15, balok praktis kerawang 10/20 (eksterior) - M2

VIII LANTAI TUJUH


A.1. PEKERJAAN LANTAI
1 Pasang keramik lantai hunian termasuk selasar dan hall 40x40 - M2
2 Pasang lantai keramik km/wc 30x30 ad. 5 cm (kasar) - M2
3 Pasang keramik tangga 40x40 - M2
4 Pasang Step nozing 10 x 40 cm - M'
5 Waterproofing (bitumen) tahap 1 di atas lantai beton - M2
Beton pengisi ( K-225 ) lantai daerah km/wc T = 15 cm + tanggulan T = 20 cm sekeliling
6 - M3
km/wc
7 Waterproofing (liquid/cement base) tahap 2 di atas beton pengisi km/wc - M2
8 Waterproofing (liquid/cement base) di dinding km/wc T = 60 cm - M2
9 Waterproofing (liquid/cement base) di daerah lantai balkon, termasuk dinding T = 15 cm - M2
10 Screed + Waterproofing (liquid/cement base) di daerah bak bunga - M2
A.2. PEKERJAAN DINDING
A.2.A. PEKERJAAN PASANGAN DAN PLESTERAN
1 Pasangan dind. batako 1:4 termasuk tangga + dind shaft - M2
2 Plester + aci dinding batako exterior/dind. Terluar - M2
3 Plester + aci dinding batako interior/dind. Bag dalam - M2
4 Plester + aci dinding traslam - M2
Kolom praktis & balok praktis 15/15, balok praktis kerawang 10/20 termasuk opening
5 - M3
kusen aluminium

PEK. ARSITEKTUR 361/632


2.2. PEKERJAAN ARSITEKTUR
2.2.A. PEKERJAAN ARSITEKTUR STANDART

NO. J E N I S P E K E R JAAN VOL. SAT.

6 Perapihan kolom beton - M2


7 Perapihan pelat beton bawah tangga + bordes - M2
8 Perapihan balok beton + balok tangga termasuk balok koridor/selasar - M2
9 Perapihan pelat beton hunian + pelat koridor.selasar + bak bunga - M2
10 Pas. Railling besi tangga nempel dinding + finish cat (terpasang) - M1
11 Pas. Railling besi tangga + kaki termasuk landasan + finish cat (terpasang) - M1
12 Pas. Keramik 25x40 dinding Lift T=3,5 M - M2
13 Pas. Keramik 25x40 dinding km/wc T = 2.8 M - M2
14 Pas. Keramik 25x40, dinding pantry T = 0,80 M - M2
15 Area Fasade :
- Dinding Fasade dari panel precast beton ringan termasuk dind lift sisi luar 131.57 M2
- Kolom praktis & balok praktis 15/15, balok praktis kerawang 10/20 - M3
- Pas. Kerawang 20x20 (type R1, R2, R2', R3, R4, R6 dan R7) 141.97 M2
- Pas. Kerawang 20x20 (area tangga) 26.25 M2
A.2.B. PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES
Kusen alum. + daun pintu double multiplek t=9 mm + lapis teakwood t=4 mm (terpasang)
1 - Unit
type P1
2 Kusen alum. + daun pintu kaca t=5 mm (terpasang) type P2 - Unit
3 Kusen PVC + Daun Pintu PVC (terpasang) type P3 - Unit
4 Kusen aluminium + daun pintu type P1 (1 unit) + partisi (terpasang) type 1 hunian - Unit
5 Kusen aluminium + daun pintu type P1 (2 unit) + partisi (terpasang) type 2 hunian - Unit
6 Kusen aluminium + daun pintu type P1 (3 unit) + partisi (terpasang) type 3 hunian - Unit
7 Kusen Aluminium + Daun jendela (terpasang) type J1 - Unit
8 Kusen Aluminium + Daun jendela (terpasang) type J2 - Unit
9 Kusen Aluminium + Daun jendela bouvenligh (terpasang) type BV - Unit
10 Kusen Baja + Pintu Kebakaran (terpasang) type PB - Unit
A.3. PEKERJAAN PLAFOND
Penutup plafond Flat Pull system GRC T=4MM + rangka metal furring uk 60x120 cm
1 - M2
(KM/WC)

2 List plafond 3/3 - M'

A.4. PEKERJAAN UTILITAS


1 Pasang closet duduk (standart) - Buah

PEK. ARSITEKTUR 362/632


2.2. PEKERJAAN ARSITEKTUR
2.2.A. PEKERJAAN ARSITEKTUR STANDART

NO. J E N I S P E K E R JAAN VOL. SAT.

2 Wastafel + kran (terpasang) - Buah


3 Pasang shower + kran type double (terpasang) - Buah
Meja dapur beton dilapis keramik + kitchen zink + kran leher angsa (terpasang) pada
4 - Buah
hunian type 1

Meja dapur beton dilapis keramik + kitchen zink + kran leher angsa (terpasang) pada
5 - Buah
hunian type 2

Meja dapur beton dilapis keramik + kitchen zink + kran leher angsa (terpasang) pada
6 - Buah
hunian type 3

Pasangan peninggian lantai T= 10 cm di bawah dan samping meja dapur (1:2:3)


7 - Buah
termasuk perapihan + keramik tanggulan pada hunian
8 Pasangan floor drain stainless - Buah
A.5. PEKERJAAN FINISHING

A.5.A. PEKERJAAN PENGECATAN

1 Cat dinding bag. Luar (exterior) - M2


2 Cat dinding bag. Dalam (interior) - M2
3 Cat kolom beton (eksterior) - M2
4 Cat kolom beton (interior) - M2
5 Cat balok beton + pelat bawah tangga - M2
6 Cat plafond expose (seluruh ruangan di lt. tujuh termasuk bak bunga) - M2
7 Cat plafond GRC (km/wc) - M2
8 Cat list plafond kayu - M2
9 Area Fasade :
- Cat dinding bag. Luar (exterior) - M2
- Cat dinding bag. Dalam (interior) - M2
- Cat kolom praktis & balok praktis 15/15, balok praktis kerawang 10/20 (eksterior) - M2

IX LANTAI DELAPAN
A.1. PEKERJAAN LANTAI
1 Pasang keramik lantai hunian termasuk selasar dan hall 40x40 - M2
2 Pasang lantai keramik km/wc 30x30 ad. 5 cm (kasar) - M2
3 Pasang keramik tangga 40x40 - M2

PEK. ARSITEKTUR 363/632


2.2. PEKERJAAN ARSITEKTUR
2.2.A. PEKERJAAN ARSITEKTUR STANDART

NO. J E N I S P E K E R JAAN VOL. SAT.

4 Pasang Step nozing 10 x 40 cm - M'


5 Waterproofing (bitumen) tahap 1 di atas lantai beton - M2
Beton pengisi ( K-225 ) lantai daerah km/wc T = 15 cm + tanggulan T = 20 cm sekeliling
6 - M3
km/wc
7 Waterproofing (liquid/cement base) tahap 2 di atas beton pengisi km/wc - M2
8 Waterproofing (liquid/cement base) di dinding km/wc T = 60 cm - M2
9 Waterproofing (liquid/cement base) di daerah lantai balkon, termasuk dinding T = 15 cm - M2
10 Screed + Waterproofing (liquid/cement base) di daerah bak bunga - M2
A.2. PEKERJAAN DINDING
A.2.A. PEKERJAAN PASANGAN DAN PLESTERAN
1 Pasangan dind. batako 1:4 termasuk tangga + dind shaft - M2
2 Plester + aci dinding batako exterior/dind. Terluar - M2
3 Plester + aci dinding batako interior/dind. Bag dalam - M2
4 Plester + aci dinding traslam - M2

Kolom praktis & balok praktis 15/15, balok praktis kerawang 10/20 termasuk opening
5 - M3
kusen aluminium

6 Perapihan kolom beton - M2


7 Perapihan pelat beton bawah tangga + bordes - M2
8 Perapihan balok beton + balok tangga termasuk balok koridor/selasar - M2
9 Perapihan pelat beton hunian + pelat koridor.selasar + bak bunga - M2
10 Pas. Railling besi tangga nempel dinding + finish cat (terpasang) - M1
11 Pas. Railling besi tangga + kaki termasuk landasan + finish cat (terpasang) - M1
12 Pas. Keramik 25x40 dinding Lift T=3,5 M - M2
13 Pas. Keramik 25x40 dinding km/wc T = 2.8 M - M2
14 Pas. Keramik 25x40, dinding pantry T = 0,80 M - M2
15 Area Fasade :
- Dinding Fasade dari panel precast beton ringan termasuk dind lift sisi luar 131.57 M2
- Kolom praktis & balok praktis 15/15, balok praktis kerawang 10/20 - M3
- Pas. Kerawang 20x20 (type R1, R2, R2', R3, R4, R6 dan R7) 141.97 M2
- Pas. Kerawang 20x20 (area tangga) 26.25 M2
A.2.B. PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES
Kusen alum. + daun pintu double multiplek t=9 mm + lapis teakwood t=4 mm (terpasang)
1 - Unit
type P1

PEK. ARSITEKTUR 364/632


2.2. PEKERJAAN ARSITEKTUR
2.2.A. PEKERJAAN ARSITEKTUR STANDART

NO. J E N I S P E K E R JAAN VOL. SAT.

2 Kusen alum. + daun pintu kaca t=5 mm (terpasang) type P2 - Unit

3 Kusen PVC + Daun Pintu PVC (terpasang) type P3 - Unit

4 Kusen aluminium + daun pintu type P1 (1 unit) + partisi (terpasang) type 1 hunian - Unit

5 Kusen aluminium + daun pintu type P1 (2 unit) + partisi (terpasang) type 2 hunian - Unit

6 Kusen aluminium + daun pintu type P1 (3 unit) + partisi (terpasang) type 3 hunian - Unit

7 Kusen Aluminium + Daun jendela (terpasang) type J1 - Unit

8 Kusen Aluminium + Daun jendela (terpasang) type J2 - Unit

9 Kusen Aluminium + Daun jendela bouvenligh (terpasang) type BV - Unit

10 Kusen Baja + Pintu Kebakaran (terpasang) type PB - Unit

A.3. PEKERJAAN PLAFOND


Penutup plafond Flat Pull system GRC T=4MM + rangka metal furring uk 60x120 cm
1 - M2
(KM/WC)

2 List plafond 3/3 - M'

A.4. PEKERJAAN UTILITAS


1 Pasang closet duduk (standart) - Buah
2 Wastafel + kran (terpasang) - Buah
3 Pasang shower + kran type double (terpasang) - Buah
Meja dapur beton dilapis keramik + kitchen zink + kran leher angsa (terpasang) pada
4 - Buah
hunian type 1

Meja dapur beton dilapis keramik + kitchen zink + kran leher angsa (terpasang) pada
5 - Buah
hunian type 2

Meja dapur beton dilapis keramik + kitchen zink + kran leher angsa (terpasang) pada
6 - Buah
hunian type 3

Pasangan peninggian lantai T= 10 cm di bawah dan samping meja dapur (1:2:3)


7 - Buah
termasuk perapihan + keramik tanggulan pada hunian

8 Pasangan floor drain stainless - Buah


A.5. PEKERJAAN FINISHING

PEK. ARSITEKTUR 365/632


2.2. PEKERJAAN ARSITEKTUR
2.2.A. PEKERJAAN ARSITEKTUR STANDART

NO. J E N I S P E K E R JAAN VOL. SAT.

A.5.A. PEKERJAAN PENGECATAN

1 Cat dinding bag. Luar (exterior) - M2


2 Cat dinding bag. Dalam (interior) - M2
3 Cat kolom beton (eksterior) - M2
4 Cat kolom beton (interior) - M2
5 Cat balok beton + pelat bawah tangga - M2
6 Cat plafond expose (seluruh ruangan di lt. delapan termasuk bak bunga) - M2
7 Cat plafond GRC (km/wc) - M2
8 Cat list plafond kayu - M2
9 Area Fasade :
- Cat dinding bag. Luar (exterior) - M2
- Cat dinding bag. Dalam (interior) - M2
- Cat kolom praktis & balok praktis 15/15, balok praktis kerawang 10/20 (eksterior) - M2

X LANTAI ATAP
A.1. PEKERJAAN LANTAI
Screed + Waterproofing (membrane) di daerah lantai dak beton dan dak beton R. Mesin
1 1,054.16 M2
Lift + dinding T=15 cm
A.2. PEKERJAAN DINDING
A.2.A. PEKERJAAN PASANGAN DAN PLESTERAN
1 Dinding Fasade dari panel precast beton ringan termasuk sekeliling dinding lift 198.79 M2
Kolom praktis & balok praktis 15/15, balok praktis kerawang 10/20 termasuk opening
4 11.25 M3
kusen aluminium
5 Perapihan pelat beton r. mesin lift 25.93 M2
6 Pas. Kerawang 20x20 (parapet T=1.20 M) 238.55 M2
A.5. PEKERJAAN FINISHING

A.5.A. PEKERJAAN PENGECATAN

1 Cat dinding bag. Luar (exterior) - M2


2 Cat dinding bag. Dalam (interior) - M2
3 Cat plafond expose (hall lift) - M2

PEK. ARSITEKTUR 366/632


2.2. PEKERJAAN ARSITEKTUR
2.2.A. PEKERJAAN ARSITEKTUR STANDART

NO. J E N I S P E K E R JAAN VOL. SAT.

4 Cat kolom praktis & balok praktis 15/15, balok praktis kerawang 10/20 (eksterior) - M2

PEK. ARSITEKTUR 367/632


QUANTITY (BOQ)
JAAN ARSITEKTUR

HARGA SATUAN JUMLAH HARGA


(Rp.) (Rp.)

TOTAL #VALUE!

SUB TOTAL #VALUE!

tidak dikerjakan -

119,300.00 -
123,200.00 -
165,500.00 -
123,200.00 -
123,200.00 -
156,100.00 -

SUB TOTAL #VALUE!


- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan

PEK. ARSITEKTUR 368/632


HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

Err:509 Err:509

- -
Err:509 Err:509
Err:509 Err:509
SUB TOTAL #VALUE!

- tidak dikerjakan

- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
SUB TOTAL #VALUE!

- tidak dikerjakan

- tidak dikerjakan
SUB TOTAL #VALUE!
- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan

PEK. ARSITEKTUR 369/632


HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

- tidak dikerjakan

- tidak dikerjakan
SUB TOTAL #VALUE!

SUB TOTAL #VALUE!

- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan

- tidak dikerjakan

#VALUE!

123,200.00 -
165,500.00 -
123,200.00 -
156,100.00 -
- -
- -
81,900.00 -

1,073,806.80 -

50,600.00 -

50,600.00 -
50,600.00 -
50,600.00 -
50,600.00 -

PEK. ARSITEKTUR 370/632


HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

SUB TOTAL #VALUE!


190,600.00 tidak dikerjakan
75,300.00 tidak dikerjakan
75,300.00 tidak dikerjakan
Err:509 tidak dikerjakan

- tidak dikerjakan

23,600.00 tidak dikerjakan


23,700.00 tidak dikerjakan
23,700.00 tidak dikerjakan
23,700.00 tidak dikerjakan
590,400.00 tidak dikerjakan
590,400.00 tidak dikerjakan
81,900.00 tidak dikerjakan
81,900.00 tidak dikerjakan
81,900.00 tidak dikerjakan

50,600.00 6,657,371.16

- tidak dikerjakan
50,600.00 3,634,901.60
50,600.00 1,328,250.00
SUB TOTAL #VALUE!

- tidak dikerjakan

- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan

PEK. ARSITEKTUR 371/632


HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

- tidak dikerjakan
SUB TOTAL #VALUE!

- tidak dikerjakan

- tidak dikerjakan
SUB TOTAL #VALUE!
3,295,400.00 tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan

421,900.00 tidak dikerjakan


SUB TOTAL #VALUE!

SUB TOTAL #VALUE!

57,000.00 tidak dikerjakan


37,800.00 tidak dikerjakan
57,000.00 tidak dikerjakan
37,800.00 tidak dikerjakan
37,800.00 tidak dikerjakan
37,800.00 tidak dikerjakan

37,800.00 tidak dikerjakan

37,800.00 tidak dikerjakan


tidak dikerjakan
57,000.00 tidak dikerjakan

PEK. ARSITEKTUR 372/632


HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

37,800.00 tidak dikerjakan


37,800.00 tidak dikerjakan

tidak dikerjakan #VALUE!

- -
- -
- -
- -
- -

- -

- -
- -
- -
- -

SUB TOTAL Err:509


- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan

PEK. ARSITEKTUR 373/632


HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

- -
- tidak dikerjakan
- -
- -
SUB TOTAL Err:509

- tidak dikerjakan

- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
SUB TOTAL #VALUE!

- tidak dikerjakan

- tidak dikerjakan
SUB TOTAL Err:509
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan

PEK. ARSITEKTUR 374/632


HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

SUB TOTAL -

SUB TOTAL #VALUE!

- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan

- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan

tidak dikerjakan Err:509

- -
- -
- -
- -
- -

- -

- -
- -
- -
- -
- -

SUB TOTAL #VALUE!


- tidak dikerjakan

PEK. ARSITEKTUR 375/632


HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan

- -
- tidak dikerjakan
- -
- -
SUB TOTAL #VALUE!

- tidak dikerjakan

- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
SUB TOTAL #VALUE!

PEK. ARSITEKTUR 376/632


HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

- tidak dikerjakan

- tidak dikerjakan

SUB TOTAL #VALUE!


- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan
SUB TOTAL -

SUB TOTAL Err:509

- tidak dikerjakan
- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan

PEK. ARSITEKTUR 377/632


HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

- tidak dikerjakan

tidak dikerjakan #VALUE!

- -
- -
- -
- -
- -

- -

- -
- -
- -
- -

SUB TOTAL #VALUE!


- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan

PEK. ARSITEKTUR 378/632


HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

- -
- tidak dikerjakan
- -
- -
SUB TOTAL #VALUE!

- tidak dikerjakan

- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
SUB TOTAL #VALUE!

- tidak dikerjakan

- tidak dikerjakan

SUB TOTAL #VALUE!


- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan

PEK. ARSITEKTUR 379/632


HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

SUB TOTAL tidak dikerjakan

SUB TOTAL #VALUE!

- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan

- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan

tidak dikerjakan #VALUE!

- -
- -
- -
- -
- -

- -

- -
- -
- -
- -

SUB TOTAL #VALUE!


- tidak dikerjakan
- tidak dikerjakan

PEK. ARSITEKTUR 380/632


HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

- tidak dikerjakan
- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan

- -
- tidak dikerjakan
- -
- -
SUB TOTAL #VALUE!

- tidak dikerjakan

- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
SUB TOTAL #VALUE!

- tidak dikerjakan

PEK. ARSITEKTUR 381/632


HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

- tidak dikerjakan

SUB TOTAL #VALUE!


- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan
SUB TOTAL #VALUE!

SUB TOTAL #VALUE!

- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan

- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan

tidak dikerjakan #VALUE!

- -

PEK. ARSITEKTUR 382/632


HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

- -
- -
- -
- -

- -

- -
- -
- -
- -
- -

SUB TOTAL #VALUE!


- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan

- -
- tidak dikerjakan
- -
- -

PEK. ARSITEKTUR 383/632


HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

SUB TOTAL #VALUE!

- tidak dikerjakan

- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
SUB TOTAL #VALUE!

- tidak dikerjakan

- tidak dikerjakan

SUB TOTAL #VALUE!


- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan
SUB TOTAL -

SUB TOTAL #VALUE!

- tidak dikerjakan

PEK. ARSITEKTUR 384/632


HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan

- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan

tidak dikerjakan #VALUE!

- -
- -
- -
- -
- -

- -

- -
- -
- -
- -

SUB TOTAL #VALUE!


- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan

- tidak dikerjakan

PEK. ARSITEKTUR 385/632


HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan

- -
- tidak dikerjakan
- -
- -
SUB TOTAL #VALUE!

- tidak dikerjakan

- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
SUB TOTAL #VALUE!

- tidak dikerjakan

- tidak dikerjakan

SUB TOTAL #VALUE!


- tidak dikerjakan

PEK. ARSITEKTUR 386/632


HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

- tidak dikerjakan
- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan
SUB TOTAL #VALUE!

SUB TOTAL #VALUE!

- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan

- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan

tidak dikerjakan #VALUE!

- -
- -
- -

PEK. ARSITEKTUR 387/632


HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

- -
- -

- -

- -
- -
- -
- -

SUB TOTAL #VALUE!


- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan

- -
- tidak dikerjakan
- -
- -
SUB TOTAL #VALUE!

- tidak dikerjakan

PEK. ARSITEKTUR 388/632


HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan

SUB TOTAL #VALUE!

- tidak dikerjakan

- tidak dikerjakan

SUB TOTAL #VALUE!


- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan

- tidak dikerjakan
SUB TOTAL tidak dikerjakan

PEK. ARSITEKTUR 389/632


HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

SUB TOTAL #VALUE!

- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan

- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan

#VALUE!

277,320.00 292,339,789.86

SUB TOTAL #VALUE!


- -

Err:509 Err:509

12,000.00 311,163.60
- -
SUB TOTAL 95,974,648.11

SUB TOTAL #VALUE!

- tidak dikerjakan
- tidak dikerjakan
- tidak dikerjakan

PEK. ARSITEKTUR 390/632


HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

- tidak dikerjakan

PEK. ARSITEKTUR 391/632


BILL OF QUANTITY (BOQ)
P E K E R JAAN ARSITEKTUR

Pekerjaan : RUSUNAWA
Lokasi : RANCACILI - JAWA BARAT
Tahun Anggaran : 2014

2.2. PEKERJAAN ARSITEKTUR


2.2.B. PEKERJAAN ARSITEKTUR NON STANDART

NO. J E N I S P E K E R JAAN VOL. SAT.

2.2.B. PEKERJAAN ARSITEKTUR NON STANDART

B.1. PEKERJAAN SKYLIGHT

1 Skylight kecil 3 buah


Kaca tempered 12 mm + acc 34.03 M2
Besi hollow 50x150x2 + zinkromat 310.86 Kg
2 Skylight diatas tangga 2 buah
Kaca tempered 12 mm + acc 188.80 M2
Besi hollow 50x150x2 + zinkromat 2,011.47 Kg

PEK. ARSITEKTUR 392/632


QUANTITY (BOQ)
JAAN ARSITEKTUR

HARGA SATUAN JUMLAH HARGA


(Rp.) (Rp.)

TOTAL 118,059,360.98

SUB TOTAL 118,059,360.98

325,000.00 11,060,156.25
19,652.16 6,109,070.46

325,000.00 61,360,375.70
19,652.16 39,529,758.57

PEK. ARSITEKTUR 393/632


REKAPITULASI
B I L L O F Q U A N T I T Y (B O Q) - P E K E R J A A N M E K A N I K A L

Pekerjaan : RUSUNAWA
Lokasi : RANCACILI BANDUNG - JAWA BARAT
Tahun Anggaran : 2014

2.3. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL

NO URAIAN PKERJAAN

2.2.A. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART

A.1. PEKERJAAN INSTALASI PLAMBING


I INSTALASI AIR BERSIH
II INSTALASI AIR KOTOR & AIR BEKAS
III INSTALASI AIR HUJAN
IV INSTALASI VENT

A.2. PEKERJAAN INSTALASI ELEKTRIKAL


I PEKERJAAN PANEL
II PEKERJAAN INSTALASI KABEL FEEDER
III PEKERJAAN KABEL LADDER (RAK KABEL)
IV PEKERJAAN ARMATUR LAMPU, SAKLAR & STOP KONTAK
V PEKERJAAN INSTALASI FINAL
VI PEKERJAAN SISTEM PENTANAHAN
VII PEKERJAAN PENANGKAL PETIR

2.2.B. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART

B.1. PEKERJAAN PEMADAM KEBAKARAN


I INSTALASI PEMIPAAN HYDRANT
II INSTALASI PEMIPAAN SPLINKLER
B.2. PEKERJAAN INSTALASI ELEKTRONIK
I PEKERJAAN SYSTEM MATV
II PEKERJAAN FIRE ALARM
III PERALATAN UTAMA SOUND SYSTEM
IV PERALATAN UTAMA CCTV
V PERALATAN UTAMA TELEPON
VI INSTALASI
B.3. PEKERJAAN SARANA DAN PRASARANA LINGKUNGAN (LUAR BANGUNAN)
I PEKERJAAN INSTALASI PLAMBING
II Passenger Elevator
KAPITULASI
KERJAAN MEKANIKAL & ELEKTRIKAL

JUMLAH HARGA
ERJAAN
(Rp)

94,651,700.00

56,752,000.00
Rp -
Rp -
Rp 56,752,000.00
Rp -

37,899,700.00
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp 37,899,700.00

-
Rp -
Rp -
-
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
-
Rp -
tidak dikerjakan

SUB TOTAL : 94,651,700.00


BILL OF QUANTITY (BOQ)
PE K E R JAAN MEKANIKAL & ELEKTRIKAL

Pekerjaan : RUSUNAWA
Lokasi : RANCACILI - JAWA BARAT
Tahun Anggaran : 2014

2.3. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


2.3.A. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART

No. URAIAN PEKERJAAN SAT VOL

2.3.A. PEKERJAAN MEKANIKAL & ELEKTRIKAL STANDART

A.1. PEKERJAAN INSTALASI PLAMBING

I INSTALASI AIR BERSIH


INSTALASI PEMIPAAN
a LANTAI 1
- PVC AW dia. 15 m -
- PVC AW dia. 20 m -
- GIP med dia. 20 m -
- GIP med dia. 32 m -
- GIP med dia. 40 m -
- GIP med dia. 50 (Riser dari Tangki Air Atas) m -
- GIP med dia. 65 (Riser ke tanki air atas) m -
Peralatan Katup-katup
(Ball Valve & Gate Valve)
- dia. 32 bh -
- Meter Air c/w BV dia. 20 bh -

b LANTAI 2
- PVC AW dia. 15 m -
- PVC AW dia. 20 m -
- GIP med dia. 20 m -
- GIP med dia. 32 m -
- GIP med dia. 40 m -
- GIP med dia. 50 (Riser dari Tangki Air Atas) m -
- GIP med dia. 65 (Riser ke tanki air atas) m -
Peralatan Katup-katup
(Ball Valve & Gate Valve)
- dia. 32 bh -
- Meter Air c/w BV dia. 20 bh -

c LANTAI 3
- PVC AW dia. 15 m -
- PVC AW dia. 20 m -
- GIP med dia. 20 m -
- GIP med dia. 32 m -
- GIP med dia. 40 m -
- GIP med dia. 50 (Riser dari Tangki Air Atas) m -
- GIP med dia. 65 (Riser ke tanki air atas) m -
Peralatan Katup-katup
(Ball Valve & Gate Valve)
- dia. 32 bh -
- Meter Air c/w BV dia. 20 bh -

d LANTAI 4
- PVC AW dia. 15 m -
- PVC AW dia. 20 m -
- GIP med dia. 20 m -
- GIP med dia. 32 m -
- GIP med dia. 40 m -
- GIP med dia. 50 (Riser dari Tangki Air Atas) m -
- GIP med dia. 65 (Riser ke tanki air atas) m -
Peralatan Katup-katup
(Ball Valve & Gate Valve)
- dia. 32 bh -
- Meter Air c/w BV dia. 20 bh -

e LANTAI 5
- PVC AW dia. 15 m -
- PVC AW dia. 20 m -
- GIP med dia. 20 m -
- GIP med dia. 32 m -
- GIP med dia. 40 m -
- GIP med dia. 50 (Riser dari Tangki Air Atas) m -
- GIP med dia. 65 (Riser ke tanki air atas) m -
Peralatan Katup-katup
(Ball Valve & Gate Valve)
- dia. 32 bh -
- Meter Air c/w BV dia. 20 bh -

e LANTAI 6
- PVC AW dia. 15 m -
- PVC AW dia. 20 m -
- GIP med dia. 20 m -
- GIP med dia. 32 m -
- GIP med dia. 40 m -
- GIP med dia. 50 (Riser dari Tangki Air Atas) m -
- GIP med dia. 65 (Riser ke tanki air atas) m -
Peralatan Katup-katup
(Ball Valve & Gate Valve)
- dia. 32 bh -
- Meter Air c/w BV dia. 20 bh -

e LANTAI 7
- PVC AW dia. 15 m -
- PVC AW dia. 20 m -
- GIP med dia. 20 m -
- GIP med dia. 32 m -
- GIP med dia. 40 m -
- GIP med dia. 50 (Riser dari Tangki Air Atas) m -
- GIP med dia. 65 (Riser ke tanki air atas) m -
Peralatan Katup-katup
(Ball Valve & Gate Valve)
- dia. 32 bh -
- Meter Air c/w BV dia. 20 bh -

e LANTAI 8
- PVC AW dia. 15 m -
- PVC AW dia. 20 m -
- GIP med dia. 20 m -
- GIP med dia. 32 m -
- GIP med dia. 40 m -
- GIP med dia. 50 (Riser dari Tangki Air Atas) m -
- GIP med dia. 65 (Riser ke tanki air atas) m -
Peralatan Katup-katup
(Ball Valve & Gate Valve)
- dia. 32 bh -
- Meter Air c/w BV dia. 20 bh -

f LANTAI ATAP & TANGKI AIR ATAS


- GIP med dia. 100 ( pipa header ) unit -
- GIP med dia. 65 m -
- GIP med dia. 50 m -
- GIP med dia. 40 m -
- PVC AW dia. 32 (Pipa Drain) m -

Peralatan Katup-katup
(Ball Valve & Gate Valve)
- dia. 65 bh -
- dia. 50 bh -
- dia. 32 bh -

II INSTALASI AIR KOTOR & AIR BEKAS


Pipa PVC Kelas AW(Incl. Fitting & Accessories)

INSTALASI PEMIPAAN
a LANTAI Dasar
- dia. 150 ( riser pipa air kotor) m -
- dia. 150 ( riser pipa air bekas ) m -
Clean Out (CO)
- CO, dia. 150 bh -

a LANTAI 1
- dia. 100 ( riser pipa air kotor) m -
- dia. 100 ( riser pipa air bekas ) m -
- dia. 100 m -
- dia. 65 m -
- dia. 50 m -
Clean Out (CO)
- CO, dia. 50 bh -
- Portable Grease Trap bh -

b LANTAI 2
- dia. 100 ( riser pipa air kotor) m -
- dia. 100 ( riser pipa air bekas ) m -
- dia. 100 m -
- dia. 65 m -
- dia. 50 m -
Clean Out (CO)
- CO, dia. 50 bh -
- Portable Grease Trap bh -

c LANTAI 3
- dia. 100 ( riser pipa air kotor) m -
- dia. 100 ( riser pipa air bekas ) m -
- dia. 100 m -
- dia. 65 m -
- dia. 50 m -
Clean Out (CO)
- CO, dia. 50 bh -
- Portable Grease Trap bh -

d LANTAI 4
- dia. 100 ( riser pipa air kotor) m -
- dia. 100 ( riser pipa air bekas ) m -
- dia. 100 m -
- dia. 65 m -
- dia. 50 m -
Clean Out (CO)
- CO, dia. 50 bh -
- Portable Grease Trap bh -

f LANTAI 5
- dia. 100 ( riser pipa air kotor) m -
- dia. 100 ( riser pipa air bekas ) m -
- dia. 100 m -
- dia. 65 m -
- dia. 50 m -
Clean Out (CO)
- CO, dia. 50 bh -
- Portable Grease Trap bh -

c LANTAI 6
- dia. 100 ( riser pipa air kotor) m -
- dia. 100 ( riser pipa air bekas ) m -
- dia. 100 m -
- dia. 65 m -
- dia. 50 m -
Clean Out (CO)
- CO, dia. 50 bh -
- Portable Grease Trap bh -

d LANTAI 7
- dia. 100 ( riser pipa air kotor) m -
- dia. 100 ( riser pipa air bekas ) m -
- dia. 100 m -
- dia. 65 m -
- dia. 50 m -
Clean Out (CO)
- CO, dia. 50 bh -
- Portable Grease Trap bh -
f LANTAI 8
- dia. 100 ( riser pipa air kotor) m -
- dia. 100 ( riser pipa air bekas ) m -
- dia. 100 m -
- dia. 65 m -
- dia. 50 m -
Clean Out (CO)
- CO, dia. 50 bh -
- Portable Grease Trap bh -

III INSTALASI AIR HUJAN


Pipa PVC Kelas AW (Incl. Fitting & Accessories)

INSTALASI PEMIPAAN
a LANTAI Dasar
- dia. 80 ( pipa tegak ) m 89.60

a LANTAI 1
- dia. 80 ( pipa tegak ) m 89.60

b LANTAI 2
- dia. 80 ( pipa tegak ) m 89.60

c LANTAI 3
- dia. 80 ( pipa tegak ) m 89.60

d LANTAI 4
- dia. 80 ( pipa tegak ) m 89.60

e LANTAI 5
- dia. 80 ( pipa tegak ) m 89.60

c LANTAI 6
- dia. 80 ( pipa tegak ) m 89.60
d LANTAI 7
- dia. 80 ( pipa tegak ) m 89.60

e LANTAI 8
- dia. 80 ( pipa tegak ) m 89.60

f LANTAI ATAP
- dia. 80 ( pipa tegak ) m 9.20

Roof Drain, Cast Iron


- dia. 80 bh 28.00
- dia. 50 ( Buangan Tanki Air Atas ) bh 6.00

IV INSTALASI VENT
Pipa PVC Kelas D (Incl. Fitting & Accessories)
INSTALASI PEMIPAAN
a LANTAI Dasar
- Dia. 50 ( pipa riser ) m -
- Dia. 32 m -

a LANTAI 1
- Dia. 50 ( pipa riser ) m -
- Dia. 32 m -

b LANTAI 2
- Dia. 50 ( pipa riser ) m -
- Dia. 32 m -

c LANTAI 3
- Dia. 50 ( pipa riser ) m -
- Dia. 32 m -

d LANTAI 4
- Dia. 50 ( pipa riser ) m -
- Dia. 32 m -
e LANTAI 5
- Dia. 50 ( pipa riser ) m -
- Dia. 32 m -

c LANTAI 6
- Dia. 50 ( pipa riser ) m -
- Dia. 32 m -

d LANTAI 7
- Dia. 50 ( pipa riser ) m -
- Dia. 32 m -

e LANTAI 8
- Dia. 50 ( pipa riser ) m -
- Dia. 32 m -

- Vent cup Dia. 50 bh -

A.2. PEKERJAAN INSTALASI ELEKTRIKAL

I PEKERJAAN PANEL

a. INSTALASI
1 P-PLN unit

2 PEKERJAAN MDP unit -

3 P-PENGELOLA unit -
- KWH-meter/3ph/63A bh -

4 P-KWH LT.1 unit -


- KWH-meter/1ph/6A bh -

5 P-KWH/LT.2 unit -
- KWH-meter/1ph/6A bh -

6 P-KWH/LT.3 unit -
- KWH-meter/1ph/6A bh -

7 P-KWH/LT.4 unit -
- KWH-meter/1ph/6A bh -

8 P-KWH/LT.5 unit -
- KWH-meter/1ph/6A bh -

8 P-KWH/LT.6 unit -
- KWH-meter/1ph/6A bh -

8 P-KWH/LT.7 unit -
- KWH-meter/1ph/6A bh -

8 P-KWH/LT.8 unit -
- KWH-meter/1ph/6A bh -

9 P-POMPA AIR BERSIH unit -

10 P-KEBAKARAN unit -

11 P-LIFT unit -

P-UNIT ( HANGER)
Pengadaan dan pemasangan P-UNIT ( HANGER), dengan kompo-
nen panel, sbb :

12 LANTAI-1 unit -
- MCB 1P, 6 A : 1 bh
- Box Hanger : 1 bh

13 LANTAI-2 unit -
- MCB 1P, 6 A : 1 bh
- Box Hanger : 1 bh

14 LANTAI-3 unit -
- MCB 1P, 6 A : 1 bh
- Box Hanger : 1 bh

15 LANTAI-4 unit -
- MCB 1P, 6 A : 1 bh
- Box Hanger : 1 bh

16 LANTAI-5 unit -
- MCB 1P, 6 A : 1 bh
- Box Hanger : 1 bh

17 LANTAI-6 unit -
- MCB 1P, 6 A : 1 bh
- Box Hanger : 1 bh

18 LANTAI-7 unit -
- MCB 1P, 6 A : 1 bh
- Box Hanger : 1 bh

19 LANTAI-8 unit -
- MCB 1P, 6 A : 1 bh
- Box Hanger : 1 bh

II PEKERJAAN INSTALASI KABEL FEEDER

a. INSTALASI
- NYY 4 x 240 mm2 + E-NYA 95 mm2 Dari P-PLN ke MDP m' -

Kabel Distribusi Daya dari MDP :


- NYY 4 x 16 mm2 + E-NYA 10 mm2 ke P-PENGELOLA-LT/1 m' -
- NYY 4 x 16 mm2 + E-NYA 10 mm2 ke P-KWH-LT/1 m' -
- NYY 4 x 16 mm2 + E-NYA 10 mm2 ke P-KWH-LT/2 m' -
- NYY 4 x 16 mm2 + E-NYA 10 mm2 ke P-KWH-LT/3 m' -
- NYY 4 x 16 mm2 + E-NYA 10 mm2 ke P-KWH-LT/4 m' -
- NYY 4 x 16 mm2 + E-NYA 10 mm2 ke P-KWH-LT/5 m' -
- NYY 4 x 16 mm2 + E-NYA 10 mm2 ke P-KWH-LT/6 m' -
- NYY 4 x 16 mm2 + E-NYA 10 mm2 ke P-KWH-LT/7 m' -
- NYY 4 x 16 mm2 + E-NYA 10 mm2 ke P-KWH-LT/8 m' -
- NYY 4 x 16 mm2 + E-NYA 10 mm2 ke P-LIFT m' -

Kabel Distribusi Daya dari P-PENGELOLA :


- NYY 4 x 6 mm2 + E-NYA 6 mm2 ke P-Air Bersih m' -
- FRC 4 x 6 mm2 + E-NYA 6 mm2 ke P-Kebakaran m' -

Kabel Distribusi Daya dari P-KWH-LT/1 ke


- NYM 3 x 4 mm2 ke P-Unit/1 m' -
- NYM 3 x 4 mm2 ke P-Unit/2 m' -
- NYM 3 x 4 mm2 ke P-Unit/3 m' -
- NYM 3 x 4 mm2 ke P-Unit/4 m' -
- NYM 3 x 4 mm2 ke P-Unit/5 m' -
- NYM 3 x 4 mm2 ke P-Unit/6 m' -
- NYM 3 x 4 mm2 ke P-Unit/7 m' -
- NYM 3 x 4 mm2 ke P-Unit/8 m' -
- NYM 3 x 4 mm2 ke P-Unit/9 m' -
- NYM 3 x 4 mm2 ke P-Unit/10 m' -
- NYM 3 x 4 mm2 ke P-Unit/11 m' -
- NYM 3 x 4 mm2 ke P-Unit/12 m' -
- NYM 3 x 4 mm2 ke P-Unit/13 m' -

Kabel Distribusi Daya dari P-KWH-LT/2 ke


- NYM 3 x 4 mm2 ke P-Unit/1 m' -
- NYM 3 x 4 mm2 ke P-Unit/2 m' -
- NYM 3 x 4 mm2 ke P-Unit/3 m' -
- NYM 3 x 4 mm2 ke P-Unit/4 m' -
- NYM 3 x 4 mm2 ke P-Unit/5 m' -
- NYM 3 x 4 mm2 ke P-Unit/6 m' -
- NYM 3 x 4 mm2 ke P-Unit/7 m' -
- NYM 3 x 4 mm2 ke P-Unit/8 m' -
- NYM 3 x 4 mm2 ke P-Unit/9 m' -
- NYM 3 x 4 mm2 ke P-Unit/10 m' -
- NYM 3 x 4 mm2 ke P-Unit/11 m' -
- NYM 3 x 4 mm2 ke P-Unit/12 m' -
- NYM 3 x 4 mm2 ke P-Unit/13 m' -

Kabel Distribusi Daya dari P-KWH-LT/3 ke


- NYM 3 x 4 mm2 ke P-Unit/1 m' -
- NYM 3 x 4 mm2 ke P-Unit/2 m' -
- NYM 3 x 4 mm2 ke P-Unit/3 m' -
- NYM 3 x 4 mm2 ke P-Unit/4 m' -
- NYM 3 x 4 mm2 ke P-Unit/5 m' -
- NYM 3 x 4 mm2 ke P-Unit/6 m' -
- NYM 3 x 4 mm2 ke P-Unit/7 m' -
- NYM 3 x 4 mm2 ke P-Unit/8 m' -
- NYM 3 x 4 mm2 ke P-Unit/9 m' -
- NYM 3 x 4 mm2 ke P-Unit/10 m' -
- NYM 3 x 4 mm2 ke P-Unit/11 m' -
- NYM 3 x 4 mm2 ke P-Unit/12 m' -
- NYM 3 x 4 mm2 ke P-Unit/13 m' -
- NYM 3 x 4 mm2 ke P-Unit/14 m' -

Kabel Distribusi Daya dari P-KWH-LT/4 ke


- NYM 3 x 4 mm2 ke P-Unit/1 m' -
- NYM 3 x 4 mm2 ke P-Unit/2 m' -
- NYM 3 x 4 mm2 ke P-Unit/3 m' -
- NYM 3 x 4 mm2 ke P-Unit/4 m' -
- NYM 3 x 4 mm2 ke P-Unit/5 m' -
- NYM 3 x 4 mm2 ke P-Unit/6 m' -
- NYM 3 x 4 mm2 ke P-Unit/7 m' -
- NYM 3 x 4 mm2 ke P-Unit/8 m' -
- NYM 3 x 4 mm2 ke P-Unit/9 m' -
- NYM 3 x 4 mm2 ke P-Unit/10 m' -
- NYM 3 x 4 mm2 ke P-Unit/11 m' -
- NYM 3 x 4 mm2 ke P-Unit/12 m' -
- NYM 3 x 4 mm2 ke P-Unit/13 m' -
- NYM 3 x 4 mm2 ke P-Unit/14 m' -
Kabel Distribusi Daya dari P-KWH-LT/5 ke
- NYM 3 x 4 mm2 ke P-Unit/1 m' -
- NYM 3 x 4 mm2 ke P-Unit/2 m' -
- NYM 3 x 4 mm2 ke P-Unit/3 m' -
- NYM 3 x 4 mm2 ke P-Unit/4 m' -
- NYM 3 x 4 mm2 ke P-Unit/5 m' -
- NYM 3 x 4 mm2 ke P-Unit/6 m' -
- NYM 3 x 4 mm2 ke P-Unit/7 m' -
- NYM 3 x 4 mm2 ke P-Unit/8 m' -
- NYM 3 x 4 mm2 ke P-Unit/9 m' -
- NYM 3 x 4 mm2 ke P-Unit/10 m' -
- NYM 3 x 4 mm2 ke P-Unit/11 m' -
- NYM 3 x 4 mm2 ke P-Unit/12 m' -
- NYM 3 x 4 mm2 ke P-Unit/13 m' -
- NYM 3 x 4 mm2 ke P-Unit/14 m' -

Kabel Distribusi Daya dari P-KWH-LT/6 ke


- NYM 3 x 4 mm2 ke P-Unit/1 m' -
- NYM 3 x 4 mm2 ke P-Unit/2 m' -
- NYM 3 x 4 mm2 ke P-Unit/3 m' -
- NYM 3 x 4 mm2 ke P-Unit/4 m' -
- NYM 3 x 4 mm2 ke P-Unit/5 m' -
- NYM 3 x 4 mm2 ke P-Unit/6 m' -
- NYM 3 x 4 mm2 ke P-Unit/7 m' -
- NYM 3 x 4 mm2 ke P-Unit/8 m' -
- NYM 3 x 4 mm2 ke P-Unit/9 m' -
- NYM 3 x 4 mm2 ke P-Unit/10 m' -
- NYM 3 x 4 mm2 ke P-Unit/11 m' -
- NYM 3 x 4 mm2 ke P-Unit/12 m' -
- NYM 3 x 4 mm2 ke P-Unit/13 m' -

Kabel Distribusi Daya dari P-KWH-LT/7 ke


- NYM 3 x 4 mm2 ke P-Unit/1 m' -
- NYM 3 x 4 mm2 ke P-Unit/2 m' -
- NYM 3 x 4 mm2 ke P-Unit/3 m' -
- NYM 3 x 4 mm2 ke P-Unit/4 m' -
- NYM 3 x 4 mm2 ke P-Unit/5 m' -
- NYM 3 x 4 mm2 ke P-Unit/6 m' -
- NYM 3 x 4 mm2 ke P-Unit/7 m' -
- NYM 3 x 4 mm2 ke P-Unit/8 m' -
- NYM 3 x 4 mm2 ke P-Unit/9 m' -
- NYM 3 x 4 mm2 ke P-Unit/10 m' -
- NYM 3 x 4 mm2 ke P-Unit/11 m' -
- NYM 3 x 4 mm2 ke P-Unit/12 m' -
- NYM 3 x 4 mm2 ke P-Unit/13 m' -

Kabel Distribusi Daya dari P-KWH-LT/8 ke


- NYM 3 x 4 mm2 ke P-Unit/1 m' -
- NYM 3 x 4 mm2 ke P-Unit/2 m' -
- NYM 3 x 4 mm2 ke P-Unit/3 m' -
- NYM 3 x 4 mm2 ke P-Unit/4 m' -
- NYM 3 x 4 mm2 ke P-Unit/5 m' -
- NYM 3 x 4 mm2 ke P-Unit/6 m' -
- NYM 3 x 4 mm2 ke P-Unit/7 m' -
- NYM 3 x 4 mm2 ke P-Unit/8 m' -
- NYM 3 x 4 mm2 ke P-Unit/9 m' -
- NYM 3 x 4 mm2 ke P-Unit/10 m' -
- NYM 3 x 4 mm2 ke P-Unit/11 m' -
- NYM 3 x 4 mm2 ke P-Unit/12 m' -
- NYM 3 x 4 mm2 ke P-Unit/13 m' -

III PEKERJAAN KABEL LADDER (RAK KABEL)

a. INSTALASI
Pengadaan dan Pemasangan Kabel Ladder lengkap dengan se-
mua fitting, aksesoris, berikut material dan alat bantu pemasa-
ngan lainnya sesuai diuraikan dalam Gambar dan Spesifikasi
Teknis.

1 Lantai-1
- Kabel Tray W200 x H100 m' -

Fitting-Fitting :
- Tee W200 x W200 x W200 x H100 bh -
- Elbow W200 x H100 bh -

Material bantu ( mur, baut, hanger rod, supporting, dll ) lot -

2 Lantai-2
- Kabel Tray W200 x H100 m' -

Fitting-Fitting :
- Tee W200 x W200 x W200 x H100 bh -
- Elbow W200 x H100 bh -

Material bantu ( mur, baut, hanger rod, supporting, dll ) lot -

3 Lantai-3
- Kabel Tray W200 x H100 m' -

Fitting-Fitting :
- Tee W200 x W200 x W200 x H100 bh -
- Elbow W200 x H100 bh -

Material bantu ( mur, baut, hanger rod, supporting, dll ) lot -

4 Lantai-4
- Kabel Tray W200 x H100 m' -

Fitting-Fitting :
- Tee W200 x W200 x W200 x H100 bh -
- Elbow W200 x H100 bh -

Material bantu ( mur, baut, hanger rod, supporting, dll ) lot -

5 Lantai-5
- Kabel Tray W200 x H100 m' -

Fitting-Fitting :
- Tee W200 x W200 x W200 x H100 bh -
- Elbow W200 x H100 bh -

Material bantu ( mur, baut, hanger rod, supporting, dll ) lot -

6 Lantai-6
- Kabel Tray W200 x H100 m' -

Fitting-Fitting :
- Tee W200 x W200 x W200 x H100 bh -
- Elbow W200 x H100 bh -

Material bantu ( mur, baut, hanger rod, supporting, dll ) lot -

7 Lantai-7
- Kabel Tray W200 x H100 m' -

Fitting-Fitting :
- Tee W200 x W200 x W200 x H100 bh -
- Elbow W200 x H100 bh -

Material bantu ( mur, baut, hanger rod, supporting, dll ) lot -

8 Lantai-8
- Kabel Tray W200 x H100 m' -

Fitting-Fitting :
- Tee W200 x W200 x W200 x H100 bh -
- Elbow W200 x H100 bh -

Material bantu ( mur, baut, hanger rod, supporting, dll ) lot -

9 Shaft
- Kabel Tray W600 x H100 m' -

IV PEKERJAAN ARMATUR LAMPU, SAKLAR & STOP KONTAK

a. INSTALASI
1 Lantai-Dasar
- TL 1 x 36 W, TL Balk Type bh -
- Lampu baret isi TL Bulat-32 watt c/w battery charger bh -
- Stop Kontak 1P, 220 Volt, 13A, Wall Type bh -
- Saklar 1 gang bh -
- Saklar 2 gang bh -

2 Lantai-1
- Lampu PL 13 Watt + Fitting E-27 bh -
- Lampu baret isi TL Bulat-32 watt c/w battery charger (Tangga) bh -
- Stop Kontak 1P, 220 Volt, 13A, Wall Type bh -
- Saklar 1 gang bh -
- Saklar 2 gang bh -

3 Lantai-2
- Lampu PL 13 Watt + Fitting E-27 bh -
- Lampu baret isi TL Bulat-32 watt c/w battery charger (Tangga) bh -
- Stop Kontak 1P, 220 Volt, 13A, Wall Type bh -
- Saklar 1 gang bh -
- Saklar 2 gang bh -

4 Lantai-3
- Lampu PL 13 Watt + Fitting E-27 bh -
- Lampu baret isi TL Bulat-32 watt c/w battery charger bh -
- Stop Kontak 1P, 220 Volt, 13A, Wall Type bh -
- Saklar 1 gang bh -
- Saklar 2 gang bh -

5 Lantai-4
- Lampu PL 13 Watt + Fitting E-27 bh -
- Lampu baret isi TL Bulat-32 watt c/w battery charger bh -
- Stop Kontak 1P, 220 Volt, 13A, Wall Type bh -
- Saklar 1 gang bh -
- Saklar 2 gang bh -

6 Lantai-5
- Lampu PL 13 Watt + Fitting E-27 bh -
- Lampu baret isi TL Bulat-32 watt c/w battery charger bh -
- Stop Kontak 1P, 220 Volt, 13A, Wall Type bh -
- Saklar 1 gang bh -
- Saklar 2 gang bh -

7 Lantai-6
- Lampu PL 13 Watt + Fitting E-27 bh -
- Lampu baret isi TL Bulat-32 watt c/w battery charger bh -
- Stop Kontak 1P, 220 Volt, 13A, Wall Type bh -
- Saklar 1 gang bh -
- Saklar 2 gang bh -

8 Lantai-7
- Lampu PL 13 Watt + Fitting E-27 bh -
- Lampu baret isi TL Bulat-32 watt c/w battery charger bh -
- Stop Kontak 1P, 220 Volt, 13A, Wall Type bh -
- Saklar 1 gang bh -
- Saklar 2 gang bh -

9 Lantai-8
- Lampu PL 13 Watt + Fitting E-27 bh -
- Lampu baret isi TL Bulat-32 watt c/w battery charger bh -
- Stop Kontak 1P, 220 Volt, 13A, Wall Type bh -
- Saklar 1 gang bh -
- Saklar 2 gang bh -

10 Lantai-Atap
- Lampu TL 1 x 18 Watt , Balk Type bh -
- Saklar 1 gang bh -
11 PEKERJAAN LAMPU TAMAN
- Lampu Taman Koridor ( t = 1,5 m ) SL 26 watt bh -

V PEKERJAAN INSTALASI FINAL

a. INSTALASI
Lantai-Dasar
- NYA 2 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu ttk -
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak ttk -

Lantai-1
- NYA 2 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu ttk -
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak ttk -

Lantai-2
- NYA 2 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu ttk -
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak ttk -

Lantai-3
- NYA 2 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu ttk -
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak ttk -

Lantai-4
- NYA 2 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu ttk -
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak ttk -

Lantai-5
- NYA 2 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu ttk -
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak ttk -

Lantai-6
- NYA 2 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu ttk -
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak ttk -
Lantai-7
- NYA 2 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu ttk -
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak ttk -

Lantai-8
- NYA 2 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu ttk -
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak ttk -

Lantai-Atap
- NYA 2 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu ttk -

PEKERJAAN LAMPU TAMAN


- NYFGBY 3 x 2,5 mm2 untuk Lampu Taman ttk -

VI PEKERJAAN SISTEM PENTANAHAN

a. INSTALASI
Pentanahan (Grounding) Netral Sistem & Pentanahan Body

- Body Panel MDP


- Body pada semua panel distribusi daya tegangan rendah

Item SBB:
- Grounding Box 40x40x40 cm bh -
- Grounding Rod GIP 1' ( untuk R lebih kecil dari 3 ohm ) bh -
- Connector Test Box set -
- Termination R.Supporting Material lot -
- Kabel BC 50 mm2 m -

VII PEKERJAAN PENANGKAL PETIR

a. INSTALASI
- Air Terminal Electrostatic Lightning Protection System, Radius +/- 80 Meter unit 1.00
- Tiang pipa dia 50 = 5 meter + Accessories unit 1.00

- NYY 70 mm2 menuju ke Bak Kontrol dalam Pipa PVC dia 2" m' 126.00

- Peralatan penunjang pendukung Air terminal lot 1.00


- Klem-klem (Bintang 3 sisi), Wire Rope 3/8", Trekskur, Isolator ,
- Bracket, Seal , Test Box , dls

- Bak Kontrol 400 x 400 x 400 mm, dari Beton Bertulang, lengkap dgn unit 1.00
- terminal dari plat tembaga electrode pentanahan sesuai dgn gambar
- perencana. (c/w Grounding System max. 2 ohm)

- Biaya Instalasi lot 1.00


- Perijinan dgn Depnaker lot 1.00
OQ)
KTRIKAL

HARGA SATUAN TOTAL HARGA


(Rp) (Rp)

tidak dikerjakan
- -
- -
- -
- -
- -
- -
- -

- -
- -

tidak dikerjakan
- -
- -
- -
- -
- -
- -
- -

- -
- -

tidak dikerjakan
- -
- -
- -
- -
- -
- -
- -

- -
- -

tidak dikerjakan
- -
- -
- -
- -
- -
- -
- -

- -
- -

tidak dikerjakan
- -
- -
- -
- -
- -
- -
- -

- -
- -

tidak dikerjakan
- -
- -
- -
- -
- -
- -
- -

- -
- -

tidak dikerjakan
- -
- -
- -
- -
- -
- -
- -

- -
- -

tidak dikerjakan
- -
- -
- -
- -
- -
- -
- -

- -
- -

tidak dikerjakan
- -
- -
- -
- -
- -

- -
- -
- -

tidak dikerjakan
- -
- -
- -

tidak dikerjakan
- -
- -
- -
- -
- -

- -
- -

tidak dikerjakan
- -
- -
- -
- -
- -

- -
- -

tidak dikerjakan
- -
- -
- -
- -
- -

- -
- -

tidak dikerjakan
- -
- -
- -
- -
- -

- -
- -

tidak dikerjakan
- -
- -
- -
- -
- -

- -
- -

tidak dikerjakan
- -
- -
- -
- -
- -

- -
- -

tidak dikerjakan
- -
- -
- -
- -
- -

- -
- -
tidak dikerjakan
- -
- -
- -
- -
- -

- -
- -

56,752,000.00

66,000.00 5,913,600.00

66,000.00 5,913,600.00

66,000.00 5,913,600.00

66,000.00 5,913,600.00

66,000.00 5,913,600.00

66,000.00 5,913,600.00

66,000.00 5,913,600.00
66,000.00 5,913,600.00

66,000.00 5,913,600.00

66,000.00 607,200.00

88,300.00 2,472,400.00
75,000.00 450,000.00

tidak dikerjakan
- -
- -

tidak dikerjakan
- -
- -

tidak dikerjakan
- -
- -

tidak dikerjakan
- -
- -

tidak dikerjakan
- -
- -
tidak dikerjakan
- -
- -

tidak dikerjakan
- -
- -

tidak dikerjakan
- -
- -

tidak dikerjakan
- -
- -

- -

tidak dikerjakan
by pln by pln

- -

- -
- -
-
- -
- -

- -
- -

- -
- -

- -
- -

- -
- -

- -
- -

- -
- -

- -
- -

- -

- -

- -

- -

- -
- -

- -

- -

- -

- -

- -

tidak dikerjakan
- -

tidak dikerjakan
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

tidak dikerjakan
- -
- -

tidak dikerjakan
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

tidak dikerjakan
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

tidak dikerjakan
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

tidak dikerjakan
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
tidak dikerjakan
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

tidak dikerjakan
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

tidak dikerjakan
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

tidak dikerjakan
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

tidak dikerjakan

tidak dikerjakan
- -

- -
- -

- -

tidak dikerjakan
- -

- -
- -

- -

tidak dikerjakan
- -

- -
- -

- -

tidak dikerjakan
- -

- -
- -

- -

tidak dikerjakan
- -

- -
- -

- -

tidak dikerjakan
- -

- -
- -

- -

tidak dikerjakan
- -

- -
- -

- -

tidak dikerjakan
- -

- -
- -

- -
- -

tidak dikerjakan
- -
- -
- -
- -
- -

tidak dikerjakan
- -
- -
- -
- -
- -

tidak dikerjakan
- -
- -
- -
- -
- -

tidak dikerjakan
- -
- -
- -
- -
- -

tidak dikerjakan
- -
- -
- -
- -
- -

tidak dikerjakan
- -
- -
- -
- -
- -

tidak dikerjakan
- -
- -
- -
- -
- -

tidak dikerjakan
- -
- -
- -
- -
- -

tidak dikerjakan
- -
- -
- -
- -
- -

tidak dikerjakan
- -
- -
tidak dikerjakan
- -

tidak dikerjakan
- -
- -

tidak dikerjakan
- -
- -

- -
- -

tidak dikerjakan
- -
- -

tidak dikerjakan
- -
- -

tidak dikerjakan
- -
- -

tidak dikerjakan
- -
- -
tidak dikerjakan
- -
- -

tidak dikerjakan
- -
- -

tidak dikerjakan
- -

tidak dikerjakan
- -

tidak dikerjakan

- -
- -
- -
- -
- -

37,899,700.00

6,576,400.00 6,576,400.00
1,949,100.00 1,949,100.00

161,700.00 20,374,200.00

2,250,000.00 2,250,000.00

2,312,500.00 2,312,500.00

687,500.00 687,500.00
3,750,000.00 3,750,000.00
BILL OF QUANTITY (BOQ)
PE K E R JAAN MEKANIKAL & ELEKTRIKAL

Pekerjaan : RUSUNAWA
Lokasi : RANCACILI BANDUNG - JAWA BARAT
Tahun Anggaran : 2014

2.3. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


2.3.B. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART

No. URAIAN PEKERJAAN SAT VOL

2.3.B. PEKERJAAN MEKANIKAL & ELEKTRIKAL NON STANDART

B.1. PEKERJAAN PEMADAM KEBAKARAN

I INSTALASI PEMIPAAN HYDRANT


INSTALASI PEMIPAAN

a LANTAI Dasar
Pemipaan BSP Sch. 40
(Incl.Fitting & All Accessories)
- dia. 150 mm (Pipa Riser ) m -
- dia. 65 mm m -
- dia. 40 mm m -
- Indoor Hydrant Box (IHB) 750x1200x180 set -
lengkap dengan : Landing Valve, Hose Valve, Hoze Nozzle
dan Accessories
Fire Extinguisher Tabung Cat Oven sesuai SPEK & Skedul :
- Type CO2 Class B & C 2,3 - 2,5 kg Seamless, c/w support bh -
- Type Class ABC 2,3 - 2,5 kg Seamless, c/w support bh -

a LANTAI 1
Pemipaan BSP Sch. 40
(Incl.Fitting & All Accessories)
- dia. 150 mm (Pipa Riser ) m -
- dia. 65 mm m -
- dia. 40 mm m -
- Indoor Hydrant Box (IHB) 750x1200x180 set -
lengkap dengan : Landing Valve, Hose Valve, Hoze Nozzle
dan Accessories
Fire Extinguisher Tabung Cat Oven sesuai SPEK & Skedul :
- Type CO2 Class B & C 2,3 - 2,5 kg Seamless, c/w support bh -
- Type Class ABC 2,3 - 2,5 kg Seamless, c/w support bh -

b LANTAI 2
Pemipaan BSP Sch. 40
(Incl.Fitting & All Accessories)
- dia. 150 mm (Pipa Riser ) m -
- dia. 65 mm m -
- dia. 40 mm m -
- Indoor Hydrant Box (IHB) 750x1200x180 set -
lengkap dengan : Landing Valve, Hose Valve, Hoze Nozzle
dan Accessories
Fire Extinguisher Tabung Cat Oven sesuai SPEK & Skedul :
- Type Class ABC 2,3 - 2,5 kg Seamless, c/w support bh -

c LANTAI 3
Pemipaan BSP Sch. 40
(Incl.Fitting & All Accessories)
- dia. 150 mm (Pipa Riser ) m -
- dia. 65 mm m -
- dia. 40 mm m -
- Indoor Hydrant Box (IHB) 750x1200x180 set -
lengkap dengan : Landing Valve, Hose Valve, Hoze Nozzle
dan Accessories
Fire Extinguisher Tabung Cat Oven sesuai SPEK & Skedul :
- Type Class ABC 2,3 - 2,5 kg Seamless, c/w support bh -
d LANTAI 4
Pemipaan BSP Sch. 40
(Incl.Fitting & All Accessories)
- dia. 150 mm (Pipa Riser ) m -
- dia. 65 mm m -
- dia. 40 mm m -
- Indoor Hydrant Box (IHB) 750x1200x180 set -
lengkap dengan : Landing Valve, Hose Valve, Hoze Nozzle
dan Accessories
Fire Extinguisher Tabung Cat Oven sesuai SPEK & Skedul :
- Type Class ABC 2,3 - 2,5 kg Seamless, c/w support bh -

e LANTAI 5
Pemipaan BSP Sch. 40
(Incl.Fitting & All Accessories)
- dia. 150 mm (Pipa Riser ) m -
- dia. 65 mm m -
- dia. 40 mm m -
- Indoor Hydrant Box (IHB) 750x1200x180 set -
lengkap dengan : Landing Valve, Hose Valve, Hoze Nozzle
dan Accessories
Fire Extinguisher Tabung Cat Oven sesuai SPEK & Skedul :
- Type Class ABC 2,3 - 2,5 kg Seamless, c/w support bh -

f LANTAI 6
Pemipaan BSP Sch. 40
(Incl.Fitting & All Accessories)
- dia. 150 mm (Pipa Riser ) m -
- dia. 65 mm m -
- dia. 40 mm m -
- Indoor Hydrant Box (IHB) 750x1200x180 set -
lengkap dengan : Landing Valve, Hose Valve, Hoze Nozzle
dan Accessories
Fire Extinguisher Tabung Cat Oven sesuai SPEK & Skedul :
- Type Class ABC 2,3 - 2,5 kg Seamless, c/w support bh -

g LANTAI 7
Pemipaan BSP Sch. 40
(Incl.Fitting & All Accessories)
- dia. 150 mm (Pipa Riser ) m -
- dia. 65 mm m -
- dia. 40 mm m -
- Indoor Hydrant Box (IHB) 750x1200x180 set -
lengkap dengan : Landing Valve, Hose Valve, Hoze Nozzle
dan Accessories
Fire Extinguisher Tabung Cat Oven sesuai SPEK & Skedul :
- Type Class ABC 2,3 - 2,5 kg Seamless, c/w support bh -

h LANTAI 8
Pemipaan BSP Sch. 40
(Incl.Fitting & All Accessories)
- dia. 150 mm (Pipa Riser ) m -
- dia. 65 mm m -
- dia. 40 mm m -
- Indoor Hydrant Box (IHB) 750x1200x180 set -
lengkap dengan : Landing Valve, Hose Valve, Hoze Nozzle
dan Accessories
Fire Extinguisher Tabung Cat Oven sesuai SPEK & Skedul :
- Type Class ABC 2,3 - 2,5 kg Seamless, c/w support bh -
- Automatic Air Vent dia 25, c/w Pressure gate, gate valve bh -

II INSTALASI PEMIPAAN SPLINKLER


INSTALASI PEMIPAAN

LANTAI DASAR
- Head sprinkler Pendent type bh -
- Main Control Valve (MCV) diameter: 80 mm bh -

Pemipaan BSP Sch. 40


(Incl.Fitting & All Accessories)
- dia. 150 mm (Pipa Riser ) m -
- dia. 80 mm m -
- dia. 65 mm m -
- dia. 50 mm m -
- dia. 40 mm m -
- dia. 32 mm m -
- dia. 25 mm m -

Pemipaan Drain GIP Medium


(Incl.Fitting & All Accessories)
- dia. 50 mm (Pipa Riser ) m -
- dia. 25 mm m -

- Drin Valve diameter: 25 mm bh -


- Sight glass diameter: 25 mm bh -

- Fiting lot -
- Material Bantu, hanger support,Clamp, Shoe, dll lot -

LANTAI 1
- Head sprinkler Pendent type bh -
- Main Control Valve (MCV) diameter: 80 mm bh -

Pemipaan BSP Sch. 40


(Incl.Fitting & All Accessories)
- dia. 150 mm (Pipa Riser ) m -
- dia. 80 mm m -
- dia. 65 mm m -
- dia. 50 mm m -
- dia. 40 mm m -
- dia. 32 mm m -
- dia. 25 mm m -
Pemipaan Drain GIP Medium
(Incl.Fitting & All Accessories)
- dia. 50 mm (Pipa Riser ) m -
- dia. 25 mm m -

- Drin Valve diameter: 25 mm bh -


- Sight glass diameter: 25 mm bh -

- Fiting lot -
- Material Bantu, hanger support,Clamp, Shoe, dll lot -

LANTAI 2
- Head sprinkler Pendent type bh -
- Main Control Valve (MCV) diameter: 80 mm bh -

Pemipaan BSP Sch. 40


(Incl.Fitting & All Accessories)
- dia. 150 mm (Pipa Riser ) m -
- dia. 80 mm m -
- dia. 65 mm m -
- dia. 50 mm m -
- dia. 40 mm m -
- dia. 32 mm m -
- dia. 25 mm m -

Pemipaan Drain GIP Medium


(Incl.Fitting & All Accessories)
- dia. 50 mm (Pipa Riser ) m -
- dia. 25 mm m -

- Drin Valve diameter: 25 mm bh -


- Sight glass diameter: 25 mm bh -

- Fiting lot -
- Material Bantu, hanger support,Clamp, Shoe, dll lot -

LANTAI 3 s/d LANTAI 8


- Head sprinkler Pendent type bh -
- Main Control Valve (MCV) diameter: 80 mm bh -

Pemipaan BSP Sch. 40


(Incl.Fitting & All Accessories)
- dia. 150 mm (Pipa Riser ) m -
- dia. 80 mm m -
- dia. 65 mm m -
- dia. 50 mm m -
- dia. 40 mm m -
- dia. 32 mm m -
- dia. 25 mm m -

Pemipaan Drain GIP Medium


(Incl.Fitting & All Accessories)
- dia. 50 mm (Pipa Riser ) m -
- dia. 25 mm m -

- Drin Valve diameter: 25 mm bh -


- Sight glass diameter: 25 mm bh -

- Fiting lot -
- Material Bantu, hanger support,Clamp, Shoe, dll lot -

LANTAI ATAP
- Head sprinkler Pendent type (test) bh -
- Automatic Air Vent dia 25, c/w Pressure gate, gate valve bh -

Pemipaan BSP Sch. 40


(Incl.Fitting & All Accessories)
- dia. 150 mm (Pipa Riser ) m -
- dia. 25 mm m -

Pemipaan Drain GIP Medium


(Incl.Fitting & All Accessories)
- dia. 50 mm (Pipa Riser ) m -

- Automatic Air Vent dia 25, c/w gate valve bh -

- Fiting lot -
- Material Bantu, hanger support,Clamp, Shoe, dll lot -

B.2. PEKERJAAN INSTALASI ELEKTRONIK

I PEKERJAAN SYSTEM MATV

a PERALATAN UTAMA SYSTEM MATV

Pengadaan dan pemasangan peralatan utama Sistem TV di-


tempatkan di Lantai Atap, dipasang secara lengkap termasuk
pondasi dan tiang penyangga sesuai diuraikan dalam Gam-
bar dan Spesifikasi Teknis.

- Antena PARABOLA 8 FIT unit -


- Antena PARABOLA INDOVISION unit -
- MA (Master Amplifier)/Mixer bh -
- Coaxial 7C/2V, dari Antena ke Mixer mtr -
- Termination & supporting material lot -

b SPLITTER TV

Pengadan dan pemasangan Splitter TV, breikut alat / mat-


erial bantu pemasangan lainnya sesuai Gambar dan Spesifi-
kasi Teknis.

Lantai-1
- Splitter 8 ports bh -
- TB-Splitter-TV/lt.1 bh -

Lantai-2
- Splitter 8 ports bh -
- TB-Splitter-TV/lt.2 bh -

Lantai-3
Splitter 8 ports bh -
TB-Splitter-TV/lt.3 bh -

Lantai-4
Splitter 8 ports bh -
TB-Splitter-TV/lt.4 bh -

Lantai-5
- Splitter 8 ports bh -
- TB-Splitter-TV/lt.5 bh -

Lantai-6
- Splitter 8 ports bh -
- TB-Splitter-TV/lt.6 bh -

Lantai-7
Splitter 8 ports bh -
TB-Splitter-TV/lt.7 bh -

Lantai-8
Splitter 8 ports bh -
TB-Splitter-TV/lt.8 bh -

c INSTALASI KABEL FEEDER SPLITTER TV


Instalasi Kabel Feeder Splitter TV menggunakan kabel coaxial
berikut semua aksesoris, material / alat bantu pemasangan
sesuai detail Gambar dan Spesifikasi Teknis.

Lantai-1
Coaxial 7C/2V dari TB-Splitter-TV/lt.2 ke TB-Splitter-lt.1 m -

Lantai-2
Coaxial 7C/2V dari TB-Splitter-TV/lt.3 ke TB-Splitter-lt.2 m -

Lantai-3
Coaxial 7C/2V dari TB-Splitter-TV/lt.4 ke TB-Splitter-lt.3 m -

Lantai-4
Coaxial 7C/2V dari TB-Splitter-TV/lt.5 ke TB-Splitter-lt.4 m -

Lantai-5
Coaxial 7C/2V dari TB-Splitter-TV/lt.2 ke TB-Splitter-lt.5 m -

Lantai-6
Coaxial 7C/2V dari TB-Splitter-TV/lt.3 ke TB-Splitter-lt.6 m -

Lantai-7
Coaxial 7C/2V dari TB-Splitter-TV/lt.4 ke TB-Splitter-lt.7 m -

Lantai-8
Coaxial 7C/2V dari TB-Splitter-TV/lt.5 ke TB-Splitter-lt.8 m -

d TV OUTLET

Pengadan dan pemasangan TV Outlet, breikut alat / material


bantu pemasangan lainnya sesuai Gambar dan Spesifikasi
Teknis.
Lantai-1
TV Outlet bh -

Lantai-2
TV Outlet bh -

Lantai-3
TV Outlet bh -

Lantai-4
TV Outlet bh -

Lantai-5
TV Outlet bh -

Lantai-6
TV Outlet bh -

Lantai-7
TV Outlet bh -

Lantai-8
TV Outlet bh -

e INSTALASI OUTLET TV

Instalasi kabel Outlet TV menggunakan kabel Coaxial 5C/2V


dalam conduit PVC HI dia.20 mm2 lengkap dengan bobokan
dan perapihan kembali, peralatan bantu dan aksesoris sesuai
detail Gambar dan Spesifikasi Teknis.

Lantai-1
TV Outlet ttk -

Lantai-2
TV Outlet ttk -

Lantai-3
TV Outlet ttk -

Lantai-4
TV Outlet ttk -

Lantai-5
TV Outlet ttk -

Lantai-6
TV Outlet ttk -

Lantai-7
TV Outlet ttk -

Lantai-8
TV Outlet ttk -

II PEKERJAAN FIRE ALARM

a PERALATAN UTAMA FIRE ALARM SYSTEM

Pengadaan dan pemasangan peralatan Sistem Fire Alarm


ditempatkan di Ruang Kontrol secara lengkap termasuk peng-
kabelan dan koneksi meliputi peralatan sesuai diuraikan dlm
Gambar dan Spesifikasi Teknis, tetapi tidak terbats pada item
sebagai berikut :

- MCFA 1 LOOP (Semi Andressable)/255 address unit -


Integrayed Flexible Analog Addressable Fire Alarm Panel
30x4 Characters LCD Display,Fireman Intercom Function,Network Function
c/w Battery and 2 hand-set Intercom
- Annunciator panel (LCD type) unit -
ADDRESS MODULE for :
- conv.detector bh -
- manual cal station bh -
- bell,lamp,&strobe bh -
- panel pressurised fan,panel lift,SS,PABX,HVAC shutdown,local device bh -

b INSTALASI KABEL FEEDER FIRE ALARM

INSTALASI FEEDER MELALUI RISER / SHAFT

Kabel NYA 5 x 2 x 2,5 mm2 in conduit Dia.32 dari MCFA ke MDF m -


Kabel NYA 3 x 2 x 2,5 mm2 in conduit Dia.32 dari MDF ke TB-FA-LT.Dasar m -
Kabel NYA 3 x 2 x 2,5 mm2 in conduit Dia.32 dari MDF ke TB-FA-LT.2 m -
Kabel NYA 3 x 2 x 2,5 mm2 in conduit Dia.32 dari MDF ke TB-FA-LT.3 m -
Kabel NYA 3 x 2 x 2,5 mm2 in conduit Dia.32 dari MDF ke TB-FA-LT.4 m -
Kabel NYA 3 x 2 x 2,5 mm2 in conduit Dia.32 dari MDF ke TB-FA-LT.5 m -
Kabel NYA 3 x 2 x 2,5 mm2 in conduit Dia.32 dari MDF ke TB-FA-LT.6 m -
Kabel NYA 3 x 2 x 2,5 mm2 in conduit Dia.32 dari MDF ke TB-FA-LT.7 m -
Kabel NYA 3 x 2 x 2,5 mm2 in conduit Dia.32 dari MDF ke TB-FA-LT.8 m -

c PERALATAN PENGINDERA dan PENANDA KEBAKARAN

Pengadaan dan pemasangan peralatan pengindera dan penan-


da kebakaran berikut alat / material bantu lainnya sesuai Gam-
bar dan Spesifikasi Teknis.

Lantai-1
- Rate Of Rise Temperature - Heat detector bh -
- Manual push button bh -
- Lampu Indikator bh -
- Bell alarm bh -
- End of Line Resistor bh -
- TB-FA-Lt.Ground bh -
Lantai-2
- Rate Of Rise Temperature - Heat detector bh -
- Manual push button bh -
- Lampu Indikator bh -
- Bell alarm bh -
- End of Line Resistor bh -
- TB-FA-Lt2 bh -

Lantai- 3 s/d lantai 6


- Rate Of Rise Temperature - Heat detector bh -
- Manual push button bh -
- Lampu Indikator bh -
- Bell alarm bh -
- End of Line Resistor bh -
- TB-FA-Lt2 bh -

Lantai-7
- Rate Of Rise Temperature - Heat detector bh -
- Manual push button bh -
- Lampu Indikator bh -
- Bell alarm bh -
- End of Line Resistor bh -
- TB-FA-Lt2 bh -

Lantai-8
- Rate Of Rise Temperature - Heat detector bh -
- Manual push button bh -
- Lampu Indikator bh -
- Bell alarm bh -
- End of Line Resistor bh -
- TB-FA-Lt2 bh -

Tangga
- Rate Of Rise Temperature - Heat detector bh -
d PERALATAN PENGINDERA dan PENANDA KEBAKARAN

Instalasi titik detector dari TB-FA dengan kabel NYA 2 x 1,5 mm2
didalam conduit dia. 20 mm2 lengkap dengan aksesoris dan
semua peralatan / material bantu pemasangan sesuai detail
Gambar dan Spesifikasi Teknis.

Lantai-1
- ROR Heat,ROR Fixed,Smoke Detektor ttk -
- Manual push button ttk -
- Lampu Indikator ttk -
- Bell alarm ttk -

Lantai-2
- ROR Heat,ROR Fixed,Smoke Detektor ttk -
- Manual push button ttk -
- Lampu Indikator ttk -
- Bell alarm ttk -

Lantai- 3 s/d lantai 6


- ROR Heat,ROR Fixed,Smoke Detektor ttk -
- Manual push button ttk -
- Lampu Indikator ttk -
- Bell alarm ttk -

Lantai-7
- ROR Heat,ROR Fixed,Smoke Detektor ttk -
- Manual push button ttk -
- Lampu Indikator ttk -
- Bell alarm ttk -

Lantai-8
- ROR Heat,ROR Fixed,Smoke Detektor ttk -
- Manual push button ttk -
- Lampu Indikator ttk -
- Bell alarm ttk -

Tangga
- Smoke detector (FRC 2x 1.5 mm2) ttk -

Perijinan dgn Depnaker lot -

Material Bantu lot -

Testing & Commissioning lot -

III PEKERJAAN SOUND SYSTEM

PERALATAN UTAMA SOUND SYSTEM

- Power Amplifier 3x150 w unit -


- Aux Pre Amp unit -
- 6 zone all cal station unit -
- DVD/CD/MP3/TUNER unit -
- Battery and Charger (4 jam) unit -
- Mic Paging (Emergency) unit -
- Mic Paging unit -
- Rack Kabinet unit -
- MTB -SS unit -

Penarikan kabel utama menggunakan kabel NYMHY 3x2,5 mm2


di dalam pipa high impact dari MTB-SS ke

- TB-SS - Lantai Dasar (NYMHY 3x2,5 mm2) c/w pipa conduit m -


- TB-SS - Lantai 1 (NYMHY 3x2,5 mm2) c/w pipa conduit m -
- TB-SS - Lantai 2 (NYMHY 3x2,5 mm2) c/w pipa conduit m -
- TB-SS - Lantai 3 (NYMHY 3x2,5 mm2) c/w pipa conduit m -
- TB-SS - Lantai 4 (NYMHY 3x2,5 mm2) c/w pipa conduit m -
- TB-SS - Lantai 5 (NYMHY 3x2,5 mm2) c/w pipa conduit m -
- TB-SS - Lantai 6 (NYMHY 3x2,5 mm2) c/w pipa conduit m -
- TB-SS - Lantai 7 (NYMHY 3x2,5 mm2) c/w pipa conduit m -
- TB-SS - Lantai 8 (NYMHY 3x2,5 mm2) c/w pipa conduit m -

Lantai-Dasar
- Box Speaker 5 w (Heat Resistant Type) bh -
- Terminal Box (TBTS) unit -
- Instalasi ceilling & Box Speaker menggunakan kabel ttk -
NYMHY 2x1,5 mm2 di dalam pipa conduit

Lantai-1
- Ceilling Speaker 3 w bh -
- Box Speaker 5 w (Heat Resistant Type) bh -
- Terminal Box (TBTS) unit -
- Volume control bh -
- Instalasi ceilling & Box Speaker menggunakan kabel ttk -
NYMHY 2x1,5 mm2 di dalam pipa conduit

Lantai-2
- Ceilling Speaker 3 w bh -
- Box Speaker 5 w (Heat Resistant Type) bh -
- Terminal Box (TBTS) unit -
- Volume control bh -
- Instalasi ceilling & Box Speaker menggunakan kabel ttk -
NYMHY 2x1,5 mm2 di dalam pipa conduit

Lantai-3 s/d lantai 6


- Ceilling Speaker 3 w bh -
- Box Speaker 5 w (Heat Resistant Type) bh -
- Terminal Box (TBTS) unit -
- Volume control bh -
- Instalasi ceilling & Box Speaker menggunakan kabel ttk -
NYMHY 2x1,5 mm2 di dalam pipa conduit
Lantai-7
- Ceilling Speaker 3 w bh -
- Box Speaker 5 w (Heat Resistant Type) bh -
- Terminal Box (TBTS) unit -
- Volume control bh -
- Instalasi ceilling & Box Speaker menggunakan kabel ttk -
NYMHY 2x1,5 mm2 di dalam pipa conduit

Lantai-8
- Ceilling Speaker 3 w bh -
- Box Speaker 5 w (Heat Resistant Type) bh -
- Terminal Box (TBTS) unit -
- Volume control bh -
- Instalasi ceilling & Box Speaker menggunakan kabel ttk -
NYMHY 2x1,5 mm2 di dalam pipa conduit

Lantai-Atap
- Box Speaker 5 w (Heat Resistant Type) bh -
- Instalasi ceilling & Box Speaker menggunakan kabel ttk -
NYMHY 2x1,5 mm2 di dalam pipa conduit

IV PEKERJAAN CCTV

PERALATAN UTAMA CCTV

- Digital Video Recording with 16 CH (kap Recording ± 2 minggu) unit -


- Video Manager unit -
- Keyboard Digital unit -
- LCD TV 21'' unit -
- Control CCTV unit -

Lantai-Dasar
- Colour Dome Camera day/nigh unit -
- Inst CCTV , Kabel Coaxial RG-11 in PVC HI conduit dia.20mm ttk -
- General Purpose Outlet, 1ph,10 Amp Installation Adaptor ttk -

Lantai-1
- Colour Dome Camera day/nigh fixed type unit -
- Inst CCTV , Kabel Coaxial RG-11 in PVC HI conduit dia.20mm ttk -
- General Purpose Outlet, 1ph,10 Amp Installation Adaptor ttk -

Lantai-2
- Colour Dome Camera day/nigh fixed type unit -
- Inst CCTV , Kabel Coaxial RG-11 in PVC HI conduit dia.20mm ttk -
- General Purpose Outlet, 1ph,10 Amp Installation Adaptor ttk -

Lantai-3 s/d lantai 6


- Colour Dome Camera day/nigh fixed type unit -
- Inst CCTV , Kabel Coaxial RG-11 in PVC HI conduit dia.20mm ttk -
- General Purpose Outlet, 1ph,10 Amp Installation Adaptor ttk -

Lantai-7
- Colour Dome Camera day/nigh fixed type unit -
- Inst CCTV , Kabel Coaxial RG-11 in PVC HI conduit dia.20mm ttk -
- General Purpose Outlet, 1ph,10 Amp Installation Adaptor ttk -

Lantai-8
- Colour Dome Camera day/nigh fixed type unit -
- Inst CCTV , Kabel Coaxial RG-11 in PVC HI conduit dia.20mm ttk -
- General Purpose Outlet, 1ph,10 Amp Installation Adaptor ttk -

- Material Bantu lot -


- Testing dan Kommisioning ls -

V PEKERJAAN TELEPON
PERALATAN UTAMA TELEPON
- PABX Cap. 10 / 150 ext (Expandable), complete with power supply, rectifier, unit -
battery charger 3 hour, operator console, MDF 180 Pair
and supporting material.
- BOX TELKOM unit -

- OTC 4Px2x0.6 dari MDF ke Box Telkom m -

Lantai-1
- Outlet Telephone bh -
- Pengabelan Telephone termasuk pengabelan dengan kabel ttk -
ITC 2 x 0,6 mm2 dalam pipa PVC diameter 3/4"
- Terminal Box 20 Pair unit -

Lantai-2
- Outlet Telephone bh -
- Pengabelan Telephone termasuk pengabelan dengan kabel ttk -
ITC 2 x 0,6 mm2 dalam pipa PVC diameter 3/4"
- Terminal Box 20 Pair unit -

Lantai-3 s/d lantai 6


- Outlet Telephone bh -
- Pengabelan Telephone termasuk pengabelan dengan kabel ttk -
ITC 2 x 0,6 mm2 dalam pipa PVC diameter 3/4"
- Terminal Box 20 Pair unit -

Lantai-7
- Outlet Telephone bh -
- Pengabelan Telephone termasuk pengabelan dengan kabel ttk -
ITC 2 x 0,6 mm2 dalam pipa PVC diameter 3/4"
- Terminal Box 20 Pair unit -

Lantai-8
- Outlet Telephone bh -
- Pengabelan Telephone termasuk pengabelan dengan kabel ttk -
ITC 2 x 0,6 mm2 dalam pipa PVC diameter 3/4"
- Terminal Box 20 Pair unit -

- Material Bantu lot -


- Testing dan Kommisioning ls -

VI PEKERJAAN SISTEM PENTANAHAN ELEKTRONIK

INSTALASI
Pentanahan (Grounding) elektronik
sesuai gambar dan spesifikasi teknis.

- Body pada semua panel elektronik

Item SBB:
- Terminal Grounding Box bh -
- Grounding Box 40x40x40 cm bh -
- Grounding Rod GIP 1' ( untuk R lebih kecil dari 1 ohm ) bh -
- Connector Test Box set -
- Termination R.Supporting Material lot -
- Kabel NYA 50 mm2 m -

- Material Bantu lot -

- Testing & Commissioning lot -

B.3. PEKERJAAN SARANA DAN PRASARANA LINGKUNGAN (LUAR BANGUNAN)

I PEKERJAAN INSTALASI PLAMBING

a. INSTALASI AIR BERSIH


PERALATAN UTAMA
Pengadaan dan pemasangan unit
1 Pengadaan dan pemasangan unit bh -
Booster Pump
Kapasitas : 160 l/menit
Head : 20 mtr
Speed : 1450 rpm
PI : 2,2 KW/380V/50Hz/3ph
Lengkap dengan Pump & Electromotor (2),Pressure Tank, Panel Kontrol, Pressure switch,
, Presure Gauge, Accessories, Gate Valve, Header & base Plat.
2 Tangki Air Atas unit -
kapasitas : 5m3
Fiber Rainforcement Plastic, lengkap dengan dudukan

b. INSTALASI AIR KOTOR & AIR BEKAS


Pipa PVC Kelas AW(Incl. Fitting & Accessories)

a SITE PLAN
- dia. 150 (air kotor dan air bekas ) m -
- dia. 150 (air kotor dan air bekas) m -

b Septic Tank Bio Media (Air Kotor) unit -


Kapasitas : 15 m3/Day
c/w Air Blower

c Tangki Sumur Resapan (Air Bekas) unit -


Kapasitas : 5 m3

- Struktur Pondasi By Sipil

c. MATERIAL BANTU lot -

d. TESTING COMMISSIONING lot -


II PEKERJAAN LIFT

1 Passenger Elevator unit -


- Kap : 15 orang / 1000 kg
Jaminan Perawatan selama 3 bulan
Interior dan pintu Stainless stell
- Panel Kontrol ALD/ARD unit -
- Lengkap terpasang, Testing Commisioning sampai dengan beroperasi unit -
BOQ)
KTRIKAL

HARGA SATUAN TOTAL HARGA


(Rp) (Rp)

tidak dikerjakan

- -
- -
- -
- -

- -
- -

tidak dikerjakan
- -
- -
- -
- -

- -
- -

tidak dikerjakan

- -
- -
- -
- -

- -

tidak dikerjakan

- -
- -
- -
- -

- -
tidak dikerjakan

- -
- -
- -
- -

- -

tidak dikerjakan

- -
- -
- -
- -

- -

tidak dikerjakan

- -
- -
- -
- -
- -

tidak dikerjakan

- -
- -
- -
- -

- -

tidak dikerjakan

- -
- -
- -
- -

- -
- -

tidak dikerjakan
- -
- -
- -
- -
- -
- -
- -
- -
- -

- -
- -

- -
- -

- -
- -

tidak dikerjakan
- -
- -

- -
- -
- -
- -
- -
- -
- -
- -
- -

- -
- -

- -
- -

tidak dikerjakan
- -
- -

- -
- -
- -
- -
- -
- -
- -

- -
- -

- -
- -

- -
- -

tidak dikerjakan
- -
- -

- -
- -
- -
- -
- -
- -
- -

- -
- -

- -
- -

- -
- -

tidak dikerjakan
- -
- -

- -
- -

- -

- -

- -
- -

tidak dikerjakan

- -
- -
- -
- -
- -

tidak dikerjakan
- -
- -

- -
- -

- -
- -

- -
- -

- -
- -

- -
- -

- -
- -

- -
- -

tidak dikerjakan
- -

- -

- -

- -

- -

- -

- -

- -

tidak dikerjakan
- -

- -

- -

- -

- -

- -

- -

- -

tidak dikerjakan

- -
- -

- -

- -

- -

- -

- -

- -

tidak dikerjakan

- -
- -

- -
- -
- -
- -

tidak dikerjakan

- -
- -
- -
- -
- -
- -
- -
- -
- -

tidak dikerjakan

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

- -
- -
- -
- -
- -
- -

- -
- -
- -
- -
- -
- -

- -
- -
- -
- -
- -
- -

- -
tidak dikerjakan

- -
- -
- -
- -

- -
- -
- -
- -

- -
- -
- -
- -

- -
- -
- -
- -

- -
- -
- -
- -

- -

- -

- -

- -

tidak dikerjakan

- -
- -
- -
- -
- -
- -
- -
- -
- -

- -
- -
- -
- -
- -
- -
- -
- -
- -

- -
- -
- -

tidak dikerjakan
- -
- -
- -
- -
- -

tidak dikerjakan
- -
- -
- -
- -
- -

tidak dikerjakan
- -
- -
- -
- -
- -
tidak dikerjakan
- -
- -
- -
- -
- -

tidak dikerjakan
- -
- -
- -
- -
- -

tidak dikerjakan
- -
- -

tidak dikerjakan

- -
- -
- -
- -
- -

tidak dikerjakan
- -
- -
- -

tidak dikerjakan
- -
- -
- -

tidak dikerjakan
- -
- -
- -

tidak dikerjakan
- -
- -
- -

tidak dikerjakan
- -
- -
- -

tidak dikerjakan
- -
- -
- -

- -
- -

-
tidak dikerjakan
- -

- -

- -

tidak dikerjakan
- -
- -

- -

tidak dikerjakan
- -
- -

- -

tidak dikerjakan
- -
- -

- -

tidak dikerjakan
- -
- -

- -

tidak dikerjakan
- -
- -
- -

- -
- -

tidak dikerjakan

- -
- -
- -
- -
- -
- -

- -

- -

-
tidak dikerjakan

- -

- -

-
tidak dikerjakan

- -
- -

- -

- -

- -

- -
-

- tidak dikerjakan

- -
- -
Pekerjaan
Lokasi
Tahun Anggaran

No Uraian Pekerjaan

PEKERJAAN MEKANIKAL, ELEKTRIKAL & PLUMB

PEKERJAAN PLUMBING
A. Peralatan Utama l/d Acesscories
1. Pompa Transfer
2. Pompa Booster
3. Tanki Atas
4. Sand / Carbon Filter
5. Penggantian Sumpit air hujan
6. Sewage Treatment Plant (STP)
Kapasitas : 36 m3 / hari
Tipe : Biotech
7. Shallow Well
Kapasitas : 100 lpm
Head / Kedalaman : 30 - 40 meter
lengkap dengan sumur pantek
B. Pekerjaan Instalasi Pemipaan l/d Fitting LT. 1 s/d Atap
(Di luar Sanitary)
1. Pipa air bersih utama dan Riser galvanis sampai Roof Tank
2. Pipa riser air bersih PVC / AW dari Roof Tank ke Shaft (PVC AW)
LT. 1 Atap s/d ke LT. 1
3. Pipa air bersih PVC AW dari Riser ke Toilet LT. 1 s/d LT. 8
4. Valve-valve dan Accessories
C. Instalasi Pemipaan Air Hujan, Air Kotor, Air Bekas dan
1. Pemipaan Air Hujan
2. Pemipaan Air Kotor, bekas dan Vent LT. 1 s/d 9
3. Floor Drain, Clean Out dan Roof Drain

B. Pekerjaan Instalasi Pemipaan l/d Fitting LT. 5 s/d Atap


(Di luar Sanitary)
3. Pipa air bersih PVC AW dari Riser ke Toilet LT. 5 s/d LT. 9

B. INSTALASI PEMIPAAN HYDRANT


No Uraian Pekerjaan

PIPA BLACK STEEL MEDIUM L/D FITTING, VALVE DAN ACCESSORIES


1. Pemipaan Utama R. Pompa
2. Pemipaan peralatan Hydrant luar bangunan (Site)
3. Pemipaan dalam Bangunan Tower LT. 5 s/d LT. 9
4. Pemipaan Riser
No Uraian Pekerjaan

D. PERALATAN PEMADAM KEBAKARAN


1. Indoor Hydrant Box
2. Sprinkler Head
3. Fire Existinguisher
4.Pemipaan Utama R. Pompa
5. Pemipaan peralatan Hydrant luar bangunan (Site)
6. Pemipaan dalam Bangunan Tower LT. 6 s/d LT. 9
7. Pemipaan Riser
8. Ootdoor Hydrant Box
9. Pillar Hydrant
10. Siamese Connection

PEKERJAAN ELEKTRIKAL

B. Pekerjaan Instalasi & Asesoris


1. Instalasi kabel Feeder dari PUTR dan SDP lantai
2. Instalasi peralatan M/E
3. Instalasi penerangan & Stop Kontak
4. Lampu-lampu, Saklar dan stop kontak
C. Pekerjaan Kabel Tray
D. Pekerjaan Penangkal Petir
E. Pekerjaan Elektronika
1. Sistem fire Alarm
2. Sistem Sound System (Evakuasi)
3. Sistem Telephone (Hanya Instalasi)
4. Sistem MATV (Peralatan Utama by Provider)

PEKERJAAN TRANSPORTASI DALAM GEDUNG

1. Pengadaan dan pemasangan Gondola l/d Panel termasuk Perijinan


2. Pengadaan dan pemasangan Lift Penumpang
3. Pengadaan dan pemasangan Lift Barang
: PEMBANGUNAN APARTEMEN RAKYAT RANCACILI 02.05
: RANCACILI JAWA BARAT
: 2018

KONTRAK AWAL
Harga Satuan Jumlah Harga
Volume Sat
(Rp.) (Rp.)

TOTAL 4,326,333,500.00

SUB TOTAL 491,626,500.00

1 set 19,000,000 19,000,000


1 set 30,000,000 30,000,000
1 set 22,000,000 22,000,000
- -
- -
1 set 160,000,000 160,000,000
- -
- -
2 set 8,000,000 16,000,000

1 lot 29,565,000.00 29,565,000


1 lot 23,166,000.00 23,166,000
-
1 lot 54,540,000.00 54,540,000
1 lot 31,387,500.00 31,387,500
-
1 lot 38,200,000 38,200,000
1 lot 49,300,000 49,300,000
1 lot 18,468,000 18,468,000

SUB TOTAL 50,000,000.00

1 lot 50,000,000.00 50,000,000.00


KONTRAK AWAL
Harga Satuan Jumlah Harga
Volume Sat
(Rp.) (Rp.)

SUB TOTAL 80,000,000.00

1 lot 20,000,000.00 20,000,000.00


1 lot 50,000,000.00 50,000,000.00
1 lot 10,000,000.00 10,000,000.00
KONTRAK AWAL
Harga Satuan Jumlah Harga
Volume Sat
(Rp.) (Rp.)

SUB TOTAL 187,661,000.00


1 lot 3,420,000.00 3,420,000.00
1 lot 19,278,000.00 19,278,000.00
1 lot 17,766,000.00 17,766,000.00
1 lot 63,352,800 63,352,800.00
1 lot 21,924,000 21,924,000.00
1 lot 20,000,000 20,000,000.00
1 lot 12,625,200 12,625,200.00
1 lot 13,608,000.00 13,608,000.00
1 lot 13,608,000.00 13,608,000.00
1 lot 2,079,000 2,079,000.00

SUB TOTAL 1,005,046,000.00


1 lot 150,000,000.00 150,000,000.00
1 lot 20,000,000.00 20,000,000.00
1 lot 250,000,000.00 250,000,000.00
1 lot 200,000,000.00 200,000,000.00
1 lot 80,000,000.00 80,000,000.00
1 lot 43,848,000.00 43,848,000.00
-
1 set 121,500,000.00 121,500,000.00
1 set 38,340,000.00 38,340,000.00
1 set 59,778,000.00 59,778,000.00
1 set 41,580,000.00 41,580,000.00
-
SUB TOTAL 2,512,000,000.00
-
1 set 972,000,000.00 972,000,000.00
2 set 540,000,000.00 1,080,000,000.00
1 set 460,000,000.00 460,000,000.00
RENCANA ANGGARAN BIAYA (RAB) PLUMBING

Pekerjaan : Pekerjaan Review Apartemen Rancacili 02 Tahap 3


Lokasi : Rancacili, Bandung, Jawa Barat
Sumber Dana : APBD Kota Bandung Tahun Anggaran 2018

NO. URAIAN
1 2
I PEKERJAAN PLUMBING

A PERALATAN UTAMA

1 Pompa Transfer
Terdiri dari pompa lengkap dengan pengkabelan, panel kontrol
dan accessories ( 1 Duty 2 Standby )
Type : Centrifugal End Suction
Kapasitas : 400 l/m ; 50 M ; 7.5 kW ; 2900 RPM
2 Pompa Booster
Terdiri dari pompa lengkap dengan pressure tank, pengkabelan, panel
kontrol dan accessories ( 1 Duty, 1 Standby )
Type : Package Booster Pump
Kapasitas : 450 l/m ; 20 M ; 4 kW ; 2900 RPM
3 Pompa Filter
Type : Package Booster Pump
Kapasitas : 200 l/m ; 12.3 M ; 1.1 kW
4 Roof tank
Kapasitas : 18 m3 (4x3x1,5) meter
Type : Fiberglass
5 Sand Filter
Kapasitas : 20 m3/h
6 Carbon Filter
Kapasitas : 20 m3/h
7 Sumppit Pump GWT
Terdiri dari pompa lengkap dengan pengkabelan, panel kontrol dan
accessories
Type : Submersible Pump
Kapasitas : 300 l/m ; 12 M ; 1.5 kW ; 1500 RPM
8 Sumppit Pump di Ruang Pompa
Terdiri dari pompa lengkap dengan pengkabelan, panel kontrol dan
accessories ( 1 Duty, 1 Standby )
Type : Submersible Pump
Kapasitas : 300 l/m ; 12 M ; 1.5 kW ; 1500 RPM
9 Sumppit Pump STP
Terdiri dari 2 unit pump lengkap dengan pengkabelan, panel kontrol
dan accessories ( 1 Duty 1 Standby )
Type : Submersible Pump
Kapasitas : 400 l/m ; 18 M ; 3.7 kW ; 1500 RPM
10 Sewage Treatment Plant
Kapasitas : 45 m3/hari
Type : Biotech & Biofiltration System
11 Grease Trap
Kapasitas : 6 m3/hari
12 Deep Well Pump
Type : Package Booster Pump
Kapasitas : 150 l/m ; 65 M ; 4 kW ; 2900 RPM

B. INSTALASI PEMIPAAN AIR BERSIH


1 Instalasi Pemipaan Utama Ruang Pompa
Pemipaan di utama ruang pompa hingga menuju shaft Air Bersih.
Pemipaan galvanis lengkap dengan fitting, valve termasuk fitting
dan Accessories.
1 Pemipaan Galvanis
- Dia. 2-1/2"
- Dia. 2"
2 Header
- Dia 4"
- Dia 3"
3 Gate Valve
- Dia. 2-1/2"
4 Check Valve
- Dia. 2-1/2"
5 Flexsible Joint
- Dia. 2-1/2"
6 Stainer
- Dia. 2-1/2"
7 Foot Valve
- Dia. 3"
8 Float Valve
- Dia. 2"
9 Fitting Valve, Elbow, Tee, Reducer, Support, dan Material bantu lainnya

2 Instalasi Pemipaan Distribusi Air Bersih


Pemipaan galvanis dari shaft sampai ke Meter Air. Pemipaan PVC AW
dari Meteran air sampai ke Fixture hunian / Peralatan rumah tangga Lengkap
dengan Fitting, Valve 'dan Accessories.
Lantai 5
1 Pemipaan Galvanis
- Dia. 2-1/2"
- Dia. 2"
- Dia. 3/4"
2 Pemipaan PVC AW Kamar Type 1 (10)
- Dia. 3/4"
3 Pemipaan PVC AW Kamar Type 2 (4)
- Dia. 3/4"
4 Pemipaan PVC AW Kamar Type 3 (13)
- Dia. 3/4"
5 Pemipaan PVC AW Kamar Type 4 (2)
- Dia. 3/4"
6 Pemipaan PVC AW Kamar Type 5 (2)
- Dia. 3/4"
7 Pemipaan PVC AW Kamar Type 6 (1)
- Dia. 3/4"
8 Meteran Air
9 Fitting Valve, Elbow, Tee, Reducer, Support, dan Material bantu lainnya
Lantai 6
1 Pemipaan Galvanis
- Dia. 2-1/2"
- Dia. 2"
- Dia. 3/4"
2 Pemipaan PVC AW Kamar Type 1 (10)
- Dia. 3/4"
3 Pemipaan PVC AW Kamar Type 2 (4)
- Dia. 3/4"
4 Pemipaan PVC AW Kamar Type 3 (14)
- Dia. 3/4"
5 Pemipaan PVC AW Kamar Type 4 (2)
- Dia. 3/4"
6 Pemipaan PVC AW Kamar Type 5 (2)
- Dia. 3/4"
7 Pemipaan PVC AW Kamar Type 6 (1)
- Dia. 3/4"
8 Meteran Air
9 Fitting Valve, Elbow, Tee, Reducer, Support, dan Material bantu lainnya
Lantai 7
1 Pemipaan Galvanis
- Dia. 2-1/2"
- Dia. 2"
- Dia. 3/4"
2 Pemipaan PVC AW Kamar Type 1 (10)
- Dia. 3/4"
3 Pemipaan PVC AW Kamar Type 2 (4)
- Dia. 3/4"
4 Pemipaan PVC AW Kamar Type 3 (14)
- Dia. 3/4"
5 Pemipaan PVC AW Kamar Type 4 (2)
- Dia. 3/4"
6 Pemipaan PVC AW Kamar Type 5 (2)
- Dia. 3/4"
7 Pemipaan PVC AW Kamar Type 6 (1)
- Dia. 3/4"
8 Meteran Air
9 Fitting Valve, Elbow, Tee, Reducer, Support, dan Material bantu lainnya
Lantai 8
1 Pemipaan Galvanis
- Dia. 2-1/2"
- Dia. 2"
- Dia. 3/4"
2 Pemipaan PVC AW Kamar Type 1 (10)
- Dia. 3/4"
3 Pemipaan PVC AW Kamar Type 2 (4)
- Dia. 3/4"
4 Pemipaan PVC AW Kamar Type 3 (13)
- Dia. 3/4"
5 Pemipaan PVC AW Kamar Type 4 (2)
- Dia. 3/4"
6 Pemipaan PVC AW Kamar Type 5 (2)
- Dia. 3/4"
7 Pemipaan PVC AW Kamar Type 6 (1)
- Dia. 3/4"
8 Meteran Air
9 Fitting Valve, Elbow, Tee, Reducer, Support, dan Material bantu lainnya
Lantai 9
1 Pemipaan Galvanis
- Dia. 2-1/2"
- Dia. 2"
- Dia. 3/4"
2 Pemipaan PVC AW Kamar Type 1 (10)
- Dia. 3/4"
3 Pemipaan PVC AW Kamar Type 2 (4)
- Dia. 3/4"
4 Pemipaan PVC AW Kamar Type 3 (14)
- Dia. 3/4"
5 Pemipaan PVC AW Kamar Type 4 (2)
- Dia. 3/4"
6 Pemipaan PVC AW Kamar Type 5 (2)
- Dia. 3/4"
7 Pemipaan PVC AW Kamar Type 6 (1)
- Dia. 3/4"
8 Meteran Air
9 Fitting Valve, Elbow, Tee, Reducer, Support, dan Material bantu lainnya
Lantai Atap
1 Pemipaan Galvanis
- Dia. 2-1/2"
2 Header
- Dia 4"
- Dia 3"
3 Gate Valve
- Dia. 2-1/2"
4 Check Valve
- Dia. 2-1/2"
5 Flexsible Joint
- Dia. 2-1/2"
6 Stainer
- Dia. 2-1/2"
7 Float Valve
- Dia. 2"
8 Fitting Valve, Elbow, Tee, Reducer, Support, dan Material bantu lainnya

C INSTALASI PEMIPAAN AIR KOTOR, AIR BEKAS, & VENT


1 Instalasi Pemipaan Riser / Pipa Tegak
Pengadaan dan pemasangan instalasi pemipaan pipa jenis PVC di ruang
shaft untuk pembuangan air kotor dan air bekas.
- Dia. 4"
- Dia. 2"
- Fitting Vent Cup, Clean Out, Elbow, Tee, Support, dan Material bantu
lainnya

2 Instalasi Pemipaan Air Kotor & Air Bekas


Pengadaan dan pemasangan instalasi pemipaan pipa jenis PVC untuk
pembuangan air kotor dan air bekas.
Lantai 5
1 Pemipaan PVC AW Kamar Type 1 (10)
- Dia. 4"
- Dia. 2"
2 Pemipaan PVC AW Kamar Type 2 (4)
- Dia. 4"
- Dia. 2"
3 Pemipaan PVC AW Kamar Type 3 (13)
- Dia. 4"
- Dia. 2"
4 Pemipaan PVC AW Kamar Type 4 (2)
- Dia. 4"
- Dia. 2"
5 Pemipaan PVC AW Kamar Type 5 (2)
- Dia. 4"
- Dia. 2"
6 Pemipaan PVC AW Kamar Type 6 (1)
- Dia. 4"
- Dia. 2"
7 Fitting Clean Out, Elbow, Tee, Support, dan Material bantu lainnya
Lantai 6
1 Pemipaan PVC AW Kamar Type 1 (10)
- Dia. 4"
- Dia. 2"
2 Pemipaan PVC AW Kamar Type 2 (4)
- Dia. 4"
- Dia. 2"
3 Pemipaan PVC AW Kamar Type 3 (14)
- Dia. 4"
- Dia. 2"
4 Pemipaan PVC AW Kamar Type 4 (2)
- Dia. 4"
- Dia. 2"
5 Pemipaan PVC AW Kamar Type 5 (2)
- Dia. 4"
- Dia. 2"
6 Pemipaan PVC AW Kamar Type 6 (1)
- Dia. 4"
- Dia. 2"
7 Fitting Clean Out, Elbow, Tee, Support, dan Material bantu lainnya
Lantai 7
1 Pemipaan PVC AW Kamar Type 1 (10)
- Dia. 4"
- Dia. 2"
2 Pemipaan PVC AW Kamar Type 2 (4)
- Dia. 4"
- Dia. 2"
3 Pemipaan PVC AW Kamar Type 3 (14)
- Dia. 4"
- Dia. 2"
4 Pemipaan PVC AW Kamar Type 4 (2)
- Dia. 4"
- Dia. 2"
5 Pemipaan PVC AW Kamar Type 5 (2)
- Dia. 4"
- Dia. 2"
6 Pemipaan PVC AW Kamar Type 6 (1)
- Dia. 4"
- Dia. 2"
7 Fitting Clean Out, Elbow, Tee, Support, dan Material bantu lainnya
Lantai 8
1 Pemipaan PVC AW Kamar Type 1 (10)
- Dia. 4"
- Dia. 2"
2 Pemipaan PVC AW Kamar Type 2 (4)
- Dia. 4"
- Dia. 2"
3 Pemipaan PVC AW Kamar Type 3 (13)
- Dia. 4"
- Dia. 2"
4 Pemipaan PVC AW Kamar Type 4 (2)
- Dia. 4"
- Dia. 2"
5 Pemipaan PVC AW Kamar Type 5 (2)
- Dia. 4"
- Dia. 2"
6 Pemipaan PVC AW Kamar Type 6 (1)
- Dia. 4"
- Dia. 2"
7 Fitting Clean Out, Elbow, Tee, Support, dan Material bantu lainnya
Lantai 9
1 Pemipaan PVC AW Kamar Type 1 (10)
- Dia. 4"
- Dia. 2"
2 Pemipaan PVC AW Kamar Type 2 (4)
- Dia. 4"
- Dia. 2"
3 Pemipaan PVC AW Kamar Type 3 (14)
- Dia. 4"
- Dia. 2"
4 Pemipaan PVC AW Kamar Type 4 (2)
- Dia. 4"
- Dia. 2"
5 Pemipaan PVC AW Kamar Type 5 (2)
- Dia. 4"
- Dia. 2"
6 Pemipaan PVC AW Kamar Type 6 (1)
- Dia. 4"
- Dia. 2"
7 Fitting Clean Out, Elbow, Tee, Support, dan Material bantu lainnya

TOTAL BIAYA PEREN


HARGA SATUAN TOTAL HARGA
SATUAN VOLUME
(Rp.) (Rp.)
3 4 5 6

2.00 unit Rp 16,125,000.00 Rp 32,250,000.00

2.00 unit Rp 8,815,000.00 Rp 17,630,000.00

2.00 unit Rp 5,745,875.00 Rp 11,491,750.00

1.00 unit Rp 43,000,000.00 Rp 43,000,000.00

1.00 unit Rp 35,475,000.00 Rp 35,475,000.00

1.00 unit Rp 48,375,000.00 Rp 48,375,000.00

2.00 unit Rp 15,910,000.00 Rp 31,820,000.00

2.00 unit Rp 15,910,000.00 Rp 31,820,000.00

2.00 unit Rp 22,575,000.00 Rp 45,150,000.00

2.00 unit Rp 172,000,000.00 Rp 344,000,000.00


1.00 unit Rp 34,400,000.00 Rp 34,400,000.00

1.00 unit Rp 6,450,000.00 Rp 6,450,000.00

24.48 m Rp 135,270.83 Rp 3,311,430.00


11.52 m Rp 110,187.50 Rp 1,269,360.00

0.70 m Rp 264,270.83 Rp 184,989.58


0.80 m Rp 185,437.50 Rp 148,350.00

4.00 bh Rp 1,160,104.17 Rp 4,640,416.67

4.00 bh Rp 3,829,687.50 Rp 15,318,750.00

4.00 bh Rp 645,000.00 Rp 2,580,000.00

4.00 bh Rp 1,075,000.00 Rp 4,300,000.00

4.00 bh Rp 1,397,500.00 Rp 5,590,000.00

1.00 bh Rp 860,000.00 Rp 860,000.00


1.00 lot Rp 1,910,164.81 Rp 1,910,164.81

4.98 m Rp 135,270.83 Rp 673,648.75


233.16 m Rp 110,187.50 Rp 25,691,317.50
190.80 m Rp 36,729.17 Rp 7,007,925.00

198.00 m Rp 8,519.38 Rp 1,686,836.25

37.92 m Rp 8,519.38 Rp 323,054.70

249.60 m Rp 8,519.38 Rp 2,126,436.00

37.44 m Rp 8,519.38 Rp 318,965.40

36.72 m Rp 8,519.38 Rp 312,831.45

19.80 m Rp 8,519.38 Rp 168,683.63


33.00 bh Rp 161,250.00 Rp 5,321,250.00
1.00 lot Rp 2,181,547.43 Rp 2,181,547.43

4.98 m Rp 135,270.83 Rp 673,648.75


233.16 m Rp 110,187.50 Rp 25,691,317.50
196.44 m Rp 36,729.17 Rp 7,215,077.50

198.00 m Rp 8,519.38 Rp 1,686,836.25

37.92 m Rp 8,519.38 Rp 323,054.70

268.80 m Rp 8,519.38 Rp 2,290,008.00

37.44 m Rp 8,519.38 Rp 318,965.40

36.72 m Rp 8,519.38 Rp 312,831.45

19.80 m Rp 8,519.38 Rp 168,683.63


33.00 bh Rp 161,250.00 Rp 5,321,250.00
1.00 lot Rp 2,200,083.66 Rp 2,200,083.66

4.98 m Rp 135,270.83 Rp 673,648.75


233.16 m Rp 110,187.50 Rp 25,691,317.50
196.44 m Rp 36,729.17 Rp 7,215,077.50

198.00 m Rp 8,519.38 Rp 1,686,836.25

37.92 m Rp 8,519.38 Rp 323,054.70

268.80 m Rp 8,519.38 Rp 2,290,008.00

37.44 m Rp 8,519.38 Rp 318,965.40

36.72 m Rp 8,519.38 Rp 312,831.45

19.80 m Rp 8,519.38 Rp 168,683.63


33.00 bh Rp 161,250.00 Rp 5,321,250.00
1.00 lot Rp 2,200,083.66 Rp 2,200,083.66

4.98 m Rp 135,270.83 Rp 673,648.75


233.16 m Rp 110,187.50 Rp 25,691,317.50
190.80 m Rp 36,729.17 Rp 7,007,925.00

198.00 m Rp 8,519.38 Rp 1,686,836.25

37.92 m Rp 8,519.38 Rp 323,054.70

249.60 m Rp 8,519.38 Rp 2,126,436.00

37.44 m Rp 8,519.38 Rp 318,965.40


36.72 m Rp 8,519.38 Rp 312,831.45

19.80 m Rp 8,519.38 Rp 168,683.63


33.00 bh Rp 161,250.00 Rp 5,321,250.00
1.00 lot Rp 2,181,547.43 Rp 2,181,547.43

4.98 m Rp 135,270.83 Rp 673,648.75


233.16 m Rp 110,187.50 Rp 25,691,317.50
196.44 m Rp 36,729.17 Rp 7,215,077.50

198.00 m Rp 8,519.38 Rp 1,686,836.25

37.92 m Rp 8,519.38 Rp 323,054.70

268.80 m Rp 8,519.38 Rp 2,290,008.00

37.44 m Rp 8,519.38 Rp 318,965.40

36.72 m Rp 8,519.38 Rp 312,831.45

19.80 m Rp 8,519.38 Rp 168,683.63


33.00 bh Rp 161,250.00 Rp 5,321,250.00
1.00 lot Rp 2,200,083.66 Rp 2,200,083.66

60.12 m Rp 135,270.83 Rp 8,132,482.50

3.00 m Rp 264,270.83 Rp 792,812.50


3.00 m Rp 185,437.50 Rp 556,312.50

15.00 bh Rp 1,160,104.17 Rp 17,401,562.50

2.00 bh Rp 3,829,687.50 Rp 7,659,375.00

2.00 bh Rp 645,000.00 Rp 1,290,000.00

2.00 bh Rp 1,075,000.00 Rp 2,150,000.00

1.00 bh Rp 1,397,500.00 Rp 1,397,500.00


1.00 lot Rp 1,969,002.25 Rp 1,969,002.25

1054.00 m Rp 87,101.88 Rp 91,805,376.25


527.00 m Rp 25,585.00 Rp 13,483,295.00
1.00 lot Rp 5,264,433.56 Rp 5,264,433.56
14.4 m Rp 87,101.88 Rp 1,254,267.00
91.2 m Rp 25,585.00 Rp 2,333,352.00

5.76 m Rp 87,101.88 Rp 501,706.80


13.92 m Rp 25,585.00 Rp 356,143.20

18.72 m Rp 87,101.88 Rp 1,630,547.10


118.56 m Rp 25,585.00 Rp 3,033,357.60

13.20 m Rp 87,101.88 Rp 1,149,744.75


24.00 m Rp 25,585.00 Rp 614,040.00

2.88 m Rp 87,101.88 Rp 250,853.40


14.40 m Rp 25,585.00 Rp 368,424.00

1.44 m Rp 87,101.88 Rp 125,426.70


14.40 m Rp 25,585.00 Rp 368,424.00
1.00 lot Rp 599,314.33 Rp 599,314.33

14.4 m Rp 87,101.88 Rp 1,254,267.00


91.2 m Rp 25,585.00 Rp 2,333,352.00

5.76 m Rp 87,101.88 Rp 501,706.80


13.92 m Rp 25,585.00 Rp 356,143.20

20.16 m Rp 87,101.88 Rp 1,755,973.80


127.68 m Rp 25,585.00 Rp 3,266,692.80

13.20 m Rp 87,101.88 Rp 1,149,744.75


24.00 m Rp 25,585.00 Rp 614,040.00

2.88 m Rp 87,101.88 Rp 250,853.40


14.40 m Rp 25,585.00 Rp 368,424.00

1.44 m Rp 87,101.88 Rp 125,426.70


14.40 m Rp 25,585.00 Rp 368,424.00
1.00 lot Rp 617,252.42 Rp 617,252.42

14.4 m Rp 87,101.88 Rp 1,254,267.00


91.2 m Rp 25,585.00 Rp 2,333,352.00

5.76 m Rp 87,101.88 Rp 501,706.80


13.92 m Rp 25,585.00 Rp 356,143.20

20.16 m Rp 87,101.88 Rp 1,755,973.80


127.68 m Rp 25,585.00 Rp 3,266,692.80

13.20 m Rp 87,101.88 Rp 1,149,744.75


24.00 m Rp 25,585.00 Rp 614,040.00

2.88 m Rp 87,101.88 Rp 250,853.40


14.40 m Rp 25,585.00 Rp 368,424.00

1.44 m Rp 87,101.88 Rp 125,426.70


14.40 m Rp 25,585.00 Rp 368,424.00
1.00 lot Rp 617,252.42 Rp 617,252.42

14.4 m Rp 87,101.88 Rp 1,254,267.00


91.2 m Rp 25,585.00 Rp 2,333,352.00

5.76 m Rp 87,101.88 Rp 501,706.80


13.92 m Rp 25,585.00 Rp 356,143.20

18.72 m Rp 87,101.88 Rp 1,630,547.10


118.56 m Rp 25,585.00 Rp 3,033,357.60

13.20 m Rp 87,101.88 Rp 1,149,744.75


24.00 m Rp 25,585.00 Rp 614,040.00

2.88 m Rp 87,101.88 Rp 250,853.40


14.40 m Rp 25,585.00 Rp 368,424.00

1.44 m Rp 87,101.88 Rp 125,426.70


14.40 m Rp 25,585.00 Rp 368,424.00
1.00 lot Rp 599,314.33 Rp 599,314.33

14.4 m Rp 87,101.88 Rp 1,254,267.00


91.2 m Rp 25,585.00 Rp 2,333,352.00

5.76 m Rp 87,101.88 Rp 501,706.80


13.92 m Rp 25,585.00 Rp 356,143.20

20.16 m Rp 87,101.88 Rp 1,755,973.80


127.68 m Rp 25,585.00 Rp 3,266,692.80

13.20 m Rp 87,101.88 Rp 1,149,744.75


24.00 m Rp 25,585.00 Rp 614,040.00

2.88 m Rp 87,101.88 Rp 250,853.40


14.40 m Rp 25,585.00 Rp 368,424.00

1.44 m Rp 87,101.88 Rp 125,426.70


14.40 m Rp 25,585.00 Rp 368,424.00
1.00 lot Rp 617,252.42 Rp 617,252.42

TOTAL BIAYA PERENCANAAN PEKERJAAN PLAMBING Rp 1,168,165,736.22


RENCANA ANGGARAN BIAYA (RAB) ELEKTRIKAL

Pekerjaan : RUSUNAWA APRA 02


Lokasi : RANCACILI JAWA BARAT
Sumber Dana: APBD Kota Bandung Tahun Anggaran 2018

NO. URAIAN

1 2
IV PEKERJAAN ELEKTRIKAL

A PEKERJAAN PANEL
1 PP Hunian Lt. 5-9
2. P kWh-Meter Kamar Hunian + Box MCB
3 PP Service Lt. 5-9
4 PP Pompa Booster
5 PP Pompa Presurized fan
6 PP Lift Penumpang 1
7 PP Lift Barang

B PEKERJAAN KABEL FEEDER/PENGKABELAN

1 Kabel Distribusi Daya dari SDP Service ke:


- NYY 4x6 mm2 ke SDP PP- LP Lt. 5
- NYY 4x6 mm2 ke SDP PP- LP Lt. 6
- NYY 4x6 mm2 ke SDP PP- LP Lt. 7
- NYY 4x6 mm2 ke SDP PP- LP Lt. 8
- NYY 4x6 mm2 ke SDP PP- LP Lt. 9
- NYY 4x95 mm2 ke SDP- Atap

1.1. Kabel Distribusi dari PP-LP Lt 5 :


- NYM 3x2.5 mm2 ke koridor Zona A-E-C
- NYM 3x2.5 mm2 ke koridor Zona B-E-D
- NYM 3x2.5 mm2 keTangga 1
- NYM 3x2.5 mm2 keTangga 2

1.2. Kabel Distribusi dari PP-LP Lt 6 :


- NYM 3x2.5 mm2 ke koridor Zona A-E-C
- NYM 3x2.5 mm2 ke koridor Zona B-E-D
- NYM 3x2.5 mm2 keTangga 1
- NYM 3x2.5 mm2 keTangga 2

1.3. Kabel Distribusi dari PP-LP Lt 7 :


- NYM 3x2.5 mm2 ke koridor Zona A-E-C
- NYM 3x2.5 mm2 ke koridor Zona B-E-D
- NYM 3x2.5 mm2 keTangga 1
- NYM 3x2.5 mm2 keTangga 2

1.4. Kabel Distribusi dari PP-LP Lt 8 :


- NYM 3x2.5 mm2 ke koridor Zona A-E-C
- NYM 3x2.5 mm2 ke koridor Zona B-E-D
- NYM 3x2.5 mm2 keTangga 1
- NYM 3x2.5 mm2 keTangga 2

1.5. Kabel Distribusi dari PP-LP Lt 9 :


- NYM 3x2.5 mm2 ke koridor Zona A-E-C
- NYM 3x2.5 mm2 ke koridor Zona B-E-D
- NYM 3x2.5 mm2 keTangga 1
- NYM 3x2.5 mm2 keTangga 2

1.6. Kabel Distribusi dari SDP ATAP :


- NYY 4x70 mm2 ke PP-Lift
- NYY 4x10 mm2 ke PP-Booster
- NYY 4x10 mm2 ke PP-Pf

2 Kabel Distribusi Daya dari SDP Hunian ke:


- NYY 4x25 mm2 ke PP-Hunian Lt. 5
- NYY 4x25 mm2 ke PP-Hunian Lt. 6
- NYY 4x25 mm2 ke PP-Hunian Lt. 7
- NYY 4x25 mm2 ke PP-Hunian Lt. 8
- NYY 4x25 mm2 ke PP-Hunian Lt. 9

Kabel Distribusi Daya dari PP Hunian Lt. 5 ke :


Kabel Distribusi Daya dari SDP Kwh A ke ;
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 2
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 5
- NYM 3x4 mm2 ke Box MCB Unit Type 4
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 2
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3

Kabel Distribusi Daya dari SDP Kwh B ke ;


- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 2
- NYM 3x4 mm2 ke Box MCB Unit Type 2
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 4
- NYM 3x4 mm2 ke Box MCB Unit Type 5
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 2
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 6

3 Kabel Distribusi Daya dari PP Hunian Lt. 6 ke :


Kabel Distribusi Daya dari SDP Kwh A ke ;
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 2
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 5
- NYM 3x4 mm2 ke Box MCB Unit Type 4
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 2
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3

Kabel Distribusi Daya dari SDP Kwh B ke ;


- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 2
- NYM 3x4 mm2 ke Box MCB Unit Type 2
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 4
- NYM 3x4 mm2 ke Box MCB Unit Type 5
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 2
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 6
4 Kabel Distribusi Daya dari PP Hunian Lt. 7 ke :
Kabel Distribusi Daya dari SDP Kwh A ke ;
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 2
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 5
- NYM 3x4 mm2 ke Box MCB Unit Type 4
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 2
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3

Kabel Distribusi Daya dari SDP Kwh B ke ;


- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 2
- NYM 3x4 mm2 ke Box MCB Unit Type 2
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 4
- NYM 3x4 mm2 ke Box MCB Unit Type 5
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 2
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 6

5 Kabel Distribusi Daya dari PP Hunian Lt. 8 ke :


Kabel Distribusi Daya dari SDP Kwh A ke ;
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 2
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 5
- NYM 3x4 mm2 ke Box MCB Unit Type 4
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 2
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3

Kabel Distribusi Daya dari SDP Kwh B ke ;


- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 2
- NYM 3x4 mm2 ke Box MCB Unit Type 2
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 4
- NYM 3x4 mm2 ke Box MCB Unit Type 5
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 2
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 6

6 Kabel Distribusi Daya dari PP Hunian Lt. 9 ke :


Kabel Distribusi Daya dari SDP Kwh A ke ;
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 2
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 5
- NYM 3x4 mm2 ke Box MCB Unit Type 4
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 2
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3

Kabel Distribusi Daya dari SDP-Kwh B ke ;


- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 2
- NYM 3x4 mm2 ke Box MCB Unit Type 2
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 4
- NYM 3x4 mm2 ke Box MCB Unit Type 5
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 1
- NYM 3x4 mm2 ke Box MCB Unit Type 2
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 3
- NYM 3x4 mm2 ke Box MCB Unit Type 6

Lantai 5
Kabel Distribusi Daya dari Box MCB A ke ;
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 2
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 5
- NYM 3x2.5 mm2 ke Unit Type 4
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 2
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3

Kabel Distribusi Daya dari Box MCB B ke ;


- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 2
- NYM 3x2.5 mm2 ke Unit Type 2
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 4
- NYM 3x2.5 mm2 ke Unit Type 5
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 2
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 6

Lantai 6
Kabel Distribusi Daya dari Box MCB A ke ;
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 2
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 5
- NYM 3x2.5 mm2 ke Unit Type 4
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 2
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3

Kabel Distribusi Daya dari Box MCB B ke ;


- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 2
- NYM 3x2.5 mm2 ke Unit Type 2
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 4
- NYM 3x2.5 mm2 ke Unit Type 5
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 2
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 6

lantai 7
Kabel Distribusi Daya dari Box MCB A ke ;
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 2
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 5
- NYM 3x2.5 mm2 ke Unit Type 4
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 2
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3

Kabel Distribusi Daya dari Box MCB B ke ;


- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 2
- NYM 3x2.5 mm2 ke Unit Type 2
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 4
- NYM 3x2.5 mm2 ke Unit Type 5
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 2
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 6

Lantai 8
Kabel Distribusi Daya dari Box MCB A ke ;
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 2
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 5
- NYM 3x2.5 mm2 ke Unit Type 4
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 2
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3

Kabel Distribusi Daya dari Box MCB B ke ;


- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 2
- NYM 3x2.5 mm2 ke Unit Type 2
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 4
- NYM 3x2.5 mm2 ke Unit Type 5
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 2
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 6

Lantai 9
Kabel Distribusi Daya dari Box MCB A ke ;
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 2
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 5
- NYM 3x2.5 mm2 ke Unit Type 4
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 2
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3

Kabel Distribusi Daya dari Box MCB B ke ;


- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 2
- NYM 3x2.5 mm2 ke Unit Type 2
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 4
- NYM 3x2.5 mm2 ke Unit Type 5
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 1
- NYM 3x2.5 mm2 ke Unit Type 2
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 3
- NYM 3x2.5 mm2 ke Unit Type 6

1 Lantai 5
- Kabel Tray U W300xH100xL29000
- CrossTray W300xH100xL29000
- Inside Riser Tray W300xH100
- Kabel Tray U W200xH100
- Inside Riser Tray W200xH100

2. Lantai 6
- Kabel Tray U W300xH100xL29000
- CrossTray W300xH100xL29000
- Inside Riser Tray W300xH100
- Kabel Tray U W200xH100
- Inside Riser Tray W200xH100

3 Lantai 7
- Kabel Tray U W300xH100xL29000
- CrossTray W300xH100xL29000
- Inside Riser Tray W300xH100
- Kabel Tray U W200xH100
- Inside Riser Tray W200xH100

4 Lantai 8
- Kabel Tray U W300xH100xL29000
- CrossTray W300xH100xL29000
- Inside Riser Tray W300xH100
- Kabel Tray U W200xH100
- Inside Riser Tray W200xH100

5 Lantai 9
- Kabel Tray U W300xH100xL29000
- CrossTray W300xH100xL29000
- Inside Riser Tray W300xH100
- Kabel Tray U W200xH100
- Inside Riser Tray W200xH100

6. Shaft
- Kabel Ladder W300xH100xL4000
- Kabel Ladder W200xH100xL4000

E PEKERJAAN ARMATURE LAMPU, STOP KONTAK DAN INSTALASI.


1. Lantai 5
PP Service
- Pas. Titik instalasi lampu NYM 3x2,5 mm2 + PVC Conduit dia. 20 mm
- Pas. Lampu Roset E27 19 Watt
- Pas. Lampu Tl-Balk 1x36 Watt
- Pas. Lampu LED Baret 20 Watt
- Pas. Lampu Exit 8 Watt
- Pas. Saklar Seri
- Pas. Saklar Tunggal
- Pas. Stop Kontak 10 A

Type 1 (10 Unit)


- Pas. Titik instalasi lampu NYM 3x2,5 mm2 + PVC Conduit dia. 20 mm
- Pas. Lampu Roset E27 19 Watt
- Pas. Saklar Seri
- Pas. Saklar Tunggal
- Pas. Stop Kontak 10 A

Type 2 (4 Unit)
- Pas. Titik instalasi lampu NYM 3x2,5 mm2 + PVC Conduit dia. 20 mm
- Pas. Lampu Roset E27 19 Watt
- Pas. Saklar Seri
- Pas. Saklar Tunggal
- Pas. Stop Kontak 10 A

Type 3 (13 Unit)


- Pas. Titik instalasi lampu NYM 3x2,5 mm2 + PVC Conduit dia. 20 mm
- Pas. Lampu Roset E27 19 Watt
- Pas. Saklar Seri
- Pas. Saklar Tunggal
- Pas. Stop Kontak 10 A

Type 4 (2 Unit)
- Pas. Titik instalasi lampu NYM 3x2,5 mm2 + PVC Conduit dia. 20 mm
- Pas. Lampu Roset E27 19 Watt
- Pas. Saklar Seri
- Pas. Saklar Tunggal
- Pas. Stop Kontak 10 A

Type 5 (2 Unit)
- Pas. Titik instalasi lampu NYM 3x2,5 mm2 + PVC Conduit dia. 20 mm
- Pas. Lampu Roset E27 19 Watt
- Pas. Saklar Seri
- Pas. Saklar Tunggal
- Pas. Stop Kontak 10 A

Type 6 (1 Unit)
- Pas. Titik instalasi lampu NYM 3x2,5 mm2 + PVC Conduit dia. 20 mm
- Pas. Lampu Roset E27 19 Watt
- Pas. Saklar Seri
- Pas. Saklar Tunggal
- Pas. Stop Kontak 10 A

2 Lantai 6
PP Service
- Pas. Titik instalasi lampu NYM 3x2,5 mm2 + PVC Conduit dia. 20 mm
- Pas. Lampu Roset E27 19 Watt
- Pas. Lampu Tl-Balk 1x36 Watt
- Pas. Lampu LED Baret 20 Watt
- Pas. Lampu Exit 8 Watt
- Pas. Saklar Seri
- Pas. Saklar Tunggal
- Pas. Stop Kontak 10 A

Type 1 (10 Unit)


- Pas. Titik instalasi lampu NYM 3x2,5 mm2 + PVC Conduit dia. 20 mm
- Pas. Lampu Roset E27 19 Watt
- Pas. Saklar Seri
- Pas. Saklar Tunggal
- Pas. Stop Kontak 10 A

Type 2 (4 Unit)
- Pas. Titik instalasi lampu NYM 3x2,5 mm2 + PVC Conduit dia. 20 mm
- Pas. Lampu Roset E27 19 Watt
- Pas. Saklar Seri
- Pas. Saklar Tunggal
- Pas. Stop Kontak 10 A

Type 3 (13 Unit)


- Pas. Titik instalasi lampu NYM 3x2,5 mm2 + PVC Conduit dia. 20 mm
- Pas. Lampu Roset E27 19 Watt
- Pas. Saklar Seri
- Pas. Saklar Tunggal
- Pas. Stop Kontak 10 A

Type 4 (2 Unit)
- Pas. Titik instalasi lampu NYM 3x2,5 mm2 + PVC Conduit dia. 20 mm
- Pas. Lampu Roset E27 19 Watt
- Pas. Saklar Seri
- Pas. Saklar Tunggal
- Pas. Stop Kontak 10 A

Type 5 (2 Unit)
- Pas. Titik instalasi lampu NYM 3x2,5 mm2 + PVC Conduit dia. 20 mm
- Pas. Lampu Roset E27 19 Watt
- Pas. Saklar Seri
- Pas. Saklar Tunggal
- Pas. Stop Kontak 10 A

Type 6 (1 Unit)
- Pas. Titik instalasi lampu NYM 3x2,5 mm2 + PVC Conduit dia. 20 mm
- Pas. Lampu Roset E27 19 Watt
- Pas. Saklar Seri
- Pas. Saklar Tunggal
- Pas. Stop Kontak 10 A

3 Lantai 7
PP Service
- Pas. Titik instalasi lampu NYM 3x2,5 mm2 + PVC Conduit dia. 20 mm
- Pas. Lampu Roset E27 19 Watt
- Pas. Lampu Tl-Balk 1x36 Watt
- Pas. Lampu LED Baret 20 Watt
- Pas. Lampu Exit 8 Watt
- Pas. Saklar Seri
- Pas. Saklar Tunggal
- Pas. Stop Kontak 10 A

Type 1 (10 Unit)


- Pas. Titik instalasi lampu NYM 3x2,5 mm2 + PVC Conduit dia. 20 mm
- Pas. Lampu Roset E27 19 Watt
- Pas. Saklar Seri
- Pas. Saklar Tunggal
- Pas. Stop Kontak 10 A

Type 2 (4 Unit)
- Pas. Titik instalasi lampu NYM 3x2,5 mm2 + PVC Conduit dia. 20 mm
- Pas. Lampu Roset E27 19 Watt
- Pas. Saklar Seri
- Pas. Saklar Tunggal
- Pas. Stop Kontak 10 A

Type 3 (13 Unit)


- Pas. Titik instalasi lampu NYM 3x2,5 mm2 + PVC Conduit dia. 20 mm
- Pas. Lampu Roset E27 19 Watt
- Pas. Saklar Seri
- Pas. Saklar Tunggal
- Pas. Stop Kontak 10 A

Type 4 (2 Unit)
- Pas. Titik instalasi lampu NYM 3x2,5 mm2 + PVC Conduit dia. 20 mm
- Pas. Lampu Roset E27 19 Watt
- Pas. Saklar Seri
- Pas. Saklar Tunggal
- Pas. Stop Kontak 10 A

Type 5 (2 Unit)
- Pas. Titik instalasi lampu NYM 3x2,5 mm2 + PVC Conduit dia. 20 mm
- Pas. Lampu Roset E27 19 Watt
- Pas. Saklar Seri
- Pas. Saklar Tunggal
- Pas. Stop Kontak 10 A

Type 6 (1 Unit)
- Pas. Titik instalasi lampu NYM 3x2,5 mm2 + PVC Conduit dia. 20 mm
- Pas. Lampu Roset E27 19 Watt
- Pas. Saklar Seri
- Pas. Saklar Tunggal
- Pas. Stop Kontak 10 A

4 Lantai 8
PP Service
- Pas. Titik instalasi lampu NYM 3x2,5 mm2 + PVC Conduit dia. 20 mm
- Pas. Lampu Roset E27 19 Watt
- Pas. Lampu Tl-Balk 1x36 Watt
- Pas. Lampu LED Baret 20 Watt
- Pas. Lampu Exit 8 Watt
- Pas. Saklar Seri
- Pas. Saklar Tunggal
- Pas. Stop Kontak 10 A

Type 1 (10 Unit)


- Pas. Titik instalasi lampu NYM 3x2,5 mm2 + PVC Conduit dia. 20 mm
- Pas. Lampu Roset E27 19 Watt
- Pas. Saklar Seri
- Pas. Saklar Tunggal
- Pas. Stop Kontak 10 A

Type 2 (4 Unit)
- Pas. Titik instalasi lampu NYM 3x2,5 mm2 + PVC Conduit dia. 20 mm
- Pas. Lampu Roset E27 19 Watt
- Pas. Saklar Seri
- Pas. Saklar Tunggal
- Pas. Stop Kontak 10 A

Type 3 (13 Unit)


- Pas. Titik instalasi lampu NYM 3x2,5 mm2 + PVC Conduit dia. 20 mm
- Pas. Lampu Roset E27 19 Watt
- Pas. Saklar Seri
- Pas. Saklar Tunggal
- Pas. Stop Kontak 10 A

Type 4 (2 Unit)
- Pas. Titik instalasi lampu NYM 3x2,5 mm2 + PVC Conduit dia. 20 mm
- Pas. Lampu Roset E27 19 Watt
- Pas. Saklar Seri
- Pas. Saklar Tunggal
- Pas. Stop Kontak 10 A

Type 5 (2 Unit)
- Pas. Titik instalasi lampu NYM 3x2,5 mm2 + PVC Conduit dia. 20 mm
- Pas. Lampu Roset E27 19 Watt
- Pas. Saklar Seri
- Pas. Saklar Tunggal
- Pas. Stop Kontak 10 A

Type 6 (1 Unit)
- Pas. Titik instalasi lampu NYM 3x2,5 mm2 + PVC Conduit dia. 20 mm
- Pas. Lampu Roset E27 19 Watt
- Pas. Saklar Seri
- Pas. Saklar Tunggal
- Pas. Stop Kontak 10 A

5 Lantai 9
PP Service
- Pas. Titik instalasi lampu NYM 3x2,5 mm2 + PVC Conduit dia. 20 mm
- Pas. Lampu Roset E27 19 Watt
- Pas. Lampu Tl-Balk 1x36 Watt
- Pas. Lampu LED Baret 20 Watt
- Pas. Lampu Exit 8 Watt
- Pas. Saklar Seri
- Pas. Saklar Tunggal
- Pas. Stop Kontak 10 A

Type 1 (10 Unit)


- Pas. Titik instalasi lampu NYM 3x2,5 mm2 + PVC Conduit dia. 20 mm
- Pas. Lampu Roset E27 19 Watt
- Pas. Saklar Seri
- Pas. Saklar Tunggal
- Pas. Stop Kontak 10 A

Type 2 (4 Unit)
- Pas. Titik instalasi lampu NYM 3x2,5 mm2 + PVC Conduit dia. 20 mm
- Pas. Lampu Roset E27 19 Watt
- Pas. Saklar Seri
- Pas. Saklar Tunggal
- Pas. Stop Kontak 10 A

Type 3 (13 Unit)


- Pas. Titik instalasi lampu NYM 3x2,5 mm2 + PVC Conduit dia. 20 mm
- Pas. Lampu Roset E27 19 Watt
- Pas. Saklar Seri
- Pas. Saklar Tunggal
- Pas. Stop Kontak 10 A

Type 4 (2 Unit)
- Pas. Titik instalasi lampu NYM 3x2,5 mm2 + PVC Conduit dia. 20 mm
- Pas. Lampu Roset E27 19 Watt
- Pas. Saklar Seri
- Pas. Saklar Tunggal
- Pas. Stop Kontak 10 A

Type 5 (2 Unit)
- Pas. Titik instalasi lampu NYM 3x2,5 mm2 + PVC Conduit dia. 20 mm
- Pas. Lampu Roset E27 19 Watt
- Pas. Saklar Seri
- Pas. Saklar Tunggal
- Pas. Stop Kontak 10 A

Type 6 (1 Unit)
- Pas. Titik instalasi lampu NYM 3x2,5 mm2 + PVC Conduit dia. 20 mm
- Pas. Lampu Roset E27 19 Watt
- Pas. Saklar Seri
- Pas. Saklar Tunggal
- Pas. Stop Kontak 10 A

F PEKERJAAN SISTEM PENTANAHAN


- Bak Kontrol untuk Genset, LVMDP, MVMDP & Trafo
Copper Rod, kabel BC, clamp rod, Bar CU, Bak kontrol 300x300x300mm

G PEKERJAAN PENANGKAL PETIR


- Penangkal Petir Elektrostatis
- Arester Lightning protection radius 50 meter
- Tiang pipa penangkal petir
- Down Conduktor 1 X 7 0mm2 + accessories
- Grounding System max. 2 ohm
Copper Rod, kabel BC, clamp rod, Bar CU, Bak kontrol 300x300x300mm

TOTAL BIAYA PERENCAN


HARGA SATUAN TOTAL HARGA
Panjang Satuan Type
(Rp.) (Rp.)
3 4 5 6

5.00 Unit Rp 23,500,000.00 Rp 23,500,000.00


33.00 Unit Rp 5,875,000.00 Rp 5,875,000.00
5.00 Unit Rp 8,225,000.00 Rp 8,225,000.00
1.00 Unit Rp 5,875,000.00 Rp 5,875,000.00
1.00 Unit Rp 7,050,000.00 Rp 7,050,000.00
1.00 Unit Rp 8,225,000.00 Rp 8,225,000.00
1.00 Unit Rp 9,400,000.00 Rp 9,400,000.00

18.10 m Rp 58,750.00 Rp 1,063,375.00


21.50 m Rp 58,750.00 Rp 1,263,125.00
25.50 m Rp 58,750.00 Rp 1,498,125.00
29.50 m Rp 58,750.00 Rp 1,733,125.00
33.50 m Rp 58,750.00 Rp 1,968,125.00

84.00 m Rp 23,500.00 Rp 1,974,000.00


50.00 m Rp 23,500.00 Rp 1,175,000.00
79.00 m Rp 23,500.00 Rp 1,856,500.00
89.00 m Rp 23,500.00 Rp 2,091,500.00

84.00 m Rp 23,500.00 Rp 1,974,000.00


50.00 m Rp 23,500.00 Rp 1,175,000.00
79.00 m Rp 23,500.00 Rp 1,856,500.00
89.00 m Rp 23,500.00 Rp 2,091,500.00

84.00 m Rp 23,500.00 Rp 1,974,000.00


50.00 m Rp 23,500.00 Rp 1,175,000.00
79.00 m Rp 23,500.00 Rp 1,856,500.00
89.00 m Rp 23,500.00 Rp 2,091,500.00

84.00 m Rp 23,500.00 Rp 1,974,000.00


50.00 m Rp 23,500.00 Rp 1,175,000.00
79.00 m Rp 23,500.00 Rp 1,856,500.00
89.00 m Rp 23,500.00 Rp 2,091,500.00

84.00 m Rp 23,500.00 Rp 1,974,000.00


50.00 m Rp 23,500.00 Rp 1,175,000.00
79.00 m Rp 23,500.00 Rp 1,856,500.00
89.00 m Rp 23,500.00 Rp 2,091,500.00

30.00 m Rp 556,950.00 Rp 16,708,500.00


30.00 m Rp 90,475.00 Rp 2,714,250.00
30.00 m Rp 90,475.00 Rp 2,714,250.00

18.10 m Rp 223,250.00 Rp 4,040,825.00


21.50 m Rp 223,250.00 Rp 4,799,875.00
25.50 m Rp 223,250.00 Rp 5,692,875.00
29.50 m Rp 223,250.00 Rp 6,585,875.00
33.50 m Rp 223,250.00 Rp 7,478,875.00

16.70 m Rp 29,375.00 Rp 490,562.50


19.40 m Rp 29,375.00 Rp 569,875.00
28.70 m Rp 29,375.00 Rp 843,062.50
31.40 m Rp 29,375.00 Rp 922,375.00
50.20 m Rp 29,375.00 Rp 1,474,625.00
50.80 m Rp 29,375.00 Rp 1,492,250.00
58.20 m Rp 29,375.00 Rp 1,709,625.00
62.30 m Rp 29,375.00 Rp 1,830,062.50
62.80 m Rp 29,375.00 Rp 1,844,750.00
62.60 m Rp 29,375.00 Rp 1,838,875.00
60.10 m Rp 29,375.00 Rp 1,765,437.50
56.70 m Rp 29,375.00 Rp 1,665,562.50
54.10 m Rp 29,375.00 Rp 1,589,187.50
49.40 m Rp 29,375.00 Rp 1,451,125.00
57.80 m Rp 29,375.00 Rp 1,697,875.00
61.40 m Rp 29,375.00 Rp 1,803,625.00

15.60 m Rp 29,375.00 Rp 458,250.00


18.30 m Rp 29,375.00 Rp 537,562.50
24.20 m Rp 29,375.00 Rp 710,875.00
51.60 m Rp 29,375.00 Rp 1,515,750.00
54.00 m Rp 29,375.00 Rp 1,586,250.00
57.60 m Rp 29,375.00 Rp 1,692,000.00
60.10 m Rp 29,375.00 Rp 1,765,437.50
62.40 m Rp 29,375.00 Rp 1,833,000.00
61.70 m Rp 29,375.00 Rp 1,812,437.50
58.60 m Rp 29,375.00 Rp 1,721,375.00
51.10 m Rp 29,375.00 Rp 1,501,062.50
50.70 m Rp 29,375.00 Rp 1,489,312.50
44.60 m Rp 29,375.00 Rp 1,310,125.00
48.10 m Rp 29,375.00 Rp 1,412,937.50
56.60 m Rp 29,375.00 Rp 1,662,625.00
60.20 m Rp 29,375.00 Rp 1,768,375.00
61.40 m Rp 29,375.00 Rp 1,803,625.00

16.70 m Rp 29,375.00 Rp 490,562.50


19.40 m Rp 29,375.00 Rp 569,875.00
28.70 m Rp 29,375.00 Rp 843,062.50
31.40 m Rp 29,375.00 Rp 922,375.00
50.20 m Rp 29,375.00 Rp 1,474,625.00
50.80 m Rp 29,375.00 Rp 1,492,250.00
58.20 m Rp 29,375.00 Rp 1,709,625.00
62.30 m Rp 29,375.00 Rp 1,830,062.50
62.80 m Rp 29,375.00 Rp 1,844,750.00
62.60 m Rp 29,375.00 Rp 1,838,875.00
60.10 m Rp 29,375.00 Rp 1,765,437.50
56.70 m Rp 29,375.00 Rp 1,665,562.50
54.10 m Rp 29,375.00 Rp 1,589,187.50
49.40 m Rp 29,375.00 Rp 1,451,125.00
57.80 m Rp 29,375.00 Rp 1,697,875.00
61.40 m Rp 29,375.00 Rp 1,803,625.00

15.60 m Rp 29,375.00 Rp 458,250.00


18.30 m Rp 29,375.00 Rp 537,562.50
24.20 m Rp 29,375.00 Rp 710,875.00
51.60 m Rp 29,375.00 Rp 1,515,750.00
54.00 m Rp 29,375.00 Rp 1,586,250.00
57.60 m Rp 29,375.00 Rp 1,692,000.00
60.10 m Rp 29,375.00 Rp 1,765,437.50
62.40 m Rp 29,375.00 Rp 1,833,000.00
61.70 m Rp 29,375.00 Rp 1,812,437.50
58.60 m Rp 29,375.00 Rp 1,721,375.00
51.10 m Rp 29,375.00 Rp 1,501,062.50
50.70 m Rp 29,375.00 Rp 1,489,312.50
44.60 m Rp 29,375.00 Rp 1,310,125.00
48.10 m Rp 29,375.00 Rp 1,412,937.50
56.60 m Rp 29,375.00 Rp 1,662,625.00
60.20 m Rp 29,375.00 Rp 1,768,375.00
61.40 m Rp 29,375.00 Rp 1,803,625.00
16.70 m Rp 29,375.00 Rp 490,562.50
19.40 m Rp 29,375.00 Rp 569,875.00
28.70 m Rp 29,375.00 Rp 843,062.50
31.40 m Rp 29,375.00 Rp 922,375.00
50.20 m Rp 29,375.00 Rp 1,474,625.00
50.80 m Rp 29,375.00 Rp 1,492,250.00
58.20 m Rp 29,375.00 Rp 1,709,625.00
62.30 m Rp 29,375.00 Rp 1,830,062.50
62.80 m Rp 29,375.00 Rp 1,844,750.00
62.60 m Rp 29,375.00 Rp 1,838,875.00
60.10 m Rp 29,375.00 Rp 1,765,437.50
56.70 m Rp 29,375.00 Rp 1,665,562.50
54.10 m Rp 29,375.00 Rp 1,589,187.50
49.40 m Rp 29,375.00 Rp 1,451,125.00
57.80 m Rp 29,375.00 Rp 1,697,875.00
61.40 m Rp 29,375.00 Rp 1,803,625.00

15.60 m Rp 29,375.00 Rp 458,250.00


18.30 m Rp 29,375.00 Rp 537,562.50
24.20 m Rp 29,375.00 Rp 710,875.00
51.60 m Rp 29,375.00 Rp 1,515,750.00
54.00 m Rp 29,375.00 Rp 1,586,250.00
57.60 m Rp 29,375.00 Rp 1,692,000.00
60.10 m Rp 29,375.00 Rp 1,765,437.50
62.40 m Rp 29,375.00 Rp 1,833,000.00
61.70 m Rp 29,375.00 Rp 1,812,437.50
58.60 m Rp 29,375.00 Rp 1,721,375.00
51.10 m Rp 29,375.00 Rp 1,501,062.50
50.70 m Rp 29,375.00 Rp 1,489,312.50
44.60 m Rp 29,375.00 Rp 1,310,125.00
48.10 m Rp 29,375.00 Rp 1,412,937.50
56.60 m Rp 29,375.00 Rp 1,662,625.00
60.20 m Rp 29,375.00 Rp 1,768,375.00
61.40 m Rp 29,375.00 Rp 1,803,625.00

16.70 m Rp 29,375.00 Rp 490,562.50


19.40 m Rp 29,375.00 Rp 569,875.00
28.70 m Rp 29,375.00 Rp 843,062.50
31.40 m Rp 29,375.00 Rp 922,375.00
50.20 m Rp 29,375.00 Rp 1,474,625.00
50.80 m Rp 29,375.00 Rp 1,492,250.00
58.20 m Rp 29,375.00 Rp 1,709,625.00
62.30 m Rp 29,375.00 Rp 1,830,062.50
62.80 m Rp 29,375.00 Rp 1,844,750.00
62.60 m Rp 29,375.00 Rp 1,838,875.00
60.10 m Rp 29,375.00 Rp 1,765,437.50
56.70 m Rp 29,375.00 Rp 1,665,562.50
54.10 m Rp 29,375.00 Rp 1,589,187.50
49.40 m Rp 29,375.00 Rp 1,451,125.00
57.80 m Rp 29,375.00 Rp 1,697,875.00
61.40 m Rp 29,375.00 Rp 1,803,625.00

15.60 m Rp 29,375.00 Rp 458,250.00


18.30 m Rp 29,375.00 Rp 537,562.50
24.20 m Rp 29,375.00 Rp 710,875.00
51.60 m Rp 29,375.00 Rp 1,515,750.00
54.00 m Rp 29,375.00 Rp 1,586,250.00
57.60 m Rp 29,375.00 Rp 1,692,000.00
60.10 m Rp 29,375.00 Rp 1,765,437.50
62.40 m Rp 29,375.00 Rp 1,833,000.00
61.70 m Rp 29,375.00 Rp 1,812,437.50
58.60 m Rp 29,375.00 Rp 1,721,375.00
51.10 m Rp 29,375.00 Rp 1,501,062.50
50.70 m Rp 29,375.00 Rp 1,489,312.50
44.60 m Rp 29,375.00 Rp 1,310,125.00
48.10 m Rp 29,375.00 Rp 1,412,937.50
56.60 m Rp 29,375.00 Rp 1,662,625.00
60.20 m Rp 29,375.00 Rp 1,768,375.00
61.40 m Rp 29,375.00 Rp 1,803,625.00

16.70 m Rp 29,375.00 Rp 490,562.50


19.40 m Rp 29,375.00 Rp 569,875.00
28.70 m Rp 29,375.00 Rp 843,062.50
31.40 m Rp 29,375.00 Rp 922,375.00
50.20 m Rp 29,375.00 Rp 1,474,625.00
50.80 m Rp 29,375.00 Rp 1,492,250.00
58.20 m Rp 29,375.00 Rp 1,709,625.00
62.30 m Rp 29,375.00 Rp 1,830,062.50
62.80 m Rp 29,375.00 Rp 1,844,750.00
62.60 m Rp 29,375.00 Rp 1,838,875.00
60.10 m Rp 29,375.00 Rp 1,765,437.50
56.70 m Rp 29,375.00 Rp 1,665,562.50
54.10 m Rp 29,375.00 Rp 1,589,187.50
49.40 m Rp 29,375.00 Rp 1,451,125.00
57.80 m Rp 29,375.00 Rp 1,697,875.00
61.40 m Rp 29,375.00 Rp 1,803,625.00

15.60 m Rp 29,375.00 Rp 458,250.00


18.30 m Rp 29,375.00 Rp 537,562.50
24.20 m Rp 29,375.00 Rp 710,875.00
51.60 m Rp 29,375.00 Rp 1,515,750.00
54.00 m Rp 29,375.00 Rp 1,586,250.00
57.60 m Rp 29,375.00 Rp 1,692,000.00
60.10 m Rp 29,375.00 Rp 1,765,437.50
62.40 m Rp 29,375.00 Rp 1,833,000.00
61.70 m Rp 29,375.00 Rp 1,812,437.50
58.60 m Rp 29,375.00 Rp 1,721,375.00
51.10 m Rp 29,375.00 Rp 1,501,062.50
50.70 m Rp 29,375.00 Rp 1,489,312.50
44.60 m Rp 29,375.00 Rp 1,310,125.00
48.10 m Rp 29,375.00 Rp 1,412,937.50
56.60 m Rp 29,375.00 Rp 1,662,625.00
60.20 m Rp 29,375.00 Rp 1,768,375.00
61.40 m Rp 29,375.00 Rp 1,803,625.00

109.00 m Rp 25,654.17 Rp 2,796,304.17 3


109.00 m Rp 25,654.17 Rp 2,796,304.17 3
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
80.00 m Rp 25,654.17 Rp 2,052,333.33 2
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
101.00 m Rp 25,654.17 Rp 2,591,070.83 5
99.00 m Rp 25,654.17 Rp 2,539,762.50 4
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
80.00 m Rp 25,654.17 Rp 2,052,333.33 2
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
109.00 m Rp 25,654.17 Rp 2,796,304.17 3

109.00 m Rp 25,654.17 Rp 2,796,304.17 3


109.00 m Rp 25,654.17 Rp 2,796,304.17 3
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
80.00 m Rp 25,654.17 Rp 2,052,333.33 2
80.00 m Rp 25,654.17 Rp 2,052,333.33 2
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
99.00 m Rp 25,654.17 Rp 2,539,762.50 4
101.00 m Rp 25,654.17 Rp 2,591,070.83 5
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
80.00 m Rp 25,654.17 Rp 2,052,333.33 2
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
138.00 m Rp 25,654.17 Rp 3,540,275.00 6

109.00 m Rp 25,654.17 Rp 2,796,304.17 3


109.00 m Rp 25,654.17 Rp 2,796,304.17 3
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
80.00 m Rp 25,654.17 Rp 2,052,333.33 2
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
101.00 m Rp 25,654.17 Rp 2,591,070.83 5
99.00 m Rp 25,654.17 Rp 2,539,762.50 4
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
80.00 m Rp 25,654.17 Rp 2,052,333.33 2
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
109.00 m Rp 25,654.17 Rp 2,796,304.17 3

109.00 m Rp 25,654.17 Rp 2,796,304.17 3


109.00 m Rp 25,654.17 Rp 2,796,304.17 3
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
80.00 m Rp 25,654.17 Rp 2,052,333.33 2
80.00 m Rp 25,654.17 Rp 2,052,333.33 2
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
99.00 m Rp 25,654.17 Rp 2,539,762.50 4
101.00 m Rp 25,654.17 Rp 2,591,070.83 5
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
80.00 m Rp 25,654.17 Rp 2,052,333.33 2
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
138.00 m Rp 25,654.17 Rp 3,540,275.00 6

109.00 m Rp 25,654.17 Rp 2,796,304.17 3


109.00 m Rp 25,654.17 Rp 2,796,304.17 3
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
80.00 m Rp 25,654.17 Rp 2,052,333.33 2
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
101.00 m Rp 25,654.17 Rp 2,591,070.83 5
99.00 m Rp 25,654.17 Rp 2,539,762.50 4
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
80.00 m Rp 25,654.17 Rp 2,052,333.33 2
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
80.00 m Rp 25,654.17 Rp 2,052,333.33 2
80.00 m Rp 25,654.17 Rp 2,052,333.33 2
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
99.00 m Rp 25,654.17 Rp 2,539,762.50 4
101.00 m Rp 25,654.17 Rp 2,591,070.83 5
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
80.00 m Rp 25,654.17 Rp 2,052,333.33 2
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
138.00 m Rp 25,654.17 Rp 3,540,275.00 6

109.00 m Rp 25,654.17 Rp 2,796,304.17 3


109.00 m Rp 25,654.17 Rp 2,796,304.17 3
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
80.00 m Rp 25,654.17 Rp 2,052,333.33 2
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
101.00 m Rp 25,654.17 Rp 2,591,070.83 5
99.00 m Rp 25,654.17 Rp 2,539,762.50 4
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
80.00 m Rp 25,654.17 Rp 2,052,333.33 2
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
109.00 m Rp 25,654.17 Rp 2,796,304.17 3

109.00 m Rp 25,654.17 Rp 2,796,304.17 3


109.00 m Rp 25,654.17 Rp 2,796,304.17 3
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
80.00 m Rp 25,654.17 Rp 2,052,333.33 2
80.00 m Rp 25,654.17 Rp 2,052,333.33 2
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
99.00 m Rp 25,654.17 Rp 2,539,762.50 4
101.00 m Rp 25,654.17 Rp 2,591,070.83 5
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
80.00 m Rp 25,654.17 Rp 2,052,333.33 2
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
138.00 m Rp 25,654.17 Rp 3,540,275.00 6

109.00 m Rp 25,654.17 Rp 2,796,304.17 3


109.00 m Rp 25,654.17 Rp 2,796,304.17 3
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
80.00 m Rp 25,654.17 Rp 2,052,333.33 2
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
101.00 m Rp 25,654.17 Rp 2,591,070.83 5
99.00 m Rp 25,654.17 Rp 2,539,762.50 4
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
80.00 m Rp 25,654.17 Rp 2,052,333.33 2
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
109.00 m Rp 25,654.17 Rp 2,796,304.17 3

109.00 m Rp 25,654.17 Rp 2,796,304.17 3


109.00 m Rp 25,654.17 Rp 2,796,304.17 3
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
80.00 m Rp 25,654.17 Rp 2,052,333.33 2
80.00 m Rp 25,654.17 Rp 2,052,333.33 2
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
99.00 m Rp 25,654.17 Rp 2,539,762.50 4
101.00 m Rp 25,654.17 Rp 2,591,070.83 5
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
76.00 m Rp 25,654.17 Rp 1,949,716.67 1
80.00 m Rp 25,654.17 Rp 2,052,333.33 2
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
109.00 m Rp 25,654.17 Rp 2,796,304.17 3
138.00 m Rp 25,654.17 Rp 3,540,275.00 6

10.00 Bh Rp 562,825.00 Rp 5,628,250.00


10.00 Bh Rp 514,650.00 Rp 5,146,500.00
1.00 Bh Rp 317,250.00 Rp 317,250.00
1.00 Bh Rp 450,025.00 Rp 450,025.00
3.00 Bh Rp 192,700.00 Rp 578,100.00

10.00 Bh Rp 562,825.00 Rp 5,628,250.00


10.00 Bh Rp 514,650.00 Rp 5,146,500.00
1.00 Bh Rp 317,250.00 Rp 317,250.00
1.00 Bh Rp 450,025.00 Rp 450,025.00
3.00 Bh Rp 192,700.00 Rp 578,100.00

10.00 Bh Rp 562,825.00 Rp 5,628,250.00


10.00 Bh Rp 514,650.00 Rp 5,146,500.00
1.00 Bh Rp 317,250.00 Rp 317,250.00
1.00 Bh Rp 450,025.00 Rp 450,025.00
3.00 Bh Rp 192,700.00 Rp 578,100.00

10.00 Bh Rp 562,825.00 Rp 5,628,250.00


10.00 Bh Rp 514,650.00 Rp 5,146,500.00
1.00 Bh Rp 317,250.00 Rp 317,250.00
1.00 Bh Rp 450,025.00 Rp 450,025.00
3.00 Bh Rp 192,700.00 Rp 578,100.00

10.00 Bh Rp 562,825.00 Rp 5,628,250.00


10.00 Bh Rp 514,650.00 Rp 5,146,500.00
1.00 Bh Rp 317,250.00 Rp 317,250.00
1.00 Bh Rp 450,025.00 Rp 450,025.00
3.00 Bh Rp 192,700.00 Rp 578,100.00

10.00 Bh Rp 377,175.00 Rp 3,771,750.00


10.00 Bh Rp 345,450.00 Rp 3,454,500.00

46.00 ttk Rp 203,079.17 Rp 9,341,641.67


29.00 bh Rp 82,250.00 Rp 2,385,250.00
1.00 bh Rp 199,750.00 Rp 199,750.00
4.00 bh Rp 264,375.00 Rp 1,057,500.00
3.00 bh Rp 82,250.00 Rp 246,750.00
5.00 bh Rp 24,675.00 Rp 123,375.00
1.00 bh Rp 16,450.00 Rp 16,450.00
3.00 bh Rp 29,375.00 Rp 88,125.00

120.00 ttk Rp 203,079.17 Rp 24,369,500.00


50.00 bh Rp 82,250.00 Rp 4,112,500.00
10.00 bh Rp 24,675.00 Rp 246,750.00
30.00 bh Rp 16,450.00 Rp 493,500.00
30.00 bh Rp 29,375.00 Rp 881,250.00

44.00 ttk Rp 203,079.17 Rp 8,935,483.33


20.00 bh Rp 82,250.00 Rp 1,645,000.00
4.00 bh Rp 24,675.00 Rp 98,700.00
8.00 bh Rp 16,450.00 Rp 131,600.00
12.00 bh Rp 29,375.00 Rp 352,500.00

195.00 ttk Rp 203,079.17 Rp 39,600,437.50


78.00 bh Rp 82,250.00 Rp 6,415,500.00
13.00 bh Rp 24,675.00 Rp 320,775.00
52.00 bh Rp 16,450.00 Rp 855,400.00
52.00 bh Rp 29,375.00 Rp 1,527,500.00

24.00 ttk Rp 203,079.17 Rp 4,873,900.00


10.00 bh Rp 82,250.00 Rp 822,500.00
2.00 bh Rp 24,675.00 Rp 49,350.00
6.00 bh Rp 16,450.00 Rp 98,700.00
6.00 bh Rp 29,375.00 Rp 176,250.00

24.00 ttk Rp 203,079.17 Rp 4,873,900.00


10.00 bh Rp 82,250.00 Rp 822,500.00
2.00 bh Rp 24,675.00 Rp 49,350.00
6.00 bh Rp 16,450.00 Rp 98,700.00
6.00 bh Rp 29,375.00 Rp 176,250.00

17.00 ttk Rp 203,079.17 Rp 3,452,345.83


7.00 bh Rp 82,250.00 Rp 575,750.00
1.00 bh Rp 24,675.00 Rp 24,675.00
5.00 bh Rp 16,450.00 Rp 82,250.00
4.00 bh Rp 29,375.00 Rp 117,500.00

46.00 ttk Rp 203,079.17 Rp 9,341,641.67


29.00 bh Rp 82,250.00 Rp 2,385,250.00
1.00 bh Rp 199,750.00 Rp 199,750.00
4.00 bh Rp 264,375.00 Rp 1,057,500.00
3.00 bh Rp 82,250.00 Rp 246,750.00
5.00 bh Rp 24,675.00 Rp 123,375.00
1.00 bh Rp 16,450.00 Rp 16,450.00
3.00 bh Rp 29,375.00 Rp 88,125.00

120.00 ttk Rp 203,079.17 Rp 24,369,500.00


50.00 bh Rp 82,250.00 Rp 4,112,500.00
10.00 bh Rp 24,675.00 Rp 246,750.00
30.00 bh Rp 16,450.00 Rp 493,500.00
30.00 bh Rp 29,375.00 Rp 881,250.00

44.00 ttk Rp 203,079.17 Rp 8,935,483.33


20.00 bh Rp 82,250.00 Rp 1,645,000.00
4.00 bh Rp 24,675.00 Rp 98,700.00
8.00 bh Rp 16,450.00 Rp 131,600.00
12.00 bh Rp 29,375.00 Rp 352,500.00

195.00 ttk Rp 203,079.17 Rp 39,600,437.50


78.00 bh Rp 82,250.00 Rp 6,415,500.00
13.00 bh Rp 24,675.00 Rp 320,775.00
52.00 bh Rp 16,450.00 Rp 855,400.00
52.00 bh Rp 29,375.00 Rp 1,527,500.00

24.00 ttk Rp 203,079.17 Rp 4,873,900.00


10.00 bh Rp 82,250.00 Rp 822,500.00
2.00 bh Rp 24,675.00 Rp 49,350.00
6.00 bh Rp 16,450.00 Rp 98,700.00
6.00 bh Rp 29,375.00 Rp 176,250.00

24.00 ttk Rp 203,079.17 Rp 4,873,900.00


10.00 bh Rp 82,250.00 Rp 822,500.00
2.00 bh Rp 24,675.00 Rp 49,350.00
6.00 bh Rp 16,450.00 Rp 98,700.00
6.00 bh Rp 29,375.00 Rp 176,250.00

17.00 ttk Rp 203,079.17 Rp 3,452,345.83


7.00 bh Rp 82,250.00 Rp 575,750.00
1.00 bh Rp 24,675.00 Rp 24,675.00
5.00 bh Rp 16,450.00 Rp 82,250.00
4.00 bh Rp 29,375.00 Rp 117,500.00

46.00 ttk Rp 203,079.17 Rp 9,341,641.67


29.00 bh Rp 82,250.00 Rp 2,385,250.00
1.00 bh Rp 199,750.00 Rp 199,750.00
4.00 bh Rp 264,375.00 Rp 1,057,500.00
3.00 bh Rp 82,250.00 Rp 246,750.00
5.00 bh Rp 24,675.00 Rp 123,375.00
1.00 bh Rp 16,450.00 Rp 16,450.00
3.00 bh Rp 29,375.00 Rp 88,125.00

120.00 ttk Rp 203,079.17 Rp 24,369,500.00


50.00 bh Rp 82,250.00 Rp 4,112,500.00
10.00 bh Rp 24,675.00 Rp 246,750.00
30.00 bh Rp 16,450.00 Rp 493,500.00
30.00 bh Rp 29,375.00 Rp 881,250.00

44.00 ttk Rp 203,079.17 Rp 8,935,483.33


20.00 bh Rp 82,250.00 Rp 1,645,000.00
4.00 bh Rp 24,675.00 Rp 98,700.00
8.00 bh Rp 16,450.00 Rp 131,600.00
12.00 bh Rp 29,375.00 Rp 352,500.00

195.00 ttk Rp 203,079.17 Rp 39,600,437.50


78.00 bh Rp 82,250.00 Rp 6,415,500.00
13.00 bh Rp 24,675.00 Rp 320,775.00
52.00 bh Rp 16,450.00 Rp 855,400.00
52.00 bh Rp 29,375.00 Rp 1,527,500.00

24.00 ttk Rp 203,079.17 Rp 4,873,900.00


10.00 bh Rp 82,250.00 Rp 822,500.00
2.00 bh Rp 24,675.00 Rp 49,350.00
6.00 bh Rp 16,450.00 Rp 98,700.00
6.00 bh Rp 29,375.00 Rp 176,250.00

24.00 ttk Rp 203,079.17 Rp 4,873,900.00


10.00 bh Rp 82,250.00 Rp 822,500.00
2.00 bh Rp 24,675.00 Rp 49,350.00
6.00 bh Rp 16,450.00 Rp 98,700.00
6.00 bh Rp 29,375.00 Rp 176,250.00

17.00 ttk Rp 203,079.17 Rp 3,452,345.83


7.00 bh Rp 82,250.00 Rp 575,750.00
1.00 bh Rp 24,675.00 Rp 24,675.00
5.00 bh Rp 16,450.00 Rp 82,250.00
4.00 bh Rp 29,375.00 Rp 117,500.00

46.00 ttk Rp 203,079.17 Rp 9,341,641.67


29.00 bh Rp 82,250.00 Rp 2,385,250.00
1.00 bh Rp 199,750.00 Rp 199,750.00
4.00 bh Rp 264,375.00 Rp 1,057,500.00
3.00 bh Rp 82,250.00 Rp 246,750.00
5.00 bh Rp 24,675.00 Rp 123,375.00
1.00 bh Rp 16,450.00 Rp 16,450.00
3.00 bh Rp 29,375.00 Rp 88,125.00

120.00 ttk Rp 203,079.17 Rp 24,369,500.00


50.00 bh Rp 82,250.00 Rp 4,112,500.00
10.00 bh Rp 24,675.00 Rp 246,750.00
30.00 bh Rp 16,450.00 Rp 493,500.00
30.00 bh Rp 29,375.00 Rp 881,250.00

44.00 ttk Rp 203,079.17 Rp 8,935,483.33


20.00 bh Rp 82,250.00 Rp 1,645,000.00
4.00 bh Rp 24,675.00 Rp 98,700.00
8.00 bh Rp 16,450.00 Rp 131,600.00
12.00 bh Rp 29,375.00 Rp 352,500.00

195.00 ttk Rp 203,079.17 Rp 39,600,437.50


78.00 bh Rp 82,250.00 Rp 6,415,500.00
13.00 bh Rp 24,675.00 Rp 320,775.00
52.00 bh Rp 16,450.00 Rp 855,400.00
52.00 bh Rp 29,375.00 Rp 1,527,500.00

24.00 ttk Rp 203,079.17 Rp 4,873,900.00


10.00 bh Rp 82,250.00 Rp 822,500.00
2.00 bh Rp 24,675.00 Rp 49,350.00
6.00 bh Rp 16,450.00 Rp 98,700.00
6.00 bh Rp 29,375.00 Rp 176,250.00

24.00 ttk Rp 203,079.17 Rp 4,873,900.00


10.00 bh Rp 82,250.00 Rp 822,500.00
2.00 bh Rp 24,675.00 Rp 49,350.00
6.00 bh Rp 16,450.00 Rp 98,700.00
6.00 bh Rp 29,375.00 Rp 176,250.00

17.00 ttk Rp 203,079.17 Rp 3,452,345.83


7.00 bh Rp 82,250.00 Rp 575,750.00
1.00 bh Rp 24,675.00 Rp 24,675.00
5.00 bh Rp 16,450.00 Rp 82,250.00
4.00 bh Rp 29,375.00 Rp 117,500.00

46.00 ttk Rp 203,079.17 Rp 9,341,641.67


29.00 bh Rp 82,250.00 Rp 2,385,250.00
1.00 bh Rp 199,750.00 Rp 199,750.00
4.00 bh Rp 264,375.00 Rp 1,057,500.00
3.00 bh Rp 82,250.00 Rp 246,750.00
5.00 bh Rp 24,675.00 Rp 123,375.00
1.00 bh Rp 16,450.00 Rp 16,450.00
3.00 bh Rp 29,375.00 Rp 88,125.00

120.00 ttk Rp 203,079.17 Rp 24,369,500.00


50.00 bh Rp 82,250.00 Rp 4,112,500.00
10.00 bh Rp 24,675.00 Rp 246,750.00
30.00 bh Rp 16,450.00 Rp 493,500.00
30.00 bh Rp 29,375.00 Rp 881,250.00

44.00 ttk Rp 203,079.17 Rp 8,935,483.33


20.00 bh Rp 82,250.00 Rp 1,645,000.00
4.00 bh Rp 24,675.00 Rp 98,700.00
8.00 bh Rp 16,450.00 Rp 131,600.00
12.00 bh Rp 29,375.00 Rp 352,500.00

195.00 ttk Rp 203,079.17 Rp 39,600,437.50


78.00 bh Rp 82,250.00 Rp 6,415,500.00
13.00 bh Rp 24,675.00 Rp 320,775.00
52.00 bh Rp 16,450.00 Rp 855,400.00
52.00 bh Rp 29,375.00 Rp 1,527,500.00

24.00 ttk Rp 203,079.17 Rp 4,873,900.00


10.00 bh Rp 82,250.00 Rp 822,500.00
2.00 bh Rp 24,675.00 Rp 49,350.00
6.00 bh Rp 16,450.00 Rp 98,700.00
6.00 bh Rp 29,375.00 Rp 176,250.00

24.00 ttk Rp 203,079.17 Rp 4,873,900.00


10.00 bh Rp 82,250.00 Rp 822,500.00
2.00 bh Rp 24,675.00 Rp 49,350.00
6.00 bh Rp 16,450.00 Rp 98,700.00
6.00 bh Rp 29,375.00 Rp 176,250.00

17.00 ttk Rp 203,079.17 Rp 3,452,345.83


7.00 bh Rp 82,250.00 Rp 575,750.00
1.00 bh Rp 24,675.00 Rp 24,675.00
5.00 bh Rp 16,450.00 Rp 82,250.00
4.00 bh Rp 29,375.00 Rp 117,500.00
Rp -
Rp -
Rp -
4 bh Rp 470,000.00 Rp 1,880,000.00
Rp 2,643,750.00 Rp 2,643,750.00
Rp -

2 bh Rp 12,337,500.00 Rp 24,675,000.00
2 bh Rp 7,990,000.00 Rp 15,980,000.00
20 m Rp 82,250.00 Rp 1,645,000.00
180 m Rp 94,000.00 Rp 16,920,000.00
2 lot Rp 4,112,500.00 Rp 8,225,000.00
Rp 2,643,750.00 Rp 2,643,750.00

TOTAL BIAYA PERENCANAAN PEKERJAAN ELEKTRIKAL Rp 1,544,677,325.00


DAFTAR HARGA BAHAN

Pekerjaan : Pengembangan Fasilitas Pelabuhan Perikanan Cikidang


Lokasi : Pelabuhan Perikanan Cikidang, Desa Babakan Pangandaran
Tahun Anggaran : 2019

No. NAMA BAHAN SATUAN HARGA SATUAN KETERANGAN

1 Semen PC (Tiga Roda 50kg) sak 73,100.00


2 Semen Grouting kg 4,400.00
3 MU-380 (perekat bata ringan) sak/40kg 150,000.00
4 Pasir Urug m3 172,700.00
5 Tanah Urug m3 66,000.00
6 Pasir Pasang/Pasir Beton m3 242,600.00
7 Batu Pecah / Screening m3 280,000.00
8 Splite / Kerikil m3 230,000.00
9 Sirtu m3 195,300.00
10 Batu Kali m3 188,700.00
11 Batu Bata Merah bh 900.00
12 Bataco bh 2,400.00
13 Bata Ringan tebal 10cm m3 850,000.00
14 Rooster Beton 20x20 bh 5,400.00
15 Besi Beton Polos kg 9,200.00
16 Besi Beton Ulir kg 9,200.00
17 Besi Mesh M6 - 8 x 8 cm m' 17,000.00
18 Kawat Beton kg 25,000.00
19 Paku (campur) kg 20,000.00
20 Papan Terentang 2/20 m3 2,700,000.00
21 Papan Terentang 3/30 m3 2,750,000.00
22 Multipleks t= 6 mm lbr 90,000.00
23 Multipleks t= 9 mm lbr 120,000.00
24 Phenol Film t=12 mm lbr 190,000.00
25 Phenol Film t=18 mm lbr 240,000.00
26 Kayu Borneo m3 2,700,000.00
27 Kayu Meranti batu m3 2,700,000.00
28 Kayu Kruing / Kamper m3 3,000,000.00
29 Papan Kamper Singkil m3 3,000,000.00
30 Papan Meranti m3 3,000,000.00
31 List kayu 3/3 (kayu kamper) m' 25,500.00
32 GRC t=4 mm lbr 41,800.00
33 GRC t=9 mm lbr 96,000.00
34 Calciumboard t. 5 mm lbr 82,800.00
35 Calciboard t. 6 mm lbr 87,700.00
36 Beton Readymix K - 125 m3 589,380.00
37 Beton Readymix K - 175 m3 737,000.00
38 Beton Readymix K - 225 m3 836,000.00
39 Beton Readymix K - 300 m3 900,000.00
40 Beton Readymix K - 350 m3 836,000.00
41 Asbes gelombang 105 x 180 lbr 63,700.00
42 Seng gelombang lbr 63,700.00
43 Baja Profil kg 12,730.00
44 Keramik 40/40 m2 50,000.00
45 Keramik 30/30 Ex. Roman B m2 86,570.00
46 Kerawangan m2 400,000.00
47 Keramik 30/30 Ex. Roman A m2 80,300.00
48 Keramik 20/20 m2 100,000.00
49 Keramik 20/20 Ex. Roman, B m2 90,000.00
50 Keramik Dinding 20/25 Ex. Roman, B m2 110,000.00
53 Nozing Keramik 10/40 bh 25,000.00
54 Nozing Keramik 10/20 m' 34,500.00
55 Plamir tembok kg 18,000.00
56 Plamir Kayu kg 21,000.00
57 Amplas lbr 5,000.00
58 Rol cat bh 10,500.00
59 Cat kayu kg 49,500.00
60 Meni kg 52,000.00
61 Meni Kayu kg 52,000.00
62 Thinner Pengencer kg 9,000.00
63 Nok Atap Aluminium bh 60,500.00
64 Atap Genteng Metal m2 110,000.00
65 Polycarbonat m2 145,000.00
66 Kusen aluminium m' 165,000.00
67 List stoper pintu/jendela + karet m' 18,000.00
68 Frame aluminium m' 120,000.00
69 Jalusi (krepyak) 3" (silver) m' 49,500.00
70 Jalusi (krepyak) 4" (silver) m' 60,000.00
71 Kaca polos t = 3 mm m2 72,000.00
72 Kaca polos t = 5 mm m2 120,000.00
73 Kaca polos t = 10 mm m2 210,000.00
74 Formika m2 62,000.00
75 Pipa GIP 2.5" m' 97,500.00
76 Pipa Baja 1,5 " kg 17,000.00
77 Pintu PVC unit 350,000.00
78 Kloset Jongkok bh 306,000.00
79 Kloset Duduk CLOSET DUDUK, CW 660 NJ / SW 660 J bh 2,850,000.00
80 Kitchen Zink bh 404,000.00
81 Cat tembok Interior ex. ICI Dulux kg 50,000.00
82 Cat tembok exterior weather coat ex. ICI Dulux kg 120,000.00
83 Paving Blok t = 6 cm m2 80,000.00
84 Kansteen bh 25,000.00
85 Ijuk ikat 19,000.00
86 Waterproving Membrane m2 86,000.00
87 Kaso 4/6 x 4 m3 2,350,000.00
88 Kaso 5/7 x 4 m3 2,400,000.00
89 Kunci Tanam 2 Slag bh 75,000.00
90 Engsel 4" bh 18,000.00
91 Engsel 3" bh 12,000.00
92 Besi nako bh 19,300.00
93 Jendela Nako m2 124,000.00
94 Daun Pintu aluminium m2 400,000.00
95 Daun Pintu Double Teakwood m2 160,000.00
96 Daun Pintu Multipleks m2 140,000.00
97 Daun Pintu Calciumboard m2 127,000.00
98 Handle + Kunci bh 107,000.00
99 Kunci Slot bh 44,100.00
100 Kusen Besi m' 145,000.00
101 Karet Kaca m' 1,800.00
102 Kait Angin Jendela psg 16,000.00
103 Kunci Jendela Sorong psg 34,000.00
104 Besi siku 40.40.4 kg 11,000.00
105 Cat Minyak kg 34,500.00
106 Kwas 3" bh 6,000.00
107 Waterproofing liquid kg 25,000.00
108 Waterproofing bitumen kg 44,000.00
109 Waterproofing Membrane m2 66,000.00
110 Semen Warna zak 108,500.00
111 Air kerja ltr 100.00
112 Bracket kaca nako (10cm) bh 8,500.00
113 Wiremesh M7-150,M6-750, M4-150 kg 12,000.00
114 Grendel Jendela bh 18,000.00
115 Kran Faucet TOTO T 23 B 13 V7N bh 320,900.00
116 Floor Drain TX1BV1 ex TOTO bh 320,900.00
117 Urinoir bh 608,000.00
118 Buis beton dia. 60 cm bh 185,700.00
119 Besi hollow 4x4 m 18,000.00
120 Baja CNP 100x50x20x3 m 63,700.00
121 Plat Baja t. 1,5 mm m2 1,762,704.17
122 Glass Block bh 24,000.00
123 Compound kg 2,800.00
124 Pipa Zincalume m 95,400.00
125 Hollow zincalume m 67,500.00
`
DAFTAR HARGA UPAH

Pekerjaan : Pengembangan Fasilitas Pelabuhan Perikanan Cikidang


Lokasi : Pelabuhan Perikanan Cikidang, Desa Babakan Pangandaran
Tahun Anggaran : 2019

No. JENIS PEKERJAAN SATUAN HARGA SATUAN KETERANGAN

1 Pekerja / Knek Hari 123,700.00 1 hari = 8 jam kerja


2 Tukang Gali Hari 143,700.00 3,091,345.56
3 Kepala Tukang Batu Hari 158,700.00 25.00
4 Tukang Batu Hari 143,700.00 123,653.82
5 Kepala Tukang Kayu Hari 158,700.00
6 Tukang Kayu Hari 143,700.00
7 Kepala Tukang Besi Hari 158,700.00

8 Tukang Besi Hari 143,700.00


9 Mandor / Pengawas Hari 173,700.00
10 Tukang Las Hari 143,700.00
11 Tukang Cat Hari 143,700.00
12 Kepala Tukang cat Hari 158,700.00
ANALISA HARG

Pekerjaan : Pengembangan Fasilitas Pelabuhan Perikanan Cikidang


Lokasi : Pelabuhan Perikanan Cikidang, Desa Babakan Pangandaran
Tahun Anggaran : 2019

No. URAIAN PEKERJAAN

1 Pengurugan dan pemadatan tanah 1m3 (per20cm)

Bahan
- Tanah urug

Upah
- Pekerja
- Mandor

2 Pengurugan 1 m3 dengan pasir urug

Bahan
- Pasir urug

Upah
- Pekerja
- Mandor

3 Dinding Batako adukan 1 PC : 5 PS/ m2

Bahan
- Batako
- Pasir pasang
- Semen PC
- Air kerja
- Alat bantu

Upah
- Pekerja
- Tukang Batu
- Kepala Tukang Batu
- Mandor

4 Dinding Batako adukan 1 PC : 4 PS/ m2

Bahan
- Batako
- Pasir pasang
- Semen PC
- Air kerja
- Alat bantu

Bahan untuk kolom praktis 12x12


- Readymix K-225
- Besi

Upah
- Pekerja
- Tukang Batu
- Kepala Tukang Batu
- Mandor

5 Dinding Panel Precast beton ringan

Bahan
- Beton
- Begisting
- Besi
- Alat bantu

Upah
- Pekerja
- Tukang Batu
- Kepala Tukang Batu
- Mandor

6 Dinding Batako adukan 1 PC : 3 PS/ m2

Bahan
- Batako
- Pasir pasang
- Semen PC
- Air kerja
- Alat bantu

Upah
- Pekerja
- Tukang Batu
- Kepala Tukang Batu
- Mandor

7 Pasangan Bata 1 : 4 (1 bata) / m2

Bahan
- Batu bata
- Pasir pasang
- Semen PC
- Air kerja
- Alat bantu

Upah
- Pekerja
- Tukang Batu
- Kepala Tukang Batu
- Mandor

8 Pasangan Bata 1 : 4 (1/2 bata) / m2

Bahan
- Batu bata
- Pasir pasang
- Semen PC
- Air kerja
- Alat bantu

Upah
- Pekerja
- Tukang Batu
- Kepala Tukang Batu
- Mandor

9 Dinding Bata ringan adukan tebal 10 cm/ m2


(untuk dinding bagian dalam)
Bahan
- Bata ringan
- Perekat bata ringan MU-380
- Alat bantu

Upah
- Pekerja
- Tukang Batu
- Kepala Tukang Batu
- Mandor

10 Dinding Bata ringan adukan tebal 10 cm/ m2


(untuk dinding bagian luar)
Bahan
- Bata ringan
- Perekat bata ringan MU-380
- Alat bantu

Upah
- Pekerja
- Tukang Batu
- Kepala Tukang Batu
- Mandor

11 Dinding Panel Precast beton ringan

Bahan
- Beton
- Begisting
- Besi
- Alat bantu

Upah
- Pekerja
- Tukang Batu
- Kepala Tukang Batu
- Mandor

12 Pasangan Dinding Rooster 1 : 4 / m2

Bahan
- Rooster beton
- Semen portland
- Pasir pasang

Upah
- Pekerja
- Tukang
- Kepala Tukang
- Mandor
13 Plester adukan 1 PC : 5 PS t. 1,5 cm /m2

Bahan
- Pasir pasang
- Semen PC
- Alat bantu

Upah
- Pekerja
- Tukang Batu
- Kepala Tukang Batu
- Mandor

14 Plester adukan 1 PC : 3 PS t. 1,5 cm /m2

Bahan
- Pasir pasang
- Semen PC
- Alat bantu

Upah
- Pekerja
- Tukang Batu
- Kepala Tukang Batu
- Mandor

15 Kolom praktis 10/10 / m3

Bahan
- Beton K-175
- Besi Mesh M6 - 8 x 8 cm
- Bekisting

Upah
- Pekerja
- Tukang
- Kepala Tukang
- Mandor

16 Balok praktis 10/10 / m3

Bahan
- Beton K-175
- Besi Mesh M6 - 8 x 8 cm
- Bekisting

Upah
- Pekerja
- Tukang
- Kepala Tukang
- Mandor

17 Topian Beton Jendela J1

Bahan
- Beton
- Besi
- Kawat beton
- Bekisting
- Alat bantu

Upah
- Pekerja
- Tukang
- Kepala Tukang
- Mandor

18 Topian Beton Jendela BV

Bahan
- Beton
- Besi
- Kawat beton
- Bekisting
- Alat bantu

Upah
- Pekerja
- Tukang
- Kepala Tukang
- Mandor

17 Perapian nat bataco / tali air /m2

Bahan
- Semen PC
- Alat bantu

Upah
- Pekerja
- Tukang Batu
- Kepala Tukang Batu
- Mandor

18 Perapihan Kolom / m2

Bahan
- Semen PC
- Alat bantu

Upah
- Pekerja
- Tukang Batu
- Kepala Tukang Batu
- Mandor

19 Perapihan balok/pelat / m2

Bahan
- Semen PC
- Alat bantu

Upah
- Pekerja
- Tukang Batu
- Kepala Tukang Batu
- Mandor

20 Screed 1 : 3 + aci/ m2
Bahan
- Pasir pasang
- Semen PC
- Alat bantu

Upah
- Pekerja
- Tukang Batu
- Kepala Tukang Batu
- Mandor

21 Acian / m2

Bahan
- Semen PC
- Alat bantu

Upah
- Pekerja
- Tukang Batu
- Kepala Tukang Batu
- Mandor
22 Keramik 40/40 / m2

Bahan
- Keramik 40 x 40
- Semen PC
- Pasir pasang
- Semen warna

Upah
- Pekerja
- Tukang Batu
- Kepala Tukang Batu
- Mandor

23 Keramik 30/30 / m2 (Ex. Roman B)

Bahan
- Keramik 30 x 30 Kasar
- Semen PC
- Pasir pasang
- Semen warna

Upah
- Pekerja
- Tukang Batu
- Kepala Tukang Batu
- Mandor

24 Keramik 30/30 / m2 (Ex. Roman A)

Bahan
- Keramik 30 x 30
- Semen PC
- Pasir pasang
- Semen warna

Upah
- Pekerja
- Tukang Batu
- Kepala Tukang Batu
- Mandor

25 Keramik 20/20 /m2 (Ex. Roman B)


Bahan
- Keramik 20 x 20
- Portland semen
- Pasir pasang
- Semen warna

Upah
- Pekerja
- Tukang Batu
- Kepala Tukang Batu
- Mandor

26 Keramik 20/25 /m2 (Ex. Roman B)


Bahan
- Keramik 20 x 25
- Portland semen
- Pasir pasang
- Semen warna
Upah
- Pekerja
- Tukang Batu
- Kepala Tukang Batu
- Mandor

27 Border Keramik 20/25 /m' (Ex. Roman B)


Bahan
- Keramik 20 x 25
- Portland semen
- Pasir pasang
- Semen warna

Upah
- Pekerja
- Tukang Batu
- Kepala Tukang Batu
- Mandor

28 Plint Keramik 10/30 /m' (Ex. Roman B)


Bahan
- Keramik 10 x 30
- Portland semen
- Pasir pasang
- Semen warna

Upah
- Pekerja
- Tukang Batu
- Kepala Tukang Batu
- Mandor

29 Stair Nozing Keramik 10/40 / m'

Bahan
- Stair Nozing 10 x 40
- Portland semen
- Pasir pasang
- Semen warna

Upah
- Pekerja
- Tukang Batu
- Kepala Tukang Batu
- Mandor

30 Stair Nozing Keramik 10/20 / m'

Bahan
- Stair Nozing 10 x 20
- Portland semen
- Pasir pasang
- Semen warna

Upah
- Pekerja
- Tukang Batu
- Kepala Tukang Batu
- Mandor

31 Cat Dinding Luar / m2

Bahan
- Cat Ex. Exterior Wather Coat ICI Dulux
- Plamir tembok
- Ampelas
- Rol cat
- Steger work

Upah
- Pekerja
- Tukang Cat
- Kepala Tukang Cat
- Mandor

32 Cat Dinding Dalam / m2

Bahan
- Cat Ex. Interior ICI Dulux
- Plamir tembok
- Ampelas
- Rol cat
- Steger work
Upah
- Pekerja
- Tukang Cat
- Kepala Tukang Cat
- Mandor

33 Cat Kolom dan Balok Struktur/ m2

Bahan
- Cat Ex. Exterior Wather Coat ICI Dulux
- Plamir tembok
- Ampelas
- Rol cat
- Steger work

Upah
- Pekerja
- Tukang Cat
- Kepala Tukang Cat
- Mandor

34 Cat Plafond / m2

Bahan
- Cat Ex. Interior ICI Dulux
- Plamir
- Ampelas
- Rol cat
- Steger work

Upah
- Pekerja
- Tukang Cat
- Kepala Tukang Cat
- Mandor

35 Cat Kayu/Besi / m2

Bahan
- Cat Minyak
- Plamir kayu
- Meni kayu
- Amplas
- Kwas 3 "
- Minyak cat

Upah
- Pekerja
- Tukang Cat
- Kepala Tukang Cat
- Mandor

36 Pintu type P1 / unit

Bahan
- Kusen Aluminium 4''
- Frame Aluminium
- Daun Pintu Double Taekwood
- Engsel Pintu 3"
- Handle + Kunci
- Engsel Jendela
- Kaca t. 5mm
- Alat Bantu

Upah
- Pekerja
- Tukang
- Kepala Tukang
- Mandor

37 Pintu type P1 / unit uk. 900x2500+600x400+600+1200

Bahan
- Kusen Aluminium 4''
- Frame Aluminium
- Daun Pintu Double Taekwood
- Engsel Pintu 3"
- Handle + Kunci
- Engsel Jendela
- Kaca t. 5mm
- Alat Bantu

Upah
- Pekerja
- Tukang
- Kepala Tukang
- Mandor

38 Pintu type P2 / unit

Bahan
- Kusen Aluminium 4''
- Frame Aluminium
- Daun Pintu Double Taekwood
- Engsel Pintu
- Handle + Kunci
- Engsel Jendela
- Kaca t. 5mm
- Alat Bantu

Upah
- Pekerja
- Tukang
- Kepala Tukang
- Mandor

39 Pintu type P3 / unit

Bahan
- Kusen Aluminium 4''
- Frame Aluminium 4"
- Daun Pintu Double Taekwood
- Engsel Pintu
- Handle + Kunci
- Engsel Jendela
- Kaca t. 5mm
- Alat Bantu

Upah
- Pekerja
- Tukang
- Kepala Tukang
- Mandor

40 Pintu type P3 / unit 700x2500


Bahan
- Kusen Aluminium 4''
- Frame Aluminium 4"
- Daun Pintu Double Taekwood
- Engsel Pintu
- Handle + Kunci
- Engsel Jendela
- Kaca t. 5mm
- Alat Bantu

Upah
- Pekerja
- Tukang
- Kepala Tukang
- Mandor

41 Pintu type P4/ unit

Bahan
- Kusen PVC
- Daun Pintu PVC
- Engsel Pintu
- Handle + Kunci
- Alat Bantu

Upah
- Pekerja
- Tukang
- Kepala Tukang
- Mandor

42 Pintu type P5 / unit

Bahan
- Kusen Aluminium 4''
- Frame Aluminium 4"
- Engsel Pintu
- Handle + Kunci
- Engsel Jendela
- Kaca t. 10mm
- Kaca t. 5mm
- Alat Bantu

Upah
- Pekerja
- Tukang
- Kepala Tukang
- Mandor

43 Pintu type P5a / unit

Bahan
- Kusen Baja CNP
- Daun Pintu Plat Baja t. 1,5 mm
- Engsel Pintu
- Handle + Kunci
- Alat Bantu

Upah
- Pekerja
- Tukang
- Kepala Tukang
- Mandor

44 Pintu type P6 / unit

Bahan
- Kusen Aluminium 4''
- Frame Aluminium 4"
- Daun Pintu Double Taekwood
- Engsel Pintu
- Handle + Kunci
- Engsel Jendela
- Kaca t. 5mm
- Alat Bantu

Upah
- Pekerja
- Tukang
- Kepala Tukang
- Mandor

45 Pintu type P7 / unit


Bahan
- Kusen Aluminium 4''
- Frame Aluminium 4"
- Engsel Pintu
- Handle + Kunci
- Engsel Jendela
- Kaca t. 10mm
- Kaca t. 5mm
- Alat Bantu

Upah
- Pekerja
- Tukang
- Kepala Tukang
- Mandor

46 Pintu type P7a / unit

Bahan
- Kusen Baja CNP
- Daun Pintu Plat Baja t. 1,5 mm
- Engsel Pintu
- Handle + Kunci
- Alat Bantu

Upah
- Pekerja
- Tukang
- Kepala Tukang
- Mandor

47 Pintu type P8 / unit

Bahan
- Kusen Aluminium 4''
- Frame Aluminium 4"
- Daun Pintu Double Taekwood
- Engsel Pintu
- Handle + Kunci
- Engsel Jendela
- Kaca t. 5mm
- Alat Bantu

Upah
- Pekerja
- Tukang
- Kepala Tukang
- Mandor

48 Pintu type P8a / unit

Bahan
- Kusen Baja CNP
- Daun Pintu Plat Baja t. 1,5 mm
- Engsel Pintu
- Handle + Kunci
- Alat Bantu

Upah
- Pekerja
- Tukang
- Kepala Tukang
- Mandor

49 Type RO / unit

Bahan
- Pasagan Dinding Rooster

50 Type PS / unit

Bahan
- Kusen Aluminium 4''
- Frame Aluminium 3"
- Krepyak 3" (silver)
- Handle + Kunci
- Engsel Jendela
- Alat Bantu

Upah
- Pekerja
- Tukang
- Kepala Tukang
- Mandor

51 Jendela type J1 / unit

Bahan
- Kusen Aluminium
- Frame Aluminium
- Engsel Jendela
- Kaca polos t = 5 mm
- Alat Bantu

Upah
- Pekerja
- Tukang
- Kepala Tukang
- Mandor

52 Bovenlight BV/ bh

Bahan
- Kusen Aluminium
- Frame Aluminium
- Kaca 5 mm
- Alat Bantu

Upah
- Pekerja
- Tukang
- Kepala Tukang
- Mandor

53 Atap Genteng Metal / m2

Bahan
- Genteng Metal
- Paku Atap Metal
- Peralatan

Upah
- Pekerja
- Tukang
- Kepala Tukang
- Mandor

54 Nok Atap Aluminium/m'

Bahan
- Nok Atap Aluminium
- Paku
- Peralatan

Upah
- Pekerja
- Tukang
- Kepala Tukang
- Mandor

55 Plafond + Rangka / m2

Bahan
- GRC t=4 mm
- Metal furing
- Paku
- Compound
- Peralatan

Upah
- Pekerja
- Tukang Kayu
- Kepala Tukang Kayu
- Mandor

56 List Plafond 3/3 / m'

Bahan
- List kayu 3/3 (kayu kamper)
- Peralatan

Upah
- Pekerja
- Tukang Kayu
- Kepala Tukang Kayu
- Mandor
57 Meja Dapur Beton + Keramik/ bh Type 1

Bahan
- Beton
- Besi
- Kawat beton
- Bekisting
- Keramik 20/20
- Dinding keramik 20/20
- Alat bantu

Upah
- Pekerja
- Tukang
- Kepala Tukang
- Mandor

58 Meja Dapur Beton + Keramik/ bh Type 2

Bahan
- Beton
- Besi
- Kawat beton
- Bekisting
- Keramik 20/20
- Dinding keramik 20/20
- Alat bantu

Upah
- Pekerja
- Tukang
- Kepala Tukang
- Mandor

59 Meja Dapur Beton + Keramik/ bh Type 3

Bahan
- Beton
- Besi
- Kawat beton
- Bekisting
- Keramik 20/20
- Dinding keramik 20/20
- Alat bantu
Upah
- Pekerja
- Tukang
- Kepala Tukang
- Mandor

60 Meja Dapur Beton + Keramik/ bh Type 4

Bahan
- Beton
- Besi
- Kawat beton
- Bekisting
- Keramik 20/20
- Dinding keramik 20/20
- Alat bantu

Upah
- Pekerja
- Tukang
- Kepala Tukang
- Mandor

61 Meja Dapur Beton + Keramik/ bh Type 5

Bahan
- Beton
- Besi
- Kawat beton
- Bekisting
- Keramik 20/20
- Dinding keramik 20/20
- Alat bantu

Upah
- Pekerja
- Tukang
- Kepala Tukang
- Mandor

62 Meja Dapur Beton + Keramik/ bh Type 6


Bahan
- Beton
- Besi
- Kawat beton
- Bekisting
- Keramik 20/20
- Dinding keramik 20/20
- Alat bantu

Upah
- Pekerja
- Tukang
- Kepala Tukang
- Mandor

63 Kitchen Zink/ bh

Bahan
- Kitchen Zink ex-lokal
- Alat bantu

Upah
- Pekerja
- Tukang
- Kepala Tukang
- Mandor

64 Kran dia. 1/2"/ bh

Bahan
- Kran dia. 1/2"
- Alat bantu

Upah
- Pekerja
- Tukang
- Kepala Tukang
- Mandor

65 Floor Drain/Unit

Bahan
- Floor Drain
- Alat bantu
Pipa AW 2", Reducer 2" ke 3 " dan T 3"
Upah
- Pekerja
- Tukang
- Kepala Tukang
- Mandor

66 Kloset Jongkok/ bh

Bahan
- Pasir pasang
- Semen PC
- Kloset Jongkok
- Alat bantu

Upah
- Pekerja
- Tukang
- Kepala Tukang
- Mandor

67 Kloset Duduk/ bh

Bahan
- Pasir pasang
- Semen PC
- Kloset Duduk
- Alat bantu

Upah
- Pekerja
- Tukang
- Kepala Tukang
- Mandor

68 Peninggian Kloset / unit

Bahan
- Batako
- Pasir pasang
- Semen PC
- Air kerja
- Alat bantu

Upah
- Pekerja
- Tukang
- Kepala Tukang
- Mandor

69 Peninggian Lantai Bag. Bawah Dapur/ bh

Bahan
- Batako
- Keramik 30 x 30
- Pasir pasang
- Semen PC
- Air kerja
- Alat bantu

Upah
- Pekerja
- Tukang
- Kepala Tukang
- Mandor

70 Pasang Urinoir/ bh

Bahan
- Pasir pasang
- Semen PC
- Urinoir
- Alat bantu

Upah
- Pekerja
- Tukang
- Kepala Tukang
- Mandor

71 Tanggul Kamar Mandi / unit


Bahan
- Beton K 175
- Plester + aci
- Alat bantu

Upah
- Pekerja
- Tukang
- Kepala Tukang
- Mandor

72 Railing GIP dia 2.5" + Cat / m'

Bahan
- Pipa GIP dia. 2.5"
- Cat Besi
- Meni
- Thineer
- Alat bantu

Upah
- Pekerja
- Tukang Besi
- Kepala Tukang Besi
- Mandor

73 Hand Railing Selasar /m'

Bahan
- Pipa GIP dia. 2"
- Cat Besi
- Meni
- Thineer
- Alat bantu

Upah
- Pekerja
- Tukang Besi
- Kepala Tukang Besi
- Mandor
74 Waterprofing (Coating) / m2

Bahan
- Water profing
- Alat bantu

Upah
- Pekerja
- Tukang
- Kepala Tukang
- Mandor

75 Waterprofing Bitumen / m2

Bahan
- Water profing bitumen
- Alat bantu

Upah
- Pekerja
- Tukang
- Kepala Tukang
- Mandor

76 Waterprofing Membrane / m2

Bahan
- Water profing (non-toxic)
- Alat bantu

Upah
- Pekerja ###
- Tukang
- Kepala Tukang
- Mandor

77 Kuda-kuda Baja Ringan

Bahan
- Kuda-kuda Baja Ringan
- Alat bantu
Upah
- Pekerja
- Tukang
- Kepala Tukang
- Mandor

78 Pasang Glass block/bh

Bahan
- Glass Block
- Semen PC
- Alat bantu

Upah
- Pekerja
- Tukang
- Kepala Tukang
- Mandor

79 List Plank GRC 9 mm x 30 cm (m')

Bahan
- GRC t=9 mm
- Cat+meni
- Alat bantu

Upah
- Pekerja
- Tukang
- Kepala Tukang
- Mandor

81 Tralis sunscreen alumunium corridor/selasar (m')

Bahan
- Kusen aluminium
- Aluminium strip
- Alat bantu

Upah
- Pekerja
- Tukang Besi
- Kepala Tukang Besi
- Mandor

82 Tralis sunscreen zincalume BALKON (unit)

Bahan
- Hollow zincalume
- Alat bantu

Upah
- Pekerja
- Tukang Besi
- Kepala Tukang Besi
- Mandor

1 1 KG KONSTRUKSI BAJA PROFIL, IWF/INP/DIR/DIN/CHA

Bahan
- Baja Profil, IWF/INP/DIR/DIN/CHANEL
- Material Pendukung Lainnya, 5% dari Jumlah Bahan

Upah
- Pekerja
- Tukang Besi
- Kepala Tukang Besi
- Mandor
ANALISA HARGA SATUAN PEKERJAAN

kanan Cikidang
bakan Pangandaran

MATERIAL + UPAH

HARGA SATUAN
KOEF. SAT.
( Rp )

1.200 m3 66,000.00

0.500 hari 123,700.00


0.050 hari 173,700.00

1.200 m3 172,700.00

0.300 hari 123,700.00


0.010 hari 173,700.00

14.000 bh 2,400.00
0.037 m3 242,600.00
0.209 sak 73,100.00
10.000 ltr 100.00
1.000 ls 250.00

0.090 hari 123,700.00


0.060 hari 143,700.00
0.015 hari 158,700.00
0.003 hari 173,700.00

14.000 bh 2,400.00
0.060 m3 242,600.00
0.251 sak 73,100.00
10.000 ltr 100.00
1.000 ls 250.00

0.014 m3 1,073,806.80
4.460 kg 15,113.31

0.090 hari 123,700.00


0.060 hari 143,700.00
0.015 hari 158,700.00
0.003 hari 173,700.00

0.200 m3 1,078,205.04
2.000 m2 139,383.85
10.000 kg 19,652.16
1.000 ls 44,000.00

0.090 hari 123,700.00


0.060 hari 143,700.00
0.015 hari 158,700.00
0.003 hari 173,700.00

14.000 bh 2,400.00
0.037 m3 242,600.00
0.212 sak 73,100.00
10.000 ltr 100.00
1.000 ls 250.00

0.100 hari 123,700.00


0.100 hari 143,700.00
0.040 hari 158,700.00
0.002 hari 173,700.00

160.000 bh 900.00
0.011 m3 242,600.00
0.455 sak 73,100.00
10.000 ltr 100.00
1.000 ls 250.00

0.225 hari 123,700.00


0.150 hari 143,700.00
0.037 hari 158,700.00
0.007 hari 173,700.00

80.000 bh 900.00
0.025 m3 242,600.00
0.382 sak 73,100.00
10.000 ltr 100.00
1.000 ls 250.00

0.112 hari 123,700.00


0.075 hari 143,700.00
0.018 hari 158,700.00
0.003 hari 173,700.00
0.100 m3 850,000.00
0.105 sak 150,000.00
1.000 ls 15,555.40

0.300 hari 123,700.00


0.100 hari 143,700.00
0.010 hari 158,700.00
0.010 hari 173,700.00

0.100 m3 850,000.00
0.105 sak 150,000.00
1.000 ls 46,666.20

0.300 hari 123,700.00


0.100 hari 143,700.00
0.010 hari 158,700.00
0.010 hari 173,700.00

0.200 m3 1,078,205.04
2.000 m2 139,383.85
10.000 kg 19,652.16
1.000 ls 44,000.00

0.090 hari 123,700.00


0.060 hari 143,700.00
0.015 hari 158,700.00
0.003 hari 173,700.00

30.000 bh 5,400.00
0.183 sak 73,100.00
0.035 m3 242,600.00

0.300 hari 123,700.00


0.100 hari 143,700.00
0.010 hari 158,700.00
0.015 hari 173,700.00

0.026 m3 242,600.00
0.104 sak 73,100.00
1.000 ls 250.00

0.200 hari 123,700.00


0.150 hari 143,700.00
0.015 hari 158,700.00
0.015 hari 173,700.00

0.023 m3 242,600.00
0.156 sak 73,100.00
1.000 ls 250.00

0.200 hari 123,700.00


0.150 hari 143,700.00
0.015 hari 158,700.00
0.015 hari 173,700.00

1.050 m3 737,000.00
105.000 m' 17,000.00
37.200 m2 28,358.96
0.600 hari 123,700.00
0.300 hari 143,700.00
0.075 hari 158,700.00
0.015 hari 173,700.00

1.050 m3 737,000.00
105.000 m' 17,000.00
37.200 m2 28,358.96

0.200
0.138 hari 123,700.00
0.062 hari 143,700.00
0.014 hari 158,700.00
0.003 hari 173,700.00

0.126 m3 836,000.00
35.091 kg 9,200.00
0.360 kg 25,000.00
2.993 m2 28,358.96
1.000 ls 146,815.73

0.900 hari 123,700.00


1.800 hari 143,700.00
0.450 hari 158,700.00
0.090 hari 173,700.00

0.041 m3 836,000.00
12.599 kg 9,200.00
0.360 kg 25,000.00
0.732 m2 28,358.96
1.000 ls 95,496.46
0.900 hari 123,700.00
1.800 hari 143,700.00
0.450 hari 158,700.00
0.090 hari 173,700.00

0.188 sak 73,100.00


1.000 ls 500.00

0.060 hari 123,700.00


0.120 hari 143,700.00
0.030 hari 158,700.00
0.006 hari 173,700.00

0.080 sak 73,100.00


1.000 ls 200.00

0.022 hari 123,700.00


0.067 hari 143,700.00
0.016 hari 158,700.00
0.003 hari 173,700.00

0.080 sak 73,100.00


1.000 ls 250.00

0.022 hari 123,700.00


0.067 hari 143,700.00
0.016 hari 158,700.00
0.003 hari 173,700.00
0.192 m3 242,600.00
0.720 sak 73,100.00
1.000 ls 250.00

0.018 hari 123,700.00


0.036 hari 143,700.00
0.009 hari 158,700.00
0.001 hari 173,700.00

0.065 sak 73,100.00


1.000 ls 250.00

0.200 hari 123,700.00


0.100 hari 143,700.00
0.010 hari 158,700.00
0.010 hari 173,700.00

1.050 m2 50,000.00
0.164 sak 73,100.00
0.044 m3 242,600.00
0.028 sak 108,500.00

0.135 hari 123,700.00


0.090 hari 143,700.00
0.022 hari 158,700.00
0.004 hari 173,700.00

1.050 m2 86,570.00
0.164 sak 73,100.00
0.044 m3 242,600.00
0.028 sak 108,500.00

0.135 hari 123,700.00


0.090 hari 143,700.00
0.022 hari 158,700.00
0.004 hari 173,700.00

1.050 m2 80,300.00
0.164 sak 73,100.00
0.044 m3 242,600.00
0.028 sak 108,500.00

0.135 hari 123,700.00


0.090 hari 143,700.00
0.022 hari 158,700.00
0.004 hari 173,700.00

1.050 m2 90,000.00
0.100 sak 73,100.00
0.029 m3 242,600.00
0.030 sak 108,500.00

0.180 hari 123,700.00


0.120 hari 143,700.00
0.030 hari 158,700.00
0.006 hari 173,700.00

1.050 m2 110,000.00
0.100 sak 73,100.00
0.029 m3 242,600.00
0.030 sak 108,500.00
0.180 hari 123,700.00
0.120 hari 143,700.00
0.030 hari 158,700.00
0.006 hari 173,700.00

0.250 m2 110,000.00
0.100 sak 73,100.00
0.029 m3 242,600.00
0.030 sak 108,500.00

0.180 hari 123,700.00


0.120 hari 143,700.00
0.030 hari 158,700.00
0.006 hari 173,700.00

3.430 bh 3,600.00
0.100 sak 73,100.00
0.029 m3 242,600.00
0.030 sak 108,500.00

0.180 hari 123,700.00


0.120 hari 143,700.00
0.030 hari 158,700.00
0.006 hari 173,700.00

5.000 bh 25,000.00
0.033 sak 73,100.00
0.003 m3 242,600.00
0.003 sak 108,500.00
0.054 hari 123,700.00
0.036 hari 143,700.00
0.009 hari 158,700.00
0.001 hari 173,700.00

5.000 bh 8,800.00
0.033 sak 73,100.00
0.003 m3 242,600.00
0.003 sak 108,500.00

0.054 hari 123,700.00


0.036 hari 143,700.00
0.009 hari 158,700.00
0.001 hari 173,700.00

0.250 kg 120,000.00
0.160 kg 18,000.00
0.500 lb 5,000.00
0.020 bh 10,500.00
1.000 ls 1,000.00

0.030 hari 123,700.00


0.060 hari 143,700.00
0.015 hari 158,700.00
0.003 hari 173,700.00

0.250 kg 50,000.00
0.160 kg 18,000.00
0.500 lb 5,000.00
0.020 bh 10,500.00
1.000 ls 1,000.00
0.030 hari 123,700.00
0.060 hari 143,700.00
0.015 hari 158,700.00
0.003 hari 173,700.00

0.250 kg 120,000.00
0.160 kg 18,000.00
0.500 lb 5,000.00
0.020 bh 10,500.00
1.000 ls 1,000.00

0.030 hari 123,700.00


0.060 hari 143,700.00
0.015 hari 158,700.00
0.003 hari 173,700.00

0.250 kg 50,000.00
0.160 kg 18,000.00
0.500 lb 5,000.00
0.020 bh 10,500.00
1.000 ls 1,000.00

0.030 hari 123,700.00


0.060 hari 143,700.00
0.015 hari 158,700.00
0.003 hari 173,700.00

0.250 kg 34,500.00
0.083 kg 21,000.00
0.165 kg 50,000.00
0.500 lb 5,000.00
0.050 bh 6,000.00
0.150 ltr 9,000.00

0.060 hari 123,700.00


0.120 hari 143,700.00
0.030 hari 158,700.00
0.006 hari 173,700.00

7.120 m' 165,000.00


2.600 m' 120,000.00
1.890 m2 160,000.00
3.000 bh 12,000.00
1.000 bh 107,000.00
2.000 bh 18,000.00
0.360 m2 120,000.00
1.000 ls 5,000.00

0.850 hari 123,700.00


1.700 hari 143,700.00
0.424 hari 158,700.00
0.084 hari 173,700.00

10.620 m' 165,000.00


8.160 m' 120,000.00
1.890 m2 160,000.00
3.000 bh 12,000.00
1.000 bh 107,000.00
4.000 bh 18,000.00
1.308 m2 120,000.00
1.000 ls 5,000.00
0.850 hari 123,700.00
1.700 hari 143,700.00
0.424 hari 158,700.00
0.084 hari 173,700.00

8.880 m' 165,000.00


2.600 m' 120,000.00
1.890 m2 160,000.00
3.000 bh 12,000.00
1.000 bh 107,000.00
2.000 bh 18,000.00
0.600 m2 120,000.00
1.000 ls 5,000.00

0.850 hari 123,700.00


1.700 hari 143,700.00
0.424 hari 158,700.00
0.084 hari 173,700.00

10.380 m' 165,000.00


6.240 m' 120,000.00
1.470 m2 160,000.00
3.000 bh 12,000.00
1.000 bh 107,000.00
2.000 bh 18,000.00
1.228 m2 120,000.00
1.000 ls 5,000.00

0.850 hari 123,700.00


1.700 hari 143,700.00
0.424 hari 158,700.00
0.084 hari 173,700.00
6.720 m' 165,000.00
2.520 m' 120,000.00
1.470 m2 160,000.00
3.000 bh 12,000.00
1.000 bh 107,000.00
2.000 bh 18,000.00
0.280 m2 120,000.00
1.000 ls 5,000.00

0.850 hari 123,700.00


1.700 hari 143,700.00
0.424 hari 158,700.00
0.084 hari 173,700.00

1.000 Unit 165,000.00


1.000 Unit 350,000.00
bh 12,000.00
bh 107,000.00
1.000 ls 5,000.00

0.425 hari 123,700.00


0.850 hari 143,700.00
0.212 hari 158,700.00
0.042 hari 173,700.00

7.320 m' 165,000.00


10.200 m' 120,000.00
3.000 bh 12,000.00
1.000 bh 107,000.00
2.000 bh 18,000.00
2.100 m2 210,000.00
0.400 m2 120,000.00
1.000 ls 5,000.00

0.850 hari 123,700.00


1.700 hari 143,700.00
0.424 hari 158,700.00
0.084 hari 173,700.00

5.360 m' 63,700.00


2.100 m2 1,762,704.17
3.000 bh 12,000.00
1.000 bh 120,000.00
1.000 ls 5,000.00

0.850 hari 123,700.00


1.700 hari 143,700.00
0.424 hari 158,700.00
0.084 hari 173,700.00

9.400 m' 165,000.00


19.000 m' 120,000.00
3.780 m2 160,000.00
6.000 bh 12,000.00
2.000 bh 107,000.00
4.000 bh 18,000.00
0.720 m2 120,000.00
1.000 ls 5,000.00

0.850 hari 123,700.00


1.700 hari 143,700.00
0.424 hari 158,700.00
0.084 hari 173,700.00
9.400 m' 165,000.00
19.720 m' 120,000.00
6.000 bh 12,000.00
2.000 bh 107,000.00
4.000 bh 18,000.00
4.680 m2 210,000.00
0.800 m2 120,000.00
1.000 ls 5,000.00

0.850 hari 123,700.00


1.700 hari 143,700.00
0.424 hari 158,700.00
0.084 hari 173,700.00

6.160 m' 63,700.00


3.780 m2 1,762,704.17
6.000 bh 12,000.00
2.000 bh 120,000.00
1.000 ls 5,000.00

0.850 hari 123,700.00


1.700 hari 143,700.00
0.424 hari 158,700.00
0.084 hari 173,700.00

7.120 m' 165,000.00


9.900 m' 120,000.00
1.890 m2 160,000.00
3.000 bh 12,000.00
1.000 bh 107,000.00
2.000 bh 18,000.00
0.360 m2 120,000.00
1.000 ls 5,000.00

0.850 hari 123,700.00


1.700 hari 143,700.00
0.424 hari 158,700.00
0.084 hari 173,700.00

5.260 m' 63,700.00


1.890 m2 1,762,704.17
3.000 bh 12,000.00
1.000 bh 120,000.00
1.000 ls 5,000.00

0.850 hari 123,700.00


1.700 hari 143,700.00
0.424 hari 158,700.00
0.084 hari 173,700.00

1.440 m2 263,500.00

3.360 m' 165,000.00


3.040 m' 120,000.00
4.880 m' 49,500.00
1.000 bh 107,000.00
2.000 bh 18,000.00
1.000 ls 5,000.00

0.850 hari 123,700.00


1.700 hari 143,700.00
0.424 hari 158,700.00
0.084 hari 173,700.00

6.720 m' 165,000.00


6.720 m' 120,000.00
2.000 bh 12,000.00
1.152 m2 120,000.00
1.000 ls 5,000.00

0.450 hari 123,700.00


0.900 hari 143,700.00
0.225 hari 158,700.00
0.045 hari 173,700.00

2.760 m' 165,000.00


- m' 120,000.00
0.336 m2 120,000.00
1.000 ls 5,000.00

0.225 hari 123,700.00


0.450 hari 143,700.00
0.113 hari 158,700.00
0.045 hari 173,700.00

1.050 m2 110,000.00
0.100 kg 24,000.00
1.000 ls 2,000.00

0.045 hari 123,700.00


0.090 hari 143,700.00
0.022 hari 158,700.00
0.004 hari 173,700.00

1.100 bh 60,500.00
0.050 kg 24,000.00
1.000 ls 2,000.00

0.022 hari 123,700.00


0.045 hari 143,700.00
0.011 hari 158,700.00
0.002 hari 173,700.00

0.350 lbr 41,800.00


1.000 m2 18,000.00
0.060 kg 20,000.00
0.500 kg 2,800.00
1.000 ls 500.00

0.170 hari 123,700.00


0.120 hari 143,700.00
0.024 hari 158,700.00
0.040 hari 173,700.00

1.050 m' 25,500.00


1.000 ls 500.00

0.015 hari 123,700.00


0.030 hari 143,700.00
0.007 hari 158,700.00
0.001 hari 173,700.00
0.150 m3 836,000.00
24.912 kg 9,200.00
0.360 kg 25,000.00
1.948 m2 28,358.96
1.540 m2 112,100.40
1.620 m2 112,100.40
1.000 ls 61,496.86

0.900 hari 123,700.00


1.800 hari 143,700.00
0.450 hari 158,700.00
0.090 hari 173,700.00

0.140 m3 836,000.00
21.468 kg 9,200.00
0.360 kg 25,000.00
1.799 m2 28,358.96
1.341 m2 112,100.40
1.620 m2 112,100.40
1.000 ls 58,166.90

0.900 hari 123,700.00


1.800 hari 143,700.00
0.450 hari 158,700.00
0.090 hari 173,700.00

0.153 m3 836,000.00
21.030 kg 9,200.00
0.360 kg 25,000.00
1.260 m2 28,358.96
1.305 m2 112,100.40
1.620 m2 112,100.40
1.000 ls 57,557.61
0.900 hari 123,700.00
1.800 hari 143,700.00
0.450 hari 158,700.00
0.090 hari 173,700.00

0.134 m3 836,000.00
18.485 kg 9,200.00
0.360 kg 25,000.00
1.088 m2 28,358.96
1.088 m2 112,100.40
1.620 m2 112,100.40
1.000 ls 54,139.41

0.900 hari 123,700.00


1.800 hari 143,700.00
0.450 hari 158,700.00
0.090 hari 173,700.00

0.159 m3 836,000.00
30.112 kg 9,200.00
0.360 kg 25,000.00
1.985 m2 28,358.96
1.341 m2 112,100.40
1.620 m2 112,100.40
1.000 ls 63,191.42

0.900 hari 123,700.00


1.800 hari 143,700.00
0.450 hari 158,700.00
0.090 hari 173,700.00
0.171 m3 836,000.00
37.273 kg 9,200.00
0.360 kg 25,000.00
2.258 m2 28,358.96
1.778 m2 112,100.40
1.620 m2 112,100.40
1.000 ls 69,839.23

0.900 hari 123,700.00


1.800 hari 143,700.00
0.450 hari 158,700.00
0.090 hari 173,700.00

1.000 bh 404,000.00
1.000 ls 5,000.00

0.213 hari 123,700.00


0.425 hari 143,700.00
0.425 hari 158,700.00
0.085 hari 173,700.00

1.000 bh 320,900.00
1.000 ls 2,500.00

0.043 hari 123,700.00


0.068 hari 143,700.00
0.021 hari 158,700.00
0.011 hari 173,700.00
1.000 bh 320,900.00
1.000 ls 2,500.00
1.000 ls 36,000.00

0.052 hari 123,700.00


0.082 hari 143,700.00
0.023 hari 158,700.00
0.013 hari 173,700.00

0.050 m3 242,600.00
0.400 sak 73,100.00
1.000 bh 306,000.00
1.000 ls 1,000.00

0.225 hari 123,700.00


0.225 hari 143,700.00
0.056 hari 158,700.00
0.011 hari 173,700.00

0.050 m3 242,600.00
0.400 sak 73,100.00
1.000 bh 2,850,000.00
1.000 ls 1,000.00

0.450 hari 123,700.00


0.225 hari 143,700.00
0.084 hari 158,700.00
0.012 hari 173,700.00

5.250 bh 2,400.00
0.594 m3 242,600.00
0.280 sak 73,100.00
5.000 ltr 100.00
1.000 ls 1,000.00

0.112 hari 123,700.00


0.112 hari 143,700.00
0.028 hari 158,700.00
0.005 hari 173,700.00

8.000 bh 2,400.00
3.150 m2 80,300.00
0.950 m3 242,600.00
0.948 sak 73,100.00
8.000 ltr 100.00
1.000 ls 1,000.00

0.179 hari 123,700.00


0.179 hari 143,700.00
0.045 hari 158,700.00
0.008 hari 173,700.00

0.050 m3 242,600.00
0.400 sak 73,100.00
1.000 bh 608,000.00
1.000 ls 1,000.00

0.225 hari 123,700.00


0.225 hari 143,700.00
0.056 hari 158,700.00
0.011 hari 173,700.00
0.009 m3 461,825.00
0.240 m2 14,136.60
1.000 ls 500.00

0.022 hari 123,700.00


0.045 hari 143,700.00
0.011 hari 158,700.00
0.002 hari 173,700.00

3.000 m 97,500.00
0.143 kg 49,500.00
0.071 kg 52,000.00
0.215 ltr 9,000.00
1.000 ls 4,000.00

0.500 hari 123,700.00


0.700 hari 143,700.00
0.337 hari 158,700.00
0.067 hari 173,700.00

5.500 m1 97,500.00
0.072 kg 49,500.00
0.036 kg 52,000.00
0.108 ltr 9,000.00
1.000 ls 4,000.00

0.200 hari 123,700.00


0.200 hari 143,700.00
0.011 hari 158,700.00
0.002 hari 173,700.00
1.500 kg 25,000.00
1.000 ls 500.00

0.018 hari 123,700.00


0.036 hari 123,700.00
0.009 hari 123,700.00
0.001 hari 173,700.00

1.500 kg 44,000.00
1.000 ls 500.00

0.018 hari 123,700.00


0.036 hari 123,700.00
0.009 hari 123,700.00
0.001 hari 173,700.00

1.050 lbr 66,000.00


1.000 ls 500.00

0.072 hari 123,700.00


0.144 hari 123,700.00
0.036 hari 123,700.00
0.004 hari 173,700.00

1.000 m2 110,000.00
1.000 ls 2,500.00
0.080 hari 123,700.00
0.200 hari 123,700.00
0.016 hari 123,700.00
0.003 hari 173,700.00

1.000 bh 24,000.00
0.010 zak 73,100.00
- ls 500.00

0.008 hari 123,700.00


0.020 hari 123,700.00
0.002 hari 123,700.00
0.000 hari 173,700.00

0.115 lbr 96,000.00


0.100 kg 58,500.00
1.000 ls 500.00

0.080 hari 123,700.00


0.100 hari 123,700.00
0.002 hari 123,700.00
0.000 hari 173,700.00

2.420 m 165,000.00
9.900 m 13,500.00
1.000 ls 25,000.00

0.300 hari 123,700.00


0.500 hari 143,700.00
0.337 hari 158,700.00
0.067 hari 173,700.00

25.000 m 13,500.00
1.000 ls 25,000.00

0.300 hari 123,700.00


0.500 hari 143,700.00
0.337 hari 158,700.00
0.067 hari 173,700.00

1.150 kg 12,700.00
0.050 ls 25,000.00

0.060 hari 123,700.00


0.060 hari 143,700.00
- hari 158,700.00
- hari 173,700.00
KEUNTUNGAN
PEMBORONG
TOTAL HARGA
JUMLAH HARGA 10%

( Rp ) ( Rp ) ( Rp )
KOEF.
164,700.00

79,200.00 7,920.00 87,120.00


79,200.00

70,535.00 7,053.50 77,588.50


61,850.00
8,685.00

270,700.00

207,240.00 20,724.00 227,964.00


207,240.00

38,847.00 3,884.70 42,731.70


37,110.00
1,737.00

89,900.00

59,104.10 5,910.41 65,014.51


33,600.00
8,976.20
15,277.90
1,000.00
250.00

22,656.60 2,265.66 24,922.26


11,133.00
8,622.00
2,380.50
521.10

190,600.00

67,754.10 6,775.41 74,529.51


33,600.00
14,556.00
18,348.10
1,000.00
250.00

82,861.52 8,286.15 91,147.67


15,462.81
67,398.71

22,656.60 2,265.66 24,922.26


11,133.00
8,622.00
2,380.50
521.10

833,000.00

734,930.30 73,493.03 808,123.33


215,641.00
278,767.70
196,521.60
44,000.00

22,656.60 2,265.66 24,922.26


11,133.00
8,622.00
2,380.50
521.10

102,000.00

59,323.40 5,932.34 65,255.74


33,600.00
8,976.20
15,497.20
1,000.00
250.00

33,435.40 3,343.54 36,778.94


12,370.00
14,370.00
6,348.00
347.40

261,400.00

181,179.10 18,117.91 199,297.01


144,000.00
2,668.60
33,260.50
1,000.00
250.00

56,475.30 5,647.53 62,122.83


27,832.50
21,555.00
5,871.90
1,215.90

148,800.00

107,239.20 10,723.92 117,963.12


72,000.00
6,065.00
27,924.20
1,000.00
250.00

28,009.60 2,800.96 30,810.56


13,854.40
10,777.50
2,856.60
521.10

188,200.00
116,305.40 11,630.54 127,935.94
85,000.00
15,750.00
15,555.40

54,804.00 5,480.40 60,284.40


37,110.00
14,370.00
1,587.00
1,737.00

222,400.00

147,416.20 14,741.62 162,157.82


85,000.00
15,750.00
46,666.20

54,804.00 5,480.40 60,284.40


37,110.00
14,370.00
1,587.00
1,737.00

833,000.00

734,930.30 73,493.03 808,123.33


215,641.00
278,767.70
196,521.60
44,000.00

22,656.60 2,265.66 24,922.26


11,133.00
8,622.00
2,380.50
521.10

263,500.00

183,892.66 18,389.26 202,281.92


162,000.00
13,401.66
8,491.00

55,672.50 5,567.25 61,239.75


37,110.00
14,370.00
1,587.00
2,605.50
72,000.00

14,136.60 1,413.66 15,550.26


6,307.60
7,579.00
250.00

51,281.00 5,128.10 56,409.10


24,740.00
21,555.00
2,380.50
2,605.50

75,300.00

17,198.31 1,719.83 18,918.14


5,579.80
11,368.51
250.00

51,281.00 5,128.10 56,409.10


24,740.00
21,555.00
2,380.50
2,605.50

4,120,200.00

3,613,803.31 361,380.33 3,975,183.64


773,850.00
1,785,000.00
1,054,953.31

131,838.00 13,183.80 145,021.80


74,220.00
43,110.00
11,902.50
2,605.50

4,006,800.00

3,613,803.31 361,380.33 3,975,183.64


773,850.00
1,785,000.00
1,054,953.31

28,787.38 2,878.73 31,666.11


17,045.86
8,966.88
2,253.54
521.10

1,238,100.00

668,549.29 66,854.92 735,404.21


105,016.23
322,836.13
9,000.00
84,881.20
146,815.73

457,038.00 45,703.80 502,741.80


111,330.00
258,660.00
71,415.00
15,633.00

805,400.00

275,101.50 27,510.15 302,611.65


33,933.24
115,913.06
9,000.00
20,758.75
95,496.45

457,038.00 45,703.80 502,741.80


111,330.00
258,660.00
71,415.00
15,633.00

49,100.00

14,206.25 1,420.62 15,626.87


13,706.25
500.00

30,469.20 3,046.92 33,516.12


7,422.00
17,244.00
4,761.00
1,042.20

23,600.00

6,048.00 604.80 6,652.80


5,848.00
200.00

15,409.60 1,540.96 16,950.56


2,721.40
9,627.90
2,539.20
521.10

23,700.00

6,098.00 609.80 6,707.80


5,848.00
250.00

15,409.60 1,540.96 16,950.56


2,721.40
9,627.90
2,539.20
521.10

119,300.00
99,461.20 9,946.12 109,407.32
46,579.20
52,632.00
250.00

9,001.80 900.18 9,901.98


2,226.60
5,173.20
1,428.30
173.70

52,200.00

5,001.50 500.15 5,501.65


4,751.50
250.00

42,434.00 4,243.40 46,677.40


24,740.00
14,370.00
1,587.00
1,737.00
123,200.00

78,200.80 7,820.08 86,020.88


52,500.00
11,988.40
10,674.40
3,038.00

33,818.70 3,381.87 37,200.57


16,699.50
12,933.00
3,491.40
694.80

165,500.00

116,599.30 11,659.93 128,259.23


90,898.50
11,988.40
10,674.40
3,038.00

33,818.70 3,381.87 37,200.57


16,699.50
12,933.00
3,491.40
694.80

158,200.00

110,015.80 11,001.58 121,017.38


84,315.00
11,988.40
10,674.40
3,038.00

33,818.70 3,381.87 37,200.57


16,699.50
12,933.00
3,491.40
694.80

173,200.00
112,100.40 11,210.04 123,310.44
94,500.00
7,310.00
7,035.40
3,255.00

45,313.20 4,531.32 49,844.52


22,266.00
17,244.00
4,761.00
1,042.20

196,300.00
133,100.40 13,310.04 146,410.44
115,500.00
7,310.00
7,035.40
3,255.00
45,313.20 4,531.32 49,844.52
22,266.00
17,244.00
4,761.00
1,042.20

99,500.00
45,100.40 4,510.04 49,610.44
27,500.00
7,310.00
7,035.40
3,255.00

45,313.20 4,531.32 49,844.52


22,266.00
17,244.00
4,761.00
1,042.20

82,800.00
29,948.40 2,994.84 32,943.24
12,348.00
7,310.00
7,035.40
3,255.00

45,313.20 4,531.32 49,844.52


22,266.00
17,244.00
4,761.00
1,042.20

156,100.00

128,465.60 12,846.56 141,312.16


125,000.00
2,412.30
727.80
325.50

13,455.00 1,345.50 14,800.50


6,679.80
5,173.20
1,428.30
173.70

67,000.00

47,465.60 4,746.56 52,212.16


44,000.00
2,412.30
727.80
325.50

13,455.00 1,345.50 14,800.50


6,679.80
5,173.20
1,428.30
173.70

57,000.00

36,590.00 3,659.00 40,249.00


30,000.00
2,880.00
2,500.00
210.00
1,000.00

15,234.60 1,523.46 16,758.06


3,711.00
8,622.00
2,380.50
521.10

37,800.00

19,090.00 1,909.00 20,999.00


12,500.00
2,880.00
2,500.00
210.00
1,000.00
15,234.60 1,523.46 16,758.06
3,711.00
8,622.00
2,380.50
521.10

57,000.00

36,590.00 3,659.00 40,249.00


30,000.00
2,880.00
2,500.00
210.00
1,000.00

15,234.60 1,523.46 16,758.06


3,711.00
8,622.00
2,380.50
521.10

37,800.00

19,090.00 1,909.00 20,999.00


12,500.00
2,880.00
2,500.00
210.00
1,000.00

15,234.60 1,523.46 16,758.06


3,711.00
8,622.00
2,380.50
521.10

58,600.00

22,768.00 2,276.80 25,044.80


8,625.00
1,743.00
8,250.00
2,500.00
300.00
1,350.00

30,469.20 3,046.92 33,516.12


7,422.00
17,244.00
4,761.00
1,042.20

2,692,500.00

2,016,400.00 201,640.00 2,218,040.00


1,174,800.00
312,000.00
302,400.00
36,000.00
107,000.00
36,000.00
43,200.00
5,000.00

431,314.60 43,131.46 474,446.06


105,145.00
244,290.00
67,288.80
14,590.80

4,226,400.00

3,410,860.00 341,086.00 3,751,946.00


1,752,300.00
979,200.00
302,400.00
36,000.00
107,000.00
72,000.00
156,960.00
5,000.00

431,314.60 43,131.46 474,446.06


105,145.00
244,290.00
67,288.80
14,590.80

3,043,600.00

2,335,600.00 233,560.00 2,569,160.00


1,465,200.00
312,000.00
302,400.00
36,000.00
107,000.00
36,000.00
72,000.00
5,000.00

431,314.60 43,131.46 474,446.06


105,145.00
244,290.00
67,288.80
14,590.80

3,805,300.00

3,028,060.00 302,806.00 3,330,866.00


1,712,700.00
748,800.00
235,200.00
36,000.00
107,000.00
36,000.00
147,360.00
5,000.00

431,314.60 43,131.46 474,446.06


105,145.00
244,290.00
67,288.80
14,590.80

2,524,800.00
1,864,000.00 186,400.00 2,050,400.00
1,108,800.00
302,400.00
235,200.00
36,000.00
107,000.00
36,000.00
33,600.00
5,000.00

431,314.60 43,131.46 474,446.06


105,145.00
244,290.00
67,288.80
14,590.80

809,200.00

520,000.00 52,000.00 572,000.00


165,000.00
350,000.00
-
-
5,000.00

215,657.30 21,565.73 237,223.03


52,572.50
122,145.00
33,644.40
7,295.40

3,889,700.00

3,104,800.00 310,480.00 3,415,280.00


1,207,800.00
1,224,000.00
36,000.00
107,000.00
36,000.00
441,000.00
48,000.00
5,000.00

431,314.60 43,131.46 474,446.06


105,145.00
244,290.00
67,288.80
14,590.80

5,099,000.00

4,204,110.76 420,411.07 4,624,521.83


341,432.00
3,701,678.76
36,000.00
120,000.00
5,000.00

431,314.60 43,131.46 474,446.06


105,145.00
244,290.00
67,288.80
14,590.80

5,848,200.00

4,885,200.00 488,520.00 5,373,720.00


1,551,000.00
2,280,000.00
604,800.00
72,000.00
214,000.00
72,000.00
86,400.00
5,000.00

431,314.60 43,131.46 474,446.06


105,145.00
244,290.00
67,288.80
14,590.80

6,369,600.00
5,359,200.00 535,920.00 5,895,120.00
1,551,000.00
2,366,400.00
72,000.00
214,000.00
72,000.00
982,800.00
96,000.00
5,000.00

431,314.60 43,131.46 474,446.06


105,145.00
244,290.00
67,288.80
14,590.80

8,584,100.00

7,372,413.77 737,241.37 8,109,655.14


392,392.00
6,663,021.77
72,000.00
240,000.00
5,000.00

431,314.60 43,131.46 474,446.06


105,145.00
244,290.00
67,288.80
14,590.80

3,656,100.00

2,892,400.00 289,240.00 3,181,640.00


1,174,800.00
1,188,000.00
302,400.00
36,000.00
107,000.00
36,000.00
43,200.00
5,000.00

431,314.60 43,131.46 474,446.06


105,145.00
244,290.00
67,288.80
14,590.80

4,684,800.00

3,827,572.88 382,757.28 4,210,330.16


335,062.00
3,331,510.88
36,000.00
120,000.00
5,000.00

431,314.60 43,131.46 474,446.06


105,145.00
244,290.00
67,288.80
14,590.80

379,400.00

379,440.00 379,440.00
379,440.00

1,914,100.00

1,308,760.00 130,876.00 1,439,636.00


554,400.00
364,800.00
241,560.00
107,000.00
36,000.00
5,000.00

431,314.60 43,131.46 474,446.06


105,145.00
244,290.00
67,288.80
14,590.80

2,542,100.00

2,082,440.00 208,244.00 2,290,684.00


1,108,800.00
806,400.00
24,000.00
138,240.00
5,000.00

228,519.00 22,851.90 251,370.90


55,665.00
129,330.00
35,707.50
7,816.50

680,800.00

500,720.00 50,072.00 550,792.00


455,400.00
-
40,320.00
5,000.00

118,167.75 11,816.77 129,984.52


27,832.50
64,665.00
17,853.75
7,816.50

156,800.00

119,900.00 11,990.00 131,890.00


115,500.00
2,400.00
2,000.00

22,685.70 2,268.57 24,954.27


5,566.50
12,933.00
3,491.40
694.80

89,100.00

69,750.00 6,975.00 76,725.00


66,550.00
1,200.00
2,000.00

11,281.00 1,128.10 12,409.10


2,721.40
6,466.50
1,745.70
347.40

93,200.00

35,730.00 3,573.00 39,303.00


14,630.00
18,000.00
1,200.00
1,400.00
500.00

49,029.80 4,902.98 53,932.78


21,029.00
17,244.00
3,808.80
6,948.00

38,200.00

27,275.00 2,727.50 30,002.50


26,775.00
500.00

7,451.10 745.11 8,196.21


1,855.50
4,311.00
1,110.90
173.70
1,420,600.00

834,395.95 83,439.59 917,835.54


125,243.25
229,189.53
9,000.00
55,229.07
172,634.61
181,602.64
61,496.85

457,038.00 45,703.80 502,741.80


111,330.00
258,660.00
71,415.00
15,633.00

1,343,700.00

764,466.90 76,446.69 840,913.59


116,831.00
197,501.03
9,000.00
51,010.67
150,354.66
181,602.64
58,166.90

457,038.00 45,703.80 502,741.80


111,330.00
258,660.00
71,415.00
15,633.00

1,329,600.00

751,671.71 75,167.17 826,838.88


128,012.50
193,475.67
9,000.00
35,732.28
146,291.02
181,602.64
57,557.60
457,038.00 45,703.80 502,741.80
111,330.00
258,660.00
71,415.00
15,633.00

1,250,600.00

679,889.61 67,988.96 747,878.57


112,337.50
170,060.52
9,000.00
30,840.36
121,909.18
181,602.64
54,139.41

457,038.00 45,703.80 502,741.80


111,330.00
258,660.00
71,415.00
15,633.00

1,459,700.00

869,981.73 86,998.17 956,979.90


132,506.00
277,034.49
9,000.00
56,292.53
150,354.66
181,602.64
63,191.41

457,038.00 45,703.80 502,741.80


111,330.00
258,660.00
71,415.00
15,633.00

1,613,300.00
1,009,585.78 100,958.57 1,110,544.35
142,956.00
342,909.11
9,000.00
64,020.35
199,258.46
181,602.64
69,839.22

457,038.00 45,703.80 502,741.80


111,330.00
258,660.00
71,415.00
15,633.00

636,400.00

409,000.00 40,900.00 449,900.00


404,000.00
5,000.00

169,570.75 16,957.07 186,527.82


26,286.25
61,072.50
67,447.50
14,764.50

378,000.00

323,400.00 32,340.00 355,740.00


320,900.00
2,500.00

20,246.78 2,024.67 22,271.45


5,257.25
9,771.60
3,372.37
1,845.56

421,900.00

359,400.00 35,940.00 395,340.00


320,900.00
2,500.00
36,000.00
24,124.00 2,412.40 26,536.40
6,432.40
11,783.40
3,650.10
2,258.10

461,300.00

348,370.00 34,837.00 383,207.00


12,130.00
29,240.00
306,000.00
1,000.00

70,962.90 7,096.29 78,059.19


27,832.50
32,332.50
8,887.20
1,910.70

3,295,400.00

2,892,370.00 289,237.00 3,181,607.00


12,130.00
29,240.00
2,850,000.00
1,000.00

103,430.07 10,343.00 113,773.07


55,665.00
32,332.50
13,330.80
2,101.77

235,300.00

178,672.40 17,867.24 196,539.64


12,600.00
144,104.40
20,468.00
500.00
1,000.00

35,260.90 3,526.09 38,786.99


13,854.40
16,094.40
4,443.60
868.50

693,300.00

573,810.84 57,381.08 631,191.92


19,200.00
252,945.00
230,567.04
69,298.80
800.00
1,000.00

56,417.44 5,641.74 62,059.18


22,167.04
25,751.04
7,109.76
1,389.60

793,500.00

650,370.00 65,037.00 715,407.00


12,130.00
29,240.00
608,000.00
1,000.00

70,962.90 7,096.29 78,059.19


27,832.50
32,332.50
8,887.20
1,910.70

21,300.00
8,049.20 804.92 8,854.12
4,156.42
3,392.78
500.00

11,281.00 1,128.10 12,409.10


2,721.40
6,466.50
1,745.70
347.40

590,400.00

309,205.50 30,920.55 340,126.05


292,500.00
7,078.50
3,692.00
1,935.00
4,000.00

227,559.80 22,755.98 250,315.78


61,850.00
100,590.00
53,481.90
11,637.90

662,400.00

546,602.75 54,660.27 601,263.02


536,250.00
3,539.25
1,846.00
967.50
4,000.00

55,573.10 5,557.31 61,130.41


24,740.00
28,740.00
1,745.70
347.40
50,600.00

38,000.00 3,800.00 41,800.00


37,500.00
500.00

7,966.80 796.68 8,763.48


2,226.60
4,453.20
1,113.30
173.70

81,900.00

66,500.00 6,650.00 73,150.00


66,000.00
500.00

7,966.80 796.68 8,763.48


2,226.60
4,453.20
1,113.30
173.70

111,800.00

69,800.00 6,980.00 76,780.00


69,300.00
500.00

31,867.20 3,186.72 35,053.92


8,906.40
17,812.80
4,453.20
694.80

149,600.00

112,500.00 - 112,500.00
110,000.00
2,500.00
37,136.30 - 37,136.30
9,896.00
24,740.00
1,979.20
521.10

30,500.00

24,000.00 2,400.00 26,400.00


24,000.00
731.00
-

3,713.63 371.36 4,084.99


989.60
2,474.00
197.92
52.11

43,900.00

17,350.00 1,735.00 19,085.00


11,000.00
5,850.00
500.00

22,516.03 2,251.60 24,767.63


9,896.00
12,370.00
197.92
52.11

805,200.00

557,950.00 55,795.00 613,745.00


399,300.00
133,650.00
25,000.00

174,079.80 17,407.98 191,487.78


37,110.00
71,850.00
53,481.90
11,637.90

590,200.00

362,500.00 36,250.00 398,750.00


337,500.00
25,000.00

174,079.80 17,407.98 191,487.78


37,110.00
71,850.00
53,481.90
11,637.90

35,100.00

15,855.00 1,585.50 17,440.50


14,605.00
1,250.00

16,044.00 1,604.40 17,648.40


7,422.00
8,622.00
-
-
Pekerjaan :
Lokasi :
Tahun Anggaran :

No. URAIAN PEKERJAAN

A PEKERJAAN PERSIAPAN

B Pekerjaan Perluasan Kolam


B.1 Pekerjaan galian pasir dan pemindahan

B.2 Pekerjaan revetment


B.2.1 Revetment type-1&2 panjang 246 m
B.2.2 Revetment type-3&4 panjang 229,5 m
B.2.3 Revetment type-3 panjang 120 m

C. Pekerjaan Perkerasan jalan


C.1 Beton rigid jalan
C.2 Perkerasan berbutir
C.3 Dinding penahan area landing fish
C.4 Pekerjaan Rip Penahan Sedimen panjang 16 m

D. Pekerjaan Sign Post


D.1 Balk Beton 20x20 cm
D.2 LPJU Solar Cell

Jumlah Bobot Rencana (%)


Komulatif Bobot Rencana (%)
JADWAL PELAKS
Pengembangan Fasilitas Pelabuhan Perikanan Cikidang
Pelabuhan Perikanan Cikidang, Desa Babakan Pangandaran
2019

BOBOT % BULAN 1 BULAN 2


M1 M2 M3 M4 M5 M6

13.361 0.636 0.636 0.636 0.636 0.636 0.636

33.795 2.816 2.816 2.816 2.816

17.016 1.418 1.418


15.248
8.430

8.726 0.727 0.727 0.727 0.727


1.718 0.143 0.143
0.204
0.203

0.565
0.735

100.00 0.636 0.636 4.180 4.180 5.741 5.741


0 0.636 1.272 5.452 9.632 15.372 21.113
ADWAL PELAKSANAAN
ng
ndaran

BULAN 2 BULAN 3 BULA


M7 M8 M9 M10 M11 M12 M13

0.636 0.636 0.636 0.636 0.636 0.636 0.636

2.816 2.816 2.816 2.816 2.816 2.816 2.816

1.418 1.418 1.418 1.418 1.418 1.418 1.418


1.271 1.271 1.271 1.271 1.271 1.271 1.271
0.703 0.703 0.703 0.703 0.703

0.727 0.727 0.727 0.727 0.727 0.727 0.727


0.143 0.143 0.143 0.143 0.143 0.143 0.143
0.017 0.017 0.017 0.017 0.017 0.017 0.017
0.017 0.017 0.017 0.017 0.017

0.071

7.028 7.028 7.748 7.748 7.748 7.748 7.818


28.142 35.170 42.918 50.666 58.414 66.162 73.980
BULAN 4 BULAN 5
M14 M15 M16 M17 M18 M19 M20

0.636 0.636 0.636 0.636 0.636 0.636 0.636

2.816

1.418 1.418 1.418


1.271 1.271 1.271 1.271 1.271
0.703 0.703 0.703 0.703 0.703 0.703 0.703

0.727
0.143 0.143 0.143
0.017 0.017 0.017 0.017 0.017
0.017 0.017 0.017 0.017 0.017 0.017 0.017

0.071 0.071 0.071 0.071 0.071 0.071 0.071


0.092 0.092 0.092 0.092 0.092 0.092 0.092

7.910 4.367 4.367 2.806 2.806 1.518 1.518


81.890 86.257 90.624 93.430 96.236 97.754 99.272

Bandung, ...... 2019


PT. ..........................
-
-
-
-
...............................
Direktur
BULAN 5
M21 KETERAGAN

0.636 100%

50%

0.092 0%

0.728
100.000

Bandung, ...... 2019