NAME OF WORK:-DESIGN OF VERTICAL FALL AT R.D.

35895 mts of LMC od Gararda project

Parental data of canal

U/S of Fall D/S of fall


Sno. Perticular
m.k.s.
1 Ground Level NSL 265.83 265.83 mts
2 Discharge Q 0.3619 0.3619 cumec
3 Bed Width B 0.40 0.40 mts
4 Full Supply depth D 0.61 0.61 mts
5 Free Board FB 0.30 0.30 mts
6 Water side slope N 1.50 1.50
7 Bed slope s= 1 in 3000 3000
8 Canal Bed Level 265.650 264.150 mts
9 Full Supply Level 266.260 264.760 mts
10 Top Bank Level 266.560 265.060 mts
11 Top width of canal 3.13 3.13 mts
12 Top width of bank 2.5 2.5 mts
13 Height of Fall 1.50 mts
Foundation strata clasification
item %
A. E/w in hard soil mixed with kanker boulder 25
B. E/w in D/R rock 25
C Hard rock not required blasting 25
D. E/w in phylites &other rock requiring nominal blasting 25
C od Gararda project
NAME OF WORK:-DESIGN OF VERTICAL FALL AT R.D. 35895 mts of LMC od Gararda project

Parental data of canal


U/S of Fall D/S of fall
Sno.Perticular
m.k.s.
1 Ground Level 265.83 265.83 mts
2 Discharge q= 0.3619 0.3619 cumec
3 Bed Width "B" 0.40 0.40 mts
4 Full Supply depth"D" 0.61 0.61 mts
5 Free Board Fb= 0.30 0.30 mts
6 Water side slope n= 1.50 1.50
7 Bed slope s= 1 3000 3000
8 Canal Bed Level 265.650 264.150 mts
9 Full Supply Level 266.260 264.760 mts
10 Top Bank Level 266.560 265.060 mts
11 Top width of canal 3.13 3.13 mts
12 Top width of bank 2.5 2.5 mts
13 Height of Fall 1.50 mts
CHEKING SECTION FOR REQUIRED DISCHARGE
13 Area of x section a= 0.8022 0.8022 sqm
14 P=2((n^2+1)^0.5*d)+b 2.60 2.60 mts
15 R=a/p 0.3086 0.3086 mts
16 R2/3 0.4567 0.4567 mts
17 N= 0.018 0.018
18 Valocity=(R2/3/N/bs^0.5) 0.463 0.463 mts/sec.
19 Q=a x v 0.3715 0.3715 cumec
Discharge pasess is more than hence O.K.

DESIGN :-
1 HYDRAULIC DESIGN:-
(I) Length of crest:- Keep Lentgh of creast equal to bed width of canal (0.50m minimum)
Length of creast = "L"= 0.50 M

(II) Creast level :- A rectangular section is provided for less than 14 cumec
Q=1.84*L*H^3/2(H/Bt)^1/6 or H=((Q*Bt^0.6667)/(1.84*L))^0.6
Assuming top width of creast Bt = 0.65 M input manually
H =( 0.3619 x 0.65 ^ 0.16667 /( 1.84 x 0.50 ))^ 0.60
HEAD OVER THE CREAST H = 0.547 mts
Valocity of approach "Va" = Q/area
Va = 0.3619 / 0.50 x 0.547 = 1.32 M/sec
Valocity of head Vh = Va^2/2g
Vh = 1.32 ^2/ 2 x 9.81 = 0.09 Mts
U/S T.E.L. = u/s FSL+ValHead
= 266.260 + 0.09 = 266.349 m
R.L.of creast = U/s T.E.L.- H
R.L.of creast = 266.349 - 0.547 = 265.802 > d/s cbl 264.760
R.L. Of Creast > D/S F.S.L. 265.80 > 264.760
Height of crest above U/S bed level = Creast level-U/S cbl-
= 265.802 - 265.650
= 0.152 m
2 SHAPE OIF CREAST :-
Adopt creast width at top as Bt=0.55(H2)^0.5
Where H2 =Heigth of the creast above D/s bed level = RL of creast -D/S C.B.L
H2 = 265.80 - 264.150
= 1.65 m
pk_nandwana@yahoo.co.in
(A) width of creast = 0.55*H2^0.5
= 0.55 x 1.65 ^ 0.5
= 0.71 m Keep 0.65 m
(B) Thickness of base of creast wall
= (H+H2)/Ge (where Ge=Density of concrete =2.24
=( 0.547 + 1.65 )/ 2.24
= 0.98 m
But Base thickness minimum = D/2 where D= height of creast above the d/s bed level
Base width = 1.65 /2
= 0.83 m.
However from structural strength considration the base width required = 1.0 M
Provided Base Width = 1.0 M
3 CISTERN:-
Depth of cistern = x =1/4(H*HL)^0.6667 H= Head over creast HL=Height of Fall
= 0.25 x( 0.547 x 1.50 )^ 0.667
= 0.219 m
But in the Vasrshnay depth of cistrern =dc/3 where dc=(q^2/g)^1/3
q=discharge /length of creast = 0.3619 / 0.50
= 0.7238
dc =( 0.7238 ^ 2 / 9.81 )^ 0.3334
= 0.38 m
Provided Cistern depth = 0.30 m
RL of Cistern =d/s cbl -X = 264.15 - 0.30
= 263.85 m
(B) Length of cistern :-
= 5*(H*HL)^0.5 mts
= 5 x( 0.55 x 1.50 )^ 0.50
= 4.53 m provided cistern length = 4.00 m
4 Approaches:-
Up stream side wing wall:-
u/s wing wall shall be splayed srraight at an angle of 45 from the edge of the
creast and shall be embeded by 1.0 mts in to the berm beyond freeboard line
Down strem side walI:-
D/S side wall are kept straigth and parallel upto the end of floor and joined with returnwall at 90

5 Upstream curtain wall:-


Depth= water depth of u/s /3 +0.6
= 0.61 / 3.00 + 0.60
= 0.80 m
However provided a curtain wall of 1.0 mts deep and 0.4 mts wide where D/R & H/R are
met.other wise provided the depth of curtain wall as calculated above where soil met.
provided depth = 1.00 mts

6 Down stream curtain wall:-


The curain wall at the d/s end of imprevious floor should be depth =depth of water /2+ 0.6
= 0.61 / 2 + 0.6
= 0.91 m
However provided a curtain wall of 1.2 mts deep and 0.4 mts wide where D/R & H/R are
met.other wise provided the depth of curtain wall as calculated above where soil met.
provided = 1.20 mts
8 Upstream floor
(A) Thickness:-
Upstream of weir the imperviious floor may be of thickness 0.3mts (nominal) as
depth of water it self will counter balance the uplift pressure
provided thickness = 0.30 mts

pk_nandwana@yahoo.co.in
(B) length :- = 1.5*u/s FSD
= 1.5 x 0.61
= 0.915 m provided length = 0.92 m
The following diagram of diamention and level pertaining to calculation
Lanes weighted creep theory is applied to calculated the uplift pressure in various point.
u/s T.E.L=. 266.35
u/s F.S.L.= 266.26
Creast level = 265.80 HL 1.50
u/s CBL= 265.65 d/s T.E.L=. 264.85
u/s floor = 0.30m d/s F.S.L.=. 264.76
u/s curtain wall 1.00
264.65 H2= 1.95 D/s CBL= 264.15
B Cistern Level = 263.85
R.L.= 263.30 1.20
1.00 4.00 R.L.= 262.95

0
Head of water causing uplift = creast level-D/s CBL
= 265.80 - 264.150
= 1.65 m
Weighted creep length Lw= 1/3 N+V
Where N= sum of all Horizontal contacts+sloping contacts less than 45
V= Sum of all vertical contacts+sloping contacts grater than 45
N = 0.000 + 1.30 + 4.00 + 0.4
5.700
V= 3.310 + 1.20
V= 4.51
Weighted creep length Lw = 1/3 N+V = m
= 0.3334 x 5.700 + 4.51
= 6.41
Creep length upto point B
Nb= 0.00 Vb= 2.35 LWb = 2.35
Uplift at point B = Head causing uplift (1-creep length upto point B/total creep length )
= H(1-Lwb/lw)
= 1.65 x( 1 - 2.35 / 6.41 )
= 1.05 m
thickness at B = uplift pressure at B/(2.24-1)
= 1.05 /( 2.24 - 1 )
= 0.84 m

Creep length upto point C


Nc = 1.00 Vc = 2.35 LWc = 2.68
However up to the toe of the body of weir uplift will not be a problem, as weight of water counter act
Uplift =
Uplift at point B = Head causing uplift (1-creep length upto point B/total creep length )
= H(1-Lwb/lw)
= 1.65 x( 1 - 2.68 / 6.41 )
= 0.96 m
thickness at B = uplift pressure at B/(2.24-1)
= 0.96 /( 2.24 - 1 )
= 0.77 m
However uniform thickness of 0.55 M maintained from the weir to end of the cistern
pk_nandwana@yahoo.co.in
1.00 1.37 1.00 T.B.L. 266.56

u/s bed level


creast level

TBL
R.L.
R.L.

u/s FSL
FB 0.30 F.S.L. 266.26
FSD 0.61 1.50 :1

266.56

NAME OF WORK:-DESIGN OF VERTICAL FALL AT R.D.


263.55
263.85
C.B.L. 265.65
0.40 2.37

0.30
A u/s x-section of canal
60

1.
** **

265.80
6
1.

265.65

266.26
** **

3 0
2.37 0.40 **** **

0.30
3.

2.37
**

1.00
0
6
A 0.15 **** ** **

1.
******* **

1.00

1.00
****** **
0.65

0.65

0.65
****** **

3.00

0.50

1.95

5.05
B B
0.50 ******

4.00

2.00
5.55
******
**

263.30

263.85
**
**

R.L.
******
2.00

262.65 ******

2.00
C C ******

###
******

265.06
264.15

264.76 D/S FSL


******** ***
0.4

0.4
***************

mts of LMC od Gararda project


Coping 75mm (1:1.5:3)
0.73

D/S TBL
0.55
0.65

0.30
D/S BL

FSL 264.76 FB 0.20


1.20

FSD 0.61
CBL 264.15 0.40
0.30

D/s x-section of canal

0.8032269148
Coping 75mm (1:1.5:3) 0.5 1.63 TBL 266.56 ** 0.15

0.7807730852
** *** ***** **
x-section at A-A

1.95

0.50
0.76
Creast level 265.80 0.955
1.60
1.30

R.R. stone masonry 1:5 0.6 :1


0.76

1.95 **
R.R. stone masonry 1:5
0.4 :1

0.50 **
Creast level

C.C.(1:3:6)
R:L
R'L
0.15

TBL

2.20 2.20 R.L. 263.85


0.30 *.*.*.*.* 2.30 *.*.*.* ****** *.*.*.*.* 2.30 *.*.*.* R.L. 263.55
263.55
263.85

266.56

C.C.(1:1.5:3) * 0.60 R.L. 263.30


265.80 2

5.20
X-SECTION AT B B
sn.

Cpping 75mm (1:1.5:3) 0.5 0.726


7
6
5 Discharge 0.3619
4
3

TBL 265.06
C.B.L.
N.S.L.
T.B.L.
F.S.L.
FALL

Parental data of canal


Creast level

R.R. stone masonry 1:5


0.50 1.21 0.6 :1
265.83
266.56
266.26
265.65
1.500

u/s
0.15

C.CC.C.(1:3:6) 1.20 1.20 R.L. 263.85


0.30 *.*. 1.30 *.*. 0.60 * * * * 1.30 .*.* R.L. 263.55
265.83
mts
265.80

0.3619
265.06
264.76
264.15

d/s

C.C.(1:1.5:3) **** * R.L. 263.30


3.20
X-SECTION AT C C
Detail

NAME OF WORK:-DESIGN OF VERTICAL FALL AT R.D. 35895 mts of LMC od Gararda project

SNO. ITEM Detail Qty


1 Earth work in excavation including loading
unloading disposal and dressing of excavated
earth within intial lead of 50m and lift upto 1.5m
in dry or moist including dressing of excavted
area with cost of dewatering
D/S cistern 1 x 5.55
x 0.60 x 2.53 = 8.425
D/S curtain wall 1 x 0.65
x 0.40 x 0.65 = 0.169
U/S impervious floor 1 x 2.37
x 0.40 x 0.30 = 0.284
U/S curtain wall 1 x 0.50
x 0.40 x( 1.00 - 0.30 ) = 0.14
Wing wall A-A 2 x( 3.30
+ 1.60 )x 1.60 x 2.28
= 17.88
2
Side wall B-B 2 x( 2.00 + 0.65 )x 2.30 x 2.28 = 27.79
2 x( 2.00 + 0.40 )x 1.30 x 2.28 = 14.23
Total = 68.91
for 1 nos = 68.90
(b)Hard soil mixed with kanker boulder 25 % qty taken only = 17.30
cum

2 Earth work in excavation including loading


unloading, disposal and dressing of excavated
rock within initial lead of 50 m and lift upto 1.50
m indry or moist including dressing of
excavated area wirh cost of dewatering
wherever required and all applicable taxes and
. levies etc. complete in all respect.
(A)Soft disintegreted rock. 25 % qty taken = 17.30
(B)Hard rock not rquirding blasting 25 % qty taken = 17.30
© Phylites & other hard rockrequiring nominal blasting 25 % qty taken = 17.30
cum
3 Cement concrete M-10(1:3:6) well mixed and
laid in position complete including all leads of
all construction material including curring and
finishing having well graded broken stone
aggrgate
(a)maximumofsize complete
upto 20mmas per technical
specification
Wing wall A-A 2 x( 3.30 + 1.60 )x 1.60 x 0.30
= 2.35
2
Side wall B-B 2 x( 2.00 + 0.65 )x 2.30 x 0.30 = 3.66

Side wallC-C 2 x( 2.00 + 0.40 )x 1.30 x 0.30 = 1.87


Total = 7.88
for 1 nos = 7.90
cum

4 Cement concrete M-20(1:1.5:3) well mixed and


laid in position complete including all leads of
all construction material including curring and
finishing having well graded broken stone
aggrgate of maximum size upto 20mm
complete as per technical specification
Cement concrete M-20(1:1.5:3) well mixed and
laid in position complete including all leads of
all construction material including curring and
finishing having well graded broken stone
aggrgate of maximum size upto 20mm
complete as per technical specification
D/S cistern 1 x 5.55 x 0.60 x 0.55 = 1.83
D/S curtain wall 1 x 0.65 x 0.40 x 0.65 = 0.17
D/S curtain wall 1 x 0.65 x 0.55 x( 0.55 + 0.30 ) = 0.30
U/S impervious floor 1 x 2.37 x 0.60 x 0.55 = 0.78
U/S curtain wall 1 x 0.65 x 0.40 x( 1.00 - 0.30 ) = 0.18
copping u/s wing wall 2 x 3.30 x 0.50 x 0.05 = 0.17
copping d/s wing wall 2 x 0.73 x 0.50 x 0.05 = 0.04
copping side wall 2 x 5.05 x 0.50 x 0.05 = 0.25
creast top 1 x 0.50 x 0.65 x 0.15 = 0.05
3.77
for 1 nos = 3.80
cum

5 Random rubble stone masonry (using R,R.


stone where 75% stone to be not less than 15
cm. in any direction and weighing not less than
23 kg. for foundation including curring all
leads of all construction material and all taxes
and with inial lift delift
In cement sand mortar 1:5
Creast wall 1 x 0.50 x( 0.65 + 1.00 )X 1.80 = 0.74
2
Wing wall A-A 2 x( 3.30 + 1.60 )x( 0.80 + 1.30 )x 1.95 = 10.06
2 2
Side wall B-B 2 x( 2.00 + 0.65 )x( 0.95 + 2.20 )x 1.95 = 16.32
2
Side wallC-C 2 x( 2.00 + 0.40 )x( 0.50 + 1.20 )X 1.16 = 4.73
2 31.85
for 1 nos 31.90
cum

6 Random rubble stone masonry (using R,R.


stone where 75% stone to be not less than 15
cm. in any direction and weighing not less than
23 kg. for superstructure including curring all
leads of all construction material and all taxes
and with inial lift delift
In cement sand mortar 1:5
Wing wall A-A 2 x( 3.30 + 1.60 )x( 0.50 + 0.80 )x 0.71 = 2.261
2 2
Side wall B-B 2 x( 2.00 + 0.65 )x( 0.50 + 0.95 )x 0.71 = 2.73
2
D/S return 2 X( 0.73 + 0.00 )x( 0.50 + 1.20 )x 1.16 = 0.716
2 2
Total = 5.706
for 1 nos = 5.80
cum
7 Plaster in cement sand mortar 1:3 including
raking of joint smooth finishing & curing etc.
including all leads of all construction material
complete of thickness 20 mm.
Creast wall 1 x 0.65 x 1.95 = 1.269
Wing wall A-A 2 x( 3.30 + 1.60 )X 0.71 = 3.470
2
Side wall B-B 2 x( 2.00 + 0.65 )x( 1.95 + 0.71 ) = 14.1

Side wallC-C 2 x( 2.00 + 0.40 )X 1.16 = 5.568

D/S return 2 X( 0.73 + 0.50 )x 1.16 = 2.844


Total = 27.25
for 1 nos 27.30
sqm
8 Rehandling excavatedearth ( excluding rock)
in trenches, pilinth side of foundation etc. in
layers not exceeding 20cm in depth,
consolidation each ldeposited layer by
ramming and watering including cost of water
including loading unloading wherever required
with cost of dewatering wherever required and
all applicable taxes . as per item no 1 68.91
for 1 nos = 69.00
cum
ABSTRACT OF COST
NAME OF WORK:-DESIGN OF VERTICAL FALL AT R.D. 35895 mts of LMC od Gararda project

Sno. ITEM Qtty Rate Unit Amount


1 Earth work in excavation including loading
unloading disposal and dressing of excavated earth
within intial lead of 50m and lift upto 1.5m in dry or
moist including dressing of excavted area with cost
of dewatering
Rate as per BSR 2008 page 13 item 1c
(b)Hard soil mixed with kanker boulder 17.30 47.00 cum 813.00

2 Earth work in excavation including loading


unloading, disposal and dressing of excavated rock
within initial lead of 50 m and lift upto 1.50 m indry
or moist including dressing of excavated area wirh
cost of dewatering wherever required and all
applicable taxes and . levies etc. complete in all
respect.

Rate as per BSR 2008 page 13 item 2


(A)Soft /disintegreted rock. 17.30 78.00 cum 1349.00
(B)Hard rock not rquirding blasting 17.30 121.00 cum 2093.00
17.30 166.00 cum 2872.00
© Phylites & other hard rockrequiring nominal blasting

3 Cement concrete M-10(1:3:6) well mixed and laid in


position complete including all leads of all
construction material including curring and finishing
having well graded broken stone aggrgate of
complete as per technical specification
(a)maximum size upto 20mm 7.90 2105.00 cum 16630.00
Rate as per BSR 2008 page 22 item 6d

4 Cement concrete M-20(1:1.5:3) well mixed and laid


in position complete including all leads of all
construction material including curring and finishing
having well graded broken stone aggrgate of
maximum size upto 20mm complete as per
technical specification
3.80 2951.00 cum 11214.00
Rate as per BSR 2008 page 22 item 4d

5 Random rubble stone masonry (using R,R. stone


where 75% stone to be not less than 15 cm. in any
direction and weighing not less than 23 kg. for
foundation including curring all leads of all
construction material and all taxes and with inial lift
delift
In cement sand mortar 1:5 31.90 1618.00 cum 51614.00
Rate as per BSR 2008 page 29 item 2e
6 Random rubble stone masonry (using R,R. stone
where 75% stone to be not less than 15 cm. in any
direction and weighing not less than 23 kg. for
superstructure including curring all leads of all
construction material and all taxes and with inial lift
delift
In cement sand mortar 1:5 5.80 1660.00 cum 9628.00
Rate as per BSR 2008 page 29 item 2e+ item 13a

7 Plaster in cement sand mortar 1:3 including raking


of joint smooth finishing & curing etc. including all
leads of all construction material complete of
thickness 20 mm.
Rate as per BSR 2008 page 34 item 4b 27.30 94.00 sqm 2566.00

8 Rehandling of excavated material including loading


unloading, and dressing with in intial leads of 50m
and lift 1.5m with cost of dewatering wherever 69.00 52.00 cum 3588.00
required and all applicable taxes and levies etc.
complete in all respect.
Rate as per BSR 2008 page 14 item 8c

Total 102367.00
ad d 3 % contengcy 3071.00
G total 105438.00
Say Rs. 1.06 Lacs
SCHEDULE - G
NAME OF WORK:-DESIGN OF VERTICAL FALL AT R.D. 35895 mts of LMC od Gararda project

1 NIT No. 7/2008-09 S.No.32


2 NIT Amount Rs. 1.03 lacs
3 Earnest money 1.Regd. Contractor @1/2%Rs.520.00
2.Other Contractor @ 2%Rs. 2100.00
4 Tender cost Rs. 200
5 Date of Selling Tender 15.09.08 to 22.09.08
6 Date of Receiving Tender 24.09.08 upto 3.00 PM
7 Date of Opening Tender 24.09.08 At 4.00 PM
8 Time of completion 4 Month
9 B.S.R. Irrigation BSR 2008

Sno. ITEM Qtty Rate Unit Amount


1 Earth work in excavation including loading unloading
disposal and dressing of excavated earth within intial
lead of 50m and lift upto 1.5m in dry or moist including
dressing of excavted area with cost of dewatering

Rate as per BSR 2008 page 13 item 1c


(b)Hard soil mixed with kanker boulder 17.30 47.00 cum 813.00

2 Earth work in excavation including loading unloading,


disposal and dressing of excavated rock within initial
lead of 50 m and lift upto 1.50 m indry or moist including
dressing of excavated area wirh cost of dewatering
wherever required and all applicable taxes and . levies
etc. complete in all respect.

Rate as per BSR 2008 page 13 item 2


(A)Soft /disintegreted rock. 17.30 78.00 cum 1349.00
(B)Hard rock not rquirding blasting 17.30 121.00 cum 2093.00
17.30 166.00 cum 2872.00
© Phylites & other hard rockrequiring nominal blasting

3 Cement concrete M-10(1:3:6) well mixed and laid in


position complete including all leads of all construction
material including curring and finishing having well
graded broken stone aggrgate of complete as per
technical specification
(a)maximum size upto 20mm 7.90 2105.00 cum 16630.00
Rate as per BSR 2008 page 22 item 6d

4 Cement concrete M-20(1:1.5:3) well mixed and laid in


position complete including all leads of all construction
material including curring and finishing having well
graded broken stone aggrgate of maximum size upto
20mm complete as per technical specification
3.80 2951.00 cum 11214.00
Rate as per BSR 2008 page 22 item 4d

5 Random rubble stone masonry (using R,R. stone where


75% stone to be not less than 15 cm. in any direction
and weighing not less than 23 kg. for foundation
including curring all leads of all construction material
and all taxes and with inial lift delift
Random rubble stone masonry (using R,R. stone where
75% stone to be not less than 15 cm. in any direction
and weighing not less than 23 kg. for foundation
including curring all leads of all construction material
and all taxes and with inial lift delift

In cement sand mortar 1:5 31.90 1618.00 cum 51614.00


Rate as per BSR 2008 page 29 item 2e

6 Random rubble stone masonry (using R,R. stone where


75% stone to be not less than 15 cm. in any direction
and weighing not less than 23 kg. for superstructure
including curring all leads of all construction material
and all taxes and with inial lift delift

In cement sand mortar 1:5 5.80 1660.00 cum 9628.00


Rate as per BSR 2008 page 29 item 2e+ item 13a

7 Plaster in cement sand mortar 1:3 including raking of


joint smooth finishing & curing etc. including all leads of
all construction material complete of thickness 20 mm.

Rate as per BSR 2008 page 34 item 4b 27.30 94.00 sqm 2566.00

8 Rehandling of excavated material including loading


unloading, and dressing with in intial leads of 50m and
lift 1.5m with cost of dewatering wherever required and 69.00 52.00 cum 3588.00
all applicable taxes and levies etc. complete in all
respect.
Rate as per BSR 2008 page 14 item 8c

Total 102367.00
Say Rs. 1.03 Lacs