You are on page 1of 21

GOVERMENT OF RAJASTHAN

WATER RESOURCES DEPARTMENT GARARDA IRRIGATION PROJECT

NAME OF WORK:- CONSTRUCTION OF SUPER PASSES AT R.D.1000m of silor disty. Of GIP


(Masonry linned canal)
A CANAL DATA :- DRAIN DATA :-
Discharge 0.944 cumec Catchments area of Nalla. = 0.38 sqkm= 0.15 Sq mile
Bed width 1.00 m Nalla Bed (N.S.L.) 261.760 m
F.S.D. 0.80 m H.F.L. in Nalla 262.760 m
Free Board 0.30 m F.S.D ( Nalla) 1.00 m
Bed slope 1 in 5000 Free Board (nalla) 0.50 m
C.B.L. 260.875 m
F.S.L. 261.675 m 0.30
T.B.L. 261.975 m 0.80
M.W.D. 1.10 m
1.00

1 Canal section :- 1.00 x 1.10 m

Adopt section for superpasses = 1.00 x 1.10 m

2 Hydraulic Design for nalla section :-

Flood discharge as per dicken's formula.


Q = C x A 3/2
Q = 1800 x( 0.15 )3/4
Q = 426 cusec
Q = 12.06 Cumec

Area required for passing required dicharge of nalla


Assume Valocity of nalla limited to 2.00 meter/ sec
A = Q/V
= 12.06 / 2.00
= 6.10 sqm

Size required for passing required dicharge of nalla= B x D


= 6.10 x 1.00 m
NAME OF WORK:- CONSTRUCTION OF SUPER PASSES AT R.D.1000m of silor disty. Of GIP
1.50

* * *

* * * * * * * * * * * * * * * * * * *
3.00

8.55
A

0.30
0
6.00

6.7
2

* * * * * * * * * * * *
1

1.30
1.45

1.30

1.45
0.60

*
3.00

x-section on B-B

* * * *
21.00
1.00

1.60

1.00

1.00

2.20

1.00

1.00
x-section on A-A
0.50

2.50

0.50
2.80

13.60

0.6
0.60
3.00

*
:1

1.30

1.45
0.25

0
6.7

:1
6.00

0.30

0.6
A
13.09

1.10

0.90

0.30
8.55
* * *
3.00

0.50
1.50
14.39

*
261.675
263.260

261.760

CB.L. 260.875

259.975
259.675
0.50

0.50
Nalla TBL 263.260 2.50 7.09
Nalla HFL 262.760 Nalla B.L. ### Nalla HFL 262.760

R.L.

R.L.

R.L.
R.L.
FSL
1.50
0.995 6.10 0.995
U/S TBL 261.975
0.30 0.30 Canal Data River data

*
*
*
*
*
*
*
*
*
*
*
*
*

*
*
*
*
*
*
*
U/S FSL 261.675 0.33 :1 2.90 1 NSL 261.760 Bed level 261.760
1.10 1.10 2 CBL 260.875 HFL 262.760
U/S CBL 260.875 260.575 CBL 260.875 D/S CBL 3 FSL 261.675 T.B.L. of nalla 263.260

*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
4 TBL 261.975 Flood discharge 12.06

*
*
0.90
R.L. 259.975 1.50 1.50 5 "Q" 0.944 Cumec
R.L. 259.675 0.30 6 Bw 1.00 6.10

*
*
*
*
*
*
*

*
*
*
*
*
*
*
Drawing Not to scale
Top bars Top &bttom Distribution bars
10 mm F 300 c/c 10mm F 300c/c

150 1688 150

415 160 1960


0.24 m

0.3 2.00 M 0.3


Main reinforcement Bottom Plain bars
12 mm F 85 c/c 10 mm F 250 c/c

Detail of Reinforcement in Super passes (for slab)


GOVERNMENT OF RAJASTHAN
WATER RESOURCES DEPARTMENT
GARARDA IRRGATION PROJECT
NAME OF WORK:- 0 0

DETAILED ESTIMATE
Sno Perticulars Detail Qty unit
1 Earth work in excavation including loading
disposal and dressing of excavate earth
with in initial leads of 50m and lift 1.5 m in
dry and moist including dressing of
excavated area, dewatering wherever
required and all applicable taxes and levies
etc. complete in all respect

Hard soil mixed with kankar /boulder morrum


Abutment block 1 x 14.39 x 3.90 x 2.10 = 117.90
Wing Wall 4 x 4.70 x 1.80 x 2.10 = 71.10
Return wall 4 x 3.00 x 1.80 x 2.10 = 45.40
Total = 234.40 cum
25 % of above = 59.00 cum
for 1 Nos = 59.00 cum
2 Earth work in excavation including loading
disposal and dressing of excavate rock
with in initial leads of 50m and lift 1.5 m in
dry and moist including dressing of
excavated area, dewatering wherever
required and all applicable taxes and levies
etc. complete in all respect

B. E/w in D/R rock 25 % of above = 59.00 cum


for 1 Nos = 59.00 cum
C.H/R not required blasting 25 % of above = 59.00 cum
for 1 Nos = 59.00 cum
D. E/w in phylites &other rock requaring nominal blasting 25 % of above = 59.00 cum
for 1 Nos = 59.00 cum
3 Cement concrete (1:3:6) M-10 well mixed
and laid in - position complete including all
leads of all construction materials including
curing and finishing having well graded
broken stone aggregate of
(a) Maximum size up to 20mm
Abutment bolck 1 x 14.39 x 3.90 x 0.30 16.90 cum
Wing Wall 4 x 4.70 x 1.80 x 0.30 10.20 cum
Return wall 4 x 3.00 x 1.80 x 0.30 6.50 cum
33.60 cum
for 1 Nos = 34.00 cum
4 R.R stone masonry (using R.R.stone
where 75% stones to be lnot ess than
15cm in size in any directon and weighing
not less than 23kg.) in Foundation
including curing all leads of construction
materials & all taxes and with initial lift
\delift of 5m from ground level.etc complete
in cement sand mortar 1:5
Abutment block 2 x 13.09 x 1.30 x 0.90 = 30.70 cum
Wing Wall 4 x 4.70 + 3.95 x 1.50 x 0.90 = 23.36 cum
2
Return wall 4 x 3.00 x 2.25 x 1.50 x 0.90 = 14.175 cum
2
total 68.23 cum
for 1 Nos = 68.30 cum
5 R.R stone masonry (using R.R.stone
where 75% stones to be not less than 15 in
size in any directon and weighing not less
than 23kg.)in superstrucuture including
curing all leads of construction materials &
all taxes and with initial lift \delift of 5m
from ground level etc complete in cement
sand mortar 1:5

cu
Abutment 2 x 8.09 + 7.44 x 1.30 + 0.6 x 0.90 = 13.28
m
2 2
Wing Wall 4 x 4.70 + 3.20 x 1.50 + 0.50 x 2.90 = 45.82 cum
2 2
Return wall 4 3.00 + 2.25 x 1.50 + 0.50 x 2.90 = 30.45 cum
2 2
total 89.55 cum
for 1 Nos = 89.60 cum
6 Centring shuttring for slabs, beams, lintels,
coloumns troughs, with or without caps and
base including proping and removing.

for slabe 1 x 8.09 x 1.60 12.94 sqm


for 1 Nos = 13.00 cum
7 Side shuttring including proping
etc.complete (to achive finish 2)for block
joints of foundation stillins basins, buckets
aprons etc. (non suspeted horizentally laid
mass concrete)

side of slabe 2 x 8.09 x 0.35 = 5.70 sqm


side of slabe 2 x 1.60 x 0.35 = 1.10 sqm
side of bed block 4 x 8.09 x 0.20 = 6.50 sqm
side of bed block 4 x 0.60 x 0.20 = 0.50 sqm
Total 13.80 sqm
for 1 Nos = 13.80 cum
8 Cement concrete (1:1.5:3) M-10 well mixed
and laid in - position complete including all
leads of all construction materials
including curing and finishing having well
graded broken stone aggregate of
(a) Maximum size up to 20mm
slabe with wearing coat 1 x 8.09 x 1.60 x 0.35 = 2.80 cum
Bed Block 2 x 8.09 x 0.60 x 0.20 = 3.30 cum
bed concrete 1 x 8.09 x 2.00 x 0.10 = 0.90 cum
total = 7.00 cum
9 Extra labour charges for obstructration in for 1 Nos = 7.00 cum
laying and placing the reinforced cement
concrete due to reinforcement.
Extra labour charges for obstructration in
laying and placing the reinforced cement
concrete due to reinforcement.
(b) Colomns, Slabs, Cantilevers as per item Nos 8 7.00 cum
projections staircase, lintels , beams, for 1 Nos = 7.00 cum
chajjas, Retaining walls, piers, abutments,
galleries, arch covers, bed plates, sluice
capstan bases etc.

### Couresd stone / kharanja masonry (using


hammer dressed stone to be not less than
20 cm in any direction and at least 50 %
stone to be more than 23 cm in depth ) for
superstructure (upto 0.5m thickness)
including curing etc.including all leads of all
construction matarials complete.in cement
sand mortar1:5

for parapet wall 2 x 21.0 x 1.00 + 0.50 x 1.50 = 47.10 cum


###
for 1 Nos = 47.10 cum
11 Supply of M S .reinforcement including
labour charges for bending binding and Length of slabe = 9.6 m
placing in position all reinfocement as per width of slabe = 1.60 m
drawing including cost of binding wire and Depth of slabe = 0.3 m
all leads and lifts using.tor or ribed bars
Tot
(As per IRC SP 20) for clear span 2.00m number required Tota
al
l weight
Dia length length c/c = x wei
= Nos. leng /m
of cc space ght
th
main crank bars bottom (cross) ### 2.54 x 9.60 / 0.085 = 114 = 289 x 0.888 257
bottom plain bars (cross) ### 9.60 x 1.60 / 0.25 = 6 = 58 x 0.785 45
top bars (cross) ### 2.30 x 9.60 / 0.30 = 32 = 73.6 x 0.785 58
top bars (long) ### 9.60 x 1.60 / 0.30 = 5 = 48 x 0.785 38
Botttom bars (long) ### 9.60 x 1.60 / 0.30 = 5 = 48 x 0.785 38
Total weight (kg) = 435
5% for cutting wastage 22
Total weight (kg.)= 457
Total weight (T) = 0.46
for 1 Nos = 0.50 ton
### Cement concrete (1:2:4) M-15 well mixed
and laid in - position complete including all
leads of all construction materials
including curing and finishing having well
graded broken stone aggregate of
maximum size upto 20mm
for nalla bed
U/S & D/S wing wall Top 2 x 9.595 x 6.00 x 0.10 = 11.51 cum
U/S & D/S return wallTop 2 x 13.09 x 3.00 x 0.10 = 7.85 cum
U/S & D/S approch 2 x 13.60 + 2.80 x 3.00 x 0.10 = 4.92 cum
2
24.29
for 1 Nos = 24.30 cum
### Plaster in cement sand mortar 1:4including
raking of joinst smooth finishing & curing
etc. including all leads of all construction
materials complete of thiickness 20mm
for abutment 2 x 7.09 x 1.10 = 15.60 sqm
U/S & D/S face 2 x 13.60 x 1.10 = 29.92 sqm
Total = 45.52 sqm
### for 1 Nos = 45.60 sqm
Flush and ruled pointing on stone masonry
including raking of joints and curring etc
complete including all leads of all
construction materials in mortar ratio
cement sand mortar 1:3
for parapet wall 4 x 21.00 x 1.50 = 126.00 sqm
for parapet end wall 4 x 0.995 x 1.50 = 3.98 sqm
Total 129.98 sqm
for 1 Nos = 130.00 cum

###
Rehandling of excaveted matrial inlcuding
loading unloading and dressing within inial
lead of 50 m and lift 1.5 m with cost of
dewatering wherever required and all
applicable taxes and lavies etc. complete
in all respect mixed strata muck. 50 % of item no 1 118.00 cum
(Rate as per irrigation BSR2006Ch 5/8c)
cum

cum

cum

cum

cum

cum
cum
cum
cum
cum
cum
cum

cum

cum
cum

cum

cum

cum
cum

sqm
cum

sqm
sqm
sqm
sqm
sqm
cum

cum
cum
cum
cum
cum
cum
cum

cum

cum

cum
cum
cum

cum

sqm
sqm
sqm
sqm

sqm
sqm
sqm
cum

cum
GOVERNMENT OF RAJASTHAN
WATER RESOURCES DEPARTMENT
GARARDA IRRGATION PROJECT
NAME OF WORK:- 0 0

(BSR 2008)
Sno Perticulars Qty Rate Unit Amount
1 Earth work in excavation including loading disposal and
dressing of excavate earth with in initial leads of 50m
and lift 1.5 m in dry and moist including dressing of
excavated area, dewatering wherever required and all
applicable taxes and levies etc. complete in all respect
Hard soil mixed with kankar /boulder morrum 59.00 47.00 p /cum 2773.00
(Rate as per irrigation BSR2008 Ch 5/1c) cum

2 Earth work in excavation including loading disposal and


dressing of excavate rock with in initial leads of 50m
and lift 1.5 m in dry and moist including dressing of
excavated area, dewatering wherever required and all
applicable taxes and levies etc. complete in all respect
(Rate as per irrigation BSR2008 Ch 5/2 )

B. E/w in D/R rock 59.00 78.00 p /cum 4602.00


cum
C.H/R not required blasting 59.00 121.00 p /cum 7139.00
cum
D. E/w in phylites &other rock requaring nominal blasting 59.00 166.00 p /cum 9794.00
cum
3 Cement concrete (1:3:6) M-10 well mixed and laid in -
position complete including all leads of all construction
materials including curing and finishing having well
graded broken stone aggregate of
(a) Maximum size up to 20mm 34.00 2105.00 p /cum 71570.00
(Rate as per irrigation BSR2008 Ch 7/6d) cum

4 R.R stone masonry (using R.R.stone where 75% stones


to be lnot ess than 15cm in size in any directon and
weighing not less than 23kg.) in Foundation including
curing all leads of construction materials & all taxes and
with initial lift \delift of 5m from ground level.etc 68.30 1618.00 p /cum 110510.00
complete in cement sand mortar 1:5
cum
(Rate as per irrigation BSR2008 Ch 8/2e)

5 R.R stone masonry (using R.R.stone where 75% stones


to be not less than 15 in size in any directon and
weighing not less than 23kg.)in superstrucuture
including curing all leads of construction materials & all
taxes and with initial lift \delift of 5m from ground level
etc complete in cement sand mortar 1:5
89.60 1660.00 p /cum 148736.00
(Rate as per irrigation BSR2008 Ch 8/2e) cum

6 Centring shuttring for slabs, beams, lintels, coloumns


troughs, with or without caps and base including proping
and removing. 13.00 131.00 P sqm 1703.00
(Rate as per irrigation BSR2008 Ch 10/2) sqm

7 Side shuttring including proping etc.complete (to achive


finish F2 Top or intermidiate bed platein between 13.80 90.00 P sqm 1242.00
masonry of piers,abutments sluice well etc. sqm
(Rate as per irrigation BSR2008 Ch 10/1b)

8 Cement concrete (1:1.5:3) M-10 well mixed and laid in -


position complete including all leads of all construction
materials including curing and finishing having well
graded broken stone aggregate of
(a) Maximum size up to 20mm 7.00 2951.00 p /cum 20657.00
(Rate as per irrigation BSR2008 Ch 7/4d) cum

9 Extra labour charges for obstructration in laying and


placing the reinforced cement concrete due to
reinforcement.
(b) Colomns, Slabs, Cantilevers projections staircase,
lintels , beams, chajjas, Retaining walls, piers,
abutments, galleries, arch covers, bed plates, sluice
capstan bases etc. 7.00 111.00 p /cum 777.00
(Rate as per irrigation BSR2008 Ch 10/11b)
cum
10 Couresd stone / kharanja masonry (using hammer
dressed stone to be not less than 20 cm in any direction
and at least 50 % stone to be more than 23 cm in
depth ) for superstructure (upto 0.5m thickness)
including curing etc.including all leads of all construction 47.10 2003.00 p /cum 94342.00
matarials complete.in cement sand mortar1:5
cum

11 Supply of M S .reinforcement including labour charges


for bending binding and placing in position all
reinfocement as per drawing including cost of binding
wire and all leads and lifts using.tor or ribed bars
(As per IRC SP 20) for clear span 2.00m 500.00 55.00 P /Kg 27500.00
kg

12 Cement concrete (1:2:4) M-15 well mixed and laid in -


position complete including all leads of all construction
materials including curing and finishing having well
graded broken stone aggregate of maximum size upto
20mm 24.30 2509.00 p /cum 60969.00
(Rate as per irrigation BSR2008Ch 7/5d) cum
13 Plaster in cement sand mortar 1:4including raking of
joinst smooth finishing & curing etc. including all leads
of all construction materials complete of thiickness 45.52 94.00 P sqm 4279.00
20mm
(Rate as per irrigation BSR2008 Ch 9/4b) sqm

14 Flush and ruled pointing on stone masonry including


raking of joints and curring etc complete including all
leads of all construction materials in mortar ratio cement
sand mortar 1:3 130.00 52.00 P sqm 6760.00
(Rate as per irrigation BSR2008 Ch 9/15) sqm
15
Rehandling of excaveted matrial inlcuding loading
unloading and dressing within inial lead of 50 m and lift
1.5 m with cost of dewatering wherever required and all
applicable taxes and lavies etc. complete in all respect
mixed strata muck. 118.00 29.00 p /cum 3422.00
(Rate as per irrigation BSR2006Ch 5/8c)

Total 576775.00
3 % contengency 17303.25
G total 594078.25
Say Rs. 5.95 lacs
SCHEDULE "G"
0 0

1 NIT No. 7/2008-09 S.No.32


2 NIT Amount Rs. 0 lacs
3 Earnest money 1.Regd. Contractor @1/2%Rs. 0.00
2.Other Contractor @ 2%Rs. 0.00
4 Tender cost Rs. 200
5 Date of Selling Tender 15.09.08 to 22.09.08
6 Date of Receiving Tender 24.09.08 upto 3.00 PM
7 Date of Opening Tender 24.09.08 At 4.00 PM
8 Time of completion 4 Month
9 B.S.R. Irrigation BSR 2008

Sno. Item Qty Rate Unit Amount


1 Earth work in excavation including loading disposal and
dressing of excavate earth with in initial leads of 50m
and lift 1.5 m in dry and moist including dressing of
excavated area, dewatering wherever required and all
applicable taxes and levies etc. complete in all respect 59.00 47.00 p /cum 2773.00
Hard soil mixed with kankar /boulder morrum cum

2 Earth work in excavation including loading disposal and


dressing of excavate rock with in initial leads of 50m
and lift 1.5 m in dry and moist including dressing of
excavated area, dewatering wherever required and all
applicable taxes and levies etc. complete in all respect

B. E/w in D/R rock 59.00 78.00 p /cum 4602.00


cum
C.H/R not required blasting 59.00 121.00 p /cum 7139.00
cum
D. E/w in phylites &other rock requaring nominal blasting 59.00 166.00 p /cum 9794.00
cum
3 Cement concrete (1:3:6) M-10 well mixed and laid in -
position complete including all leads of all construction
materials including curing and finishing having well
graded broken stone aggregate of 34.00 2105.00 p /cum 71570.00
(a) Maximum size up to 20mm cum

4 R.R stone masonry (using R.R.stone where 75%


stones to be lnot ess than 15cm in size in any directon
and weighing not less than 23kg.) in Foundation
including curing all leads of construction materials & all 68.30 1618.00 p /cum 110510.00
taxes and with initial lift \delift of 5m from ground cum
level.etc complete in cement sand mortar 1:5

5 R.R stone masonry (using R.R.stone where 75%


stones to be not less than 15 in size in any directon and
weighing not less than 23kg.)in superstrucuture
including curing all leads of construction materials & all
taxes and with initial lift \delift of 5m from ground level
etc complete in cement sand mortar 1:5
R.R stone masonry (using R.R.stone where 75%
stones to be not less than 15 in size in any directon and
weighing not less than 23kg.)in superstrucuture
including curing all leads of construction materials & all
taxes and with initial lift \delift of 5m from ground level 89.60 1660.00 p /cum 148736.00
etc complete in cement sand mortar 1:5
cum

6 Centring shuttring for slabs, beams, lintels, coloumns


troughs, with or without caps and base including 13.00 131.00 P sqm 1703.00
proping and removing. sqm

7 Side shuttring including proping etc.complete (to achive


finish F2 Top or intermidiate bed platein between 13.80 90.00 P sqm 1242.00
masonry of piers,abutments sluice well etc. sqm

8 Cement concrete (1:1.5:3) M-10 well mixed and laid in -


position complete including all leads of all construction
materials including curing and finishing having well
graded broken stone aggregate of
(a) Maximum size up to 20mm 7.00 2951.00 p /cum 20657.00
cum
9 Extra labour charges for obstructration in laying and
placing the reinforced cement concrete due to
reinforcement.
(b) Colomns, Slabs, Cantilevers projections staircase,
lintels , beams, chajjas, Retaining walls, piers,
abutments, galleries, arch covers, bed plates, sluice
capstan bases etc. 7.00 111.00 p /cum 777.00
cum
10 Couresd stone / kharanja masonry (using hammer
dressed stone to be not less than 20 cm in any
direction and at least 50 % stone to be more than 23
cm in depth ) for superstructure (upto 0.5m thickness)
including curing etc.including all leads of all 47.10 2003.00 p /cum 94342.00
construction matarials complete.in cement sand
cum
mortar1:5
11 Supply of M S .reinforcement including labour charges
for bending binding and placing in position all
reinfocement as per drawing including cost of binding
wire and all leads and lifts using.tor or ribed bars
500.00 55.00 P /Kg 27500.00
kg
12 Cement concrete (1:2:4) M-15 well mixed and laid in -
position complete including all leads of all construction
materials including curing and finishing having well
graded broken stone aggregate of maximum size upto
20mm 24.30 2509.00 p /cum 60969.00
cum
13 Plaster in cement sand mortar 1:4including raking of
joinst smooth finishing & curing etc. including all leads
of all construction materials complete of thiickness 45.52 94.00 P sqm 4279.00
20mm sqm
14 Flush and ruled pointing on stone masonry including
raking of joints and curring etc complete including all
leads of all construction materials in mortar ratio
cement sand mortar 1:3
Flush and ruled pointing on stone masonry including
raking of joints and curring etc complete including all
leads of all construction materials in mortar ratio
cement sand mortar 1:3 130.00 52.00 P sqm 6760.00
sqm
15
Rehandling of excaveted matrial inlcuding loading
unloading and dressing within inial lead of 50 m and lift
1.5 m with cost of dewatering wherever required and all
applicable taxes and lavies etc. complete in all respect
mixed strata muck. 118.00 29.00 p /cum 3422.00

Total 576775.00
62 nos main bars Distribution bars 86 nos main bars Distribution bars
7500 12mm F 120 c/c 8mm F 160 c/c 12mm F 85 c/c 10mm F 250 c/c

###

###
6600 1256 1688

150

150

150

150
Wearing coat 75mm thick
o o o o o o o o o o o o o

o o o o o
210 o o o o o o o o o o o o
240 o o o o o

Cross section of culvert


300 1500 300 300 2000 300
375 1575 416 1960

###

###
60 nos main bars Distribution bars 1.50 m span 2.00 m span
16mm F 125 c/c 10mm F 175 c/c
2508 71 nos main bars Distribution bars
150

150
16mm F 105 c/c 12mm F 200 c/c
3330

150

150
o o o o o o o o
300
o o o o o o o o o o o o o o o o

o o o o o o o o o o
370
300 3000 300 o o o o o o o o o o o o o o o o o o

506 2810
###

300 4000 300


590 3650

###
3.00 m span

4.00 m span

53 nos main bars Distribution bars 65 nos main bars Distribution bars
20mm F 140 c/c 12mm F 175 c/c 20mm F 115 c/c 12mm F 150 c/c
4040 4840
150

150

150

150
o o o o o o o o o o o o o o o o o o o o o o

o o o o o o o o o o
430 o o o o o o o o o o o o o o o o o o o o o
480 o o o o o o o o o o o

400 5000 400 400 6000 400


790 4570 890 5360
###

###

5.00 m span 6.00 m span


NOTES:-
1 Concrete:- M-25 2 Steel:- HSDY as per IS-1786 3 Cover:- 20mmat bottom & 40mm at side
4 In 1.5M, 2.0M &3.0M span only one Bar is to be crankedin each side in four bars in all other span crank alternative bars.
5 All bars cranked one end only these are placed with crank on left side and right side alternatively
6 Surface steel at top longitudinal -10mm @300mm c/c length a shown in sketh & transverse -10mm @300c/c all through out in logitudinal
provided steel in the Zone where main steel is not available plus 150mm on either side
93 nos main bars Distribution bars
20mm F 90 c/c 12mm F 125 c/c
6680
150

150
o o o o o o o o o o o o

o o o o o o o o o o o o
600 o o o o o o o o o o o o

400 8000 400


1120 7280
###

8.00 m span

62 nos main bars Distribution bars


25mm F 120 c/c 12mm F 110 c/c
8400
150

150
o o o o o o o o o o o o o o o o o o o o o o o o o o
750
o o o o o o o o o o o o o o o o o o o o o o o o o o

400 10000 400


1260 8990
###

10.00 m span
0
0

Main Reinforcement Bottonm reinforcement Top reinfrocement top steel where main not available
Center
Dia Center to Length Dia to
thickness Dia meter Center to Dia meter Center
Span Bed blok meter of center top meter of center center center
of slab of bars of bars to center
(M) length(m) bars distance porsion crank bottom bars distance distance distance Length
(m) (mm) (mm) (mm) (mm)
(mm) (mm) (mm) (mm) (mm) (mm) (mm)
x - side y - side y - side x - side
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1.5 0.21 0.3 12 120 375 130 1575 8 160 10 300 10 300 1256
2 0.24 0.3 12 85 415 160 1960 10 250 10 300 10 300 1688
3 0.3 0.3 16 125 506 220 2810 10 175 10 300 10 300 2508
4 0.37 0.3 16 105 590 290 3650 12 200 10 300 10 300 3330
5 0.43 0.4 20 140 790 320 4570 12 175 10 300 10 300 4040
6 0.48 0.4 20 115 890 400 5360 12 150 10 300 10 300 4840
8 0.6 0.4 20 90 1120 520 7280 12 125 10 300 10 300 6680
10 0.75 0.4 25 120 12 670 7280 12 125 10 300 10 300 8400